February 12, 2004
Mr. Bejai P. Mangar
19844 Southwest 116th Avenue
Boca Raton, Florida 33498
Re: Penial Evapgelical Alliance Church - Parking Lot / Elevation Change / Change of Use
MMSP 03~ 60
Dear Mr. Mangar:
In response to your request for the administrative review and approval of the modifications proposed to the
above-referenced, approved site plan, please be informed that the site improvements for the conversion of a
warehouse to a 196-seat church, proposed on the revised plans date stamped 01/15/04 are "minor", as defined
within the Land Development Regulations, Chapter 4- Site Plan Review. The following bulleted list itemizes
the approved site improvements:
· Installation of 196 seats and interior renovations;
· Fa~ade changes;
· Color changes (Benjamin Moore - Beach Glass #1564 and Benjamin Moore - Enlighten Mint #1590);
· New 29 parking spaces;
· New landscaping..
This project may continue to be processed by the Building Division as a permit application subject to the
following 36 conditions (see attached - Conditions of Approval). Be advised that the proposed changes may
require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional
questions.
Sincerely, vi
W eft(
Eric Lee Johnson, AI
Planner
Cc: Ed Breese, Principal Planner
Karen Main, Plan Review Analyst
S:IPIanning'SHAREDlWPlPROJECTSlPeni.1 Evangelical Allianee CburthlApproval Letter.dol
,,*,
CONDITIONS OF APPROVAL
Minor Modification to Site Plan
Project name: Penial Evangelical Alliance Church
File number: MMSP 03-060
Reference: 2nd review plans identified as with a January 15.2004 Planning and Zoning Department date
stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: None
PUBLIC WORKS - Traffic
Comments: None
UTILITIES
Comments: None
FIRE
Comments: None
POLICE
Comments: None
ENGINEERING DIVISION
Comments:
1. A new dumpster is indicated with no details provided. If a dumpster
enclosure is proposed, provide the dumpster enclosure detail at the time of
permitting.
2. This project falls within the CRA boundary and therefore, may utilize the
following parking stall size dimensions: Nine (9) feet in width by 18 feet in
length with a 24-foot vehicular backup distance.
3. Existing and proposed easements were not provided. Show the existing and
proposed easements on the site and landscape plans so that conflicts may be
evaluated.
BUILDING DIVISION
Comments:
4. Indicate within the site data the type of construction of the building as defined
in Chapter 6 of the 2001 FBC.
COA
02/11/04
2
DEPARTMENTS INCLUDE REJECT
5. Indicate within the site data the occupancy type of the building as defmed in
Chapter 3 of the 2001 FBC.
6. The height and area for buildings or structures of the different types of
construction shall be governed by the intended use or occupancy of the
building, and shall not exceed the limits set forth in Table 500 of the 2001
FBC.
7. Place a note on the elevation view drawings indicating that the wall openings
and wall construction comply with Table 600 of the 2001 FBC.
8. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of Chapter 6 of ASCE 7, and the
provisions of Section 1606 (Wind Loads) of the 2001 FBC. Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
9. Every building and structure shall be of sufficient strength to support the
loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table
1604.1. Indicate the live load (pst) on the plans for the building design.
10. Add to all plan view drawings of the site a labeled symbol that represents the
location and perimeter of the limits of construction proposed with the subject
request.
11. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
12. Add a labeled symbol to the site plan drawing that identifies the location of
the handicap accessible parking spaces. The quantity of the spaces shall be
consistent with the regulations specified in the 2001 FBC. The accessible
parking spaces that serve a use shall be located on the shortest safely
accessible route of travel from adjacent parking to an accessible entrance. The
2001 FBC states that buildings with multiple accessible entrances shall have
accessible parking spaces dispersed and located closest to the accessible
entrance. 2001 FBC, Sections 11-4.1.2(5),4.3, and 4.6.
13. The building plans are not being reviewed for compliance with the applicable
building codes. Therefore, add the words "Floor plan layout is conceptual"
below the drawing titled Floor Plan found on sheet 2.
14. Add a labeled symbol to the site plan drawing that represents and delineates
the path of travel for the accessible route that is required between the
accessible parking spaces and the accessible entrance doors to the building.
The installed symbol, required along the path, shall start at the accessible
parking spaces and terminate at the accessible entrance doors to the building.
COA
02/11/04
3
DEPARTMENTS
The symbol shall represent the location of the path of travel, not the location
of the detectable warning or other pavement markings. The location of the
accessible path shall not compel the user to travel in a drive/lane area that is
located behind parked vehicles. Identify on the plan the width of the
accessible route. (Note: The minimum width required by the code is forty-
four (44) inches). Add text to the drawing that would indicate that the symbol
represents the accessible route and the route is designed in compliance with
Section 11-4.3 (Accessible Route) and 11-4.6 (parking and Passenger
Loading Zones) of the 2001 FBC. Please note that at time of permit review,
the applicant shall provide detailed documentation on the plans that will
verify that the accessible route is in compliance with the regulations specified
in the 2001 FBC. This documentation shall include, but not be limited to,
providing finish grade elevations along the path of travel.
15. Add to the drawing the calculations that were used to identify the minimum
number of required handicap accessible parking spaces. Also, state the code
section that is applicable to the computations.
16. Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building.
a) From the FIRM map, identify in the site data the title of the flood zone
that the building is located within. Where applicable, specify the base
flood elevation. If there is no base flood elevation, indicate that on the
plans.
Identify the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving! drainage (civil plans).
17. On the drawing titled site plan, identify and label the symbol that represents
the property line.
18. As required by the CBBCO, Part ill titled "Land Development Regulations",
submit a site plan that clearly depicts the setback dimensions from each
property line to the leading edge of the building. The leading edge of the
building begins at the closest point of the overhang or canopy to the property
line.
19. Considering that the occupancy classification of the existing building will be
changing, indicate on the floor plan drawing the floor load capacity of the
existing floors. Specify on the plan the existing and proposed occupancy
classification as defined in the 2001 FBC. Also, indicate the floor load
capacity that is required for the new occupancy classification. Changing the
occupancy classification of a building will require that the building comply
with Chapter 34 of the 2001 FBC. The change of occupancy requires that an
engineer certify that the floor loads will comply with specifications of the new
occupancy classification. Certification of the floor loads and compliance with
Chapter 34 of the 2001 FBC will be required at time of permit review.
20. A water-use permit for the irrif];ation system is required from the SFWMD. A
INCLUDE REJECT
COA
02/11/04
4
DEPARTMENTS INCLUDE REJECT
copy of the permit shall be submitted at the time of permit application, F.S.
373.216.
21. If capital facility fees (water and sewer) have been paid in advance to the City
of Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
b) The full name of the project as it appears on the Development Order
and the Commission-approved site plan.
c) If the project is a multi-family project, the building number(s) must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
d) The number of dwelling units in each building.
e) The number of bedrooms in each dwelling unit.
t) The total amount paid and itemized into how much is for water and
how much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
22. Sheet N-1: All reference d standards shall comply with Chapter 35 of the
2001 FBC, Building. There are numerous standards listed on this sheet that
are not referenced in the 2001 FBC. Review all standards on sheet N-1 for
compliance and revise accordingly. CBB Amendments to the 2001 FBC
Section 101.4.9.
23. The survey shall be reviewed for proper finish floor elevation and
surrounding grade elevations. The finish floor elevation is noted as 50.43',
and the surrounding elevations are similar. These elevations seem to be
extremely high for this area. Clarify.
24. Since this is a change of occupancy from storage to assembly, the building,
electrical, gas, mechanical, and plumbing systems shall be made to conform
to the intent of the technical codes as required by the Building Official. 2001
FBC Section 3401.2.2.1.
25. Design loads of the building shall comply with Chapter 16 of the 2001 FBC.
"N/A" is not an acceptable design criteria as noted on sheet N-1, notes #2, #3,
and #4.
26. Delete reference to the Standing Building Code under section "Wood
Framing", note #12 and inset 2001 FBC.
27. There are two sheets labeled "Sheet 2). Delete the sheet that is not applicable.
CBB Amendments to the 2001 FBC Section 104.2.1
28. Clearly show all new and all existing construction on the submitted
documents. The electrical and mechanical plans are not required at this time
but shall be included at time of building permit application. CBB
Amendments to the 200 I FBC Section 104.2.1.
COA
02/11/04
5
DEPARTMENTS INCLUDE REJECT
PARKS AND RECREATION
Comments: None
FORESTERlENVIRONMENT ALIST
Comments:
29. All new trees shown on the Landscape Legend must be listed in the
specifications as a minimum of 12 feet to 14 feet height, and Florida #1
(Grades and Standards) (Chapter 7.5, Article II Sec. 5.C. 2.).
. 30. The applicant should indicate a minimum of 50% native species on all
landscape materials throughout the site (Chapter 7.5, Article II Sec. 5.C.
3.N.),
31. The landscape design does not include the City signature trees (Tibochina
granulosa) at the ingress 1 egress locations of the site (Chapter 7.5, Article II
Sec. 5.C.3.N.).
32. The Northeast 3rd Street road right-of-way and the N. E. 5th Avenue road
right-of-way (if required to be improved) must receive Floritam sod and
irrigation coverage (Chapter 7.5, Article II Sec. 5.C. 2.).
33. There is no irrigation system design included with the site plans (Chapter 7.5,
Article II Sec. 5A.).
34. Turf and landscape (bedding plants) areas should be designed on separate
zones and time duration for water conservation. Trees should have separate
irrigation bubblers to provide water directly to the root ball (Chapter 7.5,
Article II Sec. 5. C.2.).
PLANNING AND ZONING
Comments:
33. If the scope of the project demands removal of plant material then the new
plant material is subject to review and approval of the City Forester /
Environmentalist.
34. No new Ficus hedges are permitted. The new hedge material shall be a
minimum of 24 inches in height, 24 inches in spread and planted with tip-to-
tip spacing immediately after planting. This hedge shall be maintained at four
(4) feet.
COA
02/11/04
6
DEPARTMENTS INCLUDE REJECT
35. Place a note on the site plan that all new above ground mechanical equipment
such as exterior utility boxes, meters, and transformers shall be visually
screened (Chapter 9, Section 1O.C.4.). Equipment placed on the walls of the
building shall be painted to match the building color.
36. The elevation (sheet 3 of 6) should indicate the direction of each building
fa~ade (i.e. north, south, east, and west).
ELJ
S:IPlanningISHARED\WPlPROJECTSlPenial Evangelical Alliance ChurchlCOA.doc
,[{,,\'1~"
,{ .... . ..... \
(m .' '.))
{-) "'\. ./
, ~,. ""'v
.\ ". ~,;:-l->
l. I' () >-1 _
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 04-019
TO:
Eric Lee Johnson, AICP, Planner, Planning & Zoning
DATE:
February 4, 2004
FROM:
Laurinda Logan, P.E., Civil Engineer
F- t i~~ - /~ L~,jU'~
RE: 2nd Revision
Penial Evangelical Alliance Chur
Minor Site Plan Modification
MMSP 02-060
As requested by Planning & Zoning I have reviewed the above referenced minor modification plan
against the first review comments dated August 13, 2003. We offer the following comments:
o Provide dumpster enclosure details at the time of permitting.
o Show existing & proposed easements on the site and landscape plans so that conflicts may be
evaluated.
o This project falls with the CRA and so may use parking stall dimensions of 9 ft. x 18 ft. with a 24 ft.
back up distance.
Please let me know if you or the applicant have any questions, or if I can be of further assistance.
LUck
xc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E.I P.S.M., Utility Engineer, Engineering (via e-mail)
Ed Breese, Principal Planner, Planning & Zoning
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Penial Evangelical Alliance Church, 2nd Review.doc
Log lil V'v, Llil u rL V'vcllil
FroV'v\.:
seV'vt:
TO:
subject:
JOVlV'vSOV'v, SrLc.
FrLdCll::j,JlilV'vuClrl::j 30, 2004 1-0:25 AM
LogClV'v, LClurLV\..dCl
peV\..LClL SVClV\..geLLwL CVlurc.Vl
~
1st Review
Comments.doc
Sorry for the confusion. Here are the 1st review comments on plans that were submitted in July of 2003.
ej
1
~
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-165
TO:
Eric Lee Johnson, AICP, Planner, Planning & Zoning
FROM:
Laurinda Logan, P.E., Civil Engineer
DATE:
August 13,2003
RE:
Penial Evangelical Alliance Church
Minor Site Plan Modification
MMSP 02-060
As requested by Planning & Zoning I have reviewed the above referenced minor modification plan.
Engineering would like to request that Planning & Zoning reevaluate this project as a Major Site Plan
Modification. We note that extensive site work is indicated on the attached plans and the following items
can only be addressed, by our Code, by the Major Site Plan Modification process:
o No elevations, existing or proposed, are provided on the plan.
o Stormwater improvements are indicated but no documentation has been provided.
o The one handicap parking stall provided does not meet our or ADA standards.
o A new dumpster is indicated with no details provided.
o Water and sanitary sewer improvements are not indicated.
o Typical sections were not provided.
o Existing & proposed easements were not provided.
The above comments are based on a limited plan review. Please let me know if you have any questions
regarding my comments. Please let me know your determination regarding Minor versus Major
Modification at your earliest convenience. You can reach me at extension 6482.
LUck
xc: Jeffrey R. Livergood, P.E., Director, Public Works
Peter V. Mazzella, Deputy Utility Director, Utilities
Michael W. Rumpf, Director, Planning and Zoning
H. David Kelley, Jr., P.E./ P.S.M., Utility Engineer, Engineering (via e-mail)
Ed Breese, Principal Planner, Planning & Zoning
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Penial Evangelical Alliance Church, Minor Site Plan Mod.doc
...
.~
6~~~
r~':-:-\j .
~ ~
~r-~ I
(}~-.;~\ \ ....
Michael W. Rumpf V'}:.\ ~
~ii:::~: ~:r~:ng~-\L_.
TRC Member/Build . Ision '-- ~
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 03-172
TO:
FROM:
DATE: August 14, 2003
SUBJECT: Project - Penial Evangelical Alliance Church
File No. - MMSP 03-060 - 151 review
List of Acronvms/Abbreviations:
ASCE - American Society of Civil
Engineers
CBB - City of Boynton Beach
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensive Plan Policy
CFR - Code of Federal Regulations
FBC - Florida Building Code
FIRM - Flood Insurance Rate Map
F.S. - Florida Statutes
LOR - Land Development Regulations
NEC - National Electric Code
NFPA - National Fire Prevention Assn
NGVD - National Geodetic Vertical
Datum of 1929
SFWMD - South Florida Water
Management District
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits.
Buildina Division (Site Specific and Permit Comments) - Timothv K. Larae (561) 742-6352
1 Indicate within the site data the type of construction of the building as defined in Chapter 6 of
the 2001 FBC.
2 Indicate within the site data the occupancy type of the building as defined in Chapter 3 of the
2001 FBC.
3 The height and area for buildings or structures of the different types of construction shall be
governed by the intended use or occupancy of the building, and shall not exceed the limits set
forth in Table 500 of the 2001 FBC.
4 Place a note on the elevation view drawings indicating that the wall openings and wall
construction comply with Table 600 of the 2001 FBC.
5 Buildings, structures and parts thereof shall be designed to withstand the minimum wind
loads of 140 mph. Wind forces on every building or structure shall be determined by the
provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the
2001 FBC. Calculations that are signed and sealed by a design professional registered in the
state of Florida shall be submitted for review at the time of permit application.
6 Every building and structure shall be of sufficient strength to support the loads and forces
encountered per the 2001 FBC, Section 1601.2.1 and Table 1604.1. Indicate the live load
(pst) on the plans for the building design.
7 Add to all plan view drawings of the site a labeled symbol that represents the location and
perimeter of the limits of construction proposed with the subject request.
8 At time of permit review, submit signed and sealed working drawings of the proposed
construction.
S:\Development\Building\ TRC\ TRC 2003\Penial Evangelical Alliance Church
Page 1 of 3
9 Add a labeled symbol to the site plan drawing that identifies the location of the handicap
accessible parking spaces. The quantity of the spaces shall be consistent with the regulations
specified in the 2001 FBC. The accessible parking spaces that serve a use shall be located
on the shortest safely accessible route of travel from adjacent parking to an accessible
entrance. The 2001 FBC states that buildings with multiple accessible entrances shall have
accessible parking spaces dispersed and located closest to the accessible entrance. 2001
FBC, Sections 11-4.1.2(5), 4.3, and 4.6.
10 The building plans are not being reviewed for compliance with the applicable building codes.
Therefore, add the words "Floor plan layout is conceptual" below the drawing titled Floor Plan
found on sheet 2.
11 Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel for the accessible route that is required between the accessible parking spaces and the
accessible entrance doors to the building. The installed symbol, required along the path, shall
start at the accessible parking spaces and terminate at the accessible entrance doors to the
building. The symbol shall represent the location of the path of travel, not the location of the
detectable warning or other pavement markings. The location of the accessible path shall not
compel the user to travel in a drive/lane area that is located behind parked vehicles. Identify
on the plan the width of the accessible route. (Note: The minimum width required by the code
is forty-four (44) inches). Add text to the drawing that would indicate that the symbol
represents the accessible route and the route is designed in compliance with Section 11-4.3
(Accessible Route) and 11-4.6 (Parking and Passenger Loading Zones) of the 2001 FBC.
Please note that at time of permit review, the applicant shall provide detailed documentation
on the plans that will verify that the accessible route is in compliance with the regulations
specified in the 2001 FBC. This documentation shall include, but not be limited to, providing
finish grade elevations along the path of travel.
12 Add to the drawing the calculations that were used to identify the minimum number of
required handicap accessible parking spaces. Also, state the code section that is applicable
to the computations.
13 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed
for the building.
a) From the FIRM map, identify in the site data the title of the flood zone that the building is
located within. Where applicable, specify the base flood elevation. If there is no base
flood elevation, indicate that on the plans.
b) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the drawings titled site plan, floor plan
and paving/ drainage (Civil plans).
14 On the drawing titled site plan, identify and label the symbol that represents the property line.
15 As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan
that clearly depicts the setback dimensions from each property line to the leading edge of the
building. The leading edge of the building begins at the closest point of the overhang or
canopy to the property line.
16 Considering that the occupancy classification of the existing building will be changing,
indicate on the floor plan drawing the floor load capacity of the existing floors. Specify on the
plan the existing and proposed occupancy classification as defined in the 2001 FBC. Also,
indicate the floor load capacity that is required for the new occupancy classification. Changing
S:IDevelopmentlBuildingl TRCI TRC 20031Penial Evangelical Alliance Church Page 2 of 3
..
the occupancy classification of a building will require that the building comply with Chapter 34
of the 2001 FBC. The change of occupancy requires that an engineer certify that the floor
loads will comply with specifications of the new occupancy classification. Certification of the
floor loads and compliance with Chapter 34 of the 2001 FBC will be required at time of permit
review.
17 A water-use permit for the irrigation system is required from the SFWMD. A copy of the permit
shall be submitted at the time of permit application, F.S. 373.216.
18 If capital facility fees (water and sewer) have been paid in advance to the City of Boynton
Beach Utilities Department, the following information shall be provided at the time of building
permit application:
a) The full name of the project as it appears on the Development Order and the Commission-
approved site plan.
b) If the project is a multi-family project, the building number(s) must be provided. The
building numbers must be the same as noted on the Commission-approved site plans.
c) The number of dwelling units in each building.
d) The number of bedrooms in each dwelling unit.
e) The total amount paid and itemized into how much is for water and how much is for
sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
19 Sheet N-1: All referenced standards shall comply with Chapter 35 of the 2001 FBC, Building.
There are numerous standards listed on this sheet that are not referenced in the 2001 FBC.
Review all standards on sheet N-1 for compliance and revise accordingly. CBB Amendments
to the 2001 FBC Section 101.4.9.
20 The survey shall be reviewed for proper finish floor elevation and surrounding grade
elevations. The finish floor elevation is noted as 50.43', and the surrounding elevations are
similar. These elevations seem to be extremely high for this area. Clarify.
21 Since this is a change of occupancy from storage to assembly, the building, electrical, gas,
mechanical, and plumbing systems shall be made to conform to the intent of the technical
codes as required by the Building Official. 2001 FBC Section 3401.2.2.1.
22 Design loads of the building shall comply with Chapter 16 of the 2001 FBC. "N/A" is not an
acceptable design criteria as noted on sheet N-1, notes #2, #3, and #4.
23 Delete reference to the Standing Building Code under section "Wood Framing", note #12 and
inset 2001 FBC.
24 There are two sheets labeled "Sheet 2~ Delete the sheet that is not applicable. CBB
Amendments to the 2001 FBC Section 104.2.1.
25 Clearly show all new and all existing construction on the submitted documents. The electrical
and mechanical plans are not required at this time but shall be included at time of building
permit application. CBB Amendments to the 2001 FBC Section 104.2.1.
bf
S:IDevelopmentlBuildingl TRCI TRC 20031Penial Evangelical Alliance Church
Page 3 of 3
Plannin1! Memorandum: Forester / Environmentalist
To:
Subject:
Michael Rumpf, Director of Planning and Zoning
Kevin J. Hallahan, Forester / Environmentalist r:-J r
Penial Evangelical Alliance Church
Minor Site Plan Modification - 15t Review
MMSP 03-060
From:
Date:
August II, 2003
The applicant has indicated all of the existing trees and landscape improvements on the site.
Landscape Plan
I. All Palm trees shown on the Landscape Legend must be listed in the specifications as a
minimum of 12'-14' height, and Florida #1 (Grades and Standards) [Environmental
Regulations, Chapter 7.5, Article II Sec. 5.C. 2.]
2. Cherry hedges are not native species and should not be included in the native species
calculations. Ficus species are prohibited from being planted in the City. [Environmental
Regulations, Chapter 7.5, Article II Sec. 5. C. 3. N.]
3. The applicant should indicate a minimum of 50% native species on all landscape
materials throughout the site. [Environmental Regulations, Chapter 7.5, Article II Sec.
5.C. 3.N.]
4. The landscape design does not include the City signature trees (Tibochina granulosa) at
the ingress / egress locations of the site. [Environmental Regulations, Chapter 7.5, Article
II Sec. 5.C.3.N.]
5. The N.E. 3rd Street road right-of-way and the N. E. 5th Avenue road right-of-way (if
required to be improved) must receive Floritam sod and irrigation coverage.
[Environmental Regulations, Chapter 7.5, Article II Sec. 5.C. 2.]
Irri1!ation Plan
6. There is no irrigation system design included with the site plans. [Environmental
Regulations, Chapter 7.5, Article II Sec. 5A.]
7. Turf and landscape (bedding plants) areas should be designed on separate zones and time
duration for water conservation. Trees should have separate irrigation bubblers to provide
water directly to the root ball. [Environmental Regulations, Chapter 7.5, Article II Sec. 5.
C.2.]
kjh
FEB-10-2004 12:41 PM BEJAI P MANGAR
February 10, 2004
Mike Rumpf
City of Boynton Beach
100 E. Boynton Beach Blvd
Boynton Beach, FL 33425
Bejai P. Mangar
19844 SW 116 Ave
Boca Raton, FL 33498
State Certified General Contractor
CGC 059553
Fax 561-742-6259
Reauest for Minor Site Plan Modification
I-Demolition of walls in interior building.
2wConstruction of seating in building, pulpit.
3- Move door to center of building,
4-Close existing warehouse entrance doors as per plans .
5-Paint building, color enclosed .
6-Plant hedges, trees, landscaping per site plan.
7wFix parking lot stripe .
8-Any additional work as per site plan.
Sincerely Yours
13.;ck- rp. fr) ~
Bejai P. Mangar
561 883 1559
P.01
T.H.Mottley Construction Inc.
1124 Broadway Bldg. U
Riviera Beach~ OFt 33404
PH: 561.-863-0156
Fax 561-840-9889
To city of Boynton Beach Planning Review Board
Re: 515 N.E. 3rd. St.
This letter is to serve notice that the above referenced property is being
submitted to be converted from a warehouse to a church.
T .R. Mottley const. is being retained as contractor for the remodelling portion
of this conversion.
Please examine the plans submitted and direct all questions to me, Terrance
Mottley at 561-502-1986.
Thanking all involved for their effort.
~ectfully-~
\ Q..'~"\l'\..u ~ l\.'\ ~~~-'\\ A
Terrance Mottley . .
President,
Te7lU>YU /fVl!t~-r ~ Sb~./1f-b Phone:
~~,.J ~r t:iv..t1
f
HAVE YOU SPOKEN TO ANY STAFF MEMBER ABOUT THE PROJECT?
Yes No
(IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE-
APPLICATION rvfEETING?
f .
Applicant's Name:
1.
Time and Date of Meeting
Those attending meeting:
PRE-APPLICATION CONTACT QUESTIONS
2~S - O:z.-?J I
f6~ ; tJ/ rob
STAFF MEMBERS NALYfE:
2. LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS)
SI S - IV E ?;>ro .s r.
.
\VHA T WOULD YOU LIKE TO DO?
NEW PROJECT
BUILDING EXPANSION OR MODIFICATION.
CHANGE IN PRIOR USE?
IS THE STRUCTURE CURRENTLY VACANT?
VARIANCE TYPE:
POOL OR SCREEN ENCLOSURE
CO:MMERCIAL PROPERTY?
RESIDENTIAL PROPERTY?
INDUSTRIAL PROPERTY?
DO YOU KNO\oV THE ZONING CODE DESIGNATION?
....
.J.
~
4. TTh1E AL'ID DATE PREFERRED
5. HOW MA.1'N PEOPLE \OVILL BE AT THE PRE-APP MEETIN"G?
Note: Tell the persoll that someone from the Department will call tltem to confirm tlte meetillg.
..................................................................................
. Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled
no less than two (2) days prior to dateltime of meeting. If urgency is sensed, discuss with Mike or Lusia.
. Meetinl!:s mav be scheduled:
Monday afternoons
Tuesday all day
W ednesda y all day
Thursday mornings
Note: Lusia is not available for Tuesday a.m. meetings,
and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.m.
S; \P I ann i ng\P lanning\Pre-appl icationcon tactquestions. doc
li:;~ ):g~~ ?:~~~'",/ ~fc?t~;,Ckc'tcPL~
PRE-APPLICATION CONFERENCE REVn~W FORM
Date Ot/2-5/UJO? Time Started: 1: ~D Time Finished: S : ~'O
{ I
Attending as Applicant ~ Q,.r:~ h":- II{ ~;tz" , (!g( s.r#fl II bu /'1
Phone
Fax
Proposed Project Information
Proposed Project Name and
Type/Use ~ttecA
Site Location (Address if Available)
Site PCN
Existing Zoning C t
Existing Land Use/Density
Anticipated Submittal Date
S"lr Nt:: 3t"p dT'
Proposed Zoning Af/ A-
Proposed Land Use/Density
/
Vacant
Notes and Comments
Lot Area
?~ Gf::;-
l-it .11> I __
,2,2,0. r\
Lot Frontage
Lot Depth
Setback
Height
Parking Requirements or Improvements
/$f'4~ bt:7l.. 1&0
,
Landscaping/Buffering
Non-conforming Use or Change in Use
Other Zoning Changes Required
Environmental Review Requirements ..d /A .
Notes/Comments/Recommendations WAle';fru M lOW. r 8~ ~ N ",.~ta> I~i A CIfuR.clf.
{)Ale-S/::1 ~8.S. .5D '.X YO' ;; -<tDre,! -? F~fI.- A~re1'l'f~1 poll- Sen...,/Cf.
.4} -> E 'x.iS 7/ , ~ 1C.6O"" -
.3 ~ Apl>;tpAlI1~ 1Jl!.~,yJ -/ '" We" Pt>~ w61'feAJ ..:L W(; plL M~"/ : /
I ' - , (hJ/S~
( I/1t!'!..t>I'CAfJ A-cc.c-'1S ;~/ZiY ,'.J IIIa[' ~lU k"'l) ;'" r ullA- S/frj:J I'f1lc7'f .
~ po 4t c:rt fA Aru+c--S . ,
Y9f]1tA-T'lOtV ,eecpwk~T Aftc.1:> 1> I7E'" ul'l.K.A.WP.
~ >~N6 -= /10 ~ /'dAkl'~ -) c?s ~ 02 1(;.
NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall community goals, objectives,
policies and codes as related to the proposed development and to discuss site plan review procedures. Opinions expressed
at the pre-application conference are not binding for fonnal review purposes. Additional staff comments may be forthcoming
based on actual plans submitted for review.
PRE-APPLICATION MEETING
SIGN IN SHEET
PLEASE PRINT
IHEETING DATE:
TIME:
ATTENDING FOR APPLICANT:
NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall
community goals, objectives, policies and codes ass related to the proposed development and to
discuss site plan review procedures. Opinions express at the pre-application conference are not
. binding for formal review purposes. Additional staff comments may be forth coming based on actual
lans submitted for review.
City of Boynton Beach Attending for Applicant
Attending Staff
I
I P .~1-.~~\S
~ I
(I'{
I
I
I <,
I
I
I
I
I
J:\SHRD.-\ T A\PLA."Ii'iL'iG\SHAREDI WPIFOR.\ISIPRE-.-\PPL l\IEETI:'iG-SIGi'i c-; SHEET.DOC
/
Time and Date ofMeeting~11- ~]'\' fP t/-'!::.
Those attending ~eting:
E.:r ~ ':L~ I-IU ~u..-
1.
PRE-APPLICATION CONTACT QUESTIONS
~/ /? ,fi::d, 7.-/
/ ' ~~~~ {>4.'i~ '/' ,Phone: 06/' ,3 ~ ~ - /01/
i /fLd'/{ f~a7Ltt:C-. ,. C~L-'U..I(
HA VE YOU SPOKEN TO ANY STAFF MEMBER ABOUT THE PROJECT?
Yes L-J No
(IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE-
APPLICATION MEETING?
STAFF MEMBERS NAME: (lhy
Applicant's Name:
2.
3.
WHAT WOULD YOU LIKE TO DO?
NEvV PROJECT
BUILDING EXPANSION OR MODIFICATION. <
,/ CHANGE IN PRIOR USE? tt./1't~e~"p...-u--2.(..Lv C>(u; J.<: ,,(
IS THE STRUCTURE CURRENTLY VACANT?
VARIANCE TYPE: / L ' ~' c,L;[t~,L
POOL OR SCREEN ENCLOSURE l-ra,c4-t-~-r)
CO~ERCLALPROPERTY?
RESIDENTIAL PROPERTY?
lliDUSTRlALPROPERTY?
DO YOU KNOW THE ZONING CODE DESIGNATION?
~
~
4. TIME AJ.'\ID DATE PREFERRED /t't-~ n _-,~-4- d/Le~~
5. HOW MAJ.'\N PEOPLE WILL BE AT THE PRE-APP MEETING?
Note: Tell the person that someone from the Department will call them to confirm the meeting.
..................................................................................
. Pre-application meetings should be scheduled for a minimum of one (1) hour time module, and should be scheduled
no less than two (2) days prior to date/time of meeting. If urgency is sensed, discuss with Mike or Lusia.
. lVleetinl!s may be scheduled:
Monday afternoons
Tuesday all day
W ednesda y all day
Thursday mornings
Note: Lusia is not available for Tuesday a.m. meetings,
and Mike is not available on Mondays between 11 :30 a.m. and 2:30 p.m.
s: \P I ann i ng\P lann ing\Pre-app licationcon tactquesti ons. doc
! ~~ ~"?k~J} C/~z,d{
~~~ ~J eA-V~~
~ll- \C(Ct(
-'
PRE-APPLICATION MEETING LOG
/'
\_'30-0')
C:J (~ r W\
e
!TIME:
: po 1M
Q3'''f71'7
PHONE: ?bL-7ill
NAlvIE OF APPLICAl'fT/CONTACT:
ADDRESS:
PHONE:
I FA..X:
I
PROJECT ADDRESS:
5. 5 /JE 3/<P "l
PROPOSED TYPE OF U E/OCCUPA....i'iCY:
DATE SUBIVIITTAL RECEIVED: I DATE DEi'll:ED:
COLYuvlENTS:
'!,
J:\SHRDATA\PJ:lnningI.SHA.RED\WP\PROJECTS\PRE APPLICATIO;o;S :\IEETL'\G LOGS\Pre-Applic:ltion ~[cc:in;; Log.doc
-+" '?CI_)[~[ F~~II~4-1
A1/l~...f C1~~~ y
PRE-APPLICATION MEETING
SIGN IN SHEET
PLEASE PRINT
lVIEETING DATE: COL - 0(0-0 ~
TIME:
ATTENDING FOR APPLICANT:
NOTICE: The purpose of this conference shall be for the staff and applicant to discuss overall
community goals, objectives, policies and codes ass related to the proposed development and to
discuss site plan review procedures. Opinions express at the pre-application conference are not
. binding for formal review purposes. Additional staff comments may be forth coming based on actual
lans submitted for review.
City of Boynton Beach Attending for Applicant
Attending Staff
^ ;{IJI;(6])UCoS --
_' c.")-y\
.oj
J:\'sHRD..\ T A\PLA."INli'iGiS HARE D\ \YP\FOR.\IS\PRE-APPL l\IEETf.','G-SIGN ['i SHEET.DOC
~Iey, Judith
Subject:
Location:
Pre-App #2 Peniel Evangelical Church
PZ Conference Room
Start:
End:
Thu 1/30/2003 4:00 PM
Thu 1/30/2003 5:00 PM
Recurrence:
(none)
Meeting Status:
Meeting organizer
Required Attendees:
Ducoste-Amedee, Maxime; Johnson, Eric; Large, Tim; Hall, Ken
Pastor Jacque - wanted to get in before their closing on February 3--they didn't remember details of the meeting they had
on January 6 with churchmembers and Barbara Croft. Pastor took copy of 1/6/03 pre-app notes with him 1/15/03.
1
DEPARTMENT OF DEVELOPMENT
PLANNING AND ZONING DIVISION
. Bui/ding . Planning & Zoning . Occupational Licenses . Community Redevelopment
January 27, 2003
Rev. Dieugrand Jacques
5341 Helene Circle
Boynton Beach, FL 33437
Dear Rev. Jacques:
As a response to your written request dated January 16, 2003, please be advised that
the property located at 515 NE 3rd Street, Boynton Beach, Florida 33435and identified
under the property control number 08-43-45-21-18-000-0400, is currently zoned C-4,
General Commercial, according to the official zoning map for the City of Boynton Beach.
The building and site regulations for the C-4 zoning district require a minimum lot size of
5000 square feet, a minimum lot frontage of 50 feet and a minimum lot depth of 100
feet, a maximum structure height of 45 feet, not exceeding 4 stories.
Please be advised that the present use of the existing building is a warehouse. The
proposed use of the building as a church is permitted in the C-4 zoning district.
However, using this building for a church constitutes a change of occupancy, which
requires site and building improvements to comply with existing city regulations
(Building, landscaping, etc.). Due to the minimal information provided at the pre-
application on January 6, 2003, Staff can indicate some of the possible improvements
that could be required, but they are not limited to the following: approximately seven
(7) bathrooms (2 males, 4 females and 1 unisex) are required; the ventilation system
would need to be upgrade to support the new occupancy; parking space requirement is
based on one (1) space per 100 square feet of gross floor area, for a 4000 square feet
building, 40 parking spaces would be required calculated in accordance with Section
11.H.16 of the zoning regulations; and upgrading the site landscaping, etc.
Furthermore, please be aware that any changes to the site are subject to a minor site
plan modification to be submitted to the Planning and Zoning Division. Also, this letter is
not intended to determine all the required and necessary improvements to the site, as
we do not have exact information related to the property (i.e. survey and site plan).
If I can be of any other help, please feel free to contact me at 561-742-6260.
s~ncerel~,,_ f ~{'
'-Maxim~~A.
Planner
MDA
J:ISHRDATAIPlanningISHAREDlWPICORRESPIZONING VERIFICATION LETTERS 20031Rev Dieugrand Jacques Chureh at 515 NE 3"' Sl Change ofOeeupaney.doc
City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310
Phone: (561) 742-6260 . www.ci.boynton-beach.fl.us
..--
PROJECT NAME: Penia: ~vangelical Alliance Church
LOCATION: 515 NE 3rd Street
PCN:
I FILE NO.: MlVISP 03-060 II TYPE OF APPLICATION: I
AGENT/CONTACT PERSON: OWNER:
Terrance Mottley PHONE: ..
T .H. Mottley Construction, Inc. FAX:
PHONE: 561-863-0156/ ctl\ ~2' \q~b ADDRESS:
FAX: 561-840-9889
ADDRESS: 1124 Broadway Bldg. U
Riviera Beach, FL 33404
Date of submittal/Projected meeting dates:
SUBMITT AL / RESUBMITT AL 7/29/03
1 ST REVIEW COMMENTS DUE: N/A
PUBLIC NOTICE: N/A
TRC MEETING: N/A
PROJECTED RESUBMITTAL DATE: N/A
ACTUAL RESUBMITTAL DATE: N/A
2ND REVIEW COMMENTS DUE: N/A
LAND DEVELOPMENT SIGNS POSTED N/A
(SITE PLANS):
PLANNING & DEVELOPMENT BOARD N/A
MEETING:
COMMUNITY REDEVELOPl\1ENT N/A
AGENCY BOARD
CITY COMMISSION MEETING: N/A "'\
COMMENTS: 6Gtv\.R. \6~j 0.. \ ~uJaR- fu COPj (F\fp\ \C~5 ,)