Loading...
CORRESPONDENCE 399 W. CAMINO GARDENS BLVD. SUITE 202 BOCA RATON, FLORIDA 33432 V 561.362.0220 F' 561.362.0224 www.andersonarchitecture.com TRANSMITTAL DATE.~.O( TO. fp ~ ~f ~~...) RE. Of5.OttJ a~~~ ~ C~ M~ tJ~. ().s.0t)~ COMM WE ARE SENDING YOU ~TTACHED / VIA D FAX (_PAGES) _HARD COPY TO FOllOW D PRINTS D SPECIFICATIONS D REPRODUCABlES D SHOP DRAWINGS / SUBMITTALS D CD'S/DISKS D COPIES SETS SIZE DATE REV. DESCRIPTION , , B {"")t l\ REMARKS COPIES SIGNEDG: ~ ':l ~IL The City of Boynton Beach PO Box 310 Boynton Beach, Florida 33425-0310 PUBLIC WORKS DEPARTMENT FAX. (561) 742-6285 www boynton-beach.org August 16,2005 Chris Hair Anderson Architecture, Inc. 399 W Camino Gardens Blvd , Suite 202 Boca Raton, FL 33432 RE Request for Administrative Waiver Parking Stall Dimensions Quantum Park Lots 15 & 16 - Quantum Corporate Center (fka Coiltronics) MSPM 05-009 Dear Mr Hair' We are in receipt of your request for an Administrative Waiver to the City of Boynton Beach Engineering Standard Detail K-1 dated August 11,2005 As part of a major site plan modification you will be adding additional parking and you wish to use the standard originally used when the site was developed Your request is hereby approved Parking stalls may be 9-ft. x 18-ft. with a 27-ft. backup/aisle Please be advised that all other CODE, Land Development Regulations, and Engineering Standards still apply to this project. If you have questions or need additional information, please feel free to contact me at (561) 742-6482 or H David Kelley, PE/PSM, City Engineer, at (561) 742-6488 LUck Xc: Jeffrey R. Livergood, P E , Director, Public Works (via e-mail) H David Kelley, PE/PSM, City Engineer, Public Works/Engineering Ed Breese, Principal Planner, Planning & Zoning Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering Frantz LaFontant, Engineering Plans Analyst, Public Works/Engineering File S:\Engineering\Kribs\Req. for Admin Waiver Parking Stall Dimensions Quantum Corporate Ctr.fka Coiltronics.doc A.J.l-IERICA '8 GATEWAY TO THE GrLF8TREAM 08 11 05 Laurinda Logan - Public Works, Traffic City of Boynton Beach 100 E Boynton Beach Blvd Boynton Beach, Florida 33425 Re Quantum Corporate Center (formerly Coiltronics) MSPM #05-009 Laurinda, This letter serves as a request for an Administrative Waiver of the standard detail number K-1 (parking stall dimensions) We propose to construct the new parking stalls with dimensions to match the existing, which are 9' x 18' with a 27' backup If you have any questions, please do not hesitate to call Sincerely, a~U- - Chris Hair cC' Bob Burrow 399 W. CAMINO GARDENS BLVD, . SUITE 202 . BOCA RATON, FLORIDA 33432 · V' 561,362.0220 · F' 561.362.0224 · www.andersonarchitecture.com AA COO1997 architecture, inc. August 11, 2005 ~ ~ 01 ?'n '[ !~. r'-'~~--~ ~~ 1'";' \ r;':7 r; ._'-~._-.o; ,......., i I 'I - , I Sherie Coale Planning & Zoning Division City of Boynton Beach PO Box 310 Boynton Beach, Florida 33425-0310 AOO r 6 2005 RE Quantum Corporate Center Quantum Park Lots 15 & 16 MSPM No 05-009 Dear Ms Coale, Attached is a narrative of our responses to the comments generated during the TART review, with the required revisions reflected on the resubmittal If you have any questions, please do not hesitate to contact me Eric Anderson cc. Bob Burrow, Bocar 399 W. CAMINO GARDENS BLVD . SUITE 202 . BOCA RATON, FLORIDA 33432 · V 561.362.0220 · F' 561.362,0224 · wvvvv.andersonarchitecture.com M COO1997 Quantum Corporate Center. Public Works - General 1 Prior to permit application contract the Public Works Department (561-742- 6200) regarding the storage and handling of refuse per the CODE, Section 10-26 (a) Response. Public Works was contacted. The dumpster was discussed and compliance with the City Standard Drawing G-4 was clarified. 2. With the reconfiguration of parking along the west side of the building the existing dumpster enclosure will no longer be accessible for solid waste pickup Staff recommends relocating the dumpster enclosure to the northwest comer of the parking lot. This will allow a direct line of approach for pickup Response. Will comply The dumpster has been relocated as requested. See revised Site Plan Sheet A-1 3. Indicate by note that the site dumpster enclosure shall be constructed in accordance with City Standard Drawing G-4 Response. Noted on Site Plan, Sheet A-1 4. Canopy trees may need to be relocated to eliminate vertical conflicts with Solid Waste pickup Response. The proposed location for the dumpster was field verified - there are no vertical height conflicts. Public Works - Traffic: 5. Provide a notice of concurrency (Traffic Performance Standards Review) from Palm Beach County Traffic Engineering Response. See attached Traffic Report 6. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars, stop signs, double yellow lane separators striping, directional arrows and "00 Not Enter" signage, etc. See City Standard Drawings ilK" Series for striping details. Response. See revised Sheets A-1 and C-2 for the additional information. 7 The use of different parking stall dimensions in various areas of the parking lot will not be allowed An administrative waiver may be requested from the Engineering Division to allow the use of 9-ft. X 18-ft. stalls with a 27 -ft. backup distance as was originally approved for this project. Response. An Administrative Waiver (in letter form) to allow the new stalls to match the existing will be submitted at the TART meeting. 8. Add stop bars, stop signs, and appropriate double yellow lane separators at the three westem parking sub-lots on the east side of the building where traffic from the east parking area enters the main aisle-way around the building. Response. See revised Sheet A-1 and C-2 for this information. Engineering Division 9 Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's Code requirements at time of application These permits include, but are not limited to, the following paving, drainage, curbing, site lighting, landscaping and irrigation Permits required from other permitting agencies such as Florida Department of Transportation (FDOT), South Florida Water Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach County Engineering Department (PMCED), Palm Beach County Department of Environmental Resource Management (PMCDERM), and any others, shall be included with the permit request. Response. See note on revised Sheet A-1 10. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets Response. Noted. 11 Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the Technical Advisory Review Team (TART), process does not ensure that additional comments may not be generated by the Commission and at permit review Response. Noted 12. Provide written and graphic scales on all sheets Response. See revision on all sheets. 13. Show proposed site lighting on the Site and Landscape plans (LOR, Chapter 4, Section 7 B 4) Response. Site lighting has been added to the Site and Landscape Plans. 14. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LOR, Chapter 23, Article II, Section A.1 b) Response. Not applicable to anyon-site trees. 15. Staff recommends the use of the cultivars Cathedral or Highrise for Live Oaks in the parking islands. Response. These varieties are not appropriate for parking lots due to lack of wind-resistance. 16. Live Oaks along the west property lines should be placed a minimum of 10- feet off the property lines and a minimum of 5-feet away from parking spaces. The applicant may wish to consider palms instead Response. The 5 new oak trees match the existing oaks along the rear parking area - the trees will be placed the maximum distance from the edge of paving the site will permit. 17 Provide an engineer's certification on the Orainage Plan as specified in LOR, Chapter 4, Section 7 F.2. Response. See Certification on Sheet C-1 18. Full drainage plans, including drainage calculations, in accordance with the LOR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Response. Noted. 19. Indicate by note that catch basin and manhole covers shall be bicycle proof (LOR, Chapter 6, Article IV, Section 5.A.2 g) Response. See note on Sheet C-3. 20. Specify storm sewer diameters, inlets types, etc. on Drainage Plan Indicate grate, rim and invert elevations for all structures. Indicate grade of storm sewer segments. Indicate material specifications for storm sewer Response. See note on Sheet C-3. 21 Paving, Drainage and Site details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. Response. Noted. Utilities. 22. No utility plan was included with this submittal, therefore, the Utilities Department considers this plan incomplete as submitted, however, the proposed Site Plan is an existing site located within the Utilities' service area, and is located where utility support is available We are providing only a cursory review of the proposed Site plans as submitted at this time Additional comments may be required after a utility plan has been submitted Response. See attached Utility Plan. 23. Palm Beach County Health Department permits may be required for the water and sewer systems serving this project (CODE, Section 26-12) Response. Noted. 24. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g p.m (500 g p.m some residential developments) with 20 psi. residual pressure as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (CODE Section 26-16(b) Response. The fire flow calculations will be provided at time of permit. 25. The LDR, Chapter 6, Article IV, Section 16 required that all points on each building will be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by showing all hydrants. Response. All hydrants are shown on C-1 It has been determined that additional hydrants are not required. 26. Water and sewer lines to be owned and operated by the City shall be included within utility easements Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Section 26-33(a) Response. Easements are shown on Sheet C-1, No new easements shall be sought or required as part of this project. 27 A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15 Response. Noted. 28. Show location of water and sewer mains on the plans, inCluding tie-in points on Quantum Boulevard Response. See Sheet C-1 for mains and tie ins. 29 Show location of water and sanitary sewer service laterals, including size. Will a larger water service be required? Response. Laterals are shown on Sheet C-1 A larger service is not required. 30. Appropriate backflow preventor(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207 Response The backflow preventor is existing and is shown on the Site Plan, Sheet A-1 31 Any new easements shall be dedicated via separate instrument to the City as stated in the CODE, Section 26-33(a) Response. N/A 32. The LOR, Chapter 3, Article IV, Section 3(0) requires Master Plans to show all utilities on or adjacent to the tract. The plan must therefore show the point of service for water and sewer, and the proposed off-site utilities construction needed in order to service this project. Response. The utilities are existing and no new modifications are required. 33. The LOR, Chapter 3, Article IV, Section 3(P) requires a statement be included that utilities are available and will be provided by all other' appropriate agencies. This statement is lacking on the submitted plans. Response. See statement on Sheet A-1 34. Utility construction details will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates), they will be reviewed at the time of construction permit application Response. Noted Fire 35. All entrance gates to construction area shall have a Knox lock system that will also open in case of electrical power failure. All gates shall be a minimum of 20 feet wide if two lane, and 12 feet wide if single lane Fire Department apparatus shall be able to turn into the construction site in one turn Turn around areas within the construction site shall be made available Response. Noted 36. The construction site access roads shall be maintained free of obstructions at all times. Response. Noted. 37 Any cost of damage to Fire Department vehicles because of improperly stabilized roads or any towing fees if a vehicle becomes stuck will be the responsibility of the contractor A minimum of 32 tons is required for ground stabilization The pouring of the foundation pad is considered vertical construction The roads must be acceptable before construction begins. Response. Noted. 38. All required fire hydrants, standpipes or sprinkler systems shall be in place before going vertical. Vertical construction shall be protected by standpipes and the sprinkler system to two levels below the highest level of construction throughout the building Response. All components of the system are existing. 39 (This is a repeat of Number 37) Response. N/A Police (Comments - None) Building Division 40. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the T.A.R.T (Technical Advisory Review Team) process does not ensure that additional comments may not be generated by the commission and at permit review Response. Noted. 41 Indicate within the site data the occupancy type of the building as defined in 2001 FBC, Chapter 3 Response. Group B See revised Site Plan, Sheet A-1 42. The height and area for buildings or structures of the different types of construction shall be governed by the intended use or occupancy of the building, and shall not exceed the limits set forth in Table 500 of the 2001 FBC Response. Type IV Unprotected, Sprinklered - see Sheet A-1 43. General area modifications to buildings shall be in accordance with 2001 FBC, Sections 503 3,5033.2 and 503 3 3 Provide calculations verifying compliance with the above code sections and the 2001 FBC, Table 500 Response. See area modification tabular on sheet A-1 44. Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind Loads) Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application Response. Noted. 45. Every building and structure shall be of sufficient strength to support the loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table 16041 Indicate the live load (pst) on the plans for the building design Response. The required information will be provided at time of Building Permit review 46. At time of permit review, submit signed and sealed working drawings of the proposed construction Response. Will comply 47 The accessible parking spaces that serve a use shall be located on the shortest safety accessible route of travel from adjacent parking to an accessible entrance The 2001 FBC states that buildings with multiple accessible entrances shall have accessible parking spaces dispersed and located closest to the accessible entrance 2001 FBC, Sections 11-4 1.2(5), 4 3 and 4 6 Response. The accessible routes are depicted on the submitted plans, with multiple entrances. 48. Add to the building that is depicted on the drawing titled site plan and floor plan a labeled symbol that identifies the location of the handicap accessible entrance doors to the building 2001 FBC, Sections 11-4 1.2, 11-4 1 3 and 11-43 Response. See revised Site Plan, Sheet A-1 for this information. 49 Add a labeled symbol to the site plan drawing that represents and delineates the path of travel for the accessible route that is required between the accessible parking spaces and the accessible entrance doors to the building The installed symbol, required along the path, shall start at the accessible parking spaces and terminate at the accessible entrance doors to the building The symbol shall represent the location of the path of travel, not the location of the detectable warning or other pavement markings. The location of the accessible path shall not compel the user to travel in a drivellane area that is located behind the parked vehicles. Identify on the plan the width of the accessible route (Note. The minimum clear width of an accessible route shall be 36 inches, except at curb ramps that are part of a required means of egress shall not be less than 44 inches) Add text to the drawing that would indicate that the symbol represents the accessible route and the route is designed in compliance with 2001 FBC, Section 11-43 (Accessible Route) and 11-4 6 (Parking and Passenger Loading Zones) Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with the regulations specified in the 2001 FBC This documentation shall include, but not be limited to, providing finish grade elevations along the path of travel. Response. See revised Site Plan, Sheet A-1 for this information. 50. If an accessible route has less than 60 inches clear width, then passing spaces at least 60 inches by 60 inches shall be located at reasonable intervals not to exceed 200 feet. A "T" - intersection of two corridors or walks is an acceptable passing place 2001 FBC, Section 11-43 4 Response. Noted. 51 Indicate on the floor plan drawing within the footprint of the building the primary use of the building If the building is an expansion of an existing building, indicate with the footprint of the new existing building, the primary use of the building Response See revised Site Plan, Sheet A-1 for this information. Note that the expansion of the building occurs within the footprint of the building - the building coverage is unchanged. 52. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application A. The full name of the project as it appears on the Development Order and The Commission-approved site plan B If the project is a multi-family project, the building number/s must be provided The building numbers must be the same as note don the Commission-approved site plans. C The number of dwelling units in each building o The number of bedrooms in each dwelling unit. E. The total amount paid and itemized into how much is for water and how much is for sewer (CBBCO, Chapter 26, Article II, Sections 26-34) Response. N/A 53. At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit review Response. Noted. 54. Add a general note to the site plan that all plans submitted for permitting shall meet the City's codes and the applicable building codes in effect at the time of permit application Response. See note on sheet A-1 55. Pursuant to approval by the City Commission and all other outside agencies, the plans for this project must be submitted to the Building Division for review at the time of permit application submittal The plans must incorporate all the conditions of approval as listed in the development order and approved by the City Commission Response. Noted. 56. The handicap-accessible parking spaces shall be located on the shortest, safely accessible route of travel from adjacent parking to an accessible entrance per 2001 FBC, Section 11-4 6.2. (Relocate the two accessible spaces from the south parking lot to the west parking lot) Response. Accessible spaces have been relocated - see revised Sheet A-1 57 Sheet 1.2 - The direct burial light poles shall comply with 2001 FaC, Section 1606 1 Response. Noted. Parks and Recreation 58. Need to provide at least one signature tree standard with a minimum of six (6) feet of clear trunk at project entrance Signature trees include Yellow Elder, Tibouchina Granulosa, and Bougainvillea Response. Will comply, see revised Landscape Plan, Sheet L-1 59 Shrubs and hedges shall be a minimum of twenty-four (24) inches in height, twenty-four (24) inches in spread and planted with tip-to-tip spacing measured immediately after planting to adequately cover the planted areas on the site. Response. Noted. 60 Irrigation coverage should be 110% Response. There is an existing irrigation system. It utilizes a pump and filtration system and draws from the lake to the West. It shall be expanded to accommodate the new landscape areas with coverage of 110%. Forester I Environmentalist: 61 The applicant must indicate on the landscape plan that any existing trees/vegetation in accordance with the original approved landscape plan for lots #15 and #16 that are dead, missing or in poor health after site construction must be replaced with the same size materials throughout the lots. The existing landscaping should be identified on the plan as to species, size, diameter and health Response. Noted. See revised Landscape Plan, L-1 62. The landscape design does not include the City signature trees (Tibouchina Granulosa) at the ingress / egress areas to the site. These trees must meet the minimum size specifications for trees. (Environmental Regulations, Chapter 7 5, Article II Section 5 C 3 N) Response. same comment as #58 - see that response. 63. The Quantum Boulevard right-of-way must receive Floratam sod and irrigation coverage for both lots #15 and #16 (Environmental Regulations, Chapter 7 5, Article II Section 5 C.2) Response The project area on a small portion of the rear of the adjacent lot, not along Quantum Boulevard, such that the addition of landscaping along the ROW is not required. The landscaping of this ROW will be done in conjunction with the development of the balance of the property 64. The applicant should show a landscape elevation detail for the existing and proposed landscape improvements to scale along the Quantum Boulevard right-of-way Response. The landscaping along Quantum Boulevard is existing and is in compliance with the Landscape plan of the original approval. A photograph of the landscaping along Quantum Park is attached. 65. The applicant should add a note that all utility boxes or structures (not currently known or shown on the plan) should be screened with Cocoplum hedge plants on three sides Response. Will comply, see note on Sheets A-1 and L-1 66. The applicant should show the calculated 50% native species of trees, and shrubs. Response. Calculations for the new landscaping is shown on the revised Landscape Plan, Sheet L-1 67 Irrigation Plan - No Irrigation plan included in the submittal. The irrigation system design should be low volume water conservation using non- portable water Response Plans will be submitted at time of building permit 68. City water cannot be used for landscape improvements. Response Noted - the adjacent lake is used for irrigation. 69 Turf and landscape (bedding plants) areas should be designed on separate zones and time duration for water conservation. Response. Noted. 70. Trees should have separate irrigation bubblers to provide water directly to the root ball. (Environmental Regulation, Chapter 7 5, Article II Section 5 C.2) Response. Noted. Planning And Zoning 71 Provide paint swatches with manufacturer name and color name and number at the Technical Application Review (TART) Meeting. Response. The areas that are to be in-filled on the building exterior shall be painted to match the existing color A picture of the existing is attached. 72. The elevation pages shall include the exterior finish, paint manufacturer's names and color codes. Response. See response to comment no. 71 73. All equipment located on the building shall be painted to match the building. Response. Noted. 74. All signage must be approved concurrent with the Site Plan submittal or an additional review by Staff, Board and City Commission will be required solely for signage Provide font size, style and color as well as calculation of square footage of proposed, typical wall signage Response. No sign is proposed at this time. 75.A single sign style (such as cabinet, channel, reverse channel) shall be used for wall signage Response. Noted. 76. If a monument sign is contemplated, it should indicate colors of the proposed sign or the color and size of the lettering to be placed upon it. The base of the monument shall be enhanced with colorful groundcover plants and a minimum of two (2) colorful shrub species. Additionally, the numencal address must be placed prominently in the top portion of the sign, utilizing six (6) inch letters. Response. noted, though no sign is proposed at this time. 77 All signage must be a minimum of 10 feet from any property line. Response. Noted. 78. Quantum Park Architectural Review Committee (ARC) approval required for proposed signage Please provide letter of approval at TART meeting Response. We are currently in review with the Association. 79. Rooftops will be treated as part of the building elevation All rooftop equipment must be completely screened from view at a minimum distance of 600 feet. Response. Noted - all new equipment will comply with this requirement. 80. The proposed windows should match the design of those currently existing on the building Response. Will comply, see revised elevations, Sheet A-4. 81 Provide a unity of title for the two (2) parcels. Response. The Owner is reviewing the language with Councel - the form will be executed prior to submission for Building Permit. 82. Clearly indicate / label on the site plan the property line and phase line Response. See notes on Sheet A-1 83. Existing transformers along Quantum Boulevard shall be screened on three (3) sides with hedge material planted to a minimum of one-half the height of the transformer or 24" - whichever is greater Response. Will comply, see revised Landscape Plan, Sheet L-1 84. Landscaping along the east side of the project abutting Quantum Boulevard shall be upgraded to meet current landscape regulations. Response. The existing landscape along the East side on Quantum Boulevard is in compliance with applicable codes at time of permit. 85. Hedge should be located along west property line adjacent to the parking stalls. Response. The addition of a hedge will block the view of the lake under the canopy of the existing trees and be inconsistent with the balance of the landscaping on the west side. The combination of the existing trees and intermittent understory (shrubs) provides an adequate visual buffer - see attached picture. End of Narrative Department of Engineering and Public Works PO. Box 21229 West Palm Beach. FL 33416-1229 (561) 684-4000 www.pbcgov.com . Palm Beach COunty Board of COunty COmmissioners Tony Masilotti. Chairman Addie L. Greene. Vice Chairperson Karen T. Marcus Jeff Koons Warren H. Newell Mary McCarty Burt Aaronson County Administrator Robert Weisman An Equal Opportunity Affirmative Action Employer @ printed on recycled paper August 11 2005 Mr Michael W Rumpf Director of Planning & Zoning Department of Development City of Boynton Beach POBox 310 Boynton Beach FL 34425-0310 RE Quantum Park - Coiltronics - Lots 15 & 16 - Revised Plan TRAFFIC PERFORMANCE STANDARDS REVIEW Dear Mr Rumpf' The Palm Beach County Traffic Division has reviewed the traffic generation statement for the revised development plan of two lots within the previously approved DRI entitled; Quantum Park - Coiltronics - Lots 15 & 16 pursuant to the Traffic Performance Standards in Article 12 of the Palm Beach County Land Development Code The project is summarized as follows. Location Quantum Park - west side of Quantum Boulevard north of Gateway Boulevard. Boynton Beach 24 696 SF General Office and 15,240 SF Warehouse - to be eliminated 48 999 SF General Office 238 25 AM and 30 PM 2007 Municipality. Existing Uses Proposed Uses. New Daily Trips. New PH Trips. Build-out Year. Based on our review the Traffic Division has determined that the revised plan of the proposed project is part of the previously approved Quantum DRI and therefore meets the Traffic Performance Standards of Palm Beach County under the following condition. . Provision of an exclusive NBL turn lane on Quantum Park Boulevard, onto the project access driveway No building permits are to be issued by the town, after the build-out date, specified above. The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance. If you have any questions regarding this determination please contact me at 684-4030 Sincerely OFFICE OF THE C }/V) Masoud Atefi, M E Project Reviewer - T cc: KimJey Horn'& Associates, Inc. File, General TPS MUll Trdffic Study Review F'\TRAFFIC\ma\Admin\Approvals\050720.doc 111""'1_'" Kimley-Horn ~_~ and Associates, Inc. . July 6, 2005 4431 Embarcadero Drive West Palm Beach, Florida 33407 Mr Michael Rumpf CIty of Boynton Beach Planmng Department 100 E. Boynton Beach Boulevard Boynton Beach, Flonda 33425 Re: Quantum Corporate Center (Lot 15, Quantum Park DRI) Boynton Beach, Flonda 040750001 Dear Mr Rumpf: KImley-Hom and AssocIates, Inc has performed a traffic reVIew of the proposed office development on Lot 15 of Quantum Park m the City of Boynton Beach. Quantum Park IS an approved Development of RegIOnal Impact (DR!). The subJect parcel WIthin the DR! IS located north of Gateway Boulevard on the west SIde of Quantum Boulevard. Currently thIS parcel contams 24,896 square feet of office use and 15,240 square feet ofmdustnal warehouse use. The proposed plan results m a total of 48,999 square feet of office use on SIte. A tnp generation companson was performed between the eXIsting and proposed uses. The results are summanzed below Trip Generation The tnp generation potential of the site was determmed usmg rates and equations publIshed by Palm Beach County and by the Institute of Transportation Engmeers m Trip Generation, th Edition. The tnp generatIOn potential of the proposed uses was compared to that of the current uses to determme the net dIfference in tnps. As shown m Table 1, the proposed proJect IS expected to generate 238 net new daily tnps, 25 net new AM peak hour and 30 net new PM peak hour tnps m companson to the eXIstmg uses. The Quantum Park DR! has an eXIstmg PrevIOUS Approval as defined m ArtIcle 12, Traffic Performance Standards, of the Palm Beach County Umfied Land Development Code (ULDC) Table 2 prOVIdes a summary of the uses for each parcel wIthm the Quantum Park DR!. The lIne for thIS parcel ("Quantum Corporate Center") IS hIghlIghted. The proposed land use and mtensItIes are wIthm the maXImum thresholds of the approval for the Quantum Park DR!. Therefore, the proposed project IS not subject to further review under the Traffic Performance Standards. . TEL 561 845 0665 FAX 561 863 8175 ~__n Kimley-Horn ~ U and Associates, Inc. Mr Michael Rumpf, July 6, 2004, Page 2 Driveway Analysis The proposed sIte will have access to Quantum Boulevard VIa one full-access dnveway connectton. ProJect trIps for the proposed development as calculated before have been assIgned to the dnveway based on the locatton of the dnveway and the surroundmg roadways and developments. Dnveway volumes are provided on FIgure 1 If you have any questlOns regardmg thIS analYSIS, please do not heSItate to contact Kelly Rosenberger or me. Smcerely, KIMLEY -HORN AND ASSOCIATES, INC ~+f vJ#o Chnstopher W Heggen, P .E. T..!D}}sportation Engmeer /(0105- Flonda RegIstration # 58636 Engmeenng Busmess Number 00000696 CWWEKR/gb Cc Masoud Atefi Enc Anderson P-\0407\5000 I \070605rnr.doc TABLE 1 QUANTUM CORPORATE CENTER TRIP GENERATION EQUIVALENCY Daily AM Peak Hour PM Peak Hour Land Use Intensity Trips Total Enter Exit Total Enter Exit Existinl! Development Warehouse 15,240 s.f. 76 22 18 4 15 4 11 General Office 24,896 s.f. 457 62 55 7 67 11 56 Subtotal 533 84 73 11 82 15 67 Internal Capture Between Warehouse and Office 10% 15 4 4 0 3 1 2 Pass-By Capture Warehouse 5% 3 1 1 0 1 0 1 Office 5% 22 3 3 0 3 1 2 Subtotal 25 4 4 0 4 1 3 Driveway Trips 518 80 69 11 79 14 65 External Trips 493 76 65 11 75 13 62 Proposed Development General Office 48,999 s.f. 770 106 93 13 111 19 92 Pass-By Capture Office 5% 39 5 5 0 6 I 5 Driveway Trips 770 106 93 13 111 19 92 External Trips 731 101 88 13 105 18 87 Total New Trips 238 25 23 2 30 5 25 Notes: Trip Generation was calculated using the following data. Daily Warehouse [P.B C.] = T = 4.96 trips/1 000 s.f. General Office [P.B C.] = Ln(T) = 77 Ln(X) + 365 A.M. Peak Hour Warehouse [ITE 150] = Ln(T) = 0 71 Ln(X) + 1 15 (82% in; 18% out) General Office [ITE 710] = Ln(T) = .80 Ln(X) + 1.55 (88% ill, 12% out) P.M. Peak Hour Warehouse [ITE 150] = Ln(T) = 0 79 Ln(X) + 0.54 (25% in, 75% out) General Office [P.B C.] = Ln(T) = 0 74 Ln(X) + 1.83 (17% In, 83% out) p:\0407\50001\{tgen.xls}table 1 7/6/058.14AM JIIII"""""- n Kimley-Horn ......... _ r ~ and Associates, Inc. Copyright (!;;) 2005 Kimley-Horn and Associates. Inc. TABLE 2 QUANTUM PARK DR! LAND USE SUMMARY Land Use Data Master Plan Actual Lot Owner Desi1!oatioD Develooment Gross Floor Area Trip Generation Rate Dailv Trios Pass-bv Trios /1 Net Trios I loan Hamuton Inn OIVC HOlel 161 Rooms 7.27 I Room 1,170 0.0% 1,170 11nan OriJtinal Pancake House OIVC Restaurant 4,710 SF 130.34 /1000 SF 614 92 15.(>"/0 522 3 Quantum OfficeIW arehouse all Office 23 ,330 SF 9.21/1000 SF (I) 215 0.0% 215 Warehouse 23,330 SF 4.96 11000 SF 116 0.0% 116 4,5 United Wav Rotunda FDTN 0 Office 16442 SF 9.21 /1000 SF 1\ 151 0.0% 151 6 Stanton Magnetics LLC all Office 5356 SF 9.21 11000 SF (I) 49 0.0% 49 Industrial 27732 SF 6.97/1000 SF 193 0.0% 193 7-11 Continental Homes MU Residential-Multi 102 DU 7/DU 714 0.0% 714 17 Olen Development all Industrial 4,470 SF 6.97/1000 SF 31 2 6.4% 29 Retail 17 ,890 SF Ln (T) = .64Ln (X) + 5.87 2,244 \,003 44.7% 1,241 Office 38,243 SF 9.21 11000 SF III 352 18 5.1% 334 18,19 all Chaner School 625 Students 0.913 I Student 571 0.0% 571 Office 5,538 SF 9.21 /1000 SF (I) 51 0.0% 51 Industrial 12,923 SF 6.97 /1000 SF 90 0.0% 90 20 Stiles ProD. Man. IAUstatel all Office 16,442 SF 9.21/1000 SF (II 151 0.0% 151 21 OIen Develooment all Office 28,266 SF 9.21 11000 SF II) 260 0.0% 260 22 Boynton Masonic Lodge 0 Lodge 3,229 SF 38.6 11000 SF (4) 125 0.0% 125 Day Care Center Dav Care 3,600 SF 79.26/1000 SF 285 0.0% 285 23-31 Continental Homes MU Residential -Multi 169 DU 7/DU 1,183 0.0% 1,183 32,33,34A,34B,35-38 Premier Asset Ml!fIlt. all Industrial 336,050 SF 6.97/1000 SF 2,342 0.0% 2,342 40,41,42,43,44,45,53,54 PBCSB GilD. High School 2,500 Students 2,283 0.0% 2,283 46 an Sun Sentinel 011 Warehouse 22,700 SF 4.96 /1000 SF 113 0.0% 113 46A1oanl,47Aloan ,47B an Flowers Bakerv I Industrial 24,000 SF 6.97 11000 SF 167 0.0% 167 47Aloan ,47B an P JM & Associates I Industrial 52,000 SF 6.97 11000 SF 362 0.00/0 362 46B,47B pan ,47C Safetv Kleen I Industrial 14,824 SF 6.97 /1000 SF 103 0.0% 103 48 A,B,& C Watershed I Rehab. Center 344 Beds 4.5 /Bed 1,548 0.0% 1,548 49 Canada Drv Distribution I Industrial 50,000 SF 6.97/1000 SF 349 0.0% 349 50B Gale Industries all Warehouse 14,728 SF 4.96 11000 SF 73 0.0% 73 Office 2,641 SF 9.21 /1000 SF III 24 0.0% 24 51A Curt B. JOA all Industrial 27,000 SF 6.97/1000 SF 188 0.0% 188 51B FP & L Substation all Industrial 51D Cevas North America all Office 4,000 SF 9.21/IoooSF(I) 37 0.0% 37 Warehouse 6,000 SF 4.96 11000 SF 30 0.0% 30 52 OIen Development all Industrial 8,280 SF 6.97 II 000 SF 58 3 5.2% 55 Retail 10,080 SF Ln (T) ~ .64Ln (X) + 5.87 1,554 698 44.9% 856 Office 35,757 SF 9.21 11000 SF III 329 16 4.9% 313 55 Publix Suoer Market I Industrial 420,000 SF 6.97 /1000 SF 2,927 0.0% 2,927 58 Quantum Park Office a/I Office 51,470 SF 9.21 1000 SF I 474 0.0% 474 59,60,61 Grotto Bav lVlU Residential -Multi 272 DU 7 DU 1,904 0.0% 1,904 62-67 Quantum Park and Village S. Mt; Residential -Multi 234 DU 7/DU 1,638 0.0% 1,638 Retail 82,260 SF Ln (T) ~ .64Ln (X) + 5.87 5,957 2,576 43.2% 3,381 Office 32,010 SF 9.21 11000 SF (1) 295 0.0% 295 Restaurant 15,000 SF 89.95/1000 SF 1,349 202 15.0% 1,147 65B (pan) Mobil Oil Colporation OIllC Gas Station 16 Fuel Pos. 2,795 894 32.0% 1,901 Cony Store 3,054 SF 1,533 920 60.0% 613 68A&B,69,70,72 Boynton Industrial Realty COil" all Warehouse 212,142 SF 4.96 11000 SF 1,052 0.0% 1,052 Office 53,036 SF 9.21 /1000 SF III 488 0.0"10 488 73A,73B,74,75,76 Premier Asset Mgmt. OIIlC Warehouse 129,650 SF 4.96 /1000 SF 643 0.0% 643 Office 32,412 SF 9.21/1000 SF (1) 299 0.0% 299 Retail 34,493 SF Ln IT) ~ .64Ln IXl + 5.87 3,416 1,514 44.3% 1,902 77,78,79,80 CarMax C Auto Dealershio 53,072 SF 23 /1000 SF 1,221 0.0% 1,221 81,82 Gateway Center OIVC Retail 77,375 SF Ln (T) - .64Ln (X) + 5.87 5,728 2,484 43.4% 3,244 Restaurant-Fast 5,000 SF 379.34/1000 SF 1,897 854 45.0% 1,043 Restaurant-Hildt 5,000 SF 130.34 /1000 SF 652 98 15.0% 554 83-88 Quantum Park and ViUage N. MU Residential Mutti 142 DU 7/DU 994 0.0% 994 Retail 102,235 SF Ln (n = .64Ln IXl + 5.87 6,846 2,930 42.8% 3,916 89A SYStems Contro~ Inc. all Industrial 5,280 SF 6.97 11 000 SF 37 0.0% 37 89B Westbroook MU Residential-Multi 39 DU 7/DU 273 0.0"/" 273 90 TriRail GlIn. Park N Ride 633 0.0"/" 633 90 Gatewav Professional Office all Office 10,200 SF 9.21 /1000 SF III 94 0.0% 94 100 Grotto Bay MU Residential -Multi 42 DU 7/DU 294 0.0% 294 Total 2,355,397 SF (2)(3 62,938 14,304 48,634 I VESTED TRlPS\ 63,752 Vested Uses Committed Uses Office 637,900 SF 510,971 SF Commercial 728,768 SF 453,317 SF (2) Industrial 1,722,700 SF 1,391,109 SF Residential 1,000 Dwelling Units 1,000 DO's Movie Theater 4,000 Seats 0 Total 2,355,397 SF (3) LEGEND o Office I Industrial C Commercial G Governmental In Institutional MU Mixed Use Note: Hlgblighted areas Include proposed development plan. (I) Based on ITE 6th Edition equation for 500,000 SF offices (2) Includes hotel rooms at 268 SF per room, Auto Dealership, Restaurants and C Store (3) Does not include high schooo~ chaner schoo~ FPL Substation and Tri Trail (4) 40% of quality restaurant trip generation rate per discusssions with County staff Legend Figure 1 PROJECT DRIVEWAY VOLUMES Quantum Corporate Center N A 12 AM Peak Hour Volume (83) PM Peak Hour Volume 17701 Daily Volume ~=~ Kimley-Horn and Associates, Inc. July 5, 2005 Not to Scale 040750001 CAMERO ENGINEERS & ASS 0 C I ATE S, INC. PLANNERS July 5, 2005 City of Boynton Beach 100 East Boynton Beach Blvd Boynton Beach, FL 33435-3838 SUBJ Quantum Executive Center Boynton Beach, Palm Beach County, Florida Our Job No. 05-129 , 1 lUG JUL - 620Lb L___ PL ----;-:r.--~. . : ~, ",D h rv/\C; D::PT To Whom It May Concern I hereby certify that all components of the site drainage system ill be designed to meet the requirements of the South Florida Water Man ement District and City of Boynton Beach Chapter 6, Article 5 of these Land De lopment Regulations If you have any questions regarding this matter, please do n t hesitate to call our office .JL C/oac QCj129-('ITY-01 doc 7400 SOUTH'IVEST 50 ~ TERRACE MIAMI FLORiDA 33155 (305) 665-7602 (305) 665-8488 (FA/) ~ The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DMSON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Aorida 33425-0310 TEL. 561 742-6260 FAX, 561 742-6259 www.boynton-beach.org July II, 2005 Mr Masoud Atefi MSCE, Senior Traffic Engineer Palm Beach County Traffic Division Department of Engineering and Public Works POBox 21229 West Palm Beach, Florida 33416 Re Traffic Statement Quantum Park Lots 15 + 16 (Coiltronics) Dear Mr Atefi The enclosed traffic statement, prepared by Kimley-Horn and Associates, Inc , dated July 6, 2005, was received by Planning and zoning for the above-referenced application Please review the enclosed information for conformance with the County's Traffic Performance Standards Ordinance, and provide Tim Large, Building Code Administrator and me with your written response If you have questions regarding this matter, please call me at (561) 742- 6260 Sincerely, Michael W Rumpf Director of Planning and Zoning MWR/sc Attachments ~__n Kimley-Horn ~ U and Associates, Inc. ,- - I rl I i D / . /n1~;i UL! JUt _ 62lXS i ~---.. --../ I -----.---- -----~ ...... -- ; r- ------ . July 6, 2005 ..,----~ 4431 Embarcadero Drive West Palm Beach, Florida 33407 Mr MIchael Rumpf CIty of Boynton Beach Planmng Department 100 E. Boynton Beach Boulevard Boynton Beach, Flonda 33425 Re' Quantum Corporate Center (Lot 15, Quantum Park DR!) Boynton Beach, Flonda 040750001 Dear Mr Rumpf: KImley-Hom and AssocIates, Inc has performed a traffic reVIew of the proposed office development on Lot 15 of Quantum Park m the CIty of Boynton Beach. Quantum Park IS an approved Development of RegIOnal Impact (DR!). The subject parcel wlthm the DR! IS located north of Gateway Boulevard on the west SIde of Quantum Boulevard, Currently thIS parcel contams 24,896 square feet of office use and 15,240 square feet ofmdustnal warehouse use, The proposed plan results m a total of 48,999 square feet of office use on SIte A tnp generation companson was performed between the eXIstmg and proposed uses. The results are summanzed below Trip Generation The tnp generation potential of the SIte was determmed usmg rates and equations publIshed by Palm Beach County and by the Institute of Transportation Engmeers m Trip Generation, ih Edition. The tnp generation potential of the proposed uses was compared to that of the current uses to determme the net dIfference m tnps. As shown m Table 1, the proposed proJect is expected to generate 238 net new daily tnps, 25 net new AM peak hour and 30 net new PM peak hour tnps m companson to the eXIsting uses, The Quantum Park DR! has an eXIsting PreVIOUS Approval as defined m Article 12, Traffic Performance Standards, of the Palm Beach County Umfied Land Development Code (ULDC) Table 2 provides a summary of the uses for each parcel withm the Quantum Park DR!. The lIne for thIS parcel ("Quantum Corporate Center") IS hIghlIghted. The proposed land use and intensities are wIthm the maXImum thresholds of the approval for the Quantum Park DR!. Therefore, the proposed proJect IS not subJect to further reView under the Traffic Performance Standards. . TEL 561 845 0665 FAX 561 863 8175 ~__n Kimley-Horn ~ U and Associates, Inc, Mr Michael Rumpf, July 6, 2004 Page 2 Driveway Analysis The proposed SIte will have access to Quantum Boulevard VIa one full-access dnveway connection. Project trIps for the proposed development as calculated before have been assIgned to the dnveway based on the locatIOn of the driveway and the surroundmg roadways and developments. Dnveway volumes are prOVIded on FIgure 1 If you have any questIons regardmg thIS analysIs, please do not hesItate to contact Kelly Rosenberger or me. Smcerely, KIMLEY -HORN AND ASSOCIATES, INC ~-f-I wJtc Clmstopher VI Heggen, P ,E. T~~PO. rtahon Engmeer '/0/OS- Flonda RegistratIOn # 58636 Engmeenng Busmess Number 00000696 CWH/EKRlgb Cc Masoud Atefi Enc Anderson P'\0407\5000 I \070605mr.doc TABLE 1 QUANTUM CORPORATE CENTER TRIP GENERATION EQUIVALENCY Daily AM Peak Hour PM Peak Hour Land Use Intensity Trips Total Enter Exit Total Enter Exit Existine: Development Warehouse 15,240 s.f. 76 22 18 4 15 4 11 General Office 24,896 s.f. 457 62 55 7 67 II 56 Subtotal 533 84 73 11 82 15 67 Internal Capture Between Warehouse and Office 10% 15 4 4 0 3 I 2 Pass-By Capture Warehouse 5% 3 I I 0 1 0 I Office 5% 22 3 3 0 3 1 2 Subtotal 25 4 4 0 4 1 3 Driveway Trips 518 80 69 11 79 14 65 External Trips 493 76 65 11 75 13 62 Proposed Development General Office 48,999 s.f. 770 106 93 13 111 19 92 Pass-By Capture Office 5% 39 5 5 0 6 I 5 Driveway Trips 770 106 93 13 111 19 92 External Trips 731 101 88 13 105 18 87 Total New Trips 238 25 23 2 30 5 25 Notes: Trip Generation was calculated using the following data. Daily Warehouse [P.B C.] = T = 4.96 tnps/1,OOO s.f. General Office [P.B C.] = Ln(T) = 77 Ln(X) + 3 65 A.M. Peak Hour Warehouse [ITE 150] = Ln(T) = 0 71 Ln(X) + 1 15 (82% m; 18% out) General Office [ITE 710] = Ln(T) = .80 Ln(X) + 1.55 (88% in, 12% out) P.M. Peak Hour Warehouse [ITE 150] = Ln(T) = 0 79 Ln(X) + 0.54 (25% in, 75% out) General Office [P.B C.] = Ln(T) = 074 Ln(X) + 183 (17% in, 83% out) p:\0407\5000J\[tgen.xls]table J 7/6/058. /4 AM .......- _ n Kimley-Horn ~ _, ~ and Associates, Inc. Copyright @2005 Kimley-Horn and Associates. Inc. TABLE 2 QUANTUM PARK DRI LAND USE SUMMARY Land Use Data Master Plan Actual Lot Owner Desi2nation Development Gross Floor Area Trip Generation Rate Dailv Trios Pass-b Trios 11 Net Trios I {nart Hamotoo Inn Oll/C Hotel 161 Rooms 7.27 I Room 1,170 0.0"10 1,170 I {oart OrilZinaJ Pancake House Oll/C Restaurant 4,710 SF 130.34 11000 SF 614 92 15.0"/. 522 3 Quantum OfficeIW arehouse 011 Office 23,330 SF 9.21 11000 SF (I) 215 0.0% 215 Warehouse 23,330 SF 4.96 11000 SF 116 0.0"/. 116 4,5 United Wav Rotunda FDTN 0 Office 16442 SF 9.21 11000 SF (I) 151 0.0"/. 151 6 Stanton Magnetics LLC 011 Ollice 5356 SF 9.21 11000 SF (I) 49 0.0% 49 Industrial 27732 SF 6.97/1000 SF 193 0.0% 193 7-11 Continental Homes MU Residential-Multi 102 DU 7/DU 714 0.00/. 714 17 Olen Development 011 Industrial 4,470 SF 6.97 11000 SF 31 2 6.4% 29 Retail 17,890 SF Ln (T) = .64Ln (X) + 5.87 2,244 1,003 44.7% 1,241 Ollice 38,243 SF 9.21 11000 SF (J\ 352 18 5.1% 334 18,19 011 Charter School 625 Students 0.913 I Student 571 0.0"10 571 Office 5,538 SF 9.21 11000 SF (I) 51 0.0"10 51 Industrial 12,923 SF 6.97 11 000 SF 90 0.0% 90 20 Stiles Proo. Man. (Allstate) 011 Office 16,442 SF 9.21 I 1000 SF{\) 151 0.0% 151 2 I Olen DeveloDment 011 Ollice 28,266 SF 9.21 11000 SF (i) 260 0.0% 260 22 Boynton Masonic Lodge 0 Lodge 3,229 SF 38.6 11000 SF (4) 125 0.0% 125 Dav Care Center Dav Care 3,600 SF 79.26 I 1000 SF 285 0.0% 285 23-31 Continental Homes MU Residential-Multi 169 DU 7/DU 1,183 0.0"10 1,183 32,33,34A,34B,35-38 Premier Asset MIZlIlt. 011 Industrial 336,050 SF 6.97 11000 SF 2,342 0.0% 2,342 40,4 I ,42,43 ,44,45,53,54 PBCSB GIIn. Hi2h School 2,500 Students 2,283 0.0"/. 2,283 46A art Sun Sentinel 011 Warehouse 22,700 SF 4.96/1000 SF 113 0.0"10 113 46AIDart),47A1Dart ,47B art Flowers Bakerv I Industrial 24,000 SF 6.97 11000 SF 167 0.0% 167 47A1nart ,47B art P JM & Associates I Industrial 52,000 SF 6.97 11000 SF 362 0.0% 362 46B,47B Part ,47C SaCetv Kleen I Industrial 14,824 SF 6.97 11000 SF 103 0.0% 103 48 A,B,& C Watershed I Rehab. Center 344 Beds 4.5 I Bed 1,548 0.0"10 1,548 49 Canada Dry Distribution I Industrial 50,000 SF 6.97 11000 SF 349 0.0% 349 50B Gale Industries 011 Warehouse 14,728 SF 4.96 11000 SF 73 0.0"10 73 Ollice 2,641 SF 9.21 11000 SF II) 24 0.0% 24 5lA Curt B. JOA 011 Industrial 27,000 SF 6.97/1000 SF 188 0.0"/. 188 51B FP & L Substation 011 Industrial 5ID Cevas N onh America 011 Ollice 4,000 SF 9.21 11000 SF (I) 37 0.0% 37 Warehouse 6,000 SF 4.96 11000 SF 30 0.0% 30 52 Olen Development 011 Industrial 8,280 SF 6.97 11000 SF 58 3 5.2% 55 Retail 10,080 SF Ln (T) = .64Ln (X) + 5.87 1,554 698 44.9% 856 Ollice 35,757 SF 9.21 11000 SF (I) 329 16 4.9% 313 55 Publix SUDer Market I Industrial 420,000 SF 6.97 I 1000 SF 2,927 0.0"10 2,927 58 I Quantum Park Office 011 Office 51,470 SF 9.21/1000 SFli) 474 0.0"10 474 59,60,61 Grotto Bav MU Residential-Multi 272 DU 7/DU 1,904 0.0% 1,904 62-67 Quantum Park and Village S. MU Residential -Multi 234 DU 7/DU 1,638 0.0"10 1,638 Retail 82,260 SF Ln (T) ~ .64Ln (X) + 5.87 5,957 2,576 43.2% 3,381 Office 32,010 SF 9.21 11000 SF (I) 295 0.0% 295 Restaurant 15,000 SF 89.95 11000 SF 1,349 202 15.0% 1,147 65B (part) Mobil Oil Corporation O/IIC Gas Station 16 Fuel Pos. 2,795 894 32.0"/. 1,901 Conv Store 3,054 SF 1,533 920 60.0% 613 68A&B,69,70,72 Boynton Industrial Realty Corp. all Warehouse 212,142 SF 4.96 / 1000 SF 1,052 0.0% 1,052 Ollice 53,036 SF 9.21 11000 SF (I) 488 0.0% 488 73A,73B,74,75,76 Premier Asset Mgmt. Ollie Warehouse 129,650 SF 4.96/1000 SF 643 0.0"10 643 Ollice 32,412 SF 9.21 11000 SF (I) 299 0.0% 299 Retail 34,493 SF Ln (n = .64Ln (X) + 5.87 3,416 1,514 44.3% 1,902 77,78,79,80 CarMax C Auto DealershiD 53,072 SF 23 / 1000 SF 1,221 0.0% 1,221 81,82 Gateway Center Oll/C Retail 77,375 SF Ln (T) - .64Ln (X) + 5.87 5,728 2,484 43.4% 3,244 Restaurant-Fast 5,000 SF 379.34 I 1000 SF 1,897 854 45.0"10 1,043 Restaurant-Hi2h 5,000 SF 130.34 /1000 SF 652 98 15.0% 554 83-88 Quantum Park and Village N. MU Residential-Multi 142DU 7/DU 994 0.0% 994 Retail 102,235 SF Ln (n = .64Ln {Xl + 5.87 6,846 2,930 42.8% 3,916 89A Svstems Control, Inc. all Industrial 5,280 SF 6.97 11000 SF 37 0.0% 37 89B Westbroook MU Residential-Multi 39 DU 7/DU 273 0.0"/. 273 90 TriRail GIIn. Park N Ride 633 0.0% 633 90 Gatewav ProCessional Ollice all Office 10,200 SF 9.21 11000 SF (I) 94 0.0% 94 100 Grotto Bay MU Residential -Multi 42DU 7IDU 294 0.0% 294 Total 2,355,397 SF (2U3 62,938 14,304 48,634 I VESTED TRIPSI 63,7S2 Vested Uses Committed Uses OlrlCe 637,900 SF 510,971 SF Commercial 728,768 SF 453,317 SF (2) Industrial 1,722,700 SF 1,391,109 SF Residential 1,000 Dwelling Units I,OOODU's Movie Theater 4,000 Seats 0 Total 2,355,397 SF (3) LEGEND o Office I Industrial C Commercial G Governmental In Institutional MU Mixed Use Note: Highlighted areas include proposed development plan. (I) Based on ITE 6th Edition equation for 500,000 SF offices (2) Ineludes hotel rooms at 268 SF per room. Auto Dealership, Restaurants and C Store (3) Does not include high schoool, charter school, FPL Substation and Tri Trail (4) 40% oC quality restaurant trip generation rate per discusssions with County staff N A Not to Scale Legend Figure 1 PROJECT DRIVEWAY VOLUMES Quantum Corporate Center 12 (83) 17701 AM Peak Hour Volume PM Peak Hour Volume Dally Volume ~=~ Kimley-Horn and Associates, Inc. July 5 2005 040750001