Loading...
CORRESPONDENCE DEPARTMENT OF DEVELCPMENT PLANNING AND ZONING DIVIS ION . Building . Planning & Zoning . Occupational Licenses . Community Redevelopment April 1, 2002 .. Mr. Stephane Cantm Altman Contractors, Inc. 2201 Corporate Blvd. NW Suite 200 Boca Raton, FL.33431 Re: Hampshire Gardens - Gazebo MMSP 02-022 Dear Mr.Cantin: In response to your request for the admirustrative review and approval of the modIfications proposed to the above-referenced, approved site plan, please be informed that the gazebo addition as shown on the sIte plan date stamped 03/21/02 is "minor", as defined within the Land Development Regulations, Chapter 4- SIte Plan Review. TIns project may continue to be processed by the Buildmg Division as a permit applicatIOn subject to the following conditIon: 1. A three (3) foot setback from all property lines is reqUITed for the gazebo structure. (Chapter 2, Sec.4, J.) Be advised that the proposed change may require a modificatIon to the building permit. Please contact me at (561) 742-6260 if you have addItional questions. ()&~ d~a.~ Lusia Galav, AICP Principal Planner Cc: Jose Alfaro, Planner S:\Planning'SHARED\ WP\PROJECTS\HAMPSHIRE GARDENS\MMSP OZ"{)22\Approvat Later.doc City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310 Phone: (561) 742~350 . www.ci.boynton-beach.fl.us ALTMAN DEVELOPMENT CORPORATION March 20, 2002 Maxime Ducoste-Amedee Planner City of Boynton Beach Planning and Zoning Division 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425-0310 Re Tuscany on the Intercoastal at US1 and SE 23rd Avenue, Boynton Beach, Florida Minor Modification Application for Hampshire Gardens Gazebo Dear Sir: Please let this letter serve to advise you that Altman Development Corporation would like to install a Gazebo on the Hamphsire Gardens site adjacent to our clubhouse The gazebo will replace an aging shade structure The proposed wood gazebo is 8 feet in diameter and will be installed approximately 2 feet off the property lines This location is approximately 45 feet from building # 2440 Should you have any questions or require additional information, please do not hesitate to call Sincerely, ALTMAN DEVELOPMENT CORPORATION (~ Stephane Cantin Project Manager ~ 2 I 2201 Corporate Blvd N W, Suite 200, Boca Raton, Flonda 33431 (561) 997-8661 Fax (561) 997-8706 03/21/2002 13:51 5519979576 ALTMAN DEVELOPMENT ALTMAN DEVELOPMENT CORPORATION 2201 CORPORA T10N BOULEVARD N.W. SUITE 200 BOCA RATON, FL. 33431 DEC. 15, 2001 RE; TUSCANY ON THE INtERCOSTAL DEVCELOPMENT. GAZEBO REPLACEMENT. PAGE 02 DEAR MR. KOEHLER, THANK YOU FOR YOUR LETTER OF DEC. 12, WHEREIN YOU OFFER TO REPLACE A 8 FOOT GAZEBO IN EXCHANGE FOR OUR lNCOVENICE DUE TO THE CONSTRUCTION OF YOUR DEVELOPMENT, AND OUR CLAIM OF ADVERSE POSSESSION OF A SECTION OF LAND APPROXIMATELY 3 BY 20 FEET. OUR CORPORATION ACCEPT'S YOUR OFFER, ON CONDITION THAT THE GAZEBO IS ASSEMBLED AND LEVELED AT YOUR EXPENSES ON THAT AREA NEXT TO YOUR DEVELOPMENT AND THE WATER. /0~ 1esEPH P. VITALE PRES, 2440 CORPORA nON 2440 S. FEDERAL HIGHWAY BOYNTON BEACH, FL. 33435 561 '736 3368 r - [l . ~ ,.-_L.~-._, . i , ___ __,_.A 21 PROJECT NAME: Hamp~t.ire Gardens LOCATION: East side of Federal Highway PCN: I FILE NO.: MMSP 02-022 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: Joseph P. Vitale, President Stephane Cantin, Altman Contractors, Inc. 2440 Corporation PHONE: 561-237-1330 PHONE: 561-736-3368 FAX: 561-997-9576 FAX: CELL: 561-866-7968 ADDRESS: 2440 S. Federal Highway ADDRESS: 2201 Corporate Blvd. NW Boynton Beach, FL. 33435 Suite 200 Boca Raton, FL. 33431 Date of submittal/Proiected meetin2 dates: SUBMITTAL / RESUBMITT AL 3/21/02 1sT REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A PROJECTED RESUBMITTAL DATE: N/A ACTUAL RESUBMITTAL DATE: N/A 2ND REVIEW COMMENTS DUE: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: See agreement between Altman and Hampshire Gardens for Gazebo. S:\Planning\SHARED\WP\PROJECTS\HAMPSHIRE GARDENS\MMSP 02-022\2002 PROJECT TRACKING INFO.doc