TRAFFIC IMPACT ANALYSIS ~=~ Kimley.Horn and Associates, Inc. TRAFFIC IMPACT ANALYSIS Woolbright Plaza Boynton Beach, FL Prepared for: Ms. Veronica Motiram Boynton Beach, FL 040871000 March 2001 @ Kimley-Horn and Associates, Inc. 4431 Embarcadero Drive West Palm Beach, Florida 33407 561/845'()665 TEL 561/882-3703 FAX ~l1L;f' '12- Robert A. Ross, P.E. Florida Registration Number 56978 Engineering Business Number 696 3/g/D ( ~=~ Kimley-Horn and Associates, Inc. TABLE OF CONTENTS SECTION PAGE INTRODUCTION .. . . . . . .. .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . .. .. . . . .. .. .. . . . . ... 1 IN"~NTOR1{ J\ND P~J\NNINCi DJ\TJ\.............................................. 2 Inventory. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Planning Data...................................................................... 2 PROJ~CT TRA.FFIC .. . . ......... . . . .. . . . . . ...... . . . . . . ....... . . ..... .. . . ..... . .. . . .... .... 4 Traffic Cieneration ................................................................ 4 Traffic Distribution............................................................... 4 Traffic J\ssignment ............................................................... 6 BJ\CKCiROUND TRA.FFIC .............................................................. 8 J\SSUR~D CONSTRUCTION........................................................... 9 ~INK ~"J\~UJ\ TION ................................................................... 10 Test 1.............................................................................. 10 Test 2.............................................................................. 10 DRN~W J\ 1{ C~J\SSIFICJ\ TION & TURN ~J\N~ R~QUIR~M~NTS....... 13 Driveway Classification........................................................ 13 Turn Lane Requirements...................................................... 13 CONC~USION............................................................................ 15 J\PP~NDIX 040871000.Q301 Page i ~=~ Kimley-Horn and Associates, Inc. LIST OF FIGURES Fif/ure No. Title Paf/e 1 Site Location Map ...................................................... 3 2 Project Traffic Assignment........ ............. .... ................ ...7 3 Peak Hour Project Traffic ........ ... ....... .............. ........... 14 LIST OF TABLES Table No. Title Paf/e 1 Trip Generation.......................................................... 5 2 Average Daily Traffic Link Analysis (Test 1) .. .. .. .. .. . .. .. .... 11 3 Average Peak Hour Traffic Link Analysis... .. .................. 12 04087 1 OOO.()301 Page ii ~=~ Kimley-Horn and Associates, Inc. '-1gb b l-l, C{fr[) /" p~ ~ ~/' Lfo) 00 CJ <3D; ~ 'h- I 0; v'(J C . ~ 3SD ~ . / bl J l-fD 0 ~J1f' ( 17 ( 70 --::: 'DWD- \ The Woolbright Plaza is proposed 1 intersection of Congress A venue an The proposed site plan consists of apprOXImatelY '}V,vvv "'iU<U" ..w. ~& ~&_.__ _.-___ no more than 15,350 square feet of general commercial retail (10,000 of which is on the first floor of the office building), and an approximately 12,400 square foot pharmacy with drive-in. The site is currently occupied by an approximately 8,000 square foot drive-in bank, which is to be demolished. \ Kimley-Horn and Associates, Inc. was retained to prepare a traffic impact analysis for the project. This document presents the methodology used and the findings of these analyses. The traffic impact analysis was conducted in accordance with the updated Traffic Performance Standards of Palm Beach County. The analysis used current data available from Palm Beach County. The buildout year for the proposed development is 2002. 040871 000.030 I Page 1 ~=~ Kimley-Horn and Associates, Inc. INVENTORY AND PLANNING DA TA Inventory The data used in this analysis were obtained from Palm Beach County. They included: . 2000 24-hour traffic volumes . Roadway geometries . Approved development traffic . Historic count data The location of the site is shown in Figure 1. Planning Data Access to the development will be provided through one right-in, right-out only driveway on Woolbright Road and one right-in, right-out only driveway on Congress Avenue. Cross access will be provided to the adjacent development to the south. 040871000.()301 Page 2 OLD BOYNTON RD. BOYNTON BEACH BLVD. ~ ~ :i PtPER'S GLEN BL Fl.A\IOR PlCT RD. ~ ~ ) NOT TO SCALE P:\0llM:\4ClI7100G\WOCll.I-JI&. .1-8-01 WOOI.SRlGHT RD. d II: i g ... o 15 ~ GOlF RD. MINER RD. ~ ~ '" " z 8 GATEWAY BLVD. r--, SITEL_J LEGEND . INTERCHANGE d '" ... 8 12 ~ :J: ~ al : ~ '" g Ul f ~ ~ ~ <U I:) a I:) ..... 'l...:a ~ ..... 'l...:a ~ FIGURE 1 WOOLBRIGHT PLAZA SITE LOCATION MAP ......,_n KlmIey-Horn ~_U and Associates, Inc. o 040871000 ~=~ Kimley-Horn and Associates, Inc. PROJECT TRAFFIC Traffic Generation The daily traffic generation for the development was based on trip generation rates published by Palm Beach County. Peak hour characteristics were based on infonnation published in the Institute of Transportation Engineers' Trip Generation Report (6th Edition). Table I presents the proposed potential trip generation for the project site. Pass-by rates published by Palm Beach County were used in the analysis. Internal capture of trips between complimentary uses was assumed to occur. The trip generation potential of the existing bank on the site was removed from the total trip generation to obtain the net new external trips. Only the net new external trips are subject to compliance with the Countywide Traffic Performance Standards. Traffic Distribution From a review of the existing and approved development in Palm Beach County and considering the arterial network with its travel time characteristics, the external traffic distribution was calculated. These were summarized by general directions and are depicted below: NORTH SOUTH EAST WEST 19% 31% 25% 25% 040871 OOO.()30 1 Page 4 TABLE 1 WOOLBRIGHT PLAZA TRIP GENERA nON Land Use Intensity Daily AM Peak Hour PM Peak Hour Trips Total In Out Total In Out Proposed Site Traffic Pharmacy with Drive-Through 12,400 sJ. 1,350 33 19 14 129 63 66 General Office 30.000 sJ. 565 71 62 9 113 19 94 Commercial Retail 15,350 sJ. 2.191 52 32 20 182 87 95 Subtotal 4,106 156 113 43 424 169 255 Internal Capture Pharmacy to Office 10.00% 113 7 4 3 23 12 11 Retail to Office 10.00% 113 10 5 5 23 12 11 Retail to Pharmacy 10.00% 270 1 1- J 26 11 11 Subtotal 496 24 13 II 72 37 35 Pass-By Traffic Pharmacy with Drive-Through 40.00% 463 10 6 4 42 20 22 General Office 5.00% 23 3 3 0 5 0 5 Commercial Retail 44.75% 895 19 12 1 70 33 37 Subtotal 1,381 32 21 11 117 53 64 Proposed Net External Traffic 2,229 100 79 21 235 79 156 Existine: Site Traffic Drive-in Bank 8,000 s.f. 2,122 101 57 44 438 219 219 Pass-By Traffic Drive-in Bank 46.00% 976 46 26 20 201 101 100 Existing External Traffic 1,146 55 31 24 237 118 119 Proposed Driveway Volume 3,610 132 100 32 352 132 220 Net New External Traffic 1,083 45 48 (3) (2) (39) 37 Note: Trip generation was calculated using the following data: Daily Traffic Generation Drive-in Bank [PBC] = T = 265.21 trips 11,000 s.f. Pharmacy with Drive-Through [PBC] = T = 108.85 trips 11,000 s.f. General Office [PBC] = Ln(T) = 0.756 Ln(X) + 3.765 Commercial Retail [PBC] = Ln(T) = 0.625 Ln(X) + 5.985 AM Peak Hour Traffic Generation Drive-in Bank [ITE 912] = T = 12.63 trips 11,000 s.f. (56% in, 44% out) Pharmacy with Drive-Through [ITE 881] = T = 2.66 trips 11,000 s.f. (57% in, 43% out) General Office [ITE 710] = Ln(T) = 0.797 Ln(X) + 1.558 (88% in, 12% out) Commercial Retail [ITE 820] = Ln(T) = 0.596 Ln(X) + 2.329 (61 % in, 39% out) PM Peak Hour Traffic Generation Drive-in Bank [ITE 912] = T = 54.77 trips 11,000 s.f. (50% in, 50% out) Pharmacy with Drive-Through [ITE 881] = T = 10.40 trips 11,000 s.f. (49% in, 51 % out) General Office [ITE 710] = T = 1.121 (X) + 79.295 (17% in, 83% out) Commercial Retail [ITE 820] = Ln(T) = 0.660 Ln(X) + 3.403 (48% in, 52% out) p:I[)4()(NOO46Vwoo/p/az.xlsJtrip gen 3/81200/ JJ :07 ~=~ Kimley-Horn and Associates, Inc. Traffic Assignment The distributed external trips for the project in 2002 were assigned to the roadways within the radius of influence, both in terms of daily external trips and AM and PM peak hour volumes. The project assignment is illustrated in Figure 2. Based on the net impact of the project, it was determined that the maximum radius of development influence for Test I of the traffic performance standards is two (2) miles while the Test 2 radius of influence is one (I) mile. 04087 1 000.()301 Page 6 ptPER'S GlEN BL OLD BOYNTON RD. BOYNTON BEACH BLVD. ~ ~ :i 16% WOOlBRIGHT RD. FLAIIOR PlCT RD. ci Ill: i ~ iiJ ) NOT TO SCALE fO:\DIM.\.4OI11oaa\WOOlA-flL 3-&-Gt ci Ill: '" o ~ ~ ~ Q) GOlF RD. MINER RD. GATEWAY BLVD. 2% 1% 25% r--.., SITELJ tl! 2% (? ~ ~ Ill: " Z o o :>l! Co ~ Q) 201. tl! ~ tl! ;: ci II: 8 it: x " i: 1"1. ~ : ~ ! II: ~ g 1Il ~ 12% 25% 8% FIGURE 2 WOOLBRIGHT PLAZA PROJECT TRAFFIC ASSIGNMENT ~_n KimIey-Hom _U and Associates, Inc. o 040871000 6' 1 ~ ~ Cll o C o .... 't.) ~ .... 't.) ~ ~=~ Kimley-Horn and Associates, Inc. BACKGROUND TRAFFIC Background traffic is comprised of two components: · Traffic from the unbuilt portions of approved major developments · Historical growth Traffic from the recently constructed Wal*Mart Supercenter, the proposed BJ's Wholesale Club, and the proposed Sonny's Restaurant north of the site were also included in the analysis. A summary of traffic from these projects is included in the Appendix. No other major projects would contribute greater than ten percent (10%) of the level of service standard on any link significantly impacted by the project during its buildout time frame. According to the requirements of the Traffic Performance Standards of Palm Beach County, existing traffic volumes were grown by factors determined by a review of growth data published by Palm Beach County. The total background traffic was determined for each link within the radius of development influence by applying an annual growth rate through the buildout year and adding approved project traffic. 04087 1 OOO.()30 1 Page 8 ~=~ Kimley-Horn and Associates, Inc. ASSURED CONSTRUCTION The existing laneage for each link analyzed was identified. A review of the Five- Year Plans of Palm Beach County and the Florida Department of Transportation, as well as those improvements committed by the developers of projects in the area was made to identify pertinent roadway improvements. No roadway improvements are planned in the study area. 040871 OOO.()30 1 Page 9 ~=~ Kimley-Horn and Associates, Inc. LINK EVALUA TION Test 1 A link performance standard evaluation was undertaken for each link considering its total traffic volume and the roadway laneage to be in place in 2002. Project traffic and total traffic for 2002 are shown in Tables 2 and 3 for daily and average peak hour conditions. As can be seen, all roadway links upon which the project has significant impact meet the average daily and peak hour level of service standards through 2002. Test 2 The Model Test 2 indicates a radius of influence of one mile from the site. No roadway segments on the Test 2 failure list lie within the project's one mile of development influence. 040871 OOO.()30 1 Page 10 '0 .. ;::;: '" ~ 5 I- g!i f ~"'~I- i'!l '" ;.. ..:l ;:S ~ ~ ~ N E- ~ ~ =..:l ~cu I- iil E S ~ ~ ~ :( Q ~ j;:i ~ < ... 1l"''E .. - co .. ., '0 :E~! <I) -5 g ~ . ",I-~ c co tl ~ it~: '! oS ... ii5 tl Q .~ ~ CI'J .. 0 ~ ... - " ~ IE '0' co .. .. ~... c 5 ~ E t Of' .~ ~~~ '0 ~~E E Of' f o ~... U .c .. i s o " .. co cr-. =... g~ "'< Q~ - " ii(S~ ::::"'u .~ o ~ U E i ., .. .. .:3 o QE - " <I) ~ ~S~ 'il 's< .. ;l ~ ~ ; " ... ZO ~ o 0 zz ~~ ..... ..... 00 00 N - N - ~~ 88 N""": ~~ C'i..f <"'l- ...... VlN ~~ N...f' <"'l_ ...... VlN -g ..Q:i 8-5 ~ '" < .. .,lXl ., c::l tbB c::l ~ o 0 UlXl w CI.l CI.l I .. .. .. >->->- a;~~ 1_"I:t_ ~~o\ NN<"'l o 0 zz ~~~~~ . '" .. >- 00 00 o ~ o '" z~ ~~ Vl 00 -Vl 00 N..... N 00 ~~ 88 MOO -8 ~ ~ ::!; ....; N <"'l : - ~~ :i:i ...... NN ~~ :t:t ...... NN .. " c::l "'0 <..:: .,lXl ~~ € ~ u~ I , I en U) I .. .. >->- Vl ..... ..... <"'l ~N' ~-q: <"'l <"'l o Z ~~~~~~ ~~ 83 00 ~~~~~ ~c-r'lr-V'lO V'lOOV'lVl"'=t" cio""":oo ~ o <"'l o ~~~~~tf ('<')ONt-O'\'I::j- -N<o::t"-\OM cicici""":oo -N -N ~-O\-o r-r-Ot-M -MV'lN- ..... 00 Vl.....8;!~~ \00\("411)('1')_ ~~ 88 """:N ~~~~~ ItCivi~viM -N~N- ~ 8 '" ~~~~~~ 88~~~~ ..oO-:2:;f;i;;;::: 00 00 <"'l --N 0\ C'\ 0\ I ~C"'loO NN<"'l '~~~ 00 00 'C --..... ...a-..6-.i NN'C --'C NN~ -:--:v)" NN<"'l ~~ 0000 ~~ ~~~~~ NNNoOM ('l"'l,MtI"l~('f') NN <"'l <"'l VlVl -- 00 00 'C 'C I C") f") I NN <"'l <"'l ~~ 00 00 ..... ..... 00 - - . 00 ..... ..... ~~ -- <"'l <"'l 8 Vl C'i <"'l ~~~~~~ 000000000000 "I:t-.::t"l:t"l:J"-.:t-.::t 99 'C'C 99999 -q-..q-.q-\O"d" 9 ~ 999999 \0\0\0\0\0\0 ~~ 0000 ~~ ~~~~~ t"'iNNoON f"1('f')M'o:::tM 8 Vl C'i <"'l ~~~~~~ 000000000000 "I:t'o:::t""l:t"l:J"'o::J"'o:::t 99 'C 'C 99999 <Il:t"'d"-.::t\O'o:::t 9 ~ 999999 \0\0\0\0\0\0 "" .. '" " 0 ll~ > c::l <B Zl ~ tb~ c::l'C 0_ UO ...... ~ ; E o ~ ~ ] ~.~ -:; lXl oCCf.I _ tl ~ tb e ~.~ c V'l ~ jJ:85:~ "" '" o ~ ~ .;:: .0 g ~ .,,; '0":: (U !:Q "'0 >. ~i3g~ '0 c::l:l~"" '" BlXl~.l: g~ ~ c::l';:: 0 ~ '" ~B==~<;::a '0 ~ 8 '2' 'E ~ <5~~o:;~U 'E t -g ~""] 'C-o 88"'0 g "0 ~g ~ = ~.9~"Oo'" ~ !"'lllXl"'Il'C_"'~1l _.. i3~=-u ~ l>:~<~~<!i~l< 1<1~5~1~~1~ S...,:l..Zl-.....OZl ~"'Zl~ >....~~O" ~~~~~tbj~~~tb ~~tb~li~~I~~< o~gS~g~~~.2'g~<~..t~~~;::a~8.2''E ~ju~jul:EjO:;u~'E:E8~lXl..dolXl~O:;~ <5 ~ ~ ~.:3 8 f ~ lr-. ~ l;! ~ 8 ~ "" :a i j , .. '" ;;; ;.. ...l < Z < ~ <~ N...l <u ...l- ..,ll..!i: r.:1!i:~ ;!:aE-< <lll:lll: E-<i:Q:J ...l0 O=:: !2~ ~< r.:1 ll.. r.:1 ~ ~ r.:1 > < ". J!l...-e t ... os ~~'g S tI) CJ <'lSS;:; ~ <= e! <'lE-oE-o c ~ ~ ~. l;: Q., ". '~.s ". Vi ... CJ ~s;:; ..... 01 <= .. ='=E-o c ... ... ., 5 ~ E t -E' .~ ll..ll..~ ~ v (,J '13 ~~ ~ ='= E-o ." = s 2 i ~ ~E-o os = ;; ~ ~ v <= os ~~ ~I; 8 t = <'l~f ." ., ;: E E t rl <= .0 = U ~ ~ zo ~~ tI) l1! ~ 0 iii .g...:lU III 'R r.:1 ~~ tI) ~ o os ...:lu .. rl l: = '" os s...:l zo e E-o o 0 zz - 0 11'<11'< N- 00 NO- Of') M'-:' ...:l...:l V'lN 00 NO- Of') M'''': ...l...:l V'lN -d > gii =.= ~ ~ <= ., = ~B = ~ o 0 U= ., ., ., '~~~ ' '0'0- I ~~~ I NN~('f') o 0 ZZ o {/} Vol tI) 0 Z~~~Z "0 ,?; ., , G.l >- o ,~ ,....; ~~ -'<I' 11'<11'< N 00 '0 '0 , II'< .;::!; ,0- O. - 00 0- 0- :}:J- ...:l...:l NN 00 0- 0- :!:! ...:l...:l NN '" =' = ~] .,= rl'i;; toe = ~ o G.l Uti) ., ., I ~ ~ I '0 '0 r-'O, MM o Z o 0 0 Vol Vol 0 zzz~~z 0- r-:::N:::Vl '<I' ("f"'j,<&0'\~:!V) 11'<11'< -N 11'<11'<11'<11'<11'< 1.OV'lt'V'lN -C"I"l;f"N- II'< 0- 1I'<t;l<t;l<t;l<t;l<t;l< \OO\~~;;;:::::: '0'0'0' V'l V'l 0- I ~ ~ \0 I NNM t;l<t;l<t;l< I ~~~ I -o-o-.i f') f') 00 t ~~~ I "':-:M' 00 V'l V'l V'l V'l ~~ 00000 NNNV'lN OOOlt'iO MMM~M N N I ::!;:! I =:=: 10'0' I MM t;l<t;l< I ~~ I dd ,~~ ' C'iC'i o N o <"i 000000 V) \() V') V) V'I l(') lOV)\()1.t')V'lVl ~~~~~~ 99 '0 '0 00000 ...:l..J...:l;.J...:l '<1''<1''<1''0'<1' o ...:l '<I' 000000 ...:l...:l...:l..J..J..J '0'0'0"''''''' 00 V'l V'l V'l V'l ~~ 00000 NNN\()N O'O'O'l{")O' MMM<o:iM' o N o <"i 0'0'0'0'0'0' V'll/") l(') V') Vi iii V) l,f) V) V') l/") V') ~~~~~~ 99 '" '" 99999 "<t"<t"<t'O"<t 9 "<t 999999 \0 \0 \0 \0 \C \0 "'~ E! 0 "'~ <~ ., ~ ~~ =-0 0_ uo >>'" ~;E! o ~ ~ ~.I;: < 80" = C t': rl 'fl easto .... ~.O' c:: lI'1 ~ .:H:: 8 5: "l -0 os o ~ ~ .C .&> "0 o ~ -d -o,?; g 1:Q"i ~ ~'=o~ -0 c::~~~t,)g B&l~.cE!~ ~=.co~os ~B~ll<;S -0 ~ 8 '0' 'E ~ o~~Q:~.::l "c:l = 1 ~ ~ ~-a g ~g g ~ ~~CC"Ct~ "'~=e~= ~~= =.= ~~.=~; ~o~=o~i~o"'~ ~~ ~~='c~~G.lG.l ~~<~~<e~~~< ....<i&l=~B&l~~=' =8''~8,,,~E-08QIIl .,E-o",o ~ ~ ~o~ ~ = ~= ~ ~i~ = 1l ~ 5 ~ ~ ~ ~ < ~ ~ ~ ~ 1l < l~=g~=~=~'~~=V'l>==8=~~B_~8~o-o.... e~o~~o -~ oo-~-o 0 0l~0 =~U=~U~~~ u~~~ut= cO=~Q:~ ." >-. C .. ~ = o ~ ~ ~ ~ 8 i;'E ~ e .,,~ os e ~ ... ... '" :8 ~ ~ ~ .s. 'il " s .s. ~ i <i. ~=~ Kimley-Horn and Associates, Inc. DRIVEWA Y CLASSIFICA T/ON AND TURN LANE REQUIREMENTS Driveway Classification According to the Palm Beach County "Guide Parking Lot and Street Access Design Criteria and Standards", it is necessary to classify project entrances as minor, intermediate, or major according to the following criteria: 1. Minor - Provides for a maximum average daily traffic of 500. 2. Intermediate - Provides services for a maximum average daily traffic from 501 to 2000. 3. Major - Provides service for a maximum average daily traffic greater than 2,000. Using these criteria, both driveways will be intermediate driveways. Turn Lane Requirements Figure 3 illustrates the proposed project's AM and PM peak hour volumes assigned to the project driveways. Palm Beach County code requires a right-turn lane when inbound peak hour right-turning traffic is 75 vehicles or more. Therefore, code warrants an ingress right-turn lane driveway on Congress Avenue. 04087 I OOO.()30 I Page 13 WOOlBRIGHT RD. (33) 25 Fi: -~ -- I C\I C\I Cii It) :; -- -- -- --1 ! 116971 Oi ~ It) ,... ~ 11913 1 (68) 10 ~ i i ! i i Ln__________n____n_____________________j SITE ~ W ~ LEGEND ~ ~ ) 10 AM PEAK HOUR VOLUME (68) PM PEAK HOUR VOLUME 119131 DAILY TRAFFIC VOLUME FIGURE 3 WOOLBRIGHT PLAZA PEAK HOUR PROJECT TRAFFIC NOT TO SCALE ~_n Kimley-Hom IIIl...I_U and Associates, Inc. o 040871000 P:\1WI'l\4OI7IClOG\WOCU....... 3-1-01 ~=~ Kimley-Horn and Associates, Inc. CONCLUSION This traffic impact analysis shows that the proposed Woolbright Plaza development meets Palm Beach County's Traffic Performance Standards. 040871000.0301 Page 15 ~=~ Kimley-Horn and Associates, Inc. APPENDIX TABLE A-I WOOLBRIGHT PLAZA COMMITTED PROJECTS LIST Project Project PUD Project Approved Project Start Year Buildout % Remain Buildout Factor (I) Wal-MartlSonny's 2000 2001 100% 2002 100% (2) BJ's Wholesale Club 2000 2003 100% 2002 67% p:VJ406\l00461[ woolplaz.xls lmajpro _list 3/8/2001 9:42 3/8/2001 9:42 TABLE A-2 WOOLBRIGHT PLAZA COMMITTED PROJECT TRAFFIC Roadway 100% 67% Total From To (1) (2) Project Traffic Woolbright Road Lawrence Road Project Driveway 0 0 0 Project Driveway Congress A venue 0 0 0 Congress Avenue 1-95 0 0 0 23rd Avenue Congress Avenue Seacrest Blvd 0 0 0 Congress Avenue Woolbright Road Project Driveway 965 567 1,532 Project Driveway 23rd Avenue 965 567 1,532 p:VJ4061700461[ woolplaz.xls ]majprojjlaily 3/812001 9:42