This letter serves as response to all comments and concerns for the above-
mentioned project, which are individually addressed as follows:
A. PUBLIC WORKS - GENERAL. Mr Ken Hall:
1 Item acknowledged.
2. Item acknowledged. The 450 angle is now revised to reflect 700
3. Item acknowledged.
B. PUBLIC WORKS - TRAFFIC: Mr Jeffery Livergood:
No Comments
C UTILITIES: Mr H. David Kelley, Jr
4 Item acknowledged. I will be requesting the fire flow calculations
from the fire department today
5. We have added a hydrant near the entrance, which will be
discussed today I have verbal approval from Mr Steve Gale on
my location.
6. Their existing environmental review permit is in the process of
being renewed. There is no manufacturing process on this site, no
waste stream.
3750 Investment Lane, Suite 2, West Palm Beach, FL 33404-1765
Office (561) 863-9004 Fax (561) 863-9007
Mr Michael W Rumpf
Planning and Zoning Department
January 23, 2001
Page 2
D FIRE DEPARTMENT. Mr Bob Borden:
7 Please see attached utilities plan (added sheet) including proposed
hydrant location. Per Steve Gale, the existing gates are fine since
they will simply remove the gate lock in case of an emergency
E. ENGINEERING DIVISION: Mr H. David Kelley, Jr
8. With all due respect, I did not feel that additional survey work
outside of the property was warranted for this simple addition. We
are maintaining the same finish floor elevation as the adjacent
structure and we are not performing any improvements adjacent to
the neighboring parcels.
9. The site lighting for this project is already existing per sheet 101
The site plan shows the two (2) light poles, which should satisfy the
photometrics requirements for additional paving to the east. If a
photometrics test warrants the addition of a wall pack on the new
addition, we shall coordinate at the appropriate time.
10 The site plan, sheet 101, shows all required striping for the
additional spaces and the loading zone. No new signage is
required.
11 In our pre-application meeting with Ms. Lusia Galav and Mr Jose
Alfaro, we were told that we should not have to conform to the
island and curbing requirements since this was an existing
condition in an industrial zone.
12.a. Please see revised note NO.7 on sheet 101
12.b. Item acknowledged. See revised sheet 101
F BUILDING DIVISION: Mr Don Johnson:
13. Item acknowledged. See labeling on sheet 101 This facility is
already existing. We are simply adding on to the existing building,
which is already accessible.
14 Item acknowledged.
15. Item acknowledged.
Department of Engineering
and Public Works
Po. Box 21229
West Palm Beach, FL 33416-1229
(561) 684-4000
www.co.palm.beach.fl.us
.
Palm Beach County
Board of County
Commissioners
Warren H. Newell, Chairman
Carol A. Roberts, Vice Chair
Karen T. Marcus
Mary McCarey
Burt Aaronson
Tony MasHaW
Addie L. Greene
County Administrator
Robert Weisman
"An Equal Opportunity
AffirmatIve Action Employer"
@ printed on recycled paper
December 22, 2000
Mr Michael W Rumpf
Director of Planning & Zoning
Department of Development
City of Boynton Beach
PO Box 310
Boynton Beach, FL 34425-0310
RE: Ideal Auto Paint and Body Shop
TRAFFIC PERFORMANCE STANDARDS REVIEW
Dear Mr Rumpf:
The Palm Beach County Traffic Division has reviewed the traffic statement (received
on December 21 ,2000) forthe project entitled; Ideal Auto Paint & Bodv Shop. pursuant
to the Traffic Performance Standards in Article 15 of the Palm Beach County Land
Development Code. The project is summarized as follows:
Location:
Municipality.
Existing Uses:
Proposed Uses:
New Daily Trips:
Build-out Year'
610 Industrial Avenue
Boynton Beach
1,400 SF Office, and 5,214 SF Auto Paint & Body Shop
Addition of 1,600 SF Auto Paint & Body Shop
41
2001
Based on our review, the Traffic Division has determined that the project meets the
Traffic Performance Standards of Palm Beach C;;ounty
If you have any questions regarding this determination, please contact me at 684-4030.
Sin~e'cly,
OFFICE OF THE COUNTY ENGINEER
I
/2/j
i
Masoud Atefi, MSCE \
Sr Engineer - Traffic DiVision
cc: Collins & Collins inc. Consulting Engfneers
File: General - TPS - Mun . Traffic Study Review
F"\TRAFFIC\ma\Admin\Approvals\001220.doc
? R
\....,.
'00
Facsimile
TRANSMITTAL
CITY OF BOYNTON BEACH
100 E. BOYNTON BEACH BOULEVARD
P.O. BOX 310
BOYNTON BEACH, flORIDA 33425-0310
FAX: (561) 742-6259
PLANNING AND ZONING DIVISION
to: Gregory L. Celentano
fax#: 561-863-9007
date: December 26, 2000
from. Lusia Galav '1f /l /~ l-"L>
re: 1" Review Comments for Ideal Paint and Body Shop
Please find attached the first review comments for your project. To stay on the current review schedule, please do the
following steps listed below, and bring all documents to the TRC scheduled for January 23, 2001.
1 Revise your plans incorporating all comments listed herein, including the addition of
notes on plans to confirm response to general statements/ comments, and bring 10 copies
to the TRC review meeting (full sets including all pages originally submitted);
2. Submit the additional information as requested within the attached comments; ( i.e. traffic
analysis, engineering certification, etc.)
3 Prepare a written response (7 copies) consisting of a list briefly summarizing how each
comment has been addressed on the revised plans or with the supplemental information
including location on the plans ( this promotes an expeditious 2nd review by staff and
your project representatives during the TRC meeting );and
4
Submit reductions (8 Y, X 11) for the proposed site plans, elevations and landscaping plan
(this is required for the final report and public
presentation).
Planning and Zoning DWlsion
City of Boynton Beach
Boynton Beach, Florida 33425
The applicant should not attend a TRC (2nd review) until
all documents have been revised and copied for staff
742-6260
Fox: 742-6259
review If plans will nDt be fully revised and brDught tD the scheduled TRC meeting, cDntact
Lusia Galav in this Dffice by the Thursday priDr tD the scheduled meeting date. PrDjects
deviating from the Driginal schedule are eligible fDr review at subsequent meetings, which are
held every Tuesday TD reschedule, contact Blythe WilliamsDn, by the Thursday prior to the
Tuesday TRC meeting that YDU desire to attend. The remainder of the review schedule will be
adjusted accordingly If you have questions Dn the attached cDmments, please contact the
respective reviewer using the attached list ofTRC representatives.
lithe plans are reasonably complete and all significant comments are addressed following TRC
(2nd review), the project is fDrwarded to the Planning and Development Board Meeting that falls
approximately 2 to 3 weeks following the TRC meeting. An "*,, by any comment identifies a
comment that must be addressed prior to moving forward to the Planning and Development
board.
Note: Items recognized by staff as typically outstanding at this point include a traffic report
and/or confirmation of the traffic concurrency approval from the Palm Beach County
drainage certification by a licensed engineer, signed "Rider to Site Plan Application"
form and colored elevations of the proposed project. This infDrmation is necessary for
the proj ect to proceed. If you have submitted this information, please disregard this note.
Engineering John Guidry H. David Kelley Jr 742-6488 742-6285
Building Timothy Large DDn J Dhnson 742-6352 742-6357
Fire Department Steve Gale BDb Borden 742-6602 364-7382
Eric Wandell 742-6603 364- 7382
Police Department Marshall Gage Officer JDhn Huntington 737-3136 742-6185
Officer Louie Zeitinger 737-3136 742-6185
Utilities John Guidry H. David Kelley Jr. 742-6488 742-6285
Public W Drks-General Larry Quinn Ken Hall 742-6283 742-6285
Public W orks- Traffic Jeffery Livergood 742-6201 742-6211
Parks & Recreation John Wildner Barbara Meacham 742-6227 742-6233
Forester/Environmentalist Kevin Hallahan Kevin Hallahan 742-6267 742-6259
Planning & Zoning Michael Rumpf, Lusia Galav 742-6262 742-6259
CHAIRMAN
Revised 11/03/00
]:\SHRDAT A\PlIlRning\SHARED\WP\PROJECTS\JdeaJ Pan'll and Body Shop 20001]st Review commellts to applicanl.doc
1 st REVIEW
New Site Plan
Project name: Ideal Paint & Body Shop
File number NWSP 00-020
Reference: I "review plans identified as New Site Plan. File # NWSP 00-020 with a December 4.2000
Plannin" and Zonin" Denartment date stamn markin".
I DEPARTMENTS I INCLUDE I REJECT !
PUBLIC WORKS - General
Comments:
I Add to the dumpster note that the gates shall have steel rods to drop into
drilled holes in the concrete and asphalt to lock the door in open and closed
conditions.
2. Orient the dumpster pad so that the opening faces 20 degrees to the
southwest.
3 Widen the loading zone an additional five feet to the east to provide back-up
room for the dumpster truck.
PUBLIC WORKS - Traffic
Comments: NONE
UTILITIES
Comments:
GENERAL COMMENTS
4 Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in LDR Chap. 6, Art. IV, Sec. 16, or the
requirement imposed by insurance underwriters, whichever is greater (see
CODE Sec. 26-16(a)).
SPECIFIC CONDITIONS
5 LDR Chap. 6, Art. IV, Sec. 16 requires that all points on each building will
be within 200 feet of an existing or proposed fire hydrant. Please demonstrate
that the plan meets this condition, bv showing all hvdrants.
6. The waste stream from the manufacturing process or the use of hazardous
materials (paint) must meet the City's pretreatment requirements. If one is not
present on this site, a sampling point must be provided to allow monitoring of
this waste stream (refer to CODE Sec. 26-143, Sec. 26-147).
FIRE
Comments:
7 No water/fire hydrant distribution plan was provided LDR 6-16. A fire flow
test is reuuired LDR 6-16. A fire hvdrant reuuired with 200' of any part of
1ST REVIEW COMMENTS Ideal Paint & Body.doc
12/26/00
2
I DEPARTMENTS I INCLUDE I REJECT I
structure LDR 6-16. Any access gates require approval from the Fire Marshal
BBCC Chanter 9
ENGINEERING DNISION
Comments:
GENERAL CONDITIONS
8. Provide topography of the adjacent lands and depict the finished grades
between the proposed development and twenty-five (25) feet into the abutting
properties.
9 Provide the proposed location of the site lighting as specified in LDR, Chap.
4, Sec. 7(B):
10 Provide the proposed signing and striping plan as specified in LDR, Chap. 4,
Sec. 7(B). Add the following note that "all striping and signage shall conform
to Citv Standard Drawing B-9800 I "
SPECIFIC CONDITIONS
II Provide curbed landscape islands [maximum of 10 parking spaces between a
landscape island and end spacel (LDR, Chap. 23, Art. II, Sec. E.).
12. Proposed property signage:
a) Specify that there is no signage associated with the subject parking lot
(LDR, Chap. 4, Sec. 7(B)).
b) Add the standard "Stop" bar and "Stop" sign at the driveway exit.
BUILDING DNISION
Comments:
13 Add a labeled symbol to the site plan drawing that represents and delineates
the path of travel for the accessible route that is required between the
accessible parking spaces and the accessible entrance doors to the building.
The symbol shall start at the accessible parking spaces and terminate at the
accessible entrance doors to the building. The symbol shall represent the
location of the path of travel, not the location of the detectable warning or
other pavement markings that are required to be installed along the path. The
location of the accessible path shall not compel the user to travel in a
drive/lane area that is located behind parked vehicles. Identify on the plan the
width of the accessible route. (Note: The minimum width required by the
code is forty-four (44) inches). Add text to the drawing that would indicate
that the symbol represents the accessible route and the route is designed in
compliance with Section 4.3 (Accessible Route) and 4.6 (Parking and
Passenger Loading Zones) of the Florida Accessibility Code for Building
Construction. Please note that at time of permit review, the applicant shall
provide detailed documentation on the plans that will verifv that the
1ST REVIEW COMMENTS Ideal Paint & Body.doc
12/26/00
3
DEPARTMENTS INCLUDE REJECT
accessible route is in compliance with the regulations specified in the Florida
Accessibility Code for Building Construction. This documentation shall
include, but not be limited to, providing finish grade elevations along the path
of travel.
14. The design professional-of-record for the project shall add the following text
to the site data. "The proposed finish floor elevation _NGVD
is above the highest 100-year base flood elevation applicable to the building
site, as determined by the South Florida Water Management District's surface
water management construction development regulations."
15 From the FIRM map, identify in the site data the title of the flood zone that
the building is located within. Where applicable, specify the base flood
elevation. If there is no base flood elevation, indicate that on the plans.
16. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan. Add to
the floor plan drawing a labeled symbol that identifies the location of the
handicap accessible entrance doors to the building. The location of the doors
shall match the location ofthe accessible entrance doors that are depicted on
the site plan drawing.
17 As required by Chapter 4, section 7 of the Land Development Regulations,
submit elevation view drawings of the building. Dimension on the drawing
the overall height of the building. The overall height of a building shall be
measured from finish grade to the highest point of the roof or parapet wall.
The overall height ofthe building shall not exceed the height limitations of
the Zoning Code.
18. Add to the site plan drawing all existing easements that are shown on the
survey Also, add all proposed easements. The location, type and size of the
easement(s) shall be shown and identified on the site plan. Where applicable,
amend the plans so that structures do not encroach into an easement.
19 Place a note on the elevation view drawings indicating that the wall openings
and wall construction comply with Table 600 of the 1997 edition of the
Standard Building Code.
20. The occupancy classification shall be as defined in the 1997 edition of the
Standard Building Code, including the Boynton Beach Amendments to the
Building Code (Ordinance #99-16). 'Note on site plan and floor plan.
21 Indicate on the site plan, within the floor area of the new and existing
buildings, the primary use of the structures/facilities.
22. Indicate on the floor plan drawing, within the footprint of the building, the
1ST REVIEW COMMENTS Ideal Paint & Body.doc
12/26/00
4
DEPARTMENTS INCLUDE REJECT
primary use of the structure/facility If the building is an expansion of an
existing building, indicate with the footprint of the new and existing building
the primary use of the structure/facility
23 IdentifY on the site plan drawing the actual distance that the building is set
back from the north, east, south and west property lines. Please note that
overhangs, covered walkways, canopies, awnings or other appurtenances that
are attached to the building shall be considered when identifying building
setbacks. Therefore, identify on the plans the width of the proposed
overhangs, covered walkways, canopies, awnings, and/or other roofed areas
that extend out beyond the main walls of the building. The building setbacks
shall complv with setback regulations specified in the Zoning Code.
24. To verify that the proposed building is in compliance with the applicable
building setbacks, show and dimension on the site plan the width of the
building overhang. Also, identify the size or width of the covered walkways,
awnings, canopies and/or other roofed areas that extend out beyond the main
walls of the building.
25 At time of permit review, submit signed and sealed working drawings of the
prooosed construction.
26. On the floor plan drawing, identifY the location of the mechanical room and
electric room, if aoolicable.
27 The applicant has shown no interior improvements to the floor plan. It will be
assumed that this proposed addition shall be a shell building and separate
permits shall be required for interior improvements.
PARKS AND RECREA nON
Comments: NONE
FORESTER/ENVIRONMENTALIST
Comments:
28. The landscape plans should indicate if there are any desirable trees, and their
locations on the site. The project should continue in the normal review
process.
PLANNING AND ZONING
Comments:
29 Indicate on the landscape plan that mulch "other than Cypress" will be used.
Revise note to reflect this reauirement (Chao. 7.5, Art. II, Sec. 5).
1ST REVIEW COMMENTS Ideal Paint & Body.doc
12/26/00
5
DEPARTMENTS INCLUDE REJECT
30. Indicate whether plant material is native species. At least 50% of planting
material should be native species (Chap. 7.5, Art. II, Sec. 5.P ).
31 Indicate 10 foot site triangles at the entranceway (Chap. 7.5, Art. II, Sec.
S.H.I ).
32. All trees must be a minimum of 12 feet high with a 3-inch caliper (Chap. 7.5,
Art. II, Sec. 5 C.2.).
33 The required 7 foot landscape strip along Industrial A venue must be planted
with a layer of colorful shrubs and ground cover in addition to the plant
material shown. This layer may be planted at project comers (Chap. 7.5, Art.
II, Sec. S.D.).
34 No signage was submitted with these plans. Any proposed sign will require
separate review and approval.
35 The environmental review permit for this site must be updated. Submit
application and file to Planning and Zoning Department.
36. Indicate height of dumpster wall enclosure as six (6) feet on the site plan and
dumpster detail.
MWRlblw
J:\SHRDATA\PLANNINGISHARED\WP\PROJECTSIIOEAL PAINT AND BODY SHOP 2000\1ST REVIEW COMMENTS IDEAL PAINT & BODY. DOC
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Building
Planning & Zoning
Engineering
Occupational License
Community Redevelopment
December 18, 2000
Mr Masoud Atefi MSCE, Senior Traffic Engineer
Palm Beach County Traffic Division
Department of Engineering and Public Works
POBox 21229
West Paim Beach, Florida 33416
Re: Traffic Study' Ideal Paint and Body Shop
NWSP 00-020
Dear Mr Atefi:
The enclosed traffic generation statement for the Ideal Paint and Body Shop prepared by Collins
and Collins Inc. Consulting Engineers, waS received by Planning and Zoning recently for the
above-referenced application. Piease review the enclosed information for conformance with the
County's Traffic Performance Standard Ordinance, and provide Tim Large, Building Code
Administrator, and I with your written response.
If you have questions regarding this matter, piease cali me at (561) 742-6260.
Sincerely,
d", ildu/ ~
Michael W Rumpf
Director of Planning and Zoning
MWR/bw
J:ISHRDATAIPlanningISHAREDlWPIPROJECTSlldeal Pain! and Body Shop 2000lTRAFFIC MEMO IDEAL PAINT AND BODY doc. doc
America'5 Gateway to tlte Gulfstream
100 East Boynton Beach Blvd., P.O. Box310 Boynton Beach, Florida 33425-0310 Phone: (561) 742w6260 FAX: (561) 742-6259
LETTER OF TRANSMITTAL
FROM:
A AHRENS
AI COMPANIES
Date ~~~ 4 2-0-00
Project J.L..M P MM''+- + e.o~
Location ~~o ~t~1 ~.
Attention ~ Le
(561) 863-9004 Fax (561) 863-9007
3750 Investment Lane, Suite 2, West Paim Beach, FL 33404-1765
Re:
TO'
~it: ~lL~-P LDI("u--kr
U e>.f. " &~J-"
~l tl,oyJ.;l;"J ~ ~;'1 ~ Oef-r.
~^~ ~~ d. " ~1-
c;\'1€ f~ MPf4Jv~
GENTLEMEN:
WE ARE SENDING YOU
o PRINTS
o HEREWITH ~DElIVERED BY HAND
THE FOLLOWING ITEMS:
o SHOP DRAWING
o UNDER SEPARATE COVER
VIA
o PLANS
o ESTIMATES
o SAMPLES
o SPECIFICATIONS
o COpy OF LETTER
o
I
Z-
Description
Copies Date or No.
,-J
SloW"
101
lE)I 24>1
Q '2--
THESE ARE TRANSMITTED AS INDICATED BELOW
~ FOR YOUR USE 0 APPROVED AS NOTED
~FOR APPROVAL 0 APPROVED FOR CONSTRUCTION
~AS REQUESTED 0 RETURNED FOR CORRECTIONS
~FOR REViEW & COMMENT 0 RETURNED AFTER LOAN TO US
o
o RETURN
o SUBMIT
o RESUBMIT
o FOR BIDS DUE
CORRECTED PRINTS
COPIES FOR
COPIES FOR
Remarks:
PI~'U2. GJi It <t o~ ~ ~
-n....a....k o/rAJ...
qlAQS~S;
IF ENCLOSURES ARE NOT AS INDICATED
PLEASE NOTIFY US AT ONCE.
Signed: