Mr Tony Palumbo, Land AcqulSltIOn Manager
D R Horton Homes
1192 East Newport Center Dnve, SUIte 150
Deerfield Beach, FL 33442
Re Quantum Townhomes East / West - Elevation and Site Changes
MMSP 03-032
Dear Mr Palumbo
In response to your request for the admlnIstratlve reVIew and approval of the modIficatIOn proposed
to the above-referenced, approved sIte plan, please be mformed that the elevatIOn and sIte changes
proposed on the revIsed plans date stamped 04/30/03 are "mmor", as defined wlthm the Land
Development RegulatIOns, Chapter 4- SIte Plan ReVieW
ThIS project may contmue to be processed by the BUIldmg DIVISIOn as a permIt applIcatIOn. Be
advIsed that the proposed change may reqUIre a modIficatIOn to the bUIldmg permIt. Please contact
me at (561) 742-6260 If you have addItIOnal questIOns
Smcerely,
Ut{ x:u
Enc Lee Johnson,
Planner
Cc Karen Mam, Plan RevIew Analyst
S.\Planning\Shared\Wp\Projccu\Quantum Townhomes East & West\..~1SP 03.032 Elevation Changes \Approval Letter.dot
-
LUNING DEPr
--
J
D'R''WB'
April 30 2003
W~3 u 1@
PLANrJ;r;cA~
ZONING DEPT
Mike Rumpf, DIrector
Planmng and Zomng DIVISIon
City of Boynton Beach
100 E. Boynton Beach Boulevard
Boynton Beach, FL 33425
Dear Mike
D.R. Horton, Inc IS requestmg a mmor modIficatIon of the Quantum Park T ownhomes East
and West sIte plan. The modIficatIon will address mmor cosmetIc changes m the two story
bUIlding elevatIons and buildmg reconfiguratIons on the SIte plan. The configuratIon of the
bUIldmgs was adjusted due to refinement m calculatIons dunng the plattmg process. There
was no reductIon m the mmImum setbacks as approved by the CIty CommISSIon. Attached IS
a letter from our surveyor attestmg to thIS reconfiguratIon. The elevatIon changes are
described below and are also lughlIghted on the attached sets of plans.
4-umt building
. Front elevation - Removal of stucco bandmg from on I st story, removal of
two portal wmdows on 2nd story, removal ofbandmg on top and bottom of all
wmdows on 2nd story Two decorative medalhons were added to the 2nd story
to replace the removed wmdows. Two porthole wmdows were added to the 1 st
story, smooth stucco band and com were added around all garage doors, and a
foam moldmg was added to the base of all windows.
. Side elevations - Removal of stucco bandmg around wmdows and columns,
and removal of tile and medallion feature between the two 2nd story wmdows.
A small thIrd wmdow was added on the 2nd story to replace the tile feature and
foam moldmg was added to the bottom of all wmdows.
. Rear elevation - Removal of stucco bandmg on 1st story and removal of top
and bottom stucco banding on 1st and 2nd story wmdows. A foam moldmg
was added to the bottom of all 1 st story wmdows.
~"l1mt buildmg
. Front elevation - Removal of stucco bandmg from on 1 st story and removal
of bandmg on top and bottom of all wmdows on 2nd story A smooth stucco
band and com were added around all garage doors, and a foam moldmg was
1192 East 'e\\'porl Center Dri\'e. I Suite 150 I Deerfield Beach, Florida I 33~~2
leI. 9H ~21i.~SH fax. 9H ~28."391 I \\~n..drh{)rl{)n.com
. Page 2
April 30 2003
added to the base of all wmdows. Two small porthole wmdows were added to
the I st story
. Side elevations - Removal of stucco bandmg around WIndows and columns,
and removal of tile and medalhon feature between the two 2nd story WIndows.
A small thlfd WIndow was added on the 2nd story to replace the tile feature and
foam moldmg was added to the bottom of all WIndows.
. Rear elevation - Removal of stucco bandmg on I st story and removal of top
and bottom stucco banding on I st and 2nd story WIndows. A foam molding
was added to the bottom of all 1 st story WIndows.
6-umt buildmg
. Front elevation - Removal of stucco banding :from on I st story and removal
of banding on top and bottom of all WIndows on 2nd story A smooth stucco
band and com were added around all garage doors, and a foam molding was
added to the base of all WIndows. Two small porthole WIndows were added to
the I st story
. Side elevations - Removal of stucco bandmg around WIndows and columns,
and removal of tile and medallion feature between the two 2nd story WIndows.
A small thrrd WIndow was added on the 2nd story to replace the tile feature and
foam moldmg was added to the bottom of all WIndows.
. Rear elevation - Removal of stucco banding on I st story and removal of top
and bottom stucco banding on 1st and tID story WIndows. A foam molding
was added to the bottom of all I st story WIndows.
As discussed WIth statI: thIs modIficatIon IS necessary m order for our building permIts to be
released :from the buildmg department. Attached for your reVIew IS a SIte plan modIficatIon
applIcatIon, applIcatIOn fee and (4) four sets of the elevatIon sheets, surveyor's letter and SIte
plan (matchIng recorded plat). If you have any questIons please feel :free to contact me at
(954) 428-4854
Smcerely,
~9/<'
Karl Albertson
Asst. Manager of AcqUISItIons & Dev
D.R.HORmN@
~Offle<i
Apnl 25, 2003
CIty of Boynton Beach
Department of Commumty Development
100 E Boynton Beach Blvd
Reference, ParksIde A.K.A Quantum Park Town homes
To whom thIS may concern,
Attached IS our check 10 the amount of one hundred dollars for a mlOor site plan
modIficatlOn to the above referenced commulllty Also attached are three copIes of the
reVIsed SIte plan and archItectural elevatlOns WIth these changes hIghlIghted.
Thank you very much for your aSSIstance III thIS matter
Sincerely, -V
:o2~umbO' ~
Land AcqUlsItlOn Manager
1/92 East \e"'port Center Dri\'('. I Suite 1;0 I Deeifield Beach. Florida I 33.H2
tel. <}';-I -l2S.-Iii';-I I Jax. 9';-I-I2S. 7391 I \\w\\'.drhorlon.com
April 25, 2003
Karen MaIn
CIty of Boynton Beach
100 Boynton Beach Blvd
Boynton Beach, Honda 33425
Reference Plan reVIew comments for penrut apphcatlon #98
Dear Karen,
Pursuant to your plan reVIew comments, thIs letter will hopefully serve as a response for us to
move forward In the penmt processes.
We have provIded the response to
Comment 1 ReVIsed sIte plan that matches the plat.
Comment 2 ReVIsed sIte plan that matches the plat whtch has been calculated accordIng to
actual field survey
Comment 3 We will be applYIng for a separate overall landscape penrut for thts project whtch
these plans will make reference to all safe sIte tnangles and any other code related landscape
Items.
Comment 4 We will be applyIng for a separate over alllmgabon penrut for the total sIte In
conjunctIon WIth the CIty of Boynton Beach and South Honda water management Dlstnct.
Comment 5 ReVIsed sIte plan that matches the plat whtch shows thts area as open space
common area.
Comment 6 Both phases of thts project will not have any form of gatIng or access control pOInts
Comment 7 All street light photometnc will be desIgned and Installed by FPL after platIng.
Comment 8 Please see attached copy of Quantum CDD Penrut.
Comment 9 As explaIned by our surveyor and legal counsel, note 23 IS beIng resolved by the
overall plat that IS beIng processed for sIgnatures.
Comment 10 As explaIned by our surveyor and legal counsel, note 25 IS beIng resolved by the
overall plat that IS beIng processed for sIgnatures.
Comment 11 D R Horton Homes plans to meet WIth The Parks and RecreatIon dIrector and Mr
Page 10f2
Green to understand why we are be10g asked to pay all park Impact fees 10 advance of penmtt10g
umts as theses fees are tIes to penmt on hghts.
Comment 12 Quantum Park East and West property owners aSSOCIatIOn will responsible for the
mamtenance of both fencmg, landscapmg and ImgatlOn
Comment 13 Please see attached ledger from Bob
Comment 14 The Forrester comments are bemg worked out between Tod our land development
manager and the CIty of Boynton Beach Forrester
Please feel free to contact me should you have any other questIons.
Smcerely,
Tony Palumbo
Land AcqUISItIon Manager
~.8.JW~.
Apn125,2003
CIty of Boynton Beach
Department of Commumty Development
100 E Boynton Beach Blvd
Reference; Parkslde AK.A Quantum Park Town hames
To whom tills may cancern,
Attached IS aur check m the amount of ane hundred dollars for a mmor sIte plan
madIficatlan to' the abave referenced cammumty Also attached are three caples afthe
revIsed SIte plan and arcilltectural elevatIans wIth these changes illgWIghted.
Thank yau very much far yaur assIstance m tills matter
smcer~,-v
:i~alumbO- ~
Land AcqUIsItIan Manager
1192 East !\ewport Center Drive. I Suite 150 I Deeifield Beach. Florida I 33442
tel. 954428.4854 I fax, 954428.7391 ! mn\.Cirhorton.com
HAGEh., PALBICKE & ASSOCIAT..J~ INC.
PROFESSIONAL LAND SURVEYORS --::.::::> _
Certificate of Authorization L.B. No. 6772 \ e$:"~~ 2)~ .?j ~8
Date Thursday, April 17, 2003
To Karen Main
City of Boynton Beach
Building Department
100 E Boynton Beach Blvd
Boynton Beach, FI 33425
From Thomas R. Palbicke, P L.S
RE Quantum Park Town-homes Site Plan & Plat
Dear Ms Main
This Letter is to inform you that the changes regarding the building separation between
buildings on lots 13-17 and 18-21, have been adjusted to meet the minimum of 20 feet
separation between buildings, the final site plan and the final plat mylar have been
corrected accordingly; an excerpt of that portion of the plat is attached hereto with the
underling building separations shown, if you have any questions feel free to contact me
at (561) 395-3600
Respectfully submitted for your review,
~ f3:.~
homas R. Palblcke, P L S
RECEIVEO
APR 2 1 2003
FILE COpy
fjun..r;)~~ f:lIYIQICN
DocumentS
3850 N \X' BOCA RA. TON BLVD
SUITE 3 BOCA R.ATON FL. 33431
PHONE. (561) 395-3600
FACSIMILE. (561) 395-2237
o
o
/'
~
/'
/'
(\',
,
~'--'
JJ
,-....."
'---..;
"
'---'
''v
,...
, ,
"--'''i
/2
lee
."'0
~
r)C 0 ,~.
~~
~
'~
o
'v
Jj 4- 7:
('
0>
~
4r;, h..-;~
\J "-.J
'-
~ 0
'----'
,'-""'"
'----'
(' ,
~
~
,
,,"--" r''-.....
l>'V~_)y
4~
r', .~
::J(j
( J;
'--../ ,
/~
Ie
I CX::
L"-i
o
t\
'--'~.
1\
W~-------l~-"" ,
,...,... A,...." ~ , I Z -~,
/' 0 0 -----.; I
/' ~ '- ~IIX
/' -~"~/ "',~
. () --:--J I'J v '-: 0
! "T .~ ~ -:X:; I 0'
,'" ~ ~I---=
J _1.....----..._
i '---"
I C)
!
l~i
~
X '--/ __ ..,/
'-1...
~
~
;-r-,
2
~
~0
c >::: / 0'-1
C::) vi
O~L'..ji ~
r -.~! C)
~"'J~i
.--.., i
- I
I
!
~
I
7('\ \1
o \...J \J I \j
0) 0 0 '_.:::
,-,,' '....../
d<
.:::~
~ '-"0
':J
)
~r,
'X: :
'--' '..../
-.,
Q!
' [,.
0:1
~
~
'>'----"
T' ~:
-,- ~
/01 -
~I,
~.
L - ~ ~,n .n ~\ /'~ ".
o I~ '\Q O~ (:)0 00 ~~!
Ci'> :; Te: o,JLJ ~ ~,
C "-.J 0 ~ 8,
c. \ ~ ,,,'c ~ co :':; !,~J 11
\ CY'i
1 i !', "~"" I ~kl \
L~ \ r '~' ~ b'::J b ~ 0 ~ '-' ~ i
nr:\ ,..----. '--' 01
C\ '--"~ I
;---...' "---." ~" II
-r , ----> ~ S ~ -T\ ~
~ \ 7 G:)c 0' ~ ~,rY'\,~/'_ ~ '-' 11: l, ...---"'---/"
C5 \ n ., \JtJ ,~ _ ,
.~. \ 'c.:; 'cic E:: 30; ...., ~ / . ,,~_~
\ ~~, 0-:, ~ r' Y ___--- \
"\ I '----'~ ___.~. :-~ ~ "U,,-- ;;~...--- _,\,
~\ ~ -...--- :' - :"\.. ~...---, 0-
Yc';~ /-'/C/. C/~~v~l:~0'>; ~ .~~
/" \---'" ~. () ~ ...--- "'-./ 0,'_ \,
'. 'n ~,
0\ ----:7' '-J::.---"'--- ~ \
~,...<", ~...--- c.D"...-.." \,
oJ,... ...-----"" U y c" ~ ~ \
\ -1J --," c-' ~ ~ :\ ---;?
\ ,-/0 -"7~~
~ \ ~ ,\ ,--,'" -,- ---- G' y '\
u)...; \? 0r--C ~ ~~, 0"';
'\ ., v,... U ,;,-,'Q" 0\\
,....,....-, \ Y ---"~, ~ ? :". 0,... \
"-./ ~: c ';'----' \ 0 G-::- \\\ L.--
\\ /AJ 0 <" / \ . r--. L
/ ~ , 0 '--' /'" 0 '\ ~,... h c.
'17\./ ~ Y,..."...-..,. 0~.' "...
~~8 'c 57~"" \ _
\ ~ ,,\ C ------: (--'l "-
:.--\ --' v ~ /' ~~,... \ ~ / '-.
~--") y,... v~ \~,... \ 7,....,....- >\
v"', ? J,... .. \ \ 57 v '\
J . \ /j
,. \ '--',... C,... .-<'~ \ ~,
\/ \-:z:' -: S '. -:z: r~
/ , \ ,.-<J ~ A", ---;7,
\ "'-./\U "...-..".J.-O J/'\ ~
""\ 0\ ~ ~ 0 .-<'\~
v \ 8,...,-> /- Q G \'y
\ '''''\,.....-. "...-.., -, .
'-.../ \ /J '/ ,) ~\
,...,->\'-.-/ '-',... .-o'/; ~\O
~\, """0,...,....--- '--',/':~"" ,/I\,/J
\ '~ L./ ," ~\\./,...
, /,,,.....;' ~ '-: ~ ~,... \
\"-., ---\ \\L;~", ' ' <;', '--',... / ,\
~ \_ I' 'J~ 0' U}\~) ~
7C '\ ---;? \' \y
J i- ~\'\ '--'(5''\'~ _ ---;? C ~\ ~
~ ~ r--\J__
v ~ 0./'
\ ;., /:0 ~\
"-- --<' .~ c U, J , ,...,->
--7 \ () 0 '-Y,.....-. (:) ,...,->\ ' \,/"',
/-- \ '-",... \ '\' L/ '-.-/~ ;- ~' cP '1
----J' 'v~o / ~,'''''' ,<j.'
u \ \0 cP/ / v,...-\': \\~"" J'y;:-
o ';':~\ \. ~. 0" ';.::_ """ \
~ ~ ,\ ),...-\'\ Oi) '-..i
,--,_-.J \ \,) / v,
~ ---=: \ /~) ~ ( ,.-> ) 'I 3 L:: ,
'L;-.l \/..[\ / "" '--'0' <<.;:; c v J 1;',
\ "'/''''' V\ \J
\ CC. ,...,'-'v C ,/ :.y""'" <1. r:
/ \ '/<....-r; v _ 'c;! IA;
, \;. .~c ~' ~~
, ~ \ .C)~ ~
!
~I -.;
~\-----""
~,I~
,----,' i ,~
.---., . ~
~,
-I~
"
'-J
--,
"
'-
~
,....,
~
~
~
N
o
Q
'------'~
r _
c...8 '---"
!~
~, \
I~
--.-..
,...--ij
s::
:\"-...
'yo,
c'---"
~
1
J
o
\"-:
~ ~
,
v
;:>
D
C5
0"
\ ::
\
\y
\,...,->
\ /-.
L
\ ~.
~.~
/'V'-
\J
,....---
~'~
V ~
-);/
~,....,/
J/"
~ .--L-
,...-f'\
.~
r: ~\
'...Y
/,\0,...
v
\
"...-.
\.. . \
/.
..,......
~, y"
\-----' ( i I
cQ ':/'
,.->'~,
'--' "
/../7
~ y,
--D /,
Y
v
--,
CCI
~
0)
o
"...-..,
'-.-/ ,...
\ ,......>
~ \ 0-:
~ 'y\ /,
\ '
0\
0,...\
\
\
-\ 0
--" ~ ~\\~.
r ,,-.,--.)'-....-1 ~ ~
~0v (,/\,...
Y'", () / .....---..
J/
o
~
<:.D
---1
-: .
i I
OL \.-'
"
r'
\",: '-j
~ '0
,
\\
L.--
",
"\'----r-.
;0
\.....
~............, v
"
............0
5J~
~(J'1
~
~
'''' L
f,0,
."\y "...
\jU
\\\
~
~
----i ~
: . IV '
c~
\
\\
U-'\
\y
\ ~-~\
"0 __ \
\
CD
,/'0
V
~
,......,.
~
"I
\\',\
'. .
, .
"
~,'-j
>.:J
"
r-.\ 'Y--,
~'--"
v,L.----
.-'
~~
U- '.'\
c::=; \,JtJ
~
(f"
--,
-J
;-
;:N
"'0)
r" ,r- C) V '--"
\8':)/10
v \, r -1 G...J
'--', '-/
.-'
--,
,
\
r
r
~r
iJ"z-
n
r- \
, '-0
'1-t.-
"...-.."
'--
~,
/~
-.../
\
,
\
\
-?
r
\..., V
o~
\ -Z
~ \ '
J \ ~ ---..
...-> \, \ \ .r<')
cD \ l-+>'-' 0
- ,
,
\
r\
/
~.
r
!-I-
10
"
"-..'
~
Z
-f
C
s:
"'U
)>
;U
^
~)>
-I
OJ
o
i-<
z
-f
o
Z
OJ
m
~'-- )>
r---
/(')
/~ I
i'..,
"'U
-
CJ
"'U
r
)>
-f
Z
o
w
-
-
:'\
r-, 0
CJ~
(~
u
~
v
rO
~
cP/
TIme and Date of Meetm,::. -~....t'fL
Those attendmg meetmg'
Cr- A U-~ ie~':
'il? (iJ 3/h1'\
,
ApplIcant's Name
LICATION CONTACT QUESTIO~S
Phone 3s'.J2. ~- 3~(
1
HAVE YOU SPOKEN TO AJ."\Y STAFF MEMBER ABOUT THE PROJECT?
Yes ~ No
(IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE-
APPLICATION MEET~G?
2
t/4M
LOCATION OF P~R. TY (cRO'SSl STREEJS/INTERSECTIONS)
~-t,,'\. ##-al^ ~./
t/ ~ C-~~7<Lc ;~-}"
(..-
\\711A T 'vV01JLD YOU LIKE TO DO?
NE'vV PROJECT
BUILDING EXPA..l"JSION OR MODIFICATION-
CHAJ.'-TGE IN PRIOR USE?
IS THE STRUCTURE CURRENTLY VACANT?
VARIANCE TYPE
POOL OR SCREEN ENCLOSlJRE
COl'v&fERCL;,L PROPERTY)
RESIDENTIAL PROPERTY')
~~USTRL~PROPERTY?
DO YOU K..:.'-TO'vV THE ZONING CODE DESIGNATION?
ST AFF MEMBERS NAi\;IE
kd~~
"
,j
v
.,
4 TllvfE k'ID DATE PREFERRED af~( c/hC? 3i'-
5 HO\V MA.l'N PEOPLE \VILL BE AT THE PRE-APP MEETING? -2-
Note. Tell tlte person tltat someone from tlte Department will call tltem to confirm tlte meeting
..................................................................................
. Pre-apphcatlOn meetIngs should be scheduled for a nnrumum of one (1) hour tIme module, and should be s;::heduled
no less than nvo (2) days pnor to date:tIme ofmeetmg_ Ifurgencv IS sensed, dISCUSS \vIth Mike or LUSIa.
. Meetin!?:s ma'\ be scheduled.
Monday afternoons
Tuesday all dav
Wednesday all day
Thursday monungs
Note' LusIa IS not available for Tuesday a.m. meetmgs,
and Mike IS not available on Nlondays between 11 30 a.m. and 2.30 p.m.
S \P I ann I ng\Plann mg'.? re-app II cati oncon tactq uesti 0 ns.doc
M~SP
Date L{-7-0 3
PRE-APPLICATION CONFERENCE REVIEW FORM
Ib · 0 v
Time Started
15 00 Time Finished
-pC\ (1),1Vt ~U
Attending as Applicant
.~/VV
f
Phone
Fax
1'"\. ~. '/":;> Proposed Pro)ect Infor~ation
X. L.( "V\ rift:.- L- --,- o-w-z./ll, DiVL es
Proposed Project Name and
Type/Use
Site Location (Address if Available)
Site PCN
Existing Zoning P /7)
Existing Land Use/Density
Anticipated Submittal Date
~~A-
Proposed Zoning i~ /1)
Proposed Land Use/Density
/ Vacant
Notes and Comments
Lot Area
Lot Frontage
Lot Depth
Setback
Height
Parking Requirements or Improvements
La ndsca pi ng/ Bufferi ng
Non-conforming Use or Change in Use
Other Zoning Changes Required
Environmental Review Requirements
Notes/Comments/Recommendations PL.6j- (ezorc:R~)YI f~
~ ull/~~ l~s vv~,~c~d ~ Z- -Z'~Jt +\C~'~
4~ ~tJl~S~ A~
~~ .k~\ ~9~~-
_f'"At:-~ 1r*!~~'~
I2EQ(D~
V;,t; ov Z&!tl
NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives,
policies and codes as related to the proposed development and to discuss site plan review procedures. Opinions expressed
at the pre-application conference are not binding for formal review purposes. Additional staff comments may be forthcoming
based on actual plans submitted for review
PRE-APPLICATION MEETING
SIGN IN SHEET
PLEASE PRINT
IHEETI:'{G DATE I {-- { - O?
TIME '3.?M
ATTE~1)ING FOR APPLICA.l~T lOt0f "~B~ LA.1M ~O
NOTICE The purpose of this conference sh:lll be for the st:lff and applicant to discuss overall
community goals, objectives, policies and codes ass related to the proposed development and to
discuss site plan review procedures Opinions express at the pre-applic:ltion conference are not
binding for formal review purposes Additional st:lff comments may be forth coming based on actual
lans submitted for review
City of Boynton Beach
Attending Staff
~i&-J:&~
Attending for Applicant
I
I~'
I {\
I
i
I
I
I
o
I
,
I
I
I
I
I
~.R.'WD'
.
Robin Pedretti I Permit & Plans coordinatorj
tel. 954428.4854 ext. 103 I fax. 954 428.739]
1192 East 'ewport Center Drive Suite 150 Deerjield Beach. Florida .n..,...,.2
wW,"1.',drhorton.com ropedrf:'tti@drhorton.('om
J .5HRD.-\TA.\PLA..,!,'I.,G\.5HAREDIWP\FOR.'>lS\PRE .-\PPL \IEET['.G-SIG:'. [
D'H'HJJllION
-----f{0ff/R;(1 ·
Jm~ D.... I An. M.~g" j
tel. 561.848.5058 I fax. 561.841.56] 7 I cell: 954.8]8.6750
1192 East Newport Center Drive I Suite 150 I Deerfield Beach, Florida I 33442
,,"'WW.drhorton.com I nextelN: 159"'26 3912
PROJECT NAME' Quantu'm Townhomes (East & West)
LOCATION. North of Gateway
PCN
I FILE NO . MMSP 03-032 I TYPE OF APPLICATION Minor
Modification to Site Plan
AGENT/CONTACT PERSON OWNER.
Tony Palumbo- Land Acquisition Manager PHONE
PHONE 954-428-4854 FAX.
FAX. 954-428-7391 ADDRESS
ADDRESS 1192 East Newport Center
Drive
Suite 150
Deerfield Beach, FL 33442
Date of submittal/Proiected meetine: dates.
SUBMITTAL / RESUBMITTAL 4/28/03
1ST REVIEW COMMENTS DUE N/A
PUBLIC NOTICE N/A
TRC MEETING N/A
PROJECTED RESUBMITTAL DATE N/A
ACTUAL RESUBMITTAL DATE N/A
2ND REVIEW COMMENTS DUE N/A
LAND DEVELOPMENT SIGNS POSTED N/A
(SITE PLANS)
PLANNING & DEVELOPMENT BOARD N/A
MEETING
COMMUNITY REDEVELOPMENT N/A
AGENCY BOARD
CITY COMMISSION MEETING N/A
COMMENTS