July 10, 2002
fILE COpy
Bryan S. Greenberg
Ruden, McClosky Smith
Schuster & Russell, P.A.
200 East Broward Blvd.
Fort Lauderdale, FL 33301
Re: BOCAR Properties - Permit Applications 00-2992 and 01-3431
Dear Mr Greenberg:
After careful review, this department has determined that, in spite of the adoption of the new
Florida Building Code on March 1, 2002, the above referenced building permits can, in fact,
be extended under the provisions of the previous code. Accordingly, the department will
immediately re-activate and extend these permits for a period of 180 days.
The department has also taken steps to cancel the scheduled meeting of the Building Board
of Adjustments and Appeals that was called to appeal the initial staff decision to cancel these
permits. The required $100 fee for this meeting will also be refunded.
We trust that these departmental actions will adequately address the immediate concerns of
both you and your client in this matter
Sincerely,
Quintus Greene
Development Director
Xc: James A. Cherof, City Attorney
Robert H. Burrow, BOCAR Properties
Don Johnson, Building Official
Timothy Large, Building Code Administrator
Lusia Galav, Principal Planner
S:\DevelopmentlAdministration\Correspondence\Bocar properties - Permit Apps 00-2992,01-3431 - 7-1Q-02.doc
City of Boynton Beach. 100 East Boynton Beach Blvd., PO. Box 310 . Boynton Beach, Florida 33425-0310
Phone: (561) 742-6350 . www.boynton-beach.org
Summary Notes from meetmg WIth Robert H. Burrow
Bocar PropertIes, Inc
Tuesday, May 21,2002
Conference Room C - IPM
Those present: Mr Robert H. Burrow, Qumtus Greene, Timothy Large, LusIa Galav,
Betty Fullerton
ThIS meetmg was held to address concerns of Mr Burrow on hIS property, Lot 3 m
Quantum Park - PermIts #00-2992 & #01-3431
Mr Burrow expressed concern about bemg able to secure financmg for an office/
mdustnal project on hIS sIte, m lIght of the Issue mvolvmg the land use desIgnatIOn on hIS
property He wanted to know what hIS optIOns are as of today Mr Greene and Ms
Galav explamed to hIm that the land use changes m hIS lot from Office/Industnal to
Industnal means that:
1 Another NOPC IS reqUIred to change hIS land use back to 01 m order to go
forward with his plans.
2. The status of Mr Burrows approved sIte plan has techmcally expIred.
3 Current perrmts now must meet all new code standards m order to be m
complIance WIth new 2001 Flonda BUIldmg Code changes.
Therefore, the current buIldmg permIts and SIte plan are now null and void.
If Mr Burrow WIshes to obtam a new NOPC It would be up to MFf (Quantum Park
Developers) to take the ImtIatIve to request that the land use be amended WhICh may take
between three and four months. He would be able to do thIS concurrently whIle
resubmIttmg his site plans.
Mr Burrow was mformed that the Development Department could only aSSIst hIm at thIS
pomt If the NOPC and SIte plans are approved. However, smce Mr Burrow has been
granted numerous extenSIOns, we are unable to grant hIm addItIonal ones and stIll comply
WIth CIty ordmances and State codes.
If Mr Burrow can comply by obtammg a new NOPC and submIttmg a new SIte plan
Development wIll work WIth hIm to get the SIte plan approved.
Bf
Xc LUSIa Galav
Timothy Large
DEPARTMENT OF DEVELOPMENT
. Bul/dlng . Planning & Zoning . Occupational Licenses . Community Redevelopment
MAY " " iUU~
May 22, 2002
Robert H Burrow
Bocar Properties, Inc
3 Waterview Dr
Ocean Ridge FL 33435
Re Quantum Corporate Park Lot 3
Permit Numbers 00-2992 and 01-3431
Dear Mr B(Jrrow'
I am sorry to inform you that I can no longer grant you an extension on the above
referenced permits On March 1, 2002 the entire State of Florida adopted the 2001
Florida Building Code I can no longer extend applications under the old code, as the
new code demands more stringent requirements for wind load and extensive changes in
the technical codes (plumbing, mechanical, electrical and building)
If you decide to go forward with your project, you must submit new permit applications
and plans that comply with all the requirements of the 2001 Florida Building Code
Timo K. Large
Building Code Administrator
tkl bf
cc; Quintus Greene, Development Director
Lusia Galav, P&Z Principal Planner
City of Boynton Beach. 100 East Boynton Beach Blvd., PO. Box 310 . Boynton Beach, Florida 33425-0310
Phone: (561) 742-6350 . www.ci.boynton-beach.fl.us
----r -.... u
GORl
CHEROF, DOODY & EZROL,
A
"TTO"N~VS ..T L..'"
SUIT! 200
3099 J;AST CONM~P.C'Al. OOUl.8VAP.D
FORT LAUDERDALE FLORIDA 33308
MAY 9 t002
C'
SAMUiiL S GOReN
JAMES A_ CHEROF
DONAl.D J DOODY
KeRRY L eZROL
MICHAEl.. D CIRULl.O JR.
TeLePHON. (954) 77'.4500
FACSIMILE (i54) 771.411Z3
JULie F KLAMR
LINDSEY A PAYNE
NANCY R_ KRAMER
DAVID N TOl..CeS
STeVEN L JOSIAS O. COU"SH
May 9, 2002
Robert H, Burrow~ PreSident
Bocar Properties, Inc.
3 Waterview Dnve
Ocea.YJ RIdge, FL 33435
Re' Quantum Park Lot 3
Dear Mr Burrow.
Your May 7, 2002 letter to LUCIa Galav has been forwarded to me for review I appreciate the
concerns raised by your letter regarding the change of designation for your property As noted in Ms.
Galav's letter, the change of use deSIgnation was of a NOPC ImtIated by Douglas MacDonald and
processed b The City m accordance With the apparent authority represented by Mr MacDonald. It IS
now apparent that Mr MacDonald was not actmg Wlth your authonty The City we will work with you
and Mr MacDonald to restore the appropnate land use deSIgnatIon to the property I will forward tlus
letter and a copy of LUCia Galav's May 2, 2002 letter and your May 7, 2002 letter to the appltcanfs
Attorney, Da\id Noms with a request that his client mitiate correctIve actIon to resolve your concerns.
JAC!lrnf
H:\l 990\900 I 82BB\LETTER\Burmw Ill" re Quantum desigJlation_doc
cc: Kurt Bressner, City Manager
Lucia Galav, PnnCIpal Planne~
DaVid Noms, Esq
BOCAR PROPERTIES INC.
3 WATERVIEW DRIVE
OCEAN RIDGE, FLORIDA
II!)
tJt ~~- '-'"-
lDEPAR1MENT Cf- lJE- [,
May 7,2002
City of Boynton Beach
Department of Development Planning and Zoning Division
100 East Boynton Beach Blvd
Boynton Beach, Florida 33425-0310
Attn Lusia Galav, AICP
Subject Qunatum Park Lot 3
Lusia Galav,
In response to your letter dated May 2, 2002 I closed on lot 3 in July of 1999 after I had
obtained site plan approval for the 46,600 sq ft. office warehouse project that you
referenced in your letter That plan indicates a 50% warehouse and 50% office
approval even though I was providing parking to allow even a greater office percentage
I did not provide written permission to have the land use on my property to be changed
I am being told by the building department that I will be charged impact fees for 100%
office I do not believe Boynton Beach should have allowed the land use on my
property to be changed Why would the city of Boynton Beach allow the land use to be
changed to industrial which allows 20% office when I had a site plan approved with 50%
office
This mistake is reducing the value of my property I would like the land use on my
property changed back to office-warehouse, as it was when you approved my site plan
and I purchased my property This problem will prevent my obtaining financing or
selling my property
I would appreciate this being resolved immediately so legal fees can be spared
Sincerely,
Bocar Properties Inc
(~
Robert H Burrow
President
CC Jim Cherof, City Attorney
3099 E Commericial Blvd
Fort Lauderdale, FI 33308
Quintus Green, Development Director
~.:\Y 0,,-
--- '
Ill.- .-
0--- -- 1:
J- . ~-. . - (;
1'O~
DEPARTMENT OF DEVELOPMENT
PLANNING AND ZONING DIVISION
. Building . Planning & Zoning . Occupational Licenses . Community Redevelopment
May 2, 2002
f" r COP't
Mr Robert Burrow
Bocar PropertIes
3 WatervIew Dnve
Ocean RIdge, FL 33435
RE Quantum Park Lot 3
Dear Mr Burrow'
TIus letter IS a response to your request for clanficatIon of the CIrcumstances regardmg the above referenced
property receivmg an Industnal (I) desIgnatIOn on the Quantum Park Master Plan. Pursuant to SubsectIOn
38006 (19) Flonda Statutes, all changes to an approved Development of RegIOnal Impact (DR!) reqUIre a
Notice of Proposed Change (NOPe) be submItted to the governmg ]UflsdIctIOn and to the Flonda Department of
Commumty AffaIrs. Quantum Park IS an approved DR! and must follow thIS procedure.
On July 6, 1999, the CIty of Boynton Beach Issued a development order for a 46,660 square foot office/
warehouse buildmg to be constructed on Quantum Park Lot 3 At that tIme you were the applIcant for the SIte
plan approval and Quantum Lumted Partners, Inc was the owner of record. Quantum LImIted Partners, Inc IS
the developer of record for Quantum Park.
On January 11, 2000, Mr Douglas MacDonald, PreSIdent of MFT Development, Inc., the Quantum LImIted
Partners, L.C General Partner submItted a NOPC ApplIcatIon for Amendment #10 to the Quantum Park DR!.
Amendment #10 mcluded several changes to the master plan mcludmg the reaSSIgnment of Lot 3 from
Office/Industnal (01) to Industnal (I) The request mdIcated thIS change was bemg made "to be conSIstent WIth
the approved SIte plans for warehouse, storage and dIstributIOn" The CIty CommIssIon approved Amendment
#10 on March 7, 2000 per Ordmance No 00-02 A notIce ofpubhc heanng was publIshed m the February 26,
2000 edItIOn of the Palm Beach Post pursuant to Chapter 380 06, Flonda Statutes.
The current deSIgnatIOn for Lot 3 on the Quantum Park Mater Plan IS Industnal (I) A change to that deSIgnatIon
will reqUIre a NOPC as described above If you have any addItIonal questIons please call me at (561) 742-6260
Smcerely,
du",~ J:!d4V
LUSIa Galav, AICP
PnncIpal Planner
Cc Jim Cherof, CIty Attorney
Qumtus Greene, Development DIrector
City of Boynton Beach. 100 East Boynton Beach Blvd., P.O Box 310 . Boynton Beach, Florida 33425~310
Phone: (561) 742-6350 . www.ci.boynton-beach.or
I
~- .
Inston
.Jee
SSOclates, Inc.
,tit
~_ ~t) I
"',,\.- ~.
~J>'
1 tlld l apl' .\r -lllkclurc
I .1I]c1l'la]]lllll~
1-" 1 \ ( 1(,
LETTER OF TRANSMITTAL
VIA Hand Delivery
DATE June 9,1999
ATTENTION Michael Rumpf
JOB NO 9801009
JOB NAME Quantum Park Lot 3
I
I FROM Joni Brinkman
We are sending you the following items via Hand Delivery
No. of Copies Description
1 Set of legal reductions for the site plan and elevations on the above referenced
project, as requested Please fax our office a copy of the final staff report for
the June 22, 1999, Planmng & Development Board meeting as soon as It is
available
Remarks. 0 For Approval
For Review and 0 Reply ASAP
Comment
o Please Comment
As Requested 0 For Signature
X For your record 0 Distribution
Copy To' Bob Burrow
Signed t.}-r.J.. ~ufJ~b10
ji"
vUf~ - q
j
I53:! Old OkeeJhobee Road. SUIte 106 \\ est Palm Beach. FL 33409 5270
5h 1-689-4670 Fax 561-689-5"59
~
8 tl
~ :;
~41i
Iii
l
I Y II
~ I ;it
e t ii:
~'H
11 ';1
tr;
U
lQ
<l)1L-'
() :<!
-:I~t-
<l"'ffi
-'-:lg
*"&.:fj
a",~
~
~
J
!la
l=~
~~.
1"l:i1~
I !~~
II I
J " x
j ,I;;" 0"
I i ifr:
:!nU
l!~~gU
!l~~iUli
5 E
1. ~,
J: ill
- ~ Ii:
J 1- .~l
j vii
III
!l;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I Q
Q
=.l
I -J
lL
o
I '3
I I ~
Ill)
I I ~
11) ~
I I ~
I
i
I
I"
I
I
(
-<l
Z
-<l
U
N
-J
b-
UE?ld S'l!9
e?P! .J01::l Y::;le?~g UOlUfi09
~ 'lOl
,,>!..lE? d wn+UE?n~
I-~
~o~
i
~
! ?
& )
g
c
" ~
I ~.
:~~.D"I
i~:l!
l'!~d
~
i
~
2'
H
-~
Ii
=~
2u
a
!'Q ..
uf"
;;;:;1
~:'"
l;l'i
-2
..
~"~
::~...
.!~
<>~.
io'
IU1
~;~
~o~
.;;
W
l-
I)
Z
-\-
QQQ
'" ""'\
~
1< ~
ifl
:'92'
J:&i
2~"
..:;~
ih
-H
~_ll
hI!'
~ci
~~J
5U2'
-lw
u__
6.~
_>u
;;~u
>i1-
~..
l'h
I-l~
,
.
i
.
,
I
I
,
,
J
.
I
i
,
I
,
,
i
.
,
i
I
.
I
I
I
I
I
I
I
I
!
,
I
i
I
!
i
.
I
!
i
I
I
I
.
,
.
I
.
!
I
.
,
I
i
.
i
.
j
!
.
I
I
I
I
.
I
j
I
I
.
,
.
!
.
.
.
,
I
~
.
!
I
l
,
.
I
J
.
I
,
,
.
I
E
. .
I
i
.
.
i
!
,
I
I
t
I
a
~~~ ...
;--::;.
~ I I' ~
i I ..;;
~~~~:~H
II ~ ~J!l!:
11\ ~ ~ 11\ ~ ": ~
5~=ii ';';
i\~"'; E U
I ! ~~~
. 2 ~L
. . O".J
" .... '"' liP
~ 3 \} .. U
~ '<l Q ~~
U~ ~:!l:t(;) I
z Qii'E~ ~r- ..I)
Q LQO"" ..,.~:!: ~
~
~
;;;
~
'Q
>'!
.
.
; I.
Hl!
~,.. ~~
- !
~
!~
;b
=E
~g
>-,1)
~i
U
It~
.!!
u c
.81
2B
it
'"
-"-
~
.0 "
~ t tJ.-
tJ 0"\1.
<f) .t d) II:
~
<l
. =lP: ~i
i J~i~ t
.... . . '0......
c I ~ g ~i ;
~ il tl;~
~ I"," ~~~ I ~-~
~~~Q ~ - HIl ~i~
:2"ti~ ~.U ~ .::
~ I.ll~ ~ f i" n ~ 11::
:: ~lL II: 3 .ll!' ~L > ~ i ~. J
]ii ~~i!~!!!HH ~~H
..
.
~
~ ,
~ II
l!'~ j
'II - .! I
.... ~ Q::)
'UN.-nIQ
~ l!'~~ ~
~~~~~
d)W...JD...d)
~~ "\I II
~ ll!'
~~h
d: "' 5 t.
"-h
~~ i
"' ! ~ i
0... Jii....Cl..
1'1N'1:J
~-3 a-a-m"1
I
r
I
I
,
I
/
H
1/
j!
I'
I{
tr;
U
lQ w
lL 5i
~t- iil
: ,,~ ~
{)lLUa
-' <l~
~>I
III ~
!l;
I
!; ,
j 't
II := II,
III' ~ ~
II .0 f
'I (ir.<(
I. J~\l
i! I ~~2
11 }l~<I
I' D'.:r....l
'! I ~~"
Ii ~ ~~~
if () t-lIlz
II z <I.rr
d
"
r-9 ~
::t~<;( 21f)
:~g ~::
~~'l't';&,:'l
~.q~~..m
~a~~~~
2~<{~~~
~~~~~~
:r:i6!i2:O
~~fij~
-
-
lL
I) ~
8 ~
W I-
~
:r-l;: i ~l:
ii~ ~ ~~
:zL:::t on ...tl
I~! : !~
~~;/" t~
'O"L t- '. i
~~:j >o~
"~ i ez
I ~,I~\1 ~ 2~
o "If i r-. UI-
~ Cl 'J E :Il~
~ "" I\' 'I{ ~~
ij o~i' i ~~
! '~~~;r;!t~
"~~ ~~ gO
- <(tlll<( .~ ~t-.(
" ~!l;~ ~, !!i
..J- 1..'118. Q~ ...I_"~
.
{
~~ aI;lN;::> 9Nl.0d0H9 <;>N11QX;
~i 9a1;l\";Hl lI^Ol-l
" r<:)NJ"',,,,,,, l,...~'---.../
!
It>
"
...
..
~'\
~<
.
t \ \
3 1I
! &:
~:f'2 1. ~
"'.0' 1 of 1-=
&a~ 11 ~~
\d ~lii~l
\ -'h ..s-~!~
l!lli!sS
9He1-9Cl - veld 91-\9
ep\;O\:i \..r~e~g uo,\uRo9
<(; ,+0"1
")\..I\? d U.H""tU\?00
\- \~~
! ~
e ~..i
s s 5.'
:;r: .1 >>oj)
~ l~.;;~~
i riiU
\~;
. it
~ ~
II \\
~ "
" '"
\
\
i
\
.
\
.
I
t
I
t
i
.
\
,
.
~ \
; .
.
~ I ,
~ s I
~n. "
""1 i~ ~t n \
i- i\ ail. "' d)
@loS<:: l~ ~,_.i - d i
~! ... .!~ ~~<> ti
~ %--~ ~; <( \
;;.'4E -~< :.-a b! t",t l~ I-
1i . ; \ Ul ,
;. i . \ ~ \
~ . \ i! % 0
't , Ii l
5~ ~ Ul i
'E;~ 4'i' l- i
~~ >' < d)
..~ 4." \L \
u ~ ...'
s.z ~ o..~ 1: .
,,- ~ 6 \
~g OIl'.!! '.!!
,;r ...'" \
$- ~ \
,.;;
,
.
\
\
.
\
I
Z .
\ <( l
J \
J II-
4- .
I- J .
J .
Ul <( \
0 I-
9 on .
Ul ~ I:l !
J l' Z \
() II .
\L ~ \
l- lL
53 ~~ ~
...{l
,,:J :p "f ~~ ... \J !
~ rAL~ -
"-Ul .~~ ~'" 4. 0
~t: ,,11 ~~
ll-d) - - - - ~ t:.:1\ \
~ @ i
"'\ \
I
\
1 ~~ \
..
~ .~
;;; ~s ! \
5 ',;~.J
\ 1"\i,i "~
"\
\ ~~
~.>t :{ll
\.!~
~15 \ ll-<( \
>0.. t::1I-
()~ OIl I
tUa \ \
~() I d)
~~ I d \
.cO \ . 1 .. " t <{
....u t \ "';s ;..~ I-
-5e '" Ul
\ ~ ~ ~ "" I :z\ 0
.- ::> 4> ~ ~ ~ i~
3.... d ~\
c :ywd \ J
t~ ~9 <{ J
~ IVJ <(
,a2 l 4~ - \ \<~ - J i! I-
t~ .;.:~--:..s:.{ ~\ ~\ d)
110 Z {l.
~\ ~. ... \_ 1 "Z't
_ "II \ '\ '
"ijI g;~f d)t \ ,; ,i <f~ )/.~
t() Ul ~- \1 "'\ '.l~ OC '-
~~ t:~ \ U ll-<( <l~
" f '- tz;:. - - - ~--\ t::1I-
"c " ~ d)'.ll o..'.ll
~~- ~ ,of <:'
.'?t-~ - -\ "'!Is
-~-------------------
p \?!().E~\iC7I~::\;9~.JP3-9~:E\GF3-5P: [Ill:; ~~ 29 09. 5: 9lj~ JGP
>
"
~ . I
~ ~ I
~ ~
~ ~
.
~ .
~ ~
<
8 ~
~ ~
~ ~
~~
r
'_ m
.~
-t
2
N~~~r
~ ~ ~
r Z
~ ~
p
~
~
"
~~
~~
.0
.
~~
"~
;0
~.
;;~
^^
~~
~n
c~
~
. "n,
. ~~i
. ':1
I ':::-!
.'.""
: ..
"
I q
m-n
rr
mO
<0
1:>~
:::!lJ
Or
Z1:>
<Pz
, U1...
r
o
(;\
1:>
i I !
ES";.i....~
: , I
, ,
, I
L_LL-,-_~
c;l
_~;.::~-'J" -+
"'a"
TOO Of ~OOF;
l;l ,.:<
~ ~ g
~~~
sheet title: FLOCR PLA\l &: :...EV.A."'lCN5
file name: QP.3-Al.JWG
project no: 99018 revisions:
date: 4/26/99 -51..6.""
drawn by: R ~
checked by" JG
"
~~~
::;8-
~~i
~~~
~r
- ~
~
~
EEl
m.-.'.
W
B3
ttl
, ,
I :;:;
~ ~
i Z
~ ~
~ ~
! !il!il
, - N
J:--I
~~~
~~~
~~~
~
.
"
~Ppg
.\d~
~':;~1:'
~
r~ r:; ~
-r-
'I !\! _ ("\
~ "
. r
i~
~- ~
. ~
l!1
;=
\J
~
l> ,"
i
,
, nl
T'\ ~~
j r
~
l!1
;=
\J
~
l>
I~
I I~
ii' I
, ' I
If ----I-
i I,
(
t
'1-0-
!~.~;
l~ .
, c
'~
III ~
~ ~
I
!
Ii
II
r
!ll
:1'
i~
I
II
I~
,,,
'I'
I,
~
I
-----r---~
H
<-<
i
c}
!
!
-~--C
----.....-..-----
,
'.
--~
t
~~
~
1--------~
j(:i ,,' -------
o JI 1 \
I tr
~:
:: .. -- ~- ~ ;, !
"
,I
,i
t;
· ~I - - -- -- - f;,
; ;
i i
-----<;
I=},
,'.J ___
i I
I 12'-4"
I' :
i ~!
i~
~T
'~
,
!--.'
j (I :
;! I',
I~
\J
~~\ j
~ ..
L/
n \.,',f1,: ", I
!' ~ ~;~
.".,....<-- --<0.. ~
-0-
!/l'
~q
~<.
~ $
~
1;
~-
~:
~.
EiJ
$
SJ
cp
~
~
~
~\
~ ~
~
cp
m
"
Si~
to
~~
i
~
PROPOSED SITE PLAN FOR:
WEST QUANTUM PLAZA
QUANTUM PARK
BOYNTON BEACH, FLORIDA
@ Oliver. Glidden & Partners
Architects & Planners, Inc.Y'.. /0-/./ ./<
1401 Forum Way, Suite 100 .i:4~ '
West Palm Beach, Florida 3~"
(561l684-6841fax(5611684-0890 -./
p P:lJ:_(:~\AC::;E"E'_rp3 ;":;(h:jt:]-SPl
N ! P
~ ~
"~
~ ~ ~
~ ~~~~
~ OIl ~ 'f _
~~
.~
~!
~~
~~
~
~ ~ ~
-< ~ i
1!i 11
~ ~
:~
~
Igl
.
I~
I q
F==. ,~.:
p=-=
I :. ;_~~!
m"TI
rr
mO
<0
1> ill
:::!1)
2r
(1)1>
z
OJ...
r
G
GI
OJ
CIJ
1la1?eC9
~?S .-G1'
~
11:"4 . i
16'-r ...
7OP0<"!iOO>
i~~~
~ ~ ~ ~
::! ~ ::! ..,
~~~~
~i3~?
g..B
~~~'::
sheet tiUe: FLOOR PLA.N do:: ,,'.A. .eNS
file name: QP3 A2,DWG
project no: 99018 revisions:
date: 4 26;93 526 '11
drawn by: ~_
checked by: ~\.>
~ ~
~r
m
blii
'<
l>
-<
2
::~ -:- ~~~
.,.~I:i~~
! ~~~
" 1 ~ T
;;
"
"
~g'i
"->>
::;;!:-
Q,;!g~
;~~~
~~~~
z z
~ ~
~ ~ ~
~~'l::'l
H3
Ell
EEl
--
--
~"1
! i
"",
. " 0 0
;<2:><Q
~!il~~
...
::!=~
~U
= 0
~~
8~13~
.gg.
"'''1:~
; ~ ~ ~
~ z ;z: :z
~i~i
z z z
~ ~ ~
~Q~S
'i..,
/~
,.
i' ~
.' '~
~ jl!
~ ~
;J!
~
~
r=
tJ
~
III
!~
,
j-
!~ "
~~~
, -{J ;'.
~-----;--- rnt
H
"
~---------------~- ~q,
i
?--~---{=
------+ ~ - - -
;
f"
~----~--
~
~
?---~
,
,
!~ r
~..L~~ 11 :
;.--~ --{=
i~ "
PROPOSED SITE PLAN FOR:
WEST QUANTUM PLAZA
QUANTUM PARK
BOYNTON BEACH, FLORIDA
~i'~
~!
"
!
.~
JII~i - q
......'11
~a
., ;J!
~
Il1
r=
tJ
~
III
~
;, Lr~' ID :
0= 1 ~. ill
5~ .~~ '"
;i If
!~
I
,
~
~
~~-
~c. ill.
~
$
!I'
"i
~
$
~I
~7- l
~e I
" "11
I!lj
"II
,I
J
1
~i
il
H
II
!,
!I
]
~ (11
.1.1'1
~ ..
~~-
~C ,
'::; f i
~
:iJ
~
ill
c
I
II
1
!
,....I~'"
t ~
,
.,
l
I
I
;
~j
'<Ii
,'I
'11
I
I
I
~I
1111
::11
~~-t,~
Ef ~o Ii
r'li
o 11
Cf
Cf
ill
&
"
~. !
~
~q
;>j
@ Oliver. Glidden & Partners
Architects & Planners, Inc. /
1401 Forum Way, Suile 100 . ~L-I /'_____
West Palm Beach. Ronda 334o,iffq:l'
(561)684-6841 fax (561)684-6890 . / _
07,02/1999 13.55 1-551-68? 59 wINSTON LEE
u,,~"., rA~ I' ,. r'~ .~1~, j~'~ .,r Dev~l~nt Inc ~.~ ,t"*~~~ ~
PAGE 02
ilJlt~IIO~
Architectural Review Committee
Quantum 'ark'roperty 0WMn" Association. 1tIe.
1401 Forvm Woy, luile 101
West,aIm 'each~ fL ~1
July 2~ 1999
Mr lloba1 K BwTow
lWberts Company
lno NW )2, SUleet
l'omplUllO Beach. PL :J)064
llB; Lot 3, lUvit'wofPlIIJI
Dear Mr 8wrow'
The Atchl1mura1 Review Committee met OJ:L Friday. Jww., 1999 ad reviewed tJa. building
elevation. .ite plaD and 1~'P8 pt.", fur Lot). Consider tl1iJ Jetter sa OO1lf'innation that the
Boan! has approved .aid piau.
If you Jhould baveo, quedions, please do DOt hail* tD ~ our office_
Heather Rintoul
At~ &eview Committee
~fQN~e-pa..7'"
.
O~/02/1999 13 56
1-561-68' '559
wrNSTO~~ LEE
PAGE 131
I }':inston
X~~ociates, Inc..
Landscape Archltec\:ure
Lend PllUL1'liroi
f.iH... IIlLCCI16
I FAX COVER SHEET
DATE. July 2,1999
TO. Michael Rumpf
cc: Robert Burrow
~
---I
FROM: Joni Brinkman
RE. Quantum Park - Lot ,
Our File No. 98010.09
No. of Pages (including cover): 2
Attached please find and approval/stier issued by the Architectural Review CommittBe
for Quantum Park. This fetter complies with Comment No. 12 of the staff report,
Original:
Mailed
Ovemiahted
X Held in File
Bv Hsnd
This fac8imlte contains privileged .00 eonfidc;ntial ROO1lation int~ only for the use Qf.the Addresee9 n&med above. If you
are not the intended recipient of this facsimile, or the emplo~e or agent responsible for delivering it to the Intended reCipient,
you are hereby notlfied that any dissemination or copying of thisfacsimHe IS strictly prohibited. Jfyou have received this facsimile
in error, PMse immediately notify U~ by telephone and return the original facsimIle to us st the address below via the U S. Postel
Service. Thank you.
1532 Old Okeechobee Road, SUl1e 106, West Palm Beach, FL 33409-5170
561-689-46'70 . Fax 561-689-5559
t/
,1 ~ ~ '"
v - vl2,.-A-f-r
2ND REVIEW COMMENTS
Project name. Quantum Park - Lot 3
FIle number NWSP 99-008
Reference 2nd Review. New SIte Plan. FIle # NWSP 99-008
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments
1 Waste removal In connectIOn wIth constructIon process must be servIced
by City of Boynton Beach. Please note on dumpster detail to Indicate
same
UTILITIES - General Comments
2 All utilities easements shall be shown on the rectIfied landscapIng
drawIngs so that we may deterrmne whIch trees may interfere wIth
utIlitIes. In general, palm trees will be the only tree speCIes allowed
withIn utIlity easements. Canopy trees may be planted outSide of the
easement so that roots and branches will not impact those utilities withIn
the easement In the foreseeable future LDR Sec 7.5-18 I gives public
utIlitIes the authonty to remove any trees that Interfere with utIlIty
serVices, either In utIlity easements or public nghts-of-way
FIRE
Comments.
3 A fire flow test of SIte is reqmred, LDR 6-16
POLICE
Comments. None
ENGINEERING DIVISION
4 PrOVIde approval from LWDD for work proposed WIthIn the canal nght-
of-ways.
BUILDING DIVISION
5 Show and specify on the Site plan that the elevatIOn of the fimsh floor is
SIX inches or more above the crown of the abutting nght-of-way WIthIn
the Site Data identIfy the actual elevatIOn of the crown of the road at the
front not the proposed mInImUm crown of road requested by the South
Flonda Water Management Distnct (SFWMD) permit.
6 SpecIfy on the SIgn detaIl draWIng the approved colors for the monument
Sign.
7 At time of permit reVIew, the applicant shall venfy that the square
footage proposed for the bmldIng is In compliance With the regulatIOns
of the buildIng code by IndiCatIng on the SIte plan or floor plan draWIng
Page 2
Quantum Park - Lot 3
File No NWSP 99-008
~
-..
(l4v\
DEPARTMENTS INCLUDE REJECT
the occupancy classificatiOn and type of construction proposed for the
bUlldmg. The bUlldmg area, occupancy and type of constructIOn
proposed for the building. The bUlldmg area, occupancy and type of
constructiOn shall comply With the specificahons idenhfied m the
Buildmg Code Comphance With the bUlldmg codes will be evaluated at
hme of permit reView The permit fee, water and sewer facihty fees,
county fees and state fees will be determmed at time of permit reView
PARKS AND RECREA nON
Comments None
FORESTER/ENVIRONMENT ALIST
Comments
PLANNING AND ZONING
Comments
8 All plans shall be signed and sealed at bUildmg permit submittal. Ch.4
Sec 7
9 ProvIde the follow mformatiOn on the Site plan.
c-d.., n (
. DimenSiOn leamng areas Ch.2 Sec 11 Par.J
. PID open space reqUired:!l~ til1<lr~J~l!. Ch.2 Sec 7 Par.H 13
e-'"' ~ Landscape buffer must be consIstent WIth the penmeter landscape buffer
plan for Quantum Park.
11 Sidewalk added along row IS not reqUired by Quantum park master plan.
1\\ c, , r At /.L J.. (. ~ (
'-' \ -'t l C S. c 1 ~ r7 C'~~ -, r I."IJ... .,
s:\projecls\cond of appr\
f k..Y\.5 b'-V)'-S -(- (,c_
......a:\J I'<'".._~L d"'d ,r" -L D J i I I I { 'K.cu.e, ~ 7Scc--~,=C
, ' " r-,T "'-t' ~ \"'-'v\..- r C(f- ~ /tr '- ,-,\, -t- r - T>-<~- ~
~f-. V1 -(e
C J \" (-ri c:- v-..... C ""'- -f- '\ \"'-<._ -ft 0\..... <) { Ii e '-' C'I.. J C'- ~'- .S-:'- C off \-~ It. (
rJ~
c ~f I" It'''h_ -fl"-'^-
C Co ~"t;r -r;",~ rt --; c
V1 n: <"" ~ (?
4' (J (' C--.... .\c-c-
~,-* pt0j ~'-+ ~~-1- s
~-, ,;r ~"",,- ~"-~ S L r. r.
- (,;L~~-..,. J ,
"--+ p""--(...... r'i.
15--- ['- {>? ""'''"v-. * <:. (
-f f'VI..'-' -( &.C: r- '
~ ~ C':"-c. ""'\.. v<"...J
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BOULEVARD
PO BOX 310
BOYNTON BEACH, FLORI DA 33425-0310
FAX. (561) 742-6259
PLANNING AND ZONING DIVISION
to:
fax #.
date:
from.
re:
JOANIE
689-~ S'SS q
5/18/99
PLANNING AND ZONING DIVISION
1 ST REVIEW COMMENTS FOR QUANTUM PARK LOT 3
pages:
6 Including cover sheet.
Planning and Zoning Division
City of Boynton Beach
Boynton Beach, Florida 33425
742-6260
Fax: 742-6259
1 REVIEW COMMENTS
PrOject name' Quantum Park - Lot 3
File number NWSP 99-008
Reference' 1st RevIew. New SIte Plan. FIle # NWSP 99-008 wIth an Mav 4. 1999 Plannmg and Zoning
Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments.
1 Waste removal m connectIOn with construction process must be serviced
by CIty of Boynton Beach. Please note on dumpster detail to mdlcate
same
UTILITIES - General Comments
2 All utilitIes easements shall be shown on the rectified landscaping
drawings so that we may determine whIch trees may mterfere wIth
utIlIties. In general, palm trees will be the only tree speCIes allowed
wlthm utIlity easements. Canopy trees may be planted outside of the
easement so that roots and branches will not Impact those utilIties wlthm
the easement m the foreseeable future LDR Sec. 7.5-18 I gIves public
utIlitIes the authority to remove any trees that mterfere WIth utility
servIces, either m utIlity easements or publIc rights-of-way
3 Dept. of HRS permits will be required for the water system serving this project.
(Sec. 26-12)
4 FIre flow calculations wIll be reqUIred demonstrating the CIty Code
requirement of 1500 g.p.m as stated in LDR chap 6, Art. IV, Sec. 16, or
the requirement Imposed by msurance underwriters, whichever IS
greater (see Sec 26-16(a)) Please submIt these calculations WIth your
HRS permIt submIttal.
5 Sec 26-34(E) of the City Code requires that a capaCIty reservatIon fee be
paId for this project eIther upon my request for signature on the Health
Dept. applicatIOn forms or wlthm 30 days of SIte plan approval,
whIchever occurs first. ThIS fee wIll be determined based upon final
meter SIzes, or expected demand.
6 Comp Plan policy 3C.3 4 reqUIres the conservatIOn of potable water
CIty water may not, therefore, be used for lITIgatIon where other sources
are readily avaIlable.
7 This office will not reqUIre surety for mstallation of the water and sewer
utilIties, on conditIOn that the systems be fully completed, and given to
the City before the first permanent meter IS set. Note that setting of a
permanent water meter IS a prereqUISIte to obtaining the certIficate of
occupancy
8 Water meter SIzes are smaller than normally mstalled for a building of
the size specified. Please prOVIde engmeering calculatIOns, or an
Page 2
Quantum Park - Lot 3
File No NWSP 99-008
I DEPARTMENTS INCLUDE REJECT
explanatIOn Justifymg the meter SIze.
9 A building permit for this project shall not be issued until this office
has approved the plans for the water and/or sewer Improvements
required to serve the project. (Sec 26-15)
10 The waste stream from any potential manufacturmg process must meet
the City's pretreatment reqUlrements. A samphng point must be provided
to allow momtoring of this waste stream. (Sec. 26-143, 26-147) If a
samphng pomt will not be provided, please provide a written statement
that the faclhty wIll never house any manufacturing process.
11 Water mams appear to be closer than 10-feet from a building m some
locations. Please note that thIS Department's minimum allowable
distance for water mams from bUlldmgs IS 10 feet, whIch appears
readily achIevable for thIS SIte plan.
FIRE
Comments.
12 A fire flow test of SIte IS reqUlred, LDR 6-16
13 The locatIOn of the Fire Department connection and the turning radius
into the loadmg area are not shown on the plan.
14 All roadways and fire hydrants must be m place pnor to the start of
constructIOn.
POLICE
Comments. None
ENGINEERING DIVISION
15 Add the following note to the Site Plan sheet: All plans submItted for
speCIfic permIts shall meet the CIty'S code requirements at time of
application mcludmg all other reqUlred agency permIts.
16 Add the followmg note to the Pavmg and Dramage Plan. All signage,
stripmg and markmgs shall conform to the CIty'S standard drawmg B-
98001 ReVIse plans if applicable
17 Add the following note to the Paving and Drainage Plan. The drainage
detalls shall conform with the City Utihties Dept. standards. Revise
plans if applicable.
18 Show a 5' concrete sidewalk along Quantum Blvd. and through the
Page 3
Quantum Park - Lot 3
FIle No NWSP 99-008
DEP AR TMENTS INCLUDE REJECT
driveways on the Site and Pavmg Plans. [LDR Chapter 6, Article III,
Section 11] Sidewalk shall be 6" thick through the dnveways. [LDR
Chapter 23, Article II, SectIOn P] Also provide handicap ramps per
FDOT standards at the two dnveways.
19 On all plans show the two handicap accessible paths connecting to the
publIc sidewalk along Quantum Blvd. per Flonda AccessibilIty Code
20 At the west dnveway, replace the "Through" arrow With a "Right Turn
Only" arrow and add a "Right Turn Only" sign on the same post as the
stop sign.
21 The dumpster enclosures shall be concrete block and stucco per LDR
Chapter 9, SectIOn 10 C
22. Inlet S-l 04 pipe mvert should be 7.3 0 S W
23 Provide approval from L WDD for work proposed wlthm the canal nght-
of-ways.
24 Provide venficatlOn from the L WDD and the City UtilIties Dept. that the
locatIOn ofthe storm dramage outfall structure IS acceptable. If
stormwater treatment IS prOVided on-site why is the outfall not to the
LWDD canals adjacent to the site?
25 It appears that drainage structure S-204 should be set at elevation 900,
please venfy and revise If necessary
26 Add a certification by the engmeer on the Paving and Dramage Plan that
"the drainage wIll conform With all rules, regulatIOns and codes of the
City's Land Development RegulatIOns" [LDR Chapter 6, Article V,
SectIOn SA]
27 On the sectIOn B-B detail, change the word "parkmg" from the 13 .5'
dimenSIOn to aisle
28 Use FDOT Index 546 cntena for sight triangles and show them on the
Site & Landscaping plans With notes that there shall be clear, cross-
visibIlity wlthm the Sight tnangle between 30" and 6' from grade.
29 Show a 5' level area at the end of the handicap accessible path at the
southeast comer of bUIlding "A" and a ramp up to Sidewalk on the Site
and Paving and Dramage plans. Also, show all proposed handicap
ramps on the Paving and Dramage plans.
30 On the lighting plan add a note mdicatmg that all lIght poles shall meet
or exceed a 110- MPH wmd load. Also specify that the fixtures shall be
controlled by a photoelectric switch. [LDR Chapter 23, Article II.A]
Page 4
Quantum Park - Lot 3
File No NWSP 99-008
DEPARTMENTS INCLUDE REJECT
31 ProvIde 12' wIde stnpIng adjacent to the north side of building "A" and
the south sIde of buildIng "B" with letterIng indicating "LoadIng Zone"
[LDR Chapter 2, SectIon 6.F 7.B ]
32 ProvIde a topographIc survey for the SIte shOWIng all eXIstIng features.
[LDR Chapter 4, Section 7.A. and Chapter 23, Article I, Section
5.B.2 ]
33 ProvIde Type "D" curb along the west SIde of the dnveway at the west
side of the SIte. [LDR Chapter 23, ArtIcle ILE.]
BUILDING DIVISION
34 Identify the fimsh floor elevatIOn wIthin the footprInt of the bUIldIng
that IS illustrated on the floor plan drawIng. Add to the SIte data, found
on sheet SPl of2, the base elevation ofthe B flood zone. Ifthere is no
base flood elevation, Indicate that on the plan. Add notes and
specificatIOns to the SIte data that prove the proposed fimsh floor
elevation IS In complIance with the minimum standards of the follOWIng:
a) Mimmum elevatIOn reqUIred by the flood zone.
b) MInimum elevatIOn required by the South Florida Water
Management Dlstnct permIt for the project.
c) Show and specIfy that the elevation of the finish floor is not less than
SIX Inches above the crown of the abuttIng nght(s)-of-way
35 SpecIfy on the SIgn detaIl drawIng the approved colors for the monument
SIgn.
36 Add the word Tenant to the begInmng of the wall sIgnage note found on
sheet Al
37 At tIme ofpenmt reVIew, the applicant shall submIt sIgned and sealed
plans
38 At time of permIt reVIew, the applIcant shall venfy that the square
footage proposed for the buildIng IS in complIance WIth the regulatIOns
of the bUIlding code by indIcatIng on the SIte plan or floor plan drawing
the occupancy classIfication and type of constructIOn proposed for the
bUIldIng. The building area, occupancy and type of construction shall
comply with the specIfications identified in the BuildIng Code.
PARKS AND RECREATION
Comments None
Page 5
Quantum Park - Lot 3
FIle No NWSP 99-008
FORESTER/ENVIRONMENTALIST
Comments.
39 There are no desirable trees on the site
PLANNING AND ZONING
Comments.
40 All plans shall be signed and sealed at bUlldmg permit submittal. Ch.4
Sec.7
41 Amend the plans to provide a mmlmum of 44 mches (3'- 8")ofwldth for
all sidewalk areas adjacent to accessible ramps. 1999 ADA reqUIrements
42 On the site plan label the dashed hnes withm the bUIldings, permanent
or removable walls etc
43 Provide the follow mformatlOn on the site plan.
. Parking calculations based on employees Ch.2 Sec.7 Par.H.2
. Loadmg reqUIrements (dlmenslOned on the plan) Ch,2 Sec 11 Par.l
. PID open space reqUIred and proposed. Ch.2 Sec 7 Par.H.13
. Vehicular use landscape area. Ch. 7.5 Art.n Sec.5 Par G
44 Provide a parkmg detail whiCh mcludes the correct dimenslOns and data
for handicapped parkmg and slgnage City drawing #B-900l2
45 Along with the 20 scale landscape plans, provide an overall landscape
plan sheet drawn at the same scale as the site plan. Ch. 4 Sec 7 Par C
46 The City of Boynton Beach Comprehensive Plan Policy 4 4 6 states that
50% of reqUIred trees and shrubs shall be native On the landscape
plans provide tabular mformatlOn calculatmg native reqUIred and
proposed plant counts.
47 On the architectural plans show dlmenslOns on the bUlldmg 'B'
elevatiOns. CH.4 Sec 7 Par.D
48 Plans must be reViewed and approved by the Quantum Park
Architectural ReView Board pnor to final approval Supply City with
verification for thiS revIew
49 Landscape buffer must be consistent with the penmeter landscape buffer
plan for Quantum Park.
s:\projecls\cond of appr\
Department of Engineering
and Public Works
PO Box 21229
\Vest Palm Beach_ FL 33416-1229
(561) 684-4000
wwwco palm-beach.f1.us
.
Palm Beach County
Board of County
Commissioners
Maude Ford Lee_ ChaIr
\\arren H t\ewell. Vice Chairman
Karen T :\.larcus
Carol A Roberts
Mary :\.lcCany
Burt .>\aronson
Tony Masllmti
County Administrator
Robert \\'elsman
4~ Equal Opportunzty
4ff'nnatn-e -"ctwn Emptorer
@ printed on recycled paper
/1
I
May 18, 1999
Mr Michael Rumpf
CIty of Boynton Beach
Planning and Zoning Department
100 East Boynton Beach
POBox 310
Boynton Beach, FL 33425-0310
RE: QUANTUM PARK - LOT 3 OFFICElWAREHOUSE
TRAFFIC PERFORMANCE STANDARDS REVIEW
Mr Rumpf:
The Palm Beach County Traffic DIVIsIOn has revIewed the traffic statement
(dated April 27, 1999) for the project entItled Quantum Park Lot 3
OfficelW arehouse pursuant to the Traffic Performance Standards m ArtIcle 15
of the Palm Beach County Land Development Code The project IS
summanzed as follows.
LocatIOn,
MUlllClpahty'
Proposed Use
Quantum Boulevard, east of Congress Avenue
Boynton Beach
1) Office
2) Warehouse
335 tnps per day
2000
(23,330 sf)
(23,330 sf)
New Tnps'
Buildout.
Based on our reVIew the Traffic DIViSIon has determmed that the prCo)E:ct
meets the Traffic Performance Standards of Palm Beach County If you have
any questIons regardmg thIS reVlew, please contact me at 684-4030
Smcerely,
.- -----'
OFFICE OF THE COUNTY ENGINEER
i\ 'in
'1
MAY 2 0
Al Feden , P E,
Semor Traffic Engmeel
"
i
cc: Andrea Troutman. P.E.
Pinder Troutml:Ul Consultmg, Inc.
File. General TPS MUll Traffic Study Review
h.\traffic\apf\tps',9g064app.wpd TAZ 035
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Building
Planning & Zoning
Engineering
Occupational License
CommunilY Redevelopment
July 16, 1999
Winston Lee & Associates, Inc
1532 Old Okeechobee Road, Suite 106
West Palm Beach, Florida 33407
Re' Quantum Park Lot 3
NWSP 99-008
Dear Joame
Please see enclosed the applIcant copy of the Quantum Lot 3 Plans.
As they have been approved by Planning and Development Board, this IS one of the next steps in
the process.
~ereIY'
" - ~~~
Tic e LeWIS
Cc copy to file
100 East Boynton Beach Blvd., P.O. Box 310 Boynton ~ach, Florida 33425-0310 I'hone: (561) 742-6260 FAX: (561) 742-6259
I
~.
Jnston
ee
. S~Oclates, TI1C.
[ :lI1d 'L lpC \IL hlh'e-Iur,
I dlld PI,llllll11,>C
f- "'l! ~l ( ( llf
June 1, 1999
Mr Michael W Rumpf
CIty of Boynton Beach
Dept of Development
Planmng & Zomng DIvIsIon
100 E. Boynton Beach Blvd,
Boynton Beach, FL 33425
RE Quantum Park DR! Lot #3
FIle Number NWSP 99-008
Our File No 98010 09
Dear Mr Rumpf,
Attached please find 12 sets of plans for the above referenced project, revIsed pursuant to the TRC
comments. 1 have addressed each mdIvIdual comment as follows
PUBLIC WORKS
1 Comment: Waste removal m connectIOn wIth constructIOn process must be serviced by City
of Boynton Beach. Please note on dumpster detail to mdIcate same.
Response: Note placed on dumpster detail on Sheet SP-2 to mdIcate waste removal m
connectIOn wIth constructIOn to be servIced by the CIty of Boynton Beach.
UTILITIES
2 Comment: All utilItIes easements shall be shown on the rectIfied landscapmg drawmgs so
that we may detemllne whIch trees may mterfere wIth utilItIes In general, palm trees will
be the only tree speCIes allowed wIthm utility easements. Canopy trees may be planted
outsIde of the easement so that roots and branches wIll not Impact those utilItIes wIthm the
easement m the foreseeable future LDR Sec 7 5018 1 gIves public utIlItIes the authonty
to remove any trees that mterfere wIth utilIty servIces, eIther In utilIty easements of publIc
nghts-of-way
[ ':: () J O).,eeclwbee Road. SuIte 106 West Palm Beach, FL 33409-5270
,)hl-hR9-4670 Fax 561-689 5559
Mr MiChael Rumpf
Quantum Lot3
June 1, 1999
Page 2
Response: All utilIty easements are mdIcated on the plantmg plans. EXIstmg seagrapes are to
remam In the FP&L easement and be property maIntaIned and are part of an eXIstIng buffer for the
entIre Quantum Park development. These eXIstmg trees provIde buffenng, as reqUIred, for the
adjacent SIngle famIly residences, These trees must remaIn. All new plantIngs as a part of thiS
proposal comply WIth the comment reqUIrement.
3 Comment: Dept ofHRS permIts wIll be reqmred for the water system servIng thIS project
(Sec 26-12).
Response: An applIcatIOn for the HRS permit shall be submitted shortly
4 Comment: FIre flow calculatIons will be reqUIred demonstratmg the City Code reqUIrement
of 1500 g.p m., as stated m LDR chap 6, Art IV, Sec 16, or the reqUIrement Imposed by
Insurance underwnters, whIchever IS greater (see Sec 26-16(a)) Please submIt these
calculatIon WIth your HRS permIt submittal.
Response. These calculatIOns will be mcluded m the submIttal for the HRS permit
5 Comment: Sec. 26-349D) of the CIty Code reqUIres that a capacity reservatIOn fee be paId
for thIS project eIther upon request for SIgnature on the Health Dept. applIcatIOn forms or
wIthm 30 days of SIte plan approval, whIchever occurs first. ThIS fee wIll be detemuned
based upon final meter SIzes, or expected demand.
Response: The appropnate capaCIty reservatIon fee will be paId wIthm the speCIfied tIme
lImIts.
6 Comment: Comp Plan poltcy 3 C.3 4 reqUIres the conservatIOn of potable water CIty
water may not, therefore, be used for ungatlOn where other sources are readIly avaIlable
Response: The ungatIOn system source has been located on SP-I and PP-I
7 Comment: Tins office will not reqUIre surety for InstallatIOn ofthe water and sewer utlhtIes,
on condItion that the systems be fully completed, and gIven to the City before the first
permanent meter IS set Note that settmg of a pennanent water meter IS a prereqUIsIte to
obtammg the certIficate of occupancy
Response: Lawson, Noble, Webb & ASSOCIates will coordmate to assure the systems are
complete and dedIcated to the CIty before the first pennanent meter IS set, as reqUIred.
8 Comment: Water meter SIzes are smaller than nonnally mstalled for a buildmg of the SIze
speCIfied. Please proVIde engmeenng calculatIOns, or an explanatIOn jUstIfYmg the meter
SIze
Response: The water meter SIze has been Increased to 1"
Mr MiChael Rumpf
Quantum Lot3
June 1, 1999
Page 3
9 Comment: A buildIng permIt for thIS project shall not be Issued until thIS office has
approved the plans for the water and/or sewer Improvements reqUired to serve the project.
Response: Water and/or sewer plans will be approved by City staff pnor to bUildmg permits
bemg Issued.
10 Comment: The waste stream from any potentIal manufacturmg process must meet the CIty'S
pretreatment reqUirements. A samphng pomt must be provided to allow momtonng of this
waste stream. (Sec 26-143,26-147) If a samplIng pomt WIll not be proVided, please prOVIde
a wntten statement that the faclhty will never house any manufactunng process.
Response: A sample pomt and detail have been added to the engmeenng plans.
11 Comment: Water mams appear to be closer than 1 O-feet from a buildmg In some locatIOns.
Please note that thIS Department s mmImum allowable dIstance for water mams from
bUildmgs IS 10 feet, whIch appears readIly achIevable for thIS SIte plan.
Response: Plans have been revised so that all water mams meet the 10 dIstance reqUirement
from buildIngs.
FIRE
12. Comment: A fire flow test of SIte IS requITed. LDR6-16
Response: ThIS test WIll be conducted as part of the HRS permIttIng process.
13 Comment: The locatIon of the FITe Department connectIOn and the turnmg radIUS Into the
loadmg area are not shown on the plan.
Response: The turnmg radIUS has been mdlcated on SP-I and the Fire Department
connection has been mdicated on the Water and Wastewater Plans.
14 Comment: All roadways and fire hydrants must be m place pnor to the start of construction.
Response: All roadways and fire hydrants will be m place pnor to the start of construction.
POLICE
No Comments to Address
ENGINEERING DIVISION
15 Comment: Add the follOWIng note to the SIte Plan sheet: All plans submItted for specIfic
permIts shall meet the CIty code reqUirements at ttme of applIcatIOn, IncludIng all other
reqUITed agency permIts.
Response: Note has been added to SP-l
Mr MIchael Rumpf
Quantum Lot3
June 1, 1999
Page 4
16 Comment: Add the follOWIng note to the PavIng and DraInage Plan. All sIgnage, stnpIng
and markmgs shall conform to the CIty'S standard drawIng B-98001 ReVIse plans If
applIcable
Response: Note and detaIl added to the Pavmg and Dramage Plan as requested.
17 Comment: Add the followmg note to the Pavmg and Dramage Plan. The dramage details
shall conform With the CIty Utilities Dept. standards. ReVIse plans If applIcable
Response: Note has been added to plans. DetaIls comply WIth City standards,
18 Comment: Show a 5' concrete SIdewalk along Quantum Blvd. and through the dnveways
on the Site and PavIng Plans. (LDR Chapter 6, ArtIcle III, SectIOn 11) SIdewalk shall be
6" thIck through the dnveways. (LDR Chapter 23, ArtIcle II, SectIOn P) Also proVIde
handicap ramps per FOOT standards at the two dnveways.
Response: The five foot (5') concrete Sidewalk and handIcap ramps have been mdIcated on
all plans. Handicap ramps are conSistent With ADA accessibilIty standards.
19 Comment: On all plans show the two handIcap accessible paths connectIng to the publIc
SIdewalk along Quantum Blvd., per Flonda Ac.cessibilIty Code
Response: The handIcap accessible paths have been mdIcated on all plans and are conSIstent
With ADA accessibIlIty standards.
20 Comment: At the west dnveway, replace the Through" arrow With a 'RIght Turn Only"
arrow and add a "RIght Turn Only" SIgn on the same post as the stop Sign,
Response: The above reVISIOns have been made on SP-1 and the Pavmg and DraInage Plans.
21 Comment: The dumpster enclosures shall be concrete block and stucco per LDR Chapter
9, SectIon 10 C
Response: The dumpster detail on SP-1 meets all requlfements of Chapter 9 , SectIOn 10 C
22 Comment: Inlet S-104 pIpe mvert should be 7 30 S W
Response: Inlet has been reVIsed to 7 30 S W
23 Comment: ProVIde approval from L WDD for work proposed WIthm the canal nght-of-ways.
Response: Cross-sectIons will be proVIded wlthm a week for L WDD InItIal reVIew ThIS
will be follow-up by submIttal of the appltcatIOn for the reqUIred permIt from L WDD
24 Comment: ProVIde venficatIOn from the L WDD and the CIty UtilIttes Dept. that the
locatton of the storm draInage outfall structure IS acceptable If storm water treatment is
proVIded on-SIte, why IS the outfall not to the L WDD canals adjacent to the SIte?
Mr Michael Rumpf
Quantum Lot3
June 1, 1999
Page 5
Response: Outfall to the L WDD canals IS prohibIted m the master permit for the Quantum
Park DR! Issued by the South Flonda Water Management DIstnct.
25 Comment: It appears that dramage structure S~204 should be set at elevation 9 00, please
venfy and reVise if necessary
Response: Structure revIsed to a 9 00 elevatiOn.
26 Comment: Add a certIficatiOn by the engmeer on the Pavmg and Dramage Plan that "the
dramage will conform Wlth all rules, regulatIons and codes of the City's Land Development
Regulations" (LDR Chapter 6, ArtIcle V, Section 5A)
Response: CertIficatIon has been added to the Pavmg and Dramage Plan.
27 Comment: On the sectIon B-B detaIl, change the word "parkmg" from the 13 5' dImensiOn
to aIsle
Response: The word parkmg' has been replaced Wlth 'aIsle'
28 Comment: Use FDOT Index 546 cntena for SIght tnangles and show them on the SIte &
Landscapmg plans With notes that there shall be clear, cross-vIsibilIty wlthm the SIght
trIangle between 30" and 6' from grade.
Response: FDOT Index 546 cntena is applicable for the mtersectiOn of two nghts-of-ways
and, therefore, does not apply to thIS project as thIS SItuatiOn IS one of a pnvate dnveway
meeting a right-of-way However, the aforementioned criterIa is depIcted on the site plan
for mformatiOnal purposes. A note regardmg the clear SIght tnangle has been added to SP-l
and PP-l
29 Comment: Show a 5' level area at the end of the handicap accessible path at the southeast
comer of buildmg "A" and a ramp up to SIdewalk on the SIte and Pavmg and Dramage
Plans. Also, show all proposed handIcap ramps on the PaVIng and Dramage plans.
Response: HandIcap ramps have been mdIcated on the SIte and Pavmg & Dramage plans
The 5' level area IS proVIded on the SIdewalk west of the ramp and on the 5' access aIsle east
of the ramp The handIcap ramps as drawn are conSIstent WIth ADA accessibility standards.
30 Comment: On the hghtmg plan add a note mdlcatmg that all light poles shaH meet or
exceed a 110 MPH Wind load. Also, SpeCIfy that the fixtures shall be controlled by a
photoelectnc SWItch. (LDR Chapter 23, ArtIcle ItA.)
Response: Notes as requested have been added to LP-l
31 Comment: ProVIde a 12' WIde stnpmg adjacent to the north SIde ofbuildmg "A" and the
south SIde of buIldmg "B" With lettenng mdICatmg "Loadmg Zone" (LDR Chapter 2,
Section 6 F 7.B )
Mr MIchael Rumpf
Quantum Lot3
June 1, 1999
Page 6
Response: Stnppmg and lettenng as requested have been added to SP-I and the Pavmg and
Dramage Plan.
32 Comment: ProvIde a topographIc survey for the sIte showmg all eXIstmg features (LDR
Chapter 4, SectIOn 7.A. and Chapter 23, ArtIcle I, Section 5.B 2 )
Response: Included m thIS resubmIttal package
33 Comment: ProvIde Type "D" curb along the west sIde of the drIveway at the west sIde of
the SIte (LDR Chapter 23 ArtIcle 11.E.)
Response: Type "D" curbmg has been specIfied on SP-I as requested.
BUILDL~G DIVISION
34 Comment: IdentIfy the fimsh floor elevatIOn wIthm the footpnnt of the buildmg that IS
illustrated on the floor plan draWing. Add to the SIte data, found on sheet SPI of2, the base
elevatIOn of the B flood zone If there IS no base flood elevatIOn, mdIcate that on the plan.
Add notes and specIficatIOns to the SIte data that prove the proposed fimsh floor elevatIOn
IS m complIance With the mmImum standards of the follOWing:
a) MmImum elevatIon reqUIred by the flood zone
b) MImmum elevation reqUIred by the SFWMD permIt for the project.
c) Show and SpeCIfy that the elevatIOn of the fimsh floor IS not less than 6" above the crown
of the abuttmg nght(s)-of-way
Response: FImshed floor elevatIon of 14 7' has been added to the floor plan drawmg. The
flood zone for thIS project IS A5 and requIres a base elevatIOn of 11 0 However, SFWMD
reqUIres a mmImum 14 5' floor elevatIon and 14 7' has been proVIded. The mmImum road
crown elevatIon reqUIred by SFWMD IS 12 0' All mformatIon IS mcluded m the tabular data
on the SIte plan.
35 Comment: SpeCIfy on the SIgn detail drawmg the approved colors for the monument SIgn.
Response: SIgn colors shall comply With the approved Quantum Park signage program. A
note has been added to SP-2 to mdIcate same
36 Comment: Add the word Tenant to the begmnmg of the wall sIgnage note found on sheet
A-I
Response: The word 'Tenant has been added to the sIgnage note on A-I
37 Comment: At tIme of permIt reVIew, the applicant shall submIt SIgned and sealed plans.
Response: All plans reqUIred to be SIgned and sealed when submItted for permIts shall be
so
Mr MIchael Rumpf
Quantum Lot3
June 1, 1999
Page 7
38 Comment: At tIme of permIt reVIew, the applIcant shall venfy that the square footage
proposed for the buildmg IS m complIance With the regulatIons of the bUIldmg code by
mdtcatmg on the SIte plan or floor plan draWing the occupancy classIficatIOn and type of
constructIOn proposed for the buildmg. The buildmg area, occupancy and type of
constructIOn shall comply wIth the specIficatIOns IdentIfied In the BUIldIng Code
Response: Square footage, occupancy claSSIficatIOn and type of constructIOn Will be
mcluded m the permIt draWings.
PARKS & RECREATION
No Comments to Address.
FORESTER/ENVIRONMENTALIST
39 Comment: There are no deSIrable trees on the SIte
Response: No response required.
PLANNING & ZONING
40 Comment: All plans shall be SIgned and sealed at buildmg permIt submIttal (Chapter 4,
SectIon 7)
Response: All plans submItted for buildIng permIts requued to be SIgned and sealed shall
be so
41 Comment: Amend the plans to proVIde a mInImum of 44" (3'-8") of Width for all SIdewalk
areas adjacent to accessible ramps. 1999 ADA reqUirements.
Response: EXIstIng dImenSIOn of 3 7' feet IS m deCImal format. ThIS equates m EnglIsh
measurement to 3'8" or 44" and IS conSIstent WIth 1999 ADA reqUirements.
42 Comment: On the SIte plan label the dashed hnes WithIn the buildmgs, permanent or
removable walls, etc
Response: Dashed hnes have been labeled as 'PotentIal Tenant Walls' Note added to plan
statmg 'Tenant wall to be permanent between tenant bays."
43 Comment: ProVIde the followmg mformatIon on the SIte plan.
a) Parkmg calculatIOns based on employees Ch. 2 Sec 7 Par H.2.
b) Loadmg reqUIrements (dImenSIOned on the plan) Ch. 2. Sec 11, Par J
c) PID open space requued and proposed Ch. 2 Sec 7 Par H13
d) VehIcular use landscape area Ch. 75, Art. II, Sec 5, Par G
Mr MIchael Rumpf
Quantum Lot3
June 1, 1999
Page 8
Response:
a) Parkmg calculatiOns based on 23,330 sq. ft. of office space at Ip.sj300 sq. ft and
23,330 sq. f1. of warehouse at 1 p.s.i800 sq ft. (Chapter 2, Section 11.H.20 &
11,H24 f5 )
b) Entire area between Buildmgs A and B noted as shared loadmg/unloadmg area and
dImensiOned_
c) Tabular Data mdIcates 20 0% pervIOUS open space area reqUired for Pill and 24 9%
provIded,
d) Tabular Data mdIcates 140 sq. ft. of vehIcular use landscape area reqUired and 9,555
sq. ft. of mtenor landscape area provIded.
44 Comment: ProvIde a parkmg detail whIch mcludes the correct dImenSIOns and data for
handIcapped parkmg and sIgnage CIty drawmg #B-90012
Response: Detail reVIsed per comment on SP2.
45 Comment: Along WIth the 20 scale landscape plans, proVide an overall landscape plan sheet
drawn at the same scale as the SIte plan. Ch. 4, Sec 7 Par C
Response: A landscape plan at 1 "=30' has been provJded to match the SIte plan scale,
46 Comment: The City of Boynton Beach Cornp Plan Polley 4 4 6 states that 50% of reqUired
trees and shrubs shall be native On the landscape plans proVIde tabular mformatIOn
calculatmg natIve requlfed and proposed plant counts.
Response: Native plant matenal tabular data has been proVIded on sheet PP-l Ninety-four
(94) native trees were reqUired and 148 proVIded (50% reqUired, 82 9% proVIded). One
thousand three hundred twenty three (1,3 23) natIve shrubs were reqUired and 1 755 proVIded
(50% reqUired, 66 3% proVided).
47 Comment: On the archItectural plans, show dImenSIOns on the buildmg 'B' elevatIOns. Ch.
4, See 7, Par D
Response: DimenSIOns for buildmg B' have been added to the archItectural elevations,
48 Comment: Plans must be reVIewed and approved by the Quantum Park ArchItectural
ReVIew Board pnor to final approval. Supply CIty WIth venficatlOn for thIS reVIew
Response: A venficatIon letter from the Quantum Park Architectural ReView Board shall
be proVIded pnor to CIty CouncIl heanng thIS project.
Mr Michael Rumpf
Quantum Lot3
June 1, 1999
Page 9
49 Comment: Landscape buffer must be consIstent WIth the pen meter landscape buffer plan
for Quantum Park.
Response: The landscape buffer IS consIstent WIth the penmeter reqUIrements. QuantitIes,
SIzes and spacmg of plant matenals for the penmeter landscape buffer shall meet or exceed
establIshed standards of the Quantum Park Plantmg Program.
I belIeve that all TRC comments have been addressed and respectfully request that thIS applIcatIOn
proceed forward to the June 22, 1999 P & D Meetmg.