REVIEW COMMENTS
'<
~,(
/
FIRE & LIFE SAFETY DI~N
Memorandum No. 2000-92
,
....
""""..
'.. "- ..
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
TO: Michael Rumpf ector m n w &;
rif
Planning & Zo .,
.. ? ,'i!
,i
.,
""./
FROM: Bob Borden Fe
Dep. Fire Mar l' - <I'I
DATE: June 28, 2000
SUBJECT: Bay Vista
NWSP 00-025
Turning radius in front of clubhouse required to be 50'.
cc: File
.._---_._-_._--_.__..--_._--_..,._._._._------~-----~.----, , -
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 00-181
DATE:
Bob Borden, Deputy Fire Marshal
Larry Quinn, Public Works
Mike Haag, Building Division
Kevin Hallahan, Forester/Environmentalist
H. David Kelley Jr., Utilities Department
John Huntington, Police Department
Louie Zeitinger, Police Department
Barbara Meacham, Parks Division
H. David Kelley Jr., Engineering Department
Lusia Galav, Planning Department
Michael W. Rumpf, Director of Planning and zonin# f'
June 27, 2000
TO:
FROM:
SUBJECT:
Rectified Plans for - Altman Bay Vista
NWSP 00-005
The amended plans for Altman Bay Vista site plan modifications have been submitted for final
sign-off by the Technical Review Committee. Four (4) sets of plans, each requiring your
unconditional signature, are available for review in Planning and Zoning. A copy of the originally
reviewed plans, staff comments and development order are available for your use to perform
the review.
Please review and sign-off each of the four- (4) sets of plans, NO LATER THAN 5:00 P.M.,
July 11, 2000. If the plans are not in compliance with your staff comments or City regulations,
do not sign the plans but only indicate the memorandum number where your comments are
documented. To facilitate the sign-off process, please resubmit written comments addressed to
the Planning and Zoning Director, NO LATER THAN 5:00 P.M., July 11, 2000.
Thank you for your prompt response to this request.
MWRbw
cc: Steve Gale, Deputy Fire Chief
Marshall Gage, Police Chief
John Guidry, Utilities Director
John Wildner, Parks Department
J:\SHRDATA\Planning\SHARED\WP\PROJECTS\Altman BAY VISTA NWSP\Rectified Memo 10 TRC members.doc
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-193
TO:
Michael Rumpf, Director of Planning and Zoning
FROM:
Michael E. Haag, Building Code Administrator
DATE:
June 28, 2000
RE:
Bay Vista - Rectified Site Plan (NWSP 00-005) - 1 st Review Comments
Before the Building Division signs off on the rectified site plan, the plans shall be amended to
comply with the following comments:
Buildinl!: Division (Site Soecific and Permit Comments) - Michael E. Baal!: (561) 742-6352
1. The rectified plans did not include sheet 11 of 12 (floor plan drawings ofthe clubhouse).
Submit sheet II of 12. The sheet shall identify, within the footprint of the clubhouse
building, the floor elevation that the design professional has established for the building.
2. Identify the floor elevation that the design professional has established for the guardhouse
building on the elevation view drawing of the building that is shown on sheet 2 of 12,
MEH:bg
C:\WINDOWS\TEMP\NWSP 00-005 Bay Vista rectified site plan 1st review.doc
RE:
I~:::---~ "-"
..iID. R 1r2. p ~..
! ,-lL--1! u I
iI I ..-'
;L~,f MAY - 3
Michael Rumpf, Director of Planning and Zoning .".1 ., L...._.
7CkrO
Michael E. Haag, Building Code Administrator ."-'-.--'
May I, 2000 J
Bay Vista - New Site Plan (NWSP 00-005) 1st;: ew comments
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-118
,I,';
TO:
FROM:
~....- ~
DATE:
We have reviewed the plans for the above-referenced project. The applicant must acknowledge
and address the below listed comments before the Building Division will recommend that the
proj ect be presented to the Board for their review.
Buildinl!: Division (Permit & Site SDecific Comments) - Michael E. Baal!: (561) 742-6352
I. Add to the buildings that are depicted on the site plan a labeled symbol that identifies the
location of the proposed handicap accessible units. Add to the drawing the calculations
that were used to identify the minimum number of required accessible units. Also, state the
code section that is applicable to the computations. Show and label the same units on the
applicable floor plan drawings.
2. Add to the buildings that are depicted on the site plan a labeled symbol that identifies the
location of the handicap accessible entrance door to each of the handicap accessible units.
Show and label the same handicap accessible entrance doors on the drawing titled floor
plan.
3. Add to the drawing the calculations that were used to identify the minimum number of
required handicap accessible parking spaces. Also, state the code section that is applicable
to the computations. Move the two accessible parking spaces that are located along the
south property line of the project closer to the accessible unites). What is the reason that
there is not an accessible parking space near the entrance to the clubhouse or the tennis
court?
4. Add a labeled symbol to the site plan that represents and delineates the path of travel ofthe
accessible route that is required between the accessible parking spaces and the accessible
entrance doors to the accessible units. The symbol shall start at the accessible parking
spaces and terminate at the accessible entrance door to the unit. Also, show the symbol
leading to each of the recreational amenities provided for the project including the
boardwalk from the accessible units. The symbol shall represent the location of the path of
travel, not the location of the detectable warning or other pavement markings that are
required to be installed along the path. The location ofthe accessible path shall not compel
the user to travel in a drive/lane area that is located behind parked vehicles. Identify on the
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan -1 st review comments
May 1,2000
Page Two
plan the width of the accessible route (Note: The minimum width required by the code is
forty-four (44) inches). Add text that would indicate that the symbol represents the
accessible route and the route is designed in compliance with regulations specified in the
Fair Housing Act. Please note that at time of permit review the applicant shall provide
detailed documentation on the plans that will verify that the accessible route is in
compliance with the regulations specified in the Fair Housing Act. This documentation
shall include, but not be limited to, providing finish grade elevations along the path of
travel.
5. Within the site data found on the sheet titled site plan, identify the proposed finish floor
elevation of all of the proposed buildings (lowest floor elevation). Verify that the proposed
elevation is in compliance with regulations of the code by adding specifications to the site
data that address the following issues:
a) The design professional-of-record for the project shall add the following text to the site
data. "The proposed floor elevation _' _ NGVD is above the highest 100-year
base flood elevation applicable to the building site, as determined by the South Florida
Water Management District's surface water management construction development
regulations." [Section 3107.1.2, Chapter 31 ofthe Boynton Beach amendments to the
1997 edition of the Standard Building Code]
b) From the FIRM map of the subject area, identify the title of the flood zone that the
buildings are located within. Where applicable, specify the base flood elevation. If
there is no base flood elevation, indicate that on the plans.
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the buildings that are shown on the site plan, ground floor plan
and the paving and drainage drawing.
6. Either add to the project the lots that are shown on the survey east of the subject project or
show on the site plan the appropriate street frontage and access to the lots. At time of 2nd
review, submit a proposed survey showing the proper access and street frontage.
7. Add to the drawing titled site plan all of the easements that are shown on the survey. The
location, type and size ofthe easements shall be shown and identified on the site plan.
Where applicable, amend the plans so that structures do not encroach into an easement.
The site plan shows that there are buildings and structures encroaching into easements.
Amend the drawings accordingly.
8. At time of permit review, submit a copy ofthe recorded resolution that verifies the
abandonment of the ingress & egress easement and drainage easement that are shown on
the plan within the area of a building or structure.
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan _1st review comments
May I, 2000
Page Three
9. Identify on the site plan the structures that are shown on the plan located north and east of
the pool. Also, identify the structure that is shown near the middle of the boardwalk and
near the main entry gates.
10. At time of permit review, provide a completed and executed City unity oftitIe form. The
form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with
legal descriptions of each property that is being unified shall be submitted when processing
the form. The property owner that is identified on each deed shall match the property
owner that is identified on the form.
II. At time of permit review, the site plan shall identify the actual distance that each
building/structure is set back from the adjacent property lines. Please note that overhangs,
covered walkways, canopies, awnings or other appurtenances that are attached to the
building shall be considered when identifying building setbacks. Therefore, identify the
width of the proposed overhang, covered walkways, canopies, awnings, and/or other roofed
areas that extend out beyond the main walls of the building. The building setbacks shall
comply with setback regulations specified in the Zoning Code.
12. To properly determine the impact fees that will be assessed for the 2-story clubhouse,
provide the following information:
Submit a notarized affidavit on the letterhead of the property owner, company or
association. The letter will list and must contain an answer to the following questions.
a) Will the Clubhouse building be restricted to the residents of the entire project only?
b) Will the residents have to cross any major roads or thoroughfare to get to the
ClubhouselRecreation building?
c) Will there be any additional delivery to the site?
d) Will there be any additional employees to maintain and provide service to the site?
Once this information is complete and submitted, the City will transmit it to the Palm
Beach County Impact Fee Office for a determination on the impact fee.
13. Add to the submittal an elevation view drawing of the proposed entry sign/fence/columns.
Identify the type ofthe material. Also, provide a typical section view drawing ofthe
sign/fence/columns that identifies the height that the sign/fence/columns are above finish
grade.
14. Add to the submittal an elevation view drawing of the proposed structures that are shown
on the site plan near the pool and near the front entry gates. Identify the type of the
material.
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan -1 st review comments
May I, 2000
Page Four
15. Add to the individual unit floor plan drawings a breakdown of the area within the unit. The
area breakdowns for each unit shall specifY the total area of the unit, area of the balcony,
total area that is air-conditioned and, where applicable, total area of storage and garage
space. If the garage and storage areas are not part of a specific unit, the area shall be
included and identified within the area ofthe building.
16. Add to the site data the total area under roof of each residential building. Provide tabular
area data for each building. The data shall include a breakdown of area for each floor of
each building. The breakdown shall include the following areas (each area shall be labeled
on the applicable floor plan drawing):
a) common area covered walkways,
b) covered stairways,
c) common area balconies,
d) entrance area outside of a unit,
e) storage areas (not part of a unit),
f) garages (not part of a unit),
g) elevator room,
h) mechanical room,
i) trash room,
j) mailbox pickup and delivery area, and
k) Any other area under roof.
[Chapter 4 - Site Plan Review, Section 7. E. 2. And 3.]
17. On the floor plan drawing of building III, identifY the location of the elevator room,
mechanical room, trash room and mailbox pickup and delivery area.
18. At time of permit review, submit for review an addressing plan for the project.
MEH:bg
J:\SHRDA T A\Development\Buildingw6870\Documents\TRC\NWSP 00.005 1st review Bay Vista.doc
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO. 00-073
TO:
Michael W. Rumpf, Director of Planning and Zoning
FROM:
John A. Guidry, Interim Director of Engineering
RE:
April 25, 2000
BAY VISTA (NWSP 00-005) 1sT REVIEW COMMENTS
CONDITIONAL USE & SITE PLAN APPROVAL
DATE:
I. On the Site Plan add a general note that all plans submitted for specific permits shall meet
the City's code requirements at time of application. These permits include, but are not
limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation.
Permits required from other permitting agencies, such as FDOT, PBC, SFWMD,
PBCDERM, L WDD, FDEP and any others, shall be included with the permit request.
2. Add the following notes to the civil plans:
a. All striping, signage and markings shall conform to City Standard Drawing B-98001.
b. The drainage system shall conform to City Standard Drawing B-91007.
Correct all plan details accordingly.
3. Provide several cross sections along the north and south boundary lines depicting the
finished grades between the proposed development and twenty-five (25) feet into the
abutting properties.
4. Add an engineer's certification on the civil plans that the drainage plan will conform to all
rules, regulations and codes of the City's Land Development Regulations (LDR).
5. Prior to issuing of any building permits, provide a satisfactory abandomnent of those
easements shown on the boundary survey necessary to construct the proposed
improvements.
6. Show the proposed lighting location on the civil plans as well as the landscape plans. [LDR
Chapter 4, Section 7.B.]
7. A permit will be required from FDEP for the drainage system.
8. Regarding the handicap details:
a. Specify white paint for the handicap pavement symbol and within the 5' accessible
path.
b. Remove the words "Tow Away Zone" from the handicap post sign (see comment #2)
9. Provide an enviromnental study, including a flora and fauna survey, of the site for review
and approval by the T.R.C. as specified in LDR Chapter 7.5, Article IV.
Engineering Memo No. 00-073
Re: Bay Vista Conditional Use & Site Plan Approval- 1st Review Comments
April 25, 2000
Page Two
10. The parking garage shall conform to the items specified in LDR Chapter 23, Parking Lots.
II. On the Typical Section (Sheet C1) reverse the parking dimensions, i.e., 16-foot dimension
will be adjacent to the "green" area and the 18-foot dimension will be adjacent to the
pedestrian sidewalk.
If there are any questions please contact Dave Kelley at (561) 742-6496 or Ken Hall at (561)
742-6283.
JAG:HDK:KRH/ck
C:\My Documents\Bay Vista Conditional Use & Site Plan Approval 1st Review.doc
LIlY OF BOYNTON BEACH, FLORwA
INTER-OFFICE MEMORANDUM
TO:
Michael W. Rumpf DATE:
Dir. of Planning & Zoning
04/26/00
FILE: NWSP-00-005
FROM:
Off. Louis 1. Zeitinger
Off. John Huntington
Police Department
Crime Prevention Unit
SUBJECT: Bay Vista / Altman Development
REFERENCES: Provided Plans
ENCLOSURES:
I have viewed the above building plans and have the following comments:
I. Would like to see the results of the photometric study;
a. Interested in parking lot / garage illumination.
b. Interested in placement / type of landscaping in relation to lamp poles / fixtures.
c. Will there be adaquate lighting installed along boardwalk?
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-162
TO:
Michael Rumpf, Planning and Zoning Director
g~
Michael E. Haag, Building Code Administrator Q
June 6, 2000
Bay Vista - New Site Plan (NWSP 00-005) 3rd ev' comments
Plans are date stamped May 30, 2000
FROM:
DATE:
RE:
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits.
Buildinl!: Division (Site Soecific and Permit Comments) - Michael E. Haal!: (561) 742-6352
I. Identify the floor elevation that the design professional has established for the building
within the footprint of the clubhouse and guardhouse.
2. At time of permit review, provide a copy of the recorded City of Boynton Beach easement
release form that would authorize the guardhouse, pool pavilion, pergola, pool fence,
retaining wall, boardwalk and ramp to be constructed within the easement OR remove all
structures from the drainage easement.
3. At time of permit review, submit a copy ofthe recorded resolution that verifies the
abandonment of the 20' wide ingress & egress easement, 40' and 10' wide drainage
easements, 10' wide road reservation and 10' wide water, gas and electric easement that are
shown on the plan to be abandoned.
4. At time of permit review, provide a completed and executed City unity oftitIe form. The
form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with
legal descriptions of each property that is being unified shall be submitted when processing
the form. The property owner that is identified on each deed shall match the property
owner that is identified on the form.
Building Division Memo No. 00-162 to Michael Rumpf
RE: Bay Vista - New Site Plan - 3rd review comments
June 6, 2000
Page Two
5. At time of permit review, show on the site plan the actual distance that each
building/structure is set back from the adjacent property lines. Please note that overhangs,
covered walkways, canopies, awnings or other appurtenances that are attached to the
building shall be considered when identifying building setbacks. Therefore, identify the
width of the proposed overhangs, covered walkways, canopies, awnings, and/or other
roofed areas that extend out beyond the main walls of the building. The building setbacks
shall comply with setback regulations specified in the Zoning Code.
6. At time of permit review, submit for review an addressing plan for the project.
7. At time of permit review, provide detailed drawings and documentation on the plans that
will verify that the accessible routes that are shown on the site plan are consistent with the
regulations of the Fair Housing Act as set forth in 760.23 (10) of the Florida Statutes. The
documentation shall include, but not be limited to, identifying the type of material proposed
for the route, type of surface finish, width, cross slope, slope and length of the entire
accessible route including, where applicable, landings, ramps and handrails.
8. Clarify the square foot floor area of each type of unit. The floor areas that are identified on
the chart found on the site plan do not match the floor areas that are identified on the floor
plan drawings.
9. At time of permit review, submit an application for demolishing the existing structures.
10. Compliance with the Building Codes will be evaluated at time of permit review. The
permit fee, water and sewer facility fees, Fire and Life Safety fees, County fees and State
fees will be determined at time of permit review.
II. Permits are required to construct the improvements that are shown on the approved site
plan/conditional use documents. Permit application forms are available in the Building
Division of the Development Department. A permit submittal checklist is available in the
Building Division. The list identifies the basic documents that the Plans Analyst checks for
when an applicant submits for permit review.
MEH:bg
J:\SHRDA T A\Development\Building-6870\Documents\TRC\NWSP 00-005 3rd review Bay Vista.doc
LEISURE SERVICES: PARKS MEMORANDUM #00-75
RE:
Michael Rumpf, Director of Planning & Zoning
John Wildner, Parks Director ,J,.t:/
Barbara J. Meacham, Lands' Planner!)!) i 1
Bay Vista Apartments-3rd Site Plan Review
TO:
THRU:
FROM:
Date
May 30, 2000
The Parks Division has reviewed the new site plan for Bay Vista Apartments. The
following recreation-related comments are submitted:
I. In order to receive the Natural Resource Credit as detailed in Chapter I, Article V,
Section 3.A.2. (I), the following factors need to be addressed in mangrove/wetland
area:
a. public access
b. management and maintenance plan
c. proposed restoration methods
d. the proportionate size of the habitat to the entire development
e. the existence of protected species within the habitat
2. List on the site plan the site elements for which recreation credit will be provided.
3. Since the property is not required to be platted, the recreation dedication fee will be
due prior to the building permit being issued.
3rd Review
New Site Plan
Project name: Altman Bay Vista
File number: NWSP 00-005
Reference: 3rd Review. New Site Plan. File # NWSP 00-005 with a Mav 30. 2000 Planning and Zoning
Deoartment date stamo marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS
Comments: NONE
UTILITIES
Comments: NONE
FIRE
Comments: NONE
POLICE
Comments: NONE
ENGINEERING DIVISION
Comments:
1. Provide several cross sections along the north boundary line depicting the
finished grades between the proposed development and twenty-five (25) feet
into the abutting properties.
2. At time of permit review, provide a satisfactory abandonment of those
easements shown on the boundary survey necessary to construct the
proposed improvements.
3. If the handicapped accessible path is lower than the abutting sidewalk, show
the sidewalk at the same grade with a ramp up on both sides.
BUILDING DIVISION
Comments:
4. Identify the floor elevation that the design professional has established for
the building within the footprint of the clubhouse and guardhouse.
5. At time of permit review, provide a copy of the recorded City of Boynton
Beach easement release form that would authorize the guardhouse, pool
pavilion, pergola, pool fence, retaining wall. Boardwalk and ramp to be
----.--------..-.-----....- _...__.._._--------~.__._-_._.~~-~
Project name: Altman Bay Vista (NWSP)
File number: NWSP 00-005
Page 2
DEPARTMENTS INCLUDE REJECT
constructed within the easement OR remove all structures from the drainage
easement.
6. At time of permit review, submit a copy of the recorded resolution that
verifies the abandonment of the 20 feet wide ingress & egress easement, 40
feet and 10 feet wide drainage easements, 10 feet wide road reservation and
10 feet wide water, gas and electric easement that are shown on the plan to
be abandoned.
7. At time of permit review, provide a completed and executed City unity of
title form. The form shall describe all lots, parcels or tracts combined as one
lot. A copy of the deed with legal descriptions of each property that is being
unified shall be submitted when processing the form. The property owner
that is identified on each deed shall match the property owner that is
identified on the form.
8. At time of permit review, show on the site plan the actual distance that each
building/structure is set back from the adjacent property lines. Please note
that overhangs, covered walkways, canopies, awning or other appurtenances
that are attached to the building shall be considered when identifying
building setbacks. Therefore, identify the width ofthe proposed overhangs,
covered walkways, canopies, awnings, and/or other roofed areas that extend
out beyond the main walls of the building. The building setbacks shall
comply with setback regulations specified in the Zoning Code.
9. At time of permit review, submit for review an addressing plan forthe
project.
10. At time of permit review, provide detailed drawings and documentation on
the plans that will verify that the accessible routes that are shown on the site
plan are consistent with the regulations of the Fair Housing Act as set forth
in 760.23 (10) of the Florida Statutes. The documentation shall include, but
not limited to, identifying the type of material proposed for the route, type of
surface finish, width, cross slope slope and length of the entire accessible
route including, where applicable, landings, ramps and handrails.
11. Clarify the square foot floor area of each type of unit. The floor areas that
are identified on the chart found on the site plan do not match the floor areas
that are identified on the floor plan drawings.
12. At time of permit review, submit an application for demolishing the existing
structures.
13. Compliance with the building codes will be evaluated at time of permit
review. The permit fee, water ad sewer facility fees, Fire and Life Safety
fees, County fees and State fees will be determined at the timed of permit
review.
Project name: Altman Bay Vista (NWSP)
File number: NWSP 00-005
Page 3
DEPARTMENTS INCLUDE REJECT
14. Permits are required to construct the improvements that are shown on the
approved site plan/conditional use documents. Permit application forms are
available in the Building Division of the Development Department. A
permit submittal checklist is available in the Building Division. The list
identifies the basic documents that the Plans Analyst checks for when an
applicant submits for permit review.
PARKS AND RECREATION
Comments:
15. In order to receive the Natural Resource Credit as detailed in Chapter I,
Article V, Section 3. A. 2. (I), the following factors need to be addressed in
mangrove/wetland area:
a. public access
b. management and maintenance plan
c. proposed restoration methods
d. the proportionate size of the habitat to the entire development
e. the existence of protected species within the habitat
16. List On the site plan the site elements for which recreation credit will be
provided.
17. Since the property is not required to be platted, the recreation dedication fee
will be due prior to the building permit being issued.
FORESTER/ENVIRONMENTALlST
Comments:
18. The applicant must obtain permits from the Department of Environmental
Protection (DEP) in reference to the existing mangrove trees On the
individual land parcels combined into the One site plan. The set back
requirements for the mangroves may be a greater distance for the City of
Boynton Beach Comprehensive Plan, than the DEP setback requirements.
PLANNING AND ZONING
Comments:
19. The environmental assessment which was submitted should also include a
detailed preservation plan for the mangrove area.
Project name: Altman Bay Vista (NWSP)
File number: NWSP 00-005
Page 4
DEPARTMENTS INCLUDE REJECT
20. Delineate the Comprehensive Plan "conservation overlay" boundary on the
site plan and landscape plan.
21. A code variance is required pursuant to Ch. 2. H. e (I), (4) and (12) to allow
a reduction in parking required for the recreational amenities.
22. A code variance is required pursuant to Ch. 2, Sec. 5. G. 2. a. to allow a
reduction in the required front yard setback for the shade pavilions.
23. A code variance is required pursuant to Ch. 2, Sec. 4, J. 1., to allow an eight
foot maximum height for the proposed entrance wall feature.
24. Specify colors for the banding details shown on the elevation drawings for
the parking garage fronting Federal Highway.
25. Permits from Army Corp. of Engineers (CE) and SFWMD will be required
and Mangroves shall be preserved to the maximum extent possible.
26. Proposed entrance signs are shown on the site plan. Provide a sign typical
detail which dimensions height and area and indicates proposed colors and
materials.
28. Approval from Palm Beach County Traffic Division is required prior to
Planning and Zoning sign-off on the rectified plans.
MWR/blw
J:\SHRDATA\PLANNING\SHARED\VIIP\PROJECTS\ALTMAN BAY VISTA NWSP\Al TMAN BAY VISTA 3RD REVIEW COMMENTS. DOC
Project name: Altman Bay Vista
File number: NWSP -,JO-005
Page 3
DEPARTMENTS
INCLUDE REJECT
lce.ll access roads and~drants shall be in place prior to above grade
construction (NFP A I )~he access gates must be approved by Fire Marshal
as to type and operation prior to installation (BBCC 9-15). HiAimum turning
""litis ertlo, II, GAit IIltl3t be 45' (LDR 23).
POLlCE
Comments:
tJDlfi
j\f. Would lik results of the photometric study;
a. Int es d in parking lot / garage illumination.
b. lnte ted in placement / type of landscaping in relation to lamp
es / tures.
c. ill there be adequate lighting installed along boardwalk?
ENGINEERING DIVISION
Comments:
. On the Site Plan add a general note that all plans submitted for specific
penn its shall meet the City's code requirements at time of application.
These penn its include, but are not limited to the following: lighting, paving,
drainage, curbing, landscaping and irrigation. Penn its required from other
pennitting agencies, such as FDOT, PBC SFWMD, PBCDERM, L WDD,
FDEP and any others, shall be included with the penn it request.
. Add the following notes to the civil plans:
a. All striping, signage and markings shall confonn to City Standard
Drawing B-9800 1.
b. The drainage system shall confonn to City Standard Drawing B-
91007.
Correct all plans details accordingly.
22. rovide several cross sections along the north ~..l 1: II boundary line.
depicting the finished grades between the proposed development and
twenty-five (25) feet into the abutting properties.
\1 Add an engineer's certification on the civil plans that the drainage plan will
^ confonn to all rules, regulations and codes of the City's Land development
regulations (LOR).
t time of penn it review, provide a satisfactory abandonment of those
easements shown on the boundary survey necessary to construct the
proposed improvements.
MdlW<J
. C;;hoc0~ P"'t'()~ sttL {j ~ pan ().'l. (!.IV,eru '~ . 4rJlflq4.
If' .J+ ~ hdna~d C\l'CLoci,bk paCj..L IS IOU-J<2/L %el'l 'I/.<. 2bu-th~ SA..hkt2.dI S~
r"y I.Jk SI&wMk M'fU sa.i~e tJr12-cAe t<-l~ "- 12-~ up on hcJ'f1., $(zt"'J .
Project name: Altman Bay Vista
File number: NWSP -{)Q-005
Page 4
DEPARTMENTS
. The parking garage shall conform to the items specified on LOR Chapter
23, Parking Lots.
K On the Typical Section (Sheet C I) reverse the parking dimensions, i.e., 16-
foot dimension will be adjacent to the "green" area and the 18-foot
dimension will be adjacent to the pedestrian sidewalk.
BUILDING DIVISION
Comments:
s~()J
27. ad to the buildings that are depicted ~ the site plan a labeled symbol that
id ntifies the location of the proposed andicap accessible units. Add to the
dra ing the calculations that were us d to identify the minimum numbers of
requ ed accessible units. Also, st e the code section that is applicable to
the co putations. Show and lab the same units on the applicable floor
plan dra ings.
icted on the site plan a labeled symbol that
29. Add to the drawing e a1culations that were used to identify the minimum
number of required ha icap accessible parking spaces. Also, state the code
section that is applic e to the computations. Move the two accessible
parking spaces that e I cated along the south property line of the project
closer to the acces ble u 't(s). What is the reason that there is not an
accessible parking pace ne the entrance to the clubhouse or the tennis
court?
30..Add a labeled s mbol to the site pia that represents and delineates the path
of travel of th accessible route th is required between the accessible
parking space and the accessible entra e doors to the accessible units. The
symbol shall start at the accessible pa ing spaces and terminate at the
accessible e ranee door to the unit. Also, show the symbol leading to each
of the re eational amenities provided or the project including the
boardwalk rom the accessible units. The sy 01 shall represent the location
of the p of travel, not the location of the etectable warning or other
paveme markings that are required to be ins lied along the path. The
location of the accessible path shall not comp the user to travel in a
drivell e area that is located behind parked vehi es. Identify on the plan
the wi th of the accessible route (Note: The minimu width required by the
code' forty-four (44) inches). Add text that would indicate that the symbol
repre ents the accessible route and the route is designed in compliance with
regulations specified in the Fair Housing Act. Please note that at time of
INCLUDE
REJECT
Project name: Altman Bay Vista
File number: NWSP -00-005
Page 5
DEPARTMENTS
31. Within he site data found on the sheet titled site pia , identify the proposed
finish fl r elevation of all of the proposed buildin (lowest floor elevation).
Verify th the proposed elevation is in complia e with regulations of the
code by a ing specifications to the site data hat address the following
issues:
a) The d ign professional-of-record D r the project shall add the
followin text to the site data. "Th proposed floor elevation _
_ N VD is above the highe 100-year base flood elevation
applicable the building site, as determined by the South Florida
Water Mana ment district's sun ce water management construction
development r ulations." [S tion 3107.1.2, Chapter 31 of the
Boynton Beach mendments the 1997 edition of the Standard
building Code]
b) From the FIRM ma of the bject area, identify the title of the flood
zone that the buildin s are ocated within. Where applicable, specify
the base flood elevati n. f there is no base flood elevation, indicate
that on the plans.
c) Identify the floor e vation that the design professional has
established for the b Id g within the footprint of the building that
are shown on the s' e pi , ground floor plan and the paving and
drainage drawing.
32. Either add to the proj ct the lots tha are shown on the survey east of the
subject project or sho n on the site pI the appropriate street frontage and
access to the lots. At time of 2nd r view, submit a proposed survey
showing the proper access and street front e.
33. Add to the draw' g titled site plan all of the e ements that are shown on the
survey. The I cation, type and size of the e ements shall be shown and
identified on the site plan. Where applicabl , amend the plans so that
structures d not encroach into an easement. Th site plan shows that there
are buildi s and structures encroaching into th easements. Amend the
drawings ccordingly.
34. At ti e of permit review, submit a copy of the re orded resolution that
verifi s the abandonment of the ingress & egress easement and drainage
ease ent that are shown on the plan within the area of a building or
structure.
INCLUDE
REJECT
Project name: Altman Bay Vista
File number: NWSP -00-005
Page 6
DEPARTMENTS
35. \t time of permit review, provide a completed and exe . ted City unity of
tit~ form. The form shall describe all lots, parcels or racts combined as
one ot. A copy of the deed with legal descriptions of ach property that is
being nified shall be submitted when processing th form. The property
owner t at is identified on each deed shall match th property owner that is
identifie on the form.
36. At time of p rmit review, the site plan shall ide Ify the actual distance that
each buildin tructure is set back from the adj cent property lines. Please
note that ove hangs, covered walkways, anopies, awnings or other
appurtenances t at are attached to the buil ng shall be considered when
identifying buildl g setbacks. Therefore, i ntify the width of the proposed
overhang, covere walkways, canopies, a ning, and/or other roofed areas
that extend out be ond the main wall of the building. The building
setbacks shall comp with setback r gulations specified in the Zoning
Code.
37. To properly determine th impact Ii s that will be accessed for the 2-story
clubhouse, provide the foil ing in ormation:
a) Will the Clubhouse uil ng be restricted to the residents of the
entire project only?
b) Will the residents have cross any major roads or thoroughfare to
get to the Clubhouse cr ation building?
c) Will there be any add tiona delivery to the site?
d) Will there be any ddition employees to maintain and provide
service to the site?
Once this information is omplete and ubmitted, the City will transmit it to
the Palm Beach county mpact fee Offi for a determination on the impact
fees.
38. Add to the submi al an elevation view d wing of the proposed entry
sign/fence/colum . Identify the type of th material. Also, provide a
typical section v'ew drawing of the sign/fence olumns that identifies the
height that the s' n/fence/columns are above finisH rade.
39. Add to the s mittal an elevation view drawing of t
that are sho n on the site plan near the pool and near
Identify th type of material.
proposed structures
e front entry gates.
40. Add to t e individual unit floor plan drawings a break wn of the area
within t e unit. The area breakdown for each unit shall specify the total
area 0 the unit, area of the balcony, total area that is air-conditioned and,
wher ,a plicable, total area of storage and garage space. If the garage and
INCLUDE REJECT
Project name: Altman Bay Vista
File number: NWSP -{JO-005
Page 7
INCLUDE REJECT
D
tcrage areas are not part of a specific un' , the area shall be included and
i ntified within the area of the building.
4 \.Add to the site data the total area u er roof of each residential building.
Provide abular area data for ea building. The data shall include a
breakdow of area for each floo of each building. The breakdown shall
include the ollowing. areas (ea area shall be labeled on the applicable
floor plan dra ing):
a) common a a covered
b) covered stai
c)
d)
e) storage areas ( t pa
f) garages (not rt of a
g) elevator roo ,
h) mechanic room,
i) trash ro m,
j) mailb x pickup and delivery a ea, and
k) An)! other area under roof.
[Chap' er 4 - Site Plan Review, Sectio 7. E. 2. And 3.]
42. On he floor plan drawing of building III, i entify the location of the elevator
r m, mechanical room, trash room, and ma' box pickup and delivery area.
addressing plan for the
of permit review, submit for review
\V'
PARKS AND RECREATION
Comments:
44. In accordance with Chapter 1, Article V, Section 3 of the City's Land
Development Regulations, based on 286 multi-family units, the recreation
dedication requirements is calculated to be:
286 d.u. X 015 acres = 4.29 acres.
For one-half private recreation credit, 4.29 acres divided by 2 = 2.145 acres.
45. The developer has the option of applying for one-half credit for the private
recreation provided. In addition to providing 2.145 acres for private
recreation, to earn one-half credit, the developer must provide at least five
recreation elements. The amount of recreation elements shown on the
proposed site plan is sufficient subject to the following modifications:
a. The proposed swimming pool needs to be increased in size so
Project name: Altman Bay Vista
File number: NWSP -00-005
Page 8
\
DEPARTMENTS INCLUDE REJECT
that minimum dimensions are (20' x 50').
b. Layout (including length) of the path must be shown on the
permit submittal. Path must be constructed of asphalt, I
concrete or similar permanent material.
c. Another tennis court, half basketball court, or racket ball court
needs to be provided in addition to the one tennis court
proposed.
46. More information must be supplied concerning the equipment, material
provided and size of the recreation building to ensure it is sufficient to meet
the needs of the residents.
47. The developer may choose to pay the full recreation impact fee. Using that
option, no private recreation needs to be provided.
FORESTERlENVIRONMENT ALIST
Comments: ~[J>l". t OvJ'
\i' Y'
3ihe applicant must obtain permits from the Department of Environmental
Protection (DEP) in reference to the existing mangrove trees on the
individual land parcels combined into the one site plan. The set back
requirements for the mangroves may be a greater distance for the City of
Boynton Beach Comprehensive Plan, than the DEP setback requirements.
~;ere are other existing trees on the land parcels, which will have to be
shown on the trees survey, and addressed in the trees management plan for
the site.
X Provide an environmental study, including a flora and fauna survey, of the
site for review and approval by the T.R.C. as specified in LDR Chapter 7.5,
Article IV.
PLANNING AND ZONING
, CO)TIments:
X P)lf site plan sheet first in the submittal package.
XZlearlY delineate on the site plan the boundary between the existing R-3 and
C;J"zoning districts.
~provide "existing" and "proposed" zoning with acreage calculation under
"Site Data" on the site plan.
(I ~PPlicant has submitted an application for Land Use Amendment and
- Rezoning to change the 2.44 acre parcel along Federal Highway from
Project name: Altman Bay Vista
File number: NWSP -j}O-005
Page 9
~
DEPARTMENTS INCLUDE REJECT
Neighborhood Commercial / C-3 Zoning to Special High Density
Residential/ R-3 Zoning. This site plan is being reviewed under the R-3
Zoning category.
@v.. :~L tlte 8QR(;111~...-t fDJia " hisa 80liReatsB aAa aef.iHe3 t1."" ju.;"J:ai611al
l~f ll.~ mangFR-'- gR\'ir~-Rt.:..l ~r--- e 1ireli..:&6 ..L....~.RdW. tR8..site
pIom. Thll__ should also include a preservation plan for th....are.... I ''(Y' :e-
v t'1\VIKdIlO1:2llk-\' . l.JUQ) /);/J4 .
(j) Delineate the Comprehensive Plan "conservation overlay" boundary on the
site plan and landscape plan.
57. The following comments relate to Chapter 4, Section 7, Site Plan
Submission Requirements:
@ Provide a tree survey indicating the location of existing trees.
Also indicate which trees will remain, be relocated or moved.
X Lab']'l ElRQ ,.I;mf>n"in.... dEie?nlk alullg Ft;dcIi:11 Mie,llVVU} "n all191an
dFa":iHgS.
X Iaaieatc ~top 3ib,. loe~t;(~hl" VII tll.... .,;t" plan.
@ Indicate stop sign locations and other traffic control markings on
the landscape plan.
m Indicate location of site lighting on the landscape plan.
f. "Final" landscape plans must be submitted with the second
review for TRC.
@ Indicate the number of trees required and the number provided on
the landscape plan. Indicate the proposed colors for the building
on the elevation drawings. Use manufacturer's code numbers and
color name.
ee following comments relate to Chapter 7.5, Landscape Code:
a. Cypress mulch is not permitted. Revise note on the landscape
plan.
b. Revise note on the landscape plan indicating the source of
water for irrigation.
c. Label and dimension all required landscape buffers on the
landscape plan and site plan.
d. Identify and label the required landscape site triangles at the
entrance drive on the site plan and landscape plan.
e. Identify and label dumpster locations on the landscape plan.
Provide landscape and screening detail for the dumpsters on the
landscape plan.
f. Identify and label foundation landscaping around each building.
K The fOllxng comments relate to Chapter 9, Community Design Plan:
. All roof top equipment must be completely screened from view
K at a minimum distance of 600 feet.
? Incorporate architectural features of adjacent residential
. developments where feasible.
~\~
~
~
Project name: Altman Bay Vista
File number: NWSP -00-005
Page 10
~-(trt-~ .~~
_ ~<d?~ '
A.-~ k-< 1:>01{., fC:!'" .
o
\
. " - .. ----- J)
-~/~.....~~~ ~)..
fo ~~r~~
INCLUDE REJECT
For building type I the table indicates that D I units are included. No D I
units are shown on the building footprint.
\( The parking calculation for one bedroom / one bath units does not meet
~ code (Ch. 2 Sec. II, H. 16a (3)).
,.
Parking calculations provided do not agree with the site plan. Staff has
counted 228 surface spaces and 22 private garage spaces. Also the surface
parking space count for the smaller parking garage located to the north
totals 37 spaces. The site plan note indicates 50, I st floor spaces and 54,
2nd floor spaces. Please review and revise.
x
The tabular data for parking calculations provides for a total of 288
dwelling units. The unit table and site data indicates a total of 286 units.
Please revise the 2- bedroom unit count.
The parking calculations do not address parking for the recreation area.
Parking spaces must be provided for the pool/recreation area. (Ch. 2,
Sec.ll, E, 12). _ ,. - :4 Va.J2/Z;x.eiA IZo ,A..
he vl~t.
Add architectural design enhancements to the west, north and south facades
of the parking garage fronting Federal Highway. 5fe,,~ d.e~ "'" 'I.k
@ Setbacks for this site are addressed in the Comprehensive Plan "Problems
and Upportunities" section and Table 24: Site Specific Future Land Use and
Design Considerations. A minimum ISO-foot setback is recommended
along the ICWW shoreline. In addit~riable southern setback is
recommended adjacent to the exiting two-story residential development.
The setback is determined by the height of the proposed structure. A four-
story structure is proposed for this area (Bldg. Type I). Therefore, a 100-
foot setback is recommended. These Design Considerations should be
addressed on the current site plan.
The site plan shows encroachment into the "jurisdictional limits" of the
Environmental Preserve Area. According to DEP, an average 25-foot
setback with a minimum setback of 15 feet is required around jurisdictional
Mangrove areas. Modify the site plan accordingly. Permits from DEP will
be required and Mangroves shall be preserved to the maximum extent
possible.
Q;Pl
roposed signs are not shown on the site plan. Site signs require approval
In accordance with Chapter 21- Signs.
MWRJblw ~~)--
It A leRO?"flANNIN~\SHAREO\WPlPROJECTS\ORIANA GRANITE\1ST REVIEW COMMENTS ORIANA GRANITE DOC ~ri
~ 0/ FIb"'IL ~~ '\ ,vi1~ rY:V"'jA/l'
-:;::./ -"~4<U-~~ ~acl:S~ BJdfJ '/~I {St/...KS1~ J0{1Y1lfyvr ~'
(i)f<tf'~~l fr.Mae o-~-fh-If.e/Hl""'f" .--/'
CluW - 'SJlv;..O/qe'Cl, -€?vCGjt' COtlfy<!'i2 DU ,/fa' 5' 0 f ~,Ir.{p-",j IZ.., ~?'
_~f".i:'~_ ..._..~----- '
~y tI;yh.
;;'s fk-r'.s.c.. ~ CC7'vY) h')"'>'- + ="
(j).'?ran 'Sj~5C'%qcd ko--~ ( /?'?<>-Vrail~5/'
"- 61<:'5> e",v~ -5 ~f'v""'';/ 5/~o.A)~' Q", "- ./- j? /~." ..':JcdZ
iY?c..(:.,";~ /hf-""",'~~ pc:"."" ? (f;vi)1)
. U u ~~~'.
-C-r,l'rM-.-ft<v.. f;z7V" <E""P'..... r f1~ -r ",-(bc~, <of ~q;'a2/y ~
",/t( Ylef 6". c4fr.""'-~f,( ~ /"1~7Jr<!N~S
"
"'" 1'0:!c,~,..(;-t'y~f6 '<'!/c7/'5;rc/'t&.n P"<i-K:'-s)r""cemP'",-f-;6r<t; '~/S~rw-C?::J
@.. ~L-tb"S~s 0-".0 ~u,(c(}; rr Cay...?", -A-6r (;, r)'
J Ic.c". r4 ~s ~ f:->~'(&'~r> ~5 P'"Ss~'" -f"'7J .5o~H-r^ prr7r:'A<:.
" . (~7c'-+ /" (j . ,f
<t~r,-,c-r ,>-' ..A_,. cT /'1H~Jr..ve /.~s oJr~ '(l..~ ~v~~,.t:~ o-,c~.....
of s/tc ::s<=-t. . . In.j('-'''ne, d bl.J;Cd2~j (oec-ft~ cdr.;dJc. 10<::" .5<-fG..cl!.
J",;JicL"1\<:. .".
('5'-'-Pf""'T -h-"",,- H';".f:lL ,c <>-,,-(1<:..; p<.t:.:f..",p
fc.t:k.5J"'- ~Y;:i/.(! /r_._ r-ec... 0..,,,-,,,-- -rb t'1.<L~, .ad."",<: ~
..5~L-(.'''' e ~ r~cL<.oc.e. .LL,~s; 1'jr c--f- 510('~;;'~1C: _..".(2
/-1_1"-1"'-' ~'" c~O-A'>~1'1.@!l )h'po.<o.f Yf"'" cJ-Gl;o-c~+ -fr{,./~;'"
6.. "'yc-QS.
p",-..-~s f'<'>c--~~!=r- i5j'c-=. l(.€!J'",(' +- 1""""<1--<<'< f'i,,/~
Cf ) ~ ~
i""f>c~{ t-s'p~cJ nef 'f\<e.C>><=.C Go>' fr..j"'~f _ IA<;'~
<LA... e. <,- r Bv- r II., ~ ;'--1", "0 fee. Z5-r?".
{ylf'( T ,C5~ (( -;-t'. r Q- r"...+z "'" .1
A0d ,...4- m-<<~(..--~ ,6<>->, d<:.. ;sco~rI''''-1<'''- ~<s-r 6u/.42.;;
/ r /1\. U
W~.s ,..",.(-ce:.Q --b. .:2 .5~iC'.J ~ /"10-,>< <Y~;<..< C""'f'v--fit,;,(.',.f(- 6.0/
~<Qt.."-.........,, V,,<- L..::r" c."",-C.
rut
Qvd
~VIEW
New Site Plan
M {g)chL
Project nam( : Altman Bay Vista
File number: NWSP 00-005
Reference: 1 !ltCeview nlans consist of 12 sheets identified as New Site Plan.
~ A~.:I . 1.1, 2000 Planning and Zoning Deoartment date stamo marking.
I
File # NWSP 00-005 with a
Ma'Z
DEPARTMENTS
INCLUDE REJECT
PUBLIC WORKS
Comments:
~ The Public Works Department cannot approve this site plan until we have
more information on garbage and refuse disposal: i.e., dumpsters,
compactors, and location for pick up.
UTILITIES
Comments:
GENERAL COMMENTS
(2. )AIl utility easements shall be shown on the rectified site plan and
C/iandscaping drawing so that we may determine which trees may interfere
with utilities. In general, palm trees will be the only tree species allowed
within utility easements. Canopy trees may be planted outside of the
easement so that roots and branches will not impact the authority to remove
any trees that interfere with utility services, either in utility easements or
public right-of-way.
V Palm Beach County Health Department permits will be required for the water
1\ ~nd sewer systems serving this project (CODE Sec. 26-12).
)( Fire flow calculations will be required demonstrating the City Code
requirements of 1,500 g.p.m. as stated in LDR Chap. 6, Art. IV, Sec. 16, or
the requirements imposed by insurance underwriters, whichever is greater
(see CODE Sec. 26-l6(a)).
X Code Sec. 26-34 (E) requires that a capacity reservation fee be paid for this
project either upon the request for the Department's signature on the Health
Department application forms or within 30 days of site plan approval,
whichever occurs first. This fee will be determined based upon final meter
size, or expected demand.
~
( ~omprehensive Plan Policy 3,C.3.4. requires the conservation of potable
~ater. City water may not, therefore, be used for irrigation where other
sources are readily available.
Xprovide an engineer's written certification that drainage will conform to all
rules of the city and the South Florida Water Management District
(SFWMD) or Florida Department of Environmental Protection (FDEP),
Project name: Altman Bay Vista
File number: NWSP -00-005
Page 2
DEPARTMENTS INCLUDE REJECT
whichever has primary jurisdiction (per LDR Chap. 4, Sec. 7F).
~ P,FCIFIC CONDITIONS
A. Water and sewer lines to be owned and operated by the City shall be included
within utility easements. Please show all proposed easements on the
engineering drawing, using a minimum width of 12 feet. The easements
shall be dedicated via separate instrument to the city as stated in CODE Sec.
26-33(a).
KThiS office will not require surety for installation of tlie water and sewer
tilities, on conditions that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
~LDR Chap. 6, Art. IV, Sec.16 requires that all points on each building will be
within 200 feet of an existing or proposed fire hydrant. Please demonstrate
that the plan meets this condition by showing all hydrants.
)(Housing units shown east of the north parking garage have no utility lines
shown. How are these units served?
~he plan shows fire service to the two (2) parking garages. Do these serve
he garage( s) only?
~he clubhouse is insufficiently covered for fire protection. Please
. emonstrate that the system will cover this facility.
lXtpprOPriate backflow preventers will be required on the domestic water
service to the building(s), and the fire sprinkler line if there is one, in
accordance with CODE Sec. 26-207.
~ scaled drawing showing the site drainage plan shall be submitted (LDR
hap. 4, Sec. 7F). Delineate the contributing areas. Provide drainage
calculations showing the amount of rainfall to be retained on-site.
~a building permit for this project shall not be issued until this Department
las approved the plans for the water and/or sewer improvements required to
service this project, in accordance with CODE Sec. 26-15.
FIRE
IX/(Y',...)<
Comments (<J!I\CI/lI~~
(!)
17. Ai fir"" t1QUf hynr"At te~t is r~ql1;r~d (LDR 6- 1 h). No part of a structure may
be more than 200' from a hydrant (LDR 6-16).
.
~EVELOPMENT DEPARTME.
~MORANDUM NO. PZ 00-159
SITE PLAN REVIEW STAFF REPORT
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
moo!Jj~u
June 5, 2000
DESCRIPTION OF PROJECT
Project Name/No.: Altman/ Bay Vista/NWSP 00-005
Property Owner: Jean L Merkel and Martha Banting
Diamond Beach Development Joint Venture
David E. Blankenheim, Trustee
Rebecca P. MerkelTrustlJudith Anne Merkel Howard, Trustee
Taiwan On, Inc.
Applicant/Agent: Altman Development Corporation (Contract Purchaser)/Chris Kerr, Kilday & Associates,
Inc.
Location: Eastern terminus of SE 23'. Avenue on the east side of Federal Highway (US-1)
Land Use/Zoning: Existing:
11.89 acres @ Special High Density Residential/R-3
2.44 acres @ Local Retail Commercial/ C-3
Proposed:
14.33 acres @ Special High Density ResidentiallR-3
Type of Use:
Multifamily Residential
Project size:
Site Area:
No. of Units:
Floor Area:
Density:
14.33 acres (624,215 square feet)
286
323,560 square feet
19.96 du.lac.
Adjacent Uses:
(see Exhibit "A" - Location Map)
North - Seagate of Gulfstream Condominiums zoned R-3;
South -
Hampshire Gardens Co-Op zoned R-3;
East
Intracoastal Waterway (ICWW); and
West -
Right-of-way for Federal Highway.
Site Characteristics:The subject 14.33 acre parcel is a compilation of several parcels which are currently under
separate ownership. Existing development on site includes two (2) vacant restaurant
buildings (Gentleman Jim's and Strebbs) on the southwestern portion of the site and the
Alberts & Merkel Bros. Nursery on the northwestern portion of the site. The balance of the
property consists of a vacant lot and a mangrove preserve area. The applicant submitted
an Environmental Assessment prepared by Environmental Services, Inc. for the site. Most
of the vegetation found in the urban land area consists of exotic or nuisance species. The
mangrove swamp contains predominantly Black Mangrove with Red and White Mangrove
occurring in the canopy. Exotic and nuisance species are found on the perimeters of the
mangrove swamp and the northwestern corner, where there is disturbance from the
commercial nursery. Wildlife observed in the mangrove swamp area include: fiddler crabs,
. Page 2
Altman! Bay Vista)- Site Plan Review Staff Report
Memorandum No. PZ 00-159
Proposal:
Concurrency:
a. Traffic-
b. Drainage-
Driveways:
~ll- ~k",1)
} ~f
v" &'"
IY tG('.>
11\
Parking Facility:
raccoon, little blue heron, yellow-crowned white heron, white ibis, prairie warbler and
yellow-rumped warbler. No nesting activity was observed on site.
An "Existing Tree Documentation Report" was submitted by Michael T. Schale, the
landscape architect for the project. The total number of trees on-site is 178 of which 96 will
remain or be relocated on site and 82 existing trees will be replaced.
J- gf.,
The developer proposes to construct ~uxury rental apartments in four (4) buildings on
14.33 acres. Each building will be four14) stories high and contain a mix of one, two and
three-bedroom units. Parking will be provided using surface lots and two (2) parking garage
structures. In addition, 18 units will have private garages. A 10,560 square foot, two-story
clubhouse building, a swimming pool and one (1) tennis court are the recreational
amenities provided (see Exhibit "8" - Proposed Site Plan).
A traffic statement for this project was submitted and sent to the Palm Beach
County Traffic Division for their review and approval. Prior to final approval, staff
must receive confirmation from Palm Beach County's Traffic Division regarding
standards compliance.
Conceptual drainage information was provided for the City's review. The City's
concurrency ordinance requires drainage certification at time of site plan approval.
The Engineering Division is recommending that the review of specific drainage
solutions be deferred until time of permit review, when more complete engineering
documents are required.
There is one (1) main entrance proposed for the development located at the southwestern
portion of the site on Federal Highway (US-1). This entranceway lines up with a median
openin on Federal Highway (US-1) allowing both right and left turns from the site. The
riveway has a 24 foot entrance and a 30 foot exit separated by a 12 foot median.
Entrance to the development will be restricted by an unmanned, ,electronically operat~d,
security gate. 1'h< j"'-f"- 4>5 . r("i""S'~ "1'f'~'-< -!"'~ {-!y " f<~+~ -fk
(. \ L -t _ _ f --..o-?;/ jy L :_1 ",: I' I ~o ".. -f(.,,~- "Y' I~D ~ ""f!y..~f=%- ''J 5 1'< "<;.; .7 "'-'.Y.
Also proposed is a 12 foot driveway providing an exit ont6 Federal Highway (US-1) from
the parking garage. This will be restricted to exits only by use of an electronic gate. An
emergency access is provided at the northwestern most portion of the site. This 20 foot
driveway will be equipped with an electronic emergency access system and will remain
closed to the public.
The parking spaces required for the residential portion of the project, 548 spaces, have
been tabulated based on the applicable per bedroom ratio required by the land
development regulations. The project proposes to include a total of 556 spaces, including
11 handicap accessible spaces. All spaces, except handicap spaces, will be dimensioned
nine feet by sixteen feet (9' x 16') with a two (2) foot overhang using wheelstops.
The 556 parking spaces will be distributed as follows: 204 surface spaces, 334 structure
parking spaces and 18 private garage spaces. Two parking structures will be provided on
site. The main, two-level structure will be located in the western portion of the site along
Federal Highway (US-1). The second two-level parking garage is located in the north
central portion of the site adjacent to Building Type III.
. Page 3
Altman! Bay Vista)- Site Plan Review Staff Report
Memorandum No. PZ 00-159
Landscaping:
The project does not provide the required amount of parking for the recreational amenities.
A total of nine (9) spaces are allocated for the recreation area including the clubhouse, pool
and tennis court. A code variance is required pursuant to Chapter 2, H. e. (1), (4) and (12)
to allow a r~duction is parking required for the recreational ameniti~s. TlJ.e applicant has
filed an application for this variance. :P sf ~d =- rpr-.va,j oJ~~1""'o/~,.r-~
._ ,.) f- 7 / (. v(~<~o-f"v~'"
6..' 6- ~i ~ 4: ~ ..s;<1'i:= ,/J'<<-Yl c:t:::J'7'''''''''''''''''' ~
The landscaping of the site will fully meet code requirements when staff comments are
incorporated. Special attention was given to protecting or relocating 96 trees on site. A
total of 82 trees will be removed and replaced with new plant material incorporated into the
landscaping for the site. Side yard and front yard landscape buffers are provided as
required by code. Extensive landscaping is proposed for the entrance area and will include
a variety of palms, shade trees, shade pavilions, decorative fountains and project signage.
A tiered landscaping pattern is provided in the front buffer along Federal Highway (US-1) to
effectively screen the two-level parking garage. A total of 785 trees and 11,013 shrubs will
be provided for the site. This is well over the 371 trees and 3,575 shrubs required by code.
The landscape plan incorporates the preservation of the entire 3.5 acre mangrove wetland
area. The area is located in the eastern central portion of the site along the Intracoastal
vJ 1iJaterway. The South Florida Water Management District (SFWMD) and the U.S. Army
Corps of Engineers (CE) have verified the delineated wetland line as described in the
Environmental Assessment and shown on the site plan and landscape plan. Development
permits are required from both agencies.
Building and Site: Building and site regulations will be fully met when staff comments are incorporated into the
permit drawings.
c.:0'Vn. MOw""-
Community Design: The area surrounding the proposed development does not have any particulaJL architectural
character. The existing condominium buildings to the north and south have a dated design
using predominately white concrete block and roof tiles with minimal color accents. The
proposed development has selected a pale yellow predominant color with pastel accent
1---Color(tones in gold, peach and ivory. The roof is constructed of terracotta cement tile and
. the building fal;:ade finish is stucco. Complimented by lavish landscaping and an elaborate
entrance feature, the design conveys a "luxury" ambiance. The proposed design is
preferable for this redevelopment area of the city.
Comprehensive
Plan Issues: A discussion of a portion of the subject site is contained in Section VIII. Land use Problems
and Opportunities of the Comprehensive Plan. It is the vacant parcel identified as 1.n.,
which contains the mangrove swamp preserve area. The site is in the Conservation
Overlay cat~ory on the Future Land use Map. Asstated above. the applicant es to
.t.. preserve ~ eJ~~1 ,,,,.;I ju, ;!dietieRal limit.. ~he man rove swam-=:: u er, the
+ Compreh~slve an Coastal Management Element Table 24. Site Specific Future Land
'p-'1 Use and Design Considerations, proposes building setback recommendations regarding
. " t..~ . / the development of this site.
. V. . j/-~:--nfl A variable setback, based on building height, is recommended for the southern portion of
~d{'" ,9'1' *.the site adjacent to the two-story HampShire Gardens Co-OPt:: Toe. building height for the
f"ls'" j~/ 'Bay Vista project is four stories. The "Design Consideration3}'af1:rora setback of 100 feet.
/1'" ,L ~ The applicant has responded to thiS conslderalion by uSing a bUilding deSign that staggers
'k ,(~ the setback along this side from 30 feet to 62 feet. The clubhouse has a setback of 30 feet
Page 4
Altman! Bay Vista)- Site Plan Review Staff Report
Memorandum No. PZ 00-159
/" I ~,~c:l ,
'OJ 1~:J.j s
\ '^~,l\'.(.Y
:"0" \;j;.\'Y
'i,d.:!fIL'J'(
~vl.~
",)
;'1 V'
,((1,,0
Signage:
in this area with a large open space be n the clubhouse and the Type I apartment
building to the west The required five ( foot landscape buffer is provided along the
southern perimeter of the project site. In a dition the applicant has met with the Hampshire
Gardens Association and conveyed to staff that they received a favorable respql)Se ;.oih~ir
proposal(.f{" s 5~f r"'--{ /n~, >^<-f br<:..~ ,. ~ - cA( c""fh-l""", L.,. ,'( , '11-r,%- ~,<.-t
fr-j<c~~h) ,f!.- clq 5~rt) .
Also included as a "Design Consider r n" is a shoreline buffer zone along the Intracoastal '
waterway (ICWW) of 150 feet '''+'''-0 0 protect the mangrove swamp area. The applicant C
has responded to this conlideration by providing a study which confirms the actual i
boundaries of the mangrove swamp area and intends to preserve same as permitted by
the Army Corps of Engineers and the South Florida Water Management District. The IJ
configuration of the 3.5 acre mangrove swamp area does not neatly follow the ICWW
shoreline. It begins approximately 180 feet north of the property line and ends ~
approximately 160 feet before the south property line. The mangrove swamp area extends I
west, approximately 350 feet into the site. In the areas of the project proposed to be ft
developed, a minimum setback of 40 feet is provided along the ICWW shoreline. The "-
setbacks as proposed meet the intent of the "Design Considerations" discussed in the <
corzrehensive Plan: f-t- j {,c.0d2 erG."" b~ net& ~.".Y'- t. f- -,t: . +.. j
.5 ,'c_ (, "'. .5 ,,-~..< oL5 """'<-. C~"'''<o6/c. ~ ~ ~- ,''- - 1-<.. CO' "', J ,4 i'\ y-tb
The project is proposing to have two (2) signs, one on each side of the entrance wall
feature for the main entrance. These signs meet the City's sign requirements per Chapter
21, Article IV, Sec. 1. D. No freestanding sign is proposed for this site. (see Exhibit "c"
Conditions of Approval)
RECOMMENDATION:
Staff recommends that this site plan request be approved, subject to the comments included in Exhibit "c" -
Conditions of Approval. The Technical Review Committee (TRC) recommends that the deficiencies identified in
this exhibit be corrected on the set of plans submitted for building permit.
xc: Central File
S:\Planning\SHARED\WP\PROJECTS\Altman BAY VISTA NW$P\STAFF REPORT Altman Bay Vista.doc
Project name: Alnnan Bay Vista (NWSP)
File number: NWSP 00-005
- "-
~.l . fz))
cW- LP l-J, I ,-S
l)Je , ~ G-~:) p:{ c.:>:
~<2.--~ L V lr~
e.-f- L.-'( '-':.
yc-~ ~.". (,.:f
r",s0>?
c}r.- ~
IS'>
Page 4 \
DEPARTMENTS INCLl.; pE REJECT
20. Delineate the Comprehensive Plan "conservation overlay" boundary on the
site plan and landscape plan.
21. A code variance is required pursuant to Ch. 2. H. e (I), (4) and (12) to allow )
a reduction in parking required for the recreational amenities.
22. A code variance is required pursuant to Ch. 2, Sec. 5. G. 2. a. to allow a <- V
reduction in the required front yard setback for the shade pavilions.
.>2e/;<:.1' 4
23. ~de .Ilrillfl.s" is required pursuant to Ch. 2, Sec. 4, J. 1., to allo eight
foot n.!lltilflliIR il~~~+ 'lil' tile I'f81'F.ed entrance wall feature. -1;;~:;'y.Q
24. Specify colors for the banding details shown on the elevation drawings for
the parking garage fronting Federal Highway.
25. Permits from Army Corp. of Engineers (CE) and SFWMD will be required
and Mangroves shall be preserved to the maximum extent possible.
26. Proposed entrance signs are shown on the site plan. Provide a sign typical
detail which dimensions height and area and indicates proposed colors and
materials.
28. Approval from Palm Beach County Traffic Division is required prior to
Planning and Zoning sign-off on the rectified plans.
ADDITIONAL PLANNING AND DEVELOPMENT BOARD CONDITIONS
29. To be determined.
ADDITIONAL CITY COMMISSION CONDITIONS
30. To be determined.
MWR/blw
J:\SHRDATA\PLANNING\SHARED\WP\PROJECTSIAL TMAN BAY VISTA NWSP\Al TMAN BAY VISTA 3RD REVIEW COMMENTS. DOC
.
.
MOURIZ / SAlAZAR & AS~_ -o,,,'::S, INC.
ARCHITECTS & PLANNERS
7695 S.W. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COO0895
May 19,2000
May 29, 2000
The City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FI33425
Re: Bay Vista - Response to City Comments
To Whom It May Concern:
The following is a response to the City comments:
The text in italic denotes a response for comments noted in TRC May 23, 2000.
UTILITIES
1. The trash issue is being addressed with a trash room at each building (see building
plans). The bin will be rolled out to the curb for collection by Sanitation Company.
Areas have been indicated as per our conversations to allow for bin storage on collection
days.
2. The proposed utilities easement for water and sewer have been shown on the
preliminary engineering plan, site plan, and landscape Plan.
Proposed easements have been added to site plan.
3. It is noted that Palm Beach County Health Department Permits will be required.
4. Attached is a fire hydrant flow test performed by the City of Boynton Beach indicating a
flow of 1876 gpm at 20psi.
5. It is noted that the reservation fee will be paid prior to the City's execution of the Health
Department applications or within 30 days of the site plan approval, whichever occurs
first.
6. No other source of irrigation water is available to the project other than potable water.
Based upon a test well and water quality testing performed by Jeff Associated, Ltd., "no
zones of good quality for potential irrigation use were encountered.
Report provided by Civil Engineer.
7. A note has been added to the preliminary engineering plan.
MOURIZ
SALAZAR
...
MOURIZ / SALAZAR & A,00CIATES. INC.
ARCHITECTS & PLANNERS
7695 S.W. l04TH STREET
SU ITE 100
MIAMI, FLORIDA 33156
305/273-9911
AA COO0895
Bay Vista
City Comments
Page two
8. The proposed utility easement have been shown on the preliminary engineering plan.
The easement will be dedicated to the City prior to the first Certificate of Occupancy.
9. It has been noted that setting of the water meter is a prerequisite to obtaining the
Certificate of Occupancy.
10. A fire sprinkler system will be installed in all buildings including the parking garage,
which lessens the spacing requirement for fire hydrants. The fire hydrant location have
been shown on the preliminary engineering plan.
11. The utility services are shown in the southwest corner of the building.
12. The fire services shown to the garage serve the garage only.
13. An additional fire hydrant has been added to the plan and one of the hydrants has been
located closer to the clubhouse. The clubhouse building will contain a fire sprinkler
system.
14. Additional labels have been added to the preliminary engineering plan to indicate that
the potable water services will contain a Reduced Pressure Backflow Preventer (RPZ)
and the fire services will contain a Double Detector Check Valve (DDCV).
15. The preliminary engineering plan depicts a schematic representation of the proposed
drainage. Upon approval of the site plan, final drainage plans will be prepared and
submitted to the City including the contribution drainage area map and calculation.
16. It has been noted that a building permit shall not be issued until the water and sewer
plans have been approved.
FIRE
17. A fire hydrant flow test has been performed by the City of Boynton Beach and has been
attached.
The buildings are sprinklered, as per my conversation with Fire Official Steve Gale this
will meet the 200" requirement.
18. 20' wide emergency access provided at northeast corner of the project for the exit to
U.S. Highway.
Notes have been added to site plan detailing electronic gates and emergency access for
all gates including emergency gate. A note has also been added with access road and
hydrant requirements.
MOURIZ / SALAZAR & A:'ouCIATES. INC.
ARCHITECTS & PLANNERS
7695 SW. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COO0895
Bay Vista
City Comments
Page three
POLICE
19. Parking lot and garage light fixtures to be indicated on the landscape document.
a. Parking lot and garage light fixtures are shown on site plan and illumination
levels are to be provided as per LDR requirement (see note).
b. Light fixtures are indicated on the landscaping documents and will be
coordinated with all documents.
c. Lower light levels for pedestrian walkways will be provided along the boardwalk.
ENGINEERING DIVISION
20. A note has been added to site plan.
21. The requested notes have been added to the preliminary engineering plan.
22. A typical cross-section of the north and south property has been added to the plan to
indicate that the project will contain its stormwater runoff.
A cross section mark has been placed at north property line.
23. The requested engineer's certification is shown in General Notes NO.2.
24. The existing easements that conflict with the proposed development will be processed
for abandonment.
Note added to Civil.
25. The parking garage will conform to the items specified in the LDR (see note on site
plan).
26. As discussed in our meeting on May 17, 2000, the typical parking section has been
revised to indicate a 16 foot deep space with 2 foot of overhang beyond the curb or edge
of sidewalk.
BUILDING DIVISION
27. A general note has been added stating all units are accessible.
28. All building entrances are required to be accessible and a symbol has been added to the
site plan showing path from handicap space to the building entries.
29. Note with parking requirement has been added to site plan. An accessible space has
been added to the club's secondary entry.
MOURIZ / SALAZAR & A>oOCIATES, INC.
ARCHITECTS & PLANNERS
7695 SW. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page four
30. Path of travel has been indicated as requested the development will comply with all
requirement of the Fair Housing Act will be complied with the development.
Path note has been added to site plan.
31. Notes and discussion have been added to the preliminary engineering plan regarding
the finished floor elevation, 100 year elevation, and flood insurance rate map base flood
elevation.
32. The lots in question are located east of the subject property. The applicant previously
discussed with the City the possibility if including these parcels in development but was
informed that since the parcel were submerged, within the Intercostal right-of-way
easement, and no taxes have been paid on these parcels for decades, that no
development right remained. Therefore, no further consideration needs to be given to
the referenced parcels, and they have been removed from the updated survey thereby
properly reflecting the development area.
33. Easements have been added to the site plan.
Easements have been clearly denoted and 10" easement added on east side.
34. Comment noted, information will be submitted.
35. Comment noted, information will be submitted.
36. Comment noted.
37.
a.
b.
c.
d.
Yes
No
There will be a limited amount of deliveries to the site for residents i.e. Fed-ex.
There will be 7 full-time employees for leasing management and maintenance.
Cover letter is attached.
38. Front entry sign and wall to be detailed on landscape document to be submitted next
week.
Entry sign included in landscape package.
39. Pool structures elevation plans have been added on sheet 2.
40. Individual unit square footage breakdown has been provided with unit plans.
41. Additional square footage information has been provided on building plans.
______._.___n__.____...m___ ------".. - -. . ..-------..-..-------
MOURIZ / SALAZAR & Ao~0CIATES. INC.
ARCHITECTS & PLANNERS
7695 SW. l04TH STREET
SU ITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COO0895
Bay Vista
City Comments
Page fIVe
42. Location of elevator room, mechanical room, trash room, and mail box area has been
identified.
43. Comment noted.
44. Comment noted
45. The developer opts to apply the half credit for recreation and agrees.
a. Swimming pool to be 20'x50'.
b. Path will be constructed of a permanent material.
c. A half court is shown in the clubhouse building.
We would also like to note the community also offers a multi purpose room with billiard,
a club room, exercise room, pool, pool deck with spa, and a 3.65 acre wetlland preserve
which provides the coastal area with an environmental zone that provides a habitat for
wild life which enriches recreational activities in the area.
46. Same as 45.
47. Comment noted.
48. Refer to E.S.I environmental report.
49. Tree survey submitted to.
50. Refer to E.S.I environmental report.
51. The site plan will be placed as the first sheet.
52. The R-3 and C-3 boundaries have been indicated on the site plan.
53. The existing and proposed acreage has been indicated on the site plan.
54. Comment noted.
55. Refer to E.S.I environmental report.
56. Refer to E.S.I environmental report.
57.
a.
Landscape Architect to provide tree survey.
Landscape Architect to submit tree report only.
Schedule has been labeled and dim.
b.
MOURIZ I SALAZAR & ASSUCIATES, INC.
ARCHITECTS & PLANNERS
7695 SW. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COO0895
Bay Vista
City Comments
Page six
c. Stop signs have been indicated. See legend for symbol information.
d. Signs will be shown on Landscape plans.
Signs are shown on Landscape plans.
e. Site lighting will be shown on Landscape plans.
Site lighting is shown on Landscape plans.
f. Final Landscape drawings will be submitted next week at TRC review.
Final Landscape is attached.
g. Proposed colors have been indicated on the building elevation drawings.
Section has been provided, all equipment will be screened as per LDR
requirements.
Architectural features of adjacent developments were considered in the design of
our community.
60. The D units are located in the 2, 3 and 4th level over the private garages (see building
plan).
58.
59.
a.
b.
c.
d.
e.
Comment noted.
Comment noted.
Required landscape buffers have been indicated on site plan.
Site triangle has been indicated on site and landscape plans.
Trash is located in trash rooms at each building.
See comment 1.
Final landscape plan will identify and label foundation landscaping.
f.
a.
b.
61. Parking calculation has been revised (see site plan).
62. Parking count has been revised and parking structure has been clearly indicated (see
site plan).
63. We have provided 11 spaces in excess of the residential parking for our clubhouse
building and recreational area. All the facilities provided are for the residents and not for
the general public.
We have 9 spaces provided for the clubhouse, see variance material provided by Kilday
and Associates.
64. The north and south fa~ade of the parking structure is not visible from Federal
Highway. We have provided a full elevation of the west fa~ade with enhanced
architectural features.
Information has been added to US-1 fagade.
65. See attached memorandum Kilday & Associates.
MOURIZ I SALAZAR & ASovCIATES, INC.
ARCHITECTS & PLANNERS
7695 S.w. 104TH STREET
SUITE 100
MIAMI, FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page seven
66. See E.S.I environmental report.
67. Elevations and details for the entry signs to are to be provided by Landscape Architect.
Infonnation has been provided by Landscape Architect.
68. The tabular data has been corrected to include 286 units.
If you have any questions or comments please do not hesitate to call me.
MOURIZ / SAlAZAR & ASSC f\.ES. INC.
ARCHITECTS & PLANNERS
7695 S.W. l04TH STREET
SU ITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COO0895
May 29, 2000
The City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FI 33425
Re: Bay Vista - Comment #37 Letter
To Whom It May Concern:
This letter is to provide information on the clubhouse building for Bay Vista. The clubhouse will
be restricted to residents of the project. The residents do not have to cross any roads or
thoroughfares to reach the buildings. A limited amount of deliveries will be accepted at the
clubhouse for residents (i.e. Fedex).
There will be approximately seven (7) full time employees in management, leasing and
maintenance on site.
If you have any questions or comments please do not hesitate to call me.
Sincerely,
m ,Partner
alazar & Associates, Inc.
MOURIZ
SALAZAR
...
MOURIZ / SALAZAR & AS:'vCIATES. INC.
ARCHITECTS & PLANNERS
7695 SW. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
May 19, 2000
The City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FI 33425
Re: Bay Vista
To Whom It May Concem:
The following is my response to the City comments:
UTILITIES
1_ The trash issue is being addressed with a trash room at each building. (See building
plansO The bin will be rolled out to the curb for collection by Sanitation Company.
2. The proposed utilities easement for water and sewer have been shown on the
preliminary engineering plan, Site plan, and Landscape Plan.
3. It is noted that Palm Beach County Health Department Permits will be required.
4. Attached is a fire hydrant flow test performed by the City of Boynton Beach indicating a
flow of 1876 gpm at 20psi
5. It is noted that the reservation fee will be paid prior to the City's execution of the Health
Department applications or within 30 days of the site plan approval, whichever occurs
first.
6. No other source of irrigation water is available to the project other than potable water.
Based upon a test well and water quality testing performed by Jeff Associated, Ltd., "no
zones of good quality for potential irrigation use were encountered.
7. A note has been added to the Preliminary Engineering Plan.
8. The proposed utility easement have been shown on the Preliminary Engineering Plan.
The easement will be dedicated to the City prior to the first Certificate of Occupancy.
9. It has been noted that setting of the water meter is a prerequisite to obtaining the
Certificate of Occupancy.
MOURIZ / SALAZAR & AooOClATES. INC.
ARCHITECTS & PLANNERS
7695 S.W. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page two
10. A fire sprinkler system will be installed in all buildings including the parking garage which
lessens the spacing requirement for Fire Hydrants. The Fire hydrant location have been
shown on the Preliminary Engineering Plan.
11. The utility services are shown in the southwest comer of the building.
12. The fire services shown to the garage serve the garage only.
13. An additional fire hydrant has been added to the plan and one of the hydrants has been
located closer to the clubhouse. The clubhouse building will contain a fire sprinkler
system.
14. Additional labels have been added to the Preliminary Engineering Plan to indicate that
the potable water services will contain a Reduced Pressure Backflow Preventer (RPZ)
and the fire services will contain a Double Detector Check Valve (DOC V).
15. The Preliminary Engineering Plan depicts a schematic representation of the proposed
drainage. Upon approval of the site plan, final drainage plans will be prepared and
submitted to the City including the contribution drainage area map and calculation.
16. It has been noted that a building permit shall not be issued until the water and sewer
plans have been approved.
FIRE
17. A fire hydrant flow test has been performed by the City of Boynton Beach and has been
attached
18. 20' wide emergency access provided at northeast corner of the project for the exit to
U.S. Highway
POLICE
19. Parking lot and garage light fixtures to be indicated on the Landscape document.
a. Parking lot and garage light fixtures are shown on Site Plan and illumination levels
are to be provided as per LDR requirement. (see note)
b. Light fixtures are indicated on the landscaping documents and will be coordinated
with all documents
c. Lower light levels for pedestrian walkways will be provided along the boardwalk
MOURIZ / SAlAZAR & AooOCIATES. INC.
ARCHITECTS & PLANNERS
7695 S.W. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page three
ENGINEERING DIVISION
20. A note has been added to site plan.
21. The requested notes have been added to the Preliminary Engineering Plan.
22. A typical cross-section of the north and south property has been added to the plan to
indicate that the project will contain its stormwater runoff.
23. The requested engineer's certification is shown in General Notes No.2.
24. The existing easements that conflict with the proposed development will be processed
for abandonment.
25. The parking garage will conform to the items specified in the LDR.(see note on site
plamO)
26. As discussed in our meeting on May 17, 2000, the typical parking section has been
revised to indicate a 16 foot deep space with 2 foot of overhang beyond the curb or edge
of sidewalk.
BUILDING DIVISION
27. A general note has been added stating all units are accessible.
28. All building entrances are required to be accessible and a symbol has been added to the
site plan showing path from handicap space to the building entries.
29. Note with parking requirement has been added to site plan. An accessible space has
been added to the club's secondary entry.
30. Path of travel has been indicated as requested the development will comply with All
requirement of the Fair Housing Act will be complied with the development.
31. Notes and discussion have been added to the Preliminary Engineering Plan regarding
the finished floor elevation, 100 year elevation, and Flood Insurance Rate Map base
flood elevation.
MOURIZ / SALAZAR & A~~OCIATES, INC.
ARCHITECTS & PLANNERS
7695 S.W. 104TH STREET
SU ITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page four
32, The lots in question are located east of the subject property. The applicant previously
discussed with the City the possibility if including these parcels in development but was
informed that since the parcel were submerged, within the Intercostal right-of-way
easement, and no taxes have been paid on these parcels for decades, that no
development right remained. Therefore, no further consideration needs to be given to
the referenced parcels, and they have been removed from the updated survey thereby
properly reflecting the development area.
33. Easements have been added to the site plan.
34. Comment noted, information will be submitted
35. Comment noted, information will be submitted
36. Comment Noted.
37. a. Yes
b. No
c. There will be a limited amount of deliveries to the site for residents i.e. Fed-ex
d. There will be 7 full-time employees for leasing management and maintenance.
38. Front entry sign and wall to be detailed on landscape document to be submitted next
week.
39. Pool structures elev plans have been added on sheet 2
40. Individual unit square footage breakdown has been provided with unit plans.
41. Additional square footage information has been provided on building plans,
42. Location of elevator room, mechanical room, trash room, and mail box area has been
identified.
43. Comment Noted.
44. Comment noted
MOURIZ / SALAZAR & A~"OCIATES. INC.
ARCHITECTS & PLANNERS
7695 SW. 104TH STREET
SUITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page five
45. The developer opts to apply the half credit for recreation and agrees
a. Swimming pool to be 20'x50'
b. Path will be constructed of a permanent material
c. A half court is shown in the clubhouse building
We would also like to note the community also offers a multi purpose room with billiard,
a club room, exercise room, pool, pool deck with spa, and a 3.65 acre wetlland preserve
which provides the coastal area with an environmental zone that provides a habitat for
wild life which enriches recreational activities in the area.
46. Same as 45
47. Comment noted
48. Refer to E.S.I environmental report
49. Tree survey submitted to
50. Refer to E.S.I Environmental report
51. The site plan will be placed as the first sheet.
52. The R-3 and C-3 boundaries have been indicated on the site plan.
53. The existing and proposed acreage has been indicated on the site plan.
54. Comment noted
55. Refer to E.S.I Environmental Report
56. Refer to E.S.I Environmental Report
MOURIZ / SALAZAR & A~~OCIATES. INC.
ARCHITECTS & PLANNERS
7695 S.w. l04TH STREET
SU ITE 100
MIAMI. FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page six
57. a. Landscape architect to provide tree survey
b. Schedule has been labeled and dim.
d. Stop signs have been indicated. See legend for symbol information.
e. Signs will be shown on Landscape plans
e. Site lighting will be shown on Landscape plans
f. Final Landscape drawings will be submitted next week at TRC review
g. Proposed colors have been indicated on the building elevation drawings.
58. a. Comment noted.
b. Comment noted
c. Required landscape buffers have been indicated on site plan.
d. Site triangle has been indicated on site and landscape plans.
e. Trash is located in trash rooms at each building.
f. Final landscape plan will identify and label foundatiOn landscaping
59. a. Section has been provided, all equipment will be screened as per LDR requirements.
b. Architectural features of adjacent developments were considered in the design of
our community.
60. The D units are located in the 2, 3 and 4th level over the private garages. (See building
plan)
61. Parking calculation has been revised. (see site plans)
62. Parking count has been revised and parking structure has been dearly indicated. (see
site plans)
63. We have provided 11 spaces in excess of the residential parking for our clubhouse
building and recreational area. All the facilities provided are for the residents and not for
the general public.
64.
64. The north and south fa~e of the parking structure is not visible from Federal
Highway. We have provided a full elevation of the west fagade with enhanced
architectural features.
65. See attached memorandum Kilday & Associates
MOURIZ / SAlAZAR & ASSL.~I""<S, INC.
ARCHITECTS & PLANNERS
7695 S.W. l04TH STREET
SUITE 100
MIAMI, FLORIDA 33156
305/273-9911
AA COOO895
Bay Vista
City Comments
Page seven
66. See E.S.I Environmental report
67. Elevations and details for the entry signs to are to be provided by landscape architect
68. The tabular data has been corrected to include 286 units.
If you have any questions please do not hesitate to contact me.
Sincerely,
Jose Saumell, Partner
Mouriz, Salazar & Associates, Inc.
MOURIZ
SALAZAR
...
,M" ._...... ......_.'-''-. ~".J,_" ,.
..... ""~'~''J'--'.J.'''''L..".J
I"-'.W':"!
..:..."':;
KIlday & Aaaoelat..
Landscape Atehiteeta/Plannars
111&1 Forum PI.".. Suite 100A
WHI Pslm IIsoch. Floria 33401
(&81) 881-1&22 . F.. (581) 8811-2592
_.klIdsylno.com
MEMORANDUM
FM:
JO$e Sllutndl
Mouritz, ~ & Associates
ChriSKe~~
May 12, 1000
TO:
DT:
Bay Vlstal response to TRC comment #65
OurfiIe/lI4liS.\
RE:
Although it is not a requirement of the City's Comprehensive Plan or Lan4 Development
Regulations, we would like to further clarify Bay Vista's compliance with the intent of
the two recommendations located under Table 24 of the "Problems and Oppornmities"
section of the Comprehensive Plan. It includes design considerations tIuu can be
included in the funue development approval of a portion of the subject property. The.
The two considerations at issue for the property were:
1. a shoreline buffer zone of 150' feet fromlhe Jew.
2. a variable building setback from the southern property line. It would be based on
the height of the buildings proposed. The setback varies from 40' to 100'
depending on the height of the buildings proposed.
3.
Each of these considerations were included for II specific purpose. Item #1 is designed to
ensure that the existing mangrove adjacent to the JCW would be protected from
development. At the time this provision was written, the exact boundaries of the
manarove were not known. The ISO' 'blanket' setback wa& thought to be extensive
enough to keep bulldings out of the mangrove. However, as part of their due diligence
for the property. Altman Developtncnt has localed the exact juriSdictional limits of the
mangrove. As expected, the mangrove does not run exactly' 150' perpendicular to the
ICW. In fact, it extends almost 400' inland at its widest point, and does not exist at all in
the northeastern and southeastern portions of the site. The proposed Bay Vista site plan
incllldes the acrual location of the mangrove and restricts its development to areas
outside the true mangrove location, We believe that the proposed setbacks from the
mangrove, not the ICW. will serve the purpose of this design consideration more so than
its literal enfoICement.
Item #2 was included to ensure compatibility with the property owners to the south. To
the south is the Hampshire Gardens community. It consists of two-stOI)' condominium
buildings. Their community was concerned that the future development of the subject
. ........._.., '" ..,.............,,_....-., L..~'
I.V.U.::....'
r -".,..:=,
property would be incompatible:. with their own. The proposed site plan for Bay Vista is
of a high quality that makei it compatible with its surroundings. In an effort to meet the
intent of tho desiitl considerations, the developer hili located as feW buildings iii possible
along the southern property Une. Also, the actual layout of the mangrove hili altered the
developable area of the site such that some of the four story buildings are located inside
the 100' setback auidelino. In a purposeful effolt to protect the natural resources on site,
which was the basis for these considerations in the first place, the developer will have
two buildings located within the recommended setbacks.
Altman Development hili held two community meetings at the Hampshire Gardens
clubhouse to present the layout of .the site and present detailed elevate4 drawings. Based
on those fruitful meetings, we fully expect their suppolt of the project at our public
bearinss.
In summary, the intent of the first desIgn auideUnes was to ensure that the existing
maDifoves were protected from development. Literal interpretation of the
recommendation would prevent this. The second design guideline is clearly intended to
ensure compatibility with the Hampshire Gardens development. Based on our feedback
from the residents, we are confident that we have met the lIUe intent of this provision as
well.
DEPARTMENT OF UTILITIES
MEMORANDUM
NO. 00-90
THRU:
Michael W. Rumpf, Director ofPl~i~ and Zoning
John A. Guidry, Utilities Director y~ '
H. David Kelley, Jr., PE/PSM, Utility Engineer .~.
TO:
FROM:
RE:
April 25, 2000; amended May 2, 2000
BAY VISTA (NWSP 00-005) 1sT REVIEW COMMENTS
CONDITIONAL USE & SITE PLAN APPROVAL
DATE:
We offer the following comments on the above noted project:
GENERAL COMMENTS
I) All utility easements shall be shown on the rectified site plan and landscaping drawings so that we
may determine which trees may interfere with utilities. In general, palm trees will be the only tree
species allowed within utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in the foreseeable future.
LDR Sec. 7.5-18.1 give public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public tights-of-way.
2) Palm Beach County Health Department permits will be required for the water and sewer systems
serving this project (CODE Sec. 26-12).
3) Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m.
as stated in LDR Chap. 6, Art. IV, Sec. 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE Sec. 26-16(a)).
4) CODE Sec. 26-34(E) requires that a capacity reservation fee be paid for this project either upon
the request for the Department's signature on the Health Department application forms or within
30 days of site plan approval, whichever occurs first. This fee will be determined based upon final
meter size, or expected demand.
5) Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may
not, therefore, be used for irrigation where other sources are readily available.
6) Provide an engineer's written certification that drainage will conform to all rules of the City and
the South Florida Water Management District (SFWMD) or Florida Department of Environmental
Protection (FDEP), whichever has primary jurisdiction (per LDR Chap. 4, Sec. 7F).
Utility Department Memorandum No. 00-
Bay Vista 1st Review Comments - Conditional Use & Site Plan Approval
April 25, 2000; amended May 2, 2000
Page Two
SPECIFIC CONDITIONS
I. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
CODE Sec. 26-33(a).
2. This office will not require surety for installation of the water and sewer utilities, on conditions
that the systems be fully completed, and given to the City Utilities Department before the first
permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining
the Certificate of Occupancy.
3. LDR Chap. 6, Art. IV, Sec. 16 requires that all points on each building will be within 200 feet of
an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition by
showing all hydrants.
4. Housing units shown east of the north parking garage have no utility lines shown. How are these
units served?
5. The plan shows fire service to the two (2) parking garages. Do these serve the garage(s) only?
Please indicate the line size.
6. The clubhouse is insufficiently covered for fire protection. Please demonstrate that the system
will cover this facility.
7. Appropriate backflow preventers will be required on the domestic water service to the building( s),
and the fire sprinkler line if there is one, in accordance with CODE Sec. 26-207.
8. A scaled drawing showing the site drainage plan shall be submitted (LDR Chap. 4, Sec. 7F).
Delineate the contributing areas. Provide drainage calculations showing the amount of rainfall to
be retained on-site.
9. A building permit for this project shall not be issued until this Department has approved the plans
for the water and/or sewer improvements required to service this project, in accordance with
CODE Sec. 26-15.
JAG:HDK/ck
Xc: H. David Kelley, Jr.
File
C:\My Documents\Bay Vista - Utility Plan Review Comments.doc
Parks / Planninl!: Division Memorandum- TRC
Subject:
Mike Rumpf, Director of Planning and Zoning
Kevin 1. Hallahan, Forester / Environmentalist J<J If
Bay Vista
1st Review- conditional use and site plan approval
To:
From:
Date:
April 20, 2000
I have no conditional use comments. The applicant must obtain permits from the Department of
Environmental Protection (DEP) in reference to the existing mangrove trees on the individual
land parcels combined into the one site plan. The set back requirements for the mangroves may
be a greater distance for the City of Boynton Beach Comprehensive Plan, than the DEP setback
requirements.
There are other existing trees on the three land parcels, which will have to be shown on the tree
survey, and addressed in the tree management plan for the site.
kjh
File
FIRE & LIFE SAFETY DIVISION
Memorandum No. 2000-45
0.,.
Y'."I".'.
,. "
NFPA Life Safety Code 101, National Fire Code 1, all applicable National Fire
Protection Association codes, and the City Fire code shall be adhered to.
FROM:
Steve Gale ~ ./
Fire Marshal ~.
April 13, 2000
.
TO: Mike Rumpf, Director
Planning & Zoning
DATE:
SUBJECT: Bay Vista
SE 23rd Avenue & U.S. #1
NWSP 00-005
A fire flow hydrant test is required LDR 6-16. No part of a structure
may be more than 200' from a hydrant LOR 6-16.
All access roads and hydrants shall be in place prior to above grade
construction NFPA 1. The access gates must be approved by Fire
Marshal as to type and operation prior to installation BBCC 9-15.
Minimum turning radius of North exit must be 45' LDR 23.
cc: File
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO. 00-073
RE:
Michael W. Rumpf, Director of Planning and zo~ /
John A. Guidry, Interim Director of Engineering ~ ~
April 25, 2000
BAY VISTA (NWSP 00-005) 1ST REVIEW COMMENTS
CONDITIONAL USE & SITE PLAN APPROVAL
TO:
FROM:
DATE:
I. On the Site Plan add a general note that all plans submitted for specific permits shall meet
the City's code requirements at time of application. These permits include, but are not
limited to the following: site lighting, paving, drainage, curbing, landscaping and irrigation.
Permits required from other permitting agencies, such as FDOT, PBC, SFWMD,
PBCDERM, L WDD, FDEP and any others, shall be included with the permit request.
2. Add the following notes to the civil plans:
a. All striping, signage and markings shall conform to City Standard Drawing B-98001.
b. The drainage system shall conform to City Standard Drawing B-91007.
Correct all plan details accordingly.
3. Provide several cross sections along the north and south boundary lines depicting the
finished grades between the proposed development and twenty-five (25) feet into the
abutting properties.
4. Add an engineer's certification on the civil plans that the drainage plan will conform to all
rules, regulations and codes ofthe City's Land Development Regulations (LDR).
5. Prior to issuing of any building permits, provide a satisfactory abandomnent of those
easements shown on the boundary survey necessary to construct the proposed
improvements.
6. Show the proposed lighting location on the civil plans as well as the landscape plans. [LDR
Chapter 4, Section 7.B.]
7. A permit will be required from FDEP for the drainage system.
8. Regarding the handicap details:
a. Specify white paint for the handicap pavement symbol and within the 5' accessible
path.
b. Remove the words "Tow Away Zone" from the handicap post sign (see comment #2)
9. Provide an enviromnental study, including a flora and fauna survey, ofthe site for review
and approval by the T.R.C. as specified in LDR Chapter 7.5, Article IV.
Engineering Memo No. 00-073
Re: Bay Vista Conditional Use & Site Plan Approval- I st Review Comments
April 25, 2000
Page Two
10. The parking garage shall conform to the items specified in LDR Chapter 23, Parking Lots.
II. On the Typical Section (Sheet CI) reverse the parking dimensions, i.e., 16-foot dimension
will be adjacent to the "green" area and the 18-foot dimension will be adjacent to the
pedestrian sidewalk.
If there are any questions please contact Dave Kelley at (561) 742-6496 or Ken Hall at (561)
742-6283.
~
JAG:HDK:KRH/ck
C\My Documents\Bay Vista Conditional Use & Site Plan Approval 1st Review.doc
LEISURE SERVICES: PARKS MEMORANDUM #00-49
TO:
Michael Rumpf, Director of Planning & Zoning
John Wildner, Parks Director ~
Barbara J. Meacham, Land~e Planner~
Bay Vista Apartments-New Site Plan
THRU:
FROM:
RE:
Date
April 24, 2000
The Parks Division has reviewed the new site plan for Bay Vista Apartments. The
following recreation-related comments are submitted:
I. In accordance with Chapter I, Article V, Section 3 of the City's Land
Development Regulations, based on 286 multi-family units, the recreation
dedication requirement is calculated to be:
286 d.u. x .015 acres = 4.29 acres
For one-half private recreation credit, 4.29 acres divided by 2 = 2.145 acres.
2. The developer has the option of applying for one-half credit, for the private
recreation provided. In addition to providing 2.145 acres for private recreation, to
earn one-half credit, the developer must provide at least five recreation elements.
The amount of recreation elements shown on the proposed site plan is sufficient,
subject to the following modifications:
a. The developer needs to add permanent barbecue grills and picnic tables to the
proposed pavilion/trellis area
b. The proposed swimming pool needs to be increased in size so that minimum
dimensions are 20' x 50'.
c. Layout (including length) of the path must be shown on the permit submittal.
Path must be constructed of asphalt, concrete or similar permanent material.
d. More information must be supplied concerning the equipment, material
provided and size of the recreation building to ensure it is sufficient to the
meet the needs of the residents.
e. Another tennis court, half basketball court, or racket ball court needs to be
provided in addition to the one tennis court proposed.
~
Parks Memorandwn #OO-4~
Bay Vista Apartments-New Site Plan
Page 2
3. The developer may choose to pay the full recreation impact fee. Using that
option, no private recreation needs to be provided.
Parks / Planninl!: Division Memorandum- TRC
To:
Mike Rumpf, Director of Planning and Zoning
Kevin J. Hallahan, Forester / Environmentalist /<J II-
Bay Vista
1st Review- conditional use and site plan approval
From:
Subject:
Date:
April 20, 2000
I have no conditional use comments. The applicant must obtain permits from the Department of
Environmental Protection (DEP) in reference to the existing mangrove trees on the individual
land parcels combined into the one site plan. The set back requirements for the mangroves may
be a greater distance for the City of Boynton Beach Comprehensive Plan, than the DEP setback
requirements.
There are other existing trees on the three land parcels, which will have to be shown on the tree
survey, and addressed in the tree management plan for the site.
kjh
File
PUBLIC WORKS DEPARTMENT
MEMORANDUM #00-061
VIA:
~~,.-
00 ~ (f6 [S n c. ." ,
01",,9 ."
Mike Rumpf, Director of Planning & Zoning U! A DP I \1
Christine Roberts, Interim Public Works Director ~ t
l
TO:
" ,';
J
FROM:
Larry Quinn, Solid Waste Manager
DATE:
April 14,2000
SUBJECT:
I st Review _
Project -
Location -
Conditional Use and Site Plan Approval
Bay Vista
On the eastern terminus of S.E. 23'd Avenue
on the east side of US I.
Kilday and Associates, Inc.
NWSP 00-005
Agent -
File No. -
The Public Works Department cannot approve this until we have more information on
garbage and refuse disposal; i.e., dumpsters, compactors, and locations for pick-up.
If you have any questions please contact me at (561) 742-6200.
LQ/pl
Attachment
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 00-118
TO:
Michael Rumpf, Director of Planning and Zoning
FROM:
Michael E. Haag, Building Code Administrator
DATE:
May I, 2000
RE:
Bay Vista - New Site Plan (NWSP 00-005) 1st review comments
We have reviewed the plans for the above-referenced project. The applicant must acknowledge
and address the below listed comments before the Building Division will recommend that the
project be presented to the Board for their review.
Buildinl!: Division (Permit & Site Snecific Comments) - Michael E. Haal!: (561) 742-6352
I. Add to the buildings that are depicted on the site plan a labeled symbol that identifies the
location of the proposed handicap accessible units. Add to the drawing the calculations
that were used to identify the minimum number of required accessible units. Also, state the
code section that is applicable to the computations. Show and label the same units on the
applicable floor plan drawings.
2. Add to the buildings that are depicted on the site plan a labeled symbol that identifies the
location of the handicap accessible entrance door to each of the handicap accessible units.
Show and label the same handicap accessible entrance doors on the drawing titled floor
plan.
3. Add to the drawing the calculations that were used to identify the minimum number of
required handicap accessible parking spaces. Also, state the code section that is applicable
to the computations. Move the two accessible parking spaces that are located along the
south property line ofthe project closer to the accessible unites). What is the reason that
there is not an accessible parking space near the entrance to the clubhouse or the tennis
court?
4. Add a labeled symbol to the site plan that represents and delineates the path oftravel of the
accessible route that is required between the accessible parking spaces and the accessible
entrance doors to the accessible units. The symbol shall start at the accessible parking
spaces and terminate at the accessible entrance door to the unit. Also, show the symbol
leading to each of the recreational amenities provided for the project including the
boardwalk from the accessible units. The symbol shall represent the location of the path of
travel, not the location of the detectable warning or other pavement markings that are
required to be installed along the path. The location of the accessible path shall not compel
the user to travel in a drive/lane area that is located behind parked vehicles. Identify on the
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan - 1 st review comments
May 1,2000
Page Two
plan the width of the accessible route (Note: The minimum width required by the code is
forty-four (44) inches). Add text that would indicate that the symbol represents the
accessible route and the route is designed in compliance with regulations specified in the
Fair Housing Act. Please note that at time of permit review the applicant shall provide
detailed documentation on the plans that will verify that the accessible route is in
compliance with the regulations specified in the Fair Housing Act. This documentation
shall include, but not be limited to, providing finish grade elevations along the path of
travel.
5. Within the site data found on the sheet titled site plan, identify the proposed finish floor
elevation of all of the proposed buildings (lowest floor elevation). Verify that the proposed
elevation is in compliance with regulations of the code by adding specifications to the site
data that address the following issues:
a) The design professional-of-record for the project shall add the following text to the site
data. "The proposed floor elevation _' _ NGVD is above the highest 100-year
base flood elevation applicable to the building site, as determined by the South Florida
Water Management District's surface water management construction development
regulations." [Section 3107.1.2, Chapter 31 of the Boynton Beach amendments to the
1997 edition of the Standard Building Code]
b) From the FIRM map of the subject area, identify the title of the flood zone that the
buildings are located within. Where applicable, specify the base flood elevation. If
there is no base flood elevation, indicate that on the plans.
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the buildings that are shown on the site plan, ground floor plan
and the paving and drainage drawing.
6. Either add to the project the lots that are shown on the survey east of the subject project or
show on the site plan the appropriate street frontage and access to the lots. At time of 2nd
review, submit a proposed survey showing the proper access and street frontage.
7. Add to the drawing titled site plan all of the easements that are shown on the survey. The
location, type and size of the easements shall be shown and identified on the site plan.
Where applicable, amend the plans so that structures do not encroach into an easement.
The site plan shows that there are buildings and structures encroaching into easements.
Amend the drawings accordingly.
8. At time of permit review, submit a copy of the recorded resolution that verifies the
abandomnent of the ingress & egress easement and drainage easement that are shown on
the plan within the area of a building or structure.
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan - 1st review comments
May 1, 2000
Page Three
9. IdentifY on the site plan the structures that are shown on the plan located north and east of
the pool. Also, identifY the structure that is shown near the middle of the boardwalk and
near the main entry gates.
10. At time of permit review, provide a completed and executed City unity oftitle form. The
form shall describe all lots, parcels or tracts combined as one lot. A copy of the deed with
legal descriptions of each property that is being unified shall be submitted when processing
the form. The property owner that is identified on each deed shall match the property
owner that is identified on the form.
II. At time of permit review, the site plan shall identifY the actual distance that each
building/structure is set back from the adjacent property lines. Please note that overhangs,
covered walkways, canopies, awnings or other appurtenances that are attached to the
building shall be considered when identifying building setbacks. Therefore, identifY the
width of the proposed overhang, covered walkways, canopies, awnings, and/or other roofed
areas that extend out beyond the main walls of the building. The building setbacks shall
comply with setback regulations specified in the Zoning Code.
12. To properly determine the impact fees that will be assessed for the 2-story clubhouse,
provide the following information:
Submit a notarized affidavit on the letterhead of the property owner, company or
association. The letter will list and must contain an answer to the following questions.
a) Will the Clubhouse building be restricted to the residents of the entire project only?
b) Will the residents have to cross any major roads or thoroughfare to get to the
Clubhouse/Recreation building?
c) Will there be any additional delivery to the site?
d) Will there be any additional employees to maintain and provide service to the site?
Once this information is complete and submitted, the City will transmit it to the Palm
Beach County Impact Fee Office for a determination on the impact fee.
13. Add to the submittal an elevation view drawing of the proposed entry sign/fence/columns.
Identify the type of the material. Also, provide a typical section view drawing of the
sign/fence/columns that identifies the height that the sign/fence/columns are above finish
grade.
14. Add to the submittal an elevation view drawing of the proposed structures that are shown
on the site plan near the pool and near the front entry gates. IdentifY the type of the
material.
Building Division Memo No. 00-118 to Michael Rumpf
RE: Bay Vista - New Site Plan -1 st review comments
May I, 2000
Page Four
15. Add to the individual unit floor plan drawings a breakdown of the area within the unit. The
area breakdowns for each unit shall specify the total area of the unit, area of the balcony,
total area that is air-conditioned and, where applicable, total area of storage and garage
space. If the garage and storage areas are not part of a specific unit, the area shall be
included and identified within the area of the building.
16. Add to the site data the total area under roof of each residential building. Provide tabular
area data for each building. The data shall include a breakdown of area for each floor of
each building. The breakdown shall include the following areas (each area shall be labeled
on the applicable floor plan drawing):
a) common area covered walkways,
b) covered stairways,
c) common area balconies,
d) entrance area outside of a unit,
e) storage areas (not part of a unit),
f) garages (not part of a unit),
g) elevator room,
h) mechanical room,
i) trash room,
j) mailbox pickup and delivery area, and
k) Any other area under roof.
[Chapter 4 - Site Plan Review, Section 7. E. 2. And 3.]
17. On the floor plan drawing of building III, identify the location of the elevator room,
mechanical room, trash room and mailbox pickup and delivery area.
18. At time of permit review, submit for review an addressing plan for the project.
MEH:bg
J:\SHRDA T A\Development\Building.6870\Documents\TRC\NWSP 00-005 1st review Bay Vista. doc
DEPARTMENT OF DEVELOPMEN .
MEMORANDUM NO. PZ 00-096
TO:
TRC MEMBERS
Bob Borden, Deputy Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Rob Riggle, Police Department
Pete Mazzella, Utilities Department
Michael Haag, Building Division
Larry Quinn, Public Works Department
Barbara Meacham, Parks Division
David Kelley, Engineering Department
Frantz LaFontant, Engineering Department
FROM:
Michael W. Rumpf
Director of Planning and Zoning
DATE:
April 11 th 2000
RE:
SITE PLAN REVIEW PROCEDURES
1 ST Review - Conditional Use and Site Plan Approval
Project - Bay Vista
Location - On the eastern terminus of S.E. 23"' Ave. on the east side of US 1.
Agent Kilday & Associates, Inc.
File No. - NWSP-00-005
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments or e-mail to Blythe Williamson and I no
later than 5:00 P.M. on Mav 2nd. 2000. When preparing your comments, please separate them
into two categories; code deficiencies with code sections referenced and recommendations that
you believe will enhance the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments.
2. The documents submitted for the project were determined to be substantially complete with the
exception of traffic data, however, if the data provided to meet the submittal requirements is
insufficient to properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be requested by
the reviewer by contacting Lusia Galav, or myself.
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents.
4. Technical Review Committee member(s) shall identify in their comments when the plans depict or
Page 2
when the location and installation of their departmental required improvements may conflict with
other departmental improvements.
5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name
of the appropriate TRC Member that is responsible for the review specified.
6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me. The memorandum shall state that the plans are approved and that
they do not have any comments on the plans submitted for review and that they recommend the
project be forwarded through the approval process.
All comments shall be typed, addressed and transmitted or e-mailed to Blythe Williamson and I for
distribution to the applicant. Please include the name and phone number of the reviewer on this
memorandum or e-mail. Lusia Galav will be the Planning and Zoning staff member coordinating the
review of the project. First review comments will be transmitted to the applicant along with a list of
Technical Review Committee (TRC) members.
MWR:blw
Attachment
xc: Steve Gale, Fire Marshal
Marshall Gage, Police Department
John Guidry, Utilities Director and Interim Director of Engineering
Don Johnson, Building Division
Christine Roberts, Director of Public Works
Central File
\\CH\MAIN\SHRDATA\Planning\SHARED\WP\PROJECTS\BAYVISTA NWSP\1sl Review Plans Memo for Bay Vista.doc
APPLICATION TRACKING LOG
PROJECT TITLE: Bay Vista FILE #: NWSP-OO-OoS 81.- S;-
PROJECT LOCATION: On the eastern terminus of S.E. 23rd Ave. on the east side of US 1.
TYPE OF APPLICATION: New Site Plan
PUBLIC NOTICE REQUIRED: (Y/N) REVIEWER'S NAME: Lusia Galav
AGENT: Kildav 8[ Associates, Inc. ADDRESS: 1 S51 forum Place, Suite 100A WPB, FL 33401
AGENT PHONE: 561-689-5522 FAX: 561-689-2592
DATE REC'D: April 10th 2000 AMOUNT: $1,500.00
RECEIPT NO.: 15240
12 SETS OF PRE-ASSEMBLED PLANS SUBMIITED FOR REVIEW:
2 OF 12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
APPLlCATlON/SUBMIITAL: DATE ACCEPTED: April 11, 2000 DATE DENIED:
DATE OF LEITER TO APPLICANT IDENTIFYING SUBMISSION DEFICIENCIES:
DATE OF SUBMIITAL ACCEPTANCE LEITER:
INITIAL 1 ST REVIEW MEMO: DATE SENT: April 11, 2000 MEMO NO. 00-095 RETURN DATE: May 23rd 2000
1 ST REVIEW COMMENTS RECEIVED
PLANS MEMO# DATE PLANS MEMO# DATE
UTlL. 0 POLICE 0
P.W. 0 PLANNING 0
PARKS 0 BLDG/ENGR 0
FIRE 0 FORESTER 0
DATE OF LEITER SENT TO APPLICANT IDENTIFYING TRC REVIEW COMMENTS:
90-DAY CALENDAR DATE WHEN APPLICATION BECOMES NULL AND VOID:
DATE 12 COMPLETE (ASSEMBLED) SETS OF AMENDED PLANS SUBMIITED FOR 2ND REVIEW:
PRE-ASSEMBLED PLANS SUBMIITED FOR REVIEW:
AMENDED APPLICATION 0
2 OF12 SETS SIGNED AND SEALED 0
SURVEY 0
LANDSCAPE PLAN 0
FLOOR PLAN 0
SITE PLAN WITH SITE DATA 0
2ND REVIEW MEMO: DATE SENT:
DRAINAGE PLAN
ELEVATION VIEW DRAWINGS
COLORED ELEVATIONS RECEIVED
MATERIAL SAMPLES RECEIVED
TRANSPARENCY RECEIVED
PHOTOGRAPHS RECEIVED
o
o
o
o
o
o
MEMO NO.
RETURN DATE: