Loading...
CORRESPONDENCE DEPARTMENT OF DEVELOPMENT PLANNING AND ZONING DIVISION . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment December 11, 2002 Mr Robert J MotchkavItz, DIrector of Development PremIer Gateway Center at Quantum, LLC 2100 Park Central Boulevard, North / SUIte 900 Pompano Beach, FL 33064 Re Quantum Park - Premier Gateway Center - Dumpster Relocation and Fence (Outdoor Storage) MMSP 02-066 Dear Mr MotchkavItz In response to your request for the admmIstratlve reVIew and approval of the modIficatIOn proposed to the above-referenced, approved sIte plan, please be mformed that the proposed fence for the outdoor storage and the relocated dumpster as shown on the revIsed plans date stamped 12/11/02 are "mmor", as defined wIthm the Land Development RegulatIOns, Chapter 4- SIte Plan RevIew ThIS project may contmue to be processed by the BUIldmg DIVISIon as a permIt apphcatIOn subJect to the followmg condItIons 1 The dumpster onentatIOn (angle) must be approved by the Engmeenng DIvIsIOn, 2 If the scope of the project demands removal of plant matenal then such plant matenal must be relocated to an area subJect to approval of the CIty Forester Be advIsed that the proposed changes may reqUIre a modIficatIOn to the bUIldmg permIt. Please contact me at (561) 742-6260 If you have addItIOnal questIOns. . Smcerely, IJ ~!A .:DddJ LUSIa Galav, AICP PnncIpal Planner Cc Karen Mam, Plan RevIew Analyst Enc Lee Johnson, Planner S:\Planning\SHARED\WP\PROJECTS\QUA~UM 1000\LOTS 32 38\!\.1MSP 02-066 Dumpster Relocation\Approval Letter.doc City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310 Phnn,:ao tAA1\ 74'~~AA . ViNIIW ri Mvntnn_Na.::IIrh flller. DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO 02-237 TO Eric Lee Johnson, Planner, Planning and Zoning ill ~@~DW~r;) 1 ~ I nF"r.-2m i~ i PLANNING ANIl ZONING m:P11 FROM Laurinda Logan, P E., Senior Engineer DATE. November 25,2002 RE Standard Review Comments Minor Modification -1st Review Premier Gateway Center at Quantum Park File No MMSP 02-066 Per your request I have reviewed the above referenced plans, forwarded to me on November 22, 2002 regarding the proposed minor modifications to the site plan for the Premier Gateway Center at Quantum Park. Public Works would like to request that the dumpster enclosure be rotated approximately 300 to allow for a more direct approach by the front-loading garbage truck. Otherwise there are no objections to the proposed modifications to the site plan Please let me know if you have any questions, or if I can be of further assistance LUck Xc: Jeff Livergood, P E , Director, Public Works (via e-mail) Michael Rumpf, Director, Planning & Zoning Lusia Galav, AICP, Principal Planner, Planning & Zoning Pete Mazzella, Assistant to Director, Utilities H David Kelley, Jr , P E.I P S M , Utility Engineer, Engineering (via e-mail) Glenda Hall, Maintenance Supervisor, Parks Larry Quinn, Solid Waste Manager, Public Works Ken Hall, Engineering Plans Analyst, Engineering (via e-mail) File S'\Engineering\Kribs\Premier GaewayCen1er @ Quantum Park, 1st Rev doc PREMIER GATEWAY CENTER AT QUANTUM, LLP 2100 Park Central Boulevard, North/ Suite 900 Pompano Beach, Florida 33064 Tele 954-971-9500/ Fax: 954-969-5582 e-mail Bmotchkavitz@PremierCommercialRealty com November 13, 2002 Michael Rumpf, Planning and Zoning Director - SENT BY HAND DELIVERY City of Boynton Beach 100 East Boynton Beach Boulevard Boynton Beach, FL 33435 RE Request for Administrative Approval of a Minor Site Plan Amendment Relocation of Trash Dumpster Enclosure Tenant Improvements for Buchanan & Associates - 1143 Gateway Boulevard Quantum Business Center - Building No 1 (1101 Gateway Boulevard) Quantum Corporate Park PID, Quantum Park DRI, Boynton Beach, Florida QUANT1 BUCHDUMP NV2 Dear Mr Rumpf" I am writing as authorized representative of Premier Gateway Center at Quantum, LLP (formerly known as Quantum Business Park L.C ), the owner of Lots 32 through 38, Quantum Park PID, Plat No 6 - an approved industrial development containing three buildings with a total area of approximately 336,050 square feet) Please accept this letter and the enclosed documents as our request for Administrative Approval of a Minor Site Plan Amendment to allow for the removal and relocation of a trash dumpster enclosure in the truck court area of Building No 1 On April 18, 2000, the City issued a Development Order (NWSP-00-001) authorizing Site Plan Approval for the referenced project. On May 2, 2002, the City issued a Certificate of Completion for the base building construction of Building No 1 at the subject property' an office/service industrial building containing a total building area of approximately 142,202 square feet. Global Construction Associates, LLP has submitted a request for City Building Permit approval for the referenced tenant improvements in Building No 1, consisting of a total of approximately 15,000 s quare feet. The proposed tenant improvements include the construction of a fence enclosure and outdoor storage area in the truck court area in the rear (i e. north side) of Building No 1 Since the proposed fence/enclosure is in conflict with the existing trash dumpster enclosure, we need to provide for the removal and relocation of said dumpster facilities The new dumpster will be exactly the same size and details of the previously approved and constructed dumpster - the new dumpster location is within close proximity of the building and the dumpster to be eliminated, and is fully accessible by collection vehicles The proposed location of the dumpster enclosure will not be visible from Gateway Boulevard, and the front of the relocated dumpster will not be visible from Quantum Boulevard any existing landscaping that will be impacted by the new dumpster location will be relocated/replaced to create an appropriate screening along the rear and sides of the dumps lIy-consistent with PLANNING AND ZONING DEPT Michael Rumpf, Planning and Zoning Director - City of Boynton Beach Request for Administrative Approval of a Minor Site Plan Amendment Relocation of Trash Dumpster Enclosure Tenant Improvements for Buchanan & Associates - 1143 Gateway Boulevard Quantum Business Center - Building No 1 (1101 Gateway Boulevard) Quantum Corporate Park PID, Quantum Park DRI, Boynton Beach, Florida November 13, 2002 Page 2 The relocated dumpster will not extend over any public utility easements, and will not interfere with the operation of drainage or any other utilities The relocated dumpster will not reduce the amount of parking or loading areas required for the building below the minimum amount required by Code, and will not restrict or inhibit access from any required emergency exit from the building The relocated dumpster will not conflict with other existing uses at this project. For your use in processing this request, please find enclosed the following materials a A check (RJM) in the amount of $10000 as processing fee, and, b Four signed and sealed copies of drawings illustrating the location, dimensions and details of the proposed dumpster relocation Thank you for your consideration and prompt processing of this request. Please do not hesitate to call me or send me a note bye-mail or facsimile transmission should you have any questions or require any additional information regarding these matters Respectfully submitted, PREMIE GATEWAY CENTER AT QUANTUM, LLP By: Motchkavitz, PEl Director of Development cc. Tim Large, City of Boynton Beach - no enclosures Stephen S Raskin, President - Buchanan & Associates - by facsimile transmission Joni Brinkman, WLA, and Jaime Mayo, CGA - both with no enclosures Ted Klein, Esq , Mirti Murray, Dave Miller, Toni Padron, and IIEIJIS, all with no encl PROJECT NAME Prem i Gateway Center LOCATION Lots 32-38 ( Building #1) PCN I FILE NO l\tIMSP 02-066 II TYPE OF APPLICATION I AGENT/CONTACT PERSON O\VNER. Premier Gateway Center @ Robert LVlotchkavitz, P E Quantum, LLP PHONE 954-971-9500 PHOl\"E FAX. 954-969-5582 FAX. ADDRESS 2100 Park Central Boulevard ADDRESS North/Suite 900 Pompano Beach, FL 33064 Date of submittal/Projected meetine dates SUBMITT AL 1 RESUBMITT AL 11/13/02 1 ST REVIEW COMMENTS DUE N/A PUBLIC NOTICE N/A TRC MEETING N/A PROJECTED RESUBl\lITTAL DATE N/A ACTUAL RESUBMITTAL DATE N/A 2ND REVIE\V COlVll\tlENTS DUE N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS) PLANNING & DEVELOPlVlENT BOARD N/A MEETING COMMUNITY REDEVELOPlVlENT N/A AGENCY BOARD CITY COMMISSION lVlEETING N/A CO~llVIENTS Dumpster relocation S ,PlanningISHARED\WP\PROJECTS\QUA;\;TUM 2000\LOTS 32 38':Vl:VlSP 02.066\2002 PROJECT TRACKING INFO. doc