CORRESPONDENCE
DEPARTMENT OF DEVELOPMENT
DIvIsion of Planning and Zoning
Building
Planning & Zoning
Engineering
Occupational License
Community Redevelopment
January 13, 2000
Gregory LOUIS Celentano,
AssIstant Vice PresIdent
Ahrens CompanIes
3750 Investment Land- SUIte 2
West Palm Beach, FI 33404
Dear Mr Celentano
Re Morris Building - Intenor addItIOn
MMSP 00-001
In respone to your request for the admmIstratIve reVIew and approval of modIficatIOns proposed
to the above-referenced, approved sIte plan, please be mformed that the proposed changes are
"mmor", as defined wIthm the Land Development RegulatIOns, Chapter 4 SIte Plan ReVIew
Please be adVIsed that the number of reqUIred parkmg on SIte, bUIldmg square footage, and the
numbers of employee were use for the final approval ofthe project. Any future modIficatIOns to
thIS project mIght reqUIred the SIte to provIde addItIOnal parking, landscape, etc.
ThIS project may continue to be processed by the BUIldmg DIVlSlon as a permIt apphcatIOn.
Please contact Jim Nguyen or myself at (561) 742-6260 If you have any further questIOns.
Smcerely,
ci~A ;j~v
LUSla Galav, AICP
Semor Planner
J:\SHRDATAIPLANNINGlSHAREDlWPIPROJECTSIMORRlS BLDG.\ MINOR MOD .DOC
America's Gateway to the Gulfstream
100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 742-6260 FAX: (561) 742-6259
LETTER OF TRANSMITTAL
FROM
A AHRENS
AI COMPANIES
Date :rPrrJ~ C; I 2000
,
Project fV\,o(l..(t,f $ ~ U'~Ot,J 6-
Location LD'T 4. H1 b++ ~ OlsC.. ~
/
Attention M' 1?6 ~ F
Re
(561) 863-9004 Fax (561) 863-9007
3750 Investment Lane, Suite 2, West Palm Beach FL 33404-1765
TO.
M)~
"^ () 0 I n c.A-n a)..)
Ml~ ~IV\PF-
c, TY o-F 8-fH,J~ ~
-PUh1~IJb fnJ'O ~/J6-
GENTLEMEN
WE ARE SENDING YOU
o HEREWITH ~DELlVERED BY HAND 0 UNDER SEPARATE COVER
THE FOLLOWING ITEMS.
VIA
o PLANS
o ESTIMATES
o PRINTS 0 SHOP DRAWING
o COpy OF LETTER 0
o SAMPLES
o SPECIFICATIONS
Copies Date or No
Description
'2-
~
l 0'0 r Ot:>
~
THESE ARE TRANSMITTED AS INDICATED BELOW
~ FOR YOUR USE 0 APPROVED AS NOTED
~ FOR APPROVAL 0 APPROVED FOR CONSTRUCTION
~AS REQUESTED 0 RETURNED FOR CORRECTIONS
~FOR REVIEW & COMMENT 0 RETURNED AFTER LOAN TO US
o
o RETURN
o SUBMIT
o RESUBMIT
o FOR BIDS DUE
CORRECTED PRINTS
COPIES FOR
COPIES FOR
Remarks.
IF ENCLOSURES ARE NOT AS INDICATED
PLEASE NOTIFY US AT ONCE.
Signed"
.M M 5P- aJ-CD(
A AHRENS
AI COMPANIES
January 4, 2000
Hand Delivered
Mr Michael Rumpf
Plannmg and Zomng DIrector
CIty of Boynton Beach
100 East Boynton Beach Blvd.
Boynton Beach, FL 33425
RE The Morns BUIldmg
Minor ModIficatIOn Letter
Dear Mr Rumpf-
ThIS letter IS wntten to request a mmor modIficatIOn to the above-mentIOned project.
The changes to thIS project consIst SImply of some mtenor office reVISIOns and
enlargement. The SIte plan and bUIldmg footpnnt do not change at all. Consequently, the
mezzamne above the office grows wIth the office. The office and mezzanme are 25%
larger than ongmally proposed.
Smce thIS IS an mdustnal park, the parkmg reqUIrements remam satisfactory The
employee count has mcreased by four (4), as shown on the reVIsed SIte plan.
Please see the enclosed reVIsed SIte plan and floor plans vs. the ongmal plans.
Thank you for your cooperation and please feel free to call If you have any questIOns.
Smcerely,
S COMPANIES
-~~
regory LoUIS Celentano
ASSIstant VIce PresIdent
rw/glc/word/vol.l/morris building/minor modifications.O 1 0400
3750 Investment Lane, Suite 2 West Palm Beach, FL 33404-1765
Office (561) 863-9004 Fax (561) 863-9007
Department of Engineering
and Public Works
PO. Box 21229
West Palm Beach, FL 33416-1229
(561) 684-4000
www.co.palm-beach.fl.us
.
Palm Beach County
Board of County
Commissioners
Maude Ford Lee, Chair
Warren H. Newell, Vice Chairman
Karen T. Marcus
Carol A. Roberts
Mary McCarty
Burt Aaronson
Tony Masilotti
County Administrator
Robert Weisman
IIn Equal Opportunity
IIffirmo.tive IIction Employer"
@ printed on recycled paper
August 3, 1999
Mr Michael Rumpf
CIty of Boynton Beach
Planning and Zomng Department
100 East Boynton Beach
POBox 310
Boynton Beach, FL 33425-0310
AUG
9\999
.J
.;......"';>#'..;;;~"'""'-...,...
--...,.":'_,.,......~-,-,--~
RE. High Ridge Commerce Park - Lot 4 Morris Building
Traffic Performance Standards ReVIew
Mr Rumpf:
The Palm Beach County Traffic DIVISIOn has reVIewed the traffic statement
(dated June 8, 1999) for the project entItled Hu?;h RIdge Commerce Park Lot 4.
Moms BUIldmg pursuant to the Traffic Performance Standards m Article 15 of
the Palm Beach County Land Development Code. The project is summanzed as
follows:
Commerce Road, east of High RIdge Road
Bovnton Beach
1) General Office
2) Warehouse
New Tnps: 101 tnps per day
BUlldout: 2000
This is a portion of the previously approved HiJ!h Rl(1J!e Commerce Park. Currently (pending
issuance of al~ amended development order) thi8 8ite i8 ve8ted for 'General Indu8trie8, Light
(182,000 sf).
LocatIOn.
Mumclpahty'
Proposed Use:
(1,652 sf)
(15,104 sf)
There IS one mmor error m the traffic statement. The tnp generatIOn falls to
account for mternal and pass-by traffic. Tills error does not change the results
of the statement.
Based on our reVIew the Traffic DIVIsion has deternnned that the project meets
the Traffic Performance Standards of Palm Beach County Please contact me If
you have any questIOns regardmg tills reVIew
Smcerely,
OFFICE OF THE COUNTY ENGINEER
File. General 'l'PS Mun Traffic Study Review
F \.'fRAFFIC\.apf' tpg\.99104app.wpd TAl .U!)