Loading...
CORRESPONDENCE The City of Boynlon Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DMSON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org December 9, 2003 Mr. Kevin Busse, Program Manager Interplan LLC 933 Lee Road, 1st floor Orlando, Florida 32810 Re: Staples ( Phases II & III ) MMSP 03-115 Dear Mr. Busse: In response to your request dated November 21, 2003 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: . Rotation ofthe orientation ofthe Phase III building to provide the west elevation as the front of the building; and · Modification ofthe parking layout around the Phase III building as a result ofthe rotation ofthe building; and . Inclusion of a dumpster location for the Phase III building; and . Inclusion of a loading space area for the Phase III building. Please be informed that the proposed changes on the revised plan date stamped 11/25/03 are "minor" as defined within the Land Development Regulations, Chapter 4 - Site Plan Review. This project may continue to be processed by the Building Division as a permit application, subject to the following conditions: 1. The correction of the parking count depicted under the Site Data on Sheet C 1. A physical count of the spaces on the page reveals 172 regular parking spaces and 8 HlC spaces for a total of 180, as opposed to the 176 noted. The area where the dumpster was placed still reflects 4 parking spaces where it would appear only 2 would now fit. 2. The dual utilization of parking spaces as loading spaces does not meet code. This must be corrected on the plans. Since only 155 parking spaces are required for all 3 phases of this project, it would appear as though all or most of those dual use parking spaces noted on the plans could be soley dedicated for loading purposes. City Code requires a 12' x 35' space with unobstructed access for this purpose. 3. The correction of the note on Sheet A4 Phase ill Signs to reflect the west as the front elevation. 4. Submittal for approval by the City Forester of a landscape plan for immediately around the Phase ill building, in accordance with Condition of Approval (COA) #11 of the original Staples site plan. This condition required incorporation oflandscape plants along all sides of the Phase ill building. 5. Utilization of building materials and colors as noted on these plans. . Page 2 December 9, 2003 6. Tenant signs for Phase II are to match the Staples sign relative to sign type, font style and color, other than nationally registered tenants. 7. Tenant signs on Phase ill are to be comparable to those on Phase II, and each tenant in Phase ill shall have the same sign type, font style and color, other than nationally registered tenants. 8. Tenant signs on the monument sign shall be compatible with the Staples portion of the sign, other than nationally registered tenants. 9. Indication of all existing and proposed utilities on the plans. 10. Indication of service points for sewer and water. 11. A building permit for this project shall not be issued until Utilities has approved the plans for water and/or sewer improvements required to service this project. 12. All utility construction details shall be in accordance with the Utilities Department's ''Utilities Engineering Design Handbook and Construction Standards" manual. 13. All engineering construction details shall be in accordance with the Engineering Department's "Engineering Design Handbook and Construction Standards" manual. 14. Payment of a capacity reservation fee upon request for Utilities Department signature on the Health Department application forms or within 30 days of this approval, whichever comes first. This fee will be determined based upon final meter size, or expected demand. 15. Revise notes to indicate that the site dumpster shall be constructed in accordance with City Standard Drawing G-4. Be advised that the proposed change may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Cc: Karen Main, Plan Review Analyst Kevin Hallahan, City Forester Laurinda Logan, Senior Engineer 'C{'" 1 l~~~: / \ j \ i! .) \ . 1\ I:) )0" " ~. ~:~ _/'V t () ;--.J \.>' DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 03-231 TO: FROM: Ed Breese, Principal Planner, Planning and Zoning Laurinda Logan, P.E., Senior Engineer ~---- \. December 2, 2003 ~., " ~'o_ _,_. ..J DATE: RE: Review Comments Minor Site Plan Modification -1st Review Shoppes of Woolbright Phase II & III (Staples) File No. MMSP 03-115 The above referenced Site Plans, received on December 2, 2003, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced. PUBLIC WORKS - GENERAL 1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the storage and handling of refuse. 2. Revise notes to indicate that the site dumpster enclosure shall be constructed in accordance with City Standard Drawing G-4. PUBLIC WORKS - TRAFFIC 3. Per the LDR, Chapter 2, Section 11.K loading areas and parking spaces may not be shared. Provide a dedicated loading area. ENGINEERING 4. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 5. Please note that changes or revIsions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated at permit review. 6. Show all existing utilities on Site Development plan (LDR, Chapter 4, Section 7.A.3). 7. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. ,,, Department of Public Works, Engineering Division Memo No. 03-231 Re: Shoppes of Woolbright Phase II & III (Staples) - Minor Site Plan Modification, 1st Review December 2, 2003 Page 2 UTILlTI ES 8. Show existing and proposed utilities on the site plan. 9. Show the service points for water and sewer. 10. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand. 11. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 12. All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); they will be reviewed at the time of construction permit application. LUck Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E.I P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\Kribs\Staples, Shoppes of Woolbright Phase II & III, 1st Review.doc .J ~; f1W/A?1JJ'"G, ~ ~/~~ -. .. ~:m:St~1J~ SJhVU)~ ~(~)~~ A.hrr(~) COA~ bt- ~J~ ~Ac.5 n ; 11/27/02~~ ~ -"'" ~/77a-N(jJJ 2 . DEPARTMENTS INCLUDE REJECT 3. At time of permit review, submit signed and sealed working drawings of the X ro osed construction. PARKS AND RECREATION Comments: None X FORESTER/ENVIRONMENT ALIST Comments: None X PLANNING AND ZONING Comments: 4. A cross access agreement is required. Provide the documentation prior to the X issuance of a buildin ermit. 5. Install a row of native hedges along the south side of the dumpster enclosure X (on a temporary basis) until commencement of Phase Two of the project. Afterwards, these hed es can be relocated to another ortion of the site. 6. X X Although, the separate "future retail" elevations were not included with this X application, the building will be required to achieve visual unity of character and design through the relationship of building style, texture, color, materials, and form with the Staples, Home Depot, and Home Expo buildings Cha ter 9, Section 9.B. . Signs shall be designed and treated as part of the architecture of a building X and shall be reviewed at time of site plan review (Chapter 9, Section to.C.). Staff recommends that the tenant signs (Phase Two) be matched with the "Sta les" si Phase One in terms ofletterin font, color, and si e. 10. Staff recommends installing double or triple-trunked Pygmy Date palm trees X within the lanters. 11. Staff recommends that a provision should be made during Phase ill of the X project to incorporate groundcover plants along all sides of the 5,850 square foot building. COA 11/27/02 3 ,. ~ DEPARTMENTS Since no elevations of the Phase Three building were provided with this submittal, staff recommends that the future exterior finish and color scheme of the Phase Three building should be such that it is compatible with the Staples building and / or the other buildings within the PCD. Greater emphasis should be placed on matching the colors and exterior finish with the Staples building rather than the other buildings of the PCD due to its close roximi with the Phase Three buildin . 13. Staff strongly recommends that the overhead bay door proposed on the east facade of the Staples building be painted either tan, cream, or brown rather than bri t red in order to match the main buildin colors. 14. Staff recommends reducing the red tile area (background) to more closely match the lettering area. As an alternative, staff would support reducing the size of the "Sta les" si letters. 15. Staff recommends that the proposed monument sign be more compatible to the Dunkin Donuts / Togo's / Tuscanini monument sign with special emphasis on shape, material used, color, and design. Staff also recommends that the letters of the tenant signs (of the proposed sign) be the same font and color as that of the "Staples" portion of the sign and that the address be laced on to of the si . ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Revision of comment # 15. Staff recommends that the proposed monument X sign be more compatible to the Dunkin Donuts / Togo's / Tuscanini ent si with ecial hasi . design. On the monument sign, the font and colors of the lettering for the tenant portion of the sign shall be compatible with the "Staples" portion (excluding copy for nationally registered tenants). 17. ulred number of parking spaces shall be 155 spaces. ADDITIONAL CITY COMMISSION CONDmONS Comments: MWR/sc 1. To be determined. INCLUDE X X X x , , . REJECT x .... INTERPLAN r .# 933 LEE ROAD, FIRST FLOOR ORLANDO, FL 32810 PH 407.645.5008 FX 407.629.9124 November 21, 2003 Michael W. Rumpf City of Boynton Beach Planning and Zoning Division 100 E. Boynton Beach Boulevard Boynton Beach, Florida 33425 Reference: Minor Modification (NWSP 02-018) IP # 2003.0639 Shoppes of Woolbright Dear Mr. Rumpf: On behalf of our client Twin Rivers Capital, Interplan is requesting a minor modification to the site plan (NWSP 02-018) due to Phase II and III of the approved site plan which are now ready for submittal. Phase II was reviewed and approved as part of the Staples site plan. However, the Phase II building will be revised per the following changes: · Tile accents have been added to the Phase II building to match the Staple's building. · Awnings have also been added. The Phase III building is now ready for your review, and has been revised with the following changes: - -,_._---~- , --~~_-?_:-~~~ t 1 . --J I.: I ',.r :;c;;:; I I \ ." I :z c::::> -< "-> ~..J1 jJ'! --.J ; i ! . Phase III will consist of a 5,850 square foot building intended for retail/mercantile use. All utilities and stormwater for Phase III were previously approved under the original site plan. The building for Phase III has been rotated to the north per the City of Boynton Beach's request at an October 22, 2003 meeting. The changes are listed as follows: o Parking configurations adjacent to the Phase III building have been modified from the original site plan. o The parking spaces along the north side of the building are now located on the east side of the building. o An additional two (2) parking spaces have been added to the west side of the building. o One (1) parking space along the south side of the building has been removed. o Spot elevations adjacent to the Phase III building have been modified accordingly. . . F :\S.Z\ShoppesOfWoolbnghl\2003 .0639\Correspondences\639pmtO 1 ,doc ARCHITECTURE . ENGINEERING . PROJECT MANAGEMENT · INTERIOR DESIGN . AA 003420 . CA 8660 ORLANDO DALLAS CHICAGO development services for restaurant, retail, hospitality and commercial programs. www.interplanorlando.com . ' . . INTERPLAN LLC Please find attached four (4) sets of site and architectural elevations and a check for $100.00. Once your review is complete if you should have any questions or comments, please feel free to contact me directly. Thank you for your assistance. Sincerely, INTERPLAN LLC 11_ ~ ~ Kevin Busse Program Manager/ Site Development Services ~ enclosures cc: J.J. Lamberson, Twin Rivers Capital Truman Gee, Interplan, LLC File F :\S-Z\ShoppesOfWoolbnght\2003 ,0639\Correspondences\639pmtO 1 .doc ORLANDO DALLAS CHICAGO development services for restaurant. retail. hospitality and commercial programs . www.interplanorlando.com PROJECT NAME: Shoppes of Woolbright LOCATION: Woolbright & SW 8th PCN: I FILE NO.: MMSP 03-115 II TYPE OF APPLICATION: I AGENT/CONT ACT PERSON: OWNER: Twin Rivers Capital Kevin Busse - Interplan LLC ADDRESS: ADDRESS: 933 Lee Road First Floor PHONE: Orlando, FL 32810 FAX: PHONE: 407-645-5008 FAX: 407-629-9124 Date of submittal/Projected meetine: dates: SUBMITTAL / RESUBMITTAL 11/25/03 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: S:\Planning\SHARED\WP\PROJECTS\Shoppes of Woolbright - PCD\MMSP 03-115\2003 PROJECT TRACKING INFO.doc