Loading...
REVIEW COMMENTS CITY OF BOYNTON BEACH PLANNING & ZONING DEPARTMENT COMMENT SHEET PROJECT NAME: Waloreens TRACT/SUBDIVISION: PROJECT ADDRESS: Boynton Commons PUD PERSON RETRIEVING COMMENTS AND/OR PLANS: Signature Print Name DATE PICKED UP: IPlans - Comments DESCRIPTION: New store ~. REVIEWER'S NAME: Vanessa LLera PERMIT NO: 97-1959 DATE: 5/7/97 RECEIVED: 5/1/97 STARTED REVIEW: 5/5/97 RETURNED: 5/7/97 REVIEW (place asterisk): l' 2 3 4 REVISION APPROVED: No ZONING DISTRICT: (place asterisk) COMMERCIAL' / RESIDENTIAL /INDUSTRIAL MMSP I SPWV PERMIT' FILE NO.: FEE: NO The permit number identified above is the referenced number for your proposed improvement(s). Prior to further processing on your request, the documents that you submitted illustrating the improvement(s) shall be amended to show compliance with the below listed comment(s). To discuss the comment(s) it is recommended that an appointment be set-up with the reviewer identified in the upper right hand corner, (561) 375-6260 between 8 A.M. and 5 P.M., Monday thru Friday. Please reference the project name and permit number when corresponding with City's Staff. After amending the plan(s) to show compliance with the comment(s), return both sets of plans for re-review to the Building Department. Please note that additional comments may be generated as a result of reviewing the amended plans. All comments shall be rectified rior to staff review a rovin the documents. 1. Indicate location and height of any roof equipment in elevations and draw sight lines connecting the highest point of the equipment with the eye level from a distance of 600 feet from building. This drawing can be at a smaller scale (LDR, Chapter 9, Section 11.e). 2. Indicate store's north setback from property line. 3. Provide type a!1d color for outdoor light fixtures. Also indicate color or finish for rain shield. 4. Indicate all site improvements taken place within scope of work such as Pylon sign, Landscaping, site drainage etc. 5. Permits are required for all store signs and pylon sign. . Departments required to review the project: Building, Police, Fire, Utilities, Public Works PAGEl S:IPLANNINGISHAREDlWPIPROJECTSIPERMITSIPERMITI97 -1959.DOC