December 11, 2002
Mr Robert J MotchkavItz, DIrector of Development
PremIer Gateway Center at Quantum, LLC
2100 Park Central Boulevard, North / SUIte 900
Pompano Beach, FL 33064
Re Quantum Park - Premier Gateway Center - Dumpster Relocation and Fence (Outdoor
Storage)
MMSP 02-066
Dear Mr MotchkavItz
In response to your request for the admmIstratlve reVIew and approval of the modIficatIOn proposed to
the above-referenced, approved sIte plan, please be mformed that the proposed fence for the outdoor
storage and the relocated dumpster as shown on the revIsed plans date stamped 12/11/02 are "mmor",
as defined wIthm the Land Development RegulatIOns, Chapter 4- SIte Plan RevIew ThIS project may
contmue to be processed by the BUIldmg DIVISIon as a permIt apphcatIOn subJect to the followmg
condItIons
1 The dumpster onentatIOn (angle) must be approved by the Engmeenng DIvIsIOn,
2 If the scope of the project demands removal of plant matenal then such plant matenal must be
relocated to an area subJect to approval of the CIty Forester
Be advIsed that the proposed changes may reqUIre a modIficatIOn to the bUIldmg permIt. Please
contact me at (561) 742-6260 If you have addItIOnal questIOns.
. Smcerely, IJ
~!A .:DddJ
LUSIa Galav, AICP
PnncIpal Planner
Cc Karen Mam, Plan RevIew Analyst
Enc Lee Johnson, Planner
S:\Planning\SHARED\WP\PROJECTS\QUA~UM 1000\LOTS 32 38\!\.1MSP 02-066 Dumpster Relocation\Approval Letter.doc
City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310
Phnn,:ao tAA1\ 74'~~AA . ViNIIW ri Mvntnn_Na.::IIrh flller.
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO 02-237
TO
Eric Lee Johnson, Planner, Planning and Zoning
ill
~@~DW~r;)
1 ~ I
nF"r.-2m i~
i
PLANNING ANIl
ZONING m:P11
FROM
Laurinda Logan, P E., Senior Engineer
DATE.
November 25,2002
RE
Standard Review Comments
Minor Modification -1st Review
Premier Gateway Center at Quantum Park
File No MMSP 02-066
Per your request I have reviewed the above referenced plans, forwarded to me on November 22, 2002
regarding the proposed minor modifications to the site plan for the Premier Gateway Center at Quantum
Park.
Public Works would like to request that the dumpster enclosure be rotated approximately 300 to allow for
a more direct approach by the front-loading garbage truck. Otherwise there are no objections to the
proposed modifications to the site plan
Please let me know if you have any questions, or if I can be of further assistance
LUck
Xc: Jeff Livergood, P E , Director, Public Works (via e-mail)
Michael Rumpf, Director, Planning & Zoning
Lusia Galav, AICP, Principal Planner, Planning & Zoning
Pete Mazzella, Assistant to Director, Utilities
H David Kelley, Jr , P E.I P S M , Utility Engineer, Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Parks
Larry Quinn, Solid Waste Manager, Public Works
Ken Hall, Engineering Plans Analyst, Engineering (via e-mail)
File
S'\Engineering\Kribs\Premier GaewayCen1er @ Quantum Park, 1st Rev doc
PREMIER GATEWAY CENTER AT QUANTUM, LLP
2100 Park Central Boulevard, North/ Suite 900
Pompano Beach, Florida 33064
Tele 954-971-9500/ Fax: 954-969-5582
e-mail Bmotchkavitz@PremierCommercialRealty com
November 13, 2002
Michael Rumpf, Planning and Zoning Director - SENT BY HAND DELIVERY
City of Boynton Beach
100 East Boynton Beach Boulevard
Boynton Beach, FL 33435
RE Request for Administrative Approval of a Minor Site Plan Amendment
Relocation of Trash Dumpster Enclosure
Tenant Improvements for Buchanan & Associates - 1143 Gateway Boulevard
Quantum Business Center - Building No 1 (1101 Gateway Boulevard)
Quantum Corporate Park PID, Quantum Park DRI, Boynton Beach, Florida
QUANT1 BUCHDUMP NV2
Dear Mr Rumpf"
I am writing as authorized representative of Premier Gateway Center at Quantum, LLP (formerly
known as Quantum Business Park L.C ), the owner of Lots 32 through 38, Quantum Park PID,
Plat No 6 - an approved industrial development containing three buildings with a total area of
approximately 336,050 square feet)
Please accept this letter and the enclosed documents as our request for Administrative
Approval of a Minor Site Plan Amendment to allow for the removal and relocation of a trash
dumpster enclosure in the truck court area of Building No 1 On April 18, 2000, the City issued
a Development Order (NWSP-00-001) authorizing Site Plan Approval for the referenced project.
On May 2, 2002, the City issued a Certificate of Completion for the base building construction of
Building No 1 at the subject property' an office/service industrial building containing a total
building area of approximately 142,202 square feet.
Global Construction Associates, LLP has submitted a request for City Building Permit approval
for the referenced tenant improvements in Building No 1, consisting of a total of approximately
15,000 s quare feet. The proposed tenant improvements include the construction of a fence
enclosure and outdoor storage area in the truck court area in the rear (i e. north side) of Building
No 1 Since the proposed fence/enclosure is in conflict with the existing trash dumpster
enclosure, we need to provide for the removal and relocation of said dumpster facilities The
new dumpster will be exactly the same size and details of the previously approved and
constructed dumpster - the new dumpster location is within close proximity of the building and
the dumpster to be eliminated, and is fully accessible by collection vehicles
The proposed location of the dumpster enclosure will not be visible from Gateway Boulevard,
and the front of the relocated dumpster will not be visible from Quantum Boulevard any existing
landscaping that will be impacted by the new dumpster location will be relocated/replaced to
create an appropriate screening along the rear and sides of the dumps lIy-consistent with
PLANNING AND
ZONING DEPT
Michael Rumpf, Planning and Zoning Director - City of Boynton Beach
Request for Administrative Approval of a Minor Site Plan Amendment
Relocation of Trash Dumpster Enclosure
Tenant Improvements for Buchanan & Associates - 1143 Gateway Boulevard
Quantum Business Center - Building No 1 (1101 Gateway Boulevard)
Quantum Corporate Park PID, Quantum Park DRI, Boynton Beach, Florida
November 13, 2002
Page 2
The relocated dumpster will not extend over any public utility easements, and will not interfere
with the operation of drainage or any other utilities The relocated dumpster will not reduce the
amount of parking or loading areas required for the building below the minimum amount
required by Code, and will not restrict or inhibit access from any required emergency exit from
the building The relocated dumpster will not conflict with other existing uses at this project.
For your use in processing this request, please find enclosed the following materials
a A check (RJM) in the amount of $10000 as processing fee, and,
b Four signed and sealed copies of drawings illustrating the location, dimensions and
details of the proposed dumpster relocation
Thank you for your consideration and prompt processing of this request. Please do not hesitate
to call me or send me a note bye-mail or facsimile transmission should you have any questions
or require any additional information regarding these matters
Respectfully submitted,
PREMIE GATEWAY CENTER AT QUANTUM, LLP
By:
Motchkavitz, PEl Director of Development
cc. Tim Large, City of Boynton Beach - no enclosures
Stephen S Raskin, President - Buchanan & Associates - by facsimile transmission
Joni Brinkman, WLA, and Jaime Mayo, CGA - both with no enclosures
Ted Klein, Esq , Mirti Murray, Dave Miller, Toni Padron, and IIEIJIS, all with no encl
PROJECT NAME Prem i Gateway Center
LOCATION Lots 32-38 ( Building #1)
PCN
I FILE NO l\tIMSP 02-066 II TYPE OF APPLICATION I
AGENT/CONTACT PERSON O\VNER. Premier Gateway Center @
Robert LVlotchkavitz, P E Quantum, LLP
PHONE 954-971-9500 PHOl\"E
FAX. 954-969-5582 FAX.
ADDRESS 2100 Park Central Boulevard ADDRESS
North/Suite 900
Pompano Beach, FL 33064
Date of submittal/Projected meetine dates
SUBMITT AL 1 RESUBMITT AL 11/13/02
1 ST REVIEW COMMENTS DUE N/A
PUBLIC NOTICE N/A
TRC MEETING N/A
PROJECTED RESUBl\lITTAL DATE N/A
ACTUAL RESUBMITTAL DATE N/A
2ND REVIE\V COlVll\tlENTS DUE N/A
LAND DEVELOPMENT SIGNS POSTED N/A
(SITE PLANS)
PLANNING & DEVELOPlVlENT BOARD N/A
MEETING
COMMUNITY REDEVELOPlVlENT N/A
AGENCY BOARD
CITY COMMISSION lVlEETING N/A
CO~llVIENTS Dumpster relocation
S ,PlanningISHARED\WP\PROJECTS\QUA;\;TUM 2000\LOTS 32 38':Vl:VlSP 02.066\2002 PROJECT TRACKING INFO. doc