Loading...
APPLICATION City codes Accessed Via Website IVww.bov nton-beach.org IVww.amlegal.com/bovnton beach tl CITY OF BOYNTON BEACH, FLORIDA PLANNING & ZONING DIVISION SITE PLAN REVIEW APPLICATION FOR NEW SITE PLANS & MAJOR MODIFICATIONS TO EXISTING SITE PLAN Has applicant attended a pre-application meeting? Yes Date 7/22/03 This application must be filled out completely, accurately and submitted as an original to the Planning and Zoning Division. TWELVE COMPLETE, sequentially numbered, ASSEMBLED AND STAPLED sets of plans including a recent survey and appropriate fee shall be submitted with the application for the initial process of the Site Plan Review procedure. AN INCOMPLETE SUBMITTAL WILL NOT BE PROCESSED. Please print legibly (in ink) or type all information. I. GENERAL INFORMATION 1. Project Name: Boynton Beach City Library 2. Property Owner's (or Trustee's) Name: City of Boynton Beach Address: 100 E. Boynton Beach Blvd., Boynton Beach, FL 33435 (561) 742-6380 (Zip Code) Phone: Fax: 3. Applicant's name (person or business entity in whose name this application is made): Boynton Beach City Library (Virginia Farace, Library Director) Phone: (561) 742-6380 Fax: (561) 742-6381 I' ! I.. , (Zip Code) i' : 1'-- Address: 208 S. Seacrest Blvd. Boynton Beach, FL 33435 If contract purchaser, please attach contract for sale and purchase. I- U o 4. Agent's Name (person, if any, representing applicant): SchenkelShultz (Sam Ferreri) ChbY. L,~ \..-\-QOd \- Address: 1300 N. Congress Ave., West Palm Beach, FL 33409 Phone: 561-697-3451 (Zip Code) Fax: 561-697-5210 5. Correspondence to be mailed to agent only; if no agent, then to applicant unless a substitute is specified below:* *This is the one address to which all agendas; letters and other materials will be mailed. 6. What is applicant's interest in the premises affected? (owner, buyer, lessee, builder, developer, contract purchaser, etc.) Owner 7. Street address of location of site: 208 S. Seacrest Blvd. Boynton Beach, FL 33435 8. Property Control #(PCN) 08434528050160010 9. Legal description of site: (See Attached Sheet) 10. Intended use(s) of site: Library expansion and remodel 11. Architect: SchenkelShultz 12. Landscape Architect: Neal, Smith and Associates 13. Site Planner: 14. Engineer: Carney-Neuhaus, Inc. 15. Surveyor: Adair & Brady 16. Traffic Engineer: (To be provided by City of Boynton Beach) 17. Has a site plan been previously approved by the City Commission for this property? Yes II. SITE PLAN The following information must be filled out below and must appear, where applicable, on all copies of the site plan. 1. Land Use Category shown in the Comprehensive Plan: Public Use 2. Zoning District: PU 3. Area of Site 4.92 acres 214,413 sq. ft. 4. Land Use -- Acreage Breakdown: a. Residential, including -- acres % of site surrounding lot area of grounds b. Recreation Areas * 0.23 acres 5 % of site (excluding water area) c. Water Area acres % of site LEGAL DESCRIPTION Being a portion of land in the northeast quarter of Section 28, Township 45 South, Range 43 East, City of Boynton Beach, Palm Beach County, Florida, being more particulary described as follows: Being a portion of Block 16, SAWYER'S ADDITION TO THE TOWN OF BOYNTON BEACH, as recorded in Plat Book 1, Page 69; TOGETHER WITH that portion of abandoned road right-of-way known as Jessamine Street (S.E. 1st Avenue) as recorded in Official Record Book 4927, Page 1639; LESS road right-of-way taken for Seacrest Boulevard (fka Green Street) as recorded in Road Plat Book 5, Page 179, in the Public Records of Palm Beach County, Florida. d. Commercial % of site acres e. Industrial % of site acres f. Public/Institutional 4.69 acres 95 % of site g. h. Public, Private and Canal rights-of-way % of site acres acres % of site Other (specify) Other (specify) site % of i. acres j. Total area of site 4.92 acres 100 % of site *including open space suitable for outdoor recreation, and having a minimum dimension of 50 ft. by 50 ft. 5. Surface Cover a. b. c. courts. site d. e. Ground floor building area ("building footprint") 1.05 acres 21 % of site Water area % of site acres Other impervious areas, including paved area of public & private streets, paved area of parking lots & driveways (excluding landscaped areas), and sidewalks, patios, decks, and athletic 2.71 acres 55 % of Total impervious area 3.7 76 % of site acres Landscaped area .12 acres 2 % of site inside of parking lots (20 sq.ft. per interior parking space required - see Sec. 7.5-35(g) of Landscape Code). f. Other landscaped areas, 1.08 22 % of site acres g. Other pervious areas, including golf course, natural areas, yards, and swales, but excluding water areas acres % of site h. Total pervious areas 1.20 acres 24 % of site i. Total area of site 4.92 acres 100 % of site 6. Floor Area a. Residential 0 sq. ft. b. Commercial/Office 0 sq. ft. c. Industrial/Warehouse 0 sq. ft. d. Recreational 0 sq. ft. e. Public/lnstitutional 62,864 sq. ft. f. Other (specify) 0 sq. ft. g. h. Other (specify) sq. ft. 62,864 sq. ft. Total floor area 7. Number of Residential DwellinQ Units 8. 9. Single-family detached sq. ft. a. b. sq. ft. Duplex c. (1) (2) (3) (4) Multi-Family (3 + attached dwelling units) Efficiency 1 Bedroom 2 Bedroom 3+ Bedroom dwelling units dwelling units dwelling units dwelling units d. Total multi-family dwelling units e. Total number of dwelling units Gross Density -- dwelling units per acre Maximum height of structures on site 53'-4" feet stories 2 10. Required off-street parkina a. Calculation of required # of off-street parking spaces. 377 (please refer to site plan) Off-street parking spaces provided on site plan = 255 = = b. Calculation of required # of handicap parking spaces 8 Number of handicap spaces provided on site plan 16 = REPRESENTATIVE OF THE PROJECT MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. III. CERTIFICATION (I) (We) understand that this application and all papers and plans submitted herewith become a part of the permanent records of the Planning and Zoning Division (I) (We) hereby certify that the above statements and any statements or showings in any papers or plans submitted herewith are true to the best of (my) (our) knowledge and belief. This application will not be accepted unless signed according to the instructions below. vkF~ Signature of Owner(s) or Trustee, of Authorized Principal if property is owned by a corporation or other business entity. 10//? /03 Date { I OR Signature of contract purchaser (if applicant) Date IV. /tJ-/7- OJ Date (I) (We) her designate the above-signed person as (my) (our) authorized agent in regard to this application. \ k=F~.i Signature of Owner(s) or Trustee, _or Authorized Principal if property is owned _by a corporation or other business entity. /0 If '"1 /0 ~ Date I / OR Signature of contract purchaser (if applicant) Date A REPRESENTATIVE MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. RIDER TO SITE PLAN APPLICATION The undersigned as applicant for Final Site Plan Approval does hereby acknowledge, represent and agree that all plans, specifications, drawings, engineering, and other data submitted with this application for review by the City of Boynton Beach shall be reviewed by the various boards, commissions, staff personnel and other parties designated, appointed or employed by the City of Boynton Beach, and any such party reviewing the same shall rely upon the accuracy thereof, and any change in any item submitted shall be deemed material and substantial. The undersigned hereby agrees that all plans, specifications, drawings, engineering and other data which may be approved by the City of Boynton Beach, or its boards, commissions, staff or designees shall be constructed in strict compliance with the form in which they are approved, and any change to the same shall be deemed material and shall place the applicant in violation of this application and all approvals and permits which may be granted. The applicant agrees to allow the City of Boynton Beach all rights and remedies as provided for by the applicable codes and ordinances of the City of Boynton Beach to bring any violation into compliance, and the applicant shall indemnify, reimburse and save the City of Boynton Beach harmless from any cost, expense, claim, liability or any action which may arise due to their enforcement of the same. READ, ACKNOWLEDGED AND AGREED TO this day of , 20---, Witness Applicant Witness C'uNCURRENCY REQUIREMENl ~ . NOTICE TO APPLICANTS FOR APPROVAL OF LAND DEVELOPMENT ORDERS OR PERMITS Please be advised that all applications for the following land development orders and permits which are submitted on or after June 1, 1990 will be subject to the City's Concurrency Management Ordinance, and cannot be approved unless public facilities (potable water, sanitary sewer, drainage, solid waste, recreation, park, and road facilities) would be available to serve the project, consistent with the levels of service which are adopted in the City's Comprehensive Plan: Building permit applications for the construction of improvements, which, in and by themselves, would create demand for public facilities. Applications for site plan approval. Applications for conditional use approval. Applications for subdivision master plan approval. Applications for preliminary plat approval. Applications for final plat approval. Applications for rezoning to planned zoning districts. Applications for revisions to any of the applications listed above, which would increase the demand for any public facility. Any other application, which, in and by itself, would establish the density or intensity of use of land, or a maximum density or intensity of use of land. Applications for development orders and permits submitted after February 1, 1990 and which generate more than 500 net vehicle trips per day, must comply with the Palm Beach County Traffic Performance Standards Ordinance, unless exempt from that ordinance. Please be advised, however, that the following applications will be exempt from the Concurrency Management Ordinance, pending final approval of this ordinance by the City Commission: Applications for the development of property which was platted on or after January 13, 1978 and either the final plat or the preliminary plat and Palm Beach County Health Department permit applications were submitted or approved prior to June 1, 1990, and the use of the property is consistent with the general use which was intended for the property at the time of platting. Applications for the development of property, which was platted prior to January 13, 1978, the area of the platted lots does not exceed 2 acres, and the proposed use would not generate more than 500 net vehicle trips per day. Applications for building permit, if a site plan or conditional use application was submitted prior to June 1, 1990 and subsequently approved and the site plan or conditional use has not expired. Applications for the development of property within an approved Development of Regional Impact, and which are consistent with the approved DR!. Applications for approval of final plats, if the preliminary plat and application for Palm Beach county Health Department permits for utilities have been submitted prior to June 1, 1990. Applications for revisions to previously approved development orders or permits, which do not increase the demand for any public facility. Please be advised that these exerl,t-/cion rules are tentative and will be subjec.to final approval by the City Commission. If you have any questions concerning the proposed Boynton Beach Concurrency Management Ordinance, please contact the Boynton Beach Planning &Zoning Division at (561) 742-6260. CHAPTER 4 SITE PLAN REVIEW Section 7. Submission Requirements. Each applicant shall submit to the Planning and Zoning Division the following plans and exhibits in the number of copies specified by the Planning and Zoning Division, together with a Site Plan Review application and a fee adopted by resolution by the City Commission. 12 ASSEMBLED COPIES REQUIRED A. Existina site characteristics map: A sealed survey, not older than six months, showing all adjacent streets, alleys and driveways, and also illustrating: 1. Existing natural features, including but not limited to lakes, trees and other vegetation and soils and topography. 2. Existing buildings, building elevations, other structures, including use, height, dimensions and setbacks. 3. Existing utility lines and all easements. 4. Existing elevations (corner, street and finished floor) B. Site development plan: 1. A scaled drawing clearly illustrating proposed buildings and other structures, and any existing buildings and structures, which are to be retained, including use, height, dimensions and setbacks. 2. Proposed off-street parking spaces, driveways and sidewalks, including location, dimensions and setbacks, traffic control markings and signage. 3. Proposed fences and walls, including location, dimensions, setbacks, height and material. 4. Proposed location of lighting on site. 5. Proposed dumpster location. C. Landscape plan: 1. A separate scaled drawing (at the same scale as the site development plan) prepared as required by state law clearly illustrating proposed trees, shrubs, grass and 2. Proposed berms, watercourses and other topographic features. 3. A notation on method of irrigation. Architectural plan: 1. A scaled drawing clearly illustrating proposed building floor plan and elevations, including height, exterior dimensions, exterior color and materials. 2. A colored el...ation drawing (not mounted) showing a.. elevations of the building. (This submittal can be waived by the Planning and Zoning Director when not applicable.) E. Tabular Summary ContaininQ: 1. Total gross project area by acreage and square footage and net buildable land area in acres and square feet. 2. Total number of proposed residential units, including characteristics by number of bedrooms and bathrooms and gross square footage of each typical unit. 3. Proposed nonresidential floor type of use and total gross square footage. 4. Square footage and percentage distribution of the total project site, including areas proposed for landscaped open space, vehicular use areas, other paved areas, and building coverage and total coverage. 5. Number and ratio of required and provided off-street parking spaces and number of loading spaces. 6. Water bodies in acres and square feet. 7. Height of buildings. F. DrainaQe plan: 1. 2. A separate scaled drawing (at the same scale as the site development plan) showing elevations, flow arrows, proposed drainage structures, proposed treatment facilities, etc. An engineer's certification in writing that drainage will conform with all rules, regulations, codes, etc. including, but not limited to, Chapter 6, Article IV, Section 5 of these Land Development Regulations. Revised 10/26/01 BOYNTON BEACH LIBRARY EXPANSION Boynton Beach, Florida DRAINAGE CALCULATIONS Prepared by CARNEY-NEUHAUS, INC. Dennis Stevenson, P .E. October 16, 2003 /, L//,f /t'i' /tY'"? 3 CARNEY.NEUHAUS, INC. LIBRARY EXPANSION PRE.DEVELOPMENT DATE: 10/16/2003 BOYNTON BEACH, Florida Site Data Acreages 1 Total Site Area = 2. Drainage Project Area= 3. Impervious Buildings (Roof)= Roads and Parking= 4. Lakes= 5. Pervious= Acres 3.1720 Acres 0.2416 Acres 1 .1567 Acres 0.0000 Acres 1.7737 Acres Water Level Elevations 1. Wet Season Water Table = 2. Average Water Table Elevation= 3. Average Site Elevation= 4. Average depth of Water Table= 5. Soil Storage = 12.00 12.00 17.00 5.00 8.18 Ft. NGVD Ft. NGVD Ft. NGVD Ft. inches Rainfall 10 year one day - 25 year one day = 100 year one day = 8.00 Inches 10,00 Inches 12.00 Inches 10 year three day = 25 year three day = 100 year three day = 10.87 Inches 13.59 Inches 16.31 Inches Design Criteria A. Quality 1 Minimum required detention volume is the greater of: a. The first one inch of runoff from the entire site b. The amount of 2.5 inches times the percentage of impervious Computations A. Quality 1. The first one inch of runoff from site: 1.00 Inch X 3.17 Acres X 1 ft /12 inches 0.26 AC.-Ft. 2. The 2.5 inches times the percent of impervious: a. Site area for Water Quality (W.Q.) pervious/impervious calculations only: Site Are ( Water Area + Roof)= 3.17 ( 0.00 + 0.24) = 2.93 Acres Site W.Q. Per/lmper. b. Impervious area for water quality pervious/impervious calculations only Site W.Q. Per/lmper Area - Pervious 2.93 1.77 = 1.16 Acres Impervious W.Q. Per./Imper. By: Z.M.J. PRE-DevelpomenFIRE2 Page 1 of 3 Rainfall c. Percent of Impervious for W.O.: (Impervious W.O. 1 Site W.O.) x100%= 1.16 1 2.93 x 100 = 39 % Impervious d. For 2.5 inches times the percentage impervious: 2.5 inches x 0.39 = 0.99 Inches to be treated e. Volume required for W.O. detention= Inches to be treated x (Site Area- Lake Area) 0.99 x (3.17 0.00) 112 = 0.26 3. The required volume for water quality detention is = 0.26 AC.-Ft. SCS Curve Number The Average depth to the water table= Average Site Grade - Av. Water Table = 17.00 12.00 = Maximum 4 Ft. of Storage is assumed = 5.00 Ft. 4.00 Ft. of storage Depth Available Soil Storage: Soil Storage x Pervious Area x1 Ft/12 Inches 8.18 x 1.77 x 1/12 =1.21 Ac.Ft. Available soil storage onsite Convert available soil storage onsite per site area 1.21 1 3.17 x12in/Ft= 4.57 in. of site wide soil storage, S SCS Curve Number, CN CN = 1000/(S + 10) 10001 ( 4.57 +10) = 69 SCS Curve Number Calculate Storm Discharge: o = Runoff in Inches P = Rainfall in Inches S = Soil Storage (site wide) in Inches = 01 = Runoff from entire site in AC.Ft. 4.57 Calculated Above o = (P - (0.2x S))^2 1 (P + (0.8 xS)) 01 = 0 x Site Area (Ac.)x 1 Ft/12 in. By: Z.M.J. PRE-DevelpomenFIRE2 Page 2 of 3 Rainfall RAINFALL EVENT P 0 01 7.00 3.47 0.92 8.00 4.31 1.14 10 year one day 8.00 4.31 1.14 9.00 5.16 1.36 10.00 6.04 1.60 25 year one day 10.00 6.04 1.60 10 year three day 11.00 6.94 1.83 12.00 7.85 2.07 13.00 8.77 2.32 100 year one day 12.00 7.85 2.07 25 year three day 13.59 9.31 2.46 14.00 9.70 2.56 15.00 10.63 2.81 16.00 11.58 3.06 17.00 12.52 3.31 18.00 13.48 3.56 100 year three day 16.31 11.87 3.14 By: Z.M.J. PRE-DevelpomenFIRE2 Page 3 of 3 CARNEY-NEUHAUS, INC. LIBRARY EXPANSION STAGE/STORAGE CALCULATIONS SITE DATA PRE-DEVELOPMENT J"\ HE: 10/16/2003 '~OYNTON BEACH, Florida Total Area = Buildings = Site - Bldgs= 3.1720 ac. 0.2416 ac. 2.9304 ac. Stage Increments (ft) Site PAVEMENT 0.25 Low Elevation 16.15 16.85 High Elevation 17.70 17.70 Area (sq.ft.) 77262 3500 Site Area - Bldg. Area= SUMMARY Area (acres) 1.7737 1.1567 2.9304 aC.ft. ::storage ::storage TOT}:\[ Stage Elev. (ac.ft.) (ac.ft.) Stage Elev. (ac.ft.) 15.50 0.0000 0.0000 15.50 0.00 15.75 0.0000 0.0000 15.75 0.00 16.00 0.0000 0.0000 16.00 0.00 16.25 0.0057 0.0000 16.25 0.Q1 16.50 0.0701 0.0000 16.50 0.07 16.75 0.2060 0.0000 16.75 0.21 17.00 0.4134 0.0153 17.00 0.43 17.25 0.6923 0.1089 17.25 0.80 17.50 1.0428 0.2875 17.50 1.33 17.75 1.4633 0.5494 17.75 2.01 18.00 1.9067 0.8386 18.00 2.75 Cascade 2001 Version 1.0 File: PRE25-3dayLIB Date: October 16, 2003 Project Name: library Reviewer: C-N Project Number: 03-018 Period Begin: Jan 01, Time Step: 0.05 hr, Basin 1: Site Page 1 2000;0000 hr End: Jan 04, 2000;0000 hr Iterations: 10000 Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 25 year 1 Day Rainfall: 9 inches Area: 3.172 acres Ground Storage: 3.85 inches Time of Concentration: 0.1 hours Initial Stage: 16 ft NGVD Stage (ft NGVD) 15.50 15.75 16.00 16.25 16.50 16.75 17.00 17.25 17.50 17.75 18.00 Storage (acre-ft) 0.00 0.00 0.00 0.01 0.07 0.21 0.43 0.80 1. 33 2.01 2.75 Offsite Receiving Body: Offsite1 Time (hr) 0.00 24.00 48.00 72.00 4000.00 Structure: 1 Stage (ft NGVD) 8.00 8.00 8.00 8.00 8.00 From Basin: Site To Basin: Offsite1 Structure Type: Gravity Weir: Broad Crested, Crest Elev Bleeder: None Pipe: None Time (hr) Cumulative Rainfall (in) 16.68 ft NGVD, Length Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Duration: 72 hr 20 ft, Weir Coef Head Water Stage (ft NGVD) 3.13 Tail Water Stage (ft NGVD) =============================================================================== 0.00 1. 00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 0.05 0.11 0.16 0.22 0.27 0.33 0.38 0.44 0.49 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 16.00 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 15.50 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 Cascade 2001 Version l. File: PRE25-3dayLIB Date: October 16, 2003 Page 2 -_._---------~--------- Cumulative Instant Current Cumulative Head Water Tail Water Time Rainfall Runoff Discharge Discharge Stage Stage (hr) (in) (cfs) (cfs) (acre-ft) (ft NGVD) (ft NGVD) =============================================================================== 11.00 0.60 0.00 0.00 0.00 15.50 8.00 12.00 0.66 0.00 0.00 0.00 15.50 8.00 13 .00 0.71 0.00 0.00 0.00 15.50 8.00 14.00 0.77 0.00 0.00 0.00 15.50 8.00 15.00 0.82 0.00 0.00 0.00 16.00 8.00 16.00 0.88 0.01 0.00 0.00 16.02 8.00 17.00 0.93 0.01 0.00 0.00 16.04 8.00 18.00 0.99 0.02 0.00 0.00 16.07 8.00 19.00 1. 04 0.02 0.00 0.00 16.11 8.00 20.00 1. 09 0.03 0.00 0.00 16.16 8.00 21. 00 1.15 0.03 0.00 0.00 16.22 8.00 22.00 1. 20 0.03 0.00 0.00 16.26 8.00 23.00 1. 26 0.04 0.00 0.00 16.27 8.00 24.00 1. 31 0.04 0.00 0.00 16.28 8.00 25.00 1. 39 0.07 0.00 0.00 16.30 8.00 26.00 1. 47 0.07 0.00 0.00 16.33 8.00 27.00 1. 55 O.OB 0.00 0.00 16.35 B.OO 28.00 1. 63 O.OB 0.00 0.00 16.38 8.00 29.00 1. 71 0.09 0.00 0.00 16.41 8.00 30.00 1. 79 0.10 0.00 0.00 16.44 8.00 31.00 1. B7 0.10 0.00 0.00 16.48 8.00 32.00 1. 95 0.11 0.00 0.00 16.50 8.00 33.00 2.03 0.11 0.00 0.00 16.52 8.00 34.00 2.11 0.11 0.00 0.00 16.54 8.00 35.00 2.19 0.12 0.00 0.00 16.55 8.00 36.00 2.27 0.12 0.00 0.00 16.57 8.00 37.00 2.35 0.13 0.00 0.00 16.59 8.00 38.00 2.43 0.13 0.00 0.00 16.61 8.00 39.00 2.51 0.13 0.00 0.00 16.63 8.00 40.00 2.59 0.14 0.00 0.00 16.65 8.00 41. 00 2.67 0.14 .0.00 0.00 16.67 8.00 42.00 2.75 0.14 0.05 0.00 16.69 8.00 43.00 2.83 0.15 0.13 0.01 16.70 8.00 44.00 2.91 0.15 0.15 0.02 16.70 8.00 45.00 2.99 0.15 0.15 0.03 16.70 8.00 46.00 3.07 0.16 0.15 0.05 16.70 B.OO 47.00 3.15 0.16 0.16 0.06 16.70 8.00 48.00 3.23 0.16 0.16 0.07 16.70 8.00 49.00 3.32 0.18 0.18 0.09 16.70 8.00 50.00 3.41 0.19 O.lB 0.10 16.70 B.OO 51.00 3.52 0.23 0.22 0.12 16.70 8.00 52.00 3.64 0.27 0.25 0.14 16.71 B.OO 53.00 3.79 0.35 0.33 0.16 16.71 8.00 54.00 3.98 0.44 0.42 0.19 16.72 8.00 55.00 4.20 0.54 0.51 0.23 16.72 8.00 56.00 4.46 0.64 0.61 0.28 16.73 8.00 57.00 4.77 0.78 0.75 0.33 16.73 8.00 58.00 5.15 0.99 0.95 0.40 16.74 8.00 59.00 5.65 1. 4B 1. 32 0.50 16.76 8.00 60.00 9.14 17.15 13 .29 0.91 17.04 8.00 61. 00 10.13 2.01 2.89 1.48 16.81 B.OO 62.00 10.59 1. 22 1. 42 1. 64 16.76 B.OO 63.00 10.88 0.80 0.85 1. 73 16.74 8.00 64.00 11.15 0.80 0.80 1. 79 16.73 8.00 65.00 11.31 0.4B 0.51 1. 84 16.72 8.00 66.00 11. 47 0.4B 0.48 1. 89 16.72 8.00 67.00 11. 64 0.48 0.48 1. 92 16.72 8.00 68.00 11. 80 0.48 0.48 1. 96 16.72 8.00 69.00 11. 91 0.32 0.34 2.00 16.71 8.00 70.00 12.02 0.32 0.32 2.02 16.71 8.00 71.00 12.12 0.32 0.32 2.05 16.71 8.00 72 .00 12.23 0.32 0.32 2.08 16.71 8.00 STRUCTURE MAXIMUM AND MINIMUM DISCHARGES ------------------------------------------------------- ------------------------------------------------------- Cascade 2001 Version I.C File: PRE25-3dayLIB Date: October 16, 2003 Page 3 Struc Max (cfs) Time (hr) Time (hr) Min (efs) ======================================================= 1 13 .47 60.05 0.00 BASIN MAXIMUM AND MINIMUM STAGES 0.00 Basin Max (ft) Min (ft) =============================================================== Time (hr) Time (hr) Site 60.05 15.50 =============================================================== 17.04 BASIN WATER BUDGETS (all units in acre-ft) 0.05 Basin Total Runoff Structure Inflow Structure Outflow ================================================================================= Residual Initial Storage Final Storage Site 2.26 0.00 2.08 ========================================================~======================== 0.00 0.00 0.19 CARNEY-NEUHAUS, INC. LIBRARY EXPANSION POST DEVELOPMENT DATE: 10/16/2003 BOYNTON BEACH, Florida Site Data Acreages 1 Total Site Area = 2. Drainage Project Area= 3. Impervious Buildings (Roof)= Roads and Parking= 4. Lakes= 5. Pervious= Acres 3.1720 Acres 0.6413 Acres 1.0365 Acres 0.0000 Acres 1 .4942 Acres Water Level Elevations 1. Wet Season Water Table = 2. Average Water Table Elevation= 3. Average Site Elevation= 4. Average depth of Water Table= 5. Soil Storage = 12.00 12.00 17.75 5.75 8.18 Rainfall Ft. NGVD Ft. NGVD Ft. NGVD Ft. inches 10 year one day = 25 year one day = 100 year one day = 8.00 Inches 10.00 Inches 12.00 Inches 10 year three day = 25 year three day = 100 year three day = 10.87 Inches 13.59 Inches 16.31 Inches Design Criteria A. Quality 1 Minimum required detention volume is the greater of: a. The first one inch of runoff from the entire site b. The amount of 2.5 inches times the percentage of impervious Computations A. Quality 1. The first one inch of runoff from site: 1.00 Inch X 3.17 Acres X 1 ft /12 inches = 0.26 Ac.-Ft. 2. The 2.5 inches times the percent of impervious: a. Site area for Water Quality (W.Q.) pervious/impervious calculations only: Site Are ( Water Area + Roof)= 3.17 ( 0.00 + 0.64) = 2.53 Acres Site W.Q. Perllmper. b. Impervious area for water quality pervious/impervious calculations only Site W.Q. Per/lmper Area - Pervious 2.53 1.49 = 1.04 Acres Impervious W.Q. Per.llmper. By: Z.M.J. POST -DevelpomenLlB Page 1 of 3 Rainfall c. Percent of Impervious for W.O.: (Impervious W.O. 1 Site W.O.) x100%= 1.04 1 2.53 x 100 = 41 % Impervious d. For 2.5 inches times the percentage impervious: 2.5 inches x 0.41 = 1.02 Inches to be treated e. Volume required for W.O. detention= Inches to be treated x (Site Area- Lake Area) 1.02 x (3.17 0.00) 112 = 0.27 3. The required volume for water quality detention is = 0.27 AC.-Ft. SCS Curve Number The Average depth to the water table= Average Site Grade - Av. Water Table = 17.75 12.00 = Maximum 4 Ft. of Storage is assumed = 5.75 Ft. 4.00 Ft. of storage Depth . Available Soil Storage: Soil Storage x Pervious Area x1 Ft/12 Inches 8.18 x 1.49 x 1/12 = 1.02 AC.Ft. Available soil storage onsite Convert available soil storage onsite per site area 1.02 I 3.17 x12in/Ft= 3.85 in. of site wide soil storage. S SCS Curve Number, CN CN = 1000/(S + 10) 10001 ( 3.85 +10)= 72 SCS Curve Number Calculate Stonn Discharge: o = Runoff in Inches P = Rainfall in Inches S = Soil Storage (site wide) in Inches = 01 = Runoff from entire site in AC.Ft. 3.85 Calculated Above 0= (P - (O.2x S))^2 1 (P + (0.8 xS)) 01 = 0 x Site Area (Ac.)x 1 Ft/12 in. By: Z.M.J. POST-DevelpomenLlB Page 2 of 3 Rainfall RAINFALL EVENT P 0 01 7.00 3.85 1.02 8.00 4.72 1.25 10 year one day 8.00 4.72 1.25 9.00 5.60 1.48 10.00 6.51 1.72 25 year one day 10.00 6.51 1.72 10 year three day 11.00 7.43 1.96 12.00 8.36 2.21 13.00 9.30 2.46 100 year one day 12.00 8.36 2.21 25 year three day 13.59 9.86 2.61 14.00 10.25 2.71 15.00 11.20 2.96 16.00 12.15 3.21 17.00 13.12 3.47 18.00 14.08 3.72 100 year three day 16.31 12.45 3.29 Allowable Discharge South Florida Water Management District Basin: C-16 Allowable Discharge = 62.6 CSM Site Allowable Discharge = 0.31 cfs By: Z.M.J. POST-DevelpomenLlB Page 3 of 3 FRENCH DRAIN CALCULATIONS: L= V/[K(H2W+2H2Du-Du^2+2H2Ds )+(0.000139WDu)] Formula is per South Florida Water Management District Manual Volume IV = 463.00 FT. 13.60 ACRE-INCH 1.1337 ACRE-FT. 6.00 FT. 0.000310 CFS/FT^2-FT.HEAD 5.40 FT. 3.40 FT. 2.60 FT. L= Length of Trench V= Volume Treated V1= Volume Treated W= Width if Trench K= Hydraulic Conductivity H2= Depth to the Water Table Du= Non-saturated Trench Depth (feet) Ds= Saturated Trench Depth (feet) = = = = = = = VOLUME TREATED IN PROPOSED FRENCH DRAIN IS = 1.1337 ACRE-FT. g ~I N 0 coli: a ;r," "'U ~ IJl Z o .... z > Ujg .... e:( c .... z w ::E Q.. o ....I W > W c ..:. UJ o Q.. uZ zQ -(I) cnZ 3~ ....Q. ::1:)( iilw z> '0:: ~~ ~!!! U...J en z o ~ ::l t) ...J <t t) UJ (!) ~ O<t 1-1- en<t UJo ~UJ 1-1:: en en <.> <.> <.> III co III OM,... N...O ..... v '" ...<O1l) MON II III III Vl <i:~ ~~ o ::l 1-00 II Vl Cl "tl iii 0 Mil) M M <0 1l)<O ,...,... co 0 ON vI'-... <0... <0... <<:! ~;; 0 0"': ~"':N NM M..t ..;- 8~ > c:: <t 00 00 00 00 00 0 :!: ON '<t"<O COO Nv <0 CO 0 :!: III . ....:....: ....:....: "":cO coco COCO ai 0> ::l ~~ ... ... ... ... ... ...... ... ... ...... ... ... en III <i: i~ co u , III III III ,... <i: 0 .J!! M Il) i:i5 N 00 I'- N 0 Ol Il) 0 ...... ...... Ol CO <0 Il)M 00 CO ~ lll~ 0 Ol C> C> co I'- Il) '<t" M N'" W "":cO 0 o . 0 N ...... <0 I'-'<t" '<t" '<t" '<t" ~~ I- ... ... Il) '<l; co"" 0 0 ... N '<t"I'- C! ~ <<:! <0 ~ U 0 0 0 0 00 "':N (i) ... ~~ ...... ...... ...... W ON C> ...... 0 0 0 OC>CO <0 I'- I'- 1'-1'- '<t"... <0 Il) 0 0 0 <OMM '<t" I'- 0 M<O I- "":cO M ...... lll~ 0 0 0 ONll) C> M co N<O W ... ...... C> C'! o . 0 0 0 000 0 ...... ...... NN c:: 0 Ill4=:; 0 0 0 000 0 0 0 00 t) ~ u Z V5~ 0 t) ON ~ co 0 0 0 '<t"COOl I'- I'- <0<0 It'l N '<t"... en = 0 0 0 '<t"I'-C> co N <00 ..;- I- r---.:a:i <0 Iii 0 0 0 ...Il)N N '" ~;ili v Z ... ... N <.> 0 0 0 0 0...... N M <0 W N 0 ~ 0 0 0 0 00 0 0 00 0 :!: III W 0 ;;c e! .9 0- en 00 0 I'- 0 0 0 ...NIl) co N Il) co ... ...... '<t"0 '<t" ... =; 0 0 0 000 0 ... r:: ...N I- "":cO ... 0 0 0 0 ...'<t"0l It'l ... MC> Z M M U 0 00 000 ...N N MM W ... ... ...... 0 ~ 0 00 000 00 0 00 :!: III W Cl ;;c e! .9 0- en z 00 0 0 0 01'- """"1'- I'- 1'-"" I'- I'- 00 0 0 OM MMM M MM M M <( 00 0 = 0 OM MMM M MM M M c:: 0 <.> 0 0... ...... ... "": ... ... ... ... 0 Vl 0 ~ 0 0"': ... ... ... ... ... ... ... ... :x:-8 III t) .- 0 zen III UJ 0 c:: (i) U- S <= <= 0 0 ~ Vi :> Vl ~ ~ III &~~ = III W 00 00 00 00 00 0 > > 0- t; ON '<t"<O COO Nv <0 CO 0 u3Eo III III III ....:....: ....:....: "":cO cOcxi COCO ai W W .!!?. ~ Cl ... ... ... ... ... ... ... ... ... ... ... ~ .r::. III III III ~ Cl III III U5 .s: ...J i: <i: <i: .J!! i:i5 /I Cascade 2001 Version 1 File: POST25-3dayLIB Date: October 16, 2003 Page 1 Project Name: FIRESTATION #2 Reviewer: C-N Project Number: 03-018 Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.05 hr, Iterations: 1000 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 25 year 1 Day Rainfall: 9 inches Area: 3.172 acres Ground Storage: 3.85 inches Time of Concentration: 0.25 hours Initial Stage: 17 ft NGVD Stage (ft NGVD) 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 18.60 18.80 19.00 Storage (acre-ft) 0.00 0.03 1. 25 1. 43 1. 73 2.16 2.65 3.16 3.67 4.17 4.68 Off site Receiving Body: Offsite1 Time (hr) 0.00 24.00 48.00 72.00 4000.00 Structure: 1 Stage (ft NGVD) 8.00 8.00 8.00 8.00 8.00 From Basin: Site To Basin: Offsite1 Structure Type: Gravity Weir: Broad Crested, Crest Elev Bleeder: None Pipe: None Time (hr) Cumulative Rainfall (in) 17.2 ft NGVD, Length Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) 5 ft, Weir Coef Head Water Stage (ft NGVD) 3.13 Tail Water Stage (ft NGVD) =============================================================================== 0.00 1. 00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 0.00 0.05 0.11 0.16 0.22 0.27 0.33 0.38 0.44 0.49 0.55 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 17.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 8.00 Cascade 2001 version 1. .. File: POST25-3dayLIB Date: October 16, 2003 Page 2 Cumulative Instant Current Cumulative Head Water Tail Water Time Rainfall Runoff Discharge Discharge Stage Stage (hr) (in) (cfs) (cfs) (acre-ft) (ft NGVD) (ft NGVD) =============================================================================== 11.00 0.60 0.00 0.00 0.00 17.00 8.00 12.00 0.66 0.00 0.00 0.00 17.00 8.00 13.00 0.71 0.00 0.00 0.00 17.00 8.00 14 .00 0.77 0.00 0.00 0.00 17.00 8.00 15.00 0.82 0.00 0.00 0.00 17.00 8.00 16.00 0.88 0.01 0.00 0.00 17.00 8.00 17.00 0.93 0.01 0.00 0.00 17.01 8.00 18.00 0.99 0.02 0.00 0.00 17.02 8.00 19.00 1. 04 0.02 0.00 0.00 17.03 8.00 20.00 1. 09 0.03 0.00 0.00 17.04 8.00 21.00 1.15 0.03 0.00 0.00 17.06 8.00 22.00 1. 20 0.03 0.00 0.00 17.07 8.00 23.00 1. 26 0.04 0.00 0.00 17.09 8.00 24.00 1. 31 0.04 0.00 0.00 17.11 8.00 25.00 1. 39 0.06 0.00 0.00 17.14 8.00 26.00 1. 47 0.07 0.00 0.00 17.18 8.00 27.00 1. 55 0.08 0.00 0.00 17.20 8.00 28.00 1. 63 O.OB 0.00 0.00 17.20 B.OO 29.00 1. 71 0.09 0.00 0.00 17.20 B.OO 30.00 1. 79 0.09 0.00 0.00 17.20 B.OO 31. 00 1. 87 0.10 0.01 0.00 17.21 8.00 32.00 1. 95 0.10 0.01 0.00 17.21 B.OO 33.00 2.03 0.11 0.01 0.00 17.21 B.OO 34.00 2.11 0.11 0.01 0.00 17.21 B.OO 35.00 2.19 0.12 0.02 0.00 17.21 8.00 36.00 2.27 0.12 0.02 0.01 17.21 B.OO 37.00 2.35 0.13 0.02 0.01 17.21 B.OO 3B.00 2.43 0.13 0.03 0.01 17.21 8.00 39.00 2.51 0.13 0.03 0.01 17.22 B.OO 40.00 2.59 0.14 0.04 0.02 17.22 8.00 41.00 2.67 0.14 0.04 0.02 17.22 8.00 42.00 2.75 0.14 0.04 0.02 17.22 8.00 43.00 2.83 0.15 0.05 0.03 17.22 B.OO 44.00 2.91 0.15 0.05 0.03 17.22 8.00 45.00 2.99 0.15 0..06 0.03 17.22 8.00 46.00 3.07 0.15 0.06 0.04 17.23 B.OO 47.00 3.15 0.16 0.07 0.05 17.23 8.00 4B.00 3.23 0.16 0.07 0.05 17.23 B.OO 49.00 3.32 0.18 O.OB 0.06 17.23 8.00 50.00 3.41 0.19 O.OB 0.06 17.23 8.00 51. 00 3.52 0.23 0.09 0.07 17.23 8.00 52.00 3.64 0.26 0.10 0.08 17.23 8.00 53.00 3.79 0.35 0.11 0.09 17.24 8.00 54.00 3.98 0.44 0.13 0.10 17.24 8.00 55.00 4.20 0.53 0.15 0.11 17.25 8.00 56.00 4.46 0.63 0.18 0.12 17.25 8.00 57.00 4.77 0.77 0.22 0.14 17.26 8.00 58.00 5.15 0.97 0.27 0.16 17.27 8.00 59.00 5.65 1. 42 0.34 0.18 17.28 8.00 60.00 9.14 15.05 0.96 0.23 17.36 8.00 61. 00 10.13 2.45 2.44 0.38 17.49 8.00 62.00 10.59 1. 27 1. 85 0.56 17.44 B.OO 63.00 10.88 0.82 1. 38 0.68 17.40 8.00 64.00 11.15 0.80 1. 30 0.79 17.39 8.00 65.00 11.31 0.49 1.21 0.90 17.38 B.OO 66.00 11.47 0.48 1.12 0.99 17.37 8.00 67.00 11.64 0.48 1. 04 1. 08 17.36 B.OO 68.00 11.80 0.48 0.97 1.17 17.36 8.00 69.00 11.91 0.33 0.90 1. 24 17.35 8.00 70.00 12.02 0.32 0.84 1. 31 17.34 8.00 71.00 12.12 0.32 0.78 1. 38 17.34 8.00 72.00 12.23 0.32 0.73 1.44 17.33 8.00 STRUCTURE MAXIMUM AND MINIMUM DISCHARGES ------------------------------------------------------- ------------------------------------------------------- Cascade 2001 Version 1.C Date: October 16, 2003 File: POST25-3dayLIB Page 3 Struc Max (cfs) Time (hr) Min (cfs) ======================================================= 0.00 1 2.44 61.00 BASIN MAXIMUM AND MINIMUM STAGES Time (hr) 0.00 Basin Time (hr) --------------------------------------------------------------- --------------------------------------------------------------- Time (hr) Max (ft) Min (ft) Site 17.49 61. 00 =============================================================== BASIN WATER BUDGETS (all units in acre-ft) 17.00 0.00 Basin Total Runoff Structure Inflow --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- Residual Structure Outflow Initial Storage Final Storage Site 2.26 0.00 ================================================================================= 0.00 1. 44 0.00 0.82 . ' Cascade 2001 Version 1. File: 100-year 3-day zero dischargeLIB Date: October 16, 2003 Page 1 Project Name: FIRESTATION Reviewer: C-N Project Number: 03-018 Period Begin: Jan 01, Time Step: 0.05 hr, #2 2000;0000 hr End: Jan 04, 2000;0000 hr Iterations: 1000 Duration: 72 hr Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 100 year 1 Day Rainfall: 12 inches Area: 3.172 acres Ground Storage: 3.85 inches Time of Concentration: 0.25 hours Initial Stage: 17 ft NGVD Stage (ft NGVD) Storage (acre-ft) 17.00 17.20 17.40 17.60 17.80 18.00 18.20 18.40 18.60 18.80 19.00 0.00 0.03 1. 25 1.43 1. 73 2.16 2.65 3.16 3.67 4.17 4.68 Offsite Receiving Body: Offsite1 Time (hr) Stage (ft NGVD) 0.00 24.00 48.00 72.00 4000.00 8.00 8.00 8.00 8.00 8.00 STRUCTURE MAXIMUM AND MINIMUM DISCHARGES ------------------------------------------------------- ------------------------------------------------------- Struc Max (cfs) Time (hr) Min (cfs) Time (hr) ------------------------------------------------------- ------------------------------------------------------- BASIN MAXIMUM AND MINIMUM STAGES --------------------------------------------------------------- --------------------------------------------------------------- Basin Max (ft) Time (hr) Min (ft) Time (hr) --------------------------------------------------------------- --------------------------------------------------------------- Site 18.45 72.00 17.00 0.00 BASIN WATER BUDGETS (all units in acre-ft) ================================================================================= Basin Total Runoff Structure Inflow Structure Outflow Initial Storage Final Storage Residual ================================================================================= Site 3.28 0.00 0.00 0.00 3.28 0.00 ... '...k_ ..' @ f~-~~~""- .... II n ! l....~--->-~. :; tJ~ CARNEY-NEUHAUS, INC. W'ol, ' BOYNTON BEACH LIBRARY ADDITION DRAINAGE STATEMENT & ENGINEER CERTIFICATION The proposed project consists of a 17,000 sq ft addition to an existing library. The parking area is reducing from 50,400 sq ft to 45,200 sq ft. The net impervious area for the project site is increasing from 61,000 sq ft. to 73,000 sq ft. There is no existing drainage collection system serving the project area. The proposed drainage collection/detention system will include two connected ex- filtration trench systems to meet water quality and eliminate localized flooding and ponding problems ofthe existing project site. Drainage design is in accordance with the city and SFWMD criteria for water quality, 100 year storm building flood protection and allowable discharge rate less than or equal to pre-improvement conditions. To the best of our professional knowledge, the proposed drainage system conforms to all rules, regulations, codes, including but not limited to, chapter 6, article N, section 5 ofthe land development regulations. ( . . d ~ J!P~ Dennis Stevenson, P .E. No. 33748 11911 U.s. HIGHWAY 1, SUITE 120 NORTH PAlM BEACH GARDENS, FL 33408 TEL: (561) 622-1300 FAX: (~61) 622-1428 pbg@carney-neuhaus.com 3050 BISCAYNE BOULEVARD, SUITE 200 MIAMI, FL 33137 TEL: (305) 576-9990 FAX: (305) 576-9950 carney@carnel,l-newhaus.com o 4101 N. ANDREWS AVE., SUITE 213 FORT lflUDERDALE, FL 33309 TEL: (954) 565-0530 FAX: (305) 576-9950 carney@carney-newhaus.com The parking inventory and the preliminary parking analysis for the library expansion submitted to P&Z for the subject site plan was based on the premise that the four uses, the library, the Civic Center, the Art Center and the Madsen Center, have been and will continue sharing total parking resources. Both the proximity of the parking lots for the said uses and the established practice support this premise. However, it is clear that if the standard use-based parking ratios are applied, a significant deficiency results both in terms of current and proposed number of spaces. The total requirement (defined as above) calls for 377 total parking spaces: the current inventory shows 262 existing spaces which would be reduced to 253 spaces by the proposed expansion. Alternatively, the Code allows for the calculation of the parking requirements for two or more uses based on sharing of parking resources, if justified by the analysis of the actual parking demand patterns exhibited by each use (chapter 2, Sec.llH13). Such analysis is based on the Urban Land Institute shared parking model; it must show that the joint parking allocation is feasible and acceptable given the different days and/or hours of the peak parking demand for different uses. Ultimately, the decision regarding approval of shared parking rests with the City Commission. Staff has performed the shared parking analysis, using the parking demand surveys submitted for the uses. The accumulated peak day/peak hour parking utilization was determined to be 202 spaces. Since the Code mandates a minimum buffer of 10%, the requirement would be 223 spaces. The number of proposed spaces is 253, providing an additional buffer of 30 spaces. The total surplus of 51 spaces (30 spaces and a 10% buffer) may, to some extent, accommodate the following: . the seasonal variation (which is uncertain), . spillovers from the city's parking lots located north of the study area (the analysis was performed without accounting for the utilization patterns of these lots), . special events, and . the planned expansion of the Art Center (additional 6,002 sq ft). The expansion of the Art Center will likely necessitate construction of additional parking on the lot located east of the Civic Center. , <.....\ i, 1'1 1: ... i L':.I DEe - I {.~,-d :~ ''\ , . PROJECT NAME: City Library , , , LOCATION: 208 S. Seacrest Blvd. PCN: 08-43-45-28-05-016-0010 I FILE NO.: MSPM 03-011 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: ChoU Lightfoot - SchenkelShultz ADDRESS: ADDRESS: 1300 N. Congress Avenue PHONE: West Palm Beach, FL 33409 FAX: PHONE: 561-697-3451 FAX: 561-697-5210 Date of submittal/Projected meetine: dates: SUBMITTAL / RESUBMITT AL 10/17/03 1 ST REVIEW COMMENTS DUE: 11/3/03 PUBLIC NOTICE: N/A TRC MEETING: 12/16/03 LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT 1/13/04 AGENCY BOARD CITY COMMISSION MEETING: 1/20/04 COMMENTS: S:\Planning\SHARED\WP\PROJECTS\City Library\MSPM 03-011\2003 PROJECT TRACKING INFO.doc , . l. _ - { ~/J.0 2.~ IC\ 3c)/f~~ 1/ L l''-tU C Ufi - /' <,_~, Tfme and Date of Meeting ~u:.<-<- f ! .3 .3-=- Thos~ atte~ding mee~ing: d _ ~ _t{~ )1^~ tf1^ JL-rY' r;t .. Applicant's Name: PRE-APPLICATION CONTACT QUESTIONS Si~' ~~. . 14~ ~ ./ Phone: l.f4> (, &1 7, .3 ys / 1. HA VB YOU SPOKE~ TO ANY STAFF MEMBER ABOUT THE PROJECT? Yes No ~ (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING?, STAFF MEMBERS NAME: 2. LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS) ~r1 4-.<J; L~ "71 3. WHAT W9ULD YOU LIKE TO DO? ~ NEW PROJECT BUILDING EXPANSION OR MODIFICATION, CHANGE IN PRIOR USE? IS THE STRUCTURE CURRENTLY VACANT? VARIANCE TYPE: POOL OR SCREEN ENCLOSURE COMMERCIAL PROPERTY? RESIDENTIAL PROPERTY? INDUSTRIAL PROPERTY? DO YOU KNOW THE ZONING CODE DESIGNATION? ~ 4. TIME AND DATE PREFERRED 5. HOW MANY PEOPLE WILL BE AT THE PRE-APP MEETING? Note: Tell tlte person tltat someone from tlte Department will call them to confirm the meeting. .................................................................................. . Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia. . Meetine:s may be scheduled: Monday afternoons Tuesday all day Wednesday all day Thursday mornings Note: Lusia is not available for Tuesday a.ill. meetings, and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.m. S;\P I ann i ng\P lanning\Pre-app licationcontactquestions.doc ~7~~Yl q-,~/C /e/t1(l>(j 4~P:-jL~~'77 PRE-APPLICATION CONFERENCE REVIEW FORM Date ~f-/2,.lJ.u7>~ Time Started: II) ~ ?" ~Time Finished: 12.: IJO 1M I I Attending as Applicant Phone Fax Proposed Project Information Proposed Project Name and ~ Type/Use L,."~/l~ - LY ;;U~ t/ W Site Location (Address if vailable) Lo(;",~ ~tflPlI S&N{"~, ~ Isr Sf., otd1lJ 11ft. ....,)) Ale Site PCN f Existing Zoning I't( . Proposed Zoning .:f'tC IV/A Existing Land Use/Density f1'6/ Proposed Land Use/Density AlIA / Vacant Anticipated Submittal Date pee /~, ~'3 ' Notes and Comments Lot Area Lot Frontage Lot Depth Setback !=~ S7~ 1 ~ r ~ enJ f~")q uc--.; r . / ~ f='r1"T fh/ ~~7f-tV / S I"'fNi ~ '" AI E 2,.,0 IIYL . ~t) ~ /Z~ $e I'~ 1,:" , ~ 3S ~q-. ~ frtSftr!Gl) ?He Miw'AJ ~Pf.I4.wte ~e %~ Height Parking Requirements or Improvements Landscaping/Buffering LAt.W ~ /fI/'N ~1t7tIl4~ I/(J/).t he" ~>1UJ}/,,7)/ ~/,(}ipf f41MS -NeTr-cenfermiJ:1g Use 01 CI,afIgjc iA U3~ ~?lff 11: F/o,l '7 ~~rt:(H fttrf6 Stt'lJ f)H,IU~6 It'S 6tteWJJlkf.C u r Itfl1'n 4 U:'JffV 's. I Other Zoning Changes Required ~ ~ -r;,.' 144. ~. l$t b7P{1A1 ~""41J.6 J,{,Z Environmental Review Requirements /'I f . . () ::f' _ Notes/Comments/Recommendations P6"(jbllJ~ ~'~417 ~r''''t:D * 6e4.K,T F;JfI A- ~I'/Arp,.J . L/~ H14f. A- lJtfII~ufllli' t ~ A UKrA C/DIl. St;-h,~~~?;I~ ap lEc.. ItA 8tc'c M6b7''ri 6 ~c.,ft7J 4- (, k~pr 7t.113/lU j/ifv P4,rd (;>Ct /~ J-d33. ~S~~ ~~ t>. ,& /.pc ~. C.N'.."*.,pION ,7;t.c'7r $7>>f.$ #I'/LJ~ SC9t~/k"-:rr. ~'F $t.~ ;, ,P1t.c'pbFst:FO e.v,~'t>< /EkfS1iA-G t;~AIf."1 : Z-8 6l>o ~ - 6){~il>,.J : ?O fJtJC ;.z t. $~JZ.Ies. t:"'""X MN'~/'t>1fI , .. ' /b..c,i" ,t~.' / / I A ti It WI '/ A ~ ,'if ., . " 'Ifl'j c'W ~ ''/ f( ucA." ~~ It . !1>CA-{ ~o"~T e."..) >C"1fk 'T 'fb ~ ~W r'DAJ t/VIJwI'U r If.,{ 7fL'41fJCd NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes as related to the proposed development and to discuss site plan review procedures. Opinions expressed at the pre-application conference are not binding for formal review purposes. Additional staff comments may be forthcoming based on actual plans submitted for review. . fl~:'fft'P;tE ~o 7 PtnJe"Sf1'-'i:nJ U:~/~~ I?fiJ~JJft-N 1+'t:FtlJn.f<.iN6 AfU'YI-S. . ,~. . PRE-APPLICATION MEETlNG SIGN IN SHEET PLEASE PRINT l\1EETING DATE: If- / l.Z./tdD?> TIME: ./C : -?o AM ATTENDING FOR APPLICANT: NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass related to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not . binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach Attending for Applicant Attendina Staff En t.. ~/t-~Y d1bl: L' 4.~~f- I I I I I I ., J:\SHRDA T A\PLA.'l/NL';G\SHARED\ WP\FOR....IS\PRE-APPL l\IEETI':'iG-SIGN C'i SHEET.DOC