CORRESPONDENCE
DEPARTMENT OF DEVELOPMENT
Division of Planning and Zoning
Building
Plallning & Zoning
Engineering
Occupational License
Community Redevelopmetlt
February 23, 2001
Mr Robert Fetrow
Gator Engineering
7289 Gardens Road, Suite 104
West Palm Beach, FL. 33404
Re: POLYPLASTIC PACKAGING - EXTERIOR COLOR CHANGE
MMSP 01-010
Dear Mr Fetrow.
In response to your request for the administrative review and approval of modifications proposed to the
above-referenced, approved site plan, please be informed that the proposed change of the exterior
building color to light beige as shown on the revised plans date stamped 02/15/01 is "minor", as defined
within the Land Development Regulations, Chapter 4- Site Plan Review
This project may continue to be processed by the Building Division as a permit application. Please
contact me at (561) 742-6260 if you have additional questions.
Sincerely,
J ,}
CXUa-W .s aA:<v'
Lusia Galav, AICP
Principal Planner
Cc: Jose Alfaro, Planner
nSHRDATA\Planning\sHAREDIWP\PROJECTS\POLY PLASTIC PACKAGINGIMinor \.fad, Approval Lelltr,doc
America's Gateway to the Gulfs/ream
100 East Boynton Beach Blvd., P.O. Box 310 Boynton Beach, Florida 33425-0310 Phone: (561) 375-6260 FAX: (561) 375-6259
GATOR
ENGINEERING
SERVICES, INC.
7289 Garden Road. Suit" 104
West Palm Beach. Florida 33404
(561) 841-9990
Fax (561) 841-999J
E-mail: gatoreng@ao1.com
February 14, 2001
city of Boynton Beach
Planning Department
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33435
Attention: Mike Rumpf
RE: Change of Color for Exterior of New and Existing
Prefabricated Metal Building and Office Area Canopy for Poly
Plastic Packaging, Inc. Project at 510 Industrial Ave. in
Boynton Beach, FL.
Dear Mr. Rumpf:
This letter is being written requesting a change in color of
the exterior of the new and existing prefabricated metal
building and office area canopy for Poly Plastic Packaging,
Inc. project at 510 Industrial Ave. in Boynton Beach, FL.
The color change is from pea green to beige. Attached to
this letter are revised colored elevations along with samples
of the wall panel and canopy cloth which is requested to be
used.
If you have any questions in regards to this letter, please
feel free to contact me.
~
PROJECT NAME: POL), PLASTIC PACKAGING - ~~<:1Z- LOLa12. ClTh4'i
LOCATION:.510 East Industrial Avenue
COMPUTER ID: 01-850000010
FILE NO: MMSP 01-010 TYPE OF APPLICATION: MINOR
SITE PLAN MODIFICATION
APPLICANT/CONTACT PERSON: Robert OWNER! APPLICANT:Robert Fetrow,
Fetrow, Gator Engineering Gator Engineering
PHONE: 561-841-9990 PHONE: 561-841-9990
FAX: 561-841-9991 ADDRESS: 7289 Garden Road, Suite 104
ADDRESS: 7289 Garden Road, Suite 104 West Palm Beach, Florida 33404
West Palm Beach, Florida 33404
Date of submittal/Proiected meeting dates:
SUBMITTAL / RESUBMITTAL 02/15/01
1ST REVIEW COMMENTS DUE:
N/A
PUBLIC NOTICE:
TRC MEETING:
PLANNING AND DEVELOPMENT BOARD
MEETING
CITY COMMISSION MEETING:
COMMENTS:
J:\SHRDATAIPlanning\sHAREDlWPIPROJECTSIPOL Y PLAsnc PACKAGINGIPOL Y PLAsncs PACKAGING MMSP-2001IPROJECT TRACKlNG
INFO.doc