Loading...
REVIEW COMMENTS 7.8.2 SEMSCO INTERNATIONAL OFFICEIWAREHOUSE NEW SITE PLAN DEPARTMENT OF DEVELOPMENT MEMORANDUM NO PZ 98-268 SITE PLAN REVIEW STAFF REPORT FOR PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION September 8, 1998 DESCRIPTION OF PROJECT Project Name: Semsco International OfficelWarehouse Property Owner. Underground Supply Associates Inc Applicant/Agent: Underground Supply Associates, Inc /Lawson, Noble & Webb, Inc Location. Lot 15, High Ridge Commerce Park File No. NWSP 98-012 Land Use Plan Designation. Industnal (I) Zoning Designation. Planned Industrial District - (PID) Type of Use: Warehouse/Office Number of Bays: N/A Square Footage: Site Area. 55,170 9 sq ft. (1 27 ac ) Building Area. 4,500 sq ft. Surrounding land uses and Zoning District: (see Exhibit "A" - location map) North - Commerce Road, and farther north a vacant lot zoned PID South - Boynton Beach Waste Management Distribution Center, zoned M-1 East - Vacant Lot, zoned PID West - Amerope, zoned PID Existing Site Characteristics: The site is currently a pre-cleared, 1 27 acre lot. The western half of the site is predommately vegetated with a vanety of overgrown grasses, and a small number of exotic plant species including Australian Pines The eastern portion of the site consists of open and eroded sand trails and pits that appear to have been used as a recreatIOn area for off road vehicles To the south of the site is the waste distribution parcel and its respective landscape buffer which provides some / Page 2 Site Plan Review Staff Report Memorandum No PZ 98-268 Semsco International OfficelWarehouse Proposed Development: Concurrency- a. Traffic- b Drainage- Driveways: Parking Facility- Landscaping: Building and Site Regulations: screening for the proposed use There is no other vegetation of any significance on the site The developer is proposing the construction of a 4,500 square foot, 16 foot high, one-story Warehouse/Office facility, with related parking (see Exhibit liB" - proposed site plan) This business stores, sells and distributes utility pipes and related aquipment. Based on the Notice To Applicants For Approval Of Land Development Orders Or Permits, projects with proposed traffic generation rates of less that 500 net vehicle trips per day does not require a traffic report as part of this reVIew process Further reVIew of the proposed use and its traffic generation rates is required of the Palm Beach County Traffic Division. As a conditIon of approval, the Planmng and Zoning Division requires written confirmatIOn from the county that the project will comply with the county's traffic performance standards ordinance Conceptual drainage information was provided for the city's review The city s concurrency ordinance requires drainage certification at time of sIte plan approval The Engineering Division is recommending that the review of specIfic dramage solutions be deferred to time of permIt review Proposed on-SIte traffic circulation conSIsts of a 32 foot wide entry drive aIsle, from Commerce Road, leading to a 30 foot wide drive and access gate adjacent to the east side of the proposed building The gated drive leads to the rear of the site where the outdoor storage area is divided into three, 15 foot access aisles around ground level storage areas Before the gate, at the front of the building, IS a perpendicular 27 foot dnve aisle accessing a thirteen space, dead end, parking area which includes one handIcapped space The parking area is made up of seven standard 9 feet by 18 feet parking spaces adjacent to a dry retention area, and six, 9 feet by 16 feet spaces are provided along a 6-foot wide sidewalk adjacent to the building There are 13 parking spaces proposed, mcluding one (1) space designated as handicapped accessible The plan does currently meet the parking requirements as stated in the Land Development RegulatIOns, Chapter 2 - Zoning and ADA reqUIrements for thIS use, and provides one surplus space The landscaping of the site will fully meet the code requirements when staff comments are mcorporated The development wIll be provided with the required amount of perimeter and mternallandscaping as required in the Land Development Regulations, Chapter 7 5 Article II Building and site regulations will fully meet code when staff comments are incorporated mto the permit drawmgs ~ Page 3 Site Plan Review Staff Report Memorandum No PZ 98-268 Semsco International OfficelWarehouse Community Design Plan. The proposed building facade, as viewed from Commerce Road, is standard of typical one story steel industrial structures The new structure will receive wall sign and surface treatments of subdued colors of grey and steel blue accented with galvanized moldings and roof flashing Signage: A proposed sign detail was not submitted as part of this site plan review This site is hmited to one freestanding SIgn with an overall height of 20 feet, and 64 square feet of sign face, and one 50 square foot wall or canopy sign. Proposed sign design graphics shall be provIded as part of this plan review process, and as part of the colored architectural elevations graphIc submIttal The ultimate signage must be in conformance with the approved sign program for the PID RECOMMENDATION. The Planning and Zoning Division recommends that this request for site plan approval be approved, subject to the comments included III Exhibit "C" - Conditions of Approval Staff also recommends that the deficienCIes identified in this exhibit be corrected on the set of plans submitted for building permit. xc Central File J \SHRDA T A \Planning\SHARED\ WP\PROJECTS\Stor-All\NWSP\site plan staff report stor-all,doc 3 EXHIBIT "A" LC CATION MAP, SEM~CO INTIiJ~ATIQt!~!::D---_J L r7 0 ' 'HJI'IIl' II, !IIi ,., , f11 Pljlltij\ lJ 1'1,;. '- - '~/ l~ J~ II !"~". ~, H-1 LU, :~~ ~- ! [- ~-I " ~J\~ II ll~ II I ' r r~ tl\.o- 'w;; Fcfilt:== 1 I I II I /'"''''' I ' J =', -..L -< ,- 1- - .._ f:=f .... }- i ~ i: ~. -=, , ....-- _ "" -1TTtTl~J ".;(""~~'{jt::-rl~ P:: "\ ....~"T ,UIt - ~~ t- tf ~ t= t~ . 1 I!F _. ~~ ~ - ml E=ttr~ ~ ~ UttEr '. ~ l,~JJ t : i'-. /Ibt'~ i~ 1~!".:~'T~.~ ~t,~~~ I : I .'---............ ~ -+. fT', I ItV.<Y' t 1: -~ ~. o T"'",' IC. - I ~ -= I J+1 q/ ~/tt~ t:f~' ..,.'. vS TI'1t1 .n' , ~."\ "} :: b - ~ >~ FH ~ f +- -H I \ ~D = rl' - I - ,.'." T" "/. - R~' ! ~L:::.,CJnn I II . - ~ h",1 ~ml1 T'r 1 r - - . ~. . ._ . L '-- " !I J;:!i' ~~- [] ,*--i! /~. ,~.' ~. i ~. ~ r ~ iR 3t i r I~'i:1L!!;~ y. ~ uJ I' ~ 7 ~ -~~_ ~, ro: ~.. p::,c I- -:-- ': l'~~-:::;SZ':f l=- .: l' '.~- J i :~ . t 11= "T7' ~. - ,; + - , h lE I , ..~ t t- t' ' I, I: I I ~, 1 , . f"~ Trfttt . , I' I t+P+ : '. , ": l l' + t Ii. " t ~tT-t-tT1H,t- j)~~l ,it, ~~ n . ': II ~111-t-t -'. I"\-\, /5- '- ",Y,'.!" . .. ! II ~ ' ,'T . . ~)~ ~ . .; I . I ~ I . +~ a-< .-+~~ Mi' t. ~T' '" I [ ,~, ~. , 2 \ JT\11nTT' --rl. I ._ . U..I...... "0 II!!I'f' I r- \ HI \1 ! ' i. j [llinl \ !~~ / -, ) ~,[ . -+- H"'T.l.-L...,,1 3 Q- r . , ~ '--1'l " . /:~'T1- ~. ,~~19. rr . Y1J WI J,.'"; .~~ .~llH. ~ ~TI7~~; - JrJL; 1/-..." ">/' ~l, J. ,ttilTl U l I i r~" ..~ fl/" - ,..1 N j~p q~~~~~1.( - \ ~ \ 'U I ,.. . 1 . t--r J - J I . ,r I, ,~ $ I . ~ r 0 1/8 MILESV I~ ~ II; ,-111 Ho 18b~~T ~,r ~ : ,ilj:~tBt .l..J~ 'f,C ,- . ,/ ~ .... \ . 1 ' . , ' It ' , ' f' '. ' , . . , . ," /'1 I::~ ~ , I I \~, ~ ' , I , i .~ , " , \ ......' \ IT I I' I I \ . . 1 . '.- , I I I \ I" I \:.:. ------- lEe , \ -- . \'.>--" , . ., R'IAA .:. / , / ,j/r'W r- .....~~}-~ ~ ~ t--1 .r C ..." .-f- ,c ~ ' . I-- J-- -. ; . :: .,~ "' ~~~'''AR RI~~ I 1. STATE~~ \. ; ~ :\ ---- , . . . , . 1------ \,,:.,1, , ~r-r , ! ~.."_.,\ : .-._.:-._~\ ./ ,.. HIJ;;~ R,Q(jE i .;: ;"'~-1~ - E I 'L;[]l ..}- f ~. ".' ~(" ~ ","'E-" ~ ~ ~ II=:.pl [IL'---I'~ , i \ ~'1AA / ! NOT i J \ IN \ ~ M~- i ( C I T Y=r1;f~ll-:, I<- \ ~\ - ~J ~ 'r-; " ! I~L i 1 W.=- ~d\ ~ ~ ~'\ .,,, .J I ~~ "" T' . I t ~~~~~~~~~~z~~5 ; ~~-<~~!'1~~"'o;g-<,--< ~...ihr- ~ ~,,~~ ~iliPjJi ",l"n:"2'"o!"~z,,,n"'''' n"",-'" 00 G'>~",nr- :I::>o!=>o!"z(;Jo2' nng o~S. ""J>~J>~ S~;?I\ ~(J)-t~Vle;;i;::tIl>:A-I8N -<~53~~~:;;~~\i:?;;53~~ -<-I;,a....z~;4iCfCDJ>~-10 .,,~-<2'~Cl-<"''''~~-<O~ 'C:_Cl toto .....(')(1)_-1::0 g",z-<u;~-<:"i5:I:""Zil;_ --1>0. -4C~("")CDJ> 0 ~:"'i5--<!'1 iliP~~--<i5;~ , p."ilj~o",~",-<~..,-<", 5i g;g '" ~~ 0 ~ -< '" g -<:"c: -"",. -<:I:!2.",.."ilj, iii~:::~~iIi~~~2'~i1il~ "';:::I:~",j!I:Il2'-P;::~z 'O:~"'''''''-<-G'>~5i~ 0 o ",i1il ",,,,,,, S/'" , _",O:I: r-OO--<X~o-<<nZc;; J>:J:~~m~(')cQf'l:J::!:J: ~no. -<iii~~l4l"'nri!! cns;2z]>-1_ -1J>s;2rr1o !:!l~?:"iIi~;!!~~~~z~ ~-<::~~~H~::e",-<~n ~"'T1z. ~-I~J>~e;;!! i: !,,~::;j~iliili~~:I:~g~~ ~5"':rj!l::e' ~i=;5;;;~ 2'}>~c;;"'\)l~z-<~}>"'" c:>"';:!:rQ-<....-<"-<iil~~ zgf;l "'~- ~ ~ P 6 g;: 8--<~ "':110 Z"'''''''-<''''''ili 15~'" !!lot::!!::oz~n ~o-<ni~"'~ozClOr- -zili ~~ 5~ ~ ~~~ ':'8 ~ z~~~ili5 "" ~ I :z ~ S ,. lil - All lUl Ut ~ ~~ ~ '" "'. '= Vi .. Uil :::: ..' 8 .. e I !l ~ ~ ~ ~ ~ " '" ~ ~ ~ ~ ~ ~ ; ~ ... ... ... l .. c iD A !'> !! '" " ~ A ~ U; '" !Il ,. "' ,. ~ '" ~ :lI iIloi;~~q, c ~"''''flI~~8 ~ s Iii" 0'" Q ~ :: ~ 0 ffi ~~ ~ ! ~~~- - j; N . ........ 5G ~ l.~18 8 ~ ~ ~ ~ ~ en '" '" ~ d~ ~OV.O. 31'Q'MS .oa I l>a'G\~d JO 3003<",: 'r \' I ~~ G3M35 Alf<711N'tS lSIX3 -.-/ :lj ~~-~ N1~" !I3l ~M.B lSIX3 .02 .1 '3'~:JS . .. ~""'tMI .. .. . I.fj! jj .t>I.~~1 ~YI-IIDIT "B" ___I .. .._-. . A (10 ill....Nilil!! p~ ~~ ~~ !l~~"'~ ~ f6 " a; ~ 1; ~ ... C CD 3.~ -<Em> ~'J 3l311:JNO:J "OTCI ~ c: XlO iii i'1 J.Ol 'CTd S3lN\'~ SN3lt!'1 c: XlOlB "91 J.Ol J-~I 1~ . _L_________ i / ~ NOISMtdX33lrllnJ I llOJ ~3llY N3dO ~ I ~------Z ~~ ~ I~~.oz ~ ~~ -=- ~11r-~ · .01 ~~'02 ,.1 ,wl HH~ ~ ~ ~ ~ lil lil (',.,,_ "'gl I I A ~0ll'I'" 39WOJ.S 3J.3ll:lNOO '" l.. r-~ ~ 1/ q ~ . ~ i i ~ ~ "~I ~~~~' ~I I ~ ~ ~p 3:JN3J ""1"1 NM<l ,9-]-' ~ 1ZXXl18 'iii .1.91 '---DW lM"\ NM!l H!l1H.9 ?~ ~I i- 'On2 l ~i> !l! 2 ill NOln:xn ~ '" l5 :l.: P l@ ~~31s.o'o:J III ~ I I 2! Ul. ~-:;;: ~ i ~ ... I - - ~: III ~ :< g ! ~/1 ~ ~~~2B! 1~3llY NOllN3l3J All(] 01 I Uj" t -:oz- I r I NlY~~~~-Y __./, ~ ~~I ,.'.9 7-" ~ It'" ~I Cl~,q .02 om- ~I 0/ 0.{2 '1111 ~ J ~ 'r k..'I~,V JS~~'~;~ ~ JJ~ $~e L f-.' i- dHHbr- OO':3d 10M :.~:. .S'2 .E2' .l.::t 00'91 .JJ-E)I3-f '0019 000 ISlllOH T1'f l~ SS:;:):J~ ll3lSd'nJ - 'i I ~ !lNI0lIllEI SS3:J:J'tt' A:JN3!lll3I'I3 3OlAOlld T1'fHS~'-==t: ~ 1_ 3SllOH3lI'tM 31 't!) !lNIMS I !'> I3:>ll:lO .I.lIOJ.S I W I<<X3J<Ill'0'Oll3<J_ ---..!. g~ 00"2 '^NI_ .......~ d't:J~ I --.. ~ 6. ~ ~3lI> ' I' ~~<:?Z~ -: ~ /~~S~~;~.2 ~~~~W 1 15 3l1HM g;r~~;~-Ffq 4+ ? ~ ~n "I' _I };" ~ l@ I wHl~dllnI9ISS3:J:J~d't:JI<Nt1H-r-= ......~~r I 4f.'L ~Idfi ~--(f.13~-nl,io~~I' .. -orrz ~ -:0<=- ~ II '\i7 f;1 1.133HS "1l17~30:ESl , i .2 - <c . .OL. i\ 09[2 -&1 '" I 3:JI^lBS!I3l~M.I--t- d>l ~~ W ~ dA' l' ~ . ~ w 06'I~'O~~~=i~ ~. L ~11~.. L.~I r::.: __~Vl:t~~~J~~:JI!~ i> A-.arass~ IN'tlllOA~ I I ~ ~, ::: ;: , ~I '.". 02'02 o'N4 '\i7 ll3lN3A3lld MO'JlOYB B 1 .-..;:::: '" )<...1 .OL ,- r--3dGi ..1-.88 \Y 03A0lldd't .IIM!I3l~ .8/. 'dOW_~~ "- ,2'?:>- c--QV'L2 ~ I w I. 133iS -nn30 :335) ~' ---..:.' ~02'a2 I ~Jl rdlll d01S "lB<M :JNQ: - NOln:xn :3:JlAlBS !I3l~M lSIX3 N T ~ ~3lf<7 NO N3l30 AtIO l!! If. lB<S -nn30 335'\77 - ~ - ~ '.,'0 fcrt--- ~ - -~ -' l~ '-Y-+.- - - ~ d. f-'; r---02'02 c: ,~ L ~ ~iq - - - ~ ~j/~;' \~'~~Iai:'{ ~ \ ~~:3S rl~~ -'\- - - - - - - ~ /.1. : ~ \:r- lffi'M3OlS.. '-- .l~M:3OlS.. -t~ '1' N'tI" !I3l.M .9 "J-- l:lf1llJ.SNO:J !lNllSIX3 3lIHM :,M~;~~~ O'ltOCl 3:)C13v.Jv.JO:) ~ --7 1- -,'l--r :3"lOIfifflm'SlSIx3J1 ~ _ / I~ _I - =- - -I -'l1-J =- - - _ ll3M3S AllUN'tS "~ =- ~ _ _ --.I~ '-~I't1d3ijHI:lr'GtVd ~ !:EMIOJ dOMd3Nr<<)~.O.l2:; ;1 ..(F, IN'VijaA~ JijI..::l lSIX3 ~ ;y ~:J dOW~I'<<lll>.21 J NI~"'~~~M.B lSIX3 r IN'tlllOAH 3tlU lSlX3 I :3A'1\t^ 3l~~.9 CONGRESS AVE. "'l'<1^" ",.j{.~~~~ t f"-- ~3lf<7 NOllN31:30 AlIC '" iii :., "1 ~~~ I -CfTl sa"T'l:::O "'tnSl ",no "''''; ",r- n - ;z:8<n ~~~ '" r- '" -< ~ ~ ... Ul g ;; -< '" !Jl ~ ~~~'; I -",o::e .....-4(")U) ~~~~ Iri!l~ ~~~~ "''''0''' ~~~ :,,~~ r '" '" '" '" - ~ ~ ~~8i'; I ="'oe; ,A-l"TI3: (,N"'tJOJlo (,.o.ll>::n:::c limA (,,7I~(J)(I) ~~~i CJl~F~ Ir-... ~~* ~~~ g~~ P" ",,, ~~ fTl:" o~ 0' ill '" ~ ~ ~, '" ~ i ~ "'1 ~ I ~ '" q !< !< Z Z - - l~ ~I~ ~;3l I/> '" '" ~!Il = ~ ~ c ... " ~ .. ~ ~ ::;~ Sl z ~ x ~ l;) ~! ~ '" ~ :I:~ (li ~ ~ ... t'"J '" ~ ill" ... * III ~~ (li ~ E'" ~ ... 0 ~ c Z .. ~ ... ~~ ~ ... ;ilb III ~ .. ... 0 0 ... .. iii ~1Ii Iii < ... ~ ~ < ~ '" " ~" z ... .. ~ i' ~ ... .. ~ 2 2 o~ ... < ~ ;:;... ~ Iii~ 2 z... ...... c "'0 J:: ~ ~ '" i!l R ~ 0 ... 1; ~ i!l .. 1; -< pi HIli< RIDGE ROAD i!i f I~J ~ '" ~ ;;j ~ 1-95 ~ . ~ o 0 ~ F ~ t \ @ h SCALE: 1'030" DATE: 7n196 BY: alP O<'D: Rl. ~ i!~~ LN\Y . . . . . . . . . ....- Law8on, Noble a. Webb, Inc. .......... P........ lu...yo.. REVISIONS DATE BY CK I A\ IEVISED PER aTY BOYNTOJoI BOi.. ~ CJ)P AL SITE /IN) ENGIN:ERJt.13 PLAN Fa! SEMSCO INT US-l l' ~~ ;. E~ fUl"b :.;.... 11I"9 I ~" EXHIBIT "e" CondItions of Approval Project name Semsco International Office/Warehouse FIle number NWSP 98-012 Reference The plans consIst of 10 sheets Identified as 2nd RevIew, New SIte Plan. FIle # NWSP 98-012 wIth an August 18, 1998 Plannmg and Zonmg Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments I The Public Works Department requests detaIled drawmgs of dumpster enclosure for sIze and shape (Chapt. 7.5, ArtIcle II, Sec 5, Par J) UTILITIES Comments. 2 All utilities easements shall be shown on the rectified landscapmg drawmgs so that we may determme which trees may mterfere WIth utilities In general, palm trees wIll be the only tree specIes allowed wlthm utIlities easements. Canopy trees may be planted outsIde of the easement so that roots and branches wIll not Impact those utilities wlthm the easement m the foreseeable future. LDR Sec 7 5-18 I gIves public utilities the authonty to remove any trees that mterfere WIth utility servIces, eIther m utilIty easements or publIc nghts-of-way 3 ComprehensIve Plan policy 3C.3 4 reqUIres the conservation of potable water CIty water may, therefore, not be used for lITIgation where other sources are readIly available 4 Water and sewer lines to be owned and operated by the CIty shall be mcluded wlthm utilities easements. Please also show all proposed easements on the engmeermg drawmgs, usmg a mmlmum WIdth of 12 feet. The easements shall be dedIcated VIa separate mstrument to the CIty as stated m Sec 26-33(a) of the code 5 A buildmg permIt for thIS project shall not be Issued until this office has approved the plans for the water and/or sewer Improvements reqUIred to serve the project. (Sec 26-15) FIRE Comments None POLICE Comments. None t; Page 2 Semsco InternatIonal Office/Warehouse FIle No NWSP 98-012 ENGINEERING DIVISION Comments 6 All plans submItted for specIfic permits shall meet the city's code reqUlrements at tIme of applicatIOn. These permits mclude, but are not hmited to the followmg' site hghtmg, pavmg, dramage, curbmg, landscapmg and irngatiOn. Permits reqUlred from other permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be mcluded with your permit request. 7 Provide catch basms at both ends of dram pipes at both dry detentIOn areas. Catch basms at west end of the northerly detentIon area and m the roadway swale should be bubble-up structures and the catch basms at the north end of the detentiOn area west of the bUlldmg and at the east end of the north detentIon area should be overflow structures. [LDR Chapter 6, ArtIcle IV, SectiOn S.B 1 ] BUILDING DIVISION Comments 8 To clanfy the signage proposed for the project, place the below listed notes on the plans a. Add the followmg to the site plan drawmg: "Site signage is not approved. A modificatIon to the sIgn program wIll be reqUlred pnor to any sIgn bemg permitted for placement on the site that IS inconSIstent with the approved sIgn program" Also place the followmg note on the elevation View drawmgs of the bUlldmg: "BUlldmg slgnage shall comply with the signage specIficatiOns identIfied m the approved High Ridge Commerce Park sign program 9 Amend the engmeenng plan to show compliance wIth the Flonda Accessibility Code for Buildmg ConstructIOn with respect to the accessible route reqUlred between the access aisle at the accessible parkmg space and the accessible entrance of the bUlldmg. PARKS AND RECREATION Comments None FORESTER/ENVIRONMENTALIST Comments 10 There was no tree survey mcluded m the set of plans. The applicant should mdicate on the landscape plan any eXIstmg trees on the site which WIll be preserved, relocated or removed/replaced. 7 Page 3 Semsco InternatIOnal Office/Warehouse File No NWSP 98-012 PLANNING AND ZONING Comments 11 Include on the sIte plan the proposed type, source and style of lIghting. Chap 9, Sec. 10, Par F., Chap 23, Art. II, Par A. 12 ProvIde a sIgn detail and elevatIOns dImensIOned as follows on the SIte plan Chap 21, Art. III, Sec. 5.A. A.) One freestandmg SIgn 64 square feet maXImum face, 20' maXImum heIght. B) One wall sign, 50 square feet maXImum face 13 ProvIde 10 foot by 10 foot safe SIte tnangles on both the SIte plan and landscape plan. Locate tnangles insIde of the property line Chap 7.5, Art. II, Sec 5, Par H.l 14 Locate all proposed and eXIstmg fire hydrants on landscape plans. ProVIde a 5 foot clear area around hydrants. 15 SubmIt a colored graphIcs board and matenals board showmg the proposed sIgnage and bUIldmg elevatIOn colors. Chap 4, Sec 7, Par D.2 16 Label and dimenSIOn the mImmum tree spacmg along the right-of-way frontage (3 Palms = 1 tree) Chap 75, Art. II, Sec. 5, Par D 17 ProvIde landscape notes to mclude the followmg: A.) A notatIOn on method and source of irrigation. Chap 4, Sec 7, Par C B) Intenor parkmg lot landscape area reqUired and provided. Chap 7.5, Art, II, Sec 5, Par C C) PID open space reqUirements. Chap 2, Sec. 7, Par H.13 18 On the landscape plan, wIthm the 25 foot penmeter PID buffer, proVIde 1 tree (mahogany) per 40 linear foot of frontage and a contmuous eugema hedge (mamtamed at 6 feet) along the outsIde edge of the buffer, replacmg the cocoplum hedge proposed along south fence lIne Hedges along the sIde lot lInes must be extended to the buffer hedge Chap.2, Sec 7, Par H.17 /bme s:lprojectslSemsco InternationallNWSPI1st review comments ~ 1 st ReVIew Comments fv1~df fe< gl('II~ ~ ;:eC Project name. Semsco InternatIOnal Office/Warehouse File number NWSP 98-012 Reference' The plans consIst of 10 sheets IdentIfied as 1st ReVIew. New SIte Plan. Julv 7. 1998 PlannIng and Zonmg Department date stamp markmg. File # NWSP 98-012 wIth a J- DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS Comments ~ The Public Works Department requests detaIled drawmgs of dumpster enclosure for sIze and shape UTILITIES Comments. / All utihtIes easements shall be shown on the rectified landscaping drawings so that we may determine whIch trees may mterfere WIth utIlItIes. In general, palm trees WIll be the only tree specIes allowed withm utihties easements. Canopy trees may be planted outsIde of the easement so that roots and branches wIll not Impact those utilitIes wlthm the easement 10 the foreseeable future. LDR Sec 7.5-18 1 gIves public utIlItIes the authOrIty to remove any trees that mterfere WIth utihty servIces, eIther 10 utIlIty easements or pubhc rights-of-way ~ (Y Dept. of Health permIts may be reqUIred for the water system servmg this proJect. (Sec 26-12) f) FIre flow calculatIOns will be required demonstratmg the City Code requirement of 1500 g.p.m. as stated 10 LDR Chap 6, Art. , Sec. 16, or the reqUIrement Imposed by msurance underwrIters, whichever IS greater (see Sec 26-16( a)) Please submIt these calculatIons WIth your Health Department permIt applIcation and plans. 0 Sec 26-34(E) of the CIty Code reqUIres that a capacIty reservatIon fee be paId for thIS project either upon my request for sIgnature on the Health Department application forms or wlthm 30 days of site plan approval, whichever occurs first. ThIS fee wIll be determmed based upon final meter SIze, or expected demand. - / Comp Plan polIcy 3C.3 4 reqUIres the conservation of potable water City water may, therefore, not be used for lITIgation where other sources are readIly avaIlable. / Water and sewer hnes to be owned and operated by the CIty shall be mcluded wlthm utIlitIes easements. Please also show all proposed easements on the engineenng drawmgs, usmg a minImum WIdth of 12 feet. The easements shall be dedicated vIa separate mstrument to the CIty as stated 10 Sec 26-33(a) of the code. ~ b c;'{... Page 2 Semsco International Office/Warehouse File No NWSP 98-012 D~ARTMENTS INCLUDE REJECT 1/ The UtIlIties Department will not reqUIre surety for mstallatlon of the water and sewer utilIties, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaming the certificate of occupancy / LDR Chap. 6, ArtIcle IV, Sec. 16 reqUIres that all points on each building will be withm 200 feet of an eXIsting or proposed fire hydrant. Please revise the plan to meet this condition by showmg all proposed hydrants. ;/ Appropriate backflow preventers will be reqUIred on the domestic water servIce to the bUIlding, and the fire sprmkler line if there IS one, in accordance wIth Sec 26-207 ~ A buildmg permit for thIS project shall not be Issued until thiS office has (y approved the plans for the water and/or sewer Improvements reqUIred to serve the project. (Sec. 26-15) / Any waste stream from manufacturing processes must meet the city's pretreatment requirements. If applIcable, add sampling point to allow monitoring of thIS waste stream. (Sec 26-143,26-147) FIRE .{ -r.P i ",.t' ,~ Comments. '(\ 1 t" '( ~,y) / ! ; No portIon of the buIlding shall be more than two hundred feet (200') from a hydrant. The security gate shall conform to the followmg Fire Department's reqUIrements. The minimum performance for all security gates should be as follows: 1) All gates must have one securIty entry code (0911). 2) The gate must remain open until the Fire-Rescue umts have completed the call and have reentered 0911 while leaving. 3) Gates may be operable by telephone from our dispatch office. A phone call from our dispatchers will open the gate and a second call will be reqUIred to close the''''gate. 4) In case of power faIlure, the gate shall open automatically and remain open. 5) An exceptIOn Will be where a 24-hour security guard is stationed at the gate 6) Authorized key secunty boxes (Le. Knox, NuTech/FaII Safe) should be located on all buildmgs where alarms and/or sprinkler systems are located to assist m mimmlzing damage due to rapId forcible entry 7) AuthOrIzed key secunty boxes may be used on gates, prOVIded each gate has one and It IS well marked. A key security box on \L o Page 3 Semsco InternatIOnal Office/Warehouse FIle No NWSP 98-012 DEPARTMENTS INCLUDE REJECT a gate will not be used in heu of any other sectIOn of this letter 8) No other code numbers, operating methods or key systems will be kept on file by the Fire Department. 9) In the event our umts are unable to gam rapid entry With the above methods, It will reqUlre us to use rapId forcible entry methods to gam entry The City of Boynton Beach and/or the FIre Department shall not be responsible for, or incur any costs as a result of gammg access into any specific area. 10) Information on where authonzed key security boxes can be purchased IS avaIlable from Boynton Beach FIre-Rescue FIre Safety DiviSIOn by callmg #(561) 735-0272 dunng normal bUSIness hours. The liability of a delayed Fire-Rescue response to an emergency in your community should be a serious concern. POLICE f Comments. None ';,{l ENGINEERING DIVISION Comments. V PrOVIde a Signed and sealed, scaled draWIng of all proposed bUlldings and structures IncludIng the following: off-street parkmg areas, driveways, sidewalks, traffic control devices, fences, walls, hghting fixtures and dumpster location(s) With all necessary dlmensiomng. [LDR Chapter 4, Section 7.A.] / ProVide a landscape plan at the same scale as the site plan and as reqUlred by state law, includIng the following; proposed berms, watercourses and topographIC features Including their elevations. [LDR Chapter 4, Section 7 C ] ~ All parkIng areas shall conform to Chapter 23 of the Land Development RegulatIOns Including Standard Drawing B-90012 & B-90013 - / ,. All dram age structures and french dram shall conform to Chapter 6 and 23 of the Land Development RegulatIOns mcluding Standard Drawmg B- 91107 (mmlmum pIpe size IS 15 Inches In diameter). [LDR Chapter 6, Article IV, SectIOn 5.A.2.a.] eJ All plans submitted for specific permits shall meet the City'S code reqUIrements at time of application. These permits Include, but are not hmlted to the follOWIng: site lightIng, paving, dramage, curbing, landscapmg and lITIgation. Permits reqUIred from other permItting agencies, such as FDOT PBC, SFWMD DERM, L WDD DEP and any others, shall be Included WIth your permIt request. Page 4 Semsco InternatIonal Office/Warehouse File No NWSP 98-012 DEPARTMENTS INCLUDE REJECT @ ProvIde catch basms at both ends of drain pIpes at both dry detentIOn areas. Catch basins at west end of the northerly detentIOn area and in the roadway swale should be bubble-up structures and the catch basins at the north end of the detentIOn area west of the building and at the east end of the north detentIon area should be overflow structures. [LDR Chapter 6, Article IV, Section 5.B 1 ] V Change 25' backup dimension to 27' per CIty Standard Drawing B- 90013 1/ Maximum WIdth of dnveway at nght-of-wav line is 32 ft per LDR Chapter 23, Article II.H.l ~ Show handicap accessibility path from SIdewalk m R/W to building per Flonda Handicap Accessibility Code. V It is recommended that a 6' SIdewalk be considered m front of building to act as the wheel stop in heu of mdIvIdual wheel stops. See CIty Standard Drawmg B-90012. ~ It IS recommended that detention area(s) be constructed to mclude proposed are "designated fur future expanSIOn" If thIS area is to become impervIOUS. BUILDING DIVISION Comments. 25 The approved sign program for High Ridge Commerce Park PID does not include approval for site signs. Therefore to properly review the ~~ request for the proposed site sign the applicant shall remove the SIte SIgn from the plans and make a separate submIttal to the city requestmg -1' fa y approval to modIfy the approved SIgn program. The submIttal for the modificatIon shall mclude but not be hmIted to the below listed d5 f' J informatIon. The mformatIon for the SIgn program modIfications shall -r:J2 depIct the SIgn and SIgn structure in compliance with the SIgn regulatIons if(v J\'<:> identified in Article IV, SectIOn 2 and 7 of the Sign Code (Chapter 21 of the Land Development Regulations) and Section 10.1. of the Commumty Design Plan (Chapter 9 of the Land Development Regulations). a. ProVIde an elevatIon view drawmg of the proposed SIgn mcluding the structure to whIch It IS attached. b DImension the distance from fimsh grade to the highest point of the sign and/or structure (maxImum heIght allowed IS 20 feet). c. Show the sign copy and, where applicable, logo d. DImenSIOn the width and length of the sign face, sign copy and/or logo Also mdIcate the total area III square feet Page 5 Semsco InternatIOnal Office/Warehouse File No NWSP 98-012 DEPARTMENTS 26 v y ~ f?-~ (maximum area allowed IS 64-sq ft. for both sides of a double- faced sIgn) e. DImenSIOn the SIze of the structure and/or frame to which the sIgn Will be attached, such as the size of the pole and sign frame for a pole mounted sign or the size of the sign base and frame for a sign that has a base with an architectural sign frame. f. Identify the color name, color-code and manufacturer of the colors proposed for the SIgn face, SIgn copy and/or logo Also IdentIfy all colors ofthe SIgn structure and frame. g. IndIcate wIth a note whether the SIgn is Illummated and, where applicable, specIfy type of illumination. h. Identify WIth a note on the landscape plan the location of the landscape materIal that IS required by the sign code at the base ofthe sign (Article III, SectIOn 3 of the SIgn Code) l. DImenSIon no less than ten (10) feet from the property Ime to the leading edge of the site SIgn. Chapter 9 - Commumty DeSIgn Plan, SectIOn 10.1.1, of the Land Development RegulatIOns, speCifies that, "Signs shall be deSigned and treated as part of the archItecture of the buIldmg and shall be revIewed at time of site plan review" Therefore, add to the submIttal the below hsted wall sign informatIOn. The data shall comply With the approved sign program for High RIdge Commerce Park PID a. On the elevatIOn VIew drawmgs dimension the wIdth and height of the proposed wall signage b IndIcate m tabular form, on the elevatIon view drawmg, the square foot area of each wall SIgn. Note; the allowed SIze of slgnage is Identified m Section 2, ArtIcle IV, of Chapter 21 - SIgn Code and the method to determme the SIgn area IS defined m Chapter 1 - General ProviSIOns, ArtIcle II - DefimtIons (SIgn, area of). c IdentIfy the sign colors, sign style, letter style, location and size of non-word depIctIon signage. 27 Add to the proposed Landscape/Site Plan and SIte and EngmeerIng Plan a labeled symbol that represents the location and path of the accessible route that is reqUired between the access aIsle at the accessible parkmg spaces and the accessible bUilding entrance Place a note on the Landscape/SIte Plan and Site Engineermg Plan, next to the labeled symbol, mdlcatmg that the accessible route IS m complIance WIth the Florida Accessibility Code for Building Construction. Also Identify on the proposed Landscape/SIte Plan the width and type of materIal that IS proposed for the accessible route. [flOrIda Accessibility Code for BUIldmg ConstructIon, SectIon 4.3, Accessible Route and SectIon 4 6, Parkmg and Passenger Loading Zones] -/ Note: The IllustratIOn of the accessible route that IS reqUired to be shown INCLUDE REJECT 0v ~ { -l ~A ':,(ff Page 6 Semsco InternatlOnal Office/Warehouse File No NWSP 98-012 DEPARTMENTS on the drawings submItted for sIte plan revIew may be general in nature. However, the subsequent permit drawings (construction plans) shall contam specIfic mformatIOn to determine that the accessible route complies WIth the technical regulatIons of the accessibility code. The mformatlOn shall include but not be limited to the followmg: a. Site plan and Drainage plan - Label the location of the path with a symbol. Place a note on the Site Plan and Drainage Plan, next to the labeled symbol, indicatmg that the accessible route complIes with the regulatIOns specified in the Florida AccessibilIty Code for Building Construction. b. Site plan - DImension the width of the path and Identify the type of constructlOn material proposed for the path. c. Site plan - SpeCify the cross slope of all sections ofthe route d. Site plan - IdentIfy the slope of all sectIons of the route. e. Site plan and Drainage plan - Identify the location of all curb cuts. f. Site plan and Drainage plan - Identify the location of all ramps mcluding curb ramps. Dimension the length of each ramp and IdentIfy the slope and cross slope. Where applIcable, show and identify the slope of the flared sides of the ramps or show and Identify the return curbs. At all ramps dImension the wIdth and length of the landmgs that are required at the top and bottom of each ramp Also specIfy the slope and cross slope of the top and bottom landing. g. Site Plan - Identify the locatIon of the detectable warnmg surface and specify the type of surface. h. Site plan - DimenslOn the vertIcal clearance at all locations where there IS a change of material along the route mcluding the entrance to buildmg. i. Site plan and/or Paving & Drainage plan - The permIt plans, where applicable, shall include detail drawings of the accessible ramps. The detaIl drawings shall correlate with the locations of the ramp(s) that area depIcted on the sIte plan and/or paving and dramage plan. The detail drawmgs of the ramps shall show. type of constructIon material, type of surface finish, WIdth, length, slope and cross slope. The drawmg shall also show and specIfy the width, length, slope and cross slope of the top and bottom landings and, where required, slope of flared sides or return curbs or approprIate handrails and edge protection. The SIte Engmeering Plan shows an eight plus mch difference between the back edge of the side located at the front of the building and the INCLUDE REJECT Page 7 Semsco InternatIOnal Office/Warehouse File No NWSP 98-012 ~I l) If/ DEPARTMENTS INCLUDE REJECT fimsh floor elevatIOn of the building. Amend this area to comply with the accessibilIty code regulatIons. /' At tIme of permit review identify the setback dimenSIOn from each property [me to the leading edge of all four Sides of the building. /" To clarIfy the location of the canopy shown at the front of the building show and dimension the canopy on the landscape/site plan and dimenSIOn the canopy on the floor plan drawmg. PARKS AND RECREATION Comments. 33 rJ(f'()~ FORESTER/ENVIRONMENT ALIST COlllJllents. V There was no tree survey included m the set of plans. The applIcant should mdIcate on the landscape plan any eXlstmg trees on the SIte which Will be preserved, relocated or removed/replaced. PLANNING AND ZONING Comments. / All plans shall be Signed and sealed at tune of building permit submittal. y The Plannmg Department recommends the submittal of a 24 x 36 survey bound as part of the submittal to prevent the possibility of loss durmg the reView process. / Correct the bUlldmg square footage data to match on all documents, ? applIcatIons and tabular mformatlOn. Chap. 4, Sec. 7 / ,"- Correct the SIte plan acreage/square footage information to match survey mformation. ~ Label and dimenSIOn on the site plan and landscape plan all easements shown on the survey Chap 4, Sec. 7, Par B ~ PrOVIde traffic control markmgs and signage locatIons on the SIte plan. 7 Chap 23, Art. II, Par B - V ProVide the followmg information m the SIte plan tabular data. Chap 4, F See 7, Par E. Page 8 Semsco International OfficelWarehouse File No NWSP 98-012 V'~t DEPARTMENTS INCLUDE REJECT A.) Revised sIte square footage. B) RevIsed buildmg square footage. C) Parking calculatIOns and number of employees. D) BUIlding heIght. E.) Vehicular use landscape space. Chap 7.5, Art. II, Sec. 5, Par G F) PID open space, required and proposed. G) Setback chart Front 30', sIde 20' and rear 30' H.) Zoning and land use desIgnatIOns. 1.) Loading requirements (1 space). Chap 2, Sec. II, Par J.2. y Provide surrounding zomng and land use designations for adjacent properties. r_ >> t-<<' Include on the SIte plan the proposed type, source and style of lIghting. "t 43 ? \Y Chap. 9, Sec. 10, Par F., Chap. 23, Art. II, Par A. y Provide parkmg detaIl that is dimensioned according to the CIty of Boynton Beach, drawing #B-900l2. 45 Provide dumpster detail. Chap 7.5, Art. II, Sec. 5, Par J ~1-'~ ~ On the site plan reconfigure the entry drive width to the reqUIred maximum of 32' at the property line. Provide a 25' radius where the dnve connects to the vehicular lane. Chap. 23, Sec 2, Par H.l y Provide 27' drive aisles in parking areas. City of Boynton Drawing B- 90013 / --, Provide a handicap accessible walk from the building entry to the right- ( of-way SIdewalk. Chap 9, Sec. 10, Par B y Note on the site plan that the swmg gate provIdes for emergency access and dumpster access at all hours. 50 Provide a SIgn detaIl and elevations dimensIOned as follows on the site plan. Chap 21, Art. III, Sec. 5.A. .r .-? ,/ A.) One freestandmg sign 64 square feet maximum face, 20' - maximum heIght. B) One wall sign, 50 square feet maximum face. / Reduce the outdoor storage area to meet the 15% maximum PID requirement. Chap. 2, Sec. 6, Par E.! A(" 10' >' 10 I ~ po -(!f 5 t <IV 52. Providejsafe site tnangles on the site plan.afts ltHuh;lI3pe flljChap 7.5, J~ v ~ Art. II, Sec. 5, Par H.t I) I) J ( lJ\.) I /I Il'r'~ ~ ~e Of.) 4'17 ( Iv.., .! ftptl _LOcft'T1iiii .. TtU.4fVl;~<; I~~ IO~ u~ f (WfG/l- T1 l \ J-.I E , -nit f>>'J~ . t\i~ ,.r~ ~"~ . (\.AtJ~ ~~fi . 4/)& , LMV tJ ~ ';)\"'''I 5 I t u;' Lft N~.Jlct Page 9 Semsco International Office/Warehouse File No NWSP 98-012 DEPARTMENTS 53 Locate all proposed and eXIstmg fire hydrants on aU plans. ",<tiVf ~t3 54 y 7' ~ 59 Submit a colored graphIcs board and matenals board showmg the proposed lluttclIats and buildm olors. Chap. 4, Sec; 7, Par D.2. 5iv~~ EL. C/V If dumpster is located at the rear of the property, a mIllImum 50' turnmg radius shall be clear of stored matenals to allow emergency vehIcle turning movements. Chap. 23, Art. II, Par I. Provide the reqUIred landscapmg around the dumpster Chap 7.5, Sec. 5, Par J Label and dimension all the reqUIred landscape buffers. Chap 7.5, Art. II, Sec. 5, Par D and E. The landscape plan shall reflect the approved perimeter greenbelt buffer plans for High Ridge PID Chap. 2, Sec. 7, Par H.17 Label and dimension the mmimum tree spacmg along the right-of-way frontage (3 Palms = 1 tree) Chap 7.5, Art. II, Sec. 5, Par D o Provide a plantmg detaIl sheet mcluding the required plant lIst. Chap. 4, Sec 7, Par C tete @ ~vide landscape notes to mclude the following: ~ A notatIOn on method and source of lITIgatIOn. Chap 4, Sec. 7, Par C ~ A matenal other than cypress shall be used for mulching beds.tT' .~ Intenor parkmg lot landscape area~Chap. 7.5, Art. II, See 5, Par C. PI (ZG(il,J\[U5{) oz; rP-QVIO(: 0 PID open space requirements. Chap 2, Sec. 7, Par H.13 -- Extend hedge material along the west property line to the front edge of the parkmg lot pavement. The hedges along mternal lot lines shall be labeled "maintamed at 4' mlllImum - 6' maxImum height. The hedge along the right-of-way frontage "maintained at 3' minimum height. Chap 7.5, Art. II, Sec. 5, Par D and E. ProVide trees m the western parking lot terminal Islands. Chap 7.5, Art. II, Sec. 5, Par G PrOVide architectural plans with applicable tabular data. Chap 4, Sec. 7, Par D INCLUDE REJECT f? \ t::i lL ;!-- D r ? ? ',<:Y' ..Q , c9-~ -(p-r oJ' {- pI", 'F- c..:? { (!.'" l tbme s:lprojectslSemsco InternationallNWSPI1 st review comments Fe ( (Y\~ Il./ < 6 ~ if =-.r p (,,-Vi- fr'?/?;> ? ( ~v t,...bC ~ 1L~~ // ~e-s ?fP ~) 5'.1'1 ?~,,.,~ SI';' ,.- ~Q - ) , (),-I 1lf1f LtrN Pf5t{y;{ ftr+-r-.J) uJi IItJ/0 -n+e ~~' ft3tL-'I'-t-1b-'tL.-. fi D ~'l}~ ) P floJ\ o~ (T~t-- l;fo l-f dE- f/LorJ ~E pj.Jp f} CoIJTIt'/JUOc)-S Iftwt- t9z0tv~ 71fG- 'AIS i l-~ t 06e or 7lff' 8,-,rt=-6f2-, 7/fE COC Of Wr- ftt.-o,vu 71ft fGp./lE ~ IJtY tMOr./"6'o 7?J lH-E BUfl-6rL (V M6!7J ~;26-Q~~~.. (+t06t~ /ftoNG -n+e S1 Of L{,If ((1JfS Musr 16 C-kTf;vL)(-O 70 THt' f>ufff^- ~Oloe-- . ~ CH. 2- 5ec 7 f'ltfL tt )r"f APPLICATION TRACKING LOG PROJECT TITLE: Semsco International OfficelWarehouse FILE I: NWSP 98-012 PROJECT LOCATION: Lot 1 S, Hisrh Ridsre Commerce Park TYPE OF APPLICATION: New Site Plan PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME AGENT Lawson, Noble at Webb, Inc. ADDRESS: AGENT PHONE: (560684-6686 FAX: (561)684-1812 DATE REC'D: 717/98 AMOUNT RECEIPT NO 12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLICATION/SUBMITTAL: DATE ACCEPTED: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED DATE DENIED: o o o o o DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: DATE OF SUBMITTAL ACCEPTANCE LElTER: INITIAL 1 ST REVIEW MEMO: DATE SENT MEMO NO 98-207 RETURN DATE: 7/24/98 1 ST REVIEW COMMENTS RECEIVED UTIL. PW PARKS FIRE POLICE PLANNING BLDG/ENGR FORESTER DATE <Ii DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED o o o o o o MEMO NO RETURN DATE: 2nd REVIEW COMMENTS RECEIVED PLANS MEMOI DATE PLANS MEMOI DATE UTIL. 0 POLICE 0 PW 0 PLANNING 0 PARKS 0 IWlG/ENGR 0 qJ'-;;i.. 7(, ';}!2/ FIRE 0 FORESTER 0 BOARD MEETING DATE: BOARD: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED: DATE: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97 FIRE & LIFE SAFETY DIVISION Memorandum No 98-288 fD)! m @ lli U \ lUU JL' 3 \S~b ~1. lJ I Q' , , . ,..c .... NFPA Life Safety Code 101, National Fife Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to TO Mike Rumpf, Act. Director Planning & Zoning DIvIsion FROM Steve Gale, Fire Marshal ~ / Deputy Chief - Fire Rescue be;a~nt DATE July 13,1998 SUBJECT Semsco Int'I Office/Warehouse Lot 15 High Ridge Rd NWSP 98-012 No portion of the building shall be more than two hundred feet (200') from a hydrant. The security gate shall conform to the Fire Department's requirements (see attached) Attachment CC File The City of Boynton Beach Boynwn Beach Fire Rescue 100 E. Boynton /Jeach Boulevard P.O. Box)1O Boynton Beach. Florida ))425-0;10 Steven Gale. Deputy Chief of Operations Phone: (407) 375-6331 FAX. (407) 375-6334 December 8. 1997 RE Security Gates & Emergency Access To Whom It May Concern Boynton Beach Fire-Rescue continues to maintain the position that secunty gates are potentially detrimental to fire and rescue operations. The proliferation of security gated communities has resulted in many problems for responding emergency apparatus trying to gain entry The minimum performance for all secunty gates should be as follows 10) 1) 2) All gates must have one security entry code (0911) The gate must remain open until the Fire-Rescue units have completed the call and have reentere~ 0911 while leaving . 3) Gates may be operable by telephone from our dispatch office A phone call from our dispatchers will open the gate and a second call will be required to close the gate 4) 5) In case of power failure, the gate shall open automatically and remain open An exception will be where a 24-hour secunty guard IS stationed at the gate 6) Authonzed key secunty boxes (i e Knox, NuTech/ Fall Safe) should be located on a i buildings where alarms and/or sprinkler systems are located to assist In minimiZing damage due to rapid forCible entry 7) Authonzed key security boxes may be used on gates, prOVided each gate has one and It is well marked A key security box on a gate will not be used in lieu of any other section of this letter 8) No other code numbers, operating methods or key systems will be kept on file by the Fire Department. 9) In the event our units are unable to gain rapid entry With the above methods, it will reqUire us to use rapid forcible entry methods to gain entry The City of Boynton Beacr and/or the Fire Department shall not be responsible for, or Incur any costs as a resLit of gaining access into any speCific area. Information on where authorized key secunty boxes can be purchased IS available from Boynton Beach Fire-Rescue Fire Safety DiviSion by calling #(561) 735-0272 dunng normal business hours. The liability of a delayed Fire-Rescue response to an emergency In your community shoulc ::;e a serious concern Sincerely, Deputy Chief Ste en Gale Operations DiVISion Boynton Beach Fire-Rescue Telephone #375-6331 America's Gateway 10 the Gulfstream I(D) _m @ & u WI & mJ inJj .IllS ~ 1 ~ I .J PLA.,N"!G AND ZONING DEPT. PUBLIC WORKS DEPARTMENT MEMORANDUM #98-192 TO Mike Rumpf, Planmng & Zomng DIrector C Larry Roberts, Pubhc Works DITeC10rCfl THRU FROM Mark LIPS, SamtatIOn Foreman SUBJ New SIte Plan - 1 st RevIew - Semsco InternatIOnal/Warehouse Lot 15, High RIdge Commerce Park DATE July 14 1998 The PublIc Works Department would request detailed drawmgs of dumpster enclosure for SIze and shape for the above named proJect. ~C1~ ML/cr CIT\' OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO FROM. M. Rumpf Ofe R1g~ DATE SUBJECT REFERENCES ENCLOSURES I have no comments reference on thIS 1 st ReVIew 071698 FILE NWSP 98-012 SEMSCO Int. Office/Warehouse PZ 98-207 U~ill J1. t 6_ PlANNI AND ZONIN MEMORANDUM UTILITIES DEPT NO 98 - 197 TO' Mike Rumpf, Acting Planning Director FROM. John A Guidry, Utilities Director DATE. July 20, 1998 SUBJECT' SEMSCO International Office/Warehouse - New Site Plan We offer the following comments on this project: GENERAL COMMENTS 1) All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities In general, palm trees will be the only tree species allowed within utilities easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way 2) Dept. of Health permits may be required for the water system serving this project. (Sec 26-12) 3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as stated in LDR chap 6, Art. Sec 16, or the requirement imposed by insurance underwriters, whichever is greater (see Sec 26-16(a)) Please submit these calculations with your Health Department permit application and plans 4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for SIgnature on the Health Dept. application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 5) Comp Plan pohcy 3C.3 4 reqmres the conservation of potable water City water may, therefore, not be used for IrngatIOn where other sources are readily available. SPECIFIC CONDITIONS 1) Water and sewer lines to be owned and operated by the City shall be included within utilities easements Please also show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec 26-33(a) of the Code 2) This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy 3) LDR chap 6, Article IV, Sec 16 requires that all points on each building will be within 200 feet of an existing or proposed fire hydrant. Please revise the plan to meet this condition by showing all proposed hydrants 4) Appropriate backflow preventers will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with Sec 26-207 5) A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec 26-15) 6) Any waste stream from manufacturing processes must meet the City's pretreatment requirements If applicable, add sampling point to allow monitoring of this waste stream. (Sec 26-143, 26-147) Please refer any questions on this matter to Peter Mazzella (375-6404) of this office JAG/PVM Xc Skip Milor Peter Mazzella File MEMORANDUM UTILITIES DEPT NO 98 - 197 JL2'. TO: Mike Rumpf, Acting Planning Director IvJ~Uidry, Utilities Director Pl~NNING ~ND ZONING OEPT. l. , FROM. DATE. July 20 1998 SUBJECT SEMSCO International Office/Warehouse - New Site Plan We offer the followmg comments on this project. GENERAL COMMENTS 1) All utilities easements shall be shown on the rectified landscaping drawings so that we may determme which trees may interfere with utilities In general, palm trees will be the only tree specIes allowed within utilities easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities withm the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilIties the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way 2) Dept. of Health permits may be required for the water system serving this project. (Sec 26-12) 3) Fire flow calculations will be required demonstrating the City Code reqUIrement of 1500 g P m. as stated in LDR chap 6, Art. Sec 16, or the requirement imposed by insurance underwriters, whichever is greater (see Sec 26-16(a)) Please submit these calculations with your Health Department permit application and plans 4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for signature on the Health Dept. application forms or withm 30 days of site plan approval, whIchever occurs first. This fee will be determined based upon final meter size, or expected demand 5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may, therefore, not be used for lITIgatIOn where other sources are readIly available SPECIFIC CONDITIONS 1) Water and sewer lines to be owned and operated by the City shall be included within utilities easements Please also show all proposed easements on the engineering drawings, usmg a mimmum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec 26-33(a) of the Code 2) This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy 3) LDR chap 6, ArtIcle IV, Sec 16 requires that all points on each buildmg will be within 200 feet of an existing or proposed fire hydrant. Please revise the plan to meet this condition by showing all proposed hydrants 4) Appropriate backflow preventers will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with Sec 26-207 5) A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec 26-15) 6) Any waste stream from manufacturing processes must meet the City's pretreatment requirements If applIcable, add sampling point to allow monitoring of this waste stream. (Sec 26-143,26-147) Please refer any questions on this matter to Peter Mazzella (375-6404) of this office JAG/PVM Xc Skip Milor Peter Mazzella File RECREA TION & PARK MEMORANDUM TO Mike Rumpf, ActIng DIrector of Planmng and Zomng KevIn John Hallahan, ForesterlEnvlronmentalIst I<}r FROM, Re: Semsco International Office / Warehouse New Site Plan-1st Review DATE July 24, 1998 m AI." There was no tree survey Included In the set of plans The applIcant should IndIcate on the landscape plan any eXIsting trees on the SIte WhIch WIll be preserved, relocated or removed / replaced, The project should contInue In the normal reVIew process. KJh FIle rn TO FROM DATE RE DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. DD 98-233 100 m :~;~ rn PLANNING AND ZONING DEPT. MIchael Rumpf ActIng PlannIng & Zomng AdmInistrator ~.e~ MIchael E Haag, Plan Review AdmInlstratorr'''' Raymond F DavIdson, P E City Eng~ D July 24 1998 ~"....- SEMSCO INTERNATIONAL OFFICE/WAREHOUSE (LOT 15, HIGH RIDGE COMMERCE PARI\.. PID) - NEW SITE PLAN 1ST REVIEW NWSP 98-012 We have reviewed the subject plans and offer the folloWIng comments that should be addressed pnor to the project beIng forwarded for Board revIew Build1ll2 DIvIsIOn (Site Specific Comments) - Michael E Haag (561) 375-6350 The approved sIgn program for HIgh RIdge Commerce Park PID does not Include approval for sIte sIgns Therefore to properly revIew the request for the proposed .'iite .'iign the applicant shall remove the site sIgn from the plans and make a separate submIttal to the city requestIng approval to modify the approved sign program, The submittal for the modIfication shall Include but not be limIted to the below listed Information The Information for the sign program modIficatIons shall depIct the SIgn and SIgn structure In compliance wIth the SIgn regulations IdentIfied In ArtIcle IV Section 2 and 7 of the SIgn Code (Chapter 210fthe Land Development RegulatIOns) and SectIon 10 1 of the Commumty DesIgn Plan (Chapter 9 of the Land Development Regulations) a, ProVide an elevatIOn vIew drawIng of the proposed sIgn IncludIng the structure to which It IS attached DImensIon the dIstance from fimsh grade to the highest pOInt of the SIgn and/or sIgn structure (maximum height allowed IS 20 feet) Show the sIgn coPy and, where applicable, logo DIl11enSlOn the WIdth and length of the sIgn face, sign coPy and/or logo Also Indicate the total area 111 square feet (maxImum area allowed IS 64-sq ft for both SIdes of a double- faced sIgn) DllnenSlon the sIze of the structure and/or frame to whIch the sign will be attached, such as the sIze of the pole and sIgn frame for a pole mounted sIgn or the size of the sign base and frame for a sIgn that has a base wIth an archItectural sign frame Identify the color name, color-code and manufacturer of the colors proposed for the sIgn face sIgn coPy and/or logo Also IdentIfy all colors of the sign structure and frame Indicate with a note whether the sIgn IS illumInated and, where applicable, speCIfy type of Illummatlon Identlt\r \vah a note on the landscape plan the locatIOn of the landscape matenal that IS reqUIred by the sIgn code at the base of the sIgn (ArtIcle III Section 3 of the SIgn Code) DIIllenSlon no less than ten ( 10) teet frolll the property Ime to the leadIng edge of the site sIgn b c d e f o ~ h Department of Development Memorandum No DD 98-233 Re ';emsco International Office/Warehouse New Site Plan 1" Review July 24 1998 Page #2 2 Chapter 9 - Commul1lty DeSIgn Plan, SectIon 10 1 1 of the Land Development Regulations, specIfies that, Signs shall be deSigned and treated as part of the architecture of the bUlldmg and shall be reviewed at tIme of sIte plan review Therefore, add to the submittal the below listed wal/,..,gn mformatlOn The data shall comply with the approved sign program for High Ridge Commerce Park PID a On the elevatIon view drawmgs dimenSion the width and height of the proposed wall sign age b Indicate m tabular form, on the elevatIOn view drawmg, the square toot area of each wall sIgn Note the allowed size of slgnage IS Identified m SectIOn 2, ArtIcle IV of Chapter 21 - Sign Code and the method to determme the sIgn area IS defined m Chapter I - General ProvIsions, Article II - Defil1ltlons (sIgn, area ot) c IdentIfy the sign colors, sign style, letter style, location and size of non-word depictIon slgnage 3 Add to the proposed Landscape/Site Plan and Site and Engmeenng Plan a labeled symbol that represents the location and path of the accessible route that IS reqUired between the access aIsle at the accessible park.mg spaces and the accessible bUlldmg entrance Place a note on the Landscape/SIte Plan and SIte Engmeenng Plan, next to the labeled symbol, mdlcatmg that the accessible route IS m compliance wIth the Flonda AccessIbility Code for BUlldmg Construction Also Identify on the proposed Landscape/SIte Plan the width and type of matenal that IS proposed for the accessIble route [Flonda AccessIbilIty Code for BUlldmg Construction, SectIOn 4 1 AccessIble Route and SectIon 4 6 Parkmg and Passenger Loadmg Zones] 4 Note. The illustration of the accessIble route that IS reqUIred to be shown on the drawmgs submitted for site plan revIew may be general m nature However the subsequent permIt drawmgs (constructIon plans) shall contam speCIfic mformatlon to detenmne that the accessIble route complies with the techl1lcal regulations of the accessIbility code The mformatlOn shall mclude but not be Illmted to the tollowmg a 'ile plall alld f)ra//IaKe plall - Label the locatIOn of the path wIth a symbol Place a note on the Site Plan and Dramage Plan, next to the labeled symbol mdlcatmg that the accessible route complies with the regulations speCIfied m the Flonda AccessIbility Code for BUlldmg ConstructIon b \ill! plall - DllnenslOn the wIdth of the path and Identify the type of construction matenal proposed for the path c \ile plan - SpeCIfy the cross slope of all sectIOns of the route d \ile plall - Identify the slope of all sectIons of the route e \ile plall alld f)raillaKe plan - Identify the locatIon of all curb cuts f \ile plalllllld f)rwlIllKe plllll - IdentIfy the locatIOn of all ramps mc1udmg curb ramps DllnenSlon the length of each ramp and IdentIfy the slope and cross slope Where applicable show and IdentIfy the slope of the flared sIdes of the ramps or show and Identl(Y the return curbs At all ramps dimenSIon the wIdth and length of the landmgs that are reqUired at the top and bottom of each ramp Also speCIfy the slope and cross slope of the top and bottom landmg. Department of Development Memorandum No DO 98-233 Re Semsco InternatIOnal Office/Warehouse New Site Plan I sl Review July 24 1998 Page #3 g. \fle plall - IdentIfy the locatIon of the detectable warlllng surface and specify the type of surface h \fle plall - DImensIOn the vertical clearance at all locations where there IS a change of matenal along the route mcludmg the entrance to bUlldmg. \fle pllllllllld or l'lll'illR (~ f)rWllaRe plall - The permIt plans, where applIcable, shall mclude detatl drawmgs of the accessible ramps The detail drawmgs shall correlate wIth the locatIons of the ramp(s) that are depicted on the sIte plan and/or pavmg and dramage plan The detatl drawmgs of the ramps shall show type of constructIon matenal, type of surface fimsh, width, length, slope and cross slope The drawmg shall also show and speCIfy the wIdth, length, slope and cross slope of the top and bottom landmgs and, where reqUired, slope of flared SIdes or return curbs or appropnate handrails and edge protectIOn 'i Indicate the proposed filllsh floor elevation on the landscape/site plan drawmg Also provIde a copy of the South Flonda Water Management Dlstnct permit that venfies the proposed fimsh floor elevatIon IS m complIance wIth the mmlmum standards 6 The SIte Engmeenng Plan shows an eIght plus mch dIfference between the back edge of the SIde located at the front of the bUlldmg and the filllSh floor elevatIOn of the bulldmg. Amend thIS area to comply with the accesslblllty code regulatIons 7 At tIme of permit revIew IdentIfy the setback dimenSIOn from each property Ime to the leadmg edge of all four Sides of the bUlldmg. 8 To c1anfy the location of the canopy shown at the front of the bUlldmg show and dimenSIOn the canopy on the landscape/sIte plan and dImenSIOn the canopy on the floor plan drawmg. En2meenm! DiVision (Site Specific Comments) - SebastIan Puda & Ken Hall 'i61-375-6280 ProvIde a Signed and sealed, scaled drawmg of all proposed bUlldmgs and structures mcludmg the followmg off-street parkmg areas, dnveways, SIdewalks, traffic control deVIces, fences, walls, hghtmg fixtures and dumpster locatlon(s) with all necessary dlmenslolllng [LDR Chapter 4 5ectlOn 7 A ] 2 ProvIde a landscape plan at the same scale as the sIte plan and as reqUired by state law ll1c1udll1g the followll1g, proposed berms, watercourses and topographIc features ll1c1udll1g their elevatIOns [LOR Chapter 4 SectIOn 7 C ] 3 All parh.ll1g areas shall conform to Chapter 23 of the Land Development Regulations mcludll1g Standard Drawmgs 8-90012 & 8-90013 4 All dramage structures and french dram shall conform to Chapter 6 and 23 of the Land Development Regulations mcludmg Standard Drawll1g 8-91007 (mlmmum pIpe size IS l'i mches m dIameter) [LDR Chapter 6 Article IV SectIon 'i A 2 a ] Department of Development Memorandum No DD 98-233 'I Re Semsco InternatIOnal Office/Warehouse, New SIte Plan 1 RevIew July 24 1998 Page #4 I) All plans submItted for specIfic permIts shall meet the CltylS code reqUIrements at tIme of applicatIon These permIts mclude, but are not limIted to the followmg sIte IIghtmg, pavmg, dramage, curbmg, landscapmg and Irngatlon PermIts reqUIred from other permIttmg agencIes, such as FDOT PBC SFWMD DERM L WDD DEP and any others, shall be mcluded wIth your permIt request 6 ProVIde catch basms at both ends of dram pIpes at both dry detentIon areas Catch basms at west end of the northerly detentIon area and m the roadway swale should be bubble-up structures and the catch baSInS at the north end of the detentIon area west of the buildIng and at the east end of the north detentIon area should be overflow structures [LDR Chapter 6 ArtIcle IV SectIon I) B 1 ] 7 Change 21)' backup dImenSIon to 27' per CIty Standard DraWIng B-90013 8 MaXImum WIdth of drIveway at flght-of-way Ime IS 32 ft per LDR Chapter 23 ArtIcle II H 1 9 Show handIcap accessIbIlIty path from SIdewalk In R/W to bUIldIng per FlOrIda HandIcap AccessIbilIty Code RecommendatIons ConSIder 6' SIdewalk In front of bUIldIng to act as the wheel stop In lIeu of IndIVIdual wheel stops See CIty Standard DraWIng B-900 12 2 Construct detentIOn area(s) to mclude proposed area "deSIgnated for future expansIon" If thIS area IS to become llnpervlOus MH/SP/KH ck Xc Bulent Kastarlak Don Johnson SebastIan Puda Ken Hall l \1\ DOcllmcnts 'km,co InlLrnallOnal ()Ilic~ \\ ardllllls~, 'kw SIlL Plan I sl R~\'le\\ do, ~.I/I/ - r:~' , . Board of Supervisors C. Stanley Weaver Kermit Dell John I. Witworth III Secretary/Manager William G. Winters Assistant Manager Ronald L. Crone Attorney Perry & Schone, P.A. LAKE WORTH DRAINAGE DISTRICT fOl ~ JiL1Ll i{i p, .In! r 18 PL '---;----.--... ~ 13081 MILITARY TRAIL DELRAY BEACH FLORIDA 33484 .....---.~~-.--- August 17,1998 Trambri J Heyden, AICP Director Planning and Zoning City of Boynton Beach Post Office Box 310 Boynton Beach, Florida 33425-0310 Re Semsco International Office/Warehouse Lot 15, HIgh Ridge Commerce Park Technical ReVIew Committee Agenda- August 18, 1998 Dear Ms Heyden. This project is located outside the Lake Worth Dramage District's boundary and the DIstnct has no comments regarding the referenced project Thank you for giving us the opportunity to reVIew and comment on this project. Should you have any questions or concerns please contact me Respectfully, LAKE WORTH DRAINAGE DISTRICT atu~~ Lisa A Rowland Right-of-Technician lar Delray Beach & Boca Raton (561) 498-5363. Boynton Beach & West Palm Beach (561) 737 3835 . Fax (561) 495-9694 DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. 98-276 \0), m @ m ~ w ffi ~ 1\1\1 lIB 2 4I1lIll .\!U PlANNING AND ZONING DEPT. TO MIchael Rumpf, Actmg Plannmg and ZOnIng Admmlstrator .f,rij -ft t: 1fY' u MIchael E Haag, BUlldmg Code PermIt AdmInIstrator '0'" August 21 1998 FROM DATE RE SEMSCO INTERNATIONAL OFFICEIWAREHOUSE (LOT 15, HIGH RIDGE COMMERCE PARK PID) - NEW SITE PLAN (NWSP 98-012) 2"'f) REVIEW COMMENTS We have revIewed the subject plans and recommend that the request be forwarded for Board revIew wIth the understandmg that all remammg comments wIll be shown m compltance on the permIt drawmgs Buildin2 Division (Site Soecific and Permit Comments) To c1anfy the slgnage proposed for the project, place the below Itsted notes on the plans a. Add the followmg to the sIte plan drawmg "SIte slgnage IS not approved A modIficatIon to the sIgn program WIll be reqUIred pnor to any sIgn bemg permItted for placement on the sIte b Also place the followmg note on the elevatIon vIew drawmgs of the bUlldmg Buddmg slgnage shall comply WIth the slgnage specIficatIOns IdentIfied m the approved High RIdge Commerce Park sIgn program 2 Amend the engmeenng plan to show compltance WIth the Flonda Accesslblhty Code for BUlldmg ConstructIOn WIth respect to the accessible route reqUIred between the access aIsle at the accessIble parkmg space and the accessIble entrance of the buddmg. MEH/ck Xc Bulent Kastarlak Don Johnson c \1\ D(,,:ull1~nls"kll1s':o Inkrnalional ()tli.:~-\\ ardlOUS~ '\~\\' Sik Plan 2nd R~vi~w do.: , PUBLIC WORKS DEPARTMENT MEMORANDUM #98-192 - m~ @ m U Wi m m Jl , '51998 PLANNING AND ZONING DEPt THRU Mike Rumpf, Planmng & Zoning Director C Larry Roberts, Public Works DrrectorM TO. FROM. Mark LIPS, Sanitation Foreman SUBJ New Site Plan - 1 st Review - Semsco IntemabonallW arehouse Lot 15, High Ridge Commerce Park DATE. July 14, 1998 The Public Works Department would request detailed drawings of dumpster enclosure for size and shape for the above named project. ~Cl~ MLlcr .J..J ~ " c' '" <.:;- Y' " cA :) :.J (">- "" --:::> """':::> ,,,; .2 "'. .-'> ~-, t::-. ~ cz:= ..;..::::' c::-- '~~ DEVELOPMENT DEPARTMENT MEMORANDUM NO. PZ 98-207 FROM. Bulent Kastarlak, Director of Development Steve Gale, Fire Marshal Kevin Hallahan, Forester/Environmentalist Ofc. Robert Riggle, Police Department Pete Mazzella, Utilities Dept. Michael Haag, Building Division Ken Hall, Engineering Division Larry Roberts, Public Works Director/City Engineer John Wildner, Parks Superintendent Ray Davidson, Engineering Division ~!..c 7--<;- Michael W Rumpf Acting Director of Planning and Zoning ,-..., In) ~ @ ~ ~ W ~ !~ lJ\1 JUl I 5 1998 W TO' PLANNING AND ZONING DEPT. DATE. RE. July 9, 1998 SITE PLAN REVIEW PROCEDURES 1 ST Review - New Site Plan Project - Semsco International OfficelWarehouse Location - Lot 15, High Ridge Commerce Park Agent Lawson, Noble and Webb, Inc. File No NWSP 98-012 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on Julv 24. 1998. When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1 Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Scott Barber 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 4 Technical Review Committee membe."(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements " Page 2 Development Department Memo PZ 98-207 Semsco International OfficelWarehouse TO' TRC Members 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. I~ a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above. to me The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum. Scott Barber will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members. The applicant will contact TRC member{s) to clarify comments. Amended sets of plans will be submitted prior to, or brought to the TRC meeting. Amended plans and outstanding comments will be reviewed at the TRC meeting to confirm that the project is ready to move forward to the Planning and Development Board meeting. MWR.bme Attachment XC: (Memo Only) William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Don Johnson, Building Division Sebastian Puda, Engineering Division Bob Donovan, Building Division Central File S. \Projects\Quantum\Semsco Intemational\NWSP\ 1 "'review-plans LN\' . . . . . . . . ... .<< Lawson, Noble & Webb, In<< ENGINEERS · Pl.ANNERS · SUAVEYOI SEMSCO INTERNATIONAL OFFICE/W AREHOUSE WE HEREBY CERTIFY THAT THE DRAINAGE DESIGN FOR THE SEMSCO INTERNATIONAL OFFICE/WAREHOUSE PROJECT WILL CONFORM TO ALL RULES, REGULATIONS, CODES, ETC INCLUDING, BUT NOT LIMITED TO, CHAPTER 6, ARTICLE IV, SECTION 5 OF THE LAND DEVELOPMENT REGULATIONS OF THE CITY OF BOYNTON BEACH ? ? .'1 ~ T, P E. NO 38707 A330ENGCERT .7-7-9B.DOC LAWSON NOBLE . Wall, INc. · 420 Cok.mbla Drive · west Palm Beach. FL 33409 (561) 684.e888. F8x: (561) 684-1812 .Inw-wpbOInw-inc.cam West PUn 8eItch . Port Sl Lucie . Plantation ------. ------ # Lr-~\V . . . . . . . . . . . . .. ..- Lawson, Noble & Webb, Inc. West Palm Beach. Broward. Port St. Lucie 420 COUTlbIa 0IIIIe West ~ Beac:tI. Fl 33409 Eng-- PH.(561J6lI4-66ll6 PIa-. Fac(56IJ684-1812 ~ Job Name ..-. ~s ~ ...... . --- Job No ~..:. - .~ --- -? Sheet No. Of Caiculated By Checked By L; ___ Date - _.I1__:':v -- -.... Date ! 0.....--. ~ , J'\:~; ! ! I i l): I ^\ i _ : -_: ~-~_..~-:-:. -.-i. ;~1 .~_ \ f_~7',"~ ~~_.'". -~4--> .~.!.'.'~,:-:_ ~ i~. ----,..--"---.- , ' ii, I ! I i ; I I I I ! \--;-D\~ S'h-€" I A 1'1 .,q. f..E. ~ i , I, , ;...-' I .--.-2p \ I,LJ ; , , 5F- ; C (~:77 '~~I') ! i i . i ! i I ! ! i I I i ! I I ! CL~l R, '~~-AT",\~~.I--~~~Q\s~'p! i I if: i. . J .! ' . ; '/' 'I I -~--_r_-,.-------,-- , " I 'Z.. ,oJ. C'- ''''J_.L./_~_' -~-.' _ ~_=- ; I "", ,'" --, I f i ~ - ~ 'r-,- i<.F".=QI L~ D ! \'71' I _ I ,- ~ .- : 1=:;------.----- '. I I, , . ! !! ...!!! - ! I ; . , I, j I ,~ .! I '-rl " . I ' !- \', ! i_~ttd;~~-''4~ ~:J..~-"L+- ' ! i I . I J ! i !! i I -+-t---; \2.. i . --~- ; r! ' '-F:"----. : i i ! ' '\.! t _~~~~-~---H~~-L.h-L~- : UI.J I I' 'I i !;; ( I !, _. 'I . I I 11 i! ;; i ' i ! ' ; 1 I I r~ I ~o ~ ,--l i ; : I I! I Ii!! iUlI ~i I ~ i! i 1 :: i ! i ...r-- Iii I I ---! ! .'""tL..A..~ I '~""~:' ~' II! i i, I, I,~. I ; , , j . .: ___ : e.~ I. Ii, ~ I : i I ; i I! ~ ;::;.r-W.'Z.! I i ! i ! ! Ii! !! I I ! ! : I 1 I j / I I I I I I I l\. ' ! I I I I " IiI ! \:1.. -i ~lCn i ; '7 : \ I I ~j...; _ I ! / : i ~ I I \.! i 7J I ; ~ .....; ) 1 - ! r c...; <..-to- / ll- I I ' ! I I I : ! I I : I 1-- b\l -~ \,{-'~-C Ii! I I I I j : : t , ' 35D ~r:;;- : ! 1 Iii I Ii: : ; : i i : ! ! I i I I ! I I ! I: ! I ! I I ; ! I; n I!! I !! J I! ! I , I ; II III /7.l I ---1-'" '- T ! I I I ------- J.--""-! I ! , III _ -Zd..1D ....)_i ~ ;3 ^ ... ... , ~ fI-" I I i I I ! i 1 i i i ! I ; I I 1 i 1 i i I I 1 I j i /-\ J ; .r . i \ 'h--- i I , ; ,I ; I. --y)"; --i-J-~lA h.,~ --j \ ! (\i ;f~_~ , " \~\~,~ ! /-~~I --1-__ _, l/ :- --;---l..-~. .__ .~ , I i I I ! ; .,; Lr:\V . . . . . . . . . . . . . ...- Lawson, Noble & Webb, Inc. West Palm Beach. Broward. Port St. Lucie 420 CokrrCla DINe West Pam Beoch. Fl 33409 Engn- .M 156116ll4-66lI6 I'IanMq Fax(561)664.1812 ~ I i I I ! I.' i I. i..:I i ,"'\ f-r i ,..., .'t ;! I..?'-' i i I I ! i I I 1 I ! j I ! Job Name /""' -........-..... ~,."" .... -::-. .,-- '\ -- ~....... ---: ... --' JOb No. Sheet No. '- 01 Z 1_ ~_:J? Calculated By \c\...~ _ Date Checked By Date I i : '~~-0IG_\' ~~'~_'\i~2~,L\~~'2:~' I i . -;~_.~-- .-r-.------..... --:....-~.------- I i I / sr: I --- 1\1 --r---'--; ,I _.- f--~ --,- --,'-'" --. ~.. ---I-lVz.J A.. _,,___ !'_ ,~_ ~t i I _u; I : n': tl '-~--" i i : 'Z.'"t.. ~S .... -: ~ ---L~------ .---- --""-'-'--- - -I "2.0 '"Z.. .... ::::; --- -~"'1. .--4.. =-- r- .-. __ __,~_,.l____;-~____"_----'__'_'_7 , i i ! ! i i \ , i ! i I ~ I . K- (ll i ~~' )(i-=c\c ~ '\ ;:::. , ! '\ ,~ I,' I j ! ! I-r- _~~__k~~_,c.~. I Iii ! ! !! I~ ~--L--l--r !! I I 1 ; 'i ::! ! 'I I ! t I I 'I I ~ ~;, ).! : t i I I I i _ I j I ! I.~', i i i 1\\ ~ "I -. _ ~ : -n::....-:-~ . -J.",;:. r'M:.-"'- .:j\-."f',).;4e'Q i i """-n r '- I ~ I I' T --"! -r \ l <.>.I I i \: -.:::::: ~ ~~ , I . ! ! i t i ! i i - !..,c..l..OO"(.~ i ;!' i!. I i I i I t f I ---I ~l ..., f - ,. Q... , t:.. ! '~,! \ ,~ 7i-r,- ~ -'-!.":f' ~~-:-.' , I . ! Ii! , . . i I --+-~_._---_. I I : ! J i 1 ! ~ i lrr" '/. -+60 I ~ \ .::L I~ L_ ! i' . .~----~ i I i I I I I j i \<O:,~ __ ,_.___ _ ._ _, Uh.<:..f: j ! I ! I I I ! I I I I i , i I I i I i ! I I I I I I ! i I I I I ~ ! i f i I I ! I I I ! i I I i ! I I i I i I , 1 I f I I i I i I I I i I \ I I I I i I : ! , -I '-..." ~ ' t-..-I.a::..J' C,.F --..--- , I , I ~ ......~" ........... ,...... I i I i J ! i i ! I ! I I I I ! I I , I I I I I 1 ! ! I ! , I I i j ! I Page 2 Development Department Memo PZ 98-207 Semsco International Office/Warehouse TO' TRC Members 5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified 6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to me The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process All comments shall be typed, addressed and transmitted to me for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum Scott Barber will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members The applicant will contact TRC member(s) to clarify comments Amended sets of plans will be submitted prior to, or brought to the TRC meeting Amended plans and outstanding comments will be reviewed at the TRC meeting to confirm that the project is ready to move forward to the Planning and Development Board meeting MWR.bme Attachment XC (Memo Only) William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Don Johnson, Building Division Sebastian Puda, Engineering Division Bob Donovan, Building Division Central File s \Projects\Quantum\Semsco I nternational\NWSP\ 1 Slreview-plans TO FROM DATE. RE. DEVELOPMENT DEPARTMENT MEMORANDUM NO PZ 98-207 Bulent Kastarlak, Director of Development Steve Gale, Fire Marshal Kevin Hallahan, Forester/Environmentalist Ofc. Robert Riggle, Police Department Pete Mazzella, Utilities Dept. Michael Haag, Building Division Ken Hall, Engineering Division Larry Roberts, Public Works Director/City Engineer John Wildner, Parks Superintendent Ray Davidson, Engineering Division 7L ~ 7-4- Michael W Rumpf Acting Director of Planning and Zoning July 9, 1998 SITE PLAN REVIEW PROCEDURES 1 ST Review - New Site Plan Project - Semsco International OfficelWarehouse Location Lot 15, High Ridge Commerce Park Agent Lawson, Noble and Webb, Inc File No NWSP 98-012 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments to me no later than 5:00 P.M. on Julv 24. 1998. When preparing your comments, please separate them into two categories, code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval 1 2 3 4 Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments The documents submitted for the project were determined to be substantially complete, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Scott Barber Each comment shall reference the section of the code that is incorrectly depicted on the documents Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements , . , REVIEW COMMENTS. (Memos) AND DATA. -e:fTY of BOYNTON BEACH ~ r ,:'In.k'E''P , -... ......-. .. :-. ~ ......;. (j) 120 N,E. 2nd AVENUE P.O. BOX 310 BOYNTON 6EACH. FLORIDA 334J$.0310 pos)7~111 OFFICE OF THE PLANNING OIRECTOR -. November 19, 1985 Ms. Christina Facio Peacock and Lewis Architects and Pianners, Inc. 501 S. Flagler Drive, Suite 500 West Palm Beach, FL 33401-5985 Dear l'1s. F ac io: Please be advised that both the Planning Director and I have reviewed your preliminary site plan for Sunpoint Savings Bank. Our recommendations for.this site plan are as follows: 1. The proposed access driveway must be located at least 180 feet north of the intersection of Congress Avenue and Old Boynton Road. (Section 5-l4l.g.3 of Parking Regulations) 2. T~e curb cut onto the proposed access driveway at the southeast corner of the property may be inappropriate (situated too close to the inter~ection). Further infor- mation is necessary on ~he proposed driveway in terms of traffic volume and peak usage. Also, information is need- ed as to how this driveway will service the property to the rear (west) of the bank. 3; The proposed relocation of the dumpster pad creates a hazardous situation for the City's front-end loaders. The dumpster pad must be placed in a location and properly angled so as to allow efficient access and safe back-up space for the City's front end loaders. IJdge Two. 4. It is recomrnerlded that the proposed parking lot configuration be modified to relocate the 3 parking spaces nearest to the southwest corner of the property. The current parking lot design does not allow for sufficient back-up/turning space for these 3 spaces - particularly at peak hour usage. If you have any questions concerning these comments, please do not hesitate to contact me. Very truly yours, CITY OF BOYNTON BEACH rl'~ James J. Golden Assistant City Planner flat engineering rohert+ ~UIIIJJaIIY June 25, 1986 City of Boynton Beach 120 N.E. 2nd Avenue Boynton Beach, FL 33435-0310 Attention: Mr. Jim Golden Reference: Sunpoint Savings Bank Drainage Calculations RAC Job No. 855020 Dear Mr. Golden: The revision to the access road that has eliminated the cut- through does not affect the drainage calculations on the referenced project. If you have any questions concerning the above, please contact me. Sincerely, ROBERT AND COMPANY OF FLORIDA AJd--lJlfJ/AO C. &/M-( Douglas C. Blackmon, P.E. Vice President and General Manager DCB/mph cc: Peacock & Lewis 701 u.s. highway one suite 404 north palm beach, florida 33408-4508 ph. [305J 848-8556 ~ PEACOCK & LEWIS ARCHITECTS PLANNERS INC PEACOCK & LEWIS ARCHITECTS & PLANNERS. INC. R. Carroll Peacock, A.LA. President Howarth L. Lewis Jr., A.LA. Executive Vice President Glen P. Harris, A.LA. Vice President Stephen L. Boruff, A.LA. Vice President Paul E. Neff, A.LA. Vice President Maynard C. Hamblin Secretary/Treasurer Samuel J. Ferreri, A.LA. Associate Stanley N. Herrington Associate John p, Kibbe, Architect Associate Edward H. Sheahan III, A.IA Associate Donald H. Williams, A.LA. Associate MEMBER A.IA Flagler Center 501 South Flagler Drive Suite 500 West Palm Beach Florida 33401-5985 305/655-4063 NOVEMBER 15, 1985 MR. JIM GOLDEN CITY OF BOYNTON BEACH BUILDING DEPARTMENT POST OFFICE BOX 310 200 NORTH SEACREST BLVD. BOYNTON BEACH, FL 33425-0310 RE: SUNPOINT SAVINGS BANK P&L PROJECT NO. 85-011 DEAR JIM: ON BEHALF OF PEACOCK & LEWIS ARCHITECTS & PLANNERS, INC., I AM WRITING TO ESTABLISH ACKNOWLEDGEMENT OF OUR EFFORTS IN PROVIDING AN ACCESS ROAD OFF THE SOUTHERN PROPERTY LINE OF SUNPOINT SAVINGS BANK'S PROPERTY, WHICH IS LOCATED IN THE CORNER OF CONGRESS AVENUE (SOUTHBOUND LANE) AND THE MALL ENTRANCE ROAD (EASTBOUND LANE). THE OR I G I NAL SITE P LAN WAS S UBM I TTED AND APPROVED BY THE CITY COUNCIL ON JULY 16, 1985. SEEING THE NECESSITY FOR A BETTER TRAFFIC FLOW WITHIN THE SITE, THE ACCESS ROAD SEEMS TO FUNCTIONALLY RESOLVE ALL OUR TRAFFIC CONDITIONS. THEREFORE, WE WILL SUBMIT FOR SITE PLAN MODIFICATION APPROVAL, BUT IN THE MEANTIME, THE OWNERS WANTED TO MAKE SURE THAT THE ACCESS ROAD CAN BE BUILT AS DESIGNATED ON THE SITE PLAN. THEY HAD FELT THERE WOULD BE NO PROBLEMS BECAUSE A LETTER BY CHARLES WALKER, DIRECTOR OF TRAFFIC DIVISION, WHICH RELATED TO A PREVIOUS OWNER ABOUT ADDING A STREET AT THAT SAME LOCATION, STATED THAT IT WAS OKAY TO BUILD THE ROAD AS LONG AS IT MET WITH CERTAIN CRITERIA. PEACOCK & LEWIS ARCHITECTS PLANNERS INC. PAGE TWO - NOVEMBER 15, 1985 MR. JIM GOLDEN CITY OF BOYNTON BEACH BUILDING DEPT. RE: SUNPOINT SAVINGS BANK P&L PROJECT NO. 85-011 THE MOST CRITICAL CRITERIA, BEING THAT THE NORTHERN ACCESS POINT ON CONGRESS AVENUE MUST BE AT LEAST 185 FEET SOUTH OF THE INTERSECTION OF THE MALL ENTRANCE WITH CONGRESS, IS MET ON OUR SITE. IF ALL TRAFFIC; CODES, ETC. ARE MET, IS IT POSSIBLE TO GET A RESPONSE FROM YOU ABOUT THE LIKELIHOOD OF A POSITIVE CONFIRMATION ON THE ACCESS ROAD AND ITS LOCATION? THANK YOU FOR YOUR TIME IN THIS MATTER. SINCERELY, PEACOCK & LEWIS ARCHITECTS & PLANNERS, INC. ce.zs71JJ tr t=-kc/o CRISTINA FACIO CF:DPT ...-.,'" May 2, 1985 Timothy A. Smith, Esq. Greenberg, Traurig, Askew, Hoffman, Lipoff, Rosen & Quentel, P.A. 1401 Brickell Avenue 7th Floor Miami, Florida 33131 Re: Access to Property at Northwest Corner of Intersection of Congress Avenue and Old Boynton Road Dear Hr. Smith: I am writing to confirm the results of my meeting with Mr. Enrique Wolf, William Reiter, and yourself yesterday afternoon, concerning the property described above and shown more particu1arly on the attached survey prepared by O'Brien, Suiter & O'Brien, Inc., on December 6, 1984, which I examined and signed yesterday. The handwritten sketch of drives on the attached survey show' the three access points for the property at issue that the Traffic Division would approve, on the following conditions: · 1. The northern access point on Congress Avenue must be at least 185 feet south of the intersection of the mall entrance with Congress. That access drive will provide right turns only, for both ingress and egress. 2. The southerly access point on Congress must be a drive angled sufficiently to provide for a right-turn ingress only and must lie at least 185 feet north of the intersection of Congress and Old Boynton Road. 3. The access drive on Old Boynton Road may lie no less than 350 feet nor more than 450 feet to the west from the inter- section of Congress and Old Boynton Road. As reflected by my notation and signature on the attac~ed survey, the Traffic Division would approve of the locations and formats shown for these three access points based on the conditions stated above and on the pertinent existing ordinances, rules, and regulations of Palm Beach County and any other laws within the Timothy A. Smith, Esq. May 2, 1985 Page Two jurisdiction of the Traffic 'Division to implement. Sincerely, ~~!~~ CHARLES WALKER Director Traffic Division Department of Engineering and Public Works Palm Beach County . CITY of ~OYNTON BEACH ~ Q) ,. . .~- 120 N.E. 2nd AVENUE P_O. BOX 310 BOYNTON 6EACH, FlORIDA 33435-0310 (305) 734-8111 - OFFICE OF THE PLANNING DIRECTOR -. November 19, 1985 Ms. Christina Facio Peacock and Lewis Architects and Planners, Inc. 501 S. Flagler Drive, Suite 500 West Palm Beach, FL 33401-5985 Dear 1'1s. Facio: Please be advised that both the Planning Director and I have reviewed your preliminary site plan for Sunpoint Savings Bank. Our recommendations for.this site plan are as follows: 1. The proposed access driveway must be located at least 180 feet north of the intersection of Congress Avenue and Old Boynton Road. (Section 5-l4l.g.3 of Parking Regulations) 2. Tpe curb cut onto the proposed qccess driveway at the southeast corner of the property may be inappropriate (situated too close to the intersection). Further infor- mation is necessary on the proposed driveway in terms of traffic volume and peak usage. Also, information is need- ed as to how this driveway will service the property to the rear (west) of the bank. 3. The proposed relocation of the dumpster pad creates a hazardous situation for the City's front-end loaders. The dumpster pad must be placed in a location and properly angled so as to allow efficient access and safe back-up space for the City's front end loaders. . _.,...__.~--"_._,----~--------, Page Two. 4. It is recommerided that the proposed parking lot configuration be modified to relocate the 3 parking spaces nearest to the southwest corner of the property. The current parking lot design does not allow for sufficient back-up/turning space for these 3 spaces - particularly at peak hour usage. If you have any questions concerning these comments, please do not hesitate to contact me. Very truly yours, CITY OF BOYNTON BEACH rl'~ James J. Golden Assistant City Planner flat -- .----. STAFF COMMENTS SUNPOINT SAVINGS BANK SITE PLAN MODIFICATION Engineering Department: See attached memo. Public Works: Contact public works prior to pouring dumpster pad. Planning Department: See attached memo. Building Department: See attached memo. M E M 0 RAN DUM July 1, 1986 TO: Jim Golden Planning Department FROM: William v. Flushing Deputy City Engineer RE: Sun Point Savings Bank COMMENTS: 1. Provide property ownership certification or new survey for off-site road improvements. WVF:ck MEMORANDUM 2 July 1986 TO: Chairman and Members Planning and Zoning Board FROM: Carmen S. Annunziato Planning Director RE: Sunpoint Savings Bank - Staff Comments Please be advised of the following comments from the Planning Department in connection with the above-referenced request for site plan modification. 1. 900 parking spaces require a 27 foot wide access aisle. 2. Dumpster is to be screened on three sides with a six foot high concrete block wall. 3. Parking lot layout and design on engineering plans must conform to site plan prior to permitting. cltJvrv~~~ ' RMEN S. AN UN lATO /bks r "I FROM TO Carmen Armunz i at 0 Planning Director Bob Donovan Chief Plan Reviewer SUBJECT:. ..~~po.~Il t SaV"~.~~..~.~ ..............DA TE:..~!J:{!!!~.. "OLD. Upon review of the above mentioned addition of driveway onto Congress, please be advised of the following: 1. Plans do not match previous plan. 2. Need new survey wi th drive wi thin property 1 ines. 3. Handicap parking space not shown. BD:bh PLEASE REPLY TO . SIGNED ~a~ Bob Donovan REPLY k. DATE: 1~~2-P { SIGNED Item # F269 @ Wheeler Group Inc. 1979 ....L T~S COfIY FO'" "E~SO'" ADDftESSED -~ - r Robert and Company Associates NORTH PALM BEACH, FLORIDA JOB NAME ...sUN POI N..,- S~VIN6'5 E;ANK.. LOCATION EOY /'-..., ~ '" bC~. I F L- , NO. 65501-0 SHEET NO. I SUBJECT DRAINAGE EST. BY BLA. 0::. M ON DATE ~/21 /b5 CKD. BY DATE r .1 :~-=C:----'-I,.. q : ~ ... ._QE~dr=q It"2..~ A~R.€~ ~ I PCk-VIO - M A: I, i' '1-~' '9">'" i 3700 s~ ' L. ., ~) Jb_~)( 1- L I ~ 1 __.7_5 (., j I .5' ' xt w s ' ~ I I / 75 . [ ~. :1~:~ · - :-H~ T---+- -- --+-~--- Iii "~8; :: i ,~" I I I W .1l~ i " ' 31-0 ..~ I r ,.", - (.3) '. ~.;: _Q_~. -- 10 . ;/~/~. ~~------~- -----+---+rj' ' t--.~..735,m , 1--' ._m r- l fl, 1 ; -: . , ~,i~:~l!-:~~=I'l2-~ i-s - ~;I. ----- '1-+-1 ' fl ;T~ ..1 ! : . i-C Flcn:>~: . tl.+..;. :+.- )'1 ' 1.0 Ac.1lE~'! X . B =! , ~45 r' ,...---- -T-~~- .----1--. !. --~TI. .- . I . .2_ 04'c4E!;> I x ,:2- ": . 042- + ' · . ..l " ;,-1 !, I~-'1 j ; · ~ e; 7; .... 1._ .. j.+....I_._+___L+_~____ L- ,J,i>~ 171 i. I,.... '.' ' '.L lL'-LLl- ,- I -...----._--------r--~_.----_b i,', J .,.12- .'t.. .. , .. I li . ..m; I I I ~,' F/~l'H-azl> d FfA qop- ~ (:76). ~76 ..... 1 \. I~' __-.0-.-.-... ~----"--- - ... ! I -+- . -t-----t... I I I .-___._-1___._1 i . i I I j I r-l~ 'i.J~,/'bf' ,II l I '- .~. r Robert and Company Associates NORTH PALM BEACH, FLORIDA JOB NAME <5UNPo/",-r- S"c.v f NoS' E:>,t)N 1<- lOCATION E3::CYNI"O"-' Be w. 1Ft.-. SUBJECT 'D12.A,NA r~ NO. 6 S5() :2.0 SHEET NO. 1- EST. BY ~'-A~) DATE ,,/1,../ /65' CKD. BY DATE ---~-:; . , -. i+' " .1 + -,,' ,tj) l5:fj~'b -(ii 1 +J-' I- . "----. i .---.! I ,,; F~ 60, M , . ~~, ! SJrr; r-- r H ~ I ..,.,'--"/ I A~UWE ~~. , ' 1 I t I J c~~~~c;~ I I "1 :. . t..__ ~_'''_'_' 4-.;' ~L;>t.!J , , --f---- ,i- =t, , i lj= I._(,,! r Robert end Compsny Associstes NORTH PALM BEACH, FLORIDA JOB NAME SVtVPO ,NT 5~V INe:. 5 ~/Vt=- LOCATION f!:;()y /'J 'TON eLH F c- NO. $501...0 SHEET NO. .8 SUBJECT DI2A ( oJ A (;, E EST. BY ~J-A .>lC./"YY7r) DATE G:7/1-1 I ft6 CKD. BY r"" . ..-.----.-. -1....----... ...-..r...............'T. . j , I I . i I l . CA~G~-rt M4'XI/YlVMR-!y^,OFF . . I " 77" ! ,p Xff~1f- 5'~ -:- . c =i6MI"-.I. ~_.. .-&.?__-'l!A._- .._-" -.+--.-...-.... .._~. ..--... ! Q~. '76 (c:?! jlVlkA-)(i-,-G ~c.:) t. Q.:: ~. 8.5 c:F~' i DATE (FPI() I r--._2yr .rQ_.~9A!.FLb.I..!..8~ TIC}. tV.. ~E.?(T'ff - .~f"tfB:f>.K~....50~._._._... , - . Fr:o r PI Pi:' / .:s P. C Q :.; / (2 C' p To D/<..A I ~ ~ I (' r hJ I 'TJ-I 2.50 Fr OF r>( FI L 772-A-T;'CN I7'-cNfll. ......__7';0 rrr. ..~1; Cx.EIL, 'C0~.=.!I"2!:! [fl..J":"L'::.l.J ..{;AN . ti:i5.Q!P-Ac;z.t:.~....!,. '2.>0 jX . 0 /.5" 1-~ -= 3.:{~ c..~ ;-t- ! <MIN. 6 /0 IS 12.0 . ;30 I CALCVLPTE 57;O~GF Ory :SITE' ~ / A X t X ~O CEC,r?EP7Ei:J !PY 2.5 )I~. $70Z2M '. .. t. .76x.'3.o'/../.u,x. 8 x: C,O :: 41-4(., ,/ )(6C.::< AI)( )( II '0: 5107/ _ ~~..-.___...._l~.,_'".<i-'_. .._~. , " x7." 'X 11 '1..1'5'>)( " -:;: ~ 71.. '2... /, ')( (..9)( rI ')( 2~)( " =-.6 / j,~ I, X")"L;)( " ')( 30 X. II =- /q'"2...G. 0 i T:p H!>:N D'-~ ;2.5Yl<r f(Q~tY1 fE .;~-K ~-t~rst;i;-::-;-;;:':~f.1 i I I .' i . r)f5~H.~g{;P 470fA65 Q/7i)'P'1 , l'::) 0/; ~4.$ ....1 .~?2~__~b~.. _'"'---1 '$5 ~4- 3/{;;b +75~ ,..~ 7 J 2.8 :3/3'2- i ; 1 I , .' ------___,,_--4 ! .... . ...........L..___....__.. ....._.1_... _.. ;__c~ ..,_...".__u__._.~___.~._ -.---,.-<^".-...-- _. .'-~ - .-. '-"~--~--'r-'~-'--'-- - m_~ __c. -t' '''-0 'cn_. ~ FE/4/"f S77:),(?.AGr i2E'L;> P f@ 1-0 /I.11'tJ~ := 33-9 c;. c.+~ I A~S UN1E IS /I PIPC' 'j I.! 2.50 '-.F OF TRcNCJ..I = [4 ~ 4- - """((,3t] 250 (f;O, 7-- ) = /844 e.F. ,........_2P Q ,,-== E.. .?E, _C!.t!:::>.!f" == ~?OQ.. ~...zrft- ~.:j..::,_..~..~::?_dl:f__--...~--..L-._...-.._~._-J 1 I -, T'~, I , :.. 1 ;.. 1 ; .'" Tor~t... r~O/4A6E' SU'1L.IEn.:;:J ~4("'"7 ~F~ <t .$36 ~ .g:,e. ! ~ i . t S71';;2f" F I Sl /fa '~;ODI . ! 1 :: j 1.:- ~ /lN~AJ5".e ~.fVan-l 1Ft T~N~ .t. I ," I ' i ; I . I ' I.,..., __..._ _ __~_...... _ __ _J,...._ ~"'_ _ _ """ _ __..1.; _~_._.___. ".~. ~._~~.~_.._____....,.i_~_.....,___~<_.,,,_~ _ __..._.-L, ,_._ _.'- _, ___.",,~.__~~~,"__. _l_.... ~~~:_____w~,..,~L_,,___.l r Robert and Company Associates NORTH PALM BEACH, FLORIDA JOB NAME ~ v AJ ~ I tJ T ~-,Ll V I /Vb') 'f!;;/>t-JJ.c:- LOCATION '/3;;oyNTO,J ?pCI-!..' FL- SUBJECT D/2.A /tV A&.c NO. 05S0 (...0 SHEET NO. 4- EST. BY eLPc.~c;/'J DATE {,("L--1/65" , CKD. BY DATE I--..--~--_...._~_._-~. ... . T/ZY ~o ! I -. 'T-- .-.. ... T-" -. "'- ....--1..-.....-.--....--..--1'--.---.... --'-'---- .....1 i Ii! 3196 X, O(5~2.4~ 4iSC-f-~ I I 5/~I2-A~f ~9/~~.~_~.____~.-+ J:J~c" : i *~ I ~+. ~--~--'''i I /710 j i I ~-i L-F ~ F I 1 ! nLF IV f--I-I , +, -1 ~ I ~ i 4~ 7 S x: ti x Co 0 I.. --'---" .-..-;----..- .--...--.-----t-.......... ..--- I \ . I b ' Z"2.b.o /0 2.05 !.o ! /~ .17.. 7 :5 ~.-1L~..-~_-t..- _~Z()'? . 30 6550 K ,Pep,,e;. ~TOjZ.,Dr;,E' !2f;()IO @ 15 Mo.J.- -= 244 7 (,F: 300 L.P of T/2/:'N.::.11 ':!' [41 x: 4 - irJ (.3) -PI PE" = Q"z..3 C..F~ T?yTh. t.. '>"71?/Z.,A G [' -S:U f:of>L IE () : 1.837 ._......"?~T'2I.?A(.li:. J;;,. .~..._ >- 2.4 2"h14 I ~ r Robert and Company Associates NORTH PALM BEACH, FLORIDA JOB NAME SU/'JrbIIJl ~AVI/'JG" 5 61J1^JI<.:.- NO. 655'01-0 SHEET NO. 5 lOCATION 't3;;xJ~//'J-(o,J Be 1-1. 1=L- SUBJECT D4PIIV,A(',r=: EST. BY 13l-P <-Ic.rrPf'J DATE [, /1-1 / IJ.S CKD. BY DATE r'-'-~A'~-~~~!A ~;"~,1 ~~ ~ U ~ l.J?1 ~ U. F 4.CX)R. ! I07'AL! :S,-rF ~A ~ 1_1.Gi AC. , 8u(~4IN6 r-.,(2.E~:: ,17 ~ c- : .".,4I2..}-,A OF Glf..,4DI".)G =t /;00 j_._.__._ _~~-;_~<<_. --...--4-~ .,- ..____._~r'~..._. _,,,.,, _.._._.~_~<.~..._ on ____...._"" ". d.'.'.. ~___!t-_._.__'"N.^_._. E I...E v: t Acl "'1" Srrr v..!'C(.. POND L-INEA.I?,L. Y FROM ELE'I_ 14-. 7V EU=-V- /C:,J 0 A = ~{1r.._"&H A = t. '4 ( 1,09 A<.:) . :2.. A == .7 (A Ac - ~r: VO,-UMF TR[IJcl-l CA/'J PE:,(?';C'/..ATT IN 4,75 c. .r:/5F(.. X Goo, SEe. ^ ~O /YIIN. M 1"1_ /-II?.. -rr<.Fty~.H,.._(?A!D p,-PLYY.!'-k-,. .=?/.9~~_ h8.,,~.7 ..c;Lr=..._,-_Q.73.<;;J:~ / 1-/0 U I!.. ::: / 7} I~ 0 C.E =; ,~, ~'F7. J'.OO 17.00 71!..C N c. 1-1 .4G .4' ,4 c.. .4:4 SIn; o () .7~. t.:!; / r.or.Dp .~ .. .__,1:, b' I. ?- 'Z. /_77 /00 'Y12. RA/fvF/.::>t.. '- ::. /0, 5" II /00 YIL: .3 Dt:. Y f.2A 'N,c-~ U. =, 10_$ I' 'I.. L /-3S.~ .: { /4.2! II Y.9.?--J..II'('.F = 14-.17 /1 X /-~~'::~ ,r-_J.----:L~. l.~.~Qj~~_:ff~.. . 11- L Srn C,F /7.-. (,0 14. c. ~ i E'f OJ€- F L..A/- I S- : I. 50 --1- /~ ?h_:: ..V.us"'-~"-~'~'4'-'~'. 'f'__'___'_ p~t:~~.~oj 'I) , ! I ,.. ~_ ,......,....,.w..,.--",___.. . . ._., '_--"_k +_~'.~_.~.. ~__^.4_,,_ .m.'__., '~.'__~"..-\~_'~W_'_M ~_.~. .M', ~,,"~__''''''''.,~ ~'~_~__"_'_""" N~___"_' -.- ._ '______.._ ._~_~._. ',_ v.' ; ,.1-::.77 - /.2-"2.. = .55 ~.-:z.8, X / + I~ = ,55- i I r Robert and Company Associates NORTH PALM BEACH, FLORIDA LOCATION ~N""'r"ON ~CJ-i. ';::=" L- JOB NAME Su ~Po \ "-J. -,.- S/::;..'J. '" G.s ~,,) ""- NO. 6550'2...C - u ! SHEET NO. \ SUBJECT p(lp.\tJf:..c::>E: (Rrv I~Ct 10 Aop E,.J7t..Af-..k:;.I". @. C/?~0r-E::'~") -' r--- -. .__..._~.- ..- -..- j . t I \ I i i ' ,. I I ~_.__:7_~~:?1_?J4~?("C..<.. ,- EST. BY ~ LA c.. k.. ry. '0 N i A(Lt":A P ~ DATE ,\ /1-5 /6S CKD.BY ~-~~~r'---~~'--' -"'---'-'- -'1-"---; .~._~. -'-. 511---;:: I , 1-'3;;5 \ -{ i I i , ! 3 'J.-;S =; 7(,; :;,,5 ;5.F :;; i I l,iS, A<tP.E":S ,........-._.........&------_.~ .~-~-.. I 17' X "P Ef- \) I 0 U~ t:>I- ~ p.., : I sF'. . 1-0')<.. ~~.__-...-~. , ""."._ ..._~.m~ , '1; 1- 0 -= 197' :; "';.J:) ')( ')....0' :: r.:..c ' "" 1.- 5 -= 1...1''j.,')..5'= _._J~~__?'..:x:._.~~ :: 18')i. Iq 6 I 1. oS I 5 I X. ~so I ~ 4- ' (...4- I 14')( /)..,0' -, I y-- '"'::bCz,' 7 ' )( 4-.6 ' I 0 1 x 1-4' "....~. -~_.~'.,,_....~_.~..., -,'--'" , 10'')1" 4-(1)' \ 0' -;..., 1'2>' IOI~~ ~740 "? 0 4C 4-00 500 5 'l-S ~oo -::: 31..4 70Lt t ':50 6~ G:, '2..e-o :: = - - ::l = 'L '3 ';;- :: ~ .....,.;~ ..? :5 '-,:, -::: '"'~-A; <? 4-d 0 l"?-O \ 4- 1\ 7 S. F ) ::: :: r 4. J Ii /4~/'5GO = . 3').... A..c..(l.~'S c... 'F A c.. "TO fL DATE , r"----~.~-~---1>.--..--......-- ~.---r. ; _.~1-'i- -r- + 1.4~~ .5 j t./5 ; , \ 1 ! I j . , WE"I,61~ c... j I I :: (]2) I \ J I h"A L... ___..___._._.....___L_._..... ..... - . _wl~._~~.....__~_._~_~~_~.J._.."......__,.;.._~ r Robert and Company Associates NORTH PALM BEACH, FLORIDA JOB NAME S LJ N T=b I I.rr SA \J 't-J e:.s ~ 1Jt::. NO. 6ffiO 1..0 - 0 { SHEET NO. 1- LOCATION -eoy'-.)-rON f:x:..4.(.. J 'F L.. SUBJECT 'D(2....b1 t0t:.6E ( REV'~F r?) EST. BY ol..6. ~~0"j DATE I II z..s /6'5 . CKD. BY DATE --l-"'~. '--~~-"r ~ ~1 04,- ck:5. I .. L ~ ."77 11..1 S (3.0;: ::t '1.-55. ~ 7 1-. ~ Tf-E,..) <::+-1 (rOI?<<~ .: .. ; I ..A..AJ. ;..... -!,'EF (:(.!., ~ 'N~ CI~lL. ,J <...tTT~OfJ'"$ ~.____.,._.....____,~"n.__~ ,"n._. __~.~_,,,.._.~._J._~_. _._- .'> - -. _l._~,.._..... ~'--'..- CAL.L..VLA~r 5-.,......?a-~~!: r::Jc-Q'D. REO:;> I, D '--T-l-' ~ Ii 4 ! I I ! ! : :1 --"-"-+"-4"~---1 ! i PEP-IG. ~f2d:>.G r= l':2..EQ'D @. T(... y' 400 ~. ~ T r.!.J c..~ ...1 i j"1 4,04)1. -t)< (,,0 I s-rc;4.tV\- "DISc+,. ! ...- '" -~-,,-~-~---'--' 1)'3 ~ ":? i ~681-- i I 'l... 4 1.-:4 4 51-~ I / 2> G,,~, Go 558 I I I 4/3146 ,c.309 J. .... ...~-_..__...... fJr!-7(t- ~~ :) (p:)~ · ~ , 5 I }, ! ) ~ M It-J" ':' "1;~ <f c:f: s-ratk.€" r->f..oJ'Df.o f-JO ~!) 400 LF_ X .0 \ 5 6 t-.4 ~ J(e.:2;2..,=i::::s.L--. 5,8 1.- I ~,Oj 5 ~ -f:: M IN. . c.. , A 'I-. ~ x ~o .. ..1.__._...... ................... ..;.- b ":77 "I(='.Q"1 1.751 B Y.. (.,.0 ::: 10 II ~.o.(.'J.. I' Y,IOX ' = 15 \1 '" 7~ '/... , 'I.. 15 x ",1; ':( ~.<:) x 'I..~O'l- " ~,o I' 'f. s...b Y. I' 'I. 30'1.... " 40 I' X A..'f' x I, x ~ )(. I, -::. 81..\ I I = IdJ \ 57 -= \ A 0 (..8 ~ I P.I 6 4-1 10 ,,---~,_..,- -~ . t.; .33 -t. -t c>< ~o 5,0 "-I 310 ?~\ 1-2b~ &../2?~L......__._,_?12~~_..-- _.._~.~-J 3,1 S~ : . ! IS ~ ?- 17 i 5, (..S> 7 J5J3~O . 1-0 II" 'Sf I)S9c.. *~ ~O 14JO~b I ,) ~~4 l..').LG.74- ,.+:0.. _ ;.~_'?LE_1] I..?LI.~ 3:._.~_._~.______L___.._......_._! PEp.,c: ~r r.:2.CQ'r:>. @. 1.-0 MrtJvTE"~' F ~5(" I d.~_ ! I 400 l.--~ 0;::: 'Tr.:..rN~~ = [4-i 4- 'IY(. ~3)''''J I 400 (~O..,.) =1-~ 50 c.+ 'I {I-o l-.t=; of 1511 f?'~E: .: 113 ~ 1Y(.(.~z.. ~ \4- \0 c.f. 6 ; l,..-. ..-..-."...... ---.....-+ --'.. - ".'" ....-- ---. -+ .. i. !, -; .. -'-~L.. ~-r:Q~ I ' L=~___l_+-._J ._-. .. .. -~-~ ~'. -' --, ... - ~-- - "y.>. ----.--.~-.~'......'~---' -_..- ----t-... -" ,-, '.. ._....~..__..~"'._._.,~..,~.~_.~- -1-"-"-'''~'''-;-+ .- .-.....-... --, --', -"---~... "'-'r--" - -.,. _.- -~'- "'" '~-~'-~'-""'---'. ~ u'P1"/i.-1 ~ 0.. = , 4~~ >~.s. (0 L@ . : " t~_.~ ! i___~_J _ _~___L:.__j r Robert and compan.Y Associates NORTH PALM BEACH, FLORIDA JOB NAME -SUNPOU'J-r -SP.VltV(J5 fl..:lAN"" NO, 6ssoU'? - 0 I SHEET NO, :3 LOCATION 'Eo":>" "-Tr.t:>,J 8<:....H _ ~ L . I SUBJECT PI2.A 'IV AGE (REV t"5 ED) EST, BY -=bLj::;.c...~<JV'O tV DATE t I /1...5/b5 , CKD, BY DATE 'r""h' ""--r~' ! III ., '( i j : ..-, I -""" ....-,----+--.-------t ! ! 14..~. ~ I~:O i , I I I . ....--I.----t----....,---! I I 11 I i r I 11 ! i . J i T--~'~...._r----.---r-____1 I 1 . I YOLUM.8, 'r12-€:t-Jc:1-4, (...AN "PF't2jU'ec...ll>--rrtf Jt10~I2!11 400 X .O/;;t2'Lt = (p'~l C-F~ + !. 'I, + ',1 ~.~~ ck/'5Er<:.-x ~q SE" ~ kC) MIN ::f 1.1/16:,6 !c.:E = .?2.~~,_t:.~~ i . ; M".J : 4-\1<,! . i .! I j-=t:P-"'::~T~~--r>~;.;r "'''_~ 5+fO~4;~~~~iQA~~~.1 i ~J ,. ,I, I I :. ' . I : I ' . I i :-' . i i . 1 J "1 t ., "., i 10<;> .,ra.'II'ZA' NEt> ~'-i ~ I ().5:" i~.....I _ ....., ;,1 ,1: ) J f._Jo.p y(l.:-~~y-,~~~~~~-.::-IQ,*~- 1.:3_~, '4--~1 l--~-----+ ;-1 I VA ~l)^" e;:j 14.1."7 I/)(! I. 7S A'c, 1)(, ~ ~! 1. ,OE>~J- B:-r.... 1, ] I I 'l.. ' i '1' ~- t. I I- i ,- r--'---r'" "~'-' .....--~'-.'--T---..~.--!.-. .,.--.-... I C~_l..4Jf~ ~l, I ~!jl,-o"wcf rfLD?~ Ei€V, I .Tq-t't;il.,. is '''IE MEf'.:: 1.75 +c~ ! i i I ; .!' I I I~V~~1H9:<)~ ~JD{~~7~~~.16:A~. i 1-' . ~ .-'-.-'-.-l.---~.~---..-T-~--..-;-.wr. I ~ i' I' j ~. P'F''\.J l~l-.?C>N D 4-1 N EAt:2..L. Y 1"Ftz.oN'\ E ~v~ I. .. j I ~__ A ~ 'I"'l., ~ 8.~.__._..,", _<~.__._~._._..-+. iA =' I. 4- ( /-56) "J.,.. A ':: \ .! I I A (,._ - Fl. -t..- --+~~--- I J 1... , s 'l,.. "j' ..'&5 ....~.... i I --L.' . .~~_... , . , ~I~ -rhJ- (j i.~2- ""-"-" '-3' ..'-'" '-..--.-.-~---.... \ .1- bt., l t. t;1 1\.1? i 1.-:?O b-.?z-- . : ..-----.---{.-~--.. , t .-.. I ---- I . i.3 = . t ~ ... .. ~ I ~ _~ U~17.3 :r ,,~~ ..~__ 1 ; .. .lr~ L~l("~;_ ~.jF~O ttt- tt! , I I +.l,_~ , ! . S-rA<aE; ~,"~4 ; \~, (,,0 : . · "1.- l Y>-._-~.._._.__..__~-,.--.~-~-.-.-'"' I . J' ! 1A:.~O i ,. G,"t,. J I ~. 00. G,,'Z,.. 1/.00 . ~1..- ' j..- :Il:1 , I I ,.. , ' ! ""'-1-'''+'''+-- ! ~---,_._--+ i '. pl......'..,; '..,/ . ill '. . '. .. ,- III . . . . ... DEPTH, fT. (NOT TO SCALE) a SOIL DESCRIPTION Dc SOLI 0 PVC CASING GROUND SURFACE Very light brown fine SAND (SP) ~ I I I I, I' II II , I : " ,','I II .',',1, 11,1,1. I , I "z , I I 'I Du ? PERFORATED PVC CASING WATER TABLE -6.8' Os SCHEMATIC OF CONSTANT HEAD EXFILTRATION TEST K = HYDRAULIC CONDUCTIVITY:: Q .. AVERAGE FLOW RATE :: d:: DIAMETER OF TEST HOLE:: 0.00017 0.025 0.5 6.5 (CFS/FT.2-FT. HEAD) (CFS) C FEET) (FEET) (FEET) (FEET) ( FEET) H 2 :: DEPTH TO WATER TABLE:: Du" UNSATURATED HOLE DEPTH: 5.2 0.3 1.3 D,:: SATURATED HOLE DEPTH : Dc: UNPERFORATED CASING DEPTH.. ~.. Ard.m.n&Alloclat... Inc. .. .A. C-1tiIIt ~ 1ft W ..~. -",. F........tIe.... ...4 foIahriel T...... EXFILTRATION TEST SUN POINT BANK BOYNTON BEACH MALL .. ~ ;q -IT. "1.~847 .,.)!. .~~ifiJ;.~~[~&iiil~~~l;~!m~~Jljii1-~;~,_- 5> fA/( fo:{ NT ..5.4 V.J JV ~5 B Jr/Vk !to j) F I~..{{ /r T;:o /r/ f[.Y",- (j) q ~ 0 I'JrJ< fJ NfL S fJt-{ !3._t;; j(j3a fAr REA- ;z 7 ( WFiJ F /!-ccl3s S Jt T5 C~ -jVlj T ;2 6,f/fs ;1/0 TfO ~# )>lA.A/ ~ Fe \v' ]. PC1.l1f5TJ:/( A-r If(fJfL=(? A-)lC{L/~ fc JI(, (]) P(AJtf5Tf3R {o 1?}: 5L/CffS)/fO eN _"'5 _)1P/:5 [A/frlt A- /,J lilt-If (oAf{, BL f-, W-?}t+rlYJ l'CrJ~/~fr7T" ~~ TCfl' -l~ iAlJr U.", [3C.Dl., Lr /fA-)jjLr{JrFtf-=j) fJrllJ);k Sf AcE flt-T/t:rt5 5tfoU.LJ) );>E.SlfowA/ 0)/ 5 rrE PIA-IV' fL)JA- @ fJt-RfJ)I~ [oT /JIJ-!oVlT 1- j)1351tAl vAl i'=A/i{TA/EcR):JltL ;>[Ak-S- J1 C15 T {ok f-tJ/2 /'1 ;0 _s:r TE ftA-A/ j>R J6);2 To ?i=k/1rrr:r#4. /1 fit D t )It; ( .- jJ (/ C ~'7 wJ/l= RS/f+f~ (lfA-)J/{ E- S C1j,'>{/ (3 Y , (." .'~il.'~" ~ . ',. \' . , .. '..'. i- , ~J . -- , .101:. . \ ' . . . , i SITE PLAN APPROVAL APPLICATION City of Boynton Beach" Florida Planning and Zoning Board This application must be filled out completely and accurately and submitted in one (1) copy to the Planning Department. .Incomplete applications will not be processed. Please Print Legibly or Type all Information. I. GENERAL INFORMATION 1. Project Name: A:NEW BRANCH BANKING FACILITY FOR SUNPOINT SAVINGS BANK, FSB BOYNTON BEACH, FLORIDA -.;. . 2. Date this Application is Accepted : (to be filled out by Planning Dept.) :~ ... ": ~ ~.i..~ , " ~ "~: . '.:~~' ;". '. ~ . 3. Applicant's Name (person or business entity in.whose name this application is. made) : , . "'/;';:"~ ~'-!'.~'~~~: '" . . . .:,..;. ~ r \..:~"\.:. . _.. ..... ...... . :~;.:;j.~~;. :", ~'.,~(;;:,; ".. . Address: )~~,~'~"','~:' .'~:,' ," SUNPOINT SAVINGS BANK. FSB 501 NORTH .CONGRESS AVENUE '~E~;"~ BOYNTON BEACH, FLORIDA Pho'ne: 305 - 964-6400 .. . ~ :f~:~f?;,:...' ,_!,' 'r ... ...... 4. Agent's Name (person, if any, representing applicant): HOWARTH L. LEWIS, JR., A.I.A. .. '. '>:;~:;.'-': 501 SOUTH FLAGLER DRIVE, SUITE 500 Address: WEST PALM BEACH, FLORIDA, 33401 Phone: 305 - 655-4063 " ,~ 5. Property Owner's (or Trustee's) Name: Address: SUNPOINT SAVINGS BANK, FSB POST OFFICE BOX 471 ( ,:,' .,...... ,.-' '-;'!'l r.- /:~;:.t/:~ : LAKE WORTH, FLORIDA, 33460-0471 305 - 964-6400 ::", '/'~':~:c Phone: 6. Correspondence Address (if different than applicant or agent) *. SAME AS ABOVE * This is the address to which all agendas, letters, and other materials will be mailed. Planning Dept. 10/82 ~.,--~~~ ....~ :_':::.::~~:.~;.;. .. I.... ... ,....'.,.,.; /'..: ..- <\~'li:..i(~'/ -., - \ "','r.\ .~~~ . ;' ','! I , ..-. . " , 7. What is applicant'~ "interest in the premises affected? .': OWNER Page " '. -.,:'::e.::,. ,- ,';:F~Yfo: (Owner, Buyer, Lessee, Builder, Developer, Contract Purchaser, etc.) ~8. Street Address or Location of Site: -.', 1)'01 NORTH CONhR~C;S AVFNIIF".:, .r BOYNTON BEACH, FLORIDA ;".1'" .1 'f.:,' ],Q/3:- 9. Legal Description of Site: A PORTION OF THE PLAT OF SUBDIVISION OF SECTION 19, TOWNSHIP 45 SOUTH, RANGE 43 EAST, PALM BEACH COUNTY:FLORIC ACCORDING TO THE RECORDS OF PALM BEACH COUNTY, FLORIDA, BEING MORE' PARTICULARLY DESCRIBED ON THE ATTACHED SURVEY. 10. Intended Use(s) of Site: BRANCH BANKING FACILITY 11. Developer or Builder: SUNPOINT SAVINGS BANK, FSB I:' ... - 12. Architect: PEACOCK & LEWIS ARCH~TECTS & PLANNERS. INC. 13. Landscape Architect: MICHAEL J. CAISTOR 14. Site Planner: PEACOCK & LEWIS ARCHITECTS & PLANNERS. INC. IS'. Engineer: ROBERT AND COMPANY, CONSULTING ENGINEERS 16. Surveyor: O'BRIEN, SUITER & O'BRIEN. INC. 17. Traffic Engineer: NONE ;"".f 18. Has a site plan been previously approved by the'City Council for this property? NO _~~' Dept. 10/82 H -.. , ",: ;:~.:. : . ',.I I ,I :.1 I j I . ':.'; ;"';;;:'.;.~"f' ",", , . "<,,i'; .' Page 3 II. SITE DATA The following information must be filled out below and must appear, where applicable, on all six (6) copies.of the site plan. 1. Land Use Cateqory shown in the' Comprehensive Plan' LOCAL RETAIL ~ 2. Zoning District. C-3 COMMUNITY COMMERCIAL DISTRICT 3. Area of Site 1. 26 ac;r:es 54,,830 . sq. ft. 4. Land.Use -~ Acreage Breakdown a. Residential, including surrounding lot area or grgunds b. Recreation Areas * (excluding water area) c. Water Area d. Commercial e. Industrial .' f. Pu'blic/In- stitutional . g. Public,private, and Canal ~ -..ll: . _, Rights-of-Way ;t,', h. Other (specify) o acres o % of site o acres o % of site . % of site % of site.> % of site % of site % of site of :1':\"''- % site;. o acres o 1 .26 acres 100 o acres o o ,a c re s o o acres o o acres o. - - i.' Other (specify) o acres o % of site j. Total Area of Site 1.26 ACRES 100 % of site J a. Ground Floor Building 6512.86 Area ("building footprint") sq. ft. 11 .8 % of * Including open space suitable for outdoor recreation, and having a'.minimum dimension of 50 ft. by 50ft. Surface Cover ,5. b. Water Area o sq.ft. % of c. Other Impervious Areas, including paved area of public & private streets, paved area of parking lots & driveways (ex- cluding landscaped areas) , and sidewalks, patios, decks, and athletic courts. , ,~_22 4. 0 O.,sq. ft. ...."....;1 64.2 % 0 f site d. Total Impervious Area _~1~7~5 sq. ft. e. Landscaped Area Inside 13~092.75 sq.ft. of Parking Lots (20 sq.ft. per interior parking space required-- see s~c. 7.5-35(g) of Landscape Code) . 7 6 . 1 4 .' % 0 f site 23.8 % of site Planning Dept. 10 82 Pl;:lnT11nn nAnt. 1()/~7. . - .'1<#.~~)...'''''' :"~~~','''"rn:-t~L.~,}::'._ "~"~ii~;;,- 'f{./.;\J.'ll'l.l:;,!(:' ,; "Ii II' Ii . .",,;,,/1., , . I ,- . Page 4 ,; f. Other Landscaped Areas, excluding ~ater Area g. Other Pervious Areas, including Golf Courses, Natural Areas, Yards, and Swales, b4t excluding Water Areas o sq. ft. o . % of site ,',I ,., 0 sq. ft. 0 % of site 13...092J7S sq.ft. 23.8 % of, site 54830 ~.q.ft. 100 %, , sq. ft. 20,298 sq. ft. sq. ft. sq.ft. sq. ft. sq. ft. h. Total Pervious Areas . Total Area of Site ~. ,,6. Floor Area a. Residential b. Commercial/Office c. Industrial/Warehouse d. Recreational e. Publici Institutional f. Other (specify): g. Other (specify) sq. ft. , h. Total Floor Area ?O.?QR sq. ft. 7. Number of Residential Dwelling Units a. Single-Family Detached ... b. Duplex ... c. Multi-Family (3 + attached dwelling units (1) Efficiency (2) 1 Bedroom (3) 2 Bedroom ( 4 ) 3+ Bedroom d. Total MUlti-Family e. Total Number of Dwelling Units 0 dwelling units dwelling units dwelling units dwe.lling units dwelling units dwelling units dwelling units 8. Gross, Density o Dwelling Units per ~cre' '. 9. Maximum Height of Structures on Site 40 feet ") stories 10. Required Off-Street Parking a. Calculation of Required Number of Off-Street Parking Sp~ces OFFICE (1/300 S.F.) ,; -,'; ,',f.::~,,'" :'t:f.~f~~,~v'i'.; b. Off-Street ParkingSpaces:!')i!; . Provided on Site P lan:',:~r; , ;~c'~!;':l~i,'.~ ~,if" . 51 :-'::'\::;, . '. yv,:,: BANK (1/250 S.F.) 18 ;';:":;]J.;~~t;1(::;'!"';: '"", ;,'., \;;!;;~!l~,' . :,J,,;'_> -,: . ';~Fj~'/};_:':~:~ ."" l' TOTAL 69 -.' - ,-<:;..:,.,:~'';- . Planning Dept. lO/~2 '..- .'< .. ':'.' ':t~.<!~:;_,:, ,IV.. MISCELLANEOUS Page 7 (check) The following materials must be submitted in one (1) copy: 1. A check, payable to the City of Boynton Beach, for two hundred dollars ($200). 2. For projects that generate at least three thousand (3,000) vehicle trips per day or two hundred and fifty (250) single directional vehicle trips in a one (1) hour period, a traffic impact analysis must be submitted. 3. Any other engineering and/or technical data, as may be re- quired by the Technical Review Board to determine compliance with the provisions of the City's Code of Ordinances. v. CERTIFICATION (I) (We) understand that this application and all papers and plans submitted herewith become a part of the permanent records of the Planning and Zoning Board. (I) (We) hereby certify. that the above statements and any statements or showings in any papers or plans submitted herewith are true to the best of (my) (our) knowledge and belief. This application will not be accepted unless igned according to the instructions below. /~/ 9/% S . Date Slgnature of Own r(s)' or Trustee, or Authorized Principal if property is owned by a corporation or other business entity. VI. rDcit'~ hereby designate the above signed person as (my) regard to this application. 'C Signature of wne (s) or Trustee, or Authorized Principal if property is owned by a corporation or other business entity.. Jd.-/ ~/~.::- . 'Date SPACE BELOW THIS LINE FOR OFFICE USE ONLY Review Schedule: Date Received: Technical Review Board Planning & Zoning Board Community Appearance Board City Council Date Date Date Date Stipulations of Final Approval: Other Government Agencies/Persons to be contacted: Additional Remarks: Planning Dept. 10/82 REVIEW COMMENTS (MEMOS) AND DATA 1 st REVIEW COMMENTS 1r7V-5 ~ (, /22 Iff PrOject name Stanton Magnetics - Quamtum Park Lot 6 FJle number' NWSP 99-011 Reference 1st RevIew, New SIte Plan. FIle # NWSP 99-011 wIth an Mav 12. 1999 PlannIng and Zonmg Department date stamp markmg (V~-~ I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS {~.., ,*"~c~'c.~ 5,/1 ~/ r VG- . Comments ~ /( c./ ...... lD.... ~ --= VI ~) ..s- <2. II, cr- ... '-./'l ^ (..~""'~ C 6y c.- ~ ..~ UTILITIES - General Comments ([) All utilItles easements shall be shown on the rectified landscapmg drawings so that we may determine which trees may interfere with utilities In general palm trees will be the only tree species allowed wlthm utilIty easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilItIes the authonty to remove any trees that interfere with utilIty services eIther in utility easements or public rights-of-way I Dept. of HRS permits will be reqUired for the water system servmg this proJect. (Sec. 26-12) / Fire flow calculatlons will be reqUIred demonstrating the CIty Code requirement of 1500 g P m as stated m LD R chap 6, Art IV Sec. 16 or ) the reqUIrement imposed by insurance underwriters, whichever is greater (see Sec 26-16(a)) Please submit these calculations with your HRS permIt (I'- submittal \9 Sec 26-34(E) of the City Code reqUires that a capacity reservation fee be paid for ea -( v thiS project either upon my request for signature on the Health Dept. application \ forms or within 30 days of site plan approval, whichever occurs first. Based upon a 1.5-inch meter the fee is $1205 82. A Comp Plan policy 3C.3 4 requires the conservation of potable water City water may not. therefore, be used for irrigation where other sources are readily available /" Water and sewer lines to be owned and operated by the City shall be Included within utilit) easements. Please show all proposed easements on the engineering drawmgs, using a minimum width of 12 feet. The easements shall be dedicated via separate Instrument to the City as stated in Sec. 26-33(a) of the Code. V This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter IS set. Note that setting of a permanent water meter is a prerequIsIte to obtaining the certificate of occupancy / The waste stream from the manufacturing process must meet the City s pretreatment requirements. A sampling point must be provided to allow monitoring of thIS waste stream (Sec 26-143 26-147) Page 2 Stanton MagnetIcs - Quantum Park Lot 6 File No NWSP 99-011 DEPARTMENTS FIRE '0LJ Comments ents A fire flow calculatIOn test will be required, LDR 6- I 6 All water mainS, hydrants, and roadways will be In place prIor to above ground constructIOn, NFP A I ENGINEERING DIVISION None ~ GYl 'S..~+'k Comments. c~ VC:::-'{ + c (~'" f!- ( I +1. Add to the site plan the following note: All plans submitted for specific permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following: site lighting, paving, dramage, curbing, landscaping and irrigation. Permits required from other permitting agencies, such as FOOT PBC, SFWMO OERM, L WOO OEP and any others, shall be included with the permit request. Add a "Right Turn Only" sign at the south egress driveway y Provide 6" WIde thermoplastic, white strIpes across both drIveways to delineate pedestrIan path through driveways. The landscape Islands shall have a mInimum grassed area of 5' between the backs of curb Adjust all plans accordingly [LDR Chapter 7.5, Article II, SectIOn 5 G ] ProvIde an Engineer's certification that the draInage will conform With all rules, regulatIOns and codes of the CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7 F ] Show clear sight trIangles at both drIveways and adjust the LandscapIng Plan If needed. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.2.] Add a note to the LandscapIng Plan that there shall be a clear unobstructed vIew Within the SIght trIangles at a level between 30" and 6' above finIshed grade. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.] V\e~ "' 5L(;" un / /') C- -r--~ C" lie J.c:., C.-k~ INCLUDE REJECT ~c."""~ ~('\5(~ c-~~ Page 3 Stanton Magnetics - Quantum Park Lot 6 File No NWSP 99-011 BUILDING DIVISION Comments 17 Add a note to both accessible parkmg space areas shown on the site plan drawlllg (sheet SP 1) that refers the reader back to the typIcal parkmg stnplllg detail drawmg for the accessible route details. Add text to the detail drawmg that mdlcates the route IS m compliance with SectIOn 4.3 (AccessIble Route) and 46 (Parkmg and Passenger Loadmg Zones) of the Flonda Accessibility Code for BUlldmg ConstructIOn. Please note that at tllne of permit revIew the applicant shall provIde detailed data on the plans that will venfy that the path of the accessible route IS m compliance WIth the regulations of the Flonda Accessibility Code for BuIldlllg ConstructIOn. 18 IdentIfy the filllSh floor elevatIOn wlthm the footprmt of the bUlldmg that IS Illustrated on the site plan (sheet SP I) and the floor plan drawmg (sheet A.I) Add to the sIte data, found on sheet SP I, the flood zone that the bulldmg IS located wlthm mcludmg, where applicable, base flood elevation If there IS no base flood elevatIOn, mdlcate that on the plans Add speCificatIOns to the site data that will venfy that the proposed filllSh floor elevatIOn IS m compliance WIth the mmlmum standards of the followmg" a) Mmlmum elevatIOn reqUired by the flood zone b) Mlllllnum elevatIOn reqUired by the South Flonda Water Management District permit for the proJect. c) Show and provide computations that venfy the elevatIOn of the filllSh floor IS SIX mches or more above the crown ofthe abuttmg nght-of-way 19 At tllne of permit review Identify on the site plan the actual setback dllnenSlOn from the leadmg edge of the south faces of the bUlldmg to the south property lme Please note that the setback dimensIOn shall be measured from the overhang, covered walkways, canopIes or awnmgs. The bUlldmg setbacks shall comply WIth Zonmg Code regulatIOns. Indicate on the site plan whether the patio area IS covered. If It IS covered. proVIde plan and elevation vIew drawmgs of the structure. Also. specify the setback dimensIOns m compliance With the zonmg regulations. 20 Pro\ Ide detailed and dimenSIOned elevation view drawmgs of the site slgnage Indicate the total sign area and height of the sIgn mcludmg proYldlllg computatIons that venfy the sign area complies With the regulations of the Sign Code Also, show and dimension on the plan view drawmgs the distance the sIte sIgn IS located from the adjacent property Illles (note ten feet IS the mmlmum setback from any property line) Or Place the followmg note on the site plan 'Site slgnage IS not approved Page 4 St~.nton MagnetIcs - Quantum Park Lot 6 FIle No NWSP 99-011 \L-~ for thIs proJect. Separate sIte plan revIew and approval IS reqUIred for sIte slgnage " Drawmgs of the slgnage shall comply wIth the applicable regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land Development RegulatIOns). If a sIte sIgn IS proposed, delIneate on the landscape plan the locatIOn of the landscapmg that is reqUIred for sIte sIgnage 21 On sheet SPl, Identify the symbol that represents the property lme. 22 DimensIon the wIdth of the easement that is shown along the west property lme 23 Add to the sIte plan drawmg a labeled symbol that represents the locatIon of the sIte IIghtmg poles. Also, note on the sIte plan that the sIte IIghtmg fixtures wIlllllummate the sIte consIstent wIth the specIficatIons IdentIfied m the Parkmg Lot Code. The photometric plan IS revIewed at tIme of permIt revIew and IS not reqUIred for sIte plan revIew Therefore, remove the drawmg from the submIttal. PARKS AND RECREATION Comments. None FORESTER/ENVIRONMENT ALIST Comments A4~) The applIcant has addressed the eXIstmg trees on the sIte If the IL f{ ~ relocated trees do not survIve the transplantmg, the trees WIll be replaced dUrIng the landscapmg portIon of the project. PLANNING AND ZONING ~mments. ~ ~I On the sIte plan show the followmg: ~ ~ Setbacks chart and dimensIOns m tabular form Chapter 4 SectIon 7 t-:: ( Paragraph E JA 00/ Open space reqUIred and proposed m the tabular data. Chapter 2 SectIon 7 Paragraph H.13 i# ~ ProvIde loadmg space reqUIrements m the parkmg calculatIOns. Chapter 2 SectIOn 11 Paragraph J.2 '-"-- ()J. / BearIngs and dIstances of property lInes. Chapter 4 SectIOn 7 av-/ Paragraph B 0- ReVIse plans to proVIde parkmg lot Islands dImensIOned WIth 5' of landscape area from mSIde to mSlde of curb CIty drawmg #B- 90012 vL {)J... / Label the dashed lme shown mSlde of the west, south and east . . property lmes t,lF P<. #' Label the walk way pavmg materIal - Page 5 Stanton MagnetIcs - Quantum park~ . r F lie No NWSP 99-011 \ .eLe v . 0-<., '---- if'- 0 · Label the W ". '" \.t of the wmg walls adjacent to the loadmg AI? - wells .~ ~ SIgn plan showmg location wIth setback reqUIrements and an 1 ~ \ f-1. elevatIon drawmg wIth dImensIOns, materials and colons. SIgn and seal all plans submItted for reVIew Chapter 4 SectIon 7 '/\)' . iJ 'l./V ~ On the landscape plan show the followmg: 7' Label and dImension all reqUIred landscape buffers. Chapter 7.5 ....ArtIcle II tflL,./ Label and dImensIOn the mimmum tree spacmg along the R/W ..-frontage Chapter 7.5 ArtIcfe n Section 5 Paragraph D oy A note m the notes specIfying a materIal other than cypress shall be ~sed for mu~ v--- OJ/ProvIde safi slgat rIangles. Chapter 7 5 ArtIcle II SectIOn 5 J Paragraph H lb~t"'; / Locate IIghtmg and fire hygrants eXlstmg and proposed. Chapter 4 SectIOn 7 Paragraph B SubmIt a traffic study and WrItten confirmatIOn from the Palm Beach County Traffic DiVISIOn that the sIte meets traffic performance standards. s:lprojectslcond of apprl 1 41~f Vtt)"- M bu ulf ~ ~ , .()eW6 ( ___ - <t2,,- v ,~<r-' ( ,,0 Le ' ( A ) ? (h -,~~.f 'T$o~~ vV\ ~~ 'f p~ ..c.V(ev$~[J hr (""\ QVt'---.I'-- .-f<-~ ~cx C' k ? r~,.f:, C dY\... .f\ r ""'~ ~C4... cs.( r ~..j I ("" (.) ~ ~ (; ~ C-cVv.-( _ f lA. {/J'" I 1U (j.)hl fVIJV! ~u ~i 0J ~~vQtJ j r ~.L t.1.'fO 1 . It (- ! J 1 f of t j, f &'- L I u(' U tr1A.t vvL -( 0 UJ Lt J D U b~ v llet.J V f(o V ,<5{e f6 <<-~ (5, V 1\ ; +-y 1-/ r- /e cf) (X (., L/ t"71 c .--.f L c- c -u. Sc.. /, (" +- 70 ..... vre::. fr-J ~ Ii I . , ':nJ~J2..~f<: 5c,,-+<, 5' ~ c!'<: A~ bz/-~ it( Of - it ~ ~"'5 ~ eM.. !. "..; 5 (~ (.,)/d:..+t.;;r.. a;,s k """"'" ~ m<c"&;... 7i- .5>""'~ "" {' L // /.;; 4 -:;:y... c: e- OV, rc;1.:' 'r;rr? c:. 0-..... <" " J1.\ AA .,1.. I~ /J ,../ /l ~ ,.., (1 { " ;' ., /,., r ..<-1 c.. '-"<\ GId" e.Y .r L. c:..,-. __ ~ .. ".. . .... "} ~r I SS Sp..-.<.~.s G.-re ~:J t..f) I" C~V\Q<o.-f(Q,.... wr-d LcA-1 t/c;...yS....q..... ~ C"41 ~_ ~y f' fa {..)- ( (J o " (\ DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-076 TO. Michael W Rumpf, Drrector of Planning & Zoning Raymond F DaVIdson, P .E., Acting City E~ May 27, 1999 FROM. DATE. RE STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011) NEW SITE PLAN 1ST REVIEW COMMENTS 1 Add to the sIte plan the following note: All plans submitted for specific permits shall meet the City's code reqUIrements at tune of apphcation. These permits include, but are not limited to the following: SIte lightmg, paving, drainage, curbmg, landscaping and irrigation. Permits reqwred from other penmttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be mcluded Wlth the permIt request. 2. Add a "Right Turn Only" SIgn at the south egress dnveway 3 Provide 6" Wlde thermoplastic, wlute stripes across both dnveways to delineate pedestrian path \ through dnveways. 4 The landscape islands shall have a mInimum grassed area of 5' between the backs of curb Adjust all plans accordmgly [LD~ Chapter 7 5, ArtIcle II, Section 5 G ] -.. 5 ProvIde an Engmeer's certIfication that the dramage w1l1 conform Wlth all rules, regulations and codes of the CIty'S Land Development RegulatlOns. [LDR Chapter 4, Section 7.F ] , 6 Show clear SIght tnangles at both dnveways and adjust the Landscaping Plan if needed. [LDR Chapter 7.5, Article II, Section 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear unobstructed VIew Wltlun the SIght tnangles at a level between 30" and 6' above finished grade. [LDR Chapter 75, ArtIcle II, SectIon 5.H.] The proposed 8 mch water main to the fire hydrant at the north property lme will require a jack and bore under Quantum Blvd., an open cut of Quantum Blvd. will not be allowed. Consider providing a water lme to the fire hydrant at the north property line from the existmg water line at the south property lme as an alternatIve to aJack and bore. All plans submitted to the CIty must be sIgned and sealed by the appropriate design professionals. The Civll drawing and the Survey are not sIgned and sealed. RFD/ck Xc Ken Hall C:'My Documents\Stan!on ~agne!ics. Quantum Lo! 6 New Site Plan Is! Review.doc \J~~A +0 ~\. Uq,v'rl.W+ CQVV\ fV\ t..l'\; S dfiO ~/6-V {JUJl, DII'. Q,\~ O1Y/41.;!& .~ h 0 \<j, bP;} ~, ~ y (\\ O~ Page 3 V Stanton Magn s - Quantum Park Lot 6 File No N SP 99-011 @) BUILDING DIVISION Comments Add a note to both accessible parkmg space areas shown on the site plan drawmg (sheet SP 1) that refers the reader back to the typIcal parking strIpmg detaIl drawmg for the accessible route detaIls. Add text to the detaIl drawmg that mdlcates the route IS m complIance wIth Section 4.3 .. Ii _ (Accessible Route) and 4 6 (Parkmg and Passenger Loading Zones) of <J I the FlorIda AccessibllItv Code for BuIldmg Construction. Please note that at tIme of permIt review the applIcant shall provide detalied data on the plans that wIll verIfy that the path of the accessible route IS m complIance WIth the regulatIOns of the FlorIda AcceSSIbIlity Code for BUlldmg ConstructIOn. 18 kkm.fy th", ..p;.llil:J tl~(MO eJ..v cltIDn w iLhiu th~ fvotpflftt offtre lnakting tb3t ,e;: I11"d~atea OR the: 31te: I'ldfI (;)ll~d Sr1) clUJ tll'G flg9r piaR QRt\VIR~ (~heet ,'\.1 ). Asd t9 tbe alllil aata, fERJnB eR sb.d SP 1, llle-flvai ~gg,e t-llat the I:llllkhc.g 'i lo,,"'ted wlthm.Htc1\1dmg, ''''Rere Etfl~II~~ble, ~ tleod ele":.ltl0fl. IftRere ,e;: no h::!"1i fl9gd eleViltlQ", ,"rll~~ tba~QR,..the. . Add speCIficatIOns to the sIte data that wIll verify that the proposed fiOlsh floor elevatIOn IS m complIance WIth the mmlmum standards oftl1", fvllovVlng: R6.9,,)itr.<~ 8y""" ~ ~::::::: :::::::~ ~~;:~ ~: ~::;h 7;1~::d~ Water Management DistrIct permIt for the proJect. c) ~hg'" aReI ~r9\'ide "omputatlone;: th"'t v@nfy d'l8 el~"Mlon of the fin~sh flogr IS :JIX lrrches or 1I1ore ae9"p the crown of the ::lhlJttlRg fight of Way L1?-- \ At tIme of permit revIew IdentIfy on the site plan the actual setback dImenSIOn from the leadmg edge of the south faces of the buIldmg to the south property lIne. Please note that the setback dimensIOn shall be ~IL.. measured from the overhang, covered walkways, canopIes or aWnIngs. The bUlldmg setbacks shall comply WIth Zonmg Code regulations IndIcate on the sIte plan whether the patIo area IS covered. If It IS covered, proVide plan and elevatIOn vIew drawmgs of the structure. Also speclfv the setback dImenSIOns m complIance WIth the zonmg regulatIons. )9 ProVide detaIled and dImenSIOned elevatIOn vIew drawmgs of the sIte slgnage Indicate the total sign area and heIght of the sIgn mcludmg provldmg computatIOns that verify the sIgn area complIes With the regulatIOns of the SIgn Code Also show and dImenSIOn on the plan vIew drawmgs the dIstance the sIte sIgn IS located from the adjacent propertY lines (note ten feet IS the minImum setback from any property Ime) Or Place the following note on the site plan "SIte slgnage IS not approved /Jpo T1'i-6 ~""W-wJi\J(. N~"tC:- to rw: 6u=II(\t-Io~ /he-.lJ Pf4,piv~d we ~~;l..~'NC. Ii 13 Url,l),Nb SIl_tJ4;,~ (.bJ J...( Cc>m,Oly MJinJ r7IC IIPIMi/If..:J 4>1Ii1.v)l.,,:" /4~I</ PI /J. J> n A i'7'fr: 4AALIC/J Sf;;. ec.6vtdn..~..!;' 6? T7.j~ ~/6/'J ~~e {(,.JI:i.~ 21) S I il'J rl-OU!~ -"'1 IV'" I ' r Page 4 Stanton Magnetics - Quantum Park Lot 6 FIle No ~WSP 99-011 for thIs proJect. Separate sIte plan revIew and approval IS reqUIred for sIte slgnage." Drawmgs of the slgnage shall comply WIth the applicable regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land Development Regulations). If a sIte sign IS proposed, delmeate on the landscape plan the locatIOn of the landscaping that is required for sIte fJ: slgnage !71 On sheet SP 1 Identify the symbol that represents the property lIne. (J~ 0'1- a .22 DImenSIOn the wIdth of the easement that IS shown along the west property Ime ~ Add to the sIte plan drawing a labeled symbol that represents the ~ locatIon of the sIte IIghtmg poles. Also note on the site plan that the o~ ~j site lIghtIng fixtures will Illummate the sIte consIstent wIth the speCIficatIons IdentIfied m the Parkmg Lot Code. The photometrIc plan IS reviewed at tIme of permIt review and IS not reqUIred for sIte plan revIew Therefore, remove the drawmg from the submIttal. PARKS A~D RECREATION Comments None FORESTER/ENVIRONMENTALIST \ Comments 24 The applIcant has addressed the eXlstmg trees on the sIte If the relocated trees do not survIve the transplantIng, the trees wIll be replaced during the landscapmg portIOn of the project. PLANNING AND ZONING Comments .,~ On the sIte plan show the followmg' -) . Setbacks chart and dimensIOns m tabular form Chapter 4 SectIOn 7 Paragraph E . Open space reqUired and proposed In the tabular data. Chapter 2 Section 7 Paragraph H.13 . PrOVIde loadmg space reqUIrements m the parkmg calculatIOns. Chapter:2 SectIon 11 Paragraph J.2 . Bearmgs and dIstances of property lInes. Chapter 4 SectIOn 7 Paragraph B . ReVIse plans to proVIde parkmg lot Islands dimensIOned With 5 of landscape area from mside to mSlde of curb CIty drawmg #B- 90012 . Label the dashed lme shown InSIde of the west, south and east property lInes . Label the walk way pavmg material o\J ~ A/ws:p 07- all .1'0 ",~~ . rf) 0 w " a.. 0 \lP ~ (1\ ~TA tV Tl>") m A GN f::r;~ -"' ~ () tJ ...flu ",INJ'. \J (' rlo CO - (a.. cJ t - - ~d. ~n Ie "AlA !he BIlUliiftg G..... 'NiII be ewIulllllt!al lime 4' ~ -ril r J -~- . The permit fee, water and sewer facifaty fees, tounty fees and State "t fees will be determined at time of permit review. ~Ipt P~p~Rf/I'ILU{ ~(:f;.S 7 .. To efficiently move from site plan approval to pennit review it is recommended that the permit applicant and contractor contact a Plans Analyst in the Building Division of the Development Department to obtain a permit submittal checklist. 38 'Jf> 1'I":L.. ~L .lL [he .....,......... r....ateg8 ,..Ivr-_lld iu III k ttnlliRg il..& 81..1/111' _ ~~ v~tA n,... -awlatiQAs of tAl 911i1~inl g..... . if ....lln't9 "'" the C!it_ FlaR Jrn~f,r .. .. . . of 1 'fnll_~ti__. ,.......,..aG!"u~Ll ~Hil"i... The bwlding area, occupancy an type of construction shall comply with the specifications identified in the Building Code. . ~~I time of permit review specify, in tabular farm, on the' I "4 J _I: ,., ~ site plan iifl...ll-:M1. ,1111._ u._ ~L ~r l__l. L I..... L A.L_- "_if IraB ef r~ , illig. type of construction and occupancy classification__Working . \ drawings of the buildinge shall comply with the codes specified in Chapte~ 20 of the Land Development Regulations. ~Ar-I~ p(lop~ fOR'. ",8l,)iL~J .ut ~..!!S!..-=-7oIl1IY uecu~tl.RJJ.Jd 'ir-"'....tr L-r" 1 :1....1'1'1::11 ~ IY~ rll& ~ \"'\~ ~d~~ 4~4 I st REVIEW COMMENTS Project name Stanton Magnetics - Quamtum Park Lot 6 File number NWSP 99-011 Reference' 1st RevIew. New SIte Plan. File # NWSP 99-011 wIth an Mav 12. 1999 PlannIng and Zoning Deoartment date stamo marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments. None UTILITIES - General Comments 1 All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities In general, palm trees will be the only tree species allowed within utility easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilItIes within the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility serVIces, either in utilIty easements or public rights-of-way 2. Dept. of HRS permits will be required for the water system serving this project. (Sec. 26-12) 3 Fire flow calculations will be required demonstrating the City Code requirement of 1500 g p.m. as stated in LDR chap 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters, whichever is greater (see Sec 26-16(a)) Please submit these calculations with your HRS permit submittal 4 Sec. 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for signature on the Health Dept. application forms or within 30 days of site plan approval, whichever occurs first. Based upon a 1.5-inch meter the fee is $1205 82 5 Comp Plan policy 3C.3 4 requires the conservation of potable water CIty water may not, therefore, be used for irrigation where other sources are readily available. 6 Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineenng drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec. 26-33(a) of the Code 7 This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy 8 The waste stream from the manufacturing process must meet the City's pretreatment requirements. A sampling point must be provided to allow monitoring of this waste stream. (Sec. 26-143,26-147) Page 2 Stanton MagnetIcs - Quantum Park Lot 6 File No NWSP 99-011 DEPARTMENTS INCLUDE REJECT FIRE Comments 9 A fire flow calculatIon test wIll be required, LDR 6-16 10 All water mams, hydrants, and roadways WIll be m place pnor to above ground constructIOn, NFP A 1 POLICE Comments None ENGINEERING DIVISION Comments. 11 Add to the site plan the following note: All plans submitted for specific permits shall meet the City's code requirements at time of application. These permits include, but are not limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation. Permits required from other permitting agencies, such as FDOT, PBe, SFWMD, DERM, L WDD, DEP and any others, shall be included with the permit request. 12 Add a "Right Turn Only" sIgn at the south egress dnveway 13 ProvIde 6" WIde thermoplastIc, whIte stnpes across both dnveways to delIneate pedestnan path through driveways. 14 The landscape islands shall have a mmimum grassed area of 5' between the backs of curb Adjust all plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G ] 15 ProvIde an Engmeer's certIficatIOn that the dramage wIll conform WIth all rules, regulations and codes ofthe CIty's Land Development RegulatIons. [LDR Chapter 4, SectIOn 7.F ] 16 Show clear sight tnangles at both drIveways and adjust the Landscaping Plan If needed. [LDR Chapter 7.5, Article II, SectIon 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear unobstructed vIew wlthm the SIght tnangles at a level between 30" and 6' above finished grade. [LDR Chapter 7.5, ArtIcle II, SectIOn 5.H.] Page 3 Stanton MagnetIcs - Quantum Park Lot 6 File No NWSP 99-011 BUILDING DIVISION Comments. 17 Add a note to both accessible parkmg space areas shown on the site plan drawing (sheet SP 1) that refers the reader back to the typical parking stnpmg detaIl drawmg for the accessible route detaIls. Add text to the detaIl drawmg that mdlcates the route IS m complIance wIth SectIOn 4.3 (Accessible Route) and 4 6 (Parkmg and Passenger Loading Zones) of the Florida AccessibIlIty Code for Buildmg Construction. Please note that at tIme of permIt reVIew the applIcant shall provIde detaIled data on the plans that wIll venfy that the path of the accessible route is in complIance WIth the regulatIOns of the Flonda AccessIbIlIty Code for Buildmg Construction. 18 Identify the finIsh floor elevatIon wIthm the footprmt of the bUlldmg that IS Illustrated on the site plan (sheet SP 1) and the floor plan drawing (sheet A.l) Add to the sIte data, found on sheet SP 1, the flood zone that the bUlldmg IS located wIthm mcludmg, where applIcable, base flood elevatIOn. If there IS no base flood elevatIOn, IndIcate that on the plans. Add specIficatIOns to the sIte data that wIll venfy that the proposed finIsh floor elevatIOn IS m complIance WIth the mmlmum standards of the followmg: a) Minimum elevatIOn reqUIred by the flood zone b) Minimum elevatIon reqUIred by the South Flonda Water Management DIstnct permIt for the project. c) Show and proVIde computations that venfy the elevatIOn of the finIsh floor IS SIX mches or more above the crown of the abutting right-of-way 19 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback dImensIOn from the leadmg edge of the south faces of the bUlldmg to the south property lme Please note that the setback dImensIOn shall be measured from the overhang, covered walkways, canopIes or aWnIngs. The bUIldIng setbacks shall comply WIth Zoning Code regulatIons. IndIcate on the sIte plan whether the patIO area IS covered. If It is covered, provIde plan and elevatIOn vIew drawings of the structure Also, specIfy the setback dImensIOns m compliance with the zoning regulatIons. 20 ProvIde detaIled and dImensIOned elevatIOn VIew drawings of the sIte slgnage IndIcate the total sIgn area and height of the sign mcludmg provIding computatIOns that venfy the sIgn area complIes WIth the regulations of the SIgn Code Also, show and dImenSIon on the plan vIew draWIngs the dIstance the sIte sIgn IS located from the adjacent property lInes (note ten feet IS the mmImum setback from any property lIne) Or Place the followmg note on the site plan. "Site signage is not approved Page 4 Stanton Magnetics - Quantum Park Lot 6 FIle No NWSP 99-011 for thIS project. Separate site plan review and approval IS required for sIte slgnage." Drawmgs of the slgnage shall comply with the applIcable regulatIOns specIfied m the SIgn Code (Chapter 21 of the Land Development RegulatIons) If a sIte sIgn IS proposed, delIneate on the landscape plan the locatIon of the landscaping that IS required for sIte signage 21 On sheet SPl, IdentIfy the symbol that represents the property Ime. 22 DimenSIOn the wIdth of the easement that is shown along the west property lIne 23 Add to the sIte plan drawmg a labeled symbol that represents the locatIOn of the site IIghtmg poles Also, note on the site plan that the site IIghtmg fixtures wIll Illummate the sIte consIstent with the specificatIOns IdentIfied m the Parkmg Lot Code. The photometric plan IS revIewed at tIme of permIt revIew and IS not reqUIred for sIte plan review Therefore, remove the drawmg from the submIttal. PARKS AND RECREATION Comments. None FORE S TERlENVIRONMENT ALIST Comments 24 The applIcant has addressed the eXlstmg trees on the site. If the relocated trees do not survIve the transplanting, the trees will be replaced dunng the landscapmg portIOn of the proJect. PLANNING AND ZONING Comments. 25 On the sIte plan show the followmg: . Setbacks chart and dImenSIOns m tabular form Chapter 4 Section 7 Paragraph E . Open space reqUIred and proposed III the tabular data. Chapter 2 SectIOn 7 Paragraph H.13 . ProvIde loadmg space reqUIrements m the parkmg calculatIOns. Chapter 2 SectIOn 11 Paragraph J.2 . Bearmgs and dIstances of property lInes. Chapter 4 SectIon 7 Paragraph B . RevIse plans to prOVIde parkmg lot Islands dImenSIOned wIth 5' of landscape area from insIde to mSlde of curb City drawing #B- 90012 . Label the dashed line shown inside of the west, south and east property lInes . Label the walk way paving matenal Page 5 Stanton MagnetIcs - Quantum Park Lot 6 File No NWSP 99-011 . Label the type and heIght of the wmg walls adjacent to the loadmg wells . Sign plan showmg location wIth setback requirements and an elevatIon drawmg wIth dImensIOns, matenals and colons. 26 SIgn and seal all plans submItted for reVIew Chapter 4 Section 7 27 On the landscape plan show the followmg' . Label and dImensIOn all reqUIred landscape buffers. Chapter 7 5 ArtIcle II . Label and dImenSIOn the mll111TIUm tree spacmg along the R/W frontage Chapter 7 5 ArtIcle II SectIOn 5 Paragraph D . A note m the notes speclfymg a matenal other than cypress shall be used for mulch . Provide safe slgat tnangles. Chapter 7 5 Article II SectIon 5 Paragraph H . Locate IIghtmg and fire hydrants eXlstmg and proposed. Chapter 4 SectIOn 7 Paragraph B 28 Submit a traffic study and wntten confirmation from the Palm Beach County Traffic DIVISIOn that the sIte meets traffic performance standards. s:\projects\cond of appr\ DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-076 DATE Michael W Rumpf, DIrector of Plannmg & Zonmg Raymond F DaVidson, P.E_, Actmg ClIy Eng~ May 27, 1999 TO FROM. RE. STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011) NEW SITE PLAN 1ST REVIEW COMMENTS 1 Add to the SIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S code reqUirements at time of apphcatIOn. These permIts mclude, but are not hmIted to the followmg SIte lightmg, pavmg, dramage, curbmg, landscapmg and IrngatIOn. Permits reqUired from other permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, L WDD, DEP and any others, shall be mcluded wIth the permIt request. 2 Add a "Right Turn Only" SIgn at the south egress dnveway 3 ProVIde 6" wIde thermoplastic, whIte stnpes across both dnveways to dehneate pedestnan path through dnveways. 4 The landscape Islands shall have a mImmum grassed area of 5' between the backs of curb Adjust all plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G] 5 ProVIde an Engmeer's certIficatIOn that the dramage wIll conform wIth all rules, regulatIOns and codes ofthe CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F] 6 Show clear sIght tnangles at both dnveways and adjust the Landscapmg Plan If needed. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear unobstructed VIew WIthm the sIght tnangles at a level between 30" and 6' above fimshed grade. [LDR Chapter 75, ArtIcle II, SectIOn 5.H.] 7 The proposed 8 mch water mam to the fire hydrant at the north property lme wIll require a Jack and bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConSIder provIdmg a water hne to the fire hydrant at the north property hne from the eXIstmg water lme at the south property lme as an alternative to aJack and bore. 8 All plans submItted to the CIty must be SIgned and sealed by the appropnate desIgn profeSSIOnals. The CIvIl drawmg and the Survey are not SIgned and sealed. RFD/ck Xc Ken Hall C:\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review.doc MEMORANDUM UTILITIES DEPT NO 99 - 165 TO' M~mPf, Planning Director ~John A Guidry, UtilIties DIrector FROM. DATE. May 25, 1999 SUBJECT Stanton MagnetIcs - Quantum Park Lot 6 - 1 SI Review We offer the following comments on this project. GENERAL COMMENTS 1) All utilities easements shall be shown on the rectified landscaping drawings so that we may determine which trees may interfere with utilities In general, palm trees will be the only tree species allowed within utility easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities wIthin the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere wIth utility services, either m utility easements or public rights-of-way 2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12) 3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g p m. as stated in LDR chap 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters, whichever is greater (see Sec 26-16(a)) Please submit these calculations wIth your HRS permit submittal 4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for signature on the Health Dept. application forms or within 30 days of site plan approval, whIchever occurs first. Based upon a 1 5-mch meter, the fee IS $1205 82 5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIOn of potable water CIty water may not, therefore, be used for lITIgatIOn where other sources are readily available. SPECIFIC CONDITIONS 1) Water and sewer lines to be owned and operated by the CIty shall be included within utility easements Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec 26-33(a) of the Code 2) This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy 3) A building permit for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec 26-15) 4) The waste stream from the manufacturing process must meet the City's pretreatment reqUIrements A sampling pomt must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147) Please refer any questions on this matter to Peter Mazzella (742-6404) of this office JAG/PVM I~~ '- ------ i 0 :0. ~ - "'- 'l}ll j I ' i l. I, I - ~ Xc Skip Milor Peter Mazzella File , If .P' I ,_, "=~. I { .........,.;..........""l~ LEISURE SERVICES PARKS DIVISION MEMORANDUM TO Mike Rumpf, DIrector ofPlanOlng & Zonmg (1-' \ )J John Wildner, Parks Supenntendent 1 W FROM RE. Stanton Magnetics - Quantum Park Lot 6 DATE May 26, 1999 I have no comments on the above project. The project should contmue m the normal reVIew process JWad ,--.. , i i !.. 13 ['I ["'win, [l I', .,....:..c:.....,;,- 'j I Yf m j ~{ ~'- - ~ uu 1~llr 2 61999 ~ PLANNING AND ZONING DEPt DEPARTMENT OF DEVELOPMENT MEMORANDUM ENG 99-076 TO Michael W Rumpf, DIrector of Plannmg & ZOnIng Raymond F DaVidson, P .E., Actmg City EngI~ May 27,1999 FROM. DATE RE STANTON MAGNETICS - QUANTUM PARK LOT 6 (NWSP 99-011) NEW SITE PLAN 1ST REVIEW COMMENTS 1 Add to the sIte plan the followmg note All plans submItted for specIfic permIts shall meet the CIty'S code reqUIrements at tIme of applIcatIOn. These permIts mclude, but are not lImIted to the followmg' sIte lIghtmg, paving, dramage, curbmg, landscapmg and ImgatIOn. PermIts reqUIred from other permIttmg agencIes, such as FDOT, PBC, SFWMD, DERM, LWDD, DEP and any others, shall be mcluded WIth the permIt request. 2. Add a "RIght Turn Only" sIgn at the south egress dnveway 3 ProvIde 6" wIde thermoplastIc, whIte stnpes across both driveways to delmeate pedestnan path through dnveways. 4 The landscape Islands shall have a mInImum grassed area of 5' between the backs of curb Adjust all plans accordmgly [LDR Chapter 7.5, ArtIcle II, SectIOn 5 G] 5 ProVIde an Engmeer's certIficatIOn that the dramage WIll conform WIth all rules, regulatIOns and codes of the CIty'S Land Development RegulatIOns. [LDR Chapter 4, SectIOn 7.F ] 6 Show clear SIght tnangles at both drIveways and adjust the Landscapmg Plan If needed. [LDR Chapter 7 5, ArtIcle II, SectIOn 5.H.2.] Add a note to the Landscapmg Plan that there shall be a clear unobstructed VIew WIthm the SIght tnangles at a level between 30" and 6' above finIshed grade. [LDR Chapter 75, ArtIcle II, SectIon 5.H.] 7 The proposed 8 mch water mam to the fire hydrant at the north property lme WIll reqUIre ajack and bore under Quantum Blvd., an open cut of Quantum Blvd. wIll not be allowed. ConsIder provIdmg a water lIne to the fire hydrant at the north property lme from the eXIstmg water lme at the south property lme as an alternatIve to aJack and bore. 8 All plans submItted to the CIty must be sIgned and sealed by the appropnate deSIgn professIOnals. The CIVIl drawmg and the Survey are not sIgned and sealed. RFD/ck Xc Ken Hall C"\My Documents\Stanton Magnetics, Quantum Lot 6 New Site Plan 1st Review,doc MEMORANDUM UTILITIES DEPT NO 99 - 165 TO M~mPf, Planning Director 1/vJohn A Guidry, UtilitIes Director FROM. DATE. May 25, 1999 SUBJECT Stanton Magnetics - Quantum Park Lot 6 - 1 SI Review We offer the following comments on this project: GENERAL COMMENTS 1) All utilities easements shall be shown on the rectified landscapmg drawings so that we may determine which trees may interfere with utilities In general, palm trees will be the only tree species allowed within utility easements Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities withm the easement in the foreseeable future LDR Sec 7 5-18 1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way 2) Dept. of HRS permits will be required for the water system serving this project. (Sec 26-12) 3) Fire flow calculations will be required demonstrating the City Code requirement of 1500 g P m. as stated in LDR chap 6, Art. IV, Sec. 16, or the requirement Imposed by msurance underwriters, whichever IS greater (see Sec 26-16(a)) Please submit these calculations with your HRS permit submittal 4) Sec 26-34(E) of the City Code requires that a capacity reservation fee be paid for this project either upon my request for signature on the Health Dept. application forms or within 30 days of site plan approval, whichever occurs first. Based upon a 1 5-inch meter, the fee is $1205 82 5) Comp Plan polIcy 3C.3 4 reqUIres the conservatIon of potable water CIty water may not, therefore, be used for lITIgatIon where other sources are readily available SPECIFIC CONDITIONS 1) Water and sewer lInes to be owned and operated by the City shall be mcluded within utility easements Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in Sec 26-33(a) of the Code 2) This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the certificate of occupancy 3) A buildmg permIt for this project shall not be issued until this office has approved the plans for the water and/or sewer improvements required to serve the project. (Sec 26-15) 4) The waste stream from the manufacturing process must meet the City's pretreatment requirements A sampling point must be provided to allow monitoring of this waste stream. (Sec 26-143, 26-147) Please refer any questions on this matter to Peter Mazzella (742-6404) of thIS office JAG/PVM ~~::::----..~ '- r ~ -- ~---- / 0 r:-' - j , I 0 I ~ ;1 )/ I ., ",.-"j I ! ~~-.~ Xc Skip Milor Peter Mazzella File Parks Division Memorandum- TRC Subject. Mike Rumpf, Actmg Plannmg and Zomng Manager Kevin J Hallahan, Forester / Envlronment.hst ~ Stanton Magnetics- Quantum Park Lot 6 New Site Plan - 1st RevIew To From. Date May 25, 1999 The applIcant has addressed the eXlstmg trees on the site. If the relocated trees do not survive the transplantmg, the trees will be replaced dunng the landscapmg portIOn of the project. The project should contmue m the normal review process. I , tiJ ~,tr /. DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO 99-119 TO Michael Rumpf, Planmng and Zomng DIrector \ J r\jrt\J Michael E_ Haag, Bmldmg Code Pernnt AdmlTIlstr~ 1.- May 20, 1999 () Stanton Magnetics Quantum Park Lot 6 - New Site Pl~n~sp 99-011)- 1st review comments FROM. DATE RE We have revIewed the plans for the above-referenced project and recommend that the followmg comments be addressed pnor to the project bemg forwarded for Board reVIew' Buildine Division (Site Specific and Permit Comments) - MIchael E Haag (561) 742-6352 1 Add a note to both accessible parkmg space areas shown on the SIte plan drawmg (sheet SP 1) that refers the reader back to the typIcal parkmg stnpmg detaIl drawmg for the accessible route detaIls. Add text to the detaIl drawmg that mdlcates the route IS m comphance WIth SectIOn 43 (Accessible Route) and 4 6 (Parkmg and Passenger Loadmg Zones) of the Flonda Accessiblhty Code for BUIldmg ConstructIOn. Please note that at tIme of permIt reVIew the apphcant shall proVIde detaIled data on the plans that wIll venfy that the path of the accessible route IS m comphance WIth the regulatIOns of the Flonda Accessiblhty Code for BUIldmg ConstructIOn. 2 IdentIfy the fimsh floor elevatIOn wlthm the footpnnt of the bUIldmg that IS Illustrated on the SIte plan (sheet SP 1) and the floor plan drawmg (sheet A.l) Add to the SIte data, found on sheet SP 1, the flood zone that the bUIldmg IS located wlthm mcludmg, where apphcable, base flood elevatIOn. If there IS no base flood elevatIOn, mdlcate that on the plans. Add specIficatIOns to the SIte data that wIll venfy that the proposed fimsh floor elevatIOn IS m comphance WIth the mmlmum standards of the followmg' a) Mmlmum elevatIon reqUIred by the flood zone. b) Mmlmum elevatIOn reqUIred by the South Flonda Water Management Dlstnct permIt for the proJ ect. c) Show and provIde computatIOns that venfy the elevatIon of the fimsh floor IS SIX mches or more above the crown of the abuttmg nght-of-way BUIldmg DIVISIon Memo No 99-119 to Michael Rumpf RE Stanton MagnetIcs - 1 st ReVIew May 20, 1999 Page Two 3 At tIme of permIt reVIew, IdentIfy on the sIte plan the actual setback dImenSIOn from the leadmg edge of the south faces of the bUIldmg to the south property lIne Please note that the setback dImenSIOn shall be measured from the overhang, covered walkways, canopIes or awnmgs. The bUIldmg setbacks shall comply wIth Zonmg Code regulatIOns. IndIcate on the sIte plan whether the patIo area IS covered. If It IS covered, provIde plan and elevatIon VIew drawmgs of the structure Also, speCIfy the setback dImenSIOns m complIance wIth the zonmg regulatIOns. 4 PrOVIde detaIled and dImenSIOned elevatIOn VIew drawmgs of the sIte sIgnage IndIcate the total sIgn area and heIght of the SIgn mc1udmg provldmg computatIOns that venfy the sIgn area complIes wIth the regulatIOns of the SIgn Code. Also, show and dImenSIOn on the plan VIew drawmgs the dIstance the sIte sIgn IS located from the adjacent property lInes (note ten feet IS the mInImum setback from any property hne) Or Place the followmg note on the sIte plan. "SIte sIgnage IS not approved for thIS proJect. Separate sIte plan reVIew and approval IS reqUIred for sIte sIgnage." Drawmgs of the sIgnage shall comply wIth the apphcable regulatIOns speCIfied m the SIgn Code (Chapter 21 of the Land Development RegulatIOns) Ifa sIte SIgn IS proposed, delmeate on the landscape plan the locatIOn of the landscapmg that IS reqUIred for sIte sIgnage 5 On sheet SPl, IdentIfy the symbol that represents the property lIne. 6 DImenSIOn the WIdth of the easement that IS shown along the west property hne 7 Add to the SIte plan drawmg a labeled symbol that represents the locatIOn of the SIte lIghtmg poles. Also, note on the SIte plan that the SIte lIghtmg fixtures WIll Illummate the SIte conSIstent WIth the speCIficatIOns IdentIfied m the Parkmg Lot Code. The photometnc plan IS reVIewed at tIme of permIt reVIew and IS not reqUIred for SIte plan reVIew Therefore, remove the drawmg from the submIttal. MEH.bg J '\SHRDA T A \Development\Building-6870\Documents\ TRC\NWSP 99-011 1 st review Stanton Magnetics,doc CITY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO' MIchael Rumpf FILE DATE SUBJECT REFERENCES ENCLOSURES Ref NWSP 99-011 Stanton MagnetIcs FROM S gt. Jensen NO COMMENTS 5-17-99 NWSP 99-011 f-- r:'. ~ !o:l rs n nn '/~~r "il._!y J,fn) U U J'1fl/ I 7 J9YiJ ~i PZLANNING AND - ONING DEPT. PUBLIC WORKS DEPARTMENT MEMORANDUM #99-102 SUBJ Michael Rumpf, Plannmg & Zonmg DIrector W. Larry QUInn, AssIstant PublIc Works DIrector V SIte Plan RevIew - 15t RevIew - Stanton MagnetIcs - Quantum Park Lot 6 TO FROM DATE May 17, 1999 The PublIc Works Department has no comments m reference to the SIte plan reVIew lIsted above LQ/cr rnt~t ~ :~~ 00 PLAN!~ I \!G "~ND ZON! NG' DT. FIRE & LIFE SAFETY DIVISION Memorandum No 99-287 0',:"". "T . - .. NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to TO Mike Rumpf, Director Planning & Zoning Division FROM Steve Gale, Fire Marshal Deputy Chief - Fire Rescue Department DATE May 13,1999 SUBJECT Stanton Magnetics Quantum Park Lot 6 NWSP 99-011 A fire flow calculation test will be required, LOR 6-16 All water mains, hydrants, and roadways will be in place prior to above ground construction, NFPA 1 I recommend this plan be forwarded with the above comments CC File r~'1 6'-~8"-rs '~ :- (;..L {2 All fvJ ~ 714-J'v1tJJ f'v1A-0 U E 'n <- oS d"~jJ\CJ~ ~ (c; 1) (3tJ lI\C- 9m 'f'1fl.JJ 'S-\\<J-N Ill-6' ~L-vi " ~T&Tc:-\L- C. +tMvT AN ~ 'j) \ M e-N ~ kl N ~ j ~ 'T\9'e, Ii 0Art..- fZ, (I, ^"" c it- 1- 'S 0/ C I P ,:\-tt. E:.. · OPt'N C;pfk.E J~\I'I~;J:....Lf;:;~ J2e0.,..hf'1..(f'O $" fr\o\u.s ED -(rI"E' I N-f T ff'~\..~ j)A-)~ C t+"2- S &C / Pir/I.. ++ (9 · ft2-0Jlc>E-- ~(rV'\;0 ~lk.c- 64;-&\..i\,'26v'-FA.J'T$ f;....; 7l-/fi f % l-t Alla G4L0cJVl- Do.'vlc; C +i 1. SG-G Il ? 4fL 1" :4 -- u~...e~~ 1<';....1. t If( ':'-6". .'1...1/1 -'t-- (~,J."..- ~ I ~. ~~r'u~ d' )"3>6AvL~ "2 j)" s: \fTJ,C.<6-5 of rlU:l~'l' LI~ s= eft 'I 56::'7 PtM.. 13 " (l~'J( se- 'fL~JJ I;:. ~ p(l-cu \Q ~ "" P/TIL;C IJv G LOT IS\.A--NI,)~ Gv~L"J',')(.; CUIr.l.'L\.Ilj~ VI A./l f Jv S:, ( () ~ D V I ~ ";t:; 1:: ] ( tS of- LA- N v $ c" ~') t:- A-vl.- e t4- f-YVvv-. c08 q)6- . i () (,</ ;S t ~ f- ~r= 't Cut~6 . to; D,.~,.f'l #- /3 - ?C(j(L L,tr(!, c-L '-n+e ]) f}S t-tB> L \;J C- S I*,...... ~ &E!fI) I AI ~ I d-'<.. CJ.~ n.t (- 4/e-SJ I ~ n+ ~ fvrs, r p l1-LJ~v1 C AJc--~ L iffI~ 6L TI-f-f: u ~'T\.t- '--'~ ( IN \IV, v"-,,A %11-\ ff--U l v9-1> E L -rJ+f; "1 f t ftJ0 :::> #8(.) 1+1 cJf- 71-tf ~ I J\J l.? fh/} lTCeN, TI TttE" Lo ,+V I ^-II L-J 8 L\.J~ 51i..9 N fLt'hv ~ito"'"/'J (,\ LGCr-"llo,'-j W / SfrO{rc,:K., ~Q.vi~~~ .;- .> ,) n ? ,-' \t:J '" "- ~..., '.> ~ ',) j f~ ;::. ,.,., ~ ~ ~~ W/t'lL~ ~~..., '- ~ s~ ~~:~ '?' _'6 '-? ../\ <J,r ~~ Q,\ . er .. j.. ) <;; I 1.-.0 f>->J. ~ e- fh..., J4.u.., (' '-fHJ <;, S'u is "-" \ TTl71D ~fL, kvtt-W. (3 J.i 'i 75-&G 7 1,. ) () ,0T>>t- (AhfOS ( ~ ftV'rJJ <;;'l\ovJ .nJ-D-- fo{Io.-, l'Cj ~ 61 lA4-o ~ A<-V D :b( A." f.\j S 1(j'lV 4t,L 1~5G0l1LL\J l V1vJoYG/tr~ (J v~5,. C. ~ 7 )" /trL r.1[ f.) L fT--f.beL. h JJ {) VlofL,- r: JJ s ( C~~ 77J-E' tv! I )J 1,Vi r.; "'- o7fi-G ff' ~!CfG ()V i ft-Lo,A/~ -rc~ f2- / w Ft2f).A.,FI'I~ /;;. elf. 7 ~-- /[/1"1 ~ J!: S (? ( 5" f ,4-{L )> , fr fJoTt-' j tV (jft!- IV C /6 s. sp E-CI(=- ~ l]v I fr /Z.Ap4-it?/L.lkL tJ(1tG-rL-- 7lfwJ.../ c1tr2-eSJ S~L 06-' uSE'D ft'L )./\I,C,-,iI II P j\D V \ \) e- S iT F& S j 1..9 i+ T (yll A-- A; G Ct'"'C; C t1 7 )" /ill-j .fL S R s:- ;&(I.. tf '" " ~CA--r& LJ GH-n;t G ~4/V() ftv2E HyPf-Ao"./i~ 6. -. J/t- }~tJ E-y. \ ~T7Nl.:> c; ~L<:/)C3fj) C fI {- ~ec,'/ (;t/l :B ~ Su~;; po 7{Z..,,4f='ft6 $-lVJ?'7 /J-,vO CJP; 7'6-1./ ('P#0f2v'-"Mlol\./ F-av- ~t.- fl&tKff-' ~7f !7JlfHj c f) I v f {v.J 'nMr ~ yr& yvtf(5r!, ~. it'~f '~f1c 1~;t--r4tY("~ %/frtJOAvt.P ~ " 232 STANDARD INDUSTRIAL CLASSIFICATION Industry Group No. 367 Industry ? <::-~ECTRONIC COMPONE~ ACCESSORIES-Con. 3679 Electronic Components, Not Elsewhere Classified-Con. j -*- masers Crystals and crystal assemblies, radio Delay lines Harness assemblies for electronic use: wire and cable Headphones, radio Heads, recording for speech and musi- cal equipment Hermetic seals for electronic equip- ment Impedance conversion units, high fre- quency Liquid crystal displays Loads, electronic Microwave components Oscillators, except laboratory type Parametric amplifiers Passive repeaters Phonograph needle cartridges Phonograph needles Piezoelectric crystals Power supplies, static, and variable fre- quency Pulse forming networks Quartz crystals for electronic applica- tion Recording and playback heads, magnet- ic Recording heads for speech and musical equipment Rectifiers, electronic: except solid-state Resonant reed devices, electronic Rheostats, electronic Sockets, electronic tube Solenoids for electronic applications ,.Static power supply converters for elec- tronic applications Step positioners for transmitting equip- ment Styli, phonograph record cutting Switches, electronic Switches, stepping Transducers for use in measuring and testing instruments and equipments Tube retainers, electronic Tube spacers. mica Tube transformer assemblies used in firing electronic tubes Video triggers, except remote control television devices Voice controls Waveguides and fittings 369 MISCELLANEOUS ELECTRICAL MACHINERY, EQUIPMENT, AND SUPPLIES 3691 Storage Batteries Establishments primarily engaged in manufacturing storage batteries. Alkaline cell storage batteries Batteries, rechargeable Lead acid batteries (storage batteries) Nickel cadmium storage batteriee Storage batteries 3692 Primary Batteries, Dry and Wet Establishments primarily engaged in manufacturing primary batteries, dr: or wet. Batteries. primary' dry or wet Dry cell batteries, single and multiple cell 3694 Electrical Equipment for Internal Combustion Engines Establishments primarily engaged in manufacturing electrical equipIDI' for internal combustion engines. Important products of this industry incl1r armatures, starting motors, alternators, and generators for automobiles ~ aircraft; and ignition apparatus for internal combustion engines, includi' spark plugs, magnetos, coils, and distributors. Alternators, motor vehicle Armatures, motor vehicle Battery cable wiring sets for internal combustion engines Battery charging generators for inter nal combustion engines Breaker point sets, internal combustion Harness wiring sets for in~ r bustioD engines .... Ignition cable sets or. ~_...;_ for internal combustIon .....- Ignition systems. high freq::' ... Motors, starting: motor ve ~ craft ~ Regulators. voltage: motor ~ c;:~uu.'" nlnalll Fnr internal CO . REV'E'Af COMME"'TS (MEMO$)/DATA ENGINEERING DEPARTMENT MEMORANDUM: NO. 91-242CC November 26, 1991 TO Christopher Cutro Director of Planning & Zoning FROM Vincent A Finizio Administrative Coordinator of Engineering RE: NOTIFICATION OF TECHNICAL REVIEW BOARD SIGN-OFF Please be advised that the Engineering Department has signed off on the final submission of the following site plans Quantum, Lot 49 0~JA:=L~~ Vincent A Finizio ~ VAF/ck cc J Scott Miller, City Manager Michael Haag. Site Development Compliance Administrator "Q 'P rrT,-'; TED J:'\...L ...,J _'" Vi NO' ! I 01 <1' (.., I I PL. I cYT. - MEMORANDUM Utilities #91-577 TO Christopher Cutro, Director of Planning John A Guidry ,~t..d ~"- "" / /Ie Director of Ut ilrFlie~ /I //v- /' / November 25, 1991 FROM DATE SUBJECT Notification of Sign-Off - TRB We have completed our review and have found the following project to be in substantial compliance Canada Dry - Southeast Distribution 19b xc Mike Kazunas Skip Milor File RECEIVED NOV 2.S 9( PLANNING DtPT - PLANNING DEPARTMENT MEMORANDUM TO Mike Haag, Site Development FROM Tambri J Heyden, Senior Planner DATE October 21, 1991 RE Transmittal of Renderings Accompanying this memorandum you will find colored elevations and/or color chips and photographs for the following projects which were approved by the City Commission on October 15, 1991 SITE PLAN 1 Best Homes at Boynton Lakes, Plat 5 (41 unit townhouse project) One (1) colored elevation, photographs and color chips City commission approved subject to staff comments (those comments which were recommendations are at the option of the applicant with respect to compliance), subject to Planning and Zoning recommendation that a copy of the agreement between Best Homes and the Boynton Lakes North Homeowners' Association regarding construction of improvements on the common areas be given to the City and subject to the CAB recommendation that foundation landscaping include a 24 inch Hibiscus hedge along the rear of each building planted 24 inches on center and that trees adjacent to buildings be 10-12 feet in height 2 Southeast Atlantic Distribution Center at Quantum, Lot 49 (New distribution warehouse) One (1) colored elevation Approved by City Commission subject to staff comments excluding comments 3, 7, 11, 24 and 27 from the Building Department and subject to Planning Department Memorandum #91-265 The name of the project and date of City Commission approval have been placed on the elevations r , ~~ J~~ A / Tambri J~eYde . TJH/jm Atts A RENDER JM PLANNING DEPT. MEMORANDUM NO. 91-247 FROM: J Scott Miller, City Manager ~!~tro, Planning Director TO DATE October 10, 1991 SUBJECT: Planning and Zoning Board Meeting October 8, 1991 Please be advised that the Planning and Zoning Board met on Tuesday, October 8, 1991, and took the following action: 1. Unanimously recommended approval of the request submitted by Mr. Edward J. Kaplan for site plan approval to construct 41 townhouse units on aSS acre tract of land within Boynton Lakes, Plat 5, subject to proviso. Motion was made by Mrs. Huckle and seconded by Mr. Cwynar; Mr Howard abstained. (PM91-248) 2 Continued the public hearing for the Cross Creek Centre parking lot variance to the November 12, 1991 meeting at 7:00 pm, as per the applicant's request for a one month postponement. 3 Unanimously recommended approval of the request submitted Robert E Basehart, Urban Design Studio, for site plan approval to construct a 63,288 square foot distribution facility on lot 49 within Quantum Park, subject to proviso Motion was made by Mr. Lehnertz and seconded by Mrs. Greenhouse (PM91-249) by ~i-;v / ",,{.lfC...~~ 1;, .J __('i.'<-io,'.... 4. Unanimously made a finding of consistency with the Comprehensive Plan for the proposed amendment to Appendix A-Zoning to allow ambulance services as a permitted use in the M-1, Light Industrial, zoning district Motion was made by Mr. Howard and seconded by Mrs. Huckle; Mrs Greenhouse had left the room during the making of the motion. (PM91-250) 5 Unanimously made a finding consistency with the Comprehensive Plan for the proposed amendment to Appendix A-Zoning to allow vegetation recycling facilities in the M-1, Light Industrial, zoning district, subject to proviso. Motion was made by Lehnertz and seconded by Mr. Howard. (PM91-251) 6 Discussed placing limitations on restaurants located in the C-1, zoning district. The Planning and Zoning Board accepted the recommendations made by the Planning Department, as itemized in the Planning Department memorandum dated October 3, 1991, and additionally suggested that restaurants in C-1 be located only within multi-tenant buildings (not permitted as freestanding buildings) and allowed only as an accessory use to a lawful principal use. The Planning and Zoning Board directed the Planning Department to bring this proposed code change back to the Planning and Zoning Board at the November 12, 1991 meeting for a determination of consistency with the Comprehensive Plan. Planning Dept. Memorandum 191-247 Page 2 7. Discussed the data presented by the Planning Department which compares various cities' regulations governing service stations. The Planning and Zoning Board made recommendations for a future change to the City's service station regulations to be presented to the City Commission. CC/jm Encls cc Don Jaeger, Building Director Mike Haag, Site Development A:PM91-247.JM PLANNING DEPT MEMORANDUM NO. 91-249 (AGENDA MEMORANDUM) FROM J Scott Miller, City Manager ~-{~ Christopher Cutro, Planning Director TO DATE: October 10, 1991 SUBJECT Southeast Atlantic Distribution Center at Quantum Park - New Site Plan Please place the above-referenced item on the City Commission agenda for Tuesday, October 15, 1991 , under Development Plans - Non-Consent Agenda DESCRIPTION: Request for site plan approval to construct a 63,288 square foot distribution facility on Lot 49 within Quantum Park, located approximately 400 feet east of Park Ridge Boulevard and Beta Drive. RECOMMENDATION: The Planning and Zoning Board unanimously recommended approval of the above-referenced item, subject to staff comments, copies of which are attached, with the exception that if the City Attorney determines that unity of control for Lots 49 and 49A is sufficient, then comment #3 from Building Department Memorandum #91-358, requiring unity of title, be deleted and also with the exception that if the City Attorney and staff determine that a buffer wall is not required, the applicant shall construct a chain link fence with a dense vegetative buffer to consist of native hedge material, a minimum of 2 feet in height, and a mixture of native canopy trees CC/jm A:PM91-249.JM FIRE DEPARTMENT MEMORANDUM NO. 91-216 WDC To PLANNING DEPARTMENT From WILLIAM D CAVANAUGH FIRE DEPARTMENT TRB REP Re TRB DISTRIBUTION CENTER LOT 49 QUANTUM PARK A PRIVATE FIRE LOOP FOR WATER SUPPLY SHALL BE PROVIDED FOR THIS PROJECT THIS FIRE LINE IS NECESSARY TO PROVIDE WATER TO THE FIRE SPRINKLER SYSTEM AND FOR THE FIRE HYDRANTS REQUIRED IN THE SUB DIVISION REQUIREMENTS //{/ eUf?f(!l<~~/- W D CAVANAUGH ~ FIRE PREVENTION OFFICER I BOYNTON BEACH FIRE DEPARTMENT xc Executive Officer Crockett File 9-27-91 MEMORANDUM Utilities #91-483 TO Christopher Cutro. Planning Director FROM John A Guidry, Director of Utilities DATE September 26, 1991 SUBJECT TRB Review - Canada Dry Distribution Center Quant um Lot 49 We can approve this project, subject to the following conditions The proposed water main location is unacceptable to us from a maintenance standpoint We suggest a fire hydrant be installed within the utility easement and a separate fire line be installed at the N E corner with double check assembly located just beyond easement Reduced pressure backflow preventers will be required on the water service Indicate location, model and size We recommend dual units in parallel so service is not interrupted during testing Double check valve assembly will be required on the fire service line 9 Ductile Iron Pipe Polylined or P V C C-900 DR 18, is required entering any sanitary manhole Owner shall provide revised fire flow calculations and details of fire protection system All sanitary sewers on project are to be privately owned and operated City responsibility will end at the easement line gb xc Mike Kazunas File \tf.Cf,J:\fEU SE.f' 2,1 p\..M~~\~G Ot.Pl'. ~ TO FROM RE DATE RECREATION & PARK MEMORANDUM #93-384 Chris Cutro, Planning & Zoning Director Kevin J Hallahan, Forester/Environmentalist t<:Jf~ 49 Distributors Inc (AKA Canada Dry) Quantum Corporate Park 4895 Park Ridge Boulevard Landscape Buffer Adjacent To C-16 Canal September 16, 1993 This memorandum is in response to the request by a City resident to verify that a landscape buffer was planted along the C-16 Canal in accordance with the approved site plan for the above project City records indicate that an approved and inspected landscape buffer was planted on May 5, 1992 The present facility managers have not been adequately maintaining the vegetation although the company is in the process of removing, replacing and maintaining the buffer I am assisting the City Code Enforcement Division with completing this vegetation replacement The oversized trees were specified to be 12 feet in height and were comprised of native species of Slash Pine and Live Oak The total quantity of trees planted was fifteen, although the City buffer requirement called for planting only eight trees The planted area is approximately 25 feet wide by 200 feet long which is the size limi t permitted by the South Florida Water Management District (SFWMD) The buffer included trees, shrubs, hedges, grass sod, grass seed, an automatic irrigation system and exotic plants removal The following table is a dated activities chart detailing the sequence of inspections and permits required to complete the landscape buffer for the project DATE 4/29/92 ACTIVITY/COMMENT The project construction company, Catalfumo Construction, was nearing completion of the facility and had not received a landscape inspection for lot 49 and 49A Lot 49 contained the facilities and 49A contained the landscape buffer as shown on the approved City site plans The applicant requested a temporary Certificate of Occupancy for the facilities (lot 49) pursuant to presenting the City approved landscape plans (buffer) for lot 49A to the SFWMD (see attached memo #92-175) This organization reviews and permits all plantings in their easement The SFWMD and the adjoining easement of FP&L Utility Company have easements where the landscape buffer is shown, which limit the types and sizes of plantings *5/04/92 The applicant requested a site landscape inspection which failed for non-compliance to the approved landscape plan (lot 49) *5/18/92 The applicant requested a second site landscape inspection which failed for non-compliance to the approved landscape plan (lot 49) 5/14/92 The SFWMD approved a permit for lot 49A (landscape buffer) (see attached SFWMD permit #9611) 5/26/92 The applicant requested a third site landscape inspection for lot 49 (approved) and a first landscape inspection for lot 49A (buffer) which is approved *See attached computer printout sheet "Print Key Output" for list of inspections KH ad CC Scott Miller, City Manager Charles Frederick, Director, Recreation & Park Department Scott Blasie, Code Enforcement Supervisor Hubert Hurst, Code Enforcement Inspector Mike Haag, Zoning & Site Administrator Phil Sy, Plans Check Inspector 1/ I . RECREATION , PARK MEMORANDUM_ TO Don Jaeger, Building Official FROM Kevin J Hallahan, Forester/Environmentalist Canada Dry Distributors RE DATE April 29,1992 ~)H The applicant has not received a landscape inspection. The applicant has requested bonding the landscape materials required to be planted on the SFWMD easement (canal area), rather than planting as part of the on-site landscape inspection. KH: ad --w BUILDING DEPARTMENT MEMORANDUM NO 92-113 Apr i 1 27, 1992 TO Technical Review Committee Members Ed Allen Christopher Cu~ro Bob Eichorst Mike Kazunas Charlie Frederick John GUldry Ed Hillery Fire Chief Planning and Zoning Director Public Works Director City Engineer Parks & Recreation Director Utilities Director Police Chief FROM Don Jaeger, Building Official RE ISSUANCE OF CERTIFICATES OF OCCUPANCY Canada Dry Distribu~ors 4895 Park Ridge Blvd Catalfumo Construction, Inc The above referenced project is nearing completion Prior ~o the Building Department issuing the Certificate of Occupancy, I would I ike to ensure that you do not have any outstanding or pending conditions concerning this site that must be rectified (excluding issues that are covered entirely with a city approved surety) If any outstanding conditions are related to permits issued by the Building Department, please prOVide this department a memorandum containlng a description of the unresolved condi tions If the unresol ved conditions are not permit related, please notify the owner or the owners agent to ensure that the matters are rec';ified Please respond to Don Johnson, Building Compliance Administrator, wi thin ten (10) days in order that we may proceed in a timely m3.nner to issue the Certificate of Occupancy No response is necessary If your department is satisfied with the current state of the above referenced site Thank you for your cooperation /Q Donlger XC J Scott Miller Community Development (CRA Projects Only) Kevin Hallahan, Forester Don Johnson File ~6J SFWMD PERMIT Nu.___ (,.,., '0 Jt OCli!"l 11fC (NON-ASSIGNABLE) May 14, 1992 DATE ISSUED AUTHORIZING BEAt1TIFICATION CONSISTING OF VARIOUS TREES AND SHRUBS ENCROACHING 8' AND AI" IRRIGATION LINE WITH POP-UP SPRINKLERS WITHIN THE NORTH RIGHT OF WAY OF C-16 LOCATED 1,500' WEST OF 1-95 <QUANTUM PARK) LOCATED IN PALM BEACH COUNTY SECTION 20 TWP 45S AGE 43E ISSUED TO QRA, Inc 1900 Southeast 17th Street Causeway Fort Lauderdale, Florida 33316 lowner) ThiS permit IS Issued pursuant to Application No. 92-0330-2 dated March 10, 19~ and permittee s agreement to hold and save the Soutll FlOrida Water Management District and Its successors harmless from any ano all damages. claims or liabilities which may arise by reason of the construction. maintenance or use of the work or structure InvOlved n It':e Permit Said application including all plans and specIfications attached thereto IS by reference made a part hereof Tne permittee. Oy acceptance of tllis permit. hereby agrees that he sllall promptly comply witll all orders of tile District and shall alter repair or remove Il.s use sOlely at illS expense In a tImely faShion Permittee sllall comply With all laws and rules adminiStered cy t~e Dlstrrct ThiS permit does not convey to permittee any property rlgllts nor any rIghts or privileges otllerthan those speCified herein nor relieve tne permittee from comply'"g WIth any law regulation. or requIrement affecting the rights of other bodIes or agenc:es All structures and works Installed Oy perm,ttee hereunder shall remlln tne property 01 tne permittee, ThiS permit IS Issued by the District as a license to use or occupy District works or lands. It does not create any fight or entitlement. e'ther legal or eQultaOle. to the contlOued use of the District works or lands. Since thiS permit conveys no right to the continued use of lhe District works or lands. the District is under no Obligation to transfer thiS permit to any subsequent party By acceptance of lh.s permit. lhe permIttee expressly acknowledges that the permittee bears all risks of loss as a result of revocation of thiS perml!. WORK PROPOSED WILL BE COMPLETED ON OR BEFORE 5/3119 93 otherwise. this permit IS voided and all r.ghts thereunder are automatically cancelled unless an extension to the construction periOd IS applied for and granted. '2 LIMITING CONDITIONS (on reverse sIde of permit) SPECIAL CONDITIONS (SPECIFIC LIMITING CONDITIONS) ARE AS FOLLOWS, SPECIAL CONDITIONS ON THE ATTACHED SHEET ARE A PART OF THIS DOCUMENT c Jeff Lis 1540 Latham Road West Palm Beach, Florida 33409 FILED WITH THE CLERK OF THE SOUTH FLORIDA WATER MANAGEM~ DISTRICT ~:~~I~~~L Oe....ty Cleric heet 1 of 4 SOUTH FLORIDA WATER MANAGEMENT DISTRICT, BY ITS GOVERNING BOARD ~y.dJ ~~V~ Secretary ~ cf ~Cu'"!''' - 4OE.6.381 Limited Cor ions _4 .... l~l . The C'itnct i "utnonz.t,on to utIlize 1anai and other 'NarkS const.tutei oil revocable IIcenie In conilder atlon fo, rece'pt 0; that IIcenie perm,tteei snail dgree to De bound by the follOWIng standard limIting conditions. whlcn shall De ,n,ludea \N,tn,n 011/ permits lii~ed puri~.nt to tn,i 'hapter (1) All struCtures on Dlstn't 'Norks or landS conUructed by permittee shall remain the prOperty of pe,m,ttee WhO Shall oe solely responsible tor ensur,ng that s...Ch structures ana Other uses remaIn In gOOd and safe condItion Perm'ttees are aavlsed tnat other feaeral. state dnd 10C.l "Wfety sundards may govern the occupancy and use of the Dlstnct S lands and works The Dlst"ct assumes no duty WIth regard to ensurong that SuCh uses are so maIntaIned ..nd assumes no liabIlity WIth regard to ,nJurles c.used otnen by any SYCh f~'tYre The Olstnct further assumes no duty ~o ensure that the permitted use complies With the safety standards of othe? governmental entities (2) Perm'ttee agrees to abIde by all of the terms and condlt.ons of th,s perm,t, ,n"udlng any representat'ons maoe on tne permIt application and related documents ThiS permit Shall be sublect to the reQuirements of Chapter 373 F S and Chapter 40E 6 F A C Permittee .grees to pay all 'nvestlgatlve costs. court costs and reasonable .ttorney s fees resultIng from dny successful action taken by the OIStrlct to obtain compliance w.th the conditIons of tne permIt or removal of the permItted use If Olstrlct legal action IS taken by statt counsel . reasonable attorney s fees' IS understOOd to mean the faIr market value of tne serVIces prOVIded. based upon what a pnvate attorney would charge (3) ThIS perm.t does not create any vested nghts. and except for governmental entities and public or pnvate utIlities. IS revocable at Will upon reasonable pr'or wrrtten notIce Permittee bears all fisk of loss as to monies expended In furtherance of the permitted use upon revoc~ltIon the permittee shall promptly mOdify relocate or remove the permitted use In the event of failure to so comply WIthin the speCIfied time. the Dlstnct may remove the permitted use and permIttee shall be responSible for all removal costs (4) ThiS permit does not convey any property fights nor any fights or prrvll4!ges other than those speCified hereIn ,he Dlstnct approves the permItted use only to the extent of Its .nterest In the workS of the District, Perm,ttees shall obtaIn ail Other neceswry federal. state. local. spec,al dIstrict and pm/ate authoflutlons prror to the start of any constructIon or alterat,on authOrized by the permit, The DistrIct. however assumes no d~ty to ensure that any such authOrizatIons have been obtaoned (5) Permittee agrees to hold and save the District harmless from any and all damages or claims which ame from the ownership, construction. maintenance Or operation of the permitted use. whether ca~sed by the InJur.o person or perm'ttee and whether occurring Within the area of the permitted use or outside SUCh area, prOVided the actIVity onglnated from the permitted use. ThiS obhgatlon ell pressly Includes any alleged or actual negligence by the District as to all permItting actlv't,es regarding the sublect use. Including enforcement of permit conditIons Permittee agrees to prOVide lega' counsel. If reQuested for the defense of any such cla,ms (6) The permittee shall demonstrate that It possesses flnanClallnte9"ty to ensure compliance With permIt conditIons Tne District does not waive sOl/erelgn Immunity In any respect, (7) The perm,ttee shall not engage In any activIty regardlng'the permItted use which Interferes 'Nlth the construction alteration. maintenance or operation of the works of the District. including (a) dISCharge of debrrs or aquatIc weeds Into the works of the DlstTlct; (b) caUSing erOSIon or sh~hng Within the works of the Dlstrrct; (c) planting tr", or shrubs or ..ect.ng structures which limIt or prohibit access by Dlstnct equipment and vehIcles. except as may be authorrzed by the permIt. Permittee shall be responSible for any cosu Incurred by the Dlstflct resulting from any such Interference, (8) Perm Ittee shall allOw the Dlnflct to Inspect the permitted use at any reasonable t.me (9) The District has the fight to change, regulate. limit. schedule. Of lUSJ)end discharges Into, or Withdrawals from workS of the Dlstrtct In accordance With cflte"a established by the Dlstnct andlor the U,5. Army Corps of EngIneers for the works of the DIstrict Reasonable pnor wntten notlCI shall be gll/en to permittee, (10) If the use Involves the construction of faCIlities fOr a non exempt water Withdrawal or surfa,e water discharge the applIcant must apply for and obta." a water use or surface water management perm't before any actiVities may be conducted pursuant to the tight of way occtlpancy permit (11) The Dlstrtct shall notl.fy_the local ad valorem taxing autl'loflty of the lands affected by the permItted use. where the permittee owns the underlYIng fe.-and deriVes a substantial benefit from the permitted use The tallln9 autl'loflty may re,nstate suCh lands on the tall roll (12) PermIttees shall prOVide prIor wntten not.ce to the" successors In title of the permIt and Its terms and conditIons, Such notice may be made through flhng a copy of the permit or other approp,.ate notIce agreed to by the Olstrlct In the pubhe records of the county Or counties where the prOlect IS located and by provldln9 the District With proof of filing or through an eQUIvalent procedure All costs aSSOCiated With thIS requ"ement shall be the responSIbility of the permittee ThiS requirement applIes to permittees who are ad,acent landowners SpeClftc Authortty 173 0<<. 171113 F S Law Implemented Chapters 25209 and 25270 Laws of Florld4l. 196 t99 (1).373042, ]7].083 (1). ]7] 085 (1). ]7] 10].373 109 ]7] 129. F 5 Hlstory..Ntw 9.3.81 Amended 5-10.82. 12 29-86, 12 24.91 Formerly HiK 501 (2). 16K-5 02(2). 161C 50] (2). 16K-5 04 (41.161( 505 ,- Permit Number 9611 QRA, Inc. May 14, 1992 Sheet 2 of 4 SPECIAL CONDiTIONS ARE AS FOLLOWS: 1 THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT IS NOT RESPONSIBLE FOR DAMAGE TO INSTALLATIONS LOCATED WITHIN ITS RIGHTS OF WAY. 2 PERMITTEE SHALL BE RESPONSIBLE FOR THE REPAIR AND/OR REPLACEMENT OF EXISTING FACILITIES LOCATED WITHIN THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT'S RIGHTS OF WAY 3 ANY ADDITIONAL FACILITIES OR ALTERATIONS TO EXISTING FACILITIES WITHIN THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT'S RIGHTS OF WAY WILL REQUIRE A MODIFICATION OF THIS PERMIT 4 CANAL RIGHT OF WAY DISTURBED DURING CONSTRUCTION, INSTALLATION AND/OR MAINTENANCE OF THE AUTHORIZED FACILITY SHALL BE RESTORED TO ORIGINAL OR BETTER CONDITION BY THE PERMITTEE. 5 PERMITTEE IS SOLELY RESPONSIBLE FOR ANY RELOCATION(S) WHICH MAY BE REQUIRED AS A RESULT OF THIS AUTHORIZATION LIKEWISE, THE PERMITTEE IS RESPONSIBLE FOR ANY NOTIFICATION OR COORDINATION WITH THE OWNERS OF PREVIOUSLY PERMITTED FACILITIES LOCATED WITHIN THE DISTRICT'S RIGHTS OF WAY 6. PERMITTEE RECOGNIZES THAT IN AN EMERGENCY SITUATION ANY OR ALL PERMITTED ITEMS WITHIN THE DISTRICT'S RIGHT OF WAY ARE SUBJECT TO IMMEDIATE ALTERATION, MODIFICATION OR REMOVAL BY DISTRICT FORCES. ANY DAMAGE RESULTING THEREFROM IS NOT TH~ RESPONSIBILITY OF THE DISTRICT. 7 A COpy OF THE PERMIT PACKAGE WILL BE KEPT AT THE JOB SITE UNTIL COMPLETION OF ALL PHASES OF CONSTRUCTION 8 PERMITTEE RECOGNIZES THAT UPON THE SALE OR TRANSFER OF THE PROPERTY, IT IS THE PERMITTEE'S RESPONSIBILITY TO INFORM THE NEW OWNER THAT A PERMIT EXISTS AND THAT IMMEDIATELY FOLLOWING THE SALE OF THE PROPERTY, A REQUEST FOR TRANSFER OF SAID PERMIT MUST BE SUBMITTED TO THE DISTRICT 9 . IN ALL CASES, PUMP (S) SHALL BE LOCATED ON THE PERMITTEE'S PROPERTY; THE PUMP SHALL NOT BE LOCATED WITHIN SOUTH FLORIDA WATER MANAGEMENT DISTRICT'S LANDS. rJlit Number 9611 ,r~, Inc. MaY 14, 1992 sheet 3 of 4 10 FAILUR~-TO COMPLY WITH WATER USE RESTRICTIONS DURING WATER EMERGENCIES OR DECLARED WATER SHORTAGE(S) IS GROUNDS FOR PERMIT CANCELLATION 11 PERMITTEE IS ADVISED THAT THE DISTRICT PERIODICALLY SPRAYS THE SUBJECT CANAL FOR AQUATIC WEED CONTROL PURPOSES AND USES SUBSTANCES WHICH MAY BE HARMFUL TO HUMAN HEALTH PERMITTEE IS ADVISED TO INQUIRE OF THE DISTRICT AS TO WHETHER THE CANAL HAS BEEN SPRAYED PRIOR TO UTILIZING THE CANAL WATER FOR IRRIGATION PURPOSES. PLEASE CONTACT PAUL THOMAS OF THE DISTRICT'S WEST PALM BEACH FIELD STATION AT (407) 790-0600 12. PERMITTEE IS HEREBY PUT ON NOTICE THAT THE SPRINKLER(S) LOCATED WITHIN THE RIGHT OF WAY MAY BE SUBJECT TO DAMAGE BY DISTRICT MAINTENANCE EQUIPMENT AND VEHICLES; THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT SHALL NOT BE HELD RESPONSIBLE FOR ANY REPAIRS AND/OR REPLACEMENTS. 13 SPRINKLERS LOCATED WITHIN DISTRICT RIGHTS OF WAY MUST BE FLUSH WITH NATURAL GROUND OR BE OF THE POP-UP VARIETY NO ABOVE GROUND SPRINKLER HEADS ARE ALLOWED 14. PERMITTEE SHALL INSTALL AND MAINTAIN, IN OPERATING CONDITION, A RAIN SENSOR, SOIL MOISTURE SENSOR, SOIL MOISTURE CONTROLLER, TENSIONOMETER OR SIMILAR SWITCHING DEVICE WHICH WILL OVER-RIDE THE IRRIGATION CYCLE OF THE SPRINKLER SYSTEM WHEN AN ADEQUATE RAINFALL HAS OCCURRED 15 THE PLANTING OF ADDITIONAL TREES AND/OR SHRUBS IS NOT AUTHORIZED. 16 THE PERMITTEE IS RESPONSIBLE FOR PRUNING THE AUTHORIZED SHRUBS, HEDGES, AND TREES IN ORDER THAT THEIR CANOPIES DO NOT ENCROACH WITHIN AREAS NEEDED BY THE DISTRICT FOR CANAL MAINTENANCE PURPOSE UPON THE REQUEST OF THE DISTRICT, THE PERMITTEE SHALL TRIM OR PRUNE ANY GROWTH WHICH THE DISTRICT HAS DETERMINED INTERFERES WITH THE DISTRICT'S ACCESS, OPERATIONS, AND MAINTENANCE. 16. THIS RIGHT OF WAY OCCUPANCY PERMIT IS NOT VALID WITHOUT A CONCURRENTLY ISSUED WATER USE PERMIT FROM THE DISTRICT'S DEPARTMENT OF REGULATION. 17. DISTURBED AREAS WITHIN THE RIGHT OF WAY WILL BE GRASSED WITH BAHIA SOD, AND PEGGED AS REQUIRED, UPON COMPLETION OF CONSTRUCTION OF THE AUTHORIZED FACILITIES. Permit Number 9611 QRA, Inc May 14, 1992 Sheet 4 of 4 18. ALL MA~RIAL AND DEBRIS SHALL BE COMPLETELY REMOVED FROM THE SOUTH FLORIDA WATER MANAGEMENT DISTRICT'S CANAL AND RIGHTS OF WAY. 19 PERMITTEE SHALL CAREFULLY REMOVE ALL EXOTIC VEGETATION, BRAZILIAN PEPPER (FLORIDA HOLLY), FROM WITHIN THE DISTRICT'S RIGHTS OF WAY THROUGHOUT THE LIMITS OF THE PROJECT AND KEEP THE RIGHT OF WAY FREE OF SAID VEGETATION THROUGHOUT THE LIFE OF THIS PERMIT. ALL EXOTIC VEGETATION ON THE CANAL BANK SHALL BE CUT TO GROUND LEVEL AND IMMEDIATELY PAINTED WITH A HERBICIDE APPROVED FOR USE IN THE STATE OF FLORIDA PLEASE CONTACT DOUG SYKES PRIOR TO VEGETATION BEING CUT AND PAINTED. 20 THIS PERMIT SHALL NOT BECOME VALID UNTIL PERMITS HAVE BEEN OBTAINED FROM CITY OF BOYNTON BEACH, IF REQUIRED 21. THE PERMITTEE SHALL COMPLY WITH ANY MORE STRINGENT CONDITIONS SET FORTH IN OTHER PERMITS IF REQUIRED BY THE CITY OF BOYNTON BEACH 22 ALL PLANTINGS WITHIN THE DISTRICT'S RIGHT OF WAY SHALL CONFORM TO THE ATTACHED DRAWING LABELED SHEET 1 OF 2. NO PLANTINGS MAY ENCROACH MORE THAN 8' ONTO THE DISTRICT'S RIGHT OF WAY 23. PRIOR TO PLANTING PERMITTEE SHALL BACKSLOPE THE RIGHT OF WAY TO A 20' HORIZONTAL TO l' VERTICAL CONTOUR BEGINNING AT THE EXISTING TOP OF BANK AND CONTINUING TO THE NORTH RIGHT OF WAY LINE. 24 PERMITTEE SHALL ENSURE 80% SURVIVORSHIP OF THE PLANTINGS SPECIFIED IN SPECIAL CONDITION NUMBER 17 FOR A PERIOD OF UP TO THREE (3) YEARS FROM THE PLANTING DATE. IF AT ANY TIME DURING THE SPECIFIED 3 YEAR PERIOD THE SURVIVORSHIP LEVEL DECREASE BELOW 80% THE PERMITTEE SHALL REPLANT THE APPROPRIATE NUMBER OF NURSERY GROWN (SEEDINGS/PLUGS) OF THE SAME SPECIES TO ACHIEVE 80% SUCCESS RATE WITHIN THIRTY (30) DAYS FROM NOTICE BY THE DISTRICT. ---------- South Florida Water Management District Post Offic lox 24680 . West Palm Beach orida 33416-4680 Telephone (305) 686-8800 . Florida WATS Line' 1-800-423-2045 YJ-~-~ (DO NOT WRITE IN THIS ILOC~ APPLICATION NUMBER Application to the South Florida Water Management District For Authority to Utilize Works or Land of the District -To Be Accom Applicant's Name ORA, Inc. ... Applicant's Address 1900 S.E. 17th Street Causeway, Ft. Lauderdale, Florida 33316 ~I Applicant's Telephone Numbers 407-734-3555 (Day) (Evenlnc, .1 ~ -. .... ! 1./, ~- , -- -, ,p~;-.J -0- ~Clr-~ -- c J , ,.,.,- 1..____________ / ,. I' I :\ -- <....'" <'" o l:> ~ ~) ! C2I ;;'.e cr: jf', O/~/ La / \ I ~f~:8r;sa~ ! I - I r--;; Inter ILagOs Oi) J "'-- { ~I I ~IC i _~;:o~ " I ~ I ~, ~---l---~- MOTOROLA ~\ 1 P /: in I i ,,.~ BLVD " ~' Y N T 1] I:' \L_c~~I.; - - -- - ~ ~.~ ~~~c..;_6_",-..J' "\ \.= II: ~ ~ --~Pioneer ' \ \ ;:/'"':'.... 0 v.l'-U~~~~ Canal ~~/h.U1'r 0 C'l c:c l- __':1_ i-= cprl\. \ \ z l~ e > v.l v.l . II: 3: ;> 3: ~ 2 2 r--1AV 2 ~ 20 NW 10 ---- : " IV 9 .8.Y: E c:c 3: <: ~ ~~ LlEgflRACE NW & 2 AV f1 U 0 U 3:.~ :: = - ~t.t. 2 A V r-- AI' ~~cp." 6 AV; NW 6 ] 1\ 95 _ _..__. _ .: Wa~\~ ~~~~E ~. ~ > I " t-~h"';"~I~~::] "~~ ~~ ~, c: GOudo/aJ La I~ i~ora' AV::? . 2 2,...\ ~ :-.J ~, -~ ,_o~ -~~M~~~ ~ ~ ~ ~ (.J.q: _' -;:oquare ..g U I f [ ----- c::J 2 U i: . _ Ie -~, ......, - __ ~I 1 'Sf" 0 _. , !Bl c::J . -~.... ~1 SCIQ ";,~ I 804 I~' -, ",:-- Leisurevill~"", e1fifisu1e ~:~ ~~E:~ A~~_~~ Bovnton Plaza .r;r /' ~1. L_ ""_ ", _2_ Post'Ct-i-' -.... ::v.l: q,ni; -~.:- ":1 r.' Q/~ - orqce ~~Ia2I" scLEI~'UJREVltTh2~.C5lwICC ::SWi",. 1 ~ T <'1._..1 ~ ~~ l:> ... Z If ~ ~)- :=!: 0 l> ' :5 0 _0 X'~ 0-9 I ttJ ) : itUI" 4~ ~ .. Sun TOD L. i Sun Tree PI V Sun Rav i c: _ -18 ....~ NW 27 Ave I. ~ ;: nl ~.; Su~~'"' \i Nwl26cii OiAve cii 1~ ~ iC ;.." ~t. __~t_1 ~I j <Of ' - ~'- ~ro;. ~~I -;b I unfish =_ _~;:. ii '" . ci) N'" ! """'"" 04( rJtl,-~ .. ; i"'''' {. S'!nbirdc; NW 23 ;; Av ';: :i'" ! ~"ci ",. La .lNW 22 Wav;;~ 2 C" cO..... ':'. .... NW,Jl 22 Ave.' La NW ~ 22 Ave\ g:g: rrr NW > 21 Wa, ....0 OE4 -> (~lJ1 ~ S?" Sp..l'lOP/P ~ NWZ 20 A~ ~..::....) ~ (j I ~ ~ 3: 3: ~ II> Q r:: 2Z TUCKS RD~ ..I 2 NW 17 ~ I AlADDIN AVE NW 16 WaYI BARK IS AVE NW0 15 WaY0 o :::l 15 Ct N COElEBS AVE ~~~: ,I ~ DORRIT AVE.... ~ z ~ ~Jz c en ~ 14N _,!,V EDGAR > AVE z NW 14NAve ..J FIGARO a:l AVE Boynton IBlack-Fores~, ~ enev,. Ave --- r '" ~ r--"f ~rD:J ~ Harlow. Av I r.en ore ro _us Ivanbo.e. .6.. W racewood~-.-ti" .=. W K t I A BUY N !'U!'l ,_>_ luU..J leyn -. Infield Rd E ::.:: lothair Av CI: r~enfield g' ~ Marlow AVI ~I BEACH Ct ..J Z 19 ath ::. I ] Nor..n A.. I MALL .. Ob..on A.. .... _ Pandora Ave c: I - WI .... Quentin Ave > I Ruskin Ave ~ I " B 2 -r" d- ....C 1:- 01 U..J I ell f4lvd ......... 3 TON .. . ....-..WE ~ I .~. i r ~;..t') .....J ~-' OV'Lace La ~'s~ron ~]~.. Greentree ----.:; l ~reentr~,_ n_ o L L _ I Plaza _' lu1 -I ""')akw~d r...kes~' 1 -: ./ o(~nlon,l etr / - .-.- -- I /' ~ I Golf COUr.Je I L~ ~o" r. (\ ~"1.. II 1- OK~) lrL qJ-D330-~ C-llo .s d0/rLjjSJ/~ Y3~ !t '" ;, :l i PARK ~ -..: en D C,.i a:: w :. ....' :r . ~ L... r, r.;.~ -.--..." c...... h ; - L---., ,.. ~ 8 ~ i: . " ;; f".". ~.o., S . 11- - - -- ~ - - ,- - - - -\ . >> ~ i ---_._~, '." --::~ ' <1- - dt~ .. II : Ik i .s~ . t'l~ I \,1' . ~ I I e . ~'1' \, . ~ ,.. i ~} =- ... f '\ } II 1 , I r- 'J '"--> ~I I l I I II ~I . -"\ ; . r ! -" I I .: ! Irr~ ~'t I ~ ::: ~ ~l:,\ ,. -....----- t i r , ~ fi". ~ y~ ~ .,.. ,.t, , \> "~~ Ci.f"" ( ~ .... ~ -, : " Pl \\\'i~ ; !{,~ If ,...' . \011:. I ;~~.' ~ . I w~:~ ~~. .. ~ .. ~ :L=:'C$';.! a ' ~:!.~ ! N '" ~ ~ : r.., ~ < ... o ~. UH Hfllm ill ~a 1(11 Wt II~I f pf L.. m . II I( III I Stg - ! Landscape Plan ~ n " '" .. " .. <; , i II I Z """'!'II'II'"I'''l''' S '-,;I' 'i:j' !,l: !l: ~ iir;IJ!,h Inill,/;!,l'i lr-I 'I': if jW 'i!1 i'll il!jli;l:i!tlh.!:I!III:; i ',.i i I!:. Ii" :1', !,;.;.il",II:'I:I"i1.". z; ,!lIe '::' ,I!, 1;1!!;e:!'\:'\! !!dii,l ~ -4, iill' llel "!l "I"I:I!;II~1I11"lh e z/ 1:\;1 ('1:1 ,Iii F!r!!': j" '1'~1I ;1'1:r,~' .1 I I II" .,. ("., I" ....' 'I;l i i 1;,li ii.l '! ;1:h!;!lt;II;:/i'I,I,':',' zol 11111 II, III (';I;"I'l,.I',"I' I" 'a :i: tC: ," i'"d I'. ~~l ICIII 1 I ~ - r- eir - ~ li '} !!!Hl:: ~ Ii i'l "'i rj'l iljlll" f ~i( i ~:;~.:l ii ,~, !Hr It i I! fl:~l S IiI : IIp!!:: It I'i! 'I' iili~! o,!;lifi t ;r 'I' ;1!!lfll~1 ,~Il~ i'lI lrllic" i, J. tfl' I' I' '14 .t'tl f'I!' I! 'T li'iii'ill" I' :Ir I,,',', i!T";' , ,,!, ,,; 'Ii< I " ',I I., '1'''1 ,',! ,;fI.111' ,I I.. !I." 1l"Ii r~ : H:ll~ :~:~:i P:t, l;f'.', 1"1 1"1"11 ", I" "1 ,I:!I :, t U 'II ' ... ... " 1\ ~ " 5 I'. ,- I . ~ fjl~J~n~:i~;~i~i!i;:;U{ J I ;::i ; ~ !:lli: 1;11, ! hil':i'l;il'!!i!II!il"i! ! f iti! i .. "!"I-I,"'! ,:u""!',!'ill!II!ll'II);'! 'I ,1'1' 'Iii' ,'I'\!II'i'lll!!' Ili!!'I' ~ !el! '~t"l tn, I!\ t,IIII!,:,llll" II .", J il,lll!ll:!; 8 i;iWi:i!i,l!l!lihi!lll !lij . ", ','I ,,,1.11'1' 1"'11'1,10' I'. F: . I!; ( i."" !.,';;i;~ ,;III!;i I 'UI ojll a /r';1 it: I II I'" i " '!! ~ 11'" Ii' ~ 1 Wliil i liI!!l; ; ~":i l'~t!' ~ :.Ill,. \'1,-1 -!f!i. .I!il \''''1 "i, t:;! Ul;' !!,lul "HI 'l't~ ''''1 jl 'I' "i . !!lI:i 111'1'1 i f,U ';' .,.. ~ :a ;" m I:) c ,.. J> :II II' ~ C ,.. -i T CIl -i m 3: -i :II m m ~ J> ,.. ~ -4 :II m m I ~~ ~ i' . ~(I:ii1'" -4 ~ Z ~ Q ~l ~ !';'~I.t .1 pi ~i~ lll~l;i S" ~i; I J' . rhl..J 1,.1 ... lifl' if I .~ II . 'Ii!," if ~i~ !;:' ,.~II "4. i~f I' ;1' . ==c~', .J ~I~ l!t.~ 1(- i..t , : Hr.!t.' ::1 '~I if e~ 'I"ll!1 i I.' r ;iii~:;.. !~I =:, i:, Ii : . I'll i ! ~il~,r fl il! - 'J I, U ii" :1 i !, ~!.t~J , I. I !. 'i f .r I I "IS. J,", -4 :II m m ~ ,.. J> Z -4 Z Q i l! ff Iii I'll' to', ,1 ; -Hil I -. I' . fa I 1\ !I Ii ~ i~ ,;1:. f. I -,.. I~lc: Il, f: I I i' u!'; 1) _f, ,. ,n fa ~~ I!! : I;~I '.11 1< jl J" 'Ipl I .. -i : I , .' =.~ I T 3nl. Ii ~I' . :11: " I~=W liE 1~~m~1i' ="!=.lli 31F.ii!' ~ liE I :: I ! -I .:l ,! j ff t i - : "1'.1' "II ,,-; . '" '1. . - ~ ...". . .., :. i;:i I~ i !~ Ii: H l r I.. I!~i :. ,... ~, ...., .. ., .:;.1 I. 4.1r' iI 1(1 I :.' i t 3 If! 1:~ ., if . .. '. " < i 1 At, I ,.;; :' fi i i!!: 'ii~!!. Il~ .~ ;! I Ii 1 j I=t :~ t'rI 1 ,'. I. ! I " 'I J :l . .. " ." .... . i = I' I ~ /'. ~ i~ ,j l i \~ . ~ ,\ ~ I: I . r l/l ,..., :r [! .. ~ I , N 2. ~; if I i 5!, :I:)(,t ':U:S: 0:11 . iCII O. nZ OQ < m :II ,.. ...1 :lj rl ll"I"~ i" -CUi I II' 'u il O~i.Jil 'S. II .1. ~:C.. 'VI. :. u I. ;il 0, ~ .I:{. IiiI-. . I II I~ I iHi , ~~ i Ii Ii \II :s: :II C CII ~ n ,.. o ~ ;: ~ I ~ Z iiSl ""'i"IlI-' fill "1"'.' .d I" I:) i'" l!iS' Oi I' . t s," t" .' ;; ,U, ,\:.,ii!!i i i. i,;'I! 'I ~J . ~1.': ,."::..':e'.' -I, ~>>', &r" I:' {,rt~ ~!:i ~!iiml!ill!i U i!i! '!I i~ \~,~ " I' " ~,.. =1 I, , . 1 J . ",.. f" , hl"!I' '"1'" f fl!~ I ::J! -I fiUl: . 'I ' a" '.1 oj F I ~ua'i i ! ' m O:J~ ~ {rrl~' - - '1 "'- I"'~~!: .:!. ::;I! " ~::!~. ~. ~ !iiHi 11m iH o 1\ r i'l' Ii ill Iii Lot 49 Quantum Boynton Beach, FL I ~nrl!;r.~np. Mat.p.ri~l!l Sch~dule & Planting Details .:Mere.a". ,...; t. _ ___ ----_._----~-- LA\!tlEL HILLSjJll.AJ)D IPS 23 PG 14' I ....w,.... '~OO.llIl\...fI I.... ..'OJ '~ : .,-1 1\ o : _ C-II CANAl- z ,.. ..,.- ILl" .... !; 0 ...... 00_ "'-4 '" .. /... ., _.~ ,=t#_.., 1- I~" f ~\ z \ ... I r I I: ;,-r ~\. ~ -N- ~ Lo ~ l~ ~ii : ." ........ !____tO~. )>>oo'u"..'. ..:.,. .. -I;;:' -" ~ !.: _ _ _ ---I ~I~i! -~ ii~' ! .. ....to.,.... PROPOSED ASPHAI.T- _r- <0 f;-4 ... ~CD -n \ . 2 := ~ ~ .. III .. .. N !. ~ . ~ ~ E" ." ..0 "';!j g::: ",0 ~ .... -0 ~... n . .. ~CD -a, ii .1 ~: 1~ ,I i; 'i . ~ ! ...... .~:. .. . I..net. ~--'I. O"ICI 8 ''''11.1''' . 5 . !.i~~ ;Ii~j !ii ! iI !.. ........ is ,. ~ '.1"" ~c: z 0 JilP I ~ ; I '" .iil~:r;::.Jirl:::;-:"J , f~ =IE lilli' . .; ~ n z'" (iii1iiWHllj!jlill!lil!lllll:' H ~t; 06 ' , 10' !I !lID iill II, 1'1,' ~~o l!a!\.'III" , I,!Io,1 ':1,1'1" Z-4 Iii I I IU/111! '\' j1 "'''' --... .. .. '!~II mt Ila :vzc II II' I !! - ~.. I' i' I II IDa. " II Ii i .':c:" ~z~ l!:-n. il ,E , I' '~I' '''II !". ...z 2l~1: . - 0 !dll'! 1""1 .,r -~ ~ ~ ~ pi" 1111' ~~jI 1::;!i!I:I-'lf:;::;~:::;': !Uli"\ '" 61.... " I'll" ..:z:~ !I\:ijlllillli;ill!lllilll~lllil t ,., iPI . I ~:'O" " ell ;;; !Ii i Ii! I!! -... '0 t' "f"ll"'J' .1. C ., CD.I !. I ~ I Ill' i I i 11'1' fOil' I II n _IZ ol=' t I lhl II I; '\ G -" i I ill I 'I. " II i I · I~I I,; ,,: r- ...li . I II, 1.1 l.~ = - - - ~ - - - - _,U . 1- l' ~i --;..;..;=-~~~--------- - ., _ ._a...--;-...---:- t 11 ~ \!"" ~. ~ ~ I i!~ J~O . .' i ~ . , , 'm!;~! !~.! ~:i;i=i .J:":.= ~:P!r ~~i;:r~ . I. ... J ..=~. ~ s;iii! ~ ..' :"". ~ t. ~'i-- =:f q: ' p.:-: 1Il1!l~ · e o!..... :.- . [ . : : : : : ii~ j:li=ii= .. : l ~ i i i i i ii : ! t . ~ ~ ~ ~ :i i i ~ J ; J J J irf 1 : i ~ : ~ ~ : i;: J i ; i 5 S.5 5 i~~ ! i i~~ H f::" i: .... ~~ ; Hi H. ; i .. II !ii I I ~ e I . i - !~ , H it -. i I I , ________-<1.-___ I--~- I ' - -- c." c..... - ,.. ~ .. ;- Q.. ::: .=.. -0 -< ~ ,.. II .. . o .. r- I I I I I I I I I 1 I I I I I I I I I I Ir.! I ..._ I t 1 I ,~ J, Bt-, I I. I I 1 1 I I ..., .,.., I! r.-, 1, t ' ,.. ~ .. . Cl ,., .... .. - r- r------ I I I I I 1'1 I I I I I I I J I I II I I I I I I I I i I I I I . I. .J ~I .1 H I. II I I I I I I I G '.,' .,1\. I I I I I S l' : I I ~. ;- : i ,I .. ; I . I III I 1 :2 : I, I ~. .: I ~ - I ... . -= . -J _ . _. r I ,_ J I H" ~ H H ~ ";. ~ .i(:' \, - 11 ~ i l~1 r; III1II1 () ",,~i'l () II"IIII~- ,~' ..t~~ ---). ,1: ,,-.. .. .. . I ,-j.J ------ ., ,', I ' I, " Ii. POtk AicIp ...... - } ~ ----~ ---- - - - - - - - - - - - - - -....... - -- i -:- ~ ..r ~ i', a r t~ ria. [I ~ I;;I~ ---------------- -- t " . , ,~ 0 i: i ::. ~ It I! !Utl 1m II' ~ c , It '"1 III ,..., . IJ II ( I(it{ I ff . I' II 1111 ~:l Lot 49 Quantum Boynton Beach, FL Site Plan :Jeerel.ry -...._ :;f t~"":l_"'''''.",,_ APP_ICATION TO THE SQUTH FLORIDA WATER MA~AGEMENT DISTRICT FOR AUTHORITY TO U IZE WORKS OR LAND OF THE DISTRI The undersianed ORA Inc as fee simole owner of Lo~ 49A Ouan~u~ Park which is subiec~ ~o a oeroe~ual easernen~ in ~avor of ~he Sou~h Florida Wa~er Manaaemen~ Dis~ric~ recues~s the abili~y for 49 Dis~ribu~ors Inc the fee sinole owner of Lo~ 49. Ouan~um Pary ~o dc ~he followina work on Lo~ 49A con~our ear~h i~~o a level clane olan~ ~rass ~rass seed shrubs and trees as shown on ~he attached ~andscaoe drawina and ins~all an irri~ation line i~ oroxi~it7 co ~he lo~ line_~e~ween lo~ 49 and lo~ 49A 49 Distribu~ors Inc assumes all resoonsibilitv for "ain~enance of ~he landscape i~orovemen~s recuested herein F~r~hermore ~he par~ies here~o unders~and and aaree ~o acknowledae ~he followina resoonsibili~ies cu~lined in the 5FWMD Permi~ Information Manual 1) Pe~itioner(or i~s assian) is willina and financially cacable of maintainina ~he plantinas to the Dis~ri=t s sa~isfaction for the life of the permit 2\ Petitioner(or its assiqn) understands the _molica~ions that fallen trees represen~ with re~ard to ~he Dis~ric~ abili~y ~o perform i~s flood con~rol mission and the financial responsibili~y of ~he permi~~ee should a loss occur 3) Petitioner Cor its assign) will remove or trim the trees in a ~imely manner when requested to do so by the District and 4) Pe~itionerCor its assianl will assume the resconsibilitv for complvina with any applicable ~ree ordinances and not a~te~p~ to use such ordinances as a means ~o keec trees which the District de~ermines must be removed The SFWMD understands that ~he City of Boynton Beach Florida has reauired ~he petitioner to ins~all the reauested plantinas as a resolution to bufferina issues related to the aocroval of the site plan for Lo~ 49 Ouantum Park Petitioner s reques~ for a permit from SFWMD is peti~ioner s a~temot to comply with conditions of approval reauired by the Ci~y of Boyn~on Beach Florida ~ -. . - - ~-;:-)---- ORA ;L BY 49 DISTRIBUTORS INC BY, _'- &~<. ?~~ / r ~~ _J ... --) ....... '- - ~F .i;- ; .1 Secret." :- of ~~~~,...,.~~,- -, :,,"!./'. I '....I~.... ;.i~ , .: .,..~'* .~ ~ ") ) , & S 1 \" , o ) SA ~) .<.. ~ ~x (~ ~f. "'.'1 ;<, . ~'?'. ,~, ~.. .."i!t, , ol .~. I ~'''';',,)>.\~q.~':1~''''~~~ + i. . "::', ','"i ~~ T~ '" w/ ..:-..- t -}" ~ . , Xi: , r "" + 4" ~.:..", ".. " f~"" ....~ ~ ~!! r <oiI;.,l..>- :J .., ot' ,..4;./\~}ji ~!~~, I j,: _. . . ",;" . I ~ ""., '1'..... ~ ?- ) ~ .., ., , \ \... ~v~E:.. i-<j-r:\1A;t....- ?~~ t If.::\: ~~ \' u.cx.. ~ QE C~ ~Q.~LC'\ r;) 2-0Iq-&~~ L-O-T 4 q Q<JAO\\.L- V\. .... s.~'''1 ....."--:;- L-''"\' ,-- I -,,' - ........." -' r ~. !- €7 ~ . ~ \.! :' v , ""'-1, 2 \ ..J.\ \ E:cJ ,./'\ /' r. '- .,....... ...........:.i \~~ ...... ....... r--:-i---:;- "..... : - ---~:.~- .... ..:;-' -' , /-' \ \ - :-\ p. ~ ,-a ,., :-.. i .- ''';;12 ;:.. : - ~-j " ..; ~ \ \J '-f(JS~ ~ ~ (j(,-'1 'f\ 1\(,(~1r \"1' ,5- f). ~ L~ SrWf"\S) ~ ~{ Ge-- ...t~.~#:t.C'\. iW ~ AC b cY'-.J<. U) ~~CI ooL ("-'-~l.-~ J ,-----,J./---.. ~ ?fa 92- ;_~ D\"S~,~s-Ck,C; =..'_....,.::.. .,. w~ ~ ~...c,~+- . ~- -~ .~.~~-~ ~, ,.(f J'"I- - Lj -II -'" (,:' /- ?~~ / \ \~\- \ 1 ~ ! - , '?-........ "'-.--.........,- G!~-. , , , .'..... '-->' r- !"- \0 -- -" ...---- ;, A / '\ ::- rY'\..; I I -? -.. \ .. -.....-.-- t~~ ~/~ ~ 1. ~ c~ & )1 f\\ I ~~ ']'11 ~ (St r ) I ~lKt ex r (; I J; \~ I~' ..../ ) , \..> < /' \ -~ \ to' ~ .- " '> 'v \! ~---- ~ \/~1i/ ,,1 ',/7) (' I ~ .......-" ; \ I." I - --;' V"-.......,.; I.~ ~:,- '- -::"/ r- --, , J. 1 ' !~ \ I' '\~ V ~/ \ ----.... ~~ /--- I ----;-- , .,./---\ \ C / ~ ~ v -~ ...-=-..._:::__9:2 TU5ii: 14:1:31: CAT&::IL..FUMO P la::Z OS/2S/Q2 13 30 9396 763 8006 DEUTSCH IRELAND ~002 QUA N T U 1\.f PAR K PRO P E R-T Y 0 'V N E R S' ASS 0 C I A T ION, I N C. May 26, ]992 Mr Kevin Hallahan City forester City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425 Re: Ouantum Corporat~ Park. Lrlt 49 Dear Mr Hallahan. This letter shall serve to confirm that the maintenance and irriiation of the landscaping of the right-ot-way situated in front of Lot 49 in Quantum Corporate Park is the responsibility of the Quantum Park Property Owners' Assoc1ation, Inc. Additionally, it j, the intention of the Quantum Park Property Owners' Association to replace the grass which ha3 died on that right.oOf-way and on the right-of-way frontina the Jot adjacent to 1;)t 49 on the west. Yours very truly, L DEUTSCH Vice President SWO:db u.. ~..._..."'.......... .nt.II1"I'.".'\oIf&V -'TM flOOR. FORT LAUDEROALI, 'LORJDA 333" Q.IUlJiI!!~7r(l'" fIle grlHuulJ.!Jl .__._._--~~. -- =-=-1"-11'.-.".' 1t-H1IJ~~ -- -..~ .. . .. _ _ -- _ -. - - - - - - - .. - - - - . - - . -.- - _.--.-.__.~-- -_. ..-- = ===- -e =- ': _ = =_: :: ~ :':' =: ;~.. = =- -: ~ =-- =~~ ~ :. - := ~,': - .~ ~ ~.. - -- ~ -.- r: - .. - --. .~-:_.._ _. __.0 ~; -:. ~.:=~ .._- ._-~_.""~:-:'4 ___.._.~...."'..-...:L.__="':-.~.~ ...::-::~" ,~ . .....0 . .. ..... .. .'. . ... ._. DEVELOPING · UUlI.D/Nr · LEASING · MANACiNG DATE 5- ~,,- 9J .-J"J\1\\ - ~ 'l '--e, -\ ~ ~C'i" '\o~ ~ Q..c ~ -r~~~ L,~ Qv.a(\k~ '~cJ\..'(:- TO COMPANY: FROM: J<E! o 21Q3CQ call mo upon rocGipt Ha~d copy being sent: O mail 0 ovel:'t\ight dcalivcary [] Fax only - No copy being sent o hand dolivGry o bei.ng pi.ckod up ~otal Numbor of Pages Inoluding This Cover Page ~ ~O~ Confirmation or Problem (407) 471-0338 Our Fax i (407) 471-1201 -f"'\!-il>J> '<:~..,'O'O "''OIo~~'O'O ft:ll!'O!tilli,..,.. C,101-'-'-' U1c.qc.~ :n"Of~.....,n "'~"-"lJI" 1lI~ OON..llIlD...'(..=".... ....~<:>....~- '(17-.-. "'ra~....oa.".,oo -(l -(l -() l/l.:lI C. . :::::: r'J~JN 1llC.,po ~.-;" ii iD III C''OIill... lD '"I :lI ,- l& I'D ",.. .... U1 . . :D "11 c./ H !'I )( .. "'Tj UI H ::p- C. C. rrr'"" ])l>l>::l %ZZUI ~::::'I~1l (8:J)(/)1I nnnn ])l>l>.... "\1""-' :...M>-IQ ZZZ::l QC)(i). -il"11T1i' '""M...._ ~zzn r~~ :::l l/l '0 II n .. o :::l Tf ... tv U n III :::l n !Jl ~~-:jM r..U)~ :1:_ UI '11 til fA ~~ , 'i."~ QONlIl ....00....:;:; "'IIID -(l-o-() ... Nl ~N ~ ,ID -'!Ul -. .. a !II 2:Z;z.S! ])l>'\!ai" , ....ID 1Il , ~ tlI fA ~~ .- ",t:'.. O"'Nlllll ....mo-.... "'" ..."O"Oi ~NN i M t:' i .. ..::: ::1'(0'" ..'0.... :II lD . l& 1'11. :lI -+ lD~r n-o "'imm 0'" ..0 3: c.q 3: <:> !'I 0 " "0 ])c...., 0 ::OO.....~ "'r~j!2:~ ::01'>1-1 0- ;e~~o :;)m~....o !'I1nl-lro ':l!~~SO r...-tzo C~~(;)O M ~ o ::l :t 91 .. o .... '< ..0..0 -, (.~ ... o..~ -, t-J..o N:.l !J:I ." UI o o c: o . " " ... ~ lD Itl .. TI o ~ n .-f "'-1 :::l 0( l# '0 0 II ." n ....':l! -. 0 eo( :::lZ -I !O Z I-! ::l IX' In iT! '0 l> IDn n ::;: .. =:c Ul _. lD Ul ~.., 't ::.; :.I m :n rJl ~ .- III '( . 1;:1 !Jl < C ~J " ~J 3: <:> n ~ nIX' !iF..) l-< !'I t>'A." .'i'" e:,...... o 0( 3 o Z o ..0 , ... ~ , -() c./ 0"" -()Go .. .tl c.~ It 0- .. ~J c./,... III _ S.-e. A1LlU\1!c. ~ll.~ ~ ) ~ ho\.J\8..t fA ~"\~ o~ +d.\e, <:'-U!M.\""'iv...j lo1-s t~ o."~ "\-'3A .ntv Uf\e s.te.. ~ Sho\,u o.t\l \G.\'t..\ O\-) fu. ~ f Rc..-l..c....\:'.tlh "t- ~ "10' lJ-l'J...t. ~(.lI\f'l.tr<l.\ ~'\AQ..,,\.dt 0.\.<>.....3 tl.-e. S ou\\... rV<>f~ \'\'Ie -t ;.:L~.j\t n-~ s~~~td d\'\ ~ S f h lOCA-r.<>n "f ~~e re.~I-"'\..J. t:>fel'l 'S~Glce Go%') 7f([\e..fll\reJ.. f ~<IL;"'j: I S ~L(" d- ~"""'tl. ~t.qs 0'/\ fA 'M-"1<'V'fI.'^~ ~l--IH' ~ S"O~ f<<'~\H,~ Ell.6 '* 4-0\W\l.t. ~t"'f~ ~\,~\t ~ 6 ~'5\-. ~lJJk.t Wr...\\ s,,",ou\.d.. 1,(. ~\.Cl~ On \o-\- "\~Pt ~~I CA,~~1i} ~ ~<;~~ ~y}.v-d.;~ 1I'S'tttl\A2 \~S~\~ u~ ~ or-o-sS ((;{s c.. V<-;t.J.tot ~ 5Flf.JK.P) ~'Y\. LOT 'tAA J ~ {:.[l~lvl> \) ~ :ft{.o'M~ : ~o' or ~\;,d~ (\f.~'SI \~) ~~ \~{CIf\~ ~-.J\"F to ~2-17 -I- (Pr~ ~) rr-J... \vfro.. \.vlA.\\ sMill 'x. ~Lruzi M L-OT ~q ~ \o-r 4JA s'v~ \.e, U\.~ ~~ ~ss ~ \{ '"' (/o"~ L tft--~\.,w \,vv~ S~ ~ -'f<k to ~ ~sD u p ~n '" LeT ~,~~ tS ~ Ool'\. tL~ j,O ().A..- 0. o...hitJMlE ~~'" , f lLc s.~. ~CAk-W\. aJ. ~ ~~~ ~lIY' C ~ ~ ~ k <;c&. ') ~ ~ ~u~ \oK C't1 +- ~~(-\) CAA ~~ ~- ~ ~ ~ ~f~~~~~~ ~4tJA-~1 ~~~~~~) -- vtw's ~ C~~~ ~ ~ ~~ {~~ lt~ JllJJT 1q (A- ) - ~ f~O tll ~ (\~\' ~~ fA ~~ l~~~ ~ ~ ~ ~~ Lnh- -- fI\\ ~~~S~lKIv ~ \\'~k"", U ~ ,cl.r (~)~ C~ ~~ 5fwM.O ~ l1t 11A - ~~ ~ ~ C#'- Loi 111t '? (~V\tJ CJrWM5~ cvz. CN-t crn'cJ -tv ~ 1~1+ ~ ~sF) ~~,~ f~ W ~ SrWMO (( ~~ {rUM I~ ~ <sv~~lW ~ ()Z~ It;&oc - SpWMW w~l/ ~'-MJ Mftv\ uVJ ~ \-\- ') t/!:fA ~ 'fy.v r SVP"N\f .J, (p~~i 1~1 r MfM? pll,.ln..b furl \...,' CC' 'lLII~'\\r', .. r' \~ ~'TIt n.t. , ~v~ ~\l(. f.. '~~'\lt ti. ~ 'f~t-\.) {r jt~ \.,.,~ l' \1>'1,,,- \;It,,;~~ - ~ ,~~bf (J\ t~ ~ cJ)\) ~ ~ %/\ - C\~ k h ~~ ~"r G')\ ~ ~ ~ ~B w ~~ ~ ~ L~~~~~) ~ ellO ~ -h, s~ ~ ~ tMll f'J....2,..1 ~ (,t- 4'1A IV\ ~ 5~ ~.1()1/lY' [~ l4 i"^1'''''- ~ ~'b fo/" SF ~~) [1.t \ ()t""4~ A- i" .\ot-~ - Co.v'\- p,..u~ ~ ~~{l~ ~ J ~~,~- \~+.~ ~ ~, COD -\: S~ !illi ~0~~~~ ~~ ~~) ~ _:...~-~ 40t ~ m-\4tJ or-> CoOl. ln~(pn~o,,> otJ ,.. Wp.t.IJ 40 ftt,-\- O.p soy OR \.Of .fr~A ~ 9-% .It... \\'bQ\II)J:\) ~ let" "\\\ of tK \ . . PrU UJh ~ l~ C ( - -t1+\e.. \..t\! ~d ~ ebb 'n~J~u w..\\ ..~~ i th ~\Nt" l.o\ "" ftP~llc.()l-f'S'\ \~ ~O\ ~u'1r.vu UlT ~A - \~ ~ wtU~ '1 -7 u~~l~ ~~~.t-_*- tf.J.'CW <:>-, ~'b ~1- \ t ~()Nr.L ot ~vopk 1 ~ ~ Of~~~~W\ ~ v> )t,1I~ \:tt\~ Cmp~"'^ ~~~ *" ~ \~ C^. ~;\ with. tuMf~ r\,tlt ~~ ~ ~ \'"UJA f~ u.~. (~~:H1f"J - ~ 7. l+ rr) 1.2. 1/2. ~<<. \- 0+ SOD 01'l t.OT 't<\ A 1'2. ~z.. tu.-\ vt \C)r,lH'"'f\V\j On Lo T l\. ~ } bON. uaT~ Foe ...."'tI..' -T sA...,.., ~LQeN *" 1"\.Lu.. \~ &.. a-o./" D~ sp~ f"'~~ (~VY\1~- ~ ".H.13) (AfkA ~:J. / 4 -:;tk. PL.*~ ~ ot')ld 15'1% of l.a.~4ht.~ a..u-) .J., \ \\ " "1\" >'1\0101 DV\ r1u...ill.s (,..{'e..<>.... ~M,~e.rel- N4-"r"'VL A-ft~ft t- Oil+e~ (o.V\'l- "'-'.>L \\~lUti~~ \C4......~'>(a.~~"1.. toy HG Dfet'\ >pA-ce, '("e1-U"i"e~!l\.f :t. '" ltc.. S {' J -ttc. ~u 1.:>- C GI k.. ~ {'.} ~ " 10 tqL 4,.J(1~c..a.re- Pr"/'..e..#\'" ~ II 0+ oJ..b.. \) ~ h> 1.- -; Q.t;...Y' ~ 5 C H- O\.lei s \.) ~ t-o \ l"2. a c.~ t - CA.. ~,~~ c){ l~ ~ o-r '1, t ~o 80 s t ) -r~ 1.,'bc>{) $ t '\h()y" '" I"f. r~tf' ~~()r ' {:r:.f !uj i+ r,<}\.)\'~S E:~BJ \l.\ta~~ +i+\-e. '''''~ fo saH-01=F ~~ ~ ~\A"'.\- + ktl<.t. "tot\ ~\c\ Ww. silk ",,~JJ.lNI~ ~-(. V".I qt> >. k C~'t.4II.Gvt..u. ({1I,+,.,.) \N 0 , l"'- ~ "'^ \t.-. tA~ '(I \i (,f.lf\ \- "tv"\ ~ f'A I:if (I ~ r' ! c \.I.~~e.'i>ok ISt\.\H LilT 4'\A is tJ.-r 6l:lN~ fultUtllSE!> - 40' 6retklbel+ RaNl__t~<I\1 ~S ~6 .:Il\~TI\Lll:ll TilGEt" -;- J,tf:lo ~ "!+of - cll-f')? d'PW $""t:E ~(S}"~M'-''''_ MAI(E'l"o1E "etl\f\ S ~M. 1'10+ 4 (~ ~ ~ .q(f~ 's ~ ~ I ., C$ ") ~ .. Jl ... ;.; ~ f ~ " .j t i- t . . . ^,~\,\ hi 1l'\\(1)stt0 l<" ".1. t.<..f<(..S I't\ C\\\..~ }I..\'it'\~\\~ (\~_ ,\... I\'({.(. 'ht~u~ ~. "\ . MtJ- 1< No'~ ~"~ ""- ~ <l>- .o<F - ~ -~t~?::~ "w r d -1 ".:;. " l}t\..,.p:.. c..,1"n~'; "" " ~ \ C~.,.. ,,~ ~- oa "Lo+ i'\J&~ r~') ~ ~ ~3+V;~ ~ ~ k.- p~ p~~ ~1b~T(4 ak-StbtJ --of} ~ IN...JJ. 0.- ~y(Y\ bt.., ~ ..M- ~ ~ vetw.J. "bcA- ~ ~~~~1 f Ap ~ cA\IN\ S I...ro.... W~ ~ X s L ~ f\...;1 - ::t: -\ '> "," t.ar" ...w ok ~ ~~.:k..v ~ b3J2-g~ sf ~ \tl<;,~ \>wk~- I'ID ~~(~.t""--k'(,,.-~ ~1'Z8J '1 lke>- ~nk \} Wz, ~ C ~ ru I, &00 s t 5~) k ~ }.U.A. ~ 1..0 T ~ 'I. A C l'f'.-s W 1l>> t 4 'i) ::\.--" ffM 5 0" 1 ~ ~ ~ ""'\\ k ~~ ~ ~ ((-D-W) ~ S}7f &) ~ M."J 11> k ~ - A"':) ~"'" \SI~ 1 [~~'\ ())V\~{f ""n.\or0 "\ ~~ cJ: A-\ \ 1 J i S...x-", -] fll ') ~ ~ ~ c..k ~ rt... +ot...t. 0 r-- ~r 'b ~ ~ ,It. \-v '-><- .J- "-r ;;l.O ~ 6QI,(0. - p~ ~ ~ ~s 1"/, ~,~ Q.J.Y.- L I.<-~ ~ ~ % y~ ) " , IHJ2.. i't.i-V\~ ~ CM'OT ,~ - f\11W 1'1\1.<"'" or: lPT '\.'\/\ C"'s, ",,"-to. w~) ~ k ~ 1,-0 - rlJ..l.M~l~ ~ '\o'r""-" In. "~j~" ~ {c00NC-- ~~u,.oJ ~&~of.( ~cal.-7- 3rI t~ At~ ~ rhJ;. t.aA-;lIYI ~ Ie; cnudu-- "7 -~ ~-------- ~ r:> ~h b-t--r\~ ~ ? ~1W- 1TI ~. fJU- it # ~tA '" ~ w.l-l l.-r M (~~ ) . ~ tt ~51 UJ\k ~~ ~ l~ ~ C~ ,H.l'l- 2CSY\A~) - ~r s~ oV-R- ~ d-SI Lv\~ - Is 4~ ~d t\U.q~"'QJU.;l oJr~~ ~ ~~~~ ,uj/~.J. ~ ') ['M-u.1l- 6~loen-~ k )5'\ ~ ~ ~) * ~+ 1'1 lS ~ 11\A IS ~ ()~lIT'r.. 7.> oS .f.- qVJ 1,'-1. J,S ~ s t ~""t ,'\11'1 ti ~ c ~ .''1 "e) L1.rO? Il-C) ('S 7'2. I'r C. ) ~lN\\\ ~ ~'^-~ ~ ~ 'r ",<- - "'(I 1 -'j( XV'. +to- S~J +0 su\,-~ ~ · To~ ~~ ~\\ L no+ ~ 0f f-i> 1.. ~ A C - (c-t ~ '1> }., 1.1'2- ~ - PC ~,~ 1,./!? A-C <T'-' ~ r'lo..M .<.1) VQ.\\q.. '\0 M T \' '^~ 1\ ltwA '? 1\ j. f\ OJ n ()... I) c~ l\~t ,/( ~1'\.~...l l' 4- S So -- . iT' 4 OAA - I v WW f 1'-1:) . tw,yv,:\kJ uv-v ~.... ' ~~V\. \1l 7\'tJ,-()ff- fief ~ I i ~ c.e...J- [.6lN-vt 7 () f ~c:z S \0 ~ ~ -}o k ~-hl ~ \NW}>-~ I', ~"J'" j)11'~"" ~ a..M;P'W~6 {j ~L~ ~f\ 'f\~u.~ 5(-t\~\ 1: No ~~ ~ -fi'\ 5~ ~ t ~T Gtv"""", - 'lNM- k ~ ~ ~ ~ ~'d ~ t\ot ~ t~ ~ \o~ ___~____"_ _____n__ ________~___ L 4, ':'J f'r ~~ ~ L '''; 'r "S -\ :J. L C\ II Cr . u _. t! '" II " L, 1 -, - L1 '! ~7~~ ~ ~~ @ C2~~ 15~' , - 0 ~ .a .a t'f ~ ~ \0 '" ".oS' -.1 ir . ~ " i:' }5D" C' 0'( i.-, /' -,. 00- , \ f? .::; :: A-~ 1 - 1 t ' , \ I I r 1+ '- r--" " - r Co L 7 I l f .-{ t- ~! ~ '-< L _-1- '-.' I t l - ., J J >- I I F ( t p0 I ..JU 1 (' ts. (0+ 1~ 0.. ~~ (0"\ ') - {)>r 1tQ.;} ~~df ~ t ~ ~ Ac.c.o~~ i-o fl a.:l (() l 'CJ I {f tot"- (ot S' ~ ~ - -ter +-fe;.4 -v br-....~ ~ "^-"- ~~ j" ~ :ro ~ 0~ '(JevJ. ~~ ~ ~ .. "* MlM~~~l'~~~~ ~ s~~ ~~~ (s-~ V1- ~ ~s~~~ C4- ~ S~ c;:~ '6 B-B *' ~o ~U\~7 ~ ~ uhl:ic:r ~ ~ i, aOe> S\+O~ ~~ ~&JCl.~ hIs' u E ~ ~ ~ ct Lo+-4C-t ~ ~~..~ u.w~~~ ft-.J-. k ~ ~ ~ ~ a..J SFWMDr~~ ~'S ~ 1; ~ C~llo ~ ~) ~ ~. [~W\~ ~ U\.Gr-b(AC\r.~.J ~ b~ ~ ~ S~~ T rPL s.~1>~A- ~vnt\~ l'-~ ~ 1; ~ ~~ .;L~\~4[+ ~ L ~ {- 11 ~ I l-n \ ~ ~ l a.....-J.s ~ \~ c...-.j ~ ~ ~\'V\.~ l2 '/'2- fu}. k ~~ ~ La f- Zf't ft. b ~rut-- ~ .s b J. -'V Tk &'reLI.~ uJ~ ~ L It>+ 1q 'j r.J ~ I~ retJ- ~ teo. GVW!f~ lPt-- lr~ 0~ uf- ~ I \\.(~~ ~ h ~~~~~ ~ ~ s~-\- ~ \~ Lon 1q ~ LOT ~ C\,. A &~ ~sso(.. h · '1l\ {hs-\n,huit>Y15) ~( . .. . ~ , . . . ~ ~(U Pwl{~P) ~~ ~\\ r'& JwJfs ~ ~ )~y pi ~Y7fY yYUhf he IA ~ J ~ -h~ 6 c (;) ~~\-<Aol...- 4 (~~)- _ JLkt-t ~ jQ ~ IS fo sW-J- _ ~ Ivw 14- rU( sdt~ tV-<- ~ ("iJ11 -,1M a:f- ~ ry, ~ ~ - ~ t~) (1\ t-IWI r;....'r...l>'i~ ~ ~~: _ ~~Io-<.lCS ~{ ~ ~~ ~ ~ fb ~ \,~ *W'o~\o ~~- ~~, U'v tf)\)~\\ ~ )'-H~~'~LH. ~ ~"v~'ng'" av4 ~ \{"'~-"~'-/J I:l!-~ C/Jyc- ~ Ix..- ~ tR ~5~ ~ J ~u\u ~ ( Ll.n) ~ .1--,{'3~~S-1-7-~-".-rt" S .G f\\\~L ~ l'lJJ.9r 5v.~\: "" v 7 0 \&.~, ~~' ~,,~ (1.,,) ~ ~~~ \) ~ O.."3_~'-'1-"1-",_..oo-Oq90 &"'~ A-ss.c>C l\ Q <; E b+l. s~ 1*,2\ F~e. f\ ~ l ~L ~:nD cx~~w-h-~~~ {lL..\O L 1-'5 '{q tr ,-\q- A 5' 7Z.~ ~~~i- - ~ ~501z- ~ ~ ~M~' -ht VWR- 1 ~ ~c,-A l~ ~J ~ ') - ~~1~ -- ~~\ 5~b ~ ~ ~M~ ~ ~ ~ lot '\. C\ \M \' ~ 0YeA... L,t 4 'tA - a \.M..$? ~ (,y\ vA l~ \4 s r\V~\) ~ ~ h> \.\/teL.- ~ ~ 3'51-'(0 5)1_ r rl,..Jo~~ S .15' _~S' f~"""" (tVfW\ ~ \bP rt ~JD~ ') ~~~ 4 \JY'OJ.~\U~ - ~~ 4'- f>ls.t ~c. ~ ~ (J)t) ~ ~~UIM~ d6~ )W~Q \~.~~-r~~- ~ ~ o~lo~ ~~~ ~ ( I ~ ( /Ill A) ---7 ~-' C ~.l~ {I-s fossd,<e -to 16... F'L ~ -- 5~ ~ l 'IAl+-~ - ~ / S tNV6- o-zJ,.. J h'lt<- ~ G~~ 4 ~ ~~lN' ~ lo~ ~~ A (,>.sM db ~~ ~) / sF'Wl'f) p~ ~+5 (:'-\0 o~) GJ1 CDD 9 - ~ ~ ~ f- ;uJ I~ ljGuJl^.l G.\. ~L\ ~ uv \.MIttr.... CM~Vv ~ \a-I.S~~ ~ \M\\ UNM vr v\A\-l ~l.vv ~ W.l~'(; ,;\~~'\ ~ ~ ~ vv\\\ ~05t-0\ ~ ~ ~+ c.,O ~ ~rW~ ~ 5fV\M.v ~ \~~ ~ ct, IS- ~ -. ~. ""+> E:..A I N A ~ E C. OK OV\ r't-'1, O,..::>S ._ &iJ1tftlTJll'L.f!li15::K )/,.Q1._ t:'1__.~__.~ ? L1.Y__,f!.f.. E.9y-rON_ Bf:!.!!!!! } or;3 r/lz/91 .______.n___~._________ ~_ ---,,..., ___v or,lf- :>OB fV{J___ 1/ -?>~B) -::r. 5 r w f1 1:1 flfiHr7 IVD GO - 01503 - S ~ ('LOOl) PllOit:C-rIOf'!.__ LpCttL _ .l2Q.11? c.~ I,--~~l!i._ - 3 '112 Z 4- fiR S 7()iLH Ew.l!.'D _(}P_~.-r.'!!.I!K- - 10 , .., z ~T f'Jc. \J !> H II'l.U:!J!!:L_gP'!!b ~1:I{;-=-__,~__Z Do e-r t06. Ii t:> _______~~,l>f1~~,I'-5G-. LO-r c.i2../-({;;.(Llrt __=-~_~__n?:i, Hfl_5.70fLtC '('LOOl:> CON1QUIl-- II 4/ P7 tJ~VD N/rJ J>A-t-K./tJG. Lo-r 6.efif)E. - II 5 F, Nt..v~ c I aO 'if:t'r-IL PWO!) HI!", F=U)ofL f;,t-f;.vItI16~ - 14-.5 prr f\J~ \I!:> _~_F:J:.A f't...COD ~'-~VilfION - II () n 1-1C,IJ 1:;:. ~. w rY(cG;.L Q.U~LI-r1.{ ~ Q \..) 1Ie.~ t-f ~ -rs,._____ ____._._.___ _~______._._._!!!.PJ1.! I?~'!L :!~~"!~_..? Hf't-LL peo.~~~_ j\ 'Jz /I Q F t>J?Y ._______ __.fB:-~"1.!?~,:ft-rH~ -r _PfL/OfL -,-0 _ 01 SL/-ii\f...t..J"-l ~"..J~ -r~ :niE- ,_ __._ H ~ -r ~ 5'f C;;. -r ~H ' _ _ -r H{;.. I f1 PE:/?- v to us.._ ~_v f::. @_6..~ ~(2 __~__~________=:rI-jE: l:~-rS~,---r..~'r-J 'HI ~ P~~Ec;...-r. ?H~~ Bg.. 75 . !,~~-r I P- AN..!._l.",O-rS ..E_~ c~ t:~ ""J:~!! ~ ~~"{-A-t-...€:: Pt-'t>n I(l()r-J~ vJprr~ &vA. L (7'-1 ..1-_____.___ mn, .. -- - -(l..(;:j\-~~-r ~_l.~'::_ ~~ __~_~~J..~E:.b -::IF s ,., €: "D.{; \I f::.LC> P rl ~ '1 C!H ff.1Z~C7 t: 12--1 S"" I L ~ A ~1-rE::_,~,:::.:5, 71 <" fie. B___~_~ll-.!?_' ~ '-:_~~~fr~.__n~~__ ItL.u .t;;.. __un 'P~ _i_ E:;.t:> .t>r'~~?_n Z ~1.~_lk'n__ ._, v _-ro-(~__'_~.P~\JIOuS1\~t.A-:;;. 7:?-JfZ-oh., c. /So/D 0.1:::'. s he r. . Professional Engineer No 23 42 Registered Surveyor No. 2914 i I Z Q<r- 3 ,..pI I 'P (2... 'f l?- \::: ""T b-f,.j -r I ot-..\ 'P' I'-~!~fr"" tf ~ 1_, _ ? 'I $- -r l:= 1'-1 A \/6UJl'-1\o:::. -rp B\=.. 1~~~-:I~1>__,____ D 5" ...' 5, 7 1(... AL = Z 656 A-L - / ~ COt-i''lCOL tl 6 00 Nt:..V ~ C~~WMt:> ffc-R-~/' f'J0 50 -0/G'03 - s) " I -I f'" '" L,~. F....L \40 /'.I~vl::> S' , .. i/I/-:;;;'/II~/'I - ~~~~\)t..L \. (p" I H2.. _ lJoJ ~_'7 'q- , J{J_ 1 - - ~ -,f'o,\${ t: \::.l 8<:::> ~t fA-LLlI0{.... Hf;.trb ,E:::::.-r- s" d :;. Dl^t-4~...,bZ o\-' ,,,,,,S;( HOLt:. S"J,-z. ~ 0 41 -:;--Fe. 1-\ l... -::0 M~'~W( Oy. W4--f~ ~ 'LIHE:. -tl -::: 4 S T" 4.51 H -z. -::;. H ~I (" trl o~ W /lr'1k.-A'Z. <! 1"1 t1 t;:- -l. L -=- 4 +07-f"-. 1) ~ -:::. 2ft'""! U eK'( b::;' \-1 C> L."t- 'bUr H = 0 k d \r\- (\4 I H.) lZ\il... + 2-\-\2 T 4'D~ T ~)(-tZ--tl) K - (0 411'; \r\. (451/4,407') . [2-l4 51} -\- 2(440/'} + 4-[O)"\" b 4 nJ (?J:J0 k ~ 6 00'010<6 L q +- 8 <014- + 4-n )C36~) J {, x I D- b Qi; Ifi;. ~ - -f-t; Dr Ht.A-b 3or3 -:pl F'~f-Nc.H ~~I~ ~\;:::.slt..~ L = , , v k.. (\-\I..'N -\- z-\-\l,..\)v.. - "O",,"Z- + Z\-\~ ~~) 'r l, ;1 ~ 11.5+ ) \Nl.J~ VDU).!1.L !t-!.._ SW*LE: - ~J ~S7 .ft: 3 """ {J 6 ~ I AL -i~ -- 0 7 3ZA,- {,J /o-[A-C- \)DL VM e /0 -Gt:.. ,ef:;-tt'lE:t> -::.. z 85'6 Ac. - 1~ tflN (!-IrfIiCI-rY ;::tz.~(1A l:>JZ.AlfoJ .... 2 656 At-ltJ -O./"3?At. 1,J;;; 21V,tk-IN '4 -=- '10\...U t1 E::- -'~-A-f~ ""=. z IU ttc.- 1/0 L -.;:. ~C, ,..., 0 P -(KLI'l(H e.f:: GUIj{~ \N ~ ., (L~( t-~ lc.'l t:;.-r H I~ F1 ';... 7'- _ K.. ~ H"t>~^ \JUc.. _ J,,) \Jut. -r \ v I '!."i -;;. I l, f-. I () - s ('-f~ / (-t.4:. - r-' ld. HL....'\;;. 'r\-z.,..";' ~~1 H -, D W t1'--(~ ""'(~L~ -_ ~ I \)l.L -::;. f'lO~ - ,S.~....(U~uY(~ 't.t.R"11.1 or- -, ~.--,.j(~ t ~ 4' b ~ --- $.A-"u".A-(~'i,... -, r(.~~f"l \;;..~V-(fl ~ L') l z. ILl;.. fH_- l~ L' (, ~ID-~~ [(rP')(7~ t- 2('.')~) - (4- }'Z-_",- z-ty&)J +- (13'1 }../u-')( 7'X4 ') l - z."I"Z.(.. 'f-<...- 1,-" _0 60 1181- +- 0 t OCY3.tJ1?- L - 4-J 't f-CL , ~I rZ-~ - F=LDW U>HPu-rA-7/DNs.. G..Vi\NIUK PA(4:. U7( 4<=1 , I ' C. n'l 0 F 80'-1 To ~ t3E:. T\ U-( (P.... 1\ :SoB ,..x:> c1/-0G.f>') ?/ '3/0" 5'rlU- --r I 0 F 2.- 5'iS-rE;.M 't>E:-5 I t....r0 c..R.\ It-(LI 1\ . ::,'{~-r~ is P~SIt...r-J~ FOR FUL-L OPf-12A;-/lON OF Wf\-IZ.CI-\l)U~ BUILb/,...)L SP"I,.JI4..~ ~'-ls.'n:-M te. 1'2-00 ~PH ~ 65 P-::'l (It'1 el..t>(, ~ON,..JEC:-"O,..J) p......~ 1\ IS()6' &Pt1 PvNf'E:-e. l-tbO~ uf ,0 ONE- FIt:L H'1l)lb\rJT -('0 (1Z6~1 DE::. lSoO Cft-! #r-r ,...o-r <....€::$S -frl/+"J 'ZD ~5l /Z-E-SI DVhL p.eE:: s.s.o te-E I 43/' - IZ"~ '2...70D ~PH @- J7 r;'- (,' rI ,.2-00 6. f' ,..., TllUE- Sl'll,o.JILICAi::. rt.I$f-lI! ~ rtoe ~r t1 ~ S5 f'~i ~~ P(UOSSv<<-L ;t4 '_ (., I, f/ , 1'500 c-'Pt-t 100' - B" (/ I"5DO 6.PI1 /~ 0/\ 111- ~"rt ~ , 5C>O (;/"tf 25" - e"rj 15'6D 6,PH @ / '--(F) \)11\ Q~Pn ~c.(~ A.(t:.~ \,}f"~ RO 1,.1.(, S .(~Jf-t f.\J \-l L 'tOo H L f~O l-IL 1'11<>> "'Su,,,, r; " 1500 3,'3+ o 1'1(, 17,05 O,2-5c>3 o '2-1 0 C> '1' f O{ 20' 15' a' {p I' 1'2.0D 2,('"f D"'1(." 1'3 ~ 2- D,z...S03 OII~4- o (,' 2. (." I 1,3 ' J. Z. I 5" 8" )500 :;'. 3 of 6,541 CJ 91 ,0,,'303 0.045' I ~' o (,' "< ~' I 11--" 2-70C> ~, 00 {),766 7c.1- o 3't-=1 o C>I-:::J. b, "2... &,1" 1,0 \cf "2700 C, D () I "54-5' /I, () o 3Sz 6 C>4-t 6,~ () b 61~5 s -= / \Jt"L- '\ "Z- ~ I ."'6(, (" -CJ:!, ) (L-:;:.. 0.01 b,\J t\L--- ?OO HI... ::;; 4So t-k ':.. -rfE:: S,~f.c-;;.. 11-l ~(el.l - O'L~"LlZ~ 0.4...."l. 2j O,fj~"f /z-~ I, blJ'L/Z~ D(4'Jl-/~1 , Sf-Ie€:.- -r 2- oF' z... 9/1'"'>/'1 fOl ~ l' r:eott -.0 Q f:1:. i.. +-\ L ~:>L (-'Lot f::l-' ;:;. r"'(:6.utlU:.b A....e. 1500 2-0 (11' )( 0 '2..1) t- 'I' -to 6' + 6' -;;;; 2.0 .:; I g 6 ? 51- 2-<<6 'Of~~ B--c.. 1'500 28.& (2-5,' oJ. /1.0+;.) +-\ '3' + \ '2..' -::. \ 3 '2>1 5/7 f5L 34- 7 f~L C-l> /5D() 34 ":} (II )(. Q."Z.I') -+ €I' + ~ I + i t' == 1 ') , 7... ' v,s f~$L 1-/ 2- f' ~'- C ~E:. 1600 4-' z. (100' X O.O~/) \- z{o.~ ') ~ '5,-::J-' L '5 p~L 43 /, (1)(. f,-F 1 'ZOo 55 / (11.c;.' X 0 ,13t-) + 5' t- 5' :; rz. 3' 5.3 fS" 00 ~ f'~L ~-c... '2.7 DO <..0 1'3 (-+-31' x. 0 DI'l-) +- \,'L - f3,s' 3 1- fS'- c.~ ~ f'5 ( 6- H 2'700 L..'" '1 ( I ()')( 0 04-f-) + f., -\ 0<11 -:: I, 1. I 6,Sp~(. (P1 1- (Sf. f'~ = I f'J1""T1A-L- fll€:$Sv~ ~~6"",<<-'E.D IYf "~r1" fo,rJ-r PL- = f'~SSv~ Lb'::.'2;, ~uE 10 F(l.\L-110,...) -+ f:r1,It0'-.S f' ~ -- <<-Es \{:)VA-C f~ssv\Z-E. ~E-Q.\J\~ = F-.I- +- PL Jo fl fl PETS\..HE & ASSOCIATE~, INC. Professional Engineers · Land Surveyors · Development Consultants Exfiltration Test South Florida Water Management District Falling - Head Open - Hole Test Client: Catalfumo Companies Project: Quantum Park, Lot 49 Date Tested: September 11, 1991 SOlllOG-9/13/91 o YELLOW SAND WH ITE SAND 3.5 5.5 GREY/BROWN SAND K = d In (H~2) (2H1+2H2+4Ds+d) (+2-+1) K = HYDRAULIC CONDUCTIVITY (CFS/FT2-FT. HEAD) d = DIAMETER OF TEST HOLE (FEET) = 0.42 H1 = HEIGHT OF WATER IN HOLE ABOVE WATER TABLE AT TIME, +1 = 4.5 H2 = HEIGHT OF WATER IN HOLE ABOVE WATER TABLE AT TIME, +2 = 4.41 Os = SATURATED HOLE DEPTH (FEET) = 0 ELEV. "A" = PROPOSED TRENCH BOTTOM ELEV. (FT.-NGVD) = 9.0 +1' +2 = TIME, SECONDS K = 1.6 x 10 - 5 CFS/FT2 - FT. OF HEAD 100' South of North Property line and 20' East of West Property. Joh F10 a Professicnal Engineer No. F10 ida Registered Surveyor No TEST LOCATION: 1760 North Congress Avenue . Suite 203 · West Palm Beach, Florida 33409 . (407) 640-3800 6799 Overseas Highway. Suite 7 · Marathon, Florida 33050 . (305) 743-5788 .----. P i-\) ,)&SIb~ ~1-~f"ft:LA APPENDIX A-ZONING Sec. 7 H. DESIGN CRITERIA. 1. Paving All interior paving shall comply with specifi- cations and standards set forth and subject to the approval of the city engineer 2. Off-street parking One and one-half (llh) parking spaces shall be provided for each two (2) employees on a maximum shift. In addition. visitor parking shall be provided which is deemed adequate to serve the needs of the particular use by the planning And zoning board. 3. Acce"sway". In the interest of public safety, no more than two (2) accessways shall be permitted on to any single perimeter public right-or-way and interior .. ~UPP. No. 35 1926.3 r APPENDIX A-ZONING See. 7 accessways shall be limited to no more than two (2) per developable parcel and interior accessways shall be located no closer than one hundred and fifty (150) feet from center line to center line. 4. Hotel and motel density Permitted density for hotel and motel development shall not exceed twenty (20) units per acre. 5. Utility transmission lines, etc. All utility transmission lines, conduits, conveyances or other devices or apparatus for the transmission of utility services and products, including all franchised utilities, shall be constructed and installed beneath th,e surface of the ground with the exception of main overhead feeder lines. Appurtenances to these systems which require aboveground installation shall be effectively screened, and, thereby, may be excepted from this requirement. 6. Solid waste and refuse disposal. Plans for solid waste and refuse disposal shall conform to and be approved by the city and county health departments. 7 Sanitary sewage system. Sewage system will be furnished and installed in accordance with city standards and other pertinent city ordinances. 8. Public water system for both domestic use and fire protection. Water systems must be installed in accordance with city standards and other pertinent city ordinances. 9. Storm water system. When approved positive drainage is not available, on site containment of storm water run-off shall be provided by the developer Details of the on-site system shall be approved by the city engineer 10. Access to perform necessary public services. The developer and/or owner shall dedicate to city any easement that city deems necessary for public services and said dedication shall provide that developer and/or owner shall hold city harmless for any of its 1927 r Sec. 7 BOYNTON BEACH CODE acts performed within or abutting said easements if any loss or damage is caused to abutting property 11. Off-street loading, In no instance shall off-street loading facilities front on a public right-of-way and in no event shall these facilities be located within eyesight of residential district. 12. Plot couerage. The gross floor area of the building and its accessory structures shall not exceed sixty per cent (60%) of the plot on which it is constructed. 13. Open space Each plot to be developed shall contain a minimum of twenty per cent (20%) unobstructed. non vehicular open space. ' All open portions of any lot shall have adequate grading and drainage. and shall be continuously maintained in a dust-free condition by suitable landscaping with trees, shrubs or planted ground cover The design of such landscaping and the measures taken to insure its mainteRance shall be subject to the approval of the planning and zoning board and the community appearance board. 14. Maximum building height No building or appur- tenances thereof shall exceed forty-five (45) feet in height., 15. Distance between buildings No building shall be constructed closer than twenty-five (25) feet to another principal building on the same lot or parcel of land. 16. District setbacks Front, thirty (30) feet, side, twenty (20) feet, rear, thirty (30) feet. 17 Peripheral greenbelt The project area shall be enclosed on all sides with the exception of accessways for. traffic and freight by a landscaped area with a minimum width of twenty-five (25) feet except when such property abuts a residential district such greenbelt shall have a minimum width of forty (40) feet. 1928 r APPENDIX A-ZONING See. 7 It shall be the responsibility ot the owner or developer to carry out this requirement, and to provide such mainten~~e or guarantee ot maintenance, subject to planning and zoning board and community appearance board approval. I. PROCEDURES FOR ZONING LAND TO PID. The procedure for zoning land. to the PID classification shall be the same as for zonjng land generally Because ot the differences in PID dev.elo~ments and the concept ot unified control in development, the following procedures and requirements shall apply to applications tor zoning to the PID classification in aAd.i~ion to the gener411 requirements. 1. Applications, materials to be submitted. In addition to information required for application for zoning generally, the applicant shall submit the following materials or data. --. a. Legal documents assuring unified control of the proposed PID and the agreements required under subsection D b. A master site development plan containing: (1) The title ot the project and the names ot the professional project planner and the de- veloper; (2) Scale, date, north arrow, and general location map; (3) Boundarie!l ot the property involved, all existing streets, buildings, watercourses, ease- ments, section lines ana other existing impor- tant physical features in an<;l adjoining the project; (4) Site plan ot locations of land uses including but not limited to industrial areas, greenbelts and proposed rights-ot-way; (5) Master plan showing access and traffic flow; and (6) Tabulations ot total gross acreage in the development and the percentages thereof to be devoted to the various land'uses. c. Repealed by Ord. No. 78-37, fi 1. 1929 r ]0 12 11 '5'305 3 8996 ~'FI -~ ~~/'l I4J 002 \1.\.., rJ 1< QtA'\11 ! ~ d)J l'\ 11U", (iH: "i1~.'\f t '~}{h !: R I; j f t ': L' i. I D f) -, '....c'\ ~ C i T I p cJ 10. r L) e r l. l. ': ~uc:: ~I f I f''-' I' be r Y dl \ t)r!e~ c...t (~... .~ ..... ..-\..... l ~ " l ...J.... 10..- J n'...L. her J r J; .1 ~ tit li_ '! 1- c' )r' f , " ...... fi ~l ! , .I Ilu Pirh.PJ Q '..!rt.'t.:DBclj,B!!J ..IS \' " r__~rlfl d ~rf4 !r \n tJu J t C '1 fOri 1 t, ': ! t h J' C' 1\ r _ ! r ~ ~ l~ ...j\"-lai \c ~~ L ~e J<.... !: k \., t <l b u v; U t' ! Ll i !,k l! et"nt~elt huller R&D u ~ Of CClr.1merC at fill ,~~ r n iff' ,.-" r '- ~"r e Uv- ~c:: (}d<l U 11tl1J!::- J\..h v:.e, .\ ".e WJlhlfl Olhlilll! ' 10 12 12 '8'305 3 8996 DEUTSCH IRELAN[ i4J 003 ubuts any ct the same uses outsIde Quuntum Park shall have a twenty-five foot greenhc-It buffer between the JScs. ~ 2 No greenbelt buffer .,hall occur when the perimeter of the Quantum Park p I ~ abuts ~ road !lght-of-way a railroad nght-of way, or a transportation statio I (Tn-}: all) ft peTlITIt'ter Quantum Park properties are combIned WIth propertles lJutslde of OL.r.mtul J Park to form d slngle development, contmuous If! nature, no buffer shnl' be required 3 AIi buffers shall be measured trom Quantum Park Perimeter Propen) inward Cll1d water shall he Included as an acceptable pan of such huffer~ Wtlr-'never necessary the huffer (jlmenslons shall be Jncr~i:lsed such that a r"1l111 num of fifteen feet of earth IS provIded In a continuous fashion SUl..n iHcdS shall be rla1ted lT1 accordance with number 4 below 4 All hurter f i !~ mg plans Sh:l!l tie ~ubrrlltted to the CIty of Bo' 011 BeCich !l..f approval Vi hen (l(IJ31..t" I ress (buffert'd uea) deve!or ," pinns are "uhrmtted p!jm1I12 wltnul the huffer Shdl1 be the rCSCQilSl 01 QUdrr JrY' As,; J~late~ bllt at -;Gmetlmes mav be \..omractual1y rle lega te '1("' ad i.1C(' i, prupt'ftv de"'e]oper P:ar ng~ I)f the 11l tler lied be cc;rnpkt, ivr tc CertIficate \)f OClUralicy belflg Issued on the huf'ered !lrDpCr n dd..;, to BovnDn Reach Landscape Requ rements. the llUP1be (If pI ib/trer-s'8 ,)e pr,)V:ded stall be bJsed unon p<:nmeter trontJ\.!e hlr each t\'vent.... !JI.':- r.:~ i . . J 1,.- t:.l a pmcei ether front<; un (If contal~S a perll'1tt~r g:eenh~jt butte (i jlJ1ticma! shnlbs three toot, "IX Inches in heIl!ht ",t tilt" tilne ot p antlr~' ~; hf' rt'qulreLl ,.im1 one dCk!l! 0 IJI tree, wIth <1 rrllnnl'.nn t\\o ard one I' ller t','.e1- e foot ze~(J mchc''i liJnlnlUIJ heigllt dnd eIght toot ,'( I ~r TnInJ'Y ~Im c,lI'iory ~t tl'e time ot pialltlng, Sh,llJ hC"'required ~l II .cdltlonal landsc(1ct' matemlls shall ce nl8.led hetween ti e rtdr 01 : Ie . , de\(> (pment and the first tlfteen teet (jf g enbeil buffer arCd mea"ureJ fn j the j yelorment f.1rceL P 8cement srdll be delcrmmt:d based upun I FJ!.it from the Qudntum Park D~;;;lgrl Rev.e\>. Committee dnd the (try of B"lvrl drnC:! Forester arid the reelu'rements <!nd re:-.tfld on" ot the S'owh Ftc,!' l \\ (rer \fanageme-nt DISH 'c't, L:lk(~ Wdr'h Dn!lnage Dlstnct .:Jill! FiniiU8 p{1\~er and LilIlH Anv perrTIlh r~ql ift' J f()[ J!:dslaOli '- \ t111:1 t~je S, Iln \,; ., . ...' nd; \\ mer M~nagernenl. D! [I t '- Isemcnt re<..s si ,d. :e lCq'-' re,-, llH~m ASSOCi:lli'S i'Ol[lln1l!m ot a tlfteen fOD! Width ot greenbelt buner shall feLclVt. sod, .;1" balance of the 1,lDd area sh211 be shoped 'HiJ sfe~:ed to pwvlde I r::plereh fjm,hed appearance t\1a:ntenance of gret~nbelt butte; Hed~ "lid ! the respons hIllty (' f the underlvJng property oVvner L::nu,,-ap!ng 'A itr, , greenhelt o.Jfftr :-.hd! be lff1g8ted b.. a nroaJeJsl Irr1,.1.l1 on svs em p!aLe i ciil1f 6 the propen\ line l r t!1t: CldJacent de\el< p,'e'l pJrLe n j h m" a' '\tIO~ and Td 1'1., ur: ,., ~h II be!h respum. 11!;\ t " 1- _c ~ " Parcels uwncd [w Uuantum A~q:(,Jate~ ORA, In_ If he QU1l1tum 1",Hk. (ommumt\ Deveiopmenr DIstr'ct, may have grc~l ,r ~' e ~f'f'J1!' nts pl:c~\1 UpCn1 them th:lt are: ded!coterJ tu adjacent property owner:. H! :'t-,' in ties. It IS u'lrjelstDod 11\ Quantum :,\:-.soclates and the Cay of BOVInoI' Bea~h In t , bUlld:ng ';ethack<; shall be measured fTOrr easement iml!ts latht~r th-, pror'eltv lImIts. In those nstDnces \l. here parcels h:.tVt" .J green Sf; ed:;~~r lent (.dncellt to a can<:d th~ buddmg )ett',~ck., "ha!l be me.lsured Ir 1m thr ,)1t the n,d hell!\< ,~~JI.!J 11'_ )lJlntUITl -\Ssucldtes and the C tv hereby agree to tnfOil..e greenhdt butter ;c'qUlrements as stated herem 10 nccomrnodate projects In process (I e, 49 Dlstnbutors, lne ), Quantum As~ocIates and 49 Dlstnbulors lne, hereby agree to Stlbmlt a landscape plan for Parcel 49A consistent WIth thIS document wlthm thlrtv da\s of dCl.-eptance of thiS Master f'13n "1odltlcatlon and firni approval bj th'" ell)' of Boynton Beach Umdscapmg 111 -, uTl such r i wIll be !I1stalled PI, -! t e ISSllancc' " the CerTIficate .f Oe;.'\ nc ,) 'le 49 iJ .,tnbutors, Inc dt"vc1 . 10 12 13 'Q'"'\o: 33 SgY6 DEUTSCH IRELAN ~004 L r!der~tctrl\.. e stntus L:f the appro\ed Commul1lty Development DIstrIct Pc: ill fo;, the Quc'" 1 Park Community Development District, Quantum AssocratC'c trl_ CIty ot ton Beach hereby agree that In the future some of the Quai , ~(jCI31c" nsibilitles IdentIfied herem may be assumed by the Quantum t' . lnrrlt.. ,evelop'11ent D!stnct Such assumpt an by the Cummu t y ilc\ciopr It Dlstm,t WI:) be totn[1\ \oluntary by the DistrIct The City of Boynwi Sea h hereb\ understands that tney \'vIII be able to rel) uron executlO'1 ,)1 12" H Ils1blllt:es by the QUd!1turn Park Community Development Dlstflct only f~ tIlt' commllment to assume such resr()n~lbllItle.) 1~ l1lJ.de I)y t!tetf Governin!! 801 r I hI' M'l<.,tu Plan Modlficm:on is herebv suhmltted bv OUantlH'ii \.,:;n...l ''. 1eW (':nJ apnroval by the Cltv COmrl1J<iSIOll of Boynton Beach It~ '~un "- be ~~n rrv'lev.ed in a nrel1mmarv hshlon \\lth Cl " suff ciunnp ~ .A t . J 1 I <)'i 1 DJ.IF 'T''\5\' Zr\l~fERM <\N, Vice President of Developmei1t ; \1\:-' "OCIA TLS rYi\'~F i)RS I",C J t ~\ ) "'... - ~,)AG E thi'. day 01 ~. ,,(: 'r N i O'\. BEACH FLORIDA C'- ~l rn I'';; )-.- 'Ine r { ""' l~n~! c '!~r r-11 fr11 55! cilie r .\T 1 E~ C1 \ C!~-k ({\)f; ) It~ :..e.l ) REVIEW COMMENTS (MEMOS) AND DATA - & 5rc:.~f 'f~yne/ve'&" _fY1C--(~S rrot re.<< Sf'<~S EXHIBIT "D" COVY' f- ~ I ? P..P 5t1(~C-C!5 fVlG-5 frr O<~-/7}7 CondItIons of Aooroval Project name: Shoppes of Woolbright PCD - Home Depot Tool Rental Center File number' MPMD 98-005 Reference: The clans consist of I sheet identified as 1 st Submittal. Master Plan Modification. File # MPMD 98-005 with a December 9. 1998 PlannIng and Zoning Deoartment date stamo marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments. None UTILITIES Comments: None FIRE Comments. None POLICE Comments. /' How, If at all, wIll the stripmg and traffic flow be affected by this -f.:!'( , k "fie::. I"~ modification? tJ- ~ V What is the estimated mcrease m trip generations associated with this additional use? V Will the tool storage compound be completely enclosed and lIghted for security? ENGINEERING DIVISION Comments. / Correct the reqUIred parking total on the plan and on the calculations. BUILDING DIVISION Comments. ff. r .~ ~ c:' ,<:{( p~,-r yY) r f: :) 6 Submit a survey owing the exiltmg and proposed property lines locaten within the limIts of construction. / 02) Pfey, eft:... 7 At time of permIt submIttal, mclude a copy of a recorded Unity of Title that adjoins the property that the new facility is located on to the Home Depot prooerty o-~ ...1) ... ,.JI '\ h,1.>J -f1..c- r 8. The type of construction, fire rating of exte~~ walls ~d pe!.cent of . o~r,mgs in the extenor walls shall comply with the regulations s~cified #~ RC'- Crt' /-'C~(' ft.", /L 'Y If;r~~ ,7 Page 2 Shoppes of Woolbright PCD - Home Depot Tool Rental Center File No MPMD 98-005 DEPARTMENTS INCLUDE REJECT in Table 600 of the Standard Building Code. - PARKS AND RECREATION Comments. None FORESTER/ENVIRONMENT ALIST Comments. fj) The applicant should have the site existmg landscaping brought up to current standards as part of the site plan review process. PLANNING AND ZONING - ---- Comments (None ) ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 10 To be detennined. ADDITIONAL CITY COMMISSION CONDITIONS 11 To be detennmed. /bme s:\projects\cond of appr\ 1 st SUB MITT AL COMMENTS fY\<>-s f"'-< 1/(/1 /9 '1 PrOject name Shop pes ofWoolbnght PCD - Home Depot Tool Rental Center File number' MPMD 98-005 PermIt Number' 98-3593 Reference The plans consist of I sheet IdentIfied as 1 st SubmIttal, Master Plan ModIficatIOn. FIle # MPMD 98-005 wIth a December 9. 1998 Plannmg and Zonmg Department date stamp markmg. ? I DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments. None UTILITIES I Comments. None FIRE Comments. None POLICE Comments 2 How, If at all, will the stnpmg and traffic flow be affected by thIS modificatIOn? V What IS the estimated mcrease in tnp generations assocIated with thIS bt ~ ~\~~ addItional use? Q\.s 4 W III the tool storage compound be completely enclosed and hghted for security? ENGINEERING DIVISION Comments. 5 Correct the required parkmg total on the plan and on the calculatIOns. ~\ ..:I: ~ {~ \.'::3 BUILDING DIVISION Comments 6 SubmIt a survey showing the existmg and proposed property lInes located wIthm the limIts of construction. 7 At tIme of permit submittal, include a copy of a recorded UnIty of Title that adJoms the property that the new factlity is located on to the Home Depot property 8 The type of constructIOn, fire rating of exterior walls and percent of openings in the exterior walls shall comply with the regulatIOns specified in Table 600 of the Standard Buildmg Code. PARKS AND RECREATION Page 2 Shoppes of Woolbright PCD - Home Depot Tool Rental Center File No MPMD 98-005 DEPARTMENTS INCLUDE REJECT Comments None FORESTER/ENVIRONMENT ALIST Comments 9 The applIcant should have the site eXlstmg landscapmg brought up to current standards as part of the SIte plan revIew process. PLANNING AND ZONING Comments. 10 Ibme s:lprojectslcond of appr\ )(0rv1 c. Z2 j=>r:- f- c:~a ~frcc ~n1" ....chor, ,~;;,. t7t/~ ?b ArzcClc<r'1 /1cc-~ · iYJc-&,,:-hS ,- ~ Q.-n tdV...J2 1~l'lc05C'Y'~ jJ l6-~s .. ye~ ~vF - ~'~ Ct:ryT\ ~ ~'^ +- -=j:> &-65h,c~6 ~nd2I'7:.: l:k-YlcL5cwrr.,,,, (=tU~Y<;Yr7=Vlfs. <<->( ~J 6rn,o f ~ :;.d2 f - ~ -. ' ;;7.:<-' r- r- (j /I'k~;; < -7> <v-- t; +k '/F,---.o ~ _ ~ 0-P .f1, ( .. SI f2. L/r~:-or-"::>~J'rs 0- r c?1? 1Ycn<:c.~-S ,- re...- e...>c.~--n(......... . _ c:!.c...rvY"\ v""'- ~'^- + (y<::~W b--- c>- (f:?J~ (Ir"\ V l"'-' '"'-< ~ ~ c~~-Ao"..., f;-cf'rvl.. vEJ2r>7 ~+ us...- ~~ .1 J:\J.--t tit...FF- + e:.f (r.k,((ft~ ~.l.:... € // O-~ ~~+-=?>, ae h~__(/ ? - 1h1?G..C:+- O'L Crd'rr'~() "'-- O(;r;;.v.... ~Rc.... C~I:-"J~( '"(Jrtc'Y fu f<e;:...~f-s ~\"f"\{; ~ss~& ~ c-~~ ~ v i Yl F\-'\c iz'. & ~ ~ ~I .L' ii yY)P S;;I/1~ ,1~~ Tee+< T(<!:d/ I- jY7.r -rt;y /'.2:s / fr' -!( .6)' ..s r= v= 7-= ore tl _ 6~6u~r ~cJ.U rfr~t..lia~~'\e. rvj-",yc.. ;€<<:- fr-,/ -=- f"8:70'(; ~ v , ..~ ~ R~ Iz.-r ('" : Ok.; C)~ $ ~~oof k(~~ -,u ~ k 7)e-rfr, fr1P 12 J (78" rf~( f!.C:'o7 Sfrl/.::... (6- /:,D .(~ co.-v/14) lr r<-T<-4e- :24-10-, ( ~ ~ b, .kJ 1 1'" -----\. ~ :2, ~ k A-.-(-c/Y'YT- 72-- --/:~ r (" ~ ;;Jc / c:c; 0 ~ ~ I Gn. Iz;r .sf 2C- J:;-~ fb-( Gn r~ C)c4~y S~r - ~? -3 &f ~CJ? .:f c2 7g 7 __ .J (; , Z Q~1 ~"i1 1-- 0 '(.~ t.J ~~\/ 'Y APPLICATION TRACKING LOG PROJECT TITLE: Shoppes of Woolbright PCD - Home Depot FILE #: MPMD 98-005 PROJECT LOCATION: TYPE OF APPLICATION Master Plan Modification PUBLIC NOTICE REQUIRED: (Y IN) 0 REVIEWER'S NAME AGENT Steve Tate ADDRESS: AGENT PHONE: 561-392-1991 FAX: 561-750-1452 DATE REC'D: 12/8/98 AMOUNT RECEIPT NO.: 12 SETS OF PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLICATION/SUBMITTAL: DATE ACCEPTED: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED o o o o o DATE DENIED: DATE OF SUBMITTAL ACCEPTANCE LETTER: DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: I INITIAL 1 ST REVIEW MEMO: DATE SENT 12/10/98 I MEMO NO 98-339 1 ST REVIEW COMMENTS RECEIVED I RETURN DATE: 12/18/98 DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: UTIL. PW PARKS FIRE POLICE PLANNING BLDG ENGR FORESTER AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT MEMO# DATE DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED MEMO NO o o o o o o RETURN DATE: 2nd REVIEW COMMENTS RECEIVED PLANS MEMO# DATE PLANS MEMO# DATE UTIL. 0 PLANNING 0 PW 0 BLDG 0 PARKS 0 ENGR 0 FIRE 0 FORESTER 0 POLICE 0 BOARD MEETING DATE: BOARD: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED: DATE: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97 TO Michael Rumpf, PlannIng & ZonIng Manager n.W 4J John Wildner Parks Supenntendent l' / ~ i Dr ~"- 1 ~ ij w m,riiY , III ' ~ ~ ~; ~ O.1W \ LEISURE SERVICES. PARKS DIVISION MEMORAN FROM. i\ND :;OT. RE Shoppes of Woolbright peD - Home Depot Tool Rental Center DATE December 10, 1998 The LeIsure ServIces Department, Parks DIvIsIon, has receIved the sIte plan for Shoppes of WoolbrIght PCD - Home Depot Tool Rental Center There are no recreatIOn-related comments The plan may contInue through the normal revIew process. JWad RECREATION & PARK MEMORANDUM TO Mike Rumpf, Actmg DIrector ofPlanmng and Zomng Kevm John Hallahan, Forester/EnvIronmentahst /~b If- Shoppes of Woolbright PCD - Home Depot Tool Rental Center Master Plan Modification FROM. Re: DATE December 14, 1998 I have no comment on the above master plan modIficatIOn. The apphcant should have the sIte eXIstmg landscapmg brought up to current standards as part of the sIte plan reVIew process The project should contmue m the normal reVIew process ~,JlJU n \II rn 1m ~ i ! DEe I 4 1998 ~ U '_.W1 , I J KJh File -"""'.--........;"...~-,. /' \JD J ~- ~~T. ell :r OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO' MIchael Rumpf DATE FROM SUBJECT REFERENCES ENCLOSURES I have the followmg comments 121498 Home Depot Tool Rental PZ 98-339 1 How, If at all wIll the stnpmg and traffic flow be effected by thIS modIficatIOn? 2 What IS the estlmated mcrease m tnp generatIOns assocIated wIth thIS addItlona1 u 3 Will the tool storage compound be completely enclosed and hghted for secunty? FILE MPMD 98-005 PermIt 98-3593 rn DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. BD 98-242 00 mmmD\YJrn rn lB I Jilll PLANNING AND ZONING DEPT. TO Michael Rumpf, Actmg Plannmg and Zomng AdmlnIstrator\ ,AJ ,.~'"" Michael E Haag, BUlldmg Code Permit Admmlstrato~~ December 16, 1998 V FROM. DATE RE Shoppes of Woolbright PCD (Home Depot Tool Rental Center) - Master Plan Modification (MPMD 98-005) 1st review comments We have reViewed the subject plans and offer the followmg comments that shall be addressed pnor to the project bemg forwarded for Board review' Buildin2 Division (Site Soecific and Permit Comments) - Michael E Haag (561) 742-6352 1 Submit a survey showmg the eXlstmg and proposed property hnes located wlthm the hmlts of construction. 2 At time of permit submittal, mclude a copy of a recorded Umty of Title that adJoms the property that the new factllty IS located on to the Home Depot property 3 The type of constructlOn, fire ratmg of extenor walls and percent of openmgs m the extenor walls shall comply with the regulations speCified m Table 600 of the Standard BUlldmg Code MEH.bg XC Bulent I. Kastarlak nSHRDAT A\Development\Building-6870\Documents\TRC\MPMD 98-005 1st review Shoppes of Woolbright PCD (Home Depot Tool Rental Center).doc FIRE & LIFE SAFETY DIVISION 1 Memorandum No 98-421 L m ~@UWlEm , DEe I 8" ~ I '" lUll 1 I i PLANNING AND ZONING DEPT. n V NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire Protection Association codes, and the City Fire code shall be adhered to TO Mike Rumpf, Act. Director Planning & Zoning Division FROM Steve Gale, Fire Marshal % Deputy Chief - Fire Rescue Department DATE December 14, 1998 SUBJECT Home Depot Tool Rental Center S W 8 Street M PM D 98-005 We have no objections at this time Comments will be addressed at future plans submittal CC File ill m @ ru a v7 r5 r",:' r h~ 12-, I n i ; I /I I l DEe, 8 1998 ~ iJJ PLAf-i~ riG ~ND ZONIi~G DEPT. PUBLIC WORKS DEPARTMENT MEMORANDUM #98-335 SUBJ Michael Rumpf, Actmg Planmng & zomng~ Mer C'\ C Larry Roberts, PublIc Works DIrector Al KIm, SamtatIOn Supenntendent () ~ ~ I _ Master Plan ModIficatIOn - Shoppes ~nght PCD- Home Depot Tool Rental Center TO THRU FROM. DATE December 17, 1998 The PublIc Works Department have no comments at thIS tlme m reference to the Master Plan ModIficatIOn named above. AK/cr DEPARTMENT OF DEVELOPMENT MEMORANDUM NO ENG 98-158 -- \ ''"\ ~ ~ ~ U W ~_~ .; 'ft ~ L.l ~ \ "i:\ \ \ill DEe' 8 I99B I 1 PLANNING AND ZONING DEPT. FROM MIchael Rumpf ActIng PlannIng and ZOnIng AdmInIstrator Raymond F Davidson. P E CIty Engl~ December 17 1998 TO DATE RE SHOPPES OF WOOLBRIGHT PCD, HOME DEPOT TOOL RENTAL CENTER - MASTER PLAN MODIFICATION MPMD 98-005 1 ST REVIEW COMMENTS We have revIewed the subject plans and ofTer the follOWIng comments that should be addressed prIor to the project beIng forwarded for Board revIew En2ineerin2 DiVision (Site Specific Comments) - Sebastian Puda & Ken Hall 561-742-6280 Correct the requIred parkIng total on the plan and on the calculatIons SP/KH ck Xc Bulent Kastarlak SebastIan Puda Ken Hall (. \'lv D()~lIl11ents'Shoppes of\\oolhrighl. Home Depot Toni Rental Ctr \Iastcr Plan \lot!ili"atlnn,t!o" Ellanson, Beverly From. Sent: To Cc. Subject: Mazzella, Pete Monday December 21 199810'31 AM Ellanson, Beverly Guidry John Home Depot Tool Rental- Master Plan Modification We have no comments on this master plan modification which changes the use of this parcel. A memo will not follow Pete 1 ---... R ~ RTI-~ ~,' \5 ~ IS. ll~'i - ll.j. , I' I \ II . U \JEl; \ ..~ PLANNING AND ZONING DEPl SIll Board of Supervisors C. Stanley Weaver Kermit Dell John I. Whitworth III SecretarylManager William G. Winters Assistant Manager Ronald L. Crone Attorney Perry & Schone, P.A. LAKE WORTH DRAINAGE DISTRICT ~~ 13081 MILITARY TRAIL DELRAY BEACH, FLORIDA 33484 January 19, 1999 Michael W Rumpf, Chairman Planning and Zomng DIvision CIty of Boynton Beach Post Office Box 310 Boynton Beach, Florida 33425-0310 Re Shoppes of Woolbnght PCD-Home Depot Tool Rental Center (NW Quad of Woolbright Road & S W 8th Street) TechnIcal Review CommIttee Meeting-Tuesday, January 19, 1999 Dear Mr Rumpf ThIS petitIon is located within the Lake Worth Dramage Distnct's boundary and will require permit(s) from the District prior to constructIOn. Should thIS petition reqUIre a plat, then the DIstnct will WIthhold permit approval until a review of the plat has been completed to ensure that the DIStriCt'S nght-of-way concerns have been addressed Thank you for giving us the opportumty to review and comment on thIS petItion. Should you have any questions or concerns please contact me Respectfully, ~ Lisa A Rowland Right-of-Way Technician Delray Beach & Boca Raton (561) 498,5363 · Boynton Beach & West Palm Beach (561) 737 3835 · Fax (561) 495-9694 FROM Bulent Kastarlak Director of Development Michael W Rumpf/'-'f~ Acting Manager of Planning & Zoning PLANNiNG AND ZON NG QE PT PfK ill ce, ,ftKWi CIC<J ! ~#-d ~ ,.. kilL- 1c2/31/7P ill ~@~u~~ JAM - 4 "I'y) TO DATE December 29, 1998 SUBJECT HOME DEPOT TOOL RENTAL CENTER Although we would certainly simplify things by processing the Shoppes of Woolbright master plan modification administratively, as you prefer; this would be contrary to written procedural requirements All modifications to master plans are ultimately approved by the Commission, after reviewing staff's recommendation for a major or minor change I do think a code change to allow administrative minor changes is justified I will draft language for us to consider, using a combination of the criteria for minor site plan modifications and criteria for non-substantial changes to master plans As for the Home Depot project, I would suggest we process it as filed are required by code, as the request only uses up 2,700 square feet of the 66,207 square feet remaining If your project materializes, and of course required a maximum amount of project area, it would likely exceed the available area by more than 2,700 square feet anyway, and therefore represent a substantial modification to the master plan and require a full review including analysis of impacts generated by the additional square footage Please advise MWR.ja J:ISHRDATAIPlanning\SHAREDlWPICORRESPlbulenlk,doc fD) mDW~rn1 Ut1 . I 7 9ij [!J PLANNING AND ON/NG OEPT < (I DEPARTMENTOFDEVELOPMENT Bulent 1. Kastarlak, NCARB Director IN/;7 h cf ~, ~d~od 7r:tf Au~"~a ~ / ~ ~ Ciuf Ru~ &u~ - ?~ -f/;C~ ~ ~ ~/ Z a,~r/ ~td U!&~ ~-tvt cUiM ~ w~~ ,U I ~uui:P /l/~~ -t&-f- I ...fe ~ ~ cr ,G;K,PO ~~/ ! TILe -J.~~ ~vt~ ; /taN;! ua-~<-- ~ ~ 1tA tw~f/Or~~ ~ ~~ 1f,ef ~1-U~~ P-I- Z I'~~ g~! \j :&11:- DEPARTMENT OF DEVELOPMENT MEMORANDUl\'1 NO. BD 98-242 RE M~chael Rumpf, Act~g Plannmg and Zomng AdIIl1Illstrat:r~ MIchael E Haag, Buildmg Code PermIt AdIIl1Illstrato~~ December 16, 1998 V Shoppes of Woolbright PCD (Home Depot Tool Rental Center) - Master Plan 'Modification ~IPMD 98-005) 1st review comments TO FROM. DATE We have revIewed the subject plans and offer the followmg comments that shall be addressed pnor to the project bemg forwarded for Board reVIew. Buildin2 Division (Site SDecific and Permit Comments) - Michael E Haag (561) 742-6352 1 SubmIt a survey showmg the eXIstmg and proposed property lmes located wlthm the lImIts of constructIOn. 2 At tIme of permIt submIttal, mclude a copy ofa recorded Umty of Title that adJoms the property that the new faculty IS located on to the Home Depot property 3 The type of constructIon, fIre ratmg of extenor walls and percent of openmgs m the extenor walls shall comply WIth the regulatIOns specIfied m Table 600 of the Standard Buudmg Code J\tIEH.bg XC Bulent I. Kastarlak YSHRDATA\Development'.Building-6870IDocuments'TRC'MPMD 98-005 1st review Shoppes of Woolbright PCD (Home Depot Tool Rental Center). doc SIll Board of Supervisors C. Stanley Weaver Kermit Dell John I. Whitworth III Secretary/Manager William G. Winters Assistant Manager Ronald L. Crone Attorney Perry & Schone, P.A. LAKE WORTH DRAINAGE DISTRICT 13081 MILITARY TRAIL DELRAY BEACH, FLORIDA 33484 February 3, 1999 MIchael W Rumpf, Chairman Planning and Zonmg DIvision City of Boynton Beach Post Office Box 310 Boynton Beach, Florida 33425-0310 Re Shoppes of Woolbnght PCD-Home Depot Tool Rental Center (NW Quad of Woolbright Road & S W 8th Street) Technical Review Committee Meeting-Tuesday, February 3, 1999 Dear Mr Rumpf ThIs petItion IS located wIthm the Lake Worth Drainage DIstrict's boundary and will reqUIre permIt(s) from the DIstrict pnor to construction. Should this petition require a plat, then the Distnct will withhold permit approval untIl a reVIew of the plat has been completed to ensure that the District's right-of-way concerns have been addressed Thank: you for gIving us the opportumty to review and comment on this petition. Should you have any questions or concerns please contact me Respectfully, LAKE WORTH DRAINAGE DISTRICT ~~~ Lisa A Rowland Right-of-Way TechnIcian Delray Beach & Boca Raton (561) 498-5363. Boynton Beach & West Palm Beach (561) 737 3835. Fax (561) 495-9694 7.B.1 SHOPPES OF WOOLBRIGHT HOME DEPOT TOOL RENTAL CENTER MASTER PLAN MODIFICATION DEVELOPMENT DEPARTMENT MEMORANDUM NO PZ 99-033 TO Chairman and Members Planning and Development Board /J.?&lt::- Michael W Rumpf Acting Director of Planning & Zoning FROM DATE February 5, 1999 SUBJECT Shoppes of Woolbright PCD - File No MPMD 98-002 Master Plan Modification (Move 2,789 square feet from within the master plan to Home Depot, increase parking circulation isle and correct parking space calculation) NATURE OF REQUEST Stephen E Tate of Caulfield and Wheeler, Inc., agent for Home Depot is requesting to modify the master plan for the Shoppes of Woolbright PCD The Shoppes of Woolbright PCD commercial development is located on the north side of Woolbright Road and east of the L.W D D E-4 Canal (see Exhibit "A" - location map) The requested modifications are shown on the proposed master plan (see Exhibit "B" - Proposed Master Plan) The specific request includes moving a total of 2,789 square feet of retail square footage to the Home Depot store, from within the PCD This buildable area is proposed to be transferred from the undeveloped portion of the master plan shown as "Future Retail" (2,499 square feet), and from the Food Court Restaurant site (290 square feet) To maintain existing isle width, or sufficient space for loading and unloading, the request also includes the expansion of the front isle adjacent to the expanded building footprint. Lastly, parking calculations are proposed to be revised/corrected The total square footage designated for retail/commercial use on the site remains at 313,786 square feet. BACKGROUND The only characteristics of the master plan affected by this proposed amendment includes assignment of square footage and required parking, total project parking, and design of the main isle immediately in front of the Home Depot store These changes are described below Square Footage Area for "Future Retail"- Area for Food Court Area for Home Depot - Existino 48,706 4,000 102,250 Proposed Chanoe 46,207 (-)2,499 3,710 (-) 290 105,039 (+)2,789 Net Change. (= )0 In proposing this modification, the applicant was not aware that the master plan had been modified to increase the approved square footage of the Food Court restaurant parcel from 3,710 square feet to 4,000 square feet. The total 4,000 square feet shown on the current master is needed for this project as confirmed by current permit plans for the restaurant. The only source of this available square footage for relocation to the Home Depot site is the "Future Retail" parcel The proposed master plan must be revised to reflect the following proposed changes Square Footage Area for "Future Retail"- Area for Home Depot - Existino 48,706 102,250 / Proposed 45,917 105,039 Net Change Chanoe (-)2,789 (+)2,789 (= )0 Memorandum No PZ 99-033 Shoppes of Woolbright PCD MPMD 98-005 (Home Depot Tool Center) Page 2 Parking Data Isle Modification Other. Parking space details are proposed to be changed to reflect the reduction of six (6) spaces in front of Home Depot, and to modify parking tabulations to include spaces which had been miscalculated and excluded The square footage moved to Home Depot will be placed on the front of the building and used for a tool rental center To maintain existing isle width for circulation and loading/unloading, the three adjacent parking isles are to be reduced in length by two (2) spaces each, resulting in the total reduction of six (6) parking spaces Secondly, parking data is to be changed to include 13 additional spaces located along the rear of Home Depot which had been previously miscalculated and therefore excluded from the parking tabulations This decrease in six (6) spaces, and increase in 13 spaces yields a net increase in parking spaces of 7 spaces As indicated above, to maintain existing isle width for proper circulation and loading/unloading space the main isle immediately in front of the building is to curve slightly around the expanded portion using the width obtained through the reduction in the three adjacent parking isles Staff understands that this addition is for a tool rental center to be accessed from within the store It should be noted that, although not directly related to the master plan, Home Depot will be moving pickup functions for oversized and contract purchases to the rear of the store to lessen the congestion in the front/main loading and unloading area This change should offset the potential increase in loading/unloading activity generated from the new tool rental center Changes to Planned Commercial Development (PCD) master plans are reviewed consistent with Section 6 F 13 b of Chapter 2 - Zoning which requires that modifications to approved plans which result in an increase of less than ten (10) per cent in measurable impacts, as determined by including any changes in traffic generated, water consumed or sewage to be collected, be reviewed by the Planning and Development Board and finally approved by the City Commission. The modifications requested result in no increase in impacts above those currently vested by the approved master plan RECOMMENDATION Staff recommends that the proposed amendment to the Shoppes of Woolbright PCD be considered non- substantial, and that it be approved by the City, subject to staff comments listed in Exhibit "C" - Conditions of Approval MR Xc: Central File \\CH\MAIN\SHRDATA\Planning\SHAREDlWP\PROJECTS\Shoppes of Woolbright PCD-MPMD 98-OO5\Home Depot Tool Renta~Staff rept MPMD 98-005.doc oZ PCD --'~@f" l~#ACH J I ,"" !....~~!.,- \ 1 ~~~ '- L0CATION MA~ SHOPPES OF WOOLBRIGHT P.C.D. : f I p. :::trn. ~:~[~ -rr _J U - . Ii . ., - ~~UL R L1illIIIJ ~..1 ~f EXHIBIT A , (, , I 'I ~L_--~.__ I r..=-..:. _ \l'g -.11 51 -GlF- =lS"~ < I II I" i u;lni I i ll~ ftl' ,'I i I ~ ....... t:~IC-.~~f .- JoO~jS: 1- & n 1~lii!iU ~1 U~~ ~Il II ~,~i.~.o' &1 Uti I. g ~ 1'01: ." ~ ;1 ., I {.{ ."";;:l{ i ~ o o n.. :z:'" C:ll ~~s ~:z:~ !i-:;2 :IIJ> nn I!!: i= !> ~!l!l! g!'l~~ "GSl~ :~7e Ill" &l~"- N!:;i" ~~~6 l!jl!~ i~!!l" ~;8 -"J I:~ ~!~ .9' >....:0 =;;:~ ~Oi!o M_. in Jofo ,f N~ ~~ :; o~ ~ . m ~ S~ m~ ~'ll EXHIBIT B z i * I K" ~ ... ~~; i ~~i ~ ..~ 1:1 g,.G) . z"" . .... III "11I211 a ~ i~ ~ gg5 a '0 .'JII" ~ .00 :I: "..a '" '~i ~ ... ~ ~t : .. ~ ...211 . ~~ 0 I~ i .. . o~ ~ i ~ z !I Ii !I t' !I iI I' R" 'L ~I~I I!" Ii! :II . =:r Ill"", is :~~ li:!ll~ 1;1 ~, Ijl~::!jI 'I ;;1 I!~ ~ J> ~ I ~j 1.0 n .. I I z m _ II i I: .. i I . ;. I.. i: ~ ,\ 1 I ~ . I :1'1: !=' I J I i lfiflfli !!U:"!f 1Il1!: p Ii r riJ i...... (/I II "Wil if f i ':'i1IW~i IIi' , II i~~=i . lid'. I' ' I ",". I"'" II ! i ~~ " I . ,d. I.~~ ~ ( ~ W "fUlIII! .I~ill~i ~m l I I j Ir!i E ;! S ~ I hp'UI~:' Ii I ~ . ~iU ~ "J.. " Ii i j II Iii .1 II nJII!WII !I'; .. ~mlUg <l1!;;I;1 ~ ~ I ! !~ II ~ ~ 8 ; -\ ! i .J!l! Ii I .I!J~~~I.~ I I \ ~J I \ ~.,~!" II' llII lm~llllii!=i=i ~ III lr h'~1 . i I mlim~h Ii! C! ii ,. ~ ~ ",:II , I ~ i I .. ( :mUUi ;lllli~i i I ~ ::. e; i I HI;( ! !';;~ ;II I~!;:" ~ !j i ( I "'~I'l'hq I J 'iiilu~ ... I ;lh mi ;1 - I i:!ii I In:' i ~I!' .. f f(l!ll~ ~. r"e'. f o E r ';1 'i '~ldl':1 I" ftl~,.l ~::':.. ~! M ~ "i~l ~ It:~ H lt~ i P N ~ '" = - i'Ii' J f I ~'"'lIl..~ 1 I ;;lll il~:J I!I~ :... il,)"Cili I (..\ . .. '"' N ~ !.j! . I !.I,""!" jI PQ; ~ ! I iii ~~: I .i r 111~11i I~;iil Ii t~~;:Si ,. '" :~l'l J f! h~'i~'!Q' ~! f - - u 'l;~( f ... b ... W - - '" N lIS :i ;.::!" #i; & r ;:!~ I:.~. ~i .. :m~ i : .h)'lIil~ ,( i ,.. .... .. -- - 1 fJ)l; f 'I' j =" . , 'I" 'rll;' ll' .". r'" I ; !i rr ~ "J ('l z d co .. '\', I .n I!,:' 'I .. 0 \ I Ii' i~.;I; U' '~U~ f I" . '.' ~'I <J ::I. I (r1ilk! ", ::r .' Iii":; ~1QF'A.~.D2 :. _ _ ..\oN'.... "'-'I :..., f _ e~ Iii: .rlll I.'. ~l i~~. .. r -.. .....- 'Hi~ I f .' '~Ir.i I. I II '" =, " ._.._ '. '/>I.it._ '".! I . or I.J": I r ", l! f " jn *=::;::.=:~:.!.'-::: ,,::~. - -. . mu J " . '... I i" .'oJ ~;l .. ~ I .;il!r HI -I I '1007"""" 'u......I.. I=.J" 1"o.o:.rw.-.. ~ ~%~h I ~\1 ,Io~ '" 4,. .., .- SHOPPES OF WOOLBRlGtfI' Kilday & _ia_ r i~ ~ Architects/Plannen '~ W. ~ 1651 Forum Place SUibiIOllA ~ ~'" ' ITON lEACH. FLDRIIM ~,~ ___. FIa!:i<Ia 33401 J ~." c~i fl89.5522 I"'< - :II ".;:5 -s;;;~ !3m;;.. 811:t li~! ~:;~~ =ib ~h~ ~... ~~ ;lI~;; ~. ~ I~~ ~~~ ~~I ~~ ._; ~m 2'" ~000 Ii ~ "'~ 8~ EXHIBIT "e" CondItIons of Approval Project name Shoppes ofWoolbnght PCD - Home Depot Tool Rental Center File number MPMD 98-005 Reference The plans consist of 1 sheet IdentIfied as 2nd SubmIttal. Master Plan ModIficatIOn. File # MPMD 98-005 wIth a January 28, 1999 Planmng and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments None UTILITIES Comments None FIRE Comments None POLICE Comments None ENGINEERING DIVISION Comments None BUILDING DIVISION Comments. I At tIme of permIt, I) submIt a survey showing the eXIstmg and proposed property lInes located wIthm the lImIts of constructIOn, 2) provIde a recorded Umty of Title that adJoms the property that the new facilIty IS located on to the Home Depot property; and 3) show that the type of constructIOn, fire ratmg of exterior walls and percent of openmgs m the extenor walls shall comply WIth the regulatIOns speCIfied in Table 600 of the Standard Bmldmg Code. PARKS AND RECREATION Comments None FORESTER/ENVIRONMENTALIST Comments. 2 The applIcant should have the SIte eXIsting landscapmg brought up to current standards as part of the SIte plan reVIew process. s Page 2 Shoppes ofWoolbnght PCD - Home Depot Tool Rental Center FIle No MPMD 98-005 PLANNING AND ZONING Comments. 3 No surplus bUIldable square footage eXIsts on the restaurant parcel known as Food Court. ReVIse master plan to show current approved square footage for thIS parcel, 4,000 square feet, and reduce proposed tool center by 290 square feet or further reduce the "Future Retail" sIte by the additIonal 290 square feet. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 4 To be determmed. ADDITIONAL CITY COMMISSION CONDITIONS 5 To be determmed. \\CH\MAIN\SHRDA T A \Planning\SHARED\ WP\PROJECTS\Shoppes of Woolbright PCD-MPMD 98-005\Home Depot Tool Rental\Cond of Appr.doc /bme to DEVELOPME~- ORDER OF THE CITY COMMISS---N OF THE CII r OF BOYNTON BEACH, FLORIDA PROJECT NAME Shoppes of Woolbright PCD - Home Depot Tool Rental Center APPLICANT'S AGENT Steven Tate, Caulfield & Wheeler, Inc. APPLICANT'S ADDRESS 7301-A West Palmetto Park Road, Suite 100A, Boca Raton, FL 33433 DATE OF RATIFICATION BEFORE CITY COMMISSION January 19,1999 TYPE OF RELIEF SOUGHT Master Plan Modification LOCATION OF PROPERTY North side of Woolbright Road and east of the L.W D D E-4 Canal DRAWING(S) SEE EXHIBIT "B" ATTACHED HERETO X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows. OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows 1 Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2 The Applicant ~HAS HAS NOT established by substantial competent evidence a basis for the relief requested 3 The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included" 4 The Applicant's application for relief is hereby ~ GRANTED subject to the conditions referenced in paragraph 3 hereof DENIED 5 This Order shall take effect immediately upon issuance by the City Clerk. 6 All further development on the property shall be made in accordance with the terms and conditions of this order 7 Other DATED City Clerk J:ISHRDATAIPlanningISHAREDlWPIPROJECTSIHamptons at Boynton BeachlNWSPIDEVELOPMENT ORDER NWSP.doc 7 DEPARTMENT OF DEVELOPMENT MEMORANDUM NO PZ 98-339 FROM TRC MEMBERS Bulent Kastarlak, Development Department Bob Borden, Assistant Fire Marshal Kevin Hallahan, Forester/Environmentalist Officer Robert Riggle, Police Department Pete Mazzella, Utilities Department Michael Haag, Building Code Permit Administrator Ken Hall, Engineering Division AI Kim, Public Works Department John Wildner, Parks Superintendent Ray Davidson, Engineering Division Bob Donovan, Permit Application Group Michael W Rumpf, Chairman ..f1t.Jf\ !-t_ Acting Planning and Zoning Manager TO' DATE. December 10, 1998 RE. MASTER PLAN MODIFICATION Project - Shoppes of Woolbright PCD - Home Depot Tool Rental Center Location - North of Woolbright Road and on the east side of S W 8th Street Agent - Steven E Tate Caulfield & Wheeler, Inc File No - MPMD 98-005 Permit No - 98-3593 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments to the Director of Planning and Zoning no later than 5.00 P.M. on FRIDAY. DECEMBER 18.1998. If yOU are unable to meet this schedule please notify me in advance. When preparing your comments, please separate them into two categories, code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval 1 Use the review standards specified in Part III, Land Development Regulations, Chapter 3, Master Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments 2. The documents submitted for the project were determined to be substantially complete, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Michael Rumpf Page 2 Shoppes of Woolbright PCD - Home Depot RE. Development Department Memo PZ 98-339 3 Each comment shall reference the section of the code that is incorrectly depicted on the documents 4 Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements 5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the Department/Division responsible for the review specified 6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to the Acting Planning and Zoning Manager The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted to the Acting Planning and Zoning Manager for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum Michael Rumpf will be the Planning and Zoning staff member coordinating the review of the project. MWR.bme Attachment XC (Memo Only) William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Don Johnson, Building Division Sebastian Puda, Engineering Inspector II Larry Roberts, Public Works Director Central File S '\projectslShoppes of Woolbright MPMD 98-0051Home Depotl1 streview-plans REVIEW COMMENTS (MEMOS) AND DATA DEVELOPMENT DEPARTMENT MEMORANDUM NO PZ 98-190 FROM Chairman and Members Planning and Development Board ?~Z~ Michael W Rumpf Acting Director of Planning & Zoning TO DATE June 19,1998 SUBJECT Shoppes of Woolbright PCD - File No MPMD 98-002 Master Plan Modification (decrease in square footage on future retail; increase in square footage on lot 2) NATURE OF REQUEST Bradley D Miller of Miller Land Planning Consultants, Inc., agent for the Morton Group, Inc. is requesting to modify the master plan for the Shoppes of Woolbright PCD The Shoppes of Woolbright PCD commercial development is located on the north side of Woolbright Road and east of the L.W DO E-4 Canal (see Exhibit "A" - location map) The requested modifications are shown on the proposed master plan (see Exhibit "B" - Proposed Master Plan) The specific request to the master plan is to reduce the square footage designated "Retail" by 400 square feet, and increase the square footage planned for "Lot 2" by 290 square feet; a net reduction of 310 square feet is planned for the shopping center This modification to the master plan is being processed in conjunction and concurrent with the conditional use application for a 4,000 square foot restaurant called "Favorite Food Court" (see COUS 98-001) BACKGROUND The only characteristics of the master plan affected by this proposed amendment include square footage and required parking These two characteristics are indicated below' Existino Proposed Chanoe Square Footage. Area for "Retail"- Area for Lot 2 - 48,996 3 710 48,706 4,000 (-)290 (+ )290 Net Change (=)0 Parking Facility. The proposed adjustment in square footage for the restaurant and retail uses generates a net demand for two (2) additional parking spaces The previous demand for parking spaces, 1,520 spaces, is increased to 1,522 spaces This demand for parking spaces will be adequately met by the continued plan for 1,614 planned parking spaces The Shoppes of Woolbright is part of a November 6, 1986 and January 24, 1990 stipulated settlement agreement between the city and Tradewinds Development Corporation The City Commission ratified the settlement agreement by approving a master plan modification on May 15, 1990 that depicted the applicable conditions of the January 24, 1990 stipulation and settlement agreement. The agreement vested the project for traffic, water and sewer, so that no time extensions for concurrency would ever be required, prior to build-out of the property, so / Page 2 of 2 Memorandum No PZ 98-190 Shoppes of Woolbright PCD MPMD 98-002 long as the total number of trips and peak hour of trips did not increase The settlement agreement approved a maximum of 320,000 square feet, to include the following current uses (which have been amended multiple times since the agreement and show the proposed changes with crossed-out and underlined text) Parcel Tract "8" Approved use Cracker Barrel Restaurant - 9,970 square feet Race Trac Gas Station - 3,040 square feet Tract "C" Lot 1 Lot 2 Lot 3 Food Court Restaurant - 3+4Q 4.000 square feet Discount Auto Parts - 6,492 square feet Burger King Fast Food Restaurant - 2,911 square feet Tract "D" Parking and circulation for Home depot Tract "F" Home Depot - 1 02,250 square feet and Garden Center - 28,413 square feet Tract "E" Expo Design Center - 88,004 square feet Future retail - 20,000 Future retail- <18,996 <18.706 square feet MASTER PLAN MODIFICATION ANALYSIS Changes to Planned Commercial Development (PCD) master plans are reviewed consistent with Section 6 F 13 b of Chapter 2 - Zoning which requires that modifications to approved plans which result in an increase of less than ten (10) per cent in measurable impacts, as determined by including any changes in traffic generated, water consumed or sewage to be collected, be reviewed by the Planning and Development Board and finally approved by the City Commission The modifications requested result in no increase in impacts. RECOMMENDATION This master plan modification request was reviewed by the Technical Review Committee (TRC) on June 2, 1998 Staff recommends that the proposed amendment to the Shoppes of Woolbright PCD be considered non-substantial, and that it be approved by the City, subject to staff comments listed in Exhibit "C" - Conditions of Approval MR Xc: Central File S:\projects\Shpswool\MPMD\Shoppes MPMD 09-002 /} 0\ EXHIBIT "A" :5 REC -;:r.. . .lrA ~ l.. .. ,,_ r-- _ u .J ~-3---~" LU I ~ -- EXHIBIT "B" 6' Q :3 ::) ~ a: :: w % ~..J g ..J ~ ~ Co 1-0 ~ Zlll 1: III OJ Q E ~ I II: en-' al Lll >- ..J II: -' o 1ii o ::I ;: a .. 1:: '" ..! ... .. g z~ :f= ~ - w ;= S > !! ~ II' " ~E r."Oll.DQI.,J ~ z ~. OYO~"IYY "":)'S ~ "oi z : ~ E ! ~ 8 ~~_ . . " :..f- !~~ h ~--,-.-: !~'L I~" ,I-J.-I . t~ -!--=li~ I -:::: - JI1 I' ::1.- J,I,II, i'~~,- '11 .' II ... "'\ "I~' !: f"'~\ -:;;;:: , I .~-..~ il .: I . Ii I, , 1 ii"l;/ I t.l Ii J ! Ii". '!:P · ~ :1 g " r1 :1 ~ ik .g. 1, ,[ 6 ! ,~ ,~ .i Ir-. ~,..l" '1 " :1 I 1 e .~ <~: \ ~!l: ~,~: I ;:;~~ 1- ."'Ii.. ... ~ ~i~ ~ ~ ~ . ~ : .; 2 ;;z cn< w'" cO"' ",< "'~ C'= u< ~.; ="- o~ u::;: <.-' ....u. ....~ ~~ <~ ...J <39 w- >- ~ .... c:: <l: !.!..: J: ... UJ ...J ;:;: <' -Co uS; C/,"; >- 0: .. i 0 z = 0 .. ci ~ .. ~ ;iP .~ I ,- I i r!r4~ . / I :i~ Ji- " LU ... I /1/ ~~\ a:::!(I)~ I! '-.. =>r.::iB;// " , ....., ..... UJ ..... ~ , _____ ! =>a:~'$-/ /' < ;; c:~ !1.l- UJU- ;;= %: -<' 5C Q= , I I, "1 I I I "' \ u; '-- ;; :: c::::' ~p-- L.. Ll:~ ill. 5c <, Ut =< 0( 0: " o 0: .. W " 0( z " ;; 0: W t- '" 0( " i i i i t 1 ~ l;~l~~~ a:c ll: S 13 tis s~ <I ~" ,,~~ ~ i~ ~~~ ~ _~ a~: ~ " ; ~~t - ~ ~uj !~ 0: ~h !~ i&~.q ~~-~!~ c .~ Co W.J UW c(u ,.Ja:1- 11.:-z I-:Z:c( :Z:uu. Qa:~ a::J al:Z: .Ju o o ;: : ~ :O;~ ~. ~~ .. ~;8 ~~ 8~- ~" ~l-i~ 1 ! I~ J i~~~ I ~ ~ ~ ~ e: ~ C ..J II; > OJ Q f ~ ~ ~ c. = 0 e: <.:> <5 .... e: C :; ~~,,; 8.:\8.:\ &~;:~ ~jil "';.; i 2 ~ ~ a i ! ~ EXHIBIT "c" 7 EXHIBIT "C" CondItIons of Approval Project name' Shoppes of Woolbright PCD - Favonte Food Court File number' MPMD 98-002 Reference. The plans consIst of I sheets Identified as I st SubmIttal. Master Plan ModIfication. File # MPMD 98-002 wIth a Mav 13, 1998 Planmng and Zomng Department date stamp markmg. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS Comments None UTILITIES Comments. None FIRE Comments None POLICE Comments. None ENGINEERING DIVISION Comments. None BUILDING DIVISION Comments. None PARKS AND RECREATION Comments. None FORESTER/ENVIRONMENT ALIST Comments. None PLANNING AND ZONING Comments. None ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS I To be determined. ADDITIONAL CITY COMMISSION CONDITIONS 2 To be determmed. tbme s:\projects\cond of appr\ ? DEVELOPMEr-~~ ORDER OF THE CITY COMMISS'-~ OF THE cn r OF BOYNTON BEACH, FLORIDA PROJECT NAME. Shoppes of Woolbright PCD APPLICANT'S AGENT Bradley Miller, AICP APPLICANT'S ADDRESS 298 Pineapple Grove Way, Delray Beach, FL 33444 DATE OF CITY COMMISSION RATIFICATION July 7, 1998 TYPE OF RELIEF SOUGHT Master Plan Modification LOCATION OF PROPERTY East side of S W 8th Street, north of Woolbright Road DRAWING(S) SEE EXHIBIT "B" ATTACHED HERETO X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows. OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows 1 Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2 The Applicant -1L HAS HAS NOT established by substantial competent evidence a basis for the relief requested 3 The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included" 4 The Applicant's application for relief is hereby -1L GRANTED subject to the conditions referenced in paragraph 3 hereof DENIED 5 This Order shall take effect immediately upon issuance by the City Clerk. 6 All further development on the property shall be made in accordance with the terms and conditions of this order 7 Other DATED' City Clerk J'ISHRDA TAIPI"""9ISHAREDlWPlFaRMS\De, a"'~IDEVELqEtIT ORDER REV.do, APPLICATION TRACKING LOG PROJECT TITLE: Shoppes of Woolbright - Favorite Food FILE #: MPMD 98-002 Court PROJECT LOCATION: TYPE OF APPLICATION: Master Plan Modification PUBLIC NOTICE REQUIRED: (YIN) 0 REVIEWER'S NAME AGENT Bradley Miller ADDRESS: AGENT PHONE: 561-272-0082 FAX: DATE REC'D: 5/11/98 AMOUNT RECEIPT NO 12 SETS OF PRE.ASSEMBLED PLANS SUBMITTED FOR REVIEW 2 OF 12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 APPLICATION/SUBMITTAL: DATE ACCEPTED: DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED PHOTOGRAPHS RECEIVED o o o o o DATE DENIED: DATE OF LETTER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES: DATE OF SUBMITTAL ACCEPTANCE LETTER: INITIAL 1 ST REVIEW MEMO: DATE SENT 5/14/98 MEMO NO 98-152 RETURN DATE: 5/28/98 UTIL. - PW - PARKS FIRE MEMO# PL S MEMO# POLICE PLANNING BLDG/ENGR ...FORESTER DATE OF LETTER SENT TO SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS: 90 DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID: DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMITTED FOR 2ND REVIEW: PRE-ASSEMBLED PLANS SUBMITTED FOR REVIEW: AMENDED APPLICATION 0 2 OF12 SETS SIGNED AND SEALED 0 SURVEY 0 LANDSCAPE PLAN 0 FLOOR PLAN 0 SITE PLAN WITH SITE DATA 0 2ND REVIEW MEMO: DATE SENT DRAINAGE PLAN ELEVATION VIEW DRAWINGS COLORED ELEVATIONS RECEIVED MATERIAL SAMPLES RECEIVED TRANSPARENCY RECEIVED PHOTOGRAPHS RECEIVED o o o o o o MEMO NO. RETURN DATE: 2nd REVIEW COMMENTS RECEIVED PLANS MEMO# DATE PLANS MEMO# DATE UTIL. 0 POLICE 0 PW 0 PLANNING 0 PARKS 0 BLDG/ENGR 0 FIRE 0 FORESTER 0 BOARD MEETING DATE: LAND DEVELOPMENT SIGNS PLACED AT THE PROPERTY DATE SENT / SIGNS INSTALLED: DATE: BOARD: CITY COMMISSION: DATE: DEVELOPMENT ORDER RECEIVED FROM CITY CLERK: 0 DATE: DEVELOPMENT ORDER SENT TO APPLICANT 0 DATE: S:\FORMS\TRACKING LOG FORM revised 4/25/97 TO THRU FROM SUBJ DATE PUBLIC WORKS DEPARTMENT MEMORANDUM #98-135 T ambn J Heyden, Plannmg & Zomng Duec~1J C Larry Roberts, PublIc Works Duector C ~ Mark LIPS, SanItatIOn Foreman ill ~@mO\Vlrn ill MAY21. PLANNING AND ZONING DEPT. Master Plan ModIficatIOn - Shoppes ofWoolbnght PCD (Food Court) May 20, 1998 The PublIc Works Department has no comments m reference to the Master Plan j?Od.I cat on at t~e S ~pes ofWoolbnght. ThIS project can go forward. U, /cr FIRE & LIFE SAFETY DIVISION Memorandum No 98-260 ~ :~: TO Tambn Heyden, DIrector Planning & Zonmg DIVision FROM Steve Gale, Fire MarShal0~ Deputy Chief - Fire Rescue Department DATE May 15,1998 SUBJECT Shoppes of Woolbright - Food Court SW 8 S1., north of Woolbright Rd MPMD 98-002 We have no comments for the plan submitted CC File oorn MAY I .. PLANNING AND ZONING DEPT. " rn 00 Recreation & Park Department Memorandum 1(0) m @ m II 'if} m Ii) 1111 MAY' 5 1900 ~I To Tambn Heyden, PlannIng and Zonmg DIrector John Wildner, Parks Supenntendent h ~~ s/Iorl';;s o(C" WDO(.~ &/-Ir fJ c JJ S /IS/1r- / I From. Re. Date The Recreatlon and Park Department has revIewed the above hsted plans. There are currently no outstandIng recreatIon-related Issues. The plans may contInue through the normal reVIew process. JW RECREATION & PARK MEMORANDUM TO Tambn Heyden, Plannmg and ZOlling DIrector Kevm John Hallahan, ForesterlEnvlfonmentahst Vr~ ~ Food Court-Shoppes of Woolbright PCD Master Plan Modification FROM. Re: DATE. May 18, 1998 Site Specific Requirements I have no comments on the above proJect. The project should contmue m the normal reVIew process. Kjh file [D)~@~nw~!mi lJ1) l MAY ~_8 i998 --" ~' ~ PL4; G hND lON.\G DEPI , ~ Ellanson, Beverly From: Sent: To: Cc: Subject: Mazzella, Pete Friday May 29 1998 3 35 PM Ellanson, Beverly Guidry, John Shoppes of Woolbright PCD - Food Court - Master Plan Modification Beverly' We have no comments or objections regarding this plan. Peter Mazzella - Utilities Dept. 1 mmmow~ MAY 2 9 i998 PLANNING AND ZONING DEPI cr. , OF BOYNTON BEACH, FLORIDh INTER-OFFICE MEMORANDUM TO Tambrij Heyden Planmng & Zomng DATE 051998 FILE MPMD 002 Officer RIg~~ SUBJECT FavorIte Food Court ill ~@~n\VJ~ ill FROM REFERENCES PZ 98-152 PolIce Department MAY 19- ENCLOSURES I have nocomments reference this purposed master plan modification. PLANNING AND ZONING DEPT. DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. DO 98-142 TO MIke Rumpf Acting DIrector of Planning and Zomng FROM. Don Johnson, Deputy BUlldmg Ollie,.1 A ~t John Yeend, P E City Engmeer DATE May 28 1998 RE SHOPPES OF WOOLBRIGHT peD - FOOD COURT (MPMD 98-002) MASTER PLAN MODIFICATION G=lli- is r~ ~ n ~1 ~ ill' D ,., i..:l U .J ~ . MAY 28 9B PLANNING AND ZONING DEPT. We recommend approval of the request subject to the following comments Buildin2 Division No comments En2ineerm2 Division Close Ingress/egress on north sIde InsuffiCIent room for two way traffic [LOR Chapter 23] MH/SP/KH ck Xc Bulent Kastarlak MIchael Haag SebastIan Puda Ken Hall C \Iv Do~umenls'Shorres of\\oolhright PCD-Food Lourl. f\[aster Plan \lod..do~ - - m@mowm ,.... D, ~ Ellanson, Beverly n ~l MAY 2 9 .. From Mazzella, Pete w Sent: Friday May 29 1998 3 35 PM To. Ellanson Beverly PLANNING AND Cc. Guid John ZONING DEPT. Subject: ry Shoppes of Woolbright PCD - Food Court - Master Plan Modification Beverly' We have no comments or objections regarding this plan. Peter Mazzella - Utilities Dept. 1 {: f1 c ~ c:- I;:' ~.J ~..i l ~~i J.)O~ .~IA\V/:~ \.t\;~\oV / IA S' ) (c~ ~V1J n<<-<- f 3 loc.J r.6 frt::1. '<:~'i~ Cf'7D~_4 (' 5G t'l/ ~Y' rf /'; / /1-- 1 rj / i ({ij r<!".-( ({e,.. Vl P1~.L, f, c.. f7Cr'-. -- --~~ ---- - ~f 5 h't'1'c~ cf C--r_( C7# 7C0 r<.t..s -R-(-~~ r ~ 3... 7/0 ~ ;A .e:( C:cG c/ C;~r '-' ....(" (<:'~f..--+ d ~d~ rec:-c~", -f-K-~ / Y1 CF:~ pc..; c,-, ( .:I::;, c::. Y'"e'\.S e ~n.(; ~ c./I 5e r ./z ~ Ik<~ - ~ ~0 f BGO , /I... __: "L/ "- . k____ - ~ fA7v/::-'~ ~4tJ 15 ?tJ rI? '2 (;lor i fc t~ /C:,/Y - &A-t-S Sfi; (C)cJ ON~(' 8<t Of-.J ~6-V <: u(o f(~5 /1 1 " Bu') LUI "'JJ~~ - q! I3...l-J r I j _ _ . (;.tb.- S --- I hJ2! '22'"2 "\ ! tf 2-0 2- 2 L- It' 1 . I 'J S/<4f~-(. ~ J/t~ !L~ (o<'L w 6';-.. 0' ~J / '2- jVt,4..uJlf~ ------~ -,---- ---_...-- --' --- ..' /I r~~ {JLAJ D \(fe~t ---./~' lf1~ EXHIBIT "C" Conditions of Approval 0Itl'f1 Project name Shoppes ofWoolbnght PCD - Favonte Food Court File number' MPMD 98-002 Reference' The plans consist of 1 sheets identIfied as 1 st SubmIttal. Master Plan ModIficatIOn. 98-002 WIth a Mav 13. 1998 Planmng and Zoning Department date stamp marking. File # MPMD I DEPARTMENTS I INCLUDE I REJECT I PUBLIC WORKS Comments. None UTILITIES Comments. 1 FIRE Comments. None POLICE Comments. None ENGINEERING DIVISION Comments. 2 Close ingress/egress on north SIde InsuffiCIent room for two-way traffic. [LDR Chapter 23] BUILDING DIVISION Comments. None PARKS AND RECREATION Comments. None FORESTER/ENVIRONMENT ALIST Comments. None PLANNING AND ZONING Comments. 3 ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 4 To be determmed. Page 2 Shoppes ofWoolbnght PCD - Food Court File No MPMD 98-002 1)R4tf1 ~~~.\RTMENTS INCLUDE REJECT ADDITIONAL CITY COMMISSION CONDITIONS I 5 To be determmed. I I I /bme s:\projects\cond of appr\ EXHIBIT "C" E~]' 11c-e-'/1 CondItIOns of Approval Project name Shoppes of Woolbright PCD - Favonte Food Court FIle number MPMD 98-002 Reference' The plans consIst of I sheets identified as 1 st SubmIttal. Master Plan ModIficatIOn. File # MPMD 98-002 wIth a Mav 13. 1998 Plannmg and Zomng Department date stamp marking. v~ ~b ucP AKTMENTS INCLUDE REJECT PUBLIC WORKS Comments None UTILITIES Comments None FIRE Comments None POLICE Comments None ENGINEERING DIVISION Comments I ~e Insufficle no for -w ~traffic [L ~R apter 3 e... (, t-t-,\ E ;<.rr v N L-I BUILDING DIVISION Comments None PARKS AND RECREATION Comments. None FORESTER/ENVIRONMENT ALIST Comments. None PLANNING AND ZONING Comments 2. ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS 3 To be determined. ADDITIONAL CITY COMMISSION CONDITIONS Page 2 Shoppes ofWoolbnght PCD - Food Court File No MPMD 98-002 DEPARTMENTS INCLUDE REJECT 4 To be determmed. /bme s:\projectslcond of apprl LJEVELOPMENT DEPARTMENT MEMORANDUM NO PZ 98-152 FROM Bulent Kastarlak, Director of Development Steve Gale, Fire Marshal Kevin Hallahan, Forester/Environmentalist Officer Robert Riggle, Police Department Clyde "Skip" Milor, Utilities Dept. Chief Field Insp Michael Haag Building Code Permit Administrator Ken Hall, Engineering Division Larry Roberts, Public Works Director/City Engineer John Wildner, Parks Superintendent John Yeend, Engineering Division ~~lC, Tambri J Heyden, AICP Planning & Zoning Director TO' DATE. May 13, 1998 MASTER PLAN MODIFICATION RE. Project - Shoppes of Woolbright PCD - Food Court Location - East side of S W 8th Street, north of Woolbright Road Agent - Bradley Miller File No - MPMD 98-002 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments to the Director of Planning and Zoning no later than 5.00 P.M. on Mav 28.1998. When preparing your comments, please separate them into two categories, code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval 1 Use the review standards specified in Part III, Land Development Regulations, Chapter 3, Master Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments 2. The documents submitted for the project were determined to be substantially complete however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Michael Rumpf 3 Each comment shall reference the section of the code that is incorrectly depicted on the documents 4 Technical Review Committee member(s) shall identify in their comments when the plans depict or Page 2 Shoppes of Woolbright PCD - Food Court TO TRC Members RE Development Department Memo PZ 98-002 when the location and installation of their departmental required improvements may conflict with other departmental improvements. 5 When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified 6 If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to the Planning and Zoning Director The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process All comments shall be typed, addressed and transmitted to the Director of the Planning and Zoning Division for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum Michael Rumpf will be the Planning and Zoning staff member coordinating the review of the project. Planning and Zoning staff will send the applicant a cover letter which includes the comment(s) and directions to amend the plans to comply with the comments and the procedures for resubmission When Planning and Zoning staff receives the amended plans, we will distribute the plans with a cover memorandum to all TRC Members for review and approval T JH bme Attachment XC (Memo Only) William Bingham, Fire Chief Marshall Gage, Police Chief John Guidry, Utilities Director Don Johnson, Building Division Sebastian Puda, Engineering Inspector II Central File S '\projects\Shpswool\Food CourtlMPMD 1 slreview-plans February 8, 1991 7~ ~ ~.J!fr~_ 1~~ ~. ~ , J~ f'f1l ~ BUILDING DEPARTMENT MEMORANDUM NO 91-48 TO Technical Review Board Members THRU Don Jaeger, Building Planning Director Admin Coord of Engineering Fire Chief Police Chief Utilities Director Public Works Director Parks & Recreation Director and Zoning Director~~ Christopher Cutro - Vincent Finizio Ed Allen Ed Hillery John Guidry Bob Eichorst Charlie Frederick - FROM Michael E Haag, Zoning and Site Administrator RE ISSUANCE OF CERTIFICATE OF OCCUPANCY Safety Kleen Corporation 1510 Alpha Drive Quantum Corporate Park Roepnack Corporation The above referenced project is nearing completion Prior to the Building Department issuing the Certificate of Occupancy, I would like to ensure that you do not have any outstanding or pending issues concerning this site that must be rectified (excluding issues that are covered entirely with a city approved surety) If the issues are related to permits issued by the Building Department, please provide this department with the permit number and nature of unresolved issues If the unresolved issues are not permit related, notify the owner or the owners agent to ensure that the issues are rectified please respond to this office within ten (10) days so that we may proceed to issue the Certificate of occupancy Thank you for your cooperation and timely response Scott Miller Don Johnson, Inspector Kevin Hallahan, Forester J Broomfield, Comm Imp Bonnie Hall File SAFTYKLN SDD 1Q-~ FE8 II q I fMAt,,, " V/IVG D EPr. '\ ~ 5A-Fe T Y fr[ E E IV CD [JrAFF~R- l>.siArs ;fe-o)Jt<. oH/,f L ({ k~J10,vJ ;J If Jr zA-j(j) 0 VLS Ii /r If: /< j:A-cs ;<;:5 po )JSr:: ?L ~/V J( 1";;;(;2 (4.~Rr<::L - 10 1Jr-1.-- co)VT*:r Pit /:.JIr <9 F 5~R A-cze ;tiC E;f-S C f) -5" J - o+~/culr-(~fi- SC5r>/rJ<IrTo~!<.t::Q rA.FJ(~[) f~/< sr('J~Jtw~/~-=;e ;2UJvo ~ (firRf::J"N(i A-R~ASJ ,RV\Nw'-+YS>;RJf--J'{f-) j)ocf:~ -m.+ksf~eR. Jr-;2J.>ts)CP-/5J 5. ~E F:r( wr;{ (Jo[3S fc-+)/ CO/ijJc y: ? J .- f~)/It--)j C+kL Rf35foNs-fB;rur- 7 /),0.. -:> ;)/35+fA..Nr-OPf:)(/"j;p:;AJA-L 'YE/t5(,{ICf5s To (oA./K:;:-;V fl-ND /); J2 ~cT co/vi-fr-.Ili':;rJJA:-/f:: fj.sC(~FA-ct: /2 fA A/O P= r;:: A- w Jr- f ,F)2 0/'1 j;Jo)J D'!:'J c A->>A-- CSJ E)L. ~ e~ ~ -,. - :3 .~ j);<or!:c'r /0 }fJSelA-U(~BQu.:r-J:I5AEkt.s or::: ~ /~ ,./- ~ It f '__~~ ~\.1r~ L.../~.- .4}_ ~,' 1 "::" , ~j , L_ 1..L ~ I )/rFET'l kLEcIV _7a.~k f~vM . r (' )1 /\)1) ~ I A f/ l 'I. V'- J~ > "'- ~ " ,,~ ~_J "" c Vv / J: / '- /u {<TJ VL f "-I VI me t1 r f\. ~.(/ ~ ~ L ~," "L.r c- S / <) \- "J~, Q ~ V <( · '" VL~ 5 I (v - v- fJ ~ ~c C1 fA f. · ~ :J ). C !/;: I 5 , · 'lJ ~: C 1/ Jr ("f I U lA/,' r 6 ( ;C' ( () >'l J " / (' 0 V\. 'I. / vt IN!. (' VL t f VI ~ /' ~ l..! "- ~ J./ <. [ (' I< I Y- 0 J.- L It o J5:t (..l ~J c/JJ{ovw< t. C ,< (.' ~ ;- leo, H ~ '--" ~ I . . , , c L ~ (~c (s {/U ~ ,,<- h (~ .' c- ~ f- [/" t ~ ~ fc ~, ~ I ) J r r' I -t V 0 I \d' l<:.- L 1 ^ < ~, :J 0" - >,' 'I- ~ STAFF COMMENTS SAFETY KLEEN AT QUANTUM PARK NEW SITE PLAN Building Department See attached memo Fire Department Memo to be distributed at meeting Engineering Department See attached memo Utilities Department See attached memo Police Department See attached memo Planning Department See attached memo Forester/Horticulturist See attached memo memorandum To Carmen Annunziata Planning Director Date January 3, 1989 Subject SAFETY-KLEEN SITE PLAN APPROVAL From Mike Haag Plans Reviewer Building Department As a condition of site plan approval, the following comments should be incorporated into the related documents by the applicant 1 Raised seal, signature and date of architect of record for the project required on the plans 2 Project to be reviewed by County Health Department approval Provide letter of 3 Require letter from South Florida Water Management District stating approved finished floor elevation of proposed building 4 Identify on plans height of flag pole drawings of flag pole support Include detailed construction 5 Show on plans elevation of door entrance stoop and slope of entrance side walk Must comply with handicap code 6 All signs must comply with the overall approved Quantum sign program 7 Show on plans detailed drawings of dumpster enclosure 8 Provide letter of approval from appropriate utilities in regards to erecting fence within easement 9 Building and appurtenances drawings to be designed in compliance with Standard Building Code 1985 Edition and all other applicable codes and ordinances The applicant's prompt compliance with the preceding comments will insure a timely permitting process ~~- _J mh eaf cc E E Howell BD12/88 TRB MEMORANDUM DecP'.."l ~~ 3 ~iltl To Jim Golden From Bill Flushing Re Safety Kleen at Quantum Park 1 The storm drainage inlets should not contain water so aE to create a mosquito nuisance A 12 inch mesh covered cpening should be provided in the bottom Three cubic feet of 3/4 inch wash roch should be placed below the cpening 7i:t1iL;":j Blll Flusnlng cc Tom Clark MEMORANDUM Date Carmen Annunziato, Planning Director Cl \ John A Guidry, Director of Utilities 1,)v~ December 30, 1988 ~ To From Subject TRB Review - Safety Kleen at Quantum Park - Site Plan We can approve this project, subject to the following conditions 1 Add a gate valve just east of the fire hydrant tee, which is to become the City s control point on the fire line 2 Indicate utility easements over the water main to include the fire hydrant, meter, service line to the meter, and final gate valve just east of the hydrant assembly 3 Indicate a double check valve on the building side of the City s gate valve Double check valve shall be a Watts, Febco or Hersey model 4 Indicate a reduced pressure backflow preventer on the domestic service line, to be a Watts 909, Febco 825Y, or pre-approved equal 5 Specify type "K" copper on the water service line from the main to the meter 6 All sumps within the building shall be self-contained, with no outlet Provide sufficient details on the plans to illustrate this dmt bc Peter Mazzella REcrIVED '.\ !; ['-Ij. , __;:>T --------- - MEM()RANDUM TO DATE Mr James Golden 30 December 1988 "ILI: FROM ~U.JI:CT Lt Dale S Hammack Safety Kleen As per our discussion at the Technical Review Board on 29 December 1988, I am recommending the following 1 Comply with the city's construction Security Ordinance &{)aU~~ Lt Dale S Hammack DSH/cgm M E M 0 RAN DUM January 4, 1989 TO CHAIRMAN AND MEMBERS PLANNING AND ZONING BOARD CARMEN S ANNUNZIATO, PLANNING DIRECTOR RE SAFETY KLEEN AT QUANTUM PARK-STAFF COMMENTS FROM With respect to the above, please be advised of the following staff comments 1 All applicable requirements of the document entitled "Hazardous Materials Contamination Response Plan" prepared for Quantum Park in accordance with the issuance of the Development Order must be complied with A note should be placed on the site plan which states the above 2 An appropriate sign should be placed on both sides of the pipe bridge which indicates the clearance for this structure 3. Full details on all containment structures such as curbs, trenches, sump pump, etc to be provided 4 An Environmental Review Permit must be issued for this facility prior to the issuance of a Building Permit. 5. If the existing native growth within the Boynton Canal is removed at some future date for maintenance purposes by the South Florida Water Management District, the proposed landscaping will not be adequate to screen the industrial development from the single-family neighborhood across the canal to the south The proposed plantings should be modified to provide for an opaque buffer in the future, should the native vegetation be removed The City's Comprehensive Plan recommends that maximum buffering be provided between industrial and residential uses through the site plan review procedure 6 An additional twenty (20) feet of landscaped area must be provided within the Boynton Canal right-of-way to meet the forty (40) foot wide greenbelt required by the PID zonings regulations. 7 Buffer wall is required I"- c~s ANN~ CSA ro cc Central File M E M 0 RAN DUM TO Carmen Annunziato, City Planner FROM Kevin J Hallahan, Forester/Horticulturist DATE. January 3, 1989 RE Safety Kleen At Quantum Park - Site Plan Lot 46B The applicant should provide additional landscaping to visually buffer the site in accordance with the following. (Code of Ordinances, new subsection Page 615) 1 A vegetative buffer shall be preserved and/or planted, so as to provide a screen with not less than seventy-five percent (75%) opacity and not less than thirty (30) feet in height, within five (5) years of the date of approval of the particular plat or site plan _X~.4('~-~ Kevin J. alIa an Forester/Horticulturist KJH ad DOC.SKLEEN REVIEW COMMENTS (MEMOS) AND DATA STAFF COMMENTS SAFETY KLEEN AT QUANTUM PARK SITE PLAN MODIFICATION BUILDING DEPARTMENT: See attached memo FIRE DEPARTMENT See attached memo ENGINEERING DEPARTMENT: See attached memo UTILITIES DEPARTMENT See attached memo PLANNING DEPARTMENT See attached memo /:J;~.r.::,: w . .~ ~} ;;.t .Jjr. ......~ ~/,.,; ,~. T1"~9,:~/. 1- '~. rr i ,."')i . ~f,l.:.; ;1 :W:ti~, r <.t'4i::. 'J. 't, , :;.'(Jt;.,j' {t ,'~r .~ . :., 'J 4:.~}~J ;; ~t ",,~,), .J. "::t, 't, \ --'-..~- =~:~, ....~.. ~:":"f..&..:...: MEMORANDUM September 6, 1989 TO: Carmen Annunziato Planning Director FROM: Mike Haag Plans Reviewer RE: SITE PLAN MODIFICATION - SAFETY KLEEN The following comments must be satisfied by correcting and/or clarifying existing drawings 1. Show on plans a full section dra~ing of the site wall. Drawing should include a description of all materials, type, sizes and spacing required for structural integrity (include finish material and color). 2. Show dimensions of the site wall from all adjoining property lines (min. 2 feet). 3. Show on the plans the finish floor elevation measurement of the entrance door to meet Handicap Code requirements of 1/2" maximum difference 4. Show the dimension of the proposed free-standing sign with a minimum setback from the property line of 10 feet. Sign must not encroach into easements. 5. Show on the plans the 40 foot peripheral green belt in compliance with the overall required P.I.D. perimeter green belt. 6. Show on the plans that the future expansion area will meet the Landscape Code requirements for lawn grass and irrigation -/~ p /-4- Dike Haag MH: bh XC Don Jaeger SFTY TRB ./ ,;~.~ ., :.,; J j. 'y l~ ._ ;.~,.",f ;J.J. '.I: ""J,; ~>:- J.__ t.. J ~:,r : :::.;;/ \. ;:( ... ;.. ~.. .... TO Ffi.OM RE .( 1- Move fire hydr3nt, shown ne,t to the building, 3t least 201 aw~y from th~ building -J.; '\ ~ - :15 .< ~. ,. 2- ~ince ~~fety kleen owns the lots 3nd connects between Alp h a and 8 Eta D r' 1 v e s, ::;1 P 1" i v '1 t e t i I' e 1 i n e s h .3 1 i b e con s t r u c t e d to connect with fire lines on those two streets 'i,:;- iL~'). 'Y,~' i.;' ii'. ~_ .. .f :.. ,~~- ~";~;.f..,. ~~1r "{ ~';~- .~~~./. Jl~' l. 3- ~hould :3fety Kleen requir& security g3tes the follwing standard for security 33tes shall apply J. ).. "f," !' .$ ~r.;I. .,;. . ~i :;.1: h ~-:..i '1:;..:~, ( P,' .J.. ,t'*~ ~ F To' .,::"- (, ,I. ~; ).. ~1rY. )1. ~1';';1 I :~";"di: ~: i<<;;r "i. I~.;;\'" ~~'-#"",;":::r_ ~" ~'~l .~5:t .~. f' ;5fW?; ~::- ~i. w!.J#~'~ .~ ~.,. '-"'I.'" '1:"" -',. .~~:~C~"Ji~>2.:;~/ ~~~ ~: f F_;:~{i'l'n. . ~~. .'t.J... ~, ~. -" ":~:"# J;'"?:il ,. .< ?eptember 7, 1989 MEMORANDUM lim Galeen, P13nnin~ Dep3rtment ~ w D :~v~n3u3h, Fire Dept -TRC Rep ~afety Vleen ~t QU3ntum Fl~ce 1- Gates shall be openable by telephone, with a call from Centr3l Dispatch Center 2- When the gate is opened by the call from Central Dispatch, it shall remain open until the emer'gency is over, at which time Centr'3l Dispatch will be told, by Otficer in charge, to close the gate 3- In case of a power failure the g3te shall open autcmaticEJll Y 4- Appropri ate "Hol d Har'ml ess" ,::tgr'eement r'e gates equipment, Ate damage to II ;; ~ ~'.;.\. . '''\' ;j. ~f.(- :, _, ;~;h.. ,. ,/~ . . :~t ~6i'~ (~~ ;,<<~~, . -'~/:f 1:k I i i I I ~ ~ ;s .;;. (.:: :~ ~; MEMORANDUM September 6, 1989 TO Jim Golden Senior City Planner VIA Ann Toney Acting Engineering Administrator FROM I Roger Kuver Engineering Inspector RE TRB Comments Safety Kleen at Quantum Park 1 Parking lot light poles need an imbedmept detail and an Engineer's note certifying the structures will withstand 120 MPH winds per Article X, Section 5-142, 5-144 2 Revise handicap striping detail by replacing the letter "Hit with a standard wheelchair symbol 3 Handicap ramp detail is required 4 Provide a signed and sealed survey from a registered Florida Land Surveyor that is no older than six months Section 5-l44(b) I 5 Driveway approach radii are not indicated on plan Minimum standard is 25 feet and must be shown on plan Section 5-l42(h) 6 Provide drainage calculations by a Florida registered Engineer that meet the requirements of article X 7 South Florida Water Management District permits or exemptions are required ~4 - F:I.../ck I I I ,. {" i1! ~. ~:: i~., 1~I~J.t~:~. ~.;:..4 f $_ r~ #}t.~f;Cs!-.t.~ '.!- ;_..~. '~X~'J);.~$. ~'li 'f .~. ,<:~. ':'.!5' :(..}t':~i., ~ .'.;:. ~ ..;y/.z.;~~, 'l:. i'" ;':l:~:l-Jj..&.;. ;.o,oo;~' ,,,,:' . .~ 7,).r. ~:~:r' ~?:l i' . ->.....,.. M -].i-/.' ). i )~. :'*;?~ I Iii '~i~ ... ~. ~~..f(:;SJ~' :}~. '~~ J;~l I 'I~:;l "i.:.'-'_ :':i.';-":"'f ~o/,~?;.4~.f.'.~~ ... ;-::::.' . ;s;/i~4~. .~~~#. .~ ...'.f.JJi..t.~..~. ~ -'yir'.~;t:_~ ~~... ."...:':- i.-'~.!)~,~f. I~~ ;:<"1". MEMORANDUM TO DATE September 6, 1989 FROM Carmen Annunziato, Director of Planningc John A Guidry, \ft\. Director of utilities r SUBJ Safety sion TRB Review - Kleen Site Expan- We can approve this proje9t subject to the following conditions 1 Provide fire flow calculations~ including an allowance for domestic usage at park build-out, in support of the water distribution system design I 2 Relocate the fire hydrant away from the building, preferably to the grassed island in front of the building 3 Relocate the double check valve assembly to a point downstream of the City's control gate valve on the fire line 4 Relocate the water meter to a point closer to the water main, in a grassed area cmd xc Peter Mazzella r MEMORANDUM September 7, 1989 TO Chairman and Members Planning and Zoning Board FROM: Carmen S. Annunziato Planning Director Safety-Kleen Site Plan Modification Staff Comments - File No 297 RE: With respect to the above-referenced request, please be advised of the following: 1. Since a final sign-off for the original site plan approval has not yet been received, previous staff comments not addressed with this submittal shall remain outstanding. 2. This use has been reviewed by the Environmental Review Committee, but the environmental review permit has not been applied for through the Planning Department and will need to be issued prior to issuance of a building permit Once the environmental review permit has been issued, any changes to the use, such as the future expansion, will necessitate an amendment to the environmental review permit. Appendix A, Section 11 3(C)15 3. Label the colors of all structures, including the buffer wall, on page A-3 of the elevations. 4. Add a note to the plans that the parking lot lights along the buffer wall shall be shielded from the residents on the south side of the canal so as not to create a nuisance. Appendix A, Section 4(N)7. 5. The building coverage indicated on page 3 of the site plan application and sheet SP-1 should be amended to reflect the gross floor area of the building footprint of 17,008 square feet. Appendix A, Section 7-H(7). 6. The total industrial square footage is 11,344 square feet and the total office square footage is 8,100 square feet based on the floor plans submitted The gross floor area of all the buildings and structures is 19,444 square feet. These figures should be corrected on sheet SP-1 and page 4 of the site plan application. Appendix A, Section 7-H(7). 7 Based on the square footages in item 6 above and the parking requirements established for combined distribution/ware- house/office uses at the Boynton Commerce Center P I D , this use would require 41 parking spaces calculated at the rate of one (1) parking space for every 800 square feet of gross floor area for distribution use and one (1) parking space for every 300 square feet of gross floor area for office use. The parking rate applicable to this use has changed since the original approval as the percentage of floor area for office use has increased above 25%. The parking calculation should be amended on sheet SP-1 and page 4 of the site plan application. 8. Provide details of the curb containment area adjacent to the tank farm building where trucks unload and load their contents. Appendix A, Section 11.3(C)2. 9. The percent containment of the diked wall surrounding the storage tanks should be indicated on the plans. Appendix A, Section 11.3(C)2. c~! ::::t!:/fJL TJH frb SKleen :.;, } ~ 'I ~ .,-..... 1Ft- : ~~~,. .'~ ;irJ:., -~. r,.$ ~'::~~J: ~ .~~: :.. .-~~i: <#l:' '(< ? So ~. ;N ~ 0$;: ~. l~. ~ ... ~ .-' .. J:i- . J :.,... .. ,V- ;.~t '; ~,... .~<< ~ .\?;: ~. : Y;" ....~~ '("- ,'.v s.~', "Yl" ... ,?, ;j ~ x. J... t ~ ~ ~.L. 1- f x: r: f ~ }111 ;~ ) ;$ ~.<% ".;{' 4- ~~~: // '.~~,i2 "Ii- ~ .,~W? ::"~;6 -'.. ~lD .~ ; I: ti titi ti titi Ii lilititi titi iiiU -.{" . .. . U 0 .... u ;-I~ 0 -f".-.' :.: .. ..... ....~ i .~.. .... .il..... a .. ~'-.; o i -.1 .. 2 l~~~. .; 0 ~. :; 0 ;~f( :1 ~ <;:1: i! ! Alii I ~.~.' ii I "111 ~. I.. ,..... '..... "fS. fn':~'I!~ ..IJ.I :il~ ~. I ~. :j ~IZ r It ':'7: ;;1 ~i I '\.. I .:: !''''~I I "'i.1 !l!i -"1.,; ::... .1 CIlI co. ....... It) , N: ...... CO ~ . i. I " 11 !d I~ ~ '.JOJ I SiH ;::~ ... 'r:' ... z VOllf01.::1'H:)VlIB NOJ.NAOB ')lIlYd W,"J.NVnO ... Cl ~31.N3:> 3:>IM~3S N3:11>l-A1.3:fVS ;~oa!Q.Jd ::~ i?j ...0 , ~ I i i ., ! ,i ;10 ~ I ~I . .; ) i I ......- / , / // / I." .. ~~ :1' Ii;,'- : '~l i 1 ~f~: ,"'fll I 1.1~ "511'~ ~ li ' oil 1;J. ! : ~t . 1j,! .~H;l \ n. 1 J I .' ... {Hett I Hlill tU.eo g!l~1 &!talu ", 'Nlon 'NOIUM04MOO NI.,lI-UJlYl 1 ~. .- .... I.' · 2 ,: ..., I' 'i -i ~ 1m ~ h.~ ji ~. ~ ~I i' !, 'I !i'~~ il :!il-I. ~i! I:~! ~II~I ~I iI II i:fii:5 i;!;! I;I~ ~;. ~b. in ~I is I ~~I i 'eIIQI~! ill;! M. !i:1 =i:d ~2' Ii - ""-. ".. 'I .._on '.S I_I - ias. n~ iil' 5 .!~ ~ "1-):;: I~~~; 1:=;11 ililll'.~i i'~ I: .1 s;!; ~~i! I! lii:- !~~! i~a i' I Ii;! ; .:, ;1' II!I !~ 15.:r h. lid!. nli !u ilil,1 il,11 In I!i i 1;1 idd ;Ii i.Hh iliil m ..iUd:. ...I ...c 01 .... .: ~ ~ ~. --.-+ _. lI^,~Q Y:~~B ~'. J r~ -, - - - -..., / . .~ I 10' / .~. " ,/ o' 1 ::~ '" '- --\~ : m f m I:L --~~ *~--~~-: I ::l 1, I .J 1~i1 I ____- 3~,a I 1;<1 .ii. I .I:' .. I i ,li', '\ ...... ~f 'ff:- " ~ l~ ~(.) h ---- .-- .., I --L I I I . . . . 5 . i, t i I ".. ii .,....-T:'. . ._~........ .._,....." ,. i^,tlO VHd'V ~~ ! 1,- "'" ... . :~. ....~.. ..J C Z ---c. I). .~: ~:: ": :::: \i .Ii i S. i :;;:io so . :i ;_ c ~: ~ ~! I) ;. z ". o ;.. i_ i! ~ !E !~, il (i Ii I!:' ; ~~ IH;qml s ~ ~ H ~i l~ Ii m; iii u. U! u' u!:; WIt ::.::.!... ;"ii ii _!!u lit.. It ii!n f~ lUll : , I) ci :i ~ "- en HtD=r, ',. 1 i';': ill e ~~: '" .., I II ~I I ':;;1 , - r LC ~ATION MAF SAFETY "KLEEN AT QUANTUM~, .p"A8K ~"'(~~~;'Q' ." j~.'.._.,,-- :C:e:l5~ .. ~ =--.. ,_ . .' 00-'''...'-.-., . . c;:;:.."\. -woe , I ~~. ~l'l .. r- l. . . ....-..~::.;.-l. . . '\ 'j :.. '''c I ! 'I oooc:lP"C l.~ · n.l .. __ .. , .' :. -,. I .' I I , .. . , . ,I'. . '. . \ ,I:' , , I , . . ..' .t. l.,';..~ r.. , . It' \ ':,', rc,,'.~'~ -.0. I, /I ~~)T-~w III ~:J~ - . .......::::....... -......... .... .... M;c.. ........ ... .... .---......,......-. --~--........ t ~~~.oc:..:n&i:r2~..J.:lv..,: ~i,,~f ,tl":." 'J~''''~.u:.:t~...wut ';',... """. I .. .. . ..- · ...:;r-'''' 1M 0 -.-. -.- ........ .... .... , -..,-. ....... I. .......... . .. . r --,-. ...- , , -- ....-}- ~-" ... .... ... ..... 1'1 ........ .... . ...... ....- . ...... ..... .... ... .............. -- - " ""0 \ - ,- ..- - . '. M .. , I . I Ovantum Assoclates nT Ar.DAM "R" ~~~::,~'~c:.~t~..- . -- -- ....... "...... ...... - --... -... ........ 'j M" ~=~'1:.-=-_-t..~ ~M .=--=::'~~ ./.;.', ./ .,. ';~-t... . .,' ,"~.f'~ .. ,. '~''''\ ," .. I .:J'~"'t'" to ...... t":'..~_ ':.:. .~"":.~~-.:....! ,.\l 't '''. wi , .- fLANNING D E.P, I-se M;~ zJl~~ - ~ ~, SPf-i '/ .~~%~~-~%_~ ~-~~~~./~~~ ~~.-~~~ $ ~, ~~~ -;-~ / '!fBi' ~ :If CY'T' ,"" / {hG t1.- /~ V ' rltt ,4~-;j (?-). -r. - ~ I 'h- ~ eC1.Gt\ Z el111&jtes 11~5 / Idrfi~.~~,~.&k /~ ~ a Su 1-;-1 -{1)~ (~h ') ~ [91A (Ot9t.9 f-J GF:A~ t,v11J ~ -" . " @!5' It.-QcD "If / 7&"(:;)' ~.... . s 7~ == 3' - ~ ~ . _;2t1.3~~Ht1iC~..... ~oll.:f).F8Cc . 3€r7 J ~'I~tr 'fJ!, /, t' ? -3 b -fr; -/1;../' {6 l?o 0 .fflJo r I r 3 (..~ 'r;;: (J ~~ ~ -J 2- ~ ~~ j~~ '{.f-:o~ I ; ~i-4 G / --.r g l ~ /q 14<<-I{:1~ ~~.G 0 ,~, - ry :1L 0 C) 3,,-40 '11W?~ /! 1 ~ 'Y? w<> 0 ~~ F -iL/' ..l~Tf<!r:z.. vuPC / ~ ? J tF r tL ~ (~f/#p ~F'~ % 130. ~r % ,&>-~ <he ~~ a-'L€~ 'i- ./r; Y3bI/J A d_ ~ ~ /~'- ~3 e~c.. f7:J sJ ~ t;&Jyre.dif-+ p~ sP-Y ~ ~;l-;}- ~(. ~ d-. - d.r (; ) ", /~~~-o/jp~ (!J:36~ ~~ ~ ~ ~~ ~ ~,a0(R-1: c-/~ ~ h~~ tiff Ji/yff<: ';f (N) 7 tL ~ ~ ~<<tdd- ~ &-rL. /;; ,4- 61 'If ~~ t.~'-u~~ ~{ It? bj{ef/ tJf(? ~ c~. ~ ~_ y~ .! - aMr~dv 1 ~7z!4-- (j[)Ai · ~ - - · vs~, & f_ '~~~ ~ df~/'~ ~ ~ ~~ ~~? \.\l\fv 1;;2 ~~ ~'* ~..' ~ C!L11 (&vt,-:a:- ~ {q-(l(/~ (;:; ~ ~.- I~~.~ (P' ~. -- r4 AJ.l .,)/u ~. . tl.cfi2 - ~ 1D ~~ fer - ~ - Vl~ IS. ~ h~~~~~:C? ~ jj I .~u.d- ~ -IAf7J/J L L-.A '" $e- 9 / J .. ~~ . 1. ;' - .,.,. . '-'V ~ - Y7J ? C J-(- I .~ t ( ir~. Qu.b-1~_~_ trY A fed 1/,4 10 / ..' .- .? F(/V-- (Oc~-htn1 /'5 /~r-r~1/~ iJlnn~c( ~ . . ( I 7 - (11 is !Jfll ~~~1 -- ..----- . ()~ 4".~ #~vk~ 6, v. ~ fu~ f-- a-erz~ Ih- ~61" "'- tu1-:UMAI\L kfv --- ~ !iow~