Loading...
CORRESPONDENCE Department of Planning. Zoning & Building 100 Australian Avenue West Palm Beach. Fl 33406 (561) 233-5000 Planning Division 233-5300 Zoning Division 233-5200 Building Division 233-5100 Code Enforcement 233-5500 Contractors Certification 233-5525 Administration Office 233-5005 Executive Office 233-5003 wwwpbcgov.comfpzb . Palm Beach County Board of County Commissioners Warren H. Newell, Chairman Carol A. Roberts, Vice Chair Karen T. Marcus Mary McCarty Burt Aaronson Tony Masilotti Addie L. Greene County Administrator Robert lvVeisman An Equal Opporrunity "Vfirmative Action Employer~ @ printed on recyc/6d paper ~-:,..""." ,-' /".-. <;7> September 24, 2002 Mr Mike Rumpf Director of Planning and Zoning 100 E. Boynton Beach Blvd. Boynton Beach, FL 33435 R~ Savailllah LClKe::; Reil:>Cl::;e of Unity of Title Dear Mike' The County's review of the Savannah Lakes Release of Unity of Title application has been completed. The original Unity of Title encompassed the Savannah Lakes project, a mobile home park, and several other projects. The particular portion in question was annexed into the City of Boynton Beach and subsequently approved for a PUD - Carriage Homes of Congress Lakes (now referred to as Savannah Lakes). A condition in the Unity of Title states: if the mobile home park is removed and property rezoned, the Unity of Title will become null and void The County has determined if any part of the original parcel is alienated, the unity is null and void and that the Zoning Commission has the discretion to release the unity Based on the above, the Zoning Division will place the application for partial release of Unity of Title (for the Savannah Lakes portion only) on the October 3, 2002 Zoning Commission hearing for approval. Should the City of Boynton Beach have any concerns regarding this issue, piease contact Ronald Wong at 233-5088 prior to October 3, 2002. Sincerely, ~f~p Director Zoning Division SEP t'. 6 LIlI .1' cc: Aimee Craig Carlson, AICP, Senior Planner Ron Wong, Planner II U:\Zoning\CODEREV\Release of Unity\2002 ROU\Applications\city bb.sav.lakes.doc .~,,-.\.:'-Y......~.;;" / .J' I . , '.\11 . xi \ 0 '. CJ ~~ \'~ <y~! '."ro N ~/ DEPARTMENT OF DEVELOPMENT PLANNING AND ZONING DIVISION . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment November 29,2001 Mr. Larry McDonald Solid Gold Development Corporation 20283 State Road 7, Suite 300 Boca Raton, Fi 33498 Re: Savannah Lakes Apartments - Conversion of Racquetball Court to Storage Area MMSP 01-084 Dear Mr McDonald. In response to your request for the administrative review and approval of the modifications proposed to the above-referenced, approved site plan, please be informed that the conversion of one (1) racquetball court to a storage area as shown on the revised plans date stamped 11/16/01 is "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan Review This project may continue to be processed by the Building Division as a permit application. Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, dfriA~J Lusia Galav, AICP Principal Planner Cc: Jose Alfaro, Planner Eric Lee Johnson, Planner S:\Planning\SHARED\WP\PROJECTS\Savannah Lakes\Approval Letter.doc City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach. Florida 33425-0310 Phone: (561) 742-6350 . www.ci.boynton-beach.f1.us DEVELOPMENT CORP GENERAL CONTRACTORS Lie. #CGC060247 'I OJ fE @ f[;.--:~-r m. UD/- "_~~I r' JNG (~IO I November 15, 2001 City of Boynton Beach 100 E. Boynton Beach Blvd. PO. Box 310 Boynton Beach, Florida 33225-0310 RE. Savannah Lakes Apartments Dear Eric Johnson: Attached please find four sets of the following architectural and engineered drawings: . Site plan . Architectural plan . Electrical plan . Engineered shop drawing for canopy cover This project is a renovation to one of the existing racquetball courts. The following items are included in the scope of work for this project: · Saw cut an opening in the existing masomy wall to accommodate the installation of a new 8' x 8' impact resistant roll up garage door. · Supply and install a new 8' x 8' impact resistant roll up garage door . Provide an asphah ramp with compacted rock base as required. . Supply and install six (6) circuits for electrical outlets, one (1) light circuit and switch and one (1) 60-amp panel. . Supply and install a 42'-6" x 21 ' -6" multi-ply vinyl roof type canopy attached to the top of the existing walls. Should you need further information regarding the above, please do not hesitate to contact me at my office at 561-482-9303 or on my cell phone at 561-350-7576. tS~~~1t Larry Mc Donald, President SOLID GOLD DEVELOPMENT CORPORATION 20283 SR 7 Bui/ding 300 . Boca Raton, FL 33498 (561) 482-9303. Fax (561) 482-9304 FACSIMILE CITY OF BOYNTON BEACH City Hall, West Wing 100 E. Boynton Beach Blvd. POBox 310 Boynton Beach, Florida 33425 (561) 742-6260 (561) 742-6259 Fax ,:;..-"-- \"l Y ..... i IG-~k'~ ",- . . lJlo(\ .j:c . .~ /(J '1-.,">,. _" -,/<,_ ~-~,.A ,_rON(;'~~/ From the office of Planning & Zoning TO' JM!tL (] {;D E:>. 4/Z/o-f I t FAX. Jt? () - 4-085 FROM: DATE. NUMBER OF PAGES: (including cover) :2- RE. $A-V k1VII/A-t-I- ~.ct:.s ~ I I P9l- ~ br.s~/o.l\J 6 J:\SHROATAIPlannlnglPlannlng TemplateslP&Z FaxIP & 0 Blank Fax.dot If you receive this fax In error, or experience trouble with transmission, please notify our office Immediately; at (561) 742-6260. Thank you. TRANSMISSION VERIFICATION REPORT TIME NAME FAX TEL SER.# 04,12/2004 15.C~ PLANNING 5517425259 BROL3.J875851. DATE, TIME FAx NO./NAME DURATION PAGE(S) RESULT MODE 04/12 15.04 97904085 00.01 1.1 02 OK STANDARD ECM .'.------. r i J - - PROJECT NAME: Savan~_...h Lakes LOCATION: 220 Savannah Lakes Drive COMPUTER ID: I FILE NO.: MMSP 01-084 II TYPE OF APPLICATION: Raquetball Ct I AGENT/CONTACT PERSON: OWNER: Larry McDonald PHONE: PHONE: 561-482-9303 FAX: FAX: 561-482-9304 ADDRESS: ADDRESS: 20283 State Road 7 Building 300 Boca Raton, FL. 33498 Date of submittal/Proiected meetin2 dates: SUBMITTAL / RESUBMITTAL 11/16/01 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A PROJECTED RESUBMITTAL DATE: N/A ACTUAL RESUBMITTAL DATE: N/A 2ND REVIEW COMMENTS DUE: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: Raquetball Court Renovations S:\Planning\SHARED\WP\PROJECTS\Savannah Lakes\200 I PROJECT TRACKING INFO. doc