TRAFFIC IMPACT ANALYSIS (JUL 2003)
The City of Boy
Beach
~V.\~~...o.."
III Jr
o (J
J--v . ",""
7"ON ~
DEVELOPM NT DEPARTMENT
PLANNING AND ZONING DIVISON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
July 24, 2003
Mr. Masoud Atefi MSCE, Senior Traffic Engineer
Palm Beach County Traffic Division
Department of Engineering and Public Works
P.O. Box 21229
West Palm Beach, Florida 33416
Re:Traffic Study: Bethesda Memorial Hospital
MSPM 02-008
Dear Mr. Atefi:
The enclosed traffic generation statement, prepared by Kimley-Horn &
Associates, Inc. was recently received by Planning and zoning for the
above-referenced application. Please review the enclosed information
for conformance with the County's Traffic Performance Standards
Ordinance, and provide Tim Large, Building Code Administrator and me
with your written response.
If you have questions regarding this matter, please call me at (561)
742-6260.
Sincerely,
~o
~ichael W. Rumpf
() Director of Planning and zoning
MWR/SC
C:lOoa.Jments and Sellings\coales\My Documenls\Traffic letter to Palm Beach County.doc
.-
-
-
-
-
-
-
~=~
Kimley.Horn
and Associates, Inc.
TRAFFIC IMPACT ANALYSIS
BETHESDA MEMORIAL
HOSPITAL
BOYNTON BEACH, FLORIDA
Prepared for:
Bethesda Memorial Hospital
Boynton Beach, FL
040596002
July 2003
@ Kimley-Horn and Associates, Inc.
443! Embarcadero Drive
West Palm Beach, Florida 33407
561/8450665 TEL
561/882-0199 FAX
/I",L.J jJJ~
Chr~~E~ .
Flo[jd~ Rogistration Number 586:15
Engmet.:ting Bus,rlcs5 N!JJi.1ber o9()
7/2.'3/03
-
-
..
-
-
-
.
..
-
..
..
..
.......-._n
........._[~
Kimley.Horn
and Associates, Inc.
TABLE OF CONTENTS
SECTION
PAGE
INTRODUCTION
........................................................................................ 1
INVENTORY AND PLANNING DATA ..................................,.......................... 3
Inventory................................................................................................... 3
Planning Data............................................................................................ 3
PROJECT TRAFFIC ............. ............... ......................... ........................................ 4
Traffic Generation..................................................................................... 4
Traffic Distribution................................................................................... 6
Traffic Assignment ................................................................................... 6
BACKGROUND TRAFFIC.................................................................................. 8
ASSURED CONSTRUCTION ............................................................................. 9
PART ONE - INTERSECTION EVALUATION ...............................................10
Intersections on Project Accessed Links ................................................. 10
Intersections with Ten Percent Project Traffic........................................ II
PART TWO - LINK EVALUATION.................................................................. 12
Total Peak Hour ...................................................................................... 12
DRIVEWAY CLASSIFICATION & TURN LANE REQUIREMENTS ........... 18
Driveway Classification .......................................................................... 18
Turn Lane Requirements......................................................................... 18
CONCLUSION. ...... ....... ..... ... ... .... ... ... .... ... ....... .... .... ... ..... ... .... ... ... ... .... ... .... .... .... 19
APPENDIX... ..... ....................... ............................ ............ ....... ...Following Page 19
040596002-0703
Page i
-
-
-
-
-
-
-
-
-
-
-
-
-
-
~=n
Kimley-Horn
and Associates, Inc.
LIST OF FIGURES
Fiaure No.
1
2
Title
Paae
Site Location Map........................................................................2
Traffic Assignment .............. ....................... .... ............................. 7
LIST OF TABLES
Table No.
I
2
3
4
5
040596002-0703
Title
Paae
Trip Generation. ........... ............. ............ ........ ........... .......... .... ...... 5
Average Daily Traffic Link Analysis (Test I)............................ 14
Alternate Test One (Option 1) ................................................... 15
Alternate Test One (Option 2) ...................................................16
2005 Arterial Operational Conditions........................................ 17
Page ii
-
-
-
..
..
-
-
-
-
~=n
Kimley-Horn
and Associates, Inc.
INTRODUCTION
Bethesda Memorial Hospital an existing medical center located on the west side of
Seacrest Boulevard south of Golf Road (23'. A venue) in Boynton Beach, Florida. It
is proposed to expand the existing facility by adding 55,492 square feet of hospital
land use. The location of the hospital campus is illustrated in Figure I.
Kimley-Hom and Associates, Inc. was retained to prepare a traffic impact analysis for
the project. This document presents the methodology used and the findings of the
traffic impact analysis. The analysis was conducted in accordance with the new
requirements of the Countywide Traffic Performance Standards of Palm Beach
County. The analysis used current data available from Palm Beach County. A
buildout year of 2005 was analyzed for the proposed expansion.
040596002-0703
Pag~ 1
~
~
~
,.
g
m
...... OCEAN AVE.
-
-
-
-
-
-
-
-
-
-
-
-
-
..
-
-
-
..
-
OLD BOYNTON RD.
Iii
~
o
PIPERS GLEN BLVD. ~ it
~ E
~ '"
'" '" ;:
0 '" ~ <J
el '<' oJ
~ " '" :e
FlAVOR PICT RD. COCONUT LN. !l1 <i m
8 ~ 9
I
d ~
~ z
~ ~ 5
0
~ ~
..,
C,)
lAKE IDA RD. C)
N.W. 4th ST. C,)
.~
~ ....,
g ~ 5
0 ~ W. ATtANT1C AVE. ....,
" ....,
" ~
,. ~
W. ATI..NrnC AVE.
0
~ g
" m
0
z
LOWSON BLVD.
~
IiiiJ
J
BOYNTON BrACH LV!).
d
~
w
o
Ci
~
WOOLBRIGHT RD.
GOlF RD.
S.W. 23rd AVE.
UNTON BLVD.
FIGURE 1
BETHESDA HOSPITAL
SITE LOCATION MAP
NOT TO SCALE
11I""1.'" Kimley-Hom
~.U and Assodates, Inc.
o
040696002
P: (W()5 96002 8Eltj-SlTd"g "odel Jul 22. 2003 10'.08am by Oa~..G<ltfin
~=~
-
-
..
-
...
Kimley-Horn
and Associates, Inc.
INVENTORY AND PLANNING DATA
Inventory
The data used in this analysis were obtained from Palm Beach County. They
included:
. 2003 peak hour traffic volumes
. Historic traffic count data
. Roadway geometrics
. 2000, 2002 and 2003 intersection turning movement counts
Planning Data
External access to the site is currently provided through two access driveways on
Seacrest Boulevard and another driveway on Golf Road. No new additional access
driveways are planned to be created in conjunction with the proposed addition.
040596002-0703
Page 3
-
..
..
...
...
-
...
-
...
,-
...
~=n
Kimley.Horn
and Associates, Inc.
PROJECT TRAFFIC
Traffic Generation
The daily trip generation potential for the proposed site plan was determined using
trip generation rates published in the Palm Beach County Land Development Code
for hospital use. A pass-by capture rate of five percent was applied. Peak-hour
characteristics were based on information published in the Institute of Transportation
Engineers (ITE) Trip Generation, 6th Edition manual. The proposed expansion
consists of 55,492 square feet of Hospital land use (ITE Code 610).
The development plan was found to generate 884 daily, 79 a.m. peak hour and 69
p.m. peak hour net new external trips. Table 1 summarizes the daily and peak hour
trips associated with the proposed development plan.
040596002-0703
Page 4
-
-
-
.-
-
-
-
-
-
-
-
...
-
-
-
-
-
-
-
-
-
-
.-
..
TABLE 1
BETHESDA MEMORIAL HOSPlTAL
TRIP GENERA nON
Land Use Intensity Daily AM Peak Hour PM Peak Hour
TriDs Total In Out Total In Out
Proposed Site Traffic
Hospital 55,492 S.F. 931 83 61 22 73 18 55
Pass-By Traffic
Hospital 5.00% 47 4 3 I 4 I 3
Net Proposed External 884 79 58 21 69 17 52
Driveway Volumes
931
83
61
22
18
55
73
Note: Trip generation was calculated using the following dala:
Daily Traffic Generation
Hospilal [P.B.C.] T = 16.78 trips per 1,000 s.1.
AM Peak Hour Traffic Generation
Hospilal [ITE 610] = Ln (T) = 0.788 Ln(X) + 1.256 (73% in, 27% out)
PM Peak Hour Traffic Generation
Hospilal [ITE 610] = Ln (T) = 0.842 Ln(X) + 0.908 (24% in, 76% out)
p:VJ405\9600l\j ria.xis Itrip .-Ken
71221200315:55
~=~
Kimley-Hom
and Associates, Inc.
Copyright @ 2003
..
..
..
-
-
..
-
..
-
..
..
-
..
-
..
...
~=n
Kimley-Horn
and Associates, Inc.
Traffic Distribution
The external traffic distribution is consistent with the distribution utilized in the July
2000 traffic impact analysis for the hospital's most recent expansion. These were
summarized by general direction and are listed below:
NORTH
SOUTH
EAST
WEST
45%
20%
10%
25%
Traffic Assignment
The distributed external trips for the project were assigned to the roadway network
within the radius of influence. The project assignment is illustrated in Figure 2.
The radius of development influence was based on the number of net external trips
generated by the development. Based on the net traffic generation, it was determined
that the maximum radius of development influence for Test 1 of the Traffic
Performance Standards is two miles. The Test 2 maximum radius of influence is one
mile.
040596002-0703
Page 6
lAKE 1M RD.
,-
-
-
~
~
J
-
NOT TO SCALE
,-
p. 040596002 Bt:lJ.l-SIT,dwg ..odel
""'123.2003 9'27om by Dove.Grlffin
3% GEORGE
BUSH BL
.. ~ ~
~
~ ~
"
~ ~
~ ~
FIGURE 2
BETHESDA HOSPITAL
TRAFFIC ASSIGNMENT
llI""l_n Kimley-Hom
~_U and Associates, Inc.
.
040696002
..
-
..
-
...
-
...
...
-
..
-
..
-
..
...
-
..
..
-
..
..
~=n
Kimley-Horn
and Associates, Inc.
BACKGROUND TRAFFIC
Background traffic includes two components:
. Traffic from the unbuilt portions of the previous hospital expansion
. Historical growth
A review was conducted for committed developments within the vicinity of the
proposed project site. No major projects that would contribute traffic greater than
10% of road way capacity were found. Therefore, according to the requirements of the
TPSO, existing traffic volumes were grown by factors detennined by a review of
historic traffic count data (\998 AADT to 2001 AADT) published by Palm Beach
County. These growth rates were applied to existing volumes (Peak Season 2003).
In addition, traffic associated with Phase II of the previous hospital expansion was
included separately as additional traffic because this phase did not open until July I,
2003.
040596002-0703
Page 8
..
-
..
-
..
..
..
-
..
.
..
-
...
..
.~
..
-
...
-
..
-
4
~=n
Kimley-Horn
and Associates, Inc.
ASSURED CONSTRUCTION
The existing laneage for each link analyzed was identified. A review of the Five-
Year Plans for Palm Beach County and the Florida Department of Transportation was
made to identify pertinent roadway improvements. No roadway improvements are
planned within the study area.
040596002-0703
Page 9
.
..
...
~
~
...
..
~
..
..
-
-
...
.~
..
-
~=n
Kimley-Horn
and Associates, Inc.
PART ONE -INTERSECTION EV ALUA TION
Intersections on Project Accessed Links
An analysis was undertaken for intersections nearest to each link directly accessed by
the project on Golf Road and Seacrest Boulevard. The intersections were analyzed
using the Critical Sum planning methodology as outlined in the 1985 Highway
Capacity Manual (HCM). Existing counts were adjusted to the year 2005 conditions
and traffic generated by Phase II of the previous hospital expansion was included in
the total volumes. For the intersection counts that were conducted in 2000, traffic
generated by both Phase I and Phase II of the previous expansion was included. Trip
generation calculations for Phase II only and Phases I and II are summarized in
Tables A-I and A-2 in the Appendix.
The critical sum analysis shows that the intersection of Golf Road and Seacrest
Boulevard will not exceed the threshold of 1,400 vehicles per hour with the
committed existing geometries. Also, the intersection of Gulfstream Boulevard and
Seacrest Boulevard will not exceed the threshold. However, the intersection of Golf
Road and Congress A venue will exceed the threshold of 1,400 vehicles per hour with
the existing geometries. Critical sum worksheets are included in the Appendix.
Since the intersection of Golf Road and Congress Avenue exceeds the maximum
volume threshold of 1,400 vehicles per hour outlined in the Critical Sum planning
methodology, the intersection was analyzed using the signalized intersection
methodologies from the 2000 Highway Capacity Manual. The analysis indicates that
the intersection of Golf Road and Congress A venue will operate at a level of service
'D' during a.m. and p.m. peak periods at buildout of the project when green time is
optimized for the allowable movements. Cycle lengths and phasing plans were not
changed from existing conditions.
040596002-0703
Page 10
~=~
Kimley-Horn
and Associates, Inc.
-
Intersections with Ten Percent Project Traffic on Approach
-
The proposed Palm Beach County Traffic Perrormance Standards stipulate that an
analysis shall be undertaken for intersections where the project traffic comprises 10%
or more of the total traffic on at least one of the intersection approaches. No
intersections were found to fall within the category of this level of project impact and
therefore none were analyzed.
-
-
..
-
..
.
..
...
-
..
-
..
-
..
-
...
-
..
-
..
-
..
-
..
- 040596002-0703
-
Page 11
~=n
~
...
....
...
-
..
-
Kimley-Horn
and Associates, Inc.
PART TWO - LINK EVALUATION
Total Peak Hour
A two-way peak hour link performance standard evaluation was undertaken for each
link considering its total two-way peak hour traffic volume and the roadway laneage
to be in place in 2005. Project traffic and total traffic for both a.m. and p.m. peak
hours for two-way peak hour conditions are shown in Table 2. Significance was
determined by including the trip generation from the total 121,277 square foot recent
expansion of the hospital plus the proposed new expansion because both Phase I and
Phase II of the recent expansion were constructed within the past five years. Table
A-2 in the Appendix summarizes the trip generation calculation that was undertaken
to determine project traffic significance. Woolbright Road from Interstate 95 to
Seacrest Boulevard, Golf Road from Congress A venue to Seacrest Boulevard and
Seacrest Boulevard from the site access to George Bush Boulevard were found to be
significantly impacted by the project.
Option I - Peak Hour Peak Direction (Class /I Capacities)
The significantly impacted links that failed to meet total peak hour level of service
standards were analyzed for peak hour peak direction future conditions against the
Class II Level of Service 'D' capacities to determine whether they would pass the
Option I standard. Table 3 shows the results of this analysis. As can be seen, all links
analyzed under this option will fail to meet the standard.
Option 1/- Peak Hour Peak Direction (Class I Capacities)
The links that failed Option I were analyzed for peak hour peak direction future
conditions against the Class I Level of Service 'D' capacities to determine whether
they would meet the criteria of the Option II standard. Table 4 shows the results of
040596002-0703
Page 12
-
..
...
-
-
..
..
..
...
..
-
...
~=n
Kimley-Horn
and Associates, Inc.
this analysis. As can be seen, Woolbright Road from Interstate 95 to Seacrest
Boulevard and Golf Road from Congress A venue to Seacrest Boulevard do not meet
the standard under this option. Seacrest Boulevard from the site access to George
Bush Boulevard will meet the standard under this option.
An additional requirement of the Option IT analysis is that the intersections at each
end of the links shall be analyzed using the 1985 CMA HCM analysis to determine
whether or not the intersections will operate below the threshold of 1,400 vehicles
per hour. The intersection of Seacrest Boulevard and George Bush Boulevard will
operate below the threshold of 1,400 vehicles per hour. Therefore, this link meets the
Option IT Standard.
Option 11/ - Operational Arterial Analysis
Since Woolbright Road from Interstate 95 to Seacrest Boulevard and Golf Road from
Congress A venue to Seacrest Boulevard do not meet the Option I and Option IT
Standards, a detailed arterial analysis was performed. This link was analyzed for
peak hour peak direction future arterial conditions against the level of service 'D'
speed thresholds to determine whether it would pass the Option ill standard using
HCM arterial analysis operational methodology. These analyses were performed
using Synchro. Version 5, which is based on HeM methodology. These analyses
show that the link will operate within Level of Service 'D' speed thresholds.
Therefore, the project meets the criteria for Part Two of Test One. The arterial
analysis is summarized in Table 5. Synchro arterial analysis worksheets are included
in the Appendix.
040596002-0703
Page 13
...
...
...
-
..
...
~
o
....
:l~
t::~
,,~
~~
"'<
N:l'ii
",,,..
"'oi!;
"':;...
;:~f3
<0
",,,,
~~
~~
"'::J
i:J
'"
>
<
...
-
...
-
-
-
-
..
,,~'E
ti~
;:g~;
~
-e
g~e
N........
~ i 1'_
51:10'"
.~.9 ..
~
.
.
- .
~ 5
'e!5
"!e
~
~~E
~'?5
z=:;!-<
. - .
!55~e
. e 5
!',,,....
in
;;
iiie
~,",ll
.H
" .
<
.s.is
H~
~
.
. .
~ ~e
g..5
N.....
.
"'
oS -
.3
o .
- .
"..
. -
~.
g e~
M~~
0,.;
- .
~.
"00 ~
!~U
L.
8.!:~
s.:l
ill
0, li
~~
0"'''
1l
';:I..",
""J~
s.:l
o~
Zo
~s
. e
~..
.
~
. 0
zz
....
8'1
00
o~
....
OM
00
NN
00
M....;
1010
......
~ ~
.
....
~
~
-;
o ~
"' >
~ m ~
~ ~ ~!
= _ Jl [;
i 8
00
N N
00
....;....;
10 Q
......
~ ~
"O~
~ ;t
'"
v e
~ -8
Jl.l::
'J.
~
~
M
M
.
z
~~~~i;
..
8
d
~lf:~~<l<-
@~;!;~~
oo~oc::i
M
N
o
~DOB~~
..
o
If:~~lffi<!!
MN...........M
~
~
~
"
M
..
'i
'"
~
~
M
o
N
o
M
~:7;ggg
olneoa
....;..j"M....;M
5
~
55555
-.t-a.........".
o
N
:;}
00000
M\nNNM
concac>
...,..[....;....;,...,
5
~
99999
..,."'........-.t
.
o
5
>
<
~
~~
ii ·
=<
.. <'<I.....
~ t <:(
Jl~~
<
:;:
'"
~
~
O~
o ~
u"'
Vl "g ~
~'O ~ ~
~ ~ g <
~ := ~
-1! ~.
u 'C ~
(.1.,;9.....
~
~
O~
O~
u"'
~i;~
o ~ ~
C1~S
~~~~
If:lf:<f-t>2
0000000-
.........'<1"0
or-:r-:f'i
!:;~....,
~~~
CC~~M
~<:f1:If2lf:
N:q:q....
~~~
;;~~
...:...:'"
...."
M ~ 0
O~
-iN..o
~ N
5~~
:;;:;;:;;:;;
~:ll"'1.<'1
....l.....J....l.J
NNMN
:;;:;;:;;:;;
"'l<'1:!-:}
.....J.....J....J...J
NNMN
~
~ ~
~iii~
~ ~]
;;)VJd:
.
~
~
"
M
o
Z
;i;~;i;
~
;;
o
~
o
M
..
'i
'"
~
~
.f
.
>
<
..
M
N
.
o
5
>
-'!<
-o~~
~ ~~
....:I:'"i;
~ ~ ::I
~ -8 ~
Jllf<
'E
~
1l
o
'"
~ "
; .~"'. ~
> ~ <
.!l '0 0
~g~~o:::-g
i:Q=iii =~~~
'" ~ ~ '0 -;:: '0 ~
~ ::I ~ ~:E -5 ...
..=~~t:8=-
Jl~Jl~~~~~
e' ~
t] a .!3
. .
~ ~
. >
0<
u ~
o ~<
~8~
.'
~
00
d
...."
M 0 ~
~-~
0"":0
~
:::::~:q
:!:
"""
QO~'-D
o
;0
000
~ ~ ~
~ ~ ~
";~'<J:'
...
N
Q 10 10
.........
~ ~ ~
~
000
~ ~ ~
~ ~ ~
..;..f";
...
N
:3:3 :3
~ ~ ~
~
~
.
'"
;;
-1!
,t
o 0
zz
""
1i;;g
00
~~
"'..
~~
~>:~~~
r--r--_\Or--
@C!;~:;h
-:riri --:
~~~~~~
'-"'~
~~
t:l<~lf~
~Mb;'!i
..c"':v-i.,j
\O;;;~:!S
~~;g;;~~
~r!<r!<l;i<l;i<~
.....,C\~~~~
.....\O"l'('Io,\
M-~""'''''''
~~_OOO
r-- ..........('1
..... 0"""('1
...:-:....;-:...:
'-"'~~~t><
00000
...,...............In
00000
~o;;=~~
"1cc~.....,:}
u
0000
~ggg5:5:
0000""""'"
,...:;,...:;,...:;,..;-
::i::i
~~
9999~...l
"l'''''''''' M
~g
0000
~ggg5:g:
0000""'''''''
M"":;"":;"":; --...:
::i::i
~ ~
9g99~...l
.., .., ~ ~ N
~
.
o
'"
"l
o
~
~ :c
"~ .:!l1: II
.t=o 15 <.a:
"8 "Q 8 ~.~
::: ;:. ::: M Vl
1l ii
~ -e
~.fo ~ ~
@ 'I:: C @ -g
73 == 'E ~ -e 0
'" 8 III ..... '" ~
~~~E~~O)
~~l808li~
.....=~~~8"Q
il ti t: z ~ ~ ~
.
~
~
o 000
zzzz
t,l< ~ '-'" ~
0>0>0\0
OMVlN
0000
occ!:;cc
~eI!eI!~
OM~M
0000
l""ll""ll""ll""l
0000
,..-],..-],..;-,..;-
o Cl 0 0
...l...l...l...l
..,~'<t'<t
0000
M M M M
0000
...;,..-],..-],..-]
0000
...l...l...l...l
..,..,..,..,
~
>
on
'"
. -
"'~
1\-5
2~
"Z
1l
o
'"
. "
~.~ 1:
c ~ <
"'8"Q
8~~
1l
o
'"
.... ~ ~
~;g @ "g ~ '1:
@ "5 0 < .t=o
ii~iJ~':~<O)"8
~~~~<~~~~~
~ 0) 011 0 .0 0 0
~~:c~58~1~-s
Vj~e~o~~"cL~
. .
~ ~
.l!8
Ii"
~Ii
kl,
n~
~
II
~
o 0
zz
....
~ ~
., N
00
~~
!!:"
..;
>
ii
~
"
"
.,
o
~
.
.
1l
o
~
.,
o
~
ii
:;;:;;
<"'l<'l
.
E ~
V) .~
.2 ~
.
...'"
N N
E .-
. .
~ ~
-5~
g e
~~
'" ~
.g .~
u .~
. ~
~ 5
.. .
00 .
<= .:
.~ '"
11. ,;
d
"a 1l
~ 8
~~
l:! E
~ ~
~ '"
@ ~
.
l:! ~
~ @
~ .
g ~
... ; ~
~ E ..8
~ -5 ~
;! ;> E
~ 1:f-s
~ :~ ~
< "
. ."'''
i 2:l
> 0
< Z
:;;:;;
<'l<'l
- -
2
~
~
......
NN
~
.
o
~
"
"
.E
'8
"
'"
-
-
-
-
-
-
-
-
.-
..
..
-
-
-
-
-
-
-
-
..
-
-
~
~
z
o
t
e.
~
z
o
f-<
'"
~
f-<
~
f-<
...:l-<
~~
..~
",f-<
o...:l
==-;
...:lra
trl:Soo
::J~'"
.,0:;]
-<:>iz
~~<
:>iOd
~~
",...:l
[jl...:l
f-<~
~S
f-<
U
\:l
~
~
!5
o
==
Od
-<
~
..
:;:
-<
~..
:Iii]
I... 'l!
:;:"'S
-<",
u~
~"
~u'"
~~=
'<I\!!
...~
~
-u'"
~IE
'0' ==
u u
....."
~
..
Hj
uO'
~ J.<...
~g., ~
'"
- "
~ ~
"e"r.I=
=:;Eoo
"",f:=
r~
u"
~~
...",
~'"
8:;
"'0"
~\!!
~~
"
<;u
."
o u
u .
"..
see
~~
~u'"
8 .-
"'~"
ill\!!
d
~.~
]~~
.-:: U
~ u .
o ~ ;!
uE~
.~
Zo
~~
. u
","
.
~
~
.
u
,.
~~
$
".
~"
~ ~
'O~
~
~
"1
'0
~~
~S
~
~ ~
"
o
~
~~
.=
.5 .5
..
~
~
;!
"
~
~
:0.
~
'"
~-
..
"
'"
~
"l
"
~
".
o
~.
Q
...l
"
'"
>
c;
.
~
u
.
u
'"
'"
.
o
"
:E
.~V"l
"'~
r
'"
. u
~ ~ 'C
~ U u
~~~~~
s tb~ il .<
~ g ~ - ~
-< u Vj ~ en
'E: ~
~ ~
"5 '5
o 0
....
~ ~
"''''
~~
:;:;
'" ~
~~
~g
ggq
....
::l:B
-iN
" 0
~~
~'O
00
'" '0
~ ~
00
~ ~
~ ~
...l...l
'" '"
'"
>
~@
u
u .
<( b
" .
i;ij~
~
~
"
~
:::
~
"
"
o
~
.=
..
o
'"
~
~
~
~
~
~
'"
~
"
N
..
o
~
ci
~
'"
~
~
'0
"
o
~
~
...l
'"
'"
>
C;
ii
.
"
u
~
8
"
~ ..
:I~"E
u ~ .
::;:u", '"
~ c
-s
"'",
d
~ u '"
8'"
MCii=
~~
~
"
~
- u '"
~e
'0' ~
,~=
~
;:;
z ..
~ III
Q ~=:;.<
~ ~ ~
E-o '0' (J =
VJ ,~r.t.l
~ ... "'" =
.;'~ ~
~:;: ~
~
~
f-<
...:l
'"
u
~~
/:"
~",'"
. g 3
OOMe=
Ci) ~ ~
~ ~ ~
...:l "
-<
Z
-<
Od
z
::l
...:l
'"
Z
o
~
f-<
U
\:l
IS
~
;J
o
==
Od
'"
1::
:>i
..
-= ~
. -
o u
u .
"..
~~
~~
~ u
fliS"
ill"
d
~!;
"CI;n~
~g~
's
E ... ~
o ~ c
U e .
....l
Zo
.. e
. 0
. u
","
.
o
"
o
...
~
;:::
~-
~
~
"-
:::
"
o
'0
.=
..
~
~
'"
'0
~
'"
'"
~
"':
o
'0
::,
"
;;
ci
~
o
~.
'"
~
"l
s
:;
Q
...l
"
'"
>
c;
.
~
~
u
'"
'"
.
o u
" g
'C ~ ~
~ ~ <( ~
Q::l 1;) ~ 8
~ 5 t1<
'C V"l ~ c::: ~
::!:'i:<8c';5
g 'E
~ ::l
o 0
zz
N:g
~~
~ '0
~;!
::::;::::
"5 "5
o 0
""
.5.5
....
~ ~
"''''
~~
""
!::~
~
'0 ~
~ ~
~ ~
'0'"
~'O
~~
::l:B
-.iN
,,~
~ ~
~ ~
;::g
~'O
00
~ ~
~ ~
...l...l
"''''
'"
~~
u
u .
'" ~
.~ ~
"''''
'"
u
.
.
u .
13 8
o u
"",
i~
u
.
u
'"
~~
. lli
~ J!1 ~
"t-.l1 .~
~~~
:~
"
"
o
~
.=
..
o
'"
~
~
;!
~
~
~
"
'0
~
..
o
~
ci
~
~
'0
~
~
o
~
~
...l
'"
'"
>
C;
ii
.
"
u
~
o
u
"
~
.
11
~
~
~
~
u
.
u
'" .
gpf::l
~ ~
. '"
g. e .E
~ .a ~
I'~ii
"j( e
ViWO
;; E
~ Z
-ci
>
C;
e
~
"
'5
"
'"
Ii
'"
.
o
"
~
'0
"
"
'"
>
C;
u "
g .~
u "
'" "
u
c
u
.2 .
E 2:l
. e
'0-"
> :;
"5 e
. "
2c;j
~u
~'6
c -
.g :E
~l!
" -
.~ ~
gr ~
'0;; .0
...
13"1
co
.~ 1l
u 0
" -
",,,,
~ E
~ ~
'" .
@ ~
.
'"
>
C;
""':N
-
-
-
-
-
-
-
-
-
-
-
..
-
..
-
-
-
-
~
o
Eo<
'"
'"
Eo<
'"
Eo<
...:l<
~~
5:'"
"'!:l
0<
:=.
...:l",
...<-
,"02~
...:l0...:l
~~~
Eo<::.<
<.::
~~
",...:l
iij...:l
Eo< <
'"z
=8
Eo<
u
'"
<>:
-
~
<>:
;J
o
:=
.::
<
f!:
::.
<
_0.
",-1:
$ I .
~t'E
:;ell
'"
"~
'!j"
~.",
g....
..."
~~
"
~
- ""
a::sCI'J
'0' '"
~~=
I!!
~
'" -
-_5
z = ~ .
9 ~O'_~
t ~"12
S ...,
1l ~
le~
. .
';'~=
::1! ~
E~
e
....
~",'"
g3
"u
"
;S .
.2
o "
~~
e=
~~
'".'"
g.-
"~I~
;l;1~
c.~
. "
'E~ g
_"'u
's
E . .
UQ.! ~
E.
0'"
Ze;
.,E
. e
~""
~
'"
o
....
~
"
,.
o 0
zz
~
'"
...
......
'"'"
"'....
00
~
'"
'"
~~
C\S
....
~ ~
,
o
~
~~
."
.S .5
If
'"
'"
:!
..
~
00
:I.
~
..
'"
If
..
'"
00
"'
..
~
...
o
~
"'
"
-'
..
""
>
iO
.
~
"
.
"
'"
'"
.
o
'"
:=
~~
'" .
g-
~
'"
.
o "
Q::: g 'tl
-" .
;j < '" : ~
"al ~ 8 ~ tl
::I OU U 0 U
~~~=~
<8~gVj
1: .
~ ell
"5 '5
o 0
If If
~ ~
.. ..
ss
;:;
~~
"'....
~&
Iflf If
'"~ 0
_0 ~
<<iN ci
"0
.... ~
~'"
00
.. '"
OO~
~~
00 00
-'-'
," ..
""
~ lii
"
"
.( ~
u
~ .
Ui~
.
"
,.
- o.
"'1::1:
t~~
::1!-=
:;eill
d
g~CI'J
..."
-';I!!
....~
....
..
00
C;
~
..
~
- "'"
~=
'0' ell
. .
......"
~
,
o
~
."
If
o
..
'"
Z ..
o ~
~ ~
..
H
.
...,
00
~ 1l '"
o '60 u ~
!;; <tIE'"
~ :; f
E-o '-'E-o!Xl
I=J ~ ~
<
~ ~ ~
~ ~ =
...... lI'l'tloo
..... g 5
I:I'.l NO =
- ill!!
~ ~ ~
...:l "
...,
~ <5 '"'
...... It:.s
.:: 0"
Z '"' ~
- <:>
...:l
...:l
...,
Z
o
-
Eo<
U
~
is
<>:
;J
o
:=
.::
...,
'"
..
f
'"
'"
~
'"
00
..
....
..
....
..
00
e=
e~
....~
'" .
~i5"
. I!!
~~
c.~
. "
"CCI'J;!:
!!8~
's
E l-< ~
O.l: =
U E .
o '"
Ze;
....
'"
..
"
00
-'
..
""
>
iO
"
"
"
"
e?
o
"
"
.,E
. 0
. .
",""
.
o
'"
o
....
o
Z
o 0
ZZ
....
~
N~
~~
~
00
::::
00'"
~;\
C;
~~
,
o
'"
."
'"
'"
'"
..
'"
'"
..
..
~
'":
o
'"
...
If
..
.j
~
o
.....
..
~
"'
o
~
00.
"
-'
..
""
>
iO
~
~
"
.
"
'"
'"
.
~
:=
.~V'l
",0;-
-g-
~
'L
Q:::g 'tl
_ u .
~.( '" : ~
.... '" ou ~ ou
1 ~~ ~ ~
~ is ~ tl ~
<UVj~i:i5
1: .
~ ell
'5"5
o 0
....
.5 .5
If If
~ ~
....
........
....
S::~
\O~
0000
.... ~
"'..
~ '"
If'" If
'"~ 0
_0 ~
-.:i",i ci
..~
~ ~
....00
::18
~ '"
~2
0000
-'-'
"0'
""
>
~@
" -
" .
-< ~
~ ~
"''''
~_8
'" .s N
ou E.~ Q
>- 08'"
lH
~~ ~
8~
II
~~
~
,
o
'"
."
If
o
..
00
'"
:!
....
00
~
;\
....
00
~
'"
~
....
"
00
-'
..
""
>
iO
"
"
"
"
e?
o
"
'"
-ci
>
Oi
E
.
"
"
'"
'3
'"
""
Ii
""
.
o
'"
-
a
'"
;:;
""
>
iO
~
~
~
'"
Q
~
~
.
~ <1.i
~ .~
'" 00
. "
.8 =
~ ".2
" ~
0'::;
> .
-g ~
~"@
~.~
" -
.g :E
~ u
eoS
.~ ~
~~
'0;; .J:J
"",
"3 v:
=0
E .l:
u 0
:g.;
~ "
u E
~ ~
"" .
~ ~
.
""
>
iO
.
~
"
.
u
'" ~
oo~
= "
o .
." "
'"
~ ~E .~
]: -
~ -a ~
.s > e:
~ ~..s
~p
0, ";;( 8
a ;...; ~ rJ
~ 5""; N
~ Z
-
-
-
-
-
-
-
..
-
-
,..
'~
..
-
-
-
-
~=~
Kimley.Horn
and Associates, Inc.
Table 5
2005 Arterial Operational Conditions
AM. Peak Hour P.M. Peak Hour
Roadway Link Speed Level of Speed Level of
(moh) Service (moh) Service
Golf Road from Congress Ave to Seacrest 25.5 B 25.3 B
Blvd (Eastbound)
Golf Road from Congress Ave to Seacrest 25.2 B 19.2 C
Blvd (Westbound)
Woolbright Road from 1-95 to Seacrest 19.5 D 19.1 D
Blvd (Eastbound)
Woolbright Road from 1-95 to Seacrest 17.8 D 16.6 D
Blvd (Westbound)
Test 2
The total daily trip generation for this project, induding Phase I and Phase II of the
recent expansion, is expected to be 2,958 daily trips and 414 p.m. peak hour trips.
There are no roadways within one mile of the project on the Test 2 list of deficient
links. Therefore, the project meets the requirements for Test 2.
040596002.0703
Page 17
-
'.
-
-
-
-
-
,-
-
..
-
-
-
-
-
-
..
-
..
~=~
Kimley-Horn
and Associates, Inc.
DRIVEWA Y CLASSIFICA TION
AND TURN LANE REQUIREMENTS
Driveway Classification
According to the Palm Beach County "Guide to Parking Lot and Street Access
Design Criteria and Standards", it is necessary to classify project entrances as minor,
intermediate, or major according to the following criteria:
1. Minor - Provides for a maximum average daily traffic of 500 vehicles,
2, Intermediate - Provides services for a maximum average daily traffic from
501 to 2,000 vehicles.
3. Major - Provides service for a maximum average daily traffic greater than
2,000 vehicles.
This project is not anticipated to change the classification of the site driveways.
Turn Lane Requirements
Palm Beach County code requires a right-turn lane when inbound peak hour right-
turning traffic is 75 vehicles or more and a left-turn lane when inbound peak hour
left-turning traffic is greater than 30 vehicles. The additional traffic is not expected to
change requirements for turn lanes, at any of the site driveways. The recent study for
the Phase I and Phase II expansion of the hospital determined that although an
exclusive southbound right turn lane is warranted at the northern site driveway along
Seacrest Boulevard, the low volume of southbound through traffic on Seacrest
Boulevard enables the right.most through lane to function as a de-facto right turn
lane.
040596002-0703
Page 18
-
-
-
-
-
-
-
-
-
-
.
-
...
...
...
..
-
-
~=~
Kimley-Horn
and Associates, Inc.
CONCLUSION
Bethesda Memorial Hospital proposes to construct a 55,492 square foot expansion to
the existing hospital facility located on the west side of Seacrest Boulevard south of
Golf Road (23'd A venue) in Boynton Beach, Florida. Based on the intersection and
roadway link analyses that were undertaken and are summarized in this report, the
proposed development meets the provisions of the Palm Beach County Traffic
Performance Standards.
040596002-0703
Page 19
...
-
...
'..
.-
-
-
...
..
-
...
.w
...
-
-
-
~=~
Kimley-Horn
and Associates, Inc.
APPENDIX
JAMAR Technologies, Inc. Page 1
151 Keith Valley Road
Horsham, PA 19044 Site Code: 4610
Change These in the Preferences Screen Station ID:
CONGRESS AVE 1000' S OF HYPOLUXO RD
Latitude: 0' 0.000 Undefined
Start 06-Feb-03 NfA Hour Totals Sf A Hour Totals Combined Totals
Time Tho ~ominQ Afternoon Momin Afternoon Momin Afternoon Mornin Afternoon Momin Afternoon
- 12:00 35 281 47 263 82 544
12:15 36 283 28 271 64 534
.. 12:30 22 277 23 292 45 569
12:45 15 271 108 1092 19 295 117 1121 34 566
- 01:00 15 282 19 307 34 589
01:15 19 247 19 287 38 534
- 01:30 16 253 20 317 36 570
01:45 10 246 80 1028 14 298 72 1209 24 544
02:00 15 331 14 313 29 644
- 02:15 9 312 15 328 24 840
02:30 8 285 9 337 17 822
- 02:45 5 328 37 1254 6 333 44 1311 11 659
03:00 5 351 8 373 13 724
.. 03:15 12 347 4 355 16 702
03:30 11 313 9 318 20 631
- 03:45 4 344 32 1355 6 317 27 1383 10 681
04:00 6 345 9 342 15 687
- 04:15 9 348 10 326 19 674
04:30 16 328 7 401 23 729
- 04:45 15 319 46 1340 12 38 1414 27 854
05:00 15 346 20 35 1.28
05:15 28 to 27 53
- 05:30 42 39 81
05:45 49 .$64 132 1414 58 142 1808 105 80
,.. 06:00 46 n'[364 73 119 728
06:15 61 281 91 328 152 609
- 08:30 130 298 121 300 251 598
06:45 153 278 390 1221 161 356 446 1348 314 834
'.. 07:00 177 293 277 270 454 563
07:15 210 243 317 246 527 489
07:30 229 192 381 244 610 436
- 07:45 341 172 957 900 392 223 1367 983 733 395
08:00 247 191 248 209 495 400
- 08:15 199 216 270 195 469 411
08:30 198 198 221 203 419 401
08:45 217 162 861 767 251 195 990 802 468 357
09:00 171 159 209 190 380 349
09:15 191 156 220 180 411 336
09:30 227 134 178 148 405 282
09:45 233 110 822 559 241 121 848 639 474 231
10:00 215 88 193 143 408 231
10:15 199 97 243 99 442 196
10:30 206 88 257 99 463 167
10:45 248 64 868 317 235 89 928 410 483 133
11:00 245 61 263 61 508 122
11:15 225 45 257 42 482 87
11:30 251 44 241 47 492 91
11:45 312 36 1033 188 247 41 1008 191 559 77
Total 5346 11433 6027 12399 11373 23832
Percent 31.9% 68.1% 32.7% 67.3% 32.3% 67.7%
Combine 16779 18426 35205
d Total
Peak 11:00 05:15 07:00 05:00 --- 07:15 05:00
Volume 1033 1432 1367 1608 2365 3022
PH.F. 0.757 0.988 0.872 0.944 0.807 0.989
-
.
..
-
..
-
-
Palm Beach County Traffic Engineering Page 1
160 S. Australian Ave
West Palm Beach, FL 33406 Site Code: 5206
Station ID:
CONGRESS AVE 1750'N OF OLD BOYNTON BCH
Latitude: 0' 0.000 Undefined
Start 03-Mar-03 NfA Hour Totals Sf A Hour Totals Combined Totals
Time Moo Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon Morning Afternoon
12:00 52 440 34 404 86 844
,- 12:15 58 391 30 379 88 770
12:30 33 444 16 398 49 842
- 12:45 27 444 170 1719 19 419 99 1600 46 863
01:00 28 382 19 386 47 768
- 01:15 28 397 15 383 43 780
01:30 19 414 17 390 36 804
- 01:45 19 458 94 1651 7 366 58 1525 26 824
02:00 16 476 13 401 29 877
.- 02:15 8 417 7 420 15 837
02:30 13 487 11 396 24 863
02:45 9 455 46 1815 6 374 37 1591 15 829
03:00 10 416 7 -451 17 867
.- 03:15 18 444 9 423 25 ..~ 867
03:30 8 469 11 435 19 ". ;' 9IU
- 03:45 18 479 50 1808 13 '-420 40 1729 29 T/O 899
04:00 9 484 17 429 26 '//93.
. 04:15 7 471 17 376 24 847
04:30 18 505 20 362 38 867
- 04:45 19 53 1861 29 382 83 1529 48 783
05:00 22 35 415 57 972
- 05:15 22 37 359 59 853
05:30 27 49 373 76 898
05:45 39 110 2074 71 338 192 1485 110 836
06:00 53 491 65 372 118 863
- 06:15 65 398 118 347 183 743
06:30 114 406 201 347 315 753
06:45 152 412 384 1705 238 384 622 1430 390 776
07:00 287 348 321 340 608 688
07:15 212 344 300 608 844
07:30 235 329 266 678 595
07:45 229 285 963 1306 269 1589 1175 658 554
08:00 241 290 228 839 518
08:15 222 247 374 237 596 484
08:30 258 249 356 184 614 433
08:45 233 186 954 972 328 179 1458 828 561 365
09:00 287 209 259 203 546 412
09:15 258 192 283 154 541 346
09:30 263 168 254 150 517 318
09:45 266 148 1074 715 266 120 1062 627 532 266
10:00 282 158 296 114 578 272
10:15 332 128 281 95 613 223
10:30 314 106 348 66 662 172
10:45 339 115 1267 507 392 69 1317 344 731 184
11:00 345 91 322 63 667 154
- 11:15 385 88 356 65 741 153
11:30 346 67 365 35 711 102
11:45 365 53 1441 299 358 48 1401 211 723 101
Tolal 6606 18432 7956 14074 14562 30506
.. Percent 28.7% 71.3% 36.1% 63.9% 32.3% 67.7%
Combined 23038 22030 45088
Tolal
Peak 11:00 05:00 07:15 03:00 10:45 03:15
- Volume 1441 2074 1666 1729 2850 3563
PHF. 0.936 0.931 0.940 0.958 0.962 0.916
-
-
..
TABLE A-I
BETHESDA MEMORIAL HOSPITAL
MEDICAL OFFICE BUILDING TRIP GENERA nON
Land Use Intensity Daily AM Peak Hour PM Peak Hour
Trios Total In Out Total In Out
Phase II Site Traffic
Medical Office 88,442 S.F. 1,592 215 In 43 271 73 199
Pass-By Traffic
Medical Office 5.00% 80 II 9 2 14 4 10
Net Proposed External 1,512 204 163 41 258 69 189
Rllildont Site Traffic
Medical Office 121,277 S.F. 2,183 295 236 59 363 98 265
Pass-By Traffic
Medical Office 5.00% 109 15 12 3 18 5 13
Net Proposed External 2,074 280 224 56 345 93 252
Note: Trip generation was calculated using the following data:
Daily Traffic Generation
Medical Office [P.B.c.] = T = 18.0 trips per 1,000 s.f.
AM Peak Hour Traffic Generation
Medical Office [ITE nO] = T = 2.43 trips per 1000 s.f. (80%in, 20%out)
PM Peak Hour Traffic Generation
Medical Office [ITE nO] = Ln (T) = 0.921 Ln(X) + 1.476 (27% in, 73% out)
p:VJ405\9600ZVtia.xls]mob tgen
71231200312:07
~=~
Kimley.Hom
and Associates, Inc.
Copyright@ 2003
TABLEA-2
BETHESDA MEMORIAL HOSPITAL
TRIP GENERA nON - SIGNIFICANCE TEST
Land Use Intensi.ty Daily AM Peak Hour PM Peak Hour
Trips Total In Ont Total In Out
Proposed Site Traffic
Hospital 55,492 S.F. 931 83 61 22 73 18 55
Medical Office 121,277 S.F. 2,183 295 236 59 363 98 265
Subtotal 3,114 378 297 81 436 116 320
Pass-By Traffic
Hospital 5.00% 47 4 3 I 4 I 3
Medical Office 5.00% 109 15 12 3 18 5 13
Subtotal 156 19 15 4 22 6 16
Net Proposed External 2,958 359 282 77 414 110 304
Note: Trip generation was calculated using the following data:
Daily Traffic Generation
Hospital [P.B.C.] = T = 16.78 trips per 1,000 s.f.
Medical Office [p.B.C.] = T = 18.0 trips per 1,000 s.t.
AM Peak Hour Traffic Generation
Hospital [ITE 610] = Ln (T) = 0.788 Ln(X) + 1.256 (73% in, 27% out)
Medical Office lITE 720] = T = 2.43 trips per 1000 s.t. (80%in, 20%ouI)
PM Peak Hour Traffic Generation
Hospital [ITE 610] = Ln (T) = 0.842 Ln(X) + 0.908 (24% in, 76% out)
Medical Office [ITE 720J = Ln (T) = 0.921 Ln(X) + 1.476 (27% in, 73% out)
p:VJ405\9600Z\[tia.xls}sig tgen
712312003 n07
~=~
Kimley-Horn
and Associates, Inc.
Copyright@ 2003
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
GOLF ROAD AND SEA CREST BOlJLEV ARD
(Existing Geometry)
Growth Rate ;:;
Peak Season ;:;
Buildout Year;:;
Years =
0.50%
1.00
2005
2
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing V olurne (03/10/03 125 614 50 63 201 38 152 247 269 125 614 50
Peak Season Volume 125 614 50 63 201 38 152 247 269 125 614 50
Background 126 620 51 64 203 38 154 249 272 126 620 51
Medical Office Traffic 5 15 1 0 60 13 3 2 20 5 7 0
Project Assignment 12% 37% 3% 0% 37% 8% 8% 4% 12% 3% 4% 0%
Direction out out out io in in oul out in in in in
Project Traffic 3 8 1 0 21 5 2 1 7 2 2 0
Total 134 643 53 64 284 56 159 252 299 133 629 51
Critical Volume Analysis
No. of Lanes 1 I 2 <0 1 I 2 I <0 1 I 1 T <0 1 I 1 I <0
Approach Volume 830 404 710 813
Per Lane Volume 134 I 348 I nla 64 I 170 I nla 159 I 551 I nla 133 I 680 I nla
North-South Critical NB LT+SBTH- 304 SB LT+NBTH- 412
East-West Critical EB LT+WBTH= 839 WB LT+EBTH- 684
Maximum Critical Sum 412 + 839 - 1,251
STATUS?
NEAR
PM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/10/03 215 1004 58 57 569 138 217 249 122 43 313 62
Peak Season Volume 215 1,004 58 57 569 138 217 249 122 43 313 62
Background 217 1,014 59 58 575 139 219 251 123 43 316 63
Medical Office Traffic 23 70 6 0 26 6 15 8 8 2 3 0
Project Assignment 12% 37% 3% 0% 37% 8% 8% 4% 12% 3% 4% 0%
Direction out out out in in in out out in in in in
Project Traffic 6 19 2 0 6 1 4 2 2 1 1 0
Total 246 1103 67 58 607 146 238 261 133 46 320 63
Critical Volume Analysis
No. of Lanes 1 2 T <0 1 I 2 I <0 1 I 1 I <0 1 1 I <0
Annroach Volume 1,416 811 632 429
Per Lane Volume 246 I 585 I nla 58 I 377 nla 238 I 394 I nla 46 I 383 I nla
North-South Critical NB LT+SBTH- 623 SB LT+NBTH 643
East-West Critical EB LT+WBTH 621 WB LT+EBTH 440
Maximum Critical Sum 643 + 621 1,264
. , , . .
SIAl US !
NEAR
7/23/20039:59
p:VJ405'8600l\[tia.xls JgolJ sea
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
GOLF ROAD AND CONGRESS A VENUE
(Existing Geometry)
Growth Rate =
Peak Season =
Suildout Year =
Years =
0.50%
1.00
2005
2
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/10/03 126 992 143 344 1748 108 58 341 285 192 242 155
Peak Season Volume 126 992 143 344 1,748 108 58 341 285 192 242 155
Background 127 1,002 144 347 1.766 109 59 344 288 194 244 t57
Medical Office Traffic 0 0 11 21 0 0 0 3 0 3 1 5
Project Assignment 0% 0% 7% 13% 0% 0% 0% 2% 0% 7% 2% 13%
Direction in in in in in in in in in out out out
Project Traffic 0 0 4 8 0 0 0 1 0 1 0 3
Total 127 1,002 159 376 1,766 109 59 348 288 198 245 165
Critical Volume Analysis
No. of Lanes 1 I 3 <0 1 I 3 I <0 1 I 1 I 1 1 I 1 I 1
Approach Volume 1.288 2.251 695 608
Per Lane Volume 127 I 387 nla 376 625 I nla 59 I 348 I 288 198 I 245 I 165
North-South Critical NB LT+SBTH- 752 SB LT+NBTH- 763
East-West Critical EB LT+WBTH- 304 WB LT+EBTH- 546
Maximum Critical Sum 763 + 546 = 1,309
STATUS?
NEAR
~
PM Peak Hour
Inlerseclion Volume Developmenl
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/10/03 268 2041 188 209 1094 156 96 266 117 149 316 279
Peak Season Volume 268 2,041 188 209 1.094 156 96 266 117 149 316 279
Background 271 2,061 190 211 1.105 158 97 269 118 150 319 282
Medical Office Traffic 0 0 5 9 0 0 0 1 0 13 4 25
Project Assignment 0% 0% 7% 13% 0% 0% 0% 2% 0% 7% 2% 13%
Direction in in in in in in in in in out out out
Project Traffic 0 0 1 2 0 0 0 0 0 4 1 7
Total 271 2061 196 222 1105 158 97 270 118 167 324 314
Critical Volume Analysis
No. of Lanes 1 I 3 I <0 1 I 3 I <0 1 I 1 I 1 1 I 1 I 1
Approach Volume 2,528 1,485 485 805
Per Lane Volume 271 I 753 nla 222 421 I nla 97 I 270 I 118 167 I 324 314
North-South Critical NB LT+SBTH- 692 SB LT+NBTH- 975
East-West Critical EB LT+WBTH- 421 WB LT+EBTH= 437
Maximum Critical Sum 975 + 437 = 1,412
. , , ,
-
-
SIAIUS of
UVJ<;K
p:VJ405\9600Z\[ tia.xlsjgolf cong
7122120031 J :22
-
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
GULFSTREAM BOlJI,EY ARD AND SEA CREST BOULEY ARD
(Existing Geometry)
Growth Rate =
Peak Season ;;
Buildout Year =
Years =
0.50%
\.03
2005
3
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Votume (08/28/02 0 311 72 195 587 0 0 0 0 123 0 104
Peak Season Volume 0 320 74 201 605 0 0 0 0 127 0 107
Background 0 325 75 204 614 0 0 0 0 129 0 109
Medical Office Traffic 0 33 0 0 8 0 0 0 0 0 0 0
Project Assignment 0% 20% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Direction in in in out out out out out out in in in
Project Traffic 0 12 0 0 4 0 0 0 0 0 0 0
Total 0 370 75 204 626 0 0 0 0 129 0 109
Critical Volume Analysis
No. of Lanes 0> I I I <0 I T 1 <0 0> I I I <0 0> I I I <0
Approach Volume 445 830 0 238
Per Lane Volume 0 445 I nta 204 I 626 I nta 0 I 0 I nta 129 I 250.9 I nta
North-South Critical NB LT+SBTH- 626 SB LT+NBTH= 649
East -West Critical EB LT+WBTH- 251 WB LT+EBTH= 129
Maximum Critical Sum 649 + 251 - 900
STATUS?
UNDER
PM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (08/28/02 0 563 91 103 461 0 0 0 0 65 0 171
Peak Season Volume 0 580 94 106 475 0 0 0 0 67 0 176
Background 0 589 95 108 482 0 0 0 0 68 0 179
Medical Office Traffic 0 14 0 0 38 0 0 0 0 0 0 0
Project Assignment 0% 20% 0% 0% 20% 0% 0% 0% 0% 0% 0% 0%
Direction in in in oul out out out out out in in in
Project Traffic 0 3 0 0 10 0 0 0 0 0 0 0
Totat 0 606 95 108 530 0 0 0 0 68 0 179
Critical Volume Analysis
No. of Lanes 0> I 1 I <0 1 I 1 I <0 0> I 1 I <0 0> I I <0
Approach Volume 701 638 0 247
Per Lane Volume 0 I 701 I nta 108 I 530 I nta 0 I 0 I nta 68 I 253.8 I nta
North-South Critical NB LT+SBTH- 530 SB LT+NBTH 809
East-West Critical EB LT+WBTH- 254 WB LT+EBTH- 68
Maximum Critical Sum 809 + 254 1,063
, . ., .
ISJAJUIS !
UNDER
~
p:VJ405\9600Z\jtia.xls !gu!J sea
7/22/200311 :22
.~
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
GEORGE BUSH BOUI,EV ARD AND SEA CREST BOULEV ARDINE 2ND AVE
(Existing Geometry)
Growth Rate =
Peak Season ;:::
B uildout Year =
Years =
0.50%
\.00
2005
5
.
AM Peak Hour
Interseclion Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Votume (I II t 6100 3 131 4 94 294 11 16 178 6 24 63 66
Peak Season Volume 3 131 4 94 294 11 16 178 6 24 63 66
Background 3 134 4 96 301 11 16 182 6 25 65 68
Medical Office Traffic 0 36 0 2 9 0 0 0 0 0 0 7
Project Assignment 0% 16% 0% 3% 16% 0% 0% 0% 0% 0% 0% 3%
Direction in in in out out out out out oul in in in
Project Traffic 0 9 0 I 3 0 0 0 0 0 0 2
Total 3 179 4 99 313 11 16 182 6 25 65 77
Critical Volume Analysis
No. of Lanes 0> 1 I <0 0> I 1 I <0 0> I 1 I <0 0> I 1 I <0
Approach Volume 186 423 204 167
Per Lane Volume 0 I 189 I nla 96 I 4329 I nla 0 I 205.6 I nla 9 I 169.5 I nla
North-South Critical NB LT+SBTH= 433 SB LT+NBTH- 285
East-West Critical EB LT+WBTH- 170 WB LT+EBTH= 215
Maximum Critical Sum 433 + 215 - 648
~
STATUS?
UNDER
~
PM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (11/16/00 3 223 8 45 199 18 9 57 4 18 95 117
Peak Season Volume 3 223 8 45 199 18 9 57 4 18 95 117
Background 3 229 8 46 204 18 9 58 4 18 97 120
Medical Office Traffic 0 15 0 8 40 0 0 0 0 0 0 3
Project Assignment 0% 16% 0% 3% 16% 0% 0% 0% 0% 0% 0% 3%
Direction in in in out out out out out oul in in in
Project Traffic 0 3 0 2 8 0 0 0 0 0 0 1
Total 3 247 8 56 252 18 9 58 4 18 97 124
Critical Volume Analysis
No. of Lanes 0> I 1 I <0 0> I 1 I <0 0> I 1 I <0 0> I 1 I <0
Approach Volume 258 326 71 239
Per Lane Volume 0 I 261 I nla 53 382 I nla 0 I 80 I nla 9 240.8 I nla
North-SouIb Critical NB LT+SBTH- 382 SB LT+NBTH- 314
East-West Critical EB LT+WBTH= 241 WB LT+EBTH= 89
Maximum Critical Sum 382 + 241 - 623
. , ,.
SIAJUS'f
UNDER
...
...
p:VJ405\9600'l'{ria.xls}george sea
7/231200310:00
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
WOOLBRIGHT ROAD AND INTERSTATE 95 (wEST)
(Existing Geometry)
Growth Rate =
Peak Season =
BuildoUl Year =
Years =
0.50%
1.00
2005
5
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03113/00 0 0 0 428 0 442 0 870 525 350 638 0
Peak Season Volume 0 0 0 428 0 442 0 870 525 350 638 0
Background 0 0 0 439 0 453 0 892 538 359 654 0
Medical Office Traffic 0 0 0 43 0 0 0 4 0 7 1 0
Project Assignment 0% 0% 0% 19% 0% 0% 0% 2% 0% 12% 2% 0%
Direction in in in in out oul out in out out out in
Project Traffic 0 0 0 II 0 0 0 I 0 3 0 0
Total 0 0 0 493 0 453 0 897 538 369 655 0
Critical Volume Analysis
No. of Lanes 0 I I 0 2 I I I <0 0 I 2 I I I I 2 0
Approach Volume 0 946 1,435 1,024
Per Lane Volume 0 I 0 I nla 247 -I 453 I nla 0 448.5 I 538 369 I 328 nla
North-South Critical NB LT+SBTH= 453 SB LT+NBTH= 247
East-West Critical EB LT+ WB TH = 328 WB LT+EB RT= 907
Maximum Critical Sum 453 + 907 - 1,360
STATUS?
NEAR
..
PM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/13/00 0 0 0 394 0 365 0 984 210 290 1205 0
Peak Season Volume 0 0 0 394 0 365 0 984 210 290 1,205 0
Background 0 0 0 404 0 374 0 1,009 215 297 1.235 0
Medical Office Traffic 0 0 0 18 0 0 0 2 0 30 5 0
Project Assignment 0% 0% 0% 19% 0% 0% 0% 2% 0% 12% 2% 0%
Direction in in in in oul out out in out oul out in
Project Traffic 0 0 0 3 0 0 0 0 0 6 I 0
Total 0 0 0 425 0 374 0 Ion 215 333 1.241 0
Critical Volume Analysis
No. of Lanes 0 I 1 I 0 2 I 1 I <0 0 I 2 I I 1 I 2 I 0
Aporoach Volume 0 799 1,226 1,574
Per Lane Volume 0 I 0 I nla 213 I 374 T nla 0 I 613 I 215 333 I 621 I nla
North-South Critical NB LT+SBTH 374 SB LT+NBTH 213
East-West Critical EB LT+WBTH 621 WB LT+EBTH 946
Maximum Critical Sum 374 + 946 1,320
, , , , .
-
SIAIUS f
NEAR
p:\fJ40S\96ooZ\[tia.xIsjwooI i95w
7/221200311.22
-
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
WOOLBRIGHT ROAD AND INTERSTA TE 95 fEAST)
(Existing Geometry)
Growth Rate =
Peak Season =
Buildout Year =
Years =
0.50%
1.00
2005
5
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existiog Volume (03/13/00 206 0 249 0 0 0 376 1259 0 0 785 439
Peak Season V olwne 206 0 249 0 0 0 376 1,259 0 0 785 439
Background 211 0 255 0 0 0 385 1.291 0 0 805 450
Medical Office Traffic 0 0 27 0 0 0 0 47 0 0 8 11
Project Assignment 0% 0% 12% 0% 0% 0% 0% 21% 0% 0% 14% 19%
Direction in in in out out oul out in out in out out
Project Traffic 0 0 7 0 0 0 0 12 0 0 3 4
Total 211 0 289 0 0 0 385 1,350 0 0 816 465
Critical Volume Analysis
No. of Lanes 2 1 1 I <0 0 I 1 0 1 I 2 T 0 0 I 2 I 1
Approach Volume 500 0 1,735 1.281
Per Lane Volume 106 I 289 T n1a 0 I 0 n1a 385 675 I n1a 0 I 640.5 I 465
North-South Critical NB LT+SBTH- 106 5B LT+NBTH 289
East-West Critical EB LT+WBTH- 1026 WB LT+EBTH- 675
Maximum Critical Sum 289 + 1026 - 1,315
,
STATUS?
NEAR
PM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/13/00 450 0 303 0 0 0 502 977 0 0 1057 571
Peak Season Volume 450 0 303 0 0 0 502 977 0 0 1.057 571
Background 461 0 311 0 0 0 515 1.002 0 0 1.084 585
Medical Office Traffic 0 0 11 0 0 0 0 20 0 0 35 48
Project Assignment 0% 0% 12% 0% 0% 0% 0% 21% 0% 0% 14% 19%
Direction in in in out out out out in out In out out
Project Traffic 0 0 2 0 0 0 0 4 0 0 7 10
Total 461 0 324 0 0 0 515 1026 0 0 1126 643
Critical Volume Analysis
No. of Lanes 2 T 1 <0 0 I 1 I 0 1 I 2 I 0 0 I 2 1
Approach Volume 785 0 1,541 1,769
Per Lane Volume 231 I 324 I n1a 0 I 0 I n1a 515 I 513 I n1a 0 I 884.5 I 643
North-South Critical NB LT+5BTH- 231 5B LT+NBTH 324
East -West Critical EB LT+WBTH 1400 WB LT+EBTH- 513
Maximum Critical Sum 324 + 1400 1,724
.. .. .
-
SlAWS!
UVJ<;K
71221200311:22
-
p:VJ405\96ooZ\[till.xislwool i95e
-
INTERSECTION ANALYSIS SHEET
BETHESDA MEMORIAL HOSPITAL
WOOLBRIGHT ROAD AND SEA CREST BOULEV ARD
(Existing Geometry)
Growth Rate ::;
Peak Season ::;
Buildout Year::;
Years::;
0.50%
1.00
2005
2
AM Peak Hour
Intersection Volume Development
Northbound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Votume (03/27/03 4t5 367 78 90 530 110 74 639 443 93 569 43
Peak Season Volume 415 367 78 90 530 110 74 639 443 93 569 43
Background 419 371 79 91 535 III 75 645 447 94 575 43
Medical Office Traffic 14 4 1 0 15 0 0 0 54 5 0 0
Project Assignment 33% 9% 3% 0% 9% 0% 0% 0% 33% 3% 0% 0%
Direction out out out out in out out out in in in in
Project Traffic 7 2 1 0 5 0 0 0 19 2 0 0
Total 440 377 81 91 555 111 75 645 520 101 575 43
Critical Volume Analysis
No. of Lanes 2 I 2 T <0 1 I 2 I <0 1 I 2 I <0 1 I 2 I <0
Approach V otume 898 757 1,240 719
Per Lane Volume 220 229 I nla 9t I 333 n/a 75 583 I nla 101 I 309 nla
North-South Critical NB LT+SBTH- 553 SB LT+NBTH- 320
East-West Critical EB LT+WBTH= 384 WB LT+EBTH- 684
Maximum Critical Sum , 553 + 684 = 1,237
STATUS?
NEAR
PM Peak Hour
Intersection Volume Development
Northhound Southbound Eastbound Westbound
LT Thru RT LT Thru RT LT Thru RT LT Thru RT
Existing Volume (03/27/03 479 581 113 85 357 91 143 636 339 105 799 84
Peak Season Volume 479 581 113 85 357 91 143 636 339 105 799 84
Background 484 587 114 86 361 92 144 642 342 106 807 85
Medical Office Traffic 62 17 6 0 6 0 0 0 23 2 0 0
Project Assignment 33% 9% 3% 0% 9% 0% 0% 0% 33% 3% 0% 0%
Direction oul out out out in out out out in in in in
Project Traffic 17 5 2 0 2 0 0 0 6 1 0 0
Total 563 609 122 86 369 92 144 642 371 109 807 85
Critical Volume Analysis
No. of Lanes 2 I 2 I <0 1 I 2 I <0 1 I 2 I <0 1 I 2 I <0
Approach Volume 1.294 547 1.157 1.001
Per Lane Volume 282 I 366 I nla 86 I 231 T nla 144 I 507 I nla 109 I 446 I nla
North-South Critical NB LT+SBTH 513 SB LT+NBTH- 452
East-West Critical EB LT+WBTH- 590 WB LT+EBTH- 616
Maximum Critical Sum , 513 + 616 1,129
" , , .
-
..
StAtUS!
UNUEK
7/2212003/1.22
-
p:VJ405\9600Z\[tia.xls}wool sea
HCS2000: Signalized Intersections Release 4.1c
ffialyst: KHA User
Agency: Kimley-Horn & Associates
Date: 7/21/2003
'eriod: AM Peak Hour
'roject ID: Bethesda Memorial Hospital
E/W St: Golf Road I 23rd Avenue
Inter.: Golf Rd & Congress Ave
Area Type: All other areas
Jurisd:
Year : Buildout 2005
040596002
N/S St: Congress Avenue
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
10. Lanes 1 1 1 1 1 1 1 3 0 1 3 0
LGConfig L T R L T R L TR L TR
Volume 59 348 288 198 245 165 127 1002 159 376 1766 109
,ane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
.~TOR Vol 0 0 0 0
'Juration 0.25 Area Type: All other areas
Signal Operations
~hase Combination 1 2 3 4 5 6 7 8
EB Left A A NB Left A A
Thru A Thru A
Right A Right A
Peds Peds
I1B Left A A SB Left A A
Thru A Thru A
- Right A Right A
Peds Peds
..:.rn Right EB Right A
,B Right WE Right A
~reen 13.0 24.0 19.0 64.0
Yellow 4.0 4.0 4.0 4.0
",11 Red 1.0 1.0 1.0 1.0
Cycle Length: 140.0 sees
Intersection Performance Summary
~pprl Lane Adj Sat Ratios Lane Group Approach
Jane Group Flow Rate
_ ;rp Capacity (s) vie g/C Delay LOS Delay LOS
.'<:as tbound
240 1770 0.26 0.30 37.5 D
l' 319 1863 1.15 0.17 154.5 F
R 543 1583 0.56 0.34 38.7 D
'1estbound
217 1770 0.96 0.30 90.1 F
'1' 319 1863 0.81 0.17 70.1 E
R 543 1583 0.32 0.34 34.3 C
lorthbound
" 293 1770 0.46 0.63 30.4 C
TR 2277 4981 0.54 0.46 27.6 C
;outhbound
""" 367 1770 1. 08 0.63 101. 4 F
TR 2304 5041 0.86 0.46 37.4 D
96.6 F
66.9 E
27.9 C
48.1 D
Intersection Delay = 52.0 (sec/veh)
Intersection LOS = D
HCS2000: Signalized Intersections Release 4.1c
-
KHA
..liimley-Horn
,431 Embarcadero Drive
~est Palm Beach, FL
33407
HCS2000: Signalized Intersections Release 4.1c
.nalyst: KHA User
Agency: Kimley-Horn & Associates
Date: 7/21/2003
'eriod: PM Peak Hour
_'roject ID: Bethesda Memorial Hospital
E/W St: Golf Road / 23rd Avenue
Inter.: Golf Rd & Congress Ave
Area Type: All other areas
Jurisd:
Year : Buildout 2005
040596002
N/S St: Congress Avenue
SIGNALIZED INTERSECTION SUMMARY
Eastbound Westbound Northbound Southbound
L T R L T R L T R L T R
,,)0. Lanes 1 1 1 1 1 1 1 3 0 1 3 0
LGConfig L T R L T R L TR L TR
,Volume 97 271 118 167 324 313 271 2061 196 222 1105 158
,ane Width 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0 12.0
~TOR Vol 0 0 0 0
~uration 0.25 Area Type: All other areas
Signal Operations
~hase Combination 1 2 3 4 5 6 7 8
EB Left A A NB Left A A
Thru A Thru A
Right A Right A
Peds Peds
WE Left A A SB Left A A
Thru A Thru A
.. Right A Right A
Peds Peds
....B Right EB Right A
;B Right WE Right A
~reen 10.0 24.0 14.0 72.0
Yellow 4.0 4.0 4.0 4.0
'~,ll Red 1.0 1.0 1.0 1.0
", Cycle Length: 140.0 sees
Intersection Performance Summary
~ppr / Lane Adj Sat Ratios Lane Group Approach
Jane Group Flow Rate
"":rp Capacity (s) v/c g/C Delay LOS Delay LOS
''''as tbound
179 1770 0.57 0.28 45.3 D
"l' 319 1863 0.89 0.17 82.4 F
R 486 1583 0.26 0.31 36.7 D
lestbound
182 1770 0.97 0.28 107.1 F
T 319 1863 1. 07 0.17 127.9 F
" 486 1583 0.68 0.31 46.2 D
Jorthbound
J 311 1770 0.92 0.65 54.6 D
TR 2581 5019 0.92 0.51 37.4 D
;outhbound
L 230 1770 1. 02 0.65 112.3 F
TR 2566 4990 0.52 0.51 22.7 C
63.9 E
91. 8 F
39.2 D
36.1 D
Intersection Delay = 48.6 (sec/veh)
Intersection LOS = D
HCS2000: Signalized Intersections Release 4.1c
-
KHA
.l(imley-Horn
l431 Embarcadero Drive
~est Palm Beach, FL
33407
HCS2000: Signalized Intersections Release 4.1c
nalyst: KHA User
Agency: Kimley-Horn & Associates
Date: 7/21/2003
'eriod: AM Peak Hour
roject ID: Bethesda Memorial Hospital
E/W St: George Bush Boulevard
Inter.: George Bush & NE 2nd Ave
Area Type: All other areas
Jurisd:
Year : Buildout 2005
040596002
N/S St: NE 2nd Ave (Seacrest)
Eastbound
L T R
SIGNALIZED INTERSECTION SUMMARY
Westbound Northbound
L T R L T R
Southbound
L T R
fo. Lanes 0 1 0 0 1 0 0 1 0
"LGConfig LTR LTR LTR
Volume 16 182 6 25 65 77 3 179 4
,ane width 12.0 12.0 12.0
-."TOR Vol 0 0 0
o 1 0
LTR
99 313 11
12.0
o
":luration
0.25
~hase Combination 1
EB Left A
Thru A
Right A
Peds
1(113 Le ft
Thru
Right
Peds
AlB Right
m Right
't:reen
Yellow
',11 Red
2
Area Type: All other areas
Signal Operations
3 4
25.0
4.0
1.0
Cycle
Intersection Performance Summary
Adj Sat Ratios Lane Group
Flow Rate
(s)
-
A
A
A
45.0
4.0
1.0
.L'ppr /
Jane
,".;rp
Lane
Group
Capacity
vie
g/C
'Castbound
GTR
1019
0.56
1812
0.21
lestbound
LTR
928
0.56
1650
0.19
Jorthbound
LTR
577
0.31
1846
0.34
;outhbound
-
LTR
495
0.31
1584
0.90
. -
Intersection Delay = 27.0 (sec/veh)
Intersection LOS = C
NB
Left
Thru
Right
Peds
Left
Thru
Right
Peds
Right
Right
5
A
A
A
6 7
8
SB
EB
WE
A
A
A
Length: 80.0
sees
Approach
Delay LOS
Delay LOS
A
8.8
A
8.8
8.7
21. 5
45.5
A
8.7
A
C
21.5
C
D
45.5
D
-
HCS2000: Signalized Intersections Release 4.1c
KHA
..lI::imley-Horn
1431 Embarcadero Drive
-West Palm Beach, FL
33407
HCS2000: Signalized Intersections Release 4.1c
.palyst: KHA User
Agency: Kimley-Horn & Associates
Date: 7/21/2003
eriod: PM Peak Hour
roject ID: Bethesda Memorial Hospital
E/W St: George Bush Boulevard
Inter.: George Bush & NE 2nd Ave
Area Type: All other areas
Jurisd:
Year : Buildout 2005
040596002
N/S St: NE 2nd Ave (Seacrest)
Eastbound
L T R
SIGNALIZED INTERSECTION SUMMARY
Westbound Northbound
L T R L T R
Southbound
L T R
...40. Lanes 0 1 0 0 1 0 0 1 0
LGConfig LTR LTR LTR
){o 1 ume 9 58 4 18 97 124 3 247 8
ane width 12.0 12.0 12.0
",TOR Vol 0 0 0
010
LTR
56 252 18
12.0
o
'"'1uration
Area
~ase Combination 1
EB Left A
Thru A
Right A
Peds
WE Left
Thru
Right
Peds
,"B Right
'B Right
'ereen
Yellow
-,11 Red
2
Type: All other areas
Signal Operations
3 4
25.0
4.0
1.0
Cycle
Intersection Performance Summary
Adj Sat Ratios Lane Group
Flow Rate
(s)
0.25
-
A
A
A
45.0
4.0
1.0
4ppr/
Lane
Group
Capacity
g/C
lane
v/c
....rp
'''astbound
LTR
1006
1788
0.07
0.56
:estbound
LTR
957
1701
0.26
0.56
lorthbound
LTR
578
1849
0.47
0.31
;outhbound
LTR
515
1649
0.67
0.31
Intersection Delay = 19.5 (sec/veh)
NB
Left
Thru
Right
Peds
Left
Thru
Right
Peds
Right
Right
5
A
A
A
6 7
8
SB
EB
WE
A
A
A
Length: 80.0
sees
Approach
Delay LOS
Delay LOS
A
8.0
A
8.0
9.1
22.8
27.1
A
9.1
A
C
22.8
C
C
27.1
C
Intersection LOS = B
...
HCS2000: Signalized Intersections Release 4.1c
KHA
J<:imley-Horn
\431 Embarcadero Drive
~est Palm Beach, FL
33407
.
-
..
-
-
-
,.
Bethesda Memorial Hospital
AM Peak Hour
Arterial Level of Service: EB Golf Rd/23rd Ave
Arterial Level of Service
Seacrest Blvd 11\ 30 176.7 31.0 207.7 1.5 25.5 B
Total III 176.7 31.0 207.7 1.5 25.5 B
Arterial Level of Service: WB Golf Rd/23rd Ave
Congress Ave
Total
210.6
210.6
B
B
1.5
1.5
25:2
25.2
11\
III
30
176.7
176.7
33.9
33.9
7/23/2003
P:\0405\96002\goICcong to sea_am.sy6
kimleylvl7-ff51
Synchro 5 Report
Page 1
Bethesda Memorial Hospital
PM Peak Hour
Arterial Level of Service: EB Golf Rd/23rd Ave
Arterial Level of Service
Seacrest Blvd III ^,.,,' 30 176.7 32.6 209.3 1.5 25.3 B
Total III 176.7 32.6 209.3 1.5 25.3 B
Arterial Level of Service: WB Golf Rd/23rd Ave
Congress Ave III 30 176.7 100.1 276.8 1.5 19.2 C
Total III 176.7 100.1 276.8 1.5 19.2 C
~
-
-
-
-
7/23/2003
P:\0405\96002\gol'-cong to sea_pm.sy6
kimleylvl7-ff51
Synchro 5 Report
Page 1
Bethesda Memorial Hospital
AM Peak Hour
Arterial Level of Service: EB Woolbright Rd
Arterial Level of Service
1-95 NB Ramps II 40 13.7 9.3 23.0 0.1 18.7 D
Seacrest Blvd II 40 43.2 40.0 83.2 0.5 19.7 D
Total II 56.9 49.3 106.2 0.6 19.5 D
Arterial Level of Service: WB Woolbright Rd
1-95 NB Ramps
1-95 SB Ramps
Total
35.3
116.3
0.1
0.6
12.2
17.8
.~
7/23/2003
P:\0405\96002\woo'-95 to sea_am.sy6
kimleylvl7-ff51
Synchro 5 Report
Page 1
Bethesda Memorial Hospital
PM Peak Hour
Arterial Level of Service: EB Woolbright Rd
Arterial Level of Service
1-95 NB Ranips
Seacrest Blvd
Total
II
II
0.5
0.6
Arterial Level of Service: WB Woolbright Rd
1-95NBRamps II 40 43.2 42.4 85.6 0.5 . '19.1 D
1-95 SB Ramps II 40 13.7 25.3 39.0 0.1 11.0 F
Total II 56.9 67.7 124.6 0.6 16.6 D
,~
.~
7/23/2003
P:\0405\96002\wooL95 to sea_pm.5y6
kimleylvl7-ff51
Synchro 5 Report
Page 1