AGENDA DOCUMENTS
AGENDA
DOCUMENTS
CITY OF BOYNTON BEACH
AGENDA ITEM REQUEST FORM
Requested City Commission Date Final Form Must be Turned
Meeting Dates in to City Clerk's Office
Requested City Commission
Meetimz Dates
Date Final Form Must be Turned
in to City Clerk's Office
D April 5, 2005
D April 19 2005
D May 3, 2005
D May 17 2005
March 14,2005 (Noon.)
D June 7 2005
D June 21 2005
D July 5, 2005
~ July 19 2005
May 16, 2005 (Noon)
April 4, 2005 (Noon)
June 6, 2005 (Noon)
April 18,2005 (Noon)
June 20, 2005 (Noon)
May 2, 2005 (Noon)
July 5, 2005 (Noon)
NATURE OF
AGENDA ITEM
D Administrative
~ Consent Agenda
D Public Hearing
D Bids
D Announcement
D City Manager's Report
D Development Plans
D New Business
D Legal
D UnfInished Business
D Presentation
RECOMMENDATION Please place this request on the July 19, 2005 City Commission Agenda under Consent
Agenda. The Planning and Development Board recommended the subject be approved on June 28, 2005 For further details
pertaining to the request, see attached Department of Development Memorandum No. PZ 05-067
EXPLANATION
PROJECT
AGENT
OWNER.
LOCATION
DESCRIPTION
Quantum Park & Village South Commercial (MSPM 05-003)
Steve Fike, Olen Development
Quantum Park and Village, LLC
Southwest corner of Gateway Boulevard and High Ridge Road
Request for Master Site Plan ModifIcation approval for the construction of a mixed-use
development consisting of an additional 115 multi-family dwelling units (for a total of
349 dwelling units) and 71,708 square feet of commercial/office space on a 26.165 acre
- Mixed Use POD in the Planned Industrial Development (Pill) zoning district.
PROGRAM IMPACT N/A
nSCALIMPACT NM
ALTERNATIVES: N/A
~v~~tm
]~-J LL/
pfanning and ZoJ}fllg Director City Attorney / Finance / Human Resources
S:\Planning\SHARED\WP\PROJECTS\Quanturn Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\Agenda Item Request Quantum Pk &
Village S Comm MSPM 05-003 7 I9-05.dot
City Manager's Signature
S:\BULLETIN\FORMS\AGENDA ITEM REQUEST FORM.DOC
TO
THRU
FROM
DATE.
PROJEcr NAME/NO
REQUEST
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DMSION
MEMORANDUM NO. PZ 05-067
STAFF REPORT
Chair and Members
Planning & Development Board and City Commission
Michael Rumpf
Planning and Zoning Director
Eric Lee Johnson, AICP
Planner
May 3, 2005
Quantum Park & Village South / MSPM 05-003
Master Site Plan Modification
Property Owner.
Applicant:
Agent:
Location
Existing Land Use:
Existing Zoning
Proposed Uses:
Acreage.
Adjacent Uses:
North
South.
East:
PROJECT DESCRIPTION
Quantum Park & Village, LLC.
Olen Development
Mr Steve Fike, Vice President of Construction / Olen Development
Southwest corner of Gateway Boulevard and High Ridge Road (see
Location Map - Exhibit "AfT)
Industrial with a Mixed Use (MU) designation on the Quantum Park
Master Plan
Planned Industrial Development (PID)
115 Multi-family dwelling units and 71,708 square feet of commercial /
office space on the commercial component of the Quantum Park and
Village South Master Site Plan.
621,396 square feet (14265 acres)
Right-of-way for Gateway Boulevard and farther north is vacant Quantum
Lots 83 - 85, zoned Planned Industrial Development (PID),
Quantum Park developed Lots 62, 66, 67-A, 67-B, and 67-C, zoned PID,
the Sand Pine Preserve and right-of-way for Quantum Lane,
Right-of-way for High Ridge Road and farther east are vacant Quantum
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 2
Lots 81 & 82, zoned PID, and
West:
Quantum Park Water Management Tract "Q"
PROPERTY OWNER NOTIFICATION
Owners of properties within 400 feet of the subject major site plan modification were mailed a notice
of this request and its respective hearing dates. The applicant certifies that they posted signage and
mailed notices in accordance with Ordinance No 04-007
NATURE OF REQUEST
Mr Steve Fike, Vice President of Construction for Olen Development, is requesting to modify the Master
Site Plan for Quantum Park & Village South This development is located on the southwest corner of High
Ridge Road and Gateway Boulevard (see Exhibit "A" - Location Map) The specific request is to construct
115 dwelling units and 71,708 square feet of commercial area on the commercial "portion" of the master
site plan. This would result in a total of 349 dwelling units for the entire master site plan.
BACKGROUNDI ANALYSIS
On September 3, 2002, the master site plan was approved for 234 rental apartments and 132,032 square
feet of commercial It was also approved with six (6) waivers. Master site plan approval is valid
indefinitely per Chapter 2, Section 7 P 9 of the Land Development Regulations.
The Quantum Park & Village South master site plan is comprised of two (2) technical site plans, namely
Quantum Park & Village South Commercial (NWSP 03-004) and Quantum Park & Village South Residential
(NWSP 02-022) The residential component is also known as the third phase of Villas at Quantum Lakes.
Technical site plans on mixed use pods within Planned Industrial Developments do not require City
Commission review and approval provided that they are consistent with the master site plan For this
project, both technical site plans were found to be consistent with the master site plan and were thus
approved administratively by staff Review and approval of the residential technical site plan (NWSP 02-
022) was completed with the build-out of the Villas at Quantum Lakes apartment buildings. The technical
site plan for Quantum Park & Village South Commercial (NWSP 03-004) was originally approved for six (6)
commercial buildings for a total of 119,185 square feet. However, it was never built-out and new
modifications are currently being sought. The revised master site plan proposes dwelling units in lieu of a
portion of the commercial space originally planned Both are permitted uses within mixed use pods of the
PID However, these modifications represent a significant change to the technical site plan (NWSP 02-
022) and likewise, to the master site plan (SBMP 02-001).
Six (6) waivers were previously approved by the City Commission and are itemized on the master site plan.
The proposed changes to the commercial portion of the master plan do not impact any of the approved
waivers.
The master site plan tabular data shows the parking requirements as follows
Commercial 71,708 square feet @ 1/225
One bedroom 143 units @ 1.5 spaces
Two bedrooms 206 units @ 2 spaces
319 spaces
215 spaces
412 spaces
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 3
5% guest spaces for Villas at Quantum Lakes
19 soaces
965 spaces
The above referenced list indicates that 965 parking spaces are required The master site plan would
provide a total of 1,037 parking spaces, or an excess of 72 parking spaces.
A surface water management system has served the Quantum Community Development District since
1989 The District has legal positive outfall to the Lake Worth Drainage District's E-4 Canal The
stormwater runoff is discharged via an existing control structure. The proposed volume and rate of the
discharge would be controlled pursuant to the applicable permits. The subject property would connect to
the existing District system
The master site plan's original traffic impact study was approved by the Traffic Division of Palm Beach
County on June 28, 2002. The master site plan was approved for 234 multi-family dwelling units, 82,260
square feet of general retail, and 32, 010 square feet of office. The revised study approved on August 19,
2002 included 136 multi-family dwelling units and 102,235 square feet of general retail In February of
2005, Ordinance 05-013 for Development of Regional Impact (DRIA 05-001) was approved by the City
Commission to increase the maximum number of dwelling units allowable with Mixed Use pods (within the
entire Quantum Park DRI) from 1,000 units to 1,105 units. These additional units were earmarked, in
part, for this master site plan modification Additional units are being earmarked for the "commercial"
component of this master site plan for Quantum Park & Village South. As such, a traffic impact statement
was submitted in conjunction with this request. Staff has received confirmation from the Traffic Division of
Palm Beach County that the proposed project is part of the previously approved Quantum DRI, and
therefore, meets the Traffic Performance Standards of Palm Beach County However, no building permits
are to be issued after the build-out date of 2007 ( see Exhibit "C" - Conditions of Approval)
Concurrency.
Traffic: A traffic generation statement, prepared by Pinder Troutman Consulting, Inc. was
sent to the Palm Beach County Traffic Division for concurrency review Based on
their review, the Traffic Division determined that the proposed project is part of the
previously approved Quantum DR!, and therefore, meets the Traffic Performance
Standards (TPS) of Palm Beach County However, no building permits are to be
issued by the City after the build-out date of 2007 (see Exhibit "C" - Conditions of
Approval) The County traffic concurrency approval is subject to the Project
Aggregation Rules as set forth in the TPS Ordinance.
Utilities. Potable water and sanitary sewer / wastewater capacity is currently available to
serve this project, subject to the applicant making a firm reservation of capacity,
following approval of the site plan (see Exhibit "C" - Conditions of Approval)
Fire I Police: Fire staff reviewed the site plan and determined that the Fire Department expects
to be able to maintain an adequate level of service for the subject project, with
current or anticipated staffing. Infrastructure requirements such as hydrants and
roadways will be addressed during plan reviews and permitting It must be noted
however, that the project is in an area with significant growth In the past year
Staff supports this project with the understanding that Fire Station No. 5 will be
available when these structures are ready for occupancy
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 4
Drainage: Conceptual drainage information was provided for the City's review The
Engineering Division has found the conceptual information to be adequate and is
recommending that the review of specific drainage solutions be deferred until time
of permit review (see Exhibit "C" - Conditions of Approval)
School The project requires confirmation from the School District of Palm Beach County
that adequate services are available to support the proposed project. Their
confirmation is require prior to the issuance of any building permits (see Exhibit "C"
- Conditions of Approval)
Driveways: Sheet SP-1 shows the proposed layout of the drive aisles and parking areas. The
development fronts on Gateway Boulevard and would have three (3) access points
along that roadway All would allow for ingress 1 egress. The western entrance
would have two (2) lanes each for ingress and egress, separated by an eight (8)
foot landscaped median. The center (main) entrance would also have two (2) lanes
each for ingress and egress, but separated by a 10-foot landscaped median The
eastern entrance would have one (1) lane each for ingress and egress, separated
by a landscape median varying in width from 10 feet to 20 feet. In addition, an
entrance would be located on High Ridge Road. This entrance will have one lane
each for ingress and egress. These entrances are generally consistent with the
Quantum Park DRI Master Plan locations.
There are internal vehicular and pedestrian connections proposed between the
"commercial" and the "residential" portions of the development. Several vehicular
entrances are proposed to allow the residents to the commercial area All drive
aisles would conform to Engineering standards.
Parking Facility. Normally, the required parking for commercial 1 retail uses are based on the
following methodology' one (1) parking space per 200 square feet of gross floor
area Office uses generally require one (1) parking space per 300 square feet.
However, the Quantum Park and Village South Master Plan was approved with a
parking waiver to require one (1) parking space per 225 square feet of building
area for both commercial and office uses. The plan proposes a 71,708 square feet
of commercial 1 office area, which require 319 parking spaces. Also, 13 One-
bedroom units and 102 Two-bedroom units are proposed The project requires a
total of 543 parking spaces. The site plan tabular data indicates that, within the
commercial component, 407 surface parking spaces and 234 garage spaces would
be provided, which would equal a total of 641 spaces, or an excess of 98 parking
spaces.
The four (4)-story condominium building, proposed along the west property line,
would require 64 spaces and its accompanying parking garage would provide a total
of 234 spaces, or an excess of 170 spaces. The parking garage would be two (2)
stories wIth parking on the roof Three (3) mIxed-use buildings are proposed along
the south property line. They would consist of 11 units each and therefore, (the
residential component) would require 66 parking spaces. Parking stalls are
proposed along the south property line. These stalls would be used exclusIvely for
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 5
the residents who would reside within these mixed-use buildings. The plan would
provide a total of 79 spaces or an excess of 13 spaces for the mixed-use buildings.
However, an apartment building is proposed at the southeast corner of the
property The plans show it as a two (2)-story building with a mix of one and two-
bedroom units (a total of 18 dwelling units) As such, the building would therefore,
require 31 parking spaces. The plans provide eight (8) garage spaces and ten
surface parking spaces for a total of 18 spaces. The deficit in parking (for this
building) would draw from the 13 excess spaces provided near the mixed-use
buildings. Staff found this "shared" parking to be acceptable due to the close
proximity of the excess parking from the mixed-use buildings. Staff does not
anticipate a parking shortage for the rental units. The four (4) retail buildings
proposed along Gateway Boulevard and the commercial component of the
aforementioned mixed-use buildings would share the interior parking lot. The
proposed commercial 1 offices uses would require 319 parking spaces. The site
plan proposes 316 parking spaces. Again, staff does not anticipate a future parking
problem The site plan complies with code and no variances or waivers are
required
Landscaping
The tree relocation plan (sheet T-1) indicates that site currently contains a variety
of native and exotic trees. The proposed construction would cause either
relocation or removal of certain trees, depending upon their current location,
health, and species. Basically, 42 trees would remain in their current location while
86 would be relocated elsewhere on-site. A total of 54 trees would ultimately be
removed This process of tree removal 1 relocation would be overseen by the City
Forester 1 Environmentalist during the time of permitting
According to the landscape plan, the commercial component would have 11
different categories of trees. The 11 categories are as follows Accent palm,
Accent tree, Buffer tree, Flowering tree, Palm, Parking lot tree, Shade tree, and
Specimen palm The landscape buffer along Gateway Boulevard would receive a
majority of the relocated Oak trees. According to Chapter 7 5 of the Land
Development Regulations, the maximum tree spacing along rights-of-way would be
30 feet. The distance between the trees would vary between 20 feet and 40 feet.
Therefore, staff recommends incorporating a cluster of three (3) native palm trees
into the design of the landscape buffer (along rights-of-way) within the areas
where the tree spacing distance is greater than 30 feet apart (see Exhibit "c" -
Conditions of Approval)
Foundation landscaping would occur around the front and sides of each multi-
family dwelling building in order to enhance the visual appearance of the building
and to promote privacy in accordance with Chapter 7 5, Article II, Section 5 L. of
the Land Development Regulations. However, no plant material is proposed along
the front (north) side of the mixed-use buildings. Therefore, staff recommends
Installing either a landscape strip, potted plants, or a combination of both along the
front (north) side of the mixed-use buildings In order to enhance the appearance of
the commercial space (see Exhibit "C" - Conditions of Approval).
The landscape plan shows the detail of the Berm Cross Section (Garage) for the
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 6
proposed landscaping around the two (2) story parking garage. It shows palm
trees and relocated oak trees are proposed around the south and east sides of the
building The berm would be 20 feet in width and generally occur on the
"residential" component of the Quantum Park and Village South Master Site Plan
This is acceptable and meets the intent of the Land Development Regulations in
terms of screening and buffering
Building and Site: The subject property represents the "commercial" component of the Quantum Park
and Village South Master Site Plan This plan proposes a four (4) story
condominium building at 45 feet in height with an accessory two (2) story parking
garage. The top of the decorative feature proposed for the garage would be 34
feet - two (2) inches in height. The condominium building would be setback over
40 feet from the west property line and 15 feet from the south property line. The
parking garage is proposed with a setback of five (5) feet - five (5) inches from the
south property line. A waiver was granted with the original approval of the Master
Site Plan which allowed a zero (0) side setback rather than the required 30 feet.
The parking spaces are proposed on the roof of the parking garage. Parked
vehicles would be screened by the parapet wall The plan also proposes four (4)
retail buildings. The retail buildings would be one (1) story tall, with its decorative
features proposed at 39 feet - five (5) inches in height at the highest point. The
retail buildings would be setback 15 feet from the north property line. Again, a
waiver was granted with the original approval of the Master Site Plan which
allowed a 15-foot front building setback rather than the required 30-foot setback.
The three (3) mixed-use buildings would be two (2) stories tall, at 36 feet - three
(3) inches in height at its highest point. Front doors for the mixed-use buildings
would occur on both its front and rear facades. The entrance to the commercial
space would occur on the north facade while the entrances to the dwelling units
would occur on the opposite fa<;ade (south elevation) The mixed-use building
would be setback 64 feet from the south property line. Lastly, a two (2) story
apartment building is proposed at 29 feet - four (4) inches in height at its highest
point. The apartment building would be setback 38 feet - two (2) inches from the
east property line and 26 feet from the north property line. All buildings would
comply with the maximum height allowed in the PID zoning district and the
setbacks (via waivers) approved with the Master Site Plan
The tabular data indicates that 13 One-bedroom units and 102 Two-bedroom units
are proposed for a total of 115 dwelling units. Also, 71,708 square feet of
commercial/office space is proposed. However, the floor plans do not show the
breakdown between the uses. The traffic impact statement was approved for
14,342 square feet of general office and 57,366 square feet of general retail The
project would therefore, be limited to 57,366 square feet of retail space. For all
intents and purposes, future restaurant space would be grouped within the retail
square footage (see Exhibit "C" - Conditions of Approval). All proposed uses are
permitted on Mixed-Use podS withIn the Quantum Park PID
The applicant informed staff that the residents who would reside in the mixed-use
buildings and the two (2)-story apartment building would be allowed to utilize the
pool and recreation facilities that were constructed as part pf the Villas at Quantum
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 7
Lakes (also known as Quantum Park and Village South Residential) The four (4)-
story condominium building would have its own recreational facilities. Staff
typically endorses the idea of constructing a full-sized clubhouse facility that could
accommodate Homeowner Association meetings. No clubhouse is proposed
However, the 2nd floor plan (sheet A-26) for the condominium building shows a
large "party room" that could provide the space for such meetings. The 3rd floor
plan (sheet A-27) of the condominium building shows a large room for
administrative offices. However, the site plan shows a hatched area proposed near
the condominium building that is earmarked for 2,000 square feet of future office.
This was not within the scope of this project and is not a part of this review (see
Exhibit "C" - Conditions of Approval)
Design
The proposed development is designed as a mixed-use project with hints of new
urbanism principles. For example, the project proposes true mixed-use buildings
where commercial space is proposed on the ground floor and residential units are
proposed on the 2nd floor These are not considered to be live-work units because
there would be no internal connection between the two occupancies. Live-work
units are not indicated on the list of permitted uses in the Quantum Park DR!.
Also, the retail buildings proposed along Gateway Boulevard would be located close
to the right-of-way while its parking areas would be relegated to the rear of the
buildings. This concept invites pedestrian traffic and gathering areas in front of the
buildings rather than the typical sea of asphalt that occurs in most suburban
projects.
The project proposes a modern Spanish-Mediterranean architectural theme
throughout all of its buildings. This building style would be consistent with the
"residential" component (Villas at Quantum Lakes) of the Master Site Plan Also,
the project proposes a multitude of earth tone colors of Benjamin-Moore paints.
The proposed colors are indicated on the ledger-sized Color Schedule. These colors
are consistent with the elevation pages. Each building would be enhanced with
decorative towers and pre-cast coping / banding on the parapet walls. Also, retail
buildings would have varying heights of the parapet walls. Other decorative
features include the follOWing decorative stucco trim, railing, pre-cast inserts,
decorative keystone, medallions, and decorative grille. Any awnings, if proposed
on the buildings, would be manufactured by Glen Raven and generally placed over
windows and doorways. Three (3) awning colors are proposed off-white (Natural
4604-46), beige (Oyster 4642), and red (Jockey Red 4603-46)
The applicant submitted photometric plans with this modification The plans
propose Sternberg "Boston 5800" light poles as its freestanding outdoor lighting
fixtures. The actual light on top of the pole would be Sternberg's decorative model
(Ripon-A) The 14-foot poles are proposed south of the mixed-use buildings near
the residential areas and 18-foot tall poles, proposed within the interior parking lot.
Wall sconces would also be used throughout the development.
Signage:
The front (north) elevations of the retail buildings and mixed-use buildings show
the location of the proposed tenant signs. However, they do not indicate their size,
material, or color Staff cannot determine whether or not these signs meet code.
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 8
Therefore, staff recommends that the applicant submit a sign program during the
time of permitting The sign program would apply to the entire development (see
Exhibit "C" - Conditions of Approval) A sign program ensures both material and
aesthetic consistency for the project's signage.
A detail of a typical project development sign is shown on sheet A-37 It shows
that it would be a decorative monument-style sign but the detail does not indicate
the sign type, materials used, or proposed signage area Again, these signs would
be a component of the sign program The site plan shows that they are proposed
at only one (1) entrance. It is likely however, that in the future, the applicant
would subsequently request additional monument signs as part of their sign
program Regardless, the structures would have to be at least 10 feet from the
property line with colorful groundcover plants installed at their base. They would
require Quantum Park Architectural Review Committee review and approval
RECOMMENDATION.
Staff has reviewed this request for master site plan modification and is recommending approval,
contingent upon satisfying all conditions indicated in Exhibit "C" - Conditions of Approval Any additional
conditions recommended by the Board or City Commission shall be documented accordingly in the
Conditions of Approval
S.\Planning\SHARED\WP\PROJECfS\Quantum Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\Staff Report.doc
Exh.Jit 'A' - Location lV.dp
.
250
o
500
1000
1,500
2,000
'Feet
.+-
s
.... :IHliIIUl'li; 11= '~ill': lilii"llr.CI-f'- '\
II !~ l:ill;~li!lli~5111~~~~ell~II~Jil!~
t 111'11 ~ 1111.. ~ I.~ I '1.1112i1~I.t p-I
~ .I:! I : fUllfll1i IIIIIII;I;I.'IQ!IIJ! =,
II!I~I, 'iilll!IIJ~l h · 'I d",!1 III
i~f i!!ll!~~i~!~ I ii ~1Ji ~Il' ~
I ~I' :Id cll frl' ~ =i Ii! ,'llle " I 'I~
· II Pillel i It II' I I I
;Iilll;. miii 91 !
:JIHi;19ihl iill
'ihl.'1 ~I!r ~I
I~ U 11911:1 il!
Ii 1'.1 ~I~ ~~
1_" 1_ ~Hdr
I; II I'I"IIII~'I
'I" II gIll :
I ~. I'll:: Ij 'I.
I,n 11;;'1 I!
119 ,I r:ill
'.' 'ij I
'ii jlMI ii'
'iii "iiliil ~I ~ ~
I I ij'111I1 ill .
I 1..1. I I
. . :Ii:' . i ~
"" )>
! ! i! niim i iiWJ:.
II .J.I~:~~,: J
, , i;;i I
,/I.
II::" I
111111 I I~I
";111 II :ill
U ..
1111; r.
- II
0"1 E ,II i
VI
1.
I
",1111'
!I II
I, I I
liP-Iii
,,;, I
II hl:~
;; ~i it
"'llI'i' D'JlfIi' 1I'llIli IIIIIIWII
II"II"""I"'II"I"'II"'II"~
I 'i ! I 'i ! I 'i ! Ii! r-I
~ i i 1 ; i f i j 1 i i
I : ~ I : : I : : I : :
, I' I' I' 1
I ,I 01 01 I
Iliiiiiii liiiiiii liiiiiil liiiiii;
~:::~: :::::~: :=::=: ::::~:
, II' 'I' ., .
II '''I'i;i_ nllllmld
. IQ,liii'P !!!!I!!!!l!
1'1;' ~,I. 1m!!! ~
..-1 ,.~~ 1m I... r
11= i ~~ I;;
.. "I!;' .,.,
- !;:~
i ~iij jiij "Iiiii iin
. :~. .~~. !.....,..
- = -"1 .".:a....,..,
~ I
! ;
~II
I
~~e
~ ~I
..Wi
!hJ
~..
~~~
~~f
~ii
~h
;!~
"'~
J:~HIB T B
1\
I \,
. \
'1 \
i\
......1DOI1IiICMD
~ II !:!!Il
IEI1811 IIIIII ~1iI~t
il i ~fI j!j
1111 lUll; Jal J
,..__-...-.r. -.IMC.
I
I QU.ANT\JM PAlUt~ V1UAQI. LLC
2SOO QU.ANT\JM LAKES DRIVIIOt
BOYNTON lEACH. 33426
QU.ANT\JM LAKES MIXED USE
BOYNTON lEACH, fLOlUDA
...........--.-......~Ml__ ......_____..-.____.____..JiIM_........,.
tt'~ ~ ~ l"
II
~~~
,~
""
-
;~
i
~
~
I
"I-
'L- 181
-I-
~
I
-
-=:...
-=:...
-=:... i
~,
I I
F+
I
I
s'j
.t
I~
"'"
'--
!;Ill
l~
=
c
r=
c
2!
t;l
:E
III
-l
i
:l
~
I '" ~
~I L..L
H ,~
I
~
H. ,,~
I I
....
"'-IT"
I"
,
~
,
,
~
181
.n
-,
i
1
i
i
1
i
,
,
i
i
i
i
).
,
i
i
~ i N i j"I !
I j j ! l
'U H
ELl
~ :
~i'- :
,
181 ~ ~:
" .."
, ,
1
1 1
i i
I i
, 1
i ,
1 ,
, 1
,
,
,
1 1
1 i
1 ,
, i
, i
i i
i 1
fVu~ U h
,
'--
,
fo-
........'-
i
,
I
1
1
, '
i~;n~HnHiHinH ~
d9iP~I~1 it! i~U ~
<,II~ ~ g qo
I je · , z
ii ! ~
I !i I ~
H~I IUUf!HlJB8 J
iR~~ ~ tJ
I~I UUUH i ~
~d i i i i i i i i I ~
Iii !lU!!!! ~ g
lu 111111111 ~
I!I !!u!!!! ~
.1 IIUIIU
~l:
" ~
.Ie
~
~ II
'11
I
~
\
i)
1 ,-"
1 .
: ' J
I ~~ ~ ~ r
, I~~r
i
1
i: j I
I Iii
" j I i
I I i
r,;lei 1 i i
~aT i i i
I It. i i i
i i i
}I i i i
i i i
i i i i
i i i
! . i i i
i i i
"u U
I
I
-~
;Ill
!~
e
~
~
~
>
g
:Z(
-L~
T"
CSJI-
~I-
~l
~r
I , '-
t3:i1-
l3J~
I I
I
T~~N
} ,
-- i
i
1
T'L- 1
t:3:1- 1
i
L'~ i
1
,
,
, i
~ J5a-..i
"""""" -"!---
~~ 1
, 181:
, i
I
1
~~TT
I"" . ~ ~!
B~ 0 :
I I
..-
,-
I .... _ ~
~
~-
, $
, -
I
I
~
~
~
.....::;.
,
~
I
I
'1
1
I
i
I UI! I
I" I I
1
,
i
i
i
i
i
i
I
i
i
i
i
i
i
i
i
i
, i
J! I
! i
~ I] 1 ! ~,
~ ~iilP1
. 1 :~~
'~~ ~
.~a ~
!
i i ,I !
.v I . . i i ~! I,.
lm I..D I ! i I.
UUU
1111; 1111111 ~I!t
:OO~~~~Jv;~oI UII.II-.; Jail
BOYNTON BEACH. 33G6
! !
I 1 ,
i i i
! i i
. i
~
!
i
~
\1
! i! I E
i
i
I
I
, 1
,
I
1
~)
I
i
i
i
i
i
1
i
i
i
i
i
i
~I
,
~ j i
I
I
f-" :
1 \.
I
I
1811
i
1811
i
1::^HltJll U8"
'-- .- b I I j:1
II r .1
~ ~ : i ~
l
i I I 1
III i i
i . i I
f ~a: IEI"i
i i i
~ i~ i ! i
1'1 i .. i
I ! i
i i
~ I I i i
I
,'~ I
~ . " 1811 i
i
0 I I
:2 , i
;r.
E:~ ! i i
1SI ! i I
i i
i ,
Ii. i I
--- i I
" - i i
"--- (1) i i
,,- i i
i i
.:~-$ i I
~ ~:I i
, -I-- i
/ i i
~ I ! i
i i
'1-f :~ i
~
, \ 1 I iF
~ i i
i i
i i
i j
j I i
" i i
i i
! !
T
L II
~~
'~l9J~i
I : II .
II i~
\$1
I !
I III
'I
I
i
i
1
. I
.-r "
~~~
I......;
r,;..1 "tt-1181
T I I
~III
... -, JiI
I: I i
rc:3:-J 181
I
i
B: ) ~
II
.~
.tt
I
~
U'~
. I
, .$
.......~Jr .
i
QI1ANTUM IJ.QS MIXED USE
IOYNTON BEACH. FLORIDA
.....,.
I::XHIBIT "8"
!G
I~
I
~
~
to
il~
~::
~2
..
~I~
~~
!:s
1 I
1 I
q.------jj
I I ------
1 I
"
P,
I,
: 1
q-----tl
I I -----
.."
1 1
1 I
1 I
..
jl~
~~
!:s
i"
..
~I~
~ ::
!: f
~I~
~::
~~
111111 i
---
II
IIUI III ~ II
. q~Ssu ~ ~I~ ..II
II
~~nn~ II
.. l:j
~ !:8 I I
II
I I
'" 1 1
~
ttl .......
~
~
Ir~"
.' ,'l '1~-~~1
N l:.; /,1
!r t. 1/
II
~
~ ~ 17"0- -
q
~
sm -II i 11111 I QUANlUM UJCES MIXED USE flli III!I! =i!t
~ BOYNTON BEACH. PLOlUDA j II ~I
~ ;1 III i I I Q11ANTUM P.AIUC &. V1WGE. LLC. 111111-.; Jail
~ 2SOO QUANlUM UJCES DlUVE 101
BOYNTON BIlACH, 33426
~ -~--- -----~-- ---
.... t-) EXHIBIT "B"
Ii ;~ '~
Ie: ,c: !~
r;l ~
~ ~ ~
f}i
o-l ii!
~ ~ ~
<
~ ~
2 fi ~
tl:
tll 8 tll
E g
j:::
j::: ~ j:::
~ ~
.....
~~
~
~
o-l
~
<
~
6
:z
tl:
8
j:::
~
I
~ ~ i ' I
1 ' t,U
~ II ~II
tj
B
I un I
1111 I
, r
~~~~~ I ~ IIIUUIiIBB ~ ,
~~ i~ ,1 l ~ ~ ~ q
~o II II ~ I ::::: ~ :: I ~I
!! ~i ~ I ~ 111111111 ~!
~I!i eli II U!; Ii ~ (j
Pi Ip i ii ii ;; p ~
ql Id!! !! II !! ~
<I IlUllU
illil1~'li~il'll'll' ~
a~~llla qUi nUg
I~~p ~8 qz
; II ; i ~
~I ~Ig ! i z
I I 0
~
I
~ QUANTUM PAJU(& ~E. I.I.c.
I 2SOO QlJANTUM lADS DIM 101
BOYNTON IBACH. 33426
QUANTUM lADS MIXED USE
BOYNTON BEACH. FLOIUDA
III;; 111111 ~il!t
1111.11 -. Ja I
~
~
~
n
~
~
111 11111\ "11111\ '"
-i -i -i ~l!j \!I '"
~ ~ ~ ::t~~ \!I
III (1\ (1\ ~-i91
" " ~ ~
l> l> l>
("I ("I ("I
'" '" '" ~ ~ ~
CDl>
I . CD l> ll'
~~ . I I
ell"" CD
.<> V> V>
l>~ ~~~
~("I
(II!1'
","" ("1(1\
g;'"
'1:
1 ..
~
~
Si
>,-- I~
~ i!!i
~
- ~
- EXHIBIT "B"
i
~
r - ~ -ijlr- - l
tD q.,_
I It ~ S I
g~ ti
L____J
~
~ r
~ I
_~ L
~R
~i
~~
aS~
11:;~
~~~
~ IS
g ~
DUD
~ I~
..!'
....
;~
..[€
~~
~~
!~~
;1:;R
t~tl:
~
~~~
c' ~
~l;~
'"
~~
~~
~~
2:6
all}!
!~~
11:; c:
~~
tl:
~~I'"
g~~
'i
01
~
!~I~
~~ ::l
~ll
6
I III! I
I" I I
I
a QUANlUM PAIUC&. VILlAGE. LLC.
I 2SOO QUANTUM lADS DAM 101
BOYNTON lEACH. 33G6
QUANTUM IAl'J!S MIXED USE
BOYNTON lEACH. FLOIUDA
'"
1:jS:~
.....-
~. r-
p~ '"
~. "'a
.>
n
Ell
>
I~
~I~
1&1;; IIIII' ~I!t
1IIII"l J~II
N EXHIBIT "8"
iil"l . III UIII IIlIlBS I; I~
II Ii ,1)1 (1 !~ !~
8i Ill,u'''''i~ ::;
~~ I . . I I a . . ~ >
.-' JI~ flfI"" ::0 roo
I :c
'Ill Iii! m ! !II ! ~ ~
:;
r-
n' I!I BUff,n ~ ~ ."
:c
0
II 111,,11,,11 ~ ~
.1 (niHil F
:<
<
g ~
2: 0
z
C'%1
~,.~,.mi'='i8 SMi!8lS ~
i I,'1i if fi I 'fit ill ~
'l~iI"~ I ~I ihllil~
li'lllI ~ '''i I~
"'Iadl II. ~ ~
il11i Ii tZ
1.1 I ~
I ~ en
...,
2;
!6
~
>
roo
~
roo
:ol
2)
:j
!!l
~
~
I ~ i
ll: t H ti t
~ ~I
tJ] 2'i ~
~II
B
I UI! I
III i I
I
U QlJANTUM PARKa VILLAGE. LLC.
I 2SOO Ql.L\NTUM LAQS DRIVE 101
BOYNJ'ON BEACH. 33426
IEII; IIIIII ~1!11!l"
1111.11',1 J~II
QUAN1VM u.KI!S MIXED USE
BOYNTON BEACH. fLOlUDA
tv
e~
18
~~
-i
:;
e-
n
o
z
o
o
~
'"
-i
['1
tr.
<
:>-
-i
is
z
'l:
~ II
~ H
0_
litl,
e. I'
;~ .1
Hi
i I,
nl
tT1
pnrlnnn ~
;Sll !I~H@
I I ~
s z
I 0
@ ~
....II..S
1"1. (') em
II uuuu 0 1St;)
.'1 .........,5 ~~
..III1II1:;c ~
In 1111111" (J ~
h; iiiiiiiP ~ ~
I~I II II II!! --l ~
-I IIUIIII ~
<
:>-
;:j
o
z
- EXI-IIBIT "8"
P! ~ B! '!~
I I
"
I
i
I
i
~II
I
~::I=.=g:,Jl 11'li IIDII ~11t
~~~.:v:t~ IIIIIU"; J~II
BOYNTON lEACH. 33G6
~""""____--'.MI._--'IIO__~_"""___.___"~____________ -~
I
I
I un I
.-.11 I
N
e~
I~
::l
~
n
o
z
c
o
:E
rn
...;
'"
r-<
'"
<
>-
...;
5
z
I;UI
elll
I! ,1
IIi
I ~I
~ II
if
If:
~ III
-
tTl
Plliil"lli ~
III I llllj ~
I IE
~ z
. ~
U2
. 111111111111881
I ~ I- ()
III :::::=:: ~
i" 1111';11 2
Iii III n. II . @j
.. .....,.. ;:t>
1_. ',,'11',,11 :;0.1
'I II II >-l,
I- ..111.1." I
.1 I III II
EXHIBIT "B"
!~
I~
::l
~
n
o
z
c
o
:E
f;J
...;
'"
r
'"
<
:>-
::l
o
z
~II
I
'I !lUll
.dl I
~:t=.~~:. 1IIIIi IIIIII 511~t
~~~~:c; 1.1111111; J~I~
IOYNTON lEACH, 33G6 ~
...",,___......___~...___...__~__.....__.....___..aw~--...........____~_ ~....
I
I
IV
151
n
~
,...
n
o
z
8
z
o
;.0
:;!
I:!l
ir.
-<
>
o-i
o
z
~i1m
Iqi
~~ .i
IP'
I Ii
, ;.
hi
1
8 III
,,(,IIE1rrIIl18 ~
I II II;;
lis. I 1III,.:j
2 g I ~~ 0
I t Z
I , ~
$ Z
I ~
P;J
~II
I
.....................-..-.-.......--
- EXHIBIT "8"
!5l
j~
::j
~
n
o
z
:::l
o
u:
o
c:
:;!
. 11111111111188 I '"
i-II n h;
"I :::::~:p i2 ~
il. 11111;"1 ~ ~
,ii !U!!.!!' g
I!; "11"111 ~
I~I II!!!!!! ~
-I 11111111
i
i
I I I i I i
, '1 ~ ~ ~t
Ii U!! I
adl I
I
I QUAN1UM PAU.:& V1UMlL LLC.
:1500 QUAN1UM LUES DIUVI101
IOYNTON lEACH. 33426
QUAN1UM LADS MIXED USE
BOYNTON lEACH. FLOIUDA
JIIO__~""""___.___""""""""
1&lli 111111 ~I!t
iill u..; J~II
------- .--.
!i
)~
~
~
~
~
~
."
~
'"
Z/25
. '"
;g
...
~1:3
..."
;g
...
~~:
~
.
> ~I
I S~
~ E~
~~ ~ ~
~2 ~ ~
Cl '"
n ""
o
......U . ~
~.......~ ):10
uo8:~ f.1
(J\(J\ ;:l!
"'.,,!J' 'ii
"";
~II
I
_ EXHIBIT "B"
..;./"'
d~ i
~~ 1C
1:;1=
. ,to
a-I!!
~~ ,.
";;;I;jto
g~ S! ~
..,0 ~
l~ II; 112
..!i! Z
g~ 0 ~
....
"~IC
0- ~
~~
1~1'"
.' p
". '"
~~ ~
UI~
c:;; I!!
~;jl:
I un I
III. I
1&1;; IIIIII ~I!t
1111.11., Jail
I
I
QUANTUM u.KES MIXJlD USE
BOYNTON BEACH. PLOlUDA
Ql1ANlUM P.ARJ::&. VlLI.AGE,1.1.C
1500 Ql,lANTUM u.KES DlUVE 101
BOYNTON BBACH. 33426
,po. ..., EXHIBIT "B"
N
!~ !~ Ii s~
L~ t~ b llil
0 ~
~ ~ ~
lil ~ :3
~ ~ III
~ ~
:il
~ i ~ ~
g :l I
~ ~ ~
mB lEIm z i
i
I
i
i
i
I
i
i
I
i
1
i
i
i
I
i
i
IJ i
IJ i
i
i
En i
i
i
i
i
i i
i 1 i
i I i
! . ~~ i ' i i i I i
~ ~ ~ ,~ j i I
~ i I
I 1
1 i
1
~ ~ 1111 IlSI!lraeB I 0101 i
I '.1 i
i .I~ C":l i !o' i
jl~ UHuUi ~
~I! iiiiiiii~ ~ I i
1 I
!Ii mllln!~ I 1
hI iiiUiiP i i
1 I
Iii !! II!!!! ~ I I
i I
"I t'UIIu i i
i \
5!~ i i
tIl I II' i
II filii l HiHil ~ I ! Iii I f
~~ , t ' ,
;! ; II d P I It I g
"' I I i ~ I z
, ~ I e
T ill I ~ I
~ ~!~ z
! I I 0
~
~ I ~II I U!! I I QUANTUM LAKES MIXED USE '1I1i 111111 ~1!l1!l1'
!~ BOYNTON lEACH. fLOlUDA
W I
VI 6 1,,1 I Ql1AN1UM P.ARK& VlIU.GE, LLC. 1111 u-.; JaB!
2SOO QUANTUM LAKES DlUVI101
BOYNTON IBACH. 33426
.-"--- ~- .------ -- ---~
....:EY' ~~~tP
:ill)>....
"';;i~ 000 -4.
~i~ ~ ~~ ~
000
"" '" ,lil~ ~ g
0",,8 01 II II U C
~O3 ~"'Ul Ul ~
0 N!'>!'J~
3 ~~~~O
n" "
~~~ . 0
.." (fI U' (JI -I
0 "I'" '" g
(J'I~(Jl
~"'"1\(J'
'"
O~'" -I""Q \J ""1
goE; O~~ ~
Sij,,>, ~~~~
~,,::t """
.", ~~~ ~
-{8~
...."'.... <::l '"
-{<J> ~~~ ~
\I II h
'" 000"
" UlUl ~~ Iil..,.
--< ...
-{ , U U II . ~
" I
'" "! N(lI()I6"\ f;l
< --< ~........ 0 ..,.
0 1j\~~U"
~ i!~ ~ ~
('11"t\ f11 "'
~..,...,. ..,.
lit
I
I
I
'r
i. ~
"l
~
~
>t II
w II
~
-
EXHIBIT "B"
.0 .0
...
...
'"
i: ~
...
...
i(J fl ...0.
~ d
I :: ~'i !
~ ~ ...0.
... ~
<:>
i ~
...
'" ~
ti I-~
~ ~
r& to> ~...
.....
."
!~ !
I~ ~mnnn
",.~
g
llO
~
'"
~
~
~
c:
~
~ -
8 e:
:g ~ tli !i
. ~ ~
:g C!i:i ~ ~ iil ~ ~ ti i:il~ ;::; e:
... - <:> <; ..
'" (Ii s:
...,
.. 1! (g ~ '"
> <\ .....
.. . .
'" ;s: Is ~I~ . III ~
i ~
0
0 "f ... ... ~ '" 5 t :;: i 5 $
> ..... " ... '"
..
> :s n ....
0 <:>
'"
to> )S ;:!
z
0 <;l ;:l
.."
S~
~ ~ I.
. z I J33.~
~ ;; is
.. v;
..., ~ q 8 Q
i <\~ ~
.. ... ... I(l
'" l:l ~
<; ..., 8: ~
~ ~ E
~ ij: ~ ~ ! ~
~ . ~
5 ~
~ !!i ~ ~ I:l !i! ~
~ ...
al Ii ~
q '"
!oj ...
c ~ ~
! ~ i ~
I ~ l
-
~II I un I I Ql1ANTUM lAKES MIXED USE f'li 111111 ~I~t
BOYNTON BEACH. FLOIUDA
111 g I I QU.4.N1UM P.uK&. VlIMGE.l.LC. IIII ;'1'.; J~II
6 2500 QUANTUM u.ns DIUVE 101 n I II ~
BOYNTON B1iACH. 33426
----- ----- ----- -- --------
EXHIBIT "C"
Conditions of Approval
Project name Quantum Park & Village South Commercial
File number MSPM 05-003
Reference 2nd reVIew plans Identified as a Master SIte Plan ModificatlOn with a February 2, 2005 Planmng
and Zoning Department date stamp markmg.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments
I The proposed landscape plan does not contam enough informatlOn to X
determme If any vertical conflIcts may eXIst for dumpster enclosures and/or
Sohd Waste truck movements. Please prOVIde this mformatlOn at the hme of
permitting.
PUBLIC WORKS - Traffic
Comments
2 Close the south dnveway for thIS development to resIdential traffic PrOVIde a X
gate, eqUIpped and sIgned appropnately, to allow emergency access only
The approach may be constructed of stabIhzed sod to VIsually discourage ,
resIdents from attemptmg to uhhze thIS access pomt.
ENGINEERING DIVISION
Comments I
I
3 Show proposed SIte hghtmg on the SIte and Landscape plans (LDR, Chapter X I
4, SectlOn 7.B 4) The lighting levels shoVv'll along the south boundary seem !
too high to be adjacent to resIdenhal. Please re-evaluate hghtmg m thIS area.
4 It may be necessary to replace or relocate large canopy trees adjacent to hght X
fixtures to ehminate future shadowmg on the parking surface (LDR, Chapter
23, Article II, Sechon A.I b).
5 Full drainage plans includmg drainage calculahons, m accordance with the X
LDR, Chapter 6, ArtIcle IV, SectIOn 5, wIll be reqUIred at the hme of
permitting.
6 SpeCIfy storm sewer dIameters, mlets types, etc on dramage plan. Indicate X
grate, rim and invert elevations for all structures. IndIcate grade of storm
sewer segments. Indicate material specifications for storm sewer
7 Pavmg, Dramage and Site details will not be reviewed for constructlOn X
acceptability at this time. All engineering construction details shall be in
accordance WIth the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit apphcatlOn.
COA.doc
06/17/05
2
DEPARTMENTS INCLUDE REJECT
UTILITIES
Comments.
8 At the tIme of penmttmg, please provIde a tImeline that clearly Illustrates X
when water and sewer services will be required to serve the proposed proJect.
Your startmg date for the timelme should be the date of CIty Comrrnssion
approval. Also provIde mIlestone dates for permit apphcatIOn, the start of
constructIOn, and the setting of the first water meter This time line will be
used to determine the adequacy of water and wastewater treatment capacIty
for your project upon the project's completion, so please be as accurate as
possible
9 At the tIme of permIttmg, all utihty easements and utihty hnes shall be shown X
on the Site plan and Landscape plans (as well as the Water and Sewer Plans)
so that we may detenmne whIch appurtenances, trees or shrubbery may
mterfere with utIhties. In general, palm trees WIll be the only tree specIes
allowed wIthm utIlity easements. Canopy trees may be planted outside of the
easement so that roots and branches will not Impact those utilitIes wIthm the
easement m the foreseeable future The LDR, Chapter 7 5, ArtIcle I, SectIOn
18 1 gIves publIc utilItIes the authonty to remove any trees that mterfere WIth ,
utIlity servIces, either m utihty easements or publIc nghts-of-way
10 At the tIme of permItting, Palm Beach County Health Department penmts X
WIll be required for the water and sewer systems servmg this project (CODE,
SectIOn 26-12).
11 The CODE, SectIOn 26-34(E) reqUIres that a capacIty reservatIOn fee be paId X
for thIS prOject eIther upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of Site plan
approval, whichever occurs first. ThIS fee will be determined based upon
final meter SIze, or expected demand.
12 A building permIt for thIS project shall not be Issued until thIS Department has X
approved the plans for the water and/or sewer improvements reqUIred to
service this project, m accordance WIth the CODE, SectIOn 26-15
13 Utility constructIon details WIll not be reviewed for constructIOn acceptabIhty X
at thIS time All utility construction details shall be in accordance WIth the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
COA.doc
06/17/05
3
DEPARTMENTS INCLUDE REJECT
14 SIte addresses shall be placed conspicuously on the front of the structure, so X
the numbers can be seen plainly SIte addresses shall be placed conspicuously
on the front of the structure, so the numbers can be from the street. Numbers
used for reSIdences shall be not less than four inches in height and shall be
made of a durable and vIsible material. Numbers used for commercIal and
mdustnal bUIldmgs shall not be less than six mches in height. (CIty
Ordmance Chapter 20 SectIOn 16 )
15 Emergency access shall be prOVIded at the start of a project and be mamtamed X
throughout constructIOn per the Flonda FIre Prevention Code, Section 3-5,
and NFPA 241, ( 1996) Safeguardmg ConstructIOn, AlteratIOn, and
DemolItion OperatIOns, SectIOn 5-4 3
16 Fences and gates shall meet CIty Ordmance 98-45,2,12-1-98 Available at X
FIre Marshal's Office (plans ReVIew).
17 Pnor to FIre Department mspectIOns, new constructIOn projects must proVIde X
the results of a hydrant flow test mdIcatmg a fire flow not less that 1,500
gallons per mmute @ 20 p.s.i. above domestIC use. This applIes to new or
eXIstmg hydrants WIthin the reqUIred 200 feet of the facIlity All fire hydrants
shall be operatIOnal before constructIOn begins m the area the hydrants cover
18 All bUIldmgs three (3) stones or 30 feet in heIght shall have an automatIC fire X
spnnkler system Chapter 9, Sec 7-2-2Al CIty Ordmance.
POLICE
Comments None X
BUILDING DIVISION i
I
Comments I
19 The height and area for buildmgs or structures of the different types of X I
constructIOn shall be governed by the intended use or occupancy of the I
buildmg, and shall not exceed the lImIts set forth in Table 500 of the 2001
FBC
I
X
20 Every exterior wall wIthm 15 feet of a property lme shall be equipped with
approved opening protectives per 200 I FBC, Section 705 1 1.2.
21 Buildings, structures artd parts thereof shall be designed to withstand the X
minimum wmd loads of 140 mph. Wind forces on every building or structure
shall be determmed by the prOVIsions of ASCE 7, Chapter 6, and the
proviSIOns of 2001 FBC, Section 1606 (Wind Loads). CalculatIOns that are
SIgned and sealed by a design professional regIstered in the state of Florida
shall be submitted for review at the tIme of permit application.
COA.doc
06/17/05
4
DEPARTMENTS INCLUDE REJECT
22 Every building and structure shall be of sufficIent strength to support the X
loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table
1604 I IndIcate the lIve load (psf) on the plans for the buildmg design.
23 At tIme of permIt reVle\\, submIt sIgned and sealed workmg draWings of the X
proposed construction.
24 At the tIme of permIt review, submIt detaIls of remforcement of walls for the X
future mstallatIOn of grab bars as required by the Federal Fair Housmg Act
Title 24 CFR, Part 100.205, Section 3, Requirement #6 All bathrooms WIthin
the covered dwelling umt shall comply
25 Venfy that the proposed elevatIOn IS in comphance WIth regulations of the X
code by adding speCIficatIOns to the site data that address the followmg
Issues
a. The deSIgn professIOnal-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _ _ NGVD
IS above the highest 100-year base flood elevatIOn applIcable to the
bUIldmg SIte, as detenmned by the SFWMD s surface water management
constructIOn development regulations."
b From the FIlUv1 map, IdentIfy m the SIte data the tItle of the flood zone
that the buIlding IS located wIthm. Where apphcable, specify the base
flood elevatIOn. If there IS no base flood elevatIOn, mdlcate that on the
plans.
26. As reqUIred by the CBBCO, Part III titled "Land Development Regulations", X
submIt a site plan that clearly depIcts the setback dimenSIOns from each
property lme to the leadmg edge of the buildings. The leading edge of the
buildmgs begms at the closest pomt of the overhang or canopy to the property
line. In additIOn, show the distance between all the bUIldings on all SIdes.
27 CBBCPP 3 C 3 4 reqUIres the conservation of potable water City water may X
not, therefore, be used for landscape irrigation where other sources are readily
available.
28 If capItal facihty fees (water and sewer) are paid m advance to the City of X
Boynton Beach Utilities Department, the following mformatIOn shall be
provided at the time of building permit application.
a. The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
b. If the project IS a multi-family project, the building number/s must be
provided. The buildmg numbers must be the same as noted on the
Commission-approved site plans.
c. The number of dwelling units in each building.
d. The number of bedrooms in each dwelling unit.
e. The total amount paid and ItemIzed into how much is for water and how
much is for sewer
COA.doc
06/17/05
5
DEPARTMENTS INCLUDE REJECT
(CBBCO, Chapter 26, ArtIcle II, Sections 26-34)
29 At tune of permit reVIew, submIt separate surveys of each lot, parcel or tract. X
For purposes of settmg up property and ownershIp m the CIty computer,
provide a copy of the recorded deed for each lot, parcel or tract. The recorded
deed shall be submItted at tIme of permit review
30 At tIme of bUIldmg permIt applIcation, submIt venficatIOn that the CIty of X
Boynton Beach Parks and Recreation Impact Fee reqUIrements have been
satisfied by a paId fee or conveyance of property The followmg mformatIon
shall be provIded.
a. A legal descnptIOn of the land.
b The full name of the project as It appears on the Development Order and
the CommissIOn-approved sIte plan.
c If the project is a multi-farmly project, the building numberis must be
provIded. The buildmg numbers must be the same as noted on the
Comnussion-approved SIte plans.
d. The number of dwellmg umts m each bUIldmg.
e The total amount being paid.
(CBBCO, Chapter 1 ArtIcle V, Section 3(f))
31 Pursuant to approval by the CIty CommISSIOn and all other outsIde agencIes, X
the plans for thIS project must be submItted to the BuIlding DIVISIOn for
reVIew at the tIme of permIt applIcatIOn subrmttal. The plans must incorporate I
all the condItIons of approval as lIsted m the development order and approved
by the CIty Commission.
32. The full address of the project shall be submItted WIth the constructIOn X
documents at the time of permIt applicatIOn submittal. If the project is multi-
family, then all addresses for the partIcular buildmg type shall be subrmtted.
The name of the project as It appears on the Development Order must be
noted on the bUIldmg permIt applIcatIOn at the time of applIcation subrmttal.
33 Van accessible parking is reqUIred m the garage per the 2001 FBC, SectIon X
11-4 1.2(5)(b)
34 CBBCO, Section 9-6(A)(4), reqUIres all buildmgs or structures m excess of X
12,000 square feet per floor area to be eqUIpped with an approved automatic
fire sprinkler system.
35 The residential condo building shall comply with the Fair Housing Act. All X
the dwelling units shall comply
PARKS AND RECREATION
Comments
COA.doc
06/17/05
6
DEPARTMENTS INCLUDE REJECT
36 Irrigation must cover 110 % of area. At the time of permItting, the required X
imgatIOn shall be sho\\<TI on imgatIOn plans and notes.
37 The recreatIOn impact fee IS reqUlred as follows. X
115 multi-family dwelling units ~ 656 each = $75,440 00
FORESTER/ENVIRONMENTALIST
Comments
38 The apphcant should clearly Identify all of the landscape Improvements X
shown on the landscape plan.
PLANNING AND ZONING
Comments
39 A traffic generation statement, prepared by Pinder Troutman Consulting, Inc X
was sent to the Palm Beach County Traffic DIVisIOn for concurrency reView
Based on then reVIew, the Traffic DlVlSlon determmed that the proposed
project IS part of the preVIOusly approved Quantum DRI, and therefore, meets
the Traffic Performance Standards (TPS) of Palm Beach County However,
no bUlldmg permIts are to be Issued for thIS particular project by the CIty after
the build-out date of 2007 unless an updated traffic statement IS receIved and
approved by the County that extends the buIld-out date
40 The traffic impact statement was approved for 14,342 square feet of general X
office and 57,366 square feet of general retail. The project would therefore,
be hmlted to 57,366 square feet of retail space or be subsequently amended
pursuant to the prOVISIOns allowed for Mixed-Use pods in the Planned
Industrial Development (PID) zomng dIStrict, Chapter 2, SectIOn 7.P 4 of the
Land Development Regulations. For all mtents and purposes, future
restaurant space would be grouped WIthin the retail square footage.
41 The project must obtain approval from the School Distnct of Palm Beach
County regarding school concurrency ThIS will be required pnor to Issuance
of any building permits.
42 The Quantum Community Development District (QCDD) or its deSIgnee X
shall provide the applicant with an updated letter givmg consent to allow the
proposed gazebo to extend m Tract "Q", prior to the Issuance of a building
permit.
43 The site plan shows a hatched area proposed near the condommIUm building X
that is earmarked for 2,000 square feet of future office. This was not within
the scope of this project and is not a part of this review Elimmate this from
COA.doc
06/17/05
7
DEP ARTMENTS INCLUDE REJECT
the drawmgs at the time of permitting to mamtam consistency between the
plans.
44 Incomplete sIgnage IS shmvn on the elevatlons All elevatlons must show the X
proposed slgnage area and be consistent wIth the master SIgn program from
Quantum Park. Staff recommends that you submIt a master SIgn program that
shows the number, 10catlOn, dImensIOns, extenor finish, and color(s) of all
wall SIgnS and freestanding signs (Chapter 2, SectIOn 5.H.9). The sign
program would reqUIre Quantum Park ArchItectural Review Committee
(ARC) review and approval.
45 Add more trees around the parkmg garage These trees shall be planted a X
mimmum of Yz bUIlding heIght at time of plantmg (Chapter 7.5, ArtIcle II,
Section 5.M.).
46 All shrubs and hedges are reqUIred to be at mmImum 24 mches m height, 24 X
inches m spread, and planted with tip-to-tip spacmg measured ImmedIately
after planting to adequately cover the planted areas on the site (Chapter 7.5,
Article II, Section 5 C 4 )
47 FoundatIOn landscapmg shall be requued m the front and SIde of each multi- X
family dwelhng m order to enhance the Visual appearance of the buildmg and
to promote privacy (Chapter 7.5, ArtIcle II, SectIOn 5.L.). This would apply
to the four (4)-sto1)' condommlUm buildmg as well as the mIxed-use and I I
I
apartment buildmgs.
48 Landscapmg at project entrances shall contam a SIgnature tree at both sides of X
the entrance (Chapter 7.5, Article II, Sectlon 5.N). A SIgnature tree IS a tree
WIth blossoms or natural color other than green mtended to beautIfy project
entrances and contribute to the CIty'S image with thIS element of aesthetIc
conformIty SIgnatures trees include Yellow Elder, Tibouchina Granulosa,
and BougamvIllea. Note that SIgnature trees do not contribute toward the
total number of required penmeter trees. Signature trees must have 6 feet of
clear trunk if placed WIthin the safe-sight tnangle (Chapter 7 5, Article 2,
Section 5.N ). At the tIme of permitting, revise plans to mclude signature
trees at each project entrance (along the rights-of-way)
49 All freestandmg monument SIgnS shall have colorful groundcover mstalled at X
the base (Chapter 7 5, Article II, Section 5 0) Revise landscape plans at the
time of permitting.
50 Provide a detail sheet depicting the previously approved landscape berm X
along the south side of the Mixed Use Buildings, and how it is bemg treated
with the new roadway penetrations into the residential development to the
south.
51 At the time of permitting, provide greater detail of Gateway Boulevard X
reflecting the proposed SIX (6) lane cross-section, mcluding its proximity to
your property lme, the SIdewalk location, perimeter landscaping and location,
COA.doc
06/17/05
8
DEPARTMENTS INCLUDE REJECT
potential modificatIOn and landscaping of the medians.
52 The landscape plan (sheet L-l of 3) does not show the entIre sidewalk along X
Gateway Boulevard. These plans wll1 have to match the civil drawmgs that
show the reqUIred Sidewalk. At the tlme of penmttmg, revise landscape plans
to show Sidewalk. Also, any landscape matenal proposed outside the
property hne and withm the road nght-of-way will reqUIre the Engmeenng
DIVISIOn review and approval. ThIS landscape matenal cannot be counted
within the proposed landscape plan's tabular data. Revise plans accordingly
at the tIme of permittmg.
53 Staff recommends mcorporatmg a cluster of three (3) native palm trees into X
the design of the landscape buffer (along nghts-of-way) wlthm the areas
where the tree spacmg distance IS greater than 30 feet apart (Chapter 7 5,
Article II, Section 5.D )
!
54 Staff recommends instalhng a landscape stnp, potted plants, or a combmatIOn X
of both along the front (north) side of the rmxed-use buildings m order to
enhance the appearance of the commercIal space.
ADDITIONAL PLANNING & DEVELOPMENT BOARD COMMENTS I
Comments
55 None X
ADDITIONAL CITY COMMISSION COMMENTS
Comments
56 To be determined.
MWR/el]
S:\Planning\SHAREO\WP\PROJECTS\Quantum Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\COA.doc
Meeting Minutes
Planning and Development Board
Boynton Beach, Florida
June 28, 2005
Vice Chair Hay inquired about the new Commission process Mr Rumpf explained the
Commission would like to conduct a preliminary review of code amendments proposed
by staff or an outside party An ordinance is being drafted that would increase the
notification requirements and this would be pre-reviewed by the Commission before
coming to this Board This would provide the Commission an opportunity to express any
comments or issues they may have regarding code amendments
Ms. Jaskiewicz inquired if the Commission could deny a request before it goes to the
Boards Mr Rumpf thought this could be possible Currently code amendments can be
initiated several ways. However, there is no formal review process or requirements for
public notification on anything except for a change in zoning use If a request for a
change in zoning use is made, State law provides minimum notification requirements
and how many public hearings must be held There are no other parameters in terms of
public hearing notification
Mr Casaine inquired if the Commission would make any recommendations or reports
after they review the code amendments to the Planning and Development Board Mr
Rumpf stated any pertinent information given to staff would be provided to the Board in
the staff report.
Chairman Wische requested that Item 7 E.1 be heard with the other Knollwood items
Members agreed to this change by consensus
Assistant City Attorney Tolces administered the oath to all persons who would be
testifying
6. Unfinished Business
A. Master Site Plan Modification
Agent:
Owner'
Location
Quantum Park & Village South Commercial
(MSPM 05-003)
Steve Fike, Olen Development
Quantum Park and Village, LLC
Southwest corner of Gateway Boulevard and High
Ridge Road
1
Project:
Description Request for Master Site Plan Modification approval for
the construction of a mixed-use development
consisting of an additional 115 multi-family dwelling
units (for a total of 349 dwelling units) and 71,708
square feet of commercial/office space on a 26.165
acre - Mixed Use POD in the Planned Industrial
Development (PID) zoning district.
Steve Fike, 697 Manatee Bay Drive, Boynton Beach, was present on behalf of the
applicant. Chairman Wische noted there were 54 staff comments and asked the
3
Meeting Minutes
Planning and Development Board
Boynton Beach, Florida
June 28, 2005
applicant to address only those comments needing clarification or which they objected
to Mr Fike stated they accepted all staff comments, except for Comment #43 that
refers to a 2,000 square foot office building that is not part of the project at this time
Eric Johnson, Planner explained the 2,000 square foot office building is not part of the
site plan because it had been omitted from all other site plan information. If the applicant
wants to build the small office building in the future, staff would review it at that time In
all likelihood, this would be done administratively only If the Board and the City
Commission approve the project, the applicant could then submit plans for permits If
the applicant at that time wanted to include the small building, they would have to go
through the staff process for approval. Chairman Wische pointed out this information
was contained in the agenda packet.
Chairman Wische opened the public hearing Since no one wished to speak, the public
hearing was closed.
Vice Chair Hay asked if Fire Station #5 was on schedule for completion due to the large
amount of people moving into this area. Mr Johnson did not have this information
available Chairman Wische pointed out there was a memo in the backup material
indicating the fire station would have to be ready Vice Chair Hay noted this was stated
on Page 3 under "Fire/Police"
Mr Rumpf responded the Emergency Services Division is very hopeful the station
would be on line. However, there is no legal mandate that requires this type of service
to be under construction, let, etc. by the time a permit is issued. Mr Rumpf felt if there
were a serious service problem, staff would have been made aware of it.
Ms. Jaskiewicz asked the applicant when the project would be completed. Mr Fike
responded approximately two and one-half years from the time of permit.
Motion
Vice Chair Hay moved to approve the request for Master Site Plan Modification
approval for the construction of a mixed-use development consisting of an additional
115 multi-family dwelling units (for a total of 349 dwelling units) and 71,708 square feet
of commercial/office space on a 26.165 acre - Mixed Use POD in the Planned Industrial
Development (PID) zoning district, subject to all staff comments Motion seconded by
Mr Baldwin and carried 6-1 (Ms. Jaskiewicz dissenting)
7. New Business
A. Annexation
1
Project:
Agent:
Owner'
Knollwood II (ANEX 05-002)
Chip Bryan, Julian Bryan & Associates, Inc
Zygmunt Jadczak
4
cr
CITY OF BOYNTON BEACH
AGENDA ITEM REQUEST FORM
Requested City Commission Date Final Form Must be Turned
Meetinl! Dates in to City Clerk's Office
Requested City Commission
Meetinl! Dates
Date Final Form Must be Turned
in to City Clerk's Office
May 2, 2005 (Noon)
D June 7 2005
~ June 21 2005
D July 5, 2005
D July 19, 2005
May 16,2005 (Noon)
D April 5, 2005
D April 19,2005
D May 3, 2005
D May 17 2005
March 14,2005 (Noon.)
April 4, 2005 (Noon)
June 6, 2005 (Noon)
April 18, 2005 (Noon)
June 20, 2005 (Noon)
July 5, 2005 (Noon)
NATURE OF
AGENDA ITEM
D Administrative
~ Consent Agenda
D Public Hearing
D Bids
D Announcement
D City Manager's Report
D Development Plans
D New Business
D Legal
D UnfInished Business
D Presentation
RECOMMENDATION Please place this request on the June 21, 2005 City Commission Agenda under Consent
Agenda, to be tabled date-certain, to the July 19111 meeting. The Planning and Development Board tabled this item to their
June 28111 meeting, pursuant to a request from the applicant to allow further time to resolve staff comments. For further details
pertaining to the request, see attached Department of Development Memorandum No. PZ 05-067
EXPLANATION
PROJECT
AGENT
OWNER.
LOCATION
DESCRIPTION
Quantum Park & Village South Commercial (MSPM 05-003)
Steve Fike, Olen Development
Quantum Park and Village, LLC
Southwest corner of Gateway Boulevard and High Ridge Road
Request for Master Site Plan Modification approval for the construction of a mixed-use
development consisting of an additional 115 multi-family dwelling units (for a total of
349 dwelling units) and 71,708 square feet of commercial I office space on a 26.165 acre
- Mixed Use POD in the Planned Industrial Development (Pill) zoning district.
Develop' I Department Director City Manager's Signature
~?l?~
Janning and Zo g irector City Attorney I Finance I Human Resources
S:\Planning\SHARED\WP\PROJECTS\Quantum Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\Agenda Item Request Quantum Pk &
Village S Comm MSPM 05-OO3.6-21-05.dot
S:\BULLETIN\FORMS\AGENDA ITEM REQUEST FORM.DOC
PROGRAM IMPACT
nSCAL IMPACT
ALTERNATIVES:
TO
THRU
FROM
DATE.
PROJECf NAME/NO
REQUEST
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 05-067
STAFF REPORT
Chair and Members
Planning & Development Board and City Commission
Michael Rumpf
Planning and Zoning Director
Eric Lee Johnson, AICP
Planner
May 3, 2005
Quantum Park & Village South / MSPM 05-003
Master Site Plan Modification
PROJECT DESCRIPTION
Property Owner.
Applicant:
Agent:
Location
Existing Land Use.
Existing Zoning
Proposed Uses:
Acreage.
Adjacent Uses.
North
South
East:
Quantum Park & Village, LLC.
Olen Development
Mr Steve Fike, Vice President of Construction / Olen Development
Southwest corner of Gateway Boulevard and High Ridge Road (see
Location Map - Exhibit "AfT)
Industrial with a Mixed Use (MU) designation on the Quantum Park
Master Plan
Planned Industrial Development (PID)
115 Multi-family dwelling units and 71,708 square feet of commercial /
office space on the commercial component of the Quantum Park and
Village South Master Site Plan
621,396 square feet (14 265 acres)
Right-of-way for Gateway Boulevard and farther north is vacant Quantum
Lots 83 - 85, zoned Planned Industrial Development (PID),
Quantum Park developed Lots 62,66, 67-A, 67-B, and 67-C, zoned PID,
the Sand Pine Preserve and right-of-way for Quantum Lane,
Right-of-way for High Ridge Road and farther east are vacant Quantum
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 2
Lots 81 & 82, zoned PID; and
West:
Quantum Park Water Management Tract "Q"
PROPERTY OWNER NOTIFICATION
Owners of properties within 400 feet of the subject major site plan modification were mailed a notice
of this request and its respective hearing dates. The applicant certifies that they posted signage and
mailed notices in accordance with Ordinance No. 04-007
NATURE OF REQUEST
Mr Steve Fike, Vice President of Construction for Glen Development, is requesting to modify the Master
Site Plan for Quantum Park & Village South. This development is located on the southwest corner of High
Ridge Road and Gateway Boulevard (see Exhibit "A" - Location Map) The specific request is to construct
115 dwelling units and 71,708 square feet of commercial area on the commercial "portion" of the master
site plan This would result in a total of 349 dwelling units for the entire master site plan
BACKGROUND! ANALYSIS
On September 3,2002, the master site plan was approved for 234 rental apartments and 132,032 square
feet of commercial It was also approved with six (6) waivers. Master site plan approval is valid
indefinitely per Chapter 2, Section 7 P 9 of the Land Development Regulations.
The Quantum Park & Village South master site plan is comprised of two (2) technical site plans, namely
Quantum Park & Village South Commercial (NWSP 03-004) and Quantum Park & Village South Residential
(NWSP 02-022) The residential component is also known as the third phase of Villas at Quantum Lakes.
Technical site plans on mixed use pods within Planned Industrial Developments do not require City
Commission review and approval prOVided that they are consistent with the master site plan For this
project, both technical site plans were found to be consistent with the master site plan and were thus
approved administratively by staff Review and approval of the residential technical site plan (NWSP 02-
022) was completed with the build-out of the Villas at Quantum Lakes apartment buildings. The technical
site plan for Quantum Park & Village South Commercial (NWSP 03-004) was originally approved for six (6)
commercial buildings for a total of 119,185 square feet. However, it was never built-out and new
modifications are currently being sought. The revised master site plan proposes dwelling units in lieu of a
portion of the commercial space originally planned. Both are permitted uses within mixed use pods of the
PID However, these modifications represent a significant change to the technical site plan (NWSP 02-
022) and likewise, to the master site plan (SBMP 02-001)
Six (6) waivers were previously approved by the City Commission and are itemized on the master site plan.
The proposed changes to the commercial portion of the master plan do not impact any of the approved
waivers.
The master site plan tabular data shows the parking requirements as follows
Commercial 71,708 square feet @ 1/225
One bedroom 143 units @ 1 5 spaces
Two bedrooms 206 units @ 2 spaces
319 spaces
215 spaces
412 spaces
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 3
5% guest spaces for Villas at Quantum Lakes
19 soaces
965 spaces
The above referenced list indicates that 965 parking spaces are required The master site plan would
provide a total of 1,037 parking spaces, or an excess of 72 parking spaces.
A surface water management system has served the Quantum Community Development District since
1989 The District has legal positive outfall to the Lake Worth Drainage District's E-4 Canal The
stormwater runoff is discharged via an existing control structure. The proposed volume and rate of the
discharge would be controlled pursuant to the applicable permits. The subject property would connect to
the existing District system.
The master site plan's original traffic impact study was approved by the Traffic Division of Palm Beach
County on June 28, 2002. The master site plan was approved for 234 multi-family dwelling units, 82,260
square feet of general retail, and 32, 010 square feet of office. The revised study approved on August 19,
2002 included 136 multi-family dwelling units and 102,235 square feet of general retail In February of
2005, Ordinance 05-013 for Development of Regional Impact (DRIA 05-001) was approved by the City
Commission to increase the maximum number of dwelling units allowable with Mixed Use pods (within the
entire Quantum Park DRI) from 1,000 units to 1,105 units. These additional units were earmarked, in
part, for this master site plan modification. Additional units are being earmarked for the "commercial"
component of this master site plan for Quantum Park & Village South As such, a traffic impact statement
was submitted in conjunction with this request. Staff has received confirmation from the Traffic Division of
Palm Beach County that the proposed project is part of the previously approved Quantum DRI, and
therefore, meets the Traffic Performance Standards of Palm Beach County However, no building permits
are to be issued after the build-out date of 2007 ( see Exhibit "c" - Conditions of Approval)
Concurrency.
Traffic: A traffic generation statement, prepared by Pinder Troutman Consulting, Inc. was
sent to the Palm Beach County Traffic Division for concurrency review Based on
their review, the Traffic Division determined that the proposed project is part of the
previously approved Quantum DR!, and therefore, meets the Traffic Performance
Standards (TPS) of Palm Beach County However, no building permits are to be
issued by the City after the build-out date of 2007 (see Exhibit "c" - Conditions of
Approval) The County traffic concurrency approval is subject to the Project
Aggregation Rules as set forth in the TPS Ordinance.
Utilities: Potable water and sanitary sewer / wastewater capacity is currently available to
serve this project, subject to the applicant making a firm reservation of capacity,
following approval of the site plan (see Exhibit "c" - Conditions of Approval)
Fire I Police: Rre staff reviewed the site plan and determined that the Fire Department expects
to be able to maintain an adequate level of service for the subject project, with
current or anticipated staffing Infrastructure requirements such as hydrants and
roadways will be addressed during plan reviews and permitting It must be noted
however, that the project is in an area with significant growth in the past year
Staff supports this project with the understanding that Fire Station No. 5 will be
available when these structures are ready for occupancy
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 4
Drainage Conceptual drainage information was provided for the City's review The
Engineering Division has found the conceptual information to be adequate and is
recommending that the review of speCific drainage solutions be deferred until time
of permit review (see Exhibit "C" - Conditions of Approval)
School The project requires confirmation from the School District of Palm Beach County
that adequate services are available to support the proposed project. Their
confirmation is require prior to the issuance of any building permits (see Exhibit "e"
- Conditions of Approval)
Driveways. Sheet SP-l shows the proposed layout of the drive aisles and parking areas. The
development fronts on Gateway Boulevard and would have three (3) access points
along that roadway All would allow for ingress / egress. The western entrance
would have two (2) lanes each for ingress and egress, separated by an eight (8)
foot landscaped median The center (main) entrance would also have two (2) lanes
each for ingress and egress, but separated by a 10-foot landscaped median. The
eastern entrance would have one (1) lane each for ingress and egress, separated
by a landscape median varying in width from 10 feet to 20 feet. In addition, an
entrance would be located on High Ridge Road This entrance will have one lane
each for ingress and egress. These entrances are generally consistent with the
Quantum Park DRI Master Plan locations.
There are internal vehicular and pedestrian connections proposed between the
"commercial" and the "residential" portions of the development. Several vehicular
entrances are proposed to allow the residents to the commercial area All drive
aisles would conform to Engineering standards.
Parking Facility. Normally, the required parking for commercial/retail uses are based on the
following methodology' one (1) parking space per 200 square feet of gross floor
area Office uses generally require one (1) parking space per 300 square feet.
However, the Quantum Park and Village South Master Plan was approved with a
parking waiver to require one (1) parking space per 225 square feet of building
area for both commercial and office uses. The plan proposes a 71,708 square feet
of commercial/office area, which require 319 parking spaces. Also, 13 One-
bedroom units and 102 Two-bedroom units are proposed. The project requires a
total of 543 parking spaces. The site plan tabular data indicates that, within the
commercial component, 407 surface parking spaces and 234 garage spaces would
be provided, which would equal a total of 641 spaces, or an excess of 98 parking
spaces.
The four (4)-story condominium building, proposed along the west property line,
would require 64 spaces and its accompanying parking garage would provide a total
of 234 spaces, or an excess of 170 spaces. The parking garage would be two (2)
stories with parking on the roof Three (3) mixed-use buildings are proposed along
the south property line. They would consist of 11 units each and therefore, (the
residential component) would require 66 parking spaces. Parking stalls are
proposed along the south property line. These stalls would be used exclusively for
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 5
the residents who would reside within these mixed-use buildings. The plan would
provide a total of 79 spaces or an excess of 13 spaces for the mixed-use buildings.
However, an apartment building is proposed at the southeast corner of the
property The plans show it as a two (2)-story building with a mix of one and two-
bedroom units (a total of 18 dwelling units) As such, the building would therefore,
require 31 parking spaces. The plans provide eight (8) garage spaces and ten
surface parking spaces for a total of 18 spaces. The deficit in parking (for this
building) would draw from the 13 excess spaces provided near the mixed-use
buildings. Staff found this "shared" parking to be acceptable due to the close
proximity of the excess parking from the mixed-use buildings. Staff does not
anticipate a parking shortage for the rental units. The four (4) retail buildings
proposed along Gateway Boulevard and the commercial component of the
aforementioned mixed-use buildings would share the interior parking lot. The
proposed commercial/offices uses would require 319 parking spaces. The site
plan proposes 316 parking spaces. Again, staff does not anticipate a future parking
problem The site plan complies with code and no variances or waivers are
required
Landscaping
The tree relocation plan (sheet T -1) indicates that site currently contains a variety
of native and exotic trees. The proposed construction would cause either
relocation or removal of certain trees, depending upon their current location,
health, and species. Basically, 42 trees would remain in their current location while
86 would be relocated elsewhere on-site. A total of 54 trees would ultimately be
removed This process of tree removal/relocation would be overseen by the City
Forester / Environmentalist during the time of permitting
According to the landscape plan, the commercial component would have 11
different categories of trees. The 11 categories are as follows Accent palm,
Accent tree, Buffer tree, Flowering tree, Palm, Parking lot tree, Shade tree, and
Specimen palm The landscape buffer along Gateway Boulevard would receive a
majority of the relocated Oak trees. According to Chapter 7 5 of the Land
Development Regulations, the maximum tree spacing along rights-of-way would be
30 feet. The distance between the trees would vary between 20 feet and 40 feet.
Therefore, staff recommends incorporating a cluster of three (3) native palm trees
into the design of the landscape buffer (along rights-of-way) within the areas
where the tree spacing distance is greater than 30 feet apart (see Exhibit "C" -
Conditions of Approval)
Foundation landscaping would occur around the front and sides of each multi-
family dwelling building in order to enhance the visual appearance of the building
and to promote privacy in accordance with Chapter 7 5, Article II, Section 5 L. of
the Land Development Regulations. However, no plant material is proposed along
the front (north) side of the mixed-use buildings. Therefore, staff recommends
installing either a landscape strip, potted plants, or a combination of both along the
front (north) side of the mixed-use buildings in order to enhance the appearance of
the commercial space (see Exhibit "C" - Conditions of Approval)
The landscape plan shows the detail of the Berm Cross Section (Garage) for the
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 6
proposed landscaping around the two (2) story parking garage. It shows palm
trees and relocated oak trees are proposed around the south and east sides of the
building The berm would be 20 feet in width and generally occur on the
"residential" component of the Quantum Park and Village South Master Site Plan
This is acceptable and meets the intent of the Land Development Regulations in
terms of screening and buffering
Building and Site The subject property represents the "commercial" component of the Quantum Park
and Village South Master Site Plan This plan proposes a four (4) story
condominium building at 45 feet in height with an accessory two (2) story parking
garage. The top of the decorative feature proposed for the garage would be 34
feet - two (2) inches in height. The condominium building would be setback over
40 feet from the west property line and 15 feet from the south property line. The
parking garage is proposed with a setback of five (5) feet - five (5) inches from the
south property line A waiver was granted with the original approval of the Master
Site Plan which allowed a zero (0) side setback rather than the required 30 feet.
The parking spaces are proposed on the roof of the parking garage. Parked
vehicles would be screened by the parapet wall The plan also proposes four (4)
retail buildings. The retail buildings would be one (1) story tall, with its decorative
features proposed at 39 feet - five (5) inches in height at the highest point. The
retail buildings would be setback 15 feet from the north property line. Again, a
waiver was granted with the original approval of the Master Site Plan which
allowed a 15-foot front building setback rather than the required 30-foot setback.
The three (3) mixed-use buildings would be two (2) stories tall, at 36 feet - three
(3) inches in height at its highest point. Front doors for the mixed-use buildings
would occur on both its front and rear facades. The entrance to the commercial
space would occur on the north facade while the entrances to the dwelling units
would occur on the opposite fa~ade (south elevation) The mixed-use building
would be setback 64 feet from the south property line. Lastly, a two (2) story
apartment building is proposed at 29 feet - four (4) inches in height at its highest
point. The apartment building would be setback 38 feet - two (2) inches from the
east property line and 26 feet from the north property line. All buildings would
comply with the maximum height allowed in the PID zoning district and the
setbacks (via waivers) approved with the Master Site Plan
The tabular data indicates that 13 One-bedroom units and 102 Two-bedroom units
are proposed for a total of 115 dwelling units. Also, 71,708 square feet of
commercial/office space is proposed However, the floor plans do not show the
breakdown between the uses The traffic impact statement was approved for
14,342 square feet of general office and 57,366 square feet of general retail The
project would therefore, be limited to 57,366 square feet of retail space. For all
intents and purposes, future restaurant space would be grouped within the retail
square footage (see Exhibit "c" - Conditions of Approval) All proposed uses are
permitted on Mixed-Use pods within the Quantum Park PID
The applicant informed staff that the residents who would reside in the mixed-use
buildings and the two (2)-story apartment building would be allowed to utilize the
pool and recreation facilities that were constructed as part pf the Villas at Quantum
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 7
Lakes (also known as Quantum Park and Village South Residential) The four (4)-
story condominium building would have its own recreational facilities. Staff
typically endorses the idea of constructing a full-sized clubhouse facility that could
accommodate Homeowner Association meetings. No clubhouse is proposed
However, the 2nd floor plan (sheet A-26) for the condominium building shows a
large "party room" that could provide the space for such meetings. The 3rd floor
plan (sheet A-27) of the condominium bUilding shows a large room for
administrative offices. However, the site plan shows a hatched area proposed near
the condominium building that is earmarked for 2,000 square feet of future office
This was not within the scope of this project and is not a part of this review (see
Exhibit "c" - Conditions of Approval)
Design
The proposed development is designed as a mixed-use project with hints of new
urbanism principles. For example, the project proposes true mixed-use buildings
where commercial space is proposed on the ground floor and residential units are
proposed on the 2nd floor These are not considered to be live-work units because
there would be no internal connection between the two occupancies. Live-work
units are not indicated on the list of permitted uses in the Quantum Park DRI
Also, the retail buildings proposed along Gateway Boulevard would be located close
to the right-of-way while its parking areas would be relegated to the rear of the
buildings. This concept invites pedestrian traffic and gathering areas in front of the
buildings rather than the typical sea of asphalt that occurs in most suburban
projects.
The project proposes a modern Spanish-Mediterranean architectural theme
throughout all of its buildings. This building style would be consistent with the
"residential" component (Villas at Quantum Lakes) of the Master Site Plan Also,
the project proposes a multitude of earth tone colors of Benjamin-Moore paints.
The proposed colors are indicated on the ledger-sized Color Schedule. These colors
are consistent with the elevation pages. Each building would be enhanced with
decorative towers and pre-cast coping / banding on the parapet walls. Also, retail
buildings would have varying heights of the parapet walls. Other decorative
features include the following decorative stucco trim, railing, pre-cast inserts,
decorative keystone, medallions, and decorative grille. Any awnings, if proposed
on the buildings, would be manufactured by Glen Raven and generally placed over
windows and doorways. Three (3) awning colors are proposed off-white (Natural
4604-46), beige (Oyster 4642), and red (Jockey Red 4603-46)
The applicant submitted photometric plans with this modification. The plans
propose Sternberg "Boston 5800" light poles as its freestanding outdoor lighting
fixtures. The actual light on top of the pole would be Sternberg's decorative model
(Ripon-A) The 14-foot poles are proposed south of the mixed-use buildings near
the residential areas and 18-foot tall poles, proposed within the interior parking lot.
Wall sconces would also be used throughout the development.
Signage:
The front (north) elevations of the retail buildings and mixed-use buildings show
the location of the proposed tenant signs. However, they do not indicate their size,
material, or color Staff cannot determine whether or not these signs meet code.
Staff Report - Quantum Park & Village South (MSPM 05-003)
Memorandum No PZ 05-067
Page 8
Therefore, staff recommends that the applicant submit a sign program during the
time of permitting The sign program would apply to the entire development (see
Exhibit "C" - Conditions of Approval) A sign program ensures both material and
aesthetic consistency for the project's signage.
A detail of a typical project development sign is shown on sheet A-37 It shows
that it would be a decorative monument-style sign but the detail does not indicate
the sign type, materials used, or proposed signage area Again, these signs would
be a component of the sign program The site plan shows that they are proposed
at only one (1) entrance. It is likely however, that in the future, the applicant
would subsequently request additional monument signs as part of their sign
program Regardless, the structures would have to be at least 10 feet from the
property line with colorful groundcover plants installed at their base. They would
require Quantum Park Architectural Review Committee review and approval
RECOMMENDATION.
Staff has reviewed this request for master site plan modification and is recommending approval,
contingent upon satisfying all conditions indicated in Exhibit "c" - Conditions of Approval Any additional
conditions recommended by the Board or City Commission shall be documented accordingly in the
Conditions of Approval
S.\Planning\SHARED\WP\PROJECfS\Quantum Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\Staff Report.doc
Exr, ~)it 'A' - Location I\, 3P
'1', i
~I
'~)i
f-I
\1 j
~L
III
I
.1
1;-; )
(;-
,
500
I
250
o
500
1,000
1,500
2000
I Feet
N
..'
s
~: j; jI : . II .. 1"" lI> ,. to
~ "HI-qm'li. ,1"litlS. u"I'Tf.CI'J1
: I !~-I'!ill!ilf;~i i!,1 ~l,~ ~~~I~I,~,'I!~
~ If 'I' ~ 111'-' 31 ,I- I "-I.I~i~!" p-I
~ ,,1,1 I 111)11 nllel Jil' 1'-""1' !III!"
I Ii II ~.llhl JI!} I_ ,I- ~Ii -II ,--
l'll'I,11111 :"0' Iii, I' I rill'" !,-' I 'I
_II ""111 .ll~~!oJ 'I ~I 111111
dll.,'; i'!11'I:Ui,i i !iJI I' II' -;'.'111 H
I - ",~ 'HP I - II II II r
2, -,' Glllil ~ il,.! ,'Ia'c " ,:
f II I If II i i: -I' -! I I
i1ili I:i illiii 9i !
;~I i;1 !ihqrll
r.h ,llp~1I ~I
1m ;J911:~ !u
,ill db~l~ ';~
Ii Ii Ii "~fh 'I!
I~" M"III E'il
II" IH!I,I' ~
_ !' 1, p"'lj I
I~n I- 1'1 I!
II~ II ~II
'~I 'ijl
J ii, I MI ii'
'iii "ji!iil ~I ~ ~
1.1 ij"I..1 JIJ .
I _ ..1'1 1
.. .. :tj:" .. i ~
.." >
I r' . iiji"j' l~W~
, .111:11:1.1 JI I
" .f.' ~::~J: J
:II " i~. i
.11. I
-'I" 1
..
IItllll 11.111 I II
!I f ,I . "III II ;
I. I I U:~ .
(i f11j1 1111 ! ~r '
II ~I' '''i! ~I i
:a .,
!!l!l:n 11 i:DII
ii fit . II
ft'lll'j 1lIlllIljlllllllli'lIlll1lill'
"'11,.1111 ~I.IIII ~I'IIIIIIII.I~
. 'i ! . '. !. '. !. i ! rl
I ; i I ; j' i j Iii
I , t' . .1 I t I . I
I " I ' · I · · I ' ·
. i' I' I' I
I .1 01 01 :
~Ii;;iiii li;;iiii li;;!iii liiiiiii
! :::~~:: :::~::: ::::::: :::::::
, s, ~, ", J
II ";I'iii!ll Im'lmlll
. 1!11Iili'P !!!!I!!!!l!
II.l. I.... IIn!ll ~
,'f!''': !M!w r
I !:: :'~; ~;~
. J .~ ',..
, !;i:~
i !iii jiii "Iiiii iiii
. ",.11. !.... ....
" "s, J~~ ,un .....
. ,
~Ii
)li
~1Il..
..2.
~~
E~HIB T B
f\
! \
.1 \
i \
.....001..
~
l=Q
,
......
~II
I
till; IIIII1 ~1Il1!i1'
I ~~~~:c; 1IIIIU..i J~~I
IOmI'ON lEACH. 3306 III I
-..-n.IIlIIWM&-......~...____ .........Dty..-...........___.~___...,~_wmaltftll__......-... ..-...cn.1IC.
~gll!lIl
P 'JJ I
I nil Ii
QUANTUM lAJCES MIXED USE
BOYNTON lEACH. fWRJDA
S
!E
I
J
.....
I--
e~
IE
c:
~
~
~
~
~
'5
z
.".
I--
I;
l~
till
c:
~
z;
:E
E
l!!
!;1
~
~
~ II
l;!l.,..'T If ~ L"
I III I
I-::--~
'" -
,"-
'" 181
-
~-
I - 181
~
'"
3:,
~
1--,
i
'),
f+
I
i
i III:
! I
! i ~ . (,l :
. ! i
I j I.
~H H
I
I I I
J
sj'
.t
~
....... lei
..r ~ I
I
~
I
T,1!-
...L~ _
I I I
..--
1-' I- 181
: I-I~
~I-
181
,--' I-
~p..
,
i
,
, I
I ,
~ ~ [v;
,
I ,
, i
, i
, i
I I
I
I I
i
i
I
~l'
" ~
~
~
I
\
,
I
~:
I
,
I
I
i
, I
I I
i ,
, ,
i I
~ ~ ~i: ;
f Hj;~
;gl!n~~'nH~lninlf ~
IIPhUI 5j &8 ~ <:
~ ~i ~ 8 ; ! I P i U ' ~ ~ S ~
II' i I · i, I ~
-3 I z
'I Q 0
Iii I ~
! 1~~~9 IIIIUIBBBB~
i"h II n
I:~ UHHH i ~
il~ ;;;ii;iil ~
Iii !U!!.!!! ~
I~; 111)11 II I ~
Ii) !!!!!!!! ~
~I IIUI1u
I I
,
I--
,
I--
~
"II
6
I
i
I I
i I I
i ! i
i i :
1....1 N I I
! I I I i
Iii
i Iii
i j i i
i ~ i:
j ~i : I
. i i i
I i 'i, i
UUH
I
I Q\1ANTUM PARK&. VILlAGE. LLC.
2.500 Ql1ANlUM UKES DRIVE 101
BOYNTON BEACH. 33G6
l;
:0 H'-~
~~
!~ T ,
al ~-
~
L , -
~ I
~
~ , ~
~I.
~ '"
T '" '
> .Hj
::l
~
!! I I I
j i i
! i:
;I~
~i If
~ :
P1 ~: v
i
i !
i I
, '
I
,
, \
,
i
1::3' ....I"\.."", ' '
~ 1-'~'1-- ,
. ..'
-- [} : ~ ~
,
,
i
,
,
I I
"1 ,
C3:1-
l '
)
~
,
I
,
'" i
.~ ~::
~ 181: tl
II ' Ti :
"~~~i.i!
I S~ Sf, ! ['
, ,
. I
~I- ;
! '} i
'1-"\ ,
""!"'?lI I
~ :j
....L $:
, I- I
- ,
!
.
'I' 1)
, t- i
~I ~
i
T
T
!~I- I
k_;II"- 181 I
r~1- 181 I
I
I
!
I
I
~ 3 :
I
~I!fi
t
V
1
")
i
I sj'.
.t
I~
I UI! I
III i I
c^"'t:J11 .1:l'7
I-- - I I
!~ ~
l~ 1
III i
c
6
~ j
~ i~
~
~ !~
~
~ '"
.r=
I ~Ii
~~ ;
~
~-~: i Ei
i i i
i i i
II i ., i
! . i
i
i
i
i
i
,
i
i
i
i
,
i
i
i
i
i
i
i
~I-.lh ",,'
~ w I<:J~:I
, I-l:=" i
"l'! i ,
i
~
jp.
I L.;
B I
l8Ii
'"
I-- t- .lh
, ,t- W
rI
~
~
! !
li~
~~'
IT~~:- i
I ,
! I
T '" _ E : III~
I' ,
~ E= ~ 1$:
! !
: III
'-I
,
i
i
i
, \
~
'" I
"" i....tM Il!I
l : I
,,~ :1
I ,II ,
,
~ ~
I
, i
:G: )m
I I
,~ )
I I
'tt
I I
~i ,
) i i
i I ~!'
i i rl
'i ,
i"!6=
.~p
i rt ~
'h
0= ~
, !
: i {i vI
1- ' i' "
liJJ ! ! .! ! i
UUU
1IIIi 111111 g;~t
iilIIU..; Jail
,~-~
~
~
I
rl:Zli:::t-m-
...e..JT :J"'r
......
~
~it
ili
QUANlUM u.os MOOD USE
BOYNTON BEACH. FLORIDA
.,.. N EXHIBIT "B"
!~ !~
!~
!c Ie:
gj '" gj
IT.
~ ~ a
&i
.., ~
~ ~ ~
<
~ ...
::l ~ ~
~
III ~ z
E tzj
~
j:; j:; ~
e; e e;
i
I
j
w
I~
~
~
..,
~ i
~ i
~ i i
~ Ii
i i
j:; Ii
~ ' i
, j
I
i i
i
i!
, r ,U
J~m ~ 1111 UII3Ii!BB I I
IPI iRh n
~~ Ii I~I :n::~:: I ~
;p~ il~ulu;lIl~
Iii II!!! I!! ! gl
I ~! IH 111111 II ~ ~,
sRi I~IIIIIIIII ..."
~ E ~ ,IUI1U
.i IIUI1u I
I lilllllilllllllllllB Ii!lBI!!!!I"IB ~
~ Illilliipnl;L I ~
, p5~ln~ ~Inll~dg
a I I qz
T I .1 ; i ~
~ Iii ~ 8 -<
I II i ~
~ II ~II I UI! I I QU>>lTUM u.ns MIXED USE rill 111111 ~I~t
BOYNTON BEACH. PLOIUDA
t3 I II. I I Ql.1ANnJM P.AlUC. &. VILLAGE. LLC. 1111.11 .U Ja II
I 1500 QU>>lTUM IJJO!S DllM 101
BOYNTON BIiACH, 33426
-- ~--~-----------_._--
~~
",g:
~~ II
~~
8~
S. ;:
~i:;R
~ t1!ll:
~
Fil
n
i ~~I~
q
'" '" '" ,,'" ~ '"
'" '" '"
...... ... ~~~ ~ ~~
~ ~ ~ :r~~~
~ ~ ~ ...~ ... ~~
> > > ~r ~
"" "
'" '" '" %% 2
tII> -I -4 =i ~~
. , tII> (J\
,...'" U II II %6
(,>61 lZI!i
~61 dl""Ol
> ~ (,IV> !~~
...-
?;" !l'.l>>
-"> , 1 to> c:
lJ'!l' '" '1!~
. -., "(J\
."
Y":"" a:
."
!l:
1 ·
~
.
5:j
~ IFfj
~ ifii
~
- EXHIBIT "B"
~
~ I
~ I
~
_~ L
~;:
~R
:~
S~
=>-l
!~~
< - 'Z
f\.J::j
,~>
o~o
LHli
. ~
~ ~I!:
~, ~
g~ 0
'"
I;~ ~
"I. r-
g~~
.>
l">
co
>
~l~q!~i
"Iii
...
~
~~~
Q" '"
/0"1; ::
g
'"
-I
I
l'
~ I
eI
~d
~ I
I
I
~ I~
~~Ii
/O~ :;l
~
~ ~~I~ - l
I g~ ~ I
L____J
21~
.'"
~&l
~II
I
I !II! I
III i I
lEI;; 111111 ~I~t
1111.11"; J~II
I
~ CWANnJMP~&.VlLU.GE.l.LC.
I 2500 QUANnJM L4JCES DRIVE 101
BOYNTON BEACH, 33426
QUANTUM WCES MIXED USE
BOYNTON BEACH. FLOlUDA
~_.- ---------~ ------------
N EXHIBIT "8"
~iU3 . lIIunllB8 !; E~
II Ii il J I () )6 !~
~ Ii I. i U HUH i g ~
;;
!~ ~ ~ h "If If If ~ l"' ...
g '"
~Pi I r I n II U II n '"
3
>- >
! I' hi iiiiijH i ~ l"' ...
e ..,
'"
0
) !ll ,,11..11 ,. ~
.; ,qiinH ~ F
'"
>- <
::l ~
~ (5
z
1I111i11:l CI iii 8S I!l!i!lB8 ~
'I~fi"i~~fil'~ii~111 m
~ J .JJsPI ~I II <:
IIIUU~ I ~I~,hllil~
!i1iiil ~ aUi ';00:
hlllill II. ~~
il11i Ii lZ
1.1 I ~
I ~ tI>
IN
!~
)S
~
>
l"'
~
l""
~
!!l
~
~
I
I t I
ll: ! u ~ I
~ ~I
~ i~
I !I!! I
III i I
Q1JANTUM LAKl!S MIXED USE
BOYNTON BEACH. J'LOlUDA
I
~ Q11ANTUM PAU &. VILLAGE. l.l.c.
I 2500 Q1JANTUM LAKl!S DlUVE 101
BOYNTON BEACH, 33426
IEI~: 1'1111 ~i~t
I~ i II ~ ~ ~
IIU IUaa; Jail
~II
~
- EXHIBIT "8"
IV
liUl tTl ". 1111 1111111 IIIIB I
E~ illl n r:;
en elll rIl1iinnn ~ 1'1 IiIU"U i ~ i~
!~
;~ ,I 11,11 u.li::J ~1. iiiiiiiil ~ z
-i
:; I ~; I ~ ~ 0 ~IiIIlHIII!Q :;;
c- c-
r, I Z
0 hi i i i i i i i P ~ z
~ II. I I ~ <::
0 ~ II 0
~ ~ Z Id H!!H!! ~ ~
en Ii ,0 '"
-i @ ~ -i
'" p::
C- -I 11111111
'" '"
< <
> >
-i ~
<5
z Z
l
* IiI
0_
~il
I
1'1; 111111 ~Iit
~==~ 1IIIIu',; J~II
.-n.w&uMI&.-.o.~--'''''__Im____'''''''''__'''''._G&_.Mft~''''''''wn-.'''________ --
I un I
...11 I
I
I
QUAN'JUM L\DS MIXED USE
IOYNI'ON lEACH. PLOIUDA
N
!~
I~
::j
?:
r',
o
Z
C;
o
:l2
'"
~
'"
,...
'"
<
:>
-i
(5
Z
lim
elll
;! ~I
P'
I d
r ;1
hi
T
~ III
0_ _
r:niinnn ~
1151111111+ ~
I ~ ~ 0
I I ~
J -<
~ z
I ~
@ Bl
II 111111 II.Be
1..1. (')
III :::::~:p ~
;1. 11111111 ~
Iii !lB!.!! + g
I!I 11111111 t ~
Id !lu!!!! -+
.1 11111111
i
i
, I
i
i
i
EXHIBIT "B"
I~
I~
-i
:>
,...
I"l
o
3'i
(5
:l2
[T;
cr.
-i
111
,...
111
<
:>
-i
(5
Z
~II
I
~::I~~~ l'lli IlIill ~Iit
~~~~:o? 1IIIIu..; J~II
IOYNTON lEACH. 33426
~- .- ~____~~___",____-,"""__"'______"JM1I-'''''''''''__________
I
I
I U!! I
adl I
IV
Hi
I~
....
~
;-:
Z
::J
C
Z
o
;oJ
....
:r
Tn
,...
m
<
>
....
is
z
!t
~ II
~ i~
- EXHIBIT "8"
I~
I;
:;:
,...
r.
C
Z
'='
o
en
o
c::
. ....m.B81 ~
III- () I;;
III :::::~:p i2 ~
;h IIllIpll ~ ~
Iii II!!!.!!, g
1!I'III,lni ~
Iii !!!!!!!! ~
.1 1IIIIIn
~ilUI
Iql
~! ~I
Inl
ad
d'
nl
m
'iUJin"H ~
lis. ~ 11'1i~
IDIIIIO
I I ~
j ~
~ z
I~
8 f3l
, i
I !
I I I I I I
, '1 11 ~ ~I
I ~=~U:E IEIIi 111111 ~i!t
I ~==~ IIIIIIII.! J~I)
.-n........._..-.--=---=-ML_-.a___~--.________..._--.____.-.-__ ~...
~il
I
I 1111111
adllll
!;
IS
~
>
I'"'
~
~
~
~
g
'"
...
~
'"
~l:
1 ·
~
~
> ~I
, s;=
~ ;~
7-1~
..,.,
;g
'1.
~I~
;g
'1.
________.1
~." !Z l')
o~.... c
~~ ~ ~
(1 '"
."
o
II II ~
- - ..
3 ~ g
~ (j\ ~
"I s:
...
.11
6
- EXHIBIT "B"
";;;1'"
d1 ~
!>p:
g~11
""'I~IO
..- -
.' z
g~ Z
...0 ~
";;;11;10
~-: ~ Z
g~o ~
....
..ltlO
ci~ !i
f::~
";;;1'"
~. c
". '"
s~ .~
~
~:;I!S
g~~
I UI! I
1,,1 I
I
i
IEII; III1II ~i~t
iill,h!,! J~1t
Ql1ANTUM LADS MIXED USE
BOYNTON BEACH. FLOlUDA
Q11ANnJM PAll.K&.. VILLAGE. LoLoC.
2SOO Q11ANTUM LADS DlUVE 101
BOYNTON B:&ACH. 33426
N EXHIBIT "8"
!~ a:: !~ !e
!~ I~ l~ I~
0 0 \0
~ ~ Cl ~
~ ~
Ctl 0
~ ~ Ctl Ctl
~ ~
; ! ~ !
~ ::l
il ~ ~ 0
z
i i
i i
i I. . . i
4 r ,~ j ~ ~ t~ j I
i
i
j ~ S11l1l1ll1!l'UlB I I
1 R~~ ("') i
I:~ ;j;jUUHi~ i
il! iiiiqiil2 I
i
=R ~ P II II I ("') I i
In :.:"'11' ~ i i
I~~ PIII)U ~ I i
Id !!!!!!!! .., I I
i i
<I ~lullH i I
j I
D~ m i " I
Illili;; linin ~ ~ I . i i I I . II I
I .. i ! i I i
. II ,
~l II d ~ i II U :::l ~~ , l~ ,
~I ! ~ h ~ ~ I ~
, ! ~~ I ~
1 j' I ~ ~ ~
Ii I' ~
I I ~
~ I ~II I UI! I I Ql1AN1UM WCES MIXED USE fill 111111 ~I~t
I~ BOYNTON BEACH. fLOIUDA
W I
c.n I III g I Q1.lAN'lUM PARK&. VILLAGE. 1.Lc. iill.ua.; J~II
2500 QUANTUM IJ.XES DIUVE 101
BOYNTON BBACH. 33426
.-----..-----
IJ
~::eU' ~~~U;
:lIl......
'"'....~ 000 ....
.,,;;;J lJ'""'\..." ~
~."" U'rr-r-
000
c:'" , ~lil ~ U'
,.,~'"
0,.8 CJI It II II g
~g3 ~'''1oI101 ~
N~!"Jf'l
3 ~~~ ~ ."
n . .
1oIt.>'" iJ'",,,, '" 8
~;j8 ""1\ CJ\ lJ' IJ'I -\
(J\~lJ' ",,,, '" ~
~""'{fI
'"
8~'" -\-u."..,.
("l0E; ~~~~
Iii~f:'
~~::t """
.....'" UI~~ \J
0-
~~g l3 0.... I
-<<I' -"~,,
.". , rrr-
'" 000"
n t.>1oI ~ Iillil U'
.... ...
-< . II' . . ~
." I
'" "! ~~~ 8 ~
'< ....
0 "'1(:<1'
,. U' .,,!{;
8 ~~~ ~
C1f"1\t'1 "
" ~<I'U'U'
...
I
I
I
~l:
" It
Vi
.It
~
~ il
~ II
EXHIBIT "8"
Q
e e ~
...
...
'"
~ ~
...
...
~ N ...0-
~ Q ~ l:!
t\ ~ ~ I t I ~
... ...0-
0 ~
~ t t ~ ~ ~ ~ '" ~ '" '" g Ii
N '" .... ...
'" ~
t1l ~ ~ ~ ~-~
~ N ..'"
....
..,
!~ E
I~ ~1lIl1lIlI
S! -
8 $
q~ <=
:s , ~
:Ii ... ;;; -,- ~
... ~ 00
~ (:1 s:
~ "II ~ '"
>- ....
"
;00: ... &:
'" i '" ~
~ 0
0 :f ... iji :;:: $
>- ... ....
'" "
~ >- ... ....
0 ... ~ ~ '"
t1l Ii
~ ;Z :s ;;!
c
~ "II
S ~
~ i ~
4 ;t ..,....,. I.
.. is
~
ii qi ~
z
~ E
rJ: ..., ; ::; ... ...
:e Ii: ~ .
~ ~ ~ G
'" Q~ e ~ z ~
;00; ~ c
~ .Ii ~ ~
~ ~
~ ~ ~ ... !:l ~
'" .. !::! t;:
> '"
~ ii ~ ~ t;:
... ....
'"
C ~ '"
! ~ ..
g '"
...
I ~ l
...'...,.
~II I un I I QyANTUM LAKES MIXED USE r!ll III!II ~i!t
BOYNTON BEACH. FLOIUDA j I i ~I
I II I I I Ql.J,AN1UM PARK&. VlWGE. I.I.c. 1111 -I..' J-I!
6 2500 Q1JANTUM lAKES DRIVE 101 U 1.1 I 9
BOYNTON BIiACH, 33426
---.--------
EXHIBIT "C"
Conditions of Approval
Project name: Quantum Park & Village South Commercial
File number MSPM 05-003
Reference' 2nd review plans identified as a Master Site Plan Modification with a February 2. 2005 Planning
and Zonmg Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
I The proposed landscape plan does not contain enough information to X
determine if any vertical conflicts may exist for dumpster enclosures and/or
Solid Waste truck movements. Please provide this informatIOn at the tIme of
permitting.
PUBLIC WORKS - Traffic
Comments:
2. Close the south driveway for this development to residential traffic. Provide a X
gate, equipped and signed appropriately, to allow emergency access only
The approach may be constructed of stabilized sod to visually discourage
residents from attemptIng to utilize this access point.
ENGINEERING DIVISION
Comments:
3 Show proposed site lighting on the Site and Landscape plans (LDR, Chapter X
4, Section 7.B 4) The lighting levels shown along the south boundary seem
too high to be adjacent to residential. Please re-evaluate lighting in this area.
4 It may be necessary to replace or relocate large canopy trees adjacent to light X
fixtures to eliminate future shadowing on the parking surface (LDR, Chapter
23, Article II, Section A.I b).
5 Full drainage plans including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5, will be required at the time of
permittinl!.
6. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate X
grate, rim and invert elevations for all structures. Indicate grade of storm
sewer segments. Indicate material specificatIons for storm sewer
7 Paving, Drainage and Site details will not be reviewed for construction X
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
COA.doc
06/17/05
2
DEPARTMENTS INCLUDE REJECT
UTILITIES
Comments:
8. At the time of permitting, please provide a time line that clearly illustrates X
when water and sewer services will be required to serve the proposed project.
Your starting date for the time line should be the date of City Commission
approval. Also provide milestone dates for pernnt application, the start of
construction, and the setting of the first water meter This time line will be
used to determine the adequacy of water and wastewater treatment capacity
for your project upon the project's completion, so please be as accurate as
possible.
9 At the time of pernntting, all utility easements and utility lmes shall be shown X
on the Site plan and Landscape plans (as well as the Water and Sewer Plans)
so that we may determine which appurtenances, trees or shrubbery may
interfere with utilities. In general, palm trees will be the only tree species
allowed wIthin utility easements. Canopy trees may be planted outSIde of the
easement so that roots and branches will not impact those utilities within the
easement in the foreseeable future. The LDR, Chapter 7.5, Article I, SectIOn
18 1 gives public utilities the authority to remove any trees that interfere with
utility services, either in utility easements or public nghts-of-wav
10 At the time of permitting, Palm Beach County Health Department permits X
will be required for the water and sewer systems serving this project (CODE,
Section 26-12).
11 The CODE, Section 26-34(E) requires that a capacity reservation fee be paId X
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of Site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
12. A buildmg permit for this project shall not be issued until this Department has X
approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15
13 Utility construction details will not be reviewed for construction acceptability X
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
COAdoc
06/17/05
3
DEPARTMENTS INCLUDE REJECT
14 Site addresses shall be placed conspicuously on the front of the structure, so X
the numbers can be seen plainly Site addresses shall be placed conspicuously
on the front of the structure, so the numbers can be from the street. Numbers
used for residences shall be not less than four inches 10 height and shall be
made of a durable and visible material. Numbers used for commercial and
industrial buildings shall not be less than six inches in height. (City
Ordinance Chapter 20 Section 16.).
15 Emergency access shall be provided at the start of a project and be maintained X
throughout construction per the Florida Fire Prevention Code, Section 3-5,
and NFPA 241, (1996) Safeguarding Construction, Alteration, and
Demolition Operations, Section 5-4.3
16 Fences and gates shall meet City Ordinance 98-45,2,12-1-98, Available at X
Fire Marshal's Office (Plans Review).
17 Prior to FIre Department 1Ospections, new construction projects must provide X
the results of a hydrant flow test indicating a fire flow not less that 1,500
gallons per rmnute @ 20 p.s.i. above domestic use. This applies to new or
existing hydrants within the required 200 feet of the facility All fire hydrants
shall be operational before construction begins in the area the hydrants cover
18. All build10gs three (3) stories or 30 feet in height shall have an automatic fire X
sprinkler system Chapter 9, Sec 7-2-2Al City Ordinance.
POLICE
Comments: None X
BUILDING DIVISION
Comments.
19 The height and area for buildings or structures of the different types of X
construction shall be governed by the intended use or occupancy of the
building, and shall not exceed the limits set forth in Table 500 of the 2001
FBC.
X
20 Every exterior wall within 15 feet of a property line shall be equipped with
approved opening protectives per 2001 FBC, Section 705 I 1.2.
21 Buildings, structures artd parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of permit application.
COAdoc
06/17/05
4
DEPARTMENTS INCLUDE REJECT
22. Every building and structure shall be of sufficIent strength to support the X
loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table
1604 I Indicate the live load (pst) on the plans for the building design.
23 At time of permit review, submit signed and sealed working draWings of the X
proposed construction.
24 At the time of permit review, submit details of reinforcement of walls for the X
future installation of grab bars as required by the Federal Fair Housing Act
Title 24 CFR, Part 100.205, Section 3, Requirement #6. All bathrooms within
the covered dwelling unit shall comply
25 Verify that the proposed elevation is in compliance with regulations of the X
code by adding specifications to the site data that address the following
Issues.
a. The deSIgn professIOnal-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _ _ NGVD
is above the highest 100-year base flood elevation applicable to the
building site, as determined by the SFWMD's surface water management
construction development regulations."
b. From the FIRM map, Identify in the site data the tItle of the flood zone
that the building is located Within. Where applicable, speCIfy the base
flood elevation. If there is no base flood elevation, indicate that on the
plans.
26 As required by the CBBCO, Part III titled "Land Development RegulatIons", X
submit a site plan that clearly depicts the setback dimensions from each
property line to the leading edge of the buildings. The leading edge of the
buildings begins at the closest point of the overhang or canopy to the property
line. In addItion, show the distance between all the buildmgs on all sides.
27 CBBCPP 3 C.3 4 requires the conservatIon of potable water City water may X
not, therefore, be used for landscape irrigation where other sources are readily
available.
28 If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application.
a. The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
b. If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
c. The number of dwelling units in each building.
d. The number of bedrooms in each dwelling unit.
e. The total amount paid and itemized into how much is for water and how
much is for sewer
COA.doc
06/17/05
5
DEPARTMENTS INCLUDE REJECT
(CBBCO, Chapter 26, Article II, Sections 26-34)
29 At time of permit review, submit separate surveys of each lot, parcel or tract. X
For purposes of settmg up property and ownershIp in the City computer,
provide a copy of the recorded deed for each lot, parcel or tract. The recorded
deed shall be submitted at time of permit review
30 At time of building permit application, submit verification that the City of X
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property The following information
shall be provided.
a. A legal description of the land.
b. The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
c. If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
d. The number of dwelling units in each building.
e. The total amount being paid.
(CBBCO, Chapter I, Article V, Section 3(t))
31 Pursuant to approval by the CIty COIllIlllssIon and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the CIty Commission.
32. The full address of the project shall be submitted with the construction X
documents at the time of permit application submittal. If the project is multi-
family, then all addresses for the particular building type shall be subrrntted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
33 Van accessible parking is required in the garage per the 2001 FBC, Section X
11-4 1.2(5)(b).
34 CBBCO, Section 9-6(A)(4), requires all buildings or structures in excess of X
12,000 square feet per floor area to be equipped with an approved automatic
fire sprinkler system.
35 The residential condo building shall comply with the Fair Housing Act. All X
the dwelling units shall comply
PARKS AND RECREATION
Comments:
COA.doc
06/17/05
6
DEPARTMENTS INCLUDE REJECT
36 IrrigatIOn must cover 110 % of area. At the time of permitting, the reqUIred X
irrigation shall be shown on irrigation plans and notes.
37 The recreatIOn Impact fee is required as follows. X
115 multI-family dwelling units (aJ 656 each = $75,440 00
FORESTERlENVIRONMENT ALIST
Comments:
38. The applIcant should clearly identify all of the landscape improvements X
shown on the landscape plan.
PLANNING AND ZONING
Comments.
39 A traffic generation statement, prepared by Pinder Troutman Consulting, Inc. X
was sent to the Palm Beach County Traffic Division for concurrency review
Based on their review, the Traffic Division determined that the proposed
project is part of the previously approved Quantum DR!, and therefore, meets
the Traffic Performance Standards (TPS) of Palm Beach County However,
no building permits are to be issued for this particular project by the City after
the build-out date of 2007 unless an updated traffic statement IS received and
approved by the County that extends the build-out date.
40 The traffic impact statement was approved for 14,342 square feet of general X
office and 57,366 square feet of general retail. The project would therefore,
be limited to 57,366 square feet of retail space or be subsequently amended
pursuant to the provisions allowed for Mixed-Use pods in the Planned
Industrial Development (PID) zoning district, Chapter 2, Section 7.P 4 of the
Land Development Regulations. For all intents and purposes, future
restaurant space would be grouped within the retail square footage.
41 The project must obtain approval from the School District of Palm Beach
County regarding school concurrency This will be required prior to issuance
of any building permits.
42. The Quantum Community Development District (QCDD) or its designee X
shall provide the applicant with an updated letter giving consent to allow the
proposed gazebo to extend in Tract "Q", prior to the issuance of a building
permit.
43 The site plan shows a hatched area proposed near the condominium building X
that is earmarked for 2,000 square feet of future office. This was not within
the scope of this proiect and is not a part of this review Eliminate this from
COA.doc
06/17/05
7
DEPARTMENTS INCLUDE REJECT
the drawings at the hme of permitting to maintain consistency between the
plans.
44 Incomplete signage is shown on the elevations. All elevations must show the X
proposed signage area and be consistent with the master sign program from
Quantum Park. Staff recommends that you submit a master sign program that
shows the number, location, dimensions, exterior finish, and color(s) of all
wall signs and freestanding signs (Chapter 2, Section 5.H.9). The sign
program would require Quantum Park Architectural Review Committee
(ARC) review and approval.
45 Add more trees around the parking garage. These trees shall be planted a X
minimum of Y2 building height at time of planting (Chapter 7.5, Article II,
Section 5 .M.).
46 All shrubs and hedges are required to be at minimum 24 inches in height, 24 X
inches in spread, and planted with tip-to-tip spacing measured immediately
after planting to adequately cover the planted areas on the site (Chapter 7.5,
Article II, Section 5 CA ).
47 FoundatIon landscapmg shall be required in the front and SIde of each multi- X
family dwelling in order to enhance the visual appearance of the building and
to promote privacy (Chapter 7.5, Article II, Section 5.L.). This would apply
to the four (4)-story condomimum building as well as the rmxed-use and
apartment buildings.
48 Landscaping at project entrances shall contain a SIgnature tree at both sides of X
the entrance (Chapter 7.5, Article II, Section 5.N). A signature tree is a tree
with blossoms or natural color other than green intended to beautify project
entrances and contribute to the city's image with thIS element of aesthetic
conformity Signatures trees include Yellow Elder, Tibouchina Granulosa,
and Bougainvillea. Note that signature trees do not contribute toward the
total number of required perimeter trees. Signature trees must have 6 feet of
clear trunk If placed within the safe-sight triangle (Chapter 7.5, Article 2,
Section 5.N). At the time of permitting, revise plans to include signature
trees at each pr01ect entrance (along the rights-of-way).
49 All freestanding monument SIgnS shall have colorful groundcover installed at X
the base (Chapter 7.5, Article II, Section 5 0). Revise landscape plans at the
time of permitting.
50 Provide a detail sheet depicting the previously approved landscape berm X
along the south side of the Mixed Use Buildings, and how it is being treated
with the new roadway penetrations into the residential development to the
south.
51 At the time of permitting, provide greater detail of Gateway Boulevard X
reflecting the proposed six (6) lane cross-section, including its proximity to
your property line, the sidewalk location, perimeter landscaping and location,
COA.doc
06/17/05
8
DEPARTMENTS INCLUDE REJECT
potential modificatIon and landscaping of the medians.
52. The landscape plan (sheet L-I of 3) does not show the entire sidewalk along X
Gateway Boulevard. These plans will have to match the civil drawings that
show the required sidewalk. At the time of permitting, revise landscape plans
to show sidewalk. Also, any landscape material proposed outside the
property line and within the road right-of-way will require the Engineering
DivisIon review and approval. This landscape material cannot be counted
within the proposed landscape plan's tabular data. Revise plans accordingly
at the time of permitting.
53 Staff recommends incorporating a cluster of three (3) native palm trees into X
the design of the landscape buffer (along rights-of-way) within the areas
where the tree spacing distance is greater than 30 feet apart (Chapter 7.5,
Article II, Section 5.D ).
54 Staff recommends installIng a landscape strip, potted plants, or a combination X
of both along the front (north) side of the mixed-use buildings in order to
enhance the appearance of the commercial space.
ADDITIONAL PLANNING & DEVELOPMENT BOARD COMMENTS.
Comments:
55 None X
ADDITIONAL CITY COMMISSION COMMENTS
Comments:
56. To be determined.
MWR/elj
S:\Planning\SHARED\WP\PROJECTS\Quantum Park & Village\SBMP 02-001 south\MSPM 05-003 Commercial\COA.doc
Meeting Minutes
Planning and Development Board
Boynton Beach, Florida
May 24, 2005
Ms. Jaskiewicz suggested he look at the plans, which depicted the rear end of
the property
Mr Cohen stated they previously met with the Homeowners Association, and
reviewed all the plans when they initially went in for site plan review He
explained that because they just got the financing completed, they asked for an
extension of time to start the construction.
Warwick Houston, 1712 SW 18th St., noted he was President of Boynton
Leisureville, and had no problem with the extension
Robert Vaniguerre, 1393 SW 17th Ave., noted he resided near the canal
where the building would be. He stated he had no problem with the
construction, but was concerned about the landscaping plan
Roy Mubow, 1397 SW 17th Ave., noted he had no problems with the
extension.
Chair Wische asked if there was anyone else in the public audience who wished
to address the item There being no one else, the public hearing was closed
Motion
Vice Chair Hay moved to approve the request for a nine (9) month site plan time
extension for the construction of a 29,419 square foot, two-(2) story office
building, approved on February 3, 2004 (an extension to November 3, 2005)
Motion seconded by Ms. Jaskiewicz and carried 6-0
C. Master Site Plan Modification
1
Project:
Agent:
Owner'
Location
Description
Quantum Park &. Village South
Commercial (MSPM 05-003)
Steve Fike, Olen Development
Quantum Park and Village, LLC
Southwest corner of Gateway Boulevard and
High Ridge Road
Request for Master Site Plan Modification
approval for the construction of a mixed-use
development consisting of an additional 115
multi-family dwelling units (for a total of 349
dwelling units) and 71,708 square feet of
commercialf office space on a 26.165 acre-
9
Meeting Minutes
Planning and Development Board
Boynton Beach, Florida
May 24, 2005
Mixed Use POD in the Planned Industrial
Development (PID) zoning district.
Chair Wische inquired about tabling the Quantum Park & Village South
Commercial Master Site Plan Modification
Mr Johnson noted that staff received a fax from the applicant on the date of this
meeting, stating they would like to postpone until the next Planning and
Development Meeting.
Ed Breese pointed out there were some issues, which they wanted to resolve
with staff before coming before the Board
Motion
Mr Casaine moved that the Master Site Plan Modification for Quantum Park &
Village South Commercial (MSPM 05-003), be tabled until the next Planning and
Development Meeting, to be held on June 28, 2005 Motion seconded by Vice
Chair Hay and carried 6-0
G Code Review
2.
Project:
Building Colors along Major Roadways
(CDRV 05-009)
City initiated
N/A
Proposal to amend the Land Development
Regulations, Chapters 4 and 9 to limit building
colors, and require the review/approval for
changes to building colors for buildings located
along Boynton Beach Boulevard, Federal
Highway, and Congress Avenue.
Agent:
Location
Description
Chair Wische asked why Woolbright was left out of the proposal Mr Rumpf
stated that in some conversations with Commissioner Ensler, who was
instrumental in bringing the item forward, he suggested trying it on the three
roads, which had the greatest exposure to the public. Vice Chair Hay stated
Gateway should also be included. Mr Rumpf explained the project was to
address color changes for existing buildings, and not for new construction,
because the Board would get to review those colors.
Mr Rumpf noted he prepared a powerPoint presentation, and hoped the Board
could give comprehensive recommendations to the Commission He pointed out
10
L JTICE OF PUBLIC HEARING
STEVE FIKE, agent for QUANTUM PARK, LLC applicant/owner, has requested
the following parcel to be considered for a Major Site Plan modification and
Master Plan Modification approval
Legal Description All of Lot 100, Quantum Park at Boynton Beach P I D Plat
No 6 Replat No 1, Plat Book 94, Pages 176 throug h 177, Public Records of
Palm Beach County, Florida
Together with a portion of
Lot 62, Quantum Park at Boynton Beach P I D Plat No 6 Plat Book 57 Pages
191 through 193, Public Records of Palm Beach County, Florida
Together with
Lot 63, Quantum Park at Boynton Beach P I D Plat No 6, Plat Book 57, Pages
191 through 193, Public Records of Palm Beach County, Florida
Together with
Lots 64 and 65-A Quantum Park at Boynton Beach P I D Plat No 9, Plat Book
60, Pages 32 through 33, Public Records of Palm Beach County, Florida
Together with a portion of
Lot 65-B, Quantum Park at Boynton Beach P I D Plat No 9, Plat Book 60,
Pages 32 through 33, Public Records of Palm Beach County, Florida
Containing 14 265 acres, more or less
Proposed Use A mixed-use development with 115 Multi-family dwelling units
and 71,708 square feet of commercial/office space on 14 265 acres in a
Planned Industrial Development (PID) zoning district
A PUBLIC HEARING TO CONSIDER THE REQUEST IS SCHEDULED BEFORE
THE PLANNING AND DEVELOPMENT BOARD ON TUESDAY, May 24, 2005
AT 6 30 PM THE CITY COMMISSION WILL ALSO CONSIDER THE REQUEST
ON TUESDAY, June 21, 2005 AT 7 00 PM AT THE CITY HALL COMMISSION
CHAMBERS, 100 EAST BOYNTON BEACH BOULEVARD, BOYNTON BEACH,
FLORIDA OR AS SOON THEREAFTER AS THE AGENDA PERMITS
All interested parties are notified to appear at said hearings in person or by
attorney and be heard or file any written comments prior to the hearing dates
Any person who decides to appeal any decision of the Planning & Development
Board and City Commission with respect to any matter considered at these
meetings will need a record of the proceedings and for such purpose may need
to ensure that a verbatim record of the proceedings is made, which record
includes the testimony and evidence upon which the appeal is to be based
The City shall furnish appropriate auxiliary aids and services where necessary
to afford an individual with a disability an equal opportunity to participate in and
enjoy the benefits of a service, program or activity conducted by the City
Please contact Patricia Tucker (561) 742-6268 at least twenty-four hours prior
to the program or activity in order for the City to reasonably accommodate your
request
rov~ ~ ~ n ~ ~lru
IW \ MA~ 200j \ L..-' \
\ \
L-- \
TMENT 01= OEVELOPMf Nl
OEPAR .'
CITY OF BOYNTON BEACH
PLANNING AND ZONING DIVISION
(561) 742-6260
-,
."uTICE OF PUBLIC HEARING
STEVE FIKE, agent for QUANTUM PARK, LLC applicant/owner, has requested
the following parcel to be considered for a Major Site Plan modification and
Master Plan Modification approval
Legal Description All of Lot 100 Quantum Park at Boynton Beach P I D Plat
No 6 RepJat No 1, Plat Book 94, Pages 176 through 177, Public Records of
Palm Beach County, Florida
Together with a portion of
Lot 62, Quantum Park at Boynton Beach P I D Plat No 6, Plat Book 57, Pages
191 through 193, Public Records of Palm Beach County Florida
Together with
Lot 63, Quantum Park at Boynton Beach P I D Plat No 6, Plat Book 57, Pages
191 through 193, Public Records of Palm Beach County, Florida
Together with
Lots 64 and 65-A, Quantum Park at Boynton Beach P I D Plat No 9, Plat Book
60, Pages 32 through 33, Public Records of Palm Beach County, Florida
Together with a portion of
Lot 65-B Quantum Park at Boynton Beach P I D Plat No 9, Plat Book 60,
Pages 32 through 33, Public Records of Palm Beach County Florida
Containing 14 265 acres, more or less
Proposed Use A mixed-use development with 115 Multi-family dwelling units
and 71,708 square feet of commercial/office space on 14 265 acres in a
Planned Industrial Development (PID) zoning district
A PUBLIC HEARING TO CONSIDER THE REQUEST IS SCHEDULED BEFORE
THE PLANNING AND DEVELOPMENT BOARD ON TUESDAY, JUNE 28, 2005
AT 6 30 PM THE CITY COMMISSION WILL ALSO CONSIDER THE REQUEST
ON TUESDAY, JULY 19, 2005 AT 7 00 PM AT THE CITY HALL COMMISSION
CHAMBERS, 100 EAST BOYNTON BEACH BOULEVARD, BOYNTON BEACH,
FLORIDA OR AS SOON THEREAFTER AS THE AGENDA PERMITS
All interested parties are notified to appear at said hearings in person or by
attorney and be heard or file any written comments prior to the hearing dates
Any person who decides to appeal any decision of the Planning & Development
Board and City Commission with respect to any matter considered at these
meetings will need a record of the proceedings and for such purpose may need
to ensure that a verbatim record of the proceedings is made, which record
includes the testimony and evidence upon which the appeal is to be based
The City shall furnish appropriate auxiliary aids and services where necessary
to afford an individual with a disability an equal opportunity to participate in and
enjoy the benefits of a service, program or activity conducted by the City
Please contact Patricia Tucker (561) 742-6268 at least twenty-four hours prior
to the program or activity in order fo~ the City to reasonably accommodate your
request [0): ~ ~ ~ n w ~ ~
lJ1) I .Jl.N 2 0 200i ~
\
I
CITY OF BOYNTON BEACH
PLANNING AND ZONING DIVISION
(561) 742-6260
OEPARTMENT OF DEVElOPMENl
To the City Clerk - City Of Boynton Beach
AFFIDAVIT
-l~(:. ~ow~@
",1""2005
.... _ ~i 1
i< 41NG AND
~G OEPT
RE:
Project Name:
File #:
1000 Gateway Boulevard
Quantum Lake Villas Mixed Use
I/We, the undersigned do certify that to the best of my knowledge, the
attached ownership list, 400' radius map and mailing labels are a complete
and accurate representation of the real estate property and property
owners within at least 400 feet of the above-referenced subject property.
This reflects the most current records on file in the Palm Beach County
Property Appraiser's Office.
The notifications were postmarked a minimum of 10 days in advance of
the public hearing.
Site signs were posted on the premises 10 days in advance of the public
hearing in accordance with City Ordinance 04-007. Attached are
photographs of the signs showing their placement on the property.
Sinc~~~
~~ ~
Notary Public, State of Florida
~y ~ Sheila Rendon
~ ~ My CommissiOn 00224718
,}";I Expires September 28. 2007
~R~
("JjJ)u IZ 'JOG)
Cc: Planning & Zoning Department
U:\SHEILAIQUANTUMlPartnershipIGateway BlvdlPublic Hearing Notice - Affidavit doc
,
I · I
.
~
---<
--
=---:
~
~.\--
.'~
:, .,c-
\ c::::J:.
',ee.
\ ::::)
, :c::c
\\-:-
'\<.F>
..\U-l
,. \ ,...,,-
......-
~
C'
-
.,~.
~
.u
,", {~'y lIt
~. ~.
~.~..
"-
"r
....
" . ,.
-.,.
'\.,
~.
.~
*,
,.
(,)
C
en
en
r--
ex>
I
~
~
CO
-
~
-t-J
-
ro
<1)0;
a:~
01
-<1>
roro
O~
- -
'"
(1) <1'
a:
E~
E ,n
,"
O'J
I ...
'I
c.....~
o ~
~ 0
.- CO
Co.....",
.-z ~g
OOcnEC'l
.s CIS 0.. ~
.- '" 0 0\
000_-
~~ ~.Q
-,-(1)=
"'""0.....
"Cl3~'O
~..... c ~
.- C d
~o 00
~ .... 01) C'l
~ ~'i ~
>0_::
~ >>~tS l'.
,.:c,o
tlScn....'O
~~<.S..2
e"S 01)-6
.s e "2 ]
co..(ijO
tlS <I) cn
=S::I:~
'0 0 C
tJJ ~...;j
..... - <I)
cn .g <I)
~~s
JTICE OF PUBLIC HEARING
STEVE FIKE, agent for QUANTUM PARK, LLC applicant/owner, has requested
the following parcel to be considered for a Major Site Plan modification and
Master Plan Modification approval
Legal Description All of Lot 100, Quantum Park at Boynton Beach P I D Plat
No 6 Replat No 1, Plat Book 94, Pages 176 through 177, Public Records of
Palm Beach County, Florida
Together with a portion of
Lot 62, Quantum Park at Boynton Beach P I D Plat No 6, Plat Book 57, Pages
191 through 193, Public Records of Palm Beach County, Florida
Together with
Lot 63, Quantum Park at Boynton Beach P I D Plat No 6, Plat Book 57, Pages
191 through 193, Public Records of Palm Beach County, Florida
Together with
Lots 64 and 65-A, Quantum Park at Boynton Beach P I D Plat No 9, Plat Book
60, Pages 32 through 33, Public Records of Palm Beach County, Florida
Together with a portion of
Lot 65-B, Quantum Park at Boynton Beach P I D Plat No 9, Plat Book 60,
Pages 32 through 33, Public Records of Palm Beach County, Florida
Containing 14 265 acres, more or less
Proposed Use A mixed-use development with 115 Multi-family dwelling units
and 71,708 square feet of commercial/office space on 14 265 acres in a
Planned Industrial Development (PID) zoning district
A PUBLIC HEARING TO CONSIDER THE REQUEST IS SCHEDULED BEFORE
THE PLANNING AND DEVELOPMENT BOARD ON TUESDAY, JUNE 28, 2005
AT 6 30 PM THE CITY COMMISSION WILL ALSO CONSIDER THE REQUEST
ON TUESDAY, JULY 19, 2005 AT 7 00 PM AT THE CITY HALL COMMISSION
CHAMBERS, 100 EAST BOYNTON BEACH BOULEVARD, BOYNTON BEACH,
FLORIDA OR AS SOON THEREAFTER AS THE AGENDA PERMITS
All interested parties are notified to appear at said hearings in person or by
attorney and be heard or file any written comments prior to the hearing dates
Any person who decides to appeal any decision of the Planning & Development
Board and City Commission with respect to any matter considered at these
meetings will need a record of the proceedings and for such purpose may need
to ensure that a verbatim record of the proceedings is made, which record
includes the testimony and evidence upon which the appeal is to be based
The City shall furnish appropriate auxiliary aids and services where necessary
to afford an individual with a disability an equal opportunity to participate in and
enjoy the benefits of a service, program or activity conducted by the City
Please contact Patricia Tucker (561) 742-6268 at least twenty-four hours prior
to the program or activity in order for the City to reasonably accommodate your
request
CITY OF BOYNTON BEACH
PLANNING AND ZONING DIVISION
(561) 742-6260
APR-25-2005 MON 02'15 PM OLEN PROPERTIES
FAX NO. 954 3~ 6968
P, 03
r" i M~" :mii"::REQIJeSTt.CiOe.' ..
. BID ~q. ...1....-..... . .. .. .. '.
,.fo"':'It:... ... r.. - . ..
:~~. -..__~._ ..~ .~ ~._.. --, .... . ~.. . . .~~~..~- .---'~'-~."~~':~~'.'..'''.'.:...~~g.e~n
1--
PA!LM:.H~ .
PlletaER'TY Al'f#RAtSla
REQll'EST FOR DATA RtlN
PRotEaTY INFOlt'MA'1'lGN MQUEST
NAME OF COMPANY ANO/ORlNOIVIDUAL, QuantaID. Park & V111:.a.I11..e., LI.C
ADDRESS: 1062 Coral Ridge Drive, Cor~l Springs, FJ:. l3('71
TELEPHONE NUMBER: (954) 340-4904
DBSCRIPtl0N OF RUN OIl AREA REQUESTEP:
~~!,,~:~YI.~Of3: 4.3- 4:5-17 """f~W*'ej'Q...1'li).,OO v
08-43-45-16-33-000-0651
08-43-45-16-33-0QO-0640
08-43-4-5-16-30-000-0630
One (1) 400' Radius Map
-fLi~., ~ \1!l ($;cV
CHECK ONE:
I
I __LABELS VAIUAl"CE~
I two ~ PRlN1'-olJ1' &. LABELS INP~Y[tl{JAL ~.NAMES
.\n --- ._p.R:OO-e\;l-'F-- - ____n _ ._____ .. .._...QF_EACa~QNno.UNrr
. CD-ROM.' --==-":'::--:-TAXYCa: KBClSIP'r-
r. THE UNDERSIGNED, WISH TO ORDER THE ABOVE DESCRIBED DATA RUN.
t
I UNDERSTAND. Tn;" T I WILL Bf; RESP0NSTBLE FOR ~VCIlAltG.~S. Dl:~EI).fi)lJJl: :QF.F1€E_M"'~ .€:A:LL.Y(ULIO
RE~)uEST "P.AYMl:~T. fN.A:DVANc-t GR A.N0bMi"E~ULfLDt'tigJ:.r llE1i\1iff~.)l{K:4SU(;),CQ~'D.
PLEASB com ACT, CLARICE P PETERKIN
PU"BtJC RECOiWS
PHONB # (561) 355.2358 OR FAX. # (561) 355-4416
MAPPING COUNTER FOR V A1UANCR REQUEST
PHONE # (561)35$-2881 OR.FAX#(561)35S-1S28
~, J,"-,~QndO 0
(h~ATuRS)
.A~f~ .. ~5-0~
~~E)
i
I
I
i
i
Il.~VlSJ!.P SIO~
Impression antibourrage et a sechage rapide _
Utilisez Ie gabarit 5260MC
Jam and Smudge Free PrInting
Use Averyf'J TEMPLATE 5960""
L 0+ 100
RADIUS 0 - 400
08-43-45-16-30-000-0621
QUANTUM LAKE VILLAS II CORP
1062 CORAL RIDGE DR
POMPANO BEACH FL 33071 -4119
08-43-45-16-30-013-0000
QUANTUM PARK PROPERTY OWNERS
2500 QUANTUM LAKES DR
STE 100
BOYNTON BEACH FL 33426 8308
08-43-45-17 -09-000-0344
GATEWAY BUSINESS PARK
2100 PARK CENTRAL BLV N
#800
POMPANO BEACH FL 33064 2239
m0965 ~^WAV \!\
IIH09Z~ 6i"I....Jo.I::IAW ~ .
-
www.avery.com
1-800-GO-AVERY
-
-
WWW.8Very.com
1-800-GO-AVERY
-
08-43-45-17-11-060.1000
QUANTUM PARK & VILLAGE LLC
1062 CORAL RIDGE DR
POMPANO BEACH FL 33071 - 4119
08-43-45-16-30-000-0622
QUANTUM LAKE VILLAS II CORP
1062 CORAL RIDGE DR
POMPANO BEACH FL 33071 - 4119
08-43-45-16-32-000-0832
QUANTUM PARK & VILLAGE LLC
1401 FORUM WAY
STE 101
WEST PALM BEACH FL 33401 2324
d
I
I
I: \
D
UN,T", sT4TES
POSTAL Sgtv,CE
0000
! j
AlI3^'~-09-O'08-\.
wo"~e^l!"MMM
A1I3^"-09-008-L
__.1.- .-_.
-
-
-
~ AVERY@ 5260MC
~. AVERY@ 5960"'"'
08-43-4S::16-30-000-0590.
VILLAS AT QUANTUM LAKES INC
JIM GRAVES C 0
7 CORPORATE PLZ
NEWPORT BEACH CA 92660 7904
08-43-45-16-30-000-0630
QUANTUM PARK & VILLAGE
1401 FORUM WAY
# 101
WEST PALM BEACH FL 33401 - 2324
08-43-45-17-00-000-1010
I MINKIN DAVID TR &
19525 QUEENS BLV
#724
i FLUSHING NY 11374
L!
I ~
III
! \
I :!I'l096S ~I.leqefi 81 ZM!1!~n
~lde.llr6etpfS , ~e ~eJ.Inoq~ue UOl55aJdWl
:u09'ZS 3lYld1f!3J. el.Ja^" asn
n11\-c.~n:VUO pUN ULdo PM OLEN PROPERTIES
FAX NO. 954 ~~ 6968
P, 04
--{ BilrM~a~.:'~~~i:.f:~~G~='~~~ ':_"'~'-'.'.___-4'__ -....." ..... _.'".,~.l__ ---.-- _.- . --- ""~.____r,.., , ... ,,-........~~ .PQ9.e'fj
.-L...... t.. '0. . .. -. 'Nt..IoJ;..U"-~'L''''''''", ~ .. ... ......- . . '" ..~'~I........... .0. II .
"
----=----
.
GAl\Y Jt. Nm;QUT.&; GA
PALM SEAtlt ClllTJNTY
Pl\0t.1lUtTt NPP1tMS~A
RiSQUEBl'l?QR.:IlA1'A RtJN
'PROPERTY mY-ORMATiON Rl)'Q:l.1~S't
NAMB Of COMPANY AND/ORINDIVlDUAL: QUantum Lake Vill.as
ADDRSSSI 1')62 Coral Rid.ge Drive, Coral S9ring:s,
(954) 340-4904
II, Corp.
FL 33(171
TELEPHONE NUMBER.:
DBSCtuPTlON 01' RUN QRAREA R:~&~iIil\t~,,<.,.- ,':'~ .
PONfI 08-4-3-45-16-30-6lH)....O'622
One (1) 400' Radius Map
CItSCK ONE:
LABELS
2 PtuNT..QUT It LABELS
PlUNT-OUT
...,CP=!l-RM::,:::, -=:-c'c.:.=
VMUAN:SRE~
=!NSIYID LJ~t. ~P.;S N. , S
._. OF SAC i..COl!{J!).e.:TJNftc.._,
'TAX RO. L"MCJmlT
":)T-.
I. TIiB UNeBRSTONED, WlSH TO ORDER TIm ABOVE OESclutnm DATA RUN.
~@l1t!\~\:):t:,~R,
" ; .J.: ;
PLiASB CONTACT, CLAlUCE P PETf'.RKlN
PUBLl€ RECORBS
PHONH 1# (561) 355.2358 OR FAX # (561) 355-4416
MAPPlNG COUNTED. POll V AR:l:ANCE REQUEST
PliO"NE # (5151) 355-2881 OR FAX # (561) 355-1528
c::5t.tA) "
(Sm). Jit.: . . ;,.
~1~-OS
~Vl!lBD S/a.4
~i!1 ~g!~~Y:-:BggoEsII<}o~=--=~~.~~'=~~ __~==.:~='~~~:~:'=~~=~~.~..~=..~:'~::..:~~:::~'"~~==_.,~::~-~~::~~=~~.:=~"=~~~:.':..~-._=:.. :.:J~~9~_i .:j
. .
!
I
I
I
I
i
I
i
i
i
i
I
i
I
I
!
i
i
I
I
,
!
I
I
\
I
I
I
I
I
I
I
I
\
GARY R. NIKOLlTS, CFA
PALM BEACH COUNTY
PROPERTY APPRAISER
REQUEST FOR DATA RUN
PROPERTY INFORMATION REQUEST
Quantum Park Property Owner's Asso
NAME OF COMPANY AND/OR INDIVIDUAL.
ADDRESS: 1062 Coral Ridge Drive, COral Springs, FL 33071
TELEPHONE NUMBER:
(954) 340-4904
DESCRIPTION OF RUN OR AREA REQUESTED:
peN # 08.,..43...,;45-16-33-001-0000
One (1) 400' Radius Map
i
;
I
I
i
i
I
\
I
I
I
!
CHECK ONE.
LABELS
2 PRINT-OUT & LABELS
'PRINT~Our-'"
CD-ROM
V ARIANCE REQUEST
INDNlDUAL OWNERS NAMES
OF E:A:CHCONDO-UNIT
TAX ROLL RECEIPT
I, THE UNDERSIGNED WISH TO ORDER THE ABOVE DESCRIBED DATA RUN.
i
I
i
\
I
\
I
!
I
I UNDERSTAND THAT I WILL BE RESPONSIBLE FOR ANY CHARGES INCURRED. OUR OFFICE MAY CALL YOU TO
REOUEST PAYMENT IN ADVANCE OR A NON-REFUNDABLE DEPOSIT BEFORE THE WORK IS PROCESSED.
PLEASE com ACf CLARICE P PETERKIN
PUBLIC RECORDS
PHONE # (561) 355-2358 OR FAX # (561) 355-4416
MAPPING COUNTER FOR V ARlANCE REQUEST
PHONE # (561) 355-2881 OR FAX # (561) 355-1528
~~~
~e -;)5-05
ATE)
I
I
\
i
i
i
I
I
!
i
i
REVISED 5/04
RAmus 0 - 400
08-43-45-16-30-000-0630
QUANTUM PARK & VILLAGE
1401 FORUM WAY
# 101
WEST PA\-M BEACH FL 33401 - 2324
08-43-45-16-33-000-0681
PREMIER GA TEW A Y CENTER AT
QUANTUM
2100 PARK CENTRAL BLV N
#900
POMPANO BEACH FL 33064 - 2242
08-43-45-1 6-34-000-0810
BOYNTON BEACH CITY OF
PO BOX 310
BOYNTON BEACH FL 33425 - 0310
I{oo d lVo...y
- ....
-
-.
~-
08-43-45-16-30-002-0000
QUANTUM PARK PROP OWNERS ASSN
2500 QUANTUM LAKES OR
STE 100
BOYNTON BEACH FL 33426 - 8308
I 08-43-45-16-33-000-0690
i PREMIER GATEWAY CENTER AT
, QUANTUM
1" 2100 PARK CENTRAL BLV N
#900
POMPANO BEACH FL 33064 - 2242
~5
"NlT5D~
~&fOVf'-.
.~~.~
08-43-45-16-30-000-0622
QUANTUM LAKE VILLAS II CORP
1062 CORAL RIDGE DR
POMPANO BEACH FL 33071 4119
08-43-45-16-31-000-0770
CC INVESTORS BOYNTON
CARMAX AUTO SUPERSTORES #7113 C
o
PO BOX 42304
RICHMOND VA 23242 - 2304
08-43-45-16-33-000-0710
QUANTUM COMMUNITY DEV DIST
SPECIAL DIST SERVICES INC C 0
11000 PROSPERITY FARMS RD
STE 104
PALM BEACH GARDENS FL 33410 - 3462
0000
NJ.09~j_<.S>AlI34V_ .
Ii
Ii
~~DB~~
-
-
--.-------
-~~~-
:~09ZS !h~~cAfir.Ya~fian