REVIEW COMMENTS
7.8.2
SEMSCO INTERNATIONAL OFFICEIWAREHOUSE
NEW SITE PLAN
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO PZ 98-268
SITE PLAN REVIEW
STAFF REPORT
FOR
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
September 8, 1998
DESCRIPTION OF PROJECT
Project Name: Semsco International OfficelWarehouse
Property Owner.
Underground Supply Associates Inc
Applicant/Agent:
Underground Supply Associates, Inc /Lawson, Noble & Webb, Inc
Location.
Lot 15, High Ridge Commerce Park
File No.
NWSP 98-012
Land Use Plan
Designation.
Industnal (I)
Zoning
Designation.
Planned Industrial District - (PID)
Type of Use:
Warehouse/Office
Number of
Bays:
N/A
Square
Footage:
Site Area. 55,170 9 sq ft. (1 27 ac )
Building Area. 4,500 sq ft.
Surrounding land
uses and Zoning
District:
(see Exhibit "A" - location map)
North - Commerce Road, and farther north a vacant lot zoned PID
South - Boynton Beach Waste Management Distribution Center, zoned M-1
East - Vacant Lot, zoned PID
West - Amerope, zoned PID
Existing Site
Characteristics:
The site is currently a pre-cleared, 1 27 acre lot. The western half of the site is
predommately vegetated with a vanety of overgrown grasses, and a small number
of exotic plant species including Australian Pines The eastern portion of the site
consists of open and eroded sand trails and pits that appear to have been used as a
recreatIOn area for off road vehicles To the south of the site is the waste
distribution parcel and its respective landscape buffer which provides some
/
Page 2
Site Plan Review Staff Report
Memorandum No PZ 98-268
Semsco International OfficelWarehouse
Proposed
Development:
Concurrency-
a. Traffic-
b Drainage-
Driveways:
Parking Facility-
Landscaping:
Building and Site
Regulations:
screening for the proposed use There is no other vegetation of any significance on
the site
The developer is proposing the construction of a 4,500 square foot, 16 foot high,
one-story Warehouse/Office facility, with related parking (see Exhibit liB" -
proposed site plan) This business stores, sells and distributes utility pipes and
related aquipment.
Based on the Notice To Applicants For Approval Of Land Development
Orders Or Permits, projects with proposed traffic generation rates of less
that 500 net vehicle trips per day does not require a traffic report as part of
this reVIew process Further reVIew of the proposed use and its traffic
generation rates is required of the Palm Beach County Traffic Division.
As a conditIon of approval, the Planmng and Zoning Division requires
written confirmatIOn from the county that the project will comply with the
county's traffic performance standards ordinance
Conceptual drainage information was provided for the city's review The
city s concurrency ordinance requires drainage certification at time of sIte
plan approval The Engineering Division is recommending that the review
of specIfic dramage solutions be deferred to time of permIt review
Proposed on-SIte traffic circulation conSIsts of a 32 foot wide entry drive aIsle,
from Commerce Road, leading to a 30 foot wide drive and access gate adjacent to
the east side of the proposed building The gated drive leads to the rear of the site
where the outdoor storage area is divided into three, 15 foot access aisles around
ground level storage areas Before the gate, at the front of the building, IS a
perpendicular 27 foot dnve aisle accessing a thirteen space, dead end, parking area
which includes one handIcapped space The parking area is made up of seven
standard 9 feet by 18 feet parking spaces adjacent to a dry retention area, and six,
9 feet by 16 feet spaces are provided along a 6-foot wide sidewalk adjacent to the
building
There are 13 parking spaces proposed, mcluding one (1) space designated as
handicapped accessible The plan does currently meet the parking requirements as
stated in the Land Development RegulatIOns, Chapter 2 - Zoning and ADA
reqUIrements for thIS use, and provides one surplus space
The landscaping of the site will fully meet the code requirements when staff
comments are mcorporated The development wIll be provided with the required
amount of perimeter and mternallandscaping as required in the Land Development
Regulations, Chapter 7 5 Article II
Building and site regulations will fully meet code when staff comments are
incorporated mto the permit drawmgs
~
Page 3
Site Plan Review Staff Report
Memorandum No PZ 98-268
Semsco International OfficelWarehouse
Community Design
Plan.
The proposed building facade, as viewed from Commerce Road, is standard of
typical one story steel industrial structures The new structure will receive wall
sign and surface treatments of subdued colors of grey and steel blue accented with
galvanized moldings and roof flashing
Signage:
A proposed sign detail was not submitted as part of this site plan review This site
is hmited to one freestanding SIgn with an overall height of 20 feet, and 64 square
feet of sign face, and one 50 square foot wall or canopy sign. Proposed sign
design graphics shall be provIded as part of this plan review process, and as part
of the colored architectural elevations graphIc submIttal The ultimate signage must
be in conformance with the approved sign program for the PID
RECOMMENDATION.
The Planning and Zoning Division recommends that this request for site plan approval be approved,
subject to the comments included III Exhibit "C" - Conditions of Approval Staff also recommends that
the deficienCIes identified in this exhibit be corrected on the set of plans submitted for building permit.
xc Central File
J \SHRDA T A \Planning\SHARED\ WP\PROJECTS\Stor-All\NWSP\site plan staff report stor-all,doc
3
EXHIBIT "A"
LC CATION MAP,
SEM~CO INTIiJ~ATIQt!~!::D---_J L
r7 0 ' 'HJI'IIl' II, !IIi ,., , f11
Pljlltij\ lJ 1'1,;. '- - '~/ l~ J~ II !"~". ~, H-1
LU, :~~ ~- ! [- ~-I " ~J\~
II ll~ II I ' r r~ tl\.o-
'w;; Fcfilt:== 1 I I II I /'"''''' I ' J =',
-..L -< ,- 1- -
.._ f:=f .... }- i ~ i: ~. -=,
, ....-- _ "" -1TTtTl~J ".;(""~~'{jt::-rl~
P:: "\ ....~"T ,UIt - ~~ t- tf ~ t= t~
. 1 I!F _. ~~ ~ - ml E=ttr~
~ ~ UttEr '. ~ l,~JJ t :
i'-. /Ibt'~ i~ 1~!".:~'T~.~ ~t,~~~ I :
I .'---............ ~ -+. fT', I ItV.<Y' t 1: -~ ~.
o T"'",' IC. - I
~ -= I J+1 q/ ~/tt~ t:f~'
..,.'. vS TI'1t1 .n' , ~."\ "} :: b -
~ >~ FH ~ f +- -H I \ ~D = rl' - I
- ,.'." T" "/. - R~' !
~L:::.,CJnn I II . - ~
h",1 ~ml1 T'r 1 r - - .
~. . ._ . L '-- "
!I J;:!i' ~~-
[] ,*--i! /~. ,~.' ~. i
~. ~ r ~
iR 3t i r I~'i:1L!!;~
y. ~ uJ I' ~ 7 ~ -~~_
~, ro: ~.. p::,c I- -:-- ':
l'~~-:::;SZ':f l=- .: l' '.~- J i
:~ . t 11= "T7'
~. - ,; + - , h lE I
, ..~ t t- t' '
I, I: I I ~, 1 , . f"~ Trfttt .
, I' I t+P+
: '. , ": l l' + t Ii. "
t ~tT-t-tT1H,t- j)~~l ,it, ~~
n . ': II ~111-t-t -'. I"\-\, /5- '- ",Y,'.!"
. .. ! II ~ ' ,'T . . ~)~ ~ . .; I .
I ~ I . +~ a-< .-+~~ Mi' t. ~T'
'" I [ ,~, ~.
, 2 \ JT\11nTT' --rl. I ._
. U..I...... "0 II!!I'f'
I r- \ HI \1 ! ' i. j [llinl \ !~~ /
-, ) ~,[ . -+- H"'T.l.-L...,,1
3 Q- r . , ~ '--1'l
" . /:~'T1- ~. ,~~19. rr . Y1J
WI J,.'"; .~~ .~llH. ~ ~TI7~~; - JrJL;
1/-..." ">/' ~l, J. ,ttilTl U l I i
r~" ..~ fl/" - ,..1 N j~p q~~~~~1.( - \ ~
\ 'U I ,.. . 1 .
t--r J - J I . ,r I, ,~
$
I . ~
r 0 1/8 MILESV I~ ~
II; ,-111 Ho 18b~~T ~,r ~ :
,ilj:~tBt .l..J~ 'f,C
,-
.
,/
~ ....
\ .
1 '
.
, '
It '
, '
f'
'. '
, .
. ,
.
," /'1
I::~
~ , I I
\~, ~
' ,
I ,
i
.~
, "
, \
......' \
IT
I I' I
I \
.
.
1
.
'.-
, I
I I
\ I"
I
\:.:.
-------
lEe
, \
--
.
\'.>--"
, .
.,
R'IAA
.:.
/ , / ,j/r'W r-
.....~~}-~ ~ ~ t--1 .r
C ..." .-f- ,c
~ ' . I-- J--
-. ; . :: .,~ "'
~~~'''AR RI~~
I 1. STATE~~
\.
; ~
:\
----
, .
. .
, .
1------
\,,:.,1,
, ~r-r
, !
~.."_.,\
: .-._.:-._~\ ./
,..
HIJ;;~ R,Q(jE
i .;: ;"'~-1~ - E
I 'L;[]l ..}-
f ~. ".' ~(" ~
","'E-" ~ ~ ~ II=:.pl [IL'---I'~
, i \
~'1AA
/ !
NOT i
J \ IN \ ~ M~-
i ( C I T Y=r1;f~ll-:, I<-
\ ~\ - ~J ~ 'r-; "
! I~L i 1 W.=- ~d\
~ ~ ~'\ .,,, .J I
~~ "" T' . I
t
~~~~~~~~~~z~~5 ;
~~-<~~!'1~~"'o;g-<,--<
~...ihr- ~ ~,,~~ ~iliPjJi
",l"n:"2'"o!"~z,,,n"''''
n"",-'" 00 G'>~",nr-
:I::>o!=>o!"z(;Jo2' nng
o~S. ""J>~J>~ S~;?I\
~(J)-t~Vle;;i;::tIl>:A-I8N
-<~53~~~:;;~~\i:?;;53~~
-<-I;,a....z~;4iCfCDJ>~-10
.,,~-<2'~Cl-<"''''~~-<O~
'C:_Cl toto .....(')(1)_-1::0
g",z-<u;~-<:"i5:I:""Zil;_
--1>0. -4C~("")CDJ> 0
~:"'i5--<!'1 iliP~~--<i5;~
, p."ilj~o",~",-<~..,-<",
5i g;g '" ~~ 0 ~ -< '" g -<:"c:
-"",. -<:I:!2.",.."ilj,
iii~:::~~iIi~~~2'~i1il~
"';:::I:~",j!I:Il2'-P;::~z
'O:~"'''''''-<-G'>~5i~ 0
o ",i1il ",,,,,,, S/'" , _",O:I:
r-OO--<X~o-<<nZc;;
J>:J:~~m~(')cQf'l:J::!:J:
~no. -<iii~~l4l"'nri!!
cns;2z]>-1_ -1J>s;2rr1o
!:!l~?:"iIi~;!!~~~~z~
~-<::~~~H~::e",-<~n
~"'T1z. ~-I~J>~e;;!! i:
!,,~::;j~iliili~~:I:~g~~
~5"':rj!l::e' ~i=;5;;;~
2'}>~c;;"'\)l~z-<~}>"'"
c:>"';:!:rQ-<....-<"-<iil~~
zgf;l "'~- ~ ~ P 6 g;: 8--<~
"':110 Z"'''''''-<''''''ili
15~'" !!lot::!!::oz~n
~o-<ni~"'~ozClOr-
-zili ~~ 5~ ~
~~~ ':'8 ~
z~~~ili5 "" ~
I
:z
~
S
,.
lil -
All lUl Ut
~ ~~ ~
'" "'.
'= Vi
..
Uil ::::
..' 8
.. e
I !l
~
~ ~
~ ~
"
'"
~
~
~ ~
~ ~ ;
~
...
...
... l
..
c iD A !'> !! '"
" ~ A ~ U;
'"
!Il
,.
"'
,.
~
'"
~ :lI iIloi;~~q,
c ~"''''flI~~8
~ s Iii" 0'" Q ~
:: ~ 0 ffi ~~ ~
! ~~~-
- j; N . ........ 5G
~ l.~18 8 ~
~ ~ ~ ~ en
'" '"
~
d~ ~OV.O. 31'Q'MS .oa
I l>a'G\~d JO 3003<",:
'r \' I ~~
G3M35 Alf<711N'tS lSIX3 -.-/ :lj
~~-~
N1~" !I3l ~M.B lSIX3
.02 .1 '3'~:JS
.
..
~""'tMI
.. .. .
I.fj!
jj
.t>I.~~1
~YI-IIDIT "B"
___I .. .._-. .
A
(10
ill....Nilil!!
p~ ~~ ~~
!l~~"'~
~
f6 " a;
~ 1; ~
...
C
CD
3.~
-<Em>
~'J 3l311:JNO:J
"OTCI
~
c: XlO iii i'1 J.Ol
'CTd
S3lN\'~ SN3lt!'1
c: XlOlB "91 J.Ol
J-~I 1~
. _L_________
i / ~ NOISMtdX33lrllnJ
I llOJ ~3llY N3dO ~
I ~------Z ~~
~ I~~.oz ~ ~~
-=- ~11r-~ · .01 ~~'02 ,.1 ,wl
HH~ ~ ~ ~ ~
lil lil
(',.,,_ "'gl I I A ~0ll'I'" 39WOJ.S 3J.3ll:lNOO '" l..
r-~ ~ 1/ q ~ . ~ i i ~ ~
"~I ~~~~' ~I I ~ ~
~p 3:JN3J ""1"1 NM<l ,9-]-' ~ 1ZXXl18 'iii .1.91 '---DW lM"\ NM!l H!l1H.9
?~ ~I i- 'On2 l ~i>
!l! 2 ill NOln:xn ~ '"
l5 :l.: P l@ ~~31s.o'o:J
III ~ I I 2! Ul. ~-:;;:
~ i ~ ... I - - ~:
III ~ :< g !
~/1 ~ ~~~2B!
1~3llY NOllN3l3J All(] 01 I Uj" t -:oz- I r I
NlY~~~~-Y __./, ~
~~I ,.'.9 7-" ~ It'"
~I Cl~,q .02
om- ~I 0/ 0.{2 '1111 ~ J
~ 'r k..'I~,V JS~~'~;~ ~ JJ~ $~e
L f-.' i- dHHbr- OO':3d 10M :.~:.
.S'2 .E2' .l.::t 00'91 .JJ-E)I3-f '0019 000
ISlllOH T1'f l~ SS:;:):J~ ll3lSd'nJ - 'i I ~ !lNI0lIllEI
SS3:J:J'tt' A:JN3!lll3I'I3 3OlAOlld T1'fHS~'-==t: ~ 1_ 3SllOH3lI'tM
31 't!) !lNIMS I !'> I3:>ll:lO .I.lIOJ.S I
W I<<X3J<Ill'0'Oll3<J_ ---..!. g~ 00"2 '^NI_
.......~ d't:J~ I --.. ~ 6. ~ ~3lI>
' I' ~~<:?Z~ -: ~ /~~S~~;~.2 ~~~~W 1
15 3l1HM g;r~~;~-Ffq 4+ ? ~ ~n "I' _I };" ~
l@ I wHl~dllnI9ISS3:J:J~d't:JI<Nt1H-r-= ......~~r I 4f.'L ~Idfi ~--(f.13~-nl,io~~I'
.. -orrz ~ -:0<=- ~ II '\i7
f;1 1.133HS "1l17~30:ESl , i .2 - <c . .OL. i\ 09[2 -&1
'" I 3:JI^lBS!I3l~M.I--t- d>l ~~ W ~ dA' l' ~ .
~ w 06'I~'O~~~=i~ ~. L ~11~.. L.~I r::.: __~Vl:t~~~J~~:JI!~
i> A-.arass~ IN'tlllOA~ I I ~ ~, :::
;: , ~I '.". 02'02 o'N4 '\i7
ll3lN3A3lld MO'JlOYB B 1 .-..;:::: '" )<...1 .OL ,- r--3dGi ..1-.88 \Y
03A0lldd't .IIM!I3l~ .8/. 'dOW_~~ "- ,2'?:>- c--QV'L2 ~ I
w I. 133iS -nn30 :335) ~' ---..:.' ~02'a2 I ~Jl rdlll d01S "lB<M :JNQ:
- NOln:xn :3:JlAlBS !I3l~M lSIX3 N T ~ ~3lf<7 NO N3l30 AtIO l!! If. lB<S -nn30 335'\77
- ~ - ~ '.,'0 fcrt--- ~ - -~ -' l~ '-Y-+.-
- - ~ d. f-'; r---02'02 c: ,~ L ~ ~iq -
- - ~ ~j/~;' \~'~~Iai:'{ ~ \ ~~:3S rl~~ -'\- - - - - - -
~ /.1. : ~ \:r- lffi'M3OlS.. '-- .l~M:3OlS.. -t~
'1' N'tI" !I3l.M .9 "J-- l:lf1llJ.SNO:J !lNllSIX3
3lIHM :,M~;~~~ O'ltOCl 3:)C13v.Jv.JO:) ~ --7 1- -,'l--r
:3"lOIfifflm'SlSIx3J1 ~ _ / I~ _I
- =- - -I -'l1-J =- - - _ ll3M3S AllUN'tS "~ =- ~ _ _ --.I~
'-~I't1d3ijHI:lr'GtVd ~ !:EMIOJ dOMd3Nr<<)~.O.l2:; ;1
..(F, IN'VijaA~ JijI..::l lSIX3 ~ ;y
~:J dOW~I'<<lll>.21 J NI~"'~~~M.B lSIX3 r
IN'tlllOAH 3tlU lSlX3 I
:3A'1\t^ 3l~~.9 CONGRESS AVE.
"'l'<1^" ",.j{.~~~~ t
f"-- ~3lf<7 NOllN31:30 AlIC
'"
iii
:.,
"1
~~~ I
-CfTl
sa"T'l:::O
"'tnSl
",no
"'''';
",r-
n -
;z:8<n
~~~
'" r-
'" -<
~ ~
... Ul
g
;;
-<
'"
!Jl
~
~~~'; I
-",o::e
.....-4(")U)
~~~~
Iri!l~
~~~~
"''''0'''
~~~
:,,~~
r '"
'" '"
'" -
~ ~
~~8i'; I
="'oe;
,A-l"TI3:
(,N"'tJOJlo
(,.o.ll>::n:::c
limA
(,,7I~(J)(I)
~~~i
CJl~F~
Ir-...
~~*
~~~
g~~
P"
",,,
~~
fTl:"
o~
0'
ill '"
~ ~
~, '"
~ i ~
"'1
~
I
~ '"
q
!< !<
Z Z
- -
l~
~I~
~;3l I/> '" '" ~!Il = ~ ~ c ... " ~
.. ~ ~ ::;~ Sl z ~ x ~ l;)
~! ~ '"
~ :I:~ (li ~ ~ ... t'"J
'" ~ ill" ... * III
~~ (li ~ E'" ~ ... 0 ~ c Z
.. ~ ...
~~ ~ ... ;ilb III ~ .. ... 0
0 ... ..
iii ~1Ii Iii < ...
~ ~ < ~
'" " ~" z ... .. ~
i' ~ ... .. ~ 2 2
o~ ...
<
~ ;:;... ~
Iii~ 2
z...
......
c "'0
J:: ~
~
'" i!l R
~ 0
... 1;
~ i!l
.. 1;
-<
pi HIli< RIDGE ROAD
i!i f I~J ~
'" ~
;;j ~
1-95
~ . ~
o 0 ~
F ~ t \ @
h
SCALE: 1'030"
DATE: 7n196
BY: alP
O<'D: Rl.
~ i!~~
LN\Y
. . . . . . . . . ....-
Law8on, Noble a. Webb, Inc.
.......... P........ lu...yo..
REVISIONS DATE BY CK
I A\ IEVISED PER aTY BOYNTOJoI BOi.. ~ CJ)P AL
SITE /IN) ENGIN:ERJt.13 PLAN
Fa!
SEMSCO INT
US-l
l' ~~
;. E~
fUl"b
:.;....
11I"9
I
~"
EXHIBIT "e"
CondItions of Approval
Project name Semsco International Office/Warehouse
FIle number NWSP 98-012
Reference The plans consIst of 10 sheets Identified as 2nd RevIew, New SIte Plan. FIle # NWSP 98-012 wIth
an August 18, 1998 Plannmg and Zonmg Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments
I The Public Works Department requests detaIled drawmgs of dumpster
enclosure for sIze and shape (Chapt. 7.5, ArtIcle II, Sec 5, Par J)
UTILITIES
Comments.
2 All utilities easements shall be shown on the rectified landscapmg
drawmgs so that we may determme which trees may mterfere WIth
utilities In general, palm trees wIll be the only tree specIes allowed
wlthm utIlities easements. Canopy trees may be planted outsIde of the
easement so that roots and branches wIll not Impact those utilities wlthm
the easement m the foreseeable future. LDR Sec 7 5-18 I gIves public
utilities the authonty to remove any trees that mterfere WIth utility
servIces, eIther m utilIty easements or publIc nghts-of-way
3 ComprehensIve Plan policy 3C.3 4 reqUIres the conservation of potable
water CIty water may, therefore, not be used for lITIgation where other
sources are readIly available
4 Water and sewer lines to be owned and operated by the CIty shall be
mcluded wlthm utilities easements. Please also show all proposed
easements on the engmeermg drawmgs, usmg a mmlmum WIdth of 12
feet. The easements shall be dedIcated VIa separate mstrument to the CIty
as stated m Sec 26-33(a) of the code
5 A buildmg permIt for thIS project shall not be Issued until this office has
approved the plans for the water and/or sewer Improvements reqUIred to
serve the project. (Sec 26-15)
FIRE
Comments None
POLICE
Comments. None
t;
Page 2
Semsco InternatIonal Office/Warehouse
FIle No NWSP 98-012
ENGINEERING DIVISION
Comments
6 All plans submItted for specIfic permits shall meet the city's code
reqUlrements at tIme of applicatIOn. These permits mclude, but are not
hmited to the followmg' site hghtmg, pavmg, dramage, curbmg,
landscapmg and irngatiOn. Permits reqUlred from other permIttmg
agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any
others, shall be mcluded with your permit request.
7 Provide catch basms at both ends of dram pipes at both dry detentIOn
areas. Catch basms at west end of the northerly detentIon area and m the
roadway swale should be bubble-up structures and the catch basms at the
north end of the detentiOn area west of the bUlldmg and at the east end of
the north detentIon area should be overflow structures. [LDR Chapter 6,
ArtIcle IV, SectiOn S.B 1 ]
BUILDING DIVISION
Comments
8 To clanfy the signage proposed for the project, place the below listed
notes on the plans
a. Add the followmg to the site plan drawmg: "Site signage is not
approved. A modificatIon to the sIgn program wIll be reqUlred
pnor to any sIgn bemg permitted for placement on the site that
IS inconSIstent with the approved sIgn program"
Also place the followmg note on the elevation View drawmgs of the
bUlldmg: "BUlldmg slgnage shall comply with the signage specIficatiOns
identIfied m the approved High Ridge Commerce Park sign program
9 Amend the engmeenng plan to show compliance wIth the Flonda
Accessibility Code for Buildmg ConstructIOn with respect to the
accessible route reqUlred between the access aisle at the accessible
parkmg space and the accessible entrance of the bUlldmg.
PARKS AND RECREATION
Comments None
FORESTER/ENVIRONMENTALIST
Comments
10 There was no tree survey mcluded m the set of plans. The applicant
should mdicate on the landscape plan any eXIstmg trees on the site which
WIll be preserved, relocated or removed/replaced.
7
Page 3
Semsco InternatIOnal Office/Warehouse
File No NWSP 98-012
PLANNING AND ZONING
Comments
11 Include on the sIte plan the proposed type, source and style of lIghting.
Chap 9, Sec. 10, Par F., Chap 23, Art. II, Par A.
12 ProvIde a sIgn detail and elevatIOns dImensIOned as follows on the SIte
plan Chap 21, Art. III, Sec. 5.A.
A.) One freestandmg SIgn 64 square feet maXImum face, 20'
maXImum heIght.
B) One wall sign, 50 square feet maXImum face
13 ProvIde 10 foot by 10 foot safe SIte tnangles on both the SIte plan and
landscape plan. Locate tnangles insIde of the property line Chap 7.5,
Art. II, Sec 5, Par H.l
14 Locate all proposed and eXIstmg fire hydrants on landscape plans.
ProVIde a 5 foot clear area around hydrants.
15 SubmIt a colored graphIcs board and matenals board showmg the
proposed sIgnage and bUIldmg elevatIOn colors. Chap 4, Sec 7, Par
D.2
16 Label and dimenSIOn the mImmum tree spacmg along the right-of-way
frontage (3 Palms = 1 tree) Chap 75, Art. II, Sec. 5, Par D
17 ProvIde landscape notes to mclude the followmg:
A.) A notatIOn on method and source of irrigation. Chap 4, Sec 7,
Par C
B) Intenor parkmg lot landscape area reqUired and provided. Chap
7.5, Art, II, Sec 5, Par C
C) PID open space reqUirements. Chap 2, Sec. 7, Par H.13
18 On the landscape plan, wIthm the 25 foot penmeter PID buffer, proVIde
1 tree (mahogany) per 40 linear foot of frontage and a contmuous
eugema hedge (mamtamed at 6 feet) along the outsIde edge of the buffer,
replacmg the cocoplum hedge proposed along south fence lIne Hedges
along the sIde lot lInes must be extended to the buffer hedge Chap.2,
Sec 7, Par H.17
/bme
s:lprojectslSemsco InternationallNWSPI1st review comments
~
1 st ReVIew Comments
fv1~df fe<
gl('II~ ~ ;:eC
Project name. Semsco InternatIOnal Office/Warehouse
File number NWSP 98-012
Reference' The plans consIst of 10 sheets IdentIfied as 1st ReVIew. New SIte Plan.
Julv 7. 1998 PlannIng and Zonmg Department date stamp markmg.
File # NWSP 98-012 wIth a
J-
DEP ARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments
~ The Public Works Department requests detaIled drawmgs of dumpster
enclosure for sIze and shape
UTILITIES
Comments.
/ All utihtIes easements shall be shown on the rectified landscaping
drawings so that we may determine whIch trees may mterfere WIth
utIlItIes. In general, palm trees WIll be the only tree specIes allowed
withm utihties easements. Canopy trees may be planted outsIde of the
easement so that roots and branches wIll not Impact those utilitIes wlthm
the easement 10 the foreseeable future. LDR Sec 7.5-18 1 gIves public
utIlItIes the authOrIty to remove any trees that mterfere WIth utihty
servIces, eIther 10 utIlIty easements or pubhc rights-of-way
~
(Y Dept. of Health permIts may be reqUIred for the water system servmg
this proJect. (Sec 26-12)
f) FIre flow calculatIOns will be required demonstratmg the City Code
requirement of 1500 g.p.m. as stated 10 LDR Chap 6, Art. , Sec. 16, or
the reqUIrement Imposed by msurance underwrIters, whichever IS
greater (see Sec 26-16( a)) Please submIt these calculatIons WIth your
Health Department permIt applIcation and plans.
0 Sec 26-34(E) of the CIty Code reqUIres that a capacIty reservatIon fee be
paId for thIS project either upon my request for sIgnature on the Health
Department application forms or wlthm 30 days of site plan approval,
whichever occurs first. ThIS fee wIll be determmed based upon final
meter SIze, or expected demand. -
/ Comp Plan polIcy 3C.3 4 reqUIres the conservation of potable water City
water may, therefore, not be used for lITIgation where other sources are
readIly avaIlable.
/ Water and sewer hnes to be owned and operated by the CIty shall be
mcluded wlthm utIlitIes easements. Please also show all proposed
easements on the engineenng drawmgs, usmg a minImum WIdth of 12
feet. The easements shall be dedicated vIa separate mstrument to the CIty
as stated 10 Sec 26-33(a) of the code.
~
b
c;'{...
Page 2
Semsco International Office/Warehouse
File No NWSP 98-012
D~ARTMENTS INCLUDE REJECT
1/ The UtIlIties Department will not reqUIre surety for mstallatlon of the
water and sewer utilIties, on condition that the systems be fully
completed, and given to the City before the first permanent meter is set.
Note that setting of a permanent water meter is a prerequisite to
obtaming the certificate of occupancy
/ LDR Chap. 6, ArtIcle IV, Sec. 16 reqUIres that all points on each
building will be withm 200 feet of an eXIsting or proposed fire hydrant.
Please revise the plan to meet this condition by showmg all proposed
hydrants.
;/ Appropriate backflow preventers will be reqUIred on the domestic water
servIce to the bUIlding, and the fire sprmkler line if there IS one, in
accordance wIth Sec 26-207
~ A buildmg permit for thIS project shall not be Issued until thiS office has
(y
approved the plans for the water and/or sewer Improvements reqUIred to
serve the project. (Sec. 26-15)
/ Any waste stream from manufacturing processes must meet the city's
pretreatment requirements. If applIcable, add sampling point to allow
monitoring of thIS waste stream. (Sec 26-143,26-147)
FIRE .{ -r.P
i ",.t' ,~
Comments. '(\ 1 t" '( ~,y)
/ !
;
No portIon of the buIlding shall be more than two hundred feet (200')
from a hydrant. The security gate shall conform to the followmg Fire
Department's reqUIrements.
The minimum performance for all security gates should be as follows:
1) All gates must have one securIty entry code (0911).
2) The gate must remain open until the Fire-Rescue umts have
completed the call and have reentered 0911 while leaving.
3) Gates may be operable by telephone from our dispatch office.
A phone call from our dispatchers will open the gate and a
second call will be reqUIred to close the''''gate.
4) In case of power faIlure, the gate shall open automatically and
remain open.
5) An exceptIOn Will be where a 24-hour security guard is stationed
at the gate
6) Authorized key secunty boxes (Le. Knox, NuTech/FaII Safe)
should be located on all buildmgs where alarms and/or sprinkler
systems are located to assist m mimmlzing damage due to rapId
forcible entry
7) AuthOrIzed key secunty boxes may be used on gates, prOVIded
each gate has one and It IS well marked. A key security box on
\L
o
Page 3
Semsco InternatIOnal Office/Warehouse
FIle No NWSP 98-012
DEPARTMENTS INCLUDE REJECT
a gate will not be used in heu of any other sectIOn of this letter
8) No other code numbers, operating methods or key systems will
be kept on file by the Fire Department.
9) In the event our umts are unable to gam rapid entry With the
above methods, It will reqUlre us to use rapId forcible entry
methods to gam entry The City of Boynton Beach and/or the
FIre Department shall not be responsible for, or incur any costs
as a result of gammg access into any specific area.
10) Information on where authonzed key security boxes can be
purchased IS avaIlable from Boynton Beach FIre-Rescue FIre
Safety DiviSIOn by callmg #(561) 735-0272 dunng normal
bUSIness hours.
The liability of a delayed Fire-Rescue response to an emergency in your
community should be a serious concern.
POLICE f
Comments. None ';,{l
ENGINEERING DIVISION
Comments.
V PrOVIde a Signed and sealed, scaled draWIng of all proposed bUlldings
and structures IncludIng the following: off-street parkmg areas,
driveways, sidewalks, traffic control devices, fences, walls, hghting
fixtures and dumpster location(s) With all necessary dlmensiomng. [LDR
Chapter 4, Section 7.A.]
/ ProVide a landscape plan at the same scale as the site plan and as
reqUlred by state law, includIng the following; proposed berms,
watercourses and topographIC features Including their elevations. [LDR
Chapter 4, Section 7 C ]
~ All parkIng areas shall conform to Chapter 23 of the Land Development
RegulatIOns Including Standard Drawing B-90012 & B-90013
-
/ ,.
All dram age structures and french dram shall conform to Chapter 6 and
23 of the Land Development RegulatIOns mcluding Standard Drawmg B-
91107 (mmlmum pIpe size IS 15 Inches In diameter). [LDR Chapter 6,
Article IV, SectIOn 5.A.2.a.]
eJ All plans submitted for specific permits shall meet the City'S code
reqUIrements at time of application. These permits Include, but are not
hmlted to the follOWIng: site lightIng, paving, dramage, curbing,
landscapmg and lITIgation. Permits reqUIred from other permItting
agencies, such as FDOT PBC, SFWMD DERM, L WDD DEP and any
others, shall be Included WIth your permIt request.
Page 4
Semsco InternatIonal Office/Warehouse
File No NWSP 98-012
DEPARTMENTS INCLUDE REJECT
@ ProvIde catch basms at both ends of drain pIpes at both dry detentIOn
areas. Catch basins at west end of the northerly detentIOn area and in the
roadway swale should be bubble-up structures and the catch basins at the
north end of the detentIOn area west of the building and at the east end of
the north detentIon area should be overflow structures. [LDR Chapter 6,
Article IV, Section 5.B 1 ]
V Change 25' backup dimension to 27' per CIty Standard Drawing B-
90013
1/ Maximum WIdth of dnveway at nght-of-wav line is 32 ft per LDR
Chapter 23, Article II.H.l
~ Show handicap accessibility path from SIdewalk m R/W to building per
Flonda Handicap Accessibility Code.
V It is recommended that a 6' SIdewalk be considered m front of building
to act as the wheel stop in heu of mdIvIdual wheel stops. See CIty
Standard Drawmg B-90012.
~ It IS recommended that detention area(s) be constructed to mclude
proposed are "designated fur future expanSIOn" If thIS area is to become
impervIOUS.
BUILDING DIVISION
Comments.
25 The approved sign program for High Ridge Commerce Park PID does
not include approval for site signs. Therefore to properly review the ~~
request for the proposed site sign the applicant shall remove the SIte SIgn
from the plans and make a separate submIttal to the city requestmg -1' fa y
approval to modIfy the approved SIgn program. The submIttal for the
modificatIon shall mclude but not be hmIted to the below listed d5 f' J
informatIon. The mformatIon for the SIgn program modIfications shall -r:J2
depIct the SIgn and SIgn structure in compliance with the SIgn regulatIons if(v J\'<:>
identified in Article IV, SectIOn 2 and 7 of the Sign Code (Chapter 21 of
the Land Development Regulations) and Section 10.1. of the Commumty
Design Plan (Chapter 9 of the Land Development Regulations).
a. ProVIde an elevatIon view drawmg of the proposed SIgn
mcluding the structure to whIch It IS attached.
b DImension the distance from fimsh grade to the highest point of
the sign and/or structure (maxImum heIght allowed IS 20 feet).
c. Show the sign copy and, where applicable, logo
d. DImenSIOn the width and length of the sign face, sign copy
and/or logo Also mdIcate the total area III square feet
Page 5
Semsco InternatIOnal Office/Warehouse
File No NWSP 98-012
DEPARTMENTS
26
v
y
~
f?-~
(maximum area allowed IS 64-sq ft. for both sides of a double-
faced sIgn)
e. DImenSIOn the SIze of the structure and/or frame to which the
sIgn Will be attached, such as the size of the pole and sign frame
for a pole mounted sign or the size of the sign base and frame
for a sign that has a base with an architectural sign frame.
f. Identify the color name, color-code and manufacturer of the
colors proposed for the SIgn face, SIgn copy and/or logo Also
IdentIfy all colors ofthe SIgn structure and frame.
g. IndIcate wIth a note whether the SIgn is Illummated and, where
applicable, specIfy type of illumination.
h. Identify WIth a note on the landscape plan the location of the
landscape materIal that IS required by the sign code at the base
ofthe sign (Article III, SectIOn 3 of the SIgn Code)
l. DImenSIon no less than ten (10) feet from the property Ime to
the leading edge of the site SIgn.
Chapter 9 - Commumty DeSIgn Plan, SectIOn 10.1.1, of the Land
Development RegulatIOns, speCifies that, "Signs shall be deSigned and
treated as part of the archItecture of the buIldmg and shall be revIewed at
time of site plan review" Therefore, add to the submIttal the below
hsted wall sign informatIOn. The data shall comply With the approved
sign program for High RIdge Commerce Park PID
a. On the elevatIOn VIew drawmgs dimension the wIdth and height
of the proposed wall signage
b IndIcate m tabular form, on the elevatIon view drawmg, the
square foot area of each wall SIgn. Note; the allowed SIze of
slgnage is Identified m Section 2, ArtIcle IV, of Chapter 21 -
SIgn Code and the method to determme the SIgn area IS defined
m Chapter 1 - General ProviSIOns, ArtIcle II - DefimtIons (SIgn,
area of).
c IdentIfy the sign colors, sign style, letter style, location and size
of non-word depIctIon signage.
27 Add to the proposed Landscape/Site Plan and SIte and EngmeerIng Plan
a labeled symbol that represents the location and path of the accessible
route that is reqUired between the access aIsle at the accessible parkmg
spaces and the accessible bUilding entrance Place a note on the
Landscape/SIte Plan and Site Engineermg Plan, next to the labeled
symbol, mdlcatmg that the accessible route IS m complIance WIth the
Florida Accessibility Code for Building Construction. Also Identify on
the proposed Landscape/SIte Plan the width and type of materIal that IS
proposed for the accessible route. [flOrIda Accessibility Code for
BUIldmg ConstructIon, SectIon 4.3, Accessible Route and SectIon 4 6,
Parkmg and Passenger Loading Zones]
-/ Note: The IllustratIOn of the accessible route that IS reqUired to be shown
INCLUDE REJECT
0v
~
{
-l ~A
':,(ff
Page 6
Semsco InternatlOnal Office/Warehouse
File No NWSP 98-012
DEPARTMENTS
on the drawings submItted for sIte plan revIew may be general in nature.
However, the subsequent permit drawings (construction plans) shall
contam specIfic mformatIOn to determine that the accessible route
complies WIth the technical regulatIons of the accessibility code. The
mformatlOn shall include but not be limited to the followmg:
a. Site plan and Drainage plan - Label the location of the path
with a symbol. Place a note on the Site Plan and Drainage Plan,
next to the labeled symbol, indicatmg that the accessible route
complIes with the regulatIOns specified in the Florida
AccessibilIty Code for Building Construction.
b. Site plan - DImension the width of the path and Identify the
type of constructlOn material proposed for the path.
c. Site plan - SpeCify the cross slope of all sections ofthe route
d. Site plan - IdentIfy the slope of all sectIons of the route.
e. Site plan and Drainage plan - Identify the location of all curb
cuts.
f. Site plan and Drainage plan - Identify the location of all ramps
mcluding curb ramps. Dimension the length of each ramp and
IdentIfy the slope and cross slope. Where applIcable, show and
identify the slope of the flared sides of the ramps or show and
Identify the return curbs. At all ramps dImension the wIdth and
length of the landmgs that are required at the top and bottom of
each ramp Also specIfy the slope and cross slope of the top and
bottom landing.
g. Site Plan - Identify the locatIon of the detectable warnmg
surface and specify the type of surface.
h. Site plan - DimenslOn the vertIcal clearance at all locations
where there IS a change of material along the route mcluding the
entrance to buildmg.
i. Site plan and/or Paving & Drainage plan - The permIt plans,
where applicable, shall include detail drawings of the accessible
ramps. The detaIl drawings shall correlate with the locations of
the ramp(s) that area depIcted on the sIte plan and/or paving and
dramage plan. The detail drawmgs of the ramps shall show.
type of constructIon material, type of surface finish, WIdth,
length, slope and cross slope. The drawmg shall also show and
specIfy the width, length, slope and cross slope of the top and
bottom landings and, where required, slope of flared sides or
return curbs or approprIate handrails and edge protection.
The SIte Engmeering Plan shows an eight plus mch difference between
the back edge of the side located at the front of the building and the
INCLUDE REJECT
Page 7
Semsco InternatIOnal Office/Warehouse
File No NWSP 98-012
~I
l) If/
DEPARTMENTS INCLUDE REJECT
fimsh floor elevatIOn of the building. Amend this area to comply with
the accessibilIty code regulatIons.
/' At tIme of permit review identify the setback dimenSIOn from each
property [me to the leading edge of all four Sides of the building.
/" To clarIfy the location of the canopy shown at the front of the building
show and dimension the canopy on the landscape/site plan and
dimenSIOn the canopy on the floor plan drawmg.
PARKS AND RECREATION
Comments.
33 rJ(f'()~
FORESTER/ENVIRONMENT ALIST
COlllJllents.
V There was no tree survey included m the set of plans. The applIcant
should mdIcate on the landscape plan any eXlstmg trees on the SIte which
Will be preserved, relocated or removed/replaced.
PLANNING AND ZONING
Comments.
/ All plans shall be Signed and sealed at tune of building permit submittal.
y The Plannmg Department recommends the submittal of a 24 x 36 survey
bound as part of the submittal to prevent the possibility of loss durmg the
reView process.
/ Correct the bUlldmg square footage data to match on all documents, ?
applIcatIons and tabular mformatlOn. Chap. 4, Sec. 7
/ ,"-
Correct the SIte plan acreage/square footage information to match survey
mformation.
~ Label and dimenSIOn on the site plan and landscape plan all easements
shown on the survey Chap 4, Sec. 7, Par B
~ PrOVIde traffic control markmgs and signage locatIons on the SIte plan. 7
Chap 23, Art. II, Par B -
V ProVide the followmg information m the SIte plan tabular data. Chap 4, F
See 7, Par E.
Page 8
Semsco International OfficelWarehouse
File No NWSP 98-012
V'~t
DEPARTMENTS INCLUDE REJECT
A.) Revised sIte square footage.
B) RevIsed buildmg square footage.
C) Parking calculatIOns and number of employees.
D) BUIlding heIght.
E.) Vehicular use landscape space. Chap 7.5, Art. II, Sec. 5, Par G
F) PID open space, required and proposed.
G) Setback chart Front 30', sIde 20' and rear 30'
H.) Zoning and land use desIgnatIOns.
1.) Loading requirements (1 space). Chap 2, Sec. II, Par J.2.
y Provide surrounding zomng and land use designations for adjacent
properties. r_
>> t-<<'
Include on the SIte plan the proposed type, source and style of lIghting. "t
43 ? \Y
Chap. 9, Sec. 10, Par F., Chap. 23, Art. II, Par A.
y Provide parkmg detaIl that is dimensioned according to the CIty of
Boynton Beach, drawing #B-900l2.
45 Provide dumpster detail. Chap 7.5, Art. II, Sec. 5, Par J ~1-'~
~ On the site plan reconfigure the entry drive width to the reqUIred
maximum of 32' at the property line. Provide a 25' radius where the
dnve connects to the vehicular lane. Chap. 23, Sec 2, Par H.l
y Provide 27' drive aisles in parking areas. City of Boynton Drawing B-
90013
/ --,
Provide a handicap accessible walk from the building entry to the right- (
of-way SIdewalk. Chap 9, Sec. 10, Par B
y Note on the site plan that the swmg gate provIdes for emergency access
and dumpster access at all hours.
50 Provide a SIgn detaIl and elevations dimensIOned as follows on the site
plan. Chap 21, Art. III, Sec. 5.A. .r .-?
,/
A.) One freestandmg sign 64 square feet maximum face, 20' -
maximum heIght.
B) One wall sign, 50 square feet maximum face.
/ Reduce the outdoor storage area to meet the 15% maximum PID
requirement. Chap. 2, Sec. 6, Par E.! A("
10' >' 10 I ~ po -(!f 5 t <IV
52. Providejsafe site tnangles on the site plan.afts ltHuh;lI3pe flljChap 7.5, J~ v ~
Art. II, Sec. 5, Par H.t
I) I) J (
lJ\.) I /I Il'r'~ ~
~e
Of.) 4'17 (
Iv.., .! ftptl _LOcft'T1iiii .. TtU.4fVl;~<; I~~ IO~
u~ f (WfG/l- T1 l \ J-.I E ,
-nit
f>>'J~ .
t\i~
,.r~
~"~ .
(\.AtJ~ ~~fi
. 4/)& , LMV
tJ ~ ';)\"'''I 5 I t u;'
Lft N~.Jlct
Page 9
Semsco International Office/Warehouse
File No NWSP 98-012
DEPARTMENTS
53 Locate all proposed and eXIstmg fire hydrants on aU plans.
",<tiVf
~t3
54
y
7'
~
59
Submit a colored graphIcs board and matenals board showmg the
proposed lluttclIats and buildm olors. Chap. 4, Sec; 7, Par D.2.
5iv~~ EL. C/V
If dumpster is located at the rear of the property, a mIllImum 50' turnmg
radius shall be clear of stored matenals to allow emergency vehIcle
turning movements. Chap. 23, Art. II, Par I.
Provide the reqUIred landscapmg around the dumpster Chap 7.5, Sec. 5,
Par J
Label and dimension all the reqUIred landscape buffers. Chap 7.5, Art.
II, Sec. 5, Par D and E.
The landscape plan shall reflect the approved perimeter greenbelt buffer
plans for High Ridge PID Chap. 2, Sec. 7, Par H.17
Label and dimension the mmimum tree spacmg along the right-of-way
frontage (3 Palms = 1 tree) Chap 7.5, Art. II, Sec. 5, Par D
o Provide a plantmg detaIl sheet mcluding the required plant lIst. Chap. 4,
Sec 7, Par C
tete
@
~vide landscape notes to mclude the following:
~ A notatIOn on method and source of lITIgatIOn. Chap 4, Sec. 7,
Par C
~ A matenal other than cypress shall be used for mulching beds.tT'
.~ Intenor parkmg lot landscape area~Chap. 7.5, Art. II, See 5,
Par C. PI (ZG(il,J\[U5{) oz; rP-QVIO(: 0
PID open space requirements. Chap 2, Sec. 7, Par H.13 --
Extend hedge material along the west property line to the front edge of
the parkmg lot pavement. The hedges along mternal lot lines shall be
labeled "maintamed at 4' mlllImum - 6' maxImum height. The hedge
along the right-of-way frontage "maintained at 3' minimum height.
Chap 7.5, Art. II, Sec. 5, Par D and E.
ProVide trees m the western parking lot terminal Islands. Chap 7.5, Art.
II, Sec. 5, Par G
PrOVide architectural plans with applicable tabular data. Chap 4, Sec. 7,
Par D
INCLUDE REJECT
f? \ t::i lL
;!-- D r
?
?
',<:Y' ..Q
, c9-~
-(p-r
oJ'
{- pI",
'F-
c..:?
{ (!.'" l
tbme
s:lprojectslSemsco InternationallNWSPI1 st review comments
Fe ( (Y\~
Il./ < 6 ~ if =-.r p (,,-Vi-
fr'?/?;> ?
(
~v
t,...bC ~
1L~~
// ~e-s ?fP
~) 5'.1'1 ?~,,.,~
SI';'
,.-
~Q -
)
,
(),-I 1lf1f LtrN Pf5t{y;{ ftr+-r-.J) uJi IItJ/0 -n+e ~~' ft3tL-'I'-t-1b-'tL.-. fi D ~'l}~ )
P floJ\ o~ (T~t-- l;fo l-f dE- f/LorJ ~E pj.Jp f} CoIJTIt'/JUOc)-S
Iftwt- t9z0tv~ 71fG- 'AIS i l-~ t 06e or 7lff' 8,-,rt=-6f2-,
7/fE COC Of Wr- ftt.-o,vu 71ft fGp./lE ~ IJtY tMOr./"6'o 7?J lH-E
BUfl-6rL (V M6!7J ~;26-Q~~~.. (+t06t~ /ftoNG
-n+e S1 Of L{,If ((1JfS Musr 16 C-kTf;vL)(-O 70 THt' f>ufff^-
~Oloe-- .
~ CH. 2- 5ec 7 f'ltfL tt )r"f
APPLICATION TRACKING LOG
PROJECT TITLE: Semsco International OfficelWarehouse FILE I: NWSP 98-012
PROJECT LOCATION: Lot 1 S, Hisrh Ridsre Commerce Park
TYPE OF APPLICATION: New Site Plan
PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME
AGENT Lawson, Noble at Webb, Inc. ADDRESS:
AGENT PHONE: (560684-6686 FAX: (561)684-1812
DATE REC'D: 717/98 AMOUNT
RECEIPT NO
12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLICATION/SUBMITTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
DATE DENIED:
o
o
o
o
o
DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
DATE OF SUBMITTAL ACCEPTANCE LElTER:
INITIAL 1 ST REVIEW MEMO: DATE SENT
MEMO NO 98-207
RETURN DATE: 7/24/98
1 ST REVIEW COMMENTS RECEIVED
UTIL.
PW
PARKS
FIRE
POLICE
PLANNING
BLDG/ENGR
FORESTER
DATE
<Ii
DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
o
MEMO NO
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMOI DATE PLANS MEMOI DATE
UTIL. 0 POLICE 0
PW 0 PLANNING 0
PARKS 0 IWlG/ENGR 0 qJ'-;;i.. 7(, ';}!2/
FIRE 0 FORESTER 0
BOARD MEETING DATE:
BOARD:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED:
DATE:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE:
S:\FORMS\TRACKING LOG FORM
revised 4/25/97
FIRE & LIFE SAFETY DIVISION
Memorandum No 98-288
fD)! m @ lli U \
lUU JL' 3 \S~b
~1.
lJ
I
Q' ,
, .
,..c ....
NFPA Life Safety Code 101, National Fife Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO Mike Rumpf, Act. Director
Planning & Zoning DIvIsion
FROM Steve Gale, Fire Marshal ~ /
Deputy Chief - Fire Rescue be;a~nt
DATE July 13,1998
SUBJECT Semsco Int'I Office/Warehouse
Lot 15 High Ridge Rd
NWSP 98-012
No portion of the building shall be more than two hundred feet (200') from a
hydrant. The security gate shall conform to the Fire Department's requirements
(see attached)
Attachment
CC File
The City of
Boynton Beach
Boynwn Beach Fire Rescue
100 E. Boynton /Jeach Boulevard
P.O. Box)1O
Boynton Beach. Florida ))425-0;10
Steven Gale. Deputy Chief of Operations
Phone: (407) 375-6331
FAX. (407) 375-6334
December 8. 1997
RE Security Gates & Emergency Access
To Whom It May Concern
Boynton Beach Fire-Rescue continues to maintain the position that secunty gates are
potentially detrimental to fire and rescue operations. The proliferation of security gated
communities has resulted in many problems for responding emergency apparatus trying to gain
entry
The minimum performance for all secunty gates should be as follows
10)
1)
2)
All gates must have one security entry code (0911)
The gate must remain open until the Fire-Rescue units have completed the call and have
reentere~ 0911 while leaving
.
3)
Gates may be operable by telephone from our dispatch office A phone call from our
dispatchers will open the gate and a second call will be required to close the gate
4)
5)
In case of power failure, the gate shall open automatically and remain open
An exception will be where a 24-hour secunty guard IS stationed at the gate
6)
Authonzed key secunty boxes (i e Knox, NuTech/ Fall Safe) should be located on a i
buildings where alarms and/or sprinkler systems are located to assist In minimiZing
damage due to rapid forCible entry
7)
Authonzed key security boxes may be used on gates, prOVided each gate has one and It
is well marked A key security box on a gate will not be used in lieu of any other section
of this letter
8)
No other code numbers, operating methods or key systems will be kept on file by the
Fire Department.
9)
In the event our units are unable to gain rapid entry With the above methods, it will
reqUire us to use rapid forcible entry methods to gain entry The City of Boynton Beacr
and/or the Fire Department shall not be responsible for, or Incur any costs as a resLit of
gaining access into any speCific area.
Information on where authorized key secunty boxes can be purchased IS available from
Boynton Beach Fire-Rescue Fire Safety DiviSion by calling #(561) 735-0272 dunng
normal business hours.
The liability of a delayed Fire-Rescue response to an emergency In your community shoulc ::;e
a serious concern
Sincerely,
Deputy Chief Ste en Gale
Operations DiVISion
Boynton Beach Fire-Rescue
Telephone #375-6331
America's Gateway 10 the Gulfstream
I(D) _m @ & u WI & mJ
inJj .IllS ~ 1 ~
I .J
PLA.,N"!G AND
ZONING DEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-192
TO
Mike Rumpf, Planmng & Zomng DIrector
C Larry Roberts, Pubhc Works DITeC10rCfl
THRU
FROM
Mark LIPS, SamtatIOn Foreman
SUBJ
New SIte Plan - 1 st RevIew - Semsco InternatIOnal/Warehouse
Lot 15, High RIdge Commerce Park
DATE
July 14 1998
The PublIc Works Department would request detailed drawmgs of dumpster enclosure
for SIze and shape for the above named proJect.
~C1~
ML/cr
CIT\' OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO
FROM.
M. Rumpf
Ofe R1g~
DATE
SUBJECT
REFERENCES
ENCLOSURES
I have no comments reference on thIS 1 st ReVIew
071698 FILE NWSP 98-012
SEMSCO Int. Office/Warehouse
PZ 98-207
U~ill
J1. t 6_
PlANNI AND
ZONIN
MEMORANDUM
UTILITIES DEPT NO 98 - 197
TO'
Mike Rumpf, Acting Planning Director
FROM.
John A Guidry, Utilities Director
DATE.
July 20, 1998
SUBJECT'
SEMSCO International Office/Warehouse - New Site Plan
We offer the following comments on this project:
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities In general, palm trees will be the only tree
species allowed within utilities easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way
2) Dept. of Health permits may be required for the water system serving this project. (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as
stated in LDR chap 6, Art. Sec 16, or the requirement imposed by insurance underwriters,
whichever is greater (see Sec 26-16(a)) Please submit these calculations with your Health
Department permit application and plans
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for SIgnature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. This fee will be determined based upon final meter size, or
expected demand.
5) Comp Plan pohcy 3C.3 4 reqmres the conservation of potable water City water may, therefore, not
be used for IrngatIOn where other sources are readily available.
SPECIFIC CONDITIONS
1) Water and sewer lines to be owned and operated by the City shall be included within utilities
easements Please also show all proposed easements on the engineering drawings, using a
minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as
stated in Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) LDR chap 6, Article IV, Sec 16 requires that all points on each building will be within 200 feet of
an existing or proposed fire hydrant. Please revise the plan to meet this condition by showing all
proposed hydrants
4) Appropriate backflow preventers will be required on the domestic water service to the building,
and the fire sprinkler line if there is one, in accordance with Sec 26-207
5) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
6) Any waste stream from manufacturing processes must meet the City's pretreatment requirements If
applicable, add sampling point to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (375-6404) of this office
JAG/PVM
Xc Skip Milor
Peter Mazzella
File
MEMORANDUM
UTILITIES DEPT NO 98 - 197
JL2'.
TO:
Mike Rumpf, Acting Planning Director
IvJ~Uidry, Utilities Director
Pl~NNING ~ND
ZONING OEPT.
l. ,
FROM.
DATE.
July 20 1998
SUBJECT
SEMSCO International Office/Warehouse - New Site Plan
We offer the followmg comments on this project.
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determme which trees may interfere with utilities In general, palm trees will be the only tree
specIes allowed within utilities easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities withm the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilIties the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way
2) Dept. of Health permits may be required for the water system serving this project. (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code reqUIrement of 1500 g P m. as
stated in LDR chap 6, Art. Sec 16, or the requirement imposed by insurance underwriters,
whichever is greater (see Sec 26-16(a)) Please submit these calculations with your Health
Department permit application and plans
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or withm 30 days of site
plan approval, whIchever occurs first. This fee will be determined based upon final meter size, or
expected demand
5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may, therefore, not
be used for lITIgatIOn where other sources are readIly available
SPECIFIC CONDITIONS
1) Water and sewer lines to be owned and operated by the City shall be included within utilities
easements Please also show all proposed easements on the engineering drawings, usmg a
mimmum width of 12 feet. The easements shall be dedicated via separate instrument to the City as
stated in Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) LDR chap 6, ArtIcle IV, Sec 16 requires that all points on each buildmg will be within 200 feet of
an existing or proposed fire hydrant. Please revise the plan to meet this condition by showing all
proposed hydrants
4) Appropriate backflow preventers will be required on the domestic water service to the building,
and the fire sprinkler line if there is one, in accordance with Sec 26-207
5) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
6) Any waste stream from manufacturing processes must meet the City's pretreatment requirements If
applIcable, add sampling point to allow monitoring of this waste stream. (Sec 26-143,26-147)
Please refer any questions on this matter to Peter Mazzella (375-6404) of this office
JAG/PVM
Xc Skip Milor
Peter Mazzella
File
RECREA TION & PARK MEMORANDUM
TO
Mike Rumpf, ActIng DIrector of Planmng and Zomng
KevIn John Hallahan, ForesterlEnvlronmentalIst I<}r
FROM,
Re:
Semsco International Office / Warehouse
New Site Plan-1st Review
DATE
July 24, 1998
m
AI."
There was no tree survey Included In the set of plans The applIcant should IndIcate on the
landscape plan any eXIsting trees on the SIte WhIch WIll be preserved, relocated or removed /
replaced, The project should contInue In the normal reVIew process.
KJh
FIle
rn
TO
FROM
DATE
RE
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. DD 98-233
100 m :~;~ rn
PLANNING AND
ZONING DEPT.
MIchael Rumpf ActIng PlannIng & Zomng AdmInistrator
~.e~
MIchael E Haag, Plan Review AdmInlstratorr''''
Raymond F DavIdson, P E City Eng~ D
July 24 1998 ~"....-
SEMSCO INTERNATIONAL OFFICE/WAREHOUSE (LOT 15, HIGH RIDGE
COMMERCE PARI\.. PID) - NEW SITE PLAN 1ST REVIEW
NWSP 98-012
We have reviewed the subject plans and offer the folloWIng comments that should be addressed pnor
to the project beIng forwarded for Board revIew
Build1ll2 DIvIsIOn (Site Specific Comments) - Michael E Haag (561) 375-6350
The approved sIgn program for HIgh RIdge Commerce Park PID does not Include approval for
sIte sIgns Therefore to properly revIew the request for the proposed .'iite .'iign the applicant shall
remove the site sIgn from the plans and make a separate submIttal to the city requestIng
approval to modify the approved sign program, The submittal for the modIfication shall
Include but not be limIted to the below listed Information The Information for the sign
program modIficatIons shall depIct the SIgn and SIgn structure In compliance wIth the SIgn
regulations IdentIfied In ArtIcle IV Section 2 and 7 of the SIgn Code (Chapter 210fthe Land
Development RegulatIOns) and SectIon 10 1 of the Commumty DesIgn Plan (Chapter 9 of the
Land Development Regulations)
a, ProVide an elevatIOn vIew drawIng of the proposed sIgn IncludIng the structure to which It
IS attached
DImensIon the dIstance from fimsh grade to the highest pOInt of the SIgn and/or sIgn
structure (maximum height allowed IS 20 feet)
Show the sIgn coPy and, where applicable, logo
DIl11enSlOn the WIdth and length of the sIgn face, sign coPy and/or logo Also Indicate the
total area 111 square feet (maxImum area allowed IS 64-sq ft for both SIdes of a double-
faced sIgn)
DllnenSlon the sIze of the structure and/or frame to whIch the sign will be attached, such as
the sIze of the pole and sIgn frame for a pole mounted sIgn or the size of the sign base and
frame for a sIgn that has a base wIth an archItectural sign frame
Identify the color name, color-code and manufacturer of the colors proposed for the sIgn
face sIgn coPy and/or logo Also IdentIfy all colors of the sign structure and frame
Indicate with a note whether the sIgn IS illumInated and, where applicable, speCIfy type of
Illummatlon
Identlt\r \vah a note on the landscape plan the locatIOn of the landscape matenal that IS
reqUIred by the sIgn code at the base of the sIgn (ArtIcle III Section 3 of the SIgn Code)
DIIllenSlon no less than ten ( 10) teet frolll the property Ime to the leadIng edge of the site
sIgn
b
c
d
e
f
o
~
h
Department of Development Memorandum No DD 98-233
Re ';emsco International Office/Warehouse New Site Plan 1" Review
July 24 1998
Page #2
2 Chapter 9 - Commul1lty DeSIgn Plan, SectIon 10 1 1 of the Land Development Regulations,
specIfies that, Signs shall be deSigned and treated as part of the architecture of the bUlldmg and
shall be reviewed at tIme of sIte plan review Therefore, add to the submittal the below listed
wal/,..,gn mformatlOn The data shall comply with the approved sign program for High Ridge
Commerce Park PID
a On the elevatIon view drawmgs dimenSion the width and height of the proposed wall
sign age
b Indicate m tabular form, on the elevatIOn view drawmg, the square toot area of each wall
sIgn Note the allowed size of slgnage IS Identified m SectIOn 2, ArtIcle IV of Chapter 21
- Sign Code and the method to determme the sIgn area IS defined m Chapter I - General
ProvIsions, Article II - Defil1ltlons (sIgn, area ot)
c IdentIfy the sign colors, sign style, letter style, location and size of non-word depictIon
slgnage
3 Add to the proposed Landscape/Site Plan and Site and Engmeenng Plan a labeled symbol that
represents the location and path of the accessible route that IS reqUired between the access aIsle
at the accessible park.mg spaces and the accessible bUlldmg entrance Place a note on the
Landscape/SIte Plan and SIte Engmeenng Plan, next to the labeled symbol, mdlcatmg that the
accessible route IS m compliance wIth the Flonda AccessIbility Code for BUlldmg Construction
Also Identify on the proposed Landscape/SIte Plan the width and type of matenal that IS
proposed for the accessIble route [Flonda AccessIbilIty Code for BUlldmg Construction,
SectIOn 4 1 AccessIble Route and SectIon 4 6 Parkmg and Passenger Loadmg Zones]
4 Note. The illustration of the accessIble route that IS reqUIred to be shown on the drawmgs
submitted for site plan revIew may be general m nature However the subsequent permIt
drawmgs (constructIon plans) shall contam speCIfic mformatlon to detenmne that the accessIble
route complies with the techl1lcal regulations of the accessIbility code The mformatlOn shall
mclude but not be Illmted to the tollowmg
a 'ile plall alld f)ra//IaKe plall - Label the locatIOn of the path wIth a symbol Place a note
on the Site Plan and Dramage Plan, next to the labeled symbol mdlcatmg that the
accessible route complies with the regulations speCIfied m the Flonda AccessIbility Code
for BUlldmg ConstructIon
b \ill! plall - DllnenslOn the wIdth of the path and Identify the type of construction matenal
proposed for the path
c \ile plan - SpeCIfy the cross slope of all sectIOns of the route
d \ile plall - Identify the slope of all sectIons of the route
e \ile plall alld f)raillaKe plan - Identify the locatIon of all curb cuts
f \ile plalllllld f)rwlIllKe plllll - IdentIfy the locatIOn of all ramps mc1udmg curb ramps
DllnenSlon the length of each ramp and IdentIfy the slope and cross slope Where
applicable show and IdentIfy the slope of the flared sIdes of the ramps or show and
Identl(Y the return curbs At all ramps dimenSIon the wIdth and length of the landmgs that
are reqUired at the top and bottom of each ramp Also speCIfy the slope and cross slope of
the top and bottom landmg.
Department of Development Memorandum No DO 98-233
Re Semsco InternatIOnal Office/Warehouse New Site Plan I sl Review
July 24 1998
Page #3
g. \fle plall - IdentIfy the locatIon of the detectable warlllng surface and specify the type of
surface
h \fle plall - DImensIOn the vertical clearance at all locations where there IS a change of
matenal along the route mcludmg the entrance to bUlldmg.
\fle pllllllllld or l'lll'illR (~ f)rWllaRe plall - The permIt plans, where applIcable, shall
mclude detatl drawmgs of the accessible ramps The detail drawmgs shall correlate wIth
the locatIons of the ramp(s) that are depicted on the sIte plan and/or pavmg and dramage
plan The detatl drawmgs of the ramps shall show type of constructIon matenal, type of
surface fimsh, width, length, slope and cross slope The drawmg shall also show and
speCIfy the wIdth, length, slope and cross slope of the top and bottom landmgs and, where
reqUired, slope of flared SIdes or return curbs or appropnate handrails and edge protectIOn
'i Indicate the proposed filllsh floor elevation on the landscape/site plan drawmg Also provIde a
copy of the South Flonda Water Management Dlstnct permit that venfies the proposed fimsh
floor elevatIon IS m complIance wIth the mmlmum standards
6 The SIte Engmeenng Plan shows an eIght plus mch dIfference between the back edge of the SIde
located at the front of the bUlldmg and the filllSh floor elevatIOn of the bulldmg. Amend thIS
area to comply with the accesslblllty code regulatIons
7 At tIme of permit revIew IdentIfy the setback dimenSIOn from each property Ime to the leadmg
edge of all four Sides of the bUlldmg.
8 To c1anfy the location of the canopy shown at the front of the bUlldmg show and dimenSIOn the
canopy on the landscape/sIte plan and dImenSIOn the canopy on the floor plan drawmg.
En2meenm! DiVision (Site Specific Comments) - SebastIan Puda & Ken Hall 'i61-375-6280
ProvIde a Signed and sealed, scaled drawmg of all proposed bUlldmgs and structures mcludmg
the followmg off-street parkmg areas, dnveways, SIdewalks, traffic control deVIces, fences,
walls, hghtmg fixtures and dumpster locatlon(s) with all necessary dlmenslolllng [LDR
Chapter 4 5ectlOn 7 A ]
2 ProvIde a landscape plan at the same scale as the sIte plan and as reqUired by state law
ll1c1udll1g the followll1g, proposed berms, watercourses and topographIc features ll1c1udll1g their
elevatIOns [LOR Chapter 4 SectIOn 7 C ]
3 All parh.ll1g areas shall conform to Chapter 23 of the Land Development Regulations mcludll1g
Standard Drawmgs 8-90012 & 8-90013
4 All dramage structures and french dram shall conform to Chapter 6 and 23 of the Land
Development Regulations mcludmg Standard Drawll1g 8-91007 (mlmmum pIpe size IS l'i
mches m dIameter) [LDR Chapter 6 Article IV SectIon 'i A 2 a ]
Department of Development Memorandum No DD 98-233
'I
Re Semsco InternatIOnal Office/Warehouse, New SIte Plan 1 RevIew
July 24 1998
Page #4
I) All plans submItted for specIfic permIts shall meet the CltylS code reqUIrements at tIme of
applicatIon These permIts mclude, but are not limIted to the followmg sIte IIghtmg, pavmg,
dramage, curbmg, landscapmg and Irngatlon PermIts reqUIred from other permIttmg agencIes,
such as FDOT PBC SFWMD DERM L WDD DEP and any others, shall be mcluded wIth
your permIt request
6 ProVIde catch basms at both ends of dram pIpes at both dry detentIon areas Catch basms at
west end of the northerly detentIon area and m the roadway swale should be bubble-up
structures and the catch baSInS at the north end of the detentIon area west of the buildIng and at
the east end of the north detentIon area should be overflow structures [LDR Chapter 6 ArtIcle
IV SectIon I) B 1 ]
7 Change 21)' backup dImenSIon to 27' per CIty Standard DraWIng B-90013
8 MaXImum WIdth of drIveway at flght-of-way Ime IS 32 ft per LDR Chapter 23 ArtIcle II H 1
9 Show handIcap accessIbIlIty path from SIdewalk In R/W to bUIldIng per FlOrIda HandIcap
AccessIbilIty Code
RecommendatIons
ConSIder 6' SIdewalk In front of bUIldIng to act as the wheel stop In lIeu of IndIVIdual wheel
stops See CIty Standard DraWIng B-900 12
2 Construct detentIOn area(s) to mclude proposed area "deSIgnated for future expansIon" If thIS
area IS to become llnpervlOus
MH/SP/KH ck
Xc Bulent Kastarlak
Don Johnson
SebastIan Puda
Ken Hall
l \1\ DOcllmcnts 'km,co InlLrnallOnal ()Ilic~ \\ ardllllls~, 'kw SIlL Plan I sl R~\'le\\ do,
~.I/I/
-
r:~'
, .
Board of Supervisors
C. Stanley Weaver
Kermit Dell
John I. Witworth III
Secretary/Manager
William G. Winters
Assistant Manager
Ronald L. Crone
Attorney
Perry & Schone, P.A.
LAKE WORTH DRAINAGE DISTRICT
fOl ~ JiL1Ll i{i p,
.In! r 18
PL '---;----.--...
~
13081 MILITARY TRAIL
DELRAY BEACH FLORIDA 33484
.....---.~~-.---
August 17,1998
Trambri J Heyden, AICP
Director Planning and Zoning
City of Boynton Beach
Post Office Box 310
Boynton Beach, Florida 33425-0310
Re Semsco International Office/Warehouse
Lot 15, HIgh Ridge Commerce Park
Technical ReVIew Committee Agenda- August 18, 1998
Dear Ms Heyden.
This project is located outside the Lake Worth Dramage District's boundary and the
DIstnct has no comments regarding the referenced project
Thank you for giving us the opportunity to reVIew and comment on this project.
Should you have any questions or concerns please contact me
Respectfully,
LAKE WORTH DRAINAGE DISTRICT
atu~~
Lisa A Rowland
Right-of-Technician
lar
Delray Beach & Boca Raton (561) 498-5363. Boynton Beach & West Palm Beach (561) 737 3835 . Fax (561) 495-9694
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. 98-276
\0), m @ m ~ w ffi ~
1\1\1 lIB 2 4I1lIll .\!U
PlANNING AND
ZONING DEPT.
TO
MIchael Rumpf, Actmg Plannmg and ZOnIng Admmlstrator .f,rij
-ft t: 1fY' u
MIchael E Haag, BUlldmg Code PermIt AdmInIstrator '0'"
August 21 1998
FROM
DATE
RE
SEMSCO INTERNATIONAL OFFICEIWAREHOUSE (LOT 15, HIGH
RIDGE COMMERCE PARK PID) - NEW SITE PLAN (NWSP 98-012)
2"'f) REVIEW COMMENTS
We have revIewed the subject plans and recommend that the request be forwarded for Board
revIew wIth the understandmg that all remammg comments wIll be shown m compltance on the
permIt drawmgs
Buildin2 Division (Site Soecific and Permit Comments)
To c1anfy the slgnage proposed for the project, place the below Itsted notes on the plans
a. Add the followmg to the sIte plan drawmg "SIte slgnage IS not approved A
modIficatIon to the sIgn program WIll be reqUIred pnor to any sIgn bemg permItted
for placement on the sIte
b Also place the followmg note on the elevatIon vIew drawmgs of the bUlldmg
Buddmg slgnage shall comply WIth the slgnage specIficatIOns IdentIfied m the
approved High RIdge Commerce Park sIgn program
2 Amend the engmeenng plan to show compltance WIth the Flonda Accesslblhty Code for
BUlldmg ConstructIOn WIth respect to the accessible route reqUIred between the access
aIsle at the accessIble parkmg space and the accessIble entrance of the buddmg.
MEH/ck
Xc Bulent Kastarlak
Don Johnson
c \1\ D(,,:ull1~nls"kll1s':o Inkrnalional ()tli.:~-\\ ardlOUS~ '\~\\' Sik Plan 2nd R~vi~w do.:
,
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-192
-
m~ @ m U Wi m m
Jl , '51998
PLANNING AND
ZONING DEPt
THRU
Mike Rumpf, Planmng & Zoning Director
C Larry Roberts, Public Works DrrectorM
TO.
FROM.
Mark LIPS, Sanitation Foreman
SUBJ
New Site Plan - 1 st Review - Semsco IntemabonallW arehouse
Lot 15, High Ridge Commerce Park
DATE.
July 14, 1998
The Public Works Department would request detailed drawings of dumpster enclosure
for size and shape for the above named project.
~Cl~
MLlcr
.J..J
~
"
c'
'"
<.:;-
Y'
"
cA
:)
:.J
(">-
""
--:::>
"""':::>
,,,;
.2
"'.
.-'>
~-,
t::-.
~
cz:=
..;..::::'
c::--
'~~
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 98-207
FROM.
Bulent Kastarlak, Director of Development
Steve Gale, Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Ofc. Robert Riggle, Police Department
Pete Mazzella, Utilities Dept.
Michael Haag, Building Division
Ken Hall, Engineering Division
Larry Roberts, Public Works Director/City Engineer
John Wildner, Parks Superintendent
Ray Davidson, Engineering Division
~!..c 7--<;-
Michael W Rumpf
Acting Director of Planning and Zoning
,-...,
In) ~ @ ~ ~ W ~ !~
lJ\1 JUl I 5 1998 W
TO'
PLANNING AND
ZONING DEPT.
DATE.
RE.
July 9, 1998
SITE PLAN REVIEW PROCEDURES
1 ST Review - New Site Plan
Project
- Semsco International OfficelWarehouse
Location - Lot 15, High Ridge Commerce Park
Agent Lawson, Noble and Webb, Inc.
File No NWSP 98-012
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on Julv
24. 1998. When preparing your comments, please separate them into two categories; code
deficiencies with code sections referenced and recommendations that you believe will enhance
the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
1 Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments.
2. The documents submitted for the project were determined to be substantially complete, however,
if the data provided to meet the submittal requirements is insufficient to properly evaluate and
process the project based on the review standards or the documents show code deficiencies,
additional data and/or corrections should be requested by the reviewer by contacting Scott
Barber
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents.
4 Technical Review Committee membe."(s) shall identify in their comments when the plans depict or
when the location and installation of their departmental required improvements may conflict with
other departmental improvements
" Page 2
Development Department Memo PZ 98-207
Semsco International OfficelWarehouse
TO' TRC Members
5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified.
6. I~ a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above. to me The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process.
All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please
include the name and phone number of the reviewer on this memorandum. Scott Barber will be the
Planning and Zoning staff member coordinating the review of the project.
First review comments will be transmitted to the applicant along with a list of Technical Review Committee
(TRC) members. The applicant will contact TRC member{s) to clarify comments. Amended sets of plans
will be submitted prior to, or brought to the TRC meeting. Amended plans and outstanding comments will
be reviewed at the TRC meeting to confirm that the project is ready to move forward to the Planning and
Development Board meeting.
MWR.bme
Attachment
XC: (Memo Only)
William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
Don Johnson, Building Division
Sebastian Puda, Engineering Division
Bob Donovan, Building Division
Central File
S. \Projects\Quantum\Semsco Intemational\NWSP\ 1 "'review-plans
LN\'
. . . . . . . . ... .<<
Lawson, Noble & Webb, In<<
ENGINEERS · Pl.ANNERS · SUAVEYOI
SEMSCO INTERNATIONAL OFFICE/W AREHOUSE
WE HEREBY CERTIFY THAT THE DRAINAGE DESIGN FOR THE SEMSCO
INTERNATIONAL OFFICE/WAREHOUSE PROJECT WILL CONFORM TO ALL RULES,
REGULATIONS, CODES, ETC INCLUDING, BUT NOT LIMITED TO, CHAPTER 6,
ARTICLE IV, SECTION 5 OF THE LAND DEVELOPMENT REGULATIONS OF THE
CITY OF BOYNTON BEACH
? ? .'1 ~
T, P E.
NO 38707
A330ENGCERT .7-7-9B.DOC
LAWSON NOBLE . Wall, INc. · 420 Cok.mbla Drive · west Palm Beach. FL 33409
(561) 684.e888. F8x: (561) 684-1812 .Inw-wpbOInw-inc.cam
West PUn 8eItch . Port Sl Lucie . Plantation
------. ------
#
Lr-~\V
. . . . . . . . . . . . .. ..-
Lawson, Noble & Webb, Inc.
West Palm Beach. Broward. Port St. Lucie
420 COUTlbIa 0IIIIe West ~ Beac:tI. Fl 33409
Eng--
PH.(561J6lI4-66ll6 PIa-.
Fac(56IJ684-1812 ~
Job Name
..-.
~s
~ ......
. ---
Job No
~..:. -
.~ ---
-?
Sheet No.
Of
Caiculated By
Checked By
L; ___
Date
- _.I1__:':v
-- -....
Date
!
0.....--.
~
, J'\:~;
! ! I i
l): I ^\ i _ : -_: ~-~_..~-:-:. -.-i.
;~1 .~_ \ f_~7',"~ ~~_.'". -~4--> .~.!.'.'~,:-:_ ~ i~.
----,..--"---.-
, '
ii,
I ! I
i ; I I I I
! \--;-D\~ S'h-€"
I
A 1'1
.,q. f..E. ~
i ,
I, ,
;...-' I
.--.-2p \ I,LJ ;
, ,
5F-
; C (~:77 '~~I') !
i i .
i !
i I
! !
i
I
I
i
!
I
I
!
CL~l R, '~~-AT",\~~.I--~~~Q\s~'p!
i I if: i. .
J .! ' .
; '/' 'I I -~--_r_-,.-------,--
, "
I 'Z.. ,oJ. C'- ''''J_.L./_~_' -~-.' _ ~_=-
; I "", ,'" --, I f i ~ - ~ 'r-,- i<.F".=QI L~ D
! \'71' I _ I ,- ~ .-
: 1=:;------.-----
'. I I, , . !
!! ...!!! - ! I
; .
, I, j
I ,~ .! I
'-rl " . I ' !- \',
! i_~ttd;~~-''4~ ~:J..~-"L+- ' !
i I . I J ! i !! i
I -+-t---; \2.. i . --~- ; r! ' '-F:"----. : i i ! '
'\.! t _~~~~-~---H~~-L.h-L~-
: UI.J I I' 'I i !;; (
I !, _. 'I . I I
11 i! ;; i ' i ! ' ; 1 I I
r~ I ~o ~ ,--l i ; : I I! I Ii!!
iUlI ~i I ~ i! i 1 :: i !
i ...r-- Iii I I ---! ! .'""tL..A..~
I '~""~:' ~'
II! i i, I, I,~. I ; , , j
. .: ___ : e.~ I. Ii, ~
I : i I ; i I! ~ ;::;.r-W.'Z.! I
i ! i ! ! Ii! !! I I ! ! : I 1
I j / I I I I I I I l\. ' ! I I I I "
IiI ! \:1.. -i ~lCn i ; '7 : \ I I ~j...; _ I ! / : i
~ I I \.! i 7J I ; ~ .....; ) 1 - ! r c...; <..-to- / ll- I I '
! I I I : ! I I : I 1-- b\l -~ \,{-'~-C
Ii! I I I I j : : t , ' 35D ~r:;;-
: ! 1 Iii I Ii: : ; : i i : ! ! I
i I I ! I I ! I: ! I ! I I ;
! I; n I!! I !! J I!
! I
,
I
;
II III
/7.l
I
---1-'"
'-
T
!
I
I
I
-------
J.--""-! I !
,
III
_ -Zd..1D
....)_i ~
;3
^
...
...
,
~
fI-"
I
I
i
I
I
!
i
1
i
i
i
!
I
;
I
I
1
i 1
i i I
I 1 I j
i /-\ J
; .r . i \ 'h--- i I
, ; ,I ;
I. --y)";
--i-J-~lA h.,~ --j
\ ! (\i ;f~_~
, " \~\~,~ !
/-~~I
--1-__ _,
l/ :-
--;---l..-~. .__
.~
,
I
i
I
I
!
;
.,;
Lr:\V
. . . . . . . . . . . . . ...-
Lawson, Noble & Webb, Inc.
West Palm Beach. Broward. Port St. Lucie
420 CokrrCla DINe West Pam Beoch. Fl 33409
Engn-
.M 156116ll4-66lI6 I'IanMq
Fax(561)664.1812 ~
I
i I
I
! I.' i
I. i..:I i
,"'\ f-r i
,..., .'t ;!
I..?'-'
i
i
I
I
!
i
I
I
1
I
!
j
I
!
Job Name
/""'
-........-..... ~,.""
.... -::-. .,--
'\ --
~....... ---:
... --'
JOb No.
Sheet No.
'-
01
Z
1_ ~_:J?
Calculated By
\c\...~ _
Date
Checked By
Date
I
i
:
'~~-0IG_\' ~~'~_'\i~2~,L\~~'2:~'
I
i .
-;~_.~-- .-r-.------..... --:....-~.-------
I
i
I
/
sr:
I
---
1\1
--r---'--;
,I
_.- f--~ --,- --,'-'" --.
~.. ---I-lVz.J
A.. _,,___ !'_ ,~_
~t
i
I _u;
I :
n':
tl
'-~--"
i
i :
'Z.'"t.. ~S
....
-:
~
---L~------ .----
--""-'-'--- - -I
"2.0 '"Z..
....
::::;
---
-~"'1.
.--4..
=--
r-
.-. __ __,~_,.l____;-~____"_----'__'_'_7
,
i i
! ! i i \
, i ! i I ~ I .
K- (ll i ~~' )(i-=c\c ~ '\ ;:::. ,
! '\ ,~ I,' I j ! !
I-r- _~~__k~~_,c.~. I
Iii ! !
!! I~ ~--L--l--r
!! I I 1 ; 'i ::!
! 'I I ! t I I 'I I ~ ~;, ).!
: t i I I I i _ I j
I ! I.~', i i i 1\\ ~ "I -. _ ~
: -n::....-:-~ . -J.",;:. r'M:.-"'- .:j\-."f',).;4e'Q i i """-n r '-
I ~ I I' T --"! -r \ l <.>.I I i \: -.:::::: ~ ~~
, I . ! ! i t i ! i i - !..,c..l..OO"(.~
i ;!' i!. I i
I i I t f I ---I ~l ..., f - ,. Q... , t:..
! '~,! \ ,~ 7i-r,- ~ -'-!.":f' ~~-:-.'
, I
. ! Ii!
, .
. i
I
--+-~_._---_.
I
I
:
!
J
i 1 !
~ i lrr" '/. -+60 I ~ \ .::L I~
L_ ! i'
. .~----~
i
I
i
I
I
I I
j i
\<O:,~
__ ,_.___ _ ._ _, Uh.<:..f:
j
!
I
!
I
I
I
!
I
I
I
I
i
,
i
I
I
i
I
i
!
I
I
I
I
I
I
!
i
I
I
I
I
~
!
i
f
i
I
I
!
I
I
I
!
i
I
I
i
!
I
I
i
I
i
I
,
1
I
f
I
I
i
I
i
I
I
I
i
I
\
I
I
I
I
i
I
:
!
,
-I
'-..." ~ '
t-..-I.a::..J' C,.F
--..--- ,
I
,
I
~
......~"
........... ,......
I
i
I
i
J
!
i
i
!
I
!
I
I
I
I
!
I
I
,
I
I
I
I
I
1
!
!
I
!
,
I
I
i
j
!
I
Page 2
Development Department Memo PZ 98-207
Semsco International Office/Warehouse
TO' TRC Members
5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified
6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process
All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please
include the name and phone number of the reviewer on this memorandum Scott Barber will be the
Planning and Zoning staff member coordinating the review of the project.
First review comments will be transmitted to the applicant along with a list of Technical Review Committee
(TRC) members The applicant will contact TRC member(s) to clarify comments Amended sets of plans
will be submitted prior to, or brought to the TRC meeting Amended plans and outstanding comments will
be reviewed at the TRC meeting to confirm that the project is ready to move forward to the Planning and
Development Board meeting
MWR.bme
Attachment
XC (Memo Only)
William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
Don Johnson, Building Division
Sebastian Puda, Engineering Division
Bob Donovan, Building Division
Central File
s \Projects\Quantum\Semsco I nternational\NWSP\ 1 Slreview-plans
TO
FROM
DATE.
RE.
DEVELOPMENT DEPARTMENT
MEMORANDUM NO PZ 98-207
Bulent Kastarlak, Director of Development
Steve Gale, Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Ofc. Robert Riggle, Police Department
Pete Mazzella, Utilities Dept.
Michael Haag, Building Division
Ken Hall, Engineering Division
Larry Roberts, Public Works Director/City Engineer
John Wildner, Parks Superintendent
Ray Davidson, Engineering Division
7L ~ 7-4-
Michael W Rumpf
Acting Director of Planning and Zoning
July 9, 1998
SITE PLAN REVIEW PROCEDURES
1 ST Review - New Site Plan
Project - Semsco International OfficelWarehouse
Location Lot 15, High Ridge Commerce Park
Agent Lawson, Noble and Webb, Inc
File No NWSP 98-012
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on Julv
24. 1998. When preparing your comments, please separate them into two categories, code
deficiencies with code sections referenced and recommendations that you believe will enhance
the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval
1
2
3
4
Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments
The documents submitted for the project were determined to be substantially complete, however,
if the data provided to meet the submittal requirements is insufficient to properly evaluate and
process the project based on the review standards or the documents show code deficiencies,
additional data and/or corrections should be requested by the reviewer by contacting Scott
Barber
Each comment shall reference the section of the code that is incorrectly depicted on the
documents
Technical Review Committee member(s) shall identify in their comments when the plans depict or
when the location and installation of their departmental required improvements may conflict with
other departmental improvements
,
. ,
REVIEW COMMENTS.
(Memos) AND DATA.
-e:fTY of
BOYNTON BEACH
~
r ,:'In.k'E''P
,
-...
......-. ..
:-. ~ ......;.
(j)
120 N,E. 2nd AVENUE
P.O. BOX 310
BOYNTON 6EACH. FLORIDA 334J$.0310
pos)7~111
OFFICE OF THE PLANNING OIRECTOR
-.
November 19, 1985
Ms. Christina Facio
Peacock and Lewis
Architects and Pianners, Inc.
501 S. Flagler Drive, Suite 500
West Palm Beach, FL 33401-5985
Dear l'1s. F ac io:
Please be advised that both the Planning Director and I have
reviewed your preliminary site plan for Sunpoint Savings Bank.
Our recommendations for.this site plan are as follows:
1. The proposed access driveway must be located at least 180
feet north of the intersection of Congress Avenue and Old
Boynton Road. (Section 5-l4l.g.3 of Parking Regulations)
2. T~e curb cut onto the proposed access driveway at the
southeast corner of the property may be inappropriate
(situated too close to the inter~ection). Further infor-
mation is necessary on ~he proposed driveway in terms of
traffic volume and peak usage. Also, information is need-
ed as to how this driveway will service the property to the
rear (west) of the bank.
3; The proposed relocation of the dumpster pad creates a
hazardous situation for the City's front-end loaders. The
dumpster pad must be placed in a location and properly
angled so as to allow efficient access and safe back-up
space for the City's front end loaders.
IJdge Two.
4. It is recomrnerlded that the proposed parking lot configuration
be modified to relocate the 3 parking spaces nearest to the
southwest corner of the property. The current parking lot
design does not allow for sufficient back-up/turning space
for these 3 spaces - particularly at peak hour usage.
If you have any questions concerning these comments, please do
not hesitate to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
rl'~
James J. Golden
Assistant City Planner
flat
engineering
rohert+
~UIIIJJaIIY
June 25, 1986
City of Boynton Beach
120 N.E. 2nd Avenue
Boynton Beach, FL 33435-0310
Attention: Mr. Jim Golden
Reference: Sunpoint Savings Bank
Drainage Calculations
RAC Job No. 855020
Dear Mr. Golden:
The revision to the access road that has eliminated the cut-
through does not affect the drainage calculations on the
referenced project.
If you have any questions concerning the above, please contact
me.
Sincerely,
ROBERT AND COMPANY OF FLORIDA
AJd--lJlfJ/AO C. &/M-(
Douglas C. Blackmon, P.E.
Vice President and General Manager
DCB/mph
cc: Peacock & Lewis
701 u.s. highway one
suite 404
north palm beach, florida 33408-4508
ph. [305J 848-8556
~ PEACOCK & LEWIS
ARCHITECTS PLANNERS INC
PEACOCK & LEWIS
ARCHITECTS & PLANNERS. INC.
R. Carroll Peacock, A.LA.
President
Howarth L. Lewis Jr., A.LA.
Executive Vice President
Glen P. Harris, A.LA.
Vice President
Stephen L. Boruff, A.LA.
Vice President
Paul E. Neff, A.LA.
Vice President
Maynard C. Hamblin
Secretary/Treasurer
Samuel J. Ferreri, A.LA.
Associate
Stanley N. Herrington
Associate
John p, Kibbe, Architect
Associate
Edward H. Sheahan III, A.IA
Associate
Donald H. Williams, A.LA.
Associate
MEMBER A.IA
Flagler Center
501 South Flagler Drive
Suite 500
West Palm Beach
Florida 33401-5985
305/655-4063
NOVEMBER 15, 1985
MR. JIM GOLDEN
CITY OF BOYNTON BEACH
BUILDING DEPARTMENT
POST OFFICE BOX 310
200 NORTH SEACREST BLVD.
BOYNTON BEACH, FL 33425-0310
RE: SUNPOINT SAVINGS BANK
P&L PROJECT NO. 85-011
DEAR JIM:
ON BEHALF OF PEACOCK & LEWIS ARCHITECTS & PLANNERS,
INC., I AM WRITING TO ESTABLISH ACKNOWLEDGEMENT
OF OUR EFFORTS IN PROVIDING AN ACCESS ROAD OFF
THE SOUTHERN PROPERTY LINE OF SUNPOINT SAVINGS
BANK'S PROPERTY, WHICH IS LOCATED IN THE CORNER
OF CONGRESS AVENUE (SOUTHBOUND LANE) AND THE MALL
ENTRANCE ROAD (EASTBOUND LANE).
THE OR I G I NAL SITE P LAN WAS S UBM I TTED AND APPROVED
BY THE CITY COUNCIL ON JULY 16, 1985. SEEING THE
NECESSITY FOR A BETTER TRAFFIC FLOW WITHIN THE
SITE, THE ACCESS ROAD SEEMS TO FUNCTIONALLY RESOLVE
ALL OUR TRAFFIC CONDITIONS.
THEREFORE, WE WILL SUBMIT FOR SITE PLAN MODIFICATION
APPROVAL, BUT IN THE MEANTIME, THE OWNERS WANTED
TO MAKE SURE THAT THE ACCESS ROAD CAN BE BUILT
AS DESIGNATED ON THE SITE PLAN. THEY HAD FELT
THERE WOULD BE NO PROBLEMS BECAUSE A LETTER BY
CHARLES WALKER, DIRECTOR OF TRAFFIC DIVISION, WHICH
RELATED TO A PREVIOUS OWNER ABOUT ADDING A STREET
AT THAT SAME LOCATION, STATED THAT IT WAS OKAY
TO BUILD THE ROAD AS LONG AS IT MET WITH CERTAIN
CRITERIA.
PEACOCK & LEWIS
ARCHITECTS PLANNERS INC.
PAGE TWO - NOVEMBER 15, 1985
MR. JIM GOLDEN
CITY OF BOYNTON BEACH BUILDING DEPT.
RE: SUNPOINT SAVINGS BANK
P&L PROJECT NO. 85-011
THE MOST CRITICAL CRITERIA, BEING THAT THE NORTHERN
ACCESS POINT ON CONGRESS AVENUE MUST BE AT LEAST
185 FEET SOUTH OF THE INTERSECTION OF THE MALL
ENTRANCE WITH CONGRESS, IS MET ON OUR SITE.
IF ALL TRAFFIC; CODES, ETC. ARE MET, IS IT POSSIBLE
TO GET A RESPONSE FROM YOU ABOUT THE LIKELIHOOD
OF A POSITIVE CONFIRMATION ON THE ACCESS ROAD AND
ITS LOCATION?
THANK YOU FOR YOUR TIME IN THIS MATTER.
SINCERELY,
PEACOCK & LEWIS ARCHITECTS & PLANNERS, INC.
ce.zs71JJ tr t=-kc/o
CRISTINA FACIO
CF:DPT
...-.,'"
May 2, 1985
Timothy A. Smith, Esq.
Greenberg, Traurig, Askew, Hoffman,
Lipoff, Rosen & Quentel, P.A.
1401 Brickell Avenue
7th Floor
Miami, Florida 33131
Re: Access to Property at Northwest Corner of
Intersection of Congress Avenue and Old
Boynton Road
Dear Hr. Smith:
I am writing to confirm the results of my meeting with Mr.
Enrique Wolf, William Reiter, and yourself yesterday afternoon,
concerning the property described above and shown more particu1arly
on the attached survey prepared by O'Brien, Suiter & O'Brien, Inc.,
on December 6, 1984, which I examined and signed yesterday.
The handwritten sketch of drives on the attached survey show'
the three access points for the property at issue that the Traffic
Division would approve, on the following conditions: ·
1. The northern access point on Congress Avenue must be
at least 185 feet south of the intersection of the mall entrance
with Congress. That access drive will provide right turns only,
for both ingress and egress.
2. The southerly access point on Congress must be a drive
angled sufficiently to provide for a right-turn ingress only and
must lie at least 185 feet north of the intersection of Congress
and Old Boynton Road.
3. The access drive on Old Boynton Road may lie no less
than 350 feet nor more than 450 feet to the west from the inter-
section of Congress and Old Boynton Road.
As reflected by my notation and signature on the attac~ed
survey, the Traffic Division would approve of the locations and
formats shown for these three access points based on the conditions
stated above and on the pertinent existing ordinances, rules, and
regulations of Palm Beach County and any other laws within the
Timothy A. Smith, Esq.
May 2, 1985
Page Two
jurisdiction of the Traffic 'Division to implement.
Sincerely,
~~!~~
CHARLES WALKER
Director
Traffic Division
Department of Engineering and
Public Works
Palm Beach County
.
CITY of
~OYNTON BEACH
~
Q)
,. .
.~-
120 N.E. 2nd AVENUE
P_O. BOX 310
BOYNTON 6EACH, FlORIDA 33435-0310
(305) 734-8111
-
OFFICE OF THE PLANNING DIRECTOR
-.
November 19, 1985
Ms. Christina Facio
Peacock and Lewis
Architects and Planners, Inc.
501 S. Flagler Drive, Suite 500
West Palm Beach, FL 33401-5985
Dear 1'1s. Facio:
Please be advised that both the Planning Director and I have
reviewed your preliminary site plan for Sunpoint Savings Bank.
Our recommendations for.this site plan are as follows:
1. The proposed access driveway must be located at least 180
feet north of the intersection of Congress Avenue and Old
Boynton Road. (Section 5-l4l.g.3 of Parking Regulations)
2. Tpe curb cut onto the proposed qccess driveway at the
southeast corner of the property may be inappropriate
(situated too close to the intersection). Further infor-
mation is necessary on the proposed driveway in terms of
traffic volume and peak usage. Also, information is need-
ed as to how this driveway will service the property to the
rear (west) of the bank.
3. The proposed relocation of the dumpster pad creates a
hazardous situation for the City's front-end loaders. The
dumpster pad must be placed in a location and properly
angled so as to allow efficient access and safe back-up
space for the City's front end loaders.
.
_.,...__.~--"_._,----~--------,
Page Two.
4. It is recommerided that the proposed parking lot configuration
be modified to relocate the 3 parking spaces nearest to the
southwest corner of the property. The current parking lot
design does not allow for sufficient back-up/turning space
for these 3 spaces - particularly at peak hour usage.
If you have any questions concerning these comments, please do
not hesitate to contact me.
Very truly yours,
CITY OF BOYNTON BEACH
rl'~
James J. Golden
Assistant City Planner
flat
--
.----.
STAFF COMMENTS
SUNPOINT SAVINGS BANK
SITE PLAN MODIFICATION
Engineering Department:
See attached memo.
Public Works:
Contact public works prior to
pouring dumpster pad.
Planning Department:
See attached memo.
Building Department:
See attached memo.
M E M 0 RAN DUM
July 1, 1986
TO: Jim Golden
Planning Department
FROM: William v. Flushing
Deputy City Engineer
RE: Sun Point Savings Bank
COMMENTS:
1. Provide property ownership certification or new survey
for off-site road improvements.
WVF:ck
MEMORANDUM
2 July 1986
TO:
Chairman and Members
Planning and Zoning Board
FROM:
Carmen S. Annunziato
Planning Director
RE:
Sunpoint Savings Bank - Staff Comments
Please be advised of the following comments from the Planning
Department in connection with the above-referenced request for
site plan modification.
1. 900 parking spaces require a 27 foot wide access aisle.
2. Dumpster is to be screened on three sides with a six
foot high concrete block wall.
3. Parking lot layout and design on engineering plans must conform
to site plan prior to permitting.
cltJvrv~~~
' RMEN S. AN UN lATO
/bks
r "I
FROM
TO Carmen Armunz i at 0
Planning Director
Bob Donovan
Chief Plan Reviewer
SUBJECT:. ..~~po.~Il t SaV"~.~~..~.~
..............DA TE:..~!J:{!!!~..
"OLD.
Upon review of the above mentioned addition of driveway onto Congress,
please be advised of the following:
1. Plans do not match previous plan.
2. Need new survey wi th drive wi thin property 1 ines.
3. Handicap parking space not shown.
BD:bh
PLEASE REPLY TO
.
SIGNED
~a~
Bob Donovan
REPLY
k.
DATE:
1~~2-P {
SIGNED
Item # F269 @ Wheeler Group Inc. 1979
....L
T~S COfIY FO'" "E~SO'" ADDftESSED
-~
-
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
JOB NAME ...sUN POI N..,- S~VIN6'5 E;ANK..
LOCATION EOY /'-..., ~ '" bC~. I F L-
,
NO. 65501-0
SHEET NO. I
SUBJECT DRAINAGE
EST. BY BLA. 0::. M ON
DATE ~/21 /b5
CKD. BY
DATE
r .1 :~-=C:----'-I,.. q :
~ ... ._QE~dr=q It"2..~ A~R.€~
~ I
PCk-VIO - M A: I,
i' '1-~' '9">'" i 3700 s~ '
L. ., ~) Jb_~)( 1- L I ~ 1 __.7_5 (., j
I .5' ' xt w s ' ~ I I / 75 .
[ ~. :1~:~ · - :-H~ T---+- -- --+-~---
Iii "~8; :: i ,~" I I
I W .1l~ i " ' 31-0 ..~ I
r ,.", - (.3) '. ~.;: _Q_~. -- 10 . ;/~/~. ~~------~- -----+---+rj' '
t--.~..735,m , 1--' ._m r- l fl, 1 ; -: . ,
~,i~:~l!-:~~=I'l2-~ i-s - ~;I. ----- '1-+-1 ' fl ;T~ ..1
! : .
i-C Flcn:>~: . tl.+..;. :+.- )'1 '
1.0 Ac.1lE~'! X . B =! , ~45 r'
,...---- -T-~~- .----1--. !. --~TI. .- .
I . .2_ 04'c4E!;> I x ,:2- ": . 042- + ' · . ..l " ;,-1
!, I~-'1 j ; · ~ e; 7; .... 1._ .. j.+....I_._+___L+_~____
L- ,J,i>~ 171 i. I,.... '.' ' '.L lL'-LLl-
,- I -...----._--------r--~_.----_b
i,', J .,.12- .'t.. .. , .. I li . ..m;
I I I
~,' F/~l'H-azl> d FfA qop- ~ (:76). ~76 ..... 1
\. I~'
__-.0-.-.-... ~----"--- - ...
! I
-+- . -t-----t...
I I I
.-___._-1___._1 i
. i
I
I j I
r-l~
'i.J~,/'bf'
,II l I
'-
.~.
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
JOB NAME <5UNPo/",-r- S"c.v f NoS' E:>,t)N 1<-
lOCATION E3::CYNI"O"-' Be w. 1Ft.-.
SUBJECT 'D12.A,NA r~
NO. 6 S5() :2.0
SHEET NO. 1-
EST. BY ~'-A~)
DATE ,,/1,../ /65'
CKD. BY
DATE
---~-:; . , -.
i+' "
.1 + -,,' ,tj) l5:fj~'b
-(ii 1 +J-'
I- . "----.
i
.---.!
I ,,;
F~ 60, M
,
. ~~, ! SJrr;
r--
r H
~
I
..,.,'--"/
I
A~UWE ~~.
, '
1
I
t
I
J c~~~~c;~
I I
"1
:. . t..__ ~_'''_'_'
4-.;'
~L;>t.!J
, ,
--f----
,i- =t,
,
i
lj=
I._(,,!
r Robert end Compsny Associstes
NORTH PALM BEACH, FLORIDA
JOB NAME SVtVPO ,NT 5~V INe:. 5 ~/Vt=-
LOCATION f!:;()y /'J 'TON eLH F c-
NO. $501...0
SHEET NO. .8
SUBJECT DI2A ( oJ A (;, E
EST. BY ~J-A .>lC./"YY7r)
DATE G:7/1-1 I ft6
CKD. BY
r"" . ..-.----.-. -1....----... ...-..r...............'T.
. j , I
I . i I
l . CA~G~-rt M4'XI/YlVMR-!y^,OFF
. . I " 77"
! ,p Xff~1f- 5'~ -:- . c =i6MI"-.I.
~_.. .-&.?__-'l!A._- .._-" -.+--.-...-.... .._~. ..--...
! Q~. '76 (c:?! jlVlkA-)(i-,-G ~c.:)
t. Q.:: ~. 8.5 c:F~'
i
DATE
(FPI()
I
r--._2yr .rQ_.~9A!.FLb.I..!..8~ TIC}. tV.. ~E.?(T'ff - .~f"tfB:f>.K~....50~._._._...
, -
. Fr:o r PI Pi:' / .:s P. C Q :.; / (2 C' p To D/<..A I ~ ~ I (' r
hJ I 'TJ-I 2.50 Fr OF r>( FI L 772-A-T;'CN I7'-cNfll.
......__7';0 rrr. ..~1; Cx.EIL, 'C0~.=.!I"2!:! [fl..J":"L'::.l.J ..{;AN . ti:i5.Q!P-Ac;z.t:.~....!,.
'2.>0 jX . 0 /.5" 1-~ -= 3.:{~ c..~
;-t-
!
<MIN.
6
/0
IS
12.0
.
;30
I
CALCVLPTE 57;O~GF Ory :SITE'
~ / A X t X ~O
CEC,r?EP7Ei:J !PY 2.5 )I~. $70Z2M
'. .. t.
.76x.'3.o'/../.u,x. 8 x: C,O :: 41-4(.,
,/ )(6C.::< AI)( )( II '0: 5107/
_ ~~..-.___...._l~.,_'".<i-'_. .._~. ,
" x7." 'X 11 '1..1'5'>)( " -:;: ~ 71.. '2...
/, ')( (..9)( rI ')( 2~)( " =-.6 / j,~
I, X")"L;)( " ')( 30 X. II =- /q'"2...G. 0
i
T:p H!>:N D'-~ ;2.5Yl<r f(Q~tY1
fE .;~-K ~-t~rst;i;-::-;-;;:':~f.1
i I I .' i
. r)f5~H.~g{;P 470fA65 Q/7i)'P'1
, l'::) 0/; ~4.$ ....1
.~?2~__~b~.. _'"'---1
'$5 ~4- 3/{;;b
+75~ ,..~
7 J 2.8 :3/3'2-
i
;
1
I
,
.' ------___,,_--4
!
.... . ...........L..___....__.. ....._.1_... _..
;__c~ ..,_...".__u__._.~___.~._ -.---,.-<^".-...-- _. .'-~ - .-. '-"~--~--'r-'~-'--'-- - m_~ __c. -t' '''-0 'cn_.
~ FE/4/"f S77:),(?.AGr i2E'L;> P f@ 1-0 /I.11'tJ~ := 33-9 c;. c.+~ I
A~S UN1E IS /I PIPC' 'j I.!
2.50 '-.F OF TRcNCJ..I = [4 ~ 4- - """((,3t] 250 (f;O, 7-- ) = /844 e.F.
,........_2P Q ,,-== E.. .?E, _C!.t!:::>.!f" == ~?OQ.. ~...zrft- ~.:j..::,_..~..~::?_dl:f__--...~--..L-._...-.._~._-J
1 I -, T'~, I , :.. 1 ;.. 1
; .'" Tor~t... r~O/4A6E' SU'1L.IEn.:;:J ~4("'"7 ~F~ <t .$36 ~ .g:,e.
! ~ i . t S71';;2f" F I Sl /fa '~;ODI . ! 1 :: j
1.:- ~ /lN~AJ5".e ~.fVan-l 1Ft T~N~ .t. I ,"
I ' i ; I . I '
I.,..., __..._ _ __~_...... _ __ _J,...._ ~"'_ _ _ """ _ __..1.; _~_._.___. ".~. ~._~~.~_.._____....,.i_~_.....,___~<_.,,,_~ _ __..._.-L, ,_._ _.'- _, ___.",,~.__~~~,"__. _l_.... ~~~:_____w~,..,~L_,,___.l
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
JOB NAME ~ v AJ ~ I tJ T ~-,Ll V I /Vb') 'f!;;/>t-JJ.c:-
LOCATION '/3;;oyNTO,J ?pCI-!..' FL-
SUBJECT D/2.A /tV A&.c
NO. 05S0 (...0
SHEET NO. 4-
EST. BY eLPc.~c;/'J
DATE {,("L--1/65"
,
CKD. BY
DATE
I--..--~--_...._~_._-~. ...
. T/ZY ~o
!
I
-. 'T-- .-.. ...
T-" -. "'- ....--1..-.....-.--....--..--1'--.---.... --'-'---- .....1
i Ii!
3196 X, O(5~2.4~ 4iSC-f-~
I I
5/~I2-A~f ~9/~~.~_~.____~.-+
J:J~c" : i
*~ I
~+.
~--~--'''i I
/710 j i
I
~-i
L-F ~ F
I
1
!
nLF IV f--I-I
,
+, -1 ~
I ~ i 4~ 7 S x: ti x Co 0
I.. --'---" .-..-;----..- .--...--.-----t-.......... ..---
I \ .
I b ' Z"2.b.o
/0 2.05 !.o
!
/~ .17.. 7 :5
~.-1L~..-~_-t..- _~Z()'?
. 30 6550
K ,Pep,,e;. ~TOjZ.,Dr;,E' !2f;()IO @ 15 Mo.J.- -= 244 7 (,F:
300 L.P of T/2/:'N.::.11 ':!' [41 x: 4 - irJ (.3)
-PI PE" = Q"z..3 C..F~
T?yTh. t.. '>"71?/Z.,A G [' -S:U f:of>L IE () : 1.837
._......"?~T'2I.?A(.li:. J;;,. .~..._
>- 2.4
2"h14
I
~
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
JOB NAME SU/'JrbIIJl ~AVI/'JG" 5 61J1^JI<.:.-
NO. 655'01-0
SHEET NO. 5
lOCATION 't3;;xJ~//'J-(o,J Be 1-1. 1=L-
SUBJECT D4PIIV,A(',r=:
EST. BY 13l-P <-Ic.rrPf'J
DATE [, /1-1 / IJ.S
CKD. BY
DATE
r'-'-~A'~-~~~!A ~;"~,1 ~~ ~ U ~ l.J?1 ~ U. F 4.CX)R.
! I07'AL! :S,-rF ~A ~ 1_1.Gi AC.
, 8u(~4IN6 r-.,(2.E~:: ,17 ~ c-
: .".,4I2..}-,A OF Glf..,4DI".)G =t /;00
j_._.__._ _~~-;_~<<_. --...--4-~ .,- ..____._~r'~..._. _,,,.,, _.._._.~_~<.~..._ on ____...._"" ". d.'.'.. ~___!t-_._.__'"N.^_._.
E I...E v:
t
Acl
"'1"
Srrr v..!'C(.. POND L-INEA.I?,L. Y FROM ELE'I_ 14-.
7V EU=-V- /C:,J 0
A = ~{1r.._"&H
A = t. '4 ( 1,09 A<.:)
. :2..
A == .7 (A Ac - ~r:
VO,-UMF TR[IJcl-l CA/'J PE:,(?';C'/..ATT IN
4,75 c. .r:/5F(.. X Goo, SEe. ^ ~O /YIIN.
M 1"1_ /-II?..
-rr<.Fty~.H,.._(?A!D p,-PLYY.!'-k-,. .=?/.9~~_ h8.,,~.7 ..c;Lr=..._,-_Q.73.<;;J:~
/ 1-/0 U I!..
::: / 7} I~ 0
C.E =; ,~, ~'F7.
J'.OO
17.00
71!..C N c. 1-1
.4G
.4'
,4 c..
.4:4
SIn;
o
()
.7~.
t.:!; /
r.or.Dp
.~
.. .__,1:, b'
I. ?- 'Z.
/_77
/00 'Y12. RA/fvF/.::>t.. '- ::. /0, 5" II
/00 YIL: .3 Dt:. Y f.2A 'N,c-~ U. =, 10_$ I' 'I.. L /-3S.~ .: { /4.2! II
Y.9.?--J..II'('.F = 14-.17 /1 X /-~~'::~ ,r-_J.----:L~. l.~.~Qj~~_:ff~..
. 11- L
Srn C,F
/7.-. (,0
14. c. ~
i
E'f OJ€- F L..A/- I S-
: I. 50 --1- /~ ?h_:: ..V.us"'-~"-~'~'4'-'~'. 'f'__'___'_
p~t:~~.~oj 'I)
, ! I
,.. ~_ ,......,....,.w..,.--",___.. . . ._., '_--"_k +_~'.~_.~.. ~__^.4_,,_ .m.'__., '~.'__~"..-\~_'~W_'_M ~_.~. .M', ~,,"~__''''''''.,~ ~'~_~__"_'_""" N~___"_' -.-
._ '______.._ ._~_~._. ',_ v.'
;
,.1-::.77 - /.2-"2.. = .55
~.-:z.8, X / + I~ =
,55-
i
I
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
LOCATION ~N""'r"ON ~CJ-i. ';::=" L-
JOB NAME Su ~Po \ "-J. -,.- S/::;..'J. '" G.s ~,,) ""-
NO. 6550'2...C - u !
SHEET NO. \
SUBJECT p(lp.\tJf:..c::>E: (Rrv I~Ct 10 Aop E,.J7t..Af-..k:;.I". @. C/?~0r-E::'~")
-'
r--- -. .__..._~.- ..- -..-
j .
t
I
\
I
i
i '
,. I I
~_.__:7_~~:?1_?J4~?("C..<.. ,-
EST. BY ~ LA c.. k.. ry. '0 N
i
A(Lt":A P ~
DATE ,\ /1-5 /6S
CKD.BY
~-~~~r'---~~'--' -"'---'-'- -'1-"---; .~._~. -'-.
511---;::
I
,
1-'3;;5 \ -{
i
I
i
, !
3 'J.-;S =; 7(,; :;,,5 ;5.F
:;;
i
I
l,iS, A<tP.E":S
,........-._.........&------_.~ .~-~-..
I
17' X
"P Ef- \) I 0 U~ t:>I- ~ p.., :
I
sF'.
. 1-0')<..
~~.__-...-~. , ""."._ ..._~.m~
,
'1; 1- 0 -=
197' :;
"';.J:) ')( ')....0' ::
r.:..c ' "" 1.- 5 -=
1...1''j.,')..5'=
_._J~~__?'..:x:._.~~ ::
18')i. Iq
6 I 1. oS I
5 I X. ~so I
~ 4- ' (...4- I
14')( /)..,0'
-, I y-- '"'::bCz,'
7 ' )( 4-.6 '
I 0 1 x 1-4'
"....~. -~_.~'.,,_....~_.~..., -,'--'" ,
10'')1" 4-(1)'
\ 0' -;..., 1'2>'
IOI~~
~740
"? 0 4C
4-00
500
5 'l-S
~oo
-:::
31..4
70Lt
t ':50
6~ G:,
'2..e-o
::
=
-
-
::l
=
'L '3 ';;-
::
~ .....,.;~
..? :5 '-,:,
-:::
'"'~-A; <?
4-d 0
l"?-O
\ 4- 1\ 7 S. F
)
:::
::
r 4. J Ii /4~/'5GO = . 3').... A..c..(l.~'S
c... 'F A c.. "TO fL
DATE
,
r"----~.~-~---1>.--..--......-- ~.---r. ;
_.~1-'i- -r- + 1.4~~ .5
j t./5 ;
, \
1 !
I j
. ,
WE"I,61~ c...
j
I
I
:: (]2)
I
\
J
I
h"A
L... ___..___._._.....___L_._..... ..... -
. _wl~._~~.....__~_._~_~~_~.J._.."......__,.;.._~
r Robert and Company Associates
NORTH PALM BEACH, FLORIDA
JOB NAME S LJ N T=b I I.rr SA \J 't-J e:.s ~ 1Jt::.
NO. 6ffiO 1..0 - 0 {
SHEET NO. 1-
LOCATION -eoy'-.)-rON f:x:..4.(.. J 'F L..
SUBJECT 'D(2....b1 t0t:.6E ( REV'~F r?)
EST. BY ol..6. ~~0"j
DATE I II z..s /6'5
.
CKD. BY
DATE
--l-"'~. '--~~-"r ~
~1 04,- ck:5. I ..
L ~ ."77 11..1 S (3.0;: ::t '1.-55. ~ 7 1-. ~ Tf-E,..) <::+-1
(rOI?<<~ .: .. ;
I ..A..AJ. ;..... -!,'EF (:(.!., ~ 'N~ CI~lL. ,J <...tTT~OfJ'"$
~.____.,._.....____,~"n.__~ ,"n._. __~.~_,,,.._.~._J._~_. _._- .'> - -. _l._~,.._..... ~'--'..-
CAL.L..VLA~r 5-.,......?a-~~!: r::Jc-Q'D.
REO:;> I, D
'--T-l-' ~
Ii
4
! I
I !
!
:
:1
--"-"-+"-4"~---1
! i
PEP-IG. ~f2d:>.G r= l':2..EQ'D @.
T(... y' 400 ~. ~ T r.!.J c..~
...1
i
j"1
4,04)1. -t)< (,,0 I s-rc;4.tV\- "DISc+,. !
...- '" -~-,,-~-~---'--'
1)'3 ~ ":? i ~681--
i I
'l... 4 1.-:4 4 51-~
I /
2> G,,~, Go 558 I
I I
4/3146 ,c.309
J. .... ...~-_..__......
fJr!-7(t- ~~
:) (p:)~ · ~ , 5 I
}, ! )
~ M It-J" ':' "1;~ <f c:f: s-ratk.€" r->f..oJ'Df.o f-JO ~!)
400 LF_ X .0 \ 5 6 t-.4 ~ J(e.:2;2..,=i::::s.L--.
5,8 1.- I
~,Oj 5 ~
-f::
M IN. . c.. , A 'I-. ~ x ~o
.. ..1.__._...... ................... ..;.-
b ":77 "I(='.Q"1 1.751 B Y.. (.,.0 :::
10 II ~.o.(.'J.. I' Y,IOX ' =
15 \1 '" 7~ '/... , 'I.. 15 x
",1; ':( ~.<:) x 'I..~O'l- "
~,o I' 'f. s...b Y. I' 'I. 30'1.... "
40 I' X A..'f' x I, x ~ )(. I,
-::.
81..\ I
I
= IdJ \ 57
-= \ A 0 (..8
~ I P.I 6 4-1
10
,,---~,_..,- -~ .
t.; .33 -t. -t c>< ~o
5,0 "-I 310 ?~\ 1-2b~
&../2?~L......__._,_?12~~_..-- _.._~.~-J 3,1 S~
: . !
IS ~ ?- 17 i 5, (..S> 7 J5J3~O .
1-0 II" 'Sf I)S9c.. *~
~O 14JO~b I ,) ~~4 l..').LG.74-
,.+:0.. _ ;.~_'?LE_1] I..?LI.~ 3:._.~_._~.______L___.._......_._!
PEp.,c: ~r r.:2.CQ'r:>. @. 1.-0 MrtJvTE"~' F ~5(" I d.~_ ! I
400 l.--~ 0;::: 'Tr.:..rN~~ = [4-i 4- 'IY(. ~3)''''J I 400 (~O..,.) =1-~ 50 c.+ 'I
{I-o l-.t=; of 1511 f?'~E: .: 113 ~ 1Y(.(.~z.. ~ \4- \0 c.f.
6
;
l,..-. ..-..-."...... ---.....-+ --'.. - ".'" ....-- ---. -+ ..
i. !, -;
.. -'-~L.. ~-r:Q~
I '
L=~___l_+-._J ._-.
.. ..
-~-~ ~'. -' --, ... - ~-- - "y.>. ----.--.~-.~'......'~---' -_..- ----t-... -" ,-, '.. ._....~..__..~"'._._.,~..,~.~_.~- -1-"-"-'''~'''-;-+ .- .-.....-... --, --', -"---~... "'-'r--" - -.,. _.- -~'- "'" '~-~'-~'-""'---'.
~ u'P1"/i.-1 ~ 0.. = , 4~~ >~.s. (0 L@ . : "
t~_.~ ! i___~_J _ _~___L:.__j
r Robert and compan.Y Associates
NORTH PALM BEACH, FLORIDA
JOB NAME -SUNPOU'J-r -SP.VltV(J5 fl..:lAN""
NO, 6ssoU'? - 0 I
SHEET NO, :3
LOCATION 'Eo":>" "-Tr.t:>,J 8<:....H _ ~ L .
I
SUBJECT PI2.A 'IV AGE (REV t"5 ED)
EST, BY -=bLj::;.c...~<JV'O tV DATE t I /1...5/b5
,
CKD, BY
DATE
'r""h' ""--r~' !
III ., '(
i
j :
..-, I -"""
....-,----+--.-------t
! !
14..~. ~ I~:O i
, I
I I
. ....--I.----t----....,---!
I I
11
I i
r I
11
! i . J i
T--~'~...._r----.---r-____1
I 1 . I
YOLUM.8, 'r12-€:t-Jc:1-4, (...AN "PF't2jU'ec...ll>--rrtf Jt10~I2!11
400 X .O/;;t2'Lt = (p'~l C-F~ + !. 'I, + ',1
~.~~ ck/'5Er<:.-x ~q SE" ~ kC) MIN ::f 1.1/16:,6 !c.:E = .?2.~~,_t:.~~ i
. ; M".J : 4-\1<,! . i .! I
j-=t:P-"'::~T~~--r>~;.;r "'''_~ 5+fO~4;~~~~iQA~~~.1 i ~J
,. ,I, I I
:. ' . I : I ' . I
i :-' . i i . 1 J "1 t ., ".,
i 10<;> .,ra.'II'ZA' NEt> ~'-i ~ I ().5:" i~.....I _ ....., ;,1 ,1: ) J
f._Jo.p y(l.:-~~y-,~~~~~~-.::-IQ,*~- 1.:3_~, '4--~1 l--~-----+ ;-1
I VA ~l)^" e;:j 14.1."7 I/)(! I. 7S A'c, 1)(, ~ ~! 1. ,OE>~J- B:-r.... 1, ]
I I 'l.. ' i
'1' ~-
t.
I
I-
i
,-
r--'---r'" "~'-' .....--~'-.'--T---..~.--!.-. .,.--.-...
I C~_l..4Jf~ ~l, I ~!jl,-o"wcf rfLD?~ Ei€V,
I .Tq-t't;il.,. is '''IE MEf'.:: 1.75 +c~ !
i i I ; .!' I
I I~V~~1H9:<)~ ~JD{~~7~~~.16:A~. i
1-' . ~ .-'-.-'-.-l.---~.~---..-T-~--..-;-.wr.
I ~ i'
I' j
~. P'F''\.J l~l-.?C>N D 4-1 N EAt:2..L. Y 1"Ftz.oN'\ E ~v~
I. .. j I
~__ A ~ 'I"'l., ~ 8.~.__._..,", _<~.__._~._._..-+.
iA =' I. 4- ( /-56)
"J.,..
A ':: \ .! I I A (,._ - Fl.
-t..-
--+~~---
I J
1... , s 'l,..
"j'
..'&5
....~....
i I
--L.' . .~~_...
, . ,
~I~ -rhJ-
(j i.~2-
""-"-" '-3' ..'-'" '-..--.-.-~---....
\ .1- bt., l
t. t;1 1\.1? i
1.-:?O b-.?z-- . :
..-----.---{.-~--.. , t .-.. I ----
I . i.3 = . t ~ ... .. ~ I ~ _~ U~17.3 :r ,,~~ ..~__ 1 ; ..
.lr~ L~l("~;_ ~.jF~O ttt- tt!
,
I
I
+.l,_~
,
!
. S-rA<aE; ~,"~4
; \~, (,,0 : . · "1.- l
Y>-._-~.._._.__..__~-,.--.~-~-.-.-'"'
I . J' !
1A:.~O i ,. G,"t,. J
I ~. 00. G,,'Z,..
1/.00 . ~1..- '
j..- :Il:1
, I I
,.. , ' !
""'-1-'''+'''+--
! ~---,_._--+
i
'.
pl......'..,;
'..,/ .
ill
'.
.
'.
..
,-
III
.
.
.
.
...
DEPTH, fT.
(NOT TO SCALE)
a
SOIL
DESCRIPTION
Dc SOLI 0 PVC CASING
GROUND SURFACE
Very light brown
fine SAND (SP)
~
I
I
I
I,
I' II
II , I : "
,','I II
.',',1,
11,1,1.
I , I
"z
, I
I
'I
Du
?
PERFORATED PVC CASING
WATER TABLE
-6.8'
Os
SCHEMATIC OF CONSTANT HEAD EXFILTRATION TEST
K = HYDRAULIC CONDUCTIVITY::
Q .. AVERAGE FLOW RATE ::
d:: DIAMETER OF TEST HOLE::
0.00017
0.025
0.5
6.5
(CFS/FT.2-FT. HEAD)
(CFS)
C FEET)
(FEET)
(FEET)
(FEET)
( FEET)
H 2 :: DEPTH TO WATER TABLE::
Du" UNSATURATED HOLE DEPTH: 5.2
0.3
1.3
D,:: SATURATED HOLE DEPTH :
Dc: UNPERFORATED CASING DEPTH..
~.. Ard.m.n&Alloclat... Inc.
.. .A. C-1tiIIt ~ 1ft W ..~.
-",. F........tIe.... ...4 foIahriel T......
EXFILTRATION TEST
SUN POINT BANK
BOYNTON BEACH MALL
..
~
;q
-IT.
"1.~847
.,.)!. .~~ifiJ;.~~[~&iiil~~~l;~!m~~Jljii1-~;~,_-
5> fA/( fo:{ NT ..5.4 V.J JV ~5 B Jr/Vk !to j) F I~..{{ /r T;:o /r/
f[.Y",- (j) q ~ 0 I'JrJ< fJ NfL S fJt-{ !3._t;; j(j3a fAr REA- ;z 7 ( WFiJ F /!-ccl3s S
Jt T5 C~ -jVlj T ;2 6,f/fs ;1/0 TfO ~# )>lA.A/ ~
Fe \v' ]. PC1.l1f5TJ:/( A-r If(fJfL=(? A-)lC{L/~
fc JI(, (]) P(AJtf5Tf3R {o 1?}: 5L/CffS)/fO eN _"'5 _)1P/:5 [A/frlt A- /,J lilt-If
(oAf{, BL f-, W-?}t+rlYJ l'CrJ~/~fr7T" ~~ TCfl' -l~
iAlJr U.",
[3C.Dl., Lr /fA-)jjLr{JrFtf-=j) fJrllJ);k Sf AcE flt-T/t:rt5 5tfoU.LJ) );>E.SlfowA/
0)/ 5 rrE PIA-IV'
fL)JA- @ fJt-RfJ)I~ [oT /JIJ-!oVlT 1- j)1351tAl vAl i'=A/i{TA/EcR):JltL ;>[Ak-S-
J1 C15 T {ok f-tJ/2 /'1 ;0 _s:r TE ftA-A/ j>R J6);2 To ?i=k/1rrr:r#4.
/1 fit D t )It; ( .- jJ (/ C ~'7 wJ/l= RS/f+f~
(lfA-)J/{ E- S C1j,'>{/ (3 Y
, (." .'~il.'~"
~ .
',. \'
. ,
.. '..'. i-
, ~J .
--
, .101:.
. \ '
.
. .
, i
SITE PLAN APPROVAL APPLICATION
City of Boynton Beach" Florida
Planning and Zoning Board
This application must be filled out completely and accurately
and submitted in one (1) copy to the Planning Department. .Incomplete
applications will not be processed.
Please Print Legibly or Type all Information.
I. GENERAL INFORMATION
1. Project Name:
A:NEW BRANCH BANKING FACILITY FOR
SUNPOINT SAVINGS BANK, FSB
BOYNTON BEACH, FLORIDA
-.;. .
2.
Date this Application is Accepted :
(to be filled out by Planning Dept.)
:~ ... ": ~ ~.i..~
, "
~ "~: . '.:~~' ;". '. ~ .
3.
Applicant's Name (person or business entity in.whose name this
application is. made) :
, . "'/;';:"~
~'-!'.~'~~~:
'" . . . .:,..;. ~ r \..:~"\.:. . _.. ..... ......
. :~;.:;j.~~;. :",
~'.,~(;;:,; ".. . Address:
)~~,~'~"','~:' .'~:,' ,"
SUNPOINT SAVINGS BANK. FSB
501 NORTH .CONGRESS AVENUE
'~E~;"~
BOYNTON BEACH, FLORIDA
Pho'ne:
305 - 964-6400
.. . ~
:f~:~f?;,:...' ,_!,'
'r
...
......
4. Agent's Name (person, if any, representing applicant):
HOWARTH L. LEWIS, JR., A.I.A.
.. '. '>:;~:;.'-':
501 SOUTH FLAGLER DRIVE, SUITE 500
Address:
WEST PALM BEACH, FLORIDA, 33401
Phone:
305 - 655-4063
" ,~
5. Property Owner's (or Trustee's) Name:
Address:
SUNPOINT SAVINGS BANK, FSB
POST OFFICE BOX 471
( ,:,'
.,...... ,.-'
'-;'!'l
r.- /:~;:.t/:~ :
LAKE WORTH, FLORIDA, 33460-0471
305 - 964-6400
::", '/'~':~:c
Phone:
6. Correspondence Address (if different than applicant or agent) *.
SAME AS ABOVE
* This is the address to which all agendas, letters, and
other materials will be mailed.
Planning Dept. 10/82
~.,--~~~
....~ :_':::.::~~:.~;.;.
.. I.... ... ,....'.,.,.;
/'..:
..-
<\~'li:..i(~'/ -., -
\ "','r.\
.~~~
. ;' ','! I
, ..-.
.
"
,
7. What is applicant'~ "interest in the premises affected?
.':
OWNER
Page
"
'.
-.,:'::e.::,.
,- ,';:F~Yfo:
(Owner, Buyer, Lessee, Builder, Developer,
Contract Purchaser, etc.)
~8. Street Address or Location of Site:
-.',
1)'01 NORTH CONhR~C;S AVFNIIF".:,
.r
BOYNTON BEACH, FLORIDA
;".1'"
.1
'f.:,' ],Q/3:-
9. Legal Description of Site: A PORTION OF THE PLAT OF SUBDIVISION OF
SECTION 19, TOWNSHIP 45 SOUTH, RANGE 43 EAST, PALM BEACH COUNTY:FLORIC
ACCORDING TO THE RECORDS OF PALM BEACH COUNTY, FLORIDA, BEING MORE'
PARTICULARLY DESCRIBED ON THE ATTACHED SURVEY.
10. Intended Use(s) of Site: BRANCH BANKING FACILITY
11. Developer or Builder: SUNPOINT SAVINGS BANK, FSB
I:'
...
-
12.
Architect:
PEACOCK & LEWIS ARCH~TECTS & PLANNERS. INC.
13. Landscape Architect: MICHAEL J. CAISTOR
14. Site Planner: PEACOCK & LEWIS ARCHITECTS & PLANNERS. INC.
IS'. Engineer:
ROBERT AND COMPANY, CONSULTING ENGINEERS
16. Surveyor:
O'BRIEN, SUITER & O'BRIEN. INC.
17. Traffic Engineer: NONE
;"".f
18. Has a site plan been previously approved by the'City Council
for this property? NO _~~'
Dept. 10/82
H
-.. , ",: ;:~.:. : .
',.I
I
,I
:.1
I
j
I
. ':.';
;"';;;:'.;.~"f'
",", , .
"<,,i';
.'
Page 3
II.
SITE DATA
The following information must be filled out below and must appear,
where applicable, on all six (6) copies.of the site plan.
1. Land Use Cateqory shown in
the' Comprehensive Plan'
LOCAL RETAIL
~
2.
Zoning District.
C-3 COMMUNITY COMMERCIAL DISTRICT
3. Area of Site
1. 26
ac;r:es
54,,830 .
sq. ft.
4. Land.Use -~ Acreage Breakdown
a. Residential, including
surrounding lot area or
grgunds
b. Recreation Areas *
(excluding water area)
c. Water Area
d. Commercial
e. Industrial
.'
f. Pu'blic/In-
stitutional
. g. Public,private, and Canal
~ -..ll: . _,
Rights-of-Way
;t,', h. Other (specify)
o
acres
o
% of site
o
acres
o
% of site
. % of site
% of site.>
% of site
% of site
% of site
of :1':\"''-
% site;.
o
acres
o
1 .26
acres
100
o
acres
o
o
,a c re s
o
o
acres
o
o
acres
o.
-
-
i.' Other (specify)
o
acres
o
% of site
j. Total Area of Site
1.26 ACRES
100
% of site
J
a. Ground Floor Building 6512.86
Area ("building footprint")
sq. ft.
11 .8
% of
* Including open space suitable for outdoor recreation, and
having a'.minimum dimension of 50 ft. by 50ft.
Surface Cover
,5.
b. Water Area
o
sq.ft.
% of
c. Other Impervious Areas,
including paved area of
public & private streets,
paved area of parking
lots & driveways (ex-
cluding landscaped areas) ,
and sidewalks, patios,
decks, and athletic
courts. , ,~_22 4. 0 O.,sq. ft.
...."....;1
64.2
% 0 f site
d. Total Impervious Area _~1~7~5 sq. ft.
e. Landscaped Area Inside 13~092.75 sq.ft.
of Parking Lots
(20 sq.ft. per interior
parking space required--
see s~c. 7.5-35(g) of
Landscape Code) .
7 6 . 1 4 .' % 0 f site
23.8
% of site
Planning Dept. 10 82
Pl;:lnT11nn nAnt. 1()/~7.
. - .'1<#.~~)...'''''' :"~~~','''"rn:-t~L.~,}::'._
"~"~ii~;;,- 'f{./.;\J.'ll'l.l:;,!(:' ,; "Ii II' Ii
.
.",,;,,/1.,
, .
I
,- .
Page 4
,;
f. Other Landscaped Areas,
excluding ~ater Area
g. Other Pervious Areas,
including Golf Courses,
Natural Areas, Yards, and
Swales, b4t excluding
Water Areas
o
sq. ft.
o
. % of site
,',I
,.,
0 sq. ft. 0 % of site
13...092J7S sq.ft. 23.8 % of, site
54830 ~.q.ft. 100 %,
,
sq. ft.
20,298 sq. ft.
sq. ft.
sq.ft.
sq. ft.
sq. ft.
h. Total Pervious Areas
. Total Area of Site
~.
,,6. Floor Area
a. Residential
b. Commercial/Office
c. Industrial/Warehouse
d. Recreational
e. Publici
Institutional
f. Other (specify):
g. Other (specify)
sq. ft. ,
h. Total Floor Area
?O.?QR
sq. ft.
7. Number of Residential Dwelling Units
a. Single-Family Detached
... b. Duplex
...
c. Multi-Family (3 +
attached dwelling units
(1) Efficiency
(2) 1 Bedroom
(3) 2 Bedroom
( 4 ) 3+ Bedroom
d. Total MUlti-Family
e. Total Number of Dwelling
Units 0
dwelling units
dwelling units
dwelling units
dwe.lling units
dwelling units
dwelling units
dwelling units
8. Gross, Density
o
Dwelling Units per ~cre'
'.
9. Maximum Height of Structures on Site
40
feet
")
stories
10. Required Off-Street Parking
a.
Calculation of Required
Number of Off-Street
Parking Sp~ces
OFFICE (1/300 S.F.)
,; -,'; ,',f.::~,,'" :'t:f.~f~~,~v'i'.;
b.
Off-Street ParkingSpaces:!')i!;
. Provided on Site P lan:',:~r;
, ;~c'~!;':l~i,'.~
~,if" .
51
:-'::'\::;,
. '. yv,:,:
BANK
(1/250 S.F.)
18
;';:":;]J.;~~t;1(::;'!"';:
'"",
;,'.,
\;;!;;~!l~,' .
:,J,,;'_> -,:
. ';~Fj~'/};_:':~:~ ."" l'
TOTAL 69
-.' - ,-<:;..:,.,:~'';- .
Planning Dept. lO/~2
'..- .'<
.. ':'.' ':t~.<!~:;_,:,
,IV.. MISCELLANEOUS
Page 7
(check)
The following materials must be submitted in one (1) copy:
1. A check, payable to the City of Boynton Beach, for two hundred
dollars ($200).
2. For projects that generate at least three thousand (3,000)
vehicle trips per day or two hundred and fifty (250) single
directional vehicle trips in a one (1) hour period, a traffic
impact analysis must be submitted.
3. Any other engineering and/or technical data, as may be re-
quired by the Technical Review Board to determine compliance
with the provisions of the City's Code of Ordinances.
v. CERTIFICATION
(I) (We) understand that this application and all papers and
plans submitted herewith become a part of the permanent records
of the Planning and Zoning Board. (I) (We) hereby certify. that
the above statements and any statements or showings in any papers
or plans submitted herewith are true to the best of (my) (our)
knowledge and belief. This application will not be accepted
unless igned according to the instructions below.
/~/ 9/% S
. Date
Slgnature of Own r(s)' or Trustee,
or Authorized Principal if property
is owned by a corporation or other
business entity.
VI.
rDcit'~
hereby designate the above signed person as (my)
regard to this application.
'C
Signature of wne (s) or Trustee,
or Authorized Principal if property
is owned by a corporation or other
business entity..
Jd.-/ ~/~.::-
. 'Date
SPACE BELOW THIS LINE FOR OFFICE USE ONLY
Review Schedule:
Date Received:
Technical Review Board
Planning & Zoning Board
Community Appearance Board
City Council
Date
Date
Date
Date
Stipulations of Final Approval:
Other Government Agencies/Persons to be contacted:
Additional Remarks:
Planning Dept. 10/82
REVIEW COMMENTS (MEMOS) AND DATA
1 st REVIEW COMMENTS
1r7V-5 ~
(, /22 Iff
PrOject name Stanton Magnetics - Quamtum Park Lot 6
FJle number' NWSP 99-011
Reference 1st RevIew, New SIte Plan. FIle # NWSP 99-011 wIth an Mav 12. 1999 PlannIng and Zonmg
Department date stamp markmg
(V~-~
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
{~.., ,*"~c~'c.~ 5,/1 ~/ r VG- .
Comments ~ /( c./ ...... lD.... ~ --= VI ~) ..s- <2. II, cr- ... '-./'l ^ (..~""'~ C 6y c.- ~
..~
UTILITIES - General Comments
([) All utilItles easements shall be shown on the rectified landscapmg drawings
so that we may determine which trees may interfere with utilities In
general palm trees will be the only tree species allowed wlthm utilIty
easements Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utilities within the easement in the
foreseeable future LDR Sec 7 5-18 1 gives public utilItIes the authonty to
remove any trees that interfere with utilIty services eIther in utility
easements or public rights-of-way
I Dept. of HRS permits will be reqUired for the water system servmg this proJect.
(Sec. 26-12)
/ Fire flow calculatlons will be reqUIred demonstrating the CIty Code
requirement of 1500 g P m as stated m LD R chap 6, Art IV Sec. 16 or )
the reqUIrement imposed by insurance underwriters, whichever is greater
(see Sec 26-16(a)) Please submit these calculations with your HRS permIt (I'-
submittal
\9 Sec 26-34(E) of the City Code reqUires that a capacity reservation fee be paid for ea -( v
thiS project either upon my request for signature on the Health Dept. application \
forms or within 30 days of site plan approval, whichever occurs first. Based upon a
1.5-inch meter the fee is $1205 82.
A Comp Plan policy 3C.3 4 requires the conservation of potable water City water
may not. therefore, be used for irrigation where other sources are readily available
/" Water and sewer lines to be owned and operated by the City shall be Included within
utilit) easements. Please show all proposed easements on the engineering drawmgs,
using a minimum width of 12 feet. The easements shall be dedicated via separate
Instrument to the City as stated in Sec. 26-33(a) of the Code.
V This office will not require surety for installation of the water and sewer utilities, on
condition that the systems be fully completed, and given to the City before the first
permanent meter IS set. Note that setting of a permanent water meter is a
prerequIsIte to obtaining the certificate of occupancy
/ The waste stream from the manufacturing process must meet the City s pretreatment
requirements. A sampling point must be provided to allow monitoring of thIS waste
stream (Sec 26-143 26-147)
Page 2
Stanton MagnetIcs - Quantum Park Lot 6
File No NWSP 99-011
DEPARTMENTS
FIRE
'0LJ
Comments
ents
A fire flow calculatIOn test will be required, LDR 6- I 6
All water mainS, hydrants, and roadways will be In place prIor to above
ground constructIOn, NFP A I
ENGINEERING DIVISION
None
~ GYl
'S..~+'k
Comments.
c~ VC:::-'{ +
c (~'" f!-
( I +1.
Add to the site plan the following note: All plans submitted for specific permits
shall meet the City's code requirements at time of application. These permits
include, but are not limited to the following: site lighting, paving, dramage,
curbing, landscaping and irrigation. Permits required from other permitting
agencies, such as FOOT PBC, SFWMO OERM, L WOO OEP and any others,
shall be included with the permit request.
Add a "Right Turn Only" sign at the south egress driveway
y Provide 6" WIde thermoplastic, white strIpes across both drIveways to
delineate pedestrIan path through driveways.
The landscape Islands shall have a mInimum grassed area of 5' between
the backs of curb Adjust all plans accordingly [LDR Chapter 7.5,
Article II, SectIOn 5 G ]
ProvIde an Engineer's certification that the draInage will conform With
all rules, regulatIOns and codes of the CIty'S Land Development
RegulatIOns. [LDR Chapter 4, SectIOn 7 F ]
Show clear sight trIangles at both drIveways and adjust the LandscapIng
Plan If needed. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.2.] Add a
note to the LandscapIng Plan that there shall be a clear unobstructed
vIew Within the SIght trIangles at a level between 30" and 6' above
finIshed grade. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.]
V\e~ "'
5L(;"
un
/
/')
C- -r--~ C" lie J.c:.,
C.-k~
INCLUDE REJECT
~c."""~
~('\5(~
c-~~
Page 3
Stanton Magnetics - Quantum Park Lot 6
File No NWSP 99-011
BUILDING DIVISION
Comments
17 Add a note to both accessible parkmg space areas shown on the site plan
drawlllg (sheet SP 1) that refers the reader back to the typIcal parkmg
stnplllg detail drawmg for the accessible route details. Add text to the
detail drawmg that mdlcates the route IS m compliance with SectIOn 4.3
(AccessIble Route) and 46 (Parkmg and Passenger Loadmg Zones) of
the Flonda Accessibility Code for BUlldmg ConstructIOn. Please note
that at tllne of permit revIew the applicant shall provIde detailed data on
the plans that will venfy that the path of the accessible route IS m
compliance WIth the regulations of the Flonda Accessibility Code for
BuIldlllg ConstructIOn.
18 IdentIfy the filllSh floor elevatIOn wlthm the footprmt of the bUlldmg
that IS Illustrated on the site plan (sheet SP I) and the floor plan drawmg
(sheet A.I) Add to the sIte data, found on sheet SP I, the flood zone
that the bulldmg IS located wlthm mcludmg, where applicable, base
flood elevation If there IS no base flood elevatIOn, mdlcate that on the
plans Add speCificatIOns to the site data that will venfy that the
proposed filllSh floor elevatIOn IS m compliance WIth the mmlmum
standards of the followmg"
a) Mmlmum elevatIOn reqUired by the flood zone
b) Mlllllnum elevatIOn reqUired by the South Flonda Water Management
District permit for the proJect.
c) Show and provide computations that venfy the elevatIOn of the filllSh
floor IS SIX mches or more above the crown ofthe abuttmg nght-of-way
19 At tllne of permit review Identify on the site plan the actual setback
dllnenSlOn from the leadmg edge of the south faces of the bUlldmg to the
south property lme Please note that the setback dimensIOn shall be
measured from the overhang, covered walkways, canopIes or awnmgs.
The bUlldmg setbacks shall comply WIth Zonmg Code regulatIOns.
Indicate on the site plan whether the patio area IS covered. If It IS
covered. proVIde plan and elevation vIew drawmgs of the structure.
Also. specify the setback dimensIOns m compliance With the zonmg
regulations.
20 Pro\ Ide detailed and dimenSIOned elevation view drawmgs of the site
slgnage Indicate the total sign area and height of the sIgn mcludmg
proYldlllg computatIons that venfy the sign area complies With the
regulations of the Sign Code Also, show and dimension on the plan
view drawmgs the distance the sIte sIgn IS located from the adjacent
property Illles (note ten feet IS the mmlmum setback from any property
line)
Or
Place the followmg note on the site plan 'Site slgnage IS not approved
Page 4
St~.nton MagnetIcs - Quantum Park Lot 6
FIle No NWSP 99-011
\L-~
for thIs proJect. Separate sIte plan revIew and approval IS reqUIred for
sIte slgnage " Drawmgs of the slgnage shall comply wIth the applicable
regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land
Development RegulatIOns). If a sIte sIgn IS proposed, delIneate on the
landscape plan the locatIOn of the landscapmg that is reqUIred for sIte
sIgnage
21 On sheet SPl, Identify the symbol that represents the property lme.
22 DimensIon the wIdth of the easement that is shown along the west
property lme
23 Add to the sIte plan drawmg a labeled symbol that represents the
locatIon of the sIte IIghtmg poles. Also, note on the sIte plan that the
sIte IIghtmg fixtures wIlllllummate the sIte consIstent wIth the
specIficatIons IdentIfied m the Parkmg Lot Code. The photometric plan
IS revIewed at tIme of permIt revIew and IS not reqUIred for sIte plan
revIew Therefore, remove the drawmg from the submIttal.
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments
A4~) The applIcant has addressed the eXIstmg trees on the sIte If the IL f{
~ relocated trees do not survIve the transplantmg, the trees WIll be replaced
dUrIng the landscapmg portIon of the project.
PLANNING AND ZONING
~mments.
~ ~I
On the sIte plan show the followmg:
~ ~ Setbacks chart and dimensIOns m tabular form Chapter 4 SectIon 7
t-:: ( Paragraph E
JA 00/ Open space reqUIred and proposed m the tabular data. Chapter 2
SectIon 7 Paragraph H.13
i# ~ ProvIde loadmg space reqUIrements m the parkmg calculatIOns.
Chapter 2 SectIOn 11 Paragraph J.2
'-"-- ()J. / BearIngs and dIstances of property lInes. Chapter 4 SectIOn 7
av-/ Paragraph B
0- ReVIse plans to proVIde parkmg lot Islands dImensIOned WIth 5' of
landscape area from mSIde to mSlde of curb CIty drawmg #B-
90012
vL {)J... / Label the dashed lme shown mSlde of the west, south and east
. . property lmes
t,lF P<. #' Label the walk way pavmg materIal
-
Page 5
Stanton MagnetIcs - Quantum park~
. r
F lie No NWSP 99-011 \ .eLe v .
0-<.,
'----
if'- 0 · Label the W ". '" \.t of the wmg walls adjacent to the loadmg
AI? - wells
.~ ~ SIgn plan showmg location wIth setback reqUIrements and an
1 ~ \ f-1. elevatIon drawmg wIth dImensIOns, materials and colons.
SIgn and seal all plans submItted for reVIew Chapter 4 SectIon 7
'/\)' . iJ
'l./V ~
On the landscape plan show the followmg:
7' Label and dImension all reqUIred landscape buffers. Chapter 7.5
....ArtIcle II
tflL,./ Label and dImensIOn the mimmum tree spacmg along the R/W
..-frontage Chapter 7.5 ArtIcfe n Section 5 Paragraph D
oy A note m the notes specIfying a materIal other than cypress shall be
~sed for mu~
v--- OJ/ProvIde safi slgat rIangles. Chapter 7 5 ArtIcle II SectIOn 5
J Paragraph H
lb~t"'; / Locate IIghtmg and fire hygrants eXlstmg and proposed. Chapter 4
SectIOn 7 Paragraph B
SubmIt a traffic study and WrItten confirmatIOn from the Palm Beach
County Traffic DiVISIOn that the sIte meets traffic performance standards.
s:lprojectslcond of apprl
1
41~f
Vtt)"- M bu ulf
~
~
,
.()eW6
( ___ - <t2,,- v ,~<r-'
( ,,0 Le '
( A )
? (h -,~~.f
'T$o~~
vV\ ~~ 'f
p~
..c.V(ev$~[J
hr
(""\
QVt'---.I'-- .-f<-~
~cx C' k
? r~,.f:, C dY\... .f\ r ""'~ ~C4... cs.( r ~..j I ("" (.) ~ ~
(;
~ C-cVv.-( _
f lA. {/J'" I 1U (j.)hl
fVIJV! ~u ~i 0J
~~vQtJ j
r ~.L
t.1.'fO 1 . It
(- !
J 1 f
of
t
j, f &'-
L I u(' U tr1A.t vvL
-( 0 UJ Lt J D U b~
v
llet.J V f(o V ,<5{e
f6 <<-~ (5,
V 1\ ; +-y
1-/ r- /e
cf) (X (., L/ t"71 c .--.f
L c- c -u. Sc.. /, (" +-
70 ..... vre::.
fr-J
~
Ii I . , ':nJ~J2..~f<: 5c,,-+<, 5' ~ c!'<:
A~ bz/-~ it( Of - it ~ ~"'5 ~ eM.. !. "..; 5 (~ (.,)/d:..+t.;;r.. a;,s k """"'" ~ m<c"&;... 7i- .5>""'~
"" {' L // /.;; 4
-:;:y... c: e- OV, rc;1.:' 'r;rr? c:. 0-..... <" " J1.\ AA .,1.. I~ /J ,../ /l ~ ,.., (1 { "
;' ., /,., r ..<-1 c.. '-"<\ GId" e.Y .r L. c:..,-. __ ~ .. ".. . ....
"} ~r I SS
Sp..-.<.~.s G.-re ~:J t..f) I" C~V\Q<o.-f(Q,.... wr-d LcA-1 t/c;...yS....q..... ~ C"41 ~_ ~y
f' fa {..)-
(
(J
o
"
(\
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
TO.
Michael W Rumpf, Drrector of Planning & Zoning
Raymond F DaVIdson, P .E., Acting City E~
May 27, 1999
FROM.
DATE.
RE
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
1
Add to the sIte plan the following note: All plans submitted for specific permits shall meet the City's
code reqUIrements at tune of apphcation. These permits include, but are not limited to the following:
SIte lightmg, paving, drainage, curbmg, landscaping and irrigation. Permits reqwred from other
penmttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be
mcluded Wlth the permIt request.
2.
Add a "Right Turn Only" SIgn at the south egress dnveway
3
Provide 6" Wlde thermoplastic, wlute stripes across both dnveways to delineate pedestrian path
\
through dnveways.
4
The landscape islands shall have a mInimum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LD~ Chapter 7 5, ArtIcle II, Section 5 G ]
-..
5
ProvIde an Engmeer's certIfication that the dramage w1l1 conform Wlth all rules, regulations and
codes of the CIty'S Land Development RegulatlOns. [LDR Chapter 4, Section 7.F ]
,
6
Show clear SIght tnangles at both dnveways and adjust the Landscaping Plan if needed. [LDR
Chapter 7.5, Article II, Section 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew Wltlun the SIght tnangles at a level between 30" and 6' above finished grade.
[LDR Chapter 75, ArtIcle II, SectIon 5.H.]
The proposed 8 mch water main to the fire hydrant at the north property lme will require a jack and
bore under Quantum Blvd., an open cut of Quantum Blvd. will not be allowed. Consider providing a
water lme to the fire hydrant at the north property line from the existmg water line at the south
property lme as an alternatIve to aJack and bore.
All plans submitted to the CIty must be sIgned and sealed by the appropriate design professionals.
The Civll drawing and the Survey are not sIgned and sealed.
RFD/ck
Xc Ken Hall
C:'My Documents\Stan!on ~agne!ics. Quantum Lo! 6 New Site Plan Is! Review.doc
\J~~A +0 ~\. Uq,v'rl.W+
CQVV\ fV\ t..l'\; S
dfiO ~/6-V {JUJl, DII'. Q,\~
O1Y/41.;!& .~ h 0 \<j,
bP;} ~, ~ y
(\\ O~
Page 3 V
Stanton Magn s - Quantum Park Lot 6
File No N SP 99-011
@)
BUILDING DIVISION
Comments
Add a note to both accessible parkmg space areas shown on the site plan
drawmg (sheet SP 1) that refers the reader back to the typIcal parking
strIpmg detaIl drawmg for the accessible route detaIls. Add text to the
detaIl drawmg that mdlcates the route IS m complIance wIth Section 4.3 .. Ii _
(Accessible Route) and 4 6 (Parkmg and Passenger Loading Zones) of <J I
the FlorIda AccessibllItv Code for BuIldmg Construction. Please note
that at tIme of permIt review the applIcant shall provide detalied data on
the plans that wIll verIfy that the path of the accessible route IS m
complIance WIth the regulatIOns of the FlorIda AcceSSIbIlity Code for
BUlldmg ConstructIOn.
18 kkm.fy th", ..p;.llil:J tl~(MO eJ..v cltIDn w iLhiu th~ fvotpflftt offtre lnakting
tb3t ,e;: I11"d~atea OR the: 31te: I'ldfI (;)ll~d Sr1) clUJ tll'G flg9r piaR QRt\VIR~
(~heet ,'\.1 ). Asd t9 tbe alllil aata, fERJnB eR sb.d SP 1, llle-flvai ~gg,e
t-llat the I:llllkhc.g 'i lo,,"'ted wlthm.Htc1\1dmg, ''''Rere Etfl~II~~ble, ~
tleod ele":.ltl0fl. IftRere ,e;: no h::!"1i fl9gd eleViltlQ", ,"rll~~ tba~QR,..the.
. Add speCIficatIOns to the sIte data that wIll verify that the
proposed fiOlsh floor elevatIOn IS m complIance WIth the mmlmum
standards oftl1", fvllovVlng: R6.9,,)itr.<~ 8y"""
~ ~::::::: :::::::~ ~~;:~ ~: ~::;h 7;1~::d~ Water Management
DistrIct permIt for the proJect.
c) ~hg'" aReI ~r9\'ide "omputatlone;: th"'t v@nfy d'l8 el~"Mlon of the fin~sh
flogr IS :JIX lrrches or 1I1ore ae9"p the crown of the ::lhlJttlRg fight of Way
L1?--
\
At tIme of permit revIew IdentIfy on the site plan the actual setback
dImenSIOn from the leadmg edge of the south faces of the buIldmg to the
south property lIne. Please note that the setback dimensIOn shall be ~IL..
measured from the overhang, covered walkways, canopIes or aWnIngs.
The bUlldmg setbacks shall comply WIth Zonmg Code regulations
IndIcate on the sIte plan whether the patIo area IS covered. If It IS
covered, proVide plan and elevatIOn vIew drawmgs of the structure.
Also speclfv the setback dImenSIOns m complIance WIth the zonmg
regulatIons.
)9 ProVide detaIled and dImenSIOned elevatIOn vIew drawmgs of the sIte
slgnage Indicate the total sign area and heIght of the sIgn mcludmg
provldmg computatIOns that verify the sIgn area complIes With the
regulatIOns of the SIgn Code Also show and dImenSIOn on the plan
vIew drawmgs the dIstance the sIte sIgn IS located from the adjacent
propertY lines (note ten feet IS the minImum setback from any property
Ime)
Or
Place the following note on the site plan "SIte slgnage IS not approved
/Jpo T1'i-6 ~""W-wJi\J(. N~"tC:- to rw: 6u=II(\t-Io~ /he-.lJ Pf4,piv~d we ~~;l..~'NC.
Ii 13 Url,l),Nb SIl_tJ4;,~ (.bJ J...( Cc>m,Oly MJinJ r7IC IIPIMi/If..:J 4>1Ii1.v)l.,,:" /4~I</ PI /J.
J> n A i'7'fr: 4AALIC/J Sf;;. ec.6vtdn..~..!;' 6? T7.j~ ~/6/'J ~~e {(,.JI:i.~ 21)
S I il'J rl-OU!~ -"'1 IV'" I ' r
Page 4
Stanton Magnetics - Quantum Park Lot 6
FIle No ~WSP 99-011
for thIs proJect. Separate sIte plan revIew and approval IS reqUIred for
sIte slgnage." Drawmgs of the slgnage shall comply WIth the applicable
regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land
Development Regulations). If a sIte sign IS proposed, delmeate on the
landscape plan the locatIOn of the landscaping that is required for sIte
fJ: slgnage
!71 On sheet SP 1 Identify the symbol that represents the property lIne. (J~
0'1-
a .22 DImenSIOn the wIdth of the easement that IS shown along the west
property Ime
~ Add to the sIte plan drawing a labeled symbol that represents the
~ locatIon of the sIte IIghtmg poles. Also note on the site plan that the o~
~j site lIghtIng fixtures will Illummate the sIte consIstent wIth the
speCIficatIons IdentIfied m the Parkmg Lot Code. The photometrIc plan
IS reviewed at tIme of permIt review and IS not reqUIred for sIte plan
revIew Therefore, remove the drawmg from the submIttal.
PARKS A~D RECREATION
Comments None
FORESTER/ENVIRONMENTALIST
\
Comments
24 The applIcant has addressed the eXlstmg trees on the sIte If the
relocated trees do not survIve the transplantIng, the trees wIll be replaced
during the landscapmg portIOn of the project.
PLANNING AND ZONING
Comments
.,~ On the sIte plan show the followmg'
-)
. Setbacks chart and dimensIOns m tabular form Chapter 4 SectIOn 7
Paragraph E
. Open space reqUired and proposed In the tabular data. Chapter 2
Section 7 Paragraph H.13
. PrOVIde loadmg space reqUIrements m the parkmg calculatIOns.
Chapter:2 SectIon 11 Paragraph J.2
. Bearmgs and dIstances of property lInes. Chapter 4 SectIOn 7
Paragraph B
. ReVIse plans to proVIde parkmg lot Islands dimensIOned With 5 of
landscape area from mside to mSlde of curb CIty drawmg #B-
90012
. Label the dashed lme shown InSIde of the west, south and east
property lInes
. Label the walk way pavmg material
o\J ~ A/ws:p 07- all
.1'0 ",~~ . rf) 0 w "
a.. 0 \lP ~ (1\ ~TA tV Tl>") m A GN f::r;~ -"' ~ () tJ ...flu ",INJ'.
\J (' rlo CO - (a.. cJ t - -
~d. ~n Ie "AlA !he BIlUliiftg G..... 'NiII be ewIulllllt!al lime 4' ~ -ril
r J -~- . The permit fee, water and sewer facifaty fees, tounty fees and State
"t fees will be determined at time of permit review. ~Ipt P~p~Rf/I'ILU{ ~(:f;.S 7
.. To efficiently move from site plan approval to pennit review it is
recommended that the permit applicant and contractor contact a Plans
Analyst in the Building Division of the Development Department to obtain a
permit submittal checklist.
38 'Jf> 1'I":L.. ~L .lL [he .....,......... r....ateg8 ,..Ivr-_lld iu III k ttnlliRg il..& 81..1/111' _ ~~
v~tA n,... -awlatiQAs of tAl 911i1~inl g..... . if ....lln't9 "'" the C!it_ FlaR Jrn~f,r
.. .. . .
of 1 'fnll_~ti__. ,.......,..aG!"u~Ll ~Hil"i... The bwlding area, occupancy an
type of construction shall comply with the specifications identified in the
Building Code. .
~~I time of permit review specify, in tabular farm, on the' I "4 J _I: ,.,
~ site plan iifl...ll-:M1. ,1111._ u._ ~L ~r l__l. L I..... L A.L_- "_if IraB ef r~
, illig. type of construction and occupancy classification__Working . \
drawings of the buildinge shall comply with the codes specified in Chapte~
20 of the Land Development Regulations. ~Ar-I~ p(lop~
fOR'. ",8l,)iL~J .ut
~..!!S!..-=-7oIl1IY uecu~tl.RJJ.Jd 'ir-"'....tr L-r" 1 :1....1'1'1::11 ~ IY~ rll&
~ \"'\~
~d~~
4~4
I st REVIEW COMMENTS
Project name Stanton Magnetics - Quamtum Park Lot 6
File number NWSP 99-011
Reference' 1st RevIew. New SIte Plan. File # NWSP 99-011 wIth an Mav 12. 1999 PlannIng and Zoning
Deoartment date stamo marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments. None
UTILITIES - General Comments
1 All utilities easements shall be shown on the rectified landscaping drawings
so that we may determine which trees may interfere with utilities In
general, palm trees will be the only tree species allowed within utility
easements Canopy trees may be planted outside of the easement so that
roots and branches will not impact those utilItIes within the easement in the
foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to
remove any trees that interfere with utility serVIces, either in utilIty
easements or public rights-of-way
2. Dept. of HRS permits will be required for the water system serving this project.
(Sec. 26-12)
3 Fire flow calculations will be required demonstrating the City Code
requirement of 1500 g p.m. as stated in LDR chap 6, Art. IV, Sec. 16, or
the requirement imposed by insurance underwriters, whichever is greater
(see Sec 26-16(a)) Please submit these calculations with your HRS permit
submittal
4 Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for
this project either upon my request for signature on the Health Dept. application
forms or within 30 days of site plan approval, whichever occurs first. Based upon a
1.5-inch meter the fee is $1205 82
5 Comp Plan policy 3C.3 4 requires the conservation of potable water CIty water
may not, therefore, be used for irrigation where other sources are readily available.
6 Water and sewer lines to be owned and operated by the City shall be included within
utility easements. Please show all proposed easements on the engineenng drawings,
using a minimum width of 12 feet. The easements shall be dedicated via separate
instrument to the City as stated in Sec. 26-33(a) of the Code
7 This office will not require surety for installation of the water and sewer utilities, on
condition that the systems be fully completed, and given to the City before the first
permanent meter is set. Note that setting of a permanent water meter is a
prerequisite to obtaining the certificate of occupancy
8 The waste stream from the manufacturing process must meet the City's pretreatment
requirements. A sampling point must be provided to allow monitoring of this waste
stream. (Sec. 26-143,26-147)
Page 2
Stanton MagnetIcs - Quantum Park Lot 6
File No NWSP 99-011
DEPARTMENTS INCLUDE REJECT
FIRE
Comments
9 A fire flow calculatIon test wIll be required, LDR 6-16
10 All water mams, hydrants, and roadways WIll be m place pnor to above
ground constructIOn, NFP A 1
POLICE
Comments None
ENGINEERING DIVISION
Comments.
11 Add to the site plan the following note: All plans submitted for specific permits
shall meet the City's code requirements at time of application. These permits
include, but are not limited to the following: site lighting, paving, drainage,
curbing, landscaping and irrigation. Permits required from other permitting
agencies, such as FDOT, PBe, SFWMD, DERM, L WDD, DEP and any others,
shall be included with the permit request.
12 Add a "Right Turn Only" sIgn at the south egress dnveway
13 ProvIde 6" WIde thermoplastIc, whIte stnpes across both dnveways to
delIneate pedestnan path through driveways.
14 The landscape islands shall have a mmimum grassed area of 5' between
the backs of curb Adjust all plans accordmgly [LDR Chapter 7.5,
ArtIcle II, SectIOn 5 G ]
15 ProvIde an Engmeer's certIficatIOn that the dramage wIll conform WIth
all rules, regulations and codes ofthe CIty's Land Development
RegulatIons. [LDR Chapter 4, SectIOn 7.F ]
16 Show clear sight tnangles at both drIveways and adjust the Landscaping
Plan If needed. [LDR Chapter 7.5, Article II, SectIon 5.H.2.] Add a
note to the Landscapmg Plan that there shall be a clear unobstructed
vIew wlthm the SIght tnangles at a level between 30" and 6' above
finished grade. [LDR Chapter 7.5, ArtIcle II, SectIOn 5.H.]
Page 3
Stanton MagnetIcs - Quantum Park Lot 6
File No NWSP 99-011
BUILDING DIVISION
Comments.
17 Add a note to both accessible parkmg space areas shown on the site plan
drawing (sheet SP 1) that refers the reader back to the typical parking
stnpmg detaIl drawmg for the accessible route detaIls. Add text to the
detaIl drawmg that mdlcates the route IS m complIance wIth SectIOn 4.3
(Accessible Route) and 4 6 (Parkmg and Passenger Loading Zones) of
the Florida AccessibIlIty Code for Buildmg Construction. Please note
that at tIme of permIt reVIew the applIcant shall provIde detaIled data on
the plans that wIll venfy that the path of the accessible route is in
complIance WIth the regulatIOns of the Flonda AccessIbIlIty Code for
Buildmg Construction.
18 Identify the finIsh floor elevatIon wIthm the footprmt of the bUlldmg
that IS Illustrated on the site plan (sheet SP 1) and the floor plan drawing
(sheet A.l) Add to the sIte data, found on sheet SP 1, the flood zone
that the bUlldmg IS located wIthm mcludmg, where applIcable, base
flood elevatIOn. If there IS no base flood elevatIOn, IndIcate that on the
plans. Add specIficatIOns to the sIte data that wIll venfy that the
proposed finIsh floor elevatIOn IS m complIance WIth the mmlmum
standards of the followmg:
a) Minimum elevatIOn reqUIred by the flood zone
b) Minimum elevatIon reqUIred by the South Flonda Water Management
DIstnct permIt for the project.
c) Show and proVIde computations that venfy the elevatIOn of the finIsh
floor IS SIX mches or more above the crown of the abutting right-of-way
19 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback
dImensIOn from the leadmg edge of the south faces of the bUlldmg to the
south property lme Please note that the setback dImensIOn shall be
measured from the overhang, covered walkways, canopIes or aWnIngs.
The bUIldIng setbacks shall comply WIth Zoning Code regulatIons.
IndIcate on the sIte plan whether the patIO area IS covered. If It is
covered, provIde plan and elevatIOn vIew drawings of the structure
Also, specIfy the setback dImensIOns m compliance with the zoning
regulatIons.
20 ProvIde detaIled and dImensIOned elevatIOn VIew drawings of the sIte
slgnage IndIcate the total sIgn area and height of the sign mcludmg
provIding computatIOns that venfy the sIgn area complIes WIth the
regulations of the SIgn Code Also, show and dImenSIon on the plan
vIew draWIngs the dIstance the sIte sIgn IS located from the adjacent
property lInes (note ten feet IS the mmImum setback from any property
lIne)
Or
Place the followmg note on the site plan. "Site signage is not approved
Page 4
Stanton Magnetics - Quantum Park Lot 6
FIle No NWSP 99-011
for thIS project. Separate site plan review and approval IS required for
sIte slgnage." Drawmgs of the slgnage shall comply with the applIcable
regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land
Development RegulatIons) If a sIte sIgn IS proposed, delIneate on the
landscape plan the locatIon of the landscaping that IS required for sIte
signage
21 On sheet SPl, IdentIfy the symbol that represents the property Ime.
22 DimenSIOn the wIdth of the easement that is shown along the west
property lIne
23 Add to the sIte plan drawmg a labeled symbol that represents the
locatIOn of the site IIghtmg poles Also, note on the site plan that the
site IIghtmg fixtures wIll Illummate the sIte consIstent with the
specificatIOns IdentIfied m the Parkmg Lot Code. The photometric plan
IS revIewed at tIme of permIt revIew and IS not reqUIred for sIte plan
review Therefore, remove the drawmg from the submIttal.
PARKS AND RECREATION
Comments. None
FORE S TERlENVIRONMENT ALIST
Comments
24 The applIcant has addressed the eXlstmg trees on the site. If the
relocated trees do not survIve the transplanting, the trees will be replaced
dunng the landscapmg portIOn of the proJect.
PLANNING AND ZONING
Comments.
25 On the sIte plan show the followmg:
. Setbacks chart and dImenSIOns m tabular form Chapter 4 Section 7
Paragraph E
. Open space reqUIred and proposed III the tabular data. Chapter 2
SectIOn 7 Paragraph H.13
. ProvIde loadmg space reqUIrements m the parkmg calculatIOns.
Chapter 2 SectIOn 11 Paragraph J.2
. Bearmgs and dIstances of property lInes. Chapter 4 SectIon 7
Paragraph B
. RevIse plans to prOVIde parkmg lot Islands dImenSIOned wIth 5' of
landscape area from insIde to mSlde of curb City drawing #B-
90012
. Label the dashed line shown inside of the west, south and east
property lInes
. Label the walk way paving matenal
Page 5
Stanton MagnetIcs - Quantum Park Lot 6
File No NWSP 99-011
. Label the type and heIght of the wmg walls adjacent to the loadmg
wells
. Sign plan showmg location wIth setback requirements and an
elevatIon drawmg wIth dImensIOns, matenals and colons.
26 SIgn and seal all plans submItted for reVIew Chapter 4 Section 7
27 On the landscape plan show the followmg'
. Label and dImensIOn all reqUIred landscape buffers. Chapter 7 5
ArtIcle II
. Label and dImenSIOn the mll111TIUm tree spacmg along the R/W
frontage Chapter 7 5 ArtIcle II SectIOn 5 Paragraph D
. A note m the notes speclfymg a matenal other than cypress shall be
used for mulch
. Provide safe slgat tnangles. Chapter 7 5 Article II SectIon 5
Paragraph H
. Locate IIghtmg and fire hydrants eXlstmg and proposed. Chapter 4
SectIOn 7 Paragraph B
28 Submit a traffic study and wntten confirmation from the Palm Beach
County Traffic DIVISIOn that the sIte meets traffic performance standards.
s:\projects\cond of appr\
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
DATE
Michael W Rumpf, DIrector of Plannmg & Zonmg
Raymond F DaVidson, P.E_, Actmg ClIy Eng~
May 27, 1999
TO
FROM.
RE.
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
1 Add to the SIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S
code reqUirements at time of apphcatIOn. These permIts mclude, but are not hmIted to the followmg
SIte lightmg, pavmg, dramage, curbmg, landscapmg and IrngatIOn. Permits reqUired from other
permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be
mcluded wIth the permIt request.
2 Add a "Right Turn Only" SIgn at the south egress dnveway
3 ProVIde 6" wIde thermoplastic, whIte stnpes across both dnveways to dehneate pedestnan path
through dnveways.
4 The landscape Islands shall have a mImmum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G]
5 ProVIde an Engmeer's certIficatIOn that the dramage wIll conform wIth all rules, regulatIOns and
codes ofthe CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F]
6 Show clear sIght tnangles at both dnveways and adjust the Landscapmg Plan If needed. [LDR
Chapter 75, ArtIcle II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew WIthm the sIght tnangles at a level between 30" and 6' above fimshed grade.
[LDR Chapter 75, ArtIcle II, SectIOn 5.H.]
7 The proposed 8 mch water mam to the fire hydrant at the north property lme wIll require a Jack and
bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConSIder provIdmg a
water hne to the fire hydrant at the north property hne from the eXIstmg water lme at the south
property lme as an alternative to aJack and bore.
8 All plans submItted to the CIty must be SIgned and sealed by the appropnate desIgn profeSSIOnals.
The CIvIl drawmg and the Survey are not SIgned and sealed.
RFD/ck
Xc Ken Hall
C:\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review.doc
MEMORANDUM
UTILITIES DEPT NO 99 - 165
TO'
M~mPf, Planning Director
~John A Guidry, UtilIties DIrector
FROM.
DATE.
May 25, 1999
SUBJECT
Stanton MagnetIcs - Quantum Park Lot 6 - 1 SI Review
We offer the following comments on this project.
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscaping drawings so that we may
determine which trees may interfere with utilities In general, palm trees will be the only tree
species allowed within utility easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities wIthin the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere wIth utility
services, either m utility easements or public rights-of-way
2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g p m. as
stated in LDR chap 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater (see Sec 26-16(a)) Please submit these calculations wIth your HRS permit
submittal
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whIchever occurs first. Based upon a 1 5-mch meter, the fee IS $1205 82
5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore,
be used for lITIgatIOn where other sources are readily available.
SPECIFIC CONDITIONS
1) Water and sewer lines to be owned and operated by the CIty shall be included within utility
easements Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) A building permit for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment reqUIrements
A sampling pomt must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (742-6404) of this office
JAG/PVM
I~~ '- ------
i 0 :0. ~ - "'-
'l}ll
j I '
i l. I,
I -
~
Xc Skip Milor
Peter Mazzella
File
,
If
.P' I
,_, "=~. I {
.........,.;..........""l~
LEISURE SERVICES PARKS DIVISION MEMORANDUM
TO
Mike Rumpf, DIrector ofPlanOlng & Zonmg
(1-' \ )J
John Wildner, Parks Supenntendent 1 W
FROM
RE.
Stanton Magnetics - Quantum Park Lot 6
DATE
May 26, 1999
I have no comments on the above project. The project should contmue m the normal
reVIew process
JWad
,--..
, i i !.. 13 ['I ["'win, [l
I', .,....:..c:.....,;,- 'j I Yf m
j ~{ ~'- - ~
uu 1~llr 2 61999 ~
PLANNING AND
ZONING DEPt
DEPARTMENT OF DEVELOPMENT
MEMORANDUM
ENG 99-076
TO
Michael W Rumpf, DIrector of Plannmg & ZOnIng
Raymond F DaVidson, P .E., Actmg City EngI~
May 27,1999
FROM.
DATE
RE
STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011)
NEW SITE PLAN 1ST REVIEW COMMENTS
1 Add to the sIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S
code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg'
sIte lIghtmg, paving, dramage, curbmg, landscapmg and ImgatIOn. PermIts reqUIred from other
permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be
mcluded WIth the permIt request.
2. Add a "RIght Turn Only" sIgn at the south egress dnveway
3 ProvIde 6" wIde thermoplastIc, whIte stnpes across both driveways to delmeate pedestnan path
through dnveways.
4 The landscape Islands shall have a mInImum grassed area of 5' between the backs of curb Adjust all
plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G]
5 ProVIde an Engmeer's certIficatIOn that the dramage WIll conform WIth all rules, regulatIOns and
codes of the CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ]
6 Show clear SIght tnangles at both drIveways and adjust the Landscapmg Plan If needed. [LDR
Chapter 7 5, ArtIcle II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear
unobstructed VIew WIthm the SIght tnangles at a level between 30" and 6' above finIshed grade.
[LDR Chapter 75, ArtIcle II, SectIon 5.H.]
7 The proposed 8 mch water mam to the fire hydrant at the north property lme WIll reqUIre ajack and
bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConsIder provIdmg a
water lIne to the fire hydrant at the north property lme from the eXIstmg water lme at the south
property lme as an alternatIve to aJack and bore.
8 All plans submItted to the CIty must be sIgned and sealed by the appropnate deSIgn professIOnals.
The CIVIl drawmg and the Survey are not sIgned and sealed.
RFD/ck
Xc Ken Hall
C"\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review,doc
MEMORANDUM
UTILITIES DEPT NO 99 - 165
TO
M~mPf, Planning Director
1/vJohn A Guidry, UtilitIes Director
FROM.
DATE.
May 25, 1999
SUBJECT
Stanton Magnetics - Quantum Park Lot 6 - 1 SI Review
We offer the following comments on this project:
GENERAL COMMENTS
1) All utilities easements shall be shown on the rectified landscapmg drawings so that we may
determine which trees may interfere with utilities In general, palm trees will be the only tree
species allowed within utility easements Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities withm the easement in the foreseeable future
LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way
2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12)
3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as
stated in LDR chap 6, Art. IV, Sec. 16, or the requirement Imposed by msurance underwriters,
whichever IS greater (see Sec 26-16(a)) Please submit these calculations with your HRS permit
submittal
4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project
either upon my request for signature on the Health Dept. application forms or within 30 days of site
plan approval, whichever occurs first. Based upon a 1 5-inch meter, the fee is $1205 82
5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIon of potable water CIty water may not, therefore,
be used for lITIgatIon where other sources are readily available
SPECIFIC CONDITIONS
1) Water and sewer lInes to be owned and operated by the City shall be mcluded within utility
easements Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
Sec 26-33(a) of the Code
2) This office will not require surety for installation of the water and sewer utilities, on condition that
the systems be fully completed, and given to the City before the first permanent meter is set. Note
that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy
3) A buildmg permIt for this project shall not be issued until this office has approved the plans for the
water and/or sewer improvements required to serve the project. (Sec 26-15)
4) The waste stream from the manufacturing process must meet the City's pretreatment requirements
A sampling point must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147)
Please refer any questions on this matter to Peter Mazzella (742-6404) of thIS office
JAG/PVM
~~::::----..~ '-
r ~ -- ~----
/ 0 r:-' -
j ,
I 0 I ~
;1
)/
I
., ",.-"j I !
~~-.~
Xc Skip Milor
Peter Mazzella
File
Parks Division Memorandum- TRC
Subject.
Mike Rumpf, Actmg Plannmg and Zomng Manager
Kevin J Hallahan, Forester / Envlronment.hst ~
Stanton Magnetics- Quantum Park Lot 6
New Site Plan - 1st RevIew
To
From.
Date
May 25, 1999
The applIcant has addressed the eXlstmg trees on the site. If the relocated trees do not survive
the transplantmg, the trees will be replaced dunng the landscapmg portIOn of the project. The
project should contmue m the normal review process.
I , tiJ ~,tr /.
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO 99-119
TO
Michael Rumpf, Planmng and Zomng DIrector \ J
r\jrt\J
Michael E_ Haag, Bmldmg Code Pernnt AdmlTIlstr~ 1.-
May 20, 1999 ()
Stanton Magnetics Quantum Park Lot 6 - New Site Pl~n~sp 99-011)-
1st review comments
FROM.
DATE
RE
We have revIewed the plans for the above-referenced project and recommend that the followmg
comments be addressed pnor to the project bemg forwarded for Board reVIew'
Buildine Division (Site Specific and Permit Comments) - MIchael E Haag (561) 742-6352
1 Add a note to both accessible parkmg space areas shown on the SIte plan drawmg (sheet
SP 1) that refers the reader back to the typIcal parkmg stnpmg detaIl drawmg for the
accessible route detaIls. Add text to the detaIl drawmg that mdlcates the route IS m
comphance WIth SectIOn 43 (Accessible Route) and 4 6 (Parkmg and Passenger Loadmg
Zones) of the Flonda Accessiblhty Code for BUIldmg ConstructIOn. Please note that at tIme
of permIt reVIew the apphcant shall proVIde detaIled data on the plans that wIll venfy that the
path of the accessible route IS m comphance WIth the regulatIOns of the Flonda Accessiblhty
Code for BUIldmg ConstructIOn.
2 IdentIfy the fimsh floor elevatIOn wlthm the footpnnt of the bUIldmg that IS Illustrated on the
SIte plan (sheet SP 1) and the floor plan drawmg (sheet A.l) Add to the SIte data, found on
sheet SP 1, the flood zone that the bUIldmg IS located wlthm mcludmg, where apphcable,
base flood elevatIOn. If there IS no base flood elevatIOn, mdlcate that on the plans. Add
specIficatIOns to the SIte data that wIll venfy that the proposed fimsh floor elevatIOn IS m
comphance WIth the mmlmum standards of the followmg'
a) Mmlmum elevatIon reqUIred by the flood zone.
b) Mmlmum elevatIOn reqUIred by the South Flonda Water Management Dlstnct permIt for
the proJ ect.
c) Show and provIde computatIOns that venfy the elevatIon of the fimsh floor IS SIX mches
or more above the crown of the abuttmg nght-of-way
BUIldmg DIVISIon Memo No 99-119 to Michael Rumpf
RE Stanton MagnetIcs - 1 st ReVIew
May 20, 1999
Page Two
3 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback dImenSIOn from the
leadmg edge of the south faces of the bUIldmg to the south property lIne Please note that the
setback dImenSIOn shall be measured from the overhang, covered walkways, canopIes or
awnmgs. The bUIldmg setbacks shall comply wIth Zonmg Code regulatIOns. IndIcate on the
sIte plan whether the patIo area IS covered. If It IS covered, provIde plan and elevatIon VIew
drawmgs of the structure Also, speCIfy the setback dImenSIOns m complIance wIth the
zonmg regulatIOns.
4 PrOVIde detaIled and dImenSIOned elevatIOn VIew drawmgs of the sIte sIgnage IndIcate the
total sIgn area and heIght of the SIgn mc1udmg provldmg computatIOns that venfy the sIgn
area complIes wIth the regulatIOns of the SIgn Code. Also, show and dImenSIOn on the plan
VIew drawmgs the dIstance the sIte sIgn IS located from the adjacent property lInes (note ten
feet IS the mInImum setback from any property hne)
Or
Place the followmg note on the sIte plan. "SIte sIgnage IS not approved for thIS proJect.
Separate sIte plan reVIew and approval IS reqUIred for sIte sIgnage." Drawmgs of the
sIgnage shall comply wIth the apphcable regulatIOns speCIfied m the SIgn Code (Chapter 21
of the Land Development RegulatIOns) Ifa sIte SIgn IS proposed, delmeate on the landscape
plan the locatIOn of the landscapmg that IS reqUIred for sIte sIgnage
5 On sheet SPl, IdentIfy the symbol that represents the property lIne.
6 DImenSIOn the WIdth of the easement that IS shown along the west property hne
7 Add to the SIte plan drawmg a labeled symbol that represents the locatIOn of the SIte lIghtmg
poles. Also, note on the SIte plan that the SIte lIghtmg fixtures WIll Illummate the SIte
conSIstent WIth the speCIficatIOns IdentIfied m the Parkmg Lot Code. The photometnc plan IS
reVIewed at tIme of permIt reVIew and IS not reqUIred for SIte plan reVIew Therefore, remove
the drawmg from the submIttal.
MEH.bg
J '\SHRDA T A \Development\Building-6870\Documents\ TRC\NWSP 99-011 1 st review Stanton Magnetics,doc
CITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO'
MIchael Rumpf
FILE
DATE
SUBJECT
REFERENCES
ENCLOSURES
Ref NWSP 99-011 Stanton MagnetIcs
FROM
S gt. Jensen
NO COMMENTS
5-17-99
NWSP 99-011
f--
r:'. ~ !o:l rs n nn
'/~~r "il._!y J,fn)
U U J'1fl/ I 7 J9YiJ ~i
PZLANNING AND -
ONING DEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #99-102
SUBJ
Michael Rumpf, Plannmg & Zonmg DIrector W.
Larry QUInn, AssIstant PublIc Works DIrector V
SIte Plan RevIew - 15t RevIew - Stanton MagnetIcs - Quantum Park Lot 6
TO
FROM
DATE
May 17, 1999
The PublIc Works Department has no comments m reference to the SIte plan reVIew lIsted
above
LQ/cr
rnt~t ~ :~~ 00
PLAN!~ I \!G "~ND
ZON! NG' DT.
FIRE & LIFE SAFETY DIVISION
Memorandum No 99-287
0',:"".
"T
. - ..
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO Mike Rumpf, Director
Planning & Zoning Division
FROM Steve Gale, Fire Marshal
Deputy Chief - Fire Rescue Department
DATE May 13,1999
SUBJECT Stanton Magnetics
Quantum Park Lot 6
NWSP 99-011
A fire flow calculation test will be required, LOR 6-16 All water mains, hydrants,
and roadways will be in place prior to above ground construction, NFPA 1
I recommend this plan be forwarded with the above comments
CC File
r~'1 6'-~8"-rs
'~ :-
(;..L {2 All fvJ
~ 714-J'v1tJJ f'v1A-0 U E 'n <- oS
d"~jJ\CJ~ ~ (c;
1) (3tJ lI\C- 9m 'f'1fl.JJ 'S-\\<J-N Ill-6' ~L-vi
" ~T&Tc:-\L- C. +tMvT AN ~ 'j) \ M e-N ~ kl N ~ j ~ 'T\9'e, Ii 0Art..-
fZ, (I, ^"" c it- 1- 'S 0/ C I P ,:\-tt. E:..
· OPt'N C;pfk.E J~\I'I~;J:....Lf;:;~ J2e0.,..hf'1..(f'O $" fr\o\u.s ED
-(rI"E'
I N-f T ff'~\..~ j)A-)~ C t+"2- S &C / Pir/I.. ++ (9
· ft2-0Jlc>E-- ~(rV'\;0 ~lk.c- 64;-&\..i\,'26v'-FA.J'T$ f;....; 7l-/fi
f % l-t Alla G4L0cJVl- Do.'vlc; C +i 1. SG-G Il ? 4fL 1" :4
-- u~...e~~ 1<';....1. t If( ':'-6". .'1...1/1 -'t-- (~,J."..- ~ I ~. ~~r'u~
d' )"3>6AvL~ "2 j)" s: \fTJ,C.<6-5 of rlU:l~'l' LI~ s= eft 'I 56::'7 PtM.. 13
" (l~'J( se- 'fL~JJ I;:. ~ p(l-cu \Q ~ "" P/TIL;C IJv G LOT
IS\.A--NI,)~ Gv~L"J',')(.; CUIr.l.'L\.Ilj~
VI A./l f Jv S:, ( () ~ D V I ~
";t:;
1::
]
(
tS of-
LA- N v $ c" ~') t:- A-vl.- e t4- f-YVvv-. c08 q)6- . i () (,</ ;S t ~ f- ~r=
't
Cut~6 . to; D,.~,.f'l #- /3 - ?C(j(L
L,tr(!, c-L '-n+e ]) f}S t-tB> L \;J C- S I*,...... ~ &E!fI) I AI ~ I d-'<.. CJ.~
n.t (- 4/e-SJ I ~ n+ ~ fvrs, r p l1-LJ~v1 C AJc--~
L iffI~ 6L TI-f-f: u ~'T\.t- '--'~ ( IN \IV, v"-,,A %11-\ ff--U
l v9-1> E L -rJ+f; "1 f t ftJ0 :::> #8(.) 1+1 cJf- 71-tf ~ I J\J l.?
fh/} lTCeN, TI TttE" Lo ,+V I ^-II L-J 8 L\.J~
51i..9 N fLt'hv ~ito"'"/'J (,\ LGCr-"llo,'-j W / SfrO{rc,:K., ~Q.vi~~~
.;-
.>
,) n
? ,-'
\t:J
'" "-
~...,
'.> ~
',) j
f~
;::. ,.,.,
~ ~
~~
W/t'lL~ ~~..., '-
~ s~
~~:~
'?' _'6 '-?
../\ <J,r ~~
Q,\
.
er
..
j.. ) <;; I 1.-.0 f>->J. ~ e- fh..., J4.u.., (' '-fHJ <;, S'u is "-" \ TTl71D ~fL, kvtt-W. (3 J.i 'i
75-&G 7
1,. ) () ,0T>>t- (AhfOS ( ~ ftV'rJJ <;;'l\ovJ .nJ-D-- fo{Io.-, l'Cj ~
61 lA4-o ~ A<-V D :b( A." f.\j S 1(j'lV 4t,L 1~5G0l1LL\J l V1vJoYG/tr~ (J v~5,. C. ~ 7 )" /trL r.1[
f.)
L fT--f.beL. h JJ {) VlofL,- r: JJ s ( C~~ 77J-E' tv! I )J 1,Vi r.; "'- o7fi-G ff'
~!CfG ()V i ft-Lo,A/~ -rc~ f2- / w Ft2f).A.,FI'I~ /;;. elf. 7 ~--
/[/1"1 ~ J!: S (? ( 5" f ,4-{L )>
, fr fJoTt-' j tV (jft!- IV C /6 s. sp E-CI(=- ~ l]v I fr /Z.Ap4-it?/L.lkL
tJ(1tG-rL-- 7lfwJ.../ c1tr2-eSJ S~L 06-' uSE'D ft'L )./\I,C,-,iI
II P j\D V \ \) e- S iT F& S j 1..9 i+ T (yll A-- A; G Ct'"'C; C t1 7 )" /ill-j .fL S R s:- ;&(I.. tf
'"
" ~CA--r& LJ GH-n;t G ~4/V() ftv2E HyPf-Ao"./i~ 6. -. J/t- }~tJ
E-y. \ ~T7Nl.:> c; ~L<:/)C3fj) C fI {- ~ec,'/ (;t/l :B
~
Su~;; po 7{Z..,,4f='ft6 $-lVJ?'7 /J-,vO CJP; 7'6-1./ ('P#0f2v'-"Mlol\./
F-av- ~t.- fl&tKff-' ~7f !7JlfHj c f) I v f {v.J 'nMr
~ yr& yvtf(5r!, ~. it'~f '~f1c 1~;t--r4tY("~
%/frtJOAvt.P ~ "
232
STANDARD INDUSTRIAL CLASSIFICATION
Industry
Group
No.
367
Industry ?
<::-~ECTRONIC COMPONE~ ACCESSORIES-Con.
3679 Electronic Components, Not Elsewhere Classified-Con.
j
-*-
masers
Crystals and crystal assemblies, radio
Delay lines
Harness assemblies for electronic use:
wire and cable
Headphones, radio
Heads, recording for speech and musi-
cal equipment
Hermetic seals for electronic equip-
ment
Impedance conversion units, high fre-
quency
Liquid crystal displays
Loads, electronic
Microwave components
Oscillators, except laboratory type
Parametric amplifiers
Passive repeaters
Phonograph needle cartridges
Phonograph needles
Piezoelectric crystals
Power supplies, static, and variable fre-
quency
Pulse forming networks
Quartz crystals for electronic applica-
tion
Recording and playback heads, magnet-
ic
Recording heads for speech and musical
equipment
Rectifiers, electronic: except solid-state
Resonant reed devices, electronic
Rheostats, electronic
Sockets, electronic tube
Solenoids for electronic applications
,.Static power supply converters for elec-
tronic applications
Step positioners for transmitting equip-
ment
Styli, phonograph record cutting
Switches, electronic
Switches, stepping
Transducers for use in measuring and
testing instruments and equipments
Tube retainers, electronic
Tube spacers. mica
Tube transformer assemblies used in
firing electronic tubes
Video triggers, except remote control
television devices
Voice controls
Waveguides and fittings
369 MISCELLANEOUS ELECTRICAL MACHINERY, EQUIPMENT, AND
SUPPLIES
3691 Storage Batteries
Establishments primarily engaged in manufacturing storage batteries.
Alkaline cell storage batteries
Batteries, rechargeable
Lead acid batteries (storage batteries)
Nickel cadmium storage batteriee
Storage batteries
3692 Primary Batteries, Dry and Wet
Establishments primarily engaged in manufacturing primary batteries, dr:
or wet.
Batteries. primary' dry or wet
Dry cell batteries, single and multiple
cell
3694 Electrical Equipment for Internal Combustion Engines
Establishments primarily engaged in manufacturing electrical equipIDI'
for internal combustion engines. Important products of this industry incl1r
armatures, starting motors, alternators, and generators for automobiles ~
aircraft; and ignition apparatus for internal combustion engines, includi'
spark plugs, magnetos, coils, and distributors.
Alternators, motor vehicle
Armatures, motor vehicle
Battery cable wiring sets for internal
combustion engines
Battery charging generators for inter
nal combustion engines
Breaker point sets, internal combustion
Harness wiring sets for in~ r
bustioD engines ....
Ignition cable sets or. ~_...;_
for internal combustIon .....-
Ignition systems. high freq::' ...
Motors, starting: motor ve ~
craft ~
Regulators. voltage: motor ~
c;:~uu.'" nlnalll Fnr internal CO
.
REV'E'Af COMME"'TS (MEMO$)/DATA
ENGINEERING DEPARTMENT MEMORANDUM: NO. 91-242CC
November 26, 1991
TO
Christopher Cutro
Director of Planning & Zoning
FROM
Vincent A Finizio
Administrative Coordinator of Engineering
RE:
NOTIFICATION OF TECHNICAL REVIEW BOARD SIGN-OFF
Please be advised that the Engineering Department has signed off on the final
submission of the following site plans
Quantum, Lot 49
0~JA:=L~~
Vincent A Finizio ~
VAF/ck
cc J Scott Miller, City Manager
Michael Haag. Site Development Compliance Administrator
"Q 'P rrT,-'; TED
J:'\...L ...,J _'" Vi
NO'
! I 01
<1' (.., I I
PL. I
cYT.
-
MEMORANDUM
Utilities #91-577
TO
Christopher Cutro,
Director of Planning
John A Guidry ,~t..d ~"- "" / /Ie
Director of Ut ilrFlie~ /I //v- /' /
November 25, 1991
FROM
DATE
SUBJECT
Notification of Sign-Off - TRB
We have completed our review and have found the following
project to be in substantial compliance
Canada Dry - Southeast Distribution
19b
xc Mike Kazunas
Skip Milor
File
RECEIVED
NOV 2.S 9(
PLANNING DtPT
-
PLANNING DEPARTMENT MEMORANDUM
TO
Mike Haag, Site Development
FROM
Tambri J Heyden, Senior Planner
DATE
October 21, 1991
RE
Transmittal of Renderings
Accompanying this memorandum you will find colored elevations
and/or color chips and photographs for the following projects
which were approved by the City Commission on October 15, 1991
SITE PLAN
1 Best Homes at Boynton Lakes, Plat 5
(41 unit townhouse project)
One (1) colored elevation, photographs and color chips
City commission approved subject to staff comments (those
comments which were recommendations are at the option of the
applicant with respect to compliance), subject to Planning
and Zoning recommendation that a copy of the agreement
between Best Homes and the Boynton Lakes North Homeowners'
Association regarding construction of improvements on the
common areas be given to the City and subject to the CAB
recommendation that foundation landscaping include a 24 inch
Hibiscus hedge along the rear of each building planted 24
inches on center and that trees adjacent to buildings be
10-12 feet in height
2 Southeast Atlantic Distribution Center at Quantum, Lot 49
(New distribution warehouse)
One (1) colored elevation Approved by City Commission
subject to staff comments excluding comments 3, 7, 11, 24
and 27 from the Building Department and subject to Planning
Department Memorandum #91-265
The name of the project and date of City Commission approval
have been placed on the elevations
r , ~~
J~~ A /
Tambri J~eYde .
TJH/jm
Atts
A RENDER JM
PLANNING DEPT. MEMORANDUM NO. 91-247
FROM:
J Scott Miller, City Manager
~!~tro, Planning Director
TO
DATE
October 10, 1991
SUBJECT:
Planning and Zoning Board Meeting
October 8, 1991
Please be advised that the Planning and Zoning Board met on
Tuesday, October 8, 1991, and took the following action:
1. Unanimously recommended approval of the request submitted by
Mr. Edward J. Kaplan for site plan approval to construct 41
townhouse units on aSS acre tract of land within Boynton
Lakes, Plat 5, subject to proviso. Motion was made by Mrs.
Huckle and seconded by Mr. Cwynar; Mr Howard abstained.
(PM91-248)
2 Continued the public hearing for the Cross Creek Centre
parking lot variance to the November 12, 1991 meeting at
7:00 pm, as per the applicant's request for a one month
postponement.
3
Unanimously recommended approval of the request submitted
Robert E Basehart, Urban Design Studio, for site plan
approval to construct a 63,288 square foot distribution
facility on lot 49 within Quantum Park, subject to proviso
Motion was made by Mr. Lehnertz and seconded by Mrs.
Greenhouse (PM91-249)
by
~i-;v /
",,{.lfC...~~ 1;,
.J __('i.'<-io,'....
4. Unanimously made a finding of consistency with the
Comprehensive Plan for the proposed amendment to Appendix
A-Zoning to allow ambulance services as a permitted use in
the M-1, Light Industrial, zoning district Motion was made
by Mr. Howard and seconded by Mrs. Huckle; Mrs Greenhouse
had left the room during the making of the motion.
(PM91-250)
5 Unanimously made a finding consistency with the
Comprehensive Plan for the proposed amendment to Appendix
A-Zoning to allow vegetation recycling facilities in the
M-1, Light Industrial, zoning district, subject to proviso.
Motion was made by Lehnertz and seconded by Mr. Howard.
(PM91-251)
6 Discussed placing limitations on restaurants located in the
C-1, zoning district. The Planning and Zoning Board
accepted the recommendations made by the Planning
Department, as itemized in the Planning Department
memorandum dated October 3, 1991, and additionally suggested
that restaurants in C-1 be located only within multi-tenant
buildings (not permitted as freestanding buildings) and
allowed only as an accessory use to a lawful principal use.
The Planning and Zoning Board directed the Planning
Department to bring this proposed code change back to the
Planning and Zoning Board at the November 12, 1991 meeting
for a determination of consistency with the Comprehensive
Plan.
Planning Dept. Memorandum 191-247
Page 2
7. Discussed the data presented by the Planning Department
which compares various cities' regulations governing service
stations. The Planning and Zoning Board made
recommendations for a future change to the City's service
station regulations to be presented to the City Commission.
CC/jm
Encls
cc Don Jaeger, Building Director
Mike Haag, Site Development
A:PM91-247.JM
PLANNING DEPT MEMORANDUM NO. 91-249
(AGENDA MEMORANDUM)
FROM
J Scott Miller, City Manager
~-{~
Christopher Cutro, Planning Director
TO
DATE:
October 10, 1991
SUBJECT
Southeast Atlantic Distribution Center
at Quantum Park -
New Site Plan
Please place the above-referenced item on the City Commission
agenda for Tuesday, October 15, 1991 , under Development Plans -
Non-Consent Agenda
DESCRIPTION: Request for site plan approval to construct a
63,288 square foot distribution facility on Lot 49 within Quantum
Park, located approximately 400 feet east of Park Ridge Boulevard
and Beta Drive.
RECOMMENDATION: The Planning and Zoning Board unanimously
recommended approval of the above-referenced item, subject to
staff comments, copies of which are attached, with the exception
that if the City Attorney determines that unity of control for
Lots 49 and 49A is sufficient, then comment #3 from Building
Department Memorandum #91-358, requiring unity of title, be
deleted and also with the exception that if the City Attorney and
staff determine that a buffer wall is not required, the applicant
shall construct a chain link fence with a dense vegetative buffer
to consist of native hedge material, a minimum of 2 feet in
height, and a mixture of native canopy trees
CC/jm
A:PM91-249.JM
FIRE DEPARTMENT MEMORANDUM NO. 91-216 WDC
To PLANNING DEPARTMENT
From
WILLIAM D CAVANAUGH FIRE DEPARTMENT TRB REP
Re TRB DISTRIBUTION CENTER
LOT 49 QUANTUM PARK
A PRIVATE FIRE LOOP FOR WATER SUPPLY SHALL BE PROVIDED
FOR THIS PROJECT
THIS FIRE LINE IS NECESSARY TO PROVIDE
WATER TO THE FIRE SPRINKLER SYSTEM AND FOR THE FIRE HYDRANTS
REQUIRED IN THE SUB DIVISION REQUIREMENTS
//{/ eUf?f(!l<~~/-
W D CAVANAUGH ~
FIRE PREVENTION OFFICER I
BOYNTON BEACH FIRE DEPARTMENT
xc Executive Officer Crockett
File
9-27-91
MEMORANDUM
Utilities #91-483
TO
Christopher Cutro.
Planning Director
FROM
John A Guidry,
Director of Utilities
DATE
September 26, 1991
SUBJECT
TRB Review - Canada Dry Distribution Center
Quant um Lot 49
We can approve this project, subject to the following conditions
The proposed water main location is unacceptable to us
from a maintenance standpoint We suggest a fire
hydrant be installed within the utility easement and a
separate fire line be installed at the N E corner with
double check assembly located just beyond easement
Reduced pressure backflow preventers will be required
on the water service Indicate location, model and
size We recommend dual units in parallel so service
is not interrupted during testing
Double check valve assembly will be required on the
fire service line
9 Ductile Iron Pipe Polylined or P V C C-900 DR 18,
is required entering any sanitary manhole
Owner shall provide revised fire flow calculations and
details of fire protection system
All sanitary sewers on project are to be privately
owned and operated City responsibility will end at
the easement line
gb
xc
Mike Kazunas
File
\tf.Cf,J:\fEU
SE.f' 2,1
p\..M~~\~G Ot.Pl'.
~
TO
FROM
RE
DATE
RECREATION & PARK MEMORANDUM #93-384
Chris Cutro, Planning & Zoning Director
Kevin J Hallahan, Forester/Environmentalist t<:Jf~
49 Distributors Inc (AKA Canada Dry)
Quantum Corporate Park
4895 Park Ridge Boulevard
Landscape Buffer Adjacent To C-16 Canal
September 16, 1993
This memorandum is in response to the request by a City resident to
verify that a landscape buffer was planted along the C-16 Canal in
accordance with the approved site plan for the above project City
records indicate that an approved and inspected landscape buffer
was planted on May 5, 1992 The present facility managers have not
been adequately maintaining the vegetation although the company is
in the process of removing, replacing and maintaining the buffer
I am assisting the City Code Enforcement Division with completing
this vegetation replacement
The oversized trees were specified to be 12 feet in height and were
comprised of native species of Slash Pine and Live Oak The total
quantity of trees planted was fifteen, although the City buffer
requirement called for planting only eight trees The planted area
is approximately 25 feet wide by 200 feet long which is the size
limi t permitted by the South Florida Water Management District
(SFWMD) The buffer included trees, shrubs, hedges, grass sod,
grass seed, an automatic irrigation system and exotic plants
removal The following table is a dated activities chart detailing
the sequence of inspections and permits required to complete the
landscape buffer for the project
DATE
4/29/92
ACTIVITY/COMMENT
The project construction company, Catalfumo Construction,
was nearing completion of the facility and had not
received a landscape inspection for lot 49 and 49A Lot
49 contained the facilities and 49A contained the
landscape buffer as shown on the approved City site
plans The applicant requested a temporary Certificate
of Occupancy for the facilities (lot 49) pursuant to
presenting the City approved landscape plans (buffer) for
lot 49A to the SFWMD (see attached memo #92-175)
This organization reviews and permits all plantings in
their easement The SFWMD and the adjoining easement of
FP&L Utility Company have easements where the landscape
buffer is shown, which limit the types and sizes of
plantings
*5/04/92 The applicant requested a site landscape inspection which
failed for non-compliance to the approved landscape plan
(lot 49)
*5/18/92 The applicant requested a second site landscape
inspection which failed for non-compliance to the
approved landscape plan (lot 49)
5/14/92
The SFWMD approved a permit for lot 49A (landscape
buffer) (see attached SFWMD permit #9611)
5/26/92
The applicant requested a third site landscape inspection
for lot 49 (approved) and a first landscape inspection
for lot 49A (buffer) which is approved
*See attached computer printout sheet "Print Key Output" for list
of inspections
KH ad
CC Scott Miller, City Manager
Charles Frederick, Director, Recreation & Park Department
Scott Blasie, Code Enforcement Supervisor
Hubert Hurst, Code Enforcement Inspector
Mike Haag, Zoning & Site Administrator
Phil Sy, Plans Check Inspector
1/
I
.
RECREATION , PARK MEMORANDUM_
TO
Don Jaeger, Building Official
FROM
Kevin J Hallahan, Forester/Environmentalist
Canada Dry Distributors
RE
DATE
April 29,1992
~)H
The applicant has not received a landscape inspection. The
applicant has requested bonding the landscape materials required
to be planted on the SFWMD easement (canal area), rather than
planting as part of the on-site landscape inspection.
KH: ad
--w
BUILDING DEPARTMENT
MEMORANDUM NO 92-113
Apr i 1 27, 1992
TO Technical Review Committee Members
Ed Allen
Christopher Cu~ro
Bob Eichorst
Mike Kazunas
Charlie Frederick
John GUldry
Ed Hillery
Fire Chief
Planning and Zoning Director
Public Works Director
City Engineer
Parks & Recreation Director
Utilities Director
Police Chief
FROM
Don Jaeger, Building Official
RE
ISSUANCE OF CERTIFICATES OF OCCUPANCY
Canada Dry Distribu~ors
4895 Park Ridge Blvd
Catalfumo Construction, Inc
The above referenced project is nearing completion Prior ~o the
Building Department issuing the Certificate of Occupancy, I would
I ike to ensure that you do not have any outstanding or pending
conditions concerning this site that must be rectified (excluding
issues that are covered entirely with a city approved surety)
If any outstanding conditions are related to permits issued by the
Building Department, please prOVide this department a memorandum
containlng a description of the unresolved condi tions If the
unresol ved conditions are not permit related, please notify the
owner or the owners agent to ensure that the matters are
rec';ified
Please respond to Don Johnson, Building Compliance Administrator,
wi thin ten (10) days in order that we may proceed in a timely
m3.nner to issue the Certificate of Occupancy No response is
necessary If your department is satisfied with the current state
of the above referenced site Thank you for your cooperation
/Q
Donlger
XC J Scott Miller
Community Development (CRA Projects Only)
Kevin Hallahan, Forester
Don Johnson
File
~6J
SFWMD PERMIT Nu.___
(,.,., '0 Jt
OCli!"l 11fC
(NON-ASSIGNABLE)
May 14, 1992
DATE ISSUED
AUTHORIZING
BEAt1TIFICATION CONSISTING OF VARIOUS TREES AND SHRUBS
ENCROACHING 8' AND AI" IRRIGATION LINE WITH POP-UP SPRINKLERS
WITHIN THE NORTH RIGHT OF WAY OF C-16 LOCATED 1,500' WEST OF
1-95 <QUANTUM PARK)
LOCATED IN
PALM BEACH
COUNTY SECTION
20
TWP
45S
AGE
43E
ISSUED TO
QRA, Inc
1900 Southeast 17th Street Causeway
Fort Lauderdale, Florida 33316
lowner)
ThiS permit IS Issued pursuant to Application No. 92-0330-2 dated March 10, 19~ and
permittee s agreement to hold and save the Soutll FlOrida Water Management District and Its successors harmless from any ano all
damages. claims or liabilities which may arise by reason of the construction. maintenance or use of the work or structure InvOlved n
It':e Permit Said application including all plans and specIfications attached thereto IS by reference made a part hereof Tne
permittee. Oy acceptance of tllis permit. hereby agrees that he sllall promptly comply witll all orders of tile District and shall alter
repair or remove Il.s use sOlely at illS expense In a tImely faShion Permittee sllall comply With all laws and rules adminiStered cy t~e
Dlstrrct ThiS permit does not convey to permittee any property rlgllts nor any rIghts or privileges otllerthan those speCified herein
nor relieve tne permittee from comply'"g WIth any law regulation. or requIrement affecting the rights of other bodIes or agenc:es
All structures and works Installed Oy perm,ttee hereunder shall remlln tne property 01 tne permittee,
ThiS permit IS Issued by the District as a license to use or occupy District works or lands. It does not create any fight or entitlement.
e'ther legal or eQultaOle. to the contlOued use of the District works or lands. Since thiS permit conveys no right to the continued use
of lhe District works or lands. the District is under no Obligation to transfer thiS permit to any subsequent party By acceptance of
lh.s permit. lhe permIttee expressly acknowledges that the permittee bears all risks of loss as a result of revocation of thiS perml!.
WORK PROPOSED WILL BE COMPLETED ON OR BEFORE 5/3119 93 otherwise. this permit IS voided and all r.ghts
thereunder are automatically cancelled unless an extension to the construction periOd IS applied for and granted.
'2 LIMITING CONDITIONS (on reverse sIde of permit)
SPECIAL CONDITIONS (SPECIFIC LIMITING CONDITIONS) ARE AS FOLLOWS,
SPECIAL CONDITIONS ON THE ATTACHED SHEET ARE A PART OF THIS DOCUMENT
c Jeff Lis
1540 Latham Road
West Palm Beach, Florida 33409
FILED WITH THE CLERK OF THE SOUTH
FLORIDA WATER MANAGEM~ DISTRICT
~:~~I~~~L
Oe....ty Cleric
heet 1 of 4
SOUTH FLORIDA WATER MANAGEMENT
DISTRICT, BY ITS GOVERNING BOARD
~y.dJ ~~V~
Secretary
~ cf ~Cu'"!'''
-
4OE.6.381
Limited Cor
ions
_4
.... l~l
.
The C'itnct i "utnonz.t,on to utIlize 1anai and other 'NarkS const.tutei oil revocable IIcenie In conilder atlon fo, rece'pt 0;
that IIcenie perm,tteei snail dgree to De bound by the follOWIng standard limIting conditions. whlcn shall De ,n,ludea \N,tn,n 011/
permits lii~ed puri~.nt to tn,i 'hapter
(1) All struCtures on Dlstn't 'Norks or landS conUructed by permittee shall remain the prOperty of pe,m,ttee WhO Shall oe
solely responsible tor ensur,ng that s...Ch structures ana Other uses remaIn In gOOd and safe condItion Perm'ttees are aavlsed tnat
other feaeral. state dnd 10C.l "Wfety sundards may govern the occupancy and use of the Dlstnct S lands and works The Dlst"ct
assumes no duty WIth regard to ensurong that SuCh uses are so maIntaIned ..nd assumes no liabIlity WIth regard to ,nJurles c.used
otnen by any SYCh f~'tYre The Olstnct further assumes no duty ~o ensure that the permitted use complies With the safety
standards of othe? governmental entities
(2) Perm'ttee agrees to abIde by all of the terms and condlt.ons of th,s perm,t, ,n"udlng any representat'ons maoe on tne
permIt application and related documents ThiS permit Shall be sublect to the reQuirements of Chapter 373 F S and Chapter 40E
6 F A C Permittee .grees to pay all 'nvestlgatlve costs. court costs and reasonable .ttorney s fees resultIng from dny successful
action taken by the OIStrlct to obtain compliance w.th the conditIons of tne permIt or removal of the permItted use If Olstrlct
legal action IS taken by statt counsel . reasonable attorney s fees' IS understOOd to mean the faIr market value of tne serVIces
prOVIded. based upon what a pnvate attorney would charge
(3) ThIS perm.t does not create any vested nghts. and except for governmental entities and public or pnvate utIlities. IS
revocable at Will upon reasonable pr'or wrrtten notIce Permittee bears all fisk of loss as to monies expended In furtherance of the
permitted use upon revoc~ltIon the permittee shall promptly mOdify relocate or remove the permitted use In the event of
failure to so comply WIthin the speCIfied time. the Dlstnct may remove the permitted use and permIttee shall be responSible for all
removal costs
(4) ThiS permit does not convey any property fights nor any fights or prrvll4!ges other than those speCified hereIn ,he
Dlstnct approves the permItted use only to the extent of Its .nterest In the workS of the District, Perm,ttees shall obtaIn ail Other
neceswry federal. state. local. spec,al dIstrict and pm/ate authoflutlons prror to the start of any constructIon or alterat,on
authOrized by the permit, The DistrIct. however assumes no d~ty to ensure that any such authOrizatIons have been obtaoned
(5) Permittee agrees to hold and save the District harmless from any and all damages or claims which ame from the
ownership, construction. maintenance Or operation of the permitted use. whether ca~sed by the InJur.o person or perm'ttee
and whether occurring Within the area of the permitted use or outside SUCh area, prOVided the actIVity onglnated from the
permitted use. ThiS obhgatlon ell pressly Includes any alleged or actual negligence by the District as to all permItting actlv't,es
regarding the sublect use. Including enforcement of permit conditIons Permittee agrees to prOVide lega' counsel. If reQuested
for the defense of any such cla,ms
(6) The permittee shall demonstrate that It possesses flnanClallnte9"ty to ensure compliance With permIt conditIons Tne
District does not waive sOl/erelgn Immunity In any respect,
(7) The perm,ttee shall not engage In any activIty regardlng'the permItted use which Interferes 'Nlth the construction
alteration. maintenance or operation of the works of the District. including
(a) dISCharge of debrrs or aquatIc weeds Into the works of the DlstTlct;
(b) caUSing erOSIon or sh~hng Within the works of the Dlstrrct;
(c) planting tr", or shrubs or ..ect.ng structures which limIt or prohibit access by Dlstnct equipment and vehIcles. except
as may be authorrzed by the permIt.
Permittee shall be responSible for any cosu Incurred by the Dlstflct resulting from any such Interference,
(8) Perm Ittee shall allOw the Dlnflct to Inspect the permitted use at any reasonable t.me
(9) The District has the fight to change, regulate. limit. schedule. Of lUSJ)end discharges Into, or Withdrawals from workS
of the Dlstrtct In accordance With cflte"a established by the Dlstnct andlor the U,5. Army Corps of EngIneers for the works of the
DIstrict Reasonable pnor wntten notlCI shall be gll/en to permittee,
(10) If the use Involves the construction of faCIlities fOr a non exempt water Withdrawal or surfa,e water discharge the
applIcant must apply for and obta." a water use or surface water management perm't before any actiVities may be conducted
pursuant to the tight of way occtlpancy permit
(11) The Dlstrtct shall notl.fy_the local ad valorem taxing autl'loflty of the lands affected by the permItted use. where the
permittee owns the underlYIng fe.-and deriVes a substantial benefit from the permitted use The tallln9 autl'loflty may re,nstate
suCh lands on the tall roll
(12) PermIttees shall prOVide prIor wntten not.ce to the" successors In title of the permIt and Its terms and conditIons, Such
notice may be made through flhng a copy of the permit or other approp,.ate notIce agreed to by the Olstrlct In the pubhe records
of the county Or counties where the prOlect IS located and by provldln9 the District With proof of filing or through an eQUIvalent
procedure All costs aSSOCiated With thIS requ"ement shall be the responSIbility of the permittee ThiS requirement applIes to
permittees who are ad,acent landowners
SpeClftc Authortty 173 0<<. 171113 F S
Law Implemented Chapters 25209 and 25270 Laws of Florld4l. 196 t99 (1).373042, ]7].083 (1). ]7] 085 (1). ]7] 10].373 109
]7] 129. F 5
Hlstory..Ntw 9.3.81 Amended 5-10.82. 12 29-86, 12 24.91
Formerly HiK 501 (2). 16K-5 02(2). 161C 50] (2). 16K-5 04 (41.161( 505
,-
Permit Number 9611
QRA, Inc.
May 14, 1992
Sheet 2 of 4
SPECIAL CONDiTIONS ARE AS FOLLOWS:
1 THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT IS NOT RESPONSIBLE
FOR DAMAGE TO INSTALLATIONS LOCATED WITHIN ITS RIGHTS OF WAY.
2 PERMITTEE SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR
REPLACEMENT OF EXISTING FACILITIES LOCATED WITHIN THE SOUTH
FLORIDA WATER MANAGEMENT DISTRICT'S RIGHTS OF WAY
3 ANY ADDITIONAL FACILITIES OR ALTERATIONS TO EXISTING
FACILITIES WITHIN THE SOUTH FLORIDA WATER MANAGEMENT
DISTRICT'S RIGHTS OF WAY WILL REQUIRE A MODIFICATION OF THIS
PERMIT
4 CANAL RIGHT OF WAY DISTURBED DURING CONSTRUCTION, INSTALLATION
AND/OR MAINTENANCE OF THE AUTHORIZED FACILITY SHALL BE
RESTORED TO ORIGINAL OR BETTER CONDITION BY THE PERMITTEE.
5 PERMITTEE IS SOLELY RESPONSIBLE FOR ANY RELOCATION(S) WHICH
MAY BE REQUIRED AS A RESULT OF THIS AUTHORIZATION LIKEWISE,
THE PERMITTEE IS RESPONSIBLE FOR ANY NOTIFICATION OR
COORDINATION WITH THE OWNERS OF PREVIOUSLY PERMITTED
FACILITIES LOCATED WITHIN THE DISTRICT'S RIGHTS OF WAY
6. PERMITTEE RECOGNIZES THAT IN AN EMERGENCY SITUATION ANY OR ALL
PERMITTED ITEMS WITHIN THE DISTRICT'S RIGHT OF WAY ARE SUBJECT
TO IMMEDIATE ALTERATION, MODIFICATION OR REMOVAL BY DISTRICT
FORCES. ANY DAMAGE RESULTING THEREFROM IS NOT TH~
RESPONSIBILITY OF THE DISTRICT.
7 A COpy OF THE PERMIT PACKAGE WILL BE KEPT AT THE JOB SITE
UNTIL COMPLETION OF ALL PHASES OF CONSTRUCTION
8 PERMITTEE RECOGNIZES THAT UPON THE SALE OR TRANSFER OF THE
PROPERTY, IT IS THE PERMITTEE'S RESPONSIBILITY TO INFORM THE
NEW OWNER THAT A PERMIT EXISTS AND THAT IMMEDIATELY FOLLOWING
THE SALE OF THE PROPERTY, A REQUEST FOR TRANSFER OF SAID
PERMIT MUST BE SUBMITTED TO THE DISTRICT
9 . IN ALL CASES, PUMP (S) SHALL BE LOCATED ON THE PERMITTEE'S
PROPERTY; THE PUMP SHALL NOT BE LOCATED WITHIN SOUTH FLORIDA
WATER MANAGEMENT DISTRICT'S LANDS.
rJlit Number 9611
,r~, Inc.
MaY 14, 1992
sheet 3 of 4
10 FAILUR~-TO COMPLY WITH WATER USE RESTRICTIONS DURING WATER
EMERGENCIES OR DECLARED WATER SHORTAGE(S) IS GROUNDS FOR
PERMIT CANCELLATION
11 PERMITTEE IS ADVISED THAT THE DISTRICT PERIODICALLY SPRAYS THE
SUBJECT CANAL FOR AQUATIC WEED CONTROL PURPOSES AND USES
SUBSTANCES WHICH MAY BE HARMFUL TO HUMAN HEALTH PERMITTEE IS
ADVISED TO INQUIRE OF THE DISTRICT AS TO WHETHER THE CANAL HAS
BEEN SPRAYED PRIOR TO UTILIZING THE CANAL WATER FOR IRRIGATION
PURPOSES. PLEASE CONTACT PAUL THOMAS OF THE DISTRICT'S WEST
PALM BEACH FIELD STATION AT (407) 790-0600
12. PERMITTEE IS HEREBY PUT ON NOTICE THAT THE SPRINKLER(S)
LOCATED WITHIN THE RIGHT OF WAY MAY BE SUBJECT TO DAMAGE BY
DISTRICT MAINTENANCE EQUIPMENT AND VEHICLES; THE SOUTH FLORIDA
WATER MANAGEMENT DISTRICT SHALL NOT BE HELD RESPONSIBLE FOR
ANY REPAIRS AND/OR REPLACEMENTS.
13 SPRINKLERS LOCATED WITHIN DISTRICT RIGHTS OF WAY MUST BE FLUSH
WITH NATURAL GROUND OR BE OF THE POP-UP VARIETY NO ABOVE
GROUND SPRINKLER HEADS ARE ALLOWED
14. PERMITTEE SHALL INSTALL AND MAINTAIN, IN OPERATING CONDITION,
A RAIN SENSOR, SOIL MOISTURE SENSOR, SOIL MOISTURE CONTROLLER,
TENSIONOMETER OR SIMILAR SWITCHING DEVICE WHICH WILL OVER-RIDE
THE IRRIGATION CYCLE OF THE SPRINKLER SYSTEM WHEN AN ADEQUATE
RAINFALL HAS OCCURRED
15 THE PLANTING OF ADDITIONAL TREES AND/OR SHRUBS IS NOT
AUTHORIZED.
16 THE PERMITTEE IS RESPONSIBLE FOR PRUNING THE AUTHORIZED
SHRUBS, HEDGES, AND TREES IN ORDER THAT THEIR CANOPIES DO NOT
ENCROACH WITHIN AREAS NEEDED BY THE DISTRICT FOR CANAL
MAINTENANCE PURPOSE UPON THE REQUEST OF THE DISTRICT, THE
PERMITTEE SHALL TRIM OR PRUNE ANY GROWTH WHICH THE DISTRICT
HAS DETERMINED INTERFERES WITH THE DISTRICT'S ACCESS,
OPERATIONS, AND MAINTENANCE.
16. THIS RIGHT OF WAY OCCUPANCY PERMIT IS NOT VALID WITHOUT A
CONCURRENTLY ISSUED WATER USE PERMIT FROM THE DISTRICT'S
DEPARTMENT OF REGULATION.
17. DISTURBED AREAS WITHIN THE RIGHT OF WAY WILL BE GRASSED WITH
BAHIA SOD, AND PEGGED AS REQUIRED, UPON COMPLETION OF
CONSTRUCTION OF THE AUTHORIZED FACILITIES.
Permit Number 9611
QRA, Inc
May 14, 1992
Sheet 4 of 4
18. ALL MA~RIAL AND DEBRIS SHALL BE COMPLETELY REMOVED FROM THE
SOUTH FLORIDA WATER MANAGEMENT DISTRICT'S CANAL AND RIGHTS OF
WAY.
19 PERMITTEE SHALL CAREFULLY REMOVE ALL EXOTIC VEGETATION,
BRAZILIAN PEPPER (FLORIDA HOLLY), FROM WITHIN THE DISTRICT'S
RIGHTS OF WAY THROUGHOUT THE LIMITS OF THE PROJECT AND KEEP
THE RIGHT OF WAY FREE OF SAID VEGETATION THROUGHOUT THE LIFE
OF THIS PERMIT. ALL EXOTIC VEGETATION ON THE CANAL BANK SHALL
BE CUT TO GROUND LEVEL AND IMMEDIATELY PAINTED WITH A
HERBICIDE APPROVED FOR USE IN THE STATE OF FLORIDA PLEASE
CONTACT DOUG SYKES PRIOR TO VEGETATION BEING CUT AND PAINTED.
20 THIS PERMIT SHALL NOT BECOME VALID UNTIL PERMITS HAVE BEEN
OBTAINED FROM CITY OF BOYNTON BEACH, IF REQUIRED
21. THE PERMITTEE SHALL COMPLY WITH ANY MORE STRINGENT CONDITIONS
SET FORTH IN OTHER PERMITS IF REQUIRED BY THE CITY OF BOYNTON
BEACH
22 ALL PLANTINGS WITHIN THE DISTRICT'S RIGHT OF WAY SHALL CONFORM
TO THE ATTACHED DRAWING LABELED SHEET 1 OF 2. NO PLANTINGS
MAY ENCROACH MORE THAN 8' ONTO THE DISTRICT'S RIGHT OF WAY
23. PRIOR TO PLANTING PERMITTEE SHALL BACKSLOPE THE RIGHT OF WAY
TO A 20' HORIZONTAL TO l' VERTICAL CONTOUR BEGINNING AT THE
EXISTING TOP OF BANK AND CONTINUING TO THE NORTH RIGHT OF WAY
LINE.
24 PERMITTEE SHALL ENSURE 80% SURVIVORSHIP OF THE PLANTINGS
SPECIFIED IN SPECIAL CONDITION NUMBER 17 FOR A PERIOD OF UP TO
THREE (3) YEARS FROM THE PLANTING DATE. IF AT ANY TIME DURING
THE SPECIFIED 3 YEAR PERIOD THE SURVIVORSHIP LEVEL DECREASE
BELOW 80% THE PERMITTEE SHALL REPLANT THE APPROPRIATE NUMBER
OF NURSERY GROWN (SEEDINGS/PLUGS) OF THE SAME SPECIES TO
ACHIEVE 80% SUCCESS RATE WITHIN THIRTY (30) DAYS FROM NOTICE
BY THE DISTRICT.
----------
South Florida Water Management District
Post Offic lox 24680 . West Palm Beach orida 33416-4680
Telephone (305) 686-8800 . Florida WATS Line' 1-800-423-2045
YJ-~-~
(DO NOT WRITE IN THIS ILOC~
APPLICATION NUMBER
Application to the South Florida Water Management District
For Authority to Utilize Works or Land of the District
-To Be Accom
Applicant's Name ORA, Inc.
... Applicant's Address 1900 S.E. 17th Street Causeway, Ft. Lauderdale, Florida 33316
~I Applicant's Telephone Numbers 407-734-3555 (Day)
(Evenlnc,
.1
~ -. ....
!
1./,
~-
,
-- -,
,p~;-.J -0-
~Clr-~
--
c
J ,
,.,.,-
1..____________
/ ,.
I'
I
:\
--
<....'"
<'"
o
l:>
~
~) ! C2I
;;'.e cr: jf',
O/~/ La / \ I
~f~:8r;sa~ ! I
- I r--;;
Inter ILagOs Oi) J
"'-- {
~I
I ~IC
i _~;:o~
" I ~
I ~,
~---l---~-
MOTOROLA ~\ 1 P
/: in
I i ,,.~ BLVD "
~' Y N T 1] I:'
\L_c~~I.; - - -- - ~ ~.~ ~~~c..;_6_",-..J'
"\ \.= II: ~ ~ --~Pioneer '
\ \ ;:/'"':'.... 0 v.l'-U~~~~ Canal
~~/h.U1'r 0 C'l c:c l- __':1_ i-= cprl\.
\ \ z l~ e > v.l v.l
. II: 3: ;>
3: ~ 2 2 r--1AV
2 ~ 20 NW 10 ---- :
" IV 9 .8.Y: E c:c 3: <:
~ ~~ LlEgflRACE NW & 2 AV
f1 U 0 U 3:.~
:: = - ~t.t. 2 A V r--
AI' ~~cp." 6 AV; NW 6 ] 1\ 95
_ _..__. _ .: Wa~\~ ~~~~E ~. ~ > I "
t-~h"';"~I~~::] "~~
~~ ~, c: GOudo/aJ La I~ i~ora' AV::? . 2 2,...\ ~ :-.J
~, -~ ,_o~ -~~M~~~ ~ ~ ~ ~
(.J.q: _' -;:oquare ..g U I f [ ----- c::J 2 U i: .
_ Ie -~, ......, -
__ ~I 1 'Sf" 0 _. ,
!Bl c::J . -~.... ~1 SCIQ ";,~ I
804 I~' -, ",:-- Leisurevill~"", e1fifisu1e ~:~ ~~E:~ A~~_~~
Bovnton Plaza .r;r /' ~1. L_ ""_ ", _2_
Post'Ct-i-' -.... ::v.l: q,ni; -~.:- ":1 r.' Q/~ -
orqce ~~Ia2I" scLEI~'UJREVltTh2~.C5lwICC ::SWi",. 1 ~ T <'1._..1
~
~~
l:> ...
Z If
~ ~)-
:=!: 0 l> '
:5 0
_0 X'~
0-9 I
ttJ
)
: itUI" 4~
~ ..
Sun TOD L. i
Sun Tree PI V
Sun Rav i c: _ -18
....~ NW 27 Ave I. ~
;: nl ~.; Su~~'"' \i Nwl26cii OiAve cii 1~
~ iC ;.." ~t. __~t_1 ~I j <Of '
- ~'- ~ro;. ~~I -;b I
unfish =_ _~;:. ii '" . ci) N'" ! """'"" 04(
rJtl,-~ .. ; i"'''' {. S'!nbirdc; NW 23 ;; Av ';: :i'"
! ~"ci ",. La .lNW 22 Wav;;~ 2
C" cO..... ':'. ....
NW,Jl 22 Ave.' La NW ~ 22 Ave\
g:g: rrr NW > 21 Wa,
....0 OE4 ->
(~lJ1 ~ S?" Sp..l'lOP/P ~ NWZ 20 A~
~..::....) ~ (j I ~ ~ 3: 3: ~
II> Q r:: 2Z
TUCKS RD~ ..I 2 NW 17 ~ I
AlADDIN AVE NW 16 WaYI
BARK IS AVE NW0 15 WaY0
o :::l 15 Ct N
COElEBS AVE ~~~: ,I ~
DORRIT AVE.... ~ z ~ ~Jz
c en ~ 14N _,!,V
EDGAR > AVE z NW 14NAve
..J
FIGARO a:l AVE Boynton
IBlack-Fores~, ~ enev,. Ave --- r '" ~
r--"f ~rD:J ~ Harlow. Av I
r.en ore ro _us Ivanbo.e. .6.. W
racewood~-.-ti" .=. W K t I A BUY N !'U!'l ,_>_
luU..J leyn -.
Infield Rd E ::.:: lothair Av CI:
r~enfield g' ~ Marlow AVI ~I BEACH
Ct ..J Z 19
ath ::. I ] Nor..n A.. I MALL
.. Ob..on A..
....
_ Pandora Ave c: I
- WI
.... Quentin Ave > I
Ruskin Ave ~ I "
B
2
-r" d-
....C
1:-
01
U..J
I
ell
f4lvd
.........
3 TON .. . ....-..WE
~ I .~. i r
~;..t') .....J
~-' OV'Lace La
~'s~ron ~]~.. Greentree
----.:; l ~reentr~,_ n_
o L L _ I Plaza _' lu1 -I
""')akw~d r...kes~' 1 -:
./ o(~nlon,l etr / - .-.- -- I
/' ~ I Golf COUr.Je I
L~
~o"
r. (\ ~"1..
II
1-
OK~) lrL
qJ-D330-~
C-llo
.s d0/rLjjSJ/~ Y3~
!t
'"
;,
:l
i
PARK
~
-..:
en
D
C,.i
a::
w
:.
....'
:r
.
~
L...
r,
r.;.~ -.--..."
c......
h
; - L---.,
,..
~
8
~
i:
.
"
;; f".". ~.o., S
. 11- - - -- ~ - - ,- - - - -\
. >>
~ i
---_._~, '."
--::~
' <1-
- dt~
..
II :
Ik
i .s~
. t'l~
I
\,1'
. ~ I
I
e
.
~'1'
\,
.
~
,..
i
~}
=-
...
f '\
}
II 1
,
I
r-
'J
'"--> ~I I l
I
I
II
~I
. -"\
; .
r
! -" I
I .: !
Irr~ ~'t
I
~
:::
~
~l:,\
,.
-....-----
t
i
r
,
~
fi". ~ y~
~ .,.. ,.t,
, \>
"~~
Ci.f"" ( ~ .... ~
-, : "
Pl \\\'i~ ;
!{,~ If
,...' .
\011:. I ;~~.' ~ . I w~:~ ~~.
.. ~ .. ~ :L=:'C$';.!
a ' ~:!.~ !
N
'"
~ ~
: r..,
~ <
...
o
~. UH Hfllm ill ~a
1(11 Wt II~I f pf L.. m
. II I( III I Stg
- !
Landscape Plan
~
n
"
'"
..
"
..
<;
, i II I Z """'!'II'II'"I'''l''' S '-,;I'
'i:j' !,l: !l: ~ iir;IJ!,h Inill,/;!,l'i lr-I
'I': if jW 'i!1 i'll il!jli;l:i!tlh.!:I!III:; i ',.i
i I!:. Ii" :1', !,;.;.il",II:'I:I"i1.". z;
,!lIe '::' ,I!, 1;1!!;e:!'\:'\! !!dii,l ~ -4,
iill' llel "!l "I"I:I!;II~1I11"lh e z/
1:\;1 ('1:1 ,Iii F!r!!': j" '1'~1I ;1'1:r,~'
.1 I I II" .,. ("., I" ....' 'I;l i i
1;,li ii.l '! ;1:h!;!lt;II;:/i'I,I,':',' zol
11111 II, III (';I;"I'l,.I',"I'
I" 'a :i: tC: ," i'"d I'. ~~l
ICIII
1 I
~
-
r-
eir
-
~
li '} !!!Hl:: ~ Ii i'l "'i rj'l iljlll" f
~i( i ~:;~.:l ii ,~, !Hr It i I! fl:~l S
IiI : IIp!!:: It I'i! 'I' iili~! o,!;lifi t
;r 'I' ;1!!lfll~1 ,~Il~ i'lI lrllic"
i, J. tfl' I' I' '14 .t'tl f'I!'
I! 'T li'iii'ill" I' :Ir I,,',', i!T";' ,
,,!, ,,; 'Ii< I " ',I I., '1'''1
,',! ,;fI.111' ,I I.. !I." 1l"Ii
r~ : H:ll~ :~:~:i P:t, l;f'.',
1"1 1"1"11 ", I" "1 ,I:!I
:, t U 'II '
...
...
"
1\
~
"
5 I'. ,- I . ~ fjl~J~n~:i~;~i~i!i;:;U{ J I ;::i ;
~ !:lli: 1;11, ! hil':i'l;il'!!i!II!il"i! ! f iti! i
.. "!"I-I,"'! ,:u""!',!'ill!II!ll'II);'! 'I
,1'1' 'Iii' ,'I'\!II'i'lll!!' Ili!!'I' ~ !el!
'~t"l tn, I!\ t,IIII!,:,llll" II .",
J il,lll!ll:!; 8 i;iWi:i!i,l!l!lihi!lll !lij
. ", ','I ,,,1.11'1' 1"'11'1,10' I'. F:
. I!; ( i."" !.,';;i;~ ,;III!;i I 'UI ojll
a /r';1 it: I II I'" i " '!!
~ 11'" Ii'
~
1
Wliil i liI!!l;
; ~":i l'~t!' ~
:.Ill,. \'1,-1
-!f!i. .I!il
\''''1 "i,
t:;! Ul;'
!!,lul "HI
'l't~ ''''1
jl 'I' "i .
!!lI:i 111'1'1
i f,U ';'
.,..
~
:a
;"
m
I:)
c
,..
J>
:II
II'
~
C
,..
-i
T
CIl
-i
m
3:
-i
:II
m
m
~
J>
,..
~
-4
:II
m
m I ~~
~ i' .
~(I:ii1'"
-4 ~
Z ~
Q ~l
~ !';'~I.t .1 pi ~i~ lll~l;i S" ~i; I J'
. rhl..J 1,.1 ... lifl' if I .~ II
. 'Ii!," if ~i~ !;:' ,.~II "4. i~f I' ;1'
. ==c~', .J ~I~ l!t.~ 1(- i..t ,
: Hr.!t.' ::1 '~I if e~ 'I"ll!1 i I.'
r ;iii~:;.. !~I =:, i:, Ii : . I'll i
! ~il~,r fl il! - 'J I, U ii" :1 i !,
~!.t~J , I. I !. 'i f .r I I
"IS. J,",
-4
:II
m
m
~
,..
J>
Z
-4
Z
Q
i l! ff Iii I'll'
to', ,1 ; -Hil
I -. I' . fa I
1\ !I Ii ~ i~ ,;1:.
f. I -,.. I~lc:
Il, f: I I i' u!';
1) _f, ,. ,n
fa ~~ I!! : I;~I
'.11 1< jl J" 'Ipl
I .. -i : I , .'
=.~ I
T
3nl. Ii
~I' .
:11: "
I~=W
liE
1~~m~1i'
="!=.lli
31F.ii!' ~
liE
I :: I !
-I .:l ,! j ff t i - : "1'.1' "II ,,-;
. '" '1. . - ~ ...". . ..,
:. i;:i I~ i !~ Ii: H l r I.. I!~i
:. ,... ~, ...., .. ., .:;.1 I. 4.1r'
iI 1(1 I :.' i t 3 If! 1:~ ., if .
.. '. " < i 1 At, I ,.;;
:' fi i i!!: 'ii~!!. Il~
.~ ;! I Ii 1 j I=t :~ t'rI
1 ,'. I. ! I " 'I J :l
. .. " ."
.... . i =
I'
I ~
/'.
~
i~
,j
l
i
\~
.
~
,\
~
I:
I . r l/l
,..., :r
[! ..
~
I , N
2.
~; if I
i 5!,
:I:)(,t
':U:S:
0:11 .
iCII
O.
nZ
OQ
<
m
:II
,..
...1 :lj rl ll"I"~ i"
-CUi I II' 'u il
O~i.Jil 'S. II .1.
~:C.. 'VI. :. u I. ;il
0, ~ .I:{. IiiI-.
. I II I~ I iHi
, ~~ i Ii Ii
\II
:s:
:II
C
CII
~
n ,..
o ~
;: ~ I
~ Z iiSl ""'i"IlI-' fill "1"'.' .d I"
I:) i'" l!iS' Oi I' . t s," t" .'
;; ,U, ,\:.,ii!!i i i. i,;'I! 'I ~J
. ~1.': ,."::..':e'.' -I, ~>>', &r" I:'
{,rt~ ~!:i ~!iiml!ill!i U i!i! '!I i~
\~,~ " I' " ~,.. =1 I,
, . 1 J .
",.. f" , hl"!I'
'"1'" f fl!~ I
::J! -I fiUl:
. 'I ' a" '.1 oj
F I ~ua'i
i
! '
m
O:J~
~ {rrl~'
- - '1
"'- I"'~~!:
.:!. ::;I!
" ~::!~. ~.
~ !iiHi 11m iH
o 1\ r i'l' Ii ill Iii
Lot 49 Quantum
Boynton Beach, FL
I ~nrl!;r.~np. Mat.p.ri~l!l Sch~dule & Planting Details
.:Mere.a".
,...; t. _ ___
----_._----~--
LA\!tlEL HILLSjJll.AJ)D IPS 23 PG 14' I
....w,.... '~OO.llIl\...fI I....
..'OJ
'~
:
.,-1
1\
o
: _ C-II CANAl-
z ,.. ..,.- ILl" ....
!; 0 ...... 00_
"'-4
'" .. /... ., _.~
,=t#_.., 1-
I~" f ~\
z \
...
I
r
I
I:
;,-r
~\.
~
-N-
~
Lo ~
l~ ~ii :
." ........
!____tO~. )>>oo'u"..'. ..:.,. ..
-I;;:' -"
~ !.: _ _ _ ---I
~I~i! -~
ii~'
!
.. ....to.,....
PROPOSED ASPHAI.T-
_r-
<0
f;-4
...
~CD
-n
\
.
2
:=
~
~
..
III
..
..
N
!.
~
.
~
~
E"
."
..0
"';!j
g:::
",0
~
....
-0
~...
n
. ..
~CD
-a,
ii
.1
~:
1~
,I
i;
'i
.
~
!
...... .~:. .. .
I..net. ~--'I.
O"ICI 8
''''11.1'''
. 5 .
!.i~~
;Ii~j
!ii !
iI !.. ........
is
,.
~
'.1""
~c:
z
0 JilP I ~ ; I
'" .iil~:r;::.Jirl:::;-:"J
, f~ =IE lilli' .
.; ~ n z'" (iii1iiWHllj!jlill!lil!lllll:' H
~t; 06 ' , 10' !I !lID
iill II, 1'1,' ~~o l!a!\.'III" , I,!Io,1 ':1,1'1"
Z-4 Iii I I IU/111! '\' j1
"''''
--... .. .. '!~II mt Ila :vzc II II' I !!
- ~.. I' i' I II IDa. " II Ii i
.':c:" ~z~
l!:-n. il ,E , I' '~I' '''II !".
...z 2l~1:
. - 0 !dll'! 1""1 .,r
-~ ~ ~ ~ pi" 1111' ~~jI 1::;!i!I:I-'lf:;::;~:::;': !Uli"\ '"
61.... " I'll" ..:z:~ !I\:ijlllillli;ill!lllilll~lllil t ,.,
iPI . I ~:'O" "
ell ;;; !Ii i Ii! I!! -... '0 t' "f"ll"'J' .1. C .,
CD.I !. I ~ I Ill' i I i 11'1' fOil' I II n
_IZ ol=' t I lhl II I; '\ G
-" i I ill I 'I.
" II i I · I~I I,; ,,: r-
...li . I II, 1.1 l.~ =
- - - ~ - - - - _,U
.
1-
l' ~i --;..;..;=-~~~---------
- .,
_ ._a...--;-...---:-
t
11
~
\!""
~.
~
~
I
i!~
J~O
. .' i ~
. ,
, 'm!;~!
!~.!
~:i;i=i
.J:":.=
~:P!r
~~i;:r~
. I. ...
J ..=~. ~
s;iii! ~
..' :"". ~ t. ~'i--
=:f q: '
p.:-:
1Il1!l~
· e
o!..... :.-
. [ . : : : : : ii~
j:li=ii= ..
: l ~ i i i i i ii
: ! t . ~ ~ ~ ~ :i
i i ~ J ; J J J irf
1 : i ~ : ~ ~ : i;:
J i ; i 5 S.5 5 i~~
! i i~~
H f::"
i: ....
~~ ;
Hi
H. ;
i .. II
!ii
I I ~ e
I .
i - !~
, H it
-. i
I
I ,
________-<1.-___
I--~-
I ' - --
c." c.....
-
,..
~
..
;-
Q.. :::
.=..
-0
-<
~
,..
II
..
.
o
..
r-
I
I
I
I
I
I
I
I
I
1
I
I
I
I
I
I
I
I
I
I
Ir.! I
..._ I
t 1
I ,~
J, Bt-,
I I.
I
I
1
1
I
I
...,
.,..,
I!
r.-, 1,
t '
,..
~
..
.
Cl
,.,
....
..
-
r-
r------
I
I
I
I I
1'1
I I
I I
I I
I J I
I II
I I
I I
I I
I I i
I
I
I
I .
I.
.J
~I
.1
H
I.
II
I
I
I
I
I
I
I
G '.,'
.,1\.
I
I
I
I
I
S l' :
I
I
~. ;- : i
,I ..
; I .
I III
I
1
:2 :
I, I
~. .: I
~ - I
... . -= . -J _ . _. r I
,_ J I H" ~ H H ~ ";. ~ .i(:' \,
- 11 ~ i l~1
r; III1II1 () ",,~i'l () II"IIII~- ,~'
..t~~ ---). ,1:
,,-.. .. .. . I ,-j.J ------
.,
,',
I '
I,
"
Ii.
POtk AicIp ...... -
} ~
----~ ----
- - - - - - - - - - - - - -....... - --
i -:-
~ ..r
~ i',
a
r
t~
ria.
[I ~
I;;I~
---------------- --
t
"
. ,
,~ 0
i:
i
::.
~ It I! !Utl 1m II' ~ c
, It '"1 III ,...,
. IJ II ( I(it{ I ff
. I' II 1111 ~:l
Lot 49 Quantum
Boynton Beach, FL
Site Plan
:Jeerel.ry
-...._ :;f t~"":l_"'''''.",,_
APP_ICATION TO THE SQUTH FLORIDA WATER MA~AGEMENT DISTRICT
FOR AUTHORITY TO U IZE WORKS OR LAND OF THE DISTRI
The undersianed ORA Inc as fee simole owner of Lo~ 49A
Ouan~u~ Park which is subiec~ ~o a oeroe~ual easernen~ in
~avor of ~he Sou~h Florida Wa~er Manaaemen~ Dis~ric~
recues~s the abili~y for 49 Dis~ribu~ors Inc the fee
sinole owner of Lo~ 49. Ouan~um Pary ~o dc ~he followina work
on Lo~ 49A con~our ear~h i~~o a level clane olan~ ~rass
~rass seed shrubs and trees as shown on ~he attached
~andscaoe drawina and ins~all an irri~ation line i~ oroxi~it7
co ~he lo~ line_~e~ween lo~ 49 and lo~ 49A
49 Distribu~ors Inc assumes all resoonsibilitv for
"ain~enance of ~he landscape i~orovemen~s recuested herein
F~r~hermore ~he par~ies here~o unders~and and aaree ~o
acknowledae ~he followina resoonsibili~ies cu~lined in the
5FWMD Permi~ Information Manual
1) Pe~itioner(or i~s assian) is willina and financially
cacable of maintainina ~he plantinas to the Dis~ri=t s
sa~isfaction for the life of the permit
2\ Petitioner(or its assiqn) understands the _molica~ions
that fallen trees represen~ with re~ard to ~he Dis~ric~
abili~y ~o perform i~s flood con~rol mission and the
financial responsibili~y of ~he permi~~ee should a loss
occur
3) Petitioner Cor its assign) will remove or trim the trees
in a ~imely manner when requested to do so by the
District and
4) Pe~itionerCor its assianl will assume the resconsibilitv
for complvina with any applicable ~ree ordinances and not
a~te~p~ to use such ordinances as a means ~o keec trees
which the District de~ermines must be removed
The SFWMD understands that ~he City of Boynton Beach Florida
has reauired ~he petitioner to ins~all the reauested
plantinas as a resolution to bufferina issues related to the
aocroval of the site plan for Lo~ 49 Ouantum Park
Petitioner s reques~ for a permit from SFWMD is peti~ioner s
a~temot to comply with conditions of approval reauired by the
Ci~y of Boyn~on Beach Florida
~
-. . - - ~-;:-)----
ORA
;L
BY
49 DISTRIBUTORS INC
BY, _'- &~<. ?~~
/
r ~~ _J ...
--)
....... '-
- ~F .i;-
;
.1
Secret."
:- of ~~~~,...,.~~,-
-,
:,,"!./'. I '....I~.... ;.i~
, .: .,..~'*
.~
~ ")
) ,
& S 1
\" ,
o )
SA ~)
.<..
~ ~x
(~
~f. "'.'1 ;<, . ~'?'. ,~, ~.. .."i!t, ,
ol .~. I ~'''';',,)>.\~q.~':1~''''~~~
+ i. . "::', ','"i ~~ T~ '" w/ ..:-..- t -}" ~ . ,
Xi:
,
r
"" + 4" ~.:..", ".. " f~"" ....~ ~
~!! r <oiI;.,l..>- :J .., ot' ,..4;./\~}ji ~!~~, I
j,: _. . . ",;" . I ~ ""., '1'..... ~ ?- ) ~ ..,
., ,
\
\...
~v~E:.. i-<j-r:\1A;t....- ?~~ t If.::\: ~~ \'
u.cx.. ~ QE C~ ~Q.~LC'\
r;) 2-0Iq-&~~
L-O-T 4 q Q<JAO\\.L- V\.
.... s.~'''1
....."--:;-
L-''"\' ,--
I -,,' -
........." -' r
~.
!- €7 ~
. ~ \.! :' v
, ""'-1, 2
\ ..J.\
\ E:cJ
,./'\
/' r. '-
.,....... ...........:.i
\~~
...... ....... r--:-i---:;-
"..... : -
---~:.~-
....
..:;-'
-' ,
/-' \
\ -
:-\
p. ~ ,-a ,., :-.. i
.- ''';;12 ;:.. :
- ~-j
"
..;
~ \ \J '-f(JS~
~ ~ (j(,-'1
'f\ 1\(,(~1r \"1' ,5- f).
~ L~ SrWf"\S)
~ ~{ Ge-- ...t~.~#:t.C'\.
iW ~ AC b cY'-.J<.
U) ~~CI ooL ("-'-~l.-~ J
,-----,J./---..
~ ?fa 92-
;_~ D\"S~,~s-Ck,C; =..'_....,.::.. .,. w~ ~ ~...c,~+-
.
~- -~ .~.~~-~
~,
,.(f
J'"I- -
Lj -II -'" (,:'
/-
?~~
/ \ \~\-
\
1
~ !
-
,
'?-........
"'-.--.........,-
G!~-.
, ,
,
.'.....
'-->'
r-
!"-
\0
-- -"
...----
;, A / '\
::- rY'\..; I
I -? -..
\ ..
-.....-.--
t~~
~/~
~
1.
~
c~
& )1
f\\ I ~~
']'11 ~
(St r ) I
~lKt
ex r (;
I J;
\~
I~' ..../ ) ,
\..>
<
/'
\
-~
\ to'
~
.-
" '>
'v \! ~----
~ \/~1i/
,,1 ',/7)
(' I ~ .......-"
; \
I." I - --;'
V"-.......,.; I.~
~:,-
'- -::"/
r- --,
, J. 1 '
!~
\ I' '\~
V ~/
\ ----....
~~
/--- I ----;-- ,
.,./---\ \ C /
~ ~
v
-~
...-=-..._:::__9:2
TU5ii:
14:1:31: CAT&::IL..FUMO
P la::Z
OS/2S/Q2 13 30
9396 763 8006
DEUTSCH IRELAND
~002
QUA N T U 1\.f PAR K
PRO P E R-T Y 0 'V N E R S' ASS 0 C I A T ION, I N C.
May 26, ]992
Mr Kevin Hallahan
City forester
City of Boynton Beach
100 East Boynton Beach Boulevard
Boynton Beach, Florida 33425
Re: Ouantum Corporat~ Park. Lrlt 49
Dear Mr Hallahan.
This letter shall serve to confirm that the maintenance and irriiation of the
landscaping of the right-ot-way situated in front of Lot 49 in Quantum Corporate
Park is the responsibility of the Quantum Park Property Owners' Assoc1ation, Inc.
Additionally, it j, the intention of the Quantum Park Property Owners' Association
to replace the grass which ha3 died on that right.oOf-way and on the right-of-way
frontina the Jot adjacent to 1;)t 49 on the west.
Yours very truly,
L DEUTSCH
Vice President
SWO:db
u.. ~..._..."'.......... .nt.II1"I'.".'\oIf&V -'TM flOOR. FORT LAUDEROALI, 'LORJDA 333"
Q.IUlJiI!!~7r(l'" fIle grlHuulJ.!Jl
.__._._--~~. --
=-=-1"-11'.-.".' 1t-H1IJ~~
-- -..~ .. . .. _ _ -- _ -. - - - -
- - - .. - - - - . - - . -.- -
_.--.-.__.~-- -_. ..--
= ===- -e =- ': _ = =_: :: ~ :':'
=: ;~.. = =- -: ~ =-- =~~ ~ :. - :=
~,': - .~ ~ ~.. - -- ~ -.- r: - .. - --.
.~-:_.._ _. __.0 ~; -:. ~.:=~
.._- ._-~_.""~:-:'4 ___.._.~...."'..-...:L.__="':-.~.~ ...::-::~"
,~ . .....0 . .. ..... .. .'. . ... ._.
DEVELOPING · UUlI.D/Nr · LEASING · MANACiNG
DATE
5- ~,,- 9J
.-J"J\1\\ - ~ 'l
'--e, -\ ~ ~C'i" '\o~ ~ Q..c ~
-r~~~ L,~
Qv.a(\k~ '~cJ\..'(:-
TO
COMPANY:
FROM:
J<E!
o
21Q3CQ call mo upon rocGipt
Ha~d copy being sent:
O mail 0 ovel:'t\ight
dcalivcary
[] Fax only - No copy being sent
o
hand
dolivGry
o
bei.ng
pi.ckod up
~otal Numbor of Pages Inoluding This Cover Page ~
~O~ Confirmation or Problem (407) 471-0338
Our Fax i (407) 471-1201
-f"'\!-il>J>
'<:~..,'O'O
"''OIo~~'O'O
ft:ll!'O!tilli,..,..
C,101-'-'-'
U1c.qc.~ :n"Of~.....,n
"'~"-"lJI" 1lI~
OON..llIlD...'(..="....
....~<:>....~- '(17-.-.
"'ra~....oa.".,oo
-(l -(l -() l/l.:lI C. . ::::::
r'J~JN 1llC.,po
~.-;"
ii iD III
C''OIill...
lD '"I :lI
,- l&
I'D ",..
.... U1 . .
:D
"11
c./
H
!'I
)(
..
"'Tj
UI
H
::p-
C.
C.
rrr'""
])l>l>::l
%ZZUI
~::::'I~1l
(8:J)(/)1I
nnnn
])l>l>....
"\1""-'
:...M>-IQ
ZZZ::l
QC)(i).
-il"11T1i'
'""M...._
~zzn
r~~
:::l
l/l
'0
II
n
..
o
:::l
Tf
...
tv
U
n
III
:::l
n
!Jl
~~-:jM
r..U)~
:1:_ UI
'11
til fA ~~ ,
'i."~
QONlIl
....00....:;:;
"'IIID
-(l-o-() ...
Nl ~N ~
,ID
-'!Ul
-. ..
a
!II
2:Z;z.S!
])l>'\!ai"
, ....ID
1Il
, ~
tlI fA ~~ .-
",t:'..
O"'Nlllll
....mo-....
"'"
..."O"Oi
~NN i
M
t:'
i
..
..:::
::1'(0'"
..'0....
:II lD
. l&
1'11.
:lI
-+
lD~r n-o
"'imm 0'"
..0 3:
c.q 3: <:>
!'I 0
" "0
])c...., 0
::OO.....~
"'r~j!2:~
::01'>1-1 0-
;e~~o
:;)m~....o
!'I1nl-lro
':l!~~SO
r...-tzo
C~~(;)O
M
~
o
::l
:t
91
..
o
....
'<
..0..0
-,
(.~ ...
o..~
-,
t-J..o
N:.l
!J:I
."
UI
o
o
c:
o
.
"
"
...
~
lD
Itl
..
TI
o
~ n
.-f
"'-1
:::l 0(
l#
'0 0
II ."
n
....':l!
-. 0
eo(
:::lZ
-I
!O
Z
I-!
::l IX'
In iT!
'0 l>
IDn
n ::;:
..
=:c
Ul _.
lD Ul
~..,
't
::.;
:.I
m
:n
rJl
~
.-
III
'(
. 1;:1
!Jl
<
C
~J
"
~J
3:
<:>
n
~
nIX'
!iF..)
l-<
!'I
t>'A."
.'i'"
e:,......
o
0(
3
o
Z
o
..0
,
...
~
,
-()
c./
0""
-()Go
.. .tl
c.~ It
0-
..
~J
c./,...
III
_ S.-e. A1LlU\1!c. ~ll.~ ~ )
~ ho\.J\8..t fA ~"\~ o~ +d.\e, <:'-U!M.\""'iv...j lo1-s t~ o."~ "\-'3A .ntv Uf\e s.te..
~ Sho\,u o.t\l \G.\'t..\ O\-) fu. ~ f Rc..-l..c....\:'.tlh "t- ~ "10' lJ-l'J...t. ~(.lI\f'l.tr<l.\ ~'\AQ..,,\.dt 0.\.<>.....3
tl.-e. S ou\\... rV<>f~ \'\'Ie
-t ;.:L~.j\t n-~ s~~~td d\'\ ~ S f h lOCA-r.<>n "f ~~e re.~I-"'\..J. t:>fel'l 'S~Glce Go%')
7f([\e..fll\reJ.. f ~<IL;"'j: I S ~L(" d- ~"""'tl. ~t.qs 0'/\ fA 'M-"1<'V'fI.'^~ ~l--IH'
~ S"O~ f<<'~\H,~ Ell.6
'* 4-0\W\l.t. ~t"'f~ ~\,~\t ~ 6 ~'5\-. ~lJJk.t Wr...\\ s,,",ou\.d.. 1,(. ~\.Cl~ On \o-\- "\~Pt
~~I CA,~~1i} ~ ~<;~~ ~y}.v-d.;~ 1I'S'tttl\A2 \~S~\~ u~
~ or-o-sS ((;{s c.. V<-;t.J.tot ~ 5Flf.JK.P) ~'Y\. LOT 'tAA J ~ {:.[l~lvl> \)
~
:ft{.o'M~ : ~o' or ~\;,d~ (\f.~'SI \~) ~~ \~{CIf\~ ~-.J\"F
to ~2-17 -I- (Pr~ ~) rr-J... \vfro.. \.vlA.\\ sMill 'x. ~Lruzi M L-OT ~q
~ \o-r 4JA s'v~ \.e, U\.~ ~~ ~ss ~ \{ '"' (/o"~
L tft--~\.,w \,vv~ S~ ~ -'f<k to ~ ~sD
u p ~n
'" LeT ~,~~ tS ~ Ool'\. tL~ j,O ().A..- 0. o...hitJMlE ~~'" ,
f lLc s.~. ~CAk-W\. aJ. ~ ~~~ ~lIY' C ~ ~ ~
k <;c&. ') ~ ~ ~u~ \oK C't1 +- ~~(-\) CAA ~~ ~-
~
~ ~ ~f~~~~~~ ~4tJA-~1
~~~~~~)
--
vtw's
~ C~~~ ~ ~ ~~ {~~ lt~ JllJJT 1q (A- )
- ~ f~O tll ~ (\~\' ~~ fA ~~ l~~~ ~ ~ ~ ~~ Lnh-
-- fI\\ ~~~S~lKIv ~ \\'~k"", U ~
,cl.r
(~)~
C~ ~~ 5fwM.O ~ l1t 11A - ~~ ~ ~ C#'- Loi 111t '?
(~V\tJ CJrWM5~ cvz. CN-t crn'cJ -tv ~ 1~1+ ~
~sF)
~~,~ f~ W ~ SrWMO (( ~~ {rUM
I~ ~ <sv~~lW ~ ()Z~ It;&oc - SpWMW w~l/
~'-MJ Mftv\ uVJ ~ \-\- ')
t/!:fA ~
'fy.v r
SVP"N\f
.J, (p~~i 1~1 r
MfM? pll,.ln..b furl
\...,' CC' 'lLII~'\\r', .. r'
\~ ~'TIt n.t.
, ~v~ ~\l(. f..
'~~'\lt ti.
~ 'f~t-\.)
{r
jt~ \.,.,~ l' \1>'1,,,-
\;It,,;~~ - ~
,~~bf
(J\ t~ ~ cJ)\) ~ ~ %/\ - C\~ k h ~~ ~"r
G')\ ~ ~ ~ ~B w ~~ ~ ~ L~~~~~)
~ ellO ~ -h, s~ ~ ~ tMll f'J....2,..1 ~ (,t- 4'1A IV\ ~
5~ ~.1()1/lY' [~ l4 i"^1'''''- ~ ~'b fo/" SF ~~)
[1.t \ ()t""4~ A- i" .\ot-~ - Co.v'\- p,..u~ ~ ~~{l~ ~ J
~~,~- \~+.~
~ ~, COD -\: S~
!illi
~0~~~~
~~ ~~) ~
_:...~-~
40t
~ m-\4tJ or->
CoOl. ln~(pn~o,,>
otJ ,.. Wp.t.IJ
40 ftt,-\- O.p soy
OR \.Of .fr~A
~
9-% .It...
\\'bQ\II)J:\) ~
let" "\\\ of tK \ .
.
PrU UJh ~ l~ C ( - -t1+\e.. \..t\! ~d ~ ebb
'n~J~u w..\\ ..~~ i th ~\Nt" l.o\ ""
ftP~llc.()l-f'S'\ \~ ~O\
~u'1r.vu UlT ~A
- \~ ~
wtU~ '1 -7 u~~l~ ~~~.t-_*-
tf.J.'CW <:>-, ~'b ~1- \
t ~()Nr.L ot ~vopk 1 ~ ~ Of~~~~W\ ~ v>
)t,1I~ \:tt\~ Cmp~"'^ ~~~
*" ~ \~ C^. ~;\ with. tuMf~ r\,tlt ~~
~ ~ \'"UJA f~ u.~. (~~:H1f"J - ~ 7. l+ rr)
1.2. 1/2. ~<<. \- 0+ SOD 01'l t.OT 't<\ A
1'2. ~z.. tu.-\ vt \C)r,lH'"'f\V\j On Lo T l\. ~
} bON. uaT~ Foe ...."'tI..' -T sA...,.., ~LQeN
*" 1"\.Lu.. \~ &.. a-o./" D~ sp~ f"'~~ (~VY\1~- ~ ".H.13)
(AfkA ~:J. / 4 -:;tk. PL.*~ ~ ot')ld 15'1% of l.a.~4ht.~ a..u-)
.J.,
\ \\ " "1\"
>'1\0101 DV\ r1u...ill.s (,..{'e..<>.... ~M,~e.rel- N4-"r"'VL A-ft~ft t- Oil+e~
(o.V\'l- "'-'.>L \\~lUti~~ \C4......~'>(a.~~"1.. toy HG Dfet'\ >pA-ce, '("e1-U"i"e~!l\.f
:t. '" ltc.. S {' J -ttc. ~u 1.:>- C GI k.. ~ {'.} ~ " 10 tqL 4,.J(1~c..a.re- Pr"/'..e..#\'"
~ II 0+ oJ..b.. \) ~ h> 1.- -; Q.t;...Y' ~ 5 C H- O\.lei s \.) ~ t-o \ l"2. a c.~ t - CA..
~,~~ c){ l~ ~ o-r '1, t ~o 80 s t )
-r~ 1.,'bc>{) $ t '\h()y" '" I"f. r~tf' ~~()r ' {:r:.f !uj i+ r,<}\.)\'~S E:~BJ
\l.\ta~~ +i+\-e. '''''~ fo saH-01=F
~~ ~ ~\A"'.\- + ktl<.t. "tot\ ~\c\ Ww. silk ",,~JJ.lNI~ ~-(. V".I qt> >. k C~'t.4II.Gvt..u. ({1I,+,.,.)
\N 0 , l"'- ~ "'^ \t.-. tA~ '(I \i (,f.lf\ \- "tv"\ ~ f'A I:if (I ~ r'
!
c
\.I.~~e.'i>ok ISt\.\H
LilT 4'\A is tJ.-r 6l:lN~ fultUtllSE!> - 40' 6retklbel+
RaNl__t~<I\1 ~S ~6 .:Il\~TI\Lll:ll TilGEt"
-;-
J,tf:lo ~ "!+of - cll-f')?
d'PW $""t:E ~(S}"~M'-''''_
MAI(E'l"o1E "etl\f\ S ~M. 1'10+ 4
(~ ~ ~ .q(f~ 's ~
~
I
.,
C$ ") ~
.. Jl
...
;.;
~
f
~
"
.j
t
i-
t
.
.
.
^,~\,\ hi 1l'\\(1)stt0
l<" ".1. t.<..f<(..S I't\
C\\\..~
}I..\'it'\~\\~ (\~_ ,\...
I\'({.(. 'ht~u~ ~.
"\ . MtJ-
1< No'~ ~"~ ""- ~ <l>- .o<F - ~ -~t~?::~
"w r d -1 ".:;. " l}t\..,.p:.. c..,1"n~'; "" " ~ \
C~.,.. ,,~ ~- oa "Lo+ i'\J&~ r~')
~ ~ ~3+V;~ ~
~ k.- p~
p~~
~1b~T(4
ak-StbtJ --of}
~ IN...JJ. 0.- ~y(Y\ bt.., ~ ..M- ~ ~ vetw.J. "bcA- ~
~~~~1
f Ap ~ cA\IN\ S I...ro.... W~ ~ X s L ~ f\...;1 - ::t: -\ '> "," t.ar" ...w ok
~ ~~.:k..v ~ b3J2-g~ sf
~ \tl<;,~ \>wk~- I'ID ~~(~.t""--k'(,,.-~ ~1'Z8J
'1 lke>- ~nk \} Wz, ~ C ~ ru I, &00 s t 5~) k
~ }.U.A. ~ 1..0 T ~ 'I. A C l'f'.-s W 1l>> t 4 'i) ::\.--" ffM 5 0" 1
~ ~ ~ ""'\\ k ~~ ~ ~ ((-D-W) ~ S}7f &)
~ M."J 11> k ~ - A"':) ~"'" \SI~ 1
[~~'\ ())V\~{f ""n.\or0 "\ ~~ cJ: A-\ \ 1 J
i S...x-", -] fll ') ~ ~ ~ c..k ~ rt... +ot...t. 0 r--
~r 'b ~ ~ ,It. \-v '-><- .J- "-r ;;l.O ~
6QI,(0. - p~ ~ ~ ~s 1"/, ~,~ Q.J.Y.- L I.<-~ ~ ~ % y~ )
" , IHJ2.. i't.i-V\~ ~
CM'OT ,~ - f\11W 1'1\1.<"'" or: lPT '\.'\/\ C"'s, ",,"-to. w~) ~ k ~ 1,-0 -
rlJ..l.M~l~ ~ '\o'r""-" In. "~j~" ~ {c00NC-- ~~u,.oJ
~&~of.( ~cal.-7-
3rI t~ At~ ~ rhJ;. t.aA-;lIYI ~ Ie; cnudu-- "7
-~ ~--------
~ r:> ~h b-t--r\~ ~ ? ~1W- 1TI
~. fJU- it # ~tA '" ~ w.l-l l.-r M (~~ )
.
~ tt ~51 UJ\k ~~ ~ l~ ~
C~ ,H.l'l- 2CSY\A~) - ~r s~ oV-R-
~ d-SI Lv\~ - Is 4~ ~d t\U.q~"'QJU.;l
oJr~~ ~ ~~~~
,uj/~.J. ~ ') ['M-u.1l- 6~loen-~ k )5'\ ~ ~ ~)
* ~+ 1'1 lS
~ 11\A IS
~ ()~lIT'r.. 7.> oS .f.-
qVJ 1,'-1. J,S ~ s t
~""t ,'\11'1 ti ~
c ~ .''1 "e)
L1.rO? Il-C)
('S 7'2. I'r C. )
~lN\\\ ~ ~'^-~ ~ ~
'r ",<- - "'(I 1
-'j( XV'. +to- S~J +0 su\,-~ ~ · To~
~~ ~\\ L no+ ~ 0f f-i> 1.. ~ A C - (c-t
~ '1> }., 1.1'2- ~ - PC ~,~ 1,./!? A-C <T'-' ~ r'lo..M .<.1)
VQ.\\q.. '\0 M T \' '^~ 1\ ltwA '? 1\ j. f\ OJ n ()... I) c~ l\~t ,/(
~1'\.~...l l' 4- S So -- . iT' 4 OAA - I v WW f 1'-1:) . tw,yv,:\kJ uv-v
~.... ' ~~V\. \1l 7\'tJ,-()ff- fief ~ I
i ~ c.e...J- [.6lN-vt 7 () f ~c:z S \0 ~ ~ -}o
k ~-hl ~ \NW}>-~ I',
~"J'" j)11'~"" ~ a..M;P'W~6 {j ~L~
~f\ 'f\~u.~ 5(-t\~\
1: No ~~ ~ -fi'\ 5~ ~
t ~T Gtv"""", - 'lNM- k ~ ~ ~ ~ ~'d ~
t\ot ~ t~ ~ \o~
___~____"_ _____n__ ________~___
L
4, ':'J f'r
~~
~
L
'''; 'r "S -\
:J. L C\
II Cr
.
u _.
t!
'"
II
"
L, 1 -, - L1 '!
~7~~
~
~~
@ C2~~
15~'
,
-
0 ~ .a
.a
t'f ~
~ \0
'"
".oS'
-.1
ir
.
~
" i:'
}5D"
C'
0'( i.-, /'
-,. 00-
, \
f?
.::;
::
A-~
1 -
1
t '
, \
I
I
r
1+ '-
r--"
" -
r
Co
L
7 I
l
f .-{
t-
~! ~ '-<
L
_-1-
'-.' I t l
- .,
J
J
>- I I
F
(
t
p0
I
..JU
1
('
ts. (0+ 1~ 0.. ~~ (0"\ ') -
{)>r 1tQ.;} ~~df ~ t ~ ~
Ac.c.o~~ i-o fl a.:l (()
l 'CJ I {f tot"- (ot S'
~ ~ - -ter +-fe;.4
-v br-....~ ~ "^-"- ~~ j" ~
:ro ~ 0~ '(JevJ. ~~ ~ ~ ..
"* MlM~~~l'~~~~
~ s~~ ~~~ (s-~ V1-
~ ~s~~~ C4- ~ S~ c;:~ '6 B-B
*' ~o ~U\~7 ~ ~ uhl:ic:r ~
~ i, aOe> S\+O~ ~~ ~&JCl.~ hIs' u E ~ ~
~ ct Lo+-4C-t
~ ~~..~ u.w~~~ ft-.J-. k ~ ~
~ ~ a..J SFWMDr~~
~'S ~ 1; ~ C~llo ~ ~)
~ ~. [~W\~ ~ U\.Gr-b(AC\r.~.J
~ b~ ~ ~ S~~ T rPL s.~1>~A-
~vnt\~ l'-~ ~ 1; ~ ~~ .;L~\~4[+
~ L ~ {- 11 ~ I l-n \ ~ ~ l a.....-J.s ~ \~ c...-.j
~ ~ ~\'V\.~ l2 '/'2- fu}. k ~~ ~
La f- Zf't ft. b ~rut-- ~ .s b J.
-'V Tk &'reLI.~ uJ~ ~ L It>+ 1q 'j r.J ~ I~
retJ- ~ teo. GVW!f~ lPt-- lr~ 0~ uf- ~ I \\.(~~
~ h ~~~~~
~ ~ s~-\- ~ \~ Lon 1q
~ LOT ~ C\,. A
&~ ~sso(.. h · '1l\ {hs-\n,huit>Y15) ~(
.
..
.
~
, .
.
.
~ ~(U Pwl{~P)
~~ ~\\ r'& JwJfs ~ ~ )~y
pi ~Y7fY yYUhf he IA ~ J ~ -h~ 6 c (;)
~~\-<Aol...- 4 (~~)-
_ JLkt-t ~ jQ ~ IS fo sW-J-
_ ~ Ivw 14- rU( sdt~ tV-<- ~
("iJ11 -,1M a:f- ~ ry, ~ ~ - ~ t~)
(1\ t-IWI r;....'r...l>'i~ ~ ~~:
_ ~~Io-<.lCS ~{ ~ ~~ ~ ~ fb ~ \,~
*W'o~\o ~~- ~~, U'v tf)\)~\\ ~ )'-H~~'~LH.
~ ~"v~'ng'" av4 ~ \{"'~-"~'-/J
I:l!-~ C/Jyc- ~ Ix..- ~ tR ~5~ ~ J
~u\u ~ ( Ll.n)
~ .1--,{'3~~S-1-7-~-".-rt"
S .G f\\\~L ~ l'lJJ.9r 5v.~\: "" v 7 0
\&.~, ~~' ~,,~ (1.,,)
~ ~~~ \) ~ O.."3_~'-'1-"1-",_..oo-Oq90
&"'~ A-ss.c>C
l\ Q <; E b+l. s~ 1*,2\ F~e.
f\ ~ l ~L ~:nD
cx~~w-h-~~~
{lL..\O
L 1-'5 '{q tr ,-\q- A
5' 7Z.~
~~~i-
- ~ ~501z- ~ ~ ~M~' -ht VWR- 1 ~ ~c,-A
l~ ~J ~ ')
- ~~1~ -- ~~\ 5~b ~ ~ ~M~ ~
~ ~ lot '\. C\ \M \' ~ 0YeA... L,t 4 'tA
- a \.M..$? ~ (,y\
vA l~ \4 s r\V~\) ~ ~ h> \.\/teL.- ~ ~
3'51-'(0
5)1_ r
rl,..Jo~~ S .15' _~S' f~"""" (tVfW\ ~ \bP rt ~JD~ ')
~~~ 4 \JY'OJ.~\U~ - ~~ 4'- f>ls.t ~c. ~ ~ (J)t)
~
~~UIM~ d6~
)W~Q \~.~~-r~~- ~ ~ o~lo~ ~~~ ~
( I ~ ( /Ill A) ---7 ~-' C ~.l~ {I-s fossd,<e -to 16... F'L ~
-- 5~ ~ l 'IAl+-~
- ~ / S tNV6- o-zJ,.. J h'lt<- ~
G~~ 4 ~ ~~lN' ~ lo~ ~~ A (,>.sM db ~~ ~)
/
sF'Wl'f) p~ ~+5 (:'-\0 o~)
GJ1 CDD 9
- ~ ~ ~ f- ;uJ I~ ljGuJl^.l
G.\. ~L\ ~ uv \.MIttr.... CM~Vv ~ \a-I.S~~
~ \M\\ UNM vr v\A\-l ~l.vv ~ W.l~'(;
,;\~~'\ ~ ~
~ vv\\\ ~05t-0\ ~ ~ ~+
c.,O
~ ~rW~ ~
5fV\M.v ~ \~~ ~ ct, IS-
~
-.
~.
""+> E:..A I N A ~ E C. OK OV\ r't-'1, O,..::>S
._ &iJ1tftlTJll'L.f!li15::K )/,.Q1._ t:'1__.~__.~
? L1.Y__,f!.f.. E.9y-rON_ Bf:!.!!!!!
} or;3
r/lz/91
.______.n___~._________ ~_ ---,,..., ___v or,lf- :>OB fV{J___ 1/ -?>~B)
-::r. 5 r w f1 1:1 flfiHr7 IVD GO - 01503 - S
~ ('LOOl) PllOit:C-rIOf'!.__
LpCttL _ .l2Q.11? c.~ I,--~~l!i._ - 3 '112 Z 4- fiR S 7()iLH
Ew.l!.'D _(}P_~.-r.'!!.I!K- - 10 , .., z ~T f'Jc. \J !>
H II'l.U:!J!!:L_gP'!!b ~1:I{;-=-__,~__Z Do e-r t06. Ii t:>
_______~~,l>f1~~,I'-5G-. LO-r c.i2../-({;;.(Llrt __=-~_~__n?:i, Hfl_5.70fLtC
'('LOOl:> CON1QUIl--
II 4/ P7 tJ~VD
N/rJ J>A-t-K./tJG. Lo-r 6.efif)E. - II 5 F, Nt..v~
c
I aO 'if:t'r-IL PWO!)
HI!", F=U)ofL f;,t-f;.vItI16~ -
14-.5 prr f\J~ \I!:>
_~_F:J:.A f't...COD ~'-~VilfION - II () n 1-1C,IJ 1:;:.
~. w rY(cG;.L Q.U~LI-r1.{ ~ Q \..) 1Ie.~ t-f ~ -rs,._____ ____._._.___
_~______._._._!!!.PJ1.! I?~'!L :!~~"!~_..? Hf't-LL peo.~~~_ j\ 'Jz /I
Q F t>J?Y
._______ __.fB:-~"1.!?~,:ft-rH~ -r _PfL/OfL -,-0 _ 01 SL/-ii\f...t..J"-l ~"..J~ -r~ :niE-
,_ __._ H ~ -r ~ 5'f C;;. -r ~H ' _ _ -r H{;.. I f1 PE:/?- v to us.._ ~_v f::. @_6..~ ~(2
__~__~________=:rI-jE: l:~-rS~,---r..~'r-J 'HI ~ P~~Ec;...-r. ?H~~ Bg..
75 . !,~~-r
I P- AN..!._l.",O-rS ..E_~ c~ t:~ ""J:~!! ~
~~"{-A-t-...€::
Pt-'t>n I(l()r-J~ vJprr~ &vA. L (7'-1
..1-_____.___ mn, .. -- -
-(l..(;:j\-~~-r ~_l.~'::_ ~~ __~_~~J..~E:.b
-::IF s ,., €: "D.{; \I f::.LC> P rl ~ '1 C!H ff.1Z~C7 t: 12--1 S"" I L ~
A ~1-rE::_,~,:::.:5, 71 <" fie.
B___~_~ll-.!?_' ~ '-:_~~~fr~.__n~~__ ItL.u
.t;;.. __un 'P~ _i_ E:;.t:> .t>r'~~?_n Z ~1.~_lk'n__
._, v _-ro-(~__'_~.P~\JIOuS1\~t.A-:;;. 7:?-JfZ-oh., c. /So/D 0.1:::'.
s he r. .
Professional Engineer No 23 42
Registered Surveyor No. 2914
i I
Z Q<r- 3
,..pI I 'P (2... 'f l?- \::: ""T b-f,.j -r I ot-..\ 'P' I'-~!~fr"" tf ~ 1_, _ ? 'I $- -r l:= 1'-1
A \/6UJl'-1\o:::. -rp B\=.. 1~~~-:I~1>__,____
D 5"
...'
5, 7 1(... AL = Z 656
A-L - / ~
COt-i''lCOL tl
6 00 Nt:..V ~ C~~WMt:> ffc-R-~/' f'J0 50 -0/G'03 - s)
" I -I f'" '" L,~.
F....L \40 /'.I~vl::>
S'
, .. i/I/-:;;;'/II~/'I
-
~~~~\)t..L \. (p"
I H2..
_ lJoJ ~_'7
'q-
, J{J_ 1
-
- ~ -,f'o,\${ t: \::.l 8<:::>
~t fA-LLlI0{.... Hf;.trb ,E:::::.-r-
s"
d :;. Dl^t-4~...,bZ o\-' ,,,,,,S;( HOLt:. S"J,-z. ~ 0 41 -:;--Fe.
1-\ l... -::0 M~'~W( Oy. W4--f~ ~ 'LIHE:. -tl -::: 4 S T"
4.51
H -z. -::;. H ~I (" trl o~ W /lr'1k.-A'Z. <! 1"1 t1 t;:- -l. L -=- 4 +07-f"-.
1) ~ -:::. 2ft'""! U eK'( b::;' \-1 C> L."t- 'bUr H = 0
k
d \r\- (\4 I H.)
lZ\il... + 2-\-\2 T 4'D~ T ~)(-tZ--tl)
K - (0 411'; \r\. (451/4,407')
.
[2-l4 51} -\- 2(440/'} + 4-[O)"\" b 4 nJ (?J:J0
k ~ 6 00'010<6
L q +- 8 <014- + 4-n )C36~)
J {, x I D- b Qi; Ifi;. ~ - -f-t; Dr Ht.A-b
3or3
-:pl F'~f-Nc.H ~~I~ ~\;:::.slt..~
L =
, ,
v
k.. (\-\I..'N -\- z-\-\l,..\)v.. - "O",,"Z- + Z\-\~ ~~) 'r l, ;1 ~ 11.5+ ) \Nl.J~
VDU).!1.L !t-!.._ SW*LE: - ~J ~S7 .ft: 3 """ {J 6 ~ I AL -i~ -- 0 7 3ZA,- {,J
/o-[A-C- \)DL VM e /0 -Gt:.. ,ef:;-tt'lE:t> -::.. z 85'6 Ac. - 1~
tflN (!-IrfIiCI-rY ;::tz.~(1A l:>JZ.AlfoJ .... 2 656 At-ltJ -O./"3?At. 1,J;;; 21V,tk-IN
'4 -=- '10\...U t1 E::- -'~-A-f~ ""=. z IU ttc.- 1/0
L -.;:. ~C, ,..., 0 P -(KLI'l(H e.f:: GUIj{~
\N ~ ., (L~( t-~ lc.'l t:;.-r H I~ F1 ';... 7'- _
K.. ~ H"t>~^ \JUc.. _ J,,) \Jut. -r \ v I '!."i -;;. I l, f-. I () - s ('-f~ / (-t.4:. - r-' ld. HL....'\;;.
'r\-z.,..";' ~~1 H -, D W t1'--(~ ""'(~L~ -_ ~ I
\)l.L -::;. f'lO~ - ,S.~....(U~uY(~ 't.t.R"11.1 or- -, ~.--,.j(~ t ~ 4'
b ~ --- $.A-"u".A-(~'i,... -, r(.~~f"l \;;..~V-(fl ~ L')
l
z. ILl;.. fH_- l~
L' (, ~ID-~~ [(rP')(7~ t- 2('.')~) - (4- }'Z-_",- z-ty&)J +- (13'1 }../u-')( 7'X4 ')
l -
z."I"Z.(.. 'f-<...- 1,-"
_0 60 1181- +- 0 t OCY3.tJ1?-
L -
4-J 't f-CL
,
~I rZ-~ - F=LDW U>HPu-rA-7/DNs..
G..Vi\NIUK PA(4:. U7( 4<=1
, I '
C. n'l 0 F 80'-1 To ~ t3E:. T\ U-(
(P.... 1\ :SoB ,..x:> c1/-0G.f>')
?/ '3/0"
5'rlU- --r I 0 F 2.-
5'iS-rE;.M 't>E:-5 I t....r0 c..R.\ It-(LI 1\ .
::,'{~-r~ is P~SIt...r-J~ FOR FUL-L OPf-12A;-/lON OF Wf\-IZ.CI-\l)U~ BUILb/,...)L
SP"I,.JI4..~ ~'-ls.'n:-M te. 1'2-00 ~PH ~ 65 P-::'l (It'1 el..t>(, ~ON,..JEC:-"O,..J)
p......~ 1\ IS()6' &Pt1 PvNf'E:-e. l-tbO~ uf ,0 ONE- FIt:L H'1l)lb\rJT
-('0 (1Z6~1 DE::. lSoO Cft-! #r-r ,...o-r <....€::$S -frl/+"J 'ZD ~5l /Z-E-SI DVhL
p.eE:: s.s.o te-E I
43/' - IZ"~
'2...70D ~PH
@-
J7 r;'- (,' rI
,.2-00 6. f' ,...,
TllUE- Sl'll,o.JILICAi::. rt.I$f-lI!
~ rtoe ~r t1 ~ S5 f'~i ~~ P(UOSSv<<-L
;t4 '_ (., I, f/ ,
1'500 c-'Pt-t
100' - B" (/
I"5DO 6.PI1 /~
0/\ 111- ~"rt
~ , 5C>O (;/"tf
25" - e"rj
15'6D 6,PH
@
/
'--(F)
\)11\ Q~Pn ~c.(~ A.(t:.~ \,}f"~ RO 1,.1.(, S .(~Jf-t f.\J \-l L 'tOo H L f~O l-IL 1'11<>> "'Su,,,,
r; " 1500 3,'3+ o 1'1(, 17,05 O,2-5c>3 o '2-1 0 C> '1' f O{ 20' 15' a'
{p I' 1'2.0D 2,('"f D"'1(." 1'3 ~ 2- D,z...S03 OII~4- o (,' 2. (." I 1,3 ' J. Z. I 5"
8" )500 :;'. 3 of 6,541 CJ 91 ,0,,'303 0.045' I ~' o (,' "< ~'
I
11--" 2-70C> ~, 00 {),766 7c.1- o 3't-=1 o C>I-:::J. b, "2... &,1" 1,0
\cf "2700 C, D () I "54-5' /I, () o 3Sz 6 C>4-t 6,~ () b 61~5
s -= / \Jt"L- '\ "Z-
~ I ."'6(, (" -CJ:!, )
(L-:;:.. 0.01
b,\J t\L---
?OO HI... ::;;
4So t-k ':..
-rfE:: S,~f.c-;;..
11-l ~(el.l -
O'L~"LlZ~
0.4...."l. 2j
O,fj~"f /z-~
I, blJ'L/Z~
D(4'Jl-/~1
,
Sf-Ie€:.- -r 2- oF' z...
9/1'"'>/'1
fOl ~ l'
r:eott -.0 Q f:1:. i.. +-\ L ~:>L (-'Lot f::l-' ;:;. r"'(:6.utlU:.b
A....e. 1500 2-0 (11' )( 0 '2..1) t- 'I' -to 6' + 6' -;;;; 2.0 .:; I g 6 ? 51- 2-<<6 'Of~~
B--c.. 1'500 28.& (2-5,' oJ. /1.0+;.) +-\ '3' + \ '2..' -::. \ 3 '2>1 5/7 f5L 34- 7 f~L
C-l> /5D() 34 ":} (II )(. Q."Z.I') -+ €I' + ~ I + i t' == 1 ') , 7... ' v,s f~$L 1-/ 2- f' ~'-
C ~E:. 1600 4-' z. (100' X O.O~/) \- z{o.~ ') ~ '5,-::J-' L '5 p~L 43 /, (1)(.
f,-F 1 'ZOo 55 / (11.c;.' X 0 ,13t-) + 5' t- 5' :; rz. 3' 5.3 fS" 00 ~ f'~L
~-c... '2.7 DO <..0 1'3 (-+-31' x. 0 DI'l-) +- \,'L - f3,s' 3 1- fS'- c.~ ~ f'5 (
6- H 2'700 L..'" '1 ( I ()')( 0 04-f-) + f., -\ 0<11 -:: I, 1. I 6,Sp~(. (P1 1- (Sf.
f'~ = I f'J1""T1A-L- fll€:$Sv~ ~~6"",<<-'E.D IYf "~r1" fo,rJ-r
PL- = f'~SSv~ Lb'::.'2;, ~uE 10 F(l.\L-110,...) -+ f:r1,It0'-.S
f' ~ -- <<-Es \{:)VA-C f~ssv\Z-E. ~E-Q.\J\~ = F-.I- +- PL
Jo
fl
fl
PETS\..HE & ASSOCIATE~, INC.
Professional Engineers · Land Surveyors · Development Consultants
Exfiltration Test
South Florida Water Management District
Falling - Head Open - Hole Test
Client:
Catalfumo Companies
Project:
Quantum Park, Lot 49
Date Tested:
September 11, 1991
SOlllOG-9/13/91
o
YELLOW SAND
WH ITE SAND
3.5
5.5
GREY/BROWN
SAND
K = d In (H~2)
(2H1+2H2+4Ds+d) (+2-+1)
K = HYDRAULIC CONDUCTIVITY (CFS/FT2-FT. HEAD)
d = DIAMETER OF TEST HOLE (FEET) = 0.42
H1 = HEIGHT OF WATER IN HOLE ABOVE WATER TABLE AT TIME, +1 = 4.5
H2 = HEIGHT OF WATER IN HOLE ABOVE WATER TABLE AT TIME, +2 = 4.41
Os = SATURATED HOLE DEPTH (FEET) = 0
ELEV. "A" = PROPOSED TRENCH BOTTOM ELEV. (FT.-NGVD) = 9.0
+1' +2 = TIME, SECONDS
K = 1.6 x 10 - 5 CFS/FT2 - FT. OF HEAD
100' South of North Property
line and 20' East of West Property.
Joh
F10 a Professicnal Engineer No.
F10 ida Registered Surveyor No
TEST LOCATION:
1760 North Congress Avenue . Suite 203 · West Palm Beach, Florida 33409 . (407) 640-3800
6799 Overseas Highway. Suite 7 · Marathon, Florida 33050 . (305) 743-5788
.----.
P i-\)
,)&SIb~ ~1-~f"ft:LA
APPENDIX A-ZONING
Sec. 7
H. DESIGN CRITERIA.
1. Paving All interior paving shall comply with specifi-
cations and standards set forth and subject to the
approval of the city engineer
2. Off-street parking One and one-half (llh) parking
spaces shall be provided for each two (2) employees on
a maximum shift. In addition. visitor parking shall be
provided which is deemed adequate to serve the needs
of the particular use by the planning And zoning
board.
3. Acce"sway". In the interest of public safety, no more
than two (2) accessways shall be permitted on to any
single perimeter public right-or-way and interior
..
~UPP. No. 35
1926.3
r
APPENDIX A-ZONING
See. 7
accessways shall be limited to no more than two (2)
per developable parcel and interior accessways shall
be located no closer than one hundred and fifty (150)
feet from center line to center line.
4. Hotel and motel density Permitted density for hotel
and motel development shall not exceed twenty (20)
units per acre.
5. Utility transmission lines, etc. All utility transmission
lines, conduits, conveyances or other devices or
apparatus for the transmission of utility services and
products, including all franchised utilities, shall be
constructed and installed beneath th,e surface of the
ground with the exception of main overhead feeder
lines.
Appurtenances to these systems which require
aboveground installation shall be effectively screened,
and, thereby, may be excepted from this requirement.
6. Solid waste and refuse disposal. Plans for solid waste
and refuse disposal shall conform to and be approved
by the city and county health departments.
7 Sanitary sewage system. Sewage system will be
furnished and installed in accordance with city
standards and other pertinent city ordinances.
8. Public water system for both domestic use and fire
protection. Water systems must be installed in
accordance with city standards and other pertinent
city ordinances.
9. Storm water system. When approved positive drainage
is not available, on site containment of storm water
run-off shall be provided by the developer Details of
the on-site system shall be approved by the city
engineer
10. Access to perform necessary public services. The
developer and/or owner shall dedicate to city any
easement that city deems necessary for public services
and said dedication shall provide that developer
and/or owner shall hold city harmless for any of its
1927
r
Sec. 7 BOYNTON BEACH CODE
acts performed within or abutting said easements if
any loss or damage is caused to abutting property
11. Off-street loading, In no instance shall off-street
loading facilities front on a public right-of-way and in
no event shall these facilities be located within
eyesight of residential district.
12. Plot couerage. The gross floor area of the building and
its accessory structures shall not exceed sixty per cent
(60%) of the plot on which it is constructed.
13. Open space Each plot to be developed shall contain a
minimum of twenty per cent (20%) unobstructed.
non vehicular open space. '
All open portions of any lot shall have adequate
grading and drainage. and shall be continuously
maintained in a dust-free condition by suitable
landscaping with trees, shrubs or planted ground
cover The design of such landscaping and the
measures taken to insure its mainteRance shall be
subject to the approval of the planning and zoning
board and the community appearance board.
14. Maximum building height No building or appur-
tenances thereof shall exceed forty-five (45) feet in
height.,
15. Distance between buildings No building shall be
constructed closer than twenty-five (25) feet to
another principal building on the same lot or parcel of
land.
16. District setbacks Front, thirty (30) feet, side, twenty
(20) feet, rear, thirty (30) feet.
17 Peripheral greenbelt The project area shall be enclosed
on all sides with the exception of accessways for.
traffic and freight by a landscaped area with a
minimum width of twenty-five (25) feet except when
such property abuts a residential district such
greenbelt shall have a minimum width of forty (40)
feet.
1928
r
APPENDIX A-ZONING
See. 7
It shall be the responsibility ot the owner or
developer to carry out this requirement, and to provide
such mainten~~e or guarantee ot maintenance,
subject to planning and zoning board and community
appearance board approval.
I. PROCEDURES FOR ZONING LAND TO PID. The
procedure for zoning land. to the PID classification shall be
the same as for zonjng land generally Because ot the
differences in PID dev.elo~ments and the concept ot unified
control in development, the following procedures and
requirements shall apply to applications tor zoning to the
PID classification in aAd.i~ion to the gener411 requirements.
1. Applications, materials to be submitted. In addition to
information required for application for zoning
generally, the applicant shall submit the following
materials or data.
--.
a. Legal documents assuring unified control of the
proposed PID and the agreements required under
subsection D
b. A master site development plan containing:
(1) The title ot the project and the names ot the
professional project planner and the de-
veloper;
(2) Scale, date, north arrow, and general location
map;
(3) Boundarie!l ot the property involved, all
existing streets, buildings, watercourses, ease-
ments, section lines ana other existing impor-
tant physical features in an<;l adjoining the
project;
(4) Site plan ot locations of land uses including
but not limited to industrial areas, greenbelts
and proposed rights-ot-way;
(5) Master plan showing access and traffic flow;
and
(6) Tabulations ot total gross acreage in the
development and the percentages thereof to be
devoted to the various land'uses.
c. Repealed by Ord. No. 78-37, fi 1.
1929
r
]0
12 11
'5'305
3 8996
~'FI
-~
~~/'l
I4J 002
\1.\.., rJ 1<
QtA'\11
! ~
d)J l'\ 11U",
(iH: "i1~.'\f t '~}{h
!: R I;
j f t
':
L'
i.
I
D
f)
-,
'....c'\ ~
C i
T I
p cJ 10. r L) e r l. l.
':
~uc:: ~I f I
f''-' I' be r Y dl \ t)r!e~
c...t (~...
.~ .....
..-\..... l ~
" l
...J.... 10..- J n'...L.
her J r J; .1 ~
tit li_
'!
1- c' )r'
f ,
"
...... fi ~l !
,
.I
Ilu Pirh.PJ Q '..!rt.'t.:DBclj,B!!J ..IS
\'
"
r__~rlfl d ~rf4
!r \n
tJu J t
C '1 fOri
1 t, ': ! t h J' C' 1\ r _ ! r ~ ~
l~ ...j\"-lai \c ~~ L ~e J<....
!: k \., t <l b u v; U t' ! Ll i
!,k l! et"nt~elt huller
R&D u ~ Of CClr.1merC at
fill ,~~
r n iff' ,.-" r '-
~"r
e Uv-
~c:: (}d<l U
11tl1J!::- J\..h v:.e, .\
".e WJlhlfl Olhlilll! '
10
12 12
'8'305 3 8996
DEUTSCH IRELAN[
i4J 003
ubuts any ct the same uses outsIde Quuntum Park shall have a twenty-five
foot greenhc-It buffer between the JScs.
~
2 No greenbelt buffer .,hall occur when the perimeter of the Quantum Park
p I ~ abuts ~ road !lght-of-way a railroad nght-of way, or a transportation
statio I (Tn-}: all) ft peTlITIt'ter Quantum Park properties are combIned WIth
propertles lJutslde of OL.r.mtul J Park to form d slngle development,
contmuous If! nature, no buffer shnl' be required
3 AIi buffers shall be measured trom Quantum Park Perimeter Propen)
inward Cll1d water shall he Included as an acceptable pan of such huffer~
Wtlr-'never necessary the huffer (jlmenslons shall be Jncr~i:lsed such that a
r"1l111 num of fifteen feet of earth IS provIded In a continuous fashion SUl..n
iHcdS shall be rla1ted lT1 accordance with number 4 below
4 All hurter f i !~ mg plans Sh:l!l tie ~ubrrlltted to the CIty of Bo' 011 BeCich !l..f
approval Vi hen (l(IJ31..t" I ress (buffert'd uea) deve!or ," pinns are
"uhrmtted p!jm1I12 wltnul the huffer Shdl1 be the rCSCQilSl 01 QUdrr JrY'
As,; J~late~ bllt at -;Gmetlmes mav be \..omractual1y rle lega te '1("' ad i.1C(' i,
prupt'ftv de"'e]oper P:ar ng~ I)f the 11l tler lied be cc;rnpkt, ivr tc
CertIficate \)f OClUralicy belflg Issued on the huf'ered !lrDpCr n dd..;,
to BovnDn Reach Landscape Requ rements. the llUP1be (If pI ib/trer-s'8 ,)e
pr,)V:ded stall be bJsed unon p<:nmeter trontJ\.!e hlr each t\'vent.... !JI.':- r.:~ i
. . J 1,.-
t:.l a pmcei ether front<; un (If contal~S a perll'1tt~r g:eenh~jt butte
(i jlJ1ticma! shnlbs three toot, "IX Inches in heIl!ht ",t tilt" tilne ot p antlr~' ~;
hf' rt'qulreLl ,.im1 one dCk!l! 0 IJI tree, wIth <1 rrllnnl'.nn t\\o ard one I'
ller t','.e1- e foot ze~(J mchc''i liJnlnlUIJ heigllt dnd eIght toot ,'(
I ~r TnInJ'Y ~Im c,lI'iory ~t tl'e time ot pialltlng, Sh,llJ hC"'required
~l II .cdltlonal landsc(1ct' matemlls shall ce nl8.led hetween ti e rtdr 01 : Ie
. ,
de\(> (pment and the first tlfteen teet (jf g enbeil buffer arCd mea"ureJ fn j
the j yelorment f.1rceL P 8cement srdll be delcrmmt:d based upun I FJ!.it
from the Qudntum Park D~;;;lgrl Rev.e\>. Committee dnd the (try of B"lvrl
drnC:! Forester arid the reelu'rements <!nd re:-.tfld on" ot the S'owh Ftc,!' l
\\ (rer \fanageme-nt DISH 'c't, L:lk(~ Wdr'h Dn!lnage Dlstnct .:Jill! FiniiU8
p{1\~er and LilIlH Anv perrTIlh r~ql ift' J f()[ J!:dslaOli '- \ t111:1 t~je S, Iln
\,; ., . ...'
nd; \\ mer M~nagernenl. D! [I t '- Isemcnt re<..s si ,d. :e lCq'-' re,-,
llH~m ASSOCi:lli'S
i'Ol[lln1l!m ot a tlfteen fOD! Width ot greenbelt buner shall feLclVt. sod, .;1"
balance of the 1,lDd area sh211 be shoped 'HiJ sfe~:ed to pwvlde I
r::plereh fjm,hed appearance t\1a:ntenance of gret~nbelt butte; Hed~ "lid !
the respons hIllty (' f the underlvJng property oVvner L::nu,,-ap!ng 'A itr, ,
greenhelt o.Jfftr :-.hd! be lff1g8ted b.. a nroaJeJsl Irr1,.1.l1 on svs em p!aLe i
ciil1f 6 the propen\ line l r t!1t: CldJacent de\el< p,'e'l pJrLe n j h
m" a' '\tIO~ and Td 1'1., ur: ,., ~h II be!h respum. 11!;\ t " 1- _c ~ "
Parcels uwncd [w Uuantum A~q:(,Jate~ ORA, In_ If he QU1l1tum 1",Hk.
(ommumt\ Deveiopmenr DIstr'ct, may have grc~l ,r ~' e ~f'f'J1!' nts pl:c~\1
UpCn1 them th:lt are: ded!coterJ tu adjacent property owner:. H! :'t-,' in ties.
It IS u'lrjelstDod 11\ Quantum :,\:-.soclates and the Cay of BOVInoI' Bea~h In t
,
bUlld:ng ';ethack<; shall be measured fTOrr easement iml!ts latht~r th-,
pror'eltv lImIts. In those nstDnces \l. here parcels h:.tVt" .J green Sf;
ed:;~~r lent (.dncellt to a can<:d th~ buddmg )ett',~ck., "ha!l be me.lsured Ir 1m
thr ,)1t the n,d hell!\<
,~~JI.!J 11'_
)lJlntUITl -\Ssucldtes and the C tv hereby agree to tnfOil..e greenhdt butter
;c'qUlrements as stated herem 10 nccomrnodate projects In process (I e, 49
Dlstnbutors, lne ), Quantum As~ocIates and 49 Dlstnbulors lne, hereby agree to
Stlbmlt a landscape plan for Parcel 49A consistent WIth thIS document wlthm thlrtv
da\s of dCl.-eptance of thiS Master f'13n "1odltlcatlon and firni approval bj th'" ell)' of
Boynton Beach Umdscapmg 111 -, uTl such r i wIll be !I1stalled PI, -! t e
ISSllancc' " the CerTIficate .f Oe;.'\ nc ,) 'le 49 iJ .,tnbutors, Inc dt"vc1 .
10
12 13
'Q'"'\o: 33 SgY6
DEUTSCH IRELAN
~004
L r!der~tctrl\.. e stntus L:f the appro\ed Commul1lty Development DIstrIct Pc: ill
fo;, the Quc'" 1 Park Community Development District, Quantum AssocratC'c
trl_ CIty ot ton Beach hereby agree that In the future some of the Quai
, ~(jCI31c" nsibilitles IdentIfied herem may be assumed by the Quantum t'
. lnrrlt.. ,evelop'11ent D!stnct Such assumpt an by the Cummu t y
ilc\ciopr It Dlstm,t WI:) be totn[1\ \oluntary by the DistrIct The City of Boynwi
Sea h hereb\ understands that tney \'vIII be able to rel) uron executlO'1 ,)1
12" H Ils1blllt:es by the QUd!1turn Park Community Development Dlstflct only f~
tIlt' commllment to assume such resr()n~lbllItle.) 1~ l1lJ.de I)y t!tetf Governin!! 801 r
I hI' M'l<.,tu Plan Modlficm:on is herebv suhmltted bv OUantlH'ii \.,:;n...l ''.
1eW (':nJ apnroval by the Cltv COmrl1J<iSIOll of Boynton Beach It~ '~un "-
be ~~n rrv'lev.ed in a nrel1mmarv hshlon \\lth Cl " suff ciunnp ~ .A t
.
J 1 I <)'i 1
DJ.IF
'T''\5\' Zr\l~fERM <\N, Vice President of Developmei1t
; \1\:-' "OCIA TLS
rYi\'~F
i)RS I",C
J t ~\ ) "'...
- ~,)AG E thi'.
day 01
~. ,,(: 'r N i O'\. BEACH FLORIDA
C'- ~l rn I'';; )-.- 'Ine r
{ ""' l~n~! c '!~r
r-11 fr11 55! cilie r
.\T 1 E~
C1 \ C!~-k
({\)f; ) It~ :..e.l )
REVIEW COMMENTS (MEMOS) AND DATA
- & 5rc:.~f 'f~yne/ve'&"
_fY1C--(~S rrot re.<< Sf'<~S EXHIBIT "D"
COVY' f- ~ I ? P..P 5t1(~C-C!5
fVlG-5 frr
O<~-/7}7
CondItIons of Aooroval
Project name: Shoppes of Woolbright PCD - Home Depot Tool Rental Center
File number' MPMD 98-005
Reference: The clans consist of I sheet identified as 1 st Submittal. Master Plan Modification. File # MPMD
98-005 with a December 9. 1998 PlannIng and Zoning Deoartment date stamo marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments. None
UTILITIES
Comments: None
FIRE
Comments. None
POLICE
Comments.
/' How, If at all, wIll the stripmg and traffic flow be affected by this -f.:!'( , k
"fie::. I"~
modification? tJ- ~
V What is the estimated mcrease m trip generations associated with this
additional use?
V Will the tool storage compound be completely enclosed and lIghted for
security?
ENGINEERING DIVISION
Comments.
/ Correct the reqUIred parking total on the plan and on the calculations.
BUILDING DIVISION
Comments.
ff. r .~ ~ c:' ,<:{( p~,-r yY) r f: :)
6 Submit a survey owing the exiltmg and proposed property lines
locaten within the limIts of construction.
/ 02) Pfey, eft:...
7 At time of permIt submIttal, mclude a copy of a recorded Unity of Title
that adjoins the property that the new facility is located on to the Home
Depot prooerty o-~ ...1) ... ,.JI '\ h,1.>J -f1..c- r
8. The type of construction, fire rating of exte~~ walls ~d pe!.cent of .
o~r,mgs in the extenor walls shall comply with the regulations s~cified
#~
RC'- Crt' /-'C~(' ft.", /L 'Y If;r~~ ,7
Page 2
Shoppes of Woolbright PCD - Home Depot Tool Rental Center
File No MPMD 98-005
DEPARTMENTS INCLUDE REJECT
in Table 600 of the Standard Building Code.
-
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments.
fj) The applicant should have the site existmg landscaping brought up to
current standards as part of the site plan review process.
PLANNING AND ZONING
- ----
Comments (None )
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
10 To be detennined.
ADDITIONAL CITY COMMISSION CONDITIONS
11 To be detennmed.
/bme
s:\projects\cond of appr\
1 st SUB MITT AL COMMENTS
fY\<>-s f"'-<
1/(/1 /9 '1
PrOject name Shop pes ofWoolbnght PCD - Home Depot Tool Rental Center
File number' MPMD 98-005
PermIt Number' 98-3593
Reference The plans consist of I sheet IdentIfied as 1 st SubmIttal, Master Plan ModIficatIOn. FIle # MPMD
98-005 wIth a December 9. 1998 Plannmg and Zonmg Department date stamp markmg.
?
I
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments. None
UTILITIES I
Comments. None
FIRE
Comments. None
POLICE
Comments
2 How, If at all, will the stnpmg and traffic flow be affected by thIS
modificatIOn?
V What IS the estimated mcrease in tnp generations assocIated with thIS bt ~
~\~~
addItional use? Q\.s
4 W III the tool storage compound be completely enclosed and hghted for
security?
ENGINEERING DIVISION
Comments.
5 Correct the required parkmg total on the plan and on the calculatIOns. ~\ ..:I: ~
{~ \.'::3
BUILDING DIVISION
Comments
6 SubmIt a survey showing the existmg and proposed property lInes
located wIthm the limIts of construction.
7 At tIme of permit submittal, include a copy of a recorded UnIty of Title
that adJoms the property that the new factlity is located on to the Home
Depot property
8 The type of constructIOn, fire rating of exterior walls and percent of
openings in the exterior walls shall comply with the regulatIOns specified
in Table 600 of the Standard Buildmg Code.
PARKS AND RECREATION
Page 2
Shoppes of Woolbright PCD - Home Depot Tool Rental Center
File No MPMD 98-005
DEPARTMENTS INCLUDE REJECT
Comments None
FORESTER/ENVIRONMENT ALIST
Comments
9 The applIcant should have the site eXlstmg landscapmg brought up to
current standards as part of the SIte plan revIew process.
PLANNING AND ZONING
Comments.
10
Ibme
s:lprojectslcond of appr\
)(0rv1 c. Z2 j=>r:- f-
c:~a ~frcc ~n1" ....chor, ,~;;,. t7t/~ ?b ArzcClc<r'1 /1cc-~
· iYJc-&,,:-hS ,- ~ Q.-n tdV...J2 1~l'lc05C'Y'~ jJ l6-~s
.. ye~ ~vF - ~'~
Ct:ryT\ ~ ~'^ +-
-=j:> &-65h,c~6 ~nd2I'7:.: l:k-YlcL5cwrr.,,,, (=tU~Y<;Yr7=Vlfs. <<->( ~J 6rn,o f ~
:;.d2 f - ~ -. ' ;;7.:<-' r- r- (j /I'k~;; < -7> <v-- t; +k '/F,---.o ~
_ ~ 0-P .f1, ( .. SI f2.
L/r~:-or-"::>~J'rs 0- r c?1? 1Ycn<:c.~-S ,- re...- e...>c.~--n(......... . _
c:!.c...rvY"\ v""'- ~'^- + (y<::~W b--- c>- (f:?J~ (Ir"\ V l"'-' '"'-< ~
~ c~~-Ao"..., f;-cf'rvl.. vEJ2r>7 ~+ us...- ~~ .1 J:\J.--t tit...FF- + e:.f (r.k,((ft~
~.l.:... € // O-~
~~+-=?>, ae h~__(/ ? - 1h1?G..C:+- O'L Crd'rr'~()
"'-- O(;r;;.v.... ~Rc.... C~I:-"J~( '"(Jrtc'Y fu f<e;:...~f-s ~\"f"\{; ~ss~&
~ c-~~ ~ v i Yl F\-'\c iz'.
&
~ ~
~I
.L' ii yY)P S;;I/1~
,1~~ Tee+< T(<!:d/ I-
jY7.r -rt;y /'.2:s / fr' -!( .6)' ..s r= v= 7-= ore
tl _ 6~6u~r ~cJ.U rfr~t..lia~~'\e.
rvj-",yc.. ;€<<:- fr-,/ -=- f"8:70'(; ~ v
,
..~ ~ R~ Iz.-r ('" : Ok.; C)~ $
~~oof k(~~
-,u ~ k 7)e-rfr,
fr1P 12 J (78" rf~( f!.C:'o7 Sfrl/.::... (6-
/:,D
.(~ co.-v/14)
lr
r<-T<-4e- :24-10-, ( ~ ~ b, .kJ 1 1'" -----\. ~ :2, ~
k A-.-(-c/Y'YT- 72-- --/:~ r (" ~ ;;Jc / c:c; 0 ~
~ I Gn. Iz;r .sf 2C-
J:;-~ fb-( Gn r~
C)c4~y S~r
- ~? -3 &f
~CJ? .:f
c2 7g 7
__ .J
(; ,
Z Q~1
~"i1
1-- 0
'(.~
t.J
~~\/
'Y
APPLICATION TRACKING LOG
PROJECT TITLE: Shoppes of Woolbright PCD - Home Depot FILE #: MPMD 98-005
PROJECT LOCATION:
TYPE OF APPLICATION Master Plan Modification
PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME
AGENT Steve Tate ADDRESS:
AGENT PHONE: 561-392-1991 FAX: 561-750-1452
DATE REC'D: 12/8/98 AMOUNT
RECEIPT NO.:
12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLICATION/SUBMITTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
DATE DENIED:
DATE OF SUBMITTAL ACCEPTANCE LETTER:
DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
I INITIAL 1 ST REVIEW MEMO: DATE SENT 12/10/98 I MEMO NO 98-339
1 ST REVIEW COMMENTS RECEIVED
I RETURN DATE: 12/18/98
DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
UTIL.
PW
PARKS
FIRE
POLICE
PLANNING
BLDG
ENGR
FORESTER
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT
MEMO# DATE
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
MEMO NO
o
o
o
o
o
o
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMO# DATE PLANS MEMO# DATE
UTIL. 0 PLANNING 0
PW 0 BLDG 0
PARKS 0 ENGR 0
FIRE 0 FORESTER 0
POLICE 0
BOARD MEETING DATE:
BOARD:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED:
DATE:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE:
S:\FORMS\TRACKING LOG FORM
revised 4/25/97
TO
Michael Rumpf, PlannIng & ZonIng Manager
n.W 4J
John Wildner Parks Supenntendent l' /
~ i
Dr
~"-
1
~ ij w m,riiY
, III '
~ ~ ~; ~
O.1W
\
LEISURE SERVICES. PARKS DIVISION MEMORAN
FROM.
i\ND
:;OT.
RE
Shoppes of Woolbright peD - Home Depot Tool Rental Center
DATE
December 10, 1998
The LeIsure ServIces Department, Parks DIvIsIon, has receIved the sIte plan for Shoppes
of WoolbrIght PCD - Home Depot Tool Rental Center There are no recreatIOn-related
comments The plan may contInue through the normal revIew process.
JWad
RECREATION & PARK MEMORANDUM
TO
Mike Rumpf, Actmg DIrector ofPlanmng and Zomng
Kevm John Hallahan, Forester/EnvIronmentahst /~b If-
Shoppes of Woolbright PCD - Home Depot Tool Rental Center
Master Plan Modification
FROM.
Re:
DATE
December 14, 1998
I have no comment on the above master plan modIficatIOn. The apphcant should have the sIte
eXIstmg landscapmg brought up to current standards as part of the sIte plan reVIew process The
project should contmue m the normal reVIew process
~,JlJU n \II rn 1m
~ i ! DEe I 4 1998 ~ U
'_.W1 ,
I J
KJh
File
-"""'.--........;"...~-,.
/' \JD
J ~- ~~T.
ell :r OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO'
MIchael Rumpf
DATE
FROM
SUBJECT
REFERENCES
ENCLOSURES
I have the followmg comments
121498
Home Depot Tool Rental
PZ 98-339
1 How, If at all wIll the stnpmg and traffic flow be effected by thIS modIficatIOn?
2 What IS the estlmated mcrease m tnp generatIOns assocIated wIth thIS addItlona1 u
3 Will the tool storage compound be completely enclosed and hghted for secunty?
FILE
MPMD 98-005
PermIt 98-3593
rn
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. BD 98-242
00 mmmD\YJrn rn
lB I Jilll
PLANNING AND
ZONING DEPT.
TO
Michael Rumpf, Actmg Plannmg and Zomng AdmlnIstrator\ ,AJ
,.~'""
Michael E Haag, BUlldmg Code Permit Admmlstrato~~
December 16, 1998 V
FROM.
DATE
RE
Shoppes of Woolbright PCD (Home Depot Tool Rental Center) - Master
Plan Modification (MPMD 98-005) 1st review comments
We have reViewed the subject plans and offer the followmg comments that shall be addressed
pnor to the project bemg forwarded for Board review'
Buildin2 Division (Site Soecific and Permit Comments) - Michael E Haag (561) 742-6352
1 Submit a survey showmg the eXlstmg and proposed property hnes located wlthm the hmlts of
construction.
2 At time of permit submittal, mclude a copy of a recorded Umty of Title that adJoms the
property that the new factllty IS located on to the Home Depot property
3 The type of constructlOn, fire ratmg of extenor walls and percent of openmgs m the extenor
walls shall comply with the regulations speCified m Table 600 of the Standard BUlldmg
Code
MEH.bg
XC Bulent I. Kastarlak
nSHRDAT A\Development\Building-6870\Documents\TRC\MPMD 98-005 1st review Shoppes of Woolbright PCD (Home Depot Tool Rental
Center).doc
FIRE & LIFE SAFETY DIVISION 1
Memorandum No 98-421 L
m ~@UWlEm
, DEe I 8" ~
I
'"
lUll
1
I
i
PLANNING AND
ZONING DEPT.
n
V
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to
TO Mike Rumpf, Act. Director
Planning & Zoning Division
FROM Steve Gale, Fire Marshal %
Deputy Chief - Fire Rescue Department
DATE December 14, 1998
SUBJECT Home Depot Tool Rental Center
S W 8 Street
M PM D 98-005
We have no objections at this time Comments will be addressed at future plans
submittal
CC File
ill m @ ru a v7 r5 r",:'
r h~ 12-, I n i
; I /I I
l DEe, 8 1998 ~ iJJ
PLAf-i~ riG ~ND
ZONIi~G DEPT.
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-335
SUBJ
Michael Rumpf, Actmg Planmng & zomng~ Mer
C'\
C Larry Roberts, PublIc Works DIrector
Al KIm, SamtatIOn Supenntendent () ~ ~ I _
Master Plan ModIficatIOn - Shoppes ~nght PCD- Home Depot
Tool Rental Center
TO
THRU
FROM.
DATE
December 17, 1998
The PublIc Works Department have no comments at thIS tlme m reference to the Master
Plan ModIficatIOn named above.
AK/cr
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO ENG 98-158
-- \ ''"\ ~ ~ ~ U W ~_~
.; 'ft ~ L.l ~ \
"i:\ \
\ill DEe' 8 I99B I
1
PLANNING AND
ZONING DEPT.
FROM
MIchael Rumpf ActIng PlannIng and ZOnIng AdmInIstrator
Raymond F Davidson. P E CIty Engl~
December 17 1998
TO
DATE
RE
SHOPPES OF WOOLBRIGHT PCD, HOME DEPOT TOOL RENTAL
CENTER - MASTER PLAN MODIFICATION MPMD 98-005
1 ST REVIEW COMMENTS
We have revIewed the subject plans and ofTer the follOWIng comments that should be addressed
prIor to the project beIng forwarded for Board revIew
En2ineerin2 DiVision (Site Specific Comments) - Sebastian Puda & Ken Hall 561-742-6280
Correct the requIred parkIng total on the plan and on the calculatIons
SP/KH ck
Xc Bulent Kastarlak
SebastIan Puda
Ken Hall
(. \'lv D()~lIl11ents'Shoppes of\\oolhrighl. Home Depot Toni Rental Ctr \Iastcr Plan \lot!ili"atlnn,t!o"
Ellanson, Beverly
From.
Sent:
To
Cc.
Subject:
Mazzella, Pete
Monday December 21 199810'31 AM
Ellanson, Beverly
Guidry John
Home Depot Tool Rental- Master Plan Modification
We have no comments on this master plan modification which changes the use of this parcel.
A memo will not follow
Pete
1
---...
R ~ RTI-~ ~,'
\5 ~ IS. ll~'i
- ll.j.
, I'
I \ II
. U
\JEl; \ ..~
PLANNING AND
ZONING DEPl
SIll
Board of Supervisors
C. Stanley Weaver
Kermit Dell
John I. Whitworth III
SecretarylManager
William G. Winters
Assistant Manager
Ronald L. Crone
Attorney
Perry & Schone, P.A.
LAKE WORTH DRAINAGE DISTRICT
~~
13081 MILITARY TRAIL
DELRAY BEACH, FLORIDA 33484
January 19, 1999
Michael W Rumpf, Chairman
Planning and Zomng DIvision
CIty of Boynton Beach
Post Office Box 310
Boynton Beach, Florida 33425-0310
Re Shoppes of Woolbnght PCD-Home Depot Tool Rental Center (NW Quad of
Woolbright Road & S W 8th Street)
TechnIcal Review CommIttee Meeting-Tuesday, January 19, 1999
Dear Mr Rumpf
ThIS petitIon is located within the Lake Worth Dramage Distnct's boundary and
will require permit(s) from the District prior to constructIOn.
Should thIS petition reqUIre a plat, then the DIstnct will WIthhold permit approval
until a review of the plat has been completed to ensure that the DIStriCt'S nght-of-way
concerns have been addressed
Thank you for giving us the opportumty to review and comment on thIS petItion.
Should you have any questions or concerns please contact me
Respectfully,
~
Lisa A Rowland
Right-of-Way Technician
Delray Beach & Boca Raton (561) 498,5363 · Boynton Beach & West Palm Beach (561) 737 3835 · Fax (561) 495-9694
FROM
Bulent Kastarlak
Director of Development
Michael W Rumpf/'-'f~
Acting Manager of Planning & Zoning
PLANNiNG AND
ZON NG QE PT
PfK
ill ce,
,ftKWi CIC<J !
~#-d ~
,..
kilL-
1c2/31/7P
ill
~@~u~~
JAM - 4 "I'y)
TO
DATE
December 29, 1998
SUBJECT HOME DEPOT TOOL RENTAL CENTER
Although we would certainly simplify things by processing the Shoppes of
Woolbright master plan modification administratively, as you prefer; this would be
contrary to written procedural requirements All modifications to master plans
are ultimately approved by the Commission, after reviewing staff's
recommendation for a major or minor change I do think a code change to allow
administrative minor changes is justified I will draft language for us to consider,
using a combination of the criteria for minor site plan modifications and criteria
for non-substantial changes to master plans
As for the Home Depot project, I would suggest we process it as filed are
required by code, as the request only uses up 2,700 square feet of the 66,207
square feet remaining If your project materializes, and of course required a
maximum amount of project area, it would likely exceed the available area by
more than 2,700 square feet anyway, and therefore represent a substantial
modification to the master plan and require a full review including analysis of
impacts generated by the additional square footage
Please advise
MWR.ja
J:ISHRDATAIPlanning\SHAREDlWPICORRESPlbulenlk,doc
fD) mDW~rn1
Ut1 . I 7 9ij [!J
PLANNING AND
ON/NG OEPT
< (I DEPARTMENTOFDEVELOPMENT
Bulent 1. Kastarlak, NCARB
Director IN/;7 h cf
~, ~d~od 7r:tf
Au~"~a
~ / ~ ~ Ciuf Ru~
&u~ -
?~ -f/;C~ ~ ~
~/ Z a,~r/
~td U!&~ ~-tvt
cUiM ~ w~~ ,U I
~uui:P /l/~~ -t&-f- I
...fe ~ ~ cr ,G;K,PO ~~/ !
TILe -J.~~ ~vt~ ;
/taN;! ua-~<-- ~ ~
1tA tw~f/Or~~ ~
~~ 1f,ef ~1-U~~
P-I- Z I'~~ g~! \j
:&11:-
DEPARTMENT OF DEVELOPMENT
MEMORANDUl\'1 NO. BD 98-242
RE
M~chael Rumpf, Act~g Plannmg and Zomng AdIIl1Illstrat:r~
MIchael E Haag, Buildmg Code PermIt AdIIl1Illstrato~~
December 16, 1998 V
Shoppes of Woolbright PCD (Home Depot Tool Rental Center) - Master
Plan 'Modification ~IPMD 98-005) 1st review comments
TO
FROM.
DATE
We have revIewed the subject plans and offer the followmg comments that shall be addressed
pnor to the project bemg forwarded for Board reVIew.
Buildin2 Division (Site SDecific and Permit Comments) - Michael E Haag (561) 742-6352
1 SubmIt a survey showmg the eXIstmg and proposed property lmes located wlthm the lImIts of
constructIOn.
2 At tIme of permIt submIttal, mclude a copy ofa recorded Umty of Title that adJoms the
property that the new faculty IS located on to the Home Depot property
3 The type of constructIon, fIre ratmg of extenor walls and percent of openmgs m the extenor
walls shall comply WIth the regulatIOns specIfied m Table 600 of the Standard Buudmg
Code
J\tIEH.bg
XC Bulent I. Kastarlak
YSHRDATA\Development'.Building-6870IDocuments'TRC'MPMD 98-005 1st review Shoppes of Woolbright PCD (Home Depot Tool Rental
Center). doc
SIll
Board of Supervisors
C. Stanley Weaver
Kermit Dell
John I. Whitworth III
Secretary/Manager
William G. Winters
Assistant Manager
Ronald L. Crone
Attorney
Perry & Schone, P.A.
LAKE WORTH DRAINAGE DISTRICT
13081 MILITARY TRAIL
DELRAY BEACH, FLORIDA 33484
February 3, 1999
MIchael W Rumpf, Chairman
Planning and Zonmg DIvision
City of Boynton Beach
Post Office Box 310
Boynton Beach, Florida 33425-0310
Re Shoppes of Woolbnght PCD-Home Depot Tool Rental Center (NW Quad of
Woolbright Road & S W 8th Street)
Technical Review Committee Meeting-Tuesday, February 3, 1999
Dear Mr Rumpf
ThIs petItion IS located wIthm the Lake Worth Drainage DIstrict's boundary and
will reqUIre permIt(s) from the DIstrict pnor to construction.
Should this petition require a plat, then the Distnct will withhold permit approval
untIl a reVIew of the plat has been completed to ensure that the District's right-of-way
concerns have been addressed
Thank: you for gIving us the opportumty to review and comment on this petition.
Should you have any questions or concerns please contact me
Respectfully,
LAKE WORTH DRAINAGE DISTRICT
~~~
Lisa A Rowland
Right-of-Way TechnIcian
Delray Beach & Boca Raton (561) 498-5363. Boynton Beach & West Palm Beach (561) 737 3835. Fax (561) 495-9694
7.B.1
SHOPPES OF WOOLBRIGHT
HOME DEPOT TOOL RENTAL CENTER
MASTER PLAN MODIFICATION
DEVELOPMENT DEPARTMENT
MEMORANDUM NO PZ 99-033
TO
Chairman and Members
Planning and Development Board
/J.?<::-
Michael W Rumpf
Acting Director of Planning & Zoning
FROM
DATE
February 5, 1999
SUBJECT
Shoppes of Woolbright PCD - File No MPMD 98-002
Master Plan Modification (Move 2,789 square feet from within the master plan to Home Depot,
increase parking circulation isle and correct parking space calculation)
NATURE OF REQUEST
Stephen E Tate of Caulfield and Wheeler, Inc., agent for Home Depot is requesting to modify the master plan
for the Shoppes of Woolbright PCD The Shoppes of Woolbright PCD commercial development is located on
the north side of Woolbright Road and east of the L.W D D E-4 Canal (see Exhibit "A" - location map) The
requested modifications are shown on the proposed master plan (see Exhibit "B" - Proposed Master Plan)
The specific request includes moving a total of 2,789 square feet of retail square footage to the Home Depot
store, from within the PCD This buildable area is proposed to be transferred from the undeveloped portion of
the master plan shown as "Future Retail" (2,499 square feet), and from the Food Court Restaurant site (290
square feet) To maintain existing isle width, or sufficient space for loading and unloading, the request also
includes the expansion of the front isle adjacent to the expanded building footprint. Lastly, parking calculations
are proposed to be revised/corrected The total square footage designated for retail/commercial use on the
site remains at 313,786 square feet.
BACKGROUND
The only characteristics of the master plan affected by this proposed amendment includes assignment of
square footage and required parking, total project parking, and design of the main isle immediately in front of
the Home Depot store These changes are described below
Square Footage
Area for "Future Retail"-
Area for Food Court
Area for Home Depot -
Existino
48,706
4,000
102,250
Proposed Chanoe
46,207 (-)2,499
3,710 (-) 290
105,039 (+)2,789
Net Change. (= )0
In proposing this modification, the applicant was not aware that the master plan had
been modified to increase the approved square footage of the Food Court restaurant
parcel from 3,710 square feet to 4,000 square feet. The total 4,000 square feet shown
on the current master is needed for this project as confirmed by current permit plans for
the restaurant. The only source of this available square footage for relocation to the
Home Depot site is the "Future Retail" parcel The proposed master plan must be
revised to reflect the following proposed changes
Square Footage
Area for "Future Retail"-
Area for Home Depot -
Existino
48,706
102,250
/
Proposed
45,917
105,039
Net Change
Chanoe
(-)2,789
(+)2,789
(= )0
Memorandum No PZ 99-033
Shoppes of Woolbright PCD MPMD 98-005 (Home Depot Tool Center)
Page 2
Parking Data
Isle Modification
Other.
Parking space details are proposed to be changed to reflect the reduction of six (6)
spaces in front of Home Depot, and to modify parking tabulations to include spaces
which had been miscalculated and excluded The square footage moved to Home
Depot will be placed on the front of the building and used for a tool rental center To
maintain existing isle width for circulation and loading/unloading, the three adjacent
parking isles are to be reduced in length by two (2) spaces each, resulting in the total
reduction of six (6) parking spaces Secondly, parking data is to be changed to include
13 additional spaces located along the rear of Home Depot which had been previously
miscalculated and therefore excluded from the parking tabulations This decrease in six
(6) spaces, and increase in 13 spaces yields a net increase in parking spaces of 7
spaces
As indicated above, to maintain existing isle width for proper circulation and
loading/unloading space the main isle immediately in front of the building is to curve
slightly around the expanded portion using the width obtained through the reduction in
the three adjacent parking isles Staff understands that this addition is for a tool rental
center to be accessed from within the store
It should be noted that, although not directly related to the master plan, Home Depot will
be moving pickup functions for oversized and contract purchases to the rear of the store
to lessen the congestion in the front/main loading and unloading area This change
should offset the potential increase in loading/unloading activity generated from the new
tool rental center
Changes to Planned Commercial Development (PCD) master plans are reviewed consistent with Section
6 F 13 b of Chapter 2 - Zoning which requires that modifications to approved plans which result in an
increase of less than ten (10) per cent in measurable impacts, as determined by including any changes in
traffic generated, water consumed or sewage to be collected, be reviewed by the Planning and Development
Board and finally approved by the City Commission. The modifications requested result in no increase in
impacts above those currently vested by the approved master plan
RECOMMENDATION
Staff recommends that the proposed amendment to the Shoppes of Woolbright PCD be considered non-
substantial, and that it be approved by the City, subject to staff comments listed in Exhibit "C" - Conditions of
Approval
MR
Xc: Central File
\\CH\MAIN\SHRDATA\Planning\SHAREDlWP\PROJECTS\Shoppes of Woolbright PCD-MPMD 98-OO5\Home Depot Tool Renta~Staff rept MPMD 98-005.doc
oZ
PCD
--'~@f" l~#ACH
J I
,"" !....~~!.,- \ 1
~~~ '-
L0CATION MA~
SHOPPES OF WOOLBRIGHT P.C.D.
: f I p. :::trn. ~:~[~ -rr
_J U - . Ii
. ., - ~~UL
R L1illIIIJ ~..1
~f
EXHIBIT A
,
(,
,
I
'I
~L_--~.__
I r..=-..:. _
\l'g -.11 51
-GlF- =lS"~ <
I II I" i u;lni
I i ll~ ftl'
,'I i I
~
....... t:~IC-.~~f .- JoO~jS: 1- &
n 1~lii!iU ~1 U~~ ~Il
II ~,~i.~.o' &1 Uti I. g
~ 1'01: ." ~
;1 ., I {.{ ."";;:l{ i
~
o
o
n..
:z:'"
C:ll
~~s
~:z:~
!i-:;2
:IIJ>
nn
I!!:
i=
!>
~!l!l! g!'l~~
"GSl~ :~7e
Ill" &l~"-
N!:;i" ~~~6
l!jl!~ i~!!l"
~;8 -"J
I:~ ~!~
.9' >....:0
=;;:~ ~Oi!o
M_. in
Jofo ,f
N~ ~~
:; o~
~ . m
~ S~
m~
~'ll
EXHIBIT B
z i
* I
K" ~ ...
~~; i
~~i ~
..~ 1:1
g,.G) .
z"" .
.... III
"11I211 a
~ i~ ~
gg5 a
'0
.'JII" ~
.00 :I:
"..a '"
'~i ~
... ~
~t :
.. ~
...211 .
~~ 0
I~ i
.. .
o~ ~
i
~
z
!I
Ii
!I
t'
!I
iI
I'
R"
'L
~I~I
I!" Ii! :II
. =:r Ill"", is
:~~ li:!ll~
1;1 ~, Ijl~::!jI
'I ;;1 I!~ ~ J>
~ I ~j 1.0 n
.. I I z m
_ II i I: ..
i I . ;. I.. i:
~ ,\ 1 I ~ .
I :1'1: !='
I J I
i
lfiflfli !!U:"!f 1Il1!: p Ii r riJ i...... (/I II "Wil if f i ':'i1IW~i IIi' ,
II i~~=i . lid'. I' ' I ",". I"'" II ! i
~~ " I . ,d. I.~~ ~ ( ~
W "fUlIII! .I~ill~i ~m l I I j Ir!i E ;! S ~ I hp'UI~:' Ii I ~
. ~iU ~ "J.. " Ii i j II Iii .1 II nJII!WII !I';
.. ~mlUg <l1!;;I;1 ~ ~ I ! !~ II ~ ~ 8 ;
-\ ! i .J!l! Ii I .I!J~~~I.~ I I
\ ~J I \ ~.,~!" II'
llII lm~llllii!=i=i ~ III lr h'~1 . i I mlim~h Ii!
C! ii ,. ~ ~ ",:II , I ~ i I .. (
:mUUi ;lllli~i i I ~ ::. e; i I HI;( !
!';;~ ;II I~!;:" ~ !j i ( I "'~I'l'hq I J
'iiilu~ ... I ;lh mi ;1 - I i:!ii I In:' i ~I!' .. f
f(l!ll~ ~. r"e'. f
o E r ';1 'i '~ldl':1 I"
ftl~,.l ~::':.. ~! M ~ "i~l ~ It:~ H lt~ i
P N ~ '" = - i'Ii' J f I ~'"'lIl..~ 1 I
;;lll il~:J I!I~ :... il,)"Cili I (..\
. .. '"' N ~ !.j! . I !.I,""!" jI
PQ; ~ ! I iii ~~: I .i r
111~11i I~;iil Ii t~~;:Si ,. '" :~l'l J f! h~'i~'!Q' ~! f
- - u 'l;~( f
... b ... W - - '" N
lIS :i ;.::!" #i; & r ;:!~ I:.~. ~i
.. :m~ i : .h)'lIil~ ,( i ,..
.... ..
-- - 1 fJ)l; f 'I' j =" . ,
'I" 'rll;' ll' .". r'" I ; !i rr ~ "J ('l
z d co .. '\', I .n I!,:' 'I ..
0 \ I Ii' i~.;I; U' '~U~ f I" . '.' ~'I <J
::I. I (r1ilk! ",
::r .' Iii":; ~1QF'A.~.D2 :. _ _ ..\oN'.... "'-'I :..., f
_ e~ Iii: .rlll I.'. ~l i~~. ..
r -.. .....- 'Hi~ I f .' '~Ir.i I. I
II '" =, "
._.._ '. '/>I.it._ '".! I . or I.J": I r
", l! f " jn *=::;::.=:~:.!.'-::: ,,::~. - -. . mu J " . '... I i"
.'oJ ~;l .. ~ I .;il!r HI -I I
'1007"""" 'u......I.. I=.J" 1"o.o:.rw.-.. ~ ~%~h I ~\1 ,Io~ '"
4,. .., .- SHOPPES OF WOOLBRlGtfI' Kilday & _ia_ r i~
~ Architects/Plannen '~
W. ~ 1651 Forum Place
SUibiIOllA ~ ~'" '
ITON lEACH. FLDRIIM ~,~ ___. FIa!:i<Ia 33401
J ~."
c~i fl89.5522 I"'<
- :II
".;:5 -s;;;~
!3m;;.. 811:t
li~! ~:;~~
=ib ~h~
~... ~~
;lI~;; ~. ~
I~~ ~~~
~~I ~~
._; ~m
2'" ~000
Ii ~
"'~
8~
EXHIBIT "e"
CondItIons of Approval
Project name Shoppes ofWoolbnght PCD - Home Depot Tool Rental Center
File number MPMD 98-005
Reference The plans consist of 1 sheet IdentIfied as 2nd SubmIttal. Master Plan ModIficatIOn. File #
MPMD 98-005 wIth a January 28, 1999 Planmng and Zoning Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments None
UTILITIES
Comments None
FIRE
Comments None
POLICE
Comments None
ENGINEERING DIVISION
Comments None
BUILDING DIVISION
Comments.
I At tIme of permIt, I) submIt a survey showing the eXIstmg and proposed
property lInes located wIthm the lImIts of constructIOn, 2) provIde a
recorded Umty of Title that adJoms the property that the new facilIty IS
located on to the Home Depot property; and 3) show that the type of
constructIOn, fire ratmg of exterior walls and percent of openmgs m the
extenor walls shall comply WIth the regulatIOns speCIfied in Table 600 of
the Standard Bmldmg Code.
PARKS AND RECREATION
Comments None
FORESTER/ENVIRONMENTALIST
Comments.
2 The applIcant should have the SIte eXIsting landscapmg brought up to
current standards as part of the SIte plan reVIew process.
s
Page 2
Shoppes ofWoolbnght PCD - Home Depot Tool Rental Center
FIle No MPMD 98-005
PLANNING AND ZONING
Comments.
3 No surplus bUIldable square footage eXIsts on the restaurant parcel
known as Food Court. ReVIse master plan to show current approved
square footage for thIS parcel, 4,000 square feet, and reduce proposed
tool center by 290 square feet or further reduce the "Future Retail" sIte
by the additIonal 290 square feet.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
4 To be determmed.
ADDITIONAL CITY COMMISSION CONDITIONS
5 To be determmed.
\\CH\MAIN\SHRDA T A \Planning\SHARED\ WP\PROJECTS\Shoppes of Woolbright PCD-MPMD 98-005\Home Depot Tool Rental\Cond of Appr.doc
/bme
to
DEVELOPME~- ORDER OF THE CITY COMMISS---N OF THE
CII r OF BOYNTON BEACH, FLORIDA
PROJECT NAME Shoppes of Woolbright PCD - Home Depot Tool Rental Center
APPLICANT'S AGENT Steven Tate, Caulfield & Wheeler, Inc.
APPLICANT'S ADDRESS 7301-A West Palmetto Park Road, Suite 100A, Boca Raton, FL 33433
DATE OF RATIFICATION BEFORE CITY COMMISSION January 19,1999
TYPE OF RELIEF SOUGHT Master Plan Modification
LOCATION OF PROPERTY North side of Woolbright Road and east of the L.W D D E-4 Canal
DRAWING(S) SEE EXHIBIT "B" ATTACHED HERETO
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows.
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows
1 Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2 The Applicant
~HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested
3 The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included"
4 The Applicant's application for relief is hereby
~ GRANTED subject to the conditions referenced in paragraph 3 hereof
DENIED
5 This Order shall take effect immediately upon issuance by the City Clerk.
6 All further development on the property shall be made in accordance with the terms
and conditions of this order
7 Other
DATED
City Clerk
J:ISHRDATAIPlanningISHAREDlWPIPROJECTSIHamptons at Boynton BeachlNWSPIDEVELOPMENT ORDER NWSP.doc
7
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO PZ 98-339
FROM
TRC MEMBERS
Bulent Kastarlak, Development Department
Bob Borden, Assistant Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Officer Robert Riggle, Police Department
Pete Mazzella, Utilities Department
Michael Haag, Building Code Permit Administrator
Ken Hall, Engineering Division
AI Kim, Public Works Department
John Wildner, Parks Superintendent
Ray Davidson, Engineering Division
Bob Donovan, Permit Application Group
Michael W Rumpf, Chairman ..f1t.Jf\ !-t_
Acting Planning and Zoning Manager
TO'
DATE.
December 10, 1998
RE.
MASTER PLAN MODIFICATION
Project - Shoppes of Woolbright PCD - Home Depot Tool Rental Center
Location - North of Woolbright Road and on the east side of S W 8th Street
Agent - Steven E Tate
Caulfield & Wheeler, Inc
File No - MPMD 98-005
Permit No - 98-3593
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to the Director of Planning and Zoning
no later than 5.00 P.M. on FRIDAY. DECEMBER 18.1998. If yOU are unable to meet this schedule
please notify me in advance. When preparing your comments, please separate them into two
categories, code deficiencies with code sections referenced and recommendations that you
believe will enhance the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval
1 Use the review standards specified in Part III, Land Development Regulations, Chapter 3, Master
Plan Review and the applicable code sections of the Code of Ordinances to review and formulate
comments
2. The documents submitted for the project were determined to be substantially complete, however,
if the data provided to meet the submittal requirements is insufficient to properly evaluate and
process the project based on the review standards or the documents show code deficiencies,
additional data and/or corrections should be requested by the reviewer by contacting Michael
Rumpf
Page 2
Shoppes of Woolbright PCD - Home Depot
RE. Development Department Memo PZ 98-339
3 Each comment shall reference the section of the code that is incorrectly depicted on the
documents
4 Technical Review Committee member(s) shall identify in their comments when the plans depict or
when the location and installation of their departmental required improvements may conflict with
other departmental improvements
5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the Department/Division responsible for the review specified
6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to the Acting Planning and Zoning Manager The memorandum shall state
that the plans are approved and that they do not have any comments on the plans submitted for
review and that they recommend the project be forwarded through the approval process.
All comments shall be typed, addressed and transmitted to the Acting Planning and Zoning Manager for
distribution to the applicant. Please include the name and phone number of the reviewer on this
memorandum Michael Rumpf will be the Planning and Zoning staff member coordinating the review of
the project.
MWR.bme
Attachment
XC (Memo Only)
William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
Don Johnson, Building Division
Sebastian Puda, Engineering Inspector II
Larry Roberts, Public Works Director
Central File
S '\projectslShoppes of Woolbright MPMD 98-0051Home Depotl1 streview-plans
REVIEW COMMENTS (MEMOS) AND DATA
DEVELOPMENT DEPARTMENT
MEMORANDUM NO PZ 98-190
FROM
Chairman and Members
Planning and Development Board
?~Z~
Michael W Rumpf
Acting Director of Planning & Zoning
TO
DATE
June 19,1998
SUBJECT
Shoppes of Woolbright PCD - File No MPMD 98-002
Master Plan Modification (decrease in square footage on future retail; increase in
square footage on lot 2)
NATURE OF REQUEST
Bradley D Miller of Miller Land Planning Consultants, Inc., agent for the Morton Group, Inc. is
requesting to modify the master plan for the Shoppes of Woolbright PCD The Shoppes of
Woolbright PCD commercial development is located on the north side of Woolbright Road and
east of the L.W DO E-4 Canal (see Exhibit "A" - location map) The requested modifications
are shown on the proposed master plan (see Exhibit "B" - Proposed Master Plan) The specific
request to the master plan is to reduce the square footage designated "Retail" by 400 square
feet, and increase the square footage planned for "Lot 2" by 290 square feet; a net reduction of
310 square feet is planned for the shopping center This modification to the master plan is
being processed in conjunction and concurrent with the conditional use application for a 4,000
square foot restaurant called "Favorite Food Court" (see COUS 98-001)
BACKGROUND
The only characteristics of the master plan affected by this proposed amendment include
square footage and required parking These two characteristics are indicated below'
Existino
Proposed
Chanoe
Square
Footage.
Area for "Retail"-
Area for Lot 2 -
48,996
3 710
48,706
4,000
(-)290
(+ )290
Net Change (=)0
Parking Facility.
The proposed adjustment in square footage for the restaurant and retail
uses generates a net demand for two (2) additional parking spaces The
previous demand for parking spaces, 1,520 spaces, is increased to 1,522
spaces This demand for parking spaces will be adequately met by the
continued plan for 1,614 planned parking spaces
The Shoppes of Woolbright is part of a November 6, 1986 and January 24, 1990 stipulated
settlement agreement between the city and Tradewinds Development Corporation The City
Commission ratified the settlement agreement by approving a master plan modification on May
15, 1990 that depicted the applicable conditions of the January 24, 1990 stipulation and
settlement agreement. The agreement vested the project for traffic, water and sewer, so that
no time extensions for concurrency would ever be required, prior to build-out of the property, so
/
Page 2 of 2
Memorandum No PZ 98-190
Shoppes of Woolbright PCD MPMD 98-002
long as the total number of trips and peak hour of trips did not increase The settlement
agreement approved a maximum of 320,000 square feet, to include the following current uses
(which have been amended multiple times since the agreement and show the proposed
changes with crossed-out and underlined text)
Parcel
Tract "8"
Approved use
Cracker Barrel Restaurant - 9,970 square feet
Race Trac Gas Station - 3,040 square feet
Tract "C"
Lot 1
Lot 2
Lot 3
Food Court Restaurant - 3+4Q 4.000 square feet
Discount Auto Parts - 6,492 square feet
Burger King Fast Food Restaurant - 2,911 square feet
Tract "D"
Parking and circulation for Home depot
Tract "F"
Home Depot - 1 02,250 square feet and
Garden Center - 28,413 square feet
Tract "E"
Expo Design Center - 88,004 square feet
Future retail - 20,000
Future retail- <18,996 <18.706 square feet
MASTER PLAN MODIFICATION ANALYSIS
Changes to Planned Commercial Development (PCD) master plans are reviewed consistent
with Section 6 F 13 b of Chapter 2 - Zoning which requires that modifications to approved
plans which result in an increase of less than ten (10) per cent in measurable impacts, as
determined by including any changes in traffic generated, water consumed or sewage to be
collected, be reviewed by the Planning and Development Board and finally approved by the City
Commission The modifications requested result in no increase in impacts.
RECOMMENDATION
This master plan modification request was reviewed by the Technical Review Committee (TRC)
on June 2, 1998 Staff recommends that the proposed amendment to the Shoppes of
Woolbright PCD be considered non-substantial, and that it be approved by the City, subject to
staff comments listed in Exhibit "C" - Conditions of Approval
MR
Xc: Central File
S:\projects\Shpswool\MPMD\Shoppes MPMD 09-002
/}
0\
EXHIBIT "A"
:5
REC
-;:r.. . .lrA
~ l.. .. ,,_ r--
_ u .J ~-3---~" LU
I
~ --
EXHIBIT "B"
6'
Q :3
::) ~
a: ::
w %
~..J g
..J ~ ~
Co 1-0
~ Zlll
1: III OJ
Q E ~ I
II: en-'
al Lll >-
..J II: -'
o 1ii
o ::I
;: a
..
1::
'" ..! ...
..
g z~ :f= ~
-
w ;= S
> !!
~ II'
" ~E r."Oll.DQI.,J ~
z ~. OYO~"IYY "":)'S
~ "oi z
:
~
E
! ~
8 ~~_
. . " :..f-
!~~
h ~--,-.-:
!~'L
I~"
,I-J.-I . t~
-!--=li~
I -:::: -
JI1 I' ::1.-
J,I,II, i'~~,-
'11 .' II ... "'\
"I~' !: f"'~\ -:;;;::
, I .~-..~
il .: I
. Ii I, , 1
ii"l;/ I
t.l Ii J
! Ii". '!:P ·
~ :1 g
" r1
:1 ~
ik .g. 1,
,[ 6 !
,~ ,~ .i
Ir-. ~,..l"
'1
"
:1 I
1
e
.~
<~:
\ ~!l:
~,~:
I ;:;~~
1- ."'Ii..
... ~ ~i~ ~
~ ~
. ~ :
.;
2
;;z
cn<
w'"
cO"'
",<
"'~
C'=
u<
~.;
="-
o~
u::;:
<.-'
....u.
....~
~~
<~
...J
<39
w-
>-
~
....
c::
<l:
!.!..:
J:
...
UJ
...J
;:;:
<'
-Co
uS;
C/,";
>-
0:
..
i 0
z
=
0
..
ci
~
..
~
;iP
.~ I
,- I i
r!r4~ . /
I :i~ Ji- " LU ... I /1/
~~\ a:::!(I)~
I! '-.. =>r.::iB;//
" , ....., ..... UJ ..... ~ , _____
! =>a:~'$-/ /'
<
;;
c:~
!1.l-
UJU-
;;=
%:
-<'
5C
Q=
, I
I,
"1
I I
I
"'
\ u;
'-- ;; ::
c::::'
~p--
L..
Ll:~
ill.
5c
<,
Ut
=<
0(
0:
"
o
0:
..
W
"
0(
z
"
;;
0:
W
t-
'"
0(
"
i i i
i t 1
~ l;~l~~~ a:c ll:
S
13 tis s~
<I ~" ,,~~
~ i~ ~~~
~ _~ a~:
~
"
; ~~t -
~ ~uj !~
0: ~h !~
i&~.q
~~-~!~
c
.~
Co
W.J
UW
c(u
,.Ja:1-
11.:-z
I-:Z:c(
:Z:uu.
Qa:~
a::J
al:Z:
.Ju
o
o
;:
:
~
:O;~
~.
~~
.. ~;8
~~ 8~-
~" ~l-i~
1 ! I~
J i~~~
I
~
~
~
~
e:
~
C
..J
II;
>
OJ
Q
f ~
~
~ c.
=
0
e:
<.:>
<5
....
e:
C
:;
~~,,;
8.:\8.:\
&~;:~
~jil
"';.;
i
2
~
~ a
i !
~
EXHIBIT "c"
7
EXHIBIT "C"
CondItIons of Approval
Project name' Shoppes of Woolbright PCD - Favonte Food Court
File number' MPMD 98-002
Reference. The plans consIst of I sheets Identified as I st SubmIttal. Master Plan ModIfication. File # MPMD
98-002 wIth a Mav 13, 1998 Planmng and Zomng Department date stamp markmg.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments None
UTILITIES
Comments. None
FIRE
Comments None
POLICE
Comments. None
ENGINEERING DIVISION
Comments. None
BUILDING DIVISION
Comments. None
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments. None
PLANNING AND ZONING
Comments. None
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
I To be determined.
ADDITIONAL CITY COMMISSION CONDITIONS
2 To be determmed.
tbme
s:\projects\cond of appr\
?
DEVELOPMEr-~~ ORDER OF THE CITY COMMISS'-~ OF THE
cn r OF BOYNTON BEACH, FLORIDA
PROJECT NAME. Shoppes of Woolbright PCD
APPLICANT'S AGENT Bradley Miller, AICP
APPLICANT'S ADDRESS 298 Pineapple Grove Way, Delray Beach, FL 33444
DATE OF CITY COMMISSION RATIFICATION July 7, 1998
TYPE OF RELIEF SOUGHT Master Plan Modification
LOCATION OF PROPERTY East side of S W 8th Street, north of Woolbright Road
DRAWING(S) SEE EXHIBIT "B" ATTACHED HERETO
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows.
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows
1 Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations.
2 The Applicant
-1L HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested
3 The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included"
4 The Applicant's application for relief is hereby
-1L GRANTED subject to the conditions referenced in paragraph 3 hereof
DENIED
5 This Order shall take effect immediately upon issuance by the City Clerk.
6 All further development on the property shall be made in accordance with the terms
and conditions of this order
7 Other
DATED'
City Clerk
J'ISHRDA TAIPI"""9ISHAREDlWPlFaRMS\De, a"'~IDEVELqEtIT ORDER REV.do,
APPLICATION TRACKING LOG
PROJECT TITLE: Shoppes of Woolbright - Favorite Food FILE #: MPMD 98-002
Court
PROJECT LOCATION:
TYPE OF APPLICATION: Master Plan Modification
PUBLIC NOTICE REQUIRED: (YIN) 0 REVIEWER'S NAME
AGENT Bradley Miller ADDRESS:
AGENT PHONE: 561-272-0082 FAX:
DATE REC'D: 5/11/98 AMOUNT
RECEIPT NO
12 SETS OF PRE.ASSEMBLED PLANS SUBMITTED FOR REVIEW
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
APPLICATION/SUBMITTAL: DATE ACCEPTED:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
DATE DENIED:
DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
DATE OF SUBMITTAL ACCEPTANCE LETTER:
INITIAL 1 ST REVIEW MEMO: DATE SENT
5/14/98 MEMO NO 98-152
RETURN DATE:
5/28/98
UTIL.
- PW
- PARKS
FIRE
MEMO#
PL S MEMO#
POLICE
PLANNING
BLDG/ENGR
...FORESTER
DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW:
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
o
MEMO NO.
RETURN DATE:
2nd REVIEW COMMENTS RECEIVED
PLANS MEMO# DATE PLANS MEMO# DATE
UTIL. 0 POLICE 0
PW 0 PLANNING 0
PARKS 0 BLDG/ENGR 0
FIRE 0 FORESTER 0
BOARD MEETING DATE:
LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED:
DATE:
BOARD:
CITY COMMISSION: DATE:
DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE:
DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE:
S:\FORMS\TRACKING LOG FORM
revised 4/25/97
TO
THRU
FROM
SUBJ
DATE
PUBLIC WORKS DEPARTMENT
MEMORANDUM #98-135
T ambn J Heyden, Plannmg & Zomng Duec~1J
C Larry Roberts, PublIc Works Duector C ~
Mark LIPS, SanItatIOn Foreman
ill ~@mO\Vlrn ill
MAY21.
PLANNING AND
ZONING DEPT.
Master Plan ModIficatIOn - Shoppes ofWoolbnght PCD (Food Court)
May 20, 1998
The PublIc Works Department has no comments m reference to the Master Plan
j?Od.I cat on at t~e S ~pes ofWoolbnght. ThIS project can go forward.
U,
/cr
FIRE & LIFE SAFETY DIVISION
Memorandum No 98-260
~
:~:
TO Tambn Heyden, DIrector
Planning & Zonmg DIVision
FROM Steve Gale, Fire MarShal0~
Deputy Chief - Fire Rescue Department
DATE May 15,1998
SUBJECT Shoppes of Woolbright - Food Court
SW 8 S1., north of Woolbright Rd
MPMD 98-002
We have no comments for the plan submitted
CC File
oorn
MAY I ..
PLANNING AND
ZONING DEPT.
" rn 00
Recreation & Park Department Memorandum
1(0) m @ m II 'if} m Ii)
1111 MAY' 5 1900 ~I
To
Tambn Heyden, PlannIng and Zonmg DIrector
John Wildner, Parks Supenntendent h ~~
s/Iorl';;s o(C" WDO(.~ &/-Ir fJ c JJ
S /IS/1r-
/ I
From.
Re.
Date
The Recreatlon and Park Department has revIewed the above hsted plans. There are
currently no outstandIng recreatIon-related Issues. The plans may contInue through the
normal reVIew process.
JW
RECREATION & PARK MEMORANDUM
TO
Tambn Heyden, Plannmg and ZOlling DIrector
Kevm John Hallahan, ForesterlEnvlfonmentahst Vr~ ~
Food Court-Shoppes of Woolbright PCD
Master Plan Modification
FROM.
Re:
DATE.
May 18, 1998
Site Specific Requirements
I have no comments on the above proJect. The project should contmue m the normal
reVIew process.
Kjh
file
[D)~@~nw~!mi
lJ1) l MAY ~_8 i998 --" ~'
~ PL4; G hND
lON.\G DEPI
,
~
Ellanson, Beverly
From:
Sent:
To:
Cc:
Subject:
Mazzella, Pete
Friday May 29 1998 3 35 PM
Ellanson, Beverly
Guidry, John
Shoppes of Woolbright PCD - Food Court - Master Plan Modification
Beverly'
We have no comments or objections regarding this plan.
Peter Mazzella - Utilities Dept.
1
mmmow~
MAY 2 9 i998
PLANNING AND
ZONING DEPI
cr. , OF BOYNTON BEACH, FLORIDh
INTER-OFFICE MEMORANDUM
TO
Tambrij Heyden
Planmng & Zomng
DATE
051998
FILE
MPMD 002
Officer RIg~~ SUBJECT FavorIte Food Court ill ~@~n\VJ~ ill
FROM REFERENCES PZ 98-152
PolIce Department MAY 19-
ENCLOSURES
I have nocomments reference this purposed master plan modification. PLANNING AND
ZONING DEPT.
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. DO 98-142
TO MIke Rumpf Acting DIrector of Planning and Zomng
FROM. Don Johnson, Deputy BUlldmg Ollie,.1 A
~t John Yeend, P E City Engmeer
DATE May 28 1998
RE
SHOPPES OF WOOLBRIGHT peD - FOOD COURT
(MPMD 98-002) MASTER PLAN MODIFICATION
G=lli- is r~ ~ n ~1 ~ ill'
D ,., i..:l U .J
~ .
MAY 28 9B
PLANNING AND
ZONING DEPT.
We recommend approval of the request subject to the following comments
Buildin2 Division
No comments
En2ineerm2 Division
Close Ingress/egress on north sIde InsuffiCIent room for two way traffic [LOR Chapter 23]
MH/SP/KH ck
Xc Bulent Kastarlak
MIchael Haag
SebastIan Puda
Ken Hall
C \Iv Do~umenls'Shorres of\\oolhright PCD-Food Lourl. f\[aster Plan \lod..do~
- - m@mowm ,....
D, ~
Ellanson, Beverly
n
~l MAY 2 9 ..
From Mazzella, Pete w
Sent: Friday May 29 1998 3 35 PM
To. Ellanson Beverly PLANNING AND
Cc. Guid John ZONING DEPT.
Subject:
ry
Shoppes of Woolbright PCD - Food Court - Master Plan Modification
Beverly'
We have no comments or objections regarding this plan.
Peter Mazzella - Utilities Dept.
1
{:
f1 c ~ c:- I;:' ~.J
~..i l
~~i J.)O~
.~IA\V/:~
\.t\;~\oV
/ IA
S' ) (c~ ~V1J n<<-<- f
3 loc.J r.6 frt::1. '<:~'i~ Cf'7D~_4 ('
5G t'l/ ~Y' rf /'; /
/1-- 1 rj /
i ({ij r<!".-( ({e,.. Vl
P1~.L, f, c.. f7Cr'-. --
--~~ ---- -
~f 5 h't'1'c~ cf C--r_( C7#
7C0
r<.t..s -R-(-~~ r ~ 3... 7/0 ~ ;A .e:( C:cG c/
C;~r '-' ....(" (<:'~f..--+
d ~d~ rec:-c~", -f-K-~ / Y1 CF:~ pc..; c,-, (
.:I::;, c::. Y'"e'\.S e
~n.(; ~ c./I 5e r
./z ~ Ik<~
- ~
~0
f
BGO ,
/I... __: "L/
"- . k____
- ~ fA7v/::-'~ ~4tJ 15 ?tJ rI? '2
(;lor i fc t~ /C:,/Y
- &A-t-S Sfi; (C)cJ ON~(' 8<t Of-.J ~6-V <: u(o f(~5
/1
1
" Bu') LUI "'JJ~~
- q!
I3...l-J r I j _ _ . (;.tb.- S
---
I
hJ2! '22'"2 "\ ! tf 2-0 2- 2 L-
It' 1 . I 'J
S/<4f~-(.
~
J/t~ !L~ (o<'L
w
6';-.. 0'
~J / '2-
jVt,4..uJlf~ ------~
-,----
---_...--
--'
---
..' /I r~~
{JLAJ
D \(fe~t
---./~'
lf1~
EXHIBIT "C"
Conditions of Approval
0Itl'f1
Project name Shoppes ofWoolbnght PCD - Favonte Food Court
File number' MPMD 98-002
Reference' The plans consist of 1 sheets identIfied as 1 st SubmIttal. Master Plan ModIficatIOn.
98-002 WIth a Mav 13. 1998 Planmng and Zoning Department date stamp marking.
File # MPMD
I DEPARTMENTS I INCLUDE I REJECT I
PUBLIC WORKS
Comments. None
UTILITIES
Comments.
1
FIRE
Comments. None
POLICE
Comments. None
ENGINEERING DIVISION
Comments.
2 Close ingress/egress on north SIde InsuffiCIent room for two-way traffic.
[LDR Chapter 23]
BUILDING DIVISION
Comments. None
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments. None
PLANNING AND ZONING
Comments.
3
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
4 To be determmed.
Page 2
Shoppes ofWoolbnght PCD - Food Court
File No MPMD 98-002
1)R4tf1
~~~.\RTMENTS INCLUDE REJECT
ADDITIONAL CITY COMMISSION CONDITIONS
I 5 To be determmed. I I I
/bme
s:\projects\cond of appr\
EXHIBIT "C"
E~]' 11c-e-'/1
CondItIOns of Approval
Project name Shoppes of Woolbright PCD - Favonte Food Court
FIle number MPMD 98-002
Reference' The plans consIst of I sheets identified as 1 st SubmIttal. Master Plan ModIficatIOn. File # MPMD
98-002 wIth a Mav 13. 1998 Plannmg and Zomng Department date stamp marking.
v~ ~b
ucP AKTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments None
UTILITIES
Comments None
FIRE
Comments None
POLICE
Comments None
ENGINEERING DIVISION
Comments
I ~e Insufficle no for -w ~traffic
[L ~R apter 3 e... (, t-t-,\ E ;<.rr v N L-I
BUILDING DIVISION
Comments None
PARKS AND RECREATION
Comments. None
FORESTER/ENVIRONMENT ALIST
Comments. None
PLANNING AND ZONING
Comments
2.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
3 To be determined.
ADDITIONAL CITY COMMISSION CONDITIONS
Page 2
Shoppes ofWoolbnght PCD - Food Court
File No MPMD 98-002
DEPARTMENTS INCLUDE REJECT
4 To be determmed.
/bme
s:\projectslcond of apprl
LJEVELOPMENT DEPARTMENT
MEMORANDUM NO PZ 98-152
FROM
Bulent Kastarlak, Director of Development
Steve Gale, Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Officer Robert Riggle, Police Department
Clyde "Skip" Milor, Utilities Dept. Chief Field Insp
Michael Haag Building Code Permit Administrator
Ken Hall, Engineering Division
Larry Roberts, Public Works Director/City Engineer
John Wildner, Parks Superintendent
John Yeend, Engineering Division
~~lC,
Tambri J Heyden, AICP
Planning & Zoning Director
TO'
DATE.
May 13, 1998
MASTER PLAN MODIFICATION
RE.
Project - Shoppes of Woolbright PCD - Food Court
Location - East side of S W 8th Street, north of Woolbright Road
Agent - Bradley Miller
File No - MPMD 98-002
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments to the Director of Planning and Zoning
no later than 5.00 P.M. on Mav 28.1998. When preparing your comments, please separate them
into two categories, code deficiencies with code sections referenced and recommendations that
you believe will enhance the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval
1 Use the review standards specified in Part III, Land Development Regulations, Chapter 3, Master
Plan Review and the applicable code sections of the Code of Ordinances to review and formulate
comments
2. The documents submitted for the project were determined to be substantially complete however,
if the data provided to meet the submittal requirements is insufficient to properly evaluate and
process the project based on the review standards or the documents show code deficiencies,
additional data and/or corrections should be requested by the reviewer by contacting Michael
Rumpf
3 Each comment shall reference the section of the code that is incorrectly depicted on the
documents
4 Technical Review Committee member(s) shall identify in their comments when the plans depict or
Page 2
Shoppes of Woolbright PCD - Food Court
TO TRC Members
RE Development Department Memo PZ 98-002
when the location and installation of their departmental required improvements may conflict with
other departmental improvements.
5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified
6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to the Planning and Zoning Director The memorandum shall state that the
plans are approved and that they do not have any comments on the plans submitted for review
and that they recommend the project be forwarded through the approval process
All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning
Division for distribution to the applicant. Please include the name and phone number of the reviewer on
this memorandum Michael Rumpf will be the Planning and Zoning staff member coordinating the review
of the project.
Planning and Zoning staff will send the applicant a cover letter which includes the comment(s) and
directions to amend the plans to comply with the comments and the procedures for resubmission When
Planning and Zoning staff receives the amended plans, we will distribute the plans with a cover
memorandum to all TRC Members for review and approval
T JH bme
Attachment
XC (Memo Only)
William Bingham, Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
Don Johnson, Building Division
Sebastian Puda, Engineering Inspector II
Central File
S '\projects\Shpswool\Food CourtlMPMD 1 slreview-plans
February 8, 1991
7~
~ ~.J!fr~_
1~~
~.
~ ,
J~
f'f1l
~
BUILDING DEPARTMENT
MEMORANDUM NO 91-48
TO Technical Review Board Members
THRU
Don Jaeger, Building
Planning Director
Admin Coord of Engineering
Fire Chief
Police Chief
Utilities Director
Public Works Director
Parks & Recreation Director
and Zoning Director~~
Christopher Cutro -
Vincent Finizio
Ed Allen
Ed Hillery
John Guidry
Bob Eichorst
Charlie Frederick -
FROM
Michael E Haag, Zoning and Site Administrator
RE ISSUANCE OF CERTIFICATE OF OCCUPANCY
Safety Kleen Corporation
1510 Alpha Drive
Quantum Corporate Park
Roepnack Corporation
The above referenced project is nearing completion Prior to the
Building Department issuing the Certificate of Occupancy, I would
like to ensure that you do not have any outstanding or pending
issues concerning this site that must be rectified (excluding
issues that are covered entirely with a city approved surety)
If the issues are related to permits issued by the Building
Department, please provide this department with the permit number and
nature of unresolved issues If the unresolved issues are not
permit related, notify the owner or the owners agent to ensure
that the issues are rectified
please respond to this office within ten (10) days so that we may
proceed to issue the Certificate of occupancy Thank you for your
cooperation and timely response
Scott Miller
Don Johnson, Inspector
Kevin Hallahan, Forester
J Broomfield, Comm Imp
Bonnie Hall
File
SAFTYKLN SDD
1Q-~
FE8 II q I
fMAt,,,
" V/IVG D
EPr.
'\
~
5A-Fe T Y fr[ E E IV
CD [JrAFF~R- l>.siArs ;fe-o)Jt<. oH/,f L ({ k~J10,vJ
;J If Jr zA-j(j) 0 VLS Ii /r If: /< j:A-cs ;<;:5 po )JSr:: ?L ~/V J( 1";;;(;2 (4.~Rr<::L
- 10 1Jr-1.-- co)VT*:r Pit /:.JIr <9 F 5~R A-cze ;tiC E;f-S C f) -5" J
- o+~/culr-(~fi- SC5r>/rJ<IrTo~!<.t::Q rA.FJ(~[) f~/< sr('J~Jtw~/~-=;e ;2UJvo ~
(firRf::J"N(i A-R~ASJ ,RV\Nw'-+YS>;RJf--J'{f-) j)ocf:~ -m.+ksf~eR. Jr-;2J.>ts)CP-/5J
5. ~E F:r( wr;{ (Jo[3S fc-+)/ CO/ijJc y: ? J .-
f~)/It--)j C+kL Rf35foNs-fB;rur- 7
/),0.. -:> ;)/35+fA..Nr-OPf:)(/"j;p:;AJA-L 'YE/t5(,{ICf5s To (oA./K:;:-;V
fl-ND /); J2 ~cT co/vi-fr-.Ili':;rJJA:-/f:: fj.sC(~FA-ct: /2 fA A/O P= r;::
A- w Jr- f ,F)2 0/'1 j;Jo)J D'!:'J c A->>A-- CSJ E)L.
~
e~
~ -,. -
:3 .~ j);<or!:c'r /0 }fJSelA-U(~BQu.:r-J:I5AEkt.s or:::
~ /~ ,./- ~ It f '__~~ ~\.1r~ L.../~.- .4}_ ~,'
1 "::" ,
~j , L_
1..L
~
I
)/rFET'l kLEcIV
_7a.~k f~vM
. r (' )1 /\)1) ~ I
A f/ l 'I. V'- J~ > "'- ~ " ,,~ ~_J "" c Vv / J: / '- /u {<TJ VL f "-I VI me t1 r
f\.
~.(/ ~ ~ L ~," "L.r c-
S / <) \- "J~, Q ~ V <( · '" VL~
5 I (v - v- fJ ~ ~c
C1 fA f. · ~ :J ). C !/;: I 5 , · 'lJ ~: C 1/ Jr ("f I U lA/,' r 6 (
;C' ( () >'l J " / (' 0 V\. 'I. / vt IN!. (' VL t f VI ~ /' ~ l..! "- ~ J./ <. [ (' I< I Y- 0 J.- L It
o J5:t (..l ~J c/JJ{ovw< t. C ,< (.' ~ ;- leo, H ~
'--"
~ I . . , ,
c L ~ (~c (s {/U ~ ,,<- h (~ .' c- ~ f- [/" t ~ ~ fc ~, ~ I
) J r r' I -t
V 0 I \d' l<:.- L 1 ^ < ~, :J 0" - >,' 'I- ~
STAFF COMMENTS
SAFETY KLEEN AT QUANTUM PARK
NEW SITE PLAN
Building Department See attached memo
Fire Department Memo to be distributed at
meeting
Engineering Department See attached memo
Utilities Department See attached memo
Police Department See attached memo
Planning Department See attached memo
Forester/Horticulturist See attached memo
memorandum
To
Carmen Annunziata
Planning Director
Date
January 3, 1989
Subject
SAFETY-KLEEN
SITE PLAN APPROVAL
From
Mike Haag
Plans Reviewer
Building Department
As a condition of site plan approval, the following comments should be
incorporated into the related documents by the applicant
1 Raised seal, signature and date of architect of record for the project
required on the plans
2 Project to be reviewed by County Health Department
approval
Provide letter of
3 Require letter from South Florida Water Management District stating
approved finished floor elevation of proposed building
4 Identify on plans height of flag pole
drawings of flag pole support
Include detailed construction
5 Show on plans elevation of door entrance stoop and slope of entrance
side walk Must comply with handicap code
6 All signs must comply with the overall approved Quantum sign program
7 Show on plans detailed drawings of dumpster enclosure
8 Provide letter of approval from appropriate utilities in regards to
erecting fence within easement
9 Building and appurtenances drawings to be designed in compliance with
Standard Building Code 1985 Edition and all other applicable codes and
ordinances
The applicant's prompt compliance with the preceding comments will insure
a timely permitting process
~~-
_J
mh eaf
cc E E Howell
BD12/88
TRB MEMORANDUM
DecP'.."l ~~ 3 ~iltl
To Jim Golden
From Bill Flushing
Re Safety Kleen at Quantum Park
1 The storm drainage inlets should not contain water so aE
to create a mosquito nuisance A 12 inch mesh covered
cpening should be provided in the bottom Three cubic
feet of 3/4 inch wash roch should be placed below the
cpening
7i:t1iL;":j
Blll Flusnlng
cc Tom Clark
MEMORANDUM
Date
Carmen Annunziato, Planning Director Cl \
John A Guidry, Director of Utilities 1,)v~
December 30, 1988 ~
To
From
Subject
TRB Review - Safety Kleen at Quantum Park - Site Plan
We can approve this project, subject to the following conditions
1 Add a gate valve just east of the fire hydrant tee, which is
to become the City s control point on the fire line
2 Indicate utility easements over the water main to include the
fire hydrant, meter, service line to the meter, and final gate
valve just east of the hydrant assembly
3 Indicate a double check valve on the building side of the
City s gate valve Double check valve shall be a Watts, Febco
or Hersey model
4 Indicate a reduced pressure backflow preventer on the domestic
service line, to be a Watts 909, Febco 825Y, or pre-approved
equal
5 Specify type "K" copper on the water service line from the
main to the meter
6 All sumps within the building shall be self-contained, with no
outlet Provide sufficient details on the plans to illustrate
this
dmt
bc Peter Mazzella
REcrIVED
'.\ !; ['-Ij.
, __;:>T
--------- -
MEM()RANDUM
TO
DATE
Mr James Golden
30 December 1988
"ILI:
FROM
~U.JI:CT
Lt Dale S Hammack
Safety Kleen
As per our discussion at the Technical Review Board on 29 December 1988, I
am recommending the following
1 Comply with the city's construction Security Ordinance
&{)aU~~
Lt Dale S Hammack
DSH/cgm
M E M 0 RAN DUM
January 4, 1989
TO CHAIRMAN AND MEMBERS
PLANNING AND ZONING BOARD
CARMEN S ANNUNZIATO, PLANNING DIRECTOR
RE SAFETY KLEEN AT QUANTUM PARK-STAFF COMMENTS
FROM
With respect to the above, please be advised of the following
staff comments
1 All applicable requirements of the document entitled
"Hazardous Materials Contamination Response Plan"
prepared for Quantum Park in accordance with the
issuance of the Development Order must be complied
with A note should be placed on the site plan
which states the above
2 An appropriate sign should be placed on both sides
of the pipe bridge which indicates the clearance
for this structure
3. Full details on all containment structures such as
curbs, trenches, sump pump, etc to be provided
4 An Environmental Review Permit must be issued for
this facility prior to the issuance of a Building
Permit.
5. If the existing native growth within the Boynton Canal
is removed at some future date for maintenance purposes
by the South Florida Water Management District, the
proposed landscaping will not be adequate to screen
the industrial development from the single-family
neighborhood across the canal to the south The
proposed plantings should be modified to provide for
an opaque buffer in the future, should the native
vegetation be removed The City's Comprehensive Plan
recommends that maximum buffering be provided
between industrial and residential uses through the
site plan review procedure
6 An additional twenty (20) feet of landscaped area must
be provided within the Boynton Canal right-of-way to
meet the forty (40) foot wide greenbelt required by the
PID zonings regulations.
7 Buffer wall is required
I"-
c~s ANN~
CSA ro
cc Central File
M E M 0 RAN DUM
TO
Carmen Annunziato, City Planner
FROM
Kevin J Hallahan, Forester/Horticulturist
DATE.
January 3, 1989
RE
Safety Kleen At Quantum Park - Site Plan
Lot 46B
The applicant should provide additional landscaping to visually
buffer the site in accordance with the following.
(Code of Ordinances, new subsection Page 615)
1 A vegetative buffer shall be preserved and/or planted, so as
to provide a screen with not less than seventy-five percent
(75%) opacity and not less than thirty (30) feet in height,
within five (5) years of the date of approval of the
particular plat or site plan
_X~.4('~-~
Kevin J. alIa an
Forester/Horticulturist
KJH ad
DOC.SKLEEN
REVIEW COMMENTS (MEMOS) AND DATA
STAFF COMMENTS
SAFETY KLEEN AT QUANTUM PARK
SITE PLAN MODIFICATION
BUILDING DEPARTMENT:
See attached memo
FIRE DEPARTMENT
See attached memo
ENGINEERING DEPARTMENT:
See attached memo
UTILITIES DEPARTMENT
See attached memo
PLANNING DEPARTMENT
See attached memo
/:J;~.r.::,:
w
. .~
~}
;;.t
.Jjr.
......~
~/,.,;
,~.
T1"~9,:~/.
1-
'~.
rr
i
,."')i
.
~f,l.:.;
;1
:W:ti~, r
<.t'4i::.
'J.
't,
, :;.'(Jt;.,j'
{t ,'~r .~ .
:., 'J
4:.~}~J ;; ~t
",,~,), .J.
"::t, 't,
\
--'-..~-
=~:~,
....~..
~:":"f..&..:...:
MEMORANDUM
September 6, 1989
TO: Carmen Annunziato
Planning Director
FROM: Mike Haag
Plans Reviewer
RE: SITE PLAN MODIFICATION - SAFETY KLEEN
The following comments must be satisfied by correcting and/or
clarifying existing drawings
1. Show on plans a full section dra~ing of the site wall.
Drawing should include a description of all materials, type,
sizes and spacing required for structural integrity (include
finish material and color).
2. Show dimensions of the site wall from all adjoining property
lines (min. 2 feet).
3. Show on the plans the finish floor elevation measurement of
the entrance door to meet Handicap Code requirements of 1/2"
maximum difference
4. Show the dimension of the proposed free-standing sign with a
minimum setback from the property line of 10 feet. Sign
must not encroach into easements.
5. Show on the plans the 40 foot peripheral green belt in
compliance with the overall required P.I.D. perimeter green
belt.
6. Show on the plans that the future expansion area will meet
the Landscape Code requirements for lawn grass and
irrigation
-/~ p /-4-
Dike Haag
MH: bh
XC Don Jaeger
SFTY TRB
./ ,;~.~ .,
:.,;
J
j.
'y
l~ ._
;.~,.",f
;J.J.
'.I: ""J,;
~>:-
J.__
t.. J
~:,r
: :::.;;/ \.
;:(
...
;..
~.. ....
TO
Ffi.OM
RE
.(
1- Move fire hydr3nt, shown ne,t to the building, 3t least
201 aw~y from th~ building
-J.;
'\
~
- :15 .<
~. ,.
2- ~ince ~~fety kleen owns the lots 3nd connects between
Alp h a and 8 Eta D r' 1 v e s, ::;1 P 1" i v '1 t e t i I' e 1 i n e s h .3 1 i b e con s t r u c t e d
to connect with fire lines on those two streets
'i,:;-
iL~').
'Y,~' i.;'
ii'. ~_
.. .f :..
,~~-
~";~;.f..,.
~~1r
"{
~';~-
.~~~./.
Jl~' l.
3- ~hould :3fety Kleen requir& security g3tes the follwing
standard for security 33tes shall apply
J.
)..
"f,"
!'
.$
~r.;I.
.,;. .
~i
:;.1:
h
~-:..i
'1:;..:~, ( P,'
.J.. ,t'*~ ~ F To'
.,::"- (, ,I.
~; ).. ~1rY. )1. ~1';';1
I :~";"di: ~: i<<;;r "i. I~.;;\'"
~~'-#"",;":::r_ ~" ~'~l .~5:t .~. f'
;5fW?; ~::- ~i. w!.J#~'~ .~
~.,. '-"'I.'" '1:"" -',.
.~~:~C~"Ji~>2.:;~/ ~~~ ~:
f F_;:~{i'l'n. . ~~.
.'t.J...
~,
~.
-"
":~:"#
J;'"?:il
,.
.<
?eptember 7, 1989
MEMORANDUM
lim Galeen, P13nnin~ Dep3rtment
~
w
D
:~v~n3u3h, Fire Dept -TRC
Rep
~afety Vleen ~t QU3ntum Fl~ce
1- Gates shall be openable by telephone, with a call
from Centr3l Dispatch Center
2- When the gate is opened by the call from Central
Dispatch, it shall remain open until the emer'gency is
over, at which time Centr'3l Dispatch will be told, by
Otficer in charge, to close the gate
3- In case of a power failure the g3te shall open
autcmaticEJll Y
4- Appropri ate "Hol d Har'ml ess" ,::tgr'eement r'e
gates equipment, Ate
damage to
II
;;
~
~'.;.\.
. '''\'
;j. ~f.(-
:, _, ;~;h..
,. ,/~
. . :~t ~6i'~
(~~
;,<<~~,
. -'~/:f
1:k
I
i
i
I
I
~
~
;s
.;;.
(.::
:~
~;
MEMORANDUM
September 6, 1989
TO
Jim Golden
Senior City Planner
VIA
Ann Toney
Acting Engineering Administrator
FROM
I
Roger Kuver
Engineering Inspector
RE
TRB Comments
Safety Kleen at Quantum Park
1 Parking lot light poles need an imbedmept detail and an Engineer's note
certifying the structures will withstand 120 MPH winds per Article X,
Section 5-142, 5-144
2 Revise handicap striping detail by replacing the letter "Hit with a
standard wheelchair symbol
3 Handicap ramp detail is required
4 Provide a signed and sealed survey from a registered Florida Land
Surveyor that is no older than six months Section 5-l44(b)
I
5 Driveway approach radii are not indicated on plan Minimum standard is
25 feet and must be shown on plan Section 5-l42(h)
6 Provide drainage calculations by a Florida registered Engineer that
meet the requirements of article X
7 South Florida Water Management District permits or exemptions are
required
~4
-
F:I.../ck
I I
I
,.
{" i1!
~. ~:: i~., 1~I~J.t~:~. ~.;:..4
f $_ r~ #}t.~f;Cs!-.t.~
'.!- ;_..~. '~X~'J);.~$. ~'li
'f .~. ,<:~. ':'.!5' :(..}t':~i.,
~ .'.;:. ~ ..;y/.z.;~~,
'l:. i'" ;':l:~:l-Jj..&.;. ;.o,oo;~'
,,,,:' . .~ 7,).r. ~:~:r' ~?:l
i' . ->.....,.. M -].i-/.'
). i )~. :'*;?~ I Iii '~i~ ...
~. ~~..f(:;SJ~' :}~. '~~
J;~l
I
'I~:;l
"i.:.'-'_
:':i.';-":"'f
~o/,~?;.4~.f.'.~~ ...
;-::::.' .
;s;/i~4~. .~~~#. .~
...'.f.JJi..t.~..~.
~ -'yir'.~;t:_~
~~... ."...:':-
i.-'~.!)~,~f.
I~~
;:<"1".
MEMORANDUM
TO
DATE
September 6, 1989
FROM
Carmen Annunziato,
Director of Planningc
John A Guidry, \ft\.
Director of utilities r
SUBJ
Safety
sion
TRB Review -
Kleen Site Expan-
We can approve this proje9t subject to the following conditions
1 Provide fire flow calculations~ including an allowance for
domestic usage at park build-out, in support of the water
distribution system design
I
2 Relocate the fire hydrant away from the building, preferably
to the grassed island in front of the building
3 Relocate the double check valve assembly to a point
downstream of the City's control gate valve on the fire line
4 Relocate the water meter to a point closer to the water main,
in a grassed area
cmd
xc Peter Mazzella
r
MEMORANDUM
September 7, 1989
TO
Chairman and Members
Planning and Zoning Board
FROM:
Carmen S. Annunziato
Planning Director
Safety-Kleen Site Plan Modification
Staff Comments - File No 297
RE:
With respect to the above-referenced request, please be advised
of the following:
1. Since a final sign-off for the original site plan approval
has not yet been received, previous staff comments not
addressed with this submittal shall remain outstanding.
2. This use has been reviewed by the Environmental Review
Committee, but the environmental review permit has not been
applied for through the Planning Department and will need to
be issued prior to issuance of a building permit Once the
environmental review permit has been issued, any changes to
the use, such as the future expansion, will necessitate an
amendment to the environmental review permit. Appendix A,
Section 11 3(C)15
3. Label the colors of all structures, including the buffer
wall, on page A-3 of the elevations.
4. Add a note to the plans that the parking lot lights along
the buffer wall shall be shielded from the residents on the
south side of the canal so as not to create a nuisance.
Appendix A, Section 4(N)7.
5. The building coverage indicated on page 3 of the site plan
application and sheet SP-1 should be amended to reflect the
gross floor area of the building footprint of 17,008 square
feet. Appendix A, Section 7-H(7).
6. The total industrial square footage is 11,344 square feet
and the total office square footage is 8,100 square feet
based on the floor plans submitted The gross floor area of
all the buildings and structures is 19,444 square feet.
These figures should be corrected on sheet SP-1 and page 4
of the site plan application. Appendix A, Section 7-H(7).
7 Based on the square footages in item 6 above and the parking
requirements established for combined distribution/ware-
house/office uses at the Boynton Commerce Center P I D ,
this use would require 41 parking spaces calculated at the
rate of one (1) parking space for every 800 square feet of
gross floor area for distribution use and one (1) parking
space for every 300 square feet of gross floor area for
office use. The parking rate applicable to this use has
changed since the original approval as the percentage of
floor area for office use has increased above 25%. The
parking calculation should be amended on sheet SP-1 and page
4 of the site plan application.
8. Provide details of the curb containment area adjacent to the
tank farm building where trucks unload and load their
contents. Appendix A, Section 11.3(C)2.
9. The percent containment of the diked wall surrounding the
storage tanks should be indicated on the plans. Appendix A,
Section 11.3(C)2.
c~! ::::t!:/fJL
TJH frb
SKleen
:.;,
}
~
'I
~
.,-..... 1Ft-
: ~~~,.
.'~ ;irJ:.,
-~.
r,.$ ~'::~~J:
~ .~~:
:.. .-~~i:
<#l:' '(<
? So ~.
;N
~ 0$;:
~.
l~. ~
... ~
.-' .. J:i-
. J
:.,... .. ,V-
;.~t ';
~,...
.~<< ~ .\?;:
~. : Y;"
....~~ '("-
,'.v
s.~',
"Yl"
...
,?,
;j
~
x.
J...
t
~
~
~.L.
1-
f
x:
r:
f
~
}111
;~ )
;$
~.<%
".;{' 4-
~~~:
//
'.~~,i2
"Ii- ~
.,~W?
::"~;6 -'..
~lD
.~
; I:
ti titi ti titi Ii lilititi titi iiiU -.{"
. .. . U 0 .... u ;-I~ 0 -f".-.' :.:
.. ..... ....~ i .~.. .... .il..... a
.. ~'-.;
o i -.1
..
2 l~~~.
.; 0 ~.
:; 0 ;~f(
:1 ~ <;:1:
i! ! Alii I ~.~.'
ii I "111 ~.
I.. ,.....
'.....
"fS.
fn':~'I!~ ..IJ.I :il~ ~.
I ~. :j ~IZ r
It ':'7: ;;1 ~i
I '\.. I .::
!''''~I I "'i.1 !l!i
-"1.,; ::... .1
CIlI
co.
.......
It) ,
N:
......
CO
~ . i. I
" 11
!d I~ ~
'.JOJ I SiH
;::~
...
'r:' ... z
VOllf01.::1'H:)VlIB NOJ.NAOB ')lIlYd W,"J.NVnO ... Cl
~31.N3:> 3:>IM~3S N3:11>l-A1.3:fVS ;~oa!Q.Jd ::~ i?j
...0
,
~ I
i i .,
! ,i
;10
~
I
~I .
.; ) i
I ......-
/ ,
/
//
/
I." ..
~~ :1'
Ii;,'- : '~l i
1
~f~: ,"'fll I
1.1~ "511'~ ~
li '
oil 1;J. !
: ~t .
1j,! .~H;l
\
n. 1
J
I .'
...
{Hett
I Hlill
tU.eo
g!l~1
&!talu
", 'Nlon 'NOIUM04MOO NI.,lI-UJlYl
1
~. .- .... I.' · 2 ,: ..., I'
'i -i ~ 1m ~ h.~ ji ~. ~ ~I
i' !, 'I !i'~~ il :!il-I. ~i! I:~! ~II~I
~I iI II i:fii:5 i;!;! I;I~ ~;. ~b. in
~I is I ~~I i 'eIIQI~! ill;! M. !i:1 =i:d ~2'
Ii - ""-. ".. 'I .._on '.S I_I - ias.
n~ iil' 5 .!~ ~ "1-):;: I~~~; 1:=;11 ililll'.~i
i'~ I: .1 s;!; ~~i! I! lii:- !~~! i~a i' I Ii;!
; .:, ;1' II!I !~ 15.:r h. lid!. nli !u ilil,1 il,11
In I!i i 1;1 idd ;Ii i.Hh iliil m ..iUd:.
...I ...c 01 .... .: ~ ~ ~.
--.-+ _.
lI^,~Q Y:~~B ~'. J r~ -,
- - - -..., / . .~ I
10' /
.~. " ,/ o' 1
::~ '" '- --\~ :
m f m I:L
--~~ *~--~~-: I
::l 1, I
.J 1~i1 I
____- 3~,a I
1;<1
.ii. I
.I:' ..
I
i
,li',
'\
......
~f
'ff:-
"
~
l~
~(.)
h
----
.--
..,
I
--L
I
I
I
.
.
.
.
5
.
i,
t
i
I
".. ii
.,....-T:'.
. ._~........
.._,....." ,.
i^,tlO VHd'V
~~
!
1,-
"'"
... .
:~.
....~..
..J
C
Z
---c.
I).
.~: ~:: ": ::::
\i .Ii i S. i :;;:io so
.
:i ;_
c ~:
~ ~!
I) ;.
z ".
o ;.. i_ i! ~
!E !~, il (i Ii I!:'
; ~~ IH;qml
s ~ ~ H ~i l~ Ii m;
iii
u.
U!
u'
u!:;
WIt
::.::.!...
;"ii
ii _!!u
lit..
It ii!n
f~ lUll
:
,
I)
ci
:i
~
"-
en
HtD=r, ',. 1 i';': ill
e ~~:
'" ..,
I II ~I
I ':;;1
, - r
LC ~ATION MAF
SAFETY "KLEEN AT
QUANTUM~, .p"A8K
~"'(~~~;'Q' ." j~.'.._.,,--
:C:e:l5~ .. ~ =--.. ,_ .
.' 00-'''...'-.-., . .
c;:;:.."\. -woe , I
~~.
~l'l ..
r- l.
. . ....-..~::.;.-l.
. .
'\ 'j
:.. '''c I ! 'I
oooc:lP"C l.~ ·
n.l .. __
..
,
.'
:. -,.
I .' I I
, ..
. , .
,I'. . '.
. \ ,I:'
, ,
I
,
.
. ..' .t. l.,';..~ r.. ,
. It' \ ':,',
rc,,'.~'~ -.0.
I, /I ~~)T-~w
III ~:J~
-
. .......::::....... -......... .... .... M;c.. ........ ... ....
.---......,......-. --~--........
t ~~~.oc:..:n&i:r2~..J.:lv..,: ~i,,~f ,tl":." 'J~''''~.u:.:t~...wut ';',... """.
I
..
.. . ..- · ...:;r-'''' 1M
0 -.-. -.-
........ .... ....
, -..,-. .......
I. .......... . .. . r --,-. ...-
, , -- ....-}-
~-" ... .... ... .....
1'1 ........ .... . ......
....- . ......
..... .... ... .............. --
- " ""0
\
- ,- ..- -
.
'.
M
..
, I
.
I Ovantum Assoclates
nT Ar.DAM "R"
~~~::,~'~c:.~t~..-
. -- -- ....... "...... ......
- --... -... ........
'j M" ~=~'1:.-=-_-t..~
~M .=--=::'~~
./.;.', ./ .,. ';~-t... . .,' ,"~.f'~ .. ,. '~''''\ ," ..
I .:J'~"'t'" to ...... t":'..~_ ':.:. .~"":.~~-.:....! ,.\l 't '''. wi
,
.-
fLANNING
D E.P,
I-se
M;~
zJl~~ - ~ ~, SPf-i
'/
.~~%~~-~%_~
~-~~~~./~~~
~~.-~~~
$ ~, ~~~
-;-~ / '!fBi' ~
:If CY'T' ,"" / {hG t1.- /~ V '
rltt ,4~-;j (?-). -r. - ~
I 'h- ~ eC1.Gt\ Z el111&jtes
11~5
/ Idrfi~.~~,~.&k
/~ ~ a Su 1-;-1 -{1)~ (~h
') ~ [91A (Ot9t.9 f-J GF:A~
t,v11J ~ -" . " @!5'
It.-QcD "If / 7&"(:;)' ~.... . s 7~ == 3' - ~
~ . _;2t1.3~~Ht1iC~..... ~oll.:f).F8Cc . 3€r7 J
~'I~tr 'fJ!, /, t' ? -3 b -fr; -/1;../' {6 l?o 0 .fflJo r I r 3 (..~ 'r;;:
(J ~~ ~ -J 2- ~ ~~ j~~ '{.f-:o~ I ; ~i-4 G
/ --.r g l ~ /q 14<<-I{:1~ ~~.G 0 ,~,
- ry :1L 0 C) 3,,-40
'11W?~ /! 1 ~ 'Y? w<> 0
~~ F -iL/' ..l~Tf<!r:z.. vuPC / ~ ? J tF
r tL ~ (~f/#p ~F'~
% 130. ~r % ,&>-~ <he ~~
a-'L€~ 'i- ./r; Y3bI/J A d_ ~ ~ /~'- ~3
e~c.. f7:J sJ ~ t;&Jyre.dif-+ p~ sP-Y ~
~;l-;}- ~(. ~ d-. - d.r (; ) ",
/~~~-o/jp~
(!J:36~ ~~ ~ ~ ~~ ~
~,a0(R-1: c-/~ ~ h~~
tiff Ji/yff<: ';f (N) 7 tL ~
~ ~<<tdd- ~ &-rL. /;; ,4- 61 'If ~~
t.~'-u~~
~{ It? bj{ef/ tJf(? ~ c~. ~ ~_
y~ .! -
aMr~dv 1 ~7z!4--
(j[)Ai · ~ - - ·
vs~, & f_ '~~~
~ df~/'~ ~
~ ~~ ~~?
\.\l\fv 1;;2 ~~ ~'* ~..' ~
C!L11 (&vt,-:a:- ~ {q-(l(/~
(;:; ~ ~.-
I~~.~
(P' ~.
--
r4 AJ.l .,)/u ~. . tl.cfi2 - ~ 1D ~~
fer - ~ -
Vl~ IS. ~ h~~~~~:C?
~ jj I .~u.d- ~ -IAf7J/J L L-.A '"
$e- 9 / J .. ~~ . 1. ;' - .,.,. . '-'V ~ - Y7J ?
C J-(- I .~ t ( ir~. Qu.b-1~_~_
trY A fed 1/,4 10 / ..' .- .? F(/V--
(Oc~-htn1 /'5 /~r-r~1/~ iJlnn~c( ~
. . ( I 7
- (11 is !Jfll ~~~1
--
..-----
.
()~ 4".~ #~vk~
6, v. ~ fu~ f-- a-erz~ Ih- ~61" "'-
tu1-:UMAI\L kfv --- ~ !iow~