REVIEW COMMENTS
7.C.2
BETHESDA MEMORIAL HOSPITAL
(MSPM 03-008)
MAJOR SITE PLAN MODIFICATION
TO:
THRU:
FROM:
DATE:
PROJECT NAME/NO:
REQUEST:
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 03-208
STAFF REPORT
Chairman and Members
Planning and Development Board and City Commission
~lr~
Michael Rumpf
Planning and Zoning Director
Ed Breese ~
Principal Planner
September 2, 2003
Bethesda Memorial Hospital / MSPM 03.008
Major Site Plan Modification
Property Owner:
Applicant:
Location:
PROJECT DESCRIPTION
Bethesda Memorial Hospital, Inc.
Dennis Campbell, Kilday & Associates, Inc.
2815 South Seacrest Boulevard (see Exhibit "A"-
Location Map)
Existing Land Use/Zoning:
Public- Private, Government, Institutional (PPGI) / Public
Use (PU)
Proposed Land Use/Zoning:
Proposed Use:
Acreage:
Adjacent Uses:
North:
South:
East:
West:
No change
Construction of 56,277 square foot addition within the
current footprint of the hospital to accommodate a
Comprehensive Inpatient Rehabilitation Calter
24.22 acres (total hospital site)
Bethesda Medical Plaza, Early Learning Center @ Bethesda, and then farther north
single-family residential;
Boulevard Manor Nursing Center and then farther south High Ridge Apartments;
Seacrest Boulevard, then farther east various medical offices/bUildings and then
farther east single-family residential; and
Bethesda Memorial Hospital parking and then farther west single-family residential.
Staff Report - Bethesda Memorial Hospital (MSPM 03-008)
Memorandum No PZ 03-208
Page 2
Site Characteristic: The Site Data prepared by Kilday & Associates indicates that the site has been
developed with a 530,542 square foot hospital facility containing 300 beds, a
daycare center, a total of 1,035 on-site parking spaces (148 off-site) and
approximately 24% landscape area.
BACKGROUND
Proposal:
Bethesda Memorial Hospital is requesting to add 56,277 square feet of vertical
construction within the existing footprint of the building in order to provide a
Comprehensive Inpatient Rehabilitation Unit. The second and third level expansion
are intended to house this new unit.
ANALYSIS
Concurrency:
Traffic: A traffic statement was sent to the Palm Beach County Traffic Division for
concurrency review in order to ensure an adequate level of service. Palm Beach
County has provided a preliminary review and requested the applicant to provide
additional information. No construction permit will be issued without appropriate
sign-off from Palm Beach County Traffic Engineering (see Exhibit "C" - Conditions
of Approval).
Drainage: The proposed expansion (vertical) does not require any pavement or drainage
modifications to the site as a result of the construd:ion.
School: School concurrency is not required for this type of project.
Driveways: The proposed expansion does not modify any circulation characteristics of the site.
The Hospital proposes to limit construction traffic entering and exiting the site to
SW 23cd Avenue to restrict large equipment and vehicles from circumnavigating the
site and reducing the interaction with motorists and pedestrians during the
construction.
Parking Facility: The Site Plan prepared by Kilday & Associates provides a list of the different
uses and parking requirements of each. In accordance with City parking codes, the
plan indicates 300 hospital beds @ 2.5 parking spaces required per bed for a total
of 750 parking spaces. Additionally, the daycare center comprises 7,500 square feet
with a parking requirement of 1 parking space per every 300 square feet, for a total
of 25 parking spaces. Lastly, the utility building totals 8,968 square feet with a
parking requirement of 1 parking space per every 500 square feet, for a total of 18
parking spaces.
The sum total of required parking, based on the number of beds and ancillary
structures, is indicated on the plans as 793 parking spaces. Based upon the Site
Plan and a Parking Planning Study prepared in May, 2002, the Hospital provides
1,183 parking spaces (1,035 on-site and 148 off). By the numbers, the Hospital
Staff Report - Bethesda Memorial Hospital (MSPM 03-008)
Memorandum No PZ 03-208
Page 3
meets City parking codes and provides 390 excess parking spaces. According to the
May, 2002 Parking Planning Study conducted for Bethesda Memorial Hospital, only
1,000 on-site parking spaces were available at the time of the study due to
construction trailers and lay-down areas for on-going work on the Hospital,
reducing the number of excess parking spaces to 355. The Site Plan depicts 29
handicap parking spaces and a code requirement for 22, an excess of 7. During
construction however, the Hospital proposes to maintain the code required 22
handicap parking spaces only, since some of the handicap parking near the building
will be used for construction staging and fenced-off. Additionally, the contractor will
provide covered construction walkway tunnels for protection from the construction
when entering the building.
The 2002 Parking Planning Study also reviewed the parking demand in present
day and a 2010 planning horizon. The current planning deficit was determined to
be 198 parking spaces, with a shortfall of 693 by the year 2010. Since the time of
the study, the Hospital received approval for two physician parking structures
totaling 85 parking spaces. As a part of that approval, 12 parking spaces will be
eliminated with the new construction, resulting in the addition of 73 spaces as
opposed to 85.
TheHospital's consultants recently met with City staff to discuss conceptual plans
for a 683 car parking structure in the existing parking field immediately north of the
Comprehensive Inpatient Rehabilitation Unit that is the subject of this application.
This would appear to be a further step in addressing long-term operational issues
raised in the parking study.
Landscaping: The vertical expansion does not contemplate the addition of landscaping. Naturally,
any damage to existing landscaping during the project will be required to be
brought into compliance with the code under the supervision of the City Forester.
Building and Site: The proposed vertical expansion will house a storage room and mechanical room
on the second level and the 28 bed Comprehensive Inpatient Rehabilitation Unit
will be located on the third level. The fourth level will consist of the mechanical
room housing the elevator equipment and stair tower. The proposed addition has
been designed to be harmonious in size and scale with the surrounding floors of
the Hospital. The elevator equipment and stair tower structure will exceed the
allowable 45 foot limit by 10 feet - 5 inches and the fourth level parapet will
exceed this limit by 4 inches. The City Commission has the authority to grant a
Height Exception for these types of structures and appurtenances. The applicant
has made a separate application for the Height Exception.
Design: The addition is proposed to be compatible with the existing building elements of
the Hospital. The proposal utilizes matching stucco finish and score lines as the
existing building, curtain wall window system and matching color scheme. The
body color proposed for the building is Peach Vail (Sonneborn Acrylic Elastomeric
63 - 803). The accent color proposed is White (Sonneborn Acrylic Elastomeric 64-
235).
Staff Report - Bethesda Memorial Hospital (MSPM 03-008)
Memorandum No PZ 03-208
Page 4
Signage:
No new signs are proposed in conjunction with this request for major site plan
modification.
RECOMMENDATION:
The Technical Review Committee (TR:) has reviewed this request for major site plan modification
approval. Staff recommends approval, contingent upon all comments indicated in Exhibit "C"-
Conditions of Approval. Any additional conditions recommended by the Board or City Commission
shall be documented accordingly in the Conditions of Approval.
MWR / eb
S:\Planning\Shared\Wp\Projects\Belhesda Memorial Hospila~MSPM 03-008\Slaff Report.doc
Location Map
BETHESDA HOSPITAL
EXHIBIT "A"
n '='= '='=: ~
gj--
m--+-- -
ill --+- ----+---- -
-~ =
.
-
-
[]ill lliWJ UW UWJJ UW LlUW UW i 1--"1 - I r--- r
R3 ~~~~~~~~~$.[ff1.~ ti
DIIIIJITIIJ) ~ JI'~~ 1l --~- -j ... I:
.Z/.~ '.J I ~
)~)l_' -.. --.-! cpt -
\ I /10 I f----
L EBffi
J 1/ RV ffi~
111// i - OJCD6
~C!1 " !~Wt;
,,~?~ ! ~ TPtA ! I ttfi}&
. ?~> I Di if UJm0;ff:
~ " i ~ CODJ'/'
C 1 f{;; I~ c.. -J I}f ~fBEBtzJiS
7 = I I -I I I =-r: ~- ~rnm[[j
II - 1 I I {~'--0l!JrnmiL
~ -'
,!Ji7$t II111II111 i
= I 1 I \ I
/ ;R ~ OTTT I . 11 r
f--- .
I
Plln
---' S~RDAVE
~- ~
EEE-~~/
jj E8 ==~= SITE
--~- ~
. If-- ~ .
~~~ ~
.~
I-- _ = -~ ~
-I--
-
-
.-
-
,
W~,
S
1-
,
N I
~ I
e .
e J
~ ! '0 I
G]
, . OCD 0
n , <O;:l.
S I
I I Z31 ;:0
0 i e ()
" I 3~ '1J
10
~ 0" CD ...,
X ~O .Q.
w
m " - CD
IZ
'" I CD 0
"' ~CD .....
"
~a. Z
Ol_
e '0 C
" 6;0 3
~ - Z 0-
0; 01-
0 ez CD
w O"e ...,
'" z3
w 00"
~ . CD
~ 0
~ 0"
0<0 --"
0; .1>-01 U1
N
0 N
'U .....
'" --"
I
0
OJ
0
I
0
0
--"
)>m 01
'Ox
'0'0 fJJ
~ -. c
o ~
<~ CD
'" -.
_0 0
o=>
",0 W
~'" .....
CD~ CD
"CD
'0<- c-
CDe C
6.=> '<
_.CD
=>01 N
<0.
N N
0
0 N
.I>- 0
0
(;.l
EXHIBIT "B"
-I ;J!
"
II
)> - N '"'0 II OJN OJ
....., Zo:>..., 00:>
o 0 "< ->. CD
:::r "1J OJ~- :::::ICJ'1
-. CD CD r-+- .-+
CD )> 0. n- Ocf) ::::r
$l -I () ->. :::::10 CD
C oc.o OJS- (J)
ID m.g CD:::r
IDCf) a.
ZeD oCD m
_:::r ID
-1~ "TlQ s:
:::::I -CD
;o!Q. QU) CD
--r-+-
mCi5 0. OJ 3
IDo
I c 0
)> WCD ..,
w< -.
OJ ~ID m
~a.
-
r I
-
-I 0
)> (J)
-I "'0
- .-+
0 m
Z
C :::J
Z 0
-
-I
----
~~ ...,..,........ ~ ~ ~n~~ ! I nS5 0
~gHe ~ ~~~~~ I ~~.." ~
UFI1l!I!!11 "'i"'"
~ ~;ii~Q
II '\"" , , , !.~f~Q , ~h,~ >
riHi!!B_" , ,
I' , 'i! I !j;iO''J
,,'-.n , 8koO:
~IHn ;;;~ :l"':'O <
~n l oi:z~
i;;i t~ ~ ~ O~~
", ,
!l " "
B~ U a~
g
,
UHH~ i~ >
f ~i
.{~~ S"~~ ~ '"
J:~ 3 ; ~ 3 )> g'8 l
~i" B~ ~ ::! ~ ~~
- !;'"Q ~~
,!i, ;,~
, ", q h
i ~ ~ 0
, ~g
. , !;:;~ ~
'"c ~
~" €! ~
tlll
0" U
.,,~
.
~
-
s 3Cl ~ ~ g ~ j
00
, , > - 0_
- >
P ::1::10;0; >,
E , !tH ~~
. !;: ~ o. . . "
~ ~
oj:: ~~o<> ~, >
" .. """",,,, ,l i
, -. ~ ~...... 0
if: 1180;;;; ! \
i 0
.! ~ti~ ~ ,
, !(l~ ~ ~!:l ~
, o' ,..!" <> '" I
~i~ ~ ~... ~ ,
l
'"~ :;:~X':E ~ if;:""
~~ hn ~ 3 i~
H h-no.;;: ~~;
~ S' ;,~= ~ m:;<:
.~ !.:l.~ 0 :i-~"
:. g,., ~ ...{Ii'
f(!l ,,~" ). <; Ooi
!.l ' ~ g ~U
o z :t,,3.
o ;Q-
j-<-<Z '"r..:;
)>-... ... ...~
t;:~~ 2 !? i ;<j~a ~ .:;a ~
1:"~:l!:g '" z ~~...~ z ~...'!!. z
~ ~ l' a; il '" ~i..i " i..!: "
H?~ [; ~~iq ~~~~
;;~ ~ i a ~; a ~~~ ~
ii::5i:i: '" ~ffi~
...,.8:Jl::~ g~~...~
~__!~o~:;: ~"'1~
ai~ I {) " ii!
l "
HUHI;
a'-iij;'~H~ :.-
~~~!:;!
~~:Hif
!,,"p
8~'..},:. ~
l'.~:~~~
a...".' .~
~~:i!5i
~"l"~ '"
l' "'l:l...
a 51."1:",C:
~~~!~
. .
r~
[~
J~
'j
"''''''''''''''':!!''' ~ ....;:n<:Jln"':!l"'aa"''''... Jl
H;:l~~i~ '" ~B'i"H5!.:8~uH~'"
;-!tp-;-!=~ ~ !~!! b~_i':RH~h ~
!lj",~~3:.:! ~ f~~i["[[P':~ll'i-'!!j
5"i:Hh;:,~ ;.~~~~ Hj;'t,Hj-if~
~3:;I[~ ~ ~~:. ~ 2'!~~:l;~.:;;" m
j l f .. r'~'F i
.~
'I
i
!
e
6
5
~
~
2~
'00
! , ~m :!!i!i2J
1" mm I
j! , zO, Os:ro !::!~..:::a
tr>:i" ~n~ ~m~ IIII11II1II1I11 ~:~~
0< c::oOe ::::jS:I
3"g Lil:::r
zm;S:m )>Om iiil~
I ;l'Q" :::;:;;:g~ ~"""
'N mm ~~~
g E~w n rg--
~ E~ ~~~
'--- ~;ii
..:~..:!~<<< ~~""~,"w"~z"'z"'~
iO ~ iO~~~F~nn~C">~~
~
[;1-:" -;j-;Jn:~T:;-I:<~ i~".....t'" w.~-_-.~~-
tt:.~' r "~jt.:'~!J~r<<-~J1:~~lt~l!tfm ~'r; - ' -.:.-~
,,'t"- "~::~ ~1;'-~..,!~~_:lO.:.,.~b'.:..:c"\.::- ?~;:- '1r
,_,tq~ ;:=1 f1;;[j-; '- ~'--,-:r'~'f'" i!-f~L'1 .~II ;:4 r -~
:y"-;'- I ...~_ : r.~"'-'~ :1,lhjf-.~..,~.,1
~~_~.;:~ '.~,-. .:' '.:~:&~ ;~'I~:r nl ~i:~~~1
~- -. _ -'-"5~T.rL'~~'""~tQ l :r;_:;--';';V~-"it~ . '"
.' "":. ;:;"~'!JIJr~"s,-,.-~,;~~v,.';:'c~ri'""Iir
~~~:~;:-~;H~~~:~~~;~~jr.1t~ ~:
- _ _, ,.-~- - f' ' 1,.I'I~'1!1.'0IrJ.h I'f
. .'r'r;~'1i,~,~~':t~~
- - ------<'------<:'-
()~..c"""',,.
~
0.
co
,
~
N
~
o
o
~
Cl
,
~
o
~
n
"
'<
'"
'"
'"'
0.
'"
,
o
00
~
N
~ ,
~
0'
w!
o
~
~
m
~
w
"'
"
18
~
g
.
~
'1.1 I Ii"", II
!iliill!,j hill i I,l!l!!
I~I~I' ~I' . 'i" ..; !I!!~
!lllllil' lip: I !f!
Iii I, "'111
I I IfJi
, ,I I ,
i, [! I I;
II I: I 'f
~~I
, I I
I d '
'i
UiUi'
~!!Ul! '
:Illll!~
:, PI I 'i II ~
. ! P
,I II I
, II ' !
. ,.
. ,
EXHIBIT "B"
....... ..u '."
.... I,"
"'." Z.....
cor ."c:c
32. ~~
~.cE ~t3"'l1
~ c:~8e
c.. zm3:m
~ ~$}~
::l ~_mm~$
~.
s~
~~
0:
~ii 11I1II11II1II11
2~>
,..,
~OO~2J
~3&O
~;~~
h~~
i!ii:;J
t" ,
0'.
~~~
:1-
~I
01
01
f-' I
>
~
o
~
n
IT
':
'"
cO
"
o
CD
,
~
en
,
o
w
o
w
..
" .
~
o
t..) I
:sll
~,
EXHIBIT "B"
-.....-..i
I
!i C'~
10
~
IS
,...
~~~;
~~;...
~~;
~o
~
, I:t-;!
~~rl-i
,~ I '1 i'
'L'T
1'1 L. Itc
'. "L~L
9"
=~_I
. "
A
,I
;--'"
I c[
i ,j ~ ~
T'iO
I .:Ii
., :.1
i .,.,;
1
~
11~i It:i1
, '!;;';"""ii"""i'."!ll'
, ! ".....~... ~ ,., 2 '
Ii liiiiiii1ii i i i! 1'1.. )1
iiiililiiiiii i I! ji!illWI
: Illqlll; PI! i 15 Ii ill~i' Ii I
; I ill I !l.! i ,I! ,1,1:1 !
. I II. II r'lll".11 .,ill
~
I
~Ii IIII1III1111111
z,>
"
c
,
1! I j ~
.;:J
3
~n52J
~~~:
f'Z~~
~mJ-
i!l!~
~ojD
~~~
,
.._~_.__..._-_._---~,------
~
'~j
~
co
~ i
:> .
, i
~ !
co
~ i
;
n I
" I
'<
0- i
;
"' ;
"
co
m
~
~
en
co
w
co ,
w
..
..
co
..
w
'"
"
" ,
EXHIBIT "B"
.--.1
,
l '" .,).,
e:G
1/
11
11 1 e
~
Ilr'
-rTr"
~, i!! Hi !~iii li~l~ 1!11lil'I' 'I,,:i
III iii 1111 ~ II j I ..j I
i I II 1111 I In ~ . Il~" 'I' ' ,
11111 III l i . I
! III 'III !'111 d 'I i ai~lil I
:,,0 '1'1 'i Iii P' I
: II ! II ~. r' i 1 i 1': I i l::::
il.I,'J 'I",I.M
!:,!!~I!~i~!!: ';~
'111111111' IV: 1111.:
I' -,
I :1
I, I ;,,,
'. I Ul"tl ;Z'"
&~ .,,""
3i!. ~~
~;g ~O"'!l
:l c:8e
c. zm:;::m
g =lS;jJ!:j
3' E~iC
o "z
~~
~~
"
~Ii IIII1III1I1III1
Zrl>
"
;:Ol"2] I
0300
~~..:a
~~~~
f m":J' I
::: :1= ,
81l1Il':
.._~
-=c
t~;
~~~
~I"'~'''--''
~
Q,
"'
"
~I
"
,
'"
~
"
n
"
'<
Q,
"'
"
'"
00
~
~
~
o
w
'"
~
~
~
w
~
'"
"
iI'
10
~,
o
'"
~
L_
.:"" '.
,<., <:.'"
I"~ :/1',
1/
"11
11 1
'iOn'" ""111"11 '151jl'
, .t..... .,.. =. , ~ '
Ii liiiii i Hi i i I.... I
i iiiiiii iiii ll', jh'15~lil
, III"JI "11 ' 5 i '~ 1, I
! ,,,:I 'IJ'! ,j IIII P
; III ! ,'J,'I'lr:li'
'. ,
...'
"~.~
~n
,
~
.II"!'] ,1'1' ,. I ;"
!iWliIlIiI id III
~~""~"". .~I~ I II ! Ii!
'1"11' ""
!! i I Ii" ~ I' I l.l ,'!
'ilil1 ,
'I I " I
I I , ., " I I
I! ! I I, " ,
. ii
EXHIBIT "B"
!
! I ,!
11-11'
jTrO
;II
"
,
I
....!
:.:.:.:...1
"
\~/
\(1
~ ~ -
.,
'"
~,
3'2.
~
-[ c
Z
N =<
g
5'
o
I
~ ~n II~IIIIIIIIIII
<Q Zr)>
n
00"2]
3~O
~":D
"5"~
ffi~g ,I
o,~
!:~~1
~~~ fIIAJ
..-::.-:-.--:.~. ,,;,..,
n ,
.. I
" ,
cO ,
"
C,'
,>
"
8
~
'"
8
.~
n
c
"
en
"
8
m
N
""
~
8
W
8 o!
~
~
m i
10
~ (.I:
'U !
"
" .
,
I i
Ilr'
,.
.,
.,
"'
~~
3:2. I
[;g Jli I1III1IIIII1III
, c
. Z
N ~
g
.g. Z,l>
n
EXHIBIT "B"
---I
,
mS2J
;r~
roo ~a
!ffi~2:
8(l1I~
~o~:;:1
,., ~
J,.owOll
~~~
:, .,' "j,,"
.i
~,
t'-J I
gl
~I I
, I I
~ I
~ I !
CL
"'
"
o
m
~
"'
~
~
o
w
o
w
w
CO
"'
"
"
"
i
!)>
!N
'0
1-
, ;
~--
.., ,<" ~ 0 . ,
, f , 1
I
EEl'
I'
r _.
"
"
[.-
- ,
I
~
.
~
.
VI" 2...,
<:::.. '00>
n. ~tIl
~~ ~~."
~ c:8e
a. zm3:m
~ =ii:]~
::J ttlm~
5' E '"
. ~
~
o
z
~! ~~~~I
~ I 1 I
,
I
I~i I1II11II11111I1
2.)>-
n
EXHIBIT "B"
...... if 'Il
IWIlI, :
! .
~O~62]
~~2::t1
w;->
rz~~
~m~_
801I~
i.~~
'9:.. I
~~ ~
:1:
~!
" I
~ ,
~ :
~ ,
~ I
~I
'J
n
".
'< '
Q, i
co
"
~
ro
~
,..
en
~
o
w
o
w.
..
w
ro
en
'"
"0'
:0::1
;to
'"
o
'"
lI-'-
1 1 1
m' !
01"
1 I.
,
, .
01 j
8~-
1
tU
II
UJ-U!
! . : "
! I '
.",
,0
.1
~~.IDDD!
~: I' I I I I,
, , ,
,
'I .1.11'1'1' 11'1 If
!ill!lllllIill' :,1111 I i I!
iliiil'l iji! . 11111 !
i! II " ! I HlI
ilii ! i, li!1 : I
Ul"U Z'"
ij.~ ""lIal
3=. ~~
~.s ~O
. ~n
;J C:IlO
0. zm;s:
N :::j$:]
g tl:Im
,go ;=:r
~~
~~
~;;:;
r
~Ii 1/1111111111111
Z,>-
"
EXHIBIT "B"
~n62J
;g~:
f.Z~~
~mJ-
i ,~
!:!:;:J
~ig
, .
, i 'I ! l ! ~
, , I' Ii"
Wi !ll~ ~l~! W !!!I !!11 ~
'I!; i.,j !':I ~<' '<j: 1:1' ~
!"i'l~! l!i.j'!llll,l<j<
,I'. ,,' Iii oIl 'j; ,I,
-~; h ; 111_ ~ ~ ~I
! .ill, 8~ gl!~ t ~ !tll
~a ~,,~ ,,~H;~
, ,
iWllI"lil
1,IIWI!,1
j' "'I il'
'j "I' ,,' Q) .
. 11.,'I.., Q)I;IQ)
I' i li! il!' n.
" la~ ~~ I J
I! !!I!'::
a' s~~~ I ji
i ~~h 1~!
. I ,
I j'
i !
l~ilr!!~"!hl! 9,~i~ ~l ~ ~!~!Pi ~'~~~lH \!l
I'i., 101<0.1"'" c ~ .,~,~ ~ ^e " m
111'i!~~' ~ z~ ...S!~~ $~ 59~l!:
, !!;!n!!I~ .E.~i~ Ii ~ nm~ i.~~~5~ j;
Ii ""~il,!~.~. ~~. !'~6 ,.,. .I&~ ~-1
c' '11~j "; '''''' ,g- · II 2 J>
~~ ~1~1.l:~l ~~ i ~ ~
" 0 "1'11 &~. F ,;
I' 'I . !.' ..~~>. ~ jit'"
'@r E'T "j.y.'4 :>'~~."'~ /:: ~ ~Ii"'ll~
~~ \;~ ~ 'I: ~~i~~; ~ ~ 'in~~~'-
,~ . ....ll .i c~","."
~~ ::5:S~ ~ ~~:::~~~ ~ ~ ~~ _i~~~
, ,"'Ill VI "''' ~ '..' ",0 v>v>",,> '!l
~~ H." .. ~~~;:!~ ~ ' ~......~g . :--"~ :>"2<::>
,; (j)lO -
,_ 0
~~ ~ 5~~~
-I (j) 0
. 0
~j. -
i~ 3
,;
J;
~~
,-
ji
.~
I
g,CIl
.~ "'0
1
......
t2 ~ 1 [I~I~ }limn
~ trl ~ i,~ ,r H<r
'" .' ..
I . ! "ll~i
~ ~ .. II .
, ~
EXHIBIT "B"
i~
>I
~~
,
I~!l
!<!l.
il~
,
,
. I
" '
,
~ I
,
.
~ I
m .
~ ~
~
".
-fJ"
10'0<;
i >l..1l'i.69S
-.
~i
".
"
.
"
~
SB'l'~'I]"[ 65120'
GOLF ROAD
SW.
23RD AVENUE
City of Boynton Beach, Florida
!qln~l-
!'I!fil!
I' II 1.1
I I'
I '
.,
!
C.;mceplulll SIt.. PI&I\
Bethesda Memorial
Hospital
Project 19 - 28 BED COMPREHENSIVE
I ""-1 D A "T'T""......rr DI'lU6ATT rrLJ.'T'T"'" TT1'Jrr
EXHIBIT "B"
~
I
'~;
\~ I
" ~ I
:; I " -r -;:
..,,_ .J.
~ .N~"
- ~ .~:~ :-~
,- ~;~: '>.,~,-, ~
"i";, 11tl
I:
"
" i
'I i ,,<c< <<<u ,/
~ ._"~~ I . r"M p_' 5"
_ . I . Jft/? "01'"'" A>',,", I
"';::"_' '.',,,,,,,," ;,;;;:' ! 0"",,,:'0'- #/L;' ,-""
1lff[~E~:.~'":~1~~ i{;L'
,!IV" ~",.~vJ:-' /. - .",
.'~Wi' V ,[~,,-,->,>;;;:::> I'r'" ,~ .
" ", " , ,-' " ,-,' ';(-" - "-
, :rfl' ' " ,"" " "I, c,"" ,>' '
", ,I ">;., .y'/';" ,../,<
, \l.," ',., ~"" I' · \ '
tH~ ,'!ji"'" (f '
'IG:~ "<'j"., f" I,
I 1;\, ' ::-" '--;P> N./
'Ii! (', '-' :,y~~( '!
'~i\r;--'-----'~""'~' ,~,,--'
.ft''''' \ II,,. ",)/ ft. "<-' "''< I'
"lq 1',," ,I
~:'.r~';~~:M: ,I', "'. ,/!-' ,/
, ' ..: ~~~ ~- - . . '
i" I ,.-;:.- " ' /.
,~...,..,K~:'
, r,)"?" ,'>/ '.
Ii$> .'
~ ~t' !
./":: 'F~ ~ .-~
/ ".,~I'III.o/,!
/' ".1 ~ I I I/i/fl/.:
,:~:-.~"~ ; tX:;
{;-./~:' f'/:::
'11.../ _1'1."
I ' ,>".;~~:'f.:r, ,,~::/Z~i/i '
'_;'''.~ ,1'-'
/ ;/I,.!'.ioll1 /,"-~<>-' ~
~.'__ -,' ,'" i\ 1/ ~-~--
"c/ " - ."', ,,," - 1_,'
i N,~",:,;:~':;"C~"'/l : I~"-' ~'
, '",dj ,/ (/,' ' !
'J.:S ~:: ,Ii" 'o>;;jj .
~'>- <. I Y \ .iJ/~"'" j'
~', ,I, '1;f ~ u-- $-
.~,.. . <. (C.5~Y~ _ ,.'r
~~, ~:l~&-;) &:
"--', ~ ":": ':"',' /1/
" ~,;;...;.",,~ "';" ~.i "
"<'''' ;;~:~~~: j/
.:.~.,&'&~, Z~.,
~'~
/.
f
\...:;.,E,"-""
c "i(C=cr 5
/'t:L .o:rA/L ~..=-
r~,"'? Aft:""
"
/---- .~ :'
_./ ,.'
"
. /,".; ~ ,,. /
, f . _,-,c .,r.'cc,""4- J'
~ /'".:f[f}C:.r/I.'
,/>_ /"c- ,..-oV,'
/AK'EA //./5 \_
JJ:.:....:,~(
)\. -t.",\",
",.", .~--,~
~\\
'.4~\
" "
~h J::
!f!:c::5?~
~ $.'~'/ '. "'':-~ '"
..,t, ~ :..;:.}
,t..,/.. ','
/ ~ . "". ~!!1f.~
, <J '-,/\.Ji:k
~.~';"9C' -r II .-" "'"- ~''-'1'''' 0'
!,(';.{C7.0" I ~ 2.4'1'
,rQC.r'4 / ~ =--J',';~ '7'
,,_ ."5_ ? ;I-e-
. ,,;','.'0_.':::'- 11>: I.'
! . " ~~ - ,"/,
--.L:;, /~;~;~;)!'!/
/:"-., . ' ",0 c\if//\~;('
'</, ,,:' ,. f.l! A(
l l <,If "'i? l.i'
/if .. /(, IF/ .1';,
,.,9 ""~67' I- jI/";'" /
) ,/2) ,~(' I /( 'I I '
, /~, , i i,"ld" / /..'
/,' " r ~' /:t..~/^,.I/ J"
".,1 \ /) / i':'>- j'/ .t',' 1;'// "
>!J/1 j"/ ..:~:,
.~n ~.,
',-"i~/ r~'"
1;/ ~\~
/' )\,'
'~o
v,_~-----,---"'-
"
~~
"
, .
~ ~:
i
. -~
!q
r.
!i
i~--
.."~
,,',
" ---,
"
,
"--'-
/"
(
,\
";
~tl
-------...:.,-~<j'
=,*.,~ _ t~,,!
I ~
.?~
;~~r ~~---~ ~~; H^t
~ ~dri!;~ ~! m ~i~~ i:
~:i~~;~ 52: ~~ ~~~~ 1]
. ,:~~'..VlI \.1 :H~ <;;;
j II: i' ~iS'<';; ~;; ~]~' tlJ
IPla~ JI ~!~~ s:
\ ~~ ~~~ ~~r0 ~ni ~
Ul ~~i~ C) <<>~ - ~~. ~
:~- ,,~.~ ~ ~~~ .:~~! <;
;- ~~Il H~~ ~ E'tl n~: ~
~ '>,. . ...... ~ I ,..~-
" .' " -\ .~ ",."
:;. .. ~ ~., ~ ~ ~:~;;r"i
~ ' -::i jH'--<
. i
'.
"
~<
,
<
~'"
;';;'.;.>'" /
_,,-, 1
~""~""2:1...,'-.
_ ,,;':-:i/'
/ <<<I
/ o--.:,~--=-~
.~~~~--
'-~:;.
"
'~
, '.
~ ~
\.
~ :;
~ "
,~
"'<,
,
,
;~
i<'
"
~.
"
"
,
.'"
...
1
I
!
,
j
"
1
~~T ~i
,1~~! q ~,
~~,i '~~~~ 7~1
~'li~j'''".1
'\.~ ~.;~!
~ J;~~i]!
\;. l~iH~>:i
~1 ' ~;i~~ ~
~ 11/':; ~.
:j. ~ I .
"
/'.....\
"-.....,/
.::/
"\
',-~
'~'~<
~,j
'-t,
r,
"
'"
7";
,,.: -',
"~I:
" '.,."
\,. ~~
"
"
'\
,.
_-;~,~-".-c
I
/,'
;::
//" ),~,~"
Ii;;" ",' .........:---. l,~,
I"'~ ;" "-
'f -/ 1", ~ "'-,
~: Ii :i~');/
, ,
< :>~, :i 0\/;:/
~,' Y.. 'I. .';
f.. "'\',.j' ?/
,'~I . /
. .l"'~.;) ';/
if' 1\ (, ('>I .,~:.: '
Y ;l,\ \ ":~"~'8< i!-V0~"
1 II " ~- ~'" c':-<~':..,j ,'~ ,~ ,"
'C. . . '.... '. _ /
'" '.", " ...... v
~:\ " "'. "'''~'.
"\\ - ......, "'-..,
:- -"\, ,~ -c~.
./'---:
"
""......
"'.
.............
-:::-:,...........
J
'........
')
, 4'''')
:;-,\ I (",?
'\.'!\ '...;"
::.\. ""'--' ;
\(~" .c./---___7_~.~..,.;,~ ;,~,.~::-;'-
'_;)_:'~..':.. , ~ -. ~ .
- . ,11"-'.
.! ~ - ,- -:~, '1' 'I"
/ """,;/
'-;.' ,.' I' ;;' ,
..';..... l::>" c\ .;jf
'- '''';' Y
/ ;~" ',,\
//l;..",,,;,,
" 1/)....
~ ~'r
\<'~./(ll, ' /i
/. ,'. '. [1,_ >c"'. /S'::. ."")"/','
.' (" '. ~"~ ',...~~> I rf
.I ---' -"\ # "'~:e_ -/ '_.__(,
...~ ...~- ,... ,-;....C";6-d ,.
,-- ~ ~ 1---,< ~v,:.-~ I
'~""""':
~" ;\ /
~~'~..,~,./'
/
"'"--:'~,
I"~. )
. ,
i
3:/
.
:(i'
'.('',:;:-.:,: ..
',-.-:-. I
.....,<. 1
"/"
)
.:';
j''':"
" ,
, ~ t ,
,,~' ~";
:: ~~'
i';
,
"
L'
:~ ;-
/;-l-~I
\. , ! ~
'--.Lj
. i
\
,
". -"
\ .~ ~ % ~,
~~~;.~(
,. '.
~ ;
t
,
..
':
~-"'-"'---
4 _-?'?' ~
J";/,.y;;
7?G
,,', "
;. ~
'" .,
..
"
;- .~ \ ~:
~,~ ~ ~
.'
, ~,
""
> :.:;;,
i
.~
~ ~,
''<
l
I
~
",,-
)~... 'h;ij~ / '~-".J 1/' ~;'>' _I -'-0
/ ,:::U;' 1-:1-( ;,.., . '~'TI - ,~o!-'
'~'~<i: "(~ ,.:"-) >~:/~~1-'. ~~ ~, -
()~r; II:.
, .:. ' 0~i" '~'~ " l' rll:T:. !c
, J", "" .
_ ; r ',~ '-:.- ~ f'-'
. I~'
,1'-
I. ~.'
~;
,
1:1 I I'
" ["
I'~: ,~
;, '"""--' =., '.
,c
= = ,~\
.,','-. . " \ \
__,~ . ".CI . ,"\
';~" '\- \; \ ::",,;ew,.,
I'; "'l'''\~' "\\J.. "'. ~<
,:.","'::~C" ~ "
Jf,,""I" . '~"
'. .:r'j..i i:1H!"~1"'t'.'''\;~:;''
.:.:Pt, l'j, ~:~:Jll_;"~~'~'
w''''''A'G IT V
, C':. P;"\ll:l; \,C~ Ji j
'1:: '.~",:I ..~
I' i-~-;-~' ."",.". '1
! .~" '---;~ i ~':'}; ^., f~'!: :'
r-:-!r-< ' I: it~ ; _L,-~
! 1~'I,. ,I;I"'~." =," "'ti '
I ',.,.1 j,u d II~r: ,,,,,-,,; .1;1; i
":"I'~ij,rl J1I I
'rl.: ,;, --r~1 ~"'"'-'--'-"'-.- .' U,.'
i~'~! '..~"::~--:'::"~' I ~
.: 1 :" ," i I
: ~ I ! " ~ I
I : " I j , ~ "i '
; i "I
Ii' ,0 ,,-,,
_; ,J;I :1
~!%i.i~;i~".~u:l;c,i~;~i .
III 'f ,j ,
!' 1'1 LTI~
~."-;;:: ~. il:l' ,J'" "c~~2-;
~; , , ,
i L
, ~
.,
~,~;-
..""
.. ~
"'''"'-'' ~.;;,
'I
,: ~ ~
- 3 ~~ ,~
I~ml~
; ~" I',...},
~ ~i~1 ,~!
~ ~ ~ : ~
; ~ .:; ~ ~
~ '1 ~ "
HI
i ~ ~
;; ,
-31
I . ~
.;:,.,
c"?',',."';.
, 0
---==-.- ----=--:::-'/
~r;/';,,\'. i].,rz '.\1.<:
,.X.",,";
,':E:.-','X-
'_,,-i;
o ~ , '
cu
, '
,,"
0"
~'-!
~;
~. ~
,
lj
i I
1 I
: 1
@
Ir
~
I
, .
,
~
=
r ~,S~,E'
I' : b ,.
P.' .1 ,0;;'
7'- .~ .,:."
~'i..';j.~
}~~,.~..tJ
~
.____~.-=.:~'"E__;
"" ",,,... ",,,~J
~'~.';!;j _, '0:)
'";,, I
lUlL
, "
'" .;. ^
1~ Lj
~, : ~
t I ' . '> ~ -
: '
I ' ; ~
;;1
~ ~ ~
2 ~
, .~ < ' , . ;
~ ~ ~
~ ~ '"
~ < -,
~ ~ i
~ ~ ~
~ i
;' ~
, .
.~ ~
, ~
EXHIBIT
---I
liB"
~~
,.
r
r
~
f-
I,
I
i
~ll~r" ~
Jii"., 1,<0 ,~'
.~ ~~~~ .<:
_,I"v"
!~.H;;~:
<l ~dn~
5 I' a
, ~; ~ <;xi
2 t!H~~.~
~ :' -.:~! ~,
: ; 1-,--
i(
~
EXHIBIT "B"
."'-.
I '"
I ~
/ ~,-
/ ....' ~~
II " ,,'<
;
/
;
;'
I
I
'I'
i
/7
/'1
"
I
II
;'
/
f
,j,
(."
"
i .~,.,____,,,.
~- '<",
':>.,;" ~ I '::. ~ ",,<,~~
.._-~ c.."::-..::. -<...
( ,," '< "'"
'---.' ''---- ' '----.',
, i;:' 0~
(;;;\ ) --'.) .":,,,
" / ,J ~~;!.
/' ~
/" /. ~ '.J
// ~-F, ",'
;' ::// .oS
, Yo..;' /
,: /' ~:~i~S::
/ ~~,.-... k/'~
/ ;",. ,~
G..' :1;/ j f! J2
" /;'7/ I i!? I',
, -tJ/
. l rf""
. . ,,/ I" ,"
4"'.1 I ::-: ~':"
.~:' i",.' .I'" ',,-
s::' .;~~' ;/.; -- - -
,..;/'
Cl:
1(J 1';
r-'.
"-'-
~
'~
'..1",.
<c
"
~ ~,TX
~
[;
~ $
~ K::
I
~
---
'----,.
'----
rf>'
;:/'
(:}rf
",Gt"
;.. A'
^"I'<
.Cf/~)
~{//j/
"<",,Co'
,.,vi.
.pJ:::
r,,\YCJ
.~! '
;~1
L
\
.
1
~
10
I ~
~p~
"~;'i ~~ ~;I'
"II ~~ ~
""!, !ih~1
~ ~i~5~
.~~~~~~
~ ~I!nl
'J' ,.,II ~ = -~,
Q 1'1'1" ~i ~'
: ~ ~. -~ 'J!
EXHIBIT "B"
i , : ! 7
1 ; ~ ! !
,
; ,
, !
, ,
, ;
!
,
~;~~
;:.~~~
~~~~
",,~
~~~
,,~~
i:i~.;
~~~
Ili:
~~~
if<,:::
.':~-
','
~:;
I
,'Si.~_, :1 I ~i
"".~'''' "\ f7'- - .---- "'_..n - --z-- ~ r-
_ ""!",,-ml. .,:~---r..,;;;:;;-.:;;;;;--~i.~ ~ I
___7":'~ "ifJ}.:A"'" I ' rw>J;;;;: -'"."'~' c..1-
~ ! II '--~""=-===,"-'"", 'yr
~, (6b ON' 9' $"~'~ ~~' ;!~ I ,,-
I I ':f,W:>08'.."'i 511YI>3 I ~t *
.' iJOO"3~~' .'JO'8 i ,:" I ii~ :
,
.----nr--,
Ii
",
\ :.-'/,,,'!:.
(I: ",
.j',
;
)
"'I
..~
,,'.'
~.'-'
".'1
"-
i~.'
f"
'"
"'~ :'
~~.I~-r-
<,-,' . ~
-} ~
".
~:
-.- ~ "3.0,/,;'., H~LZ MS - :r-
, . o,~
t.-.,
'-'
I I' ,-'--:---:
':;".;:':~!,~ I
" 'lr"
! , .
1',;;:
: i!i~ :
.6fC,
,,,:.,,-&
~ .'<'-
,.Jo,o
, I~'
--I
I
I
I
\
.,
::II'}!:
~~~
:1
,I
',------
I ~ ,
"
,:::
,
'"
"
~; ~
: ~I
J/~~~~~
I
1:1
I
)
/'):P!
;~:I
~'I
~,
~ :1
r,''''_
;;0'
,
"
i'l
Ii
~______..J~
I
,
c,)
:,
; >Xl"
L ~ :,
~
{
EXHIBIT "e"
Conditions of Approval
Project name: Belhesda Memorial Hospital
File number: MSPM 03-008
Reference: 2nd review plans idenlified wilh an August 26, 2003 Planning & Zoning Department dale slamp
marking
I DEPARTMENTS I INCLUDE ! REJECT !
PUBLIC WORKS- General
Commenls: None
PUBLIC WORKS- Traffic
Comments: None
UTILITIES
Comments: None
FIRE
Commenls: None
POLICE
Commenls: None
ENGINEERING DIVISION
C ommenls:
1. Allhough the parking for the hospilal meets current code requiremenls,
Engineering recommends thaI lhe Hospital review lhe data from lheir May,
2002 parking study to implemenl addilional on-sile parking thaI is flexible
enough 10 grow with lhe hospilal's needs.
BUILDING DIVISION
Comments:
2. Title Sheet shall reflect The Year Slandards thaI are in effect:
a) The 2002 Edition of NEC is in effecl as of June 30,
2003,
b) The 1995 Edition ofNFPA 80.
3. The noted fire resislance ratings on lhe litle sheet shall comply with Table
600 of 200 I FBC for lhe required fire resislance ratings.
4, Place a nole on the elevalion view drawings indicating lhal lhe wall openings
and wall construction comply with Table 600 of the 2001 FBC,
5. Buildings. slructures and parts thereof shall be designed to wilhsland lhe
Condilions of Approvat
2
II DEPARTMENTS I INCLUDE \ REJECT !
minimum wind loads of 140 mph. Wind forces on every building or slruclure
shall be determined by the provisions of Chapter 6 of ASCE 7, and the
provisions of Section 1606 (Wind Loads) of the 200 I FBC, Calculations lhat
are signed and sealed by a design professional regislered in the stale of
Florida shall be submitted for reviewal the time of permil applicalion.
6. Every building and structure shall be of sufficienl strength 10 support the
loads and forces encountered per the 2001 FBC, Seclion 1601.2,1 and Table
1604.1. Indicale the live load (pst) on lhe plans for the building design.
7, Al time ofpermil review, submit signed and sealed working drawings oflhe
proposed conslruction.
8, Indicate lhe number of accessible parking spaces provided and where lhe
exisling Handicap spaces will be relocaled.
9. Add a labeled symbol to lhe site plan drawing that represents and delineates
lhe palh of travel for lhe accessible route thaI is required between the
accessible parking spaces and lhe accessible entrance doors to the building.
The inslalled symbol, required along the palh, shall slart at lhe accessible
parking spaces and lerminale al the accessible enlrance doors to the building.
The symbol shall represent lhe localion of lhe path of lravel, nol lhe localion
of lhe deleclable warning or other pavement markings. The localion of the
accessible palh shall nol compel lhe user 10 travel in a drive/lane area lhat is
localed behind parked vehicles. Identify on the plan lhe widlh of the
accessible roule, (Note: The minimum widlh required by the code is forty-
four (44) inches). Add lexl to the drawing thaI would indicale lhal the symbol
represents the accessible route and lhe route is designed in compliance wilh
Section 11-4,3 (Accessible Route) and 11-4,6 (Parking and Passenger
Loading Zones) of the 2001 FBC. Please nole that al lime of permit review,
the applicant shall provide delailed documenlation on lhe plans lhal will
verify that lhe accessible roule is in compliance with lhe regulalions specified
in the 200 I FBC. This documentation shall include, bul nol be limiled to,
providing finish grade elevalions along lhe palh of Ira vel. Clarify 10 where the
exisling Handicap spaces will be relocaled,
to. If capilal facilily fees (waler and sewer) have been paid in advance to the City
of Boynlon Beach Ulilities Departmenl, the following information shall be
provided at the lime of building permil applicalion:
t. The full name of lhe projecl as il appears on lhe
Development Order and lhe Commission-approved site
plan,
11. The lolal amount paid and ilemized inlo how much is for
water and how much is for sewer.
(CBBCO, Chapler 26, Article II, Seclions 26-34)
PARKS AND RECREATION
Comments: None
I DEPARTMENTS I INCLUDE I REJECT I
FORESTER/ENVIRONMENT ALIST
Comments: None
PLANNING AND ZONING
Comments:
11, The "Mechanical Room" exceeds lhe 45 fool height limilalion by 10 feel 5
inches and will reauire a Height Exceplion by lhe Citv Commission.
12, All above ground mechanical equipment will need 10 be visually screened,
13. Any equipmenl attached 10 the exterior walls shall be painled 10 malch lhe
building
14. Any landscape required to be removed due 10 the conslruclion should be
nOled, complele with a replanting schedule, and should be coordinated wilh
lhe Citv Foresler.
15. The revised Traffic Study has been forwarded to Palm Beach County Traffic
Division for review and determination, No permit shall be issued prior 10
receipt of an approval letter.
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
1, To be delermined.
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
I 1. To be delermined, I I I
S:\Planning\SHARED\ WP\PROJ ECTS\Bethesda\MSPM 03-008\COAdoc
1st REVIEW COMMENTS
Maior Site Plan Modification
Project name: Bethesda Memorial Hospital
File number: MSPM 03-08
Reference: 1st review plans identified as a Maior Site Plan Modification with a Julv 23. 2003 Planninl!
and Zoninl! Department date stamp markinl!.
REVISED RESPONSE COMMENTS BY KIWAY &
ASSOCIATES ON 8/29/03 (revised answers 6. 23. 28)
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Commenls:
1. Prior to pennil application, conlact the Public Works Deparlmenl (561-
742-6200) rel!ardin!! lhe stora!!e and handlin!! of refuse.
This project will be using the existing utilities on the site.
Therefore, there are no new utilities coming onto this site for
ResDonse: this proiect.
PUBLIC WORKS - Traffic
Comments:
2. No modifications were made 10 pavemenl area; therefore lhis segment
will be reviewed at pennit time for any technical adjuslments required.
ResDonse: Noted
UTILITIES
Commenls: NONE
ENGINEERING DIVISION
Commenls:
3. No modifications were made to the pavement or drainage areas:
lherefore this segmenl will be reviewed at pennit time for any technical
adjustments required.
Response: Noted
4. The Parking Planned Study dated May, 2002, reflects a current parking
space deficil of 198 spaces. It further projects lhat lhe parking needs for
lhe year 2010 will reflecl a deficit of 693 spaces. By allowing for an
upper floor(s) addilion at this time, how is the hospital complex going 10
resolve their oarkin!! deficit(s)?
Response: In September, a Parking Structure plan for the Hospital
complex will be submitted to do a Major Site Plan
Modification.
File No. 352.21
8/29/03
- I -
5. Any (and all) comments requiring changes and/or correclions lolhe
plans shall be reflecled on all appropriate sheels.
Resnonse: Revised plans are attached.
6. No utility plan was included with this submittal; therefore. the Utililies
Departmenl considers this plan incomplele as submilled, The proposed
Site Plan is wilhin a previous approved project where utilily support is
available, We are providing only a cursory review of lhe proposed
project as submilted al lhis time. Addilional commenls will be required
after a utilily plan is submitted. The current concern is the capacity to
provide service to this oroiect without svstem improvements.
Response: The building is being expanded vertically and will be using
the existing adequate utilities on the site. Therefore, there
are no new utilities coming onto this site for this project.
FIRE
Commenls:
7. A fire in an area of a hospital that is under construclion and withoul
sprinkler proteclion, poses a significanl threat to portions of the hospital
occupied by palienls lhal may not be capable of rapid egress, (See the
Florida Fire Prevention Code Seclion 19.1.1.3). A fire in an
unsprinklered area could rapidly spread and overwhelm sprinklers in the
protected areas.
Response: The uew addition will be constructed with a two (2) hour
rated roof system and will be fully sprinkIered. The
addition is located over an existing sprinkIered out patient
portion of the hospital and remotely from the existing
natient bed tower.
8. Accordingly, provide a plan of aclions 10 be laken to protecl patients in
exisling occupied areas from the threat posed by construction activities.
The plan will be reviewed in accordance with lhe Florida Fire
Prevention Code Section 4.6.10. I and Chapler 5 (Fire Protection) of
NFPA 241, Safeguarding Construction, Alteration, and Demolition
Operations. The plan is expected to address all applicable sections of
NFPA 241, with emphasis on Section 5-1.3, (Pre-Fire Plans), 5-1.6.,
(Hot Work Permits): and 5-1.8 (Impairments).
Response: A fire manual for the hospital is attached.
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
9. Tille Sheet: The Year Standards in Effect Are:
a) The 2002 Edition of NEC is in effect al of June 30, 2003.
b) The 1995 Edilion ofNFPA 80,
ResDonse: Coversheet has been updated.
10. The noted fire resistance ratings on the title sheet shall comply with
Table 600 of 2001 FBC for the reCluired fire resistance ratings.
File No. 352.21
8/29/03
-2-
ResDonse: Coversheet has been undated.
II. Place a nole on the elevalion view drawings indicating thaI the wall
openings and wall construclion comply wilh Table 600 oflhe 2001
FBC.
Remonse: Sheets A201 and A202 have been undated
12. Buildings, structures and parts thereof shall be designed 10 withstand the
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be delermined by the provisions of Chapter 6 of ASCE 7,
and the provisions of Section 1606 (Wind Loads) of the 2001 FBC.
Calculations lhat are signed and sealed by a design professional
regislered in lhe slate of Florida shall be submitted for reviewal lhe lime
of oermil aoolicalion.
Response: The addition has been designed to meet these requirements.
Signed and sealed calculations will be submitted for review
at the time of nermit annlication.
13. Every building and structure shall be of sufficient strength 10 support the
loads and forces encountered per lhe 2001 FBC, Section 1601.2.1 and
Tale 1604: I. Indicate the live load (psf) on the plans for the building
design,
ResDonse: Sheets A101, AI04, A105 and AI05A have been undated.
14. Al time of permit review, submit signed and sealed working drawings of
lhe orooosed conslruction,
Response: Signed and sealed working drawings will be submitted at
time of permit annlication.
15. Indicate lhe total number of parking spaces thaI will be provided for this
expansion and indicate the number of accessible parking spaces
provided. Comply with 200 I FBC Section 11-4.1.6.
Response: The Hospital has not planned to add parking spaces in
connection to this expansion because it meets the City's
Code. However, a Parking Structure plan for the Hospital
complex will be submitted to in September.
16. Add a labeled symbol to the site plan drawing lhat represents and
delineales the palh of travel for lhe accessible route thaI is required
belween the accessible parking spaces and the accessible entrance doors
to the building. The installed symbol, required along the path, shall start
al lhe accessible parking spaces and lerminale at lhe accessible enlrance
doors 10 lhe building. The symbol shall represenl lhe location of lhe
palh of travel, not lhe location of lhe delectable warning or other
pavement markings. The location of lhe accessible path shall nol
compel the user 10 travel in a drive/lane area lhat is located behind
parked vehicles. Identify on the plan the widlh of the accessible route,
(Nole: The minimum widlh required by the code is forty.four (44)
inches). Add text to the drawing that would indicate lhat the symbol
represents the accessible route and lhe route is designed in compliance
with Section 11-4.3 (Accessible Route) and 11-4.6 (Parking and
Passenger Loading Zones) of the 200 I FBC. Please note that at time of
permit review, the applicant shall provide detailed documentation on the
plans thaI will verify that the accessible route is in compliance with the
regulations specified in the 2001 FBC. This documentation shall
include, bul not be limited to, providing finish grade elevalions along
the nalh of lrave\.
File No. 352.21
8/29/03
- 3 -
Response: Items have been npdated on the revised site plan.
17. Add 10 lhe drawing the calculalions lhal were used 10 identify lhe
minimum number of required handicap accessible parking spaces. Also,
slale lhe code section lhal is aoolicable to the comoutalions.
Response: Item has been updated on the revised site plan.
18. Idenlify wilhin lhe site dala the finish floor elevalion (lowesl floor
elevation) that is proposed for the/each building. Verify lhat lhe
proposed elevation is in compliance with regulations of the code by
adding specifications 10 the site dala lhat address the following issues
[Section 3107.1.2, Chapler 31 oflhe 2001 FBC]:
a) The design professional-of-record for the projecl shall add lhe
following text to lhe sile dala. "The proposed finish floor elevation
NGVD is above lhe highest loo-year base flood
elevalion applicable to the building site, as determined by the
SFWMD's surface water managemenl construction developmenl
regulations."
b) From lhe FIRM map, idenlify in the site data the tille of the flood
zone lhal the building is located within. Where applicable, specify
the base flood elevation, If there is no base flood elevation, indicale
lhal on the plans.
c) Idenlify lhe floor elevalion that the design professional has
established for lhe building within the foolprinl of the building thaI
is shown on the drawings titled sile plan, floor plan and
pavin!>/drainage (civil plans).
Response: Items have been adjusted to the revised site plans.
19, In the drawing litled site plan, identify and label the symbol that
represents the oroperty line.
Response: Item has been updated on the revised site plan.
20. A water use permit is required for the irrigation system. A copy of the
oermit shall be submitted al the time of oermit aoplication, F.S. 373.216.
Response: Since no new irrigation is required for this project, the
existing water use permit will suffice.
21. If capital facilily fees (water and sewer) have been paid in advance to
the City of Boynlon Beach Utilities Departmenl, lhe following
information shall be provided at the time of building permit application:
i. The full name of the project as il appears on lhe Developmenl Order
and the Commission-approved site plan.
ii. If lhe project is a multi-family projecl, lhe building number(s) must
be provided. The building numbers musl be lhe same as noted on
lhe Commission-approved sile plans.
iii. The number of dwelling units in each building.
IV, The number of bedrooms in each dwelling unit.
v. The total amount paid and itemized into how much is for waler and
how much is for sewer.
(CBBCO, Chapler 26, Article II, Section 26-34)
File No. 352.21
8/29/03
-4-
Response: If needed, these items wiD be provided at the time of building
permit application.
PARKS AND RECREATION
Comments: NONE
PLANNING AND ZONING
Comments:
DEPARTMENTS INCLUDE REJECT
22. The fourth level "Mechanical Room" exceeds the 45 foot height
limitation and will require a Height Exception or Variance (depending
upon exacl circumstances) by lhe Cily Commission. Additionally, il is
unclear whal lhe exacl dimension of lhe parapet wall on the lhird level is
intended to be. Please indicate the dimension on the plans and if lhe
heil!hl exceeds 45 feet, it will reouire an exceolion,
Response: Sheets A201 and A202 have been updated to reflect
dimensions of roof and parapet. A written statement to
request for a Height Exception will be submitted at time of
Technical Review Committee meetinS! on AuS!ust 26, 2003.
23. A mechanical room is intended for such purposes as the elevator and
stairwell indicaled, however the plans depicl a slorage room and office
in lhis structure as well. Please explain the reasoning and necessily for
these SDaces.
Response: The elevator and stair depicted on Sheet AI05 are intended
for roof access on level four. This roof has also been
designed to accommodate relocating the existing helipad
from the to second level to the fourth level. The Office
R4002 and Storage R4002 have been deleted on the revised
site plan, per discussion at TRC on 8/26/03. Relocating the
existing helipad has been submitted as an Alternate to the
project.
24, The LOR's require Major Site Plan Modificalions to submit the same
infonnation as required for a New Site Plan, i.e. Landscape Plan,
Drainage Plan and a Site Plan depicling site lighting, parking stall/aisle
dimensions. elc. These Dal!eS were nol attached,
Response: These pages are not attached because the project is to
expand the building vertically and there are no horizontal
adjustments at this time being done to the site.
25. The size of submitted nlans shall not exceed 24" x 36".
Response: The plans that will be submitted for the TRC meeting shall
be 24" X 36".
26, Indicale how handicapped.accessible parking and ingress/egress will be
accomplished during the construction phase since construclionlslaging
areas are occuoving these snaces.
Response: Item has been adjusted on the revised site plan.
27. There should be a designated construction entrance to limit large trucks
and eouiomenl from drivin!1 all throughout the site.
File No. 352.21
8/29/03
- 5 -
Response: Sheet GIOI has been modified to indicate Public Access vs.
Construction Access. Construction access will occur off of
S. W. 23" Avenue.
28. Provide details on how pedestrians will be protecled from overhead
construction.
Response: Sheet GIOI defines construction staging areas, which has a
pedestrian construction tunnels from the construction
staging areas to the Oncology, Emergency and Outpatient
entrances. These pedestrian construction tunnels wiD
protect pedestrians from overhead construction. The
contractor is responsible to provide further protection to
meet OSHA requirements.
29, Site dala labulalions do not match between Kilday drawing SP-l (dated
7-23-03) and HDR cover sheet (issue dale 7-22-03).
Response: The revised site plan and the revised elevation coversheet
match the site data tabulation information.
30. Indicale how roof draina2e is bein2 addressed for the new construclion.
Response: The addition is being built over an existiug portion of the
hospital. No new footprint is being added as part of this
effort, therefore there is no increase in roof area of the
building. Roof drainage will be handled by connecting the
new roof drains into the existim! svstem
31. Will there be any new lighting attached to the walls of lhe new
construction? Any new light fixtures in the immediale vicinity of the
new construction? If so. complete specificalions including height. color
and wind lead resistance will need 10 be submitted.
Response: No new exterior lighting is currently planned for this
addition, except for lights at the roof level door and for the
Alternate for the roof of the fourth level helioad.
32, All above ground mechanical equipment will need to be visually
screened.
Response: There is no ground level or roof level mechanical eqnipment
in this project. All mechanical equipment is enclosed within
the second level mechanical room. The roof top elevator
vent is located bevond line of sil!ht from the l!round.
33, Any equipment altached to lhe exterior walls shall be painled to malch
lhe buildin2.
Response: There is no equipment attached to the exterior walls of the
addition.
34. Anv addilional Si2nal!e needs to be reflected on the plans.
Response: No additional signage is proposed.
35. Any landscape required to be removed due to lhe construclion should be
noted. complele with a replanting schedule. and should be coordinaled
with the Citv Forester,
Response: NA - all existing landscape is to remain and wiD be
orotected durin!! construction.
36. Provide paint swalches with manufacturer name and color name and
number at TRC meeting,
File No. 352.21
8/29/03
-6-
Response: Exterior paint color swatches will be snbmitted at TRC
meeting on Angnst 26, 2003. The addition is intended to
match the color scheme of the existinl! facilitv.
37. Provide clip-mounled color elevation drawings on presenlation boards at
TRC meelinl!.
Response: Color Elevation drawings will be submitted at TRC meeting
on AUl!ust 26, 2003.
38. The revised Traffic Sludy will be forwarded to Palm Beach Counly
Traffic Division for review and delennination, No pennit shall be
issued prior to receipl of an approval letter.
Response: A letter dated Augnst 18, 2003 from Palm Beach County
Traffic Division is attached. The Project Traffic Engineer
will work with the Palm Beach County Division to revise the
traffic study as necessary.
39. The required updated survey shall be submitted. It shall include Q!l.Q!!!;.
sheet, the newly completed renovations to lhe main entrance and lhe
addilionallots acauired for parkinl! purooses.
Response: The updated survey is attached. Paul Engle from O'Brien,
Suiter & O'Brien, Inc. spoke with Ed Breeze that the survey
will be on different sheets based on the complexity of the site.
File No, 352.21
8/29/03
- 7 -
1st REVIEW COMMENTS
Maior Site Plan Modification
Projecl name: Belhesda Memorial Hospital
File number: MSPM 03-00~
Reference: I" review plans idenlified as a Maior Sile Plan Modificalion with a July 23, 2003 Planning and
Zoning Department date slamu marking
I I I
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior 10 permil applicalion, conlact the Public Works Departmenl (561-742-
6200( regarding lhe slorage and handling of refuse,
I PUBLIC WORKS - Traffic ,
Commenls:
2, No modifications were made to pavemenl area; lherefore lhis segmenl will
be reviewed at permil lime for any lechnical adjuslmenls required.
UTILITIES
Comments: NONE
ENGINEERING DIVISION
Comments:
3. No modifications were made to the pavemenl or drainage areas; lherefore
this segment will be reviewed at permit lime for any technical adjustmenls
reauired.
4, The Parking Planned Study daled May, 2002, reflecls a currenl parking I
space deficit of 198 spaces. It further projecls thaI the parking needs for lhe !
year 2010 will reflecl a deficit of 693 spaces. By allowing for an upper-
1100r(s) addition at this time, how is lhe hospital complex going to resolve
their parking deficit(s)?
5. Any (and all) commenls requiring changes and/or correclions to lhe plans
shall be reflecled on all appropriale sheets.
6. No ulilityplan was included wilh lhis submittal; lherefore, lhe Ulililies
Department considers this plan incomplete as submitted. The proposed Site
Plan is within a previous approved project where utility support is available,
We are providing only a cursory review of the proposed projecl as
submitted al lhis lime, Addilional comments will be required after a utility
plan is submitted. The currenl concern is the capacity 10 provide service 10
this proiecl wilhout syslem imurovemenls,
FIRE
Commenls:
7. A fire in an area of a hospital lhat is under construction and wilhoul
sprinkler proteclion. poses a significant lhreat to portions of the hospilal
occupied by patienls lhal may nol be capable of rapid egress. (See the
1ST REVIEW COMMENTS
08/12/03
2
, II
DEPARTMENTS INCLUDE REJECT
Florida Fire Prevention Code Section 19,1.1.3) A fire in an unsprinklered
area could rapidlv sDread and overwhelm sorinklers in lhe orotecled areas,
8. Accordingly, provide a plan of aclions to be taken to prolecl patienls in
exisling occupied areas from the lhreal posed by construclion activilies,
The plan will be reviewed in accordance wilh lhe Florida Fire Prevention
Code Seclion 4.6.10.1 and Chapler 5 (Fire Prolection) ofNFPA 241,
Safeguarding COllstruetion, Alteration, and Demolition Operations. The
plan is expecled to address all applicable seclions ofNFPA 241, wilh
emphasis on Sections 5-1.3, (Pre-Fire Plans), 5-1.6., (Hot Work Permits),
and 5-1.8 (Impairments)
I POLICE
I
Commenls: NONE
BUILDING DIVISION
Comments:
9. Title Sheel: The Year Slandards in Effect Are:
a) The 2002 Edition ofNEC is in effecl as of June 30, 2003,
b) The 1995 Edilion ofNFPA 80.
, la, The noled fire resislance ralings on lhe title sheel shall comply wilh Table
600 of 200 I FBC for the required fire resistance ralings.
II. Place a nole on lhe elevation view drawings indicating lhat lhe wall
openings and wall construction comply wilh Table 600 of the 2001 FBe.
12. Buildings, structures and parts lhereof shall be designed to wilhsland the
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be delermined by lhe provisions of Chapler 6 of ASCE 7, and
lhe provisions of See lion 1606 (Wind Loads) oflhe 2001 FBC. Calculalions
thaI are signed and sealed by a design professional regislered in lhe state of
Florida shall be submitted for reviewal lhe time of permil applicalion.
13. Every building and struclure shall be of sufficienl strength to support lhe
loads and forces encounlered per lhe 2001 FBC, Section 1601.2,1 and Table
1604. I. Indicate lhe live load (psi) on lhe olans for the building design,
14, At time of permil review, submit signed and sealed working drawings of lhe
proposed construction,
15, Indicatc the lotal number of parking spaces lhat will be provided for lhis
expansion and indicale the number of accessible parking spaces provided.
Comply wilh 200 I FBC Seclion 11-4.1.6.
16. Add a labeled symbol to the site plan drawing that represenls and delineates
1ST REVIEW COMMENTS
08/12/03
3
DEPARTMENTS
the path of travel for the accessible route lhal is required belween the
accessible parking spaces and the accessible entrance doors to lhe building,
The installed symbol, required along the palh, shall slarl al the accessible
parking spaces and lerminate al the accessible entrance doors to the
building. The symbol shall represent lhe location of lhe path of travel. not
the localion of the delectable warning or other pavemenl markings. The
location of the accessible palh shall not compel the user 10 travel in a
drive/lane area lhat is localed behind parked vehicles, IdentifY on lhe plan
lhe width of the accessible route. (Nole: The minimum widlh required by
the code is forty-four (44) inches). Add lext 10 lhe drawing lhal would
indicate lhal the symbol represenls lhe accessible route and lhe roule is
designed in compliance wilh Section 11-4.3 (Accessible Roule) and 11-4.6
(Parking and Passenger Loading Zones) of the 2001 FBe. Please note lhat
at time of permit review, lhe applicanl shall provide detailed documenlation
on lhe plans thaI will verifY lhal the accessible route is in compliance wilh
the regulalions specified in lhe 2001 FBC. This documenlalion shall
include, but nol be limited to, providing finish grade elevalions along the
path of travel.
117.
Add to lhe drawing the calcu1alions that were used to identifY the minimum
number ofrequired handicap accessible parking spaces. Also, slate the code
section lhal is applicable to lhe computations.
18.
IdentifY within the site dala the finish floor elevation (lowesl floor elevalion)
that j, proposed for the/each building. VerifY that the proposed elevation is
in compliance wilh regulations of lhe code by adding specificalions 10 the
sile dala thaI address the following issues [Seclion 3107,1.2, Chapler 31 of
the 2001 FBC]:
a) The design professional-of-record for lhe projecl shall add lhe
following texl 10 lhe site dala. "The proposed finish floor elevation
_' _ NGVD is above the highest 100-year base flood elevalion
applicable to lhe building sile, as determined by lhe SFWMD's surface
waler managemenl construclion developmenl regu1alions."
b) From lhe FIRM map, idenlifY in lhe site dala lhe tille of the flood zone
thaI lhe building is located wilhin. Where applicable, specifY the base
flood elevalion, If lhere is no base flood elevation, indicate that on lhe
plans.
c) IdentifY the floor elevation lhal lhe design professional has eSlablished
for the building wilhin the footprinl of the building that is sho'ml on
the drawings lilled site plan, noor plan and paving! drainage (civil
plans),
19. In lhe drawing litled site plan, idenlifY and label the symbol lhat represenls
lhe property line.
20. A water use permit is required for the irrigation system. A copy of the
permil shall be submitted al the time ofpermil applicalion, F.S. 373.216.
INCLUDE REJECT
1ST REVIEW COMMENTS
08/12/03
3
DEP ARTlVIENTS
the path of travel for lhe accessible route lhat is required belween the
accessible parking spaces and lhe accessible entrance doors to the building.
The installed symbol, required along lhe path, shall slart at the accessible
parking spaces and terminale at lhe accessible entrance doors 10 the
building. The symbol shall represenl the location of the palh of travel, not
the location of the deteclable warning or other pavement markmgs. The
location of lhe accessible palh shall nol compel lhe user to travel in a
drive/lane area that is located behind parked vehicles, IdenlifY on lhe plan
the width of lhe accessible route. (Nole: The minimum width required by
the code is forty-four (44) inches). Add text to lhe drawing lhat would
indicale lhat lhe symbol represents the accessible roule and lhe route is
designed in compliance with Section 11-4.3 (Accessible Roule) and 11-4.6
(Parking and Passenger Loading Zones) of the 2001 FBe. Please note lhat
al lime of permit review, the applicanl shall provide delailed documenlation
on the plans lhat will verifY thaI the accessible route is in compliance wilh
lhe regulalions specified in the 2001 FBe. This documenlation shall
include, bul not be limiled 10, providing finish grade elevalions along lhe
path of travel.
17. Add 10 lhe drawing lhe calculalions lhat were used to identifY lhe minimum
number ofrequired handicap accessible parking spaces, Also, state lhe code
seclion that is applicable to the computations.
18.
IdenlifY wilhin the sile data the finish floor elevalion (lowest floor elevalion)
thaI is proposed for lhe/each building, YerifY lhal lhe proposed elevation is
in compliance wilh regulalions of the code by adding specificalions 10 lhe
site dala thaI address the following issues [Section 3107.1.2, Chapler 31 of
the 2001 FBe]:
a) The design professional-of-record for lhe projecl shall add lhe
following text 10 lhe site dala. "The proposed finish floor elevation
_' _ NGYD is above the highesl 100-year base flood elevation
applicable to lhe building site, as determined by lhe SFWMD's surface
waler management construction developmenl regulations."
b) From lhe FIRM map, idenlifY in lhe sile dala the litle of the flood zone
lhal lhe building is localed within. Where applicable, specifY the base
flood elevalion. If lhere is no base flood elevalion. indicale lhal on lhe
plans.
c) IdenlifY lhe floor elevalion lhal lhe design professional has established
for lhe building wilhin lhe footprint of the building lhal is shown on
the drawings tilled site plan, floor plan and paving! drainage (civil
plans).
19. In lhe drawing titled site plan, idenlifY and label the symbol lhal represenls
lhe property line.
20. . A copy of the permit shall be submitted at the time of permit application,
F.S, 373.216.
INCLUDE
REJECT
1ST REVIEW COMMENTS
OSil2/03
4
I I
DEP ARTlYIENTS INCLUDE REJECT I
21. If capilal facility fees (waler and sewer) have been paid in advance 10 lhe
City of Boynton Beach Utilities Departmenl, the following information shall
be provided al the time of building permit applicalion:
1. The full name of the project as il appears on lhe Development Order
and lhe Commission-approved sile plan.
t1. If the projecl is a multi-family project, the building number(s) must be
provided. The building numbers must be the same as noled on lhe
Commission-approved site plans.
111. The number of dwelling unils in each building.
IV. The number of bedrooms in each dwelling unit.
v. The total amounl paid and ilemized inlo how much is for waler and
how much is for sewer.
(CBBCO, Chapter 26. Article II. Seclions 26-34)
PARKS AND RECREATION
Comments: NONE
FORESTERJENVlRONMENT ALIST
Commenls: NONE
PLANNING AND ZONING
Comments:
22. The fourth level "Mechanical Room" exceeds lhe 45 fool heighl limitation
and will require a Height Exception or Variance (depending upon exacl
circumstances) by the City Commission, Additionally, il is unclear whal lhe
exact dimension of lhe parapel wall on lhe lhird level is inlended 10 be.
Please indicale the dimension on the plans and if the heighl exceeds 45 feel,
il will require an excention,
23. A mechanical room is intended for such purposes as lhe elevator and
slairwell indicaled, however lhe plans depict a slorage room and office in
this struclure as well. Please explain the reasoning and necessity for these
soaces.
24, The LDR's require Major Site Plan Modifications to submil the same
informalion as required for a New Site Plan, i.e. Landscape Plan, Drainage
Plan, and a Site Plan depicting site lighting, parking stall/aisle dimensions,
etc. These pages were nol attached.
25. The size of submitted plans shall nol exceed 24" x 36".
26. Indicate how handicapped-accessible parking and ingress/egress will be
accomplished during the construction phase since constructionlslaging areas
are occunving lhese snaces.
27. There should be a designaled construclion entrance to limil large trucks and
eouinment from driving all lhroughout lhe sileo
1ST REVIEW COMMENTS
08/12/03
,
,
I .1
DEPARTMENTS INCLUDE REJECT
I I
28. Provide details on how pedeslrians will be protecled from overhead
construction
29. Site data labulations do nol malch between Kilday drawing SP- I (dated 7-
23-03) and HDR cover sheel (issue dale 7-22-03).
30. Indicate how roof drainage is being addressed for the new construction
31. Will lhere be any new lighting attached to lhe walls of lhe new
construclion? Any new lighl fixtures in lhe immediate vicinity of the new
construction? If so, complele specifications including heighl, color and wind
load resislance will need 10 be submitted.
32. All above ground mechanical equipmenl will need 10 be visually screened.
33. Any equipmenl attached to lhe exterior walls shall be painted 10 malch the
building
34. Any additional signage needs to be reflected on the plans
35. Any landscape required to be removed due to lhe construction should be
noted, complele with a replanting schedule, and should be coordinaled wilh
the City F oresler.
36. Provide painl swalches wilh manufacturer name and color name and
number at TRC meeling
I 37. Provide clip-mounted color elevalion drawings on presenlalion boards at
TRC meeting.
38. The revised Traffic Study will be forwarded 10 Palm Beach County Traffic
Division for review and delermination, No permit shall be issued prior 10
receipt of an approval letter,
39. The required updated survey shall be submitted. It shall include on one
sheet, the newly compleled renovations 10 the main entrance and lhe
addilionallots acquired for narkin~ purposes
MWRlsc
S:IPlanningISHAREDlWPIPROJECTSIBetl1esdaIMSPM 03-00811 ST REVIEW COMMENTS.doc
PLANNING AND ZONING
MEMORANDUM
TO: Sherie Coale, Senior Office Assistant
FROM: Ed Breese, Principal Planner
DATE: August 8, 2003
SUBJECT: Bethesda Memorial Hospital (MSPM 03-008)
Please include the following comments in the TRC review of the above-mentioned
project:
1. The fourth level "Mechanical Room" exceeds the 45 foot height limitation and
will require a Height Exception or Variance (depending upon exact
circumstances) by the City Commission. Additionally, it is unclear what the exact
dimension of the parapet wall on the third level is intended to be. Please indicate
the dimension on the plans and if the height exceeds 45 feet, it will require an
exception,
2. A mechanical room is intended for such purposes as the elevator and stairwell
indicated, however the plans depict a storage room and office in this structure as
well, Please explain the reasoning and necessity for these spaces.
3. The LDR's require Major Site Plan Modifications to submit the same information
as required for a New Site Plan, i.e. Landscape Plan, Drainage Plan, and a Site
Plan depicting site lighting, parking stall/aisle dimensions, etc. These pages were
not attached,
4. The size of submitted plans shall not exceed 24" x 36".
5, Indicate how handicapped-accessible parking and ingress/egress will be
accomplished during the construction phase since construction/staging areas are
occupying these spaces,
6, There should be a designated construction entrance to limit large trucks and
equipment from driving all throughout the site.
7, Provide details on how pedestrians will be protected from overhead construction.
8. Site data tabulations do not match between Kilday drawing SP-l (dated 7-23-03)
and HDR cover sheet (issue date 7-22-03),
9. Indicate how roof drainage is being addressed for the new construction,
10. Will there be any new lighting attached to the walls of the new construction? Any
new light fixtures in the immediate vicinity of the new construction? If so,
complete specifications including height, color and wind load resistance will need
to be submitted.
11. All above ground mechanical equipment will need to be visually screened,
12, Any equipment attached to the exterior walls shall be painted to match the
building,
13. Any additional signage needs to be reflected on the plans.
14. Any landscape required to be removed due to the construction should be noted,
complete with a replanting schedule, and should be coordinated with the City
Forester.
15. Provide paint swatches with manufacturer name and color name and number at
TRC meeting.
16. Provide clip-mounted color elevation drawings on presentation boards at TRC
meeting.
17, The revised Traffic Study will be forwarded to Palm Beach County Traffic
Division for review and determination. No permit shall be issued prior to receipt
of an approval letter.
18. The required updated survey shall be submitted, It shall include on one sheet, the
newly completed renovations to the main entrance and the additional lots acquired
for parking purposes.
:{.~...tj.
H," t-. !
i.,. .., C ~_:<i'
~'
,
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-161
FROM:
Michael W. Rumpf, Director
Planning and Zoning
H. David Kelley, Jr., PE/PS~-'
City Engineer
TO:
DATE:
August 8, 2003
RE:
Review Comments
Major Site Plan Modification - 1 st Review
Bethesda Memorial Hospital
File No. MSPM 03-008
The above referenced Site Plans, forwarded on August 5, 2003, were reviewed by
representatives from Public Works, Engineering, Solid Waste, Parks and Utilities against the
requirements outlined in the City of Boynton Beach Code of Ordinances, Following are our
comments with the appropriate Code and Land Development Regulations (LDR) referenced.
PUBLIC WORKS - GENERAL
1, Prior to permit application, contact the Public Works Department (561-742-6200)
regarding the storage and handling of refuse.
PUBLIC WORKS - TRAFFIC
2. No modifications were made to pavement area; therefore this segment will be reviewed
at permit time for minor traffic sign age or striping improvements,
ENGINEERING
3. No modifications were made to the pavement or drainage areas; therefore this segment
will be reviewed at permit time for any technical adjustments required.
4, The Parking Planning Study dated May, 2002, reflects a current parking space deficit of
198 spaces. It further projects that the parking needs for the year 2010 will reflect a
deficit of 693 spaces. By allowing for an upper-floor(s) addition at this time, how is the
hospital complex going to resolve their parking deficit(s)?
5. Any (and all) comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
6. No utility plan was included with this submittal; therefore, the Utilities Department
considers this plan incomplete as submitted. HOWEVER, the proposed Site Plan is
within a previous approved project where utility support is available. THUS, we are
providing only a cursory review of the proposed project as submitted at this time.
Additional comments will be required after a utility plan is submitted. The current concern
is the capacity to provide service to this project without system improvements.
cc: Jeffrey L. Livergood, P,E., Director, Public Works (via e-mail)
Peter Mazzella, Assistant to Director, Utilities
Laurinda Logan, PE, Senior Engineer, Public Works/Engineering
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
(PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering
File
S:\Engineering\Office Associates File\Kelley\03-161 Bethesda Memorial Hosiptal- major modification 1st review.doc
/
/
Ll fY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO:
Michael W. Rumpf DATE:
Dir. of Planning & Zoning
8/7/03
FILE: MSPM 03-008
FROM:
Off. John Huntington
Police Department
CPTED Practitioner
SUBJECT: Bethesda Memorial Hospital
REFERENCES: Site Plan
ENCLOSURES:
I have viewed the above building plans and have the following comments:
No Comments,
,/
Coale, Sherie
From:
Sent:
To:
Cc:
Subject:
Majors, Wally
Tuesday, August 05, 2003 8:59 AM
Coaie, Sherie
Rumpf, Michael
Site Plan Review Bethesda Hospital
Sherie,
Recreation & Parks staff reviewed the site plan for the Bethesda's Rehab Center. The Parks and Rec. impact fee does
not apply since the plan does not involve any residential component. Therefore we have no comment regarding this plan.
Wally Majors, Director
Recreation & Parks Department
1
,/
CITY OF BOYNTON BEACH
Fire and Life Safety Division
100 East Boynlon Beach Blvd.
P.O Box 310
Boynton Beach, Florida 33425-0310
PLAN REVIEW COMMENTS
For review of:
MSPM 03-008 1st review
Project Name and Address:
Bethesda Memorial Hospital
2815 S. Seacrest Blvd.
Reviewed by:
~
Rodqer Kemmer, Fire Protection Enqineer
Department:
Fire and Life Safety
Phone:
(561) 742-6753
Comments to:
Sherie Coale by email on 7/3003
CODE REQUIREMENTS
A fire in an area of a hospital that is under construction and without
sprinkler protection, poses a significant threat to portions of the hospital
occupied by patients that may not be capable of rapid egress. (See the
Florida Fire Prevention Code Section 19.1,1.3) A fire in an unsprinklered
area could rapidly spread and overwhelm sprinklers in the protected
areas.
Accordingly, provide a plan of actions to be taken to protect patients in
existing occupied areas from the threat posed by construction activities,
The plan will be reviewed in accordance with the Florida Fire Prevention
Code Section 4.6.10.1 and Chapter 5 (Fire Protection) of NFPA 241,
Safeguarding Construction, Alteration, and Demolition Operations. The
plan is expected to address all applicable sections of NFPA 241, with
emphasis on Sections 5-1.3, (Pre-Fire Plans), 5-1.6" (Hot Work Permits),
and 5-1.8 (Impairments)
cc: Steve Gale
Bob Borden
------
FROM:
Michael W. Rumpf
Director of Planning and Zoning
Timothy K. Large ~
TRC Member/Building Divisi~
of Acronyms/Abbreviations:
ASCE - American Society of Civil
Engineers
CBB - City of Boynton Beach
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensive Plan Policy
CFR - Code of Federal Reguiations
FBC - Florida Building Code
FIRM - Flood Insurance Rate Map
F S. - Florida Statutes
LOR - Land Oeveiopmenl Regulations
NEC - National Eleclrical Code
NFPA - National Fire Prevention Assn
NGVO - Nationai Geodetic Vertical
Oalum of 1929
SFWMO - South Florida Water
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 03-160
TO:
DATE:
August 4, 2003
SUBJECT: Project - Bethesda Memorial Hospital
Comprehensive Inpatient Rehabilitation Unit
File No. - MSPM 03-008 - 1 sl review
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits,
BuildinQ Division (Site Specific and Permit Comments) - Timothv K. LarQe (561) 742-6352
1 Title Sheet: The Year Standards in Effect Are:
a) The 2002 Edition of NEC is in effect as of June 30, 2003.
b) The 1995 Edition of NFPA 80.
2 The noted fire resistance ratings on the title sheet shall comply with Table 600 of 2001 FBC
for the required fire resistance ratings.
3 Place a note on the elevation view drawings indicating that the wall openings and wall
construction comply with Table 600 of the 2001 FBC.
4 Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads
of 140 mph. Wind forces on every building or structure shall be determined by the provisions
of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 2001 FBC,
Calculations that are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
5 Every building and structure shall be of sufficient strength to support the loads and forces
encountered per the 2001 FBC, Section 1601.2.1 and Table 1604.1. Indicate the live load
(pst) on the plans for the building design.
6 At time of permit review, submit signed and sealed working drawings of the proposed
construction.
7 Indicate the total number of parking spaces that will be provided for this expansion and
indicate the number of accessible parking spaces provided. Comply with 2001 FBC Section
11-4.1.6.
S:\Devefopment\Building\ TRC\ TRC 2003\Bethesda Memorial Hospital fnpatient Rehab Unit
Page 10f2
8 Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel for the accessible route that is required between the accessible parking spaces and the
accessible entrance doors to the building, The installed symbol, required along the path, shall
start at the accessible parking spaces and terminate at the accessible entrance doors to the
building. The symbol shall represent the location of the path of travel, not the iocation of the
detectable warning or other pavement markings. The location of the accessible path shall not
compel the user to travel in a drive/lane area that is located behind parked vehicles. Identify
on the plan the width of the accessible route. (Note: The minimum width required by the code
is forty-four (44) inches). Add text to the drawing that would indicate that the symbol
represents the accessible route and the route is designed in compliance with Section 11-4.3
(Accessible Route) and 11-4,6 (Parking and Passenger Loading Zones) of the 2001 FBC.
Please note that at time of permit review, the applicant shall provide detailed documentation
on the plans that will verify that the accessible route is in compliance with the regulations
specified in the 2001 FBC. This documentation shall include, but not be limited to, providing
finish grade elevations along the path of travel.
9 Add to the drawing the caiculations that were used to identify the minimum number of
required handicap accessible parking spaces. Also, state the code section that is applicable
to the computations.
10 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed for
the/each building. Verify that the proposed elevation is in compliance with regulations of the
code by adding specifications to the site data that address the following issues [Section
3107,1.2, Chapter 31 of the 2001 FBC]:
a) The design professional-of-record for the project shall add the following text to the site
data. "The proposed finish floor elevation _' _ NGVD is above the highest 100-year
base flood elevation appiicable to the building site, as determined by the SFWMD's
surface water management construction development regulations,"
b) From the FIRM map, identify in the site data the title of the flood zone that the building is
located within. Where applicable, specify the base flood elevation. If there is no base
flood elevation, indicate that on the plans.
c) Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the drawings titled site plan, floor plan
and pavingl drainage (civil plans),
Q1 he drawing titled site plan, identify and label the symbol that represents the property line.
1 I.A WA~ {J~ ~/T!'7 ~l!tX'D. ro,e. ~ I ~1C9l4.-TIO,o ~7i~Jf1
. 12. copy of the permit shall be submitted at the time of permit application, F,S. 373.216,
13 If capital facility fees (water and sewer) have been paid in advance to the City of Boynton
Beach Utilities Department, the following information shall be provided at the time of building
permit application:
i, The full name of the project as it appears on the Development Order and the Commission-
approved site plan.
ii. If the project is a multi-family project, the building number(s) must be provided. The
building numbers must be the same as noted on the Commission-approved site plans,
iii. The number of dwelling units in each building,
iv, The number of bedrooms in each dwelling unit.
v. The total amount paid and itemized into how much is for water and how much is for
sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)