Loading...
CORRESPONDENCE ~".Y... o./:-. III ]x o V J- . . "V. vV' '1'0 N <;;; The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P O. Box 310 Boynton Beach, Florida 33425-0310 TEL. 561 742-6260 FAX. 561 742-6259 www.boynton-beach.org July 21,2003 Mr Karl Albertson DR Horton Homes 1192 East Newport Center Dnve, SUIte 150 Deerfield Beach, FL 33442 Re Quantum Park Townhouse East / West - Elevation Changes MMSP 03-051 Dear Mr Albertson. In response to your request for the admmlstratIve reVIew and approval ofthe modIficatIOns proposed to the above-referenced, approved sIte plan, please be mformed that the elevatIOn changes proposed on the reVIsed plans date stamped 06/27/03 are "mmor", as defined wlthm the Land Development RegulatIOns, Chapter 4- SIte Plan ReVIew ThIs project may contmue to be processed by the BUIldmg DIvIsIOn as a permIt applIcatIOn. Be advIsed that the proposed changes may reqUIre a modIficatIOn to the bUIldmg permIt. Please contact me at (561) 742-6260 If you have addItional questIOns. SIncerely, .~ ffUA iZd Enc Lee Johnson, AICP Planner Cc Karen Mam, Plan RevIew Analyst S ,Planning\Shared\Wp\Projects\Quantum Townhomes East & West\MMSP 03-051 Elevation Changes\Approval Letter dot ~.R.IWB. June 27, 2003 Mike Rumpf: Drrector Planmng and Zomng DIVISIon City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach, FL 33425 Dear Mike. D.R Horton, Inc. IS requestmg a mmor modification of the Quantum Park Townhomes East and West SIte plan. The modification will address mmor cosmetIc changes m the three story buildmg elevations. The elevation changes are described below and are also Inghlighted on the attached sets of plans. 5-urnt buildmg . Front elevation - Removal of stucco bandmg from structure's penmeter corners (umts "DR" and "DL") on 2nd story as well as 3m story, mcluding these same bandings adjacent to the corner-most 2nd story wmdow of these same urnts. The stucco bandings have been removed from the 3m story wmdows of umts AL and BR Stucco score lines on all columns have been omrtted. The rmddle umts described as unrts "AL, BR and CL" are now deSIgnated as umts "CL, CL, and CR", respectJ.vely These deSIgnations are a result of"rmrronng" umts "BR" and "CL" from therr ongmal deSIgns, and has resulted m a shared gable roof and adjommg balcomes separated by a shared column. . Side elevations - Removal of stucco bandmg from structure's penmeter corners (umts ''DR'' and ''DL'') on 2nd story as well as 3m story The stucco score lmes have been ormtted from all columns. . Rear elevation - Removal of stucco banding from structure's penmeter corners (umts ''DR'' and ''DL'') on 2nd story as well as 3m story Stucco score lmes on all columns have been omrtted. The IDlddle unIts described as umts "AR, BL and CR" are now deSIgnated as umts "CR, CL, and CL", respectively These deSIgnationS are a result of "rmrronng" umts "BL" and "CR" from therr ongmal deSIgns and has resulted m an alteration to the roof elevatIon TIns alteration omrtted the gabled roof features ofumts "AR" and "CR" (now "CR" and "CL") and IS now a staggered roof deSIgn wInch runs parallel to the pnmary roof The stucco banding shared by umts "AR" and 1192 East J\ewport Center Drive, I Suite 150 I Deeifield Beach, Florida I 33442 tel. 954 428.4854 I fa.\:. 954 428.~391 I )\w\\'.drhorton.com . Page 2 June 27, 2003 "BL", as well as the stucco banding shared byumts "BL" and "CR" have been mmtted. 6-umt buildmg . Front elevation - Removal of stucco banding from structure's 2nd story as well as 3rd story Stucco score lmes on the 1 st and 2nd story columns have been ormtted. The umts preVlously known as "BR, BL, and AR" are now referred to as "CL, CR, and BL" respectIvely TIns change IS a result of "ffillTonng" these umts from therr ongmal deSIgn and has resulted m a change m roof elevatIOn. The roof elevanon now mcorporates "3" gable features and ofwru.ch one IS a shared gable desIgn (umts "CL and CR"). AdditIOnally the front porch has been expanded to mclude the area directly below the wmdow adjacent to the front door and now features a fence deSIgn penmeter . Side elevations - Removal of stucco bandmg from structure's penmeter comers (umts ''DR'' and ''DL'') on 2nd story as well as 3rd story The stucco score hnes have been ormtted from all columns. . Rear elevation - Removal of stucco bandmg from structure s penmeter comers (umts "DL" and ''DRL'') on 2nd story as well as 3rd story Stucco score lmes on all columns have been ormtted. The rmddle umts described as urnts "AR, BL and BR" are now desIgnated as unrts "BL, CR, and CL", respectlvely These desIgnatiOns are a result of "mrrronng" unrts "BL, BR, and AL" from theIr ongmal deSIgns and has resulted m an alteratlon to the roof elevanon. TIns alteranon ormtted the gabled roof features ofunrts "AR" and "AL" (now"AR" and "CL") and IS now a staggered roof deSIgn wru.ch runs parallel to the pnmary roof The stucco banding shared by umts ''DL'' and "AR", as well as the stucco bandmg shared by umts "AL" and ''DR'' have been ormtted. A foam molding, srmilar m desIgn to that above the garage, was added to the top of all 2nd story wmdows. 7 -urnt building . Front elevation - Removal of stucco bandmg from structure's penmeter comers (umts ''DR'' and'TIL") on 2nd story as well as 3rd story Stucco score hnes on all columns have been omrtted. The ffilddle umts described as uruts "BR, CL, BL, and AR" are now deSIgnated as uruts "CR, CL, CR, and BL", respectIvely These deSIgnatIons are a result of "nnrronng" umts preVlously referred to as ''BL'' and "AR" from therr ongmal deSIgns and has resulted m an alteratIon to the roof elevatlon. Tills alteration ormtted the gabled roof feature of umts ''BL and AR" (now "CR" and ''BL'') and now exhibIts a gabled roof shared by umts "CL and CR" as well as a gabled roof over the urnt now known as umt ''BL'' . Side elevations - Removal of stucco banding from structure's penmeter comers (umts ''DR'' and ''DL'') on 2nd story as well as 3rd story The stucco score hues have been ormtted from all columns. . Page 3 June 27 2003 . Rear elevation - Removal of stucco bandmg from structure's penmeter comers (umts ''DL'' and "DRL") on tlli story as well as 3rd story Stucco score lmes on all columns have been OImtted. The tmddle umts described as umts "AR, BL, CL, and BR" are now desIgnated as umts "BL, CR, CL and CR", respectIvely These desIgnatIOns are a result of "rmrronng" umts "BR and AL" from therr ongmal desIgns and has resulted m an alteratIon to the roof elevatIOn. TIns alteratIon Otmtted the gabled roof features of uruts "AR, CL, and AL" (now "BL, CL, and CR") and IS now a staggered roof desIgn whIch runs parallel to the pnmary roof The stucco banding shared by umts "DL and AR", "BL and CL", "CL and BR", and "AI... and DR" have been OlTIltted. A foam molding, sImilar m deSIgn to that above the garage, was added to the top of all 2ndt story wmdows. As discussed WIth sta:H: tlns modIficatIon IS necessary m order for our building penmts to be released from the building department. Attached for your reVIew IS a SIte plan modificatIon applIcatIOn, applicatIOn fee and (4) four sets of the elevatIon sheets. If you have any questIons please feel free to contact me at (954) 428-4854 Smcerely, J& Karl Albertson Asst. Manager of AcqUISItIons & Dev PROJECT NAME. Quantum Park East/West Townhomes LOCATION 2751 South Evergreen Circle PCN I FILE NO MMSP 03-051 II TYPE OF APPLICATION I AGENT/CONTACT PERSON OWNER. Karl Albertson - D.R. Horton Homes PHONE PHONE 954-4284854 FAX. FAX. 954-428-7391 ADDRESS ADDRESS 1192 E. Newport Center Drive Suite 150 Deerfield Beach, FL 33442 Date of submittal/Proiected meetinf! dates SUBMITTAL / RESUBMITTAL 6/27/03 1 ST REVIEW COMMENTS DUE N/A PUBLIC NOTICE N/A TRC MEETING N/A PROJECTED RESUBMITTAL DATE N/A ACTUAL RESUBMITTAL DATE N/A 2ND REVIEW COMMENTS DUE N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS) PLANNING & DEVELOPMENT BOARD N/A MEETING COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING N/A COMMENTS S:\Planning\SHARED\WP\PROJECTS\Quantum Townhomes East & West\MMSP 03-051\2003 PROJECT TRACKING INFO.doc