Loading...
APPLICATION , Ci~:CodC~ Ac"cessed Via Website www.bovnton-bcach.org www.amlegal.comlboynton _beach_flus CITY OF BOYNTON BEACH, FLORIDA PLANNING & ZONING DIVISION SITE PLAN REVIEW APPLICATION FOR NEW SITE PLANS & MAJOR MODIFICATIONS TO EXISTING SITE PLAN Has applicant attended a pre-application meeting? ,<e.~ ,Date '2//'LlD/O~ This application must be filled out compl~tely, accurately and submitted as an original to the Planning and' . Zoning Division. TWELVE COMPLETE, sequentially numbered, ASSEMBLED AND STAPtED sets of plans including a recent survey and appropriate fee shall be submitted with the application for the initial process of the Site Plan Review procedure. AN INCOMPLETE SUBMITTAL WILL NOT BE PROCESSED. Please print legibly (in ink) or type all information. I. GENERAL INFORMATION 1. Project Name: L ~'/"~O po', Y\te 2. Property Owner's (or Trustee's) Name: Phone: p\-\ e~ \~':f Urrf' tt,~O \ ~tV'a(.o~ste Lor. , ~) SloS-B2.95 \;tt L- ~dtw~ ~le , fL ",,'05 (Z~ cOd'e~ Fax:~ 5 S - ~51 Address: 3. Applicant's name (person or business entity in whose name this application is made): P\\.eb \ ~ U,YF' I},OO\ Uttv~GO~~~fo-tt L~d.vJJDa ~~~5 ) ) (Zip Code) (W S~S-r;2.9C) Fax:~ 5"S- e'2.Cf) Address: Phone: If contract purchaser, please attach contract for sale and purchase. 4. Agent's Name (person, if any, representing applicant): · iJ li ~c:; Q\.\.\lt\vohnsoY\ A~~q~~~(,tc;! ~C. Address: ~ dr'L\t f100-re. ~, ():"oc...'d ~tcrY\ I FL ~)~f>1 (, ) {Zip Code) Phone: \.;Sfo\ ~'tBm Fax: (c;(QI) ill- '<PIO 5. Correspondence to be mailed to agent only; if no agent, then to applicant unless a substitute is specified below:* *This is the one address to which all agendas; letters and other materials will be mailed. , 6. What is applicant's interest in the premises affected? (owner, buyer, lessee, builder, developer, contract purchaser, etc.) c:>wV\b(" 7. Street address of location of site: 9. Legal description of site: (s~~ (Sa ~tta"~ a') ~tt 'd ,,\....Q.d) 8. Property Control #(PCN) 10. Intended use(s) of site: '20 u..Mt trNJV\ ~S~ 12. Landscape Architect: G.. v.. \ 'vi ':i J 0 \..I<\"OV\ t-. S.,O<..\ a 1.ec, ~ J-:. Ws, llA C. . l-Ac.C I l,^G.. Qu:.. \.\ 1 ..)0 ~V\ ~IM At,.so~~.es AYJ.:t:.~,>, \ lAC.. F\o'f'~ d~ Urv\~~\~ t;\Aj'\~ J \V\L. .L. \ ~ ~ C)~ ~(.. ~~~~d ~ ~c. 11. Architect: 13. Site Planner: 14. Engineer: 15. Surveyor: 16. Traffic Engineer: 17. Has a site plan been previously approved by the City Commission for this property? . NO II, -SITE PLAN The following information must be filled out below and must appear, where applicable, on all copies of the site plan. sq. ft. 1. Land Use Category shown in the Comprehensive Plan: 2. Zoning District: 3. Area of Site L.....9.:l 4. Land Use - Acreage 13re8Kdown: acres a. Residential, including ~ 0 acres surrounding lot area of grounds Recreation Areas * \ OCl>1--acres (excluding water area) qfl, ~ % of site b. % of site c. Water Area bl! acres d. Commercial NA.r acres e. Industrial NA. acres '- f. Public/Institutional AA acres g. Public, Private and Canal rights-of-way acres 2 % of site % of site % of site % of site % of site h. Other (specify) N~ f'\tT % of site acres % of site l. Other (specify) acres J. Total area of site \. '\.1 acres I DO % of site *including open space suitable for outdoor recreation, and having a minimum dimension of 50 f1. by 50 ft. 5. Surface Cover a. Ground floor building \ t.lL acres 1.~ % of site . area ("building footprint") Water area NA acres btA % of site b. c. Other impervious areas, including paved area of public & private streets, paved area of parking lots & driveways (excluding landscaped areas), and sidewalks, patio,s( decks, and athletic courts. . c.tl--acres I( ~ % of site d. Total impervious area , q ~acres 4 b % of site e. Landscaped area l . O? acres 5 2. % of site inside of parking lots (20 sq.ft. per interior parking space required - see Sec. 7.5-35(g) of Landscape Code). f. Other landscaped areas, t-...\ Ar acres NA % of site g. Other pervious areas, including golf cour~e, natural areas, yards, and swales, but excluding water areas tJ A acres N A % of site Total pervious areas \ .u 3 acres ~'2.. % of site Total area of site \ . ~acres (<=>o % of site h. i. 6. Floor Area a. Residential b. Commercial/Office c. Industrial/W arehouse d. Recreational e. Publicllnstitutional f. Other (specify) g. Other (specify) h. Total floor area ~o, O~sq. ft. N" sq. ft. NA. sq. ft. b( A sq. ft. NA sq. ft. N ~ sq. ft. ~A- sq. ft. 4o.o~sq. ft. 7. Number of Residential DwellinQ Units a. Single-family detached ~A NA- sq. ft. sq. ft. b. Duplex 3 e. Total number of dwelling units .1.0 Gross Density JO .Ir:; dwelling units per acre Maximum height of structures on site 30 feet 1- d. 8. 9. c. (1 ) (2) (3) (4) Multi-Family (3 + attached dwelling units) Efficiency l'-l A 1 Bedroom NA. 2 Bedroom l--\~ 3+ Bedroom '1.0 Total multi-family 110 dwelling units dwelling units dwelling units dwelling units dwelling units \.,' -; ". ',' stories 10. Required off-street Darkinq a. b. Calculation of required # of off-street parking spaces. ~( IJ..OwMts x. ?/~t) = Off-street parking spaces provided on site plan 4~ = = Calculation of required # of handicap parking spaces NA Number of handicap spaces provided on site plan fo.JA. = REPRESENTATIVE OF THE PROJECT MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. " 4 III. CERTIFICATION (I) (We) understand that this application and all papers and plans submitted herewith become a part of the permanent records of the Planning and Zoning Division (I) (We) hereby certify that the above statements and any statements or showings in any papers or plans submitted herewith are true to the best of (my) (our) knowledge and belief. This application will not be accepted unless signed according to the instructions below. 3h ~ ) ~ "3 Date OR Signature of contract purchaser (if applicant) Date IV. AUTHORIZATION OF AGENT .. 3/( BID ~ Date (I) (We) hereby designate the above-signed person as (my) (our) authorized agent in regard to this application. ~ht f~'3 Date OR Signature of contract purchaser (if applicant) Date A REPRESENTATIVE MUST BE PRESENT AT ALL TECHNICAL REVIEW COMMITTEE, PLANNING AND DEVELOPMENT BOARD OR COMMUNITY REDEVELOPMENT AGENCY (CRA) AND CITY COMMISSION MEETINGS HELD TO REVIEW THIS PROJECT. " 5 I' ~ , " \.,'" ~. " RIDER TO SITE PLAN APPLICATION The undersigned as applicant for Final Site Plan Approval does hereby acknowledge, represent and agree that all plans, specifications, drawings, engineering, and other data submitted with this application for review by the City of Boynton Beach shaU be reviewed by the various boards, commissions, staff personnel and other parties designated, appointed or employed by the City of Boynton Beach, and any such party reviewing the same shall rely upon the accuracy thereof, and any change in any item submitted shall be deemed material and substantial. The undersigned hereby agrees that all plans, specifications, drawings, engineering and other data which may be approved by the City of Boynton Beach, or its boards, commissions, staff or designees shall be constructed in strict compliance with the form in which they are approved, and any change to the same shall be deemed material and shall place the applicant in violation of this application and all approvals and permits which may be granted. The applicant agrees to allow the City of Boynton Beach all rights and remedies as provided for by the applicable codes and ordinances of the City of Boynton Beach to bring any violation into compliance, and the applicant shall indemnify, reimburse and save the City of Boynton Beach harmless from any cost, expense, daim. liability or any a<?tion which may arise due to their enforcement of the s?me. LEDGED AND AGREED TO this ~ day of , 20..L'3 , '- 6 63/18/2663 12:65 9549711553 DSTEPHENSON PAGE 61/01 PAGE 01 03/17/2003 11:04 l3545G58~ul PHEGLEV .1-'" -oJ-=' j ""~W' I__~^"~~~ , ~eld~n~~ ;~:'1"I/III\ltO '" " ~\~." i Wt"t.l\~ ~ 6~'i"'~'-N - ..S G J - ~ ~ ') _ ') ~ ~~ III1III1IIIII11I11111I ~vMbvl~lo: OL116/2003 10:59158 200300293.2 DR BK 1"'7& ... ._ PAlm Beaoh COlnty, Fla~ld. A"T 400,000.00 D~ 8~..p e,aoo.oo CAMl'f.Q, LD'81TZ NQ) fOt.LEB, 1'.A. ' 55n BIIfJaDrI W.~ SaitD 700 Coral G.'bltt, nJ J31:M FUc Nwnber. 1693-159~ Will Call No.: ._[sptee ....bove T1IlI , .hi" 11'..,. Rfto.-lros ~IA) Specl~l Warranty Deed 11111 Specll) WIft'IDty Deed made this lsit.. day af>>--ber, 2_ betwllU. 'WILL NO-JIfO, INC'i . J1...wa c."o'lfloa wlw'D poll ow. JddI'CIlli ~ _ BIIIm.oI"e W.,., SlUe ,... Coral Oabla, PL I3ISC. paIltor.1Ild ,.BlGLIY COJt:r. . I'hwId.t COI'JNI"8tloo MlOIC poet omca I4dms it 4101 North Aa~ A'I'eIMR, S.II1. Fvn ......etdalc, FL33309. graDtee: (WI\cMVer \llICf III!1'ell1 IIll: _ ...... .n' p1eC ItlcWc In tho putlct lD diM 1.l1rulllCDl -' IIle beita. kal' tepR:ICIIlIU.,.I. IItd "11_ 01 1lI41Yi<lull1t. ,lilt lbe IUl:llCIIJIIlS IIl111 ~ IIII'CO/1IOlllian" III\IItIlIld '"IftNC) . I WitIlflletll, that ntd tnntm', tbr u4 in collllderaficm of'lbr: IWII TBN AM) NOflOO DOI.J..ARS ($10.00) ad otMr lood lad valu.b1c CVIJ&ideraliOllll to Slid pntw in band p.1d by nld gt'UIlElI, the ftJecipr wllmal ic heN"oy lC:~cl, .. grantm, b.-plDed. and mid 10 the saCd aralllEe, ud erantee's heita IIIId assign. rMCwt. ~ iiolJowioS dllltcn'bed land, ritwlte. lyinG ad bcilllln P"ftl BeIdI Coaa'fJ, ~orlcla. to-wit 1.OIlI , tbroll&lI ,. 04 4Z t1lroqll41, mdaal,,~ ChrtltS... Vill.s Suhltivfsioa PIIlt No. ~ accordtDI to tile pa.t thereoF, ., rteorded in ....t RGok 40, P-,e 102 of the 7.bJie Ittcenl, .r r.l~ he. COUllty, "nrld. and Tract It.. Christlan VUla, SubdMllon Plat No. 2. .ordlll '- die !'Iat tbenof, .1 .......td 10 ,lat Baak 4n, '11,.11>>2 .,f tilt "-bile: ReecwdI .r PaJGllIetIe' CoalltJ, "oms. Subjoct to bus for tile yetr 1t11~ ad '.'II\tent ,...-r. CO,"ClltDtl, cOb.it(o.~ ftatrleticma, Itndtltiou Ind cllemcntt or 'leon!, If any. tared Ideatif"atSoa Nu1Jlbct'.~ {} 43-45--32.12.000-0090; 1f3-tS.32-12-000.0100j 4J"',-Jz.lz.ooo.oJ JO; 43045-32-12.000.0120; 4345-32.J2-0Q0.It t"(\; ~s.J2- !2-ClO() 01"0; 43"S~2.12~J50;43-4S-3~-1~160i4]'4S-3Z.1~J70:4~-4S-32-t2~180i 43.o1S-32-t2~O.ot 90; 43-4S-31~J2-OOO-0200; 4~.45-32.1:z..ool>>21 0; 43-45-32-12.000.0210; 4)~2-12-000-0230: .c3-tS-~,..11.-000..0240i 43.4S-32-12 000-0.420, 43045-3~ 12-OO0-0430j 4~-4s...J2.12.o0o.0440; 43-45-32- J 200llQ.04S0;43-4S-32-t2.000-0460: 43-4S.31.12-ooo..o47tlj 43..45-32- t a.oOO-0.480. Together willa ..lIl11c 1CI\emcnlS. llII'edJl2ments aDd Ippur1CDarlC\!~ therelo bel0ft8i11S or UllSI)'9liae ~llI.Uil1in8. To Rave llnd to Hold. the nJtl8 ill ~ cimtllc forever. " DautJle11mM Florida Consulting Engineers, Inc. 4081 NW Boca Raton Blvd. Boca Raton, Florida 33431 Phone: 561-362-8724 E-mail: floridaengineers@email.com Fax: 561-362-7188 TRAFFIC STATEMENT Project: Largo Pointe, S.W. 19th Avenue, Boynton Beach, Florida Date: March 17,2003 The subject property consists of approximately 1.97 acres generally located 2 blocks south of Woolbright Road and 1 block east of Congress. The site has a land use designation category of Medium Density Residential which allows for the construction of twenty townhouses. According to the Trip Generation Manual published by the Institute of Transportation Engineers, 6th Edition, the average weekday daily trip for a townhouse is 5.86 trips/dwelling unit/ weekday. Saturday average daily trip is 5.67 trips/dwelling unit/day. Sunday average daily trip is 4.84 trips/dwelling unit/day. Attached please find copies of data tabulations. The average for the week is 5.68 trips/dwelling unit/day. According to Table 10.8 - Fair Share Road Impact Fee Schedule, effective October 1, 2001, the average daily trip for a single family attached residence is 7 Trips/dwelling unit/day. Therefore the proposed trip generation for the proposed community is as follows: Proposed number of units for the project = 20 A verage trip generation per dwelling unit = 7 trips / day Total average trip generation for the project = 140 trips / day Since the proposed traffic generation is less than 500 net trip per day, it is not necessary to submit a traffic impact analysis. ~ 5117/0.1 Zuhair M. Jalloul, P.E. FL. Registration No. 35416 Land Use: 230 Residential CondominiumITownhouse Description Residential condominiums/townhouses are defined as single-family ownership units that have at least one other single-family owned unit within the same building structure. Both condominiums and townhouses are included in this land use. Studies that did not identify whether the condominium/townhouse was a low-rise or a high-rise were included in this category. . Additional Data The peak hour of the generator typically coincides with the peak hour of the adjacent street traffic. The sites were surveyed from the mid-1970s to the mid-1990s throughout the United States and Canada. The number of vehicles and the number of residents have a high correlation with average weekday vehicle trip ends. The use of these variables is limited, however, because the number of vehicles and residents is often difficult to obtain or predict. The number of dwelling units is generally used as the independent variable of choice because it is usually readily available, easy to project, and has a high correlation with average weekday vehicle trip ends. Source Numbers 4,92,94,95,97,100,105,106,114, 168, 186,204,237,253,293,319,320,321,390,412,418 Trip Generation, 6th Edition 360 Institute of Transportation Engineers - Residential CondominiumfTownhouse (230) Average Vehicle Trip Ends vs: Dwelling Units On a: Weekday Number of Studies: 53 Avg. Number of Dwelling Units: 185 Directional Distribution: 50% entering, 50% exiting Trip Generation per Dwelling Unit Average Rate 5.86 Range of Rates 1.83 - 11.79 Standard Deviation 3.09 Data Plot and Equation I/) '0 c: W 0- .t: I- 11l C3 :c 11l > 11l Cl ctl Q; > <( II I- 8,000 7,000 . . ...,~' . . . . . : . . . . . ~ . . . . . ~ . . . . . ", . . . . . ",' . . . . '.' . - . . ',' . . . . -.' . . . . -.' . . . . ',' . . . . . :' . . . .,:,:.-: . - . - . ,~/" , ' / ' - - . . . ~ . . . . . : . . . . . : - . . . - .' . . . . . .'. . . . . ,'. . . . . .'. . . . . . '. . . . . .', . . . . . '. /" . . . '. . - . . . ~ . . . . . . . , . .. y " 6,000 5,000 , . , . .......~....... --~>/- ~/.;:' : . x x: 4,000 " - : . . . . . ~ . . . . . ~ . . . - . .: . . . . . .:. . . . . .:. . - :;"'<' . . . . .:. . . , . . . . . c . . . . . c . .. . . c . . . . . .. x>>///. . . .. . - - - -c- - - - - - c- - . - - - c- . - - - -. - - - - - c - - - - - x,,:,...... 3,000 2,000 , . . . . . . . . . - - ~ . . . . . ~ . . /-' X .,' x . ><<.-/. X'x , x. x' x. x 1,000 . . . . , . , ... -.... - -.................... -......... -." -. -.... . . . . . . . . o o 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 x ::;: Number of Dwelling Units X Actual Data Points Fitted Curve - - - - - - Average Rate Fitted Curve Equation: Ln(T) = 0.850 Ln(X) + 2.564 R2 = 0.83 Trip Generation, 6th Edition 361 Institute of Transportation Engineers Residential Condominiumrrownhouse (230) Average Vehicle Trip Ends vs: Dwelling Units On a: Saturday Number of Studies: 30 Avg. Number of Dwelling Units: 209 Directional Distribution: 50% entering, 50% exiting Trip Generation per Dwelling Unit Average Rate 5.67 Range of Rates 1. 17 - 11 040 3.10 Standard Deviation Data Plot and Equation 8.000 7,000 '. " .. - - - -................. -.. -.. -...... . . . , . , - . . . ... . . . . . .. "/ . . . , . . . . ....... -............ . , , , 6,000 ., -.'..... -:..... .:.. -.. .:... -. -:. - -.. .:.. - - - ':',>'<:" -. -.,....- / . . . .... -............... -. . . . III U C W c. .;:: I- <Il (3 :c <Il > <Il 0) tll Ii> > <( II I- 5,000 ........ -. -.... -......... -. -.. .,_.... .,_.... ",- , , , . , - . . . ~~',~>'-"< - . . - '" . - . . . . 4,000 , . , . . . . . , . , .............. -............ -... -..... -. -...,.. -.... -... -.... .......... -... ' , . . . , " " '. , , , , , /. 3,000 x . . . . . ~ . . - . . . . . . . . . . . . . . . .... .',. -. - .'.. -.. .'...... '.... _. l...._ . . . . : x 2,000 , " , . . . . . . - . . . . ~ . . . . . ~ . . ;>,.(. ~ - . , -... ','" -. ",".... -,"' -.. ,,'. -.. .,..... -.......,....- 1,000 x . " "'" .... - -..................................... -......... . . , , . . . . . o o 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 x = Number of Dwelling Units X Actual Data Points Fitted Curve ------ Average Rate Fitted Curve Equatlol:'l: T=: 3.615(X) + 427.925 R2 = 0.84 Trip Generation, 6th Edition 366 Institute of Transportation Engineers Residential CondominiumlTownhouse (230) Average Vehicle Trip Ends vs: Dwelling Units On a: Sunday Number of Studies: 30 Avg. Number of Dwelling Units: 209 Directional Distribution: 50% entering, 50% exiting Trip Generation per Dwelling Unit Average Rate 4.84 Range of Rates Standard Deviation 1.36 8.56 2.71 Data Plot and Equation 7,000 6,000 . . ....... -.. -..... -.... . . . 5,000 , , . , .. -'. -................... . . . . -. -.. -.. -...... -..... , . . . . I . - ",". -.. ",".... ",".... ",". -.. ',". -'. -.-..... ,"....... . , : -"-,,,"" , , . . . . . -:. . . . ~,'>/ . " . en 'C c: W Q. .;:: roo CIl (3 :c CIl > CIl Cl ca .... CIl > <( " roo 4,000 , . ...........,............:..... .:..... .:..... .:. ~~,',);/'~' .:..... .:......:.... ....... , ,. ....... ............................ >.:--,:,~~~ .:.. -...... ........ - -... -............... ;-/" . x.......... : . , .. -'" -...... -........ -..... -.. -. ' . . '" ' , . : /'x . . - -.... -. -..... -. - -....... -. . . . . . . -..... -....... . . 3,000 2,000 x x 1,000 .. . . . :x . . . ~ .....:......:......:-.... -:. . . . . .:- . . . . .:- . . . . .:- . . . . _:- _ . . . . :. . . . . . : . . . . . , ....,..,. o 100 200 300 400 500 600 700 800 900 1000 1100 1200 1300 o x ::; Number of Dwelling Units X Actual Data Points Fitted Curve - - - - - - Average Rate Fitted Curve Equation: T::; 3.132(X) + 357.258 R2 ::; 0.88 Trip Generation, 6th Edition 368 Institute of Transportation Engineers . Largo Pointe Boynton Beach, Florida DRAINAGE CALCULATION AND FLOOD ROUTING MODELING Prepared By: [F~@[fOtdl@l CC;@lTi1~(!J]~~OlTi1~ ~lTi1~OlTi1@@[f~~ ~lTi1~ March 17, 2003 ~ ? //7/oJ LARGO POINTE BOYNTON BEACH FLORIDA [P[j'@ Date: MARCH 17, 2003 g [?O@Il'O@IID @@1Ji)@lli!OUDIJi) AREAS Buildings Roof = Roads and Parking= Lakes= Pervious= Total Area= Abbreviation (BR) (RP) (LA) (PR) (TA) 0.550 Acres 0.540 Acres 0.000 Acres 0.880 Acres 1.970 Acres Water Level Elevations Wet Season Water Table = Average Water Table Elevation= Average Site Elevation= Average depth of Water Table= Soil Storage = Abbreviation WWT AWT ASE DWT SST 8.50 Ft. NGVD 8.50 Ft. NGVD 13.80 Ft. NGVD 5.30 Ft. 8.18 inches RAINFALL DATA SOURCE: SFWMD Volume IV Calculated based upon: P for 3-day = P for 1-day x 1 .359 RAINFALL EVENT P (inch) 1 a-year 1-day = 10.00 25-year 1-day = 12.00 1 OO-year 1-day = 16.00 RAINFALL EVENT P (inch) 1 a-year 3-day = 13.59 25-year 3-day = 16.31 1 OO-year 3-day= 21.74 WATER QUALITY COMPUTATIONS Minimum required treatment volume is the greater of: 1. The first one inch of runoff from the entire site 2. The amount of 2.5 inches times the percentage of impervious 1. The first one inch of runoff from site: (TAx 1 inch x 1 ft/12 inches) = 0.16 AC.-Ft. Abbreviation 2. The 2.5 inches times the percent of impervious: a. Site area for Water Ouality (W.O.) pervious/impervious calculations only: (TA - LA - BR) = 1.42 Acres Site W.O. Per/lmper. Abbreviation b. Impervious area for water quality pervious/impervious calculations only (TA - LA - BR - PR) = 0.54 Acres Impervious W.O. Per./lmper. Abbreviation c. Percent of Impervious for W.O.: (OIP / SWO) x1 00%= 38.03 % Impervious d. For 2.5 inches times the percentage impervious: 2.5 inches x PIO / 100 = 0.95 Inches to be treated Abbreviation e. Volume required for W.O. detention= [(INT x (TA - LA)] /12 = 0.16 AC.-Ft. Abbreviation 3. The required volume for water quality detention is = THE GREATER OF (FIN) AND (TIN) = 0.1642 AC.-Ft. Page 1 of 3 (FIN) (SWO) (OPI) (PIO) (INT) (TIN) (DWT) LARGO POINTE BOYNTON BEACH FLORIDA !?(f@ Date: MARCH 17. 2003 DETENTION AREA VOLUME DETENTION AREA #1 AREA = AVERAGE DEPTH= VOLUME = 6716 SO. FT. 1 FT. 6716 CU. FT. or 0.154 Ac.ft. DETENTION AREA #2 AREA = AVERAGE DEPTH= VOLUME = 3208 SO. FT. 0.6 FT. 1924.8 CU. FT. or 0.044 AC.ft. TOTAL TREATED VOLUME (FRENCH DRAIN + RETENTION) = VOLUME TREATED EXCEEDS THE REQUIRED VOLUME FOR WATER QUALITY 0.1984 Ac.ft. SCS Curve Number - Soil Storaqe (AST) The Average depth to the water table = ASE - AWT = Storage depth is equal to DWT or 4 ft. maximum = 5.30 ft. Abbreviation 4.00 ft. Available Onsite Soil Storage: =SST x PR x 1 ft./12 inches = 0.60 AC.Ft. Abbreviation (S) (CN) SITE WIDE SOIL STORAGE: Convert available soil storage onsite per site area Onsite Soil Storage (SITE WIDE) = (AST 1 T A) x 12 inchesl ft. = 3.65 in. Abbreviation SCS Curve Number, CN = 1000/(S + 10) = 73 Abbreviation Page 2 of 3 LARGO POINTE BOYNTON BEACH FLORIDA 1?1l'@ ~Il'@@] 00 ~ IFO@ll'o@@ @@1J1)@(!j]01JOIJ1) ~1J1) OIJ1)@@Il'@~ OIJ1)@c Storm DischarQe Calculations: Date: MARCH 17. 2003 STORM EVENT Precipitation (P) * Runoff (0) ** Site Runoff (at) Inches Inches aC.n. 10-year 1-day I 10.00 6.65 1.09 25-year 1-day 12.00 8.51 1.40 1 O-year 3-day 13.59 10.01 1.64 25-year 3-day 16.31 12.62 2.07 100-year 1-day 16.00 12.32 2.02 1 OO-year 3-day 21.74 17.90 2.94 * R ff (0) = (P - (0.2x S))^2 uno (P + (0.8 xS) ** Site Runoff (at) = 0 x TA x (1 fV12 in.) Page 3 of 3 @ rs = .--. +- ..... U ~ C\I co C\I a a C") a:> r--- 0) co co 0) '<T a LO a a ,.- C\I C") -.:t: LO r--- ~ "! Ll? ~ C\I ~ 0) -l 0 0 0 0 0 0 >- <( a a a ,.- ,.- ,.- C\I C\I C\I a: I- <( 0 ::2: I- ::2: ::;) (f) :> Q) LO a LO a LO a LO a LO a [jJ a LO a LO a 0) ""-: -.:t: ~ ~ ,.- -.:t: ~ 0) ...-- -.:t: ~ ~ ...-- -.:t: Q) a ...-- ,.- ...-- ...-- C\i C\I C\I C\I cv) C") C") C") ..t '<T Ol ,.- ...-- ,.- ...-- ...-- ...-- ...-- ...-- ...-- ...-- ,.- ...-- ...-- ,.- ...-- co US II co :t-= Q) oi--; .... c..> <( co Ol "'0 as , co Q) ~ a .~ C\I -.:t: (f) ,.- .--. (f)W ;; ::;)0... a c..> r--- r--- LO ...-- co 0) 0) a:> LO a '<T ...-- ...-- ...-- ...-- 0<( a LO C\I ~ r--- co 0) co co a a:> a co co 0) C\I LO a:> ...-- -0 LO '<T LO ,.- '<T a:> '<T ...-- a 0) ...-- C") r--- C\I 0) LO ,.- a:> >(f) 0 cv) ~ Q) a a a ...-- C\I C") ~ LO co r--: 0) ~ "! -.:t: Ll? Ol a:Z ,.- ...-- a co a a a 0 0 0 a 0 0 a a ...-- ...-- ,.- ...-- W<( .... o...-l 0 US .--. +- ..... 0<( a c..> a a a a a a 0) a:> a LO C") '<T LO LO LO a LO a ~ a a a a a a ...-- C\I r--- '<T LO 0) C\I r--- C\I Ww C") r--- '<T a a a a a a a C\I co C") C\I C") r--- a '<T >a: C\I cv) LO Q) a a a a ~ ~ ~ ~ ~ ...-- C\I C") '<T co r--- ~<( ...-- ...-- 0 Ol 0 0 0 0 0 0 0 0 0 0 co a a a a a .... 0 US .--. Z +- 0 ..... co (,) a a C") a:> a C\I C\I co a '<T a:> C\I co a I- a a ~ ,.- ~ LO C") a a a C") ,.- C\I r--- LO C") C\I a a:> r--- LO '<T Z ...-- r--- a a a a ...-- C\I C") LO r--- 0) ...-- C\I '<T co a:> W =1:1: ...-- C\I a Q) a a a a a a ~ a ~ a ,.- ,.- ...-- ,.- ,.- Ol I- ...-- ,.- a co a a a a a a a a a a 0 0 0 0 0 W .... 0 a: US .--. Z +- Q '+-: C\I c..> C\I C") C\I a co a C\I C") 0) '<T a LO co C\I I- a a ~ ...-- LO LO '<T co co ...-- ...-- LO LO 0) r--- LO '<T C") ...-- a a:> r--- Z ...-- LO a ...-- C") LO r--- a C") r--- ...-- LO 0) C") r--- a '<T =1:1: Q) W a C\I ...-- Ol a a ~ a a ...-- ...-- ...-- C\I "! "! C") C") -.:t: -.:t: I- ,.- ...-- 0 co a a a a a 0 0 0 a a a a a a a W .... 0 a: US .--. c .t:: 0 - c :;::; :> (/) 0 co en ~ Q) +- > a LO a L{) a L{) a L{) a L{) a L{) a L{) a Ol c LO ~ Q) Q) W 0) ""-: '<T ~ ~ ...-- -.:t: co 0) ...-- '<T co 0) ...-- '<T co Q) "! > > .... Q) C\i cv) ..t ..t E Q) c..> a ...-- ,.- ...-- ...-- C\I C\I C\I C") C") C") U5 a Q) [jJ ~ Ol ,.- ...-- ,.- ...-- ...-- ...-- ...-- ...-- ...-- ...-- ...-- ...-- ,.- ...-- ...-- ~ a; co c..> ::: ..c co US c .Ql Q) - 0 .... -l I <( rrJ o o N r-- I tJ Q; 0: ~ <( o L ~ ~ ,~ Cascade 2001 version 1.0 File: 25-Year 3-Day post-Develepment Date: March 17, 2003 Page 1 Project Name: LARGO POINTE Reviewer: ZJ Project Number: Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.1 hr, Iterations: 1000 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 25 year 1 Day Rainfall: 12 inches Area: 1.97 acres Ground Storage: 3.65 inches Time of Concentration: 0.15 hours Initial Stage: 10.5 ft NGVD Stage (ft NGVD) Storage (acre-ft) 10.50 10.90 11.15 11.40 11.65 11.90 12.15 12.40 12.65 13 .15 13.40 13.65 13.90 14.15 14.40 0.00 0.02 0.06 0.12 0.20 0.30 0.43 0.58 0.77 0.99 1. 56 1. 89 2.24 2.60 2.95 Offsite Receiving Body: Offsite1 Time (hr) Stage (ft NGVD) 0.00 12.00 24.00 36.00 48.00 60.00 72.00 1000.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Structure: 1 From Basin: Site To Basin: Offsitel Structure Type: Gravity Weir: Broad Crested, Crest Elev Bleeder: Inv-Tri, Invert Elev = Width = 0.5 ft Default Coefs: Weir Coef = 2.5, Pipe: None = 12.5 ft NGVD, Length = 4 ft, 10 ft NGVD, Height = 0.5 ft Weir Coef 3.13 Orifice Coef = 0.6 Cascade 2001 Version 1.0 File: 25-Year 3-Day post-Develepment Date: March 17, 2003 Cumulative Time Rainfall (hr) (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Page 2 Tail Water Stage (ft NGVD) ======================================================= ------------------------ ------------------------ 0.00 1. 00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00 13.00 14.00 15.00 16.00 17.00 18.00 19.00 20.00 21.00 22.00 23.00 24.00 25.00 26.00 27.00 28.00 29.00 30.00 31. 00 32.00 33.00 34.00 35.00 36.00 37.00 38.00 39.00 40.00 41.00 42.00 43.00 44.00 45.00 46.00 47.00 48.00 49.00 50.00 51.00 52.00 53.00 54.00 55.00 56.00 57.00 58.00 59.00 60.00 61. 00 62.00 63.00 64.00 65.00 0.00 0.07 0.15 0.22 0.29 0.36 0.44 0.51 0.58 0.66 0.73 0.80 0.88 0.95 1. 02 1.10 1.17 1. 24 1. 31 1. 39 1. 46 1. 53 1. 61 1. 68 1. 75 1. 86 1. 96 2.07 2.18 2.28 2.39 2.50 2.60 2.71 2.82 2.92 3.03 3.14 3.24 3.35 3.46 3.56 3.67 3.78 3.88 3.99 4.10 4.20 4.31 4.43 4.55 4.69 4.85 5.05 5.30 5.60 5.95 6.36 6.86 7.54 12.18 13.51 14.12 14.51 14.87 15.08 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.02 0.02 0.03 0.03 0.04 0.04 0.04 0.05 0.05 0.05 0.06 0.09 0.09 0.10 0.10 0.11 0.11 0.11 0.12 0.12 0.13 0.13 0.13 0.13 0.14 0.14 0.14 0.14 0.15 0.15 0.15 0.15 0.15 0.16 0.16 0.18 0.18 0.22 0.26 0.34 0.42 0.50 0.59 0.72 0.90 1. 32 14.49 1. 79 1. 05 0.69 0.68 0.41 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.22 0.64 0.82 0.83 0.83 0.82 0.81 0.00 0.02 0.04 0.05 0.07 0.09 0.11 0.13 0.15 0.16 0.18 0.20 0.22 0.24 0.26 0.27 0.29 0.31 0.33 0.35 0.37 0.38 0.40 0.42 0.44 0.46 0.47 0.49 0.51 0.53 0.55 0.57 0.58 0.60 0.62 0.64 0.66 0.68 0.69 0.71 0.73 0.75 0.77 0.79 0.80 0.82 0.84 0.86 0.88 0.89 0.91 0.93 0.95 0.97 0.99 1. 00 1. 02 1. 04 1. 06 1. 08 1.10 1.17 1. 23 1. 30 1. 37 1. 44 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 10.50 11.46 12.18 12.24 12.23 12.21 12.16 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Cascade 2001 Version 1.0 File: 25-Year 3-Day post-Develepment Date: March 17, 2003 Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Page 3 Tail Water Stage (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 66.00 67.00 68.00 69.00 70.00 71.00 72.00 15.30 15.52 15.73 15.88 16.02 16.16 16.31 0.41 0.41 0.41 0.28 0.28 0.28 0.28 0.80 0.79 0.77 0.75 0.73 0.71 0.68 Struc Max (cfs) Time (hr) STRUCTURE MAXIMUM AND MINIMUM DISCHARGES Min (cfs) 1. 51 1. 57 1. 64 1. 70 1. 76 1. 82 1. 88 ------------------------------------------------------- ------------------------------------------------------- Time (hr) ------------------------------------------------------- ------------------------------------------------------- 1 0.83 BASIN MAXIMUM AND MINIMUM STAGES 62.20 0.22 0.00 Basin Max (f t ) =============================================================== Time (hr) Min (ft) Time (hr) Site 12.24 --------------------------------------------------------------- --------------------------------------------------------------- 62.20 BASIN WATER BUDGETS (all units in acre-ft) 10.50 12.10 12.04 11. 98 11.91 11.81 11.72 11.63 0.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Basin Total Runoff ================================================================================= Residual Structure Inflow Structure Outflow Initial Storage Final Storage Site 2.07 ================================================================================= 0.00 0.00 1. 87 0.00 0.19 Cascade 2001 Version 1.0 File: 100-Year 3-Day Post-Dev ZERO DISCHARGE Date: March 17, 2003 Page 1 Project Name: LARGO POINTE Reviewer: ZJ Project Number: Period Begin: Jan 01, 2000;0000 hr End: Jan 04, 2000;0000 hr Duration: 72 hr Time Step: 0.1 hr, Iterations: 1000 Basin 1: Site Method: Santa Barbara Unit Hydrograph Rainfall Distribution: SFWMD - 3day Design Frequency: 100 year 1 Day Rainfall: 16 inches Area: 1.97 acres Ground Storage: 3.65 inches Time of Concentration: 0.15 hours Initial Stage: 10.5 ft NGVD Stage (ft NGVD) Storage (acre-ft) 10.50 10.90 11.15 11.40 11. 65 11.90 12.15 12.40 12.65 13 .15 13.40 13.65 13.90 14.15 14.40 0.00 0.02 0.06 0.12 0.20 0.30 0.43 0.58 0.77 0.99 1. 56 1. 89 2.24 2.60 2.95 Offsite Receiving Body: Offsite1 Time (hr) Stage (ft NGVD) 0.00 12.00 24.00 36.00 48.00 60.00 72.00 1000.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 2.00 Structure: 1 From Basin: Site To Basin: Offsite1 Structure Type: Gravity Weir: None Bleeder: None Pipe: None Time Cumulative Rainfall Instant Runoff Current Discharge Cumulative Discharge Head Water Stage Tail Water Stage Cascade 2001 Version 1.0 File: 100-Year 3-Day Post-Dev ZERO DISCHARGE Date: March 17, 2003 Page 2 (hr) (in) (cfs) (cfs) (acre-ft) (ft NGVD) (ft NGVD) ------------ ----------------------============================================= ---------------------------------- 0.00 0.00 0.00 0.00 0.00 10.50 2.00 1. 00 0.10 0.00 0.00 0.00 10.50 2.00 2.00 0.19 0.00 0.00 0.00 10.50 2.00 3.00 0.29 0.00 0.00 0.00 10.50 2.00 4.00 0.39 0.00 0.00 0.00 10.50 2.00 5.00 0.49 0.00 0.00 0.00 10.50 2.00 6.00 0.58 0.00 0.00 0.00 10.50 2.00 7.00 0.68 0.00 0.00 0.00 10.50 2.00 8.00 0.78 0.00 0.00 0.00 10.50 2.00 9.00 0.88 0.01 0.00 0.00 10.52 2.00 10.00 0.97 0.02 0.00 0.00 10.54 2.00 11.00 1. 07 0.03 0.00 0.00 10.59 2.00 12.00 1.17 0.04 0.00 0.00 10.64 2.00 13.00 1. 27 0.05 0.00 0.00 10.71 2.00 14.00 1. 36 0.05 0.00 0.00 10.79 2.00 15.00 1. 46 0.06 0.00 0.00 10.88 2.00 16.00 1. 56 0.06 0.00 0.00 10.93 2.00 17.00 1. 65 0.07 0.00 0.00 10.96 2.00 18.00 1. 75 0.07 0.00 0.00 11.00 2.00 19.00 1. 85 0.08 0.00 0.00 11.04 2.00 20.00 1. 95 0.08 0.00 0.00 11.08 2.00 21.00 2.04 0.09 0.00 0.00 11.12 2.00 22.00 2.14 0.09 0.00 0.00 11.16 2.00 23.00 2.24 0.10 0.00 0.00 11.20 2.00 24.00 2.34 0.10 0.00 0.00 11. 23 2.00 25.00 2.48 0.15 0.00 0.00 11.28 2.00 26.00 2.62 0.16 0.00 0.00 11.33 2.00 27.00 2.76 0.16 0.00 0.00 11. 39 2.00 28.00 2.90 0.17 0.00 0.00 11.43 2.00 29.00 3.05 0.18 0.00 0.00 11.48 2.00 30.00 3.19 0.18 0.00 0.00 11.53 2.00 31.00 3.33 0.19 0.00 0.00 11.57 2.00 32.00 3.47 0.19 0.00 0.00 11.62 2.00 33.00 3.61 0.19 0.00 0.00 11.67 2.00 34.00 3.76 0.20 0.00 0.00 11.71 2.00 35.00 3.90 0.20 0.00 0.00 11.75 2.00 36.00 4.04 0.20 0.00 0.00 11.79 2.00 37.00 4.18 0.21 0.00 0.00 11.83 2.00 38.00 4.32 0.21 0.00 0.00 11.87 2.00 39.00 4.47 0.21 0.00 0.00 11. 91 2.00 40.00 4.61 0.22 0.00 0.00 11.95 2.00 41.00 4.75 0.22 0.00 0.00 11.98 2.00 42.00 4.89 0.22 0.00 0.00 12.02 2.00 43.00 5.03 0.22 0.00 0.00 12.05 2.00 44.00 5.18 0.22 0.00 0.00 12.09 2.00 45.00 5.32 0.23 0.00 0.00 12.12 2.00 46.00 5.46 0.23 0.00 0.00 12.16 2.00 47.00 5.60 0.23 0.00 0.00 12.19 2.00 48.00 5.74 0.23 0.00 0.00 12.22 2.00 49.00 5.90 0.26 0.00 0.00 12.26 2.00 50.00 6.06 0.26 0.00 0.00 12.29 2.00 51.00 6.26 0.32 0.00 0.00 12.34 2.00 52.00 6.46 0.38 0.00 0.00 12.38 2.00 53.00 6.74 0.49 0.00 0.00 12.44 2.00 54.00 7.07 0.60 0.00 0.00 12.50 2.00 55.00 7.47 0.72 0.00 0.00 12.57 2.00 56.00 7.94 0.84 0.00 0.00 12.66 2.00 57.00 8.48 1. 02 0.00 0.00 12.84 2.00 58.00 9.15 1. 26 0.00 0.00 13.05 2.00 59.00 10.05 1. 85 0.00 0.00 13 .19 2.00 60.00 16.24 19.86 0.00 0.00 13.59 2.00 61.00 18.02 2.44 0.00 0.00 13.95 2.00 62.00 18.83 1. 43 0.00 0.00 14.05 2.00 63.00 19.34 0.93 0.00 0.00 14.11 2.00 64.00 19.82 0.93 0.00 0.00 14.16 2.00 65.00 20.11 0.56 0.00 0.00 14.20 2.00 66.00 20.40 0.56 0.00 0.00 14.23 2.00 67.00 20.69 0.56 0.00 0.00 14.27 2.00 Cascade 2001 Version 1.0 File: 100-Year 3-Day Post-Dev ZERO DISCHARGE Date: March 17, 2003 Time (hr) Cumulative Rainfall (in) Instant Runoff (cfs) Current Discharge (cfs) Cumulative Discharge (acre-ft) Head Water Stage (ft NGVD) Page 3 Tail Water Stage (ft NGVD) ------------------------------------------------------------------------------- ------------------------------------------------------------------------------- 68.00 69.00 70.00 71.00 72.00 20.98 21.17 21.36 21.55 21.74 0.56 0.37 0.37 0.37 0.37 0.00 0.00 0.00 0.00 0.00 Struc Max (cfs) Time (hr) STRUCTURE MAXIMUM AND MINIMUM DISCHARGES Min (cfs) 0.00 0.00 0.00 0.00 0.00 ------------------------------------------------------- ------------------------------------------------------- Time (hr) ------------------------------------------------------- ------------------------------------------------------- 1 0.00 0.00 0.00 Basin Max (ft) BASIN MAXIMUM AND MINIMUM STAGES Time (hr) Min (ft ) 0.00 --------------------------------------------------------------- --------------------------------------------------------------- Time (hr) Site 14.39 --------------------------------------------------------------- --------------------------------------------------------------- 0.00 72.00 BASIN WATER BUDGETS (all units in acre-ft) 10.50 14.30 14.32 14.34 14.37 14.39 2.00 2.00 2.00 2.00 2.00 Basin Total Runoff -------------------------------------------------------------------------- -------------------------------------------------------------------------- Residual Structure Structure Inflow Outflow Initial Storage Final Storage Site 2.93 -------------------------------------------------------------- -------------------------------------------------------------- 0.00 0.00 0.00 0.00 2.93 Letter of Transmittal o CORPORATE OFFICE: 949 Clint Moore Road Boca Raton, FL 33487 Phone 561-997-9997 Fax 561-997-1610 e-mail info(c[)quincyiohnson.com web http://www.quincviohnson.com DATE: JOB NAME: RE: 3/19/03 OB No. 6840 LARGO POINTE SITE PLAN SUBMITTAL P & z. . ()UiNCY ATOONSON j~RCHITECTS .... . ~Sheri Cole City of Boy ton Beach Cc: Charles Love, Zuhair Jalloul, Bryan Phegley. Phone: 1561-742-6265 WE ARE SENDING YOU: o Shop Drawings #OF SETS TOTAL PRINTS PER SET 5 TOTAL # OF PRINTS 60 12 12 12 12 12 lot Cto r-z... \. , ''2.. DELIVERY PAYMENT: METHOD OF DELIVERY: D Priority Overnight Mail DUS. Mail $ o Attached o Prints o Under Separate Cover o Copy of Letter X Other: P & Z Submission Plans TYPE OF REPRODUCTION (SIZEffYPE- V /B/C) 36" X 24" 36" X 24" 8 Yz" x 11" 8 Yz" x 11" DWG CREATION DATE 3/19/03 3/19/03 3/19/03 3/19/03 ,. ,. f-' " 3/l7fo~ X Reimbursable DNon-Reimbursable o Standard Express Mail # D Pick Up *- ~\i c.C)t~ M .(lL of ~ 1 SO .00 CHARGEABLE TO CLIENT (YES/NO) Yes Yes Yes Yes Atra~j DESCRIPTION DOC TYPE o Other: o Courier ~Other: Delivered by Hand 3<> ! ~ Time and Date of Meeting J.J ~~ '2-- 2& T~Tatten~11 mect~~ \~ I Ct~p Applicant's Name: PRE-APPLICATION CONTACT QUESTIONS ~~ Phone: j'~!- rr 7 -- 7?9l t/' Iff L HA VE ~/ SPOKEN T AL"<r STAFF MEMBER ABOUT THE PROJECT? Yes No (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING? STAFF MEMBERS NAL\tlE: [\ ~ /" 'l-{...L/ 2. LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS) o l{) .11 ill {i-1/-~ 3. WHAT W9ULD YOU LIKE TO D~ ( / NEW PROJECT - - I trU~lA--.:r.-<.~ BUILDING EXPAL~SION OR MODIFICATION. CHAL~GE IN PRIOR USE? IS THE STRUCTURE CURRENTLY VACANT? VARIANCE TYPE: POOL OR SCREEN ENCLOSURE COMMERCIAL PROPERTY? RESIDENTIAL PROPERTY? INDUSTRIAL PROPERTY? DO YOU KNOvV THE ZONING CODE DESIGNATION? 4. TIME AL'-.TD DATE PREFERRED 5. HOW MA.l"fY PEOPLE WILL BE AT THE PRE-APP MEETING? Note: Tell the person that someone from the Department will call them to confirm the meeting. .................................................................................r · Pre-application meetings should be scheduled for a minimum of one (I) hour time module, and should be scheduled no less than hvo (2) days prior to date/time of meeting. If urgency is sensed, discuss \vith Mike or Lusia. . l\Ieetine-s may be scheduled: Monday afternoons Tueslby ZLll day V/ednesday all day Thursday mornings Note: Lusia is not available for Tuesday a.rn. meetings, and Mike is not available on Mondays behveen 11 :30 a.rn. and 2:30 p.rn. S: \P I ann i ngIP lann ing\P re-app] i cat ion co n tactq uesti 0 ns. doc ., {( L.w;jo POIIJf.e 1( ~~Ct c~~ ~lt.~ ~~ Vi {lli'<; PRE-APPLICA.TION MEETING LOG MEETING DATE: '2. - Z1v --0:' APPLICATIONS: ZONiNG DISTRICT: PROJECT NAl\1E: 3'?:>o - 4-'? . _JU ATTENDING STAFF: ATTENDING AS APPLIC. T: J A1111J?S P- . I FAtX: :](~ I FA_X: I /11t'(~(<; ,20.. .. J:'.SHRD.-\ T.-\\PIJnning\SRA..'U:D\ WP\PROJECTS\PRE AI' PLICA TIO:'.'S :\IEETC-;C LOCS\P,e--Appliotion :\(<<ting Log,doc '~ ~/~) PRE-APPLICATION MEETING SIGN IN SHEET PLEASE PRINT IYlEETING DATE: L / '20-- () S TIME: ATTE~1)ING FOR APPLICA.1~T: NOTICE: The purpose of this conference sh:lll be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass related to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not . binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach Attending Staff I I I I I I I I I I I I Attending for Applicant n {) / P-v\ ~t'{/l -I' , C{"Lev l) ./ J}~ lhn ( dC tJ,'/ (/t<M. Y <, J:'5HRD.-\. T.-\.\PLA";'.'L'iG\SHAREDI \Y1'IFOR.\IS\PRE-.-\.PPL :'.IEETl.\G-SIG;'.' L'i SHEET.DOC Time and Date of Meeting "91d-2.0 J-ft L.- Those attending meeting: J 'v1./I \_- ~~./ (f , fl/~ YYY--1 c ~ V, t!.A ,+o-.d /c) /J/?1 Applicant's Name: PRE-APPLICATION CONTACT QUESTIONS q ,;,-oJ ~. ~'-u<'{:c Phone: ~ (" 1- 'i't7 - Id? 'j....-/ CU~ fl /- .) ry - CZ~9 2-- 1. HAVE YOU SPOKEN TO AL'N STAFF MEMBER ABOUT THE PROJECT? Yes No (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING? STAFF MEMBERS NA1YfE: 2. LOCATION OF PROPERTY (CROSS STREETS/JNTERSECTIONS) >k ~ L 'C~d~' J&;L' 0"0 (? &J.. "T. v~ U~~ i:rJ ,., .J. WHAT WOULD YOU LIKE TO DO? ). / NEW PROJECT I{/t:llf-h --4 ~tc; ./.J-e(4~ BUILDING EXPANSION OR MODIFICATION . L}tc7c~ /- c/~ru- CHANGE IN PRIOR USE? I / I' IS THE STRUCTURE CURRENTLY VACANT? . /'/2; /') " -L.: VARIANCE TYPE: ~-Z /t ~( I ~(fL.- POOL OR SCREEN ENCLOSURE "7c.c <c J~/J~/ " COMMERCIAL PROPERTY? ~ \" .f\' I/') RESIDENTIAL PROPERTY? " '-J a~ _..D<- C .'--? (tt- LV"\. u./!~ It INDUSTRIAL PROPERTY? DO YOU KNOW THE ZONING CODE DESIGNATION? ~ 4. TIME AND DATE PREFERRED 5. HO\V MANY PEOPLE WILL BE AT THE PRE-APP MEETING? Note: Tell the person that someone from the Department will call tltem to confirm tlte meeting. .................................................................................. · Pre-application meetings should be scheduled for a minimum of one (I) hour time module, and should be scheduled no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia. . Meetin2's may be scheduled: Monday afternoons Tuesday all day Weclnesday all day Thursday mornings Note: Lusia is not available for Tuesday a.rn. meetings, and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.rn. S;\P lann i ng\P lann ing\Pre-appl icationcon tactquestions.doc /'(1 , I . ~~ ~ c . ua-l ~ I :if- (U:7 (dx,~ '-< //L~U"~ ) PRE-APPLICATION MEETING LOG IHEETING DATE: . b 2. .z.. 2...(JO Z APP IC TIONS: ZONING DISTRICT: R ~ PROJECT NAME: I TIME: /0 : OtJ 4M ATTENDING STAFF: ATTENDING AS APPLICAL'iT: PHON~: _ ~b 1- t)Ob NAivIE OF APPLICANT/CONTACT: ADDRESS: PHONE: I FA..X: I ~~7:> ru,7' W~). J:\SHRDA TA\PI:lnning\sH..l".RED\WP\PROJECTS\PRE APPLICA TIO:'iS :\IEETL"G LOGS\Pre-Applic:ltion :>{~e(in;:: Log.doc PRE-APPLICATION MEETING SIGN IN SHEET PLEASE PRINT MEETING DATE: TIME: ATTENDING FOR APPLICANT: NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass rel:1ted to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach Attending for Applicant Attendina Staff I~ -11 . I I I I ~ I I I I I J:\SHRDA T A\PLA.'1i'H1'iG\SHARED\ WP\FOR.'rIS\PRE-APPL i'rIEETf."G-SIG" C'i" SHEET.DOC Time and Date ofMeeting~ I ~ ~ 1-0 - ;>. "30 Those attending meeting: ~~~ PRE-APPLICATION CONTACT QUESTIONS Applicant's Name: ~~ Phone: S~ i - 3 jp 1- - 0 2.. 2.. ~ 1. HAVE YOU SPOKEN TO ANY STAFF MEMBER ABOUT THE PROJECT? Yes No )<_ (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING? STAFF MEMBERS NAME: 2. LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS) ~ JA~~ '?~!ff~ t2-,-(. ~b ~~ ~-~~ ~~~ ~~ ~~~ ~~~ ~h n;"- 3. WHAT WOULD YOU LIKE TO DO? X. NEW PROJECT BUILDING EXPANSION OR MODIFICATION. CHANGE IN PRIOR USE? IS THE STRUCTURE CURRENTLY VACANT? VARIANCE TYPE: POOL OR SCREEN ENCLOSURE CO~ERCLALPROPERTY? RESIDENTIAL PROPERTY? ll{DUSTRLALPROPERTY? DO YOU KNOW THE ZONING CODE DESIGNATION? 4. TTh1E Ai'ID DATE PREFERRED 5. HOW MANY PEOPLE WILL BE AT THE PRE-APP MEETING? Note: Tell the person that someone from the Department will call them to confirm the meeting. .................................................................................. . Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia. . IVleetinl!:s may be scheduled: Monday afternoons Tuesday all day Wednesday all day Thursday mornings Note: Lusia is not available for Tuesday a.rn. meetings, and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.rn. s: \P I ann ing\P lanning\Pre-app I icationcon tactquestions.doc o C:4Jc:J,';L, -- r3 /,qt: }'L,,()-/9-.;) PRE-APPLICATION MEETING LOG g-Z(-D'Z, !TIME: /0.' 2().- (I' 2-0 :MEETING DATE: APPLICATIONS: ZONING DISTRICT: PROJECT NAME: I C]~ JZ lStl kN ~\t~ ATTENDING STAFF:D ATTENDING AS APPLICANT: A) [ tJ- ~ -rat-\.. . . . -r J-- PHONE: Stet - ~ 2 ~ D22.0 FAX: NA1\1E OF APPLICANT/CONTACT: ADDRESS: PHONE: FAX: PROJECT ADDRESS: .~ 5bU ICr~'A-V'..e PROPOSED TYPE OF USE/OCCUPA...NCY: Di.oVnl- ()l.,~~~ DATE SUBIV1ITTAL RECEIVED: DATE DEl'IIED: COMl\1ENTS: ( ~~ \, J:ISHRDATA\PlanningISHARED\WP\PROJEcrS\PRE APPLICATIO,,",S :'rIEETL'iG LOGS\Pre-Applic:ltion :'r{eerin;:: Log.doc : l. PRE-APPLICATION MEETING SIGN IN SHEET PLEASE PRINT lVIEETING DATE: TThfE: ATTENDING FOR APPLICANT: NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass related to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not binding for formal review purposes. Additional staff comments may be forth coming based on actual I b 'tt d f plans su rru e or reVIew. City of Boynton Beach Attending for Applicant Attending Staff I I I I I I I I I I I ~ J:\SHRDATA\PLANl'iL'iG\SHARED\\YP\FOR.\IS\PRE-APPL l\IEETP';G-SIGl'i 'J?'j SHEET.DOC Applicant's Name: ~., Time and Date of Meeting ~~fy.~ .;; bJ'Y/ Those attending meeting: () / 1/. l t- 1"""- filL-if k;-r1, AJlL~ f!fL1'i~ t::~~,'T aM<r.'~L- .4" <' z'_ 9.- L-')(" ,..-h_ ~:~CAT~~~;~;:;I~SL{'-W~-/ ~___t:.A_ . 4')l~;L<- > Phone: o? 7j/ - 7;0(. ,/ . - f" 1. HA VE Y,QU SPOKEN TO ANY STAFF MEMBER ABOUT THE PROJECT? Yes \./ No (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING? STAFF MEMBERS NAME: )Jt~f 2. :.)'3 2/2C {lOoe,?d / / 3. (?, WHAT W~ULD YOU LIKE TO DO? ./ NEW PROJECT BUILDING EXPANSION OR MODIFICATION. CHANGE IN PRIOR USE? IS THE STRUCTURE CURRENTL Y VACANT? VARIANCE TYPE: POOL OR SCREEN ENCLOSURE / COMl\1ERCIAL PROPERTY? ,,/ RESIDENTIAL PROPERTY? INDUSTRIAL PROPERTY? DO YOU KNOW THE ZONING CODE DESIGNATION? ~ 4. TIME AND DATE PREFERRED 5. HOW MANY PEOPLE WILL BE AT THE PRE-APP MEETING? Note: Tell the person that someone from the Department will call them to confirm the meeting. .................................................................................. . Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia. . Meetine:s may be scheduled: Monday afternoons Tuesday all day Wednesday all day Thursday mornings Note: Lusia is not available for Tuesday a.m. meetings, and Mike is not available on Mondays between II :30 a.m. and 2:30 p.rn. S;\P lanning\P lann ing\Pre-applicationcontactquestions.doc (, t'. -tf , (J . . vhJ21~ tllrtJ Vd(~ TO~uN 17VM~5 y PRE-APPLICATION MEETING LOG l'rIEETING DATE: ?-/D 02- I TIlY1E: I L{OO - IS' ';J{..> APPLICATIONS: ZONING DISTRICT: R - 3 PROJECT NAME: ATTENDING STAFF: r: ATTENDING AS APPLICANT: PHONE: 5 G.? I ;;t,:2- 3;.352 NAt\1E OF APPLICANT/CONTACT: ADDRESS: PHONE: I FA.X: PROJECCi::D~SS{(.(/..t f- ,5i1.i 1/9th1-ve Lots PROPOSED. PE OF USE/OCCUPA...i'{CY: DATE SUBMITTAL RECEIVED: DATE DEl'IiED: COM.I\1ENTS: 7 . Ay - ~ ~ p.t:.a.(..u-n::7 J:\'sHRD.-I. T.-I.\PlanningI.SHARED\WP\.PROJECTS\PRE .-I.PPLIC.-I.TIO:'iS :\IEETL,G LOGS\Pre-.-I.pplication :\lcc[in~ Lo~.doc ~ Ch f- IS tV-'-"1-1 !h1,-':yJ 11 {~r : -. PRE-APPLICATION MEETlNG SIGN IN SHEET PLEASE PRINT '7 ~ I D 1>2 lVIEETING DATE: .-:7' !.-'t/- ~ rOD' TThfE: . c-. .. ATTENDING FOR APPLICANT: F(eC~ bR:- L F P-U.:J NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass related to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not . binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach t Attendino Staff U26L5 'i&v\ [6$ c- . jZ Ie ',T o11.,r1'1S;L~ I I I I I I I I ., J:\SHRDA T A\PLA.'1l'iL'iG\SHARED\ WP\FOR.\IS\PRE-APPL l\IEETP';G-SIGl'i r:-; SHEET.DOC r ,~ "', \. 'f't''', , l ,"\ 1 \ L t ~ "~ ~... 0,{ C:-;.. \. ( ,,/ ~pf, Michael From: Sent: To: Subject: Rumpf, Michael Tuesday, October 01,2002 12:47 PM 'stevem@quincyjohnson.com' Christian Villas/Largo Point Townhomes October 1, 2002 Hello Steve, In response to your letter dated September 25, 2002, wherein you request confirmation of on your understanding of discussion items and conclusions, I state the following: 1. Item #5 regarding school concurrency - Concurrency status/capacity is not determined or estimated by city staff. I recommend that you contact David DeYoung of the School District, at 434-7343, for information on a "equivalency determination" I understand is available at a small cost and provided in advance of the review that occurs at time of site plan approval; 2. Item #6 regarding site plan application information - The drainage information needed at site plan stage includes conceptual estimates and design; and 3. Item #8 regarding screen enclosures - This is correct, but be sure to include all setbacks on the drawings consistent with Land Development Regulations. Mike 1 PROJECT: PROJECT No: SUBJECT: ATTENDEES: Largo Pointe-Townhomes, S.W. 19th Ave. 6747.00 Site Plan Pre-application Meeting Larry Finklestein-Lamar Realty Steve Myott-Quincy Johnson & Associates James Williams-Quincy Johnson & Associates t.1. 1.'- '-L '-L f- l.. ", I- .,. 1 \ PROJECT MEETING NOTES DATE: 11/06/02 LOCATION: City of Boynton Beach Lusia Galav-City of Boynton Beach ;Laurinda Logan-City of Boynton Beach Eric Johnson-City of Boynton Beach Discussion: 1. The preliminary site plan layout showing 20 townhouses can be done as a fee simple development with common areas in a home-owner's association. 2. The existing 5' high wall at the rear of the property can remain (it will not have to be increased to 6' high). 3. The site plan submittal is to include sight lighting, mail kiosk location & provision for garbage collection (roll out from individual units is preferred). 4. Re-platting will be necessary, but this step could follow site plan approval. 5. Abandonment of the existing easement and creation of a new one can be handled during the site plan approval process. A minimum 12' easement will be required for the sanitary sewer line depending on the depth of the line more width may be required. 6. A flow test will be required on the existing 6" water line. If the flow is too Iowan 8" line will be required. 7. School Board concurrency will be required as part of the review process. 8. A second fire hydrant will be required on the site to meet the requirement of no more than 200' from a hydrant to any part of a building. 9. Show project signage design at site plan approval stage. Signage must be a minimum of 10' off the property line and the site triangle at driveways must be maintained. 10. Patios and screened enclosures should be considered at time of site plan review. If no roof is included, these areas can be in the setbacks up to within 8' of the property line. 11. All storm water must be retained on the site. 12. A one-car garage and one parking space in the driveway are provided for each unit. The driveway spot will need to be included in the lot plat of each unit not in the common area. Guest parking is not required but can be provided as an amenity. 13. The site plan approval process generally takes 3 months. 14. The architects and their civil engineer will schedule a meeting with Laurinda prior to the submission for site plan approval to go over new requirements. " 949 Clint Moore Road. Boca Raton. Florida 33487 561.9979997 . Fax 240 250 7416 . .. Project Meeting Note.:. Largo Pointe November 6,2002 Page 2 (continued) Please submit any wrrections to the above within five (5) days of receipt. If no corrections are received, then the notes will be filed as being accurate. Respectfully Submitted, Quicny Johnson Architects cc: Attendees ./ Ja,?) fo,J-c PRE-APPLICA.TION MEETING LOG l'dEETING DA7TE): , ' II (f) 02 APPLICATIONS: ~ ZONING DISTRlCT: PROlE,CT NMfE: (/1/?-l-~17t.A VI/I(U) IJUl ;Vb I de f/afMJ.,2. ATTEN' NGSTAFF: LiUiC<. 6~v) ATTENDING AS APPLICA.J.'iT: si;...( PHONE: NAtvfE OF i\PPLICA.NT/CONTACT: ADDRESS: PHO~'"E: I TI~IE: J I (/gr.~ fj-1 7/2..( G J(JI1I15(."". zurc(,)7(/ot'(.. - {/ w / j Cl/2tJllJJe 'S/et ]/U F.~X: ,)e' .?......- I i I I i I I I I I S-Jl-.-M C PROJECT ADDRESS: 5w Iq~ Ilre. PROPOSED TYPE OF USE/OCCUPA.'iCY: DATE SUBIYI1TTAL RECEIVED: I DATE DEl'I1ED: COiYIMENTS: . 7\()c.ru.2LJ,- ( "i) I) -' :. dD ut\h / :i:JIUY.-u'Il' . - ('J 'C.:tl? 2) J:., , FAX: I I I I I I I I I I C.t~1N~ I ~ / .Sv.:.:..> /rJ (,l~u/. I ! I I I 'Ivl Rcu.e-1l-t.-e () 'J Vlt'~O..e.1 , /1...e-1...(' a..-u,,~. l'h"~LL..)C>'~s W1v<J\ ~ J:\SHRDATA\Pl3nning\S~O~CT~~L~IO"S :.IEETL"C L~\~re-APPlic~tion :.rcctin~ Lo~,doc ~!I'{wf ~ ffW ~ ~ - f'oll-t9Wfs ~J7. Leur- ~",.4e PRE-APPLICATION MEETING SIGN IN SHEET PLEASE PRINT IVIEETINGDATE: /I/~hlo;v TThIE: / .' ~ () f/J1 ATTEI'.fDING FOR APPLICA.L~T: * NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass rel:1ted to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not . binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach Attending Staff ~~ <Tv /tVv1 '/Y\ It ;;', J1'" . < " 1 ~. l I ,'. '~' 1 I I I I ! .ff(~'\ I I I I I I I I Attending for Applicant f7 ~~ J1-(: I,~I <, J:'.5HRDATA\PLA.'i:'iI.';GiSHARED\\Y1'\FOR.\IS\PRE-APPL ;\IEETf.\G-SIG:'i ['i SHEET.DOC eXI~I""4 r;'"IG.tJ c,1lS- \HAL.l- -() -:r '2.0' '2,1' I , I .----.~ . - - . ......1 e , c ~11 I I I I I I I I 321 o ~ I n Lift 4)t.t;O" Uo~ , s.yJ. I~T" AVE GUINCY JOONSON .f\RCHllE CiS ~ \"-::50' LARQO POlNT€ ., 12.~/0'1.. PROJECT MEETING NOTES DATE: 9/25/02 LOCATION: City of Boynton Beach .. ~fL / PROJECT: Largo Pointe-Townhomes PROJECT No: 6747.00 SUBJECT: Site Plan Pre-application Meeting ATTENDEES: Bert Frehoff-Pointe Bank Andre-Pointe Bank Steve Myott-Quincy Jol:1nson & Associates James Williams-Quincy Johnson & Associates Mike Rumpf- City of Boynton Beach Lusia Galav-City of Boynton Beach Dick Hudson-City of Boynton Beach Ken Hall-City of Boynton Beach Discussion: 1. The preliminary site plan layout showing 20 townhouse units in 3 clusters (6 units, 6units & 8 units) with the required R-3 setbacks is generally acceptable on this site 2. Re-platting will be necessary, but this step could follow site plan approval. 3. Gated entrance would be OK with all the required fire department/service vehicle entry requirements met. 4. A $771/unit recreation impact fee will be required even if on site recreation amenities are provided. 5. School Board concurrency will be required as part of the review process, however the capacity should be OK at this location. 6. Site plan approval will require floor plans, elevations, site plan with drainage, lighting and landscape. 7. Show project signage and entry wall/gate design at site plan approval stage. Include column caps, cornices etc. for walls and gates. 8. Patios and screened enclosures should be considered at time of site plan review. If no roof is included, these areas can be in the setbacks. 9. The site plan approval process generally takes 3 months. Please submit any corrections to the above within five (5) days of receipt. If no corrections are received, then the notes will be filed as being accurate. Respectfully Submitted, Quicny Johnson Architects at cc: Attendees 949 Clint Moore Road. Boca Raton. Florida 33487 561.997.9997. Fax 240.250.7416 PROJECT MEETING NOTES DATE: 9/25/02 LOCATION: City of Boynton Beach ~ ( )lJ lr'Jl_~Y L~ r. JC)HN~',()N ..--.. ARCHITI'TS VV PROJECT: Largo Pointe-Townhomes PROJECT No: 6747.00 SUBJECT: Site Plan Pre-application Meeting ATTENDEES: Bert Frehoff-Pointe Bank Andre-Pointe Bank Steve Myott-Quincy Jol)nson & Associates James Williams-Quincy Johnson & Associates Mike Rumpf- City of Boynton Beach Lusia Galav-City of Boynton Beach Dick Hudson-City of Boynton Beach Ken Hall-City of Boynton Beach 4"r::~ 0: -~ Discussion: 1. The preliminary site plan layout showing 20 townhouse units in 3 clusters (6 units, 6units & 8 units) with the required R-3 setbacks is generally acceptable on this site 2. Re-platting will be necessary, but this step could follow site plan approval. 3. Gated entrance would be OK with all the required fire department/service vehicle entry requirements met. 4. A $77l1unit recreation impact fee will be required even if on site recreation amenities are provided. 5. School Board concurrency will be required as part of the review process, however the capacity should be OK at this location. 6. Site plan approval will require floor plans, elevations, site plan with drainage, lighting and landscape. 7. Show project signage and entry wall/gate design at site plan approval stage. Include column caps, cornices etc. for walls and gates. 8. Patios and screened enclosures should be considered at time of site plan review. If no roof is included, these areas can be in the setbacks. 9. The site plan approval process generally takes 3 months. Please submit any corrections to the above within five (5) days of receipt. If no corrections are received, then the notes will be filed as being accurate. Respectfully Submitted, Quicny Johnson Architects cc: Attendees 949 Clint Moore Road. Boca Raton · Florida 33487 561.997.9997. Fax 240.250.7416 .1- It / >_:::- t, ^ il/2C-c' (//V/ c ({! /lk!/J ;II1N )/eJA' ( 7L') PRE-APPLICATION MEETING LOG IHEETING DATE: . 'I~ " ,.- J""-: "', APPLICATIONS: ZONING DISTRICT: PROJECT NAME: "L (J.-Y- "0 I TI~[E: :S.'Cd I I j ~J2 ATTENDING STAF : ATTENDING AS APPLICAl'{T: 5>fe.V1!.- PHONE: NAl\1E OF APPLICAl'{T/CONTACT: ADDRESS: PHONE: FA_X: PROJECT ADDRESS: - 6.., ~ <>- . C h r ~ yf7c.....Yl oJ: (( C',.S; PROPOSED TYPE OF USE/OCCUPAl'{CY: DATE SUBIVIITTAL RECEIVED: DATE DEl'l"1ED: COlYuvlENTS: ~ "",C" -ti~ 'p(.l.-f ~ I~f ~~ ~ tQ . (0 r' ~'ne.. ~ ; ~ ~ ~~?Z2 ~'I r;.~:t:;< --;-~ -~. - -;: b~ ksf] n"", ~ ~e'S C C'., / L! J'" ( Or, c..e.. - ( ~ s- 000 . ~ ' I I I 0#'l ~ "'- ,.- .c:, -: tl- I I I ., ]:'.SHRDATA\PI3nnir:gi.5H..lu.'tEDlWP\PROJECfS\PRE A?PUC.-\TIO:'iS :'-lEETL"G LOGS\Pre-Appli':3cion :'-lcctin;:; Log.do.: Page 1 0[2 ~ .. Tucker, Patricia ~ iv~ From: Rumpf, Michael Sent: Friday, September 20,20023:35 PM To: Tucker, Patricia Cc: 'stevem@quincyjohnson.com' Subject: RE: Christian Villas- New project '1~.r (<J ,1-17 _ ~+J , >>-. Pat, please have a meeting arranged with Steve, Lusia, engineering, Tim Large and I as soon as possible. Make it for as many as can appear but at minimum, Lusia and I. In otherwise, don't move it off into the distant future just to get all individuals present. Steve's number is at the bottom of this message. Thanks, MR. -----Original Message----- From: Steve Myott [mailto:stevem@quincyjohnson.com] Sent: Friday, September 20,20023:34 PM To: Rumpf, Michael Cc: Jim Williams; Rich Jones Subject: RE: Christian Villas- New project Mike, We want to show you the design as well and the sooner the better. We do have issues with the R-3 setbacks with the type of project that we are envisioning. Let us come in and go over it with you and staff at your earliest opportunity. Please confirm a time that is good for you and we will be there. Thank you, Steve -----Original Message----- From: Rumpf, Michael [mailto:RumpfM@ci.boynton-beach.f1.us] Sent: Friday, September 20,20022:52 PM To: 'Steve Myott' Subject: RE: Christian Villas- New project Steve, I was pleased to have delivered you a response this morning which answers your question. From your message it appears that you did not receive it. It read as follows: Steve, WE HAVE AN ANSWER!!! Finally I know, but better late than never Uust kidding). I discussed this with Lusia and we feel it's best to finish the project as close to how it was started, rather recognizing its vested status in terms of zoning. We would recommend that R-3 zoning be maintained and setbacks followed. We are interested in seeing your design. Did you say that the existing HOA will take this portion in under its wing? Can you comply with R-3 setbacks? Please forward any further questions; I believe the tough one is past and future questions will generate much quicker answers. Have a good day and weekend Steve. I again apologize for the time required to respond. Mike Please call me if you still have questions. I assume that the R-3 route is simplest for you as the rezoning and master plan processes would be avoided, PUD standards involving enhanced landscaping, etc would be minimized, and you would have only one process, site plan review, to follow. Mike 9/20/2002 Page 2 of2 " -----Original Message----- From: Steve Myott [mailto:stevem@quincyjohnson.com] Sent: Friday, September 20,20022:34 PM To: Rumpf, Michael Cc: Rich Jones Subject: Christian Villas- New project Mike, Our client spoke to Dick Hudson today and it Dick's impression that a PUD designation was not possible, This is a change from our conversation, please call me or lets meet to discuss, our Client is anxious to know which way we need to move. Thank you, Steve Myott ph: (56]) 997-9339 ext. 3] Quincy Johnson Architects 949 Clint Moore Rd. Boca Raton, FL 33487 fax: (56]) 997-]610 website: l:!nQ:/ /www.quincyjohnson.com 9/2012002 '" Time and Date ofMeeting"UJ~ 7;Js 3f-Yrt'/ Those attending meeting: v.... ~ L-(,.. ~ ~ IIAI". ~'*- PRE-APPLICATION CONTACT QUESTIONS Applicant's Name: ~ ~~~ -rt4 Phone: \/(,/- '1'17.:..337' _3/ 1. HAVE YOU SPOKEN TO AL"N STAFF MEMBER ABOUT THE PROJECT? Yes./ No (IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE- APPLICATION MEETING? STAFF MEMBERS NAL\;lE: ~. ~ 2. LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS) .., ~. \VHAT \VOtJLD YOU LIKE TO DO? /' NEW PROJECT BUILDING EXPANSION OR MODIFICATION. CHANGE IN PRIOR USE? IS THE STRUCTURE CURRENTLY VACANT? VARIANCE TYPE: POOL OR SCREEN ENCLOSURE COMMERCIAL PROPERTY? RESIDENTIAL PROPERTY? INDUSTRIAL PROPERTY? DO YOU Ki"l"OW THE ZONING CODE DESIGNATION? <, 4. TIME Al'ID DATE PREFERRED ~.r t o/'....s- c: .3/,,,, HOW M.A...i"N PEOPLE WILL BE AT THE PRE-APP MEETING? 5. Note: Tell the person that someone from the Department will call them to confirm the meeting. .................................................................................. . Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia. . Meetin2:s may be scheduled: Monday afternoons Tuesday all day W ednesda y all day Thursday mornings Note: Lusia is not available for Tuesday a.m. meetings, and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.m. s: \P I ann i ng\Plann ing\Pre.applicationcon tactquestions.doc PRE-APPLICATION MEETING SIGN IN SHEET PLEASE PRINT lVIEETING DATE: TIME: ATTENDING FOR APPLICANT: NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives, policies and codes ass rebted to the proposed development and to discuss site plan review procedures. Opinions express at the pre-application conference are not . binding for formal review purposes. Additional staff comments may be forth coming based on actual lans submitted for review. City of Boynton Beach Attending for Applicant Attending Staff (.:j L. L rt/JaJ. ~ ((, VJiL- <, J:'.5HRDA T.-\\PlA..'1;-1I:'iG\SHAREDI \\1'\FOR..\IS\PRE-APPL MEETf."G-S IG:'i L' SHEET.DOC ~pley, Judith Subject: Location: Steve Myott - Christian Villas PZ Conference Room Start: End: Wed 9/25/2002 3:00 PM Wed 9/25/2002 4:00 PM Recurrence: (none) Meeting Status: Meeting organizer Required Attendees: Rumpf, Michael; Galav, Lusia; Large, Tim; Hall, Ken Mr. Myatt has confirmed for this date and time. 1 Page 1 of2 Tucker, Patricia ------~---_..._-- From: Rumpf, Michael Sent: Friday, September 20,20023:35 PM To: Tucker, Patricia Cc: 'stevem@quincyjohnson.com' Subject: RE: Christian Villas- New project Pat, please have a meeting arranged with Steve, Lusia, engineering, Tim Large and I as soon as possible. Make it for as many as can appear but at minimum, Lusia and I. In otherwise, don't move it off into the distant future just to get all individuals present. Steve's number is at the bottom of this message. Thanks, MR. -----Original Message----- From: Steve Myott [mailto:stevem@quincyjohnson.com] Sent: Friday, September 20,20023:34 PM To: Rumpf, Michael Cc: Jim Williams; Rich Jones Subject: RE: Christian Villas- New project Mike, We want to show you the design as well and the sooner the better. We do have issues with the R-3 setbacks with the type of project that we are envisioning. Let us come in and go over it with you and staff at your earliest opportunity. Please confirm a time that is good for you and we will be there. Thank you, Steve -----Original Message----- From: Rumpf, Michael [mailto:RumpfM@cLboynton-beach.f1.us] Sent: Friday, September 20, 20022:52 PM To: 'Steve Myott' Subject: RE: Christian Villas- New project Steve, I was pleased to have delivered you a response this morning which answers your question. From your message it appears that you did not receive it. It read as follows: Steve, WE HAVE AN ANSWER!!! Finally I know, but better late than never Oust kidding). I discussed this with Lusia and we feel it's best to finish the project as close to how it was started, rather recognizing its vested status in terms of zoning. We would recommend that R-3 zoning be maintained and setbacks followed. We are interested in seeing your design. Did you say that the existing HOA will take this portion in under its wing? Can you comply with R-3 setbacks? Please forward any further questions; I believe the tough one is past and future questions will generate much quicker answers. Have a good day and weekend Steve. I again apologize for the time required to respond. Mike Please call me if you still have questions. I assume that the R-3 route is simplest for you as the rezoning and master plan processes would be avoided, PUD standards involving enhanced landscaping, etc would be minimized, and you would have only one process, site plan review, to follow. Mike 9/2012002 Page 2 of2 -----Original Message----- From: Steve Myott [mailto:stevem@quincyjohnson.com] Sent: Friday, September 20, 20022:34 PM To: Rumpf, Michael Cc: Rich Jones Subject: Christian Villas- New project Mike, Our client spoke to Dick Hudson today and it Dick's impression that a PUD designation was not possible, This is a change from our conversation, please call me or lets meet to discuss, our Client is anxious to know which way we need to move. Thank you, Steve Myott ph: (561) 997-9339 ext. 31 Quincy Johnson Architects 949 Clint Moore Rd. Boca Raton, FL 33487 fax: (561) 997-1610 website: htm://www.quincyiohnson.com 912012002