Mr. Gary P. Eliopoulos, Principal
Eliopoulos Architecture, Incorpora1ed
205 George Bush Boulevard
Delray Beach, FL 33444
Re: Hunter's Run South Entrance Gatehouse - Site Modifications
MMSP 03-003
Dear Mr. Eliopoulos:
In response to your request for the administrative review and approval of the modification proposed to the
above-referenced, approved site plan, please be informed that the changes proposed on the revised plans date
stamped 02/25/03 are "minor", as defined within the Land Development Regulations, Chapter 4- Site Plan
Review. The modifications include the following:
. New site location;
. New parking spaces;
. Lighting (photometrics);
. New landscaping; and
. Drainage.
This project may continue to be processed by the Building Division as a permit application subject to the
following conditions:
1. If the scope of the project demands removal of plant material, the new plant material is subject to the
review and approval of the City Forester I Environmentalist;
2. If mechanical equipment is proposed outside the building, then it must be visually screened with
landscaping or appropriate fence material;
3. See attached conditions pursuant to Engineering Division Memorandum No. 03-044.
Be advised that the proposed change may require a modification to the building permit. Please contact me at
(561) 742-6260 if you have additional questions.
~~IY: ,/,
ex u.J-'.A s!7ddV
Lusia Galav, AICP
Principal Planner
Cc: Eric Lee Johnson, A1CP, Planner
Karen Main, Plan Review Analyst
S:\Plannmg\Shared\Wp\ProJe~ts\Hunler's RunlMMSP 03-003 South Gatehouse\Approval Leller dOl
~~;
ro 0J
FROM:
Laurinda Logan, P.E., Senior Engineer
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-044
'm '"" (;) ;7.-" - ;....;::-:
'..../0 8 lb is iJ \11.. ~ I e,
! n ~---~_._~,.
IJ., MAR, 3 c_~~
: l___n
TO:
Michael W, Rumpf, Director. Planning and Zoning
DATE:
March 13. 2003
RE:
Conditions of Approval
Hunter's Run South Entrance Gatehouse
File No. MMSP 03-003
At the request of the applicant I have reviewed our Memorandum No. 03-041 regarding first review
comments for the above reference minor modification. We. Public Works/Engineering, feel this project
can move forward conditioned on the following
1. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's
Code requirements at time of application. These permits include. but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
permitting agencies such as Florida Department of Transportation (FDOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD). Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD). Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with the permit request.
2, All drawings are to be signed and sealed in accordance with the provisions of the Land Development
Regulations.
3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
4. Provide written and graphic scales on all sheets.
5. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
6. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. Staff recommends that solid waste be handled using roll-out cart(s).
7. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage. etc.
See City Standard Drawings B-98001 and B-90013 for striping details.
8. Correct Pavement Section A-A to reflect a pavement thickness of 1 Y, (one and one half) inches S-III
(or 1 Y. inches S-1) plant mix pavement in accordance with Standard Drawings P-1, P-2 and P-3.
Public Works Department, Engineering Division Memo No. 03-044
Re: Hunter's Run South Entrance Gatehouse, Conditions of Approval
March 13, 2003
Page 2
9. Revise the Typical Striping Plan detail on Sheet A 1.01 to reflect a standard stall dimension of 9'-6" x
18'6" (standard stall incorrectly shown as 12' wide). Provide a written, administrative waiver request
to revise the stall dimensions.
10. Revise Pavement Section B-B to correctly reflect the full parking lot cross-section. Revise drive aisle
to two 12'-6" lanes to match the plans. In accordance with Standard Drawing K-12 base course shall
be 6 (six) inches thick under the parking areas and 8 (eight) inches thick under drive aisles;
pavement thickness shall be 1 (one) inch thick under the'parking areas and 1;1, (one and one half)
inches thick under drive aisles.
11. On the Site and Lighting Plans show the proposed relocated position of light poles. It appears
additional lighting may be required along the north and south side of the Gatehouse.
12. On the Lighting plan provide a note that the fixtures shall be operated by photo-electrical control and
will remain on until 2:00 a.m. (LDR, Chapter 23, Article II, Section A.1.a.)
13. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate
future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.1.b). It appears there
will be a conflict between an existing tree and light pole on the west side of the new parking lot.
14. All utility easements shall be shown on the site plan and landscape drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of the easement so that roots
and branches will not impact those utilities within the easement in the foreseeable future.
15. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II, Section 5.H).
16. Landscaped areas shall be protected from vehicular encroachment by a continuous, raised curb
(LDR, Chapter 7.5, Article II, Section SA and Chapter 22, Article II, Section E.) Add Type "D" curb
around the landscaped area on the west side of the parking lot.
17. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section
7.F.2.
18. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
19. Indicate by note that catch basin and manhole covers shall be bicycle proof (LDR, Chapter 6, Article
IV, Section 5.A.2.f).
20. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may not,
therefore, be used for irrigation where other sources are readily available. Show on the plans the
source for irrigation water. Irrigation plans will be required at the time of permitting.
21. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
the CODE, Section 26-33(a).
Public Works Department, Engineering Division Memo No. 03-044
Re: Hunter's Run South Entrance Gatehouse, Conditions of Approval
March 13, 2003
Page 3
22. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet
of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition by
showing all hydrants.
23. Paving, Drainage and Site details as shown on Sheet 2 of 2 and A 1.01 will not be reviewed for
construction acceptability at this time. All engineering construction details shall be in accordance
with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability
at the time of construction permit application.
LUck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., PE/ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Hunter's Run S. Entrance Gatehouse, Conditions of Approval.doc
~,.."'.!.,
0'..... '.. '~,
C~"
J \/
1-_ ~) ',,/
1 () >; .'
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
Mi~,,' W R,mpl Di~fE:':":::~:i:O. 03-0!1~1~;'li~.\\7 fie
> '^' 0- ~
, ,
Laurinda Logan, P.E., Senior Engineer
TO:
FROM:
DATE:
March 13, 2003 (
Conditions of Approval .~
Hunter's Run South Entrance Gatehouse
File No. MMSP 03-003
RE:
At the request of the applicant I have reviewed our Memorandum No. 03-041 regarding first review
comments for the above reference minor modification. We, Public Works/Engineering, feel this project
can move forward conditioned on the following
1. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's
Code requirements at time of application. These permits include, but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
permitting agencies such as Florida Department of Transportation (FDOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with lhe permit request.
2. All drawings are to be signed and sealed in accordance with the provisions of the Land Development
Regulations.
3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets,
4. Provide written and graphic scales on all sheets.
5. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
6. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. Staff recommends that solid waste be handled using roll-out cart(s).
7. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs. double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc.
See City Standard Drawings B-98001 and B-90013 for striping details.
8, Correct Pavement Section A-A to reflect a pavement thickness of 1 Y, (one and one half) inches S-1I1
(or 1Y. inches S-1) plant mix pavement in accordance with Standard Drawings P-1, P-2 and P-3,
Public Works Department, Engineering Division Memo No. 03-044
Re: Hunter's Run South Entrance Gatehouse, Conditions of Approval
March 13, 2003
Page 2
9. Revise the Typical Striping Plan detail on Sheet A1.01 to reflect a standard stall dimension of 9'-6" x
18'6" (standard stall incorrectly shown as 12' wide). Provide a written, administrative waiver request
to revise the stall dimensions.
10. Revise Pavement Section B-B to correctly reflect the full parking lot cross-section. Revise drive aisle
to two 12'-6" lanes to match the plans. In accordance with Standard Drawing K-12 base course shall
be 6 (six) inches thick under the parking areas and 8 (eight) inches thick under drive aisles;
pavement thickness shall be 1 (one) inch thick under the parking areas and 1% (one and one half)
inches thick under drive aisles.
11. On the Site and Lighting Plans show the proposed relocated position of light poles. It appears
additional lighting may be required along the north and south side of the Gatehouse.
12. On the Lighting plan provide a note that the fixtures shall be operated by photo-electrical control and
will remain on until 2:00 a.m. (LDR, Chapter 23, Article II, Section A.1.a.)
13, It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate
future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.1.b). It appears there
will be a conflict between an existing tree and light pole on the west side of the new parking lot.
14. All utility easements shall be shown on the site plan and landscape drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of the easement so that roots
and branches will not impact those utilities within the easement in the foreseeable future.
15. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II, Section 5.H).
16. Landscaped areas shall be protected from vehicular encroachment by a continuous, raised curb
(LDR, Chapter 7.5, Article II, Section 5A and Chapter 22, Article II, Section E.) Add Type "D" curb
around the landscaped area on the west side of the parking lot.
17. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section
7.F.2,
18. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
19. Indicate by note that catch basin and manhole covers shall be bicycle proof (LDR, Chapter 6, Article
IV, Section 5A2.f).
20. Comprehensive Plan Policy 3.C.3.4, requires the conservation of potable water. City water may not,
therefore, be used for irrigation where other sources are readily available. Show on the plans the
source for irrigation water. Irrigation plans will be required at the time of permitting.
21. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
the CODE, Section 26-33(a).
Public Works Department, Engineering Division Memo No. 03-044
Re: Hunter's Run South Entrance Gatehouse, Conditions of Approval
March 13, 2003
Page 3
22. The LDR, Chapter 6, Article IV. Section 16 requires that all points on each building be within 200 feet
of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition by
showing all hydrants.
23. Paving, Drainage and Site details as shown on Sheet 2 of 2 and A 1.01 will not be reviewed for
construction acceptability at this time. All engineering construction details shall be in accordance
with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability
at the time of construction permit application.
LL/ck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Hunter's Run S. Entrance Gatehouse, Conditions of Approval.doc
FACSIMILE
CITY OF BOYNTON
BEACH
City Hall, West Wing
100 E. Boynton Beach Blvd.
P.O. Box 310
Boynton Beach, Fiorida 33425
(561) 742-6260
(561) 742-6259 Fax
From the office of
Planning & Zoning
TO: f\()N Un..f3l1f"Z-
Ef2.\0 ,JO h0\DJ
FAX:
(5(,: I) ~"J<1- ~ /2- Cj
FROM:
DATE:
3-iU.[)L(
NUMBER OF PAGES: (including
cover)
4---
RE:... tfurvteJ2 ''5 fZ..\) 1\J ~ r~hDU ~ <(
Rur0 I
A-%~'\,eJ Me Me., LUjCU" ~ CL)M.l-{e~+s r..z,jMCS 'TIv _ ,
i1 .r <fr. lA ,_J AIM 1Y\A.M,-i-1 A.Ji oJrw /flrvfd.l//?f,A}fl.
Q\~uve. ~,e(.{ r LYvV"-v. \J"" t v I J ~ vvvf"'-V'v<'v
ll~CtJ:-s
If you receive this fax in error, or experience trouble with transmission, please notify our office
immediately, at (561) 742-6260. Thank you.
Sl",:"
. '
i'
, \
\~')!.
/(i:"i \:>
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-041
TO:
Michael W. Rumpf, Director, Planning and Zoning
FROM:
Laurinda Logan, P.E., Senior Engineer
OW~rrJ1;
1111,
MAA-72003 ~j
I
-'
PLANNING AND
lONING om
DATE:
March 7, 2003
ill
RE:
Standard Review Comments
Minor Site Plan Modification -1st Review
Hunter's Run South Entrance Gatehouse
File No, MMSP 03-003
The above referenced minor modification, forwarded on February 27, 2003, was reviewed against the
requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments
with the appropriate Code and Land Development Regulations (LDR) referenced,
1. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's
Code requirements at time of application. These permits include, but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
permitting agencies such as Florida Department of Transportation (FDOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with the permit request.
2. All drawings are to be signed and sealed in accordance with the provisions of the Land Development
Regulations.
3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
4. Provide written and graphic scales on all sheets.
5. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
6. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. Staff recommends that solid waste be handled using roll-out cart(s).
7. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc.
See City Standard Drawings B-98001 and B-90013 for striping details.
8, Correct Pavement Section A-A to reflect a pavement thickness of 1)1, (one and one half) inches S-1I1
(or 1 Y. inches S-1) plant mix pavement in accordance with Standard Drawings P-1, P-2 and P-3.
Public Works Department, Engineering Division Memo No. 03-041
Hunter's Run South Entrance Gatehouse Minor Site Plan Modification, 1" Review
March 7,2003
Page 2
9. Revise the Typical Striping Plan detail on Sheet A 1.01 to reflect a standard stall dimension of 9'-6" x
18'6" (standard stall incorrectly shown as 12' wide). Provide a written, administrative waiver request
to revise the stall dimensions.
10. Revise Pavement Section B-B to correctly reflect the full parking lot cross-section. Revise drive aisle
to two 12'-6" lanes to match the plans. In accordance with Standard Drawing K-12 base course shall
be 6 (six) inches thick under the parking areas and 8 (eight) inches thick under drive aisles;
pavement thickness shall be 1 (one) inch thick under the parking areas and 1 Y, (one and one half)
inches thick under drive aisles.
11. On the Site and Lighting Plans show the proposed relocated position of light poles. It appears
additional lighting may be required along the north and south side of the Gate House,
12. On the Lighting plan provide a note that the fixtures shall be operated by photo-electrical control and
will remain on until 2:00 a.m. (LDR, Chapter 23, Article II, Section A.1.a.)
13. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate
future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.1.b). It appears there
will be a conflict between an existing tree and light pole on the west side of the new parking lot.
14. All utility easements shall be shown on the site plan and landscape drawings so that we may
determine which trees may interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of the easement so that roots
and branches will not impact those utilities within the easement in the foreseeable future.
15. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II, Section 5,H).
16. Landscaped areas shall be protected from vehicular encroachment by a continuous, raised curb
(LDR, Chapter 7.5, Article II, Section 5.A. and Chapter 22, Article II, Section E.) Add Type "D" curb
around the landscaped area on the west side of the parking lot.
17. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section
7,F.2.
18. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
19. Indicate by note that catch basin and manhole covers shall be bicycle proof (LDR, Chapter 6, Article
IV, Section 5.A.2.f).
20. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may not,
therefore, be used for irrigation where other sources are readily available. Show on the plans the
source for irrigation water. Irrigation plans will be required at the time of permitting.
21. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
the CODE, Section 26-33(a).
Public Works Department, Engineering Division Memo No. 03-041
Hunter's Run South Entrance Gatehouse Minor Site Plan Modification, 151 Review
March 7, 2003
Page 3
22. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet
of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition by
showing all hydrants.
23. Paving, Drainage and site details as shown on Sheet 2 of 2 and A1.01 will not be reviewed for
construction acceptability at this time. All engineering construction details shall be in accordance
with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability
at the time of construction permit application.
LUck
Xc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\EngineeringlKribs\Hunter's Run Oatehouse Minor Site Plan Mod. 1st Rev..doc
To:
From:
Subject:
Date:
Planninl!: Memorandum: Forester / Environmentalist
Lusia Galav, Principal Planner
G~
Kevin J. Hallahan, Forester / Environmentalist
Hunters Run south Entrance Gatehouse
Minor Site Plan Modification - I st Review
MMSP 03-003
February 13, 2003
kjh
File
Existinl!: Trees
I. The applicant should indicate on the landscape plan any existing trees that will be
preserved, relocated, or removed / replaced on the site. This should be indicated with
a separate symbol on a landscape plan sheet. [Environnemental. Regulations,
Chapter. 7.5, Article II Sec. 7.C.]
Irril!:ation Svstem
2. There is not an irrigation system design included with the landscape plans.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 5,A.]
1 st REVIEW COMMENTS
Minor Modification to Site Plan
Project name; Hunter's Run South Entrance Oatehouse
File number: MMSP 03-003
Reference; I "review plans identified as with a January 21. 2003 Planning and Zoning Department date stamp
marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments; None
PUBLIC WORKS - Traffic
Comments: None
UTILITIES
Comments; None
FIRE
Comments: None
POLICE
Comments: None
ENGINEERING DIVISION
Comments;
1. The plans provided appear to be incomplete. Previously reviewed and
approved plans indicated work between the new gatehouse and Congress
Avenue. A re-submittal will be required depicting the entire project site.
2. Prior to permit application contact the Public Works Department (561-
742-6200) regarding the storage and handling of refuse. The dumpster
will be supplied by Public Works.
3. Add a general note to the site plan that all plans submitted for specific
permits shall meet the City's Code requirements at time of application.
These permits include, but are not limited to, the following: paving,
drainage, curbing, site lighting, landscaping and irrigation. Permits
required from other permitting agencies such as Florida Department of
Transportation (FDOT), South Florida Water Management District
(SFWMD), Lake Worth Drainage District (LWDD), Florida Department
of Environmental Protection (FDEP), Palm Beach County Health
Department (PBCHD), Palm Beach County Engineering Department
(PBCED), Palm Beach County Department of Environmental Resource
1st review comments
02112/03
2
DEPARTMENTS INCLUDE REJECT
Management (PBCDERM) and any others, shall be included with the
permit request.
4. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
5. Show proposed site lighting on the site and landscape plans (LDR,
Chapter 4, Section 7.B.4.) The lighting design shall provide a minimum
average light level of one foot-candle. On the Lighting Plan, specify that
the light poles shall withstand a 140 MPH wind load (LDR, Chapter 23,
Article II, Section AI.a and Florida Building Code). Provide a note that
the fixtures shall be operated by photo-electrical control and to remain on
until 2:00 a,m. (LDR, Chapter 23, Article II, Section AI.a.) Include pole
wind loading, and pole details in conformance with the LDR, Chapter 6,
Article N, Section II, Chapter 23, Article I, Section 5.B.7 and Chapter
23, Article II, Section A on the Lighting Plan. Lighting shall be directed
away from any residential uses (LDR, Chapter 2, Section 4.N.7). Please
provide photometrics as part of your TRC plan submittals.
6. Provide a landscape plan per the LDR, Chapter 4, Section 7.C. In
addition to the information required by the LDR the landscape plan also
needs to depict, at a minimum, the location of site lighting and easements
so that any conflicts may be identified.
7. It may be necessary to replace or relocate large canopy trees adjacent to
light fixtures to eliminate future shadowing on the parking surface (LDR,
Chanter 23 Article II Section A1.b).
8. Show sight triangles on the Site and Landscape plans (LDR, Chapter 7.5,
Article II, Section 5 .H.). Reference FDOT Standard Index 546 for the
sight triangles along all collector and arterial roadways.
9. Indicate, by note on the Landscape Plan, that within the sight triangles
there shall be an unobstructed cross-visibility at a level between 2.5 feet
and 6 feet above the pavement (LDR, Chapter 7.5, Article II, Section
5.H.).
10. Landscaped areas shall be protected from vehicular encroachment by a
continuous, raised curb (LDR, Chapter 7.5, Article II, Section 5.A. and
Chapter 23, Article II, Section E). Add curb (Type "D") along the west
edge of the parking lot.
II. Change dimension of the handicap parallel parking space to a minimum
of 10 feet x 25 feet per proposed City Standard Drawing K-IO (since the
Engineer-of-Record is using the proposed standards for parking for the
remainder of the project). An administrative waiver request, addressed to
the City Engineer, will be required for this revision.
12. Provide a drainage plan per the LDR, Chapter 4, Section 7.F.
1st review comments
02/12/03
3
DEPARTMENTS INCLUDE REJECT
\3, Provide an engineer's certification on the drainage plan as specified in
LDR, Chapter 4, Section 7.F.2.
14. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
15. Indicate by note that catch basin and manhole covers shall be bicycle
proof (LDR, Chapter 6, Article N, Section 5A2.l).
16. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators
striping, directional arrows and "Do Not Enter" signage, etc. See City
Standard Drawings B-9800 I and B-900 13 for striping details.
17. Indicate to what standard the project is to be constructed; if the FDOT
Standard Specifications for Road & Bridge Construction and Standard
Index are to be used - the 2000 Specifications are recommended since
they contain both English and Metric units.
18. Provide written and graphic scales on all sheets.
19, Paving, drainage and site details as shown on CE sheets 5 & 6 of 9 will
not be reviewed for construction acceptability at this time. All
engineering construction details shall be m accordance with the
applicable City of Boynton Beach Standard Drawings and will be
reviewed for constructability at the time of construction permit
application.
BUILDING DIVISION
Comments: None
PARKS AND RECREATION
Comments: None
FORESTERlENVIRONMENT ALIST
Comments:
PLANNING AND ZONING
Comments:
1 st review comments
02/12/03
4
DEPARTMENTS INCLUDE REJECT
20. The Engineering Division must approve the dimensions of the parking
area, including the parallel parking space.
21. Show the location of anv outdoor freestanding lighting fixtures.
22. Show the new landscape material on the redeveloped portion of the site.
Identify the plants to be removed.
23. If the scope of the project demands removal of plant material then the
new plant material is subject to review and approval ofthe City Forester 1
Environmentalist.
24. Place a note on the site plan that all new above ground mechanical
equipment such as exterior utility boxes, meters, and transformers shall
be visually screened (Chapter 9, Section 10.CA.), Equipment placed on
the walls of the building shall be painted to match the building color.
25. On the elevations, (sheet A-3) indicate the proposed colors, including the
paint manufacturer's name and color code. Staff recommends utilizing a
color schedule (tabular format).
LG/elj
S:\Plannlng\Shared\Wp\Projects\Hunter's Run\MMSP 03-003 South Gatehouse\1sl review comments.doc
,!~)
i !; ~
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-026
DATE:
Michael W. Rumpf, Director, Planning and Zoning
Laurinda Logan, P.E., Senior Engine~r~
February 11, 2003 ~ )
Standard Review Comments
Minor Modification -1st Review
Hunter's Run Gatehouse
File No. MMSP 03-003
@~nw~
rn
FROM:
rn
FEB , 2 ?nm
TO:
PLANNING AND
ZONING DEPT
RE:
The above referenced Site Plans, forwarded on February 6, 2003, were reviewed against the
requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments
with the appropriate Code and Land Development Regulations (LDR) referenced,
1. The plans provided appear to be incomplete. Previously reviewed and approved plans indicated
work between the new gatehouse and Congress Avenue. A re-submittal will be required depicting
the entire project site.
2. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. The dumpster will be supplied by Public Works.
3. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the
City's Code requirements at time of application. These permits include, but are not limited to, the
following: paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required
from other permitting agencies such as Florida Department of Transportation (FDOT), South
Florida Water Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida
Department of Environmental Protection (FDEP), Palm Beach County Health Department
(PBCHD), Palm Beach County Engineering Department (PBCED), Palm Beach County
Department of Environmental Resource Management (PBCDERM) and any others, shall be
included with the permit request.
4. All comments requiring changes andlor corrections to the plans shall be reflected on all
appropriate sheets.
5. Show proposed site lighting on the Site and Landscape plans (LDR, Chapter 4, Section 7.B.4.)
The lighting design shall provide a minimum average light level of one foot-candle. On the
Lighting Plan, specify that the light poles shall withstand a 140 MPH wind load (LDR, Chapter 23,
Article II, Section A,1.a and Florida Building Code). Provide a note that the fixtures shall be
operated by photo-electrical control and to remain on until 2:00 a.m. (LDR, Chapter 23, Article II,
Section A.1.a.) Include pole wind loading, and pole details in conformance with the LDR, Chapter
6, Article IV, Section 11, Chapter 23, Article I, Section 5.B.7 and Chapter 23, Article II, Section A
on the Lighting Plan, Lighting shall be directed away from any residential uses (LDR, Chapter 2,
Section 4.N.7). If possible please provide photometrics as part of your TRC plan submittals - it is
much easier to identify and correct any deficiencies now than while you are waiting on a permit!
Department of Public Works, Engineering Division Memo No. 03-026
Re: Hunter's Run Gatehouse, Minor Modification - 1" Review, MMSP 03-003
February 11, 2003
Page 2
6. Provide a landscape plan per the LDR, Chapter 4, Section 7.C. In addition to the information
required by the LDR the landscape plan also needs to depict, at a minimum, the location of site
lighting and easements so that any conflicts may be identified.
7. It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate
future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A.1.b).
8. Show sight triangles on the Site and Landscape plans (LDR, Chapter 7.5, Article II, Section 5.H.).
Reference FDOT Standard Index 546 for the sight triangles along all collector and arterial
roadways.
9. Indicate, by note on the Landscape Plan, that within the sight triangles there shall be an
unobstructed cross-visibility at a level between 2.5' and 6' above the pavement (LDR, Chapter 7.5,
Article II, Section 5.H.).
10. Landscaped areas shall be protected from vehicular encroachment by a continuous, raised curb
(LDR, Chapter 7.5, Article II, Section SA and Chapter 23, Article II, Section E). Add curb (Type
"D") along the west edge of the parking lot.
11. Change dimension of the handicap parallel parking space to a minimum of 1 0 ft. x 25 ft. per
proposed City Standard Drawing K-10 (since the Engineer-of-Record is using the proposed
standards for parking for the remainder of the project). An administrative waiver request,
addressed to the City Engineer, will be required for this revision.
12. Provide a drainage plan per the LDR, Chapter 4, Section 7.F.
13. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section
7.F.2.
14. Full drainage plans in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
15. Indicate by note that catch basin and manhole covers shall be bicycle proof (LDR, Chapter 6,
Article IV, Section 5.A.2.f).
16, On the Site and Civil plans, show and identify all necessary traffic control devices such as stop
bars, stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter"
signage, etc. See City Standard Drawings B-98001 and B-90013 for striping details.
17. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
18. Provide written and graphic scales on all sheets.
Department of Public Works, Engineering Division Memo No. 03-026
Re: Hunter's Run Gatehouse, Minor Modification - 1" Review, MMSP 03-003
February 11, 2003
Page 3
19. Paving, drainage and site detaiis as shown on CE sheets 5 & 6 of 9 will not be reviewed for
construction acceptability at this time. All engineering construction details shall be in accordance
with the applicable City of Boynton Beach Standard Drawings and will be reviewed for
constructability at the time of construction permit application.
LUck
xc: Jeff Livergood, P.E., Director, Public Works (via e-mail)
Pete Mazzella, Assistant to Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Parks
Larry Quinn, Solid Waste Manager, Public Works
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Hunter's Run Gatehouse 1st Review Comments.doc
(6~ \ ~,Y.' , ,)F'\,,
; Ci \ ' '>~ '
0\ /,",,:
;.' ,~
'Ie,",>,.
rO~J \c)v'
DEPARTMENT OF DEVELOPMENT
Memorandum
PZ
TO:
FROM:
Gary Eliopoulos, A.I.A NCARS
"7t'.
[...
Eric Johnson, AICP
DATE:
February 13, 2003
RE:
Hunter's Run South Entrance Gatehouse
Please revise and submit plans according to the attached comments we have provided. If you have
any questions, please call me at 561-742-6260.
TRANSMISSION VERIFICATION REPORT
TIME 02/13/2003 09:46
NAME
FAX
TEL
SER.* BROE2J409484
DATE, TIME
FAX NO./NAME
DURATION
PAGE(S)
RESULT
MODE
02/13 09:44
92766129
00:01:24
06
OK
STANDARD
ECM
E
ELIOPOULOS ARCHITECTURE, INC
January 17, 2003
Architecture, Planning + Design
AA0003179
Planning & Zoning Division
100 E. Boynton Beach Boulevard
P.O. Box310
Boynton Beach, FL 33425-0310
Dear Planning & Zoning Division:
We seek your determination of the following proposal to qualifY under a minor modification. The original
Permit # 01-1932 for the south gate of Hunter's Run dated May200lis now non-void. We are requesting
to proceed with our changes, as ourrevised proposal of the south gate accomplishes improvements in the
following form:
Site location- The guard house will sit approximately 125'-0" west ofthe existing guard house on the
broadest part of the road. This will allow us to reconfigure vehicular paths without having to relocated any
existing utility lines.
Building footprint: (smaller: 800 sq. ft.) Unlike the original proposal, (Permit # 01-1932) ofthe
1,800 sq. ft. plus structure, which would have forced us to shut down access of the entire south entrance
during construction, the new size and location will facilitate a smooth transition. The existing guard will
continue to function until the construction ofthe new guard house is complete and the transition has been
made without no down time.
Parking- Weare providing a total of8 parking spaces and I handicap space on site. The common spaces
will be located 40'-0" west of the guard house on a clearly delineated area. Isolating the parking lot from
the turning aisle will improve vehicular circulation as well. We will also comply with the new parking
regulations and provide 9'-6" wide by 18'-6" deep parking spaces, and a 25'-0" back up aisle.
Lighting- The existing site lighting will be relocated and aligned for the new configuration.
A photometric site plan will be provided with the permit set of construction documents.
Landscaping- Most of the landscaping along the main driveway entrance shall remain the same. New
landscape plans shall be provided for foundation planting at proposed new gate house and new parking
lot. Also included in the landscape drawings shall be irrigation drawings/modifications to the existing
system. These drawings will be included in the permit set of construction documents.
Civil-A complete set of civil drawings depicting all drainage, easements, utilities and new septic tank
location will be provided with the permit set of construction documents.
Weare certain that you will see the above mentioned improvements as minor modifications and grant us
to proceed with t e project. Thank you for your time and we look forward to working with you.
;;!';:';I'I~O
'." "~ PT
ffi~\
~l
I
_ J
rn
rn ~ ~ fi
JAN2'.
205 George Bush Blvd. . Delray Beach, FL 33444 . Phone: (561) 276-6011 . Fax: (561) 276-6129 . E-mail: GPE@AOL.COM
PROJECT NAME: Hunter's Run South Entrance Gatehouse
LOCATION:
PCN:
I FILE NO.: MMSP 03-003 I TYPE OF APPLICATION: Minor
Modification to Site Plan
AGENT/CONTACT PERSON: OWNER: Hunter's Run HOA
Gary P. Eliopoulos, A.I.A. NCARB PHONE:
PHONE: 276-6011 v\l- \Z.nN FAX:
FAX: 276-6129 ADDRESS:
ADDRESS: 205 George Bush Blvd.
Delray Beach, FL 33444
Date of submittal/Proiected meetinl!: dates:
SUBMITTAL / RESUBMITT AL 1/21/03
1ST REVIEW COMMENTS DUE: N/A
PUBLIC NOTICE: N/A
TRC MEETING: N/A
PROJECTED RESUBMITT AL DATE: N/A
ACTUAL RESUBMITTAL DATE: N/A
2ND REVIEW COMMENTS DUE: N/A
LAND DEVELOPMENT SIGNS POSTED N/A
(SITE PLANS):
PLANNING & DEVELOPMENT BOARD N/A
MEETING:
COMMUNITY REDEVELOPMENT N/A
AGENCY BOARD
CITY COMMISSION MEETING: N/A
COMMENTS: SpOt'o1 'to 1<o,/J H\ l..!tqo~_ l-\:{ sa\t\' "vt c~ ()I SU\p4
(Y..JJ \'-/Jd ~ \ ^' ^L iA.,~-z)l)-ch 'J;
\ ,
S;\Planning\sHARED\WP\PROJECTS\Hunter'S Run\MMSP 03-0U3 South Gatehouse\2002 PROJECT TRACKING INFO.doc
(LI:~ \) ~ \7k\:::.I- - t:1\'6.o~ lA\,{,~W~(L, [J\~\\<j\.) 3 10' De>,
Time ~nd D~te or\kdin~ / / ~/ 03
Thos~ ~lt:~nc.Jr1:; n1cctlnl~ . A. ~ ,:'
#/~/.2h:'" ./',' -.;1L.JL.V/~~ ,I
I Oo.--n..
~<<-
Applic:mt's Name:
PRE-APPLICA no" CO:"TACT QUESTIO:"S
'jf~/~ Phone 3fc1 ;27&-ilO/1
'_~ ________~o'S
I. HA VE YOU SPOKEN TO .i\..""i'{ STAFF MEMBER ABOUT THE PROJECT"
Yes No
IIF YES, HAVE THOSE SL\FF ME\[BERS BEEN SCHEDULED FOR THE PRE-
APPLICATION MEETING?
ST.\FF MEMBERS NA..ly[E:
2.
LOCATION OF PROPERTY (CROSS STREETS/1....HERSECTIOi\S I
'7-/;/ At #/'UJ- ~
-'.
\\ 'HA T WOULD YOU LIKE TO DO'
NeW PROJECT
BlJlLDING EXPAt'\iSION OR MODIFICATION
CHANGE IN PRIOR USE?
IS THE STRUCTURE ClTRRENTLY VACA..l'H"
V ARlANCE TYPE:
POOL OR SCREEN ENCLOSlJRE
COMlvlERCLA..L PROPERTY:
RESIDENTIAL PROPERTY"
E'-!1JUSTRlAL PROPERTY"
DO YOU KJ'\iOW THE ZONI:\G CODE DESIGNATION?
,
4. TIME .;\;.,'1) DATE PREFERRED
5. HOW M.;\;.'Y PEOPLE WILL BE AT THE PRE-APP MEETDG"
.Vote: Tell the persoll that someolle from the Departmellt will call them to cOllfirm the meetillg.
. . . .... .. . . . ................... .. . ........ .... . . . .. . . ... . . . . .. . .. . . . .... .. .. . . . . . I
. Prc-JDD!icJ.t:on mee~'12S should be schcdul.:=d for a IT'i[ljrnum of one \ 1) hour tlIT.:: moJu~~, J.r.c ShOl:!J be ;;;.:~~cc.:~;:"":
no less th;1; "(\\."o (2) days pri;r to date,'time ofme~[ing. If urgency LS sensed. discllss \vich :vrike or LUSIJ.
. ;\[eetim!s may be scheduled:
:\t[ondayafternoons
Tuesday all day
Wednesday all day
Thursday mornings
Note: Lusia is not available for Tuesday a.m. meetmgs,
Jnd :\trike is not available on ivfondays ber\:I.'een 11 :30 a.m. and 2:30 p.m.
s: \ P !J":ln lng" P I:mn mg' Pre-app I Icati oncon tactqucstion5. doc
-Y' tf[-f~P-S PeG '*
~ h [/1 DcA 5 e:
PRE-APPLICATIOl\ I\IEETI'i'iG LOG
II "'IEETING D.-HE: : TIyIE:
, t. '3'o:~ l0 0(_ -!l'.DO 1'.1'1,
i A.PPLICATIONS: MIVlSP
1 ZOl'iING DISTRICT: pvD
I PROJECT NAiYIE: \-h"\lJf'Z'~s 12~ u au..-i j..'1l:;-t-!.4E'
j ATTENDING STA.FF: ~- L--L-
I ATTENDING AS APPLIC. NT: pLl ou oS Gvc"?
I PHONE; ~f(o- &Dt' 3P1l. I ~7_ -'D<-\.-Yz,l. 'Bl~ ~~~
I NAlvIE OF APPLICAJ.'iT/CONTACT: f<.olv I {'M.-l.{, () IA./Y.-l 131,c,s
I ADDRESS:
I PHOi'<"E: ;;l.j0 -(vD / / I F.H:
! PROJECT ADDRESS: 1
I, 1. .l- ' 'J7) !
, [lV!)J (-tll/;7 t:--uv !
PROPOSED TYPE OF USE/OCCUPA,...'CY: 84.te~\lM_S(J
DATE SUBI\IITTAL RECEIVED: I D.-HE DE:'."IED:
COMMENTS: p IlQ-t Jt..~A.<J..e.l ,~___ 'Jf:tl ~--( Cl Z I 2DD 1;zf <.:J<11.Ja1d~1.9U4f' .
P/l.~.,,,<;v.u'd l.L\S Ii ~l()L-U-{ h~
~ ;;~~:::.~ ~y,,~~:,rh ;':J::j ;;:);J:,<~::: /'i:~.v:1
- S,CH.l ~(J~u--..'o ~"
~ ""c:~ ( /!R6".t:e~ :3A'r' t7r.<-JL.,
~~~ -~<- ~~ ~
~, ",,- , ' -: ~~._,-; .Je'
.: SnRD..\ T .J...2:;:nning"SE-L.1....l"ZED\ \\iP'PROJECTS".?::',': .l.,r'?uc.-\ 7:0'..5 'dE:::-:-::-t ,:; :""GG-3' .?:-~-\;::Jii":::':IJn '.[..:~::.-:~ Lu'~":;~
PRE-APPLICATION MEETING
SIGN IN SHEET
PLEASE PRIl'iT
IHEETINGDATE: (/?(D~
TTh1E: /oew>- - /(',C'o AWl
ATTE:"Il)ING FOR A.PPLICk'iT: Dvt\-c-~ B I :'7'/
NOTICE: The purpose of this conference sh~1I be for the stoff ~nd opplicont to discuss overolI
community g03.Is, objectives, policies and codes J.ss related [Q the proposed development and to
discuss site plan review procedures. Opinions express at the pre-applicJ.tion confer-eace are not
binding for form:!l review- purposes. Additional staff comments m::ry be forth corning b:lsed on actual
laos submitted for re'''riew.
City of Boynton Beach
Attending Staff
I
-'--ARy P EL\OPC~...::u)':)1
I
f2.f-:>A t:-l i
I
I
I
I
NA-W P
(....O.llVly1d(i Lvr
I
I
I
I
I~
I
I
I
I
I
I
!
Attending for Applicant
~~s
J:\.$HRDA T A\P LA'I;\" I.'" G\.S H.-\.RED\ \\1>\FOR.\!S\PRE--\.PPL .\IE:':T~-C-.5IG~ ("'.. SHEC:T.DOC
'>
Time and Date of Meeting ,?tCl1
Those att~nding ~~ng: .
?A./-<,~ . ./1~
/
~
<>21:J /J1 ,/
f'
er(
~<>
PRE-APPLICATION CONTACT QUESTIONS /
Applicant's Name: ~ IJ.P A11..f~ Phone: -~.?1) 4/<6 - 0& ()(p
HAVE YOJI-SPOKEN TO ANY STAFF MEMBER ABOUT THE PROJECT?
Yes / No .
(IF YES, HAVE THOSE STAFF MEMBERS BEEN SCHEDULED FOR THE PRE-
APPLICATION MEETING?,
STAFF MEMBERS NAME: ~
LOCATION OF PROPERTY (CROSS STREETS/INTERSECTIONS)
'~JJ,1:~/ ~~~ ~
1.
2.
3.
WHAT WOULD YOU LIKE TO DO?
NEW PROJECT
BUILDING EXPANSION OR MODIFICATION,
CHANGE IN PRIOR USE?
IS THE STRUCTURE CURRENTLY VACANT?
V AlliANCE TYPE:
POOL OR SCREEN ENCLOSURE
CO~RCLALPROPERTY?
RESIDENTLAL PROPERTY?
INDUSTRIAL PROPERTY?
DO YOU KNOW THE ZONING CODE DESIGNATION?
4. TIl\1E Ai'ID DATE PREFERRED
5. HOW MANY PEOPLE WILL BE AT THE PRE-APP MEETING?
"fedo
Note: Tell the persoll that someO/le from the Departmellt will cal,
........... ..... ....... ..... ............. .............
. Pre-application meetings should be scheduled for a minimum of one (I) hou:
no less than two (2) days prior to date/time of meeting. rfurgency is sensed, discl
. l\Ieetine:s mav be scheduled:
Monday afternoons
Tuesday all day
Wednesday all day
Thursday mornings
Note: Lusia is not available for Tuesday a.m. meetings,
and Mike is not available on Mondays between II :30 a.m and 2:30 p,
IPLANNING,INC.
MembBr: American Institutn of Architects
,
M-0002894
lB-()()OO927
hd'l11<i[",1"dI1111<i
Hendrik S. DeMello, AIA NCARB
954/418.0606 710 E. Hillsboro Boulevard Ste.101
f: 954/418-()()22 Deerlield Beach, Florida 33441
S :\Planning\Planning\Pre.appJicat.ioncontactquestions.doc
//
eJ-jOL--0-t;' L"1 };11t'7,[.fj
03-{)O,.J
PRE-APPLICATION MEETING LOG
l'rIEETING DATE: L I TIlYIE:
, ' ~ " 2-0 r 01- 1-- : Dc-> ' ~ ',00
APPLICATIONS: fV1MSD
ZONING DISTRICT: Pi.-' D
PROJECT NAI\1E:
Hvt '" t-<: (Li" ~v ""
ATTENDING STAFF: L--b
ATTENDING AS APPLIC I-Ie,Alv!/2It:- D!f1tllv
PHONE: (ifS4 Y IYJ" 0&00 I FAX:
NA1"IE OF APPLICA..NT/CONTACT: n[%..
ADDRESS:
PHONE: I FA"X:
PROJECT ADDRESS: I
PROPOSED TYPE OF USEIOCCUPAl'{CY:
DATE SUBMITTAL RECEIVED: DATE DEi'i'IED:
COMMENTS:
'0.
)
,
J:\,SHRDATA\PlanningISHA..RED\\YP\PROJEcrS\PRE APPLICATIO;","S ~lEETL';G LOGS\Pre-Applk.:J.cion ~[.:ctin; Log:.do.;
PRE-APPLICATION MEETING
SIGN IN SHEET
PLEASE PRINT
MEETING DATE:
TIME:
ATTENDING FOR APPLICANT:
NOTICE: The purpose of this conference shall he for the staff and applicant to discuss overall
community goals, objectives, policies and codes ass related to the proposed development and to
discuss site plan review procedures. Opinions express at the pre-application conference are not
binding for formal review purposes. Addition:!l staff comments may be forth coming based on actu:ll
lans submitted for review.
City of Boynton Beach Attending for Applicant
Attending Staff
I
I
I
I
I
I
,
I
I
I
I
,
J:I.SHRDATAIPLAZ""L'iG\SHARED\WPIFOR.\IS\PRE-AP?L ~IEETI:'G-SIG'" 4'i SHEET.DOC