Loading...
CORRESPONDENCE DEPARTMENT OF DEVELOPMENT PLANNING AND ZONING DIVISION . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment 'fILE COpy March 11, 2002 Mr Ron Uphoff, Architect 4483 Willow Pond Road West Palm Beach, Florida 33417 Re: Baps Temple - Volleyball/Basketball Courts MMSP 02-014 Dear Mr. Uphoff: In response to your request for the administrative review and approval of the modifications proposed to the above-referenced, approved site plan, please be informed that the addition of a volleyball court and a basketball court as shown on the site plan date stamped 03/01102 are "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan Review. This project may continue to be processed by the Building Division as a permit application. Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742- 6260 if you have additional questions. Sincerely, ~JA Sdav Lusia Galav, AICP Principal Planner Cc. Jose Alfaro, Planner Eric Lee Johnson, Planner S"\Ptanning\SHARED\WP\PROJECfS\BAPS TEMPLE CHURCH\MMSP 02-01-I\Approval Letter.doc City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310 Phone: (561) 742-6350 . www.ci.boynton-beach.f1.us Computer Aided Design & Energy Calculations Code & Design Consultant ARCHITECT · PLANNER · INSPECTOR #5133 #616 (561) 683-8028 RON UPHOFF 44830 Willow Pond Rd. · W.P.B FL 33417 The Director Zoning DIvIsion, Planning Zoning & Building City of Boynton Beach, Boynton Beach, Flonda. February 26, 2002 RE: REQUEST FOR MINOR MODIFICATION TO APPROVED SITE PLAN FOR BAPS TEMPLE AT 541 SE 18th. AVENUE BOYNTON BEACH. r: It tl Ii ;....,;l~:_\ _ 12002 L-- Dear Sir or Madam: We hereby request approval for minor modifications to the approved site plan based on the guidelines per Chapter 4 provIded to us. The improvements to the above property are as described under: 1) AddItion of a sand volley ball court 70'x 40' with poles and nets. No lighting is bemg provided at this time 2) Construction of a half basketball court 40'x 40' The court will be constructed of 4" thick concrete slab pitched to provide positive drainage on to the adjacent pervIOUS area. This minor change to the ImpervIOus area does not require any modifications to the drainage plan. These are minor modifications that we believe qualify for the minor modification process, per Chapter 4 of the Zoning Code. Please do not hesitate to call If you need any addItional informatIon. We thank you for your assistance in this process. Sincerely, Ronald L. Uphoff ~~~ 2. 2~.O~ ~;':':'~'."0>'.,r~'~/'\, . . . .'." . .' - - '.' -'"-'-.".'~.._~-- \1Io,-'),:r-// t.}::t",/, 7' r (; ~~ ~.... GENERAL yQNT ACT: Inauirles re: Oefine4< PROCESS C~iterla: E> r. :d MINOR MODIFICATION PROCESS (Chapter 4) FACT SHEET City Codes AC:C:8SSed Via Websltll: 'f:!'HW bovnton.b.aeh.ora www.aml.gal.com/ooynton_beach_f1.iU Planning & Zoning Division - (561) 742-6260 Minor Modification A change to an approved site plan or built site which Qualifies as a minor modification ;s defined by criteria listed in the land Development Regulations, Chapter 4. Site Plan Review. Modifications qualifying as Nminor" may be approved administratively. This process Is initiated with four sets of plans showing the proposed modifications, e cover letter describing In detail the proposed changes and reQuesting the determination of .mino!"', and a fee of 5100.00. The determination will be made within approXimately one week. Those projects deemed "major' must be proceased through the complete site plan process initiated by requesting a pre- application meeting. Once determined "minor", applicatIons for building permits may be submitted to the Building Division by the applicant or his/her designee. NOTE: INTENSIFICATION OF NON-CONFORMING SITES, OR CHANGES IN USE, MAY INITIATE REVIEW AND RECTIFICATION OF EXISTING NON- CONFORMITIES SUCH AS NUM8ER OF PARKING SPACES, PARKING LOT LAYOUTS, AND LANDSCAPING. In making a minor/major modification determination, the following shall be conSidered: a. Does the modification increase the buildable square footage of the" NO . development by more than five (5) percent. b. Does the modification reduce the provided number of parking spaces below the required number of parking spaces. NO . c, Does the modification cause the development to be below the development standards ror the zoning district in which it is located or other applicable standards in the Land Development Regulations. ~ d. Does the modification have an adverse effect on adjacent or nearby property or reduce reQuired physIcal buffers. such as fences, trees, or hedges. f.O e Does the modification adversely affect the elevation design of the structure or reduce the overall design of the structure below the standards stated in the NO . community design plan. r. Does the modified development meet the concurrency requirements of the d?\. Boynton Beach Comprehensive Plan. \ 7' Q. Does the modIfication alter the site layout so that the mOdified site plan does not resemble the approved site plan. t> 12986L : 01 :wo~~ d8f:80 2002-02-83j Minor Modification Process ract Sheet Page 2 fr2cess: Request is submitted to Planning and Zoning Director and consists of: a. Four sets of plans or drawings clearly showing the proposed changes on the appropriate documents (e,g. site plan, landscaping plan, elevation drawings, etc.). All tabular data should be updated, or provided, to reflect proposed changes. Changes affecting impervious surfaces may warrant submittal of a drainage plan. b. A cover letter requesting minor modifications and listing/describing the specifio proposed Changes. c. A $100.00 processIng fee. d. A current survey may be required depending on the magnitude of any building expansions, The review is conducted Within approximately one week (see item #4 below). The Director generates a letter documenting the results (Major or Minor) and forwards it to applicant and the Building Division. A pre-application meeting Is optional, but a direct discussIon with a planner prior to submittal is required. If Minor: "The letter, rel:juest, and one set of plans erB forwarded to the BuildIng Code Administrator. "Building permit applications are filed by applicant, Ineluding the approval letter, or revisions flied If minor modifications differ from permit drawings (if submitted prior to approvQI of minor modification. If Major: "Modifications must be processed through the full site plan review process required of new site plans or major modifications to existing plans or Sites. "A pre-application meeting must be held prior to submittal for major modificatiOns. QUESTIONS/ANSWERS Q: -Hew long does it take for "minor' determlnaUon? A: The review period ia a factor of the magnitude of propo$ed changes. The review penod requIred for the simplest of proposed Changes is approximated one week. However, if 1I1e changes are significant, which warrants revIews Oy other TRC members, and addlUonal infonnation and feedback frem the applicants. !WO to four '.\leeks msy be required for thOse requests involving extensive revisions to the site, the TRC review process may be warranted which could increase the review time and the processing fee (based on duration and hourly rate of revlewers). Q: *What information is reviewed for /'minor" determimJtion? A: Generally, this review targets whether the proposed changes impact the size or appearance of the site plan or existing improvements. This review will also attempt to anticipate and resolve site plan design issues fllat may be initiated by the proposed changes (e.g. impact of the proposed changes en solid waste removal by Public Works). Staff 'NIII also consider application of regulations on non-conforming uses and sites as indicated in Chapter 2. Zoning, Sectlol'1 11.1. E>2:d t11; ~'386.!.. : 01 :WOd= d6~:80 2002-02-83~ ) - <II> Minor Modification Process Fact SMst Page 3 Specific limitations are placed on the expansion and improvements to non- conforming uses and proper1iee. Q: *If the proposed changes .to d..med minoT, can the changes be made without involving thQ permIt process? A: No, the minor modification process is not a $ubstilute for the permit process. If permit applications were filed prior to requesting "minor" determination, the permit applications must be revised for consistency with the proposed changes. Q: -If the project Is d..",.d "mino,.", are the plans automatically forwarded to the Building Divi$/on for p.nnit review? A. No, as the miner modification process i$ separate from the permit review process. All applications for permit must be submitted by the applicant or his/her designee. Revilltld 2.16.01 J:\SHRDATAI.Planning\SHAREO\WP\Procidures\FACT SHt=ETS\Minor Mod Fact SneeI1-29-01 ,doe. E>Z:d b 1: 2986L : 01 :wo~~ d6[:80 20a2-02-83~ PROJECT NAME: BAPS .L~MPLE r LOCATION: 541 SE 18TH AVE. PCN: I FILE NO.: MMSP 02-014 I TYPE OF APPLICATION: Minor Modification AGENT/CONTACT PERSON: OWNER: Baps Development, Inc. Ron Uphoff, Architect PHONE: PHONE: 561-683-8028 FAX: FAX: 561-683-2622 ADDRESS: ADDRESS: 4483 Willow Pond Rd. West Palm Beach, FL. 33417 Date of submittal/Proiected meetin2 dates: SUBMITT AL / RESUBMITT AL 3/1/02 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A PROJECTED RESUBMITTAL DATE: N/A ACTUAL RESUBMITTAL DATE: N/A 2ND REVIEW COMMENTS DUE: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: Sand volleyball & half basketball courts. -fc, pl~ up CfprovcJ {etJe.rL . ;t( C~~ steffe Na.fle.re. at ~~( -(d)l- 88Li8 S:\Planning\SHARED\WP\PROJECTS\BAPS TEMPLE CHURCH\MMSP 02-014\2002 PROJECT TRACKING INFO,doc