Loading...
APPLICATION City Codes Accessed Via Website www.",wnton-bcach.org WW\\ .:lllllcl!:.tl.comibovnton beach fl CITY OF BOYNTON BEACH, FLORIDA PLANNING & ZONING DIVISION SITE PLAN REVIEW APPLICATION FOR NEW SITE PLANS & MAJOR MODIFICATIONS TO EXISTING SITE PLAN Has applicant attended a pre-application meeting? Date II/OS jtJ$ , I This application must be filled out completely, accurately and submitted as an original to the Planning and Zoning Division. TWELVE COMPLETE, sequentially numbered, ASSEMBLED AND STAPLED sets of plans including a recent survey and appropriate fee shall be submitted with the application for the initial proces::>..oL._ the Site Plan Review procedure. AN INCOMPLETE SUBMITTAL WILL NOT BE P~Q~Q-::-.-:~--: .._~"",\ '- '1 I ~" ' ~ Please print legibly (in ink) or type all information. .~ NOV J I. GENERAL INFORMATION 1. Project Name: Fire Station # 4 I I ..-- j 2. Property Owner's (or Trustee's) Name: City of Boynton Rpi'll'n F'; rp Dppi'lrtmpnt ("',In D;:nrjd Li" Address: 100 E Boynton Beach Blvd Phone: (561) 742-6339 33435 (Zip Code) Fax: (561) 742-6334 3. Applicant's name (person or business entity in whose name this application is made): City of Boynton Beach Fire Department Address: 100 E Boynton Beach Blvd c/o David Liu 33435 (Zip Code) Phone: ( 561) 742 - 6 3 3 9 Fax: (561) 742-6334 If contract purchaser, please attach contract for sale and purchase. 4. Agent's Name (person, if any, representing applicant): Engineering Department City of Boynton Beach Phone: (561) 742-6485 33435 (Zip Code) Fax: ( 5 61) 7 4 2 - 6 2 8 5 Address: 100 E Boynton Beach Blvd 5. Correspondence to be mailed to agent only; if no agent, then to applicant unless a substitute is specified below:* Engineering Department City of Boynton Beach P.O. Box 310 Boytnon Beach, Fl 33425 *This is the one address to which all agendas; letters and other materials will be mailed. 6. What is applicant's interest in the premises affected? (owner, buyer, lessee, builder, developer, contract purchaser, etc.) Owner 7. Street address of location of site: 1919 South Federal Highway 33435 8. Property Control #(PCN) 08-43-45-33-00-000-1250 9. Legal description of site: 33-45-43, NLY 275 ft of SLY 1735 ft of WLY 467.17 ft (less N 110 ft of ELY 383.08 ft) of E 1/2 of NE 1/4 LYG W of Dixie Hwy. 10. Intended use(s) of site: Fire Station '~ 11. Architect: Mike Flattery - CH2M Hill 12. Landscape Architect: Chris Dellaqo - CH2M Hill 13. Site Planner: CH2M Hill 14. Engineer: Richard Staudinqer - CH2M Hill 15. Surveyor: Timothy M. Smith 16. Traffic Engineer: City of Boynton Beach Engineering Division 17. Has a site plan been previously approved by the City Commission for this property? None II. SITE PLAN The following information must be filled out below and must appear, where applicable, on all copies of the site plan. 1. Land Use Category shown in the Comprehensive Plan: Commercial / Public Use 2. Zoning District: 3. Area of Site 1. 89 acres 82,328 sq. ft. 4. Land Use -- Acreage Breakdown: a. Residential, including 0 acres 0 % of site surrounding lot area of grounds b. Recreation Areas * 0 acres 0 % of site (excluding water area) c. Water Area 0 acres 0 % of site d. Commercial 0 acres 0 % of site Industrial 0 a.~res 0 "/0 or :::,,;e Public/Institutional 1. 89 acres 100 % of site Public, Private and Canal rights-of-way 0 acres 0 % of site Other (specify) 0 acres 0 % of site Other (specify) 0 acres 0 % of site e. f. g. h. i. J. Total area of site 1 .89 acres 100 % of site *including open space suitable for outdoor recreation, and having a minimum dimension of 50 ft. by 50 ft. " 5. Surface Cover a. b. c. courts. site d. e. 10 % of site Ground floor building 0 . 19 area ("building footprint") acres Water area 0 o % of site acres Other impervious areas, including paved area of public & private streets, paved area of parking lots & driveways (excluding landscaped areas), and sidewalks, patios, decks, and athletic o . 66 acres 35 % of Total impervious area 0.85 % of site 45 acres Landscaped area acres % of site inside of parking lots (20 sq.ft. per interior parking space required - see Sec. 7.5-35(g) of Landscape Code). f. Other landscaped areas, % of site acres g. Other pervious areas, including golf course, natural areas, yards, and swales, but excluding water areas acres % of site fl. Totai pervious areas 1.04 acres 55 % of site i. Total area of site 1. 89 % of site 100 acres 6. Floor Area a. Residential N/A sq. ft. b. Commercial/Office N/A sq. ft. c. Industrial/Warehouse N/A sq. ft. d. Recreational N/A sq. ft. e. Public/Institutional 8,200 sq. ft. f. Other (specify) N/A sq. ft. g. h. Other (specify) N/A sq. ft. Total floor area sq. ft. 7. Number of Residential Dwellinq Units a. Single-family detached N/A sq. ft. b. Duplex N/A sq. ft. c. Multi-Family (3 + attached dwelling units) (1 ) Efficiency N/A dwelling units (2) 1 Bedroom N/A dwelling units (3) 2 Bedroom N/A dwelling units (4) 3+ Bedroom N/A dwelling units a, Total multi-family N/A dwelling units e. Total number of dwelling units N/A 8. Gross Density N/A dwelling units per acre 9. Maximum height of structures on site 30 feet stories 10. Required off-street parkinq a. Calculation of required # of off-street parking spaces. Off-street parking spaces provided on site plan Public Bldg - 4 spaces = 20 = = b. Calculation of required # of handicap parking spaces 1 - 25 = 1 Number of handicap spaces provided on site plan 1 = REPRESENTATIVE OF THE PROJECT MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. III. CERTIFICATION (I) (We) understand that this application and all papers 2nd p!2ns submitted herewith cecome a part of the permanent records of the Planning and Zoning Division (I) (We) hereby certify that the above statements and any statements or showings in any papers or plans submitted herewith are true to the best of (my) (our) knowledge and belief. This application will not be accepted unless signed according to the instructions below. u~?~ Signature of Owner(s) or Trustee, of Authorized Principal if property is owned by a corporation or other business entity. /0 (1-2-( 0-'1 Date OR " Signature of contract purchaser (if applicant) Date IV. AUTHORIZATION OF AGENT Signature of Authorized Agent Date (I) (We) hereby designate the above-signed person as (my) (our) authorized agent in regard to this application. Signature of Owner(s) or Trustee, _or Authorized Principal if property is owned _by a corporation or other business entity. Date OR Signature of contract purchaser (if applicant) Date A REPRESENTATIVE MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. RIDER TO SITE PLAN APPLICATION The undersigned as applicant for Final Site Plan Approval does hereby acknowledge, represent and agree that all plans, specifications, drawings, engineering, and other data submitted with this application for review by the City of Boynton Beach shall be reviewed by the various boards, commissions, staff personnel and other parties designated, appointed or employed by the City of Boynton Beach, and any such party reviewing the same shall rely upon the accuracy thereof, and any change in any item submitted shall be deemed material and substantial. The undersigned hereby agrees that all plans, specifications, drawings, engineering and other data which may be approved by the City of Boynton Beach, or its boards, commissions, staff or designees shall be constructed in strict compliance with the form in which they are approved, and any change to the same shall be deemed material and shall place the applicant in violation of this application and all approvals and permits which may be granted. The applicant agrees to allow the City of Boynton Beach all rights and remedies as provided for by the applicable codes and ordinances of the City of Boynton Beach to bring any violation into compliance, and the applicant shall indemnify, reimburse and save the City of Boynton Beach harmless from any cost, expense, claim, liability or any action which may arise due to their enforcement of the same. READ, ACKN~EDGED AND AGREED TO this "2-2---A day of 0 L,,,l e_ ,20 0.'3 ~ ,( ~ U~?-~ Applicant CONCURRENCY REQUIREMENTS NOTICE TO APPLICANTS FOR A" PROVAL OF LAND DEVELOPMENT ORDERS OR PERMITS Please be advised that all applications for the fOllowing land development orders and permits which are submittedJn or after June 1, 1990 will be subject to the City's Concurrency Management Ordinance, and cannot be approved unless public facilities (potable water, sanitary sewer, drainage, solid waste, recreation, park, and road facilities) would be available to serve the project, consistent with the levels of service which are adopted in the City's Comprehensive Plan: Building permit applications for the construction of improvements, which, in and by themselves, would create demand for public facilities. Applications for site plan approval. Applications for conditional use approval. A'pplications for subdivision master plan approval. Applications for preliminary plat approval. Applications for final plat approval. Applications for rezoning to planned zoning districts. Applications for revisions to any of the applications listed above, which would increase the demand for any public facility. Any other application, which, in and by itself, would establish the density or intensity of use of land, or a maximum density or intensity of use of land. Applications for development orders and permits submitted after February 1, 1990 and which generate more than 500 net vehicle trips per day, must comply with the Palm Beach County Traffic Performance Standards Ordinance, uf1less exemot from that ordinance. Please be advised, however, that the following applications will be exempt from the Concurrency Management Ordinance, pending final approval of this ordinance by the City Commission: Applications for the development of property which was platted on or after January 13, 1978 and either the final plat or the preliminary plat and Palm Beach County Health Department permit applications were submitted or approved prior to June 1, 1990, and the use of the property is consistent with the general use which was intended for the property at the time of platting. Applications for the development of property, which was platted prior to January 13, 1978, the area of the platted lots does not exceed 2 acres, and the proposed use would not generate more than 500 net vehicle trips per day. Applications for building permit, if a site plan or conditional use application was submitted prior to June 1, 1990 and subsequently approved and the site plan or conditional use has not expired. Applications for the development of property within an approved Development of Regional Impact, and which are consistent with the approved DR!. Applications for approval of final plats, if the preliminary plat and application for Palm Beach county Health Department permits for utilities have been submitted prior to June 1, 1990. Applications for revisions to previously approved development orders or permits, which do not increase the demand for any public facility. Please be advised that these exe'm'ption rules are tentative and will be subject to final approval by the City Co;]mis.:;io,. ,- you have any questions con ;...,i~g the '-. pas ~: 8_. :on Beach Concurrenr"l Management Ordinance, ple,;se cont2,:t the Boynton Beac:: Planning &Zonin~ Division at (561) 742-6260. CHAPTER 4 SITE PLAN REVIEW Section 7. Submission Requirements. Each applicant shall submit to the Planning and Zoning Division the following plans and exhibits in the number of copies specified by the Planning and Zoning Division, together with a Site Plan Review application and a fee adopted by resolution by the City Commission. 12 ASSEMBLED COPIES REQUIRED A. Existin~ site characteristics map: A sealed survey, not older than six months, showing all adjacent streets, alleys and driveways, and also illustrating: 1. Existing natural features, including but not limited to lakes, trees and other vegetation and soils and topography. 2. Existing buildings, building elevations, other structures, including use, height, dimensions and setbacks. 3. Existing utility lines and all easements. 4. Existing elevations (corner, street and finished floor) B. Site development plan: 1. A scaled drawing clearly illustrating proposed buildings and other structures, and any existing buildings and structures, which are to be retained, including use, height, dimensions and setbacks. 2. Proposed off-street parking spaces, driveways and sidewalks, including location, dimensions and setbacks, traffic control markings and signage. 3. Proposed fences and walls, including location, dimensions, setbacks, height and material. 4. Proposed location of lighting on site. 5. Proposed dumpster location. C. Landscape plan: 1. A separate scaled drawing (at the same scale as the site development plan) prepared as required by state law clearly illustrating proposed trees, shrubs, grass and 2. Proposed berms, watercourses and other topographic features. 3. A notation on method of irrigation. Architectural plan: 1. A scaled drawing clearly illustrating proposed building floor plan and elevations, including height, exterior dimensions, exterior color and materials. 2. A colored elevation drawing (not mounted) showinq a: 31evations of the building. (This submittal car] De waived by the Fianning and Zoning Director when not applicable.) E. Tabular Summary Containinq: 1. Total gross project area by acreage and square footage and net buildable land area in acres and square feet. Total number of proposed residential units, including characteristics by number of bedrooms and bathrooms and gross square footage of each typical unit. Proposed nonresidential floor type of use and total gross square footage. Square footage and percentage distribution of the total project site, including areas proposed for landscaped open space, vehicular use areas, other paved areas, and building coverage and total coverage. Number and ratio of required and provided off-street parking spaces and number of loading spaces. Water bodies in acres and square feet. Height of buildings. 2. 3. 4. " F. Drainaqe plan: 1. Revised 10/26/01 5. 6. 7. 2. A separate scaled drawing (at the same scale as the site development plan) showing elevations, flow arrows, proposed drainage structures, proposed treatment facilities, etc. An engineer's certification in writing that drainage will conform with all rules, regulations, codes, etc. including, but not limited to, Chapter 6, Article IV, Section 5 of these Land Development Regulations. .. CH2MHILL ..... FIRE STATION NO.4 CITY OF BOYNTON BEACH DRAINAGE CALCULATIONS I 1J4- J/ ~1-D\.i ~ I H~.rvey Castro, P.E. 11/05/2003 POST DEVELOPMENT DATE: 11/05/2003 BOYNTON BEACH, Florida FIREST A TION #4 Site Data Acreages 1 Total Site Area = 2. Drainage Project Area= 3. Impervious Buildings (Roof)= Roads and Parking= 4. Lakes= 5. Pervious= 1.9000 Acres 1.9000 Acres 0.1915 Acres 0.6642 Acres 0.0000 Acres 1.0443 Acres Water Level Elevations 1. Wet Season Water Table = 2. Average Water Table Elevation= 3. Average Site Elevation= 4. Average depth of Water Table= 5. Soil Storage 5.00 5.00 10.50 5.50 8.18 Ft. NGVD Ft. NGVD Ft. NGVD Ft. inches Rainfall 10 year one day 25 year one day 100 year one day = 8.00 Inches 9.00 Inches 12.00 Inches 10 year three day 25 year three day 100 year three day 10.87 Inches 12.23 Inches 16.31 Inches Design Criteria A. 100% Storm water runoff retention on-site B. Quality 1 Minimum required detention volume is the greater of: a. The first one inch of runoff from the entire site b. The amount of 2.5 inches times the percentage of impervious Page 1 of 3 POST DEVELOPMENT DATE: 11/05/2003 BOYNTON BEACH, Florida FIRESTATION #4 Computations A. Ouality 1. The first one inch of runoff from site: 1.00 Inch X 1.90 Acres X 1 It /12 inches 0.16 AC.-Ft. 2. The 2.5 inches times the percent of impervious: a. Site area for Water Ouality (W.O.) pervious/impervious calculations only: Site Area ( Water Area + Roof)= 1.90 ( 0.00 + 0.19) = 1.71 Acres Site W.O. Per/lmper. b. Impervious area for water quality pervious/impervious calculations only Site W.O. Per/lmper Area - Pervious 1.71 1.04 0.66 Acres Impervious W.O. Per.llmper. c. Percent of Impervious for W.O.: (Impervious W.O. / Site W.O.) x1 00%= 0.66 / 1.71 x 100 = 39 % Impervious d. For 2.5 inches times the percentage impervious: 2.5 inches x 0.39 0.97 Inches to be treated e. Volume required for W.O. detention= Inches to be treated x (Site Area- Lake Area) 0.97 x (1.90 0.00 ) /12 = 0.15 3. The required volume for water quality detention is = 50% credit for retention system= 0.16 0.08 AC.-Ft. ac-ft SCS Curve Number The Average depth to the water table= Average Site Grade - Av. Water Table = 10.50 5.00 Maximum 4 Ft. of Storage is assumed 5.50 Ft. 4.00 Ft. of storage Depth Available Soil Storage: Soil Storage x Pervious Area x1 Ft/12 Inches 8.18 x 1.04 x 1/12 = 0.71 AC.Ft. Available soil storage onsite Convert available soil storage onsite per site area 0.71 / 1.90 x12in/Ft= 4.50 in. of site wide soil storage, S SCS Curve Number, CN CN 1000/(S + 10) 1000 / ( 4.50 +10) = 69 SCS Curve Number Page 2 of 3 FIRESTATION #4 POST DEVELOPMENT DATE: 11/05/2003 BOYNTON BEACH, Florida SUMMARY Water Quality Volume Provided= 100-yr, 3-day Stage: 25-yr, 3-day Stage: 10-yr, 3-day Stage: 0.5 ac-ft 10.05 ft 8.93 ft 8.52 It. Page 3 of 3 Cascade 2001 Version 1.0 File: post Date: November OS, 2003 Page 1 Project Name: Fire Station #4 Reviewer: Project Number: 182969 Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.2 hr. Iterations: 10 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 10 year 3 Day Rainfall: 10.87 inches Area: 1.9 acres Ground Storage: 8.18 inches Time of Concentration: 0.25 hours Initial Stage: 6 ft NGVD Stage (ft NGVD) Storage (acre-ft) 6.00 7.00 8.00 9.00 10.00 11.00 12.00 0.00 0.23 0.56 0.97 1. 45 2.24 3.60 Offsite Receiving Body: Offsite Time (hr) Stage (ft NGVD) 0.00 80.00 12.00 12.00 Structure: 1 From Basin: Site To Basin: Offsite Structure Type: Gravity Weir: None Bleeder: None Pipe: None Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Tail Water Stage (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 6.00 12.00 1. 00 0.05 0.00 0.00 0.00 6.00 12.00 2.00 0.10 0.00 0.00 0.00 6.00 12.00 3.00 0.15 0.00 0.00 0.00 6.00 12.00 4.00 0.19 0.00 0.00 0.00 6.00 12.00 5.00 0.24 0.00 0.00 0.00 6.00 12.00 6.00 0.29 0.00 0.00 0.00 6.00 12.00 7.00 0.34 0.00 0.00 0.00 6.00 12.00 8.00 0.39 0.00 0.00 0.00 6.00 12.00 9.00 0.44 0.00 0.00 0.00 6.00 12.00 10.00 0.49 0.00 0.00 0.00 6.00 12.00 11.00 0.54 0.00 0.00 0.00 6.00 12.00 12.00 0.58 0.00 0.00 0.00 6.00 12.00 13 .00 0.63 0.00 0.00 0.00 6.00 12.00 14.00 0.68 0.00 0.00 0.00 6.00 12.00 15.00 0.73 0.00 0.00 0.00 6.00 12.00 16.00 0.78 0.00 0.00 0.00 6.00 12.00 17.00 0.83 0.00 0.00 0.00 6.00 12.00 18.00 0.88 0.00 0.00 0.00 6.00 12.00 Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Page 2 Tail Water Stage (ft NGVD) =============================================================================== 19.00 20.00 21. 00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51. 00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61. 00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72 .00 0.92 0.97 1. 02 1. 07 1.12 1.17 1. 24 1. 31 1. 38 1. 45 1. 52 1. 59 1. 66 1. 74 1. 81 1. 88 1. 95 2.02 2.09 2.16 2.23 2.30 2.37 2.45 2.52 2.59 2.66 2.73 2.80 2.87 2.95 3.03 3.13 3.23 3.37 3.54 3.74 3.97 4.24 4.58 5.02 8.12 9.01 9.41 9.67 9.91 10.05 10.20 10.34 10.49 10.58 10.68 10.77 10.87 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.02 0.02 0.02 0.02 0.02 0.02 0.03 0.03 0.03 0.03 0.03 0.04 0.04 0.05 0.06 0.08 0.11 0.14 0.18 0.23 0.30 0.46 5.75 1. 02 0.54 0.35 0.35 0.21 0.21 0.21 0.21 0.14 0.14 0.14 0.14 Struc STRUCTURE MAXIMUM AND MINIMUM DISCHARGES Min (cfs) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 ======================================================= Max (cfs) Time (hr) Time (hr) 1 ======================================================= 0.00 0.00 0.00 BASIN MAXIMUM AND MINIMUM STAGES 0.00 =============================================================== Basin Max (ft) Time (hr) Min (ft) Time (hr) =============================================================== 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.01 6.01 6.02 6.02 6.03 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.14 6.15 6.17 6.20 6.24 6.28 6.34 6.41 6.51 6.64 7.30 7.91 8.07 8.15 8.22 8.27 8.31 8.36 8.40 8.43 8.46 8.49 8.52 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Page 3 Site 8.52 72.00 6.00 0.00 BASIN WATER BUDGETS {all units in acre-ftl --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- Basin Total Runoff Structure Inflow Structure Outflow Initial Storage Final Storage Residual --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- Site 0.77 0.00 0.00 0.00 0.77 0.00 Cascade 2001 Version 1.0 File: post Date: November OS, 2003 Page 1 Project Name: Fire Station #4 Reviewer: Project Number: 182969 Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.2 hr, Iterations: 10 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 25 year 3 Day Rainfall: 12.23 inches Area: 1.9 acres Ground Storage: 8.18 inches Time of Concentration: 0.25 hours Initial Stage: 6 ft NGVD Stage (ft NGVD) Storage (acre-ft) 6.00 7.00 8.00 9.00 10.00 11.00 12.00 0.00 0.23 0.56 0.97 1.45 2.24 3.60 Offsite Receiving Body: Offsite Time (hr) Stage (ft NGVD) 0.00 80.00 12.00 12.00 Structure: 1 From Basin: Site To Basin: Offsite Structure Type: Gravity Weir: None Bleeder: None Pipe: None Time (hr) Cumulative Rainfall (in) Instant Runof f (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Tail Water Stage (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 0.00 0.00 0.00 0.00 0.00 6.00 12.00 1.00 0.05 0.00 0.00 0.00 6.00 12.00 2.00 0.11 0.00 0.00 0.00 6.00 12.00 3.00 0.16 0.00 0.00 0.00 6.00 12.00 4.00 0.22 0.00 0.00 0.00 6.00 12.00 5.00 0.27 0.00 0.00 0.00 6.00 12.00 6.00 0.33 0.00 0.00 0.00 6.00 12.00 7.00 0.38 0.00 0.00 0.00 6.00 12.00 8.00 0.44 0.00 0.00 0.00 6.00 12.00 9.00 0.49 0.00 0.00 0.00 6.00 12.00 10.00 0.55 0.00 0.00 0.00 6.00 12.00 11.00 0.60 0.00 0.00 0.00 6.00 12.00 12.00 0.66 0.00 0.00 0.00 6.00 12.00 13.00 0.71 0.00 0.00 0.00 6.00 12.00 14.00 0.77 0.00 0.00 0.00 6.00 12.00 15.00 0.82 0.00 0.00 0.00 6.00 12.00 16.00 0.88 0.00 0.00 0.00 6.00 12.00 17.00 0.93 0.00 0.00 0.00 6.00 12.00 18.00 0.99 0.00 0.00 0.00 6.00 12.00 Cascade 2001 Version 1.0 File: post Date: November 05. 2003 Page 2 Cumulative Instant Current Cumulative Head Water Tail Water Time Rainfall Runoff Discharge Discharge Stage Stage (hr) (in) (cfs) (cfs) (acre-ft) (ft NGVD) (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 19.00 1. 04 0.00 0.00 0.00 6.00 12.00 20.00 1. 09 0.00 0.00 0.00 6.00 12.00 21.00 1.15 0.00 0.00 0.00 6.00 12.00 22.00 1. 20 0.00 0.00 0.00 6.00 12.00 23.00 1. 26 0.00 0.00 0.00 6.00 12.00 24.00 1. 31 0.00 0.00 0.00 6.00 12.00 25.00 1. 39 0.00 0.00 0.00 6.00 12.00 26.00 1. 47 0.00 0.00 0.00 6.00 12.00 27.00 1. 55 0.00 0.00 0.00 6.00 12.00 28.00 1. 63 0.00 0.00 0.00 6.00 12.00 29.00 1. 71 0.00 0.00 0.00 6.00 12.00 30.00 1. 79 0.00 0.00 0.00 6.00 12.00 31.00 1. 87 0.01 0.00 0.00 6.00 12.00 32.00 1. 95 0.01 0.00 0.00 6.01 12.00 33.00 2.03 0.01 0.00 0.00 6.01 12.00 34.00 2.11 0.02 0.00 0.00 6.02 12.00 35.00 2.19 0.02 0.00 0.00 6.02 12.00 36.00 2.27 0.02 0.00 0.00 6.03 12.00 37.00 2.35 0.02 0.00 0.00 6.04 12.00 38.00 2.43 0.03 0.00 0.00 6.05 12.00 39.00 2.51 0.03 0.00 0.00 6.06 12.00 40.00 2.59 0.03 0.00 0.00 6.07 12.00 41.00 2.67 0.03 0.00 0.00 6.08 12.00 42.00 2.75 0.03 0.00 0.00 6.09 12.00 43.00 2.83 0.04 0.00 0.00 6.10 12.00 44.00 2.91 0.04 0.00 0.00 6.11 12.00 45.00 2.99 0.04 0.00 0.00 6.13 12.00 46.00 3.07 0.04 0.00 0.00 6.14 12.00 47.00 3.15 0.04 0.00 0.00 6.16 12.00 48.00 3.23 0.05 0.00 0.00 6.17 12.00 49.00 3.32 0.05 0.00 0.00 6.19 12.00 50.00 3.41 0.06 0.00 0.00 6.21 12.00 51.00 3.52 0.07 0.00 0.00 6.24 12.00 52.00 3.64 0.08 0.00 0.00 6.26 12.00 53.00 3.79 0.11 0.00 0.00 6.30 12.00 54.00 3.98 0.15 0.00 0.00 6.34 12.00 55.00 4.20 0.18 0.00 0.00 6.40 12.00 56.00 4.46 0.23 0.00 0.00 6.48 12.00 57.00 4.77 0.29 0.00 0.00 6.57 12.00 58.00 5.15 0.37 0.00 0.00 6.69 12.00 59.00 5.65 0.57 0.00 0.00 6.86 12.00 60.00 9.13 6.91 0.00 0.00 7.57 12.00 61. 00 10.13 1.21 0.00 0.00 8.24 12.00 62.00 10.59 0.64 0.00 0.00 8.41 12.00 63.00 10.88 0.41 0.00 0.00 8.51 12.00 64.00 11.15 0.41 0.00 0.00 8.59 12.00 65.00 11.31 0.25 0.00 0.00 8.65 12.00 66.00 11.47 0.25 0.00 0.00 8.69 12.00 67.00 11.64 0.25 0.00 0.00 8.74 12.00 68.00 11.80 0.25 0.00 0.00 8.79 12.00 69.00 11.91 0.17 0.00 0.00 8.83 12.00 70.00 12.01 0.17 0.00 0.00 8.87 12.00 71. 00 12.12 0.17 0.00 0.00 8.90 12.00 72.00 12.23 0.17 0.00 0.00 8.93 12.00 STRUCTURE MAXIMUM AND MINIMUM DISCHARGES ------------------------------------------------------- ------------------------------------------------------- Struc Max (cfs) Time (hr) Min (cfs) Time (hr) 1 0.00 0.00 0.00 0.00 BASIN MAXIMUM AND MINIMUM STAGES --------------------------------------------------------------- --------------------------------------------------------------- Basin Max (ft) Time (hr) Min (ft) Time (hr) Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Site Page 3 8.93 72.00 BASIN WATER BUDGETS (all units in acre-ft) 6.00 0.00 Basin Total Runoff --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- Residual Structure Inflow Structure Outflow Initial Storage Final Storage Site 0.94 --------------------------------------------------------------------------------- --------------------------------------------------------------------------------- 0.00 0.00 0.00 0.00 0.94 Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Page 1 Project Name: Fire Station #4 Reviewer: Project Number: 182969 Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.2 hr, Iterations: 10 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 100 year 3 Day Rainfall: 16.31 inches Area: 1.9 acres Ground Storage: 8.18 inches Time of Concentration: 0.25 hours Initial Stage: 6 ft NGVD Stage (ft NGVD) Storage (acre-ft) 6.00 7.00 8.00 9.00 10.00 11.00 12.00 0.00 0.23 0.56 0.97 1.45 2.24 3.60 Offsite Receiving Body: Offsite Time (hr) Stage (ft NGVD) 0.00 80.00 12.00 12.00 Structure: 1 From Basin: Site To Basin: Offsite Structure Type: Gravity Weir: None Bleeder: None Pipe: None Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Tail Water Stage (ft NGVD) =============================================================================== 0.00 0.00 0.00 0.00 0.00 6.00 12.00 1. 00 0.07 0.00 0.00 0.00 6.00 12.00 2.00 0.15 0.00 0.00 0.00 6.00 12.00 3.00 0.22 0.00 0.00 0.00 6.00 12.00 4.00 0.29 0.00 0.00 0.00 6.00 12.00 5.00 0.37 0.00 0.00 0.00 6.00 12.00 6.00 0.44 0.00 0.00 0.00 6.00 12.00 7.00 0.51 0.00 0.00 0.00 6.00 12.00 8.00 0.58 0.00 0.00 0.00 6.00 12.00 9.00 0.66 0.00 0.00 0.00 6.00 12.00 10.00 0.73 0.00 0.00 0.00 6.00 12.00 11.00 0.80 0.00 0.00 0.00 6.00 12.00 12.00 0.88 0.00 0.00 0.00 6.00 12.00 13.00 0.95 0.00 0.00 0.00 6.00 12.00 14.00 1. 02 0.00 0.00 0.00 6.00 12.00 15.00 1.10 0.00 0.00 0.00 6.00 12.00 16.00 1.17 0.00 0.00 0.00 6.00 12.00 17.00 1.24 0.00 0.00 0.00 6.00 12.00 18.00 1. 31 0.00 0.00 0.00 6.00 12.00 Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (ds) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Page 2 Tail Water Stage (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 19.00 20.00 21. 00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31.00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41. 00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61.00 62.00 63.00 64.00 65.00 66.00 67.00 68.00 69.00 70.00 71.00 72 .00 1. 39 1.46 1. 53 1. 61 1. 68 1. 75 1. 86 1. 97 2.07 2.18 2.28 2.39 2.50 2.60 2.71 2.82 2.92 3.03 3.14 3.24 3.35 3.46 3.56 3.67 3.78 3.88 3.99 4.10 4.20 4.31 4.43 4.55 4.69 4.85 5.05 5.30 5.60 5.95 6.36 6.86 7.54 12.18 13.51 14.13 14.51 14.87 15.09 15.30 15.52 15.73 15.88 16.02 16.17 16.31 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.02 0.02 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.05 0.06 0.06 0.06 0.07 0.07 0.07 0.08 0.08 0.08 0.08 0.09 0.09 0.10 0.10 0.13 0.15 0.20 0.26 0.32 0.39 0.48 0.62 0.92 10.44 1. 78 0.93 0.60 0.59 0.36 0.36 0.36 0.36 0.24 0.24 0.24 0.24 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Struc STRUCTURE MAXIMUM AND MINIMUM DISCHARGES 1 Max (cfs) Time (hr) 0.00 0.00 BASIN MAXIMUM AND MINIMUM STAGES Basin Max (ft) Time (hr) Min (ds) 0.00 Min (ft) Time (hr) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Time (hr) 6.00 6.00 6.00 6.00 6.00 6.00 6.00 6.01 6.01 6.02 6.03 6.04 6.05 6.07 6.08 6.10 6.12 6.13 6.15 6.18 6.20 6.22 6.25 6.27 6.30 6.33 6.35 6.38 6.41 6.44 6.48 6.52 6.56 6.61 6.67 6.76 6.86 6.99 7.10 7.24 7.43 8.37 9.22 9.43 9.55 9.65 9.72 9.78 9.84 9.90 9.95 9.99 10.02 10.05 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 12.00 Cascade 2001 Version 1.0 File: post Date: November 05, 2003 Site 10.05 Page 3 72.00 BASIN WATER BUDGETS (all units in acre-ftl Basin Total Runoff Site 1. 49 Structure Inflow 0.00 Structure Outflow 0.00 6.00 Initial Storage 0.00 0.00 Final Storage 1. 49 Residual 0.00