Loading...
CORRESPONDENCE DEPARTMENT OF DEVELOPMENT Division of Planning and Zoning Building Plallning & Zoning Engineering Occupational License Community Redevelopmetlt February 23, 2001 Mr Robert Fetrow Gator Engineering 7289 Gardens Road, Suite 104 West Palm Beach, FL. 33404 Re: POLYPLASTIC PACKAGING - EXTERIOR COLOR CHANGE MMSP 01-010 Dear Mr Fetrow. In response to your request for the administrative review and approval of modifications proposed to the above-referenced, approved site plan, please be informed that the proposed change of the exterior building color to light beige as shown on the revised plans date stamped 02/15/01 is "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan Review This project may continue to be processed by the Building Division as a permit application. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, J ,} CXUa-W .s aA:<v' Lusia Galav, AICP Principal Planner Cc: Jose Alfaro, Planner nSHRDATA\Planning\sHAREDIWP\PROJECTS\POLY PLASTIC PACKAGINGIMinor \.fad, Approval Lelltr,doc America's Gateway to the Gulfs/ream 100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259 GATOR ENGINEERING SERVICES, INC. 7289 Garden Road. Suit" 104 West Palm Beach. Florida 33404 (561) 841-9990 Fax (561) 841-999J E-mail: gatoreng@ao1.com February 14, 2001 city of Boynton Beach Planning Department 100 E. Boynton Beach Blvd. Boynton Beach, FL 33435 Attention: Mike Rumpf RE: Change of Color for Exterior of New and Existing Prefabricated Metal Building and Office Area Canopy for Poly Plastic Packaging, Inc. Project at 510 Industrial Ave. in Boynton Beach, FL. Dear Mr. Rumpf: This letter is being written requesting a change in color of the exterior of the new and existing prefabricated metal building and office area canopy for Poly Plastic Packaging, Inc. project at 510 Industrial Ave. in Boynton Beach, FL. The color change is from pea green to beige. Attached to this letter are revised colored elevations along with samples of the wall panel and canopy cloth which is requested to be used. If you have any questions in regards to this letter, please feel free to contact me. ~ PROJECT NAME: POL), PLASTIC PACKAGING - ~~<:1Z- LOLa12. ClTh4'i LOCATION:.510 East Industrial Avenue COMPUTER ID: 01-850000010 FILE NO: MMSP 01-010 TYPE OF APPLICATION: MINOR SITE PLAN MODIFICATION APPLICANT/CONTACT PERSON: Robert OWNER! APPLICANT:Robert Fetrow, Fetrow, Gator Engineering Gator Engineering PHONE: 561-841-9990 PHONE: 561-841-9990 FAX: 561-841-9991 ADDRESS: 7289 Garden Road, Suite 104 ADDRESS: 7289 Garden Road, Suite 104 West Palm Beach, Florida 33404 West Palm Beach, Florida 33404 Date of submittal/Proiected meeting dates: SUBMITTAL / RESUBMITTAL 02/15/01 1ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: TRC MEETING: PLANNING AND DEVELOPMENT BOARD MEETING CITY COMMISSION MEETING: COMMENTS: J:\SHRDATAIPlanning\sHAREDlWPIPROJECTSIPOL Y PLAsnc PACKAGINGIPOL Y PLAsncs PACKAGING MMSP-2001IPROJECT TRACKlNG INFO.doc