REVIEW COMMENTS
7.A.l
OCEAN 95 EXCHANGE PLAZA
(NWSP 06-020)
NEW SITE PLAN
A - ~-/
D .~f -h~ tk-0 ~ C\ ~~J
~ect7l1-vlW<v<V I j (
C ,S \{. C. KDSS ~ C 1v tk sC, ~J .(,~ 71u
fr4* W- .)Jot t00LUh') wI 1lW
frp~
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 06-175
STAFF REPORT
TO:
Chair and Members of the Planning and Development Board and City
Commission
THRU:
Michael Rumpf
Planning and Zoning Director
FROM:
Eric Johnson, AICP
Planner
ccj
DATE:
September 20, 2006
Ocean 95 Exchange Plaza / NWSP 06-020
PROJECf NAME/NO:
REQUEST:
New Site Plan
PROJECT DESCRIPTION
Property Owner:
Mr. Michael C. DeSimone and Coral Capital Palm Beach, LLC
Applicant:
Boynton Industrial, LLC
Agent:
Mr. Crockett Farnell
Location:
514 though 518 West Ocean Avenue, which is located on the south side of
West Ocean Avenue, directly abutting the east side of the C.S.X. Railroad
tracks and the west side of Intestate 95 (see Exhibit "A" - Location Map)
Parcel Size:
294,997 square feet (6.77-acres)
Existing Land Use:
Industrial (1)
Existing Zoning:
Light Industrial (M-l)
Proposed Land Use:
No change
Proposed Zoning:
No change
Proposed Use:
133,911 square feet of office / warehouse
Adjacent Uses:
North: Right-of-way for West Ocean Avenue, then farther north is developed
property classified with Industrial (1) land use and zoned Light Industrial
(M-l);
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 2
South:
Undeveloped property classified with Industrial (I) land use and zoned
Light Industrial (M-l);
East:
Right-of-way for Interstate 95, then farther east is developed residential
property classified with Low Density Residential (LOR) land use and zoned
Single-family Residential (R-l-A); and
West:
Right-of-way for C.S.X. Railroad tracks, and then farther west are
properties with varying land use classifications and zoning districts.
Northwest of the C.S.X Railroad tracks are developed residential properties
classified with Medium Density Residential (MDR) land use and zoned
Duplex Residential (R-2). Southwest of the C.S.X. Railroad tracks is a
storm-water retention area for Industrial Park, classified with High Density
Residential (HDR) land use, and zoned Planned Unit Development (PUD).
Site Characteristic: According to the survey, the subject site was previously developed and licensed for
a fence company (Bulldog Fence) and a welding / manufacturing business (Four
Steel Corporation) but now it sits vacant. The survey indicates the property is an
irregularly-shaped decagon, nestled between the C.S.X Railroad tracks (to the
west) and Interstate 95 (to the east). The east and west property lines, which
form the "length" of the site, are much longer than the north and south boundaries
(width). Also, the width of the south property line is shorter (less deep) than the
north end, which further exposes the difficulty in developing the site to current
design standards. The survey indicates that an existing Cracker Barrel billboard
sign is located along the east property line, near the middle of the site. Also, an
existing cell tower is located along the east property line approximately 270 feet
south of West Ocean Avenue. Neither the billboard nor the cell tower would be
removed or relocated as a result of the proposed development. According to the
applicant, the lease of the sign commenced on June 1, 1996 and will not expire for
another 30 years. The cell tower least started on November 24, 1999 and will not
expire until 2036.
BACKGROUND
Proposal:
Mr. Crockett Farnell, representing Boynton Industrial, LLC is requesting site plan
approval for the construction of three (3) office / warehouse buildings totaling
133,911 square feet on the 6.77-acre parcel. As previously mentioned, the subject
parcel is comprised of several lots and previously developed with a fence company
and welding / manufacturing business. The intent is to combine all lots, raze each
structure, and construct new buildings and parking areas. Although the site is
located in an isolated area of the City, it is afforded much exposure and visibility
due to its close proximity to Interstate 95. It is the developer's intent to have the
buildings ready for occupancy by January 2008.
Concurrency:
ANALYSIS
Traffic:
A Traffic Impact Analysis was sent to the Palm Beach County Traffic Division for
concurrency review in order to ensure an adequate level of servic,
2006, the Palm Beach County Traffic Division responded with sev
that the applicant needed to address in order for them to ma~
determination. On August 22, 2006, the applicant submitted a n
that was sent to the Traffic Division. However, as of the date of this report, the
Traffic Division has not yet confirmed that the project meets the Traffic
Performance Standards of Palm Beach County. Therefore, this confirmation will be
required prior to the issuance of any building permits (see Exhibit "Cft - Conditions
of Approval).
7.4./
OG#1W 'it
l1l4C/MJ"tHF
~4~
("'Wt/" )
~ - O;lC)
1- fI/J'1C.
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 3
Utilities:
The City's water capacity, as increased through the purchase of up to 5 million
gallons of potable water per day from Palm Beach County Utilities, would meet the
projected potable water for this project (project estimated to require a total of
17,000 gallons per day). Local piping and infrastructure improvements may be
required, especially on the water delivery system for the project, depending upon
the final project configuration and fire-flow demands. These local improvements
would be the responsibility of the site developer and would be reviewed at the
time of permitting. Sufficient sanitary sewer and wastewater treatment capacity is
currently available to serve the projected total of 17,000 gallons per day, subject to
the applicant making a firm reservation of capacity, following approval of the site
plan (see Exhibit "Cft - Conditions of Approval).
Police/Fire: Staff reviewed the site plan and determined that current staffing levels would be
sufficient to meet the expected demand for services.
Drainage: Conceptual drainage information was provided for the City's review. The
Engineering Division has found the conceptual information to be adequate and is
recommending that the review of specific drainage solutions be deferred until time
of permit review. All South Florida Water Management District permits and other
drainage related permits must be submitted at time of building permit (see Exhibit
"Cft - Conditions of Approval).
School: School concurrency is not required for this type of project.
Driveways: The site plan (Sheet A-D. 1) shows that one (1) point of ingress/egress is proposed
for the project. The driveway opening would occur at the northeast corner of the
parcel, which would connect to the terminus of West Ocean Avenue. This opening
would be 30 feet in width. The site is situated in such a way that it can only have
one (1) point of ingress / egress. While it would be preferable to have a second
point of egress, additional driveway openings would require the developer to
connect to the existing rights-of-way located on the opposite side of the railroad
tracks, which would require additional railroad crossings.
Parking Facility: According to the Land Development Regulations, the parking methodologies for
office / warehouse uses are based upon the following: One (1) parking space per
300 square feet of gross floor area (for the office) and one (1) parking space per
800 square feet of gross floor area (for the warehouse space). The cover sheet
tabular data (Sheet A-D) C3) proposes 23,296 square feet of office space and
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 4
110,615 square feet of warehouse space, which requires a total of 217 parking
spaces. The site plan depicts 219 parking spaces, including 10 designated for
handicap use. Therefore, there would be two (2) excess parking spaces provided
for the entire development.
All spaces, excluding the handicap spaces, would be dimensioned 9 feet - six (6)
inches in width and 18 feet - six (6) inches in length. All proposed parking stalls,
including the size and location of the handicap spaces were reviewed and approved
by both the Engineering Division and Building Division.
landscaping:
The site currently contains two (2) Sabal palm and five (5) Live Oak trees. The
developer will be required to relocate the Sabal palm tree (on-site) and re-evaluate
the health of the Live Oaks (for possible relocation). According to the cover sheet
tabular data, the proposed open space or "pervious" area would be 54,183 square
feet or 18.4% of the total parcel. The Plant List (Sheet L -3) indicates that 84 or
58% of the 145 palm trees and 141 (85%) of the 166 palm trees would be native.
The landscape data indicates that 99% of the shrubs would also be native. The
landscape plan would provide the following species of trees: Alexander, Double-
Alexander, Black Bamboo, Sabal, Green Buttonwood, Silver Buttonwood, East
Palatka Holly, Eastern Red Cedar, Crape Myrtle, Live Oak, Bald Cypress, and Yellow
Elder.
The site plan shows that a lO-foot wide landscape buffer is proposed along the
north property line, adjacent to West Ocean Avenue. This buffer would contain
Live Oak, Yellow Elder, Redtip Cocoplum, Croton, and Green Island. The east
landscape buffer proposed along Interstate 95 would be three (3) feet in width at
its narrowest point and contain an array of plant material, consisting of the
following species: Eastern Red Cedar, East Palatka Holly, clusters of Sabal palm,
Redtip Cocoplum, and Fakahatchee Grass. The existing fence around the cell tower
would have Redtip Cocoplum installed along its base. The elevation plan along
Interstate 95 (Sheet L-4) illustrates how the landscaping would "soften" and
"break-up" the building expanse. The site plan indicates that the south landscape
buffer would be at least five (5) feet in width at its narrowest point. It would have
a cluster of Sabal palm trees installed at the southeast corner of the property.
Also, a row of Silver Buttonwood trees would be installed along this 76-foot long
stretch. The west landscape buffer, proposed along the C.S.X. Railroad tracks
would generally be 10 feet in width. This buffer would be the one that screens the
office / warehouse buildings from the residential neighborhood west of the railroad
tracks. It should be noted that a portion of the west landscape buffer is reduced in
width at the northwest corner of the property to accommodate the design of the
new parking areas. This buffer would contain a row of Green Buttonwood, Bald
Cypress, and Black Bamboo. Each tree would be installed at 14 to 16 feet in height
and spaced 20 feet apart from each other. A row of hedges would be installed
along the base of each building. The aforementioned plant material would be
sufficient in terms of lower and upper level buffering in part, because no employee
or customer activity would occur west of the buildings and vehicular use areas are
principally proposed along the eastern portion of the site.
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 5
Building I Site:
Design:
The project proposes three (3) separate buildings, labeled "north", "central", and
"south". The north building would be the largest, proposed at 59,327 square feet.
The central building would be 43,122 square feet and the south, 31,462 square
feet. According to the cover sheet tabular data, the lot coverage would 39.6%,
which is under the 60% maximum allowed in the M-l zoning district. The floor
plans show the north building would have 15 individual bays. The central building
would have 11 bays and the south, 13 bays. All buildings would be one (1) story
tall and of equal height. The top of the main parapet wall would be 28 feet - six
(6) inches tall. The top of the entry feature would be 34 feet - six (6) inches tall,
which would be below the maximum height of 45 feet. All buildings would meet
the minimum setbacks required in the M-l zoning district. The building and site
design as proposed would generally meet code requirements when staff comments
are incorporated into the permit drawings.
As previously mentioned, the site is located in an isolated area of the city and lacks
frontage on a major thoroughfare. Trucks traveling to and from the site would
have to traverse through residential neighborhoods in order to access the site.
Staff has communicated this concern to the developer. The developer has
suggested that the proposed building sizes, on-site design, and uses would
informally discourage large tractor trailers from coming to the industrial site. While
the developer's response may be justified because of those aforementioned
reasons, there is nothing in city code that would prohibit or restrict the infrequent
and / or wayward visit of a tractor trailer. As such, the developer has provided
staff with three (3) viable truck route plans (see Exhibit "D''). While all routes
would be adequate, staff determined that Option 1.A is the one most qualified to
absorb the traffic impact due to its wider rights-of-way (of West Ocean Drive),
length of roadway segments, and characteristics that accommodate
maneuverability (see Exhibit "c" - Conditions of Approval). However, each option
and I or a combination of each option are feasible based on their own merits.
The project would require an on-site lift-station for sanitary sewer. The structure
would be located along the west property line between the central and south
buildings, opposite the water-retention (drainage) area so as to not impact any of
the residential areas. Six (6) dumpster enclosures are proposed along the
easternmost limits of the drive aisle and parking lots. The back-up dimensions
have been reviewed and approved by engineering staff. Additionally, the Rre Plan
(Sheet A-0.3) shows the large turning radii and wide drive-aisle dimensions that
will accommodate service vehicles, such as fire trucks, ambulances, and garbage
trucks.
The exterior design of the proposed buildings would be an upgrade from the
current on-site conditions (dilapidated, unsafe structures). The new buildings
would consist of tilt-wall construction and comply with the 2004 Florida Building
Code. The east fa~de or the "front" of the buildings would face Interstate 95.
These elevations show that future knock-out panels are incorporated into the
design to allow the owner the choice of adding more front doors. The floor plans
and elevations show that each building would be long and narrow, with tilt-up enby
panels and triangular-shaped wedges proposed at each front entrance. The entry
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 6
Signage:
panels would help to "break-up" the monotony of the flat roof and provide focal
points. Also, these elements will help to distract from the overhead bay doors that
are oriented towards Intestate 95 and the north / south sides of the building. No
doors (overhead or pedestrian) would face the residential neighborhoods to the
west. However, the west fac;ades, or the "rear" of each building were only
enhanced with score lines. Therefore, staff recommends incorporating variations in
height of the parapet wall for the west fac;ade, similar to that of the east facades.
This would help to improve the appearance of the west fac;ade by breaking-up the
linear nature of the buildings (see Exhibit "c" - Conditions of Approval).
The buildings would be painted with an array of earth-tone colors and be adorned
with score lines and triangular entry features. The Benjamin Moore paints are
proposed as follows:
Paint Name Common name Color Code
Whale Grav Dark gray 2134-40
Province Blue BI ue-CI ray 2135-40
Brilliance White White Ready-mixed
Dakota Woods Green Dark Green 2139-20
Grav Miraae Tan 2412-50
The buildings would also contain clear anodized aluminum frames with light gray
tinted impact glass. The photometric plan (Sheet E1-1B) shows the proposed
lighting levels for the parking areas along Interstate 95. The levels are such that it
would provide for a safe environment at night but not too excessive that they
would be more noticeable than any other industrial property.
The elevation pages show that wall signs are proposed on the front (east elevation)
and sides (north and south elevations) of each building, above either the doors or
windows. All letters would be made of 20" high clear anodized aluminum channel
letters and of Century Gothic font. No Sign color(s) are proposed at this time.
According to Chapter 21, Article IV, Section 5.B., the maximum area for all wall
signage is based on one (1) square foot of area of each one (1) foot of linear
building frontage. A freestanding monument sign is proposed at the southeast
corner of the property. According to the Freestanding Sign Detail (Sheet A-0.2), it
would be 20 feet in height and contain 16" high clear anodized aluminum channel
letters in a Century Gothic font. The base of the sign would have multiple colors
(Province Blue and Mirage Blue). According to Chapter 21, Article IV, Section 5.F.,
a directional sign not exceeding four (4) square feet in area and five (5) feet in
height would be allowed along West Ocean Drive. A directory sign is proposed at
the northeast corner of the site. All freestanding signs must be located at least 10
feet from the property line. Because of the site's visibility to Interstate 95, staff
recommends creating a Sign Program for the entire development, which would
include the sign type(s), color(s), material(s), and location(s). All future site and
building sign age would be subject to the Sign Program for the entire center (see
Exhibit "c" - Conditions of Approval).
Staff Report - Ocean 95 Exchange Plaza (NWSP 06-020)
Memorandum No PZ 06-175
Page 7
RECOMMENDATION
Staff has reviewed this request for new site plan approval and recommends approval contingent upon
satisfying all comments indicated in Exhibit "c" - Conditions of Approval. Any additional conditions
recommended by the Board or City Commission shall be documented accordingly in the Conditions of
Approval.
5:\Planning\5HARED\WP\PROJEcrs\Ocean 95 Exchange Park\5taff Report.doc
LOCATION MAP
Ocean 95 Exchange Plaza
Exhibit "A"
800
'Feet
N
+
200 100 0
,
200
400
600
I
! ___-1
\~ ~ ~~O~_~_~_ 0:0000 0000, 071f~
~ ---.....- '--'1 '
-----cu ~I~ '1 . , I
I : U! '~ ~ ~
1 /I i~ I, :
\. .' :1'., i
I I I
I ,
I' ,
I " I
I ,
I ,
I
,
,
I
,
,
I
,
,
I
,
i !!1!III!UI!!I!!i!llil!IIIII!!ii!lli!1
,I lm!;ii:I!~,li:! mil.!!, I; I
'I i I ll~!li!!!iib',111 I !llill!!', h I
II "II"III!'1" I. '11"" II ,
: 'I !'I!I'..Ii!II,11i i!III!:II.ll I
II, ;:.II!IIII'.'I'- 'I., I'!.'!' I
, I J !!:ij!I!I!III~!'ll I !;gi!I:!.1 ,
, 'i "'HI"I!I!F:' · "j'llF: I
I ~,~. I i !,lj!:i!!1!iti i! I i ij!lj!j'l i! I
I. :. 1,1~~:IiI;!I~ '1'1 1 jill:il'l~ 'I I
\ I ':llll.h,!"., '"I'''
, iI. "illlllll' il'I'lil! I
, illl,III"I'" II ! 'II!I.;,. I
,_ I '1':':" ~I~ld. e i.!'l'lill .
.._" ",,11'11" i !,.!. ," i
-~ ..JI!.-!!I,., .'l!.t~'!
1.....1..1 ij' 1
I ~.~ , . .".
,
,
I
MATCH UNE:
~! ..-
'.1 \
,
I
I!
'j
If 0
I
i
\)
\
I
.,
~~
II
"
" '.
j "
I '
I ,
I :
I . l
I :
\ :
I 1\
I :
+ I 1
\" +1
II '
i :
II :
I :
j :
I ~
I :
I :
I :
.\ '
I ~I! .
I I~'
I '
/ I" I
Il' ..
j ,
I _
f- E~-- - .
'I
~~
II
.
"
II
'1'
~.
1:\1 L
.1 "
MATC LINE
,
,
I
1
,
,
I
,
,
I
,
,
1
,
,
I
,
,
I
,
,
I
,
,
I
,
"-:=i
. '
'"
'l'll-
" !
I',
~\\
\\
\~
ITS
IllIJ""'I'llli'l r i I gUN!ill!lI11li!ft'H1 ~ II
iii;!!.lljl':llimi,,' 1,1 'llllliii1~I;r~1Ii!il!I;l:!!l!III:'" { I
'il"" ""II' !lI"", 'ij~"'r' II "
!I!'miil!!!!h!:i! lii!iij~l!li!iillj!llli!i:!il!
!11'!'j!lil,i:ii!!I! i !il~:!hi!i!.!P..iill:ll:!UI i
l'"I,~! 1!:li~il' l.!il'llli.ll:lliillil'!ihi"
'!i','llllil','I',lilii' 1':~I',I!!"'II!;:!al~II!P:'I'I,,II'ii I
"111111, 1'1' "11i hid"" !III' 'i .
'l'I"I'il,II'1 lill"I!""",I.li 'Ill',
il I. "ll. ','I I !l',II.I'I'I,!"", "
1!!ll!~jillii!l! I i!:II!!ld!lldjili!lll!l!ill!!
li~!I!!!!!!li!~.1 I ill.!!lli!:I!lll' !lli'!ii'l 1
Ill'il'l:!;;r:1 I,' i I l!nil~ll!el!':1 rill
" I". 'I n" "1" . 'I
Ii Ii!' hl~~ J: ~11:I~i~ ;i:~~ Ii
;,. ,~ II Iil!il!!il!!!',lI
l". . 1"llllll"I~'
1!1!I'! 11'1~li r: I;i"l,.'jhli r:
h!l 1/.. "!" 1!II,i,llll"!"
%ili::ilil'f., li'il"I""!'I!I,'
lilli!!i:!.!' ~mll::!I.!'
1"II:II!i!"I,' i1l1ill!!!I,!lj
'i:lli.'I,I' "il:il',li
il....:,.II,.j: I 1,:",,,11111: i
'''i "1." 'i'I"III."
~i'::"I!!I'I" ! !:i1Ii.t '1" I
III,I:!!,' !'Ikl'l-" i
1,;"I'i"" I ,;,'I.,'!"'I
~i ~ I.wl~ , '\ ! ~
.
"li'I"I:J!I!'!~"~I' ~ Illlll!i II
'II~'" ',"!' 1.1' . II"
lil.i,II,j.I.,lm'I' II,,~
'n"'li,., W" j'
lil,jliillllli,'i:~!:!il ,II
1~'1!1l t 'I '~~Z!I,.. 1'1
! ll,"'IIIl/i'r:,', I!
"I!.lIl""l.lllll" ,
~~ ~II~ _It: I~ ~I I' all
'l'ii!"'llj"'I!'1 "111
11!,iilll!ii!I:!I~':!"!:"'1 ~I! I
I,ll" . 1'1" i 1U'!1 ~ il~18 'I
~. ~'~,:Iill~ 1~'1~:111 a~!I'I.j:' il
il!lil!~:I'lil!'i' :I.!
!lIlfl!!!'!h!llj!! 'I'il.g
i,' ..1,.1 . ,II. 1
Ilill';'I'f~II!!I.1 1.1I!! I,
"n!I.lal;'''ilil' ,!,,1l11
i,H"II~'ljlll'll!r'I'i :' Ii
"'!I~I !: . .', 1111 l
. ~ ~ i'
liilll,II' 1!~1 PliiF, i
'1:" '~I'."1
t.1rjl ~', ~ IIIII
"Rd.; ii!1 ~ 'I
!~~lJ !lld I'
Illlll' Illii
'l'lil! II.,
.,'111111 I;:!
I'!' ....1
lilll,,1111 IIi
~" II,~
I!I!'I iill
Irill II:!
iil IIIil' 1'1 'liIIil'
ill!iiili I! ~li'~lil~!i!iiiii I!
illlll!1 ! Illi~il,llililll!!I !
1l11' · I~Jlllll.I"11 ·
",,1 1 -1'1 I,. I
::i!I' li~: 1:;1 I
!!II · I "I! ,
,I"' I i 1,,1 .
'I!' I Ill" I
i.j -dill I
.! I' I'" I
i! I! I!!ijii I
Ii iill.;11
i 1!!:!I!i!li!il
! 'illi !!!!l
i 'U Ij
t
1
,
,
If! I
~!. ,
"1 ,
,- I
>
i ,
/ ,
,- -4
.
'I ...
1i ~, I
, ...
"- '!i ,
, ,
. I
". ,
,
'. " I
,
,
I
,
" ,
'. .... I
,
,
I
,
'. I~I! ,
\ :ir I
... ... '.
, ,
,
, ,
, I
,
,
... ,
,
~ ,
,
'II ... ,
1,\ ,
,
1 , ,
. , ,
,
, I
,
,
, ,
,
, ,
, I
"- ,
,
,
, ,
, ,
,
, I
,
,
,
, ,
, ,
---r:1 ,
, I
_GF~ r. ... ,
,
"I =:.o.r.:r"::::"uo> I ,
i~ ,
I ,
I
MATCH LINE II,
ITS
'i'!' 'I'I;III'II!'I"!I"'III'II
I "I!!!~.~rl:ll!,li; J!Jj!jliiii " Inil
I l'II'I'II!llj""!II!!'I"
! 1",,'i!,!~!!!!i!!ill!l!lli!!!i!iili
i Il!l!ll!i!!,fid!ii!!jlj!!j:l!:illljJll
i'IWI;II!!i'I!!!iiiill';!!llll:l:ml!hi~
Ii II", '1"lll~II.II"'II'I"":1 ~
i!!!!i~ii!i!!I~lilii!m!irl;I!!lii! !i
Ih!i:i'II!"lill,!'ll;h:!:L!!,'il'llil!i
'!,,'lll' U "I!,'I"'" .
ijfliji11i!'idl! !hl,l!liiiiliHi II
hi',! 1'1. "I !1,~"I'I' I
1i.11111!"!li; I'! ",~,5!i~'!'I'~ i
i!'i!lilfll!'l!~ "I~!'II!.III~!1 Ii I
i;tI+!I!i'I!:I~!;l'W >!..:I'
1I!!ililj,jl h!
li,iIIl':1 "Ill
III .. I'
,hli
. ..
J: iO.
"~/I."
1.11
ii ill
hll
II Ii
I, II
, "
:;
~~
! Ilillllll~'I'III!lil i
!i' I"!' :11111\I~i, I,'! I I
I ~ i~'~1 t'Xiax ~ a
Ii 1"l!III",llhl!i'! I
~ ,.! ~"IIl' hlllllll h~ = f
I ji . ill'I'IIPI !I; , ,
I I! I.!,.I., 'il! I
I Ii! till !
: J: t i. 1,,-
, !, I IIlaI I !!II:I
i ;\1 !'i:'l'iill!il
1 I' I ./;;i;I.,..!
! I!: I"
" I ,.I
!i i IIi
I ! i'
1"1 "'! d
~~t:' . III
:; Ii Ij Ifill
!In I; " 'l
".'. '1 I! II II ~
",,, ., 'il
liii! III~; I'"
".i'~ .,..
'l,," In 1111'
'!~ ." - r I
!~.; 'I '
. '.
! !1'ill1
dl ~I'I
'IS i,l
; ofll
I!: ilEj
III II'
I
! " if !II!1 ~
I "" I "
j'rl'lflll
, r 'I"
~t'll/': "
,,! I J
:; h!!I.1
1;,[>' =rlilil
Hi rr..
; ~ ii )I'~J.
:1 JIl:i
ii m :1:
l! III I
! ~ I
~ = filii
i ~ If II"
~ ;'j ii "11
! '~1 I, _:1
0- 0 11'. :/:
'- m ' .
" ~ Ill',
~ ! ~ 1
Illfm
ll!~;ji
!'i';'
II;!.!
Iud; ';
. i! I! m
~ !" I: ur
~ '," J' 'r;
z ~ :; R~'
~. I ~ ;
I Ii :
I " ~
,
~ i
'il Ii fil
!., Ii Ili
>- _;r '; !II
I ~ >.. h w.,
o ~ ~ ~ ;
~ ~ ~ .
it
li~
l~!
.
I
.
'Iii UI
!. 1.lh
',' I! III
i II il\
~. I~ ,
II
n'~ {'- - --
',Ii ~, Ii-\\ \ '''ia
" \ P-l 5~
~~\, \1, ~~ ~ '~
~' t> ~ ~~ :\' ~~ \ I;
~," \', liPI\\\ . \ H
,\ \ \ f,l, \1 \ 1 ~ ,
,i \ i ~I J !. \ ~:;: 'i
, . \ ' llii i\' " l
t> il\ ~ \
\\\ ~~ "
\,\\ ~i \
~v Q" I
J; ~
'\: "
;-\1, \
;r '
\\~ \
~i\ \.
\\\ 1
l~jliltijll'll
1;~lI'i'!!lHd .
.!~!II:J!W
!!'IIU,!,'! ~1-lfll!
: ff' niil'
l:j~iI.lli'-
i IhI!liilll'
, '-flFI"
fiY' !II
\\!l"bl'
'I: III
\,,\',!'ll
\' Il'
'i'j!11
,\1
+
\i!li11i\\,
'i II '-,\",
I j '\
, ,\'0\
\[;3. <l \'\
, :'0;~\\lli!;~
OJ ~ 'o,'~!
Ii" I>-
I'll
JW"I'll
lllll
!>
t>
.
,....
, ,.,
,
,
,
,
,
,
,
,
',\
"
Il~
"
,~
,~
',f;
,.
l ~
,
J \
,
~~ \
,
~- J "
r->' ~~, ~ \,
,I ~., 2. I
" '
:; ;1: Il
%:~ ~ ~ ~
., .~~f~ ~
~~'" tl 1"
_~" Z. t..
}Q,"i~ l~
;:;;'\l,-f1 If.
~~~,~ ~~
1"~ ,
. i ~
i a
"~
D
....
, ,..
,
,
,
,
,
,
,
'~
i~
,
'.
..
l i)o t>'~
I." '
E 'a,;, . ~
~ ~31I~~ Ii
'-" -,"~ '
!!..p:a~7bg:l I
1'~UH~ \
::'.' i~Qi'tJ* \
,I.";', j~~~
"11" ~~
;~, ~'+~N~;l. :H"1 tolVH
",,""""" ,.--.....-...
, . -IBIT B
1----- \.~ ~
, ' >-
'; ';1\ ~~
~ ,II
i~ <-1-,
il II: C/)
:5 iJ ......,
,;! \1: >-3:
I 1J; tn
, ;1; l-c;l
: "-:,It, r-<
- ,-- '1-; ;>>
" '----- -il'~ z
., .' "
; 1 il!III'
I.' , " 1[; I Z
, ......, ;,: ao
"!: _ -J+t t
J, l.t ili '&
t " i ~~i :[:
, - ~h
, I
'1\
3t~_ I tol'iH
V>
o
"
S--
I>-
l
...J
~
0:.
~,
"
,
~t>
l~~~
J~.;q "'ii, 0
g,~~ 1'..6 [l1~
~ 6.. 3' -.".:1 'N:t
=. "" ~ ~." :- '"
~:..3;; ~'Sc
g.~"',5l\ :z:~
,."HQ\1
-f"i:!:-' <jz
\~rs :r:g,,, Cl
D"nF;'
J ,,,,.
"
"
,
: c:=>\
, ,
t'
"tt;- ,
\~
\\
~t:<\\,~-:
., '\! ,
.
~\
.
l
J
" ,;
T
! :,+r,
l:l 'ji
nd;
1_"1:\1
. "':'1;
.!!l~ 'Ii
.~ : j-H
: 'I;
: i
I ''I''
, i
I ',j'!
, i
I ,..L.
, I
, ;1,;
: I
: "h
if; I.
I;.: 'T~
'''1 i
~ !.i
:"' i'
Itt "j-'
'~ .1;
I
;,i
I
i;
I
I,
n~
I
W
lj!
'H
ii
p.. .\.
:iffil;
~H
~ in
~ Hi
Q. I'
'- h'!
ii ~;I!
1:'1til
r'-iJMJ.
, ill 'I
: "1
',' ',,:!h,J,il
II:! .. ~.
1 ~ G~ij ~q
III ~ll"'Cli
I :1
l 'I
t!
~'':'t
'" '11
.,.;>; ..
~ ~ ~I
1~ ,','!
'to'
i .i~: ~
i;iii!
~~i:q
! :~! c
I' ~~, =
!!q
~ : ~
, i ~
C
n
c
1 ~
, 0
, ~
, m
If-f::i
.;." ~
~ z
" 0
5: [T1
" ,
>
~
~lT,Z
~~g
~ ;:...;
:J"
o~
z-
~5
z
o
;>-.
I ,.
" ~ :
...,.....,",
0'.
I
f>j jii
l'i;1
, ~l
I
I
,
II
I:
r
"I
I
I!
3X
,
II
II
II
II
.. ,"l!
I"'
1,1.
""I'
. ,
II
II
II
II
II
II
11!ll&ll,eO "
~ ,.~. y"
n
'I'
M
, .
,:i,.! ..! ~
1~' ." [f)
.. >-l
"." tI1
; .'~ I f;;
. . II ;;
~il ::l
1II ~
...
I
ij
"
"
HIBIT B
z
o
1:l
::c:
tI1
~
d
o
z
II'
M
~~I
III
I
lilt
~11"
, '"
~.' 1I
, !1'~N
'II'
"~Il
i. .
~I i Iii liilj I ~
il,: IE I ~
~ I II I Ii
: II! 3
I · Ii
I I\!
! lllilill
I II !
i
!
j'{'
111:
.~I'
. .
.
, N
i
[f)
o
C
>-l
::c:
tI1
~
o
z
I
I :'~t
! ;~;i
1:1::
I",;i
~!I
., ,. ~ '"
f ?,'<
~a~
'~~ lIll" 1111
~~ 15iff : Ie
"0
"
>- ~I
~;: Ii
L_~
J - I
,
it
J!'
M
,.
,
I IlIIlli!ElIIllllljeljll 11111 ;il
EWII~\'I!l: ., il "I!I'l' tI1
l"il 'l'i'le,ll! !it "II, tI1
!!I I' 'II Ii! 'I ~
o
H
z
II II ~
z
o
['J
>-
e;
,
'""
X
tI1
o
'"
6
tI1
n
::J
Z
Cl
1 ~
~
,
~ i
r-<
tI1
en
;!
>-J
tI1
I'I!! ~lilli ~
Ill' ].,la z
1M i'll
1111 l[
'/'1
,II
r illl I
IIII
~lll
1111,li'lii
j!!lhl!11
1l!1~1! "I!
], c,.'ll
~
'11Iil
lill!l
'11111
ilil
lip
'I
1111
!ilj 0
,II ~
'"
en
t;j
~
tI1
[;;
~
o
z
II< 1I 1;1
li1, Ii I!
l!'
II!
II
en
tI1
n
>-J
I~ .....
I ~
"I
It
,Ii
I l!!ll!l!j!!1 8
'. II Il t }illl'II"i11 ~
t~ !!l' p q
>111 l' . ~
1111,li'lli '!II'~ 'II H
'!!li,!!11 !.,i Ih i ~
11"'.1., "'! I','" J.,la 0
I 'I' 'I I.II~ i'll tI1
l"l~ 'II IIII II ;!
'1:1 ~
II
~
O-'!Ii"
,
. r
J ! I
m
r
m
-<
J>.
-t
o
Z
It
~
o
=r
u
.......,:,.
:.i"'~:':" :.~::
:,,^).,.: .;
.,
,
.:~ i~
':- ..
"i,!
..)',.... 's:
;~'.
~~~;}..
~~~l~;!
..<:- ,",
j. ~;:
i:.-;;.
'. ~,
;:,.......... .....,;
(~~?~1~!"
~'.
"0'
,.
}
.',
I
Ul
\JT
.~.. '..,.
,.,.
,.' ":.
Alri'~~
.......
iUJ t t:1
{ II I
I ~ III II
I till~ff Id,l
o
f a
ndi
m
r
m
-<
J>.
-t
o
Z
It
~
o
=r
o
()
m
J>.
z
J>.
-<
m
z
c
m
~(~:~:t.:;:.. '1
\....rJ;~'r:. {:
~~tt~1 ~;~ j;~
^~ ..f".. ., ..'-;.' .,....
,,:.....::.
.'.r .' . F~~::': ':~;J' ~1 ;~1.
A.,.~/.J..~ ...."1',."!.~ -\.,
~~~~;;~{~~~~ft:. ~: .~;
11~~!lr
~dd!1
Ilnll
QDi
lit m~ .: I
( V. JI t
; ~ I 1.i1 it i~ JILl
.
--1 EXHIBIT B
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-1-:---
" --
I
I
I
I
I
I
I
I '
I I
, -.l I
-- --~.
-- - I
I
I
I
I
I
I
I
I
I
I
I
il~!!lr
l'I;lcl
I ,.
!IMI
~
. ill ln~ 1:1
. r 'It II t
t ~! l.iI Ilif II~JI
: EXHIBIT B
~"':~I
I i
uSil
I
I
EXHIBIT B
1I
,
1
.
.
.
.
:
1
I
,
,
1
(
I ]I
.
. I
.. .
I ~ . .
'1
~
~
H il'
~
1
.
=-..;:a
.
-""
ijJ
lii~ Iii
If! ·
'1 II umlil
mimi,
~f;m;
~l'lllllll
ili Ii m!~ 1'1 , Ulji 1~1
HB, . , U I ",' if;:
.."" I I , Ii 1m
"" I I" . I t H f::
I" ! 0 . p
. I ,
I I. 11' I
. . . .
!! YiP. ii
.."."..hh IS I~H
UU UUU U ~ ~ II If I
lIil.,i'II'"
II '11'1111........1
11~~WI~nml, 'e~Hn~~, 'iii~,
1111~ ~~~~~~~~~~I llH!!lliiP.P.!f1 ""-"I
o I' ! f f f' J , , , 't'~" If ; ; H~" ., I! P.: P-
l. : ::.. ; i i "'liill" Ii I!I( 11(
, , , , , ' 'jI I' !l I ·
I . J I!
It I . · I I I . I · I II ; OJ
.. . .. . !I . .. .8 t '" I !1ft
4 . a.... .. . . . .. ..I
.. .. .. . .. .. .. ..I 1
.... .
: Iii fUJ J: I
' r {I (I t
I I Ull,l
I CI) I _ .i1I! f It,1
I ~
nd!
I .
.- -- -- -- .-
- ~-n--ft- z
. . .
~ ~ ~ - 0
I.... I
l~m , I ~
pi!! ___...1 JliU
:t;~ I :I:
I'" Ill! I:l:I
:d
! ~~J n, c::
~ - - ----- - - - - ~ ......
I l III G
I ......
J Z
---, 0
I
I. I ,
~ --l!-- -- - - ~ fl
j, 0
0
ll' ;<l
It ~ · "C
I ! ~L _ . ~
- - - -
II
---, ,I
"!
f , ~ I
, . I
; ~ ; - --f
, I
II I
___J
. !i!I
,
,
I II'!- ------ -
F
I
l
--,
I
I
---f----- - - -
I
j I
l ___J I
I
I
~ 56
~ 0=1 l
s:::; i
!:~
z~ I, 1 Jlj
o
>.,
1 ~ ~
~ ~ ~
. .~:
o
,
I
I
--+-----
-{li
- - - - -
j
--,
I
l ,
l! . .
'I"
M '-
Exhibit "C"
Conditions of Approval
Proj ect name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: 3'" review plans identified as a New Site Plan with a Seotember 12. 2006 Plannin!! & Zonin!! date
ki
stamn mar n".
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments: None X
PUBLIC WORKS - Forestry and Grounds
Comments: None X
PUBLIC WORKS - Traffic
Comments:
1. Provide a notice of concurrency (Traffic Performance Standards Review) X
from Palm Beach County Traffic EOlrineerin!!.
2. Provide Off-Site Roadway Improvement plans for the truck route to be used X
to access this project using Option IA (SW 8th St. and W. Ocean Dr.)
Roadway improvements may include, at a minimum, but not be limited to,
design of two 12-ft. travel lanes, drainage, sidewalk, signing, and striping as
required and determined necessary along the proposed truck route. Design
shall be finalized after public input and approval by the appropriate governing
boards and Commission.
ENGINEERING DIVISION
Comments:
3. At the time of permitting. all comments requiring changes and/or corrections X
to the plans shall be reflected on all aopropriate sheets.
4. Provide written and graphic scales on all sheets. Correct the written and X
graphic scale on the landscape plan so that they both match.
5. At time of permitting, provide a drainage plan in accordance with the LDR, X
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stormwater
mana!!ement.
6. Full drainage plans. including drainage calculations. in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
COA
09/25/06
2
DEPARTMENTS INCLUDE REJECT
7. Paving, drainage and site details will not be reviewed for construction X
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
UTILITIES
Comments:
8. Palm Beach County Health Department permits will be required for the water X
and sewer svstems serving this oroiect (CODE, Section 26-12).
9. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV. Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will1eave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hydrant can be eliminated. Excessively long dead-end
sections of main can lead to stagnation in the line and bacteriological growth.
10. The CODE. Section 26-34(E) requires that a capacity reservation fee be paid X
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
11. Water and sewer lines to be owned and operated by the City shall be included X
within utility easements. Please show all proposed easements on the
engineering drawings, using a minimum width of 12 feet. The easements
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
12. This office will not require surety for installation of the water and sewer X
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occuoancv.
13. A building permit for this project shall not be issued until this Department has X
approved the plans for the water and/or sewer improvements required to
service this proiect, in accordance with the CODE, Section 26-15.
14. Provide appropriate easements for the force main work within the CSXRR X
right-of-way.
IS. Utility construction details will not be reviewed for construction acceptability X
COA
09/25/06
3
DEPARTMENTS INCLUDE REJECT
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction Permit application.
16. Replace 2-in. water main with 8-in. water main from the existing main in X
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
FIRE
Comments: None X
POLICE
Comments: None X
BUILDING DIVISION
Comments:
17. Buildings. structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of nermit annlication.
18. At time of permit review. submit signed and sealed working drawings of the X
Proposed construction.
19. Vertical accessibility to the mezzanine area shall be required per the 2004 X
FBC, Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations),
20. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may X
not. therefore, be used for landscape irrigation where other sources are readily
available.
21. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time ofnermit annlication. F.S. 373.216.
22. If capital facility fees (water and sewer) are paid in advance to the City of X
Bovnton Beach Utilities Department. the followinl! information shall be
COA
09/25/06
4
DEPARTMENTS INCLUDE REJECT
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
23. At time of permit review. submit separate surveys of each lot. parcel, or tract. X
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot, parcel, or tract. The recorded
deed shall be submitted at time of nermit review.
24. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
bv the City Commission.
25. The full address of the project shall be submitted with the construction X
documents at the time of permit application submittal. Ifthe project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the buildin" nermit annlication at the time of application submittal.
26. Submit irri"ation nlans at the time of permitting. X
PARKS AND RECREATION
Comments: None X
FORESTER/ENVIRONMENTALIST
Comments:
Existing Trees List - Management Plan
Sheet L - 4
27. The Landscape Architect should tabulate the total diameter inches of existing X
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms, 5 Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet L-4 of 4 (Environmental
Regulations, Chanter 7.5, Article I Sec. 7.D.n. 2).
28. Fifty percent (50%) of all site landscape materials must be native species X
(Chapter 7.5, Article II, Section 5.P). At the time of permitting, on the
landscane olan, indicate the total auantities within each categorv and their
COA
09/27/06
5
DEPARTMENTS INCLUDE REJECT
native nercentages.
29. All trees proposed under any existing overhead electric power lines must meet X
the FP & L Ri"ht tree in the Ri"ht Place manual selection for small trees only.
PLANNING AND ZONING
Comments:
30. The maximum height allowed in the M-I zoning district is 45 feet, not 55 feet X
as indicated on the cover sheet and site plan tabular data. Correct the plans at
the time ofnennitting.
31. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is X
encouraged (Chapter 9, Section 10.F.3.). This is especially pertinent for the
east building facades that would be visible from Interstate 95.
32. Correct the label for the Yellow Elder trees so that it matches the Plant List X
(on the landscape plan sheet L-3).
33. The monument sign proposed (at the southeast comer) and the directory sign X
proposed at the northeast comer of the property must be located at least 10
feet from the property line. Also, the monument sign must be shown on the
landscape plan with colorful groundcover plants installed at its base. Because
of the site's visibility to Interstate 95, staff recommends creating a Sign
Program for the entire development. which would include all sign type(s),
color(s), material(s), and location(s). All future site and building signage
would be subject to the Sign Program for the entire center.
34. The west fayade of each building is long, linear, and uninterrupted by any X
variations in height. This is the fayade that is oriented towards the railroad
tracks and the residential neighborhoods. Therefore, staff recommends
incorporating variations to the height to west elevation' s parapet wall, similar
to that of the east facades. This would help to improve the appearance of the
west fayade because varying heights of the parapet wall would break-up the
linear nature ofthe buildings
PLANNING AND DEVELOPMENT BOARD COMMENTS:
Comments:
35. Board recommends that the Commission obtain approval for a second railroad X
crossing at the south end of this M-I zoned area.
CITY COMMISSION COMMENTS:
Comments:
COA
09/25/06
6
DEPARTMENTS INCLUDE REJECT
36. To be determined.
MWRlelj
S:\Planning\SHAREDlWP\PROJECTS\Ocean 95 Exchange Park\COA.doc
o
EOHIBIT D
0
~
~ .
~ .. ..z
~ 0
~
g
o
EOiIBIT 0
c
~
~ a
~ '" .*z
! c
.
l!
c
o
QXHIBIT 0
0
01 a
I g: _-$-z
.
I!i
0
3 ... REVIEW COMMENTS
New Site Plan
('v~c\st~p,
>
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: 2"d review plans identified as a New Site Plan with a August 22, 2006 Planning & Zoning date
stamo marking
DEPARTMENTS
PUBLIC WORKS - Solid Waste
Comments:
I. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
1 0-26 (a)~
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed nickun of dumpsters.
PUBLIC WORKS - Forestrv and Grounds
Comments:
3. Show sight triangles on the Landscape plans (LOR, Chapter 7.5. Article II,
Section 5.H.) using a 25 foot sight triangle.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscane islands to nrevent breaking and heaving at the tree's maturity.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowinl! non-Dublic uses on their properties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL' s "Plant
the Ril!hi Tree in the Ril'ht Place."
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrency (Traffic Performance Standards Review)
from Palm Beach County Traffic Enl!ineerinl!.
INCLUDE REJECT
V'
~
v
t/
v
v
t/
/'
t/
3rd REVIEW COMMENTS.doc
09112/06
2
DEPARTMENTS
INCLUDE REJECT
9. Staff is concerned that the existing pavement structures in the area of the
proposed development may not be able to handle the additional heavy wheel v'
loadings of truck traffic and that the additional trucks could harm the existing
streets, adding to the tax burden of Boynton Beach residents. Because of
these impacts, Staff believes that it is entirely appropriate for the developer to
be required to mitigate the safety and potential structural impacts associated
with the additional truck traffic.
In Staffs opinion, the preferred truck route is along SW 8th St., south to West
Ocean Dr., then east-northeast to West Ocean Ave., and east to the Ocean 95
Exchange Plaza. This route is preferred because it has the greatest roadway
and right-of-way width and fewest turning movements that could negatively
affect private properties. Specific design detail must be give to pedestrian
safety in the vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available
south of Boynton Beach Blvd. Each of these alternatives possess' their own
pros and cons. Again, for strictly technical reasons, the Ocean Dr. corridor is
preferable. However. Staff would encourage public deliberation on this
matter because of the sensitive nature and public perceptions related to
increased truck volumes.
The analysis should include the extent and cost of road improvements', need
for additional right-of-way, ability of the roadways to accommodate various
truck sizes, and number of residents impacted bv each alternative.
ENGINEERING DIVISION
Comments:
10. All comments requiring changes and/or corrections to the plans shall be ~
reflected on all appropriate sheets.
II. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory Review
Team (TART) process does not ensure that additional comments may not be
!!enerated bv the Commission and at permit review.
12. Provide written and graphic scales on all sheets.
13. At time of permitting, provide a drainage plan in accordance with the LOR,
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stormwater
management.
14. Provide an engineer's certification on the Drainage Plan as specified in LOR,
Chapter 4, Section 7.F.2.
/
v
v
t/
3rd REVIEW COMMENTS.doc
09/12/06
3
DEPARTMENTS INCLUDE REJECT
15. Full drainage plans, including drainage calculations, in accordance with the V
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permittinl!:.
16. Show on plans (and identifY) the 4S-inch RCP drainage pipe and associated ,/
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identifY and resolve these conflicts.
17. Paving, drainage and site details will not be reviewed for construction V
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Constrnction Standards"
and will be reviewed at the time of construction oermit aoolication.
UTILITIES
Comments:
IS. Please provide a time line that clearly illustrates when water and sewer V
services will be required to serve the proposed project. Your starting date for
the time line should be the date of City Commission approval. Also provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This timeline will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon
the proiect's completion, so please be as accurate as possible.
19. All utility easements and utility lines shall be shown on the site plan and t/
landscape plans (as well as the Water and Sewer Plans) so that we may
determine which appurtenances, trees or shrubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LDR, Chapter 7.5, Article I, Section IS.I gives
public utilities the authority to remove any trees that interfere with utility
services. either in utility easements or public rights-of-wav. ,
20. Palm Beach County Health Department permits will be required for the water ./
and sewer systems serving this proiect (CODE, Section 26-12).
21. Fire flow calculations will be required demonstrating the City Code t/
requirement of 1,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE. Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hvdrant can be eliminated. Excessivelv lonl!: dead-end
3rd REVIEW COMMENTS.doc
09/12/06
4
DEPARTMENTS INCLUDE REJECT
sections of main can lead to stagnation in the line and bacteriolol!icall!Towth.
22. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has /
sufficient coverage. the Central Building is almost covered, and the North
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above. usually requires overlapping fire hydrant coverage,
or a sprinkler system internal to each building in addition to the skeleton
system shown on the submitted plans. As noted above, a looped water supply
svstem will be required in order to achieve this.
23. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid /
for this project either upon the request for the Department's signature on the
Health Department application fonns or within seven (7) days of site plan
approval, whichever occurs first. This fee will be detennined based upon
final meter size, or expected demand.
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable /
water. As other sources are readily available City water shall not be allowed
for irril!ation.
25. Water and sewer lines to be owned and operated by the City shall be included /
within utility easements. Please show all proposed easements on the
engineering drawings, using a minimum width of 12 feet. The easements
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
26. This office will not require surety for installation of the water and sewer t/
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first pennanent meter is set. Note that
setting of a pennanent water meter is a prerequisite to obtaining the
Certificate of Occupancv.
27. A building penn it for this project shall not be issued until this Department has V
approved the plans for the water and/or sewer improvements required to
service this project. in accordance with the CODE, Section 26-15.
28. Sanitarv sewer main shall be PVC C-900 material. 7
29. The pfeps<'p,J pr;"~tg lift JttttiSH "..ill bG uv\"cvl.ab11;. All ;,al1;tc'u.l SiV,'@rQR the /
OeeM 95 Exeka~gp PI~ Jh411 b"" pJ;~MC. .{' v. _ 8 maiM will b~{,QI:Q~ the
property nftho ('11' nfJ:lnyntnn 11'l3rb. Provide appropriate easements for the
force main. Perftlits ..;II be requ"ed [UI tI", work within the CSXRR right-of-
wav.
3rd REVIEW COMMENTS.doc
09/12/06
5
DEPARTMENTS INCLUDE REJECT
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit application.
31. Verif)' size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the
drawings.
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
FIRE
Comments:
33. Provide a sheet, dedicated only to Fire Department concerns. Include on this
sheet, the location of all hydrants, the water supply information and
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building is
more than 200' from a hvdrant.
34. All construction gates shall have a Knox lock for Fire Department access. All
gates shall be 12' wide if for one-way traffic and 20' wide if for two-way
traffic. Before construction begins, the Fire Department will field test the
gate access with an engine. This engine must be able to access the site in one
turn, with no backing up. During the construction any road shall have turn
around capabilities so that no road will dead end with out a place for the
engine to turn around.
35. All roads shall be compacted to 32 tons to the point of vertical construction.
These roads shall be kept clear of debris so that emergency vehicles can
access any portion of the site. If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
responsible for the costs involved.
36. Provide a flow test, conducted by the Boynton Beach Fire Department that
shows a water supply of3,OOOgpm at 20psi. To schedule this test, call (561)
742-6600.
3rd REVIEW COMMENTS.doc
09112/06
6
DEPARTMENTS INCLUDE REJECT
37. Will this project be condominiums or one owner?
38. A fire alarm will be required throughout all buildings. The fire sprinkler
system shall be monitored by an approved Central Station and a UL Letter of
Certification or an FM Placard shall be obtained.
39. Early Power release will not be given unless all Life Safety equipment is
installed and working. The only exception is that the alann system does not
have to transmit to a central station at that point. but must sound locally to
notify workers to evacuate the buildin~.
POLICE
Comments:
40. Landscapin~ should not obstruct view from windows or walkwavs. v"
41. All exterior doors should be equipped with security hinges and should be V
reinforced with case hardened strike plate.
42. All buildings should be pre-wired for CCTV and alann systems. V
43. Glass perimeter doors should be equipped with case hardened guard rings to c../
protect the mortise lock cvlinder.
44. Rear doors should be eauipoed with 180-degree oeephole viewer. V
45. Mailboxes for buildings with multi-units should be placed in high activity and ~
consoicuous location for enhanced safety and natural surveillance of users.
BUILDING DIVISION
Comments:
46. Buildings, structures and parts thereof shall be designed to withstand the /"
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of permit application.
47. At time of permit review, submit signed and sealed working drawings of the V
prooosed construction.
48. Vertical accessibility to the mezzanine area shall be required per the 2004 FBC, /
Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations).
3rd REVIEW COMMENTS.doc
09/12/06
7
DEPARTMENTS INCLUDE REJECT
49. Identiry within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building. Veriry that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues: /'
A The design professional-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _' _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD's surface water management construction
development regulations."
B From the FIRM map, identiry in the site data the title of the flood zone
that the building is located within. Where applicable, speciry the base flood
elevation. If there is no base flood elevation, indicate that on the plans.
C Identity the floor elevation that the design professional has established for the
building within the footprint of the building that is shown on the drawings titled site
olan, floor olan and oavingfdraina~e (civil olans).
50. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may 1/
not, therefore, be used for landscape irrigation where other sources are readily
available.
51. A water-use permit from SFWMD is required for an irrigation system that v'
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time ofoermit aoolication, F.S. 373.216.
52. If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be i/
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article 11, Sections 26-34)
53. At time of permit review, submit separate surveys of each lot, parcel, or tract. l/
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot. parcel. or tract. The recorded
deed shall be submitted at time of nermit review.
54. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for V
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
bv the City Commission.
55. The full address of the project shall be submitted with the construction r/
documents at the time of permit application submittal. Ifthe project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the oroiect as it aooears on the Develooment Order must be
3rd REVIEW COMMENTS.doc
09112/06
8
DEPARTMENTS INCLUDE REJECT
noted on the buildin~ oermit aoolication at the time of application submittal. /
56. Submit irri~ation olans. /
PARKS AND RECREATION
Comments:
57. Plant List - separate trees and palms from shrubs and sod. Denote which V
soecies are native and the overall oercenta~e of native plants.
58. Irrigation must have 110% coverage, have a non-potable water source, have V
seoarate bubblers for each tree and have seoarate zones for sod and bed areas.
59. The use of large trees that need large root beds to support the large canopies \....-""
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 ]/2 feet wide. This is not
sufficient area to allow a root system needed for the oak canopy. It is
recommended that a different soecies be considered for these areas.
FORESTER/ENVIRONMENT ALIST
Comments:
Existin~ Trees List - Mana~ement Plan
Sheet L - 4
60. The Landscape Architect should tabulate the total diameter inches of existing V
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms, 5 Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet L-4 of 4. [Environmental
Regulations, Chapter 7.5, Article I Sec. 7.D.p. 2.]
Plant List Sheet L-4
61. All shade and palm trees must be listed in the description as a minimum of /
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-]4' to meet the 3" diameter requirement; or any clear trunk
(c.t.) specifications. [Environmental Regulations, Chapter 7.5, Article 11 Sec.
5.C.2.-1
62. All trees proposed under any existing overhead electric power lines must meet /
the FP & L Right tree in the Right Place manual selection for small trees
onlv. I
63. The shade tree planting detail should including a line indicating where the vi
diameter and height of all of the trees will be measured at time of planting
3rd REVIEW COMMENTS. doc
0911 2/06
9
DEPARTMENTS INCLUDE REJECT
and insoection.
64. The palm tree planting detail should include a line indicating where the clear V
trunk and height of all of the palm trees will be measured at time of planting
and inspection.
65. The shrub and groundcover planting detail should include a line indicating c/
where the height and spread of the shrubs and groundcover plants will be
measured at time of planting and inspection.
66. The applicant should add a note that all utility boxes or structures (not r/
currently known or shown on the plan) should be screened with Coco plum
hedge plants on three sides.
67. The applicant should show an elevation cross-section detail of the actual t,/
heights of the proposed landscape trees and vegetation (proper scale) at the
time of planting to visually buffer the proposed buildings and parking lot
from the 1-95 and SW 8th Street road rights-of-ways.
PLANNING AND ZONING
Comments:
~ At the technical advisory review team (TART) meeting, provide written V
responses to all staff's comments and questions. Submit 12 sets of revised
nlans. Each set should be folded and stapled.
)( At the technical advisory review team meeting, also provide a full set of v'
. reduced drawings, sized 8Y, inches by II inches of each plan. Save each plan
to a comoact disk and submit that to staff as well.
~taff considers these plans to be at the final stage of site plan review, the last V
tage prior to pennit review. As such, all comments need to be addressed and
shown on the plans orior to the TART meeting.
~t is the applicant's responsibility to ensure that the new site plan is publicly r/
advertised in accordance with Ordinance 04-007 and Ordinance 05-004.
'X.. Applicants who wish to utilize City electronic media equipment for V'
presentations at City Commission Public Hearings must notifY the Planning
and Zoning Department representative at least one week prior to the
scheduled meeting. Staff recommends using a PowerPoint presentation at the
Community Redevelopment Agency Board meeting.
~ pee0 tv ri ;1
. The New SI e Plan application indicates that "Boynton Industrial, LLC" is the
, nrooerty owner. Please provide a copv of the deed indicating the same.
~. The New Site Plan aoolication (11.2\ indicates the subject property is zoned V'
\
3rd REVIEW COMMENTS.doc
09/12/06
10
?
DEPARTMENTS INCLUDE REJECT
"MIC", which is incorrect because there is no such zoning district. The
correct zoning for the subject property is "M-I Light Industrial". Please
submit a revised application that indicates the correct zoning district.
Qrre applicant is responsible for compliance with Ordinance 05-060, the "Art
in Public Places" program and must demonstrate their participation. Please
advise how the project would comply. Would the a~~t ~Viding,:l
or paving the fee? Please advise. fYV.<.LI @/2DV OV\-lu
g "
r76 The traffic impact analysis must be approved by the Palm Beach County
Traffic Division for concurrency purposes prior to the issuance of any ./
building permits (Chapter 4. Section 8.F.). Also, staff has great concerns
over the type of vehicular traffic (i.e. tractor trailers, big rigs) that this project
is expected to generate. The site is nestled between the C.S.x. railroad tracks
deep within an established single-family community. The traffic analysis
states "the proposed redevelopment of the site...is expected to result in uses
that are primarily served by smaller single unit box trucks for pickups and
deliveries". While the analysis is eloquently articulated, staff still has
concerns over the legitimacy and practicality of its conclusions. In fact, the
anticipated performance of the site (i.e. truck traffic) may conflict and impact
the adjacent residential land use that the project would not meet the intent,
purpose, and protections that the zoning code provides. How can the city be
assured there would be no conflicts with large truck traffic? Deed or lease
restrictions? Please see Engineering comments regarding off-site roadway
imorovements.
y;
77 The size of the lot must match between the~, New Site Plan Application
(11.3), and site plan tabular data. All three (3) must items be consistent with
each other. Revise accordinglv.
XPlan revisions must be reflected on all appropriate sheets throughout the plan ~
set.
~earingS and distances (of perimeter property lines) were added to the site V
Ian (sheet A-O.I) but no survey was provided with the August 22, 2006
submittal. Staff could not determine their accuracy. Please provide surveys
for the next TART submittal.
~. Gross floor area is defined as follows: The total floor area of a building or a
use occupying part of a building, measured from center lines of partitions and /
exterior of outside walls. Gross floor area shall include all floor area
occupied by the main or principal use, plus any floor area occupied by
accessory uses such as storage rooms, maintenance and mechanical rooms,
offices, lounges, restrooms, lobbies, basements, mezzanines, and hallways.
The project's required parking is based on gross floor area, which would
include the meter rooms. Ensure that the parking tabular data is correct and
consistent.
~The survev shows that the site contains a "Cracker Barrel" billboard and a
'--"
7
3rd REVIEW COMMENTS.doc
09/12/06
II
~ 0
DEPA
INCLUDE REJECT
f t Department of
V' Abandonment and rededication of easements must be recorded prior to
issuance of a building permit for the project. Vacating easements may be
accomplished through the platting process, which is overseen by the
En ineerin Division of Public Works.
"p; A signature tree (such as a Yellow Elder, Tibouchina Granulsola, or
Bouganvillea) is required at both sides of the project entrance / exit on West
Ocean A venue. The signature trees must have six (6) feet of clear trunk if
placed within the safe-sight triangle (Chapter 7.5, Article 2. Section 5.N.).
Alternative plant material may be substituted if the above referenced plant
material is not available or undesired. Any substitution of plant material (for
the signature tree requirement) will be subject to the City Forester /
Environmentalist review and a roval.
~ The trees proposed around the office / warehouse buildings must be installed
at Yo the buildin hei ht of the buildin s 14 feet to 16 feet).
.x Include shrubs into the landscape design within pervious areas along the sides
for the three (3) buildings, as well as in areas labeled "sod" along east
buildin elevations.
. Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7.5, Article II, Section 5.P). Please categorize into the three (3)
categories as follows: I. Shade trees, 2. Palm trees, 3. Shrubs &
Groundcover. On the landscape plan, indicate the total quantities within each
cate 0 and their native ercenta es.
'"'- All shrubs and hedges are required to be at minimum 24 inches in height. 24
'\ inches in spread, and planted with tip-to-tip spacing measured immediately
after planting to adequately cover the planted areas on the site (Chapter 7.5,
Article II, Section 5.CA.
P J ^^f f
)( If potable water is used for irrigation purposes, the use of drought tolerant
plant species (per the South Florida Water Management District Manual)
shall be maximized, and the irrigation system should have water conserving
desi ns such as a dri s stem, where ossible.
tI
v
v
v
v
v
v'
v/
3rd REVIEW COMMENTS.doc
09/12/06
12
2
DEPARTMENTS INCLUDE REJECT
east building facades that would be visible from Interstate 95.
!~2. All proposed signage is subject to the Planning & Development Board and /'
V City Commission review and approval. Staff recommends that you submit a
master sign program that shows the number, location. dimensigns, exterior
finish,_and color(s) of all wall signs and freestanding sign. (The monument
sign must be located 10 feet from-all property Iin~
lK Staff recommends installing a cluster of palm trees near the dumpster i/'
enclosures in lieu of canODV trees.
94. Staff recommends enhancing the east fa9ade of all three (3) buildings due to
the fact that they will be highly visible from Interstate 95. A comparable
office / warehouse project by Levitt Corporation was recently constructed
along High Ridge Road (within the city) that contained unique qualities that
further enhanced its design. Likewise, staff is particularly conscious of this
project's current location because of its close proximity and visibility to
Interstate 95. Therefore, staff will be making design-related comments to
both the Planning & Development Board and the City Commission. Staff
understands that the constraints of this linear site (and location) and concurs
with the project intent to face the overhead doors eastward, opposite the
residential homes. However, if possible, staff recommends recessing the
overhead doors, approximately four (4) to five (5) feet from the main exterior
wall. Also, the overhead doors should be separated six (6) to eight (8) feet
from each other. This would help to break up the double doors and the
"look" of massive 24-foot wide overhead doors. Please consider the use of
low-profile overhead doors rather than wide panel doors. Finally, please
consider increasing the height of the entry panels to help break up the
"horizontal" characteristic of the project. The use of faux Bahama-style
shutters would look nice over the office windows.
95. West fa9ade requires additional architectural enhancement, as there is a great
deal of blank wall facing a residential neighborhood. A variation in roof line.
as shown on the east elevation, would also improve the west facade.
96. The cell tower compound on the site does not appear to have any landscaping
other than sod surrounding it. The fenced compound should have shrubs to a
minimum of half the height of the fence and trees every 20 feet on center.
97. All rooftop equipment must be completely screened from view at a minimum
distance of 600 feet.
MWR/elj
- correit N t7(~ Oil ~.fp.
S:IPlanningISHAREDIWPIPROJECTSIOcean 95 Exchange Park\3rd REVIEW COMMENTS.doc
-S~e-w~~~ ):KepI "r) -R-. r
t> 'AYz- 'il! - 5lA}LV\ I
(J; b~.1/1 -€>ffUA~ va hPd ~
ceil ~
s:,[6 AJ
@ ~fIClRs 1 /i.-I.-L-
"EPTEMBER 12TH, 2006
3rd REVIEW RESPONSES
HNM ARCHITECTURE, LLC
New Site Plan
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
DEPARTMENTS
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a). WILL COMPLY
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
PUBLIC WORKS - Forestry and Grounds
Comments:
3. Show sight triangles on the Landscape plans (LOR, Chapter 7.5, Article 11,
Section 5.H.) using a 25 foot sight triangle.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscape islands to prevent breaking and heaving at the tree's maturity.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-public uses on their properties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's "Plant
the Right Tree in the RiQht Place."
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrencv (Traffic Performance Standards Review)
:,EP I
') .
INCLUDE REJECT
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
2
DEPARTMENTS INCLUDE REJECT
from Palm Beach County Traffic Engineering.
9. Staff is concerned that the existing pavement structures in the area of the
proposed development may not be able to handle the additional heavy wheel
loadings of truck traffic and that the additional trucks could hann the existing
streets, adding to the tax burden of Boynton Beach residents. Because of
these impacts, Staff believes that it is entirely appropriate for the developer to
be required to mitigate the safety and potential structural impacts associated
with the additional truck traffic.
In Staffs opinion, the preferred truck route is along SW 8th St., south to West
Ocean Dr., then east-northeast to West Ocean Ave., and east to the Ocean 95
Exchange Plaza. This route is preferred because it has the greatest roadway
and right-of-way width and fewest turning movements that could negatively
affect private properties. Specific design detail must be give to pedestrian
safety in the vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available
south of Boynton Beach Blvd. Each of these alternatives possess' their own
pros and cons. Again, for strictly technical reasons, the Ocean Dr. corridor is
preferable. However, Staff would encourage public deliberation on this
matter because of the sensitive nature and public perceptions related to
increased truck volumes.
The analysis should include the extent and cost of road improvements', need
for additional right-of-way, ability of the roadways to accommodate various
truck sizes, and number of residents impacted by each alternative.
ENGINEERING DIVISION
Comments:
. . and/or corrections to the plans shall be
10. All comments requlflng changes
reflected on all appropriate sheets. REVISION CLOUDS PROVIDED
II. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory Review
Team (TART) process does not ensure that additional comments may not be
generated by the Commission and at pennit review. NOTED
12. Provide written and graphic scales on all sheets. PROVIDED
13. At time of pennitting, provide a drainage plan in accordance with the LDR,
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stonnwater
management.
14. Provide an engineer's certification on the Drainage Plan as specified in LDR,
Chapter 4, Section 7.F.2.
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
3
, ,
DEPARTMENTS INCLUDE REJECT
IS. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
oermitting.
16. Show on plans (and identify) the 4S-inch RCP drainage pipe and associated
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identify and resolve these conflicts.
PIPE HAS BEEN IDENTIFIED
17. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction oermit application.
UTILITIES
Comments:
IS. Please provide a time line that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date for
the timeline should be the date of City Commission approval. Also provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This timeline will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon
the oroiect's completion, so olease be as accurate as possible.
19.
20. Palm Beach County Health Department permits will be required for the water
and sewer systems serving this project (CODE, Section 26-12).
WILL COMPLY
21. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hydrant can be eliminated. Excessively long dead-end
sections of main can lead to stagnation in the line and bacteriological growth.
22. The LOR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has
sufficient coverage, the Central Building is almost covered, and the North
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
4
, .
DEPARTMENTS INCLUDE REJECT
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1.500 gpm
requirement noted above, usually requires overlapping fire hydrant coverage,
or a sprinkler system internal to each building in addition to the skeleton
system shown on the submitted plans. As noted above, a looped water supply
system will be reuuired in order to achieve this.
23. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or exoected demand.
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. As other sources are readily available City water shall not be allowed
for irrigation.
25. Water and sewer lines to be owned and operated by the City shall be included
within utility easements. Please show all proposed easements on the
engineering drawings, using a minimum width of 12 feet. The easements
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
26. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occuoancy.
27. A building permit for this project shall not be issued until this Department has
approved the plans for the water and/or sewer improvements required to
service this oroiect, in accordance with the CODE, Section 26-15. NOTED
28. Sanitary sewer main shall be PVC C-900 material.
29. The proposed private lift station will be acceptable. All sanitary sewer on the
Ocean 95 Exchange Plaza shall be private. Force main will become the
property of the City of Boynton Beach. Provide appropriate easements for the
force main. Permits will be required for the work within the CSXRR right-of-
way.
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction oermit application.
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
5
, ,
DEPARTMENTS INCLUDE REJECT
31. VerifY size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the
drawings.
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
FIRE
Comments:
33. Provide a sheet, dedicated only to Fire Department concerns. Include on this
sheet, the location of all hydrants, the water supply information and
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building is
,nore than 200' from a hydrant. ADDED A 0.3 SITE PLAN-FIRE DEPT
34. All construction gates shall have a Knox lock for Fire Department access. All
gates shall be 12' wide if for one-way traffic and 20' wide if for two-way
traffic. Before construction begins, the Fire Department will field test the
gate access with an engine. This engine must be able to access the site in one
turn, with no backing up. During the construction any road shall have turn
around capabilities so that no road will dead end with out a place for the
engine to turn around. WILL COMPLY
35. All roads shall be compacted to 32 tons to the point of vertical construction.
These roads shall be kept clear of debris so that emergency vehicles can
access any portion of the site. If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
resoonsible for the costs involved.
36. Provide a flow test, conducted by the Boynton Beach Fire Department that
shows a water supply of 3,000gpm at 20psi. To schedule this test, call (561)
742-6600. WILL COMPLY
37. Will this proiect be condominiums or one owner?
38. A fire alarm will be required throughout all buildings. The fire sprinkler
system shall be monitored by an approved Central Station and a UL Letter of
Certification or an FM Placard shall be obtained. WILL COMPLY
39. Early Power release will not be given unless all Life Safety equipment is
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
6
I I
DEPARTMENTS INCLUDE REJECT
installed and working. The only exception is that the alarm system does not
have to transmit to a central station at that point, but must sound locally to
notify workers to evacuate the building. NOTED
POLICE
Comments:
40. Landscaping should not obstruct view from windows or walkways. NOTED
41. All exterior doors should be equipped with security hinges and should be
reinforced with case hardened strike plate. NOTED
42. All buildings should be ore-wired for CCTV and alarm svstems. NOTED
43. Glass perimeter doors should be equipped with case hardened guard rings to
orotect the mortise lock cvlinder. NOTED
44. Rear doors should be eauiooed with l80-degree oeeohole viewer. NOTED
45. Mailboxes for buildings with multi-units should be placed in high activity and
conspicuous location for enhanced safety and natural surveillance of users.
NOTED
BUILDING DIVISION
Comments:
46. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of oermit aoolication. NOTED
47. At time of permit review, submit signed and sealed working drawings of the
oroposed construction. NOTED
48. Vertical accessibility to the mezzanine area shall be required per the 2004 FBC,
Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations). NOTED
49. Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building. Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A The design professional-of-record for the proiect shall add the following
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
7
, ,
DEPARTMENTS INCLUDE REJECT
text to the site data. "The proposed finish floor elevation _. _ NGVD is
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD's surface water management construction
development regulations."
B From the FIRM map, identifY in the site data the title of the flood zone
that the building is located within. Where applicable, specifY the base flood
elevation. Iflhere is no base flood elevation, indicate that on the plans.
C Identify the floor elevation that the design professional has established for the
building within the footprint of the building that is shown on the drawings titled site
plan, floor plan and paving/drainage (civil plans).
PROVIDED SEE GENERAL NOTES ON SHEET AO.l
50. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may
not, therefore, be used for landscape irrigation where other sources are readily
available.
51. A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time of permit application, F.S. 373.216. NOTED
52. If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO. Chapter 26, Article II, Sections 26-34)
53. At time of permit review, submit separate surveys of each lot, parcel, or tract.
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot, parcel, or tract. The recorded
deed shall be submitted at time of permit review. NOTED
54. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the City Commission. NOTED
55. The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. Iflhe project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
NOTED
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09108/06
8
I I
DEPARTMENTS INCLUDE REJECT
56. Submit irril!ation plans.
PARKS AND RECREATION
Comments:
57. Plant List - separate trees and palms from shrubs and sod. Denote which
snecies are native and the overall nercental!e of native plants.
58. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have senarate zones for sod and bed areas.
59. The use of large trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide. This is not
sufficient area to allow a root system needed for the oak canopy. It is
recommended that a different snecies be considered for these areas.
FORESTERlENVIRONMENT ALlST
Comments:
Existinl! Trees List - Manal!ement Plan
Sheet L - 4
60. The Landscape Architect should tabulate the total diameter inches of existing
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms, 5 Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet LA of 4. [Environmental
Regulations, Chapter 7.5, Article I Sec. 7.D.p. 2.]
Plant List Sheet L-4
61. All shade and palm trees must be listed in the description as a minimum of
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk
(c.l.) specifications. [Environmental Regulations, Chapter 7.5, Article II Sec.
5.C. 2.]
62. All trees proposed under any existing overhead electric power lines must meet
the FP & L Ril!ht tree in the Ril!ht Place manual selection for small trees
onlv.
63. The shade tree planting detail should including a line indicating where the
diameter and height of all of the trees will be measured at time of planting
and insnection.
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
9
I I
DEPARTMENTS INCLUDE REJECT
64. The palm tree planting detail should include a line indicating where the clear
trunk and height of all of the palm trees will be measured at time of planting
and insoection.
65. The shrub and groundcover planting detail should include a line indicating
where the height and spread of the shrubs and groundcover plants will be
measured at time of plantin!! and insnection.
66. The applicant should add a note that all utility boxes or structures (not
currently known or shown on the plan) should be screened with Coco plum
heMe olants on three sides.
67. The applicant should show an elevation cross-section detail of the actual
heights of the proposed landscape trees and vegetation (proper scale) at the
time of planting to visually buffer the proposed buildings and parking lot
from the 1-95 and SW Sth Street road rights-of-ways.
PLANNING AND ZONING
Comments:
6S. At the technical advisory review team (TART) meeting, provide written
responses to all staff s comments and questions. Submit 12 sets of revised
plans. Each set should be folded and stapled. PROVIDED
69. At the technical advisory review team meeting, also provide a full set of
reduced drawings, sized SY, inches by 11 inches of each plan. Save each plan
to a compact disk and submit that to staff as well. PROVIDED
70. Staff considers these plans to be at the final stage of site plan review, the last
stage prior to permit review. As such, all comments need to be addressed and
shown on the olans prior to the TART meeting. NOTED
71. It is the applicant's responsibility to ensure that the new site plan is publicly
advertised in accordance with Ordinance 04-007 and Ord 05-004. NOTED
72. Applicants who wish to utilize City electronic media equipment for
presentations at City Commission Public Hearings must notifY the Planning
and Zoning Department representative at least one week prior to the
scheduled meeting. Staff recommends using a PowerPoint presentation at the
Community Redevelopment Agencv Board meeting. NOTED
73. The New Site Plan application indicates that "Boynton Industrial, LLC" is the
mooertv owner. Provide copv ofthe deed indicating thesame. PROVIDED
74. The New Site Plan application (11.2) indicates the subject property is zoned
"MIC", which is incorrect because there is no such zoning district. The
correct zonin!! for the subiect property is "M-l Li!!ht Industrial". Please
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
10
, ,
DEPARTMENTS INCLUDE REJECT
submit a revised application that indicates the correct zoning district.
REVISED APPLICATION ENCLOSED
75. The applicant is responsible for compliance with Ordinance 05-060, the "Art
in Public Places" program and must demonstrate their participation. Please
advise how the project would comply. Would the applicant be providing art
or oaving the fee? Please advise.
76. The traffic impact analysis must be approved by the Palm Beach County
Traffic Division for concurrency purposes prior to the issuance of any
building permits (Chapter 4. Section 8.F.). Also, staff has great concerns
over the type of vehicular traffic (i.e. tractor trailers, big rigs) that this project
is expected to generate. The site is nestled between the C.S.X. railroad tracks
deep within an established single-family community. The traffic analysis
states "the proposed redevelopment of the site... is expected to result in uses
that are primarily served by smaller single unit box trucks for pickups and
deliveries". While the analysis is eloquently articulated, staff still has
concerns over the legitimacy and practicality of its conclusions. In fact, the
anticipated performance of the site (Le. truck traffic) may conflict and impact
the adjacent residential land use that the project would not meet the intent,
purpose, and protections that the zoning code provides. How can the city be
assured there would be no conflicts with large truck traffic? Deed or lease
restrictions? Please see Engineering comments regarding off-site roadway
imorovements.
77. The size of the lot must match between the survey, New Site Plan Application
(IIJ), and site plan tabular data. All three (3) must items be consistent with
each other. Revise accordingly. REVISED TO 294,997 SF 6. 77 ACRES
78. Plan revisions must be reflected on all appropriate sheets throughout the plan
set. PROVIDED REVISION CLOUDS
79. Bearings and distances (of perimeter property lines) were added to the site
plan (sheet A-O.l) but no survey was provided with the August 22, 2006
submittal. Staff could not determine their accuracy. Please provide surveys
for the next TART submittal. SURVEYS ENCLOSED
80. Gross floor area is defined as follows: The total floor area of a building or a
use occupying part of a building, measured from centerlines of partitions and
exterior of outside walls. Gross floor area shall include all floor area
occupied by the main or principal use, plus any floor area occupied by
accessory uses such as storage rooms, maintenance and mechanical rooms,
offices, lounges, restrooms, lobbies, basements, mezzanines, and hallways.
The project's required parking is based on gross floor area, which would
include the meter rooms. Ensure that the parking tabular data is correct and
consistent. REVISED PARKNG CALCS SEE COVER AND AO.l
81. The survev shows that the site contains a "Cracker Barrel" billboard and a
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
II
, .
DEPARTMENTS INCLUDE REJECT
ce 11 tower. Will the billboard be removed? If not, when the does the lease
agreement exoire?
82. Will an on-site lift station be required as a result of this development? If so,
indicate its location on the site olan. LIFT STATION INDICATED
83. A unity of title may be required. The Building Division of the Department of
Development will determine its aoolicability. NOTED
84. Abandonment and rededication of easements must be recorded prior to
issuance of a building permit for the project. Vacating easements may be
accomplished through the platting process, which IS overseen by the
Engineering Division of Public Works. NOTED
85. A signature tree (such as a Yellow Elder, Tibouchina Granulsola, or
Bouganvillea) is required at both sides of the project entrance / exit on West
Ocean Avenue. The signature trees must have six (6) feet of clear trunk if
placed within the safe-sight triangle (Chapter 7.5, Article 2, Section 5.N.).
Alternative plant material may be substituted if the above referenced plant
material is not available or undesired. Any substitution of plant material (for
the signature tree requirement) will be subject to the City Forester /
Envira:1mentalist review and anoroval.
86. The trees proposed around the office / warehouse buildings must be installed
at \I, the building height of the buildings (14 feet to 16 feet).
87. Include shrubs into the landscape design within pervious areas along the sides
for the three (3) buildings, as well as in areas labeled "sod" along east
building elevations.
88. Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7.5, Article II, Section 5.P). Please categorize into the three (3)
categories as follows: 1. Shade trees, 2. Palm trees, 3. Shrubs &
Groundcover. On the landscape plan, indicate the total quantities within each
category and their native nercentages.
89. All shrubs and hedges are required to be at minimum 24 inches in height, 24
inches in spread, and planted with tip-to-tip spacing measured immediately
after planting to adequately cover the planted areas on the site (Chapter 7.5,
Article II, Section 5.CA.I.
90. If potable water is used for irrigation purposes, the use of drought tolerant
plant species (per the South Florida Water Management District Manual)
shall be maximized, and the irrigation system should have water conserving
designs (such as a drio svstem), where possible.
91. Feature lighting emphasizing plants, trees, barriers, entrances, and exits is
encouraged (Chaoter 9, Section 10.F.3.). This is especially pertinent for the
2006-09-12 3rd REVIEW RESPONSES-HNM.doc
09/08/06
12
. .
DEPARTMENTS INCLUDE REJECT
east building facades that would be visible from Interstate 95.
GROUND MOUNTED LIGHTING FEATURING SIGNS PROVIDED
92. All proposed signage is subject to the Planning & Development Board and
City Commission review and approval. Staff recommends that you submit a
master sign program that shows the number, location, dimensions, exterior
finish, and color(s) of all wall signs and freestanding sign. The monument
sign must be located 10 feet from all property lines.
SIGNAGE DETAILS PROVIDED AO.2
93. Staff recommends installing a cluster of palm trees near the dumpster
enclosures in lieu of canonv trees.
94. Staff recommends enhancing the east fa,ade of all three (3) buildings due to
the fact that they will be highly visible from Interstate 95. A comparable
office / warehouse project by Levitt Corporation was recently constructed
along High Ridge Road (within the city) that contained unique qualities that
further enhanced its design. Likewise, staff is particularly conscious of this
project's current location because of its close proximity and visibility to
Interstate 95. Therefore, staff will be making design-related comments to
both the Planning & Development Board and the City Commission. Staff
understands that the constmints of this linear site (and location) and concurs
with the project intent to face the overhead doors eastward, opposite the
residential homes. However, if possible, staff recommends recessing the
overhead doors, approximately four (4) to five (5) feet from the main exterior
wall. Also, the overhead doors should be separated six (6) to eight (8) feet
from each other. This would help to break up the double doors and the
"look" of massive 24-foot wide overhead doors. Please consider the use of
low-profile overhead doors rather than wide panel doors. Finally, please
consider increasing the height of the entry panels to help break up the
"horizontal" characteristic of the project. The use of faux Bahama-style
shutters would look nice over the office windows.
3D RENDERING PROVIDED
95. West fa,ade requires additional architectural enhancement, as there is a great
deal of blank wall facing a residential neighborhood. A variation in roof line,
as shown on the east elevation, would also improve the west fa,ade.
ADDITIONAL LANDSCAPE FOR SCREEENING PROVIDED
96. The cell tower compound on the site does not appear to have any landscaping
other than sod surrounding it. The fenced compound should have shrubs to a
minimum of half the height of the fence and trees every 20 feet on center.
97. All rooftop equipment must be completely screened from view at a minimum
distance of 600 feet. NOTED
MWR/elj
S:\Planning\SHAREDlWP\PROJECTS\Ocean 95 Exchange Park\3rd REVIEW COMMENTS.doc
3rd REVIEW COMMENTS.doc
09/11/06
2
,~cP
/.
DEPARTMENTS . INCLUDE REJECT
9. Staff is concerned that the existing pavement structures in the area of the
proposed development may not be able to handle the additional heavy wheel
loadings of truck traffic and that the additional trucks could harm the existing
streets, adding to the tax burden of Boynton Beach residents. Because of
these impacts, Staff believes that it is entirely appropriate for the developer to
be required to mitigate the safety and potential structural impacts associated
with the additional truck traffic.
In Staff s opinion, the preferred truck route is along SW 8th St., south to West
Ocean Dr., then east-northeast to West Ocean Ave., and east to the Ocean 95
Exchange Plaza. This route is preferred because it has the greatest roadway
and right-of-way width and fewest turning movements that could negatively
affect private properties. Specific design detail must be give to pedestrian
safety in the vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available
south of Boynton Beach Blvd. Each of these alternatives possess' their own
pros and cons. Again, for strictly technical reasons, the Ocean Dr. corridor is
preferable. However, Staff would encourage public deliberation on this
matter because of the sensitive nature and public perceptions related to
increased truck volumes.
The analysis should include the extent and cost of road improvements', need
for additional right-of-way, ability of the roadways to accommodate various
truck sizes, and number of residents impacted by each alternative.
ENGINEERING DIVISION
Comments:
10. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
Comment acknowled!!ed
II. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory Review
Team (TART) process does not ensure that additional comments may not be
generated by the Commission and at permit review.
Comment acknowledl!ed
12. Provide written and graphic scales on all sheets.
Written and l!;raohic scales have been included on all sheets.
13. At time of permitting, provide a drainage plan in accordance with the LDR,
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stormwater
management.
Comment acknowledl!ed
3rd REVIEW COMMENTS.doc
09/1 1/06
3
DEPARTMENTS INCLUDE REJECT
14. Provide an engineer's certification on the Drainage Plan as specified in LOR,
Chapter 4, Section 7.F.2.
A certification has been added to the Pavinl! and Drainal!e Plans
I S. Full drainage plans, including drainage calculations, in accordance with the
LOR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
Comment acknowledl!ed
16. Show on plans (and identifY) the 4S-inch RCP drainage pipe and associated
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identify and resolve these conflicts.
The existing 48" RCP location has been added to the Plans. Elevations of
proposed utilities will be designed with adequate clearances on the final
Plans,
17. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction pennit application.
Comment acknowledged. Detail sheets have been omitted from this plan
submission.
UTILITIES
Comments:
IS. Please provide a timeline that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date for
the timeline should be the date of City Commission approvaL Also provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This timeline will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon
the project's completion, so please be as accurate as Dossible.
19. All utility easements and utility lines shall be shown on the site plan and
landscape plans (as well as the Water and Sewer Plans) so that we may
detennine which appurtenances, trees or shrubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LOR, Chapter 7.5, Article I, Section IS.I gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
Proposed utility easements have been nrovided to the Landscane Architect to
3rd REVIEW COMMENTS.doc
0911 1/06
4
DEPARTMENTS INCLUDE REJECT
include on his Dlans.
20. Palm Beach County Health Department pennits will be required for the water
and sewer systems serving this project (CODE, Section 26-12).
Comment acknowlede:ed
21. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hydrant can be eliminated. Excessively long dead-end
sections of main can lead to stagnation in the line and bacteriological growth.
A fire flow test has been ordered from the Fire Department. The requested
fire flow calculations will be based upon the results of the fire flow test.
22. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has
sufficient coverage, the Central Building is almost covered, and the North
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above, usually requires overlapping fire hydrant coverage,
or a sprinkler system internal to each building in addition to the skeleton
system shown on the submitted plans. As noted above, a looped water supply
system will be required in order to achieve this.
A looped water supply system and additional fire hydrants have been added
to tbe plans in order to comply with the reQuested criteria.
23. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
Comment acknowledged
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. As other sources are readily available City water shall not be allowed
for irrigation.
Comment acknowlede:ed
25. Water and sewer lines to be owned and operated by the City shall be included
within utility easements. Please show all proposed easements on the
engineering drawings, using a mimmum width of 12 feet. The easements
3rd REVIEW COMMENTS.doc
09/11/06
5
DEPARTMENTS INCLUDE REJECT
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
The requested utilitv easements have been added to the Plans.
26. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
Comment acknowledged
27. A building pennit for this project shall not be issued until this Department has
approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
Comment acknowled!!ed
28. Sanitary sewer main shall be PYC C-900 material.
Sewer mains have been changed to PVC C-900.
29. The proposed private lift station will be acceptable. All sanitary sewer on the
Ocean 95 Exchange Plaza shall be private. Force main will become the
property of the City of Boynton Beach. Provide appropriate easements for the
force main. Permits will be required for the work within the CSXRR right -of-
way.
An easement or agreement from CSXRR will be provided for the proposed
utilities crossin!! the Rail Road tracks.
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit application.
Comment acknowledged. Utility Details have been removed from this
submittal.
31. Yerify size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the
drawings.
The South connection is 8". The North connection is 6".
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
The replacement Hne has been chan!!ed to 8".
3rd REVIEW COMMENTS.doc
09/11/06
2 'on I n .-
'-'
DEPARTMENTS INCLUDE. REJECT
9. Staff is concerned that the existing pavement structures in the area of the
proposed development may not be able to handle the additional heavy wheel
loadings of truck traffic and that the additional trucks could harm the existing
streets, adding to the tax burden of Boynton Beach residents. Because of
these impacts, Staff believes that it is entirely appropriate for the developer to
be required to mitigate the safety and potential structural impacts associated
with the additional truck traffic.
In Staff's opinion, the preferred truck route is along SW 8th St., south to West
Ocean Dr., then east-northeast to West Ocean Ave., and east to the Ocean 95
Exchange Plaza. This route is preferred because it has the greatest roadway
and right-of-way width and fewest turning movements that could negatively
affect private properties. Specific design detail must be give to pedestrian
safety in the vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available
south of Boynton Beach Blvd. Each of these alternatives possess' their own
pros and cons. Again, for strictly technical reasons, the Ocean Dr. corridor is
preferable. However, Staff would encourage public deliberation on this
matter because of the sensitive nature and public perceptions related to
increased truck volumes.
The analysis should include the extent and cost of road improvements', need
for additional right-of-way, ability of the roadways to accommodate various
truck sizes, and number of residents impacted by each alternative.
ENGINEERING DIVISION
Comments:
10. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
Comment acknowled!!ed
II. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory Review
Team (TART) process does not ensure that additional comments may not be
generated by the Commission and at permit review.
Comment acknowledl!ed
12. Provide written and graphic scales on all sheets.
Written and graphic scales have been included on all sheets.
13. At time of permitting, provide a drainage plan in accordance with the LDR,
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stormwater
management.
Comment acknowledl!ed
3rd REVIEW COMMENTS.doc
0911 1106
3
DEPARTMENTS INCLUDE REJECT
14. Provide an engineer's certification on the Drainage Plan as specified in LDR,
Chapter 4, Section 7.F.2.
A certification has been added to the Pavinl! and Drainal!e Plans
15. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
Comment acknowledged
16. Show on plans (and identifY) the 48-inch RCP drainage pipe and associated
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identify and resolve these conflicts.
The existing 48" RCP location has been added to the Plans. Elevations of
proposed utilities will be designed with adequate clearances on the final
Plans.
17. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
Comment acknowledged. Detail sheets have been omitted from this plan
submission.
UTILITIES
Comments:
18. Please provide a timeline that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date for
the timeline should be the date of City Commission approval. Also provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This timeline will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon
the project's completion, so please be as accurate as possible.
19. All utility easements and utility lines shall be shown on the site plan and
landscape plans (as well as the Water and Sewer Plans) so that we may
determine which appurtenances, trees or shrubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
Proposed utility easements have been orovided to the Landscaoe Architect to
3rd REVIEW COMMENTS.doc
09/11/06
4
DEPARTMENTS INCLUDE REJECT
include on his olans.
20. Palm Beach County Health Department pennits will be required for the water
and sewer systems serving this project (CODE, Section 26-12).
Comment acknowledl!ed
21. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hydrant can be eliminated. Excessively long dead-end
sections of main can lead to stagnation in the line and bacteriological growth.
A fire flow test has been ordered from the Fire Department. The requested
fire flow calculations will be based uoon the results of the fire flow test.
22. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has
sufficient coverage, the Central Building is almost covered, and the North
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above, usually requires overlapping fire hydrant coverage,
or a sprinkler system internal to each building in addition to the skeleton
system shown on the submitted plans. As noted above, a looped water supply
system will be required in order to achieve this.
A looped water supply system aod additional fire hydrants have been added
to the plans in order to comolv with the relluested criteria.
23. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of site plan
approval, whichever occurs first. This fee will be detennined based upon
final meter size, or expected demand.
Comment acknowledged
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. As other sources are readily available City water shall not be allowed
for irrigation.
Comment acknowledged
25. Water and sewer lines to be owned and operated by the City shall be included
within utility easements. Please show all proposed easements on the
engineering drawings, using a minimum width of 12 feet. The easements
3rd REVIEW COMMENTS.doc
09/11106
5
. .
DEPARTMENTS INCLUDE REJECT
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
The requested utilitv easements have been added to the Plans.
26. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
Comment acknowledl!ed
27. A building permit for this project shall not be issued until this Department has
approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
Comment acknowledl!ed
28. Sanitary sewer main shall be rvc C-900 material.
Sewer mains have been chanl!ed to PVC C-900.
29. The proposed private lift station will be acceptable. All sanitary sewer on the
Ocean 95 Exchange Plaza shall be private. Force main will become the
property of the City of Boynton Beach. Provide appropriate easements for the
force main. Permits will be required for the work within the CSXRR right-of-
way.
An easement or agreement from CSXRR will be provided for the proposed
utilities crossin" the Rail Road tracks.
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit application.
Comment acknowledged. Utility Details have been removed from this
submittal.
31. VerifY size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the
drawings.
The South connection is 8". The North connection is 6".
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
The renlacement line has been chanl!ed to 8".
SEP , 2
dave bodker
landscape architecture/planning inc.
75 rl e sixth avenue, suite 209
uelr'ClY IJt:!ClCh, flol'ida 33483
561'2l6.S311-(fax) 561 2763869
September 12, 2006
City of Boynton Beach
Re: Ocean 95 Exchange Plaza
Response to Comments dated Aug!Jst 22, 2006
To whom it may concern:
The responses below correspond to the comments by department and comment
number.
Public Works - Solid Waste:
2. The planting plan has been rearranged or different species have been used so
that there are no vertical conflicts with the dumpster and canopy trees.
Public Works - Forestry and Grounds:
3. A sight triangle has been indicated on the planting plan.
4. Canopy trees have been moved back from drive isles to minimize potential
vertical conflicts with high profile vehicles.
5. Gumbo limbos have been eliminated from the pl~nting plan.
6. Live oaks and Gumbo limbos have not been used along the east or west
property lines.
7. The overhead electrical lines will be placed underground.
Enaineerina Division:
12. Written and graphic scales are on all of the planting plan sheets.
Utilitv Department:
19. All utility easements and utility lines are shown on the planting plans.
Police Department:
40. We have attempted to provide planting that does not obstruct the view from
windows or walkways.
Ocean 95 Exchange Plaza
Response to Comments dated August 22, 2006
September 12, 2006
Page 2
Buildina Division:
50. The irrigation system will use a pump and well.
51. A Water Use Permit will be applied for by the engineer. The landscape
architect will provide the water use calculations.
56. Irrigation plans will be submitted when the site plan is finalized.
Parks and Recreation:
57. The plant separates the trees and palms from the shrubs and groundcover. We
have denoted the native species and the overall percentage of native plants.
58. We specify 150% overlap coverage for the irrigation system. The system will
have a pump and well as its water source. Note #3 on our planting plans
specifies that each tree will have a separate bubbler and that there will be
separate zones for sad areas and shrub and groundcover beds. The irrigation
plan will incorporate these items.
59. Smaller species of trees have been specified in the small planting islands.
Forester/Environmentalist:
60. An existing tree list ison the planting plan and it identifies the seven trees which
are to be removed. The replacement trees have been noted as replacement
trees on the planting plan.
61. The designation of 3. dbh has been used in the plant specification in the plant
list. The contractor is required to meet all requirements of the specification.
62. The overhead electric powerlines are going to be placed underground.
63. "Plant Size Details. depicting the height, spread, clear trunk, and dbh have
been added to the planting plan.
64. See #63 above.
65. See #63 above.
66. This note has been added.
67. Elevations have been shown from 1-95,. SW 8th Street, and from the west
property line.
Plannina and Zonina:
68. 12 sets of plans will be submitted. Response to comments has been submitted.
69. An 8 %. x 11" set has been submitted and a CD has been submitted.
85. A signature tree (yellow elder) has been planted on both sides of the project
entrance. It has been specified with 6' of clear trunk.
86. The trees proposed around the officelwarehouse buildings have been specified
with a height of 14' to 16'.
87. Shrubs and groundcovers have been incorporated into the landscape design
within the pervious areas along the sides of the three buildings.
,
Ocean 95 Exchange Plaza
Response to Comments dated August 22, 2006
September 12, 2006
Page 3
88. 50% of all required landscape materials are native species.
89. Required shrubs and hedges have been specified at 24" minimum height and
24" minimum spread with 24" o.c. spacing.
90. Potable water will not be used for irrigation purposes.
93. Palm trees have been used near the dumpster enclosure in lieu of canopy
trees.
94. The 1-95 perimeter buffer contains 43 more trees than are required. In addition
to this, 46 more trees than are required within the vehicular use area have been
utilized to enhance the east elevation of the building.
95. There are 13 more trees than required along the west property line. In addition
to this, hedges and clusters of bamboo have been utilized to enhance and
soften the western elevation of the building.
96. The cell tower fence will have vines planted on it. The vines are specified with
48" . runners.
ave Bodker
15205.601
Page 1 of 1
Johnson, Eric
From: Logan, Laurinda
Sent: Friday, September 15, 2006 1 :03 PM
To: Johnson, Eric
Cc: Livergood, Jeffrey; Kelley, David; Breese, Ed
Subject: Ocean 95 Exchange Plaza
Eric,
I believe I have finalized the COA to use in place of the comment we previously had regarding the truck
route. I spoke with Chris Hagen at KH this morning to go over what was needed for the plans for the
P&D Board and Commission. He will be renumbering/relabeling the options so that Option 1A is our
preferred option (currently our preferred option is labeled 1 B.) He is also only putting in three of the
four options. We will not be including the option that starts at Woolbright and comes north to get to the
site. He will keep that option should it need to be presented during one of the public hearings at P&D
or Commission. He is also preparing a cover sheet for the "Off-Site Truck Route Improvements" that
will include typical roadway sections (one with curb & gutter and one with a swale section), notes and a
legend. I asked him to contact you directly to find out what timing was needed for KH to meetr our
schedule for submittal to P&D.
Here's the proposed COA:
Provide Off-Site Roadway Improvement plans for the truck route to be used to access this project using
Option 1A (SW 8th St. and W. Ocean Dr.) Roadway improvements may include, at a minimum, but not
be limited to, design of two 12-ft. travel lanes, drainage, sidewalk, signing, and striping as required and
determined necessary along the proposed truck route. Design shall be finalized after public input and
approval by the appropriate governing boards and Commission.
Let me know if you need anything else from me on this project. Also please let me know what P&D
meeting and Commission meetings they will be targeting. Thank you.
LClurtV\,c\Cl
9/1512006
Page 1 of2
Johnson, Eric
From: Logan, Laurinda
Thursday, September 14, 2006 2:16 PM
'Chris.Heggen@kimley-horn.com'; Johnson, Eric
cfarnell@genesisdevelopmenl.org; jmayo@hnm-architecture.com; dblapinc@aol.com;
a_desimone1@yahoo.com; dsteven2@ch2m.com; Lance.Petrie@ch2m.com
Subject: RE: Ocean 95 Exchange Park - truck route schematics
Sent:
To:
Cc:
Chris,
Thanks for providing the four alternative truck routes for my review. I see that Eric has sent you an e-mail
regarding what we will need for the plans. I will be writing a new condition of approval (COA) regardomg the truck
route. You will be provided that comment after it has been sent to P&Z. As you know Staff prefers Option #1 B,
along SW 8th SI. and W. Ocean Dr., and that alternative will be emphasized in the COA. As we discussed
yesterday we will finalize design of the truck route after it has been through the P&D Board and Commission.
During that process there will be public hearings and the public will have a chance to see and comment upon
them. The final decision is the public's and our elected officials. Thanks for your help with providing this
information they will need to make an informed decision.
I look forward to talking to you again.
LU"vl",ciu Lo0~'"
se",lov s"'0"",eer
C.lt(j of-g,o(j",to", -g,wcfl
1>"bllc WOYR..s/s"'0"",eev""'0
5b:1-742-b322
5b:1-742-b225 (fux)
lo'lu ~J@cl. bot! ",to",- bw cfl. fl. c~s.
From: Chris. Heggen@kimley-horn.com [mallto:Chris.Heggen@kimley-horn.com]
Sent: Wednesday, September 13, 2006 3:56 PM
To: Johnson, Eric; Logan, Laurinda
Cc: darnell@genesisdevelopment.org; jmayo@hnm-architecture.com; dblapinc@aol.com;
a_desimonel@yahoo.com; dsteven2@ch2m.com; Lance.Petrie@ch2m.com
Subject: RE: Ocean 95 Exchange Park - truck route schematics
E-mail 2 of 2.
Please let me know if there are comments or questions.
-Chris
Kimley-Horn and Associates, Inc.
ChristopherW. Heggen, P,E. (FL)
4431 Embarcadero Drive
West Palm Beach, FL 33407
9/14/2006
Johnson, Eric
From:
Sent:
To:
Subject:
Eric
Mazzella, Pete
Thursday, September 14, 200610:54 AM
Johnson, Eric
RE: Ocean 95 Exchange Plaza2
I would stick with the office number for now. Some warehouse uses can demand a lot of water, so this is really a best
guess at this point.
Take care.
Pete
From:
Sent:
To:
Subject:
Johnson, Eric
Thursday, September 14, 2006 1O:S2 AM
Mazzella, Pete
RE: Ocean 95 Exchange Plaza2
Everything is great with me. Thanks,
Question: Do we want to go with the office number as the primary? I should mention that this will be primarily constructed
as an industrial project (110,615 square feet of warehouse) with 23,296 square feet of accessory office. You decide.
Either way, it's fine by me. Thanks again...
ej
From:
Sent:
To:
Subject:
Eric
Mazzella, Pete
Thursday, September 14, 2006 10:37 AM
Johnson, Eric
RE: Ocean 95 Exchange Plaza
I hope all is well with you.
See below. These numbers are based primarily on office use, which may make them a bit higher than some warehouse
uses.
Pete
From:
Sent:
To:
Cc:
Subject:
Pete,
Johnson, Eric
Thursday, September 14, 2006 10:25 AM
Mazzella, Pete
Breese, Ed
Ocean 95 Exchange Plaza
As you know the above referenced site plan is scheduled for the September Planning & Development Board meeting. The
developer proposes three (3) separate buildings for a total of 133,911 square feet of office I warehouse. What is the
expected potable water and sanitary sewer demands? Please fill in the "x".
The City's water capacity, as increased through the purchase of up to 5 million gallons of potable water per day from
Palm Beach County Utilities, would meet the projected potable water for this project (project estimated to require a
total of 17000 gallons per day). Local piping and infrastructure improvements may be required, especially on the
water delivery system for the project, depending upon the final project configuration and fire-flow demands. These
1
local improvements would be the responsibility of the site developer and would be reviewed at the time of permitting.
Sufficient sanitary sewer and wastewater treatment capacity is currentiy available to serve the projected total of 17000
gallons per day, subject to the applicant making a firm reservation of capacity, following approval of the site plan (see
Exhibit "C" - Conditions of Approval).
Thanks much,
Eric Lee Johnson, AICP
Planner
City of Boynton Beach
2
Johnson, Eric
From:
Sent:
To:
Subject:
Mazzella, Pete
Thursday, September 14, 2006 10:37 AM
Johnson, Eric
RE: Ocean 95 Exchange Plaza
Eric
I hope all is well with you.
See below. These numbers are based primarily on office use, which may make them a bit higher than some warehouse
uses.
Pete
From:
Sent:
To:
Cc:
Subject:
Johnson, Eric
Thursday, September 14, 2006 10:25 AM
Mazzella, Pete
Breese, Ed
Ocean 95 Exchange Plaza
Pete,
As you know the above referenced site pian is scheduled for the September Planning & Development Board meeting. The
developer proposes three (3) separate buildings for a total of 133,911 square feet of office I warehouse. What is the
expected potable water and sanitary sewer demands? Piease fill in the "x".
The City's water capacity, as increased through the purchase of up to 5 million gallons of potable water per day from
Palm Beach County Utilities, would meet the projected potable water for this project (project estimated to require a
total of 17000 gallons per day). Local piping and infrastructure improvements may be required, especially on the
water delivery system for the project, depending upon the finai project configuration and fire-flow demands. These
local improvements would be the responsibility of the site developer and would be reviewed at the time of permitting.
Sufficient sanitary sewer and wastewater treatment capacity is currently available to serve the projected total of 17000
gallons per day, subject to the applicant making a firm reservation of capacity, following approval of the site plan (see
Exhibit "c" - Conditions of Approval).
Thanks much,
Eric Lee Johnson, AICP
Planner
City of Boynton Beach
1
Of:{ C{,'~~'~,
~II;/[ib
:J j REVIEW COMMENTS
New Site Plan
FIRS-
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: 2nd review plans identified as a New Site Plan with a August 22, 2006 Planning & Zoning date
stam" markino,
DEPARTMENTS
INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
I 0-26 (a)~
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed nickup of dumnsters.
PUBLIC WORKS - Forestrv and Grounds
Comments:
3. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II,
Section 5.H.) usin" a 25 foot si"ht trian"le.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb In
landscaoe islands to orevent breakin" and heavin" at the tree's maturitv.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowin" non-nublic uses on their oronerties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's "Plant
the Ri"ht Tree in the Ri"ht Place."
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrency (Traffic Performance Standards Review)
from Palm Beach Countv Traffic Enl!ineerinl!.
...
3rd REVIEW COMMENTS.doc
09/12/06
5
DEPARTMENTS INCLUDE REJECT
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit application.
31. VeriI)' size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the
drawings.
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
FIRE
Comments:
33. Provide a sheet, dedicated only to Fire Department concerns. Include on this
sheet, the location of all hydrants, the water supply information and V'
acknowledge that the buildings shall have an approved NFPA 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building is
more than 200' from a hydrant.
34. All construction gates shall have a Knox lock for Fire Department access. All
gates shall be 12' wide if for one-way traffic and 20' wide if for two-way V
traffic. Before construction begins, the Fire Department will field test the
gate access with an engine. This engine must be able to access the site in one
turn, with no backing up. During the construction any road shall have turn
around capabilities so that no road will dead end with out a place for the
engine to turn around.
35. All roads shall be compacted to 32 tons to the point of vertical construction. V
These roads shall be kept clear of debris so that emergency vehicles can
access any portion of the site. If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
responsible for the costs involved.
36. Provide a flow test, conducted by the Boynton Beach Fire Department that ~
shows a water supply of 3,OOOgpm at 20psi. To schedule this test, call (561)
742-6600.
...
3rd REVIEW COMMENTS.doc
09/12/06
6
DEPARTMENTS INCLUDE REJECT
37. Will this project be condominiums or one owner?
38. A fire alann will be required throughout all buildings. The fire sprinkler V
system shall be monitored by an approved Central Station and a UL Letter of
Certification or an FM Placard shall be obtained.
39. Early Power release will not be given unless all Life Safety equipment is ~
installed and working. The only exception is that the alann system does not
have to transmit to a central station at that point, but must sound locally to
notify workers to evacuate the building.
POLICE
Comments:
40. Landscaping should not obstruct view from windows or walkwavs.
41. All exterior doors should be equipped with security hinges and should be
reinforced with case hardened strike plate.
42. All buildings should be ore-wired for CCTV and alarm systems.
43. Glass perimeter doors should be equipped with case hardened guard rings to
protect the mortise lock cvlinder.
44. Rear doors should be eauipped with 180-degree peephole viewer.
45. Mailboxes for buildings with multi-units should be placed in high activity and
conspicuous location for enhanced safety and natural surveillance of users.
BUILDING DIVISION
Comments:
46. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be detennined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of pennit application.
47. At time of penn it review, submit signed and sealed working drawings of the
proposed construction.
48. Vertical accessibility to the mezzanine area shall be required per the 2004 FBC,
Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations).
,
3' REVIEW COMMENTS
New Site Plan
r:DC:
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: 2"d review plans identified as a New Site Plan with a August 22. 2006 Planning & Zoning date
stam" markino.
I ~ ,
,.'...... "
DEPARTMENTS
INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
I. Prior to pennit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a).
,.
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickuo of dumosters.
PUBLIC WORKS - Forestrv and Gronnds
Comments:
3. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II,
Section 5.H.) usin" a 25 foot sight triangle.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscane islands to orevent breaking and heaving at the tree's maturity.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-nublic uses on their properties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's "Plant
the Right Tree in the Right Place."
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrency (Traffic Perfonnance Standards Review) .
from Palm Beach County Traffic Engineering.
3rd REVIEW COMMENTS.doc
09/12/06
2
DEPARTMENTS
9. Staff is concerned that the existing pavement structures in the area of the
proposed development may not be able to handle the additional heavy wheel
loadings of truck traffic and that the additional trucks could harm the existing
streets, adding to the tax burden of Boynton Beach residents. Because of
these impacts, Staff believes that it is entirely appropriate for the developer to
be required to mitigate the safety and potential structural impacts associated
with the additional truck traffic.
In Staff's opinion, the preferred truck rou~e is '~W 8th St., south to West
~ ./
Ocean Dr., then east-northeast to West 0 Ave" iljl east to the Ocean 95
Exchange Plaza. This route is prefened because it has the greatest roadway
and right-of-way width and fewest turJril:1g movements that could negatively
affect private properties, Specific desigri~ail must be give to pedestrian
safety in the vicinity of Hibiscus Park.
Staff recognizes that bumerous other truck route alternatives are available
south of Boynton Beach lllvd. Each of these alternatives possess' their own
pros and cons, Again, for ~i~tly te~nical reasons, the Ocean Dr. corridor is
preferabt~ However, Staff ",auld encourage public deliberation on this
matter bec~'Of~. sensitive nature and public perceptions related to
increased truck ~umes. .
The analysis should include the extent and cost of road improvements', need
for additional right-of-way, ability of the roadways to accommodate various
truck sizes, and number of residents impacted bv each alternative.
ENGINEERING DIVISION
Comments:
INCLUDE REJECT
10. All comments requiring changes and/or corrections to the plans shall be ",
reflected on all appropriate sheets.
11. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory Review
Team (TARn process does not ensure that additional comments may not be
generated by the Commission and at permit review.
, . i 'l !"
12. Provide written and graphic scales on all sheets., i .
13. At time of permitting, provide a drainage plan in accordance with the LOR,
Chapter 4, Section 7.F. The plan should include a sufficient number of
existing and proposed grades to indicate general flow patterns for stormwater
management.
14. Provide an engineer's certification on the Drainage Plan as specified in LOR,
Chapter 4, Section 7.F.2.
~
3rd REVIEW COMMENTS.doc
09/12/06
3
DEPARTMENTS INCLUDE REJECT
15. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
16. Show on plans (and identif'y) the 4S-inch RCP drainage pipe and associated
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identitY and resolve these conflicts.
17. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in "
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit aoolication.
UTILITIES
Comments:
IS. Please provide a time line that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date for
the time line should be the date of City Commission approval. Also provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This time line will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon
the project's completion, so please be as accurate as possible.
19. All utility easements and utility lines shall be shown on the site plan and
landscape plans (as well as the Water and Sewer Plans) so that we may
determine which appurtenances, trees or shrubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LDR, Chapter 7.5, Article !, Section IS.I gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
20. Palm Beach County Health Department permits will be required for the water
and sewer systems serving this project (CODE, Section 26-12).
21. Fire flow calculations will be required demonstrating the City Code
requirement of ! ,500 gpm with 20 psi residual pressure as stated in the LDR,
Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-
ft. in length. Re-evaluate the location and spacing of fire hydrants to see if
the furthest south fire hydrant can be eliminated. Excessively long dead-end
..
3rd REVIEW COMMENTS.doc
09/12/06
4
DEPARTMENTS INCLUDE REJECT
sections of main can lead to stagnation in the line and bacteriological growth.
22. The LDR, Chapter 6, Article IV, Section] 6 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has
sufficient coverage, the Central Building is almost covered, and the North 'Y
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above, usually requires overlapping fire hydrant coverage,
or a sprinkler system internal to each building in addition to the skeleton
system shown on the submitted plans. As noted above, a looped water supply
svstem will be required in order to achieve this.
23. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid
for this project either upon the request for the Department's signature on the
Health Department application forms or within seven (7) days of site plan ,
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable .;
water. As other sources are readily available City water shall not be allowed
for irrigation.
25. Water and sewer lines to be owned and operated by the City shall be included
within utility easements. Please show all proposed easements on the ,
engineering drawings, using a minimum width of 12 feet. The easements
shall be dedicated via separate instrument to the City as stated in CODE Sec.
26-33(a).
26. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the "-
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
27. A building permit for this project shall not be issued until this Department has
approved the plans for the water and/or sewer improvements required to "
service this project, in accordance with the CODE, Section 26-15.
28. Sanitary sewer main shall be PYC C-900 material. "
29. The proposed ~hft"tatioowillbe~-AIl saRitary~__lhe
~5 E"eh8flge .~-sIlalHle .pr.wate,..-F~ beC61uG the ' .
-pr.opelt)L4lhe.-Ci4'.ofBgynten'Beach. Provide appropriate easements for the
force main... Pennits will be required ~work within the CSXRR right-of-
wav.
3rd REVIEW COMMENTS.doc
09112/06
5
DEPARTMENTS INCLUDE REJECT
30. Utility construction details will not be reviewed for construction acceptability
at this time. All utility construction details shall be in accordance with the "<
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit aoolication.
31. VerifY size/diameter of water mains to be connected to. Our review indicates
that the existing water mains are 6-in. diameter, not 8-in. as shown in the .
drawings.
32. Replace 2-in. water main with 8-in. water main from the existing main in
West Ocean Ave. to the proposed 900 or 8-in. tee at the north end of the "-
development. The City may consider allowing 6-in. water main for this
project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main
diameter.
FIRE
Comments:
33. Provide a sheet, dedicated only to Fire Department concerns. Include on this
sheet, the location of all hydrants, the water supply information and
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building is
more than 200' from a hvdrant.
34. All construction gates shall have a Knox lock for Fire Department access. All
gates shall be 12' wide if for one-way traffic and 20' wide if for two-way
traffic. Before construction begins, the Fire Department will field test the
gate access with an engine. This engine must be able to access the site in one
turn, with no backing up. During the construction any road shall have turn
around capabilities so that no road will dead end with out a place for the
engine to turn around.
35. All roads shall be compacted to 32 tons to the point of vertical construction.
These roads shall be kept clear of debris so that emergency vehicles can
access any portion of the site. If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
resoonsible for the costs involved.
36. Provide a flow test, conducted by the Boynton Beach Fire Department that
shows a water supply of3,000gpm at 20psi. To schedule this test, call (561)
742-6600.
3rd REVIEW COMMENTS.doc
09/12/06
8
I<)(f
9 . [;J.. . 0(;
DEPARTMENTS INCLUDE REJECT
noted on the building permit application at the time of application submittal.
56. Submit irrigation plans.
PARKS AND RECREATION
Comments:
57. Plant List - separate trees and palms from shrubs and sod. Denote which
species are native and the overall percentage of native plants.
58. Irrigation must have] 10% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed areas.
59. The use of large trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 ]/2 feet wide. This is not
sufficient area to allow a root system needed for the oak canopy. It is
recommended that a different species be considered for these areas.
FORESTER/ENVIRONMENT ALIST
Comments:
Exislinl!: Trees List - Management Plan
Sheet L - 4
60. The Landscape Architect should tabulate the total diameter inches of existing /
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms, 5 Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet L-4 of 4. [Environmental
Regulations, Chapter 7.5, Article I Sec. 7.D.p. 2.]
Plant List Sheet L-4
61. All shade and palm trees must be listed in the description as a minimum of ~
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk
(c.t.) specifications. [Environmental Regulations, Chapter 7.5, Article II Sec.
5.C.2.1
~ --
62. All trees proposed under any existing overhead electric power lines must meet j
the FP & L Right tree in the Right Place manual selection for small trees
only. V
V
63. The shade tree planting detail should including a line indicating where the
diameter and height of all of the trees will be measured at time of planting
.
3rd REVIEW COMMENTS. doc
09/12/06
9
DEPARTMENTS INCLUDE REJECT
and inspection.
64. The palm tree planting detail should include a line indicating where the clear V
trunk and height of all of the palm trees will be measured at time of planting
and inspection.
65. The shrub and groundcover planting detail should include a line indicating V'
where the height and spread of the shrubs and groundcover plants will be
measured at time of planting: and inspection.
66. The applicant should add a note that all utility boxes or structures (not /
currently known or shown on the plan) should be screened with Coco plum
hedg:e plants on three sides.
~ /
67. The applicant should show an elevation cross-section detail of the actual
heights of the proposed landscape trees and vegetation (proper scale) at the
time of planting to visually buffer the proposed buildings and parking lot
from the 1-95 and SW Sth Street road rig:hts-of-ways.
PLANNING AND ZONING
Comments:
6S. At the technical advisory review team (TART) meeting, provide written
responses to all staff's comments and questions. Submit 12 sets of revised
plans. Each set should be folded and stapled.
69. At the technical advisory review team meeting, also provide a full set of
reduced drawings, sized Sy, inches by II inches of each plan. Save each plan
to a compact disk and submit that to staff as well.
70. Staff considers these plans to be at the final stage of site plan review, the last
stage prior to permit review. As such, all comments need to be addressed and
shown on the plans prior to the TART meeting.
7 I. It is the applicant's responsibility to ensure that the new site plan is publicly
advertised in accordance with Ordinance 04-007 and Ordinance 05-004.
72. Applicants who wish to utilize City electronic media equipment for
presentations at City Commission Public Hearings must notifY the Planning
and Zoning Department representative at least one week prior to the
scheduled meeting. Staff recommends using a PowerPoint presentation at the
Community Redevelopment Agencv Board meeting.
73. The New Site Plan application indicates that "Boynton Industrial, LLC" is the
properly owner. Please provide a copv of the deed indicating the same.
74. The New Site Plan application (JI.2) indicates the subiect propertY is zoned
3'" REVIEW COMMENTS
New Site Plan
Jo D'-\
PA--R~S
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: 2"d review plans identified as a New Site Plan with a August 22. 2006 Planning & Zoning date
stamn markino.
DEPARTMENTS
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to pennit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a).
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
PUBLIC WORKS - Forestrv and Grounds
Comments:
3. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article 11,
Section 5.H.) using a 25 foot sight triangle.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscaDe islands to orevent breaking and heaving at the tree's maturity.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-Dublic uses on their DroDerties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's "Plant
the Right Tree in the Right Place,"
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrency (Traffic Perfonnance Standards Review)
from Palm Beach County Traffic Engineering.
INCLUDE REJECT
3rd REVIEW COMMENTS. doc
09/12/06
8
DEPARTMENTS INCLUDE REJECT
noted on the building permit application at the time of application submittal.
56. Submit irrigation plans.
PARKS AND RECREATION
Comments:
57. Plant List - separate trees and palms from shrubs and sod. Denote which ~
species are native and the overall percentage of native plants.
58. Irrigation must have I 10% coverage, have a non-potable water source, have V
separate bubblers for each tree and have separate zones for sod and bed areas.
59. The use of large trees that need large root beds to support the large canopies /
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 112 feet wide. This is not
sufficient area to allow a root system needed for the oak canopy. It is
recommended that a different species be considered for these areas.
FORESTER/ENVIRONMENTALIST
Comments:
Existinl!: Trees List - Manal!:ement Plan
Sheet L - 4
60. The Landscape Architect should tabulate the total diameter inches of existing
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms,S Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet L-4 of 4. [Environmental
Regulations, Chapter 7.5, Article I Sec. 7.D.p. 2.]
Plant List Sheet L-4
61. All shade and palm trees must be listed in the description as a minimum of
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk
(c.l.) specifications. [Environmental Regulations, Chapter 7.5, Article II Sec.
S.C. 2.1
62. All trees proposed under any existing overhead electric power lines must meet
the FP & L Right tree in the Right Place manual selection for small trees
only.
63. The shade tree planting detail should including a line indicating where the
diameter and height of all of the trees will be measured at time of planting
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
R fo 2"d I
'd t'fi d
N
S't PI
'th A
3LVb
~ul<1 ftJ~/~ .
~,
t 22 2006 PI . & Z . d t ~
3' - REVIEW COMMENTS
New Site Plan
e erence: reVIew 0 ans 1 en lIe asa ew Ie an WI a UgUS . annmg onmg ae 4J
stamn markino. 'l<
"
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
I. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
I 0.26 (a)~
2. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed oickuo of dumosters.
PUBLIC WORKS - Forestrv and Grounds
Comments:
3. Show sight triangles on the Landscape plans (LOR, Chapter 7.5, Article II,
Section 5.H.) using a 25 foot sight triangle.
4. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile
vehicles.
5. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscane islands to nrevent breakinl! and heavinl! at the tree's maturity.
6. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-Dub lie uses on their oroDerties.
7. There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's "Plant
the Ril!ht Tree in the Ri"ht Place."
PUBLIC WORKS - Traffic
Comments:
8. Provide a notice of concurrency (Traffic Performance Standards Review)
from Palm Beach Countv Traffic Enl!ineerinl!. I
3rd REVIEW COMMENTS.doc
09/12/06
6
DEPARTMENTS INCLUDE REJECT
37. Will this oroiect be condominiums or one owner?
38. A fire alarm will be required throughout all buildings. The fire sprinkler
system shall be monitored by an approved Central Station and a UL Letter of
Certification or an FM Placard shall be obtained.
39. Early Power release will not be given unless all Life Safety equipment is
installed and working. The only exception is that the alarm system does not
have to transmit to a central station at that point, but must sound locally to
notify workers to evacuate the buildino:.
POLICE
Comments:
40. Landscanino: should not obstruct view from windows or walkwavs.
41. All exterior doors should be equipped with security hinges and should be
reinforced with case hardened strike nlate.
42. All buildino:s should be ore-wired for CCTV and alarm svstems.
43. Glass perimeter doors should be equipped with case hardened guard rings to
nrotect the mortise lock cvlinder.
44. Rear doors should be eauipped with l80-degree peephole viewer.
45. Mailboxes for buildings with multi-units should be placed in high activity and
consnicuous location for enhanced safety and natural surveillance of users.
BUILDING DIVISION
Comments:
46. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or structure .VI
shall be detennined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of penn it aoolication. /
47. At time of penn it review, submit signed and sealed working drawings of the V
proposed construction. J
48. Vertical accessibility to the mezzanine area shall be required per the 2004 FBC, /
Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations),
3rd REVIEW COMMENTS.doc
09/12/06
7
DEPARTMENTS INCLUDE REJECT
49. IdentifY within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building. VerifY that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A The design professional-of-record for the project shall add the following
text to the site data. "The proposed finish floor elevation _' _ NOVD is
above the highest 100-year base flood elevation applicable to the building /
site, as determined by the SFWMD's surface water management construction
development regulations."
B From the FIRM map, identifY in the site data the title of the flood zone
that the building is located within. Where applicable, specifY the base flood
elevation. If there is no base flood elevation, indicate that on the plans.
C IdentifY the floor elevation that the design professional has established for the
building within the footprint of the building that is shown on the drawings titled site
plan, floor plan and paving/drainage (civil plans).
50. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may J
not, therefore, be used for landscape irrigation where other sources are readily
available.
51. A water-use permit from SFWMD is required for an irrigation system that J
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time of permit application, F.S. 373.216.
52. If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be J
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
53. At time of permit review, submit separate surveys of each lot, parcel, or tract. j
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot, parcel, or tract. The recorded
deed shall be submitted at time of permit review. I
54. Pursuant to approval by the City Commission and all other outside agencies, J
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the City Commission.
55. The full address of the project shall be submitted with the construction \J
documents at the time of permit application submittal. If the project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the proiect as it appears on the Development Order must be
3rd REVIEW COMMENTS.doc
09/12/06
8
DEPARTMENTS INCLUDE REJECT
noted on the building permit application at the time of application submittal. /
V
56. Submit irrigation plans.
PARKS AND RECREATION
Comments:
57. Plant List - separate trees and palms from shrubs and sod. Denote which
species are native and the overall percentage of native plants.
58. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed areas.
59. The use of large trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide. This is not
sufficient area to allow a root system needed for the oak canopy. It is
recommended that a different species be considered for these areas.
FORESTERlENVIRONMENT ALIST
Comments:
Existing Trees List - Management Plan
Sheet L - 4
60. The Landscape Architect should tabulate the total diameter inches of existing
trees on the site. The tabular data should show the individual species of trees
proposed to be preserved in place (2 Sabal Palms, 5 Live Oaks), relocated or
removed and replaced on site. The replacement trees should be shown by a
separate symbol on the landscape plan sheet L-4 of 4. [Environmental
Regulations, Chapter 7.5, Article I Sec. 7.D.p. 2.]
Plant List Sheet L-4
61. All shade and palm trees must be listed in the description as a minimum of
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk
(c.t.) specifications. [Environmental Regulations, Chapter 7.5, Article II Sec.
5.C. 2.1
62. All trees proposed under any existing overhead electric power lines must meet
the FP & L Right tree in the Right Place manual selection for small trees
onlv.
63. The shade tree planting detail should including a line indicating where the
diameter and height of all of the trees will be measured at time of planting
3rd REVIEW COMMENTS.doc
09/12/06
6
DEPARTMENTS INCLUDE REJECT
37. Will this oroiect be condominiums or one owner?
38. A fire alann will be required throughout all buildings. The fire sprinkler
system shall be monitored by an approved Central Station and a UL Letter of
Certification or an FM Placard shall be obtained.
39. Early Power release will not be given unless all Life Safety equipment is
installed and working. The only exception is that the alarm system does not
have to transmit to a central station at that point, but must sound locally to
notifY workers to evacuate the building.
POLICE r.~1
Comments: ~(
40. Landscaoing should not obstruct view from windows or walkwavs. j
41. All exterior doors should be equipped with security hinges and should be .,/
reinforced with case hardened strike plate.
42. All buildings should be ore-wired for CCTV and alarm svstems. .,/
43. Glass perimeter doors should be equipped with case hardened guard rings to ,/
orotect the mortise lock cvlinder.
44. Rear doors should be eauipped with l80-degree oeeohole viewer. /
45. Mailboxes for buildings with multi-units should be placed in high activity and ../
consoicuous location for enhanced safelY and natural surveillance of users.
BUILDING DIVISION
Comments:
46. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be detennined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of oennit aoolication.
47. At time of penn it review, submit signed and sealed working drawings of the
orooosed construction.
48. Vertical accessibility ta the mezzanine area shall be required per the 2004 FBC,
Sections 11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6
(Alterations),
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
TO:
Ed Breese, Principal Planner, Planning and Zoning
Eric L. Johnson, Planner, Planning & Zoning
FROM:
Laurinda Logan, Senior Engineer
ld-\---
\ \
\ )
;
I ~ j
Ie
DATE:
August 25, 2006
AUG 2 8 'J< i' '"
Ll.l..Ju
RE:
Review Comments
New Site Plan - 2nd Review
Ocean 95 Exchange
File No. NWSP 06-020
L __
After completing our second review of the above referenced Site Plans at TARTS on 8/22/06 please
revise the following comments. All other comments have been addressed on the "1" Review Comments"
form.
PUBLIC WORKS - TRAFFIC
20. Staff is concerned that the existing pavement structures in the area of the proposed development
may not be able to handle the additional heavy wheel loadings of truck traffic and that the additional
trucks could harm the existing streets, adding to the tax burden of Boynton Beach residents.
Because of these impacts, Staff believes that it is entirely appropriate for the developer to be required
to mitigate the safety and potential structural impacts associated with the additional truck traffic.
In Staff's opinion, the preferred truck route is along SW 8'h St., south to West Ocean Dr., then east-
northeast to West Ocean Ave., and east to the Ocean 95 Exchange Plaza. This route is preferred
because it has the greatest roadway and right-of-way width and fewest turning movements that could
negatively affect private properties. Specific design detail must be give to pedestrian safety in the
vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available south of Boynton Beach
Blvd. Each of these alternatives possess' their own pros and cons. Again, for strictly technical
reasons, the Ocean Dr. corridor is preferable. However, Staff would encourage public deliberation on
this matter because of the sensitive nature and public perceptions related to increased truck
volumes.
The analysis should include the extent and cost of road improvements', need for additional right-of-
way, ability of the roadways to accommodate various truck sizes, and number of residents impacted
by each alternative.
UTILITIES
38. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 gpm with 20
psi residual pressure as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement
imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)). The proposed
system looping for this project will leave a dead-end line approximately 400-ft. in length. Re-evaluate
the location and spacing of fire hydrants to see if the furthest south fire hydrant can be eliminated.
Dept. of Public Works, Engineering Division
RE: Ocean 95 Exchange Plaza, New Site Plan - 2nd Review, NWSP 06-020
August 25, 2006
Page 2
Excessively long dead-end sections of main can lead to stagnation in the line and bacteriological
growth.
50. The proposed private lift station will be acceptable. All sanitary sewer on the Ocean 95 Exchange
Plaza shall be private. Force main will become the property of the City of Boynton Beach. Provide
appropriate easements for the force main. Permits will be required for the work within the CSXRR
right-of-way.
Add the following new comments in the Utilities Section:
1. Verify size/diameter of water mains to be connected to. Our review indicates that the existing water
mains are 6-in. diameter, not 8-in. as shown in the drawings.
2. Replace 2-in. water main with 8-in. water main from the existing main in West Ocean Ave. to the
proposed 90' or 8-in. tee at the north end of the development. The City may consider allowing 6-in.
water main for this project if fire flow and domestic demands can be accommodated adequately.
Provide demand and head loss calculations supporting the desired main diameter.
Cc: Jeffrey R. Livergood, P.E., Director, Public Works
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
File
S:\Engineering\Logan\TRC\Ocean 95 Exchange Plaza 2nd Review 082306.doc
.TO:
Page I of3
Johnson, Eric
From: Logan, Laurinda
Sent: Friday, August 25, 2006 9:53 AM
To: Johnson, Eric
Subject: Ocean 95 Exchange Plaza 2nd Review 082306
Should be able to cut & paste from this version without all the extra.
TO:
Ed Breese, Principal Planner, Planning and Zoning
Kathy Zeitler, Planner, Planning & Zoning
FROM:
Laurinda Logan, Senior Engineer
DATE:
August ~25, 2006
RE:
Review Comments
New Site Plan - 2nd Review
Ocean 95 Exchange
File No. NWSP 06-020
After completing our second review of the above referenced Site Plans at TARTS on 8/22/06 please
revise the following comments. All other comments have been addressed on the "1st Review
Comments" form.ne':ie1'.s COffiffl8At f8FFA I3rs'/iao8 at U~0 T,^,nT FA00tiA@.
PUBLIC WORKS - TRAFF!C
29.8t8# RSS B0riGbl8 eSASSFR5 8BSblt tAe iFRI361st af 8ssitisASI tfl:Jslc traffie tAF8b1€jA tRe r6sissRtial area.
TRsre is SA 8HistiA€j if-blsle rSblte aleA€, ~J~I 1m .t-.\'8. tAat is SIdf3J2H?lSoely sarryiA€j 13 yepy lTliAilTlal
SA"lSIdFlt sf trl:jsl: tra#is frsrxfl gW gtlot Et. tEl tRG iFlEh:JstFial sres. It S~)3BSrS tASt tRis I'Sblte was sRsseR iA
earlier yesFs eeesl:jse it Rsa tRB lesst Al:jFf1Ber af RaFfles tRat w6b1la se iA=lf3astsa BY tRe trblslt tFa#ie
'NA8A e81TlpareeJ t8 etA0r area r08i~eAti81 0tr88t8. HGwe'/er, tRis rSl::l1s is ASt tRe rxfI8st le~iasl WSR"l
tRe f3ers)3eetivs af tFl:lslt A=lS';eR=l8Ats. IAterseetisR F8aii at all J38iRffi a18A~ tRe ral:lte 8Fe iRsld#ieisRt fer
IsrEler t1'l:181(8 18 aVfaiEJ aaA"1G~G to a~jQe(mt tldooe ri~Ate faf way BRa )3Fi'/ste )3r8)3eFties.
BeeGblse tAe )3Fal3eSea sevelS)3ITlSRt will SiE]Rif.ie8Rtly sas t8 iRe vetblA4e sf truelt iraffie tRreldE1R tRe
resis0RtiGl ares, St8# eelie'/ee tAst 13 trtlslt rStlte SAStllet ae eets8les tASt ASS tAe least ilTl)3aet sr
J3stsRtial t8 eaR=la~e tAB I3b1Blie Fi(;)At af way. FblRAerA"laFe, all )3aSSiBle aetieRS 18 rxfIiRiFAize trbl8h eSR}liets
\...itA )3eeestriaRs (i.e.. 8RilsF8A at l><Iiais8b1s ~ar1t) SA8b1let ee 8SASis8F8S. Lastly, 8ta# is 8sRseTRea tRat
tRe eHisliR~ )3aVerxfleAt strtletblres iA tRe iFAFfleeliate area aFe Ret aBle 1s AaAsls tRe sselitisASI ASS':Y
wReelleaaiRfis sf trLlelt tFClms aRa tAat tRe aasitieAal trl:181(s eeblla RarFA tRe e)(istiA~ streets 8saiRg) t8
tRe tSH BtlraeA af BerRteR B08eR resiaeRts. Tt:lsFef8F8, I3seablee af tRsse iFAJ38ets, staff l3alie'/ss tAGt it is
sAtirel)' 8J3J3rs)3riato fer tAG sO\'010f3e)r to 130 f06teJirG)(~ to miti@Jat0 HiOGe) safety aRe stFldstbJffil imJ361st0
oe60sistes 'lIitA tAG ss~itieAal tFblelt trame.
20, Staff is concerned that the existing pavement structures in the area of the proposed development
may not be able to handle the additional heavy wheel loadings of truck traffic and that the additional
trucks could harm the existing streets, adding to the tax burden of Boynton Beach residents.
Because of these impacts, Staff believes that it is entirely appropriate for the developer to be
required to mitigate the safety and potential structural impacts associated with the additional truck
traffic.
8/25/2006
TO:
Page 2 of3
In Staff's opinion, the preferred truck route is along CSAstrblet 61 Flew HElSet frSFfl r.~eFleA'S Way RSFtR
ie tRe J3f0j90608 8fr;010J3rT1ElAt. TAB J3F8!38SSeJ re8away sAall Rave a 69 ft J3ri','ste ri~t:lt af way VlistR,
a FfliRiffil:HTl af ~\'e 12 fit laRes, sie8Wall( SA at IGGlst eRE) sieja af iRe street, BRe J3fs'/ieie fer
sterFAwater rldAeff. TAB eJeSiE)AsteeJ tFblSIt r8b1te 'Nilles We8IBFi~Rt 10 8V.' gfR. St. ts MarteR'S Viay
U'ISA AsFlA ts tAs OseaA 96 EiHsAaA!:je rlaza.SW 8th St., south to West Ocean Dr., then east-
northeast to West Ocean Ave., and east to the Ocean 95 Exchange Plaza. This route is preferred
because it has the greatest roadway and right-of-way width and fewest turning movements that
could negatively affect private properties, Specific design detail must be give to pedestrian safety in
the vicinity of Hibiscus Park.
Staff recognizes that numerous other truck route alternatives are available south of Boynton Beach
Blvd. Each of these alternatives possess' their own pros and cons. Again, for strictly technical
reasons, the Ocean Dr. corridor is preferable. However, Staff would encourage public deliberation
on this matter because of the sensitive nature and public perceptions related to increased truck
volumes.
The analysis should include the extent and cost of road improvements', need for additional right-of-
way, ability of the roadways to accommodate various truck sizes, and number of residents impacted
by each alternative.
UTILITIES
38. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 gpm with
20 psi residual pressure as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement
imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)). A siA!:jls e iA,
sJ3b1r liRS, 1 ,829 leA~, e# af 8R 8HistiAEJ € iA. water FflsiA (iA OesaR .~Ne.) '1:ill FIst IT1set tRis
rsEtblirsFA8At. IFflJ3FS'/SFfl8AtS 18 tRB water b1tility s)'steJX'fl eft site will l3e r8Etblirea iA 8F8sr ie 8b1J3J38rt
tRis J3reJ38seeJ eJs'/sleJ3Ff18At via 61 lesJ3sa water FflsiFl s)'steFfl. The proposed system looping for this
project will leave a dead-end line approximately 400-ft. in length. Re-evaluate the location and
spacing of fire hydrants to see if the furthest south fire hydrant can be eliminated. Excessively long
dead-end sections of main can lead to stagnation in the line and bacteriological growth.
~50. .^. eirTlJ3le lT1iRsr Iif.t atatieR eSAAeetieA iAts tRe eity's lTlaeter 29 iA, feree rTIBiA ee'/eriR~ tRe 8esterR
Relf af tRe sit)' (as sAswR SR SAeet C 2) v,'ill Ret Be J3eFFflittsEL ,A.S 8.A alterA8te, sSAitar)' sewer A=ls)'
tie iRts tRe v;ast6water s)'steFA ssP/iA~ tAB BajaeeRt r6aiaeAtiel SYStSR4. TA8 J3reFJeseel 1 iF!. ferss
FASiA will Be rSEl!direa ts "t!dARel" !dRSar tRB csxnn ts tAe e)(istiA~ SYStSR4 Iseat08 iR S'A' 6#t~
Cals!dlatisRs '1JiII ae FSEltlifeEl t6 refleet tA8.t tRis e)(istiA~ system eaA a8s8FflFfl08ate tRe J3rSJ38SSe
aeveleJ3FReAt as elge'NA eA tl9ie stJl3FRittal.The proposed private lift station will be acceptable, All
sanitary sewer on the Ocean 95 Exchange Plaza shall be private, Force main will become the
property of the City of Boynton Beach. Provide appropriate easements for the force main, Permits
will be required for the work within the CSXRR right-of-way.
Add the following new comments in the Utilities Section:
1, Verify size/diameter of water mains to be connected to. Our review indicates that the existing water
mains are 6-in. diameter, not 8-in. as shown in the drawings.
2. Replace 2-in. water main with 8-in. water main from the existing main in West Ocean Ave. to the
proposed 90' or 8-in, tee at the north end of the development. The City may consider allowing 6-in,
water main for this project if fire flow and domestic demands can be accommodated adequately,
Provide demand and head loss calculations supporting the desired main diameter.
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
8/25/2006
TO:
Page 3 of3
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., PE/ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
File
S:\Engineering\Logan\TRC\Ocean 95 Exchange Plaza 2nd Review 082306.doc
8/25/2006
1st REVIEW COMMENTS
New Site Plan
F-t"Z-
M~
-
Project name: Ocean 95 Exchange Plaza
File number; NWSP 06-020
Reference: 1st review plans identified as a New Site Plan with a Mav 17. 2006 Planning & Zoning date stamu
markincr,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742- ~
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a).
2, The provided site dumpster enclosure detail (Sheet A-O.I does not meet the
minimum requirements of City Standard Drawing G-4 and LDR, Chapter V
7.5, Article II, Section 5.J. and Article III, Section 9.A.9,a, Revise the detail
to provide a minimum 10 foot (intemal) depth and width for the pad.
3. The required gates for the dumpster shall contain long steel rods to drop into
the pavement in order to secure the gates in the open and closed positions. <./'
Drilled holes (for concrete) or metal sleeves (for asphalt) shall be provided
for the locking rods,
4, The proposed dumpster enclosure locations (Civil Sheets C-I through C-3)
do not provide the required minimum backing clearance of 60 feet
(measured from the front edge of the dumpster pad.) (LDR, Chapter 2, V
Section II.J.2.b.) Please correct.
5, Provide a minimum outside turning radius of 55 feet to allow turning
movements for Solid Waste (and FirelRescue) inside the proposed /'
development. Using AutoTum (or similar), show on the plans that the
required tuming movements are provided. Particular attention should be
given to the entryways and turn-around areas that allow ingress and egress
for Solid Waste and FirelRescue.
6. Rotate the first five dumpsters (north to south) 1800 so that Solid Waste is /
picked up on the way out of the plaza. This will minimize (somewhat) the
backing across both lanes of traffic,
7. The location and orientation of the sixth dumpster (furthest south) is not
acceptable because turning around cannot be safely accomplished at this V
location, Please revise location and/or orientation using the criteria
oreviouslv stated in this memo.
8. There are vertical conflicts between the proposed dumpster enclosure ;V
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East ~
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters,
1ST REVIEW COMMENTS
06/26/06
2
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Forestry and Grounds
Comments:
9. Show sight triangles on the Landscape plans (LDR, Chapter 7,5, Article II, c/
Section 5.H.) using a 25 foot sight triangle,
10. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile V
vehicles.
11. Gumbo Limbo should placed a minimum of 10 foot away from curb in /
landscape islands to prevent breaking and heaving at the tree's maturity,
12. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from V
the property lines to allow for maintenance at maturity, The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-public uses on their properties,
13. There are overhead lines along the north and west property lines. /
Landscaping shall be designed and installed in accordance with FPL' s
"Plant the Right Tree in the Right Place,"
PUBLIC WORKS - Traffic
Comments:
14. Provide a notice of concurrency (Traffic Performance Standards Review) t/
from Palm Beach County Traffic Engineering.
15. On the Site and Civil plans, show and identifY all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping, V
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe
the "Loading Area" (LDR, Chapter 2, Section II,J); include a pavement
message in yellow indicating "No Parking - Loading Zone". See City
Standard Drawings "K" Series for striping details.
16. Provide Fire Lanes in accordance with the LDR, Chapter 23, Article II, V
Section B.2 and Section M,
17. Parking stalls are incorrectly dimensioned at 9 feet x 18 feet The correct
stall dimension is 9Yz-feet x I 8 Yz-feet with a 25 foot minimum aisle width, V-
18. Staff strongly recommends specifying wider lane widths to accommodate
truck traffic and backing movements. }./""
19. The proposed site layout will not adequately accommodate tum-around /
movements for any trucks using this development. Turn-arounds will need
to be provided for Solid Waste, Fire-Rescue, and trucks doing business
1ST REVIEW COMMENTS
06/26/06
3
DEPARTMENTS
within the Plaza.
20, Staff has serious concerns about the impact of additional truck traffic
through the residential area. There is an existing truck route along NW I"
Ave, that is supposedly carrying a very minimal amount of truck traffic from
SW 8th Street to the industrial area, It appears that this route was chosen in
earlier years because it had the least number of homes that would be
impacted by the truck traffic when compared to other area residential streets.
However, this route is not the most logical from the perspective of truck
movements, Intersection radii at all points along the route are insufficient
for larger trucks to avoid damage to adjacent turfed rights of way and
private properties.
Because the proposed development will significantly add to the volume of truck
traffic through the residential area, staff believes that a truck route should be
selected that has the least impact or potential to damage the public right of
way. Furthermore, all possible actions to minimize truck conflicts with
pedestrians (i,e.. children at Hibiscus Park) should be considered. Lastly,
Staff is concerned that the existing pavement structures in the immediate area
are not able to handle the additional heavy wheel loadings of truck traffic and
that the additional trucks could harm the existing streets adding to the tax
burden of Boynton Beach residents. Therefore, because of these impacts, staff
believes that it is entirely appropriate for the developer to be required to
mitigate these safety and structural impacts associated with the additional
truck traffic.
Upon review of the Traffic Impact Analysis and Local Street Analysis provided
for this project Staff proposes three alternatives for movement of traffic
accessing the Ocean 95 Exchange Plaza. Recommended alternatives are
given in order of preference:
a, Construct a new road from Morton's Way north to the proposed
development. The proposed roadway shall have a 50foot private right-of-
way width, a minimum of two 12 foot lanes, sidewalk on at least one side
of the street, and provide for stormwater runoff, The designated truck
route will be Woolbright to SW 8th Street to Morton's Way then north to
the Ocean 95 Exchange Plaza.
b. Reconstruct the existing truck route (Boynton Beach Blvd, to NW 7th St.
to NW I" Ave, to NW 6th St. to W, Ocean Ave. then east into the Ocean
95 Exchange Plaza.) The right-of-way width for these roads is 50 feet
except for Ocean Ave., which is 70 feet. The typical section shall consist
of a 30 foot paved roadway with curb & guller, sidewalk on at least one
side of the street, and provide for storm water runoff. Additional work
will be required at the round-about at the intersection of W, Ocean
Avenue, West Ocean Drive and NW 6th Street to accommodate correct
luming movements for all vehicles using this intersection,
c. Reconstruct W. Ocean Avenue from Boynton Beach Blvd. to Ocean
A venue then east to the Ocean 95 Exchange Plaza. This will become the
designated truck route. The right-of-way width for Ocean Ave. is 50 feet
to the intersection of Ocean Ave. and NW 6th Street then 70 feet from the
INCLUDE REJECT
/
1ST REVIEW COMMENTS
06/26/06
4
DEPARTMENTS INCLUDE REJECT
intersection east. The typical section shall consist of a 30 foot paved
roadway with curb & gutter, sidewalk on both sides of the street and
provide for storm water runoff. Additional work will be required at the
round-about at the intersection of West Ocean Avenue, West Ocean
Drive and NW 6th Street to accommodate correct turning movements for
all vehicles using this intersection.
ENGINEERING DIVISION
Comments:
21. Add a note to the Site Plan stating "All plans submitted for specific pennits
shall meet the City's Code requirements at time of application. These
pennits include, but are not limited to, the following: paving, drainage, /'
curbing, site lighting, landscaping and irrigation. Pennits required from
other pennitting agencies such as Florida Department of Transportation
(FDOT), South Florida Water Management District (SFWMD), Lake Worth
Drainage District (LWDD), Florida Department of Environmental
Protection (FDEP), Palm Beach County Health Department (PBCHD),
Palm Beach County Engineering Department (PBCED), Palm Beach
County Department of Environmental Resource Management (PBCDERM)
and anv others, shall be included with the nennit reouest."
22. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets, ,/
23, Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory ,/
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at pennit review,
24. Provide written and graphic scales on all sheets, t/
25, Show and identify all features adjacent to the site to be developed on the
plans (including the site plan, civil plan, and landscape plans) such as the V
CSXRR and ]-95.
26. Provide the Site, Civil and Landscape plans at the same scale (LDR, V
Chapter 4, Section 7.)
27, Provide the Civil plans at the same sheet size as the remainder of the
package (24-in. x 36-in.) V
28. Show proposed site lighting on the Site and Civil plans (LDR, Chapter 4, /
Section 7.B.4.)
29. Provide a drainage plan in accordance with the LDR, Chapter 4, Section ,/
7,F. The plan should include a sufficient number of existing and proposed
!!fades to indicate eenera] flow nattems for stormwater manaeement.
1ST REVIEW COMMENTS
06/26/06
5
DEPARTMENTS INCLUDE REJECT
30. Provide an engineer's certification on the Drainage Plan as specified in V
LDR, Chapter 4, Section 7.F.2,
31. Full drainage plans, including drainage calculations, in accordance with the /
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
32. Show on plans (and identify) the 48-inch RCP drainage pipe and associated .v/
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed
water and sewer mains. Please identify and resolve these conflicts.
33. Correct Sheet C-3 to read W. Ocean A venue, not Ocean Boulevard. /'
34. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in /
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
UTILITIES
Comments:
35. Please provide a time line that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date 1/
for the time line should be the date of City Commission approval. Also
provide milestone dates for permit application, the start of construction, and
the setting of the first water meter, This time line will be used to determine
the adequacy of water and wastewater treatment capacity for your project
upon the project's completion, so please be as accurate as possible.
36. All utility easements and utility lines shall be shown on the site plan and
landscape plans (as well as the Water and Sewer Plans) so that we may
determine which appurtenances, trees or shrubbery may interfere with V
utilities. In general, palm trees will be the only tree species allowed within
utility easements. Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
37, Palm Beach County Health Department permits will be required for the V
water and sewer systems serving this project (CODE, Section 26-12).
38. Fire flow calculations will be required demonstrating the City Code /
requirement of 1,500 gpm with 20 psi residual pressure as stated in the
LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by
1ST REVIEW COMMENTS
06/26/06
6
DEPARTMENTS INCLUDE REJECT
insurance underwriters, whichever is greater (CODE, Section 26-16(b)). A
single 6-inch spur line, 1,830 long, off of an existing 6-inch water main (in
Ocean Ave.) will not meet this requirement. Improvements to the water
utility system off-site will be required in order to support this proposed
development via a looped water main system,
39. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has /
sufficient coverage, the Central Building is almost covered, and the North
Building does not have sufficient coverage. The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above, usually reqUIres overlapping fire hydrant
coverage, or a sprinkler system internal to each building in addition to the
skeleton system shown on the submitted plans. As noted above, a looped
water supply system will be required in order to achieve this.
40, The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature ./
on the Health Department application forms or within seven (7) days of site
plan approval, whichever occurs first. This fee will be determined based
uoon final meter size, or exoected demand,
41. Comprehensive Plan Policy 3,C.3.4. requires the conservation of potable
water. As other sources are readily available City water shall not be allowed ~
for irrigation.
42. Water and sewer lines to be owned and operated by the City shall be
included within utility easements. Please show all proposed easements on /
the engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated in
CODE Sec, 26-33(a),
43. This office will not require surety for installation of the water and sewer V
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
44. A building permit for this project shall not be issued until this Department V
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
45. PVC material not permitted on the City's water system. All lines shall be v'
DIP.
46. Aoorooriate backflow preventer(s) will be required on the domestic water r v"
1 ST REVIEW COMMENTS
06/26/06
7
DEPARTMENTS INCLUDE REJECT
service to the building, and the fire sprinkler line if there is one, In /
accordance with the CODE, Section 26-207.
47. Provide a minimum of 10-foot separation between water main, sanitary /
sewer, and storm sewer lines. Please note that City of Boynton Beach (
separation standards are more stringent that FDEP standards.
48. The LDR, Chapter 3, Article IV, Section 3(0) requires Master Plans to
show all utilities on or adjacent to the proposed tract. The plan must /
therefore show the point of service for water and sewer, and the proposed
off-site utilities construction needed in order to service this project.
49. The LDR, Chapter 3, Article IV, Section 3(P) requires a statement be
included that utilities are available and will be provided by all other /
appropriate agencies, This statement is lacking on the submitted plans,
50. A simple minor lift station connection into the city's master 20-inch force
main covering the eastern half of the city (as shown on Sheet C-2) will not
be permitted. As an altemate, sanitary sewer may tie into the wastewater ./
system serving the adjacent residential system, The proposed 4-inch force
main will be required to "tunnel" under the CSXRR to the existing system
located in SW 6th St. Calculations will be required to reflect that this
existing system can accommodate the proposed development as shown on
this submittal.
51. Utility construction details will not be reviewed for construction
acceptability at this time. All utility construction details shall be in ~
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates)
and will be reviewed at the time of construction permit application.
FIRE
Comments:
52, Provide a sheet, dedicated only to Fire Department concerns. Include on
this sheet, the location of all hydrants, the water supply information and V
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System, Show the proposed location of the Fire Department
Connections, Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building
is more than 200' from a hydrant.
53. All construction gates shall have a Knox lock for Fire Department access.
All gates shall be 12' wide if for one-way traffic and 20' wide if for two- i/
way traffic. Before construction begins, the Fire Department will field test
the gate access with an engine. This engine must be able to access the site
in one tum, with no backing up. During the construction any road shall have
turn around capabilities so that no road will dead end with out a place for
1ST REVIEW COMMENTS
06/26/06
8
DEPARTMENTS INCLUDE REJECT
the emnne to turn around.
54. All roads shall be compacted to 32 tons to the point of vertical construction.
These roads shall be kept clear of debris so that emergency vehicles can V
access any portion of the site. If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
responsible for the costs involved.
55. Provide a flow test, conducted by the Boynton Beach Fire Department that
shows a water supply of 3,000gpm at 2Opsi. To schedule this test, call (/
(56!) 742-6600.
56. Will this project be condominiums or one owner? V
57. A fire alarm will be required throughout all buildings, The fire sprinkler
system shall be monitored by an approved Central Station and a UL Letter t.../"
of Certification or an FM Placard shall be obtained.
58, Early Power release will not be given unless all Life Safety equipment is v'
installed and working. The only exception is that the alarm system does not
have to transmit to a central station at that point, but must sound locally to
notify workers to evacuate the building.
POLICE 'r;... . I
.:...../ l
Connnents:
59, Building lighting (non-glare) should be around perimeter on all sides and on
pedestrian walkways ./
I
60. Landscaping should not obstruct view from windows or walkways. ./
61. Landscaping should be maintained at three feet or less, Trees should be
installed so as not to conflict with the lighting system and tree limbs should /
be maintained at seven feet or higher.
62, All exterior doors should be equipped with security hinges and should be
reinforced with case hardened strike plate. ../
63. All buildings should be pre-wired for CCTV and alarm systems, ./
64. Glass perimeter doors should be equipped with case hardened guard rings to
protect the mortise lock cylinder. -/
65, Rear doors should be equipped with 180-degree peephole viewer.
-/
66. Mailboxes for buildings with multi-units should be placed in high activity
and conspicuous location for enhanced safety and natural surveillance of -/
users.
1ST REVIEW COMMENTS
06/26/06
9
DEPARTMENTS INCLUDE REJECT
67. Dumpsters should not allow for easy concealment, not create blind spots or I
hiding areas.
BUILDING DIVISION
Comments:
68. ptease note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the TART (Technical V
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
69. Indicate within the site data the type of construction of each building as
defined in 2004 FBC, Chapter 6. V
70. Indicate within the site data the occupancy type of each building as defined
in 2004 FBC, Chapter 3. V
71. The height and area for buildings or structures of the different types of
construction shall be govemed by the intended use or occupancy of the /'
building, and shall not exceed the limits set forth in Table 503 of the 2004
FBC.
72. Place a note on the elevation view drawings indicating that the exterior wall
openings and exterior wall construction comply with 2004 FBC, Table
704.8, or 2004 FBC, Residential, Section R302.2. Submit calculations that V'
clearly reflect the percentage of protected and unprotected wall openings
permitted per 2004 FBC, Table 704.8 or 2004 FBC, Residential, Section
R302,2.
73. General area modifications to buildings shall be in accordance with 2004
FBC, Section 506. Provide calculations verifYing compliance with the /'
above code sections and the 2004 FBC, Table 503,
74. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and /
the provisions of 2004 FBC, Section 1609 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
75. Add to all plan view drawings of the site a labeled symbol that represents
the location and perimeter of the limits of construction proposed with the V
subject request.
76. At time of permit review, submit signed and sealed working drawings of the ~
proposed construction.
1ST REVIEW COMMENTS
06/26/06
10
DEPARTMENTS INCLUDE REJECT
77. Add a labeled symbol to the site plan drawing that identifies the location of
the handicap-accessible parking spaces, The quantity of the spaces shall be
consistent with the regulations specified in the 2004 FBC. The accessible /
parking spaces that serve a use shall be located on the shortest safety
accessible route of travel from adjacent parking to an accessible entrance.
The 2004 FBC states that buildings with multiple accessible entrances shall
have accessible parking spaces dispersed and located closest to the
accessible entrance. 2004 FBC, Sections 11-4.1.2(5),4.3, and 4.6,
78. On the site plan and floor plan, indicate the number of stories that are in
each building including, where applicable, mezzanines. indicate the overall (/
height of each building.
79, Add to each building that is depicted on the drawing titled site plan and
floor plan a labeled symbol that identifies the location of the handicap- v/
accessible entrance doors to each building. 2004 FBC, Sections 11-4,1,2,
11-4,1.3, and 11-4,3,
80, Add a labeled symbol to the site plan drawing that represents and delineates
the path of travel for the accessible route that is required between the
accessible parking spaces and the accessible entrance doors to each
building. The installed symbol, required along the path, shall start at the
accessible parking spaces and terminate at the accessible entrance doors to
each building. The symbol shall represent the location of the path of travel,
not the location of the detectable warning or other pavement markings. The
location of the accessible path shall not compel the user to travel in a V
drive/lane area that is located behind parked vehicles. Identify on the plan
the width of the accessible route, (Note: The minimum clear width of an
accessible route shall be 36 inches, except at curb ramps that are part of a
required means of egress shall not be less than 44 inches), Add text to the
drawing that would indicate that the symbol represents the accessible route
and the route is designed in compliance with 2004 FBC, Section 11-4,3
(Accessible Route) and 11-4.6 (parking and Passenger Loading Zones).
Please note that at time of permit review, the applicant shall provide detailed
documentation on the plans that will verify that the accessible route is in
compliance with the regulations specified in the 2004 FBC, This
documentation shall include, but not be limited to, providing finish grade
elevations along the path of travel.
81. Vertical accessibility to the mezzanine area shall be required per the 2004 ~
FBC, Sections 11-4.1.2, 11-4,1.3(5) (New Construction) and Section 11-
4.1.6 (Alterations).
82. Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building. Verify that the proposed elevation is in ~
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A The design professional-of-record for the project shall add the following
text to the site data, "The proposed finish floor elevation NOVD is
1ST REVIEW COMMENTS
06/26/06
11
DEPARTMENTS INCLUDE REJECT
above the highest 100-year base flood elevation applicable to the building
site, as detennined by the SFWMD's surface water management construction
development regulations,"
B From the FIRM map, identifY in the site data the title of the flood zone
that the building is located within. Where applicable, specifY the base flood V
elevation. Ifthere is no base flood elevation, indicate that on the plans,
C IdentifY the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans), /
83. On the drawinl! titled site plan identify the property line. V
84. CBBCPP 3,C.3.4 requires the conservation of potable water. City water may /'
not, therefore, be used for landscape irrigation where other sources are
readily available,
85. A water-use pennit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source. A copy of the V
pennit shall be submitted at the time ofpennit application, F.S, 373,216.
86. If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and /'
the Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how
much is for sewer,
(CBBCO, Chapter 26, Article II, Sections 26-34)
87. At time of permit review, submit separate surveys of each lot, parcel, or tract. t/
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot, parcel, or tract. The
recorded deed shall be submitted at time of pennit review.
88. Add a general note to the site plan that all plans submitted for pennitting /'
shall meet the City's codes and the applicable building codes in effect at the
time of permit application,
89. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for /
review at the time of pennit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
90, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. If the project is multi- /
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building pennit application at the time of application submittal.
1ST REVIEW COMMENTS
06/26/06
12
DEPARTMENTS INCLUDE REJECT
91, Clarify the type of construction in accordance with the 2004 FBC, Chapter 6 v/
and Table 601.
92. Sheet A-O.I calls out for 12 handicap accessible parking spaces but the site t/
nlan onlv shows 10. Clarify
93. Sheet AU - Indicate the required fire rating of the typical tenant separation V
wall per the 2004 FBC.
94, Sheet A-O indicates a mezzanine area in the bays. Clearly show the locations
of the mezzanines on the floor plans, the square footage of each mezzanine V
and the means of egress from each mezzanine in accordance with 2004
FBC,
95. An approved automatic fire sprinkler system is required in each building per ;/
Chapter 9 of the CBBCO, Section 9-6(A)(4), and 2004 FBC, Section
903.2.13.
96. Submit irri"ation nlans. V
PARKS AND RECREATION
Comments: /
97. Plant List - separate trees and palms from shrubs and sod. Denote which V
snecies are native and the overall nercental!e of native nlants.
98. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed V
areas.
99. The use of large trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in small or confined areas. V
This plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide. This is
not sufficient area to allow a root system needed for the oak canopy, It is
recommended that a different snecies be considered for these areas.
FORESTERlENVIRONMENT ALIST
Comments:
Existin!! Trees List - Mana!!ement Plan
Sheet L - 4
100. The Landscape Architect should tabulate the total diameter inches of V
existing trees on the site, The tabular data should show the individual
species of trees proposed to be preserved in place (2 Sabal Palms, 5 Live
Oaks), relocated or removed and replaced on site. The replacement trees
should be shown by a separate symbol on the landscape plan sheet L-4 of
4. [Environmental Regulations, Chapter 7.5, Article I Sec. 7,D.p. 2.]
I ST REVIEW COMMENTS
06/26/06
13
DEPARTMENTS INCLUDE REJECT
Plant List Sheet L-4
101. All shade and palm trees must be listed in the description as a minimum of
3" DBH (4.5' off the ground) not caliper. The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk t./
(c.t.) specifications. [Environmental Regulations, Chapter 7.5, Article II
Sec. 5.C, 2,]
102. All trees proposed under any existing overhead electric power lines must
meet the FP & L Right tree in the Right Place manual selection for small V
trees only,
103. The shade tree planting detail should including a line indicating where the
diameter and height of all of the trees will be measured at time of planting v'
and inspection,
104, The palm tree planting detail should include a line indicating where the
clear trunk and height of all of the palm trees will be measured at time of V
planting and inspection.
105, The shrub and groundcover planting detail should include a line indicating
where the height and spread of the shrubs and groundcover plants will be
measured at time of planting and inspection. ~
106, The applicant should add a note that all utility boxes or structures (not
currently known or shown on the plan) should be screened with Coco plum V
hedge plants on three sides.
107. The applicant should show an elevation cross-section detail of the actual
heights of the proposed landscape trees and vegetation (proper scale) at the ~
time of planting to visually buffer the proposed buildings and parking lot
from the 1-95 and SW 8th Street road rights-of-ways,
PLANNING AND ZONING
ents:
~ At the technical advisory review team (TART) meeting, provide written /
responses to all staff's comments and questions. Submit 12 sets of revised
f".. plans, Each set should be folded and stapled.
'!Y' At the technical advisory review team meeting, also provide a full set of /
reduced drawings, sized 81'2 inches by II inches of each plan, Save each
~ plan to a compact disk and submit that to staff as well.
~ Staff considers these plans to be at the final stage of site plan review, the /
last stage prior to permit review. As such, all comments need to be
addressed and shown on the olans prior to the TART meeting.
8 It is the applicant's responsibility to ensure that the new site plan is publicly /
advertised in accordance with Ordinance 04-007 and Ordinance 05-004.
~ Applicants who wish to utilize City electronic media equioment for ./
'-./
1 ST REVIEW COMMENTS
06/26/06
14
fI
tJ
~.
DEPARTMENTS
INCLUDE REJECT
presentations at City Commission Public Hearings must notify the Planning
and Zoning Department representative at least one week prior to the
scheduled meeting, Staff recommends using a PowerPoint presentation at
the Community Redevelopment Agency Board meeting.
The New Site Plan application indicates that "Boynton Industrial, LLC" is
the property owner. Please provide a copy of the deed indicating the same.
The New Site Plan application (11.2) indicates the subject property is zoned
"MIC", which is incorrect because there is no such zoning district. The
correct zoning for the subject property is "M-I Light Industrial". Please
submit a revised application that indicates the correct zoning district.
The applicant is responsible for compliance with Ordinance 05-060, the
"Art in Public Places" program and must demonstrate their participation.
Please advise how the ro'ect would com I . w;q . (, 7,
A drainage statement is required prior to the Technical Advisory Review
Team (TART) meeting (Chapter 4, Section 7,F.2.),
~
v'
r./
G The traffic impact analysis must be approved by the Palm Beach County
Traffic Division for concurrency purposes prior to the issuance of any
building permits (Chapter 4, Section 8.F.). Also, staff has great concerns /
over the type of vehicular traffic (i.e. tractor trailers, big rigs) that this
project is expected to generate. The site is nestled between the C.S.x,
railroad tracks deep within an established single-family community, The
traffic analysis states "the proposed redevelopment of the site...is expected
to result in uses that are primarily served by smaller single unit box trucks
for pickups and deliveries", While the analysis is eloquently articulated,
staff still has concerns over the legitimacy and practicality of its
conclusions. In fact, the anticipated performance of the site (i.e. truck
traffic) may conflict and impact the adjacent residential land use that the
project would not meet the intent, purpose, and protections that the zoning
code provides. How can the city be assured there would be no conflicts
with large truck traffic? Deed or lease restrictions? Please see Engineering
comments regarding off-site roadway improvements,
(
8
e surveys when all lots are combined (excluding the 0.138-acre
lot) create 295,013 uare-foot parcel. However, both the New Site Plan
application, survey both indicate a parcel size of 294,914 square
feet. All three (3) must items be consistent with each other. Revise
accordingly. ,
\J c;,D
Plan revisions must be reflected on all appropriate sheets throughout the
plan set.
UVt.Kd Fo.\2.~{lI
v
t/
1/
tST REVIEW COMMENTS
06/26/06
15
DEPARTMENTS
Qdd bearings and distances (which match survey) to perimeter property
~ine~ on site plan (sheet A-O,I). f'lo S\.V'l.{."l'<j t;J'A-J :,v.X~bq
,vITh h~.ult v . Cf'\,~ &t(UUU
f'(;;) Gross floor area is defined as follows: The total floor area of a building or a
D use occupying part of a building, measured from centerlines of partitions
and exterior of outside walls. Gross floor area shall include all floor area
occupied by the main or principal use, plus any floor area occupied by
accessory uses such as storage rooms, maintenance and mechanical rooms,
offices, lounges, restrooms, lobbies, basements, mezzanines, and hallways.
The project's required parking is based on gross floor area, which would
include the meter rooms. Huw~y'~, staff uvtGJ tflftt the el83~d J.Udl;;l IUUUU5
W@f'" not ln~l11rl~a 7;ithill the breakasyffl. .)f J."''iU~.l""J Pa.lh.~l1g,. 'Flll ~p r~,
re,q€~ the sik plan tabular data to iaeh:u:le tile 111Gt"".l lUUII~ witbiu tin... flVUl
area gf Pltl1f~T t1:)e "gffiee" or "n'a.ld.lol1sc" ~ . Slaff l\;\,,;uudlleJldS
~~~::~eheu~th~ef~ .O~~~~ than
V1 .] e
INCLUDE REJECT
~
~
In addition to the parking required for each building, please provide a
summary for all three (3) buildings combined, which itemizes total office
area and total warehouse area. De ftol ",^""]ud",, tin;; lucrer IUUlIJ.:S [lUlu tL"
parJdAg r~'J:aireu.l\'''l1l unless they redeSIgned. so that lllcy au::; llUL l;;udv.;>c8 'by
an gvtPM')'" 998r.
On the site plan, please provide a label indicating the number of spaces
proposed within each row. Ensure that the number of parking spaces within
each row and their respective label is match and are correct.
The survey shows that the site contains a "Cracker Barrel" billboard and a
cell tower. Will the billboard be removed? If not, when the does the lease
agreement expire?
~v'"
C"..,
''JI''
v
G'0~0...
~ Will an on-site lift station be required as a result ofthis development? If so,
indicate its location on the site plan,
A unity of title may be required. The Building Division of the Department
of Develo ment will determine its a licabili .
Abandonment and rededication of easements must be recorded prior to
issuance of a building permit for the project. Vacating easements may be
accomplished through the platting process, which is overseen by the
En 'neerin Division of Public Works.
~.
z/
vi
v
/
v
l/
/'
v
tST REVIEW COMMENTS
06/26/06
16
)>{
B.
DEPARTMENTS
Public Works' review and approval.
~
The placement and angle of the dumpster enclosures will be subject to
Public Works' review and a roval,
Provide a detail of the parking space and HlC space on the paving &
drainage plan (sheet C-6) and make sure that they are consistent with what
is shown on the site plan (sheet A-O,I). The site plan currently shows the
spaces would be dimensioned 16 feet in length with two (2) feet of
vehicular overhang for a total of 18 feet but the parking stall detail shows
that each space would be 20 feet in length. Please clarify.
I
3 .
Include a color rendering of all elevations prior to the TART meeting
(Chapter 4, Section 7,D.2.). These will be on display at the public
meetings.
All building elevations should indicate the paint manufacturer's name and
color codes (Chapter 4, Section 7.D.). Provide paint swatches for the
elevations. Staff recommends using a color schedule (Chapter 4, Section
7,D,).
I
Place a note on the site plan that all above ground mechanical equipment
such as exterior utility boxes, meters, transformers, and back-flow
preventers shall be visually screened (Chapter 9, Section 10.CA.).
A signature tree (such as a Yellow Elder, Tibouchina Granulsola, or
Bouganvillea) is required at both sides of the project entrance / exit on West
Ocean Avenue. The signature trees must have six (6) feet of clear trunk if
placed within the safe-sight triangle (Chapter 7.5, Article 2, Section 5.N.).
Alternative plant material may be substituted if the above referenced plant
material is not available or undesired. Any substitution of plant material
(for the signature tree requirement) will be subject to the City Forester /
Environmentalist review and approval.
The trees proposed around the office / warehouse buildings must be
installed at Yz the buildin hei ht of the buildin s 14 feet to 16 feet ,
clude shrubs into the landscape design within pervious areas along the
sides for the three (3) buildings, as well as in areas labeled "sod" along east
buildin elevations.
Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7,5, Article II, Section 5.P), Please categorize into the three (3)
categories as follows: 1. Shade trees, 2. Palm trees, 3, Shrubs &
Groundcover. On the landscape plan, indicate the total quantities within
each category and their native percentages.
INCLUDE REJECT
v
/
v'
v'
v'
v
v
/'
./
1ST REVIEW COMMENTS
06/26/06
17
DEPARTMENTS INCLUDE REJECT
d All shrubs and hedges are required to be at minimum 24 inches in height,
24 inches in spread, and planted with tip-to-tip spacing measured /
immediately after planting to adequately cover the planted areas on the site
(Chapter 7.5, Article II, Section 5.CA.),
@ If potable water is used for irrigation purposes, the use of drought tolerant V'
plant species (per the South Florida Water Management District Manual)
shall be maximized, and the irrigation system should have water conserving
designs (such as a drip system), where possible,
l' Lighting shall not be of an intensity that produces glare on adjacent property V
(Chapter 9, Section IO.F.2,).
r---\
I e;Y Feature lighting emphasizing plants, trees, barriers, entrances, and exits is L/
encouraged (Chapter 9, Section IO,F.3.). This is especially pertinent for the
east buildinl! facades that would be visible from Interstate 95.
ell proposed signage is subject to the Planning & Development Board and
City Commission review and approval. Ng u'all sigaage ii cohmun nn the l---"""
eJ~UJltiQns. Staff recommends that you submit a master sign program that
shows the number, location, dimensions, exterior finish, and color(s) of all
wall signs and freestanding sign. PrsH1d.e a 8@tatI ....f tlJ~ 1I1UlIUHU;uL ::loiell
rr~p.......sea ttt \Y"'o::ll O",Gj}t.. ?.,'eR'le. -C811~GtinJ], tin; lulu} ,{all sigr'':Jgp lTl~Y
not PYl"ppn 1 :145 gflHare feet (Ckapter 21, ~\J.t~dG IY, Seeaea S.C.).
Indi<':lte I:'Q~liafle' VY~tlJ. filii:) '"'ud.... limitatiQM nn plthp-r thE> pl~~'ati8B 3... flVVl
plan Bf~'"jl'lgs. 1Iu> }{)O'<'MI....z'^-"! ~~ ~ V iOr
~.Wv\. &<-R.J' lYl,;iocd:c x' ',>v,
Q . ,
143. Staff recommends installing a cluster of palm trees near the dumpster t./'
, _ ~nclosures in lieu of canopy trees.
~~affrecommends enhancing the east fayade of all three (3) buildings due to
the fact that they will be highly visible from Interstate 95. A comparable
office / warehouse project by Levitt Corporation was recently constructed ./
along High Ridge Road (within the city) that contained unique qualities that
further enhanced its design. Likewise, staff is particularly conscious of this
project's current location because of its close proximity and visibility to
Interstate 95. Therefore, staff will be making design-related comments to
both the Planning & Development Board and the City Commission. Staff
understands that the constraints of this linear site (and location) and concurs
with the project intent to face the overhead doors eastward, opposite the
residential homes, However, if possible, staff recommends recessing the
overhead doors, approximately four (4) to five (5) feet from the main
exterior wall. Also, the overhead doors should be separated six (6) to eight
(8) feet from each other. This would help to break up the double doors and
the "look" of massive 24-foot wide overhead doors, Please consider the use
P\ "\i
1ST REVIEW COMMENTS
06/26/06
18
DEPARTMENTS INCLUDE REJECT
of low-profile overhead doors rather than wide panel doors. Finally, please V
consider increasing the height of the entry panels to help break up the
"horizontal" characteristic of the project. The use of faux Bahama-style
~ shutters would look nice over the office windows.
~, West fayade requires additional architectural enhancement, as there is a ~
great deal of blank wall facing a residential neighborhood. A variation in
roof line, as shown on the east elevation, would also improve the west
~ facade.
~ The cell tower compound on the site does not appear to have any t/
landscaping other than sod surrounding it. The fenced compound should
have shrubs to a minimum of half the height of the fence and trees every 20
F ~... feet on center.
~ All rooftop equipment must be completely screened from view at a J
minimum distance of 600 feet.
MWR/sc
S:IPlanningISHARED\WP\PROJECTSIOcean 95 Exchange Parkl1ST REVIEW COMMENTS.doc
F'{4~~-
- po~n,
91, ~L.l t\1
-c~~1'(l...
Lf?>jtz.,?., ~
-s~
---
* 7;;>llL{w2 U1
Tof Irt-- _
\"'71,9 1\ ~
o HIe. E: -'" ~[-;Lqb @ ~(..?V() -:; II, eeS (7?J\
\Vf\1L-~(-tPj,(.5 e ~ IID,{OlS @ \.tt,OO ~ ID'b .L(p (\ 3'1)
2\5 /~
1st REVIEW COMMENTS
New Site Plan
EAJ6
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: I"reviewplans identified as a New Site Plan with a Mav 17. 2006 Planning & Zoning date stamp
ki
mar n".
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section .\
10-26 (a).
2, The provided site dumpster enclosure detail (Sheet A-O.! does not meet the
minimum requirements of City Standard Drawing G-4 and LDR, Chapter
7,5, Article II, Section 5.J. and Article III, Section 9.A,9,a. Revise the detail "
to provide a minimum 10 foot (internal) depth and width for the pad.
3. The required gates for the dumpster shall contain long steel rods to drop into
the pavement in order to secure the gates in the open and closed positions, ','
Drilled holes (for concrete) or metal sleeves (for asphalt) shall be provided
for the locking rods,
4. The proposed dumpster enclosure locations (Civil Sheets C-l through C-3)
do not provide the required minimum backing clearance of 60 feet
(measured from the front edge of the dumpster pad.) (LDR, Chapter 2, \,
Section II.J,2,b.) Please correct.
5, Provide a minimum outside turning radius of 55 feet to allow tuming
movements for Solid Waste (and FirelRescue) inside the proposed
development. Using AutoTum (or similar), show on the plans that the
required turning movements are provided, Particular attention should be
given to the entryways and turn-around areas that allow ingress and egress
for Solid Waste and FirelRescue.
6. Rotate the first five dumpsters (north to south) 180' so that Solid Waste is
picked up on the way out of the plaza, This will minimize (somewhat) the
backing across both lanes of traffic.
7, The location and orientation of the sixth dumpster (furthest south) is not
acceptable because tuming around cannot be safely accomplished at this
location. Please revise location and/or orientation using the criteria
previously stated in this memo.
8, There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly,) Please relocate canopy trees so that they do not create a ,
vertical conflict for Solid Waste pickup or replace canopy trees with a tree .
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
1ST REVIEW COMMENTS
06/26/06
2
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Forestrv and Grounds
Comments:
9. Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II,
Section 5.H.) using a 25 foot sight triangle, .~'
10. Staff strongly recommends placing canopy trees far enough back from drive
aisles to minimize the potential for vertical conflicts with high-profile ...,
vehicles,
11. Gumbo Limbo should placed a minimum of 10 foot away from curb in
landscape islands to prevent breaking and heaving at the tree's maturity.
12. Live Oaks and Gumbo Limbo should be placed a minimum of 10 feet from
the property lines to allow for maintenance at maturity. The east and west
property lines abut the 1-95 and CSXRR rights-of-way, respectively. Both
entities have restrictions in allowing non-public uses on their properties.
13, There are overhead lines along the north and west property lines.
Landscaping shall be designed and installed in accordance with FPL's
"Plant the Right Tree in the Right Place."
PUBLIC WORKS Traffic
Comments:
14. Provide a notice of concurrency (Traffic Performance Standards Review)
from Palm Beach County Traffic Engineering.
15. On the Site and Civil plans, show and identifY all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe "
the "Loading Area" (LDR, Chapter 2, Section 11.1); include a pavement
message in yellow indicating "No Parking - Loading Zone". See City
Standard Drawings "K" Series for striping details.
16, Provide Fire Lanes in accordance with the LDR, Chapter 23, Article II,
Section B,2 and Section M, ,
-
[5T Parking stalls are incorrectly dimensioned at 9 feet x 18 feet The correct
stall dimension is 9y,-feet x 18y,-feet with a 25 foot minimum aisle width.
18. Staff strongly recommends specifying wider lane widths to accommodate
truck traffic and backing movements.
19. The proposed site layout will not adequately accommodate turn-around
movements for any trucks using this development. Tum-arounds will need ..
to be nrovided for Solid Waste, Fire-Rescue, and trucks doinl!: business
1ST REVIEW COMMENTS
06/26/06
3
DEPARTMENTS
within the Plaza.
20, Staff has serious concerns about the impact of additional truck traffic
through the residential area. There is an existing truck route along NW I"
Ave. that is supposedly carrying a very minimal amount of truck traffic from
SW 8th Street to the industrial area. It appears that this route was chosen in
earlier years because it had the least number of homes that would be
impacted by the truck traffic when compared to other area residential streets.
However, this route is not the most logical from the perspective of truck
movements. Intersection radii at all points along the route are insufficient
for larger trucks to avoid damage to adjacent turfed rights of way and
private properties.
Because the proposed development will significantly add to the volume of truck
traffic through the residential area, staff believes that a truck route should be
selected that has the least impact or potential to damage the public right of
way. Furthermore, all possible actions to minimize truck conflicts with
pedestrians (i,e.. children at Hibiscus Park) should be considered. Lastly,
Staff is concerned that the existing pavement structures in the immediate area
are not able to handle the additional heavy wheel loadings of truck traffic and
that the additional trucks could harm the existing streets adding to the tax
burden of Boynton Beach residents. Therefore, because of these impacts, staff
believes that it is entirely appropriate for the developer to be required to
mitigate these safety and structural impacts associated with the additional
truck traffic.
Upon review of the Traffic Impact Analysis and Local Street Analysis provided
for this project Staff proposes three alternatives for movement of traffic
accessing the Ocean 95 Exchange Plaza. Recommended alternatives are
given in order ofpreference:
a. Construct a new road from Morton's Way north to the proposed
development. The proposed roadway shall have a 50foot private right-of-
way width, a minimum of two 12 foot lanes, sidewalk on at least one side
of the street, and provide for stormwater runoff. The designated truck
route will be Woolbright to SW 8th Street to Morton's Way then north to
the Ocean 95 Exchange Plaza.
b. Reconstruct the existing truck route (Boynton Beach Blvd, to NW 7th St.
to NW I" Ave. to NW 6th St. to W. Ocean Ave. then east into the Ocean
95 Exchange Plaza.) The right-of-way width for these roads is 50 feet
except for Ocean Ave" which is 70 feet. The typical section shall consist
of a 30 foot paved roadway with curb & gutter, sidewalk on at least one
side of the street, and provide for storm water runoff. Additional work
will be required at the round-about at the intersection of W. Ocean
Avenue, West Ocean Drive and NW 6th Street to accommodate correct
tuming movements for all vehicles using this intersection.
c, Reconstruct W. Ocean Avenue from Boynton Beach Blvd. to Ocean
Avenue then east to the Ocean 95 Exchange Plaza. This will become the
designated truck route. The right-of-way width for Ocean Ave. is 50 feet
to the intersection of Ocean Ave. and NW 6th Street then 70 feet from the
,
INCLUDE REJECT
1ST REVIEW COMMENTS
06/26/06
4
DEPARTMENTS INCLUDE REJECT
intersection east. The typical section shall consist of a 30 foot paved
roadway with curb & gutter, sidewalk on both sides of the street and
provide for storm water runoff. Additional work will be required at the
round-about at the intersection of West Ocean Avenue, West Ocean
Drive and NW 6th Street to accommodate correct tuming movements for
all vehicles using this intersection.
ENGINEERING DIVISION
Comments:
21. Add a note to the Site Plan stating "All plans submitted for specific permits
shall meet the City's Code requirements at time of application. These
permits include, but are not limited to, the following: paving, drainage,
curbing, site lighting, landscaping and irrigation. Permits required from ,
other permitting agencies such as Florida Department of Transportation
(FDOT), South Florida Water Management District (SFWMD), Lake Worth
Drainage District (LWDD), Florida Department of Environmental
Protection (FDEP), Palm Beach County Health Department (PBCHD),
Palm Beach County Engineering Department (PBCED), Palm Beach
County Department of Environmental Resource Management (PBCDERM)
and anvothers, shall be included with the permit request."
22. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
23. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review.
24. Provide written and graphic scales on all sheets.
25, Show and identify all features adjacent to the site to be developed on the
plans (including the site plan, civil plan, and landscape plans) such as the
CSXRR and 1-95.
26. Provide the Site, Civil and Landscape plans at the same scale (LDR,
Chapter 4, Section 7,) ,
27. Provide the Civil plans at the same sheet size as the remainder of the
package (24-in. x 36-in.)
28. Show proposed site lighting on the Site and Civil plans (LDR, Chapter 4,
Section 7.BA,)
29. Provide a drainage plan in accordance with the LDR, Chapter 4, Section
7.F. The plan should include a sufficient number of existing and proposed ,
grades to indicate general flow patterns for stormwater management.
'.
1ST REVIEW COMMENTS
06/26/06
5
DEPARTMENTS INCLUDE REJECT
30. Provide an engineer's certification on the Drainage Plan as specified in
LDR, Chapter 4, Section 7,F.2.
31. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article N, Section 5 will be required at the time of
permitting.
32. Show on plans (and identifY) the 48-inch RCP drainage pipe and associated
perpetual easement located between the North and Central Buildings. A
potential vertical conflict may exist between the drainage pipe and proposed "
water and sewer mains. Please identifY and resolve these conflicts.
33. Correct Sheet C-3 to read W. Ocean A venue, not Ocean Boulevard,
34. Paving, drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
UTILITIES
Comments:
35. Please provide a time line that clearly illustrates when water and sewer
services will be required to serve the proposed project. Your starting date
for the time line should be the date of City Commission approval. Also .'
provide milestone dates for permit application, the start of construction, and
the setting of the first water meter. This time line will be used to determine
the adequacy of water and wastewater treatment capacity for your project
upon the project's completion, so please be as accurate as possible.
I 11 '
36. All utilUy~ents and utility lines shall be shown on the site plan and
\, landscape plan~(as well as the Water and Sewer Plan~ so that we may
, aelemtlne 'w1llch 'appurtenances, trees or slriubbery may interfere with
utilities. In general, palm trees will be the only tree species allowed within
utility easements, Canopy trees may be planted outside of the easement so
that roots and branches will not impact those utilities within the easement in
the foreseeable future, The LDR, Chapter 7.5, Article I, Section 18.1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
37. Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Section 26-12).
38. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 gpm with 20 psi residual pressure as stated in the
LDR, Chapter 6, Article N, Section 16, or the requirement imposed by . '
1ST REVIEW COMMENTS
06/26/06
6
DEPARTMENTS INCLUDE REJECT
insurance underwriters, whichever is greater (CODE, Section 26-16(b)). A
single 6-inch spur line, 1,830 long, off of an existing 6-inch water main (in
Ocean Ave.) will not meet this requirement. Improvements to the water
utility system off-site will be required in order to support this proposed
development via a looped water main system.
39. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant.
Please demonstrate that the plan meets this condition, by showing all
hydrants. Our preliminary review indicates that the South Building has
sufficient coverage, the Central Building is almost covered, and the North
Building does not have sufficient coverage, The proposed fire hydrant
configuration needs to be reviewed entirely. A single fire hydrant can only
deliver approximately 750 gpm at best. To provide the 1,500 gpm
requirement noted above, usually requires overlapping fire hydrant
coverage, or a sprinkter system intemal to each building in addition to the
skeleton system shown on the submitted plans. As noted above, a looped
water supply system will be required in order to achieve this.
40. The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within seven (7) days of site
plan approval, whichever occurs first. This fee will be determined based
UDon final meter size, or expected demand.
41. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. As other sources are readily available City water shall not be allowed
for irrigation.
42. Water and sewer lines to be owned and operated by the City shall be
included within utility easements. Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated in
CODE Sec. 26-33(a).
43. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy,
44, A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15,
45. PVC material not permitted on the City's water system. All lines shall be
DIP.
46, Appropriate backflow preventer(s) will be required on the domestic water
'.'
I ST REVIEW COMMENTS
06/26/06
7
DEPARTMENTS INCLUDE REJECT
service to the building, and the fire sprinkler line if there IS one, in
accordance with the CODE, Section 26-207. .-
47. Provide a minimum of lO-foot separation between water main, sanitary
sewer, and storm sewer lines. Please note that City of Boynton Beach
separation standards are more stringent that FDEP standards,
48. The LOR, Chapter 3, Article N, Section 3(0) requires Master Plans to
show all utilities on or adjacent to the proposed tract. The plan must
therefore show the point of service for water and sewer, and the proposed ,
off-site utilities construction needed in order to service this project.
49. The LOR, Chapter 3, Article N, Section 3(P) requires a statement be
included that utilities are available and will be provided by all other ..
appropriate agencies. This statement is lacking on the submitted plans.
50. A simple minor lift station connection into the city's master 20-inch force
main covering the eastem half of the city (as shown on Sheet C-2) will not
be permitted. As an alternate, sanitary sewer may tie into the wastewater
system serving the adjacent residential system, The proposed 4-inch force - ,
main will be required to "tunnel" under the CSXRR to the existing system
located in SW 6th St. Calculations will be required to reflect that this
existing system can accommodate the proposed development as shown on
this submittal.
51. Utility construction details will not be reviewed for construction
acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construetion Standards" manual (including any updates) .
and will be reviewed at the time of construction permit application.
FIRE
Comments:
52, Provide a sheet, dedicated only to Fire Department concerns. Include on
this sheet, the location of all hydrants, the water supply information and
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building
is more than 200' from a hydrant.
53, All construction gates shall have a Knox lock for Fire Department access.
All gates shall be 12' wide if for one-way traffic and 20' wide if for two-
way traffic. Before construction begins, the Fire Department will field test
the gate access with an engine. This engine must be able to access the site
in one turn, with no backing up. During the construction any road shall have
turn around capabilities so that no road will dead end with out a place for
HNM ARCHITECTURE, LLC
3705 NORTH FEDERAL HIGHWAY
DELRAY BEACH, FLORIDA
TEL: 561.733.2225
FAX: 561 .733.23B3
AUGUST 22NO, 2006
CITY DF BOYNTON BEACH PLANNING AND ZONING DIVISION
PROJECT NAME: OCEANS 95 EXCHANGE PARK
FILE NUMBER: NWSP 06-020
RE: 1sT REVIEW RESPONSES TO COMMENTS DATED 2006-06-20
PUBLIC WORKS - SOLID WASTE
COMMENT NO.2:
DUMPSTER ENCLOSURE... MINIMUM 10FT DEPTH AND WIDTH FOR PAD
RESPONSE:
DUMPSTER ENCLOSURE PADS HAVE BEEN REVISED TO APPROPRIATE DEPTH AND
WIDTH, SEE AD. 1 AND DETAIL ON AO.2.
COMMENT NO.3:
DUMPSTER ENCL05URE...STEEL RODS TO DROP INTO PAVEMENT.....DRILLED
HOLES FOR CONCRETE, METAL FOR ASPHALT.....
RESPONSE:
DUMPSTER DETAIL ON SHEET AD.2 PROVIDES SLEEVES AS REQUIRED.
COMMENT No.4:
DUMPSTER ENCL05URE...MINIMUM BACKING 60'
RESPONSE:
ApPROPRIATE BACKING DISTANCE NOW PROVIDED REFER TO SITE PLAN AD. 1.
COMMENT NO.5:
MINIMUM OUTSIDE TURNING RADIUS OF 55....SHOW ON PLANS, INGRESS EGRESS
AREAS TURN AROUND AREAS....ENTRYWAYS.
RESPONSE:
SITE PLAN HAS BEEN REVISED EXTENSIVELY IN AREAS MENTIONED ABOVE.
PAVEMENT AREAS HAVE BEEN WIDENED AT ENTRY, BETWEEN BUILDINGS AND IN
THE BACK (SOUTH END) OF THE SITE TO ACCoMADATE 55' TURNING RADIUS FOR
SOLID WASTE AND FIRE RESCUE TURN AROUND. REFER TO SHEET AD. 1.
COMMENT No.6:
ROTATE THE FIRST FIVE DUMPSTERS 180 DEGREES
RESPONSE:
DUMPSTERS HAVE BEEN ROTATED AS REQUESTED, REFER TO AD. 1.
S:\20a5\2D05-PRD.JECT5\05~036-BOYNTDN BCH & J-95 MWOOD\ 1-0DCS-EMAIL\LETTERS-Mlsc\2D06-07-25-1 ST
REVIEW RESPONSES-TART. DOC
COMMENT No.7:
LOCATION AND ORIENTATION OF THE SIX DUMPSTER...
RESPONSE:
SIX DUMPSTER HAS BEEN ROTATED PER CRITERIA STATED IN COMMENT No.6
ABDVE, REFER TO SHEET AD. 1
PU8L1C WORKS - TRAFFIC
COMMENT NO. T 5:
ON SITE PLAN...SHDW AND IDENTIFY ALL NECESSARY TRAFFIC CONTROL DEVICES
RESPONSE:
ALL TRAFFIC CDNTROL DEVICES NOW SHOWN DN SITE PLAN SHEET AD. 1.
COMMENT NO. T 7:
PARKING STALLS ARE INCORRECTLY DIMENSIDNED AT 9 FT X 18FT ...
RESPONSE:
PARKING STALLS HAVE BEEN
LOR ARTICLE II DEFINITIONS
CORRECTED TO 9'-6" X 1
STATE STALLS MAY BE 9'
S'-6", EVEN THOUGH
X 18' @.
COMMENT NO. T B:
STAFF STRONGLY RECOMMENTS SPECIFYING WIDER LANE WiDTHS.........
RESPONSE:
LANES AND PAVEMENT AREAS AT THE CRITICAL LOCATIONS HAVE BEEN WIDENED
(AT ENTRY, BETWEEN BUILDINGS AND IN THE BACK (SOUTH END) OF THE
SITEI.REFER TO SHEET AD. 1
COMMENT NO. T 9:
THE PROPOSED SITE LAYOUT WILL NOT ADEQUATELY ACCOMMODATE TURN-
AROUND MOVEMENTS FOR ANY TRUCKS USING THIS DEVELOPMENT.
RESPONSE:
SITE PLAN HAS BEEN REVISED EXTENSIVELY IN AREAS MENTIONED ABOVE.
PAVEMENT AREAS HAVE BEEN WIDENED AT ENTRY, BETWEEN BUILDINGS AND IN
THE BACK (SOUTH END) OF THE SITE TO ACCOMADATE 55' TURNING RADIUS FOR
SOLID WASTE AND FIRE RESCUE TURN AROUND. TRACTOR TRAILER/TRUCKS ARE
NOT ANTICIPATED IN THIS PARK. PROJECT WILL HAVE LIGHT INDUSTRIAL USERS
THAT WILL USE SMALLER VAN/ PICK UP TRUCKS (I.E. FED EX, UPS, BAKERY VAN
STYLE/SIZE TRUCKS) IF ANY. REFER TO SHEET AD. 1.
ENGINEERING DIVISION
COMMENT NO.2 T :
ADD NOTE "ALL PLANS SUBMITTED FOR SPECIFIC PERMITS SHALL MEET CITY...
RESPONSE:
NOTE HAS BEEN ADDED TO ARCHITECTURAL SITE PLAN SHEET AD. 1
COMMENT NO. 22:
ALL COMMENTS REl;IUIRING CHANGES AND/OR CORRECTIONS TO THE PLANS ...
RESPONSE:
ALL REI:i;IUIRED CHANGES HAVE BEEN CLOUDED AND MARKED WITH REVISION
TRIANGLE No.1.
5:\200S\200S-PRo.JECTS\OS-036-BOYNToN BCH & 1-95 MWooo\ 1 -OOCS-e:MAIL\LETTE:RS-MISC\2006-07-26-1 ST
REVIEW RESPONSES-TART. DOC
COMMENT NO.24:
PROVIDE WRITTEN AND GRAPHIC SCALES ON ALL SHEETS.
RESPONSE:
WRITTEN AND GRAPHIC SCALES ARE PROVIDED ON ALL ARCHITECTURAL SHEETS.
COMMENT NO.25:
SHOW AND IDENTIFY ALL FEATURES ADJACENT TO THE SITE TO BE DEVELOPED
ON THE PLANS..
RESPONSE:
ALL FEATURES ADJACENT TO SUBJECT PROPERTY INCLUDING CSXRR AND 1-95
ARE SHOWN ON ARCHITECTURAL SITE PLAN SHEET AD. 1.
COMMENT NO.26:
PROVIDE DRAWINGS AT SAME SCALE.
RESPONSE:
ALL SITE PLANS SHALL BE AT 1" = 40'-0" SCALE PER ARCHITECTURAL SITE
PLAN SHEET AD. 1.
COMMENT No.2B:
SHOW PROPOSED SITE LIGHTING.
RESPONSE:
PROPOSED SITE LIGHTING SHOWN ON ARCHITECTURAL SITE PLAN SHEET AD.l.
UTILITIES
COMMENT NO.36:
ALL UTILITY EASEMENTS AND UTILITY LINES SHALL BE SHOWN ON THE SITE
PLAN...
RESPONSE:
ALL EASEMENTS AND LINES HAVE BEEN ADDED TO ARCHITECTURAL SITE PLAN
SHEET AD. 1
COMMENT NO. 39:
LDR CHPT 5 ART IV, SECTION 15 REQUIRES THAT ALL POINTS ON EACH BLoG
WILL BE WITHIN 200 FT OF A FIRE HYDRANT ...
RESPONSE:
ALL FIRE HYDRANT LOCATIONS HAVE BEEN ADDED TO ARCHITECTURAL SITE
PLAN SHEET AD. 1
COMMENT NO. 39:
LDR CHPT 3 ART IV, SECTION 3P REQUIRES A STATEMENT BE INCLUDED...
RESPONSE:
STATEMENT HAS BEEN ADDED TO ARCHITECTURAL SITE PLAN SHEET AO.l
POLICE DIVISION
COMMENT No.59 THRU 67:
CRIME PREVENTION DESIGN SHOULD BE UTILIZED THROUGHOUT PRO.JECT..
RESPONSE:
ALL COMMENTS WILL BE TAKEN INTO CONSIDERATION TO PROVIDE A SAFE
ENVIRONMENT.
S:\2005\2005-PRa.JECTs\05~036-BOYNTON BCH & 1-95 MWooo\ 1-00CS-EMAIL\LETTERS-Mlsc\Z005-07-Z5-' ST
REVIEW RESPONSES-TART. DOC
BUILDING DIVISION
COMMENT No.6 9 THRU 71:
TYPE OF OONSTRUCTION...OCCUPANCY.......HEIGHT AND AREA
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' AND COVER SHEET.
COMMENT NO.
PLACE A NOTE
RESPONSE:
NOTE STATING
A4.2.
72:
ON ELEVATION
PER TABLE 704.8 EXTERIOR WALL OPENINGS...
SUCH HAS BEEN ADDED TO ELEVATION SHEETS A4.D, A4.' AND
COMMENT NO. 73:
GENERAL AREA MODIFiCATIONS......
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' AND COVER SHEET.
COMMENT NO. 74:
DESIGN WIND LOADS' 40 MPH......
RESPONSE:
NOTE HAS BEEN ADDED UNDER GENERAL NOTES ON ARCHITECTURAL SITE PLAN
SHEET AD.'.
COMMENT NO. 75:
LABEL SYMBOL THAT REPRESENTS LIMITS OF CONSTRUCTION......
RESPONSE:
PROPERTY LINE HAS BEEN DENOTED ON ARCHITECTURAL SITE PLAN SHEET
AD.' .
COMMENT NO. 77:
ADD A SYMBOL....LDCATIDN OF HANDICAP PARKING STALLS......
RESPONSE:
HANDICAP PARKING STALL ARE IDENTIFIED ON SITE PLAN WITH STANDARD
HANDICAP SYMBOL. REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' .
COMMENT NO. 78:
SITE PLAN AND FLOOR PLAN INDICATE NO. OF STORIES, MEZZANINE..OVERALL
HEIGHT OF EACH BUILDING.
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' AND COVER SHEET, FOR
ADDITIONAL BUILDING INFO REQUESTED ABDVE. FLOOR PLAN FOR EACH
BUILDING AND OVERALL SITE PLAN NOW DEPICTS LINE OF MEZZANINE
PROPOSED.
COMMENT NO. 79 & 80:
LABEL SYMBOL THAT REPRESENTS HANDICAP ACCESSIBLE DOOR AND
ACCESSIBLE PATH OF TRAVEL TO DOOR......
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD. , , SYMBOL FOR ACCESSIBLE
DOOR AND PATH/WIDTH OF TRAVEL IS NOW DEPICTED.
S:\200S\ZDD5-PRO.JECTS\05-D36-BOYNTON SCH & 1-95 MWooo\ ]-DOCS-EMAIL\Le::TTERS-MISC\2006-07-26-' ST
REVIEW Re::SPONSES-TART.oOC
COMMENT NO. B2:
IDENTIFY ON FLOOR PLANS AND SITE PLANS PROPOSED NGVD......ADD NOTE
REGARDING' 00 YR FLOOD.....BASE FLOOD ELEVATION.....
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' , UNDER GENERAL NOTES FOR
INFO REl\lUESTED. REFER TO ARCHITECTURAL FLOOR PLANS FOR EACH BUILDING
FOR FLOOR ELEVATION OF EACH.
COMMENT NO. B3:
IDENTIFY PROPERTY LINE......
RESPONSE:
PROPERTY LINE HAS BEEN IDENTIFIED ON ARCHITECTURAL SITE PLAN SHEET
AD.'.
COMMENT NO. BS:
ADD NOTE THAT ALL PLANS SUBMITTED FOR PERMITTING SHALL MEET THE
CITY'S CODES AND THE APPLICABLE BUILDING CODES IN EFFECT AT THE TIME......
RESPONSE:
NOTE HAS BEEN ADDED TO GENERAL NOTES ON ARCHITECTURAL SITE PLAN
SHEET AD.' .
COMMENT NO. 91:
CLARIFY TYPE OF CONSTRUCTION......
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' AND COVER SHEET FOR
STATS CLARIFYING TYPE OF CONSTRUCTION.
COMMENT NO. 92:
'2 HANDICAP SPACES OR 10......
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' AND COVER SHEET FOR
STATS CLARIFYING NUMBER OF HANDICAP STALLS WHICH IS , D.
COMMENT NO. 93:
INDICATE TYPICAL TENANT SEPARATION FIRE RATING......
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD.' , NOTE IDENTIFYING TYP'CAL
SEPARATION WALL AS 2HR FIRE RATED WALL IS NOTED UNDER GENERAL NOTES.
COMMENT NO. 94:
SHEET AD INDICATES A MEZZANINE AREA...... CLEARLY SHOW
LOCATIONS....5QUARE FOOTAGE OF EACH.....MEANS OF EGRESS.
RESPONSE:
LOCATIONS OF MEZZANINES ARE NOW REPRESENTED BY A DASHED LINE WITHIN
EACH BUILOING'S FOOTPRINT ON THE ARCHITECTURAL S'TE PLAN SHEET AD. , ,
AND WITHIN THE FLOOR PLAN OF EACH BUILDING. THERE ARE TWO TYPICAL
MEZZANINES (CORNER AND TYP'CALl BOTH OF WHICH ARE 500 SF EACH. REFER
TO ENTRY DETAIL SHEET A4.3 FOR MORE INFORMATION REGARDING THE
MEZZANINES.
S:\2005\2005-PRD.JECTS\OS-036-BOYNTON 8CH & 1-95 MWODD\ '-DOCS-EMAIL\LETTERS-MISC\ZD06-07-26-1 ST
REVIEW RESPONSES-TART. DOC
COMMENT NO. 95:
AN APPROVED AUTOMATIC FIRE SPRINKLER IS REQUiRED.....
RESPDNSE:
BLDG STATS ON ARCHITECTURAL GOVER SHEET AND SITE PLAN SHEET AD. 1
DENOTES THAT ALL BUILDINGS SHALL BE EQUIPPED WITH AUTOMATIC FIRE
SPRINKLER SYSTEM.
PLANNING AND ZONING DIVISION
COMMENT NO.1 1 B:
SURVEY sHows.....295,0 13 SF; HOWEVER NEW SITE PLAN SHOWS 294,014..
RESPONSE:
REFER TO ARCHITECTURAL SITE PLAN SHEET AD. 1 AND GOVER SHEET FOR
STATS THAT HAVE BEEN REVISED TO SHOW 295,013 SF AS THE TOTAL
Sl\lUARE FOOTAGE (EXCLUDING THE 0.1 3B ACRE LoTl.
COMMENT NO.1 20:
ADD BEARINGS AND DISTANCES TO PERIMETER LINES ON SITE PLAN..
RESPONSE:
ARCHITECTURAL SITE PLAN SHEET AD. 1 NOW SHOWS BEARINGS AND DISTANCES
AS SHOWN ON THE SURVEY.
COMMENT NO. 121 & NO. 122:
GROSS FLOOR AREA IS DEFINES....PRo.JECT'S REl\lD PARKING...INCLUDE METER
RDDMS......AS WAREHOUSE SPACE. PROVIDE SUMMARY OF PARKING COMBINED...
RESPONSE:
ARCHITECTURAL SITE PLAN SHEET AD. 1 AND GOVER SHEET STATS HAVE BEEN
REVISED TO SHOW SUMMARY OF PARKING COMBINED FOR ALL THREE SLOGS.
COMMENT NO. 123:
INDICATE NUMBER OF STALLS WITHIN EACH ROW...
RESPONSE:
ARCHITECTURAL SITE PLAN SHEET AD. 1 NOW SHOWS NUMBER OF STALLS WITHIN
EACH RDW.
COMMENT No.1 32:
ALL BUILDING ELEVATIONS SHOULD INDICATE THE PAINT MANUFACTURERS...
RESPONSE:
REFER TO BUILDING ELEVATIONS AND ENTRY DETAIL ELEVATIONS FOR PAINT
COLOR LEGEND AND SCHEME. PAINT SWATCHES ARE ENCLOSED WITHIN.
COMMENT NO. 133:
PLACE A NOTE ON THE SITE PLAN THAT ALL ABOVE GROUND MECHANICAL...
RESPONSE:
NOTE STATING SUCH HAS BEEN ADDED UNDER GENERAL NOTES ON
ARCHITECTURAL SITE PLAN SHEET Ao.l.
COMMENT NO. 142:
SUBMIT MASTER SIGN PROGRAM.......
RESPONSE:
SHEET Ao.2 HAS BEEN ADDED, DEPICTING ALL PROPOSED SIGNAGE.
S:\200S\200S-PRO..JECTS\05-035-BOYNTON BCH & 1-95 MWooo\ 1.ooCS-EMAIL\LETTERS-Mlsc\2005-07.Z5-1 ST
REVIEW RESPONSES-TART. DOC
COMMENT NO.1 44:
STAFF RECOMMENCES ENHANCING THE EAST FACADE...........
RESPONSE:
REFER TO 3D COLOR RENDERING.
COMMENT NO.1 45:
WEST FA9ADE REC\lUIRES ADDITIONAL ARCHITECTURAL ENHANCEMENT.......
RESPONSE:
WEST WALLS OF ALL BUILDINGS SHALL SERVE AS A PHYSICAL AND NOISE
BARRIER FOR THE RESIDENTIAL NEIGHBORHOODS FURTHER WEST OF THE
PROJECT. To SOFTEN THE WALL WE ARE PROPOSING TALL SHRUB/HEDGE
ALONG THE ENTIRE PERIMETER OF THE WESTERN WALLS.
COMMENT NO.1 47:
ALL ROOFTOP EQUIPMENT MUST BE COMPLETELY SCREENED.......
RESPONSE:
NOTE STATING SUCH HAS BEEN ADDED UNDER GENERAL NOTES ON
ARCHITECTURAL SITE PLAN SHEET AD. 1.
PLEASE DO NOT HESITATE TO CONTACT THIS OFFICE SHOULD YOU HAVE ANY
C\lUESTloNS (561) 733.2225
r
.JAIME MAYO
H N M ARCHITECTURE, LLC
6 :\2005\200S-PRO..JECTS\OS-03 c.SOYNTON SOH & 1-95 MWooo\ 1 -DOC:S-EMAIL\LETTER5-MISC\ZD06-07-26-' ST
REVIEW RESPONSES-TART.DOO
A ~~ O1!>//;;
, ,Y,. 1st REVIEW COMMENTS
New Site Plan
-f/b
<([C-')
c'>. 0./
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: I"reviewplans identified as a New Site Plan with a Mav 17. 2006 Planning & Zoning date stamp
ki
mar ng,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a),
2. The provided site dumpster enclosure detail (Sheet A-O.I does not meet the
minimum requirements of City Standard Drawing G-4 and LDR, Chapter
7.5, Article II, Section 5.J, and Article III, Section 9.A.9,a, Revise the detail
to provide a minimum 10 foot (internal) depth and width for the pad.
3. The required gates for the dumpster shall contain long steel rods to drop into
the pavement in order to secure the gates in the open and closed positions.
Drilled holes (for concrete) or metal sleeves (for asphalt) shall be provided
for the locking rods.
4, The proposed dumpster enclosure locations (Civil Sheets C-I through C-3)
do not provide the required minimum backing clearance of 60 feet
(measured from the front edge of the dumpster pad.) (LDR, Chapter 2,
Section 11.J,2.b,) Please correct.
5, Provide a minimum outside turning radius of 55 feet to allow tuming
movements for Solid Waste (and Fire/Rescue) inside the proposed
development. Using AutoTum (or similar), show on the plans that the
required turning movements are provided. Particular attention should be
given to the entryways and tum-around areas that allow ingress and egress
for Solid Waste and Fire/Rescue,
6. Rotate the first five dumpsters (north to south) 1800 so that Solid Waste is
picked up on the way out of the plaza. This will minimize (somewhat) the
backing across both lanes of traffic.
7. The location and orientation of the sixth dumpster (furthest south) is not
acceptable because turning around cannot be safely accomplished at this
location, Please revise location and/or orientation using the criteria
previouslv stated in this memo,
8, There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
1ST REVIEW COMMENTS
06/26/06
7
DEPARTMENTS INCLUDE REJECT
service to the building, and the fire sprinkler line if there is one, in
accordance with the CODE, Section 26-207.
47. Provide a minimum of la-foot separation between water main, sanitary
sewer, and stann sewer lines. Please note that City of Boynton Beach
separation standards are more stringent that FDEP standards.
48. The LDR, Chapter 3, Article IV, Section 3(0) requires Master Plans to
show all utilities on or adjacent to the proposed tract. The plan must
therefore show the point of service for water and sewer, and the proposed
off-site utilities construction needed in order to service this project.
49. The LDR, Chapter 3, Article IV, Section 3(P) requires a statement be
included that utilities are available and will be provided by all other
appropriate agencies, This statement is lacking on the submitted plans.
50. A simple minor lift station connection into the city's master 20-inch force
main covering the eastern half of the city (as shown on Sheet C-2) will not
be permitted, As an altemate, sanitary sewer may tie into the wastewater
system serving the adjacent residential system. The proposed 4-inch force
main will be required to "tunnel" under the CSXRR to the existing system
located in SW 6th St. Calculations will be required to reflect that this
existing system can accommodate the proposed development as shown on
this submittal.
51. Utility construction details will not be reviewed for construction
acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates)
and will be reviewed at the time of construction permit application,
FIRE
Comments:
52. Provide a sheet, dedicated only to Fire Department concems. Include on ~
this sheet, the location of all hydrants, the water supply information and
acknowledge that the buildings shall have an approved NFP A 13 Fire
Sprinkler System. Show the proposed location of the Fire Department
Connections. Fire Hydrants shall be installed so that no more than 300' of
road travel occurs between hydrants, and so that no portion of any building
is more than 200' from a hydrant.
53, All construction gates shall have a Knox lock for Fire Department access,
All gates shall be 12' wide if for one-way traffic and 20' wide if for two- V
way traffic, Before construction begins, the Fire Department will field test
the gate access with an engine. This engine must be able to access the site
in one turn, with no backing up. During the construction any road shall have
turn around capabilities so that no road will dead end with out a place for
1 ST REVIEW COMMENTS
06/26/06
8
DEPARTMENTS INCLUDE REJECT
the en"ine to tum around.
54, All roads shall be compacted to 32 tons to the point of vertical construction.
These roads shall be kept clear of debris so that emergency vehicles can /
access any portion of the site, If due to the negligence of the contractor, any
emergency vehicle becomes stuck and/or damaged, the contractor shall be
responsible for the costs involved.
55, Provide a flow test, conducted by the Boynton Beach Fire Department that V
shows a water supply of 3,000gpm at 20psi, To schedule this test, call
(561) 742-6600,
56. Will this project be condominiums or one owner? ~
57. A fire alarm will be required throughout all buildings. The fire sprinkler /
system shall be monitored by an approved Central Station and a UL Letter
of Certification or an FM Placard shall be obtained.
58. Early Power release will not be given unless all Life Safety equipment is /
installed and working. The only exception is that the alarm system does not
have to transmit to a central station at that point, but must sound locally to
notify workers to evacuate the buildinl?:,
POLICE
Comments:
59. Building lighting (non-glare) should be around perimeter on all sides and on
pedestrian walkways
60, Landscaping should not obstruct view from windows or walkways.
61. Landscaping should be maintained at three feet or less, Trees should be
installed so as not to conflict with the lighting system and tree limbs should
be maintained at seven feet or higher,
62. All exterior doors should be equipped with security hinges and should be
reinforced with case hardened strike plate,
63, All buildings should be pre-wired for CCTV and alarm systems.
64. Glass perimeter doors should be equipped with case hardened guard rings to
protect the mortise lock cylinder.
65, Rear doors should be equipped with l80-degree peephole viewer.
66. Mailboxes for buildings with multi-units should be placed in high activity
and conspicuous location for enhanced safety and natural surveillance of
users.
1st REVIEW COMMENTS
New Site Plan
COli,! FOt')e<7feiZ-
'VCle~ T 12-.e( ,
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: I" review plans identified as a New Site Plan with a Mav 17.2006 Planning & Zoning date stamp
markinl1.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a),
2. The provided site dumpster enclosure detail (Sheet A-O.I does not meet the
minimum requirements of City Standard Drawing G-4 and LDR, Chapter
7,5. Article II, Section 5.J, and Article III, Section 9,A.9,a. Revise the detail
to provide a minimum 10 foot (intemal) depth and width for the pad.
3. The required gates for the dumpster shall contain long steel rods to drop into
the pavement in order to secure the gates in the open and closed positions.
Drilled holes (for concrete) or metal sleeves (for asphalt) shall be provided
for the locking rods,
4, The proposed dumpster enclosure locations (Civil Sheets C-I through C-3)
do not provide the required minimum backing clearance of 60 feet
(measured from the front edge of the dumpster pad.) (LDR, Chapter 2,
Section 11.J.2.b,) Please correct.
5. Provide a minimum outside turning radius of 55 feet to allow turning
movements for Solid Waste (and Fire/Rescue) inside the proposed
development. Using AutoTum (or similar), show on the plans that the
required turning movements are provided, Particular attention should be
given to the entryways and turn-around areas that allow ingress and egress
for Solid Waste and Fire/Rescue.
6. Rotate the first five dumpsters (north to south) ISOO so that Solid Waste is
picked up on the way out of the plaza. This will minimize (somewhat) the
backing across both lanes of traffic.
7. The location and orientation of the sixth dumpster (furthest south) is not
acceptable because tuming around cannot be safely accomplished at this
location. Please revise location and/or orientation using the criteria
ureviouslv stated in this memo.
S, There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly.) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
L'O b
~~ \-\
rv
c{; . "
1ST REVIEW COMMENTS ~
06/26106
12
'7
DEPARTMENTS INCLUDE REJECT
91. Clarify the type of construction in accordance with the 2004 FBC, Chapter 6
and Table 60 l.
92. Sheet A-O.I cal1s out for 12 handicap accessible parking spaces but the site
plan only shows 10. Clarify
93. Sheet AI.I _ Indicate the required fire rating of the typical tenant separation
wal1 per the 2004 FBC.
94. Sheet A-O indicates a mezzanine area in the bays. Clearly show the locations
of the mezzanines on the floor plans, the square footage of each mezzanine
and the means of egress from each mezzanine in accordance with 2004
FBC.
95. An approved automatic fire sprinkler system is required in each building per
Chapter 9 of the CBBCO, Section 9-6(A)(4), and 2004 FBC, Section
903.2.13.
96. Submit irrigation plans.
PARKS AND RECREATION
Comments:
97, Plant List _ separate trees and palms from shrubs and sod. Denote which /
species are native and the overal1 percental!e of native plants.
98. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed /
areas.
99, The use oflarge trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in smal1 or confined areas, V
This plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide, This is
not sufficient area to al10w a root system needed for the oak canopy. It is
recommended that a different species be considered for these areas.
FORESTERlENVIRONMENT ALlST
Comments:
Existinl! Trees List - Manal!ement Plan
Sheet L - 4
100, The Landscape Architect should tabulate the total diameter inches of
existing trees on the site. The tabular data should show the individual /
species of trees proposed to be preserved in place (2 Sabal Palms, 5 Live
Oaks), relocated or removed and replaced on site. The replacement trees
should be shown by a separate symbol on the landscape plan sheet L-4 of
4. [Environmental Regulations, Chapter 7.5, Article I Sec. 7,D.p. 2,]
.
'3 .22.'()~ IZ~ tt
1ST REVIEW COMMENTS
06/26/06
13
DEPARTMENTS INCLUDE REJECT
Plant List Sheet L-4
10 1. All shade and palm trees must be listed in the description as a minimum of /
3" DBH (4.5' off the ground) not caliper, The height of the trees may be
larger than 12'-14' to meet the 3" diameter requirement; or any clear trunk
(c,t.) specifications. [Environmental Regulations, Chapter 7.5, Article II
Sec. 5,C, 2.1
102. All trees proposed under any existing overhead electric power lines must /'
meet the FP & L Right tree in the Ril!ht Place manual selection for small
trees only,
103, The shade tree planting detail should including a line indicating where the /
diameter and height of all of the trees will be measured at time of planting
and inspection.
104, The palm tree planting detail should include a line indicating where the
clear trunk and height of all of the palm trees will be measured at time of t/
planting and inspection.
105, The shrub and groundcover planting detail should include a line indicating
where the height and spread of the shrubs and groundcover plants will be ~
V
measured at time of planting and inspection.
106. The applicant should add a note that all utility boxes or structures (not
currently known or shown on the plan) should be screened with Coco plum V
hedge plants on three sides,
107, The applicant should show an elevation cross-section detail of the actual
heights of the proposed landscape trees and vegetation (proper scale) at the t/'
time of planting to visually buffer the proposed buildings and parking lot
from the 1-95 and SW 8th Street road ril!hts-of-wavs.
PLANNING AND ZONING
Comments:
108. At the technical advisory review team (TART) meeting, provide written
responses to all staffs comments and questions. Submit 12 sets of revised
plans. Each set should be folded and stapled,
109, At the technical advisory review team meeting, also provide a full set of
reduced drawings, sized 8Yz inches by II inches of each plan, Save each
plan to a comoact disk and submit that to staff as well.
110. Staff considers these plans to be at the final stage of site plan review, the
last stage prior to permit review, As such, all comments need to be
addressed and shown on the plans prior to the TART meeting.
Ill. It is the applicant's responsibility to ensure that the new site plan is publicly
advertised in accordance with Ordinance 04-007 and Ordinance 05-004.
112. Applicants who wish to utilize City electronic media equipment for
Project name: Ocean 95 Exchange Plaza
File number: NWSP 06-020
Reference: I" review plans identified as a New Site Plan with a Mav 17. 2006 Planning & Zoning date stamp
marking.
.~,,:([& Yt "rr:'->c4(
1st REVIEW.COMMENTS {hI /~fCYP (JP-clt-(d-;"-:J -
New Site Plan J. / ,I
c ---;. '7 7{~ J? !dd--/~
"
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - Solid Waste
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a).
2. The provided site dumpster enctosure detail (Sheet A-O, I does not meet the
minimum requirements of City Standard Drawing G-4 and LDR, Chapter
7,5, Article II, Section 5.J. and Article III, Section 9.A.9.a, Revise the detail
to provide a minimum 10 foot (internal) depth and width for the pad.
3, The required gates for the dumpster shall contain long steel rods to drop into
the pavement in order to secure the gates in the open and closed positions.
Drilled holes (for concrete) or metal sleeves (for asphalt) shall be provided
for the locking rods.
4, The proposed dumpster enclosure locations (Civil Sheets C-I through C-3)
do not provide the required minimum backing clearance of 60 feet
(measured from the front edge of the dumpster pad.) (LDR, Chapter 2,
Section II.J,2.b,) Please correct.
5. Provide a minimum outside turning radius of 55 feet to allow turning
movements for Solid Waste (and FirelRescue) inside the proposed
development. Using AutoTurn (or similar), show on the plans that the
required tuming movements are provided, Particular attention should be
given to the entryways and turn-around areas that allow ingress and egress
for Solid Waste and FirelRescue,
6. Rotate the first five dumpsters (north to south) 180' so that Solid Waste is
picked up on the way out of the plaza, This will minimize (somewhat) the
backing across both lanes of traffic.
7. The location and orientation of the sixth dumpster (furthest south) is not
acceptable because turning around cannot be safely accomplished at this
location, Please revise location and/or orientation using the criteria
previously stated in this memo.
8. There are vertical conflicts between the proposed dumpster enclosure
locations and proposed canopy trees (Live Oak, Gumbo Limbo and East
Palarka Holly,) Please relocate canopy trees so that they do not create a
vertical conflict for Solid Waste pickup or replace canopy trees with a tree
species that has a small canopy or no canopy (such as palms) to allow for
unobstructed pickup of dumpsters.
1ST REVIEW COMMENTS
06/26/06
9
DEPARTMENTS INCLUDE REJECT
67. Dumpsters should not allow for easy concealment, not create blind spots or
hiding areas.
BUILDING DIVISION
Comments:
68. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the TART (Technical Z/
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review,
69, Indicate within the site data the type of construction of each building as
defined in 2004 FBC, Chapter 6. V
70. Indicate within the site data the occupancy type of each building as defined
in 2004 FBC, Chapter 3, 1/
71. The heigh! and area for buildings or structures of the different types of
construction shall be govemed by the intended use or occupancy of the V
building, and shall not exceed the limits set forth in Table 503 of the 2004
FBC.
72. Place a note on the elevation view drawings indicating that the exterior wall
openings and exterior wall construction comply with 2004 FBC, Table
704.8, or 2004 FBC, Residential, Section R302,2, Submit calculations that ~
clearly reflect the percentage of protected and unprotected wall openings
permitted per 2004 FBC, Table 704.8 or 2004 FBC, Residential, Section
R302,2.
73. General area modifications to buildings shall be in accordance with 2004
FBC, Section 506. Provide calculations verifying compliance with the V
above code sections and the 2004 FBC, Table 503.
74. Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2004 FBC, Section 1609 (Wind Loads), Calculations that L./'"
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
75, Add to all plan view drawings of the site a labeled symbol that represents /
the location and perimeter of the limits of construction proposed with the
subject request.
76, At time of permit review, submit signed and sealed working drawings of the V'
proposed construction,
,
1ST REVIEW COMMENTS
06/26/06
10
<
DEPARTMENTS INCLUDE REJECT
77. Add a labeled symbol to the site plan drawing that identifies the location of
the handicap-accessible parking spaces, The quantity of the spaces shall be
consistent with the regulations specified in the 2004 FBC. The accessible
parking spaces that serve a use shall be located on the shortest safety
accessible route of travel from adjacent parking to an accessible entrance. V
The 2004 FBC states that buildings with multiple accessible entrances shall
have accessible parking spaces dispersed and located closest to the
accessible entrance, 2004 FBC, Sections 11-4.1.2(5),4.3, and 4.6.
78, On the site plan and floor plan, indicate the number of stories that are in V
each building including, where applicable, mezzanines. Indicate the overall
height of each building.
79. Add to each building that is depicted on the drawing titled site plan and
floor plan a labeled symbol that identifies the location of the handicap- ~
accessible entrance doors to each building. 2004 FBC, Sections 11-4.1.2,
11-4,1.3, and 11-4,3,
80, Add a labeled symbol to the site plan drawing that represents and delineates
the path of travel for the accessible route that is required between the
accessible parking spaces and the accessible entrance doors to each
building. The installed symbol, required along the path, shall start at the
accessible parking spaces and terminate at the accessible entrance doors to
each building. The symbol shall represent the location of the path of travel,
not the location of the detectable warning or other pavement markings. The
location of the accessible path shall not compel the user to travel in a
drive/lane area that is located behind parked vehicles. Identify on the plan ,
the width of the accessible route, (Note: The minimum clear width of an V
accessible route shall be 36 inches, except at curb ramps that are part of a
required means of egress shall not be less than 44 inches). Add text to the
drawing that would indicate that the symbol represents the accessible route
and the route is designed in compliance with 2004 FBC, Section 11-4.3
(Accessible Route) and 11-4.6 (parking and Passenger Loading Zones).
Please note that at time of permit review, the applicant shall provide detailed
documentation on the plans that will verify that the accessible route is in
compliance with the regulations specified in the 2004 FBC, This
documentation shall include, but not be limited to, providing finish grade
elevations along the path of travel.
81. Vertical accessibility to the mezzanine area shall be required per the 2004 /
FBC, Sections 11-4.1.2, 11-4,1.3(5) (New Construction) and Section 11-
4.1.6 (Alterations).
82. Identify within the site data the finish floor elevation (lowest floor elevation)
that is proposed for the building. Verify that the proposed elevation is in
compliance with regulations of the code by adding specifications to the site
data that address the following issues:
A The design professional-of-record for the project shall add the following
text to the site data, "The proposed finish floor elevation NGVD is
1
1ST REVIEW COMMENTS
06/26/06
11
~,
,
DEPARTMENTS INCLUDE REJECT
above the highest 100-year base flood elevation applicable to the building
site, as determined by the SFWMD' s surface water management construction
development regulations."
B From the FIRM map, identifY in the site data the title of the flood zone
that the building is located within. Where applicable, specifY the base flood V
elevation. If there is no base flood elevation, indicate that on the plans.
C IdentifY the floor elevation that the design professional has established for
the building within the footprint of the building that is shown on the
drawings titled site plan, floor plan and paving/drainage (civil plans),
83. On the drawin!! titled site olan identifv the orooertv line, L./
84. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may ~~
not, therefore, be used for landscape irrigation where other sources are
readily available.
85. A water-use permit from SFWMD is required for an irrigation system that ~
utilizes water from a well or body of water as its source, A copy of the
permit shall be submitted at the time of permit application, F.S. 373.216.
86, If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and ~
the Commission-approved site plan,
B The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
87, At time of permit review, submit separate surveys of each lot, parcel, or tract.
For purposes of setting up property and ownership in the City computer, ~
provide a copy of the recorded deed for each lot, parcel, or tract. The
recorded deed shall be submitted at time of permit review.
88, Add a general note to the site plan that all plans submitted for permitting
shall meet the City's codes and the applicable building codes in effect at the /
time of permit application.
89. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for V
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
90, The full address of the project shall be submitted with the construction /~
documents at the time of permit application submittal. Ifthe project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
1
1ST REVIEW COMMENTS
06/26/06
12
~
DEPARTMENTS INCLUDE REJECT
91. Clarify the type of construction in accordance with the 2004 FBC, Chapter 6 t/
and Table 601.
92. Sheet A-O.I calls out for 12 handicap accessible parking spaces but the site V
plan onlv shows 10. Clarify
93. Sheet AU - Indicate the required fire rating of the typical tenant separation V
wall per the 2004 FBC.
94, Sheet A-O indicates a mezzanine area in the bays. Clearly show the locations
of the mezzanines on the floor plans, the square footage of each mezzanine V
and the means of egress from each mezzanine in accordance with 2004
FBC,
95. An approved automatic fire sprinkler system is required in each building per /
Chapter 9 of the CBBCO, Section 9-6(A)(4), and 2004 FBC, Section
903.2.13.
.r
96. Submit irrigation plans. ,,/'
PARKS AND RECREATION
Comments:
97. Plant List - separate trees and palms from shrubs and sod. Denote which
species are native and the overall percentage of native plants.
98. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed
areas.
99, The use oflarge trees that need large root beds to support the large canopies
such as oaks are not recommended to be planted in small or confined areas.
This plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide. This is
not sufficient area to allow a root system needed for the oak canopy, It is
recommended that a different species be considered for these areas.
FORESTER/ENVIRONMENT ALlST
Comments:
Existing Trees List - Manaeement Plan
Sheet L - 4
100. The Landscape Architect should tabulate the total diameter inches of
existing trees on the site. The tabular data should show the individual
species of trees proposed to be preserved in place (2 Sabal Palms, 5 Live
Oaks), relocated or removed and replaced on site. The replacement trees
should be shown by a separate symbol on the landscape plan sheet L-4 of
4. [Environmental Regulations, Chapter 7,5, Article I Sec, 7.D,p, 2,]
(~'(~:\
\,' )
\ l ,.'::
...'., ,/\
l'~'; '-<~".\.
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 06-065
TO:
Ed Breese, Principal Planner, Planning and Zoning
FROM:
Laurinda Logan, P.E., Senior Engineer
1)
DATE:
June 13, 2006
RE:
Review Comments
New Site Plan -1st Review
Ocean 95 Exchange
File No. NWSP 06-020
The above referenced Site Plans, received on June 1, 2006, was reviewed for Public Works,
Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of
Ordinances. Following are our comments with the appropriate Code and Land Development Regulations
(LOR) referenced.
PUBLIC WORKS - SOLID WASTE
1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse per the CODE, Section 10-26 (a),
2. The provided site dumpster enclosure detail (Sheet A-0.1 does not meet the minimum requirements
of City Standard Drawing G-4 and LOR, Chapter 7.5, Article II, Section 5,J, and Article III, Section
9.A,9.a. Revise the detail to provide a minimum 10-ft. (internal) depth and width for the pad,
3. The required gates for the dumpster shall contain long steel rods to drop into the pavement in order
to secure the gates in the open and closed positions. Drilled holes (for concrete) or metal sleeves
(for asphalt) shall be provided for the locking rods.
4. The proposed dumpster enclosure locations (Civil Sheets C-1 through C-3) do not provide the
required minimum backing clearance of 60 ft, (measured from the front edge of the dumpster pad,)
(LOR, Chapter 2, Section 11.J.2.b.) Please correct.
5. Provide a minimum outside turning radius of 55 ft. to allow turning movements for Solid Waste (and
Fire/Rescue) inside the proposed development. Using AutoTurn (or similar), show on the plans that
the required turning movements are provided. Particular attention should be given to the entryways
and turn-around areas that allow ingress and egress for Solid Waste and Fire/Rescue,
6. Rotate the first five dumpsters (north to south) 180' so that Solid Waste is picked up on the way out
of the plaza. This will minimize (somewhat) the backing across both lanes of traffic.
7. The location and orientation of the sixth dumpster (furthest south) is not acceptable because turning
around cannot be safely accomplished at this location. Please revise location and/or orientation
using the criteria previously stated in this memo.
8. There are vertical conflicts between the proposed dumpster enclosure locations and proposed
canopy trees (Live Oak, Gumbo Limbo and East Palarka Holly.) Please relocate canopy trees so
that they do not create a vertical conflict for Solid Waste pickup or replace canopy trees with a tree
Dept. of Public Works, Engineering Division Memo No, 06-065
RE: Ocean 95 Exchange Plaza, New Site Plan -1st Review, NWSP 06-020
June 13, 2006
Page 2
species that has a small canopy or no canopy (such as palms) to allow for unobstructed pickup of
dumpsters,
PUBLIC WORKS - FORESTRY & GROUNDS
9. Show sight triangles on the Landscape plans (LOR, Chapter 7.5, Article II, Section 5.H.) using a 25-ft,
sight triangle,
10. Staff strongly recommends placing canopy trees far enough back from drive aisles to minimize the
potential for vertical conflicts with high-profile vehicles.
11. Gumbo Limbo should placed a minimum of 10-ft. away from curb in landscape islands to prevent
breaking and heaving at the tree's maturity,
12. Live Oaks and Gumbo Limbo should be placed a minimum of 10-ft. from the property lines to allow
for maintenance at maturity. The east and west property lines abut the 1-95 and CSXRR rights-of-
way, respectively. Both entities have restrictions in allowing non-public uses on their properties.
13. There are overhead lines along the north and west property lines. Landscaping shall be designed
and installed in accordance with FPL's "Plant the Right Tree in the Right Place."
PUBLIC WORKS - TRAFFIC
14. Provide a notice of concurrency (Traffic Performance Standards Review) from Palm Beach County
Traffic Engineering,
15. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc,
Delineate and stripe the "Loading Area" (LOR, Chapter 2, Section 11.J); include a pavement
message in yellow indicating "No Parking - Loading Zone". See City Standard Drawings "K" Series
for striping details.
16. Provide Fire Lanes in accordance with the LOR, Chapter 23, Article II, Section B,2 and Section M,
17. Parking stalls are incorrectly dimensioned at 9-ft, x 18-ft. The correct stall dimension is 9)1,-ft. x 18)1,-
ft. with a 25-ft. minimum aisle width.
18. Staff strongly recommends specifying wider lane widths to accommodate truck traffic and backing
movements.
19. The proposed site layout will not adequately accommodate turn-around movements for any trucks
using this development. Turn-arounds will need to be provided for Solid Waste, Fire-Rescue, and
trucks doing business within the Plaza.
20. Staff has serious concerns about the impact of additional truck traffic through the residential area.
There is an existing truck route along NW 1" Ave. that is supposedly carrying a very minimal amount
of truck traffic from SW 8'h St. to the industrial area, It appears that this route was chosen in earlier
years because it had the least number of homes that would be impacted by the truck traffic when
compared to other area residential streets. However, this route is not the most logical from the
perspective of truck movements. Intersection radii at all points along the route are insufficient for
larger trucks to avoid damage to adjacent turfed rights of way and private properties,
Dept. of Public Works, Engineering Division Memo No. 06-065
RE: Ocean 95 Exchange Plaza, New Site Plan - 1 st Review, NWSP 06-020
June 13, 2006
Page 3
Because the proposed development will significantly add to the volume of truck traffic through the
residential area, staff believes that a truck route should be selected that has the least impact or
potential to damage the public right of way, Furthermore, all possible actions to minimize truck
conflicts with pedestrians (Le.. children at Hibiscus Park) should be considered. Lastly, Staff is
concerned that the existing pavement structures in the immediate area are not able to handle the
additional heavy wheel loadings of truck traffic and that the additional trucks could harm the existing
streets adding to the tax burden of Boynton Beach residents. Therefore, because of these impacts,
staff believes that it is entirely appropriate for the developer to be required to mitigate these safety
and structural impacts associated with the additional truck traffic,
Upon review of the Traffic Impact Analysis and Local Street Analysis provided for this project Staff
proposes three alternatives for movement of traffic accessing the Ocean 95 Exchange Plaza,
Recommended alternatives are given in order of preference:
a. Construct a new road from Morton's Way north to the proposed development. The proposed
roadway shall have a 50-ft. private right-of-way width, a minimum of two 12-ft, lanes, sidewalk on
at least one side of the street, and provide for stormwater runoff. The designated truck route will
be Woolbright to SW 8'h St. to Morton's Way then north to the Ocean 95 Exchange Plaza,
b. Reconstruct the existing truck route (Boynton Beach Blvd. to NW 7'h St. to NW 1" Ave. to NW 6'h
St. to W. Ocean Ave. then east into the Ocean 95 Exchange Plaza.) The right-of-way width for
these roads is 50-ft. except for Ocean Ave., which is 70-ft. The typical section shall consist of a
30-ft. paved roadway with curb & gutter, sidewalk on at least one side of the street, and provide
for storm water runoff. Additional work will be required at the round-about at the intersection of
W. Ocean Ave" W. Ocean Dr. and NW 6'h St. to accommodate correct turning movements for all
vehicles using this intersection.
c. Reconstruct W. Ocean Ave. from Boynton Beach Blvd, to Ocean Ave. then east to the Ocean 95
Exchange Plaza. This will become the designated truck route, The right-of-way width for Ocean
Ave, is 50-ft. to the intersection of Ocean Ave, and NW 6'h St. then 70-ft. from the intersection
east. The typical section shall consist of a 30-ft. paved roadway with curb & gutter, sidewalk on
both sides of the street and provide for storm water runoff. Additional work will be required at the
round-about at the intersection ofW, Ocean Ave., W. Ocean Dr. and NW 6'h St. to accommodate
correct turning movements for all vehicles using this intersection.
ENGINEERING
21. Add a note to the Site Plan stating "All plans submitted for specific permits shall meet the City's Code
requirements at time of application. These permits include, but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
permitting agencies such as Florida Department of Transportation (FOOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with the permit request."
22. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
23. Please note that changes or revisions to these plans may generate additional comments,
Acceptance of these plans during the Technical Advisory Review Team (TART) process does not
ensure that additional comments may not be generated by the Commission and at permit review,
Dept. of Public Works, Engineering Division Memo No. 06-065
RE: Ocean 95 Exchange Plaza, New Site Plan -1st Review, NWSP 06-020
June 13, 2006
Page 4
24, Provide written and graphic scales on all sheets,
25. Show and identify all features adjacent to the site to be developed on the plans (including the site
plan, civil plan, and landscape plans) such as the CSXRR and 1-95,
26. Provide the Site, Civil and Landscape plans at the same scale (LOR, Chapter 4, Section 7,)
27. Provide the Civil plans at the same sheet size as the remainder of the package (24-in. x 36-in,)
28. Show proposed site lighting on the Site and Civil plans (LOR, Chapter 4, Section 7.B.4,)
29, Provide a drainage plan in accordance with the LOR, Chapter 4, Section 7.F. The plan should
include a sufficient number of existing and proposed grades to indicate general flow patterns for
stormwater management.
30, Provide an engineer's certification on the Drainage Plan as specified in LOR, Chapter 4, Section
7.F.2.
31. Full drainage plans, including drainage calculations, in accordance with the LOR, Chapter 6, Article
IV, Section 5 will be required at the time of permitting,
32, Show on plans (and identify) the 48-in, RCP drainage pipe and associated perpetual easement
located between the North and Central Buildings. A potential vertical conflict may exist between the
drainage pipe and proposed water and sewer mains. Please identify and resolve these conflicts.
33. Correct Sheet C-3 to read W. Ocean Ave., not Ocean Blvd.
34. Paving, drainage and site details will not be reviewed for construction acceptability at this time. All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application.
UTILITIES
35, Please provide a timeline that clearly illustrates when water and sewer services will be required to
serve the proposed project. Your starting date for the timeline should be the date of City Commission
approval. Also provide milestone dates for permit application, the start of construction, and the setting
of the first water meter. This timeline will be used to determine the adequacy of water and
wastewater treatment capacity for your project upon the project's completion, so please be as
accurate as possible.
36. All utility easements and utility lines shall be shown on the site plan and landscape plans (as well as
the Water and Sewer Plans) so that we may determine which appurtenances, trees or shrubbery may
interfere with utilities. In general, palm trees will be the only tree species allowed within utility
easements. Canopy trees may be planted outside of the easement so that roots and branches will
not impact those utilities within the easement in the foreseeable future, The LOR, Chapter 7,5,
Article I, Section 18.1 gives public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way.
Dept. of Public Works, Engineering Division Memo No, 06-065
RE: Ocean 95 Exchange Plaza, New Site Plan - 1 st Review, NWSP 06-020
June 13, 2006
Page 5
37. Palm Beach County Health Department permits will be required for the water and sewer systems
serving this project (CODE, Section 26-12).
38, Fire flow calculations will be required demonstrating the City Code requirement of 1,500 gpm with 20
psi residual pressure as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement
imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)). A single 6-in,
spur line, 1,830 long, off of an existing 6-in. water main (in Ocean Ave,) will not meet this
requirement. Improvements to the water utility system off-site will be required in order to support this
proposed development via a looped water main system,
39. The LOR, Chapter 6, Article IV, Section 16 requires that all points on each building will be within 200
feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition,
by showing all hydrants, Our preliminary review indicates that the South Building has sufficient
coverage, the Central Building is almost covered, and the North Building does not have sufficient
coverage. The proposed fire hydrant configuration needs to be reviewed entirely. A single fire
hydrant can only deliver approximately 750 gpm at best. To provide the 1,500 gpm requirement
noted above, usually requires overlapping fire hydrant coverage, or a sprinkler system internal to
each building in addition to the skeleton system shown on the submitted plans. As noted above, a
looped water supply system will be required in order to achieve this,
40, The CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either
upon the request for the Department's signature on the Health Department application forms or within
seven (7) days of site plan approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
41. Comprehensive Plan Policy 3.C,3.4. requires the conservation of potable water. As other sources
are readily available City water shall not be allowed for irrigation.
42. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in
CODE Sec. 26-33(a),
43. This office will not require surety for installation of the water and sewer utilities, on condition that the
systems be fully completed, and given to the City Utilities Department before the first permanent
meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy,
44. A building permit for this project shall not be issued until this Department has approved the plans for
the water and/or sewer improvements required to service this project, in accordance with the CODE,
Section 26-15.
45. PVC material not permitted on the City's water system. All lines shall be DIP.
46. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and
the fire sprinkler line if there is one, in accordance with the CODE, Section 26-207.
47. Provide a minimum of 10-ft. separation between water main, sanitary sewer, and storm sewer lines,
Please note that City of Boynton Beach separation standards are more stringent that FDEP
standards.
Dept. of Public Works, Engineering Division Memo No. 06-065
RE: Ocean 95 Exchange Plaza, New Site Plan - 1 st Review, NWSP 06-020
June 13, 2006
Page 6
48. The LOR, Chapter 3, Article IV, Section 3(0) requires Master Plans to show all utilities on or adjacent
to the proposed tract. The plan must therefore show the point of service for water and sewer, and
the proposed off-site utilities construction needed in order to service this project.
49. The LOR, Chapter 3, Article IV, Section 3(P) requires a statement be included that utilities are
available and will be provided by all other appropriate agencies. This statement is lacking on the
submitted plans.
50. A simple minor lift station connection into the city's master 20-in. force main covering the eastern half
of the city (as shown on Sheet C-2) will not be permitted. As an alternate, sanitary sewer may tie into
the wastewater system serving the adjacent residential system, The proposed 4-in. force main will
be required to "tunnel" under the CSXRR to the existing system located in SW 6'h St. Calculations
will be required to reflect that this existing system can accommodate the proposed development as
shown on this submittal.
51. Utility construction details will not be reviewed for construction acceptability at this time, All utility
construction details shall be in accordance with the Utilities Department's "Utilities Engineering
Design Handbook and Construction Standards" manual (including any updates) and will be
reviewed at the time of construction permit application.
Cc: Jeffrey R. Livergood, P,E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H, David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\ Memorandums\Memorandums 2006\06-065 LOGAN- Ocean 95 Exchange Plaza 061306 New Site Plan 1st Review.doc
TART COMMENTS
PROJECT:
LOCATION:
Ocean 95 Exchange Plaza
Boynton Beach Blvd & 95, East of Tracks,
West of 95. (Old Four Steel Property)
NWSP 06-020
Industrial, Warehouses and Office Space
137,000sqft Divided into three buildings
FILE#
TYPE OF PROJECT:
CAPACITY:
COMMENTS
I, Provide a sheet, dedicated only to Fire Department concerns, Include on this sheet, the
location of all hydrants, the water supply information and acknowledge that the buildings
shall have an approved NFP A 13 Fire Sprinkler System, Show the proposed location of
the Fire Department Connections. Fire Hydrants shall be installed so that no more than
300' of road travel occurs between hydrants, and so that no portion of any building is
more than 200' from a hydrant.
2, All construction gates shall have a Knox lock for Fire Department access. All gates shall
be 12' wide if for one-way traffic and 20' wide if for two-way traffic. Before
construction begins, the Fire Department will field test the gate access with an engine.
This engine must be able to access the site in one turn, with no backing up, During the
construction any road shall have turn around capabilities so that no road will dead end
with out a place for the engine to turn around.
3, All roads shall be compacted to 32 tons to the point of vertical construction. These roads
shall be kept clear of debris so that emergency vehicles can access any portion of the site,
If due to the negligence of the contractor, any emergency vehicle becomes stuck and/or
damaged, the contractor shall be responsible for the costs involved.
4. Provide a flow test, conducted by the Boynton Beach Fire Department that shows a water
supply of 3,000gpm at 20psi. To schedule this test, call (561) 742-6600,
5. Will this project be condominiums or one owner?
6, A fire alarm will be required throughout all buildings. The fire sprinkler system shall be
monitored by an approved Central Station and a UL Letter of Certification or an FM
Placard shall be obtained.
7. Early Power release will not be given unless all Life Safety equipment is installed and
working. The only exception is that the alarm system does not have to transmit to a
central station at that point, but must sound locally to notify workers to evacuate the
building.
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
To: Peter Mazzella, Assistant Director, Utilities
Kofi Boatang, Director of Utilities
Matthew Immler, Police Chief
Rodger Kemmer, Deputy Chief / Fire Marshal
Jody Rivers, Parks Superintendent
Cc: William Bingham, Fire Chief
Wally Majors, Parks Director
Laurinda Logan, Civil Engineer
Rick Lee, Fire Protection Analyst
John Huntington, Police Officer
Ed Breese, Principal Planner ~
From:
Date:
Re:
5/31/06
Impacts of proposed site plan upon City facilities and services
Project: Ocean 95 Exchange Plaza
MEMORANDUM
As part of the City's concurrency requirements, the City Commission directed the Planning & Zoning
Division to report whether or not the City could maintain an adequate level of service with current
infrastructure and / or staffing levels in order to support the proposed development.
Plans for the above-mentioned project have been forwarded to your department's representative
for their technical review and comment. We are requesting that you review the proposed project for
anticipated impacts to your department's level of service (as requested by the City Commission) and
provide us with your comments for direct insertion into our staff report. In the past, you have sent
us something that indicates your current staff / infrastructure would either be able to support the
proposed project or what would be required to meet the adopted level of service. Please respond
no later than 2 weeks from today. Aiso, any recommendations that you believe that would
enhance the project are certainly welcomed. I thank you for your assistance in this matter. Should
you have any questions regarding the requested information, please do not hesitate to call me at
742-6260.
S:\Planning\SHARED\WP\PROJECTS\Ocean 95 Exchange Park\lmpact Analysis.doc
Page I of I
/'
Rivers, Jody
To: Breese, Ed; Coale, Sherie
Subject: Site Plan Review - Ocean 95 Exchange Plaza
Project
File No.
Ocean 95 Exchange Plaza
NWSP 06-020
1. Plant List separate trees and palms from shrubs and sod Denote which
species are native and the overall percentage of native plants.
2. Irrigation must have 110% coverage, have a non-potable water source, have
separate bubblers for each tree and have separate zones for sod and bed areas.
3 The use of large trees that need large root beds to support the large canopies
such as oaks are not recommended to be pianted in small or confined areas. This
plans shows oaks in areas that are 3 1/2 and 5 1/2 feet wide. This is not sufficient
area to allow a root system needed for the oak canopy. It is recommended that a
different species be considered for these areas.
JOGltJ RLvers
Parks Supenntendent
City of Boynton Beach
100 E Boynton Beach Blvd
Boynton Beach. FL 33425
(561) 742-6226
(561) 742-6233 (faxl
A sense of COMMUNITY It Starts in Parks
What transforms a crowd into a community? Parks provide that chance Boynton Beach's parks are
where lifetime friendships are formed, where generations can come together, where people discover
what they have in common. It starts in parks.
6/5/2006
/
FROM:
List of Acronvms/Abbreviations:
ANSI- American National Standards Institute
ASCE - American Society of Civil
Engineers
eBB - City of Boynton Beach
CBBA - Boynton Beach Amendments
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensive Plan Policy
CFR - Code of Federal Regulations
EPA - Environment Protection Agency
FBC - Florida Buildin9 Code
FFHA - Federal Fair Housing Act
FFPC - Florida Fire Prevention Gode
FIRM - Flood Insurance Rate Map
F.S. - Florida Statutes
LOR -land Development Regulations
NEe - National Electric Code
NFPA - National Fire Prevention Assn
NGVO - National Geodetic Vertical
Datum of 1929
SFWMD - South Florida Water
Management District
,..
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 06-097
TO: Ed Breese
Principal Planner
DATE: June 6,2006
SUBJECT: Project - Ocean 95 Exchange Plaza
File No. - NWSP 06-020 - 1st review
Building Division (Site Specific and Permit Comments) - Timothv K. Large (561) 742-6352
1 Please note that changes or revisions to these plans may generate additional comments.
Acceptance of these plans during the TART (Technical Advisory Review Team) process
does not ensure that additional comments may not be generated by the commission and at
permit review.
2 Indicate within the site data the type of construction of each building as defined in 2004
FBC, Chapter 6.
3 Indicate within the site data the occupancy type of each building as defined in 2004 FBC,
Chapter 3.
4 The height and area for buildings or structures of the different types of construction shall be
governed by the intended use or occupancy of the building, and shall not exceed the limits
set forth in Table 503 of the 2004 FBC.
5 Place a note on the elevation view drawings indicating that the exterior wall openings and
exterior wall construction comply with 2004 FBC, Table 704.8, or 2004 FBC, Residential,
Section R302.2. Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 2004 FBC, Table 704.8 or 2004 FBC, Residential,
Section R302.2.
6 General area modifications to buildings shall be in accordance with 2004 FBC, Section 506.
Provide calculations verifying compliance with the above code sections and the 2004 FBC,
Table 503.
7 Buildings, structures and parts thereof shall be designed to withstand the minimum wind
loads of 140 mph. Wind forces on every building or structure shall be determined by the
provisions of ASCE 7, Chapter 6, and the provisions of 2004 FBC, Section 1609 (Wind
Loads). Calculations that are signed and sealed by a design professional registered in the
state of Florida shall be submitted for review at the time of permit application.
SIDevelopmentlBuilding\ T ART\ TART 2006\Ocean95 Exchange Plaza
Page 1 0'4
8 Add to all plan view drawings of the site a labeled symbol that represents the location and
perimeter of the limits of construction proposed with the subject request.
9 At time of permit review, submit signed and sealed working drawings of the proposed
construction.
10 Add a labeled symbol to the site plan drawing that identifies the location of the handicap-
accessible parking spaces. The quantity of the spaces shall be consistent with the
regulations specified in the 2004 FBC. The accessible parking spaces that serve a use
shall be located on the shortest safety accessible route of travel from adjacent parking to
an accessible entrance. The 2004 FBC states that buildings with multiple accessible
entrances shall have accessible parking spaces dispersed and located closest to the
accessible entrance. 2004 FBC, Sections 11-4.1.2(5), 4.3, and 4.6.
11 On the site plan and floor plan, indicate the number of stories that are in each building
including, where applicable, mezzanines. Indicate the overall height of each building.
12 Add to each building that is depicted on the drawing titled site plan and floor plan a labeled
symbol that identifies the location of the handicap-accessible entrance doors to each
building. 2004 FBC, Sections 11-4.1.2,11-4.1.3, and 11-4.3.
13 Add a labeled symbol to the site plan drawing that represents and delineates the path of
travel for the accessible route that is required between the accessible parking spaces and
the accessible entrance doors to each building. The installed symbol, required along the
path, shall start at the accessible parking spaces and terminate at the accessible entrance
doors to each building. The symbol shall represent the location of the path of travel, not the
location of the detectable warning or other pavement markings. The location of the
accessible path shall not compel the user to travel in a drive/lane area that is located
behind parked vehicles. Identify on the plan the width of the accessible route. (Note: The
minimum clear width of an accessible route shall be 36 inches, except at curb ramps that
are part of a required means of egress shall not be less than 44 inches). Add text to the
drawing that would indicate that the symbol represents the accessible route and the route is
designed in compliance with 2004 FBC, Section 11-4.3 (Accessible Route) and 11-4.6
(Parking and Passenger Loading Zones). Please note that at time of permit review, the
applicant shall provide detailed documentation on the plans that will verify that the
accessible route is in compliance with the regulations specified in the 2004 FBC. This
documentation shall include, but not be limited to, providing finish grade elevations along
the path of travel.
14 Vertical accessibility to the mezzanine area shall be required per the 2004 FBC, Sections
11-4.1.2, 11-4.1.3(5) (New Construction) and Section 11-4.1.6 (Alterations).
15 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed
for the building. Verify that the proposed elevation is in compliance with regulations of the
code by adding specifications to the site data that address the following issues:
A The design professional-of-record for the project shall add the following text to the site
data. "The proposed finish floor elevation _' _ NGVD is above the highest 100-year
base flood elevation applicable to the building site, as determined by the SFWMD's
surface water management construction development regulations."
SIDevelopmentlBuilding\ TARn TART 2006\Ocean95 Exchange Plaza
Page 2 of 4
B From the FIRM map, identify in the site data the title of the flood zone that the building is
located within. Where applicable, specify the base flood elevation. If there is no base
flood elevation, indicate that on the plans.
C Identify the floor elevation that the design professional has established for the building
within the footprint of the building that is shown on the drawings titled site plan, floor
plan and paving/drainage (civil plans).
16 On the drawing titled site plan identify the property line.
17 CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore,
be used for landscape irrigation where other sources are readily available.
18 A water-use permit from SFWMD is required for an irrigation system that utilizes water from
a well or body of water as its source. A copy of the permit shall be submitted at the time of
permit application, F.S. 373.216.
19 If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach
Utilities Department, the following information shall be provided at the time of building
permit application:
A The full name of the project as it appears on the Development Order and the
Commission-approved site plan.
B The total amount paid and itemized into how much is for water and how much is for
sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
20 At time of permit review, submit separate surveys of each lot, parcel, or tract. For purposes
of setting up property and ownership in the City computer, provide a copy of the recorded
deed for each lot, parcel, or tract. The recorded deed shall be submitted at time of permit
review.
21 Add a general note to the site plan that all plans submitted for permitting shall meet the
City's codes and the applicable building codes in effect at the time of permit application.
22 Pursuant to approval by the City Commission and all other outside agencies, the plans for
this project must be submitted to the Building Division for review at the time of permit
application submittal. The plans must incorporate all the conditions of approval as listed in
the development order and approved by the City Commission.
23 The full address of the project shall be submitted with the construction documents at the
time of permit application submittal. If the project is multi-family, then all addresses for the
particular building type shall be submitted. The name of the project as it appears on the
Development Order must be noted on the building permit application at the time of
application submittal.
24 Clarify the type of construction in accordance with the 2004 FBC, Chapter 6 and Table 601,
25 Sheet A-O,1 calls out for 12 handicap accessible parking spaces but the site plan only
shows 10. Clarify.
SIDevelopmentlBuilding\ TARn TART 2006\Ocean95 Exchange Plaza
Page 3 of 4
26 Sheet A 1.1 - Indicate the required fire rating of the typical tenant separation wall per the
2004 FBC.
27 Sheet A-O indicates a mezzanine area in the bays. Clearly show the locations of the
mezzanines on the floor plans, the square footage of each mezzanine and the means of
egress from each mezzanine in accordance with 2004 FBC.
28 An approved automatic fire sprinkler system is required in each building per Chapter g of
the CBBCD, Section 9-6(A)(4), and 2004 FBC, Section 903.2.13.
29 Submit irrigation plans,
bf
SIDevelopmentlBuildingl TARn TART 200610cean95 Exchange Plaza
Page 4 of 4
~
CITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
TO:
Ed Breese,
Principal Planner
DATE:
June 6, 2006
FILE: 06-020
FROM:
Off. John Huntington
Police Department
CPTED Practitioner
SUBJECT:
REFERENCES:
Ocean 95 Exchange Park
Site Plan
ENCLOSURES:
I have viewed the above building plans and have the following comments:
I, Building lighting (non-glare) should be around perimeter on all sides and on pedestrian walkways
2, Landscaping should not obstruct view from windows or walkways,
3, Landscaping should be maintained at three feet or less. Tress should be installed so as not to
conflict with the lighting system and tree limbs should be maintained at seven feet or higher.
4, All exterior doors should be equipped with security hinges and should be reinforced with case
hardened strike plate,
5. All buildings should be pre-wired for CCTV and alarm systems.
6. Glass perimeter doors should be equipped with case hardened guard rings to protect the mortise
lock cylinder.
7. Rear doors should be equipped with 180-degree peephole viewer.
8, Mailboxes for buildings with multi-units should be placed in high activity and conspicuous
location for enhanced safety and natural surveillance of users.
9. Dumpsters should not allow for easy concealment, not create blind spots or hiding areas,
TRC Memorandum
Page I of2
Coale, Sherie
From: Hallahan, Kevin
Sent: Tuesday, June 13, 2006 2:42 PM
To: Coale, Sherie
Subject: Ocean 95 Exchange Plaza
Planning Memorandnm: Forester / Environmentalist
To:
Ed Breese, Principal Planner
From:
Kevin J. Hallahan, Forester / Environmentalist
Subject:
Ocean 95 Exchange Plaza
New Site Plan - 1st Review
NWSP 06-020
Date:
June 5, 2006
Existing Trees List - Management Plan
Sheet L - 4
The Landscape Architect should tabulate the total diameter inches of existing trees on the site, The
tabular data should show the individual species of trees proposed to be preserved in place (2 Sabal
Palms, 5 Live Oaks), relocated or removed and replaced on site. The replacement trees should be shown
by a separate symbol on the landscape plan sheet L-4 of 4. [Environmental Regulations, Chapter 7.5,
Article 1 Sec. 7.D,p, 2,]
Plant List Sheet L-4
1. All shade and palm trees must be listed in the description as a minimum of 3" DBH (4.5' off the
ground) not caliper. The height of the trees may be larger than 12'-14' to meet the 3" diameter
requirement; or any clear trunk (c.t.) specifications. [Environmental Regulations, Chapter 7.5,
Article II Sec. 5.C. 2.]
2. All trees proposed under any existing overhead electric power lines must meet the
FP & L Right tree in the Right Place manual selection for small trees only.
3. The shade tree planting detail should including a line indicating where the diameter and height of
all of the trees will be measured at time of planting and inspection.
4. The palm tree planting detail should include a line indicating where the clear trunk and height of
all of the palm trees will be measured at time of planting and inspection,
5. The shrub and groundcover planting detail should include a line indicating where the height and
spread of the shrubs and groundcover plants will be measured at time of planting and inspection.
6. The applicant should add a note that all utility boxes or structures (not currently known or shown
on the plan) should be screened with Coco plum hedge plants on three sides.
7, The applicant should show an elevation cross-section detail of the actual heights of the proposed
landscape trees and vegetation (proper scale) at the time of planting to visually buffer the
proposed buildings and parking lot from the 1-95 and SW 8th Street road rights-of-ways.
6/13/2006
TRC Memorandum
Page 2 of2
Irrigation Plan
8. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration
for water conservation.
9. Trees should have separate irrigation bubblers to provide water directly to the root ball.
[Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.]
Kjh
10. All shade and palm trees must be listed in the description as a minimum of 12'-14' height, 3"
DBH (4.5' off the ground) not caliper, and Florida #1 (Florida Grades and Standards manual).
The height of the trees may be larger than 12'-14' to meet the 3" diameter requirement; or any
clear trunk (c.t.) / gray wood, specifications. [Environmental Regulations, Chapter 7.5, Article II
Sec. 5.C. 2,]
I!. All shrubs, accents and groundcover plants should have a height and spread dimension.
,Irrigation Plan
12. Turf and landscape (bedding plants) areas should be designed on separate zones and time duration
for water conservation.
13. Trees should have separate irrigation bubblers to provide water directly to the root ball,
[Environmental Regulations, Chapter 7,5, Article II Sec. 5. C,2.]
Kjh
6/13/2006