Loading...
CORRESPONDENCE The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org April 4, 2003 Mr. Melvin Lowe, President M & L Roofing 630 Industrial Avenue Boynton Beach, FL 33426 Re: M & L Roofing - Color Changes MMSP 03-024 Dear Mr. Lowe: In response to your request for the administrative review and approval of the modification proposed to the above-referenced, approved site plan, please be informed that the color changes proposed on the revised plans date stamped 03/28/03 are "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan Review. The proposed colors are as follows: · Wall: Benjamin Moore "Clay Beige" - OC11 · Overhead bay doors: Made by DBCI, #20 Desert Tan; · Mansard: Standing seam metal roof by MBCI Kynar 500, Signature 300 "Colonial Red". This project may continue to be processed by the Building Division as a permit application. Be advised that the proposed change may require a modification to the building permit. Also, the conditions of approval from the Major Site Plan Modification (MSPM 02-003) are still relevant and may require revisions to the plans. Please contact me at (561) 742-6260 if you have additional questions. ~: lJ) ~~~'<9d~v Lusia Galav, AICP Principal Planner Cc: Eric Lee Johnson, AICP, Planner Karen Main, Plan Review Analyst S.IPlanningISharedIWpIProjeclSIM&L RoofinglMMSP 03-024 Color ChangelApproval Letter.dol - M & L ROOFING March 28, 2003 City of Boynton Beach 101 E. Boynton Beach Blvd. P. O. Box 310 Boynton Beach, Florida 33425-0310 ;, ,Ii '\ \.~. n~ i UU\ . 2 8 r f,_,( ,'I. \,\ - - ;") " I _.' ,\ " --..-- ;':" i "I \ t:!J ,--.- -- - -- - ,- Attention: Michael W. Rumph Director, Planning and Zoning PL~NNl~~G PW ZONiNG DEPT Dear Mr. Rumph, We would like to make a color change on our building to Benjamin Moore CIBOC 1, Clay Beige. Enclosed please find sample of the colors we have chosen. If you will note, no color was ever discussed as far as the mansard roof It is a a 5 V crimp standing seam metal roof, manufacturer, MBCI, and we have chosen the color Colonial Red (Kynar 500, Signature 300). As you can see, this color combination is a better contrast of colors than was originally chosen.(Please see prints for the original color: color chip enclosed). We would appreciate any assistance you can give us in this color approval, as we would like to get the building completed as soon as possible and really need your help. Thank you for your attention to this matter, Sincerely, .7 -? ".4/y ;/ /// . ,,7 ~.. /// ~vin 1:. owe/ President Mellowe Construction, Inc. d/b/a M & L Roofing and Construction samples enclosed cc: file 630 INDUSTRIAL AVENUE -:- BOYNTON BEACH, FLORIDA 33426 -:- (561) 736-7211 PROJECT NAME: M & hRoofing , LOCATION: 630 Industrial Ave. PCN: I FILE NO.: MMSP 03- 024 I TYPE OF APPLICATION: Minor Modification to Site Plan AGENT/CONTACT PERSON: OWNER: Melvin Lowe- President PHONE: Mellowe Construction, Inc. d/b/a FAX: M & L Roofing and Construction ADDRESS: PHONE: 736-7211 FAX: ADDRESS: 630 Industrial Avenue Boynton Beach, FL 33426 Date of submittal/Proiected meetin2: dates: SUBMITTAL / RESUBMITTAL 3/28/03 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A PROJECTED RESUBMITTAL DATE: N/A ACTUAL RESUBMITTAL DATE: N/A 2ND REVIEW COMMENTS DUE: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: S:\Planning\SHARED\WP\PROJECTS\M&L Roofing\MMSP 03-024\2003 PROJECT TRACKING INFO.doc I F '"".'" - ~ ClO .... FPVC Curtain Wear StrIp >< ~ N .... =' ... .c ~ CIl .... 5~1~~~: dn-cVo~" \ ... ." en I:: I:: CIl .i:L o - " . "" " ; ,f . . " ~ MASDNRy"MDUNT BOTTOM BAR ASSEMBLY STEEL MOUNT Bottom bors ore constructed of 6061-T6 oluminum extrusion reinforced by 2" x 1 112" galvanized steel ongle, ond hove a replaceoble vinyl weather seol. HARDWARE Soddles ore supplied in order to securely lock axle into ploce. Slide locks ore provided for eoch side af doar. Slide locks ore of 10 gouge galvanized steel. OPERATION Monuol rope operation for doors thru 10'x10'. Doors wider or toller thon 10' use 4 to 1 reduction hoist. Electric operator is ovoilable. INSULATION (SERIES 2250) Foil Backed Air-Bubble Insulation ~ Vinyl Side Draft Stop " Insulation consists of two layers of oluminum mylor film laminated to the outside of two layers of heovy-duty polyethylene oir,bubble cushioning" Material is extremely effective at controlling heot goin/loss ond provides an R-volue of 7. Top drah stop is mode of vinyl and is supplied in order to form 0 weother seol between the door and heoder. A flexible vinyl side drah stop is ottoched to the inside of the guides ond seols ogainst the insulation creoting 0 superior seal to guard agoinst the elements. '7cQ J\fl'C~ L-c)GJC~ ~ to L aLee> 'Ce>l-V\cJ. t eM. (y) \k9 CL kJ()-E'. INSULATED DOOR DETAIL SERIES 2250 . JJSCI ~ II - in 9 5 CURTAIN Door features strong, 26 gouge, deep ribbed corrugation available in 20 standard colors. Hard Grade E steel provides strength and durability. Each colar comes with a 20 year film integrity warranty and an up ta 20-year guarantee against chalking and fading. Steel is prepainted with one coot siliconized polyester point over primer on top coat and wash coat over primer an reverse side. Flexible PVC wear strips are attached to curtain to reduce friction and ensure a quiet and smooth operation. GUIDES Guides are constructed of formed 14 gauge galvanized steel. Polyethylene wear strips are attached to guides to reduce friction and ensure a quiet and smooth aperatian. TORQUE-TUBE ASSEMBLY Axles are 1 5/6" 0.0. steel tubing. Springs are oil tempered tarsian type. Drums are 16 gauge galvanized steel with 1 5/6" steel ball bearing stated in center. Tap sheet is 26 gauge galvanized steel. """'" ~~t "~1 2 8' OPENING WIDTH + 18" _I -----------------~ HEADROOM I MASONRY MOUNT ONLY 1.1/2", 1-1/2', 1CXJ,2.1/2" Galv. Steel @ 35" D.C INTERIOR ELEVATION ! 24" jTYP 6" STEEL! Gal~:ni~~~~~eel 1/4", 1/2.' Slot @ 24" D,C Wind load Certified Doors: DBCI offers optional wind load doors that are tested and certified to meet 1 DO mph, 110 mph and Dade county applications. . ~DBC/~