Loading...
CORRESPONDENCE ,~ ~-: . " C;;". .-'" DEPARTMENT OF DEVELOPMENT . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment ..' fu(~ lDt-3 July 10, 2002 fILE COpy Bryan S. Greenberg Ruden, McClosky Smith Schuster & Russell, P.A. 200 East Broward Blvd. Fort Lauderdale, FL 33301 Re: BOCAR Properties - Permit Applications 00-2992 and 01-3431 Dear Mr Greenberg: After careful review, this department has determined that, in spite of the adoption of the new Florida Building Code on March 1, 2002, the above referenced building permits can, in fact, be extended under the provisions of the previous code. Accordingly, the department will immediately re-activate and extend these permits for a period of 180 days. The department has also taken steps to cancel the scheduled meeting of the Building Board of Adjustments and Appeals that was called to appeal the initial staff decision to cancel these permits. The required $100 fee for this meeting will also be refunded. We trust that these departmental actions will adequately address the immediate concerns of both you and your client in this matter Sincerely, Quintus Greene Development Director Xc: James A. Cherof, City Attorney Robert H. Burrow, BOCAR Properties Don Johnson, Building Official Timothy Large, Building Code Administrator Lusia Galav, Principal Planner S:\DevelopmentlAdministration\Correspondence\Bocar properties - Permit Apps 00-2992,01-3431 - 7-1Q-02.doc City of Boynton Beach. 100 East Boynton Beach Blvd., PO. Box 310 . Boynton Beach, Florida 33425-0310 Phone: (561) 742-6350 . www.boynton-beach.org Summary Notes from meetmg WIth Robert H. Burrow Bocar PropertIes, Inc Tuesday, May 21,2002 Conference Room C - IPM Those present: Mr Robert H. Burrow, Qumtus Greene, Timothy Large, LusIa Galav, Betty Fullerton ThIS meetmg was held to address concerns of Mr Burrow on hIS property, Lot 3 m Quantum Park - PermIts #00-2992 & #01-3431 Mr Burrow expressed concern about bemg able to secure financmg for an office/ mdustnal project on hIS sIte, m lIght of the Issue mvolvmg the land use desIgnatIOn on hIS property He wanted to know what hIS optIOns are as of today Mr Greene and Ms Galav explamed to hIm that the land use changes m hIS lot from Office/Industnal to Industnal means that: 1 Another NOPC IS reqUIred to change hIS land use back to 01 m order to go forward with his plans. 2. The status of Mr Burrows approved sIte plan has techmcally expIred. 3 Current perrmts now must meet all new code standards m order to be m complIance WIth new 2001 Flonda BUIldmg Code changes. Therefore, the current buIldmg permIts and SIte plan are now null and void. If Mr Burrow WIshes to obtam a new NOPC It would be up to MFf (Quantum Park Developers) to take the ImtIatIve to request that the land use be amended WhICh may take between three and four months. He would be able to do thIS concurrently whIle resubmIttmg his site plans. Mr Burrow was mformed that the Development Department could only aSSIst hIm at thIS pomt If the NOPC and SIte plans are approved. However, smce Mr Burrow has been granted numerous extenSIOns, we are unable to grant hIm addItIonal ones and stIll comply WIth CIty ordmances and State codes. If Mr Burrow can comply by obtammg a new NOPC and submIttmg a new SIte plan Development wIll work WIth hIm to get the SIte plan approved. Bf Xc LUSIa Galav Timothy Large DEPARTMENT OF DEVELOPMENT . Bul/dlng . Planning & Zoning . Occupational Licenses . Community Redevelopment MAY " " iUU~ May 22, 2002 Robert H Burrow Bocar Properties, Inc 3 Waterview Dr Ocean Ridge FL 33435 Re Quantum Corporate Park Lot 3 Permit Numbers 00-2992 and 01-3431 Dear Mr B(Jrrow' I am sorry to inform you that I can no longer grant you an extension on the above referenced permits On March 1, 2002 the entire State of Florida adopted the 2001 Florida Building Code I can no longer extend applications under the old code, as the new code demands more stringent requirements for wind load and extensive changes in the technical codes (plumbing, mechanical, electrical and building) If you decide to go forward with your project, you must submit new permit applications and plans that comply with all the requirements of the 2001 Florida Building Code Timo K. Large Building Code Administrator tkl bf cc; Quintus Greene, Development Director Lusia Galav, P&Z Principal Planner City of Boynton Beach. 100 East Boynton Beach Blvd., PO. Box 310 . Boynton Beach, Florida 33425-0310 Phone: (561) 742-6350 . www.ci.boynton-beach.fl.us ----r -.... u GORl CHEROF, DOODY & EZROL, A "TTO"N~VS ..T L..'" SUIT! 200 3099 J;AST CONM~P.C'Al. OOUl.8VAP.D FORT LAUDERDALE FLORIDA 33308 MAY 9 t002 C' SAMUiiL S GOReN JAMES A_ CHEROF DONAl.D J DOODY KeRRY L eZROL MICHAEl.. D CIRULl.O JR. TeLePHON. (954) 77'.4500 FACSIMILE (i54) 771.411Z3 JULie F KLAMR LINDSEY A PAYNE NANCY R_ KRAMER DAVID N TOl..CeS STeVEN L JOSIAS O. COU"SH May 9, 2002 Robert H, Burrow~ PreSident Bocar Properties, Inc. 3 Waterview Dnve Ocea.YJ RIdge, FL 33435 Re' Quantum Park Lot 3 Dear Mr Burrow. Your May 7, 2002 letter to LUCIa Galav has been forwarded to me for review I appreciate the concerns raised by your letter regarding the change of designation for your property As noted in Ms. Galav's letter, the change of use deSIgnation was of a NOPC ImtIated by Douglas MacDonald and processed b The City m accordance With the apparent authority represented by Mr MacDonald. It IS now apparent that Mr MacDonald was not actmg Wlth your authonty The City we will work with you and Mr MacDonald to restore the appropnate land use deSIgnatIon to the property I will forward tlus letter and a copy of LUCia Galav's May 2, 2002 letter and your May 7, 2002 letter to the appltcanfs Attorney, Da\id Noms with a request that his client mitiate correctIve actIon to resolve your concerns. JAC!lrnf H:\l 990\900 I 82BB\LETTER\Burmw Ill" re Quantum desigJlation_doc cc: Kurt Bressner, City Manager Lucia Galav, PnnCIpal Planne~ DaVid Noms, Esq BOCAR PROPERTIES INC. 3 WATERVIEW DRIVE OCEAN RIDGE, FLORIDA II!) tJt ~~- '-'"- lDEPAR1MENT Cf- lJE- [, May 7,2002 City of Boynton Beach Department of Development Planning and Zoning Division 100 East Boynton Beach Blvd Boynton Beach, Florida 33425-0310 Attn Lusia Galav, AICP Subject Qunatum Park Lot 3 Lusia Galav, In response to your letter dated May 2, 2002 I closed on lot 3 in July of 1999 after I had obtained site plan approval for the 46,600 sq ft. office warehouse project that you referenced in your letter That plan indicates a 50% warehouse and 50% office approval even though I was providing parking to allow even a greater office percentage I did not provide written permission to have the land use on my property to be changed I am being told by the building department that I will be charged impact fees for 100% office I do not believe Boynton Beach should have allowed the land use on my property to be changed Why would the city of Boynton Beach allow the land use to be changed to industrial which allows 20% office when I had a site plan approved with 50% office This mistake is reducing the value of my property I would like the land use on my property changed back to office-warehouse, as it was when you approved my site plan and I purchased my property This problem will prevent my obtaining financing or selling my property I would appreciate this being resolved immediately so legal fees can be spared Sincerely, Bocar Properties Inc (~ Robert H Burrow President CC Jim Cherof, City Attorney 3099 E Commericial Blvd Fort Lauderdale, FI 33308 Quintus Green, Development Director ~.:\Y 0,,- --- ' Ill.- .- 0--- -- 1: J- . ~-. . - (; 1'O~ DEPARTMENT OF DEVELOPMENT PLANNING AND ZONING DIVISION . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment May 2, 2002 f" r COP't Mr Robert Burrow Bocar PropertIes 3 WatervIew Dnve Ocean RIdge, FL 33435 RE Quantum Park Lot 3 Dear Mr Burrow' TIus letter IS a response to your request for clanficatIon of the CIrcumstances regardmg the above referenced property receivmg an Industnal (I) desIgnatIOn on the Quantum Park Master Plan. Pursuant to SubsectIOn 38006 (19) Flonda Statutes, all changes to an approved Development of RegIOnal Impact (DR!) reqUIre a Notice of Proposed Change (NOPe) be submItted to the governmg ]UflsdIctIOn and to the Flonda Department of Commumty AffaIrs. Quantum Park IS an approved DR! and must follow thIS procedure. On July 6, 1999, the CIty of Boynton Beach Issued a development order for a 46,660 square foot office/ warehouse buildmg to be constructed on Quantum Park Lot 3 At that tIme you were the applIcant for the SIte plan approval and Quantum Lumted Partners, Inc was the owner of record. Quantum LImIted Partners, Inc IS the developer of record for Quantum Park. On January 11, 2000, Mr Douglas MacDonald, PreSIdent of MFT Development, Inc., the Quantum LImIted Partners, L.C General Partner submItted a NOPC ApplIcatIon for Amendment #10 to the Quantum Park DR!. Amendment #10 mcluded several changes to the master plan mcludmg the reaSSIgnment of Lot 3 from Office/Industnal (01) to Industnal (I) The request mdIcated thIS change was bemg made "to be conSIstent WIth the approved SIte plans for warehouse, storage and dIstributIOn" The CIty CommIssIon approved Amendment #10 on March 7, 2000 per Ordmance No 00-02 A notIce ofpubhc heanng was publIshed m the February 26, 2000 edItIOn of the Palm Beach Post pursuant to Chapter 380 06, Flonda Statutes. The current deSIgnatIOn for Lot 3 on the Quantum Park Mater Plan IS Industnal (I) A change to that deSIgnatIon will reqUIre a NOPC as described above If you have any addItIonal questIons please call me at (561) 742-6260 Smcerely, du",~ J:!d4V LUSIa Galav, AICP PnncIpal Planner Cc Jim Cherof, CIty Attorney Qumtus Greene, Development DIrector City of Boynton Beach. 100 East Boynton Beach Blvd., P.O Box 310 . Boynton Beach, Florida 33425~310 Phone: (561) 742-6350 . www.ci.boynton-beach.or I ~- . Inston .Jee SSOclates, Inc. ,tit ~_ ~t) I "',,\.- ~. ~J>' 1 tlld l apl' .\r -lllkclurc I .1I]c1l'la]]lllll~ 1-" 1 \ ( 1(, LETTER OF TRANSMITTAL VIA Hand Delivery DATE June 9,1999 ATTENTION Michael Rumpf JOB NO 9801009 JOB NAME Quantum Park Lot 3 I I FROM Joni Brinkman We are sending you the following items via Hand Delivery No. of Copies Description 1 Set of legal reductions for the site plan and elevations on the above referenced project, as requested Please fax our office a copy of the final staff report for the June 22, 1999, Planmng & Development Board meeting as soon as It is available Remarks. 0 For Approval For Review and 0 Reply ASAP Comment o Please Comment As Requested 0 For Signature X For your record 0 Distribution Copy To' Bob Burrow Signed t.}-r.J.. ~ufJ~b10 ji" vUf~ - q j I53:! Old OkeeJhobee Road. SUIte 106 \\ est Palm Beach. FL 33409 5270 5h 1-689-4670 Fax 561-689-5"59 ~ 8 tl ~ :; ~41i Iii l I Y II ~ I ;it e t ii: ~'H 11 ';1 tr; U lQ <l)1L-' () :<! -:I~t- <l"'ffi -'-:lg *"&.:fj a",~ ~ ~ J !la l=~ ~~. 1"l:i1~ I !~~ II I J " x j ,I;;" 0" I i ifr: :!nU l!~~gU !l~~iUli 5 E 1. ~, J: ill - ~ Ii: J 1- .~l j vii III !l; I I I I I I I I I I I I I I I I Q Q =.l I -J lL o I '3 I I ~ Ill) I I ~ 11) ~ I I ~ I i I I" I I ( -<l Z -<l U N -J b- UE?ld S'l!9 e?P! .J01::l Y::;le?~g UOlUfi09 ~ 'lOl ,,>!..lE? d wn+UE?n~ I-~ ~o~ i ~ ! ? & ) g c " ~ I ~. :~~.D"I i~:l! l'!~d ~ i ~ 2' H -~ Ii =~ 2u a !'Q .. uf" ;;;:;1 ~:'" l;l'i -2 .. ~"~ ::~... .!~ <>~. io' IU1 ~;~ ~o~ .;; W l- I) Z -\- QQQ '" ""'\ ~ 1< ~ ifl :'92' J:&i 2~" ..:;~ ih -H ~_ll hI!' ~ci ~~J 5U2' -lw u__ 6.~ _>u ;;~u >i1- ~.. l'h I-l~ , . i . , I I , , J . I i , I , , i . , i I . I I I I I I I I ! , I i I ! i . I ! i I I I . , . I . ! I . , I i . i . j ! . I I I I . I j I I . , . ! . . . , I ~ . ! I l , . I J . I , , . I E . . I i . . i ! , I I t I a ~~~ ... ;--::;. ~ I I' ~ i I ..;; ~~~~:~H II ~ ~J!l!: 11\ ~ ~ 11\ ~ ": ~ 5~=ii ';'; i\~"'; E U I ! ~~~ . 2 ~L . . O".J " .... '"' liP ~ 3 \} .. U ~ '<l Q ~~ U~ ~:!l:t(;) I z Qii'E~ ~r- ..I) Q LQO"" ..,.~:!: ~ ~ ~ ;;; ~ 'Q >'! . . ; I. Hl! ~,.. ~~ - ! ~ !~ ;b =E ~g >-,1) ~i U It~ .!! u c .81 2B it '" -"- ~ .0 " ~ t tJ.- tJ 0"\1. <f) .t d) II: ~ <l . =lP: ~i i J~i~ t .... . . '0...... c I ~ g ~i ; ~ il tl;~ ~ I"," ~~~ I ~-~ ~~~Q ~ - HIl ~i~ :2"ti~ ~.U ~ .:: ~ I.ll~ ~ f i" n ~ 11:: :: ~lL II: 3 .ll!' ~L > ~ i ~. J ]ii ~~i!~!!!HH ~~H .. . ~ ~ , ~ II l!'~ j 'II - .! I .... ~ Q::) 'UN.-nIQ ~ l!'~~ ~ ~~~~~ d)W...JD...d) ~~ "\I II ~ ll!' ~~h d: "' 5 t. "-h ~~ i "' ! ~ i 0... Jii....Cl.. 1'1N'1:J ~-3 a-a-m"1 I r I I , I / H 1/ j! I' I{ tr; U lQ w lL 5i ~t- iil : ,,~ ~ {)lLUa -' <l~ ~>I III ~ !l; I !; , j 't II := II, III' ~ ~ II .0 f 'I (ir.<( I. J~\l i! I ~~2 11 }l~<I I' D'.:r....l '! I ~~" Ii ~ ~~~ if () t-lIlz II z <I.rr d " r-9 ~ ::t~<;( 21f) :~g ~:: ~~'l't';&,:'l ~.q~~..m ~a~~~~ 2~<{~~~ ~~~~~~ :r:i6!i2:O ~~fij~ - - lL I) ~ 8 ~ W I- ~ :r-l;: i ~l: ii~ ~ ~~ :zL:::t on ...tl I~! : !~ ~~;/" t~ 'O"L t- '. i ~~:j >o~ "~ i ez I ~,I~\1 ~ 2~ o "If i r-. UI- ~ Cl 'J E :Il~ ~ "" I\' 'I{ ~~ ij o~i' i ~~ ! '~~~;r;!t~ "~~ ~~ gO - <(tlll<( .~ ~t-.( " ~!l;~ ~, !!i ..J- 1..'118. Q~ ...I_"~ . { ~~ aI;lN;::> 9Nl.0d0H9 <;>N11QX; ~i 9a1;l\";Hl lI^Ol-l " r<:)NJ"',,,,,,, l,...~'---.../ ! It> " ... .. ~'\ ~< . t \ \ 3 1I ! &: ~:f'2 1. ~ "'.0' 1 of 1-= &a~ 11 ~~ \d ~lii~l \ -'h ..s-~!~ l!lli!sS 9He1-9Cl - veld 91-\9 ep\;O\:i \..r~e~g uo,\uRo9 <(; ,+0"1 ")\..I\? d U.H""tU\?00 \- \~~ ! ~ e ~..i s s 5.' :;r: .1 >>oj) ~ l~.;;~~ i riiU \~; . it ~ ~ II \\ ~ " " '" \ \ i \ . \ . I t I t i . \ , . ~ \ ; . . ~ I , ~ s I ~n. " ""1 i~ ~t n \ i- i\ ail. "' d) @loS<:: l~ ~,_.i - d i ~! ... .!~ ~~<> ti ~ %--~ ~; <( \ ;;.'4E -~< :.-a b! t",t l~ I- 1i . ; \ Ul , ;. i . \ ~ \ ~ . \ i! % 0 't , Ii l 5~ ~ Ul i 'E;~ 4'i' l- i ~~ >' < d) ..~ 4." \L \ u ~ ...' s.z ~ o..~ 1: . ,,- ~ 6 \ ~g OIl'.!! '.!! ,;r ...'" \ $- ~ \ ,.;; , . \ \ . \ I Z . \ <( l J \ J II- 4- . I- J . J . Ul <( \ 0 I- 9 on . Ul ~ I:l ! J l' Z \ () II . \L ~ \ l- lL 53 ~~ ~ ...{l ,,:J :p "f ~~ ... \J ! ~ rAL~ - "-Ul .~~ ~'" 4. 0 ~t: ,,11 ~~ ll-d) - - - - ~ t:.:1\ \ ~ @ i "'\ \ I \ 1 ~~ \ .. ~ .~ ;;; ~s ! \ 5 ',;~.J \ 1"\i,i "~ "\ \ ~~ ~.>t :{ll \.!~ ~15 \ ll-<( \ >0.. t::1I- ()~ OIl I tUa \ \ ~() I d) ~~ I d \ .cO \ . 1 .. " t <{ ....u t \ "';s ;..~ I- -5e '" Ul \ ~ ~ ~ "" I :z\ 0 .- ::> 4> ~ ~ ~ i~ 3.... d ~\ c :ywd \ J t~ ~9 <{ J ~ IVJ <( ,a2 l 4~ - \ \<~ - J i! I- t~ .;.:~--:..s:.{ ~\ ~\ d) 110 Z {l. ~\ ~. ... \_ 1 "Z't _ "II \ '\ ' "ijI g;~f d)t \ ,; ,i <f~ )/.~ t() Ul ~- \1 "'\ '.l~ OC '- ~~ t:~ \ U ll-<( <l~ " f '- tz;:. - - - ~--\ t::1I- "c " ~ d)'.ll o..'.ll ~~- ~ ,of <:' .'?t-~ - -\ "'!Is -~------------------- p \?!().E~\iC7I~::\;9~.JP3-9~:E\GF3-5P: [Ill:; ~~ 29 09. 5: 9lj~ JGP > " ~ . I ~ ~ I ~ ~ ~ ~ . ~ . ~ ~ < 8 ~ ~ ~ ~ ~ ~~ r '_ m .~ -t 2 N~~~r ~ ~ ~ r Z ~ ~ p ~ ~ " ~~ ~~ .0 . ~~ "~ ;0 ~. ;;~ ^^ ~~ ~n c~ ~ . "n, . ~~i . ':1 I ':::-! .'."" : .. " I q m-n rr mO <0 1:>~ :::!lJ Or Z1:> <Pz , U1... r o (;\ 1:> i I ! ES";.i....~ : , I , , , I L_LL-,-_~ c;l _~;.::~-'J" -+ "'a" TOO Of ~OOF; l;l ,.:< ~ ~ g ~~~ sheet title: FLOCR PLA\l &: :...EV.A."'lCN5 file name: QP.3-Al.JWG project no: 99018 revisions: date: 4/26/99 -51..6."" drawn by: R ~ checked by" JG " ~~~ ::;8- ~~i ~~~ ~r - ~ ~ ~ EEl m.-.'. W B3 ttl , , I :;:; ~ ~ i Z ~ ~ ~ ~ ! !il!il , - N J:--I ~~~ ~~~ ~~~ ~ . " ~Ppg .\d~ ~':;~1:' ~ r~ r:; ~ -r- 'I !\! _ ("\ ~ " . r i~ ~- ~ . ~ l!1 ;= \J ~ l> ," i , , nl T'\ ~~ j r ~ l!1 ;= \J ~ l> I~ I I~ ii' I , ' I If ----I- i I, ( t '1-0- !~.~; l~ . , c '~ III ~ ~ ~ I ! Ii II r !ll :1' i~ I II I~ ,,, 'I' I, ~ I -----r---~ H <-< i c} ! ! -~--C ----.....-..----- , '. --~ t ~~ ~ 1--------~ j(:i ,,' ------- o JI 1 \ I tr ~: :: .. -- ~- ~ ;, ! " ,I ,i t; · ~I - - -- -- - f;, ; ; i i -----<; I=}, ,'.J ___ i I I 12'-4" I' : i ~! i~ ~T '~ , !--.' j (I : ;! I', I~ \J ~~\ j ~ .. L/ n \.,',f1,: ", I !' ~ ~;~ .".,....<-- --<0.. ~ -0- !/l' ~q ~<. ~ $ ~ 1; ~- ~: ~. EiJ $ SJ cp ~ ~ ~ ~\ ~ ~ ~ cp m " Si~ to ~~ i ~ PROPOSED SITE PLAN FOR: WEST QUANTUM PLAZA QUANTUM PARK BOYNTON BEACH, FLORIDA @ Oliver. Glidden & Partners Architects & Planners, Inc.Y'.. /0-/./ ./< 1401 Forum Way, Suite 100 .i:4~ ' West Palm Beach, Florida 3~" (561l684-6841fax(5611684-0890 -./ p P:lJ:_(:~\AC::;E"E'_rp3 ;":;(h:jt:]-SPl N ! P ~ ~ "~ ~ ~ ~ ~ ~~~~ ~ OIl ~ 'f _ ~~ .~ ~! ~~ ~~ ~ ~ ~ ~ -< ~ i 1!i 11 ~ ~ :~ ~ Igl . I~ I q F==. ,~.: p=-= I :. ;_~~! m"TI rr mO <0 1> ill :::!1) 2r (1)1> z OJ... r G GI OJ CIJ 1la1?eC9 ~?S .-G1' ~ 11:"4 . i 16'-r ... 7OP0<"!iOO> i~~~ ~ ~ ~ ~ ::! ~ ::! .., ~~~~ ~i3~? g..B ~~~':: sheet tiUe: FLOOR PLA.N do:: ,,'.A. .eNS file name: QP3 A2,DWG project no: 99018 revisions: date: 4 26;93 526 '11 drawn by: ~_ checked by: ~\.> ~ ~ ~r m blii '< l> -< 2 ::~ -:- ~~~ .,.~I:i~~ ! ~~~ " 1 ~ T ;; " " ~g'i "->> ::;;!:- Q,;!g~ ;~~~ ~~~~ z z ~ ~ ~ ~ ~ ~~'l::'l H3 Ell EEl -- -- ~"1 ! i "", . " 0 0 ;<2:><Q ~!il~~ ... ::!=~ ~U = 0 ~~ 8~13~ .gg. "'''1:~ ; ~ ~ ~ ~ z ;z: :z ~i~i z z z ~ ~ ~ ~Q~S 'i.., /~ ,. i' ~ .' '~ ~ jl! ~ ~ ;J! ~ ~ r= tJ ~ III !~ , j- !~ " ~~~ , -{J ;'. ~-----;--- rnt H " ~---------------~- ~q, i ?--~---{= ------+ ~ - - - ; f" ~----~-- ~ ~ ?---~ , , !~ r ~..L~~ 11 : ;.--~ --{= i~ " PROPOSED SITE PLAN FOR: WEST QUANTUM PLAZA QUANTUM PARK BOYNTON BEACH, FLORIDA ~i'~ ~! " ! .~ JII~i - q ......'11 ~a ., ;J! ~ Il1 r= tJ ~ III ~ ;, Lr~' ID : 0= 1 ~. ill 5~ .~~ '" ;i If !~ I , ~ ~ ~~- ~c. ill. ~ $ !I' "i ~ $ ~I ~7- l ~e I " "11 I!lj "II ,I J 1 ~i il H II !, !I ] ~ (11 .1.1'1 ~ .. ~~- ~C , '::; f i ~ :iJ ~ ill c I II 1 ! ,....I~'" t ~ , ., l I I ; ~j '<Ii ,'I '11 I I I ~I 1111 ::11 ~~-t,~ Ef ~o Ii r'li o 11 Cf Cf ill & " ~. ! ~ ~q ;>j @ Oliver. Glidden & Partners Architects & Planners, Inc. / 1401 Forum Way, Suile 100 . ~L-I /'_____ West Palm Beach. Ronda 334o,iffq:l' (561)684-6841 fax (561)684-6890 . / _ 07,02/1999 13.55 1-551-68? 59 wINSTON LEE u,,~"., rA~ I' ,. r'~ .~1~, j~'~ .,r Dev~l~nt Inc ~.~ ,t"*~~~ ~ PAGE 02 ilJlt~IIO~ Architectural Review Committee Quantum 'ark'roperty 0WMn" Association. 1tIe. 1401 Forvm Woy, luile 101 West,aIm 'each~ fL ~1 July 2~ 1999 Mr lloba1 K BwTow lWberts Company lno NW )2, SUleet l'omplUllO Beach. PL :J)064 llB; Lot 3, lUvit'wofPlIIJI Dear Mr 8wrow' The Atchl1mura1 Review Committee met OJ:L Friday. Jww., 1999 ad reviewed tJa. building elevation. .ite plaD and 1~'P8 pt.", fur Lot). Consider tl1iJ Jetter sa OO1lf'innation that the Boan! has approved .aid piau. If you Jhould baveo, quedions, please do DOt hail* tD ~ our office_ Heather Rintoul At~ &eview Committee ~fQN~e-pa..7'" . O~/02/1999 13 56 1-561-68' '559 wrNSTO~~ LEE PAGE 131 I }':inston X~~ociates, Inc.. Landscape Archltec\:ure Lend PllUL1'liroi f.iH... IIlLCCI16 I FAX COVER SHEET DATE. July 2,1999 TO. Michael Rumpf cc: Robert Burrow ~ ---I FROM: Joni Brinkman RE. Quantum Park - Lot , Our File No. 98010.09 No. of Pages (including cover): 2 Attached please find and approval/stier issued by the Architectural Review CommittBe for Quantum Park. This fetter complies with Comment No. 12 of the staff report, Original: Mailed Ovemiahted X Held in File Bv Hsnd This fac8imlte contains privileged .00 eonfidc;ntial ROO1lation int~ only for the use Qf.the Addresee9 n&med above. If you are not the intended recipient of this facsimile, or the emplo~e or agent responsible for delivering it to the Intended reCipient, you are hereby notlfied that any dissemination or copying of thisfacsimHe IS strictly prohibited. Jfyou have received this facsimile in error, PMse immediately notify U~ by telephone and return the original facsimIle to us st the address below via the U S. Postel Service. Thank you. 1532 Old Okeechobee Road, SUl1e 106, West Palm Beach, FL 33409-5170 561-689-46'70 . Fax 561-689-5559 t/ ,1 ~ ~ '" v - vl2,.-A-f-r 2ND REVIEW COMMENTS Project name. Quantum Park - Lot 3 FIle number NWSP 99-008 Reference 2nd Review. New SIte Plan. FIle # NWSP 99-008 DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments 1 Waste removal In connectIOn wIth constructIon process must be servIced by City of Boynton Beach. Please note on dumpster detail to Indicate same UTILITIES - General Comments 2 All utilities easements shall be shown on the rectIfied landscapIng drawIngs so that we may deterrmne whIch trees may interfere wIth utIlitIes. In general, palm trees will be the only tree speCIes allowed withIn utIlity easements. Canopy trees may be planted outSide of the easement so that roots and branches will not impact those utilities withIn the easement In the foreseeable future LDR Sec 7.5-18 I gives public utIlitIes the authonty to remove any trees that Interfere with utIlIty serVices, either In utIlity easements or public nghts-of-way FIRE Comments. 3 A fire flow test of SIte is reqmred, LDR 6-16 POLICE Comments. None ENGINEERING DIVISION 4 PrOVIde approval from LWDD for work proposed WIthIn the canal nght- of-ways. BUILDING DIVISION 5 Show and specify on the Site plan that the elevatIOn of the fimsh floor is SIX inches or more above the crown of the abutting nght-of-way WIthIn the Site Data identIfy the actual elevatIOn of the crown of the road at the front not the proposed mInImUm crown of road requested by the South Flonda Water Management Distnct (SFWMD) permit. 6 SpecIfy on the SIgn detaIl draWIng the approved colors for the monument Sign. 7 At time of permit reVIew, the applicant shall venfy that the square footage proposed for the bmldIng is In compliance With the regulatIOns of the buildIng code by IndiCatIng on the SIte plan or floor plan draWIng Page 2 Quantum Park - Lot 3 File No NWSP 99-008 ~ -.. (l4v\ DEPARTMENTS INCLUDE REJECT the occupancy classificatiOn and type of construction proposed for the bUlldmg. The bUlldmg area, occupancy and type of constructIOn proposed for the building. The bUlldmg area, occupancy and type of constructiOn shall comply With the specificahons idenhfied m the Buildmg Code Comphance With the bUlldmg codes will be evaluated at hme of permit reView The permit fee, water and sewer facihty fees, county fees and state fees will be determmed at time of permit reView PARKS AND RECREA nON Comments None FORESTER/ENVIRONMENT ALIST Comments PLANNING AND ZONING Comments 8 All plans shall be signed and sealed at bUildmg permit submittal. Ch.4 Sec 7 9 ProvIde the follow mformatiOn on the Site plan. c-d.., n ( . DimenSiOn leamng areas Ch.2 Sec 11 Par.J . PID open space reqUired:!l~ til1<lr~J~l!. Ch.2 Sec 7 Par.H 13 e-'"' ~ Landscape buffer must be consIstent WIth the penmeter landscape buffer plan for Quantum Park. 11 Sidewalk added along row IS not reqUired by Quantum park master plan. 1\\ c, , r At /.L J.. (. ~ ( '-' \ -'t l C S. c 1 ~ r7 C'~~ -, r I."IJ... ., s:\projecls\cond of appr\ f k..Y\.5 b'-V)'-S -(- (,c_ ......a:\J I'<'".._~L d"'d ,r" -L D J i I I I { 'K.cu.e, ~ 7Scc--~,=C , ' " r-,T "'-t' ~ \"'-'v\..- r C(f- ~ /tr '- ,-,\, -t- r - T>-<~- ~ ~f-. V1 -(e C J \" (-ri c:- v-..... C ""'- -f- '\ \"'-<._ -ft 0\..... <) { Ii e '-' C'I.. J C'- ~'- .S-:'- C off \-~ It. ( rJ~ c ~f I" It'''h_ -fl"-'^- C Co ~"t;r -r;",~ rt --; c V1 n: <"" ~ (? 4' (J (' C--.... .\c-c- ~,-* pt0j ~'-+ ~~-1- s ~-, ,;r ~"",,- ~"-~ S L r. r. - (,;L~~-..,. J , "--+ p""--(...... r'i. 15--- ['- {>? ""'''"v-. * <:. ( -f f'VI..'-' -( &.C: r- ' ~ ~ C':"-c. ""'\.. v<"...J Facsimile TRANSMITTAL CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BOULEVARD PO BOX 310 BOYNTON BEACH, FLORI DA 33425-0310 FAX. (561) 742-6259 PLANNING AND ZONING DIVISION to: fax #. date: from. re: JOANIE 689-~ S'SS q 5/18/99 PLANNING AND ZONING DIVISION 1 ST REVIEW COMMENTS FOR QUANTUM PARK LOT 3 pages: 6 Including cover sheet. Planning and Zoning Division City of Boynton Beach Boynton Beach, Florida 33425 742-6260 Fax: 742-6259 1 REVIEW COMMENTS PrOject name' Quantum Park - Lot 3 File number NWSP 99-008 Reference' 1st RevIew. New SIte Plan. FIle # NWSP 99-008 wIth an Mav 4. 1999 Plannmg and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments. 1 Waste removal m connectIOn with construction process must be serviced by CIty of Boynton Beach. Please note on dumpster detail to mdlcate same UTILITIES - General Comments 2 All utilitIes easements shall be shown on the rectified landscaping drawings so that we may determine whIch trees may mterfere wIth utIlIties. In general, palm trees will be the only tree speCIes allowed wlthm utIlity easements. Canopy trees may be planted outside of the easement so that roots and branches will not Impact those utilIties wlthm the easement m the foreseeable future LDR Sec. 7.5-18 I gIves public utIlitIes the authority to remove any trees that mterfere WIth utility servIces, either m utIlity easements or publIc rights-of-way 3 Dept. of HRS permits will be required for the water system serving this project. (Sec. 26-12) 4 FIre flow calculations wIll be reqUIred demonstrating the CIty Code requirement of 1500 g.p.m as stated in LDR chap 6, Art. IV, Sec. 16, or the requirement Imposed by msurance underwriters, whichever IS greater (see Sec 26-16(a)) Please submIt these calculations WIth your HRS permIt submIttal. 5 Sec 26-34(E) of the City Code requires that a capaCIty reservatIon fee be paId for this project eIther upon my request for signature on the Health Dept. applicatIOn forms or wlthm 30 days of SIte plan approval, whIchever occurs first. ThIS fee wIll be determined based upon final meter SIzes, or expected demand. 6 Comp Plan policy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore, be used for lITIgatIon where other sources are readily avaIlable. 7 This office will not reqUIre surety for mstallation of the water and sewer utilIties, on conditIOn that the systems be fully completed, and given to the City before the first permanent meter IS set. Note that setting of a permanent water meter IS a prereqUISIte to obtaining the certIficate of occupancy 8 Water meter SIzes are smaller than normally mstalled for a building of the size specified. Please prOVIde engmeering calculatIOns, or an Page 2 Quantum Park - Lot 3 File No NWSP 99-008 I DEPARTMENTS INCLUDE REJECT explanatIOn Justifymg the meter SIze. 9 A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer Improvements required to serve the project. (Sec 26-15) 10 The waste stream from any potential manufacturmg process must meet the City's pretreatment reqUlrements. A samphng point must be provided to allow momtoring of this waste stream. (Sec. 26-143, 26-147) If a samphng pomt will not be provided, please provide a written statement that the faclhty wIll never house any manufacturing process. 11 Water mams appear to be closer than 10-feet from a building m some locations. Please note that thIS Department's minimum allowable distance for water mams from bUlldmgs IS 10 feet, whIch appears readily achIevable for thIS SIte plan. FIRE Comments. 12 A fire flow test of SIte IS reqUlred, LDR 6-16 13 The locatIOn of the Fire Department connection and the turning radius into the loadmg area are not shown on the plan. 14 All roadways and fire hydrants must be m place pnor to the start of constructIOn. POLICE Comments. None ENGINEERING DIVISION 15 Add the following note to the Site Plan sheet: All plans submItted for speCIfic permIts shall meet the CIty'S code requirements at time of application mcludmg all other reqUlred agency permIts. 16 Add the followmg note to the Pavmg and Dramage Plan. All signage, stripmg and markmgs shall conform to the CIty'S standard drawmg B- 98001 ReVIse plans if applicable 17 Add the following note to the Paving and Drainage Plan. The drainage detalls shall conform with the City Utihties Dept. standards. Revise plans if applicable. 18 Show a 5' concrete sidewalk along Quantum Blvd. and through the Page 3 Quantum Park - Lot 3 FIle No NWSP 99-008 DEP AR TMENTS INCLUDE REJECT driveways on the Site and Pavmg Plans. [LDR Chapter 6, Article III, Section 11] Sidewalk shall be 6" thick through the dnveways. [LDR Chapter 23, Article II, SectIOn P] Also provide handicap ramps per FDOT standards at the two dnveways. 19 On all plans show the two handicap accessible paths connecting to the publIc sidewalk along Quantum Blvd. per Flonda AccessibilIty Code 20 At the west dnveway, replace the "Through" arrow With a "Right Turn Only" arrow and add a "Right Turn Only" sign on the same post as the stop sign. 21 The dumpster enclosures shall be concrete block and stucco per LDR Chapter 9, SectIOn 10 C 22. Inlet S-l 04 pipe mvert should be 7.3 0 S W 23 Provide approval from L WDD for work proposed wlthm the canal nght- of-ways. 24 Provide venficatlOn from the L WDD and the City UtilIties Dept. that the locatIOn ofthe storm dramage outfall structure IS acceptable. If stormwater treatment IS prOVided on-site why is the outfall not to the LWDD canals adjacent to the site? 25 It appears that drainage structure S-204 should be set at elevation 900, please venfy and revise If necessary 26 Add a certification by the engmeer on the Paving and Dramage Plan that "the drainage wIll conform With all rules, regulatIOns and codes of the City's Land Development RegulatIOns" [LDR Chapter 6, Article V, SectIOn SA] 27 On the sectIOn B-B detail, change the word "parkmg" from the 13 .5' dimenSIOn to aisle 28 Use FDOT Index 546 cntena for sight triangles and show them on the Site & Landscaping plans With notes that there shall be clear, cross- visibIlity wlthm the Sight tnangle between 30" and 6' from grade. 29 Show a 5' level area at the end of the handicap accessible path at the southeast comer of bUIlding "A" and a ramp up to Sidewalk on the Site and Paving and Dramage plans. Also, show all proposed handicap ramps on the Paving and Dramage plans. 30 On the lighting plan add a note mdicatmg that all lIght poles shall meet or exceed a 110- MPH wmd load. Also specify that the fixtures shall be controlled by a photoelectric switch. [LDR Chapter 23, Article II.A] Page 4 Quantum Park - Lot 3 File No NWSP 99-008 DEPARTMENTS INCLUDE REJECT 31 ProvIde 12' wIde stnpIng adjacent to the north side of building "A" and the south sIde of buildIng "B" with letterIng indicating "LoadIng Zone" [LDR Chapter 2, SectIon 6.F 7.B ] 32 ProvIde a topographIc survey for the SIte shOWIng all eXIstIng features. [LDR Chapter 4, Section 7.A. and Chapter 23, Article I, Section 5.B.2 ] 33 ProvIde Type "D" curb along the west SIde of the dnveway at the west side of the SIte. [LDR Chapter 23, ArtIcle ILE.] BUILDING DIVISION 34 Identify the fimsh floor elevatIOn wIthin the footprInt of the bUIldIng that IS illustrated on the floor plan drawIng. Add to the SIte data, found on sheet SPl of2, the base elevation ofthe B flood zone. Ifthere is no base flood elevation, Indicate that on the plan. Add notes and specificatIOns to the SIte data that prove the proposed fimsh floor elevation IS In complIance with the minimum standards of the follOWIng: a) Mimmum elevatIOn reqUIred by the flood zone. b) MInimum elevatIOn required by the South Florida Water Management Dlstnct permIt for the project. c) Show and specIfy that the elevation of the finish floor is not less than SIX Inches above the crown of the abuttIng nght(s)-of-way 35 SpecIfy on the SIgn detaIl drawIng the approved colors for the monument SIgn. 36 Add the word Tenant to the begInmng of the wall sIgnage note found on sheet Al 37 At tIme ofpenmt reVIew, the applicant shall submIt sIgned and sealed plans 38 At time of permIt reVIew, the applIcant shall venfy that the square footage proposed for the buildIng IS in complIance WIth the regulatIOns of the bUIlding code by indIcatIng on the SIte plan or floor plan drawing the occupancy classIfication and type of constructIOn proposed for the bUIldIng. The building area, occupancy and type of construction shall comply with the specIfications identified in the BuildIng Code. PARKS AND RECREATION Comments None Page 5 Quantum Park - Lot 3 FIle No NWSP 99-008 FORESTER/ENVIRONMENTALIST Comments. 39 There are no desirable trees on the site PLANNING AND ZONING Comments. 40 All plans shall be signed and sealed at bUlldmg permit submittal. Ch.4 Sec.7 41 Amend the plans to provide a mmlmum of 44 mches (3'- 8")ofwldth for all sidewalk areas adjacent to accessible ramps. 1999 ADA reqUIrements 42 On the site plan label the dashed hnes withm the bUIldings, permanent or removable walls etc 43 Provide the follow mformatlOn on the site plan. . Parking calculations based on employees Ch.2 Sec.7 Par.H.2 . Loadmg reqUIrements (dlmenslOned on the plan) Ch,2 Sec 11 Par.l . PID open space reqUIred and proposed. Ch.2 Sec 7 Par.H.13 . Vehicular use landscape area. Ch. 7.5 Art.n Sec.5 Par G 44 Provide a parkmg detail whiCh mcludes the correct dimenslOns and data for handicapped parkmg and slgnage City drawing #B-900l2 45 Along with the 20 scale landscape plans, provide an overall landscape plan sheet drawn at the same scale as the site plan. Ch. 4 Sec 7 Par C 46 The City of Boynton Beach Comprehensive Plan Policy 4 4 6 states that 50% of reqUIred trees and shrubs shall be native On the landscape plans provide tabular mformatlOn calculatmg native reqUIred and proposed plant counts. 47 On the architectural plans show dlmenslOns on the bUlldmg 'B' elevatiOns. CH.4 Sec 7 Par.D 48 Plans must be reViewed and approved by the Quantum Park Architectural ReView Board pnor to final approval Supply City with verification for thiS revIew 49 Landscape buffer must be consistent with the penmeter landscape buffer plan for Quantum Park. s:\projecls\cond of appr\ Department of Engineering and Public Works PO Box 21229 \Vest Palm Beach_ FL 33416-1229 (561) 684-4000 wwwco palm-beach.f1.us . Palm Beach County Board of County Commissioners Maude Ford Lee_ ChaIr \\arren H t\ewell. Vice Chairman Karen T :\.larcus Carol A Roberts Mary :\.lcCany Burt .>\aronson Tony Masllmti County Administrator Robert \\'elsman 4~ Equal Opportunzty 4ff'nnatn-e -"ctwn Emptorer @ printed on recycled paper /1 I May 18, 1999 Mr Michael Rumpf CIty of Boynton Beach Planning and Zoning Department 100 East Boynton Beach POBox 310 Boynton Beach, FL 33425-0310 RE: QUANTUM PARK - LOT 3 OFFICElWAREHOUSE TRAFFIC PERFORMANCE STANDARDS REVIEW Mr Rumpf: The Palm Beach County Traffic DIVIsIOn has revIewed the traffic statement (dated April 27, 1999) for the project entItled Quantum Park Lot 3 OfficelW arehouse pursuant to the Traffic Performance Standards m ArtIcle 15 of the Palm Beach County Land Development Code The project IS summanzed as follows. LocatIOn, MUlllClpahty' Proposed Use Quantum Boulevard, east of Congress Avenue Boynton Beach 1) Office 2) Warehouse 335 tnps per day 2000 (23,330 sf) (23,330 sf) New Tnps' Buildout. Based on our reVIew the Traffic DIViSIon has determmed that the prCo)E:ct meets the Traffic Performance Standards of Palm Beach County If you have any questIons regardmg thIS reVlew, please contact me at 684-4030 Smcerely, .- -----' OFFICE OF THE COUNTY ENGINEER i\ 'in '1 MAY 2 0 Al Feden , P E, Semor Traffic Engmeel " i cc: Andrea Troutman. P.E. Pinder Troutml:Ul Consultmg, Inc. File. General TPS MUll Traffic Study Review h.\traffic\apf\tps',9g064app.wpd TAZ 035 DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning Building Planning & Zoning Engineering Occupational License CommunilY Redevelopment July 16, 1999 Winston Lee & Associates, Inc 1532 Old Okeechobee Road, Suite 106 West Palm Beach, Florida 33407 Re' Quantum Park Lot 3 NWSP 99-008 Dear Joame Please see enclosed the applIcant copy of the Quantum Lot 3 Plans. As they have been approved by Planning and Development Board, this IS one of the next steps in the process. ~ereIY' " - ~~~ Tic e LeWIS Cc copy to file 100 East Boynton Beach Blvd., P.O. Box 310 Boynton ~ach, Florida 33425-0310 I'hone: (561) 742-6260 FAX: (561) 742-6259 I ~. Jnston ee . S~Oclates, TI1C. [ :lI1d 'L lpC \IL hlh'e-Iur, I dlld PI,llllll11,>C f- "'l! ~l ( ( llf June 1, 1999 Mr Michael W Rumpf CIty of Boynton Beach Dept of Development Planmng & Zomng DIvIsIon 100 E. Boynton Beach Blvd, Boynton Beach, FL 33425 RE Quantum Park DR! Lot #3 FIle Number NWSP 99-008 Our File No 98010 09 Dear Mr Rumpf, Attached please find 12 sets of plans for the above referenced project, revIsed pursuant to the TRC comments. 1 have addressed each mdIvIdual comment as follows PUBLIC WORKS 1 Comment: Waste removal m connectIOn wIth constructIOn process must be serviced by City of Boynton Beach. Please note on dumpster detail to mdIcate same. Response: Note placed on dumpster detail on Sheet SP-2 to mdIcate waste removal m connectIOn wIth constructIOn to be servIced by the CIty of Boynton Beach. UTILITIES 2 Comment: All utilItIes easements shall be shown on the rectIfied landscapmg drawmgs so that we may detemllne whIch trees may mterfere wIth utilItIes In general, palm trees will be the only tree speCIes allowed wIthm utility easements. Canopy trees may be planted outsIde of the easement so that roots and branches wIll not Impact those utilItIes wIthm the easement m the foreseeable future LDR Sec 7 5018 1 gIves public utIlItIes the authonty to remove any trees that mterfere wIth utilIty servIces, eIther In utilIty easements of publIc nghts-of-way [ ':: () J O).,eeclwbee Road. SuIte 106 West Palm Beach, FL 33409-5270 ,)hl-hR9-4670 Fax 561-689 5559 Mr MiChael Rumpf Quantum Lot3 June 1, 1999 Page 2 Response: All utilIty easements are mdIcated on the plantmg plans. EXIstmg seagrapes are to remam In the FP&L easement and be property maIntaIned and are part of an eXIstIng buffer for the entIre Quantum Park development. These eXIstmg trees provIde buffenng, as reqUIred, for the adjacent SIngle famIly residences, These trees must remaIn. All new plantIngs as a part of thiS proposal comply WIth the comment reqUIrement. 3 Comment: Dept ofHRS permIts wIll be reqmred for the water system servIng thIS project (Sec 26-12). Response: An applIcatIOn for the HRS permit shall be submitted shortly 4 Comment: FIre flow calculatIons will be reqUIred demonstratmg the City Code reqUIrement of 1500 g.p m., as stated m LDR chap 6, Art IV, Sec 16, or the reqUIrement Imposed by Insurance underwnters, whIchever IS greater (see Sec 26-16(a)) Please submIt these calculatIon WIth your HRS permIt submittal. Response. These calculatIOns will be mcluded m the submIttal for the HRS permit 5 Comment: Sec. 26-349D) of the CIty Code reqUIres that a capacity reservatIOn fee be paId for thIS project eIther upon request for SIgnature on the Health Dept. applIcatIOn forms or wIthm 30 days of SIte plan approval, whIchever occurs first. ThIS fee wIll be detemuned based upon final meter SIzes, or expected demand. Response: The appropnate capaCIty reservatIon fee will be paId wIthm the speCIfied tIme lImIts. 6 Comment: Comp Plan poltcy 3 C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore, be used for ungatlOn where other sources are readIly avaIlable Response: The ungatIOn system source has been located on SP-I and PP-I 7 Comment: Tins office will not reqUIre surety for InstallatIOn ofthe water and sewer utlhtIes, on condItion that the systems be fully completed, and gIven to the City before the first permanent meter IS set Note that settmg of a pennanent water meter IS a prereqUIsIte to obtammg the certIficate of occupancy Response: Lawson, Noble, Webb & ASSOCIates will coordmate to assure the systems are complete and dedIcated to the CIty before the first pennanent meter IS set, as reqUIred. 8 Comment: Water meter SIzes are smaller than nonnally mstalled for a buildmg of the SIze speCIfied. Please proVIde engmeenng calculatIOns, or an explanatIOn jUstIfYmg the meter SIze Response: The water meter SIze has been Increased to 1" Mr MiChael Rumpf Quantum Lot3 June 1, 1999 Page 3 9 Comment: A buildIng permIt for thIS project shall not be Issued until thIS office has approved the plans for the water and/or sewer Improvements reqUired to serve the project. Response: Water and/or sewer plans will be approved by City staff pnor to bUildmg permits bemg Issued. 10 Comment: The waste stream from any potentIal manufacturmg process must meet the CIty'S pretreatment reqUirements. A samphng pomt must be provided to allow momtonng of this waste stream. (Sec 26-143,26-147) If a samplIng pomt WIll not be proVided, please prOVIde a wntten statement that the faclhty will never house any manufactunng process. Response: A sample pomt and detail have been added to the engmeenng plans. 11 Comment: Water mams appear to be closer than 1 O-feet from a buildmg In some locatIOns. Please note that thIS Department s mmImum allowable dIstance for water mams from bUildmgs IS 10 feet, whIch appears readIly achIevable for thIS SIte plan. Response: Plans have been revised so that all water mams meet the 10 dIstance reqUirement from buildIngs. FIRE 12. Comment: A fire flow test of SIte IS requITed. LDR6-16 Response: ThIS test WIll be conducted as part of the HRS permIttIng process. 13 Comment: The locatIon of the FITe Department connectIOn and the turnmg radIUS Into the loadmg area are not shown on the plan. Response: The turnmg radIUS has been mdlcated on SP-I and the Fire Department connection has been mdicated on the Water and Wastewater Plans. 14 Comment: All roadways and fire hydrants must be m place pnor to the start of construction. Response: All roadways and fire hydrants will be m place pnor to the start of construction. POLICE No Comments to Address ENGINEERING DIVISION 15 Comment: Add the follOWIng note to the SIte Plan sheet: All plans submItted for specIfic permIts shall meet the CIty code reqUirements at ttme of applIcatIOn, IncludIng all other reqUITed agency permIts. Response: Note has been added to SP-l Mr MIchael Rumpf Quantum Lot3 June 1, 1999 Page 4 16 Comment: Add the follOWIng note to the PavIng and DraInage Plan. All sIgnage, stnpIng and markmgs shall conform to the CIty'S standard drawIng B-98001 ReVIse plans If applIcable Response: Note and detaIl added to the Pavmg and Dramage Plan as requested. 17 Comment: Add the followmg note to the Pavmg and Dramage Plan. The dramage details shall conform With the CIty Utilities Dept. standards. ReVIse plans If applIcable Response: Note has been added to plans. DetaIls comply WIth City standards, 18 Comment: Show a 5' concrete SIdewalk along Quantum Blvd. and through the dnveways on the Site and PavIng Plans. (LDR Chapter 6, ArtIcle III, SectIOn 11) SIdewalk shall be 6" thIck through the dnveways. (LDR Chapter 23, ArtIcle II, SectIOn P) Also proVIde handicap ramps per FOOT standards at the two dnveways. Response: The five foot (5') concrete Sidewalk and handIcap ramps have been mdIcated on all plans. Handicap ramps are conSistent With ADA accessibilIty standards. 19 Comment: On all plans show the two handIcap accessible paths connectIng to the publIc SIdewalk along Quantum Blvd., per Flonda Ac.cessibilIty Code Response: The handIcap accessible paths have been mdIcated on all plans and are conSIstent With ADA accessibIlIty standards. 20 Comment: At the west dnveway, replace the Through" arrow With a 'RIght Turn Only" arrow and add a "RIght Turn Only" SIgn on the same post as the stop Sign, Response: The above reVISIOns have been made on SP-1 and the Pavmg and DraInage Plans. 21 Comment: The dumpster enclosures shall be concrete block and stucco per LDR Chapter 9, SectIon 10 C Response: The dumpster detail on SP-1 meets all requlfements of Chapter 9 , SectIOn 10 C 22 Comment: Inlet S-104 pIpe mvert should be 7 30 S W Response: Inlet has been reVIsed to 7 30 S W 23 Comment: ProVIde approval from L WDD for work proposed WIthm the canal nght-of-ways. Response: Cross-sectIons will be proVIded wlthm a week for L WDD InItIal reVIew ThIS will be follow-up by submIttal of the appltcatIOn for the reqUIred permIt from L WDD 24 Comment: ProVIde venficatIOn from the L WDD and the CIty UtilIttes Dept. that the locatton of the storm draInage outfall structure IS acceptable If storm water treatment is proVIded on-SIte, why IS the outfall not to the L WDD canals adjacent to the SIte? Mr Michael Rumpf Quantum Lot3 June 1, 1999 Page 5 Response: Outfall to the L WDD canals IS prohibIted m the master permit for the Quantum Park DR! Issued by the South Flonda Water Management DIstnct. 25 Comment: It appears that dramage structure S~204 should be set at elevation 9 00, please venfy and reVise if necessary Response: Structure revIsed to a 9 00 elevatiOn. 26 Comment: Add a certIficatiOn by the engmeer on the Pavmg and Dramage Plan that "the dramage will conform Wlth all rules, regulatIons and codes of the City's Land Development Regulations" (LDR Chapter 6, ArtIcle V, Section 5A) Response: CertIficatIon has been added to the Pavmg and Dramage Plan. 27 Comment: On the sectIon B-B detaIl, change the word "parkmg" from the 13 5' dImensiOn to aIsle Response: The word parkmg' has been replaced Wlth 'aIsle' 28 Comment: Use FDOT Index 546 cntena for SIght tnangles and show them on the SIte & Landscapmg plans With notes that there shall be clear, cross-vIsibilIty wlthm the SIght trIangle between 30" and 6' from grade. Response: FDOT Index 546 cntena is applicable for the mtersectiOn of two nghts-of-ways and, therefore, does not apply to thIS project as thIS SItuatiOn IS one of a pnvate dnveway meeting a right-of-way However, the aforementioned criterIa is depIcted on the site plan for mformatiOnal purposes. A note regardmg the clear SIght tnangle has been added to SP-l and PP-l 29 Comment: Show a 5' level area at the end of the handicap accessible path at the southeast comer of buildmg "A" and a ramp up to SIdewalk on the SIte and Pavmg and Dramage Plans. Also, show all proposed handIcap ramps on the PaVIng and Dramage plans. Response: HandIcap ramps have been mdIcated on the SIte and Pavmg & Dramage plans The 5' level area IS proVIded on the SIdewalk west of the ramp and on the 5' access aIsle east of the ramp The handIcap ramps as drawn are conSIstent WIth ADA accessibility standards. 30 Comment: On the hghtmg plan add a note mdlcatmg that all light poles shaH meet or exceed a 110 MPH Wind load. Also, SpeCIfy that the fixtures shall be controlled by a photoelectnc SWItch. (LDR Chapter 23, ArtIcle ItA.) Response: Notes as requested have been added to LP-l 31 Comment: ProVIde a 12' WIde stnpmg adjacent to the north SIde ofbuildmg "A" and the south SIde of buIldmg "B" With lettenng mdICatmg "Loadmg Zone" (LDR Chapter 2, Section 6 F 7.B ) Mr MIchael Rumpf Quantum Lot3 June 1, 1999 Page 6 Response: Stnppmg and lettenng as requested have been added to SP-I and the Pavmg and Dramage Plan. 32 Comment: ProvIde a topographIc survey for the sIte showmg all eXIstmg features (LDR Chapter 4, SectIOn 7.A. and Chapter 23, ArtIcle I, Section 5.B 2 ) Response: Included m thIS resubmIttal package 33 Comment: ProvIde Type "D" curb along the west sIde of the drIveway at the west sIde of the SIte (LDR Chapter 23 ArtIcle 11.E.) Response: Type "D" curbmg has been specIfied on SP-I as requested. BUILDL~G DIVISION 34 Comment: IdentIfy the fimsh floor elevatIOn wIthm the footpnnt of the buildmg that IS illustrated on the floor plan draWing. Add to the SIte data, found on sheet SPI of2, the base elevatIOn of the B flood zone If there IS no base flood elevatIOn, mdIcate that on the plan. Add notes and specIficatIOns to the SIte data that prove the proposed fimsh floor elevatIOn IS m complIance With the mmImum standards of the follOWing: a) MmImum elevatIon reqUIred by the flood zone b) MImmum elevation reqUIred by the SFWMD permIt for the project. c) Show and SpeCIfy that the elevatIOn of the fimsh floor IS not less than 6" above the crown of the abuttmg nght(s)-of-way Response: FImshed floor elevatIon of 14 7' has been added to the floor plan drawmg. The flood zone for thIS project IS A5 and requIres a base elevatIOn of 11 0 However, SFWMD reqUIres a mmImum 14 5' floor elevatIon and 14 7' has been proVIded. The mmImum road crown elevatIon reqUIred by SFWMD IS 12 0' All mformatIon IS mcluded m the tabular data on the SIte plan. 35 Comment: SpeCIfy on the SIgn detail drawmg the approved colors for the monument SIgn. Response: SIgn colors shall comply With the approved Quantum Park signage program. A note has been added to SP-2 to mdIcate same 36 Comment: Add the word Tenant to the begmnmg of the wall sIgnage note found on sheet A-I Response: The word 'Tenant has been added to the sIgnage note on A-I 37 Comment: At tIme of permIt reVIew, the applicant shall submIt SIgned and sealed plans. Response: All plans reqUIred to be SIgned and sealed when submItted for permIts shall be so Mr MIchael Rumpf Quantum Lot3 June 1, 1999 Page 7 38 Comment: At tIme of permIt reVIew, the applIcant shall venfy that the square footage proposed for the buildmg IS m complIance With the regulatIons of the bUIldmg code by mdtcatmg on the SIte plan or floor plan draWing the occupancy classIficatIOn and type of constructIOn proposed for the buildmg. The buildmg area, occupancy and type of constructIOn shall comply wIth the specIficatIOns IdentIfied In the BUIldIng Code Response: Square footage, occupancy claSSIficatIOn and type of constructIOn Will be mcluded m the permIt draWings. PARKS & RECREATION No Comments to Address. FORESTER/ENVIRONMENTALIST 39 Comment: There are no deSIrable trees on the SIte Response: No response required. PLANNING & ZONING 40 Comment: All plans shall be SIgned and sealed at buildmg permIt submIttal (Chapter 4, SectIon 7) Response: All plans submItted for buildIng permIts requued to be SIgned and sealed shall be so 41 Comment: Amend the plans to proVIde a mInImum of 44" (3'-8") of Width for all SIdewalk areas adjacent to accessible ramps. 1999 ADA reqUirements. Response: EXIstIng dImenSIOn of 3 7' feet IS m deCImal format. ThIS equates m EnglIsh measurement to 3'8" or 44" and IS conSIstent WIth 1999 ADA reqUirements. 42 Comment: On the SIte plan label the dashed hnes WithIn the buildmgs, permanent or removable walls, etc Response: Dashed hnes have been labeled as 'PotentIal Tenant Walls' Note added to plan statmg 'Tenant wall to be permanent between tenant bays." 43 Comment: ProVIde the followmg mformatIon on the SIte plan. a) Parkmg calculatIOns based on employees Ch. 2 Sec 7 Par H.2. b) Loadmg reqUIrements (dImenSIOned on the plan) Ch. 2. Sec 11, Par J c) PID open space requued and proposed Ch. 2 Sec 7 Par H13 d) VehIcular use landscape area Ch. 75, Art. II, Sec 5, Par G Mr MIchael Rumpf Quantum Lot3 June 1, 1999 Page 8 Response: a) Parkmg calculatiOns based on 23,330 sq. ft. of office space at Ip.sj300 sq. ft and 23,330 sq. f1. of warehouse at 1 p.s.i800 sq ft. (Chapter 2, Section 11.H.20 & 11,H24 f5 ) b) Entire area between Buildmgs A and B noted as shared loadmg/unloadmg area and dImensiOned_ c) Tabular Data mdIcates 20 0% pervIOUS open space area reqUired for Pill and 24 9% provIded, d) Tabular Data mdIcates 140 sq. ft. of vehIcular use landscape area reqUired and 9,555 sq. ft. of mtenor landscape area provIded. 44 Comment: ProvIde a parkmg detail whIch mcludes the correct dImenSIOns and data for handIcapped parkmg and sIgnage CIty drawmg #B-90012 Response: Detail reVIsed per comment on SP2. 45 Comment: Along WIth the 20 scale landscape plans, proVide an overall landscape plan sheet drawn at the same scale as the SIte plan. Ch. 4, Sec 7 Par C Response: A landscape plan at 1 "=30' has been provJded to match the SIte plan scale, 46 Comment: The City of Boynton Beach Cornp Plan Polley 4 4 6 states that 50% of reqUired trees and shrubs shall be native On the landscape plans proVIde tabular mformatIOn calculatmg natIve requlfed and proposed plant counts. Response: Native plant matenal tabular data has been proVIded on sheet PP-l Ninety-four (94) native trees were reqUired and 148 proVIded (50% reqUired, 82 9% proVIded). One thousand three hundred twenty three (1,3 23) natIve shrubs were reqUired and 1 755 proVIded (50% reqUired, 66 3% proVided). 47 Comment: On the archItectural plans, show dImenSIOns on the buildmg 'B' elevatIOns. Ch. 4, See 7, Par D Response: DimenSIOns for buildmg B' have been added to the archItectural elevations, 48 Comment: Plans must be reVIewed and approved by the Quantum Park ArchItectural ReVIew Board pnor to final approval. Supply CIty WIth venficatlOn for thIS reVIew Response: A venficatIon letter from the Quantum Park Architectural ReView Board shall be proVIded pnor to CIty CouncIl heanng thIS project. Mr Michael Rumpf Quantum Lot3 June 1, 1999 Page 9 49 Comment: Landscape buffer must be consIstent WIth the pen meter landscape buffer plan for Quantum Park. Response: The landscape buffer IS consIstent WIth the penmeter reqUIrements. QuantitIes, SIzes and spacmg of plant matenals for the penmeter landscape buffer shall meet or exceed establIshed standards of the Quantum Park Plantmg Program. I belIeve that all TRC comments have been addressed and respectfully request that thIS applIcatIOn proceed forward to the June 22, 1999 P & D Meetmg. cc Robert Burrow John GlIdden Ted Sanders Douglas MacDonald