SITE PLAN REVIEW STAFF REPORT
PLANNING AND DEVELOPMENT BOARD AND CITY COMMISSION
April 13, 2001
DESCRIPTION OF PROJECT
Project Name/No.. High Ridge Commerce Park PID, Lot 17/ NWSP 01-002
Property Owner' Condor Investment of Palm Beach
(C.M.S.I., Contract Purchaser)
Applicant/Agent: Michael Sipula, JMS Design
Location: Address: 160 Commerce Road
Lot 17, Block 2 "Cedar Ridge, a P.U.D and High Ridge Commerce Park, a P.I.D"
Land Use/Zoning: Industrial/ PID (Planned Industrial District)
Type of Use: Office / Warehouse
Project size: Site Area: 1.26 acres (55,170.9 square feet)
Building area: 16,980 square feet (30.7%)
Adjacent Uses: (see Exhibit "A" - Location Map)
North - Commerce Road right-of-way, farther north is Depuy South Florida, Inc., zoned
PID;
South
Waste Management Inc. of South Florida, zoned M-1,
East
Amerope, zoned PID;
West
Lot 18 High Ridge Commerce Park, under construction, zoned PID
Site Characteristics: The subject site is a rectangular-shaped lot that includes an abandoned portion (54 feet) of the
Miner Road right-of-way According to the survey, a temporary electric box is located along the
center of the western property line and will be removed prior to developing the parcel.
Proposal: This proposal is to construct a one-story, 16,980 square-foot office I warehouse building on a
1.26-acre parcel. The design of the building will accommodate four (4) individual tenants. As
currently proposed, Space A will be 4,980 square feet and Space B, C, and D will be 4,000
square feet each. The specifications for each bay area are conceptual and may vary in order to
satisfy the needs of the individual tenant and applicable codes. The dumpster will be located in
the southwest corner of the site. Four (4) loading zones are proposed in the front of the building
(see west elevation). The entire project is to be constructed in one phase (see Exhibit "B"
Proposed Site Plan).
Concurrency'
a. Traffic.
A traffic statement for this project was submitted and was sent to the Palm Beach County
Traffic Division for their review and approval. The Palm Beach County Traffic Division
determined the project met the Traffic Performance Standards of Palm Beach County
b. Drainage-
Conceptual drainage information was provided for the City's review. The Engineering
Division is recommending that the review of specific drainage solutions be deferred until
time of permit review.
Page 2
High Ridge Commerce Park Lot 17 - Site Plan Review Staff Report
Memorandum No. PZ 01-069
Driveways: On-site traffic circulation will consist of one proposed two-way driveway providing access from
Commerce Road. This entrance is 27 feet wide and is located in the northwest corner of the
property
Parking Facility' A total of 34 parking spaces are required for the proposed use based on the ratio of one (1)
space per 500 square feet of total floor area. The total number of parking spaces provided
equals 39, of which, two (2) spaces are designated for handicap use. All 900 spaces, except the
two handicap spaces will be dimensioned nine feet by eighteen feet (9' x 18') and will include
wheelstops. All parking spaces and drive aisles will be located along the west and north sides of
the building. The east and south sides of the building will be landscaped and contain no
provision for parking.
Landscaping: The plan exceeds the minimum landscape requirements as set forth in the City Code. A Wax
Myrtle hedge exists on the adjacent property along the east property line. Redtip Cocoplum
hedges are proposed along the north, west, and south property lines. The north (front) property
line will contain four (4) clusters of Ixora "Nora Grant" mixed with Indian Hawthorne. Each cluster
of plant material will surround a Live Oak Tree. Five (5) Live Oaks are also proposed along the
rear property line. Staff recommends that these Live Oaks be substituted with Sweet Mahogany
trees in order to be consistent with the trees found in the rear perimeter landscape buffers of
surrounding properties. Seven (7) West Indies Mahogany trees are proposed along the east
property line. Wax Jasmine and Dwarf Shefflera plants will accent the north and west building
foundation.
Building and Site: Building and site regulations will be fully met when staff comments are incorporated into the
permit drawings.
Community Design: The proposed building will be a one-story structure 22 feet - 8 inches in height with a flat roof
The architectural design will consist of the CBS walls painted tan (MAB Paints - Oat Cakes
5080P) accented with stucco score lines and stucco bands painted white (MAP - Camelia
5889P). The proposed building fa<;:ade, facing Commerce Road, has been designed to be
architecturally compatible with this predominately industrial use area. The loading zones on the
west building side will have a blue canvas roof. The overhead bay doors will not be visible from
Commerce Road. The building side facing Commerce Road (north elevation) will have a false
outside entryway, identical to the actual entryways. This false entryway serves no other purpose
than for aesthetic enhancement.
Signage: The west elevation drawing indicates four (4) walls signs, which will be centered over each
individual tenant entryway The wall sign dimensions and design graphics shall be submitted as
part of this plan review process. No wall sign is proposed on the north side facing Commerce
Road where the false entryway is to be located. No freestanding monument sign has been
submitted with this request.
RECOMMENDATION:
Staff recommends site plan approval, subject to the comments included in Exhibit "C" - Conditions of Approval. The
Technical Review Committee (TRC) recommends that the deficiencies identified in this exhibit be corrected on the set of
plans submitted for building permit.
xc: Central File
\\CH\MAINISHRDATA\Planning\SHAREDIWP\PROJECTS\Quanlum All High Ridge Corrrnerce Park Folders\Quantum High Ridge Commerce Park lot 17\Staff report NWSP 01-Q02.doc
LOCA liON MAP
High Ridge Commerce Park, Lot 17
~mr
: :
, .:1= -IL '
c&.-. ""1
-ur~~~
. ~t1
, f- 1:.//
,1-'_//
A
,
-
~! :
, '0-
, /
-" ,
::;1,: il;;
- :.=
:;
....:.\ .
, ,
" '
..~) 1C
~~:? ',~ ;~
"~'--7'", j!
I:' -L-,
! :bJj-" Z:
:'~. wr
,S:::rr ~
- ,.- If '-I
;g-~fI
~21_1"
IDtr]:r7 ,
~QiK":'
~"~,~
ITi',~
1IIh:::: ,():
frr
~Og,}
"K" t::'"
~~..'
I ,':
~ -II
~/i
fl .
J'/:'
:: I
:: .
:: '
:; !
;'.1-
.
" :.
, ~
,
"
"
l:., .
(' '
, .
, ,
,
, ,
, ,
, ,
, '
~\,\
, '
" ~
REC
, ,
,",v-=.-:J
, ,
, ,
\',
\. ~
"
"
"
"
<1
\,'
t)
~--,.,
. '.- ~ "
" ..----'.:, ./
".,~..
"\"""""
, "
\. -'I
, ,
, ,
\'. ,
" ,
'\:\
\:l
R'IAA
1,/ '; , Nof
. -. ~
T.- ,
o 1/8
/III II
:'0 400 800
FEET
O;.-,eMI
,',
, ,
, "
,
, ,
'!
p~l~
LU~I
I--- T
FO~~II I
':lAI; ~ ~ 1 F,," <I ~
Iii I I \
I I
, ,
,
/"
Ii
, ,
, ,
, ,
:' : .Ii.
r:J ""
1:: \
, '
, '
,
, '
, '
, ,
"
:: I
I
\
-,
, ,
, ,
C-' ,-
, ~L_
, R1AA 1
'~I: ~+/"'~. c-I
,~. e--
;J t::::.~- _ ~_
h '. ~. ::1.1:::1-'
K' -r
',. .f1AR R'JZWf.
i STATE -.~
; -~' .- .. ~:-.
I
, I
~~:t. .
1""~I_l
IL "'t"'1j
.1"'"''
, "
}... /1 T
i '---SITE,
, '
~,M"
A.'J;~r" >--
L ~ITE::rm
- '''', :~
~' I :1
-r~ '-."
. > "'I< \"
JU<M""..A. ,;''d0;~ ~...... ,1 .4' I
E
',' '-
EXHIBIT "A"
I, j llil1JL- I L
IV~;B
r ~[
ar
Il ceF ,u
IY bL-'~~
I ~ I <=~'-
i ~
~<<
~--:-,t
R3 :~,
,b, j.
=-= (I r - c-t '
I 1-1=
1IIIilll'lli- ,-r~
~lil' f~ ~-=
"'II III H 0- f-
I I: ,I I I '- ,
,
t:ri
~
1k fui
~, II
~~
<,,~(m\- .
Nil Ill! ~.~ I
M , L I' TFJ!:::X' 1
"'- IJ. - rr, . L'>-:
. ~ l~ ~.! .L::f-ll:; H
'I,j) \ ? I i1_~,---
'"jJ ,i
" .
~4d -1$
I If' '
J H ~~i~ll
, /'1 '" !il}
I . !I;fl
~ Ii ; 1{'1 '
""" '! "t
I'i ,,11\'11,
11ft 1 "I'
n 1 '-11
I II<
I u~
H
"
: ~
"~ '
~ '<:
i ~ \il
E!I .-1
>- I~~
:=;:;
~ aij
g ~u
>!
ljll mil I I ;'l'lfj' lId
l.l!"'!, 1 I '!IlL I ';
ni' i'I' Iii 1 r I i'!!fU!ill!fL
,i, i :-," I,' ! I f I !!;'i'~-I;.h!l1j I
~ _ ~.. Oil i 1 '" i f ~..<I I I' I
~:;~ Hl"~ll l j II fn~~~l!.~ih.n~
;ii:~ -:~ I .' _' - J~'1f-l"tllifl ,!
hj~ iii'l' HI,m! i'lmd if, !.'I',;IU:i
I} ~ I', ' , !;P f ,uHf' !I '11 illSi!i,
.::. 1i 0; ;0 ?'.. ~"l" ;0 ;>?;>;o II _~ '1 i ;>
: ~\~. 'HIWnm, I, -, '1;11 i
f ~ i - ! :!.1.1i 1j~i}!~ r ~~ r~f JI
I ! ~! l" 11 i' ~.~ hI' -
ii ! 1 f ~ll ~ I
; - ; - ~~ I h
_; f ~~ l~l
1 ,
I -I
11mI' ;\'I;I!'I;I,
i!~~~ ~IW:~g !~,
~~ti. ~ t;;bca.!1 h
1""1' :lf~l,'
!~:~~ -.""-.-
""~i"" ~" I~II !~r I
! ~ l~" .~,~! ~f2I(giilli~1
. ~ . I~.U~ ~ U> ~ v.......
i p:! ii!JJ~ ~ r;j "";',: ,
m """'~/L' I
~- h~i~ m. :
::j - ...1"" R tt. : ~
g __':__~ ".J ~ L -.~:~.~
c '
;'1;1 I '
. .. m~!!P.IIPi:"'lil"1
:~11I~ m!' ~ ~J ~~L.i!R ~!~~~~~S
~,! =i: I~ ~ ~~~ i~;ti: ~~!
~
~_.._,
~ Ii
:ti~@i,
~ L. j ..._.....::€::.'...-.~':,_ _~J
r i- -..,.,"'''"' , .m! 14', -, 1
~-i"ll~ :",~t;'li~ j" -;-
~ I r~! i'=~~ll 'Ii ~:,
~ I "'''''} ',,:i !,..,~:;". :
B ~.-2 I ~
, "ikr- ~ -i.:- ':i -i:.- I
li~
. I I I
,
. r !Iillljll!i 1111 1I:11.:;lil 11'1
! ~ '1~1~~n.~. S'j ,.11
~ 11I11:1'!1 II!, illWpl
I", 1'"" 'f'l rl' ~ ..~ ' ~~! I!.
~ I il!ill,. ;~I jl:I:.-!J' I"
>
~ l.ilTr ':11'=*: i"l ',I!' .1, Ii!
'll ";',
!lill"ll .i" : ~ &' .
.n as..;o.i
hi "1
=, .
DTIO-
~: .
'CMSI FLEX SPACE BUIWING"
PREliMINARY SITE PLAN
LOTS 17 BLOCK 2, CEDAR RIDGE, A P U. D.
& HIGH RIDGE COMMERCE PARK, A P.I.D.
EXHIBIT "B"
._mnmmmmnnnn.m..m_...m_...mm.m...'.....I~JT..n_..hmh
_ '"~~~~C~ I:~ I: I
-j++r .A
-llt1t-
1';bGJ
,
!
I 'o-!:F' ..~, ""i"n_u<
IO'UTIJtT~n~lCTllNE
~ ,c~~~~R ROA~T'.~I% i ~
....n:..1l1l-Ji&.!A~I.&..._
, , 11
~F
_qt_
,
p'
.,.~
~-o
.,;;
'x
'l.-
i~
.n
. m
.
, .
."1
I
~
_ "!
~ d~.:.:..,
:I\~ Si~ ..-",
, "1'.0 f.
~.:ff: l!!"'<= ~
~ e~i iI.J~--, #
'" j..'I: ~CD ;.!.!..-_..;
, -!' i.sl ' . I' ,
~ .. ~~5 iI, ...
Q ;z ~. I' I
:!: Co .r
51 _:: r
II ~: r
i I~
I!
. ,.
;; !j
,!
,.
<
~~
^'
.,
~
"
,.
,
il!!' .
:;:..,..,.,.
;"~j!ll ~
'!a~ "
~~i
"!
!~~
~!.
I-I
lili!~
li
!-
~
i II ~~
i ~ ~
Ie 0: a:!
I j__
ii
.
;;
~,
:j "~~~
~ .naq
~
i~
.n
.m
, .
.>:
- Q
'~"'1Ir
I~
1
~ >.' ~
:
1'1
I,
,
,
-l17lfTlJTT~~T
~mJ.1NE
~<uc-_t
Eoc.EOP)1'UP"'VErEMT
~
I;~ii~ ~I~'~
=:: tj;liS;",
'lIE: t;!@~1lI_~_
'II Oil!
..II i~ ;
a1;~ ~,
II> ---~
-II '
,-
umnmnmnnmnnnmnmn.m._.,""..Lmnn..umm..mn
---COMMERCE ROAD
''''':~'
n-J
I;;~:I
.~~~
..~,
,*
M E IGN IN 'r;:;;'~"''''''"'''j
711 IlI/lHfWEIlM.HI_I.IaIIlIOlWOl.!U'II11ll
llllT1ll.III..IHIIIll_Fl.luUlm..1tf2
ARCHITECTS & CONSULTANTS
!III' !I !I!I~II I i igiii, iril~.
; i Ii i 'I' ~ : tlgltl tn ;
! I ~ I t:l 1111111 {'I'
; i I ~ ill It H
.- . -.... "I
I jiijii ill
J IS..... ",
I ",,,, ...
_I . ',..,; m
.- I -;1- . 'J 9!n1 HI
','11'_ ...
...., ltl
(In~ III
I II
iUI,liUIII " _i ~~mJ.llmmlll b ~
IJldlll-U 1!5~!Ii ~ml~ 'l ~II ~I :
,-Ull.bl' ijjU ~ 1m ' I U II Ill, ~
IIJI~'III I.iii N hi = ~ 91:;'
11"1.1 i~'I'i!!iI!!l!e e.; ~
. ,in"I' il~ illl!!i Uu iili !iJ1 g'
i HU !' ! h~ r;' ill J j; fP IF!I! ..
II! ~IJJ Ii q 1~IU,:'lifll II..'
IB Ii R ; ".
I ~ q ~~'l' .
~ II!II I
ill iI i
~ n i~II-1
~ :! -I
U i ~
II . 1
.
r
r
I
! II~I
I
EXHIBIT "B"
lr
.0
1~I.alJJ>.F .
~ .
l-I..........'"
.
.
.
.
.
.
.
>
.
.
.1 -f
4..rJ..
...........
IIU I
I I i
lUll
IH
Ii i
I . I
, I i
I il
, I
. "......', ." , .
:'.-.....,. ,- ,
COWMERCE ROAD
, 1'111
H IIII!: I HIGH RIDGE COMMERCE CENTER If!1 !~~ in] If
I IlII. LOT 17, COMMERCE CENTER I . f tI ..,'iiJ'
~ BOYTON BEACH, flORIDA !I C3 5
PlANllNG PLAN i! _ .(5 !=
i
I
II
----
r'-" , , ,n, , , ,-,~
I: ~I
I: _'lI't,
f" /:; ~~ 1- .:-_-..! JJj "
: ~.]~t:::'
~~ ' '.@"~ 'f--- - --
1~:' ~~.~~//iW,;J~~: -: : f:
! ;:::~Xk-'/ tL) . '.
;:: Y/;'
z
;/ ;/, % 0 .' 'TI~--~ : r
.. ~~//.--;:~%0;,~~ [~, _:=, " ~
I // Wh/// ~ ~ R:
;'~~~ ;/ (--; ~
" '.%?_~~~.~ F.-~ : t
, /:0% ~:il ' _' ,~'
~ 111.1
/ / / // ~ 1~ ~; ; [
:. ;// ~/;: r:F ,--, , t:
'IJ~ ,-" ,[
/ ;/h; ~ IL--, (
:, _../~.~~.IIJ-:--: ,I,
0?~/(-;/~ II -
~'~.'i;'-I~'-I-;'I'~':'~;-I.""!"-1 II: :
"r~""',1, p ,
':11: I: [:\! i i hi : "(
,:L oL,~~~ J :j, ::
~--- --~-- --_.,-
:;" e -e -"!""""~-~~-- _ /~. ~ -~ \
"
"
~.~'D. ,
~ ~ ~ 7.. ~
. S>!.
-~
CMSI FLEX SPACE BUILDING"
PRELIMINARY SITE PLAN
LOTS 17 BLOCK 2, CEDAR RIDGE, A P U, D.
&: HIGH RIDGE COMMERCE PARK. A P. I. D
EXHIBIT "B"
~ - I
. . !
I 'J . . ,
, I, "~ii"C 'ill!
i i "i'1
,I!, 'I!' I
,i
. ;' WI $Iii f i
. ill!
~ i,. >>
~ ,. -
, ~ f ~ ihi - i ffl
. . ~ ~
~ '11 J'I j 2
n
~ h ~:~ a
. . f
. 'I. ~~. c
I' to:! 1;:;
. . I III
f
I ; ; ,
, i
i .
"!
. . !
. - I
. ,
,
~ = 1I .. .. " .. .. .. .. .. - J
E
........................ i ~
~
, 1 tl ' , , ~ i:: '" ' , , .. :lJ
!-.~eE~."iq~ ~
!! !!! !! l! m 'I ~
II ~ Ill! III !II II 11 llll!!! .. ~
.. ~ .. .. .. .. !; Ii .. .. .. i l/I
~ ! ! ~ ! ! ! ! ! ! ! ! J
p
.:Jl
:~
. ~
<E
>
~
~
13
~
~
~ ~ tor
:~
~ ~ ! &~ ~ --.
~ !lii 1~ /1 I!
" 11!1 il! .
m .... ~
~ ARCH'T'::S & CONSULTANTS
"!'
i!t'
!'l!
",
ii.
11
,-
ii
"!'
i!ji
Iii!
"j
i~lI
211IOJ1Kfut....HllWlIlOlKIOIWCll.A.llIlliol
&lIntll. Tfl. (!III m_ IJI. I~II m-_
IGN IN . .;-~~~:~j";,~A("'..-,,
,
1"11.' t ""I
4:tj .\> i
.!.t r'
".~1'
i~ ,J -~_
:e.-fii ~ ~
JlI~_~::,__
" 'I
,'. 'J" 'I
dil~
, ,..- + .'
Iv ~ !~ I
~ ....~.
I,{i---<-'~
>!j.~'., ~
r:t:: ''":I;:L
, 'Ii ..
.___n._un ....t ~ ;.
.;;..)i~ ~.
I, ~: I
I' , . ":
11 ~..:--
. l
. , ,
''-(It''r'"-~-'~\
81: !~.1,_._~! ~
I:' -'
I: t
,
.;..t...c....,_.,,,,,,
i~tli~
!r:(.-':."'.;;.Il<N'I!
:' J I:",j)l
III ~i I ""1/
I::: 'j '-j'~'
I~..J:
~~"I'
I >.~:\ ~
- '-y"'-r
! 'tttc
~. !1?ljjr:=
.~~-c~ i-' ,tJI .'.: L :~Ll:!I' .: ..
H I 7'~ ~, ,,;.. ~,.~.~ I tll'~ I;
i : IH I I L-: ~:l,_,j__....-=-,-,.~,
i I" ~---_."..)
I
I
r,." ,-
, ~
l~
l~
:ij
:::
!
!
i;€
,n
,m
5<1
,
!
r !
I " ~~H~
"
- -- "~
, ~ ~ :~ ,
, "h~ !
" " ,
s ~ ~ ~
i
,
!
,
1'6
,I';
,m
tic;!
"
I
'-\,J,'
l
I
,
a
!
.
,
,
j
[[JO- '
001
t..,
i~
'h1
,
ACi
i~
,n
~~
!" ~Lfr ~I~
;: 'ill >"t~1 ~:I
.. _,~ ,~ I, ~-..... ~
~ ~--""i
; ~ ;11' In~ "
Ili:'f If',
'_-,-1i .". ..1
: tt ' I
, '
: 11 ~
ill"'.']
,
a
,
r--
I:
,
!;; ~
,;; ~
!
, ,
~ ~
, '
~----_.._.--
-~--~-- ~ ~
; -< -~
, I
~-
; ;~
---..--"--}
"
1;
!
,
.
,
. ,
~ ;,
,
,
a
"CMSI FLEX SPACE BUILDING"
PREUMINARY SITE PLAN
LOTS 17, BWCK 2. CEDAR RIDGE, A P U.D.
& HIGH RIDGE COMMERCE PARK A P. I. D.
-.-....,
EXHIBIT "B"
I~
.~
l"
n.
.......,...-
~
~. "
" j "
eEl , .
, " '1 ' "., ,
- ~ .!:"P'''''''''-'
l.
" ';'1
--EJ "
':1
! ~;/l ';,:1
! ~i~
, :!I
I ;'!l~ l
I'
l. ;'1
~; I",
, 0 "'1
;!
.
,
,
". ,
" if .
, 0 " I
I' I
; ~
" ,
i I
l. .
" , ,
0 1 1
. !
~ ;
"
.
"1
; " ,
I" ~ ,'I
I s5 ;~. !
4J .'
! .
j;!i '.
! ~i~ , ~
, "1 -
I 111
!'
,
,
, """lOOI'(I<>OIr
~
;!:
0 , ,
.
J I
~ I
..wnT........... .
,~...... -, .,
I
J
,
I
I
,
,
1
I
~
.
i
.
!
~;~:m
;~~r:
.~
: ~~!
'.n,'_
o;o.u.Cil'l'lJIl:"''''''.~''''
ARCHITECTS & CONSULTANTS
f ._._~
!!
~;
_ m
,~
~
~ J
F
nTID
Bbi ;
"
,
I'
i
,.
0'
(!' ll~
"I'
ii' !
"~I i
~"ij -
~~. t=
.,l Ii:
~q i
~~ ~
nil i
:; ~ !
[! ~ ~
~ :i.
, .
, ,
;
;
11
l~
, m
u;;
~
~
:~ '
,
I,
,~r
" ::.1
ii!
!!
~~ H
EXHIBIT "B"
~-------
.. ,
1< '
<;l ~
I ,
~
I i 'i~ :,
. .
~ ~. ~
I :i
,0
'i'l
,~
l;<
, m
l ~
<
>
~
I Il
, a
!
"I:
I r III
~:
, '
I
i,
1
~
C
'.
~
,~ :f
!I
I,'"
jo, ,
,
,
~ij
r ll-r
!~
i~
~
I~
I ~~ i~
GU
1il!
j'
;1
Ii
II
H
"
l'
!e
:~
Ii
"
,i
I
" !I li II ! , . ! I' I I I I I ; I ~
:1 ; . f j j j I Iii
r !I .i " . i I I ,I ~ I I .
0, j , ~ - ~
J 1 1 ij j . . e ! I ~
" ! m
m
m ~~~ 'I ~ ~ !;i 'I " ~~ 'i I' i' j' I! :1 ..! ~
!l " I' ~
fh iil :~ II ,~ li .. .1 .1 1~ I, '._
.,i l; j ! j
ill ,aC h .. i' I; II i~ ; j g
,. J:"; . I
'r il Ii 'i !' I 5
h:~ .' ! i;;~ I
" .' i ~
~iii !H:~ H! &:;'iI i!i lti 1-:'IH I-A !fi w: IiI !ilt !i! !:= I Q
~~~~ ii!~": ~;! tiii :~g !ij! !il!ij!li ~~!!ai ! i s} I U~j I ~
Ili'Ii!'! ~1! l~ ! II Ii .1 Ii . '1-
lilt I~~~I lilli' ~,' I III I II ji ji I m
,i~j !ii~i ill'li " ! 11 i 1
. g .. ~ . ,
"CMSI FLEX SPACE BUILDING"
PREUMINARY SITE PLAN
LOTS 17 BLOCK 2, CEDAR RIDGE, A P U. D.
& HIGH RIDGE COMMERCE PARK. A P I.D.
;li~~~
1 m~~
~ ;~
M SI N IN '~'~-'~."-""J
711 IlIIlIfflll:'llIl.""M,tT,JOIIIIQlIEJoDt.FUlllIO
iIJlIf tl. ltL. 1;111 t3Hl1i1l1 '~lllll J:&_ _
ARCH I TECTS a. CONSULTANTS' --
EXHIBIT "C"
Conditions of Approval
Project name: High Ridge Commerce Park Lot 17
File number: NWSP 01-002
Reference: 2nd review plans identified as New Site Plan, File # 01-002 with a April 03. 2001 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments, NONE
PUBLIC WORKS - Traffic
Comments: NONE
UTILITIES
Comments: NONE
FIRE
Comments:
1 Access roads and hydrants must be in place prior to above grade construction,
NFPAl
POLICE
Comments: NONE
ENGINEERING DIVISION
Comments:
2, Provide topography of the adjacent lands and depict the finished grades between
the proposed development and twenty-five (25) feet into the abutting properties,
3, Specify a six (6) inch thick sidewalk through the drivewav
BUILDING DIVISION
Comments:
4 Add a labeled symbol to the site plan drawing that identifies the location of the
handicap accessible parking spaces, The quantity of the spaces shall be
consistent with the regulations specified in the Florida Accessibility Code for
Building Construction, The accessible parking spaces that serve a use shall be
located on the shortest safely accessible route of travel from adjacent parking to
an accessible entrance, The Florida Accessibility Code for Building
Construction states that buildings with multiple accessible entrances shall have
accessible parking spaces dispersed and located closest to the accessible
Conditions of Approval
04/18/01
2
DEPARTMENTS INCLUDE REJECT
entrance, Florida Accessibility Code for Building Construction, Section
4 1,2(5),4,3,4,6, (See attached Figure for Parking Space Dimensions and
Design.) The dimensions and design of the accessible parking spaces shall
comply with the Florida Accessibility Code for Building Construction Sec, 4,6,3
and Figure 9 (a), Dimensions shall be measured center to center of the required
4" blue stripes for the accessible spaces and the access aisle.
5, At time of permit review, submit signed and sealed working drawings of the
proposed construction,
6, At time of permit review, submit for review an addressing olan for the proiect.
PARKS AND RECREATION
Comments: NONE
FORESTER/ENVIRONMENTALIST
Comments: NONE
PLANNING AND ZONING
Comments:
7 The landscape plan shall indicate existing natural feature, including but not
limited to lakes, trees, and other vegetation, It should also include the location
of the oine trees to be removed,
8, Staff recommends that the Live Oak trees proposed in the 25-foot perimeter
landscape buffer be substituted with Sweet Mahogany trees in order to be
consistent with the trees planted in the perimeter landscape buffer on the
surrounding properties,
9 Delete the note that refers to the monument sign in the Materials and Color
Schedule on page A.2,
10 The dumpster enclosure shall be screened with appropriate hedge material on
three (3) sides, Provide accent shrubs along the screen walls (Chapter 7,5,
Article II, Section 1.J), The dumnster will be moved to meet this condition,
ADDITIONAL PLANNING AND DEVELOPMENT BOARDS CONDITIONS
II. To be determined,
ADDITIONAL CITY COMMISSION CONDITIONS
12. To be determined,
MWRlblw
IICHIMAINISHRDATAIPLANNINGISHAREDlWPIPROJECTSIQUANTUM ALL HIGH RIDGE COMMERCE PARK FOLDERSIQUANTUM
HIGH RIDGE COMMERCE PARK LOT 17ICONDITIONS OF APPROVAL.DOC
DEVELOPM' T ORDER OF THE CITY COMMlf-ON OF THE
Cl fY OF BOYNTON BEACH, FLORlln-\
PROJECT NAME, High Ridge Commerce Park Lot 17
APPLICANT'S AGENT Michael Sipula (Arch) c/o JMS Design
APPLICANT'S ADDRESS, 1072A Newport Center Drive, Deerfield Beach Florida 33442
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: May 01,2001
TYPE OF RELIEF SOUGHT Request for site plan approval to construct a 16,980 square foot
office/warehouse on 1.2665 acres
LOCATION OF PROPERTY Lot 17, Block 2, High Ridge Commerce Park P.I.D
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO
THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above, The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above, The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1 Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's Land Development Regulations,
2, The Applicant
HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3, The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included"
4 The Applicant's application for relief is hereby
_ GRANTED subject to the conditions referenced in paragraph 3 hereof,
DENIED
5, This Order shall take effect immediately upon issuance by the City Clerk,
6, All further development on the property shall be made in accordance with the terms
and conditions of this order
7 Other
DATED'
City Clerk
IICHIMAINISHROATAIPlanninglSHAREDlWPIPROJECTSIQuantum All High Ridge Commerce Park FolderslQuantum High Ridge
Commerce Park Lot 17\Develop.Order.doc
DEPARTMENT OF ENGINEERING
MEMORANDUM
NO. 01-044
'~
TO:
Michael W Rumpf, Director of Planning and Zoning
FROM:
H, David Kelley, Jr., PEIPSM, Civil/Utility Engineer
Acting Interim Director of Engineering
DATE:
March 19,2001
HIGH RIDGE COMMERCE PARK - LOT 17
NWSP 01-002 _1ST REVIEW
RE:
This department is assisting the Department of Public Works in the plan technical review process, Our
engineering review will be preceded by our review on behalf of the Department of Public Works,
Therefore, we offer the following comments on the above noted project:
PUBLIC WORKS
A, Add a note to the dumpster plans specifying that the gates shall have linch pins that shall drop into
metal sleeves within the pavement to maintain the gates in both open and closed positions,
ENGINEERING
1 On the Site Plan, add a general note that all plans submitted for specific permits shall meet the City's
Code requirements at time of application, These permits include, but are not limited to the following:
paving, drainage, curbing, site lighting, landscaping and irrigation, Permits required from other
permitting agencies such as FDOT, SFWMD, L WOD, FDEP, PBCHD, PBCED, PBCDERM and any
others shall be included with the permit request.
2, Provide topography of the adjacent lands and depict the finished grades between the proposed
development and twenty-five (25) feet into the abutting properties,
3 Provide a cross-section thru the swale and the outfall structure to show the grate elevation a minimum
of 6" above the finished swale bottom for percolation,
4 Specify a 6" thick sidewalk through the driveway
5 As an option, the 4' sidewalk may be widened to 6' to act as a continuous wheel stop, which will
eliminate the individual wheel stops and associated paving,
6, Removal of on-site fill will require an excavation/fill permit in accordance with chapter 8 of the City's
LDR.
7 The maximum runoff distance over impervious surfaces before diversion to percolation areas is fifty
(50) feet (Ch. 6, Art .IV, Sec, 5B2a). Modify the drainage system along the west parking lot to
provide inlets and piping to deliver stormwater to the rear, swaled area,
Engineering Department Memor<. dm No, 01-044
Re: High Ridge Commerce Park - Lot 17 (NWSP 01-002) 1 st Review
March 19,2001
Page Two
8, Add the following notes to the civil plans:
a. all striping, marking and signage shall conform to City Standard Drawing B-98001
b, the drainage system shall conform to City Standard Drawing B-91007
c, the drainage will conform to the City's Land Development Regulations, specifically Chapter 6
and 23
9 Show on the appropriate plans two 25 foot, 4-inch yellow lane separations lines at the egress stop bar
It is recommended that the ingress lane be IS' wide and the egress lane, 12' wide to accommodate
truck turning maneuvers into the site,
HDK,KRH/ck
Xc: File
C:\My Documents\High Ridge Commerce Park, Lot 17-Engineering ist Review Comments.doc
CITY OF BOYNTON BEACH
PUBLIC WORKS DEPARTMENT
INTEROFFICE MEMORANDUM
TO:
Mike Rumpf, Director of Planning and Zoning
FROM:
Jeffrey R. Livergood, Director of Public Works
DATE:
March 16, 200 I
SUBJECT
Public Warks Review, High Ridge Commerce Park - Lot 17
I have reveiwed the above referenced plans and have no traffic related comments,
nSHRDA T A \Planning\SHARED\ WP\PROJECTS\Quantum High Ridge Commerce Park Lot
17\Public Works Traffic comments,doc
0/ y-r.{, "'-
--
High Ridge Commerce Park Lot 17
NWSP 01-002
1st Review Planning
March 9, 2001
1. On the survey, correct the direction of the north arrow because it incorrectly points east instead of
north,
2, Correct the following discrepancies in the tabular data on the site plan:
a) The street label "Miner Road" is misspelled;
b) The subject lot is incorrectly identified as "lot 14" instead of "lot 17"
3, Include a color rendering prior to the Planning & Development Board meeting,
4. The survey shall indicate existing natural features, including but not limited to lakes, trees, and other
vegetation.
5 Provide the official Future Land Use designations of the site as "Industrial" in the tabular data on sheet
SP I
6, Provide the typical dimensions and striping detail (City standards drawing # B-90012) for the loading
areas.
7 The landscape plan's tabular data indicates three hundred eighty-four (384) Chrysobalanus icaco
(Redtip Cocoplum) plants but only graphically shows three hundred seventy-two (372) plants, This
discrepancy between the two must be corrected so that they match,
8, No vehicle encroachment is permitted within the landscaped area,
9 The landscape plan shall include the following notes, "FDOT Type D or F curb shall be provided along
the perimeter of all landscape, drainage and grassed areas adjacent to paved vehicular use areas, except
where wheel stops are provided"
10, The dumpster enclosure shall be screened with appropriate hedge material on three (3) sides, Provide
accent shrubs along the screen walls (Chapter 7.5, Article II, Section I 1),
II The Ixora . Nora Grant' along Cononerce Road shall be planted at a minimum of 24" in height with
24" in spread (Chapter 7,5, Article II, Section 5 C.2,),
12, The proposed two-hundred (200) Chrysobalanus icaco (Redtip Cocoplum) which form a continuous
hedge along the western property line shall be planted no less than four (4) feet nor greater than six (6)
feet in height (Chapter 7,5, Article II, Section 5 E), The landscape plan is not in compliance with this
requirement because the plant list indicates that all proposed Redtip Cocoplum will be planted 24" in
height.
\3, A minimum of one (I) interior tree is required for every 10 parking spaces" (Chapter 7.5), The
landscape data on the landscape plan should indicate the following notation, "4 trees are required - 4
trees provided" rather than what it currently reads "3 trees are required - 3 trees provided.
14, On the elevations, staff recommends the stucco bands I score lines on the exterior walls on the building
located in the area designated as "fire truck turn around" be continued to connect with the stucco bands
and score found on the remainder of the building,
15, Staff recommends solid decorative gates on the dumpster enclosure rather than chain link fencing with
infill and vision obstruction inserts.
16. By defmitioll, the proposed monument sign near the entrance is technically a "'directional sign" per
Chapter 1, Article II Definitions, Directional signs must conform to the building setbacks of the
respective zoning district.
\\CH\MAIN\USERSIJOHNSONE\Comments\Major\lst Review\High Ridge Commerce Park Lot 17.doc
DEPARTMENT OF UTILITIES
MEMORANDUM
NO. 01-058
TO'
Michael W Rumpf, Director of Planning and Zoning
H, David Kelley, Jr., PE/PSM, Utility Engineer~---
Acting Interim Director of Engineering V-
FROM,
DATE,
March 19,2001
RE,
HIGH RIDGE COMMERCE PARK - LOT 17
NWSP 01-002 _1st REVIEW
We offer the following comments on the above noted project:
GENERAL COMMENTS
I) Palm Beach County Health Department permits will be required for the water main extension(s)
for the fire hydrant locations serving this project (CODE Sec, 26-12),
2) CODE Sec, 26-34(E) requires that a capacity reservation fee be paid for this project either upon
the request for the Department's signature on the Health Department application forms or within
30 days of site plan approval, whichever occurs first. This fee will be determined based upon final
meter size, or expected demand,
3) Comprehensive Plan Policy 3,C.3 4 requires the conservation of potable water. City water may
not, therefore, be used for irrigation where other sources are readily available,
SPECIFIC COMMENTS
None
Ii: lei I~ \':1
~ )~) '. ~,..
~
MAR ? 0 ?OOI
~
HDKlck
Xc: Georganne Barden, Utilities
Dept, File
PLANNING ANO
ZONING om
C:\My Documents\High Ridge Commerce Park, Lot 17~Utility 1st Review Comments.doc
FIRE & LIFE SAFETY DIVISION
Memorandum No. 2001-20
@,...
"",.'.'
.
DATE
Mike Rumpf, Director
Planning & Zoning
Steve Gale ~
Fire Marshar ,7 U
February 27, 2001
TO
FROM
SUBJECT
NWSP 01-002
High Ridge Commerce Park
Lot 17
A fire hydrant fire flow test is required LDR 6-16
NOTE 1 Access roads and hydrants must be in place prior to above
grade construction. NFPA 1
NOTE 2' Automatic fire sprinkler system is required for building
Boynton Beach Fire Code 9-6(a 4)
cc: E-mail Blythe Williamson
File
[OJ r~
Illl I-tc L (\
L
r-,
~
J
cn I OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO'
Michael W Rumpf
Dir of Planning & Zoning
DATE,
3/02/0 I
FILE, Y2KOOI
FROM,
Off, John Huntington
Police Department
Crime Prevention Unit
SUBJECT
REFERENCES,
CMSI Flex Space Bk -~,' ~ @ ~ n U, fG\
Site Plan D '111.\
MAR 2 2001 l)
ENCLOSURES,
PLANNiNG ~NO
I have viewed the above building plans and have the following comments:
No Comments at this time,
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO, 01-042
~
~ ~ '\!I ~
-~.
~
~
TO'
Michael Rumpf, Planning & Zoning Director
FROM,
Timothy K, Large, Building Code Administ
PL~NNING ~NO
ZONING OEP1
DATE,
March 2, 2001
SUBJECT
High Ridge Commerce Park New Site Plan (NWSP 01-002) _1" review
comments
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits,
Buildine: Division (Site Specific and Permit Comments) - Timothv K. Lare:e (561) 742-6352
1st review comments
1 Add to the building that is depicted on the drawing titled site plan a labeled symbol that
identifies the location of the handicap accessible entrance doors to each tenant space,
Florida Accessibility Code for Building Construction, Section 4 1,2, 4.3
2, On the floor plan drawing, add a labeled symbol that identifies the location of the handicap
accessible entrance doors to each tenant space, The location ofthe doors shall match the
location ofthe accessible entrance doors that are depicted on the site plan drawing, Florida
Accessibility Code for Building Construction, Section 4 1,2, 4,3
3 Add a labeled symbol to the site plan drawing that identifies the location ofthe handicap
accessible parking spaces, The quantity of the spaces shall be consistent with the
regulations specified in the Florida Accessibility Code for Building Construction, The
accessible parking spaces that serve a use shall be located on the shortest safely accessible
route oftravel from adj acent parking to an accessible entrance. The Florida Accessibility
Code for Building Construction states that buildings with multiple accessible entrances
shall have accessible parking spaces dispersed and located closest to the accessible
entrance, Florida Accessibility Code for Building Construction, Section 4 1.2(5),4.3,4,6,
(See attached Figure for Parking Space Dimensions and Design,) The dimensions and
design of the accessible parking spaces shall comply with the Florida Accessibility Code
for Building Construction Sec, 4,6,3 and Figure 9 (a), Dimensions shall be measured
center to center of the required 4" blue stripes for the accessible spaces and the access aisle,
4 Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel for the accessible route that is required between the accessible parking spaces and the
accessible entrance doors to each tenant space, The symbol shall start at the accessible
parking spaces and terminate at the accessible entrance doors to the building, The symbol
shall represent the location of the path of travel, not the location of the detectable warning
Memo No, 01-042 to Michael Rumpf
March 2,2001
RE. High Ridge Commerce Park New Site Plan (NWSP 01-002) _1st review comments
Page 2
or other pavement markings that are required to be installed along the path. The location of
the accessible path shall not compel the user to travel in a drive/lane area that is located
behind parked vehicles, Identify on the plan the width of the accessible route, (Note: The
minimum width required by the code is forty-four (44) inches), Add text to the drawing
that would indicate that the symbol represents the accessible route and the route is designed
in compliance with Section 4.3 (Accessible Route) and 4,6 (Parking and Passenger Loading
Zones) of the Florida Accessibility Code for Building Construction, Please note that at
time of permit review, the applicant shall provide detailed documentation on the plans that
will verify that the accessible route is in compliance with the regulations specified in the
Florida Accessibility Code for Building Construction, This documentation shall include,
but not be limited to, providing finish grade elevations along the path of travel.
5 Identify within the site data the finish floor elevation (lowest floor elevation) that is
proposed for the building, Verify that the proposed elevation is in compliance with
regulations ofthe code by adding specifications to the site data that address the following
issues [Section 31071.2, Chapter 31 of the Boynton Beach amendments to the 1997 edition
of the Standard Building Code]:
a) The design professional-of-record for the project shall add the following text to the site
data, "The proposed finish floor elevation _ _ NGVD is above the highest 100-
year base flood elevation applicable to the building site, as determined by the South
Florida Water Management District's surface water management construction
development regulations,"
b) From the FIRM map, identify in the site data the title of the flood zone that the
building is located within, Where applicable, specify the base flood elevation, If there
is no base flood elevation, indicate that on the plans,
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the drawings titled site plan, floor
plan and paving/ drainage (civil plans),
6, On the drawing titled site plan, identify and label the symbol that represents the property
line,
7 The building plans are not being reviewed for compliance with the applicable building
codes, Therefore, add the words "Floor plan layout is conceptual" below the drawing titled
Floor Plan found on sheet A,l However, add to the floor plan drawing a labeled symbol
that identifies the location of the handicap accessible entrance doors to the tenant spaces,
The location of the doors shall match the location ofthe accessible entrance door that are
depicted on the site plan drawing,
8, Add to the site plan drawing all existing easements that are shown on the survey Also, add
all proposed easements, The location, type and size ofthe easements shall be shown and
identified on the site plan, Where applicable, amend the plans so that structures do not
encroach into an easement.
9 Place a note on the elevation view drawings indicating that the wall openings and wall
construction comply with Table 600 ofthe 1997 edition of the Standard Building Code,
Memo No, 01-042 to Michael Rumpf
March 2, 2001
RE. High Ridge Commerce Park New Site Plan (NWSP 01-002) _1st review comments
Page 3
lOOn the site plan, indicate within the footprint of the building the number of stories that are
in the building including, where applicable, mezzanines, Also, add to the site data the
number of stories in each building including identifying mezzanines, where applicable,
Indicate the overall height of the building within the site data. The overall height ofthe
building shall not exceed the height limitations of the Zoning Code,
liOn all floor plan drawings, indicate within the footprint ofthe building the number of
stories that are in the building including, where applicable, mezzanines,
12, Identify on the site plan drawing the actual distance that the building is set back from the
north, east, south and west property lines, Please note that overhangs, covered walkways,
canopies, awnings or other appurtenances that are attached to the building shall be
considered when identifying building setbacks, Therefore, identify the width of the
proposed overhangs, covered walkways, canopies, awnings, and/or other roofed areas that
extend out beyond the main walls of the building. The building setbacks shall comply with
setback regulations specified in the Zoning Code, The layout of the property on the survey
doesn't correlate with the site plan, (Note relation of property to point of compass,)
13 To verify that the proposed building is in compliance with the applicable building setbacks,
show and dimension on the site plan the width of the building overhang, Also, identify the
size or width of the covered walkways, awnings, canopies and/or other roofed areas that
extend out beyond the main walls of the building,
14 At time of permit review, submit signed and sealed working drawings of the proposed
construction,
15 At time of permit review, submit for review an addressing plan for the project.
16, Add to all plan view drawings of the site a labeled symbol that represents the location and
perimeter of the limits of construction proposed with the subject request.
TKL/rd
Attachment
J:\SHRDATA\Development\Building-6870\Documents\TRC\NWSP Ol..()()2 1st review High Ridge Commerce.doc
...!
"'1
c
c
c
c
c
c
c
c
c
c
Accessible Route
c
,
w/.'
r ,,{"::
;::'~
... ./..~
C;,(-:
:,/'i
:- /':
(T /r
~/~
;Ii
, ,f.',
1- i
,
144 mini 60 :144 min
c
"
"
,
I ,
348 mm
Fig, 9(a)
Standards Parking Space Design
I...
~~,~~~.~~.~~~:~..l. ...
By ~=6
o 0" 4D 0
0_0'';''0 0
01,-' !V:,p 0
011 IY~ 0
n l~ ~
ol~~ 0
OC 1?'6.:7 0
I ;:nl ~n lor 96 min for vans
1 I
I I,
252 mm
1
Fig. 9(b)
Alternative Parking Spaces for
Theme Park and Entertainment Complex Only
I
~I
rd
240 min
IC~:] J(
Fig, 10
Access Aisle at Passenter Loading Zones
FLORIDA ACCESSIBILITY CODE FOR BUILDING CONSTRUCTION
OCTOBER 1997 EDITION 93
lEISURE SERVICES: PARKS MEMORANDUM #01-20
FROM:
Michael Rumpf, Director of Planning and Zoning
John Wildner, Parks Director jJ
Barbara J Meacham, park$. landscape Planner--f,~
lusia Galav
TO'
THRU'
CC'
RE,
High Ridge Commerce Park-lot 17
Date
March 6, 2001
The Parks Division has reviewed the site plan for High Ridge Commerce Park-lot 17
The following recreation-related comments are submitted
1) Submit detailed irrigation plans for required R-O-W landscape improvements
during the construction document permitting stage for review and approval by
the Parks Division staff Include on the plans location of any existing irrigation
in the Commerce Road R-O-W
2) Please provide notes on the plans to the contractor to notify the Parks
Division prior to any construction activity in the Commerce Road R-O-W
lID) It! ---
il D I..lU~ P. r -r7 I? (0:1
.. I" n,I,11
J ;11' L'
tl_IWl-6
,.,---1
Planninl! Memorandum: Forester / Environmentalist
Date:
February 27,2001
To'
Lusia Ga1av, Principal Planner
From:
Kevin J Hallahan, Forester I Environmentalist
Subject:
High Ridge Commerce Park-Lot 17
NWSP #01-002
1 st Review
The applicant should review the site to ascertain that there are no protected species of plants or
animals, The project should continue in the normal review process,
Kjh
Xc: Blythe Williamson thru E-mail
file
FILE COpy
Plannine Memorandum: Forester / Environmentalist
To:
Lusia Galav, Principal Planner
From:
Kevin J Hallahan, Forester I Environmentalist
Subject:
High Ridge Commerce Park-Lot 17
NWSP #01-002
1 st Review
Date:
February 27,2001
The applicant should review the site to ascertain that there are no protected species of plants or
animals, The project should continue in the normal review process,
Kjh
Xc: Blythe Williamson thru E-mail
file
IJEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 01-029
FILE COPY
FROM:
TRC MEMBERS
Bob Borden, Deputy Fire Marshal
Kevin Hallahan, Forester/Environmentalist
Louie Zeitinger, Police Department
John Huntington, Police Department
H, David Kelley Jr., Utilities Department
Timothy K. Large, Building Division
Ken Hall, (Engineering) Public Works-General
Jeffery Livergood, Public Works-Traffic
Barbara Meacham, Parks Division
H.David Kelley Jr" Engineering Department
Lusia Galav, Planning Department
Michael W Rumpf ~.~ ~
Director of Planning-and Z~ning
TO'
DATE,
February 23, 2001
RE,
SITE PLAN REVIEW PROCEDURES
1 ST Review' Site Plan Approval
Project: High Ridge Commerce Park-Lot 17
Location: High Ridge Commerce Park-Lot 17 (east side of Commerce Road)
Agent: Michael Sipula/JMS Design
File No.. NWSP 01-002
Find attached for your review the plans and exhibits for the above-referenced project. Please review the
plans and exhibits and transmit formal written comments or e-mail to BIy1he Williamson and I no
later than 5:00 P,M, on March 09. 2001. When preparing your comments, please separate them
into two categories; code deficiencies with code sections referenced and recommendations that
you believe will enhance the project.
Adhering to the following review guidelines will promote a comprehensive review and enable the
applicant to efficiently obtain Technical Review Committee approval:
1 Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review
and the applicable code sections of the Code of Ordinances to review and formulate comments,
2, The documents submitted for the project were determined to be substantially complete with the
exception of traffic data, however, if the data provided to meet the submittal requirements is
insufficient to properly evaluate and process the project based on the review standards or the
documents show code deficiencies, additional data and/or corrections should be requested by the
reviewer by contacting Lusia Galav, or myself.
3. Each comment shall reference the section of the code that is incorrectly depicted on the
documents,
4 Technical Review Committee member(s) shall identify in their comments when the plans depict or
Page 2
when the location and installation of their departmental required improvements may conflict with
other departmental improvements,
5, When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the
comment and the specific code section may be included in their review comments with the name of
the appropriate TRC Member that is responsible for the review specified.
6, If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time
frame stated above, to me, The memorandum shall state that the plans are approved and that they
do not have any comments on the plans submitted for review and that they recommend the project
be forwarded through the approval process,
All comments shall be typed, addressed and transmitted or e-mailed to Blythe Williamson and I for
distribution to the applicant. Please include the name and phone number of the reviewer on this
memorandum or e-maiL Lusia Galav will be the Planning and Zoning staff member coordinating the review
of the project. First review comments will be transmitted to the applicant along with a list of Technical
Review Committee (TRC) members.
MWRblw
Attachment
xc: Steve Gale, Fire Marshal
Marshall Gage, Police Department
John Guidry, Utilities Director and Interim Director of Engineering
Don Johnson, Building Division
Christine Roberts, Director of Public Works
Central File
J:\SHRDATAIPlanning\SHARED\WP\PROJECTS\RiChardson Buildmg\TRC Memo for Plans Review New Office Bldg..doc