Loading...
CORRESPONDENCE .o{f7J'" c' ~~'"t '1r~ON ~~ DEPARTMENT OF DEVELOPMENT PLANNING AND ZONING DIVISION . Bui/ding . Planning & Zoning . Occupational Licens9S · Community Redevelopment February 11, 2003 Mr. Martin Serraes Serraes Construction General Contractor, Inc. 1300 53rd Street West Palm Beach, FL 33407 Re: St. Mark Catholic Church - Shed MMSP 03-008 Dear Mr. Serraes: In response to your request for the administrative review and approval of the modifications proposed to the above-referenced, approved site plan, please be informed that the proposed changes as shown on the revised plans date stamped 02/07/03 are "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan Review. This project may continue to be processed by the Building Division as a permit application subject to the following condition: 1. All four (4) sides of the shed must be painted to match the color of the principle church building. Be advised that the proposed change may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, dIi~f.I 6&,. v' Lusia Galav, AICP Principal Planner Cc: Eric Lee Johnson, AICP, Planner Karen Main, Plan Review Analyst S;IPlanninglShared\ WplProjectslSt Mark Catholic ChurchlMMSP 03-008 Storage ShedlApproval Letter.doc City of Boynton Beach. 100 East Boynton Beach Blvd., P.O. Box 310 . Boynton Beach, Florida 33425-0310 Ph^rt.a.o 1J;A1 \ 7 A?..Jl"lM . ~..-i lvot.uft."'n-hd."2.....h A 1Ia: DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 04-262 TO: Technical Review Committee Members Marshall Gage, Police Chief Jeff Livergood, Public Works Director Wally Majors, Recreation & Parks Director Pete Mazzella, Utilities Department Director Mike Rumpf, Planning & Zoning Director Rick Lee, Fire Protection Engineer FROM Don Johnson, Building Official ~ November 17, 2004 DATE: RE: ISSUANCE OF CERTIFICATE OF OCCUPANCY PROJECT NAME: St. Mark's Catholic Church ADDRESS: 643 NE 4th Ave. PERMIT #: 03-1068 CONTRACTOR: Serraes Construction General Contractors The above referenced project is nearing completion. Prior to the Building Division issuing the Certificate of Occupancy, I would like to ensure that you do not have any outstanding or pending conditions concerning this site that must be rectified (excluding issues that are covered entirely with a City approved surety). If any outstanding conditions are related to permits issued by the Building Division, please provide this division a memorandum containing a description of the unresolved conditions. If the unresolved conditions are not permit related, please notify the owner or the owner's agent to ensure that the matters are rectified. Please respond to me, within ten (10) days, in order that we may proceed in a timely manner to issue the Certificate of Occupancy. No response is necessary if your department is satisfied with the current state of the above referenced site. Thank you for your cooperation. DJ:rs XC: Timothy K. Large, Building Code Administrator Bud Gall, Senior Building Inspector Kevin Hallahan, ForesterlEnvironmentalist Frantz LaFontant, Engineering Inspector II Rodger W. Kemmer, Deputy Chief and Fire Marshal Permit File # 03-1068 S:\Development\BUILDING\TRC 10 Day Memos\2004\St Mark's Catholic Church 03-1068.doc .. a (l ( rL~ f1 i5J:1, ARCHITt"CTURE 4 AAOOO2348 225 Southern Boulevard, West Palm Beach, Florida Email: janstis@aol.com Phone (561) 655-9327 AAOOO2347 Suite 101 33405-2768 Fax (561) 655-9341 JAMES H. ANSTIS, FAIA, AR0004829 MEMORANDUM DATE: JUNE 30,2004 FATHER MARK SZANYI MARTY SERRAES JIM BANNON MIKE RUMPF JIMANSTIS ~l~ ST. MARK CATHOLIC CHURCH TOWER TO: FROM: RE: I reviewed the tower proposal as currently configured at 65 feet in height to the top of the cross with Mike Rumpf of the City of Boynton Beach Department of Planning & Zoning. The following items were discussed: 1. We discussed the proposed tower is not physically connected to the church building currently under construction. 2. The footprint of the tower was shown on our previous site plan approval application and was included in the approval as being a future installation. 3. The height as currently proposed is 65'-0" to the top of the cross. This is scaled down from the 85'-0" height that was originally contemplated at the time of the earlier site plan approval 4. The property is located on the CBD zone. 5. The maximum height permitted is 45'_0". Howevir" ~~here is conditional use approval for which application can b'efu~de for heights between 45'-0" and 100'_0". 100'-0" is the maximutn'hetght permitted under any circumstances. Architecture. Construction Consulting. Interior Design. Forensics MEMBERS OF THE AMERICAN INSTITUTE OF ARCHITECfS 1 '" "" 6. The possibility of carillon bells was discussed and there doesn't appear to be any areas of the city code that address carillons except for the maximum sound level of 50- 55 db at the property line adjacent to residential properties. 7. There is a separate application form for the conditional use review and approval process. 8. Once the design is set we should arrange for pre-application review with city staff. 9. We will proceed with the current preliminary design process moving toward pricing the proposed tower and after obtaining a price and acceptance by Fr. Mark and the Diocese apply for the city approvals. 2 Serraes Construction General Contractor, Inc. 561-848-6607 CG-C018453 Mr. Mike Rumpf Dep1. of Development City of Boynton Beach 100 East Boynton Beach Blvd. Boynton Beach, FL 33425-0310 IroJl-~"~ ~ ~ W ~ rii1/ Il~1 "'j 7 ?m1 I~ I L I I "--~--. ___. -----.J ! ,:l~ :,,:'J \C; ;i!.D . . , i~; '.~l____._ J February 6,2003 RE: S1. Mark's Storage Building MMSP 02-059 Dear Mike, Attached are 4 sets of revised plan for the storage building at S1. Marks Church. The following changes have been made to the building elevations: 1. the Overhead garage door has been raised from existing grade level to dock level approximately 2' 6" higher 2. the entry door has been relocated from the west elevation to the north elevation and a handicap ramp has been added. These changes must be made in order to meet the minimum floor elevation of 7"0" as required by ordinance. If you have any questions please call me. 1300 53rd Street · West Palm Beach, Florida 33407 -2288 FAX 561-848-8735 PROJECT NAME: St. M~Ks LOCATION: 643NE 4th Avenue PCN: 08-43-45-22-05-000-0070 I FILE NO.: MMSP 03-008 I TYPE OF APPLICATION: Minor Modification to Site Plan AGENT/CONTACT PERSON: OWNER: Archdiocese of Palm Beach County Martin Serraes PHONE: PHONE: 561-848-6607 FAX: FAX: 561-848-8735 ADDRESS: ADDRESS: 1300 53rd Street West Palm Beach, FL 33407-2288 Date of submittal/Proiected meetine dates: SUBMITTAL / RESUBMITT AL 2/7/03 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A PROJECTED RESUBMITTAL DATE: N/A ACTUAL RESUBMITTAL DATE: N/A 2ND REVIEW COMMENTS DUE: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: S:\Planning\SHARED\WP\PROJECTS\St Mark Catholic Church\MMSP 03-008\2003 PROJECT TRACKING INFO.doc