Loading...
CORRESPONDENCE ....~...("..(). . / .. ;:, ! ;y, \ b./~> C_' '\_ / ' "" .-'-'" v/, DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 03-195 FROM: Ed Breese, Principal Planner, Planning and Zoning Laurinda Logan, P.E., Senior Engineer~----- October 13, 2003 TO: DATE: RE: Review Comments Minor Modification High Ridge Commerce Center #2 File No. MMSP 03-094 ) The above referenced Site Plans, received on October 10, 2003, were reviewed against the requirements outlined in the City of Boynton Beach Code of Ordinances. The applicants have previously contacted this office regarding the proposed changes and it appears that concerns regarding circulation and access have been addressed with this submittal. Public Works, Engineering and Utilities have no objection to the proposed phasing modification. If you have any questions or require additional information, please feel free to give me a call at x6482. LUck Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail) File . ----~.- l _' L S:\Engineering\Kribs\High Ridge Commerce Center #2, Minor Mod Review.doc The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Flonda 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org October 22, 2003 Ms. Joni Brinkman, Project Planner Winston Lee & Associates, Inc. 1532 Old Okeechobee Road, Suite 106 West Palm Beach, Florida 33409-5270 Re: High Ridge Commerce Center II MMSP 03-097 Dear Ms. Brinkman: In response to your request dated September 30, 2003 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: . Placement of phasing information in the site plan tabular data (as depicted on the attached drawing) . . Construction in Phase II of the perimeter buffer, curbing, pavement and drive aisle south of phase III (as depicted on the attached drawing) . . Construction of perimeter parking in Phase II, with completion of striping of at the conclusion of Phase III (as depicted on the attached drawing) . . Maximum of 16,508 square feet of mezzanine allowed to be constructed in Phases I & II, until the remaining parking is completed. . Placement of a phase line on the site plan, landscape plan and civil plans (as depicted on the attached drawing) . . Revision to landscape plan to reflect landscaping to be installed in Phase I (as depicted on the attached drawing) . . In accordance with Building Division comments, the shifting to the north of the handicap access for Building #2 (as depicted on the attached drawing) . . Revised southern elevation for Phase II to avoid blank wall effect until Phase III is constructed (as depicted on the attached drawing) . . Page 2 October 22, 2003 . Deletion of seeding requirement due to commencement of Phase III within 30 days of completion of Phase II. . Revision of color scheme to reflect primary body color of Embassy Green (BM 1523), secondary body color of Spring In Aspen (BM954), base trim of Cleveland Green (BM 1525), windows/doors of Ivory White (BM 925), metal awnings of Formal Green (SW 1455), and canvas canopy of Forest Green/Natural White (5637), as depicted on the mounted color board. Please be informed that the proposed changes on the revised plan date stamped 09/30/03 are "minor" as defined within the Land Development Regulations, Chapter 4- Site Plan Review. This project may continue to be processed by the Building Division as a permit application, subject to the following conditions: 1. The requirement for seeding shall once again be imposed should the time between the conclusion of Phase II and beginning of Phase III exceed 30 days. 2. The contractor shall be bound by any regulations imposed by the Building Division to mitigate the wind-blown sand for the duration of the project as well as between Phases II and III. Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst I Winston . ee. . ~ ,~-~~..' ~ --j"~ ~SSOcldteS. in,-,_ ',"" I',: Mr. Michael W. Rumpf City of Boynton Beach Dept. of Development Planning & Zoning Division 100 E. Boynton Beach Blvd. Boynton Beach, FL 33425 , c < ) 2 0 '\ I i \. __J September 30, 2003 \ \ RE: High Ridge Commerce Center II File Number NWSP 02-019 Our File No. 02-022.01 Dear Mr. Rumpf, Attached please find four sets of the revised site plan, landscape plan, and civil engineering plans for the above referenced project. These plans are submitted for the purpose of requesting a minor modification to the site plan approved by the City Commission on January 21,2003. Two previous minor modifications to the site plan have been approved on the project. On March 21, 2003, a revision to the site plan was approved which reduced square footage. On June 20, 2003, a second revision to the site plan was approved by the City which allowed the project to be constructed in two (2) phases, the northernmost building comprising the first phase. The purpose of this request is for approval to divide the project into three (3) phases. The second and third phases of the project would consist of the north half of the southernmost building (Phase II) and the southern half of the southernmost building (Phase III). Both these phases will consist of 38,629 sq. ft. of ground floor area. The following modifications have been made to the plan: . The site plan tabular information has been revised to indicate the phasing information. Please note that the civil plans' notes indicate that the interior parking spaces, islands, curbs and pavement adjacent to the Phase III building pad will be constructed as part of Phase III. This is to avoid damage to same during the construction of the final phase. The perimeter buffer, curbing, and pavement, as well as the drive aisle depicted to the south of Phase III will be constructed as part of Phase n. This will allow for on-site circulation for emergency vehicles, as required. As stated, the perimeter parking spaces along the High Ridge right of way and to the rear of the site abutting the preserve area will be constructed as part of Phase n and are included in the tabular data. However, the applicant is requesting that these spaces not be striped until the completion of Phase III, to avoid customers and employees parking is I ..., ~ 1 i Ii, I \ 'I.ll ~ ", ,hl'\.' R, I~!d l:..lilk' ] (Ih, \\ C',( h: ill f k~:\-,]1. j"I ~ \~{ 1'-)-"' i.: ,,'::,:.;u ll' 1',.1;\ 5/:! (.~Ii ,''': Ii. tP:,il! ',\:n,t'ii\\I;!"~t,,;,_"!iI Mr. Michael W. Rumpf September 30, 2003 Page 2 what would be considered a construction area during the erection of Phase III. These parking spaces total 64. Therefore, the amount of spaces actually "available" on site with the construction of Phase II will be 178. As only 145 spaces are required, there will be an excess of 33 spaces that can be utilized for potential mezzanine space prior to completion of the project. This equates to a maximum amount of 16,508 square feet of mezzanine that is allow to be constructed in Phases I & II, until the remaining parking is completed. . A phase line has been added to the site plan, landscape plan, and civil plans. . The landscape plans have been revised to indicate the landscape to be installed in Phase I versus Phase II. . Handicap access from the right of way to Building #2 (as previously requested by the building department) has been shifted to the north to provide access as part of Phase II. . The color scheme has been revised. A color board is included with this submittal and the elevations color schedule has been revised. . A revised southern elevation for Phase II has been submitted. This elevation incorporates temporary architectural features for this facade to avoid the appearance of a 'blank wall' prior to the construction of Phase III (see Sheet A5.1). . The applicant is proposing that the construction of Phase III will commence within 30 days of the completion of Phase II. Therefore, seeding of the area covered under Phase III will not be required at this time. The applicant acknowledges the fact that it may be required to have the general contractor water the area as needed at any time to prevent blowing soil from being carried off the site, as was agreed to on the previously approved phase plan. I would like to respectfully request approval of the attached phased plans. Please feel free to call with any questions or concerns you may have with the revised plans. Sincerely, ~j, ~(,fJ1tJAJ vr~~;; Brinkman, AlCP Project Planner cc: Seth Wise, Levitt Commercial Kevin Carroll, Levitt Commercial Barbara Hansen, Levitt Commercial Mike Gai, Sun-Tech Engineering Jorge Serralta, Ken Carlson Architects PROJECT NAME: High Ridge Commerce Ctr. #2 LOCATION: High Ridge & Miner Rd PCN: I FILE NO.: MMSP 03-097 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: Joni Brinkman ADDRESS: Winston Lee &Associates, Inc. PHONE: ADDRESS: 1532 Old Okeechobee Rd Suite FAX: 106 West Palm Beach, FL 33409 PHONE: 561-689-4670 FAX: - 561-689-5559 Date of submittal/Proiected meetinl! dates: SUBMITTAL / RESUBMITTAL 9/30/03 1 ST REVIEW COMMENTS DUE: N/A PUBLIC NOTICE: N/A TRC MEETING: N/A LAND DEVELOPMENT SIGNS POSTED N/A (SITE PLANS): PLANNING & DEVELOPMENT BOARD N/A MEETING: COMMUNITY REDEVELOPMENT N/A AGENCY BOARD CITY COMMISSION MEETING: N/A COMMENTS: S:\Planning\SHARED\WP\PROJECTS\High Ridge Commerce Park An Folders\High Ridge Commerce Ctr. #2\MMSP 03.097\2003 PROJECT TRACKING INFO.doc