Loading...
REVIEW COMMENTS ,', (f " '- " ,", ; " _.. 1'- ,.~/ The City of Boynton Beach DEVELOPMENT DEPARTMENT DIRECTOR'S OFFICE 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6372 FAX: 561-742-6089 www.boynton-beach.org Outstanding items from the Second Amended Mediation Agreement - As of 11/22/06 1. Restore parking pattern along Casa Loma Blvd and within the Parking Garage as depicted in the approved plans, Exhibit B, and Section 12 A of the Second Amended Mediation Agreement. Immediately cease all parking on the undeveloped Restaurant parcel and Overlook area. Parking is allowed only in designated parking areas. 2. Remove all valet restrictions from all non-Two Georges parking spaces. All six (6) handicap parking spaces located at the eastern end of Casa Loma Blvd must remain open and accessible for self-parking by any vehicle which displays a disabled parking permit. (FS 316.1955) Relocate Valet booth to Two Georges property. 3. Restore traffic circulation to original agreement, permitting non-exclusive right of ingress and egress to the public. 4. Convey all required reservations and dedications to the City Engineering division. (Exhibit E and Exhibit H Conditions of Approval COUS 98-008, comments 12,26,60 of the Second Amended Mediation Agreement; Conditions of Approval COUS 03-003, comment 15.) 5. Provide the City with the required engineer's estimate for the cost of the Casa Loma Overlook improvements as specified in Article 12 E and Comment 27, Exhibit H, Conditions of Approval COUS 98-008, of the Second Amended Mediation Agreement and Conditions of Approval COUS 03-003. Upon approval of the estimate by the City, construct the improvements as depicted on the Site Plan and the Casa Loma Overlook Construction and Use Detail. Prepare the undeveloped future Restaurant Site, per City Ordinance, Land Development Regulations, Chapter 8, Article IV E, or place sod as a ground cover. 6. Exhibit "H" Conditions of Approval COUS 98-008 Outstanding items: Comment # . 1. - Complete the dumpster at the East end of Casa Loma Blvd (Two Georges). Gates are missing. . 18. - Fee in lieu of dedication approved by City Commission was set at $70,000. Fee collected at time of permit was $68,000. Remit balance of $2,000. . 22 - Provide the City with a copy of the Dock Lease agreement, indicating the required stipulations from this comment. . 23 - Provide the City with a copy of the Retail Lease agreement, indicating the required stipulations from this comment. . 30 - Provide the City with a copy of the Maintenance Agreement for Casa Loma Blvd. . 48 - Comply with the required landscaping conditions, completing missing landscape from the Northwest corner of the site, .' EXHBIT "C" Conditions of Approval Project name: Boynton Beach Marina Townhomes File number: caus 03-003 Reference: 2nd I review plans identified as a Conditional Use with a June 17. 2003 Plannimr and Zoning Department date stamp marking. DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior to permit application contact the Public Works Department (561-742-6200) X regarding the storage and handling of refuse, The dumpster will be supplied by Public Works. 2, Staff has concerns regarding the proximity of the trash room! dumpster enclosure X to the Townhomes (Bldg. 4-Unit I) with respect to noise and odor. PUBLIC WORKS - Traffic Comments: None X UTILITIES Comments: 3, Fire flow calculations will be required demonstrating the City Code requirement X of 1,500 g.p,m. as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)). 4. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be X paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 5. Water and sewer lines to be owned and operated by the City shall be included X within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26- 33(a). 6. Provide a phasing plan for water and sewer (sanitary and storm) construction. X ENGINEERING DIVISION Comments: 7. Please note that changes or revisions to these plans may generate additional X ,. COA 07/09/03 2 DEPARTMENTS INCLUDE REJECT comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit reVIew. 8. Full drainage plans in accordance with the LDR, Chapter 6, Article N, Section 5 X will be required at the time of permitting. Also provide drainage analysis showing compliance with the requirements of the SFWMD permit(s) and City of Boynton Beach requirements. 9. A complete review of the details will not be reviewed for construction X acceptability at this time, All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application, FIRE Comments: None X POLICE Comments: None X BUILDING DIVISION Comments: None X PARKS AND RECREATION Comments: 10. The Parks and Recreation Facilities impact fee is figured based on 11 single X family attached (Townhouse) Units. The following fee is due at the time of first applicable building permit: 11 single-family attached units @ $771 each = $8,481. FORESTERJENVIRONMENT ALIST Comments: None X PLANNING AND ZONING Comments: 11. The elevations shall indicate the proposed buildin~ hei~ht. X \< COA 07/09/03 3 DEPARTMENTS INCLUDE REJECT 12. Staff recommends that a period of one (1) year be allowed to obtain a building X permit for this portion of the Marina Project. 13. Continued compliance is required with amended mediation agreement including, X but not limited to the overlook area. COMMUNITY REDEVELOPMENT AGENCY CONDITIONS: Comments: 13. With direction from staff, delete Engineering condition #2 which has been X satisfied. 14. Provide decorative wall-mounted lighting fixtures on the north side of the X building, The lighting levels from the fixtures shall be indicated on the photometric plans and elevation drawings. 15. A public access easement shall be provided along the sidewalk, north of the X proposed townhouse units to ensure perpetual use and enjoyment bv public. CITY COMMISSION CONDITIONS: Comments 15. To be determined, ~ t-nt ~ ~J) U' elJ S:\PlanningIShared\Wp\Projects\BOYNTON BEACH MARINA\COUS- Townhomes 03-003\COA,doc DEPARTMENT OF DEVELOPMENT Planning and Zoning Division Memorandum PZ 03-123 TO: FROM: DATE: RE: Lawrence Justiz - The Related Group Boynton Beach, L TO Ed Breese, Principal Planner June 3, 2004 Marina Townhomes Please be advised that site plan approval for the above referenced project will expire on July 15. 2004. The City Commission granted site plan approval on July 15. 2003, To date, no building permit has been issued for this project. A building permit must be secured within one year of site plan approval in order to maintain the vested status. . The Land Development Regulations Chapter 4, Section 5, provides for a one-year extension for site plan approval if the application is submitted before the expiration date, Please call the Planning and Zoning Division at (561) 742-6260 for more information regarding the site plan time extension procedure. S:\Planning\SHAREO\WP\PROJECTS\BOYNTON BEACH MARl NA\COU S- Townhomes 03-003\exp warning.doc DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO, PZ 03-156 FROM: Chairman and Members Community Redevelopment Agency Michael RumPf~~ Director of Planning and Zoning Eric Lee Johnson, AICP~\J-e- (f- Planner TO: THRU: DATE: June 24, 2003 PROJECT: Boynton Beach Marina Townhomes / COUS 03-003 REQUEST: Conditional Use approval for 11 townhouse units in the Mixed-Use High (MU-H) zoning district PROJECT DESCRIPTION Property Owner: TRG - Boynton Beach, Ltd, Applicant: TRG - Boynton Beach, Ltd. Agent: Lawrence Justiz Location: 743 Northwest 1st Avenue (see Exhibit "A" - Location Map) Existing Land Use/Zoning: Mixed-Use (MU) / Mixed-Use High (MU-H) Proposed Land Use/Zoning: No change proposed Proposed Use: Townhouses Acreage: 26,076 square feet / (0.60-acre) Adjacent Uses: North: Right-of-way for Boynton Beach Boulevard and farther north city lift station and undeveloped land occupied by mangroves zoned Central Business District (CBD); South: East: Right-of-way for Ocean Avenue and farther south is developed commercial (Ocean Plaza shopping center), zoned CBD; Right-of-way for Northeast 6th Street (a.k.a Marina Drive) and the Intracoastal Waterway; and Boynton Beach Marina - COUS 03-003 Page 2 Memorandum No. PZ 03-156 West: Developed commercial property (First Financial Plaza), zoned CBD. BACKGROUND In 1997, the City Of Boynton Beach approved a site plan for the Marina. The site plan included an eight (8)-story building containing 220 rental apartment units, ground floor commercial area, a parking garage and a two (2)-story restaurant. The parking garage would have contained 605 parking spaces. In November 2000, the property ownership changed to AERC of Virginia, Incorporated. The City's Land Development Regulations were amended on June 18, 2002 to adopt zoning regulations for mixed-use zoning districts. After the creation of the Mixed-Use High (MU-H) zoning district, in September 2002, the City Commission approved a major site plan modification (MSPM 02-005) to the Marina. The project, known as the Residences at Marina Village was approved for two (2) mixed-use buildings and a parking garage. The mixed-use buildings were nine (9) stories tall and the parking garage was seven (7) stories tall. Compared with the 1997 plan, the number of apartment units increased from 220 units to 282 units and the total number of spaces proposed within the garage increased to 751. The property ownership changed again in December 2002. The current property owners (TRG - Boynton) were approved for another major site plan modification (MSPM 03-001). This project was approved for three (3) mixed-use buildings, a restaurant, and a parking garage. The location of the office / commercial uses would remain on the first floor of all three (3) mixed use buildings. However, compared with the 2002 plan, the number of stories increased from nine (9) stories to 15 stories (Building #1 and Building #2), the number of residential units increased from 282 to 338, and the area for the office / commercial uses increased to 17,591 square feet. In addition, the project proposed 12 townhouse units. However, at that time, townhouse units were not listed as permitted uses in the MU-H zoning district. Therefore, one of the conditions of approval for the major site plan modification (MSPM 03-001) stated the following: "Residential single-family attached units (Townhouses) are not permitted in the MU-H district. (Chapter 2, Section 6,F. - Table 6.F-1). The applicant has requested a Code review to add Townhomes to the list of permitted uses. Site Plan approval is contingent upon the approval of this amendment to the LDR's." At the time of the request for major site plan modification (MSPM 03-001), the applicant concurrently requested to amend the Land Development Regulations (CDRV 03-001) to allow Residential Single-family attached units within the MU-H zoning district. Staff opposed the proposed code revision due to it's contrast with athe intended purpose of the mixed use high district to facilitate the creation of an activity center. However, the City Commission granted the revision to allow townhouses in the MU-H zoning district but only as conditional uses (Ordinance 03-015). Now, this request for conditional use (COUS 03-003) would represent the townhouse portion of the Boynton Beach Marina major site plan modification (MSPM 03-001) that was approved on April 15, 2003. The applicant is providing a site plan that shows 11 townhouse units rather than 12 units, as originally seen by the Commission, According to the applicant, completion of the townhouse units would be completed in one (1) phase. STANDARDS FOR EVALUATING CONDITIONAL USES AND ANALYSIS Section 11.2.D of the Land Development Regulations contains the following standards to which conditional uses are required to conform. Following each of these standards is the Planning and Zoning Division's evaluation of the application as it pertains to standards. Boynton Beach Marina - CO US 03-003 Page 3 Memorandum No. PZ 03-156 The Planning and Development Board and City Commission shall consider only such conditional uses as are authorized under the terms of these zoning regulations and, in connection therewith, may grant conditional uses absolutely or subject to conditions including, but not limited to, the dedication of property for streets, alleys, recreation space and sidewalks, as shall be determined necessary for the protection of the surrounding area and the citizens' general welfare, or deny conditional uses when not in harmony with the intent and purpose of this section. In evaluating an application for conditional use approval, the Board and Commission shall consider the effect of the proposed use on the general health, safety and welfare of the community and make written findings certifying that satisfactory provisions have been made concerning the following standards, where applicable: 1. Ingress and egress to the subject property and proposed structures thereon, with particular reference to automobile and pedestrian safety and convenience, traffic flow and control, and access in case of fire or catastrophe. The project proposes two (2) points of ingress / egress, one (1) on Marina Way and the other along Boynton Beach Boulevard, Both openings are 24 feet wide, The openings would accommodate a 12-foot wide ingress lane and a 12-foot wide egress lane, A 20-foot wide auto court would access the townhouses. This private drive, adorned with brick pavers, would provide access to the rear of each townhouse unit where the garages are proposed. 2. Off-street parking and loading areas where required, with particular attention to the items in subsection above, and the economic, glare, noise, and odor effects the conditional use will have on adjacent and nearby properties, and the city as a whole. Required parking for the proposed residential uses is based on the following methodology: Two (2) and three (3) bedrooms require two (2) parking spaces, Since the proposed townhouses would be a minimum of two (2) bedrooms each, a total of 22 parking spaces would be required. The site plan (sheet A-2) and floor plan (sheet A-5) show that two (2)-car garages are proposed for each unit, Although the dimensions on the floor plan indicate that the vehicles would be parked in an ''in-line'' configuration rather than side-to-side, the garage space itself would provide for a total of 22 parking spaces, which complies with the Land Development Regulations, It must be noted that the "fee in lieu" of parking (associated with the Boynton Beach Marina approved earlier this year) would not be a component of this townhouse portion of the project, 3. Refuse and service areas, with particular reference to the items in subsection 1 and 2 above. No outside trash enclosure is proposed. The site plans Trash Area detail (sheet A-3) shows that refuse would be temporarily stored in an air-conditioned "trash room" to be located on the west side of the building, According to the applicant, the room is ''intended for use only by the townhouses so that its use would be minimal, We do not expect problems with noise'~ Staff concurs, 4. Utilities, with reference to locations, availability, and compatibility. Consistent with Comprehensive Plan policies and city regulations, all utilities, including potable water and sanitary sewer are available for this project. 5. Screening, buffering and landscaping with reference to type, dimensions, and character. Boynton Beach Marina - COUS 03-003 Page 4 Memorandum No, PZ 03-156 The proposed townhouse use would not require additional landscaping, Much of the landscape material for the subject site was approved earlier this year as part of the major site plan modification (MSPM 03-001). According to the review of the major site plan modification (see Memorandum No PZ03-067), the proposed landscaping for the entire site would meet or exceed the code. However, the staff report identified a shortcoming within the landscape plan (sheet L-2) in terms of complying with the 50% native species landscape requirement. The landscape plan (sheet L -2) of MSPM 03- 001 showed that the 50% native requirement was met for trees and shrubs but not for the ancillary plants. The applicant had two (2) choices, either comply with the 50% requirement or obtain relief from the Land Development Regulations. Staff anticipates that the applicant will submit a rectified landscape plan at the time of permitting. The landscape plan has not changed significantly in association with this request for conditional use. However, the previously approved site plan (sheet A12 of MSPM 03-001) showed the townhouse units at 11' within one (1) continuous building, In contrast the new plans (for this conditional use request) show the continuous building separated into two (2) buildings containing a total of 11 units, and separated by 15 feet of landscaped area. The proposed landscape plan (sheet L-3) shows that eight Alexander Palm trees and 200 Scheff/era arbicola hedges would be installed within this landscaped area, No new conditions of approval regarding the proposed landscape material are associated with this request for conditional use. All previous landscape conditions associated with the major site plan modification (MSPM 03-001) will be addressed during the permitting process, 6. Signs, and proposed exterior lighting, with reference to glare, traffic safety, economic effect, and compatibility and harmony with adjacent and nearby properties. No additional signs are associated with this request for conditional use. 7. Required setbacks and other open spaces. The proposed building would meet all setback requirements of the MU-H zoning district. 8. General compatibility with adjacent property and other property in the zoning district. The Land Development Regulations were recently amended to allow townhouses (residential, Single- family attached homes) as conditional uses in the Mixed-Use Low (MU-L) and Mixed Use (MU-H) zoning districts. As the proposed townhomes represent a small portion of the entire project there should be minimal on-site impact and no adverse effects will occur from the proposed townhouse use. There will be little or no impact on the adjacent properties or the general area, However, the way in which the sidewalks and buildings are configured, staff pragmatically anticipates that the townhouse owners would complain of pedestrian traffic en route to the restaurants due to the narrow width of the sidewalk "in front" of their homes. The sidewalk is proposed at seven (7) feet - four (4) inches in width, Nevertheless, the configuration of the buildings, sidewalks, and drive aisles meet the minimum Land Development Regulations and Florida Building Code requirements in providing pedestrian and vehicular access. As indicated above, it was staffs original position that the proposed townhomes would be less compatible with the mixed use project than the additional commercial uses that were previously approved where the townhomes are proposed. g. Height of building and structures, with reference to compatibility and harmony to adjacent and nearby properties, and the city as a whole, Boynton Beach Marina - COUS 03-003 Page 5 Memorandum No, PZ 03-156 The maximum allowable building height in the MU-H zoning district is 150 feet. The proposed buildings would be three (3) stories tall and easily comply with the zoning districts maximum allowable height. The elevations (sheet A-6) do not indicate the proposed building height. This would be required at the time of permitting (see Exhibit "c" - Conditions of Approval). 10. Economic effects on adjacent and nearby properties, and the city as a whole. According to the applicant, the townhouse units would "promote public appearance, comfort, convenience, general welfare, good order, health, morals, prosperity, and safety of the city. The use creates a physical environment that is of a character and quality that people would want to live there and offer an investment motive for home ownership. These are two (2) vital components to achieving success in a mixed-use downtown development. The placement of townhouses in the Marina Project architecturally promotes an environment of comfort and safety, By placing townhouses in that location, pedestrians may use the walkways on either side of the townhouses and not feel as if they are walking through isolated areas that would be unoccupied at night'~ 11. Conformance to the standards and requirements which apply to site plans, as set forth in Chapter 19, Article II of the City of Boynton Beach Code of Ordinances. (Part III Chapter 4 Site Plan Review). With incorporation of staff comments, the proposed project would comply with all requirements of applicable sections of city code, 12, Compliance with, and abatement of nuisances and hazards in accordance with the performance standards within Section 4.N. of the Land Development Regulations, Chapter 2; also, conformance to the City of Boynton Beach noise Control Ordinance. With incorporation of all conditions and staff recommendations contained herein, the proposed use would operate in a manner that is in compliance with the above-referenced codes and ordinances of the City of Boynton Beach. RECOMMENDATION Based on the discussions contained herein, compliance with development regulations, and the consistency with the Comprehensive Plan, staff recommends that this request be approved subject to satisfying all conditions of approval as contained in Exhibit "CIf. Furthermore, pursuant to Chapter 2 - Zoning, Section 11.2 Conditional Uses, a time limit is to be set within which the proposed project is to be developed, Staff recommends that a period of one (1) year be allowed to obtain a building permit for this project (see Exhibit "CIf - Conditions of Approval). ELl S. IPlanninglSHAREDI WPIPROJECTSIBOYNTON BEACH MARINA ICOUS, Townhomes 03,0031Staff Report.doc .' Location Map Marina EXHIBIT "A" -1-- r ! Ii ! i ~ : I.' I. ' '. I I; OY~ITO~J B dl I / !l=ji ! 1//, ,I i.tf; , :'~ Ii' .I Icn 1:-1 ili Z ,"Tl m r1 ?; :1' r Z ,I m :;: O'l -< ~ I ,q I I' I II , i ! I , KE WO~TH ICWW! ' I I / I / I / 1/ ( ,I, Ii I , ' ~ , I J RE "I "I, i : !!1 I ! , I , ! ! ! i i i ! ..J "'-, I ',I I: / I : i I! I, I :/ , i/"---J /1 \ 1~iT1'Ti::' ! 'f::::.li., " I I i j I \ I I /,1, L!\ 1,,"----- ;\1 i )' I ,I ;!i ::;~: " . ,I' I , i ' ! ! I ; :-' III I d I ! I \. II I' " I . ' . I I :1 ill I : i i ! : I i I '~'II' ,'. I.' , ;1. . r 'i' . ": , I ; R3 ,- i . 400 o 400 800 1200 Feet CL 1"--, '- L N\ ~- W~E , ' ; I . ---r- I I' .' EXHBIT "C" Conditions of Approval Project name: Boynton Beach Marina Townhomes File number: COUS 03-003 Reference: 2nd (review plans identified as a Conditional Use with a June 17,2003 Planning and Zoning Department date stamp marking DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: l. Prior to permit application contact the Public Works Department (561-742-6200) regarding the storage and handling of refuse. The dumpster will be supplied by Public Works. 2. Staff has concerns regarding the proximity of the trash room! dumpster enclosure to the Townhomes (Bldg. 4-Unit 1) with respect to noise and odor. PUBLIC WORKS - Traffic Comments: None UTILITIES Comments: 3. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)). 4. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 5. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26- 33(a). 6. Provide a phasing plan for water and sewer (sanitary and storm) construction. ENGINEERING DIVISION Comments: 7. Please note that changes or revisions to these plans may generate additional .' COA 07/02/03 2 DEPARTMENTS INCLUDE REJECT comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit reVIew. 8. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Also provide drainage analysis showing compliance with the requirements of the SFWMD permit(s) and City of Boynton Beach requirements. 9. A complete review of the details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. FIRE Comments: None POLICE Comments: None BUILDING DIVISION Comments: None PARKS AND RECREATION Comments: 10. The Parks and Recreation Facilities impact fee is figured based on 11 single family attached (Townhouse) Units. The following fee is due at the time of first applicable building permit: 11 single-family attached units @ $771 each = $8,481. FORESTER/ENVIRONMENTALIST Comments: None PLANNING AND ZONING Comments: 11. The elevations shall indicate the proposed building height. COA 07/02/03 3 DEPARTMENTS INCLUDE REJECT 12. Staff recommends that a period of one (1) year be allowed to obtain a building permit for this portion of the Marina Project. 13. Continued compliance is required with amended mediation agreement including, but not limited to the overlook area. COMMUNITY REDEVELOPMENT AGENCY CONDITIONS: Comments: 14. To be determined. CITY COMMISSION CONDITIONS: Comments 15. To be determined. elj S:\Planning\Shared\Wp\Projecls\BOYNTON BEACH MARINA\COUS-Townhomes 03-003\COA.doc Nteo! ,f~ (/lrvl p5 1 st REVIEW COMMENTS Conditional Use ifVl ~S+-e12- Project name: Boynton Beach Marina Townhomes File number: COUS 03-003 Reference: 1 slreview plans identified as a Conditional Use with a May 7,2003 Planning and Zoning Department date stamp marking. DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior to permit application contact the Public Works Department (561-742- / 6200) regarding the storage and, handling of refuse. The dumpster will be supplied by Public Works. 2. Early morning pick-up will need to be arranged with the Public Works / Department to minimize the inconvenience of blocking Marina Drive 3. Staff has concerns regarding the proximity of the trash room! dumpster enclosure to the Townhomes (Bldg. 4-Unit 1) with respect to noise and / odor. PUBLIC WORKS - Traffic Comments: NONE UTILITIES Comments: 4. Fire flow calculations will be required demonstrating the City Code / requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by msurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b )). 5, CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's / signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 6. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable / water. City water may not, therefore, be used for irrigation where other sources are readily available. 7. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on V' the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). 8. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each / building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plans meet this condition, by showing all hydrants. 1 ST REVIEW COMMENTS OS/27/03 2 . 11 DEPARTMENTS INCLUDE REJECT 9, Appropriate backflow preventer(s) will be required on the domestic water / service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207. 10. A portion of the sanitary sewer (existing) at the west end of Casa Lorna / Blvd. is shown under the restaurant. This segment will need to be abandoned. Please correct plans accordingly. A II. Provide a phasing plan for water and sewer (sanitary and storm) / constructi on. 12. Utility construction details as shown on Civil Engineering (CE) sheets C6 thru C8 will not be reviewed for construction acceptability at this time. All / utility construction details shall be III accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual; and will be reviewed at the time of construction permit application. ENGINEERING DIVISION Comments: 13. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. ~ 14. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not V ensure that additional comments may not be generated by the Commission and at permit review. 15. Show sight triangles on the landscape plans (LDR, Chapter 7.5, Article II, ~ Section 5 .R.) 16. Show easements, existing and proposed utilities on the landscape plan. / 17. Provide details for the proposed paver systems showing compliance with the LDR, Chapter 2, Section 6.F.8.d.(2). /' 18. Clarify the connection to the baffle box at the west end of the Boynton t/ Beach Boulevard extension. The screened text is illegible. Also provide a detail of the main connection at this point. 19. Clarify the connection to the baffle box at the west end of the Boynton / Beach Boulevard extension. The screened text is illegible. Provide a detail of the main connection at this point. 20. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, / Section 5 will be required at the time of permitting. Also provide drainage analysis showing compliance with the requirements of the SFWMD permit(s) and City of Bovnton Beach requirements 2I. Indicate to what standard the project is to be constructed; if the FDOT ,/ Standard Specifications for Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are recommended since they contain both English and Metric units. 1 ST REVIEW COMMENTS OS/27/03 3 DEPARTMENTS INCLUDE REJECT 22. Per the LDR, Chapter 23, Article II, Section M the fire lane pavement width vi shall be a minimum of 22 (twenty-two) feet. 23. Provide cross-sections and details for the Boynton Beach Boulevard / extension 24. Revise the Drainage Notes on Sheet C-2 to reflect use of the Engineering Design Handbook & Construction Standards, February 2003. Striping shall / be in accordance with Standard Drawings "K" Series; Road Construction shall be in accordance with Standard Drawings "P" Series; and Drainage shall be in accordance with Standard Drawings "D" Series. 25. A complete review of the details will not be reviewed for construction ,/ acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. FIRE Comments: 26. City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire sprinkler systems throughout all buildings or structures regardless of the / type of construction which are 3 stories or more in height or all buildings or structures in excess of 30 ft. in height as measured from finish ground floor grade to the underside of the topmost roof assembly. POLICE Comments: NONE BUILDING DIVISION Comments: NONE PARKS AND RECREATION Comments: 27. The Parks and Recreation Facilities impact fee is figured based on 11 single family attached (Townhouse) Units. 11 single-family attached units @ $771 each = $8,481 The fee is due at the time of first applicable building permit. 1ST REVIEW COMMENTS OS/27/03 4 DEPARTMENTS FORESTER/ENVIRONMENTALIST Comments: NONE PLANNING AND ZONING omments: This project requires conditional use approval. Provide justification for approval of the project based on the standards for evaluating conditional uses found in Chapter 2, Section 11.2.D. of the City of Boynton Beach Land Deve10 ment Re ulations. On the site plan tabular data (sheet A-2), label the "Type 1" units as either "Type 1.1", "Type 1.2", or "Type 1.3" in order to be consistent with the information indicated in the ~ ARTMENT UNIT ,MIX. 't-0t JG / 30. On the site plans (sheet A-2 and sheet A-3), identify the rectangular "boxes" that are shown on the north side of the building. These "boxes" seem to extend beyond the limits of the fee-simple townhouse property boundary. Also, they seem to lessen the width of the pedestrian walkway. Please clarify. (L{v~ .'7 31. Cantilever portions of the townhouse buildings cannot protrude beyond the limits of the townhouse property boundary. The location of the fee-simple ro e bounda must be consistent between all lans f 1. On sheet A-4, the words "SCALE: 3 / 32" = l' - 0" should be changed to SCALE: 1 / 16" = l' - 0". The elevations must indicate the paint manufacturer's name and color code (Chapter 4, Section 7.D.). Equipment placed on the walls of the buildings shall be painted to match the building color (Chapter 9, Section 10.CA.). Place a note on the site plan indicatin this re uirement The eight (8) new Alexander Palm trees (as shown on the landscape plan plant list, sheet L-4) must be installed at minimum 12 feet overall height and three (3) caliper inches (Chapter 7.5, Article II, Section 5,C.2,). All shrubs and hedges are required to be at minimum 24 inches in height, 24 inches in s read, and lanted with ti -to-tip s acin measured INCLUDE REJECT 1 st REVIEW COMMENTS Conditional Use '1 ANSWERS from The Related Group are in BOLD - June 1 fl, 20(U...--,-, ~ Project name: Boynton Beach Marina Townhomes File number: COUS 03-003 Reference: 1 slreview plans identified as a Conditional Use DeQartment date stamp marking L.-._m , with a May 7 ,2003 Planning and Zoning DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse, The dumpster will be supplied by Public Works, ANS: This comment is noted, 2. Early morning pick-up will need to be arranged with the Public Works Department to minimize the inconvenience of blocking Marina Drive ANS: This comment is a2reed to, 3, Staff has concerns regarding the proximity of the trash room/dumpster enclosure to the Townhomes (Bldg, 4-Unit 1) with respect to noise and odor. ANS: The trash room will be air-conditioned to control odor, and is intended for use only by the townhouses so use will be minimal. We do not expect problems with noise. PUBLIC WORKS - Traffic Comments: NONE UTILITIES Comments: 4. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m, as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by Insurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b )). ANS: Fire flow calculations will be provided to the Utilities dept, at the time of Final Enl!:ineerinl!: submittal demonstrating the referenced requirement, 5. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. ANS: The capacity reservation fee for Marina Village has already been paid for bv the developer, TRG-Boynton Beach, L TD, 6, Comprehensive Plan Policy 3.C.3.4, requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. ANS: This comment is noted, however there are no cost effective alternatives available for irri2ation, 2003,6,17 Boynton Townhouses 1st Review Answers from Related 06/16/03 2 DEPARTMENTS INCLUDE REJECT 7. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). ANS: All proposed utility easements for both the water and sewer systems have been adjusted per Mr. Peter Mazzella's review. S, The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plans meet this condition, by showing all hydrants. ANS: All proposed and existing fire hydrants are depicted on the Schematic Water and Sewer plan Sheet CS. 9. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207. ANS: Backflow prevention devices will be used on all domestic and fire mains. 10. A portion of the sanitary sewer (existing) at the west end of Casa Lorna Blvd, is shown under the restaurant. This segment will need to be abandoned. Please correct plans accordingly. ANS: See revised plans. The existing sanitary sewer main will be removed after the new system is in place and approved thru Palm Beach County Health Dept, 11. Provide a phasing plan for water and sewer (sanitary and storm) construction, ANS: Utilitv installation on this proiect will not be phased, 12. Utility construction details as shown on Civil Engineering (CE) sheets C6 thru CS will not be reviewed for construction acceptability at this time. All utility construction details shall be In accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual; and will be reviewed at the time of construction permit application. ANS: This comment is noted, ENGINEERING DIVISION Comments: 13, All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets, ANS: This comment is noted, 14. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit review. ANS: This comment is noted, 15. Show sight triangles on the landscape plans (LDR, Chapter 7.5, Article II, Section 5.H.) ANS: The si2ht trian21e is shown, 2003,6,17 Boynton Townhouses 1st Review Answers from Related 06/16/03 3 , " DEPARTMENTS INCLUDE REJECT 16. Show easements, existing and proposed utilities on the landscape plan. ANS: There are no easements within the townhouse area, 17. Provide details for the proposed paver systems showing compliance with the LOR, Chapter 2, Section 6.F.8.d.(2). ANS: See schematic en1!ineering detail sheet. 18. Clarify the connection to the baffle box at the west end of the Boynton Beach Boulevard extension. The screened text is illegible. Also provide a detail of the main connection at this point. ANS: The screened text has now been made legible, The connection to this box will be via a 24 inch core at elevation EI. = 0.75' NGVD. as called out on the plans, 19. Clarify the connection to the baffle box at the west end of the Boynton Beach Boulevard extension, The screened text is illegible. Provide a detail of the main connection at this point. ANS: Same as above. 20. Full drainage plans in accordance with the LOR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Also provide drainage analysis showing compliance with the requirements of the SFWMD permit(s) and City of Boynton Beach requirements ANS: This comment is noted and all necessary permits will be applied for and obtained prior to the start of construction, 21. Indicate to what standard the project is to be constructed; if the FOOT Standard Specifications for Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are recommended since they contain both English and Metric units, ANS: See revised plan sheet C2 for this note. 22. Per the LOR, Chapter 23, Article II, Section M the fire lane pavement width shall be a minimum of 22 (twenty-two) feet. ANS: Casa Lorna Blvd, is the fire lane for the townhouses, The width is 24 feet, 23. Provide cross-sections and details for the Boynton Beach Boulevard extension ANS: See revised plan sheet C4 for this cross-section. 24. Revise the Drainage Notes on Sheet C-2 to reflect use of the Engineering Design Handbook & Construction Standards, February 2003. Striping shall be in accordance with Standard Drawings "K" Series; Road Construction shall be in accordance with Standard Drawings "P" Series; and Drainage shall be in accordance with Standard Drawings "0" Series. ANS: See revised plan sheet C2 for this revision. 25. A complete review of the details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. ANS: This comment is noted and will be re-submitted at the time of final eDl~ineering. FIRE 2003,6,17 Boynton Townhouses 1 st Review Answers from Related 06/16/03 4 DEP ARTMENTS INCLUDE REJECT Comments: 26. City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire sprinkler systems throughout all buildings or structures regardless of the type of construction which are 3 stories or more in height or all buildings or structures in excess of 30 ft. in height as measured from finish ground floor grade to the underside of the topmost roof assembly, ANS: Note added as Note 5 to Sheet A-I. POLICE Comments: NONE BUILDING DIVISION Comments: NONE PARKS AND RECREATION Comments: 27. The Parks and Recreation Facilities impact fee is figured based on 11 single family attached (Townhouse) Units. 11 single-family attached units @ $771 each = $8,481 The fee is due at the time of first applicable building permit. ANS: We a2ree, FORESTERlENVIRONMENT ALIST Comments: NONE PLANNING AND ZONING Comments: 28, This project requires conditional use approval. Provide justification for approval of the project based on the standards for evaluating conditional uses found in Chapter 2, Section 1l.2.D. of the City of Boynton Beach Land Development Regulations. ANS: The conditional use justification statement was submitted to the City with our site plan application packa2e, 29. On the site plan tabular data (sheet A-2), label the "Type 1" units as either "Type 1.1", "Type 1.2", or "Type 1.3" in order to be consistent with the information indicated in the APARTMENT UNIT MIX. ANS: Unit desi2nations on site plan coordinated with the tabular data, 2003,6,17 Boynton Townhouses 1st Review Answers from Related 06/16/03 5 DEPARTMENTS INCLUDE REJECT 30. On the site plans (sheet A-2 and sheet A-3), identify the rectangular "boxes" that are shown on the north side of the building. These "boxes" seem to extend beyond the limits of the fee-simple townhouse property boundary. Also, they seem to lessen the width of the pedestrian walkway. Please clarify, ANS: The long rectangular boxes are 1 '-8" wide landscape strips, The boxes shown as A-3 are cantilevered balconies which occur on the 2nd or 3rd floor only, They do not decrease the pedestrian walkway, Refer vto Elevation on Sheet A-6, These townhouses are not fee simple ownership, but will be condominiums, 31. Cantilever portions of the townhouse buildings cannot protrude beyond the limits of the townhouse property boundary, The location of the fee-simple property boundary must be consistent between all plans ANS: Cantilevers are permitted for condominium townhouses units, 32. On sheet A-4, the words "SCALE: 3 /32" = I' - 0" should be changed to SCALE: I /16" = I' - 0". ANS: Graphics and written scale are coordinated, 33. The lighting levels proposed on the photometric plan (sheet A-7) are subject to the Engineering Division's review and approval. ANS: This comment is noted, 34. The elevations must indicate the paint manufacturer's name and color code (Chapter 4, Section 7.D.). ANS: Paint manufacturer information added to Sheet A-6, 35. Equipment placed on the walls of the buildings shall be painted to match the building color (Chapter 9, Section 10.C.4.). Place a note on the site plan indicating this requirement ANS: Note added to site plan, 36. The eight (8) new Alexander Palm trees (as shown on the landscape plan plant list, sheet L-4) must be installed at minimum 12 feet overall height and three (3) caliper inches (Chapter 7.5, Article II, Section 5.C.2.), ANS: Height of Alexander Palms changed to 12' with minimum 3" caliper, See plantin2 le2end on Sheet L-3, 37. All shrubs and hedges are required to be at minimum 24 inches in height, 24 inches m spread, and planted with tip-to-tip spacmg measured immediately after planting to adequately cover the planted areas on the site (Chapter 7.5, Article II, Section 5.C.4.). ANS: Shrubs and hedges revised, See plant list on Sheet L-3 and note added to Sheet L-3, 38. Place a note on the landscape plan indicating that mulch other than Cypress shall be used and maintained for landscape purposes (Chapter 7.5, Article II, Section 5.C.8.). 2003,6,17 Boynton Townhouses 1 st Review Answers from Related 06/16/03 6 , II DEPARTMENTS INCLUDE REJECT ANS: Note added to Sheet L-3 that Cypress mulch is not allowed, MWR/sc S:\Planning\SHARED\WP\PROJECTS\BOYNTON BEACH MARINA\COUS-Townhomes 03-003\1ST REVIEW COMMENTS,doc J:\THE RELATED GROUP\PROPERTY FOLDERS\BOYNTON BEACH MARINA\Townhouse Comments from City\2003,6.17 Boynton Townhouses 1st Review Answers from Related,doc . / ~Irz~ 11/ ~ U1111o~ 'It I 1 st REVIEW COMMENTS Conditional Use Project name: Boynton Beach Marina Townhomes File number: CO US 03-003 Reference: 151 review plans identified as a Conditional Use with a May 7, 2003 Department date stamp marking. Planning and Zoning DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: l. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and, handling of refuse. The dumpster will be supplied by Public Works. 2. Early morning pick-up will need to be arranged with the Public Works Department to minimize the inconvenience of blocking Marina Drive 3. Staff has concerns regarding the proximity of the trash room! dumpster enclosure to the Townhomes (Bldg. 4-Unit 1) with respect to noise and odor. PUBLIC WORKS - Traffic Comments: NONE UTILITIES Comments: 4. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Article II, Section 26-l6(b)). 5. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 6. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 7. Water and sewer lines to be owned and operated by the City shall be included within utility easements, Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). 8. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plans meet this condition, by showing all hydrants. 1 ST REVIEW COMMENTS OS/27/03 3 DEP ARTMENTS INCLUDE REJECT 22. Per the LDR, Chapter 23, Article II, Section M the fire lane pavement width shall be a minimum of 22 (twenty-two) feet. 23. Provide cross-sections and details for the Boynton Beach Boulevard extension 24. Revise the Drainage Notes on Sheet C-2 to reflect use of the Engineering Design Handbook & Construction Standards, February 2003. Striping shall be in accordance with Standard Drawings "K" Series; Road Construction shall be in accordance with Standard Drawings "P" Series; and Drainage shall be in accordance with Standard Drawings "D" Series. 25. A complete review of the details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. FIRE Comments: 26. City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire V sprinkler systems throughout all buildings or structures regardless of the /' type of construction which are 3 stories or more in height or all buildings or /Jolc ~ structures in excess of 30 ft. in height as measured from finish ground floor SIJ A-( grade to the underside of the topmost roof assembly. POLICE Comments: NONE BUILDING DIVISION Comments: NONE PARKS AND RECREATION Comments: 27. The Parks and Recreation Facilities impact fee is figured based on 11 single family attached (Townhouse) Units. 11 single-family attached units @ $771 each = $8,481 The fee is due at the time of first applicable building permit. 1 st REVIEW COMMENTS Conditional Use \ 'I , r, I ~ '.i) r.... i .~. \ ~ I i ~ :";',; i ANSWERS from The Related Grou are in BOLD - June 17 2003 Project name: Boynton Beach Marina Townhomes File number: COUS 03-003 Reference: 1 st review plans identified as a Conditional Use Department date stamp marking. r-:-~__It=- i. it....' \,'v... ~~-'-\.i"' .~ I_/\.i t~' i... /! 11 ~- So , 1'(, L I-Ic"{iklt. t' ,,_,,/-.1:.', with a May 7 ,2003 Planning and Zoning , " DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior to permit application contact the Public Works Department (561-742- ~m(i'!{(" 6200) regarding the storage and handling of refuse. The dumpster will be :, supplied by Public Works. \ ! ANS: This comment is noted, 2. Early morning pick-up will need to be arranged with the Public Works ~'~ /11IL) Department to minimize the inconvenience of blocking Marina Drive ANS: This comment is agreed to, i , 3. Staff has concerns regarding the proximity of the trash room/dumpster i,(\ ~:'\:t lJ ' !:. ' enclosure to the Townhomes (Bldg, 4-Unit 1) with respect to noise and \(; " ! il 2, V I':; .L ;( odor. ANS: The trash room will be air-conditioned to control odor, and is intended for use only by the townhouses so use will be minimal. We do not exoect oroblems with noise, PUBLIC WORKS - Traffic Comments: NONE UTILITIES Comments: 4. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by Insurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b )). ANS: Fire flow calculations will be provided to the Utilities dept. at the time of Final Ene:ineerine: submittal demonstratinl.! the referenced reQuirement, 5. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. ANS: The capacity reservation fee for Marina Village has already been paid for bv the developer, TRG-Boynton Beach, L TD, 6, Comprehensive Plan Policy 3,C,3.4, requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. ANS: This comment is noted, however there are no cost effective alternatives available for irrigation, 2003,6,17 Boynton Townhouses 1 st Review Answers from Related 06/16/03 2 , II DEPARTMENTS INCLUDE REJECT 7. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). ANS: All proposed utility easements for both the water and sewer systems have been adjusted per Mr. Peter Mazzella's review. 8. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plans meet this condition, by showing all hydrants. ANS: All proposed and existing fire hydrants are depicted on the Schematic Water and Sewer plan Sheet CS. 9. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207. ANS: Backflow prevention devices will be used on all domestic and fire mains, 10. A portion of the sanitary sewer (existing) at the west end of Casa Lorna Blvd. is shown under the restaurant. This segment will need to be abandoned. Please correct plans accordingly. ANS: See revised plans, The existing sanitary sewer main will be removed after the new system is in place and approved thru Palm Beach County Health Deot, II. Provide a phasing plan for water and sewer (sanitary and storm) construction. ANS: Utilitv installation on this proiect will not be phased, 12. Utility construction details as shown on Civil Engineering (CE) sheets C6 thru C8 will not be reviewed for construction acceptability at this time. All utility construction details shall be In accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual; and will be reviewed at the time of construction permit application. ANS: This comment is noted, ENGINEERING DIVISION Comments: 13. All comments requiring changes and/or corrections to the plans shall be lc\ t reflected on all appropriate sheets, . l. i', Ii L \ ANS: This comment is noted, \ \ 14. Please note that changes or revisions to these plans may generate additional ll-i\ ' comments. Acceptance of these plans during the TRC process does not " 'I '(/L ) \\. ensure that additional comments may not be generated by the Commission and at permit review. ANS: This comment is noted, 15. Show sight triangles on the landscape plans (LDR, Chapter 7.5, Article II, l4\m., Section 5.H.) \ I ! '- \~ ANS: The sight triangle is shown, \ .l. 2003,6,17 Boynton Townhouses 1 st Review Answers from Related 06/16/03 3 DEPARTMENTS INCLUDE REJECT 16. Show easements, existing and proposed utilities on the landscape plan. ~4/Im/ii" ANS: There are no easements within the townhouse area, 17. Provide details for the proposed paver systems showing compliance with the kt~m LDR, Chapter 2, Section 6.F.8.d.(2). ' Vir II ANS: See schematic engineering detail sheet. \ 18. Clarify the connection to the baffle box at the west end of the Boynton lir~.' Beach Boulevard extension. The screened text is illegible, Also provide a i ( !! //( detail of the main connection at this point. \ 1 ANS: The screened text has now been made legible, The connection to this I ,..- box will be via a 24 inch core at elevation El. = 0,75' NGVD, as called out on the plans, 19, Clarify the connection to the baffle box at the west end of the Boynton ~-' Beach Boulevard extension, The screened text is illegible. Provide a detail C\' i, _ Ii, ....' of the main connection at this point. ; ANS: Same as above. -, 20. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, k(\-.-- Section 5 will be required at the time of permitting. Also provide drainage \ ,. I' ! Ie') analysis showing compliance with the requirements of the SFWMD " permit(s) and City of Boynton Beach requirements ANS: This comment is noted and all necessary permits will be applied for and obtained prior to the start of construction. 21. Indicate to what standard the project is to be constructed; if the FDOT ~~"'/l-I!l Standard Specifications for Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are recommended since they \ contain both English and Metric units. \ \ ANS: See revised plan sheet C2 for this note. 22. Per the LDR, Chapter 23, Article II, Section M the fire lane pavement width L, 4- , shall be a minimum of 22 (twenty-two) feet. ;i' \ : . . Ii '\'-' , ANS: Casa Lorna Blvd, is the fire lane for the townhouses. The width is 24 feet, 23. Provide cross-sections and details for the Boynton Beach Boulevard l^'\- - !{ I" \'< (' , extension \ '. ANS: See revised plan sheet C4 for this cross-section. ~-~-- 24. Revise the Drainage Notes on Sheet C-2 to reflect use of the Engineering (Y\ Design Handbook & Construction Standards, February 2003. Striping shall \,~ . . be in accordance with Standard Drawings "K'" Series; Road Construction it shall be in accordance with Standard Drawings "p,,- Series; and Drainage , shall be in accordance with Standard Drawings "D" Series. .' ANS: See revised plan sheet C2 for this revision, 25. A complete review of the details will not be reviewed for construction ,:t,.t acceptability at this time. All engineering construction details shall be in lEt\"- accordance with the applicable City of Boynton Beach Standard Drawings '\. II 'Ill '). and will be reviewed for constructability at the time of construction permit , I application, ANS: This comment is noted and will be re-submitted at the time of final enl!ineerinl!, FIRE '2., ''') ') ~ 1 st REVIEW COMMENTS Conditional Use " "'. ~,'~ ( ;/; >J / / ~") l.f , v '-.J ANSWERS from The Related Group are in BOLD - June 17, 2003 Project name: Boynton Beach Marina Townhomes File number: COUS 03-003 Reference: 1 st review plans identified as a Conditional Use with a May 7, 2003 Planning and Zoning DeQartment date stamp marking DEP ARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior to permit application contact the Public Works Department (561-742- 6200) regarding the storage and handling of refuse. The dumpster will be supplied by Public Works, ANS: This comment is noted, 2. Early morning pick-up will need to be arranged with the Public Works Department to minimize the inconvenience of blocking Marina Drive ANS: This comment is a2reed to, 3. Staff has concerns regarding the proximity of the trash room/dumpster enclosure to the Townhomes (Bldg, 4-Unit i) with respect to noise and odor. ANS: The trash room will be air-conditioned to control odor, and is intended for use only by the townhouses so use will be minimal. We do not expect problems with noise, PUBLIC WORKS - Traffic Comments: NONE UTILITIES Comments: 4. Fire flow calculations will be required demonstrating the City Code ~ requirement of 1,500 g,p,m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by msurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)). ANS: Fire flow calculations will be provided to the Utilities dept. at the time of Final En2:ineerin2: submittal demonstratin2: the referenced requirement, 5. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's '/ signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined .-, based upon final meter size, or expected demand. '--' ANS: The capacity reservation fee for Marina Village has already been paid for bv the developer, TRG-Boynton Beach, LTD. '" 6. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable t; water. City water may not, therefore, be used for irrigation where other / I , i "" sources are readily available. /.II/(~ ANS: This comment is noted, however there are no cost effective ~1N alternatives available for irri2ation. " .( " 2003,6,17 Boynton Townhouses 1 st Review Answers from Related 06/16/03 2 DEP ARTMENTS ',- INCLUDE REJECT 7. Water and sewer lines to be owned and operated by the City shall be ~ included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). ANS, All pcoposed otilHy easemeots foc bolh the wat"f and s~ec systems have been adjusted per Mr. Peter Mazzella's review, \"\\ \ ,\ .,.... " \ .. :.) \ \' \ ~. I.- "- 8. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each " ~. building be within 200 feet of an existing or proposed fire hydrant. Please ,~ r \ i :!, ;," demonstrate that the plans meet this condition, by showing all hydrants. \! I(i( ANS: All proposed and existing fire hydrants are depicted on the Schematic \ i i I' , i.,- Water and Sewer plan Sheet C5, l 9. Appropriate backflow preventer(s) will be required on the domestic water I~ service to the building, and the fire sprinkler line if there is one, in I . " accordance with the CODE, Section 26-207. j: , "'L . ANS: Backtlow prevention devices will be used on all domestic and fire \ { " . mains, -( 10. A portion of the sanitary sewer (existing) at the west end of Casa Lorna ,~. Blvd, is shown under the restaurant. This segment will need to be {,~ t;).. ~ abandoned. Please correct plans accordingly. ANS: See revised plans, The existing sanitary sewer main will be removed after the new system is in place and approved thru Palm Beach County Health ., Dept. 11. Provide a phasing plan for water and sewer (sanitary and storm) ~. construction. ANS: Utilitv installation on this proiect will not be phased, 12, Utility construction details as shown on Civil Engineering (CE) sheets C6 ("'. thru C8 will not be reviewed for construction acceptability at this time. All '~ utility construction details shall be In accordance with the Utilities ii' . I ~ 'l'f;, . Department's "U tilities Engineering Design Handbook and c. Construction Standards" manual; and will be reviewed at the time of I \ construction permit application. ANS: This comment is noted. ENGINEERING DIVISION Comments: 13, All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. ANS: This comment is noted, 14. Please note that changes or revisions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit review. ANS: This comment is noted, 15. Show sight triangles on the landscape plans (LDR, Chapter 7.5, Article II, Section 5.H.) ANS: The sight triangle is shown, ......' / ~ , ~' \ \~2" /. . ...... - - '\ (' ..... \ . I 0\.'.. ~..i0 L" ~ / c l~"~~--'-' f () >J 'Iv DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 03-100 FROM: Michael W. Rumpf, Director, Planning and Zoning Laurinda Logan, P.E., Senior Engineer l~"--- May 23, 2003 (" '\ "'~- .-/ TO: DATE: RE: Standard Review Comments Conditional Use - 1 st Review Boynton Beach Marina Townhomes File No, CO US 03-003 The above referenced Site Plans, received on May 8, 2003, were reviewed by representatives from Public Works, Engineering, Solid Waste, Parks and Utilities against the requirements outlined in the City of Boynton Beach eode of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced PUBLIC WORKS - GENERAL 1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the storage and handling of refuse. The dumpster will be supplied by Public Works. 2. Early morning pick-up will need to be arranged with the Public Works Department to minimize the inconvenience of blocking Marina Drive. 3. Staff has concerns regarding the proximity of the trash room/ dumpster enclosure to the Townhomes (Bldg. 4-Unit 1) with respect to noise and odor. PUBLIC WORKS - TRAFFIC 4. No comments at this time. ENGINEERING 5. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. >> Please note that changes or revIsions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the eommission and at permit review. 7. Show sight triangles on the Landscape plans (LDR, ehapter 7.5, Article II, Section 5.H.) 8. Show easements, existing and proposed utilities on the Landscape Plan. . Department of Public Works, Engineering Division No. 03-100 Re: Boynton Beach Marina Townhomes, eonditional Use - 1st Review Comments May 23, 2003 Page 2 9. Provide details for the proposed paver systems showing compliance with the LDR, Chapter 2, Section 6.F.8.d.(2). 10. elarify the connection to the baffle box at the west end of the Boynton Beach Boulevard extension. The screened text is illegible. Also provide a detail of the main connection at this point. 11. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. Also provide drainage analysis showing compliance with the requirements of the SFWMD permit(s) and eity of Boynton Beach requirements. 12. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are recommended since they contain both English and Metric units. 13. Per the LDR, ehapter 23, Article II, Section M the fire lane pavement width shall be a minimum of 22 (twenty-two) feet. 14. Provide cross-sections and details for the Boynton Beach Boulevard extension. 15. Revise the Drainaqe Notes on Sheet e-2 to reflect use of the Enqineerinq Desiqn Handbook & Construction Standards, February 2003. Striping shall be in accordance with Standard Drawings "K" Series; Road Construction shall be in accordance with Standard Drawings lip" Series; and Drainage shall be in accordance with Standard Drawings "D" Series. 16. A complete review of the details will not be reviewed for construction acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. UTI L1TI ES 17. Fire flow calculations will be required demonstrating the City eode requirement of 1,500 g.p.m. as stated in the LDR, ehapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)). 18. eODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 19. Comprehensive Plan Policy 3.e.3.4. requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 20. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in the CODE, Article II, Section 26-33(a). Department of Public Works, Engineering Division No. 03-100 Re: Boynton Beach Marina Townhomes, eonditional Use _1st Review eomments May 23,2003 Page 3 21. The LDR, ehapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plans meet this condition, by showing all hydrants. 22. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207. 23. A portion of the sanitary sewer (existing) at the west end of easa Loma Blvd. is shown under the restaurant. This segment will need to be abandoned. Please correct plans accordingly. 24. Provide a phasing plan for water and sewer (sanitary and storm) construction. 25. Utility construction details as shown on Civil Engineering (CE) sheets e6 thru e8 will not be reviewed for construction acceptability at this time. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual; and will be reviewed at the time of construction permit application. LUck Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E.I P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division (PW/F&G) Larry Quinn, Solid Waste Manager, Public Works/Solid Waste Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail) File S:\Engineering\Kribs\Boynton Beach Marina Townhomes, 1st Review,doc / PARKS DIVISION MEMORANDUM #03-21 FROM: Michael W. Rumpf, Planning and Zoning Director John Wildner, Deputy Recreation and Parks Director~ Boynton Beach Marina Townhomes - Conditional Use TO: SUBJECT: cc: Wally Majors, Recreation and Parks Director File DATE: May 27, 2003 The Recreation and Parks Department has reviewed the new site plan for Boynton Marina Townhomes. The following comments are submitted: The Parks and Recreation Facilities impact fee is figured based on 11 single family attached (Townhouse) Units, 11 single-family attached units @ $771 ea = $8,481 - Fee is due at the time of the first applicable building permit. JW , DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 03-112 ~ TO: TRC MEMBERS Rodger Kemmer, Fire Protection Engineer Kevin Hallahan, Forester/Environmentalist John Huntington, Police Department H. David Kelley Jr., Utilities Department Timothy K. Large, Building Division Ken Hall, (Engineering) Public Works-General John Wildner, Parks Division Laurinda Logan, Engineering Department Eric Johnson, Planning Department Michael W. Rumpf 131ft#.- Director of Planning and Zoning FROM: DATE: May 8, 2003 SITE PLAN REVIEW PROCEDURES RE: 1 ST Review - Conditional Use Project Boynton Beach Marina Townhomes Location - 743 Northeast First Avenue Agent Lawrence Justiz File No. - COUS 03-003 ~L S""/9~.i' l........, . _ ~ (b/??~E~ Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments. Comments should be made available via e-mail to Sherie Coale and I no later than 5:00 P.M, on Thursdav. Mav 22. 2003. When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete with the exception of traffic data, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Eric Johnson, or myself. 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. Page 2 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to me. The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted or e-mailed to Sherie Coale and I for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum or e- mail. Eric Johnson will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members. MWR:sc Attachment xc: Steve Gale, Fire Marshal Bob Borden, Deputy Fire Marshal Marshall Gage, Police Department Pete Mazzella, Assistant Dir. Of Utilities Jeffrey Livergood, Public Works Director Don Johnson, Building Division S:\Planning\SHARED\WP\PROJECTS\BOYNTON BEACH MARINA\COUS-Townhomes 03-003\TRC Memo for 1st Plans Review .doc Revised 1/14/02 _/ CITY OF BOYNTON BEACH Fire and Life Safety Division 100 East Boynton Beach Blvd, P,O, Box 310 Boynton Beach, Florida 33425-0310 PLAN REVIEW COMMENTS For review of: COUS 03-003 1 st review-fire Marina Villaqe 743 NE First Ave. Project Name and Address: Reviewed by: R..J:1 Rodqer Kemmer. Fire Protection Enqineer Fire and Life Safety Department: Phone: (561) 742-6753 Comments to: Sherie Coale by email on 5/09/03 CODE REQUIREMENTS City Ordinance Section 9-6,3./7-11 requires approved automatic fire sprinkler systems throughout all buildings or structures regardless of the type of construction which are 3 stories or more in height or all buildings or structures in excess of 30 ft. in height as measured from finish ground floor grade to the underside of the topmost roof assembly. cc: Steve Gale Bob Borden ..,..-,,- BOYNTON BEACH MARINA TOWNHOMES COUS 03-003 1st Review Planning May 21,2003 This project requires conditional use approval. Provide justification for approval of the project based on the standards for evaluating conditional uses found in Chapter 2, Section 11.2.D. of the City of Boynton Beach Land Development Regulations. On the site plan tabular data (sheet A-2), label the "Type I" units as either "Type 1.1", "Type 1.2", or "Type 1.3" in order to be consistent with the information indicated in the APARTMENT UNIT MIX. On the site plans (sheet A-2 and sheet A-3), identify the rectangular "boxes" that are shown on the north side of the building. These "boxes" seem to extend beyond the limits of the fee-simple townhouse property boundary. Also, they seem to lessen the width of the pedestrian walkway. Please clarify. Cantilever portions of the townhouse buildings cannot protrude beyond the limits of the townhouse property boundary. The location of the fee-simple property boundary must be consistent between all plans. On sheet A-4, the words "SCALE: 3/32" = l' - 0" should be changed to SCALE: 1 / 16" = l' - 0". The lighting levels proposed on the photometric plan (sheet A-7) are subject to the Engineering Division's review and approval. The elevations must indicate the paint manufacturer's name and color code (Chapter 4, Section 7.D.). Equipment placed on the walls of the buildings shall be painted to match the building color (Chapter 9, Section 10.CA.). Place a note on the site plan indicating this requirement. The eight (8) new Alexander Palm trees (as shown on the landscape plan plant list, sheet L-4) must be installed at minimum 12 feet overall height and three (3) caliper inches (Chapter 7.5, Article II, Section 5.C.2.). All shrubs and hedges are required to be at minimum 24 inches in height, 24 inches in spread, and planted with tip-to-tip spacing measured immediately after planting to adequately cover the planted areas on the site (Chapter 7.5, Article II, Section 5.CA.). Place a note on the landscape plan indicating that mulch other than Cypress shall be used and maintained for landscape purposes (Chapter 7.5, Article II, Section 5.C.8.). S:IPJanninglSharedlWplProjectsIBOYNTON BEACH MARINAICOUS,Townhomes 03,0031Planning 1st review.doc ~ DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 03-090 FROM: Michael W. Rumpf Director of Planning and Zoning ~. Timothy K. Large ./ . TRC Member/Building Divis ~ TO: DATE: May 14, 2003 SUBJECT: Project - Boynton Beach Marina Townhomes File No, - COUS 03-003 - 1 st review The Building Division has no issues with the conditional use for the town homes at this time. TKL:bf S:IDevelopmentlBuildinglTRCITRC 20031Boynton Beach Marina Townhomes Page 1 of 1 TRC Memorandum Page 1 of 1 Coale, Sherie From: Hallahan, Kevin Sent: Thursday, May 22, 2003 2:48 PM To: Coale, Sherie Cc: Johnson, Eric Subject: Boynton Beach Marina Townhomes, conditional use-doc Planning Memorandum: Forester / Environmentalist To: Eric Johnson, Planner From: Kevin J. Hallahan, Forester / Environmentalist Subject: Boynton Beach Marina Townhomes Conditional Use - 1 st Review caus 03-003 Date: May 22, 2003 I have no comment on the proposed conditional use application to change the number of Townhome units as shown from 12 to 11 units. kjh File 6/12/2003 Facsimile TRANSMITTAL CITY OF BOYNTON BEACH 100 E. BOYNTON BEACH BOULEVARD P.O. BOX 310 BOYNTON BEACH, FLORIDA 33425-0310 FAX: (561) 742-6259 PlANNING AND ZONING DIVISION to: Lawrence Justiz, The Related Group fax #: 305-445-1834 date: May 27,2003 from: Eric Johnson, AICP re: 1 ST REVIEW COMMENTS FOR Boynton Beach Marina Townhomes Please find attached the first review comments for your project. To stay on the current review schedule, please do the following steps listed below, and bring all documents to the TRC scheduled for Tuesday, June 17,2003. 1. Revise your plans incorporating all comments listed herein, including the addition of notes on plans to confirm response to general statements/ comments, and bring 10 copies to the TRC review meeting (full sets including all pages originally submitted); 2. Submit the additional information as requested within the attached comments; ( i.e. traffic analysis, engineering certification, etc.) 3. Prepare a written response (7 copies) consisting of a list briefly summarizing how each comment has been addressed on the revised plans or with the supplemental information including location on the plans ( this promotes an expeditious 2nd review by staff and your project representatives during the TRC meeting );and 4. Submit reductions 8 ~ x 11 and 11x 17 for the proposed site plans, elevations and landscaping plan (this is required for the final report and public presentation). Planning and Zoning Division City of Boynton Beach Boynton Beach, Florida 33425 The applicant should not attend a TRC (2nd review) until all documents have been revised and copied for staff 742-6260 Fax: 742-6259 review. If plans will not be fully revised and brought to the scheduled TRC meeting, contact Sherie Coale in this office by the Thursday prior to the scheduled meeting date. Projects deviating from the original schedule are eligible for review at subsequent meetings, which are held every Tuesday. To reschedule, contact Sherie Coale, by the Thursday prior to the Tuesday TRC meeting that you desire to attend. The remainder of the review schedule will be adjusted accordingly. If you have questions on the attached comments, please contact the respective reviewer using the attached list of TRC representatives. If the plans are reasonably complete and all significant comments are addressed following TRC (2nd review), the project is forwarded to the Planning and Development Board Meeting that falls approximately 2 to 3 weeks following the TRC meeting. An "*,, by any comment identifies a comment that must be addressed prior to moving forward to the Planning and Development board. Note: Items recognized by staff as typically outstanding at this point include a traffic report and/or confirmation ofthe traffic concurrency approval from the Palm Beach County drainage certification by a licensed engineer, signed "Rider to Site Plan Application" form and colored elevations of the proposed project. This information is necessary for the project to proceed. If you have submitted this information, please disregard this note. DEPARTMENT REPRESENTATIVE REPRESENT A TIVES' PHONE FAX DESIGNEE Engineering Dave Kelley Laurinda Logan 742-6482 742-6485 Building Don Johnson Timothy Large 742-6352 742-6352 Fire Department Steve Gale Bob Borden 742-6602 364-7382 Rodger Kemmer 742-6753 742-6357 Police Department Marshall Gage John Huntington 737-6167 737-3136 Utilities Pete Mazzella H. David Kelley Jr. 742-6401 742-6485 Public Works-General Larry Quinn Laurinda Logan 742-6482 742-6485 Public W orks- Traffic Jeffrey Livergood Laurinda Logan 742-6482 742-6485 Parks & Recreation John Wildner 742-6227 742-6233 F orester/Environmentalist Kevin Hallahan Kevin Hallahan 742-6267 742-6259 Planning & Zoning Michael Rumpf, Eric Johnson 742-6262 742-6256 CHAIRMAN Revised 0 \114/02 S;IPlanningISHAREDlWPIPROJECTSIBOYNTON BEACH MARlNAICOUS-Townhome, 03-00311,! Review comment, FAX COVER.doc DEPARTMENT OF DEVELOPMENT MEMORANDUM NO. PZ 03-112 TO: TRC MEMBERS '~odger Kemmer, rlre Protection Engineer Kevin Hallahan, ForE'stE'r/Envirsl9ll'1elltalist JORFlllulIlillglull, Police Depari.lllelll ++:-Bavid" Kelley-d-r7j-lJtilities Department ;: IO~~ '<'iarge, l3uilain~ Di':iGioA " II I, ( ngineering) Public Works-General John Wildnp-r Parke Divi:::.iulI I" ~llrinrl~ I og::m, Enginp-p-ring nAr~rtment Eri,c Johnson,J2larming np-r;:)rtmAnt - Michael W. Rumpf l)1J 1/IfI!-,- Director of Planning and Zoning FROM: DATE: May 8, 2003 SITE PLAN REVIEW PROCEDURES RE: 1 ST Review - Conditional Use Project Boynton Beach Marina Townhomes Location - 743 Northeast First Avenue Agent Lawrence Justiz File No. - COUS 03-003 Find attached for your review the plans and exhibits for the above-referenced project. Please review the plans and exhibits and transmit formal written comments. Comments should be made available via e-mail to Sherie Coale and I no later than 5:00 P.M. on Thursdav. Mav 22. 2003. When preparing your comments, please separate them into two categories; code deficiencies with code sections referenced and recommendations that you believe will enhance the project. Adhering to the following review guidelines will promote a comprehensive review and enable the applicant to efficiently obtain Technical Review Committee approval: 1. Use the review standards specified in Part IV, Land Development Regulations, Site Plan Review and the applicable code sections of the Code of Ordinances to review and formulate comments. 2. The documents submitted for the project were determined to be substantially complete with the exception of traffic data, however, if the data provided to meet the submittal requirements is insufficient to properly evaluate and process the project based on the review standards or the documents show code deficiencies, additional data and/or corrections should be requested by the reviewer by contacting Eric Johnson, or myself. 3. Each comment shall reference the section of the code that is incorrectly depicted on the documents. 4. Technical Review Committee member(s) shall identify in their comments when the plans depict or when the location and installation of their departmental required improvements may conflict with other departmental improvements. Page 2 5. When a TRC Member finds a code deficiency that is outside of his/her review responsibility, the comment and the specific code section may be included in their review comments with the name of the appropriate TRC Member that is responsible for the review specified. 6. If a TRC member finds the plans acceptable, he/she shall forward a memorandum, within the time frame stated above, to me. The memorandum shall state that the plans are approved and that they do not have any comments on the plans submitted for review and that they recommend the project be forwarded through the approval process. All comments shall be typed, addressed and transmitted or e-mailed to Sherie Coale and I for distribution to the applicant. Please include the name and phone number of the reviewer on this memorandum or e- mail. Eric Johnson will be the Planning and Zoning staff member coordinating the review of the project. First review comments will be transmitted to the applicant along with a list of Technical Review Committee (TRC) members. MWR:sc Attachment XC: Steve Gale, Fire Marshal Bob Borden, Deputy Fire Marshal Marshall Gage, Police Department Pete Mazzella, Assistant Dir. Of Utilities Jeffrey Livergood, Public Works Director Don Johnson, Building Division S:\Planning\SHARED\WP\PROJECTS\BOYNTON BEACH MARINA\COUS-Townhomes 03-003\TRC Memo for 1st Plans Review .doc Revised 1/14/02