Loading...
REVIEW COMMENTS 7.C.2 BETHESDA MEMORIAL HOSPITAL (MSPM 03-008) MAJOR SITE PLAN MODIFICATION TO: THRU: FROM: DATE: PROJECT NAME/NO: REQUEST: DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 03-208 STAFF REPORT Chairman and Members Planning and Development Board and City Commission ~lr~ Michael Rumpf Planning and Zoning Director Ed Breese ~ Principal Planner September 2, 2003 Bethesda Memorial Hospital / MSPM 03.008 Major Site Plan Modification Property Owner: Applicant: Location: PROJECT DESCRIPTION Bethesda Memorial Hospital, Inc. Dennis Campbell, Kilday & Associates, Inc. 2815 South Seacrest Boulevard (see Exhibit "A"- Location Map) Existing Land Use/Zoning: Public- Private, Government, Institutional (PPGI) / Public Use (PU) Proposed Land Use/Zoning: Proposed Use: Acreage: Adjacent Uses: North: South: East: West: No change Construction of 56,277 square foot addition within the current footprint of the hospital to accommodate a Comprehensive Inpatient Rehabilitation Calter 24.22 acres (total hospital site) Bethesda Medical Plaza, Early Learning Center @ Bethesda, and then farther north single-family residential; Boulevard Manor Nursing Center and then farther south High Ridge Apartments; Seacrest Boulevard, then farther east various medical offices/bUildings and then farther east single-family residential; and Bethesda Memorial Hospital parking and then farther west single-family residential. Staff Report - Bethesda Memorial Hospital (MSPM 03-008) Memorandum No PZ 03-208 Page 2 Site Characteristic: The Site Data prepared by Kilday & Associates indicates that the site has been developed with a 530,542 square foot hospital facility containing 300 beds, a daycare center, a total of 1,035 on-site parking spaces (148 off-site) and approximately 24% landscape area. BACKGROUND Proposal: Bethesda Memorial Hospital is requesting to add 56,277 square feet of vertical construction within the existing footprint of the building in order to provide a Comprehensive Inpatient Rehabilitation Unit. The second and third level expansion are intended to house this new unit. ANALYSIS Concurrency: Traffic: A traffic statement was sent to the Palm Beach County Traffic Division for concurrency review in order to ensure an adequate level of service. Palm Beach County has provided a preliminary review and requested the applicant to provide additional information. No construction permit will be issued without appropriate sign-off from Palm Beach County Traffic Engineering (see Exhibit "C" - Conditions of Approval). Drainage: The proposed expansion (vertical) does not require any pavement or drainage modifications to the site as a result of the construd:ion. School: School concurrency is not required for this type of project. Driveways: The proposed expansion does not modify any circulation characteristics of the site. The Hospital proposes to limit construction traffic entering and exiting the site to SW 23cd Avenue to restrict large equipment and vehicles from circumnavigating the site and reducing the interaction with motorists and pedestrians during the construction. Parking Facility: The Site Plan prepared by Kilday & Associates provides a list of the different uses and parking requirements of each. In accordance with City parking codes, the plan indicates 300 hospital beds @ 2.5 parking spaces required per bed for a total of 750 parking spaces. Additionally, the daycare center comprises 7,500 square feet with a parking requirement of 1 parking space per every 300 square feet, for a total of 25 parking spaces. Lastly, the utility building totals 8,968 square feet with a parking requirement of 1 parking space per every 500 square feet, for a total of 18 parking spaces. The sum total of required parking, based on the number of beds and ancillary structures, is indicated on the plans as 793 parking spaces. Based upon the Site Plan and a Parking Planning Study prepared in May, 2002, the Hospital provides 1,183 parking spaces (1,035 on-site and 148 off). By the numbers, the Hospital Staff Report - Bethesda Memorial Hospital (MSPM 03-008) Memorandum No PZ 03-208 Page 3 meets City parking codes and provides 390 excess parking spaces. According to the May, 2002 Parking Planning Study conducted for Bethesda Memorial Hospital, only 1,000 on-site parking spaces were available at the time of the study due to construction trailers and lay-down areas for on-going work on the Hospital, reducing the number of excess parking spaces to 355. The Site Plan depicts 29 handicap parking spaces and a code requirement for 22, an excess of 7. During construction however, the Hospital proposes to maintain the code required 22 handicap parking spaces only, since some of the handicap parking near the building will be used for construction staging and fenced-off. Additionally, the contractor will provide covered construction walkway tunnels for protection from the construction when entering the building. The 2002 Parking Planning Study also reviewed the parking demand in present day and a 2010 planning horizon. The current planning deficit was determined to be 198 parking spaces, with a shortfall of 693 by the year 2010. Since the time of the study, the Hospital received approval for two physician parking structures totaling 85 parking spaces. As a part of that approval, 12 parking spaces will be eliminated with the new construction, resulting in the addition of 73 spaces as opposed to 85. TheHospital's consultants recently met with City staff to discuss conceptual plans for a 683 car parking structure in the existing parking field immediately north of the Comprehensive Inpatient Rehabilitation Unit that is the subject of this application. This would appear to be a further step in addressing long-term operational issues raised in the parking study. Landscaping: The vertical expansion does not contemplate the addition of landscaping. Naturally, any damage to existing landscaping during the project will be required to be brought into compliance with the code under the supervision of the City Forester. Building and Site: The proposed vertical expansion will house a storage room and mechanical room on the second level and the 28 bed Comprehensive Inpatient Rehabilitation Unit will be located on the third level. The fourth level will consist of the mechanical room housing the elevator equipment and stair tower. The proposed addition has been designed to be harmonious in size and scale with the surrounding floors of the Hospital. The elevator equipment and stair tower structure will exceed the allowable 45 foot limit by 10 feet - 5 inches and the fourth level parapet will exceed this limit by 4 inches. The City Commission has the authority to grant a Height Exception for these types of structures and appurtenances. The applicant has made a separate application for the Height Exception. Design: The addition is proposed to be compatible with the existing building elements of the Hospital. The proposal utilizes matching stucco finish and score lines as the existing building, curtain wall window system and matching color scheme. The body color proposed for the building is Peach Vail (Sonneborn Acrylic Elastomeric 63 - 803). The accent color proposed is White (Sonneborn Acrylic Elastomeric 64- 235). Staff Report - Bethesda Memorial Hospital (MSPM 03-008) Memorandum No PZ 03-208 Page 4 Signage: No new signs are proposed in conjunction with this request for major site plan modification. RECOMMENDATION: The Technical Review Committee (TR:) has reviewed this request for major site plan modification approval. Staff recommends approval, contingent upon all comments indicated in Exhibit "C"- Conditions of Approval. Any additional conditions recommended by the Board or City Commission shall be documented accordingly in the Conditions of Approval. MWR / eb S:\Planning\Shared\Wp\Projects\Belhesda Memorial Hospila~MSPM 03-008\Slaff Report.doc Location Map BETHESDA HOSPITAL EXHIBIT "A" n '='= '='=: ~ gj-- m--+-- - ill --+- ----+---- - -~ = . - - []ill lliWJ UW UWJJ UW LlUW UW i 1--"1 - I r--- r R3 ~~~~~~~~~$.[ff1.~ ti DIIIIJITIIJ) ~ JI'~~ 1l --~- -j ... I: .Z/.~ '.J I ~ )~)l_' -.. --.-! cpt - \ I /10 I f---- L EBffi J 1/ RV ffi~ 111// i - OJCD6 ~C!1 " !~Wt; ,,~?~ ! ~ TPtA ! I ttfi}& . ?~> I Di if UJm0;ff: ~ " i ~ CODJ'/' C 1 f{;; I~ c.. -J I}f ~fBEBtzJiS 7 = I I -I I I =-r: ~- ~rnm[[j II - 1 I I {~'--0l!JrnmiL ~ -' ,!Ji7$t II111II111 i = I 1 I \ I / ;R ~ OTTT I . 11 r f--- . I Plln ---' S~RDAVE ~- ~ EEE-~~/ jj E8 ==~= SITE --~- ~ . If-- ~ . ~~~ ~ .~ I-- _ = -~ ~ -I-- - - .- - , W~, S 1- , N I ~ I e . e J ~ ! '0 I G] , . OCD 0 n , <O;:l. S I I I Z31 ;:0 0 i e () " I 3~ '1J 10 ~ 0" CD ..., X ~O .Q. w m " - CD IZ '" I CD 0 "' ~CD ..... " ~a. Z Ol_ e '0 C " 6;0 3 ~ - Z 0- 0; 01- 0 ez CD w O"e ..., '" z3 w 00" ~ . CD ~ 0 ~ 0" 0<0 --" 0; .1>-01 U1 N 0 N 'U ..... '" --" I 0 OJ 0 I 0 0 --" )>m 01 'Ox '0'0 fJJ ~ -. c o ~ <~ CD '" -. _0 0 o=> ",0 W ~'" ..... CD~ CD "CD '0<- c- CDe C 6.=> '< _.CD =>01 N <0. N N 0 0 N .I>- 0 0 (;.l EXHIBIT "B" -I ;J! " II )> - N '"'0 II OJN OJ ....., Zo:>..., 00:> o 0 "< ->. CD :::r "1J OJ~- :::::ICJ'1 -. CD CD r-+- .-+ CD )> 0. n- Ocf) ::::r $l -I () ->. :::::10 CD C oc.o OJS- (J) ID m.g CD:::r IDCf) a. ZeD oCD m _:::r ID -1~ "TlQ s: :::::I -CD ;o!Q. QU) CD --r-+- mCi5 0. OJ 3 IDo I c 0 )> WCD .., w< -. OJ ~ID m ~a. - r I - -I 0 )> (J) -I "'0 - .-+ 0 m Z C :::J Z 0 - -I ---- ~~ ...,..,........ ~ ~ ~n~~ ! I nS5 0 ~gHe ~ ~~~~~ I ~~.." ~ UFI1l!I!!11 "'i"'" ~ ~;ii~Q II '\"" , , , !.~f~Q , ~h,~ > riHi!!B_" , , I' , 'i! I !j;iO''J ,,'-.n , 8koO: ~IHn ;;;~ :l"':'O < ~n l oi:z~ i;;i t~ ~ ~ O~~ ", , !l " " B~ U a~ g , UHH~ i~ > f ~i .{~~ S"~~ ~ '" J:~ 3 ; ~ 3 )> g'8 l ~i" B~ ~ ::! ~ ~~ - !;'"Q ~~ ,!i, ;,~ , ", q h i ~ ~ 0 , ~g . , !;:;~ ~ '"c ~ ~" €! ~ tlll 0" U .,,~ . ~ - s 3Cl ~ ~ g ~ j 00 , , > - 0_ - > P ::1::10;0; >, E , !tH ~~ . !;: ~ o. . . " ~ ~ oj:: ~~o<> ~, > " .. """",,,, ,l i , -. ~ ~...... 0 if: 1180;;;; ! \ i 0 .! ~ti~ ~ , , !(l~ ~ ~!:l ~ , o' ,..!" <> '" I ~i~ ~ ~... ~ , l '"~ :;:~X':E ~ if;:"" ~~ hn ~ 3 i~ H h-no.;;: ~~; ~ S' ;,~= ~ m:;<: .~ !.:l.~ 0 :i-~" :. g,., ~ ...{Ii' f(!l ,,~" ). <; Ooi !.l ' ~ g ~U o z :t,,3. o ;Q- j-<-<Z '"r..:; )>-... ... ...~ t;:~~ 2 !? i ;<j~a ~ .:;a ~ 1:"~:l!:g '" z ~~...~ z ~...'!!. z ~ ~ l' a; il '" ~i..i " i..!: " H?~ [; ~~iq ~~~~ ;;~ ~ i a ~; a ~~~ ~ ii::5i:i: '" ~ffi~ ...,.8:Jl::~ g~~...~ ~__!~o~:;: ~"'1~ ai~ I {) " ii! l " HUHI; a'-iij;'~H~ :.- ~~~!:;! ~~:Hif !,,"p 8~'..},:. ~ l'.~:~~~ a...".' .~ ~~:i!5i ~"l"~ '" l' "'l:l... a 51."1:",C: ~~~!~ . . r~ [~ J~ 'j "''''''''''''''':!!''' ~ ....;:n<:Jln"':!l"'aa"''''... Jl H;:l~~i~ '" ~B'i"H5!.:8~uH~'" ;-!tp-;-!=~ ~ !~!! b~_i':RH~h ~ !lj",~~3:.:! ~ f~~i["[[P':~ll'i-'!!j 5"i:Hh;:,~ ;.~~~~ Hj;'t,Hj-if~ ~3:;I[~ ~ ~~:. ~ 2'!~~:l;~.:;;" m j l f .. r'~'F i .~ 'I i ! e 6 5 ~ ~ 2~ '00 ! , ~m :!!i!i2J 1" mm I j! , zO, Os:ro !::!~..:::a tr>:i" ~n~ ~m~ IIII11II1II1I11 ~:~~ 0< c::oOe ::::jS:I 3"g Lil:::r zm;S:m )>Om iiil~ I ;l'Q" :::;:;;:g~ ~""" 'N mm ~~~ g E~w n rg-- ~ E~ ~~~ '--- ~;ii ..:~..:!~<<< ~~""~,"w"~z"'z"'~ iO ~ iO~~~F~nn~C">~~ ~ [;1-:" -;j-;Jn:~T:;-I:<~ i~".....t'" w.~-_-.~~- tt:.~' r "~jt.:'~!J~r<<-~J1:~~lt~l!tfm ~'r; - ' -.:.-~ ,,'t"- "~::~ ~1;'-~..,!~~_:lO.:.,.~b'.:..:c"\.::- ?~;:- '1r ,_,tq~ ;:=1 f1;;[j-; '- ~'--,-:r'~'f'" i!-f~L'1 .~II ;:4 r -~ :y"-;'- I ...~_ : r.~"'-'~ :1,lhjf-.~..,~.,1 ~~_~.;:~ '.~,-. .:' '.:~:&~ ;~'I~:r nl ~i:~~~1 ~- -. _ -'-"5~T.rL'~~'""~tQ l :r;_:;--';';V~-"it~ . '" .' "":. ;:;"~'!JIJr~"s,-,.-~,;~~v,.';:'c~ri'""Iir ~~~:~;:-~;H~~~:~~~;~~jr.1t~ ~: - _ _, ,.-~- - f' ' 1,.I'I~'1!1.'0IrJ.h I'f . .'r'r;~'1i,~,~~':t~~ - - ------<'------<:'- ()~..c"""',,. ~ 0. co , ~ N ~ o o ~ Cl , ~ o ~ n " '< '" '" '"' 0. '" , o 00 ~ N ~ , ~ 0' w! o ~ ~ m ~ w "' " 18 ~ g . ~ '1.1 I Ii"", II !iliill!,j hill i I,l!l!! I~I~I' ~I' . 'i" ..; !I!!~ !lllllil' lip: I !f! Iii I, "'111 I I IfJi , ,I I , i, [! I I; II I: I 'f ~~I , I I I d ' 'i UiUi' ~!!Ul! ' :Illll!~ :, PI I 'i II ~ . ! P ,I II I , II ' ! . ,. . , EXHIBIT "B" ....... ..u '." .... I," "'." Z..... cor ."c:c 32. ~~ ~.cE ~t3"'l1 ~ c:~8e c.. zm3:m ~ ~$}~ ::l ~_mm~$ ~. s~ ~~ 0: ~ii 11I1II11II1II11 2~> ,.., ~OO~2J ~3&O ~;~~ h~~ i!ii:;J t" , 0'. ~~~ :1- ~I 01 01 f-' I > ~ o ~ n IT ': '" cO " o CD , ~ en , o w o w .. " . ~ o t..) I :sll ~, EXHIBIT "B" -.....-..i I !i C'~ 10 ~ IS ,... ~~~; ~~;... ~~; ~o ~ , I:t-;! ~~rl-i ,~ I '1 i' 'L'T 1'1 L. Itc '. "L~L 9" =~_I . " A ,I ;--'" I c[ i ,j ~ ~ T'iO I .:Ii ., :.1 i .,.,; 1 ~ 11~i It:i1 , '!;;';"""ii"""i'."!ll' , ! ".....~... ~ ,., 2 ' Ii liiiiiii1ii i i i! 1'1.. )1 iiiililiiiiii i I! ji!illWI : Illqlll; PI! i 15 Ii ill~i' Ii I ; I ill I !l.! i ,I! ,1,1:1 ! . I II. II r'lll".11 .,ill ~ I ~Ii IIII1III1111111 z,> " c , 1! I j ~ .;:J 3 ~n52J ~~~: f'Z~~ ~mJ- i!l!~ ~ojD ~~~ , .._~_.__..._-_._---~,------ ~ '~j ~ co ~ i :> . , i ~ ! co ~ i ; n I " I '< 0- i ; "' ; " co m ~ ~ en co w co , w .. .. co .. w '" " " , EXHIBIT "B" .--.1 , l '" .,)., e:G 1/ 11 11 1 e ~ Ilr' -rTr" ~, i!! Hi !~iii li~l~ 1!11lil'I' 'I,,:i III iii 1111 ~ II j I ..j I i I II 1111 I In ~ . Il~" 'I' ' , 11111 III l i . I ! III 'III !'111 d 'I i ai~lil I :,,0 '1'1 'i Iii P' I : II ! II ~. r' i 1 i 1': I i l:::: il.I,'J 'I",I.M !:,!!~I!~i~!!: ';~ '111111111' IV: 1111.: I' -, I :1 I, I ;,,, '. I Ul"tl ;Z'" &~ .,,"" 3i!. ~~ ~;g ~O"'!l :l c:8e c. zm:;::m g =lS;jJ!:j 3' E~iC o "z ~~ ~~ " ~Ii IIII1III1I1III1 Zrl> " ;:Ol"2] I 0300 ~~..:a ~~~~ f m":J' I ::: :1= , 81l1Il': .._~ -=c t~; ~~~ ~I"'~'''--'' ~ Q, "' " ~I " , '" ~ " n " '< Q, "' " '" 00 ~ ~ ~ o w '" ~ ~ ~ w ~ '" " iI' 10 ~, o '" ~ L_ .:"" '. ,<., <:.'" I"~ :/1', 1/ "11 11 1 'iOn'" ""111"11 '151jl' , .t..... .,.. =. , ~ ' Ii liiiii i Hi i i I.... I i iiiiiii iiii ll', jh'15~lil , III"JI "11 ' 5 i '~ 1, I ! ,,,:I 'IJ'! ,j IIII P ; III ! ,'J,'I'lr:li' '. , ...' "~.~ ~n , ~ .II"!'] ,1'1' ,. I ;" !iWliIlIiI id III ~~""~"". .~I~ I II ! Ii! '1"11' "" !! i I Ii" ~ I' I l.l ,'! 'ilil1 , 'I I " I I I , ., " I I I! ! I I, " , . ii EXHIBIT "B" ! ! I ,! 11-11' jTrO ;II " , I ....! :.:.:.:...1 " \~/ \(1 ~ ~ - ., '" ~, 3'2. ~ -[ c Z N =< g 5' o I ~ ~n II~IIIIIIIIIII <Q Zr)> n 00"2] 3~O ~":D "5"~ ffi~g ,I o,~ !:~~1 ~~~ fIIAJ ..-::.-:-.--:.~. ,,;,.., n , .. I " , cO , " C,' ,> " 8 ~ '" 8 .~ n c " en " 8 m N "" ~ 8 W 8 o! ~ ~ m i 10 ~ (.I: 'U ! " " . , I i Ilr' ,. ., ., "' ~~ 3:2. I [;g Jli I1III1IIIII1III , c . Z N ~ g .g. Z,l> n EXHIBIT "B" ---I , mS2J ;r~ roo ~a !ffi~2: 8(l1I~ ~o~:;:1 ,., ~ J,.owOll ~~~ :, .,' "j,," .i ~, t'-J I gl ~I I , I I ~ I ~ I ! CL "' " o m ~ "' ~ ~ o w o w w CO "' " " " i !)> !N '0 1- , ; ~-- .., ,<" ~ 0 . , , f , 1 I EEl' I' r _. " " [.- - , I ~ . ~ . VI" 2..., <:::.. '00> n. ~tIl ~~ ~~." ~ c:8e a. zm3:m ~ =ii:]~ ::J ttlm~ 5' E '" . ~ ~ o z ~! ~~~~I ~ I 1 I , I I~i I1II11II11111I1 2.)>- n EXHIBIT "B" ...... if 'Il IWIlI, : ! . ~O~62] ~~2::t1 w;-> rz~~ ~m~_ 801I~ i.~~ '9:.. I ~~ ~ :1: ~! " I ~ , ~ : ~ , ~ I ~I 'J n ". '< ' Q, i co " ~ ro ~ ,.. en ~ o w o w. .. w ro en '" "0' :0::1 ;to '" o '" lI-'- 1 1 1 m' ! 01" 1 I. , , . 01 j 8~- 1 tU II UJ-U! ! . : " ! I ' .", ,0 .1 ~~.IDDD! ~: I' I I I I, , , , , 'I .1.11'1'1' 11'1 If !ill!lllllIill' :,1111 I i I! iliiil'l iji! . 11111 ! i! II " ! I HlI ilii ! i, li!1 : I Ul"U Z'" ij.~ ""lIal 3=. ~~ ~.s ~O . ~n ;J C:IlO 0. zm;s: N :::j$:] g tl:Im ,go ;=:r ~~ ~~ ~;;:; r ~Ii 1/1111111111111 Z,>- " EXHIBIT "B" ~n62J ;g~: f.Z~~ ~mJ- i ,~ !:!:;:J ~ig , . , i 'I ! l ! ~ , , I' Ii" Wi !ll~ ~l~! W !!!I !!11 ~ 'I!; i.,j !':I ~<' '<j: 1:1' ~ !"i'l~! l!i.j'!llll,l<j< ,I'. ,,' Iii oIl 'j; ,I, -~; h ; 111_ ~ ~ ~I ! .ill, 8~ gl!~ t ~ !tll ~a ~,,~ ,,~H;~ , , iWllI"lil 1,IIWI!,1 j' "'I il' 'j "I' ,,' Q) . . 11.,'I.., Q)I;IQ) I' i li! il!' n. " la~ ~~ I J I! !!I!':: a' s~~~ I ji i ~~h 1~! . I , I j' i ! l~ilr!!~"!hl! 9,~i~ ~l ~ ~!~!Pi ~'~~~lH \!l I'i., 101<0.1"'" c ~ .,~,~ ~ ^e " m 111'i!~~' ~ z~ ...S!~~ $~ 59~l!: , !!;!n!!I~ .E.~i~ Ii ~ nm~ i.~~~5~ j; Ii ""~il,!~.~. ~~. !'~6 ,.,. .I&~ ~-1 c' '11~j "; '''''' ,g- · II 2 J> ~~ ~1~1.l:~l ~~ i ~ ~ " 0 "1'11 &~. F ,; I' 'I . !.' ..~~>. ~ jit'" '@r E'T "j.y.'4 :>'~~."'~ /:: ~ ~Ii"'ll~ ~~ \;~ ~ 'I: ~~i~~; ~ ~ 'in~~~'- ,~ . ....ll .i c~","." ~~ ::5:S~ ~ ~~:::~~~ ~ ~ ~~ _i~~~ , ,"'Ill VI "''' ~ '..' ",0 v>v>",,> '!l ~~ H." .. ~~~;:!~ ~ ' ~......~g . :--"~ :>"2<::> ,; (j)lO - ,_ 0 ~~ ~ 5~~~ -I (j) 0 . 0 ~j. - i~ 3 ,; J; ~~ ,- ji .~ I g,CIl .~ "'0 1 ...... t2 ~ 1 [I~I~ }limn ~ trl ~ i,~ ,r H<r '" .' .. I . ! "ll~i ~ ~ .. II . , ~ EXHIBIT "B" i~ >I ~~ , I~!l !<!l. il~ , , . I " ' , ~ I , . ~ I m . ~ ~ ~ ". -fJ" 10'0<; i >l..1l'i.69S -. ~i ". " . " ~ SB'l'~'I]"[ 65120' GOLF ROAD SW. 23RD AVENUE City of Boynton Beach, Florida !qln~l- !'I!fil! I' II 1.1 I I' I ' ., ! C.;mceplulll SIt.. PI&I\ Bethesda Memorial Hospital Project 19 - 28 BED COMPREHENSIVE I ""-1 D A "T'T""......rr DI'lU6ATT rrLJ.'T'T"'" TT1'Jrr EXHIBIT "B" ~ I '~; \~ I " ~ I :; I " -r -;: ..,,_ .J. ~ .N~" - ~ .~:~ :-~ ,- ~;~: '>.,~,-, ~ "i";, 11tl I: " " i 'I i ,,<c< <<<u ,/ ~ ._"~~ I . r"M p_' 5" _ . I . Jft/? "01'"'" A>',,", I "';::"_' '.',,,,,,,," ;,;;;:' ! 0"",,,:'0'- #/L;' ,-"" 1lff[~E~:.~'":~1~~ i{;L' ,!IV" ~",.~vJ:-' /. - .", .'~Wi' V ,[~,,-,->,>;;;:::> I'r'" ,~ . " ", " , ,-' " ,-,' ';(-" - "- , :rfl' ' " ,"" " "I, c,"" ,>' ' ", ,I ">;., .y'/';" ,../,< , \l.," ',., ~"" I' · \ ' tH~ ,'!ji"'" (f ' 'IG:~ "<'j"., f" I, I 1;\, ' ::-" '--;P> N./ 'Ii! (', '-' :,y~~( '! '~i\r;--'-----'~""'~' ,~,,--' .ft''''' \ II,,. ",)/ ft. "<-' "''< I' "lq 1',," ,I ~:'.r~';~~:M: ,I', "'. ,/!-' ,/ , ' ..: ~~~ ~- - . . ' i" I ,.-;:.- " ' /. ,~...,..,K~:' , r,)"?" ,'>/ '. Ii$> .' ~ ~t' ! ./":: 'F~ ~ .-~ / ".,~I'III.o/,! /' ".1 ~ I I I/i/fl/.: ,:~:-.~"~ ; tX:; {;-./~:' f'/::: '11.../ _1'1." I ' ,>".;~~:'f.:r, ,,~::/Z~i/i ' '_;'''.~ ,1'-' / ;/I,.!'.ioll1 /,"-~<>-' ~ ~.'__ -,' ,'" i\ 1/ ~-~-- "c/ " - ."', ,,," - 1_,' i N,~",:,;:~':;"C~"'/l : I~"-' ~' , '",dj ,/ (/,' ' ! 'J.:S ~:: ,Ii" 'o>;;jj . ~'>- <. I Y \ .iJ/~"'" j' ~', ,I, '1;f ~ u-- $- .~,.. . <. (C.5~Y~ _ ,.'r ~~, ~:l~&-;) &: "--', ~ ":": ':"',' /1/ " ~,;;...;.",,~ "';" ~.i " "<'''' ;;~:~~~: j/ .:.~.,&'&~, Z~., ~'~ /. f \...:;.,E,"-"" c "i(C=cr 5 /'t:L .o:rA/L ~..=- r~,"'? Aft:"" " /---- .~ :' _./ ,.' " . /,".; ~ ,,. / , f . _,-,c .,r.'cc,""4- J' ~ /'".:f[f}C:.r/I.' ,/>_ /"c- ,..-oV,' /AK'EA //./5 \_ JJ:.:....:,~( )\. -t.",\", ",.", .~--,~ ~\\ '.4~\ " " ~h J:: !f!:c::5?~ ~ $.'~'/ '. "'':-~ '" ..,t, ~ :..;:.} ,t..,/.. ',' / ~ . "". ~!!1f.~ , <J '-,/\.Ji:k ~.~';"9C' -r II .-" "'"- ~''-'1'''' 0' !,(';.{C7.0" I ~ 2.4'1' ,rQC.r'4 / ~ =--J',';~ '7' ,,_ ."5_ ? ;I-e- . ,,;','.'0_.':::'- 11>: I.' ! . " ~~ - ,"/, --.L:;, /~;~;~;)!'!/ /:"-., . ' ",0 c\if//\~;(' '</, ,,:' ,. f.l! A( l l <,If "'i? l.i' /if .. /(, IF/ .1';, ,.,9 ""~67' I- jI/";'" / ) ,/2) ,~(' I /( 'I I ' , /~, , i i,"ld" / /..' /,' " r ~' /:t..~/^,.I/ J" ".,1 \ /) / i':'>- j'/ .t',' 1;'// " >!J/1 j"/ ..:~:, .~n ~., ',-"i~/ r~'" 1;/ ~\~ /' )\,' '~o v,_~-----,---"'- " ~~ " , . ~ ~: i . -~ !q r. !i i~-- .."~ ,,', " ---, " , "--'- /" ( ,\ "; ~tl -------...:.,-~<j' =,*.,~ _ t~,,! I ~ .?~ ;~~r ~~---~ ~~; H^t ~ ~dri!;~ ~! m ~i~~ i: ~:i~~;~ 52: ~~ ~~~~ 1] . ,:~~'..VlI \.1 :H~ <;;; j II: i' ~iS'<';; ~;; ~]~' tlJ IPla~ JI ~!~~ s: \ ~~ ~~~ ~~r0 ~ni ~ Ul ~~i~ C) <<>~ - ~~. ~ :~- ,,~.~ ~ ~~~ .:~~! <; ;- ~~Il H~~ ~ E'tl n~: ~ ~ '>,. . ...... ~ I ,..~- " .' " -\ .~ ",." :;. .. ~ ~., ~ ~ ~:~;;r"i ~ ' -::i jH'--< . i '. " ~< , < ~'" ;';;'.;.>'" / _,,-, 1 ~""~""2:1...,'-. _ ,,;':-:i/' / <<<I / o--.:,~--=-~ .~~~~-- '-~:;. " '~ , '. ~ ~ \. ~ :; ~ " ,~ "'<, , , ;~ i<' " ~. " " , .'" ... 1 I ! , j " 1 ~~T ~i ,1~~! q ~, ~~,i '~~~~ 7~1 ~'li~j'''".1 '\.~ ~.;~! ~ J;~~i]! \;. l~iH~>:i ~1 ' ~;i~~ ~ ~ 11/':; ~. :j. ~ I . " /'.....\ "-.....,/ .::/ "\ ',-~ '~'~< ~,j '-t, r, " '" 7"; ,,.: -', "~I: " '.,." \,. ~~ " " '\ ,. _-;~,~-".-c I /,' ;:: //" ),~,~" Ii;;" ",' .........:---. l,~, I"'~ ;" "- 'f -/ 1", ~ "'-, ~: Ii :i~');/ , , < :>~, :i 0\/;:/ ~,' Y.. 'I. .'; f.. "'\',.j' ?/ ,'~I . / . .l"'~.;) ';/ if' 1\ (, ('>I .,~:.: ' Y ;l,\ \ ":~"~'8< i!-V0~" 1 II " ~- ~'" c':-<~':..,j ,'~ ,~ ," 'C. . . '.... '. _ / '" '.", " ...... v ~:\ " "'. "'''~'. "\\ - ......, "'-.., :- -"\, ,~ -c~. ./'---: " ""...... "'. ............. -:::-:,........... J '........ ') , 4'''') :;-,\ I (",? '\.'!\ '...;" ::.\. ""'--' ; \(~" .c./---___7_~.~..,.;,~ ;,~,.~::-;'- '_;)_:'~..':.. , ~ -. ~ . - . ,11"-'. .! ~ - ,- -:~, '1' 'I" / """,;/ '-;.' ,.' I' ;;' , ..';..... l::>" c\ .;jf '- '''';' Y / ;~" ',,\ //l;..",,,;,, " 1/).... ~ ~'r \<'~./(ll, ' /i /. ,'. '. [1,_ >c"'. /S'::. ."")"/',' .' (" '. ~"~ ',...~~> I rf .I ---' -"\ # "'~:e_ -/ '_.__(, ...~ ...~- ,... ,-;....C";6-d ,. ,-- ~ ~ 1---,< ~v,:.-~ I '~""""': ~" ;\ / ~~'~..,~,./' / "'"--:'~, I"~. ) . , i 3:/ . :(i' '.('',:;:-.:,: .. ',-.-:-. I .....,<. 1 "/" ) .:'; j''':" " , , ~ t , ,,~' ~"; :: ~~' i'; , " L' :~ ;- /;-l-~I \. , ! ~ '--.Lj . i \ , ". -" \ .~ ~ % ~, ~~~;.~( ,. '. ~ ; t , .. ': ~-"'-"'--- 4 _-?'?' ~ J";/,.y;; 7?G ,,', " ;. ~ '" ., .. " ;- .~ \ ~: ~,~ ~ ~ .' , ~, "" > :.:;;, i .~ ~ ~, ''< l I ~ ",,- )~... 'h;ij~ / '~-".J 1/' ~;'>' _I -'-0 / ,:::U;' 1-:1-( ;,.., . '~'TI - ,~o!-' '~'~<i: "(~ ,.:"-) >~:/~~1-'. ~~ ~, - ()~r; II:. , .:. ' 0~i" '~'~ " l' rll:T:. !c , J", "" . _ ; r ',~ '-:.- ~ f'-' . I~' ,1'- I. ~.' ~; , 1:1 I I' " [" I'~: ,~ ;, '"""--' =., '. ,c = = ,~\ .,','-. . " \ \ __,~ . ".CI . ,"\ ';~" '\- \; \ ::",,;ew,., I'; "'l'''\~' "\\J.. "'. ~< ,:.","'::~C" ~ " Jf,,""I" . '~" '. .:r'j..i i:1H!"~1"'t'.'''\;~:;'' .:.:Pt, l'j, ~:~:Jll_;"~~'~' w''''''A'G IT V , C':. P;"\ll:l; \,C~ Ji j '1:: '.~",:I ..~ I' i-~-;-~' ."",.". '1 ! .~" '---;~ i ~':'}; ^., f~'!: :' r-:-!r-< ' I: it~ ; _L,-~ ! 1~'I,. ,I;I"'~." =," "'ti ' I ',.,.1 j,u d II~r: ,,,,,-,,; .1;1; i ":"I'~ij,rl J1I I 'rl.: ,;, --r~1 ~"'"'-'--'-"'-.- .' U,.' i~'~! '..~"::~--:'::"~' I ~ .: 1 :" ," i I : ~ I ! " ~ I I : " I j , ~ "i ' ; i "I Ii' ,0 ,,-,, _; ,J;I :1 ~!%i.i~;i~".~u:l;c,i~;~i . III 'f ,j , !' 1'1 LTI~ ~."-;;:: ~. il:l' ,J'" "c~~2-; ~; , , , i L , ~ ., ~,~;- .."" .. ~ "'''"'-'' ~.;;, 'I ,: ~ ~ - 3 ~~ ,~ I~ml~ ; ~" I',...}, ~ ~i~1 ,~! ~ ~ ~ : ~ ; ~ .:; ~ ~ ~ '1 ~ " HI i ~ ~ ;; , -31 I . ~ .;:,., c"?',',."';. , 0 ---==-.- ----=--:::-'/ ~r;/';,,\'. i].,rz '.\1.<: ,.X.",,"; ,':E:.-','X- '_,,-i; o ~ , ' cu , ' ,," 0" ~'-! ~; ~. ~ , lj i I 1 I : 1 @ Ir ~ I , . , ~ = r ~,S~,E' I' : b ,. P.' .1 ,0;;' 7'- .~ .,:." ~'i..';j.~ }~~,.~..tJ ~ .____~.-=.:~'"E__; "" ",,,... ",,,~J ~'~.';!;j _, '0:) '";,, I lUlL , " '" .;. ^ 1~ Lj ~, : ~ t I ' . '> ~ - : ' I ' ; ~ ;;1 ~ ~ ~ 2 ~ , .~ < ' , . ; ~ ~ ~ ~ ~ '" ~ < -, ~ ~ i ~ ~ ~ ~ i ;' ~ , . .~ ~ , ~ EXHIBIT ---I liB" ~~ ,. r r ~ f- I, I i ~ll~r" ~ Jii"., 1,<0 ,~' .~ ~~~~ .<: _,I"v" !~.H;;~: <l ~dn~ 5 I' a , ~; ~ <;xi 2 t!H~~.~ ~ :' -.:~! ~, : ; 1-,-- i( ~ EXHIBIT "B" ."'-. I '" I ~ / ~,- / ....' ~~ II " ,,'< ; / ; ;' I I 'I' i /7 /'1 " I II ;' / f ,j, (." " i .~,.,____,,,. ~- '<", ':>.,;" ~ I '::. ~ ",,<,~~ .._-~ c.."::-..::. -<... ( ,," '< "'" '---.' ''---- ' '----.', , i;:' 0~ (;;;\ ) --'.) .":,,, " / ,J ~~;!. /' ~ /" /. ~ '.J // ~-F, ",' ;' ::// .oS , Yo..;' / ,: /' ~:~i~S:: / ~~,.-... k/'~ / ;",. ,~ G..' :1;/ j f! J2 " /;'7/ I i!? I', , -tJ/ . l rf"" . . ,,/ I" ," 4"'.1 I ::-: ~':" .~:' i",.' .I'" ',,- s::' .;~~' ;/.; -- - - ,..;/' Cl: 1(J 1'; r-'. "-'- ~ '~ '..1",. <c " ~ ~,TX ~ [; ~ $ ~ K:: I ~ --- '----,. '---- rf>' ;:/' (:}rf ",Gt" ;.. A' ^"I'< .Cf/~) ~{//j/ "<",,Co' ,.,vi. .pJ::: r,,\YCJ .~! ' ;~1 L \ . 1 ~ 10 I ~ ~p~ "~;'i ~~ ~;I' "II ~~ ~ ""!, !ih~1 ~ ~i~5~ .~~~~~~ ~ ~I!nl 'J' ,.,II ~ = -~, Q 1'1'1" ~i ~' : ~ ~. -~ 'J! EXHIBIT "B" i , : ! 7 1 ; ~ ! ! , ; , , ! , , , ; ! , ~;~~ ;:.~~~ ~~~~ ",,~ ~~~ ,,~~ i:i~.; ~~~ Ili: ~~~ if<,::: .':~- ',' ~:; I ,'Si.~_, :1 I ~i "".~'''' "\ f7'- - .---- "'_..n - --z-- ~ r- _ ""!",,-ml. .,:~---r..,;;;:;;-.:;;;;;--~i.~ ~ I ___7":'~ "ifJ}.:A"'" I ' rw>J;;;;: -'"."'~' c..1- ~ ! II '--~""=-===,"-'"", 'yr ~, (6b ON' 9' $"~'~ ~~' ;!~ I ,,- I I ':f,W:>08'.."'i 511YI>3 I ~t * .' iJOO"3~~' .'JO'8 i ,:" I ii~ : , .----nr--, Ii ", \ :.-'/,,,'!:. (I: ", .j', ; ) "'I ..~ ,,'.' ~.'-' ".'1 "- i~.' f" '" "'~ :' ~~.I~-r- <,-,' . ~ -} ~ ". ~: -.- ~ "3.0,/,;'., H~LZ MS - :r- , . o,~ t.-., '-' I I' ,-'--:---: ':;".;:':~!,~ I " 'lr" ! , . 1',;;: : i!i~ : .6fC, ,,,:.,,-& ~ .'<'- ,.Jo,o , I~' --I I I I \ ., ::II'}!: ~~~ :1 ,I ',------ I ~ , " ,::: , '" " ~; ~ : ~I J/~~~~~ I 1:1 I ) /'):P! ;~:I ~'I ~, ~ :1 r,''''_ ;;0' , " i'l Ii ~______..J~ I , c,) :, ; >Xl" L ~ :, ~ { EXHIBIT "e" Conditions of Approval Project name: Belhesda Memorial Hospital File number: MSPM 03-008 Reference: 2nd review plans idenlified wilh an August 26, 2003 Planning & Zoning Department dale slamp marking I DEPARTMENTS I INCLUDE ! REJECT ! PUBLIC WORKS- General Commenls: None PUBLIC WORKS- Traffic Comments: None UTILITIES Comments: None FIRE Commenls: None POLICE Commenls: None ENGINEERING DIVISION C ommenls: 1. Allhough the parking for the hospilal meets current code requiremenls, Engineering recommends thaI lhe Hospital review lhe data from lheir May, 2002 parking study to implemenl addilional on-sile parking thaI is flexible enough 10 grow with lhe hospilal's needs. BUILDING DIVISION Comments: 2. Title Sheet shall reflect The Year Slandards thaI are in effect: a) The 2002 Edition of NEC is in effecl as of June 30, 2003, b) The 1995 Edition ofNFPA 80. 3. The noted fire resislance ratings on lhe litle sheet shall comply with Table 600 of 200 I FBC for lhe required fire resislance ratings. 4, Place a nole on the elevalion view drawings indicating lhal lhe wall openings and wall construction comply with Table 600 of the 2001 FBC, 5. Buildings. slructures and parts thereof shall be designed to wilhsland lhe Condilions of Approvat 2 II DEPARTMENTS I INCLUDE \ REJECT ! minimum wind loads of 140 mph. Wind forces on every building or slruclure shall be determined by the provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 200 I FBC, Calculations lhat are signed and sealed by a design professional regislered in the stale of Florida shall be submitted for reviewal the time of permil applicalion. 6. Every building and structure shall be of sufficienl strength 10 support the loads and forces encountered per the 2001 FBC, Seclion 1601.2,1 and Table 1604.1. Indicale the live load (pst) on lhe plans for the building design. 7, Al time ofpermil review, submit signed and sealed working drawings oflhe proposed conslruction. 8, Indicate lhe number of accessible parking spaces provided and where lhe exisling Handicap spaces will be relocaled. 9. Add a labeled symbol to lhe site plan drawing that represents and delineates lhe palh of travel for lhe accessible route thaI is required between the accessible parking spaces and lhe accessible entrance doors to the building. The inslalled symbol, required along the palh, shall slart at lhe accessible parking spaces and lerminale al the accessible enlrance doors to the building. The symbol shall represent lhe localion of lhe path of lravel, nol lhe localion of lhe deleclable warning or other pavement markings. The localion of the accessible palh shall nol compel lhe user 10 travel in a drive/lane area lhat is localed behind parked vehicles. Identify on the plan lhe widlh of the accessible roule, (Note: The minimum widlh required by the code is forty- four (44) inches). Add lexl to the drawing thaI would indicale lhal the symbol represents the accessible route and lhe route is designed in compliance wilh Section 11-4,3 (Accessible Route) and 11-4,6 (Parking and Passenger Loading Zones) of the 2001 FBC. Please nole that al lime of permit review, the applicant shall provide delailed documenlation on lhe plans lhal will verify that lhe accessible roule is in compliance with lhe regulalions specified in the 200 I FBC. This documentation shall include, bul nol be limiled to, providing finish grade elevalions along lhe palh of Ira vel. Clarify 10 where the exisling Handicap spaces will be relocaled, to. If capilal facilily fees (waler and sewer) have been paid in advance to the City of Boynlon Beach Ulilities Departmenl, the following information shall be provided at the lime of building permil applicalion: t. The full name of lhe projecl as il appears on lhe Development Order and lhe Commission-approved site plan, 11. The lolal amount paid and ilemized inlo how much is for water and how much is for sewer. (CBBCO, Chapler 26, Article II, Seclions 26-34) PARKS AND RECREATION Comments: None I DEPARTMENTS I INCLUDE I REJECT I FORESTER/ENVIRONMENT ALIST Comments: None PLANNING AND ZONING Comments: 11, The "Mechanical Room" exceeds lhe 45 fool height limilalion by 10 feel 5 inches and will reauire a Height Exceplion by lhe Citv Commission. 12, All above ground mechanical equipment will need 10 be visually screened, 13. Any equipmenl attached 10 the exterior walls shall be painled 10 malch lhe building 14. Any landscape required to be removed due 10 the conslruclion should be nOled, complele with a replanting schedule, and should be coordinated wilh lhe Citv Foresler. 15. The revised Traffic Study has been forwarded to Palm Beach County Traffic Division for review and determination, No permit shall be issued prior 10 receipt of an approval letter. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 1, To be delermined. ADDITIONAL CITY COMMISSION CONDITIONS Comments: I 1. To be delermined, I I I S:\Planning\SHARED\ WP\PROJ ECTS\Bethesda\MSPM 03-008\COAdoc 1st REVIEW COMMENTS Maior Site Plan Modification Project name: Bethesda Memorial Hospital File number: MSPM 03-08 Reference: 1st review plans identified as a Maior Site Plan Modification with a Julv 23. 2003 Planninl! and Zoninl! Department date stamp markinl!. REVISED RESPONSE COMMENTS BY KIWAY & ASSOCIATES ON 8/29/03 (revised answers 6. 23. 28) DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Commenls: 1. Prior to pennil application, conlact the Public Works Deparlmenl (561- 742-6200) rel!ardin!! lhe stora!!e and handlin!! of refuse. This project will be using the existing utilities on the site. Therefore, there are no new utilities coming onto this site for ResDonse: this proiect. PUBLIC WORKS - Traffic Comments: 2. No modifications were made 10 pavemenl area; therefore lhis segment will be reviewed at pennit time for any technical adjuslments required. ResDonse: Noted UTILITIES Commenls: NONE ENGINEERING DIVISION Commenls: 3. No modifications were made to the pavement or drainage areas: lherefore this segmenl will be reviewed at pennit time for any technical adjustments required. Response: Noted 4. The Parking Planned Study dated May, 2002, reflects a current parking space deficil of 198 spaces. It further projects lhat lhe parking needs for lhe year 2010 will reflecl a deficit of 693 spaces. By allowing for an upper floor(s) addilion at this time, how is the hospital complex going 10 resolve their oarkin!! deficit(s)? Response: In September, a Parking Structure plan for the Hospital complex will be submitted to do a Major Site Plan Modification. File No. 352.21 8/29/03 - I - 5. Any (and all) comments requiring changes and/or correclions lolhe plans shall be reflecled on all appropriate sheels. Resnonse: Revised plans are attached. 6. No utility plan was included with this submittal; therefore. the Utililies Departmenl considers this plan incomplele as submilled, The proposed Site Plan is wilhin a previous approved project where utilily support is available, We are providing only a cursory review of lhe proposed project as submilted al lhis time. Addilional commenls will be required after a utilily plan is submitted. The current concern is the capacity to provide service to this oroiect without svstem improvements. Response: The building is being expanded vertically and will be using the existing adequate utilities on the site. Therefore, there are no new utilities coming onto this site for this project. FIRE Commenls: 7. A fire in an area of a hospital that is under construclion and withoul sprinkler proteclion, poses a significanl threat to portions of the hospital occupied by palienls lhal may not be capable of rapid egress, (See the Florida Fire Prevention Code Seclion 19.1.1.3). A fire in an unsprinklered area could rapidly spread and overwhelm sprinklers in the protected areas. Response: The uew addition will be constructed with a two (2) hour rated roof system and will be fully sprinkIered. The addition is located over an existing sprinkIered out patient portion of the hospital and remotely from the existing natient bed tower. 8. Accordingly, provide a plan of aclions 10 be laken to protecl patients in exisling occupied areas from the threat posed by construction activities. The plan will be reviewed in accordance with lhe Florida Fire Prevention Code Section 4.6.10. I and Chapler 5 (Fire Protection) of NFPA 241, Safeguarding Construction, Alteration, and Demolition Operations. The plan is expected to address all applicable sections of NFPA 241, with emphasis on Section 5-1.3, (Pre-Fire Plans), 5-1.6., (Hot Work Permits): and 5-1.8 (Impairments). Response: A fire manual for the hospital is attached. POLICE Comments: NONE BUILDING DIVISION Comments: 9. Tille Sheet: The Year Standards in Effect Are: a) The 2002 Edition of NEC is in effect al of June 30, 2003. b) The 1995 Edilion ofNFPA 80, ResDonse: Coversheet has been updated. 10. The noted fire resistance ratings on the title sheet shall comply with Table 600 of 2001 FBC for the reCluired fire resistance ratings. File No. 352.21 8/29/03 -2- ResDonse: Coversheet has been undated. II. Place a nole on the elevalion view drawings indicating thaI the wall openings and wall construclion comply wilh Table 600 oflhe 2001 FBC. Remonse: Sheets A201 and A202 have been undated 12. Buildings, structures and parts thereof shall be designed 10 withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be delermined by the provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 2001 FBC. Calculations lhat are signed and sealed by a design professional regislered in lhe slate of Florida shall be submitted for reviewal lhe lime of oermil aoolicalion. Response: The addition has been designed to meet these requirements. Signed and sealed calculations will be submitted for review at the time of nermit annlication. 13. Every building and structure shall be of sufficient strength 10 support the loads and forces encountered per lhe 2001 FBC, Section 1601.2.1 and Tale 1604: I. Indicate the live load (psf) on the plans for the building design, ResDonse: Sheets A101, AI04, A105 and AI05A have been undated. 14. Al time of permit review, submit signed and sealed working drawings of lhe orooosed conslruction, Response: Signed and sealed working drawings will be submitted at time of permit annlication. 15. Indicate lhe total number of parking spaces thaI will be provided for this expansion and indicate the number of accessible parking spaces provided. Comply with 200 I FBC Section 11-4.1.6. Response: The Hospital has not planned to add parking spaces in connection to this expansion because it meets the City's Code. However, a Parking Structure plan for the Hospital complex will be submitted to in September. 16. Add a labeled symbol to the site plan drawing lhat represents and delineales the palh of travel for lhe accessible route thaI is required belween the accessible parking spaces and the accessible entrance doors to the building. The installed symbol, required along the path, shall start al lhe accessible parking spaces and lerminale at lhe accessible enlrance doors 10 lhe building. The symbol shall represenl lhe location of lhe palh of travel, not lhe location of lhe delectable warning or other pavement markings. The location of lhe accessible path shall nol compel the user 10 travel in a drive/lane area lhat is located behind parked vehicles. Identify on the plan the widlh of the accessible route, (Nole: The minimum widlh required by the code is forty.four (44) inches). Add text to the drawing that would indicate lhat the symbol represents the accessible route and lhe route is designed in compliance with Section 11-4.3 (Accessible Route) and 11-4.6 (Parking and Passenger Loading Zones) of the 200 I FBC. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans thaI will verify that the accessible route is in compliance with the regulations specified in the 2001 FBC. This documentation shall include, bul not be limited to, providing finish grade elevalions along the nalh of lrave\. File No. 352.21 8/29/03 - 3 - Response: Items have been npdated on the revised site plan. 17. Add 10 lhe drawing the calculalions lhal were used 10 identify lhe minimum number of required handicap accessible parking spaces. Also, slale lhe code section lhal is aoolicable to the comoutalions. Response: Item has been updated on the revised site plan. 18. Idenlify wilhin lhe site dala the finish floor elevalion (lowesl floor elevation) that is proposed for the/each building. Verify lhat lhe proposed elevation is in compliance with regulations of the code by adding specifications 10 the site dala lhat address the following issues [Section 3107.1.2, Chapler 31 oflhe 2001 FBC]: a) The design professional-of-record for the projecl shall add lhe following text to lhe sile dala. "The proposed finish floor elevation NGVD is above lhe highest loo-year base flood elevalion applicable to the building site, as determined by the SFWMD's surface water managemenl construction developmenl regulations." b) From lhe FIRM map, idenlify in the site data the tille of the flood zone lhal the building is located within. Where applicable, specify the base flood elevation, If there is no base flood elevation, indicale lhal on the plans. c) Idenlify lhe floor elevalion that the design professional has established for lhe building within the foolprinl of the building thaI is shown on the drawings titled sile plan, floor plan and pavin!>/drainage (civil plans). Response: Items have been adjusted to the revised site plans. 19, In the drawing litled site plan, identify and label the symbol that represents the oroperty line. Response: Item has been updated on the revised site plan. 20. A water use permit is required for the irrigation system. A copy of the oermit shall be submitted al the time of oermit aoplication, F.S. 373.216. Response: Since no new irrigation is required for this project, the existing water use permit will suffice. 21. If capital facilily fees (water and sewer) have been paid in advance to the City of Boynlon Beach Utilities Departmenl, lhe following information shall be provided at the time of building permit application: i. The full name of the project as il appears on lhe Developmenl Order and the Commission-approved site plan. ii. If lhe project is a multi-family projecl, lhe building number(s) must be provided. The building numbers musl be lhe same as noted on lhe Commission-approved sile plans. iii. The number of dwelling units in each building. IV, The number of bedrooms in each dwelling unit. v. The total amount paid and itemized into how much is for waler and how much is for sewer. (CBBCO, Chapler 26, Article II, Section 26-34) File No. 352.21 8/29/03 -4- Response: If needed, these items wiD be provided at the time of building permit application. PARKS AND RECREATION Comments: NONE PLANNING AND ZONING Comments: DEPARTMENTS INCLUDE REJECT 22. The fourth level "Mechanical Room" exceeds the 45 foot height limitation and will require a Height Exception or Variance (depending upon exacl circumstances) by lhe Cily Commission. Additionally, il is unclear whal lhe exacl dimension of lhe parapet wall on the lhird level is intended to be. Please indicate the dimension on the plans and if lhe heil!hl exceeds 45 feet, it will reouire an exceolion, Response: Sheets A201 and A202 have been updated to reflect dimensions of roof and parapet. A written statement to request for a Height Exception will be submitted at time of Technical Review Committee meetinS! on AuS!ust 26, 2003. 23. A mechanical room is intended for such purposes as the elevator and stairwell indicaled, however the plans depicl a slorage room and office in lhis structure as well. Please explain the reasoning and necessily for these SDaces. Response: The elevator and stair depicted on Sheet AI05 are intended for roof access on level four. This roof has also been designed to accommodate relocating the existing helipad from the to second level to the fourth level. The Office R4002 and Storage R4002 have been deleted on the revised site plan, per discussion at TRC on 8/26/03. Relocating the existing helipad has been submitted as an Alternate to the project. 24, The LOR's require Major Site Plan Modificalions to submit the same infonnation as required for a New Site Plan, i.e. Landscape Plan, Drainage Plan and a Site Plan depicling site lighting, parking stall/aisle dimensions. elc. These Dal!eS were nol attached, Response: These pages are not attached because the project is to expand the building vertically and there are no horizontal adjustments at this time being done to the site. 25. The size of submitted nlans shall not exceed 24" x 36". Response: The plans that will be submitted for the TRC meeting shall be 24" X 36". 26, Indicale how handicapped.accessible parking and ingress/egress will be accomplished during the construction phase since construclionlslaging areas are occuoving these snaces. Response: Item has been adjusted on the revised site plan. 27. There should be a designated construction entrance to limit large trucks and eouiomenl from drivin!1 all throughout the site. File No. 352.21 8/29/03 - 5 - Response: Sheet GIOI has been modified to indicate Public Access vs. Construction Access. Construction access will occur off of S. W. 23" Avenue. 28. Provide details on how pedestrians will be protecled from overhead construction. Response: Sheet GIOI defines construction staging areas, which has a pedestrian construction tunnels from the construction staging areas to the Oncology, Emergency and Outpatient entrances. These pedestrian construction tunnels wiD protect pedestrians from overhead construction. The contractor is responsible to provide further protection to meet OSHA requirements. 29, Site dala labulalions do not match between Kilday drawing SP-l (dated 7-23-03) and HDR cover sheet (issue dale 7-22-03). Response: The revised site plan and the revised elevation coversheet match the site data tabulation information. 30. Indicale how roof draina2e is bein2 addressed for the new construclion. Response: The addition is being built over an existiug portion of the hospital. No new footprint is being added as part of this effort, therefore there is no increase in roof area of the building. Roof drainage will be handled by connecting the new roof drains into the existim! svstem 31. Will there be any new lighting attached to the walls of lhe new construction? Any new light fixtures in the immediale vicinity of the new construction? If so. complete specificalions including height. color and wind lead resistance will need 10 be submitted. Response: No new exterior lighting is currently planned for this addition, except for lights at the roof level door and for the Alternate for the roof of the fourth level helioad. 32, All above ground mechanical equipment will need to be visually screened. Response: There is no ground level or roof level mechanical eqnipment in this project. All mechanical equipment is enclosed within the second level mechanical room. The roof top elevator vent is located bevond line of sil!ht from the l!round. 33, Any equipment altached to lhe exterior walls shall be painled to malch lhe buildin2. Response: There is no equipment attached to the exterior walls of the addition. 34. Anv addilional Si2nal!e needs to be reflected on the plans. Response: No additional signage is proposed. 35. Any landscape required to be removed due to lhe construclion should be noted. complele with a replanting schedule. and should be coordinaled with the Citv Forester, Response: NA - all existing landscape is to remain and wiD be orotected durin!! construction. 36. Provide paint swalches with manufacturer name and color name and number at TRC meeting, File No. 352.21 8/29/03 -6- Response: Exterior paint color swatches will be snbmitted at TRC meeting on Angnst 26, 2003. The addition is intended to match the color scheme of the existinl! facilitv. 37. Provide clip-mounled color elevation drawings on presenlation boards at TRC meelinl!. Response: Color Elevation drawings will be submitted at TRC meeting on AUl!ust 26, 2003. 38. The revised Traffic Sludy will be forwarded to Palm Beach Counly Traffic Division for review and delennination, No pennit shall be issued prior to receipl of an approval letter. Response: A letter dated Augnst 18, 2003 from Palm Beach County Traffic Division is attached. The Project Traffic Engineer will work with the Palm Beach County Division to revise the traffic study as necessary. 39. The required updated survey shall be submitted. It shall include Q!l.Q!!!;. sheet, the newly completed renovations to lhe main entrance and lhe addilionallots acauired for parkinl! purooses. Response: The updated survey is attached. Paul Engle from O'Brien, Suiter & O'Brien, Inc. spoke with Ed Breeze that the survey will be on different sheets based on the complexity of the site. File No, 352.21 8/29/03 - 7 - 1st REVIEW COMMENTS Maior Site Plan Modification Projecl name: Belhesda Memorial Hospital File number: MSPM 03-00~ Reference: I" review plans idenlified as a Maior Sile Plan Modificalion with a July 23, 2003 Planning and Zoning Department date slamu marking I I I DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: 1. Prior 10 permil applicalion, conlact the Public Works Departmenl (561-742- 6200( regarding lhe slorage and handling of refuse, I PUBLIC WORKS - Traffic , Commenls: 2, No modifications were made to pavemenl area; lherefore lhis segmenl will be reviewed at permil lime for any lechnical adjuslmenls required. UTILITIES Comments: NONE ENGINEERING DIVISION Comments: 3. No modifications were made to the pavemenl or drainage areas; lherefore this segment will be reviewed at permit lime for any technical adjustmenls reauired. 4, The Parking Planned Study daled May, 2002, reflecls a currenl parking I space deficit of 198 spaces. It further projecls thaI the parking needs for lhe ! year 2010 will reflecl a deficit of 693 spaces. By allowing for an upper- 1100r(s) addition at this time, how is lhe hospital complex going to resolve their parking deficit(s)? 5. Any (and all) commenls requiring changes and/or correclions to lhe plans shall be reflecled on all appropriale sheets. 6. No ulilityplan was included wilh lhis submittal; lherefore, lhe Ulililies Department considers this plan incomplete as submitted. The proposed Site Plan is within a previous approved project where utility support is available, We are providing only a cursory review of the proposed projecl as submitted al lhis lime, Addilional comments will be required after a utility plan is submitted. The currenl concern is the capacity 10 provide service 10 this proiecl wilhout syslem imurovemenls, FIRE Commenls: 7. A fire in an area of a hospital lhat is under construction and wilhoul sprinkler proteclion. poses a significant lhreat to portions of the hospilal occupied by patienls lhal may nol be capable of rapid egress. (See the 1ST REVIEW COMMENTS 08/12/03 2 , II DEPARTMENTS INCLUDE REJECT Florida Fire Prevention Code Section 19,1.1.3) A fire in an unsprinklered area could rapidlv sDread and overwhelm sorinklers in lhe orotecled areas, 8. Accordingly, provide a plan of aclions to be taken to prolecl patienls in exisling occupied areas from the lhreal posed by construclion activilies, The plan will be reviewed in accordance wilh lhe Florida Fire Prevention Code Seclion 4.6.10.1 and Chapler 5 (Fire Prolection) ofNFPA 241, Safeguarding COllstruetion, Alteration, and Demolition Operations. The plan is expecled to address all applicable seclions ofNFPA 241, wilh emphasis on Sections 5-1.3, (Pre-Fire Plans), 5-1.6., (Hot Work Permits), and 5-1.8 (Impairments) I POLICE I Commenls: NONE BUILDING DIVISION Comments: 9. Title Sheel: The Year Slandards in Effect Are: a) The 2002 Edition ofNEC is in effecl as of June 30, 2003, b) The 1995 Edilion ofNFPA 80. , la, The noled fire resislance ralings on lhe title sheel shall comply wilh Table 600 of 200 I FBC for the required fire resistance ralings. II. Place a nole on lhe elevation view drawings indicating lhat lhe wall openings and wall construction comply wilh Table 600 of the 2001 FBe. 12. Buildings, structures and parts lhereof shall be designed to wilhsland the minimum wind loads of 140 mph. Wind forces on every building or structure shall be delermined by lhe provisions of Chapler 6 of ASCE 7, and lhe provisions of See lion 1606 (Wind Loads) oflhe 2001 FBC. Calculalions thaI are signed and sealed by a design professional regislered in lhe state of Florida shall be submitted for reviewal lhe time of permil applicalion. 13. Every building and struclure shall be of sufficienl strength to support lhe loads and forces encounlered per lhe 2001 FBC, Section 1601.2,1 and Table 1604. I. Indicate lhe live load (psi) on lhe olans for the building design, 14, At time of permil review, submit signed and sealed working drawings of lhe proposed construction, 15, Indicatc the lotal number of parking spaces lhat will be provided for lhis expansion and indicale the number of accessible parking spaces provided. Comply wilh 200 I FBC Seclion 11-4.1.6. 16. Add a labeled symbol to the site plan drawing that represenls and delineates 1ST REVIEW COMMENTS 08/12/03 3 DEPARTMENTS the path of travel for the accessible route lhal is required belween the accessible parking spaces and the accessible entrance doors to lhe building, The installed symbol, required along the palh, shall slarl al the accessible parking spaces and lerminate al the accessible entrance doors to the building. The symbol shall represent lhe location of lhe path of travel. not the localion of the delectable warning or other pavemenl markings. The location of the accessible palh shall not compel the user 10 travel in a drive/lane area lhat is localed behind parked vehicles, IdentifY on lhe plan lhe width of the accessible route. (Nole: The minimum widlh required by the code is forty-four (44) inches). Add lext 10 lhe drawing lhal would indicate lhal the symbol represenls lhe accessible route and lhe roule is designed in compliance wilh Section 11-4.3 (Accessible Roule) and 11-4.6 (Parking and Passenger Loading Zones) of the 2001 FBe. Please note lhat at time of permit review, lhe applicanl shall provide detailed documenlation on lhe plans thaI will verifY lhal the accessible route is in compliance wilh the regulalions specified in lhe 2001 FBC. This documenlalion shall include, but nol be limited to, providing finish grade elevalions along the path of travel. 117. Add to lhe drawing the calcu1alions that were used to identifY the minimum number ofrequired handicap accessible parking spaces. Also, slate the code section lhal is applicable to lhe computations. 18. IdentifY within the site dala the finish floor elevation (lowesl floor elevalion) that j, proposed for the/each building. VerifY that the proposed elevation is in compliance wilh regulations of lhe code by adding specificalions 10 the sile dala thaI address the following issues [Seclion 3107,1.2, Chapler 31 of the 2001 FBC]: a) The design professional-of-record for lhe projecl shall add lhe following texl 10 lhe site dala. "The proposed finish floor elevation _' _ NGVD is above the highest 100-year base flood elevalion applicable to lhe building sile, as determined by lhe SFWMD's surface waler managemenl construclion developmenl regu1alions." b) From lhe FIRM map, idenlifY in lhe site dala lhe tille of the flood zone thaI lhe building is located wilhin. Where applicable, specifY the base flood elevalion, If lhere is no base flood elevation, indicate that on lhe plans. c) IdentifY the floor elevation lhal lhe design professional has eSlablished for the building wilhin the footprinl of the building that is sho'ml on the drawings lilled site plan, noor plan and paving! drainage (civil plans), 19. In lhe drawing litled site plan, idenlifY and label the symbol lhat represenls lhe property line. 20. A water use permit is required for the irrigation system. A copy of the permil shall be submitted al the time ofpermil applicalion, F.S. 373.216. INCLUDE REJECT 1ST REVIEW COMMENTS 08/12/03 3 DEP ARTlVIENTS the path of travel for lhe accessible route lhat is required belween the accessible parking spaces and lhe accessible entrance doors to the building. The installed symbol, required along lhe path, shall slart at the accessible parking spaces and terminale at lhe accessible entrance doors 10 the building. The symbol shall represenl the location of the palh of travel, not the location of the deteclable warning or other pavement markmgs. The location of lhe accessible palh shall nol compel lhe user to travel in a drive/lane area that is located behind parked vehicles, IdenlifY on lhe plan the width of lhe accessible route. (Nole: The minimum width required by the code is forty-four (44) inches). Add text to lhe drawing lhat would indicale lhat lhe symbol represents the accessible roule and lhe route is designed in compliance with Section 11-4.3 (Accessible Roule) and 11-4.6 (Parking and Passenger Loading Zones) of the 2001 FBe. Please note lhat al lime of permit review, the applicanl shall provide delailed documenlation on the plans lhat will verifY thaI the accessible route is in compliance wilh lhe regulalions specified in the 2001 FBe. This documenlation shall include, bul not be limiled 10, providing finish grade elevalions along lhe path of travel. 17. Add 10 lhe drawing lhe calculalions lhat were used to identifY lhe minimum number ofrequired handicap accessible parking spaces, Also, state lhe code seclion that is applicable to the computations. 18. IdenlifY wilhin the sile data the finish floor elevalion (lowest floor elevalion) thaI is proposed for lhe/each building, YerifY lhal lhe proposed elevation is in compliance wilh regulalions of the code by adding specificalions 10 lhe site dala thaI address the following issues [Section 3107.1.2, Chapler 31 of the 2001 FBe]: a) The design professional-of-record for lhe projecl shall add lhe following text 10 lhe site dala. "The proposed finish floor elevation _' _ NGYD is above the highesl 100-year base flood elevation applicable to lhe building site, as determined by lhe SFWMD's surface waler management construction developmenl regulations." b) From lhe FIRM map, idenlifY in lhe sile dala the litle of the flood zone lhal lhe building is localed within. Where applicable, specifY the base flood elevalion. If lhere is no base flood elevalion. indicale lhal on lhe plans. c) IdenlifY lhe floor elevalion lhal lhe design professional has established for lhe building wilhin lhe footprint of the building lhal is shown on the drawings tilled site plan, floor plan and paving! drainage (civil plans). 19. In lhe drawing titled site plan, idenlifY and label the symbol lhal represenls lhe property line. 20. . A copy of the permit shall be submitted at the time of permit application, F.S, 373.216. INCLUDE REJECT 1ST REVIEW COMMENTS OSil2/03 4 I I DEP ARTlYIENTS INCLUDE REJECT I 21. If capilal facility fees (waler and sewer) have been paid in advance 10 lhe City of Boynton Beach Utilities Departmenl, the following information shall be provided al the time of building permit applicalion: 1. The full name of the project as il appears on lhe Development Order and lhe Commission-approved sile plan. t1. If the projecl is a multi-family project, the building number(s) must be provided. The building numbers must be the same as noled on lhe Commission-approved site plans. 111. The number of dwelling unils in each building. IV. The number of bedrooms in each dwelling unit. v. The total amounl paid and ilemized inlo how much is for waler and how much is for sewer. (CBBCO, Chapter 26. Article II. Seclions 26-34) PARKS AND RECREATION Comments: NONE FORESTERJENVlRONMENT ALIST Commenls: NONE PLANNING AND ZONING Comments: 22. The fourth level "Mechanical Room" exceeds lhe 45 fool heighl limitation and will require a Height Exception or Variance (depending upon exacl circumstances) by the City Commission, Additionally, il is unclear whal lhe exact dimension of lhe parapel wall on lhe lhird level is inlended 10 be. Please indicale the dimension on the plans and if the heighl exceeds 45 feel, il will require an excention, 23. A mechanical room is intended for such purposes as lhe elevator and slairwell indicaled, however lhe plans depict a slorage room and office in this struclure as well. Please explain the reasoning and necessity for these soaces. 24, The LDR's require Major Site Plan Modifications to submil the same informalion as required for a New Site Plan, i.e. Landscape Plan, Drainage Plan, and a Site Plan depicting site lighting, parking stall/aisle dimensions, etc. These pages were nol attached. 25. The size of submitted plans shall nol exceed 24" x 36". 26. Indicate how handicapped-accessible parking and ingress/egress will be accomplished during the construction phase since constructionlslaging areas are occunving lhese snaces. 27. There should be a designaled construclion entrance to limil large trucks and eouinment from driving all lhroughout lhe sileo 1ST REVIEW COMMENTS 08/12/03 , , I .1 DEPARTMENTS INCLUDE REJECT I I 28. Provide details on how pedeslrians will be protecled from overhead construction 29. Site data labulations do nol malch between Kilday drawing SP- I (dated 7- 23-03) and HDR cover sheel (issue dale 7-22-03). 30. Indicate how roof drainage is being addressed for the new construction 31. Will lhere be any new lighting attached to lhe walls of lhe new construclion? Any new lighl fixtures in lhe immediate vicinity of the new construction? If so, complele specifications including heighl, color and wind load resislance will need 10 be submitted. 32. All above ground mechanical equipmenl will need 10 be visually screened. 33. Any equipmenl attached to lhe exterior walls shall be painted 10 malch the building 34. Any additional signage needs to be reflected on the plans 35. Any landscape required to be removed due to lhe construction should be noted, complele with a replanting schedule, and should be coordinaled wilh the City F oresler. 36. Provide painl swalches wilh manufacturer name and color name and number at TRC meeling I 37. Provide clip-mounted color elevalion drawings on presenlalion boards at TRC meeting. 38. The revised Traffic Study will be forwarded 10 Palm Beach County Traffic Division for review and delermination, No permit shall be issued prior 10 receipt of an approval letter, 39. The required updated survey shall be submitted. It shall include on one sheet, the newly compleled renovations 10 the main entrance and lhe addilionallots acquired for narkin~ purposes MWRlsc S:IPlanningISHAREDlWPIPROJECTSIBetl1esdaIMSPM 03-00811 ST REVIEW COMMENTS.doc PLANNING AND ZONING MEMORANDUM TO: Sherie Coale, Senior Office Assistant FROM: Ed Breese, Principal Planner DATE: August 8, 2003 SUBJECT: Bethesda Memorial Hospital (MSPM 03-008) Please include the following comments in the TRC review of the above-mentioned project: 1. The fourth level "Mechanical Room" exceeds the 45 foot height limitation and will require a Height Exception or Variance (depending upon exact circumstances) by the City Commission. Additionally, it is unclear what the exact dimension of the parapet wall on the third level is intended to be. Please indicate the dimension on the plans and if the height exceeds 45 feet, it will require an exception, 2. A mechanical room is intended for such purposes as the elevator and stairwell indicated, however the plans depict a storage room and office in this structure as well, Please explain the reasoning and necessity for these spaces. 3. The LDR's require Major Site Plan Modifications to submit the same information as required for a New Site Plan, i.e. Landscape Plan, Drainage Plan, and a Site Plan depicting site lighting, parking stall/aisle dimensions, etc. These pages were not attached, 4. The size of submitted plans shall not exceed 24" x 36". 5, Indicate how handicapped-accessible parking and ingress/egress will be accomplished during the construction phase since construction/staging areas are occupying these spaces, 6, There should be a designated construction entrance to limit large trucks and equipment from driving all throughout the site. 7, Provide details on how pedestrians will be protected from overhead construction. 8. Site data tabulations do not match between Kilday drawing SP-l (dated 7-23-03) and HDR cover sheet (issue date 7-22-03), 9. Indicate how roof drainage is being addressed for the new construction, 10. Will there be any new lighting attached to the walls of the new construction? Any new light fixtures in the immediate vicinity of the new construction? If so, complete specifications including height, color and wind load resistance will need to be submitted. 11. All above ground mechanical equipment will need to be visually screened, 12, Any equipment attached to the exterior walls shall be painted to match the building, 13. Any additional signage needs to be reflected on the plans. 14. Any landscape required to be removed due to the construction should be noted, complete with a replanting schedule, and should be coordinated with the City Forester. 15. Provide paint swatches with manufacturer name and color name and number at TRC meeting. 16. Provide clip-mounted color elevation drawings on presentation boards at TRC meeting. 17, The revised Traffic Study will be forwarded to Palm Beach County Traffic Division for review and determination. No permit shall be issued prior to receipt of an approval letter. 18. The required updated survey shall be submitted, It shall include on one sheet, the newly completed renovations to the main entrance and the additional lots acquired for parking purposes. :{.~...tj. H," t-. ! i.,. .., C ~_:<i' ~' , DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 03-161 FROM: Michael W. Rumpf, Director Planning and Zoning H. David Kelley, Jr., PE/PS~-' City Engineer TO: DATE: August 8, 2003 RE: Review Comments Major Site Plan Modification - 1 st Review Bethesda Memorial Hospital File No. MSPM 03-008 The above referenced Site Plans, forwarded on August 5, 2003, were reviewed by representatives from Public Works, Engineering, Solid Waste, Parks and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances, Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced. PUBLIC WORKS - GENERAL 1, Prior to permit application, contact the Public Works Department (561-742-6200) regarding the storage and handling of refuse. PUBLIC WORKS - TRAFFIC 2. No modifications were made to pavement area; therefore this segment will be reviewed at permit time for minor traffic sign age or striping improvements, ENGINEERING 3. No modifications were made to the pavement or drainage areas; therefore this segment will be reviewed at permit time for any technical adjustments required. 4, The Parking Planning Study dated May, 2002, reflects a current parking space deficit of 198 spaces. It further projects that the parking needs for the year 2010 will reflect a deficit of 693 spaces. By allowing for an upper-floor(s) addition at this time, how is the hospital complex going to resolve their parking deficit(s)? 5. Any (and all) comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 6. No utility plan was included with this submittal; therefore, the Utilities Department considers this plan incomplete as submitted. HOWEVER, the proposed Site Plan is within a previous approved project where utility support is available. THUS, we are providing only a cursory review of the proposed project as submitted at this time. Additional comments will be required after a utility plan is submitted. The current concern is the capacity to provide service to this project without system improvements. cc: Jeffrey L. Livergood, P,E., Director, Public Works (via e-mail) Peter Mazzella, Assistant to Director, Utilities Laurinda Logan, PE, Senior Engineer, Public Works/Engineering Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division (PW/F&G) Larry Quinn, Solid Waste Manager, Public Works/Solid Waste Ken Hall, Engineering Plans Analyst, Public Works/Engineering File S:\Engineering\Office Associates File\Kelley\03-161 Bethesda Memorial Hosiptal- major modification 1st review.doc / / Ll fY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO: Michael W. Rumpf DATE: Dir. of Planning & Zoning 8/7/03 FILE: MSPM 03-008 FROM: Off. John Huntington Police Department CPTED Practitioner SUBJECT: Bethesda Memorial Hospital REFERENCES: Site Plan ENCLOSURES: I have viewed the above building plans and have the following comments: No Comments, ,/ Coale, Sherie From: Sent: To: Cc: Subject: Majors, Wally Tuesday, August 05, 2003 8:59 AM Coaie, Sherie Rumpf, Michael Site Plan Review Bethesda Hospital Sherie, Recreation & Parks staff reviewed the site plan for the Bethesda's Rehab Center. The Parks and Rec. impact fee does not apply since the plan does not involve any residential component. Therefore we have no comment regarding this plan. Wally Majors, Director Recreation & Parks Department 1 ,/ CITY OF BOYNTON BEACH Fire and Life Safety Division 100 East Boynlon Beach Blvd. P.O Box 310 Boynton Beach, Florida 33425-0310 PLAN REVIEW COMMENTS For review of: MSPM 03-008 1st review Project Name and Address: Bethesda Memorial Hospital 2815 S. Seacrest Blvd. Reviewed by: ~ Rodqer Kemmer, Fire Protection Enqineer Department: Fire and Life Safety Phone: (561) 742-6753 Comments to: Sherie Coale by email on 7/3003 CODE REQUIREMENTS A fire in an area of a hospital that is under construction and without sprinkler protection, poses a significant threat to portions of the hospital occupied by patients that may not be capable of rapid egress. (See the Florida Fire Prevention Code Section 19.1,1.3) A fire in an unsprinklered area could rapidly spread and overwhelm sprinklers in the protected areas. Accordingly, provide a plan of actions to be taken to protect patients in existing occupied areas from the threat posed by construction activities, The plan will be reviewed in accordance with the Florida Fire Prevention Code Section 4.6.10.1 and Chapter 5 (Fire Protection) of NFPA 241, Safeguarding Construction, Alteration, and Demolition Operations. The plan is expected to address all applicable sections of NFPA 241, with emphasis on Sections 5-1.3, (Pre-Fire Plans), 5-1.6" (Hot Work Permits), and 5-1.8 (Impairments) cc: Steve Gale Bob Borden ------ FROM: Michael W. Rumpf Director of Planning and Zoning Timothy K. Large ~ TRC Member/Building Divisi~ of Acronyms/Abbreviations: ASCE - American Society of Civil Engineers CBB - City of Boynton Beach CBBCO - City of Boynton Beach Code of Ordinances CBBCPP - City of Boynton Beach Comprehensive Plan Policy CFR - Code of Federal Reguiations FBC - Florida Building Code FIRM - Flood Insurance Rate Map F S. - Florida Statutes LOR - Land Oeveiopmenl Regulations NEC - National Eleclrical Code NFPA - National Fire Prevention Assn NGVO - Nationai Geodetic Vertical Oalum of 1929 SFWMO - South Florida Water DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 03-160 TO: DATE: August 4, 2003 SUBJECT: Project - Bethesda Memorial Hospital Comprehensive Inpatient Rehabilitation Unit File No. - MSPM 03-008 - 1 sl review We have reviewed the subject plans and recommend that the request be forwarded for Board review with the understanding that all remaining comments will be shown in compliance on the working drawings submitted for permits, BuildinQ Division (Site Specific and Permit Comments) - Timothv K. LarQe (561) 742-6352 1 Title Sheet: The Year Standards in Effect Are: a) The 2002 Edition of NEC is in effect as of June 30, 2003. b) The 1995 Edition of NFPA 80. 2 The noted fire resistance ratings on the title sheet shall comply with Table 600 of 2001 FBC for the required fire resistance ratings. 3 Place a note on the elevation view drawings indicating that the wall openings and wall construction comply with Table 600 of the 2001 FBC. 4 Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 2001 FBC, Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 5 Every building and structure shall be of sufficient strength to support the loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table 1604.1. Indicate the live load (pst) on the plans for the building design. 6 At time of permit review, submit signed and sealed working drawings of the proposed construction. 7 Indicate the total number of parking spaces that will be provided for this expansion and indicate the number of accessible parking spaces provided. Comply with 2001 FBC Section 11-4.1.6. S:\Devefopment\Building\ TRC\ TRC 2003\Bethesda Memorial Hospital fnpatient Rehab Unit Page 10f2 8 Add a labeled symbol to the site plan drawing that represents and delineates the path of travel for the accessible route that is required between the accessible parking spaces and the accessible entrance doors to the building, The installed symbol, required along the path, shall start at the accessible parking spaces and terminate at the accessible entrance doors to the building. The symbol shall represent the location of the path of travel, not the iocation of the detectable warning or other pavement markings. The location of the accessible path shall not compel the user to travel in a drive/lane area that is located behind parked vehicles. Identify on the plan the width of the accessible route. (Note: The minimum width required by the code is forty-four (44) inches). Add text to the drawing that would indicate that the symbol represents the accessible route and the route is designed in compliance with Section 11-4.3 (Accessible Route) and 11-4,6 (Parking and Passenger Loading Zones) of the 2001 FBC. Please note that at time of permit review, the applicant shall provide detailed documentation on the plans that will verify that the accessible route is in compliance with the regulations specified in the 2001 FBC. This documentation shall include, but not be limited to, providing finish grade elevations along the path of travel. 9 Add to the drawing the caiculations that were used to identify the minimum number of required handicap accessible parking spaces. Also, state the code section that is applicable to the computations. 10 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed for the/each building. Verify that the proposed elevation is in compliance with regulations of the code by adding specifications to the site data that address the following issues [Section 3107,1.2, Chapter 31 of the 2001 FBC]: a) The design professional-of-record for the project shall add the following text to the site data. "The proposed finish floor elevation _' _ NGVD is above the highest 100-year base flood elevation appiicable to the building site, as determined by the SFWMD's surface water management construction development regulations," b) From the FIRM map, identify in the site data the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate that on the plans. c) Identify the floor elevation that the design professional has established for the building within the footprint of the building that is shown on the drawings titled site plan, floor plan and pavingl drainage (civil plans), Q1 he drawing titled site plan, identify and label the symbol that represents the property line. 1 I.A WA~ {J~ ~/T!'7 ~l!tX'D. ro,e. ~ I ~1C9l4.-TIO,o ~7i~Jf1 . 12. copy of the permit shall be submitted at the time of permit application, F,S. 373.216, 13 If capital facility fees (water and sewer) have been paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: i, The full name of the project as it appears on the Development Order and the Commission- approved site plan. ii. If the project is a multi-family project, the building number(s) must be provided. The building numbers must be the same as noted on the Commission-approved site plans, iii. The number of dwelling units in each building, iv, The number of bedrooms in each dwelling unit. v. The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO, Chapter 26, Article II, Sections 26-34) bf S:\Devefopment\BuifdingITRCITRC 2003\Bethesda Memoria' Hospital Inpatient Rehab Unit Page 2 of 2