Loading...
CORRESPONDENCE 03/08/2004 14 50 5616895559 WINSTON LEE ASSO PAGE 01 1M. IDst( n ee . ssocu ltes, Inc. - Landscape Architel:ure I.and 'Planning F.S.L #LCC1l6 FACSIMILE MEMORANDUM Date. March 8, 2004 From: JoniBrinkman To Ed Breese Subject: lot 3 Quantum Park Our File No 98010 09 No of Pag, tS: 3 Per our r ,cent telephone conversation, attached please find a copy of email corresponc ence between myself and Mike Rumpf back in August of 2003. The issue revolves ar lund the approval process for Increasing the amount of allowed office square footage on a lot in Quantum park that was originally approved for 50% office and 50% warehouse His respon ;e seems to indicate that such a request would be a minor amendment to the approved s te plan. No revisions to the site layout would be proposed with the request. The only C 1ange to the site plan would be a revision to the tabular data. A traffic statement/! tudy would be done to accommodate any increase in intensity associated with the increas ~ in office. The property owner has indicated to me that impact fees were based on c ffice since the square footage for that use was over 30% Therefore, there should be r 0 increase to impact fees due to this request Can you cc ,firm that this is the appropriate approval process? I have also 3ttached a copy of the parking summary that the project is required to submit with each ( ccupational licence application, which was a condition of approval from the gymnastic c enter approval. The property owner wiJ/ continue to do so. 1532 Old Okeechobee Road, Suite 106, West Palm Beach, FL 33409-5270 561-6894670 . Fax 561-689-5559 03/08/2004 14 50 5616895559 WINSTON LEE ASSO PAGE 02 Joni Brinkman From: Sent: To: Cc: Rumpf, Michael (RumpfMgci.bQvnton-belK;h,fI.us] Wedneaday August 20. 2003 8'..42 AM 'Joni Bl1nkm8nf 8Ivese. Ed; Jcn.." Eric RE. 0Uantt.m ORI USe DesIgnations Subject Joni, A use designation wl ich Includes 2 or more use opIIon8 (i.e. 110 or IIOIC) means that the lot Cli I"l be used solely fer one of the Options or tJIrf combtnation. A d1an ,e pmpoeed on a site plan would be 8Ubject to the Bne mInorfma;or crtterta i 1 Q18pIer 4 (i.e- 5% 'net Base in eqt88 footage? change NdlJce proje :t below dev ~?, change site layout eo It does not resemble the 8PS roved Iayout?, adven18 ~ on elevation deIIgn? etc.). I hOpethahn WBl'8yourquestion. Mike ---Origtnea Me.sag. -- From: Jori BdnIcrnar [fnlilto:jbrinkrn8rONIainel] 8Gnl: Tueeday, AuglJ il19. 2003 1'16 PM To:Rumpf,Mk:haeI SubjeCt Quantum 01 U Use DesignItions Mike, Eric suggested I ems I with my queetion. It ooncerns a tot within Quantum PR \IlHch posses 8l 110 - InduIbiIIIIOffic designation. Does that U88 deeignaticn allow the peroeI to be up to 100% offtce ..1 The sight plan was 01 gin8Ity appmIted with a 50150 &pIit d industrtal and office 8qU8I9 footage If the perking would support a AIqU8It to amend the lite plan to allow add lionaI offiGe (over 50%). would the request be a minor amendment to __ the square fOOtage ~ulIll'lBlionB on the apprcPied plan? ObvioUsly. a fllVieBd traffic study'MlUld need to be submitted to e&pture the addItIon8 required trips for the lncreae In omce square footage. 11'IaI1Q for your __ anoe. Joni 8rir1kn&l. AICP Project Ptanner WinIton Lee & Asaoc ates. Inc. 1532 Old 0keechDbI t Road, Suite 106 West Pslm Beech, FI 33409 Phone561~O Fax 561..f389..5559 1 I-'RQ<- - 1,411451014 LEE A550 108/2004 14 50 5010895559 , \ ' (JI %. r- O'~~\ , 0,\ .... 0,\ i'.... " .. 0 ,'0 \~. ~ 9 g \ \ \ \ \ \ '" ~1li Ii =t ,0 1'''''' i ,I' \ ~"'''1RI'\'' " ..' ." 2 ." I \ '" 0 ~ - 0 ~ ~~' "\fA; \)', ' \ \ \' \ \ \ z.'i~~!I~ ' I) d ~ 0 ~ ~.\ \ \ \' \1\H\'~ ,. z: ' ~ ~\ l> a~ t' \ \ \ \ I~,'" "~ ~ ' ;a \ \ 1 \ \ \\ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ f\ \ ~\ \ ~ \ ~,\ \~\_~-t\\~~U \1-\-~L+'l~~\ r-\1g \ \,'0 I '\ \ \ \ \ I \ \ \ \ 1 \ ' \ \ \ I f"f~1 ' I \\ \ ~ \' \ \ \ \ \ \ \\\ \ \ \ \ \ \ \ \ \ \ \ \ \" \ ~\ r\ \ \ \ \ 2 \ \ I ' \ I \ \ \ I \ \ \ \, 1 \ \ V"I \' \ e\ \ \ .. \ \'\ \ \ \ \ \ \\~\\\ \\\ \ \ \ \ \ \ \\'\" \\\\\ \ \ \ \ \'\ ~\ \\~ \ I \" \ \ \ \ \\, \ \ \ \ \ I \ ' " ~ \~\ i\ \ ~\ ' \l\~\\~J U\ \ \\~}~, \ \~ -f\; ,..' iT ' \ t \ \ \'" $ \ \,- \ ~ ~ \~ -t \-\ . n ~\\r\--\ u.\ -\ t,LI II ,'" , Ii ,UI \ \ \ \ \\ \ \ \" \ \ \ \\ \ \ \ \ .,\':i\-;\fl.. ..\'Z! i lJ\ \5 1\ \}, \!\\t\'\'J':i~l\;\t':l\~~ft- ~i \ \\ \ ~\ \ \~ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \\ ~ ~I \ ....\ ~\ , \~ \1' \ \ \ i\\'\,\'\"O\.\o\'\t'\'\'\'J~~~\~~\_- ~ I.~_\-n-\-\\-+Vt/n'\ \-r\\ \\\\ 1 \\~~ ~,\ 1 \\' 1 I, \ 0....\ I 0101 ?Sill' J \ \ \J. \. \ \,.\\10\) 0 \' \, \' \. · \, \' \' \, \' \' ~\~ \si\!l~:\ ~ 1- \ .\--!l k.-\ t' cJ il ,1 r~ "\ I' -1-\ \ '\ \ fI \ -I \ \ \ \ 1 \ 1 '\ \ " \ \ \ 1 \ \ 1 ,\ \ \ ,!"I 1 I ~I ~, \ L \ \ \ ~ \1~\'\'\t"lt\\'\J\~L\~V1.} \IIr l ' \\-Yi 1'\'\ \ \ \.- \- \ i \ \ '\ \1 \ \1\ \ \\ \ \ \~\ \ \\ ~ , \ l\ \ \ \ '\'\ \ \ .\ $ I - ~\ \ . \ ,~ . ---.--------------------------- ---------- Department of Engineering and Public Works PO. Box 21229 West Palm Beach, FL 33416-1229 (561) 684-4000 www.pbcgovcom . Palm Beach County Board of County Commissioners Karen T. Marcus, Chair Tony Masilotti. Vice Chairman Jeff Koons Warren H. Newell Mary McCarty Burt Aaronson Addie L. Greene County Administrator Robert Weisman 4n Equal Opportunity Affirmative Action Employer- @ printed on recycled paper July 6 2004 Mr Michael W Rumpf Director of Planning & Zoning Department of Development City of Boynton Beach POBox 310 Boynton Beach FL 34425-0310 RE. Quantum Park - Lot 3 - Revised Plan TRAFFIC PERFORMANCE STANDARDS REVIEW Dear Mr Rumpf" The Palm Beach County Traffic Division has reviewed the traffic generation statement for revised plan of the previously approved project entitled; Quantum Park - Lot 3 pursuant to the Traffic Performance Standards in Article 15 of the Palm Beach County Land Development Code The project is summarized as follows. Location Municipality. Proposed Uses Quantum Park - North side of Quantum Boulev3rd. Boynton Beach 33470 SF Genera! Office 4050 Medical Office 4050 SF Gymnastic Center and 5 090 SF warehouse 612 83 .A.M and 122 PM 2005 New Daily Trips New PH Trips Build-out Year' Based on our review the Traffic Division has determined that the project is part of the previously approved Quantum DRI and therefore meets the Traffic Performance Standards of Palm Beach County No building permits are to be issued by the town, after the build-out date specified above The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance It should also be noted that our records indicate that up to date and including thiS parcel, concurrency letters for a total of 52,112 new daily trips have been issued for projects in Quantum Park. If you have any questions regarding this determination please contact me at 684-4030 Sincerely OFF,ICE OF THE COUN ~( Masoud Atefi, MS Sr Engineer - Tra r~ ~ l~ ~ rTf, I D I, , ~ I r 'r I, 'JI.. tm4 ! ~ I I l_______ J~ cc: Pinder Troutman Consulting Inc. File: General TPS Mun Traffic Study Review F-\TRA FFIC\ma\Admin\Approvals'D40604.doc I ( PINDE~ TROUTMAN CONSULTING. INC. Transportation Planners and Engmeers 2324 South Congress Avenue, Suite 1 H West Palm Beach, FL 33406 (561) 434-1644 Fax 434-1663 www.pindertroutman.com June 23, 2004 Mr Michael Rumpf City Boynton Beach '00 E. Boynton Beach Boulevard Boynton Beach, FL 33425 Re: Quantum Park - Lot 3 - #PTC99-46 Dear Mr Rumpf. The above referenced project has been approved for 23,330 SF of general office and 23, 330 SF of warehouse. The site is located along Quantum Boulevard in the City of Boynton Beach. Access to the site is via two (2) driveway connections to Quantum Boulevard. The proposed development plan includes the following uses and intensities: Lot 3 Development Plan Use Intensity Office 33,470 SF Medical Office 4,050 SF Gymnastic Center 4,050 SF Warehouse 5,090 SF As shown on Attachment 1, these uses are projected to generate an additional 281 daily trips, 6 less AM peak hour trips and 37 additional PM peak hour trips as compared to the approved uses. Driveway volumes are provided on Attachment 2. Quantum Park DRI is an approved project, and is considered a Previous Approval under Article 12, Traffic Performance Standards, of the Unified Land Development Code (ULDC) The proposed land use and intensities are within the limits of the original approval of the Quantum Park DRI, as shown on Attachment 3, therefore the proposed project is not subject to the Traffic Performance Standards. If you have any questions regarding the contents of this letter, do not hesitate to contact this office. AMT/ldr Enclosures cc: Masoud Atefi Bob Burrow Eugene Gerlica Joni Brinkman Letter Rumpf 99-46 6-23-04 ~r.:1 R ~ R n r[) r~ m I 0 ~ Ls lif) LS U ~ . l5 1 ~ I" J ! I, k!' JUN 2 5 lU04 ( ~ ' f I I I I L , . . 1 T~. I..,.............r r.. , r . . f P..~. \ 't- lIe ,r nr' ~r "''';1 . '--- -----:-~--- '" .-_'_J rm. Attachment 1 Quanwm Park lot 3 Trip Generation Comparison #PTC99-46 6123/04 lripsen _ 6-22~ Pase'of' DAILY ~ ITE Land Use Code Intensity Trio Generalion Rate (1) Total Trios Office 710 23 330 SF 9.21 /1 000 SF (2) 215 Warehouse 150 23,330 SF 4.96 /1,000 SF 116 TOTAL 46,660 SF 331 ~ IT[ Land Use Code Intensity Trio Generation Rate (1) TOIaI Trios Office 710 33 470 SF 9.21 /1.000 SF (2) 308 Medical Office 720 4,050 SF 36.13 /1 ,000 SF 146 Gvmnastic Center 492 4,050 SF 32.93 /1,000 SF 133 Warehouse 150 5,090 SF 4.96 /1,000 SF 25 TOTAL 46,660 SF 612 lNet lnaease 2811 AM Peak Hour Aporoved IT[ Total Tri :IS Land Use Code Intensity Trio Generation Rate (1) In Out Total Office 710 23,330 SF Ln m-O.80LnOO+1.55 (8llf12) 52 7 59 Warehouse 150 23 330 SF Ln m=O.71LnOO+1.15 (82/18) 25 5 30 TOTAL 46,660 SF 77 12 89 ~ IT[ Total Tri is Land Use Code Intensity Trip Generalion Rate (1) In Out TOIaI Office 710 33,470 SF Ln m=O.797LnOO+ 1.558 (8llf12) 51 7 58 Medical Office 720 4050 SF 2.48 /1,000 SF (79/21 8 2 10 Gvmnastic Center 492 4,050 SF 1.21 /1,000 SF (42/58 2 3 5 Warehouse 150 5,090 SF Ln m=O.71LnOQ+1.15 (82/181 8 2 10 TOTAL 46,660 SF 69 14 83 lNet lnaease -81 21 -61 PM Peak Hour ~ ITE Total Tri K Land Use Code Intensity Trio Generation Rate (1) In Out Total Office 710 23 330 SF Ln (TJ=O.74LnOO+ 1.83 (17183) 11 53 64 Warehouse 150 23,330 SF Ln m=o.79LnOO+O.54 (25/751 5 16 21 TOTAL 46,660 SF 16 69 85 ~ IT[ TOIaI Tri:lS Land Use Code Intensity T riD Generation Rate (1) In Out Total Office 710 33,470 SF Ln m=O.74lnOO+1.83 (17/83) (3) 14 70 84 Medical Office 720 4,050 SF Ln m=O.93LnOQ+ 1.47 (27/73) 4 12 16 Gvmnastic Center 492 4,050 SF 4.05 /1 ,000 SF (51/49 8 8 16 Warehouse 150 5,090 SF Ln m=O.79lnOO+O.54 (25/75) 2 4 6 TOTAL 46,660 SF 28 94 122 INet lnaease 121 251 371 (115ouKe: Mide 13, hir Share Rood ImpocI F.... of IIle P....1lNch County Unifoed Lone! Development Code. (2) Bosed on T riD Genention. 7th edition equotion for 500,000 Sf oft"oce. (3) Soun::e: 1_ 01 Tronsportotion EngjneelSllTEI, Trio Genention. Sth Edition.