REVIEW COMMENTS
August 23, 1991
\Q
City Of R>
BOYnton B '
each
SfP 4 - 1991:.
Utll/ties
Director
,
BUILDING DEPARTMENT
MEMORANDUM NO. 91-328
TO: Technical Review Board Members
Christopher cutro
Vincent Finizio
Ed Allen
Ed Hillery
John Guidry
Bob Eichorst
Charlie Frederick
Planning Director
Admin. Coord. of Engineering
Fire Chief
Police Chief
utilities Director
Public works Director
Parks & Recreation Director
THRU:
Don Jaeger, Building Officia~
Michael E. Haag, Zoning & Site Development Administrator
FROM:
RE: ISSUANCE OF CERTIFICATE OF OCCUPANCY
Nine to Five Day Care Center
1770 N.E. 4th Street
. FeIner construction, Inc.
The above referenced project is nearing completion. Prior to the
Building Department issuing the Certificate of Occupancy, I would
like to ensure that you do not have any outstanding or pending
issues concerning this site that must be rectified (excluding
issues that are covered entirely with a city approved surety).
If the issues are related to permits issued by the Building
Department, please provide this department with the permit number and
nature of unresolved issues. If the unresolved issues are not
permit related, notify the owner or the owners agent to ensure
that the issues are rectified.
Please respond to this office within ten (10) days so that we may
proceed to issue the Certificate of Occupancy, Thank you for your
cooperation and timely response.
J. Scott Miller
Don Johnson, Inspector
Kevin Hallahan, Forester
Johnnetta Broomfield
File
~~~'7~-;t
~C,!)
9-b-9/ ~~-
~ /339
SEP 06 .,
eo~~e DEVil.,
~II, FW/i/1i4
I
, '"
;'.1 r-'"
--~-------'
,
,
BUILDING DEPARTMENT
MEMORANDUM NO. 91-328
'\ '
-,
....
RECEIVED
AUG 23 1991
...
Christopher Cutro
Vincent Finizio
Ed Allen
Ed Hillery
John Guidry
Bob Eichorst
Charlie Frederick
Planning Director
Admin. Coord. of Engineering
Fire Chief
Police Chief
utilities Director
Public Works Director
Parks & Recreation Director
\ \
. "I '
j'l
. jl \.
\ .:'. \_'J
August 23, 1991
TO: Technical Review Board Members
THRU:
Don Jaeger, Building Officia~
Michael E, Haag, Zoning & Site Development Administrator
FROM:
RE: ISSUANCE OF CERTIFICATE OF OCCUPANCY
Nine to Five Day Care Center
1770 N,E. 4th Street
FeIner construction, Inc.
The above referenced project is nearing completion, Prior to the
Building Department issuing the Certificate of Occupancy, I would
li}~e to e::Jsure that you do not have any outstanding or pending
issues concerning this site that must be rectified (excluding
issues that are covered entirely with a city approved surety).
If the issues are related to permits issued by the Building
Department, please provide this department with the permit number and
nature of unresolved issues. If the unresolved issues are not
permi t related, notify the owner or the owners agent to ensure
that the issues are rectified.
Please respond to this office within ten (10) days so that we may
proceed to issue the Certificate of Occupancy. Thank you for your
cooperation and timely response,
qJ3jV ;W/C-: Ai'f i" )J-::c,:,j:
, ("(12):'('--
f(CC::P,-;F~ ":l..J ~~,"/'''''2'\~ ':-.:- A::~ 'j..) - - .,
J. Scott Miller
Don Johnson, Inspector
Kevin Hallahan, Forester
Johnnetta Broomfield
File
Ji /JJ.l. 1.-1
C ')"
RECEIVED
SEP Q 3 \991
SITE OEVEL.
BOYNTON BEACH. nORUY-
1\"'11"
i ' , " ~' ,~~
\
\\, , \ '
I
\
BUILDING DEPARTMENT
MEMORANDUM NO, 91-328
\ I
August 23, 1991
TO: Technical Review Board Members
Christopher cutro
Vincent Finizio
Ed Allen
Ed Hillery
John Guidry
Bob Eichorst
Charlie Frederick
Planning Director
Admin. Coord. of Engineering
Fire Chief
Police chief
Utilities Director
Public Works Director
Parks & Recreation Director
THRU:
Don Jaeger, Building Officia~
Michael E, Haag, zoning & Site Development Administrator
FROM:
RE: ISSUANCE OF CERTIFICATE OF OCCUPANCY
Nine to Five Day Care Center
1770 N.E, 4th street
FeIner Construction, Inc,
The above referenced project is nearing completion, Prior to the
Building Department issuing the Certificate of Occupancy, I would
like to ensure that you do not have any outstanding or pending
issues concerning this site that must be rectified (excluding
issues that are covered entirely with a city approved surety).
If the issues are related to permits issued by the Building
Department, please provide this department with the permit number and
nature of unresolved issues, If the unresolved issues are not
permit related, notify the owner or the owners agent to ensure
that the issues are rectified,
Please respond to this office within ten (10) days so that we may
proceed to issue the Certificate of Occupancy, Thank you for your
cooperation and timely response.
J, Scott Miller
Don Johnson, Inspector
Kevin Hallahan, Forester
Johnnetta Broomfield
File
A/~~~
~~
1-6 ~ 91
~~
TO:
FROM:
/.\, cOiI/~
/~~'" .
/ "~/ ~ ,~. '," ~,\ '; r.
,,: (,' \ ~ " ,
PUBLIC ~,:ORKS MEMORANDUM NO. 9'1-' I-I ~ :.j cf (~\",_\., '" ~
;-, AUG 2. 9 19'31
','
..-". '"..~
........-' ~l,\1~\~_~~\1.t
\'<I),"'0"8:'u" 'E"'c.."\'
... "'..(. I, I' .- /
MICHAEL E. HAAG - ZONING AND SITE ADMINISTRATOR ~
ROBERT EICHORST - PUBLIC WORKS DIRECTOR
DATE:
SUBJ: ISSUANCE OF FINAL CERTIFICATE OF OCCUPANCY
Public Works does not have any problem with the issuance of
a Certificate of Occupancy to:
Nine to Five Day Care Center
1770 N,E, 4th street
FeIner construction, Inc.
~/-
" / ~!:.:.-- ,-
Robert Eichorst
RE:he
cc:file
RECEIVED
AUG 3 0 1991
~ITl DEYS..
f/QV~"",FLOIIIIIl
" ;.
(J1)" .
PLANNING DEPT. MEMORANDUM NO. 91-051
TO:
Don Jaeger, Building Official
(!.jT<"IQ..U
Christopher Cutro, Planning Director
FROM:
DATE:
March 6, 1991
RE:
9 to 5 Day Care Center Traffic Analysis
It is my understanding the owner of 9 to 5 Day Care Center has
taken umbrage at their traffic impact fees.
On FridaYr March 1, 1991 I was given the attached copy of a
traffic analysis for the development by Vicent Finizio, the
Administrative Coordinator of Engineering. I have concluded
that this report was mistakenly addressed to Mr. Finizio and
should have been directed to you,
Since the developer is questioning the county generation
numbers for the development, I would suggest submitting this
report to the County Traffic Engineer for their review and
base the impact fee on the outcome of that review.
If you should have any questions, please feel free to call me.
CC/cmc
"b/~e~trb ~ !ft'v,j IVITI" ~H.4" 4,,vtA..
17,.) ~'1.1J I "'Q/E.y~71It tJ~~",,~4.. IIu
1v1A.~IN. AlJI'J f1.J4 ~~ "',.", "'f/N1ttII
,11/1. 1661". 1j.C)' v~, If .If11N'O'''' TV#"
11 ~V&.13NIN oq,,~.u ~/t.' _tVt II- t/t~
~hi4. W~ fld~6'14 dttMf.l/ll!1v ~ /1
~r,b ~ 711# PtwJ~ r..... '11J4. ee-,,,,
~. 0<<",. ~.r4
t 6"'~J
RECREATION & PARK MEMORANDUM 1191-361
FROM:
Kevin J. Hallahan
Forester/Environmentalist
k~rl
<'0-'"
11; 'dy.
.""':",,Y::;
! __I ,,' I',' I, - .., "'< ,.
Ic;~ ~U~~;"9; t~~'l ~ ,-
\:::: ,,,,;\,,"0
~ [\ L'l.~.
~.,.,'
'~.
TO:
Michael Haag
Zoning & Site Development Administrator
RE:
Nine To Five Day Care Center
DATE:
August 28, 1991
The landscape inspection has been completed with all changes
noted.
KH:ad
...
BUILDING DEPARTMENT
MEMORANDUM NO. 90-344
August 6, 1990
THRU:
Jim Golden, Interim planning Director
1
Don Jaeger, BUilding & Zoning Directo~~
Michael E. Haag, Zoning & Site Development Administrator
TO:
FROM:
RE:
SITE PLAN CONDITIONAL USE - NINE TO FIVE DAY CARE CENTER
Upon review of the above mentioned project, the following list of
comments must be addressed in order to conform with the Boynton
Beach City Codes:'
1, All drawings and/or documents, submitted for public
record and prepared by a design professional, shall show
oriqinal legible raised seal and signature of a Florida
registered design professional responSible for the
drawings/documents.
2. Clarify the overall height of the bUilding; site
data states thirty-eight feet (38') and elevation view
draWings identifies twenty-eight feet two inches (28'2")
3. Identify on the plans the width of the landscape strip
located South of the South ingress accessway to the site.
4. Provide a detailed plan view and full section view
drawing of the dumpster enclosure and pad. Identify the
type, size and color of the material proposed for the
sides of the enclosure. Specify the size and type of all
required vertical and horizontal structural material and
components for the enclosure walls and associated pad.
Identify the overall heightr width and length of the
enclosure. Show ten foot (10') clear minimum width of
the enclosure opening (clear width to be measured inside
of gate and post material or meet with the Public Works
Department specifications for compactor enclosure).
SpeCify method of holding the enclosure gates in the open
and closed positions,
5. Show on the site plan draWing the sidewalk that runs
parallel to the publiC right-Of-way at the front of the
property.
6, Show on the plans the difference in elevation between the
finish floor elevation and the level platform located at
the handicapped accessible entrance door to the building.
7. SpeCify on the plans that the height of the wall/fence
located along the perimeter of the property, between the
west property and the front bUilding line will have a
maximum height of 4'0".
Memo: Jim Golden
RE: Nine to Five Day Care Center
August 6, 1990
Page Three
,
10. Show on the landscape plans the location and size of the
line-of-site triangle at both ingresses/egresses to the
site. State that the space between 30" and 72" within
the triangle will be unobstructed to allow cross-
visibility so as not to create a traffic hazard.
11. Identify on the plans the color of the fascia.
12, All site lighting must be photocell controlled.
13, Show on.the plans the proper traffic control signs for
the site.
14. I recommend not relocating Ficus aureus adjacent to
asp~a1t surfaces because of its potential to damage
parking area pavement; instead provide a different kind
of tree.
15. Provide the native species computation for the landscape
material. Mango trees are not native.
In order to facilitate the permitting process, the following
information should be included with your documents submitted to
the Building Department for review and permitting:
All signage must comply with the requirements of the
sign code. Maximum square frontage of sign shall not
exceed (32') square feet.
E. Haag
.' J
BUILDING DEPARTMENT
MEMORANDUM NO. 90-252
June 7, 1990
TO: Timothy P. Cannon, Interim Planning Director
THRU: Don Jaeger, Building & Zoning Director~
FROM: Michael E. Haag, Zoning & Site Development Administrator
RE: COURTESY COMMENTS - SITE PLAN
NINE TO FIVE DAY CARE CENTER
Upon review of the above mentioned projectr the following list of
comments have been provided as a courtesy with the applicants
full knowledge that there will be a full review made when the
project is placed on a future Technical Review Board agenda:
jJ.
h.
h.
}--5.
J...6 .
,1 7.
,
i'- 8.
All drawings and/or documents, submitted for pUblic record
and prepared by a design professional, shall show original
raised seal (legible) and signature of a Florida registered
design professional responsible for the drawings/documents,
Show on the site plan drawing the required rear yard
setback distance consistent with the zoning district
setback regulations (minimum 40'0").
Clarify that the overall height of the building; site data
states thirty-eight feet (38') and elevation view drawing
identifies twenty-eight feet (28').
4. Provide horizontal control dimensions through the length of
the property from the north to the south property line,
Include the width of the perimeter landscape areas.
Identify the size and width of the regular parking space
pavement markings,
Provide a detailed plan view and full section view drawing
of the dumpster enclosure and pad. Identify the type, size
and color of the material proposed for the sides of the
enclosure. Specify the size and type of all required
vertical and horizontal structural material and components
for the enclosure walls and associated pad. Identify the
overall height, width and length of the enclosure. Show
ten foot (10') clear minimum width of the enclosure opening
(clear width to be measured inside of gate and post
material or meet with the Public Works Department
specifications for compactor enclosure). Specify method of
holding the enclosure gates in the open and closed
positions.
Show on the site plan drawing the sidewalk that runs
parallel to the pUb\ic right-of-way at the front of the
property. (": :) (<."
Show on the site plan drawing the required handicapped
~~""Ac:c:;n;l;ru "t...7::l11'lrt...7=rou" lA.::lIninrr .......... t-'ho. nll;lninrr ont-r=ron("'Oo
I
Memo: Timothy Cannon
Re: Nine to Five Day Care
June 7, 1990
Page Two
11. Show on the plans the handicapped accessible "walkway"
leading to the entrance of the building from the parking
surface at the handicapped parking space. Include
elevation of parking surface, spot elevations along the
walkway surface leading to building entrance and show
detailed drawings of curb cuts where required.
12. Show the location (with respect to latch side of door and
door swing), width, length and elevation of the level
platform that is required at the entrance to the building.
13. Show on the landscape plans the location and size of the
line-of-site triangle at both ingresses/egresses to the
site. State that the space between 36" and 72" within the
triangle will be unobstructed to allow cross-visibility so
as not to create a traffic hazard,
14. Identify the color of the fascia and include all the colors
shown on the color elevation view drawing on the plans
submitted for site review. Specify the slope of the roof
on the elevation view drawings.
!
If" 15.
I recommend not relocating ficus aureus adjacent to asphalt
surfaces because of its potential to damage parking area
pavement; instead provide a different kind of tree.
1(16.
Provide the native species computation for the landscape
material.
I
:,. 17.
All site lighting must be photocell controlled.
18.
Provide proper traffic control signs for the site.
In order to facilitate the permitting process, the following
information should be included with your documents submitted to
the Building Department for review and permitting:
All signage must comply with the requirements of the sign
code.
. Haag
<
SITE LiGHTING REViEW CHECKLIST FOR
T~iE SITE PLAN i<EVIEV A:!'Jl:! l-'E~.XITTING ?ROCESS
I EnGINEERING DEPARTMENT - REVIE\,l,7 RESPONE~IBII...ITIES DURING THE SITE
PLAK REVIEw A~D ?ERKITTIKG PROCESS
A. Establish the location of the site lighting poles and fixtures
on the appropriate plans submitted for site review,
.
. .
B, Ensure that photometric drawing(s) are submitted and that the
drawings show and specify the code required light levels,
Also, ensure that the layout and configuration of the ?arking
area shown on the site plan and paving and drainage drawings
~tch in every respect the layout sh8wn on t~e pho~c~~tric
.irawing<s)
'.
C, Ensure that the type, height and power of each requireG site
lig!:ting fixture is speci'fied on the p:h8T.ometric drawiLt, (=:;)
:), E,:;:.="....:;:-e t:l3.t the :?hDtometric d:;:-;:;."";:Tl~S:=,;:'E-::t',,~ : ":l3.-I-. ~.l~ :;:-E:<,,-.:'~-~':'~
:=..:"te
~:SL~~L8 fixtu~es a~2 ~~o~=:~~:
- - -I- "" .'. _ .... _ ~
, , -
'-'_.._,~--~,
E, Ensure that the required site lighting pole, fixture type
and location specified on the photometric drawing(s) matches
in every respect all other,drawings that show site lighting
poles and fixtures.
F. Ensure that all site lighting pole and fixt~~e location<s)
shown on all plans do not conflict with d~ainage structures,
parking spacers>, landscaping macerial and c~use off-site
glare.
~1)0
.
II SI,E DEVELCP~ENl I,IVISION - RESPONSIBILITY DURING THE SITE PLAN
REVIE~ AND THE REVIEW AND PERMITTING
P~D':'ESS OF SITE LIGHTING PLANS
'When the site lighting plans 'that are submitted for permit do not
match tLe approved final signed-off ,RB drawings, the reviewer will
fill-out a comment sheet identifying that the plans do not match and
'.rOlIIi<i contClc-t the engineering dep",rt,men-t, After the engineering
:::ep.3.rtment staff ~ i gr.:="-of f -the permi t plans and not if ies the reviewer I
the building department may complete -the review and permit the plans.
All inconsistencies in the permit and TRB plans will be rectified by
the engineering department.
'.
Show and. specify on signed and sealed typical elevation
view drawing of each required site lighting pole(s) the
following information:
AND/OR
Show On the signed and sealed plans a typical elevation view
drawing for each different type of site lighting pole that is
specified on the photometric drawing(s), Typical drawinA~b
to show and specify the following information: ~
a, the material and color proposed for each site ~
lighting pole,
"I -\
~
b, the distance each pole will be installed above
grade
o [t:...
OK.
- . . .
-c':.2 rlE::'....;:'Lt
u
023."::1
::: :..::-:1.2re will
be
mO:::lted
~~
-.'
T.::~e
~
-~-=
d, For direct burial site lighting poles, specify the depch
the pole is required to be installed below grade to meet~
the 120 MPH wind load requirements.
<l>/'-
e, For site lighting poles that require a pole base to attach~
the pole, specify the followi~S ~nfo~mation:
AND/OR
f. For site lighting poles that are required to be e~bedded~
in a base, specify the following information:
i) thickness and/or diameter
i1> width
iii) length and/or depth
iv distance to the top of the base from grade
v) type, size and spacing"of the fasteners required
attach the pole to the base
vi) type, size and spacing of the steel reinforcement
material required to construct the base
..J...
~
..(
to
~
and ~
g. Make a statement on the typical site
declaring the pole, fixture and base
withstanding a 120 MPH wind load
lighting pole drawing
are capable of
~
J
.
III PLAN REVIE~ AND PERMITTING DIVISION - RESPONSIBILITY DURING THE
REVIEW AND PERMITTING OF SITE LIGHTING PLANS
When the site lighting plans that are submitted for permit do not
~atch the approved final signed-off TRB drawings, the reviewer will
fill-out a cOllli"nent Eheet identifying that the plans do not match and
contact the engineering department. Aft.er the engineer ing department
staff signs-off the permit plans and notifies the reviewer, tile
building ,department may complete the review and permit the plar~5.
All inconsistencies in the permit and TRB plans will be rectified by
the engineering department.
ELECTRIC REVIEW
~
.
Submit site lighting electrical plans that are signed and
sealed by a Florida registered architect and/or engineer.
Show and specify the following information on the plants):
AKD/OR
2;..0""'; and sFecify the following infol-tna'tio:'l on the signed and
ss~led electrical site lighting plan(s):
a, a cut sheet for each fixture specified on the photometric
plants), Each cut sheet will show and specify the
following information:'
i) manufacturer(s) name and model number of each fixture
i1) a distingui2hsb:e sy~bol that ciYe~tlv relates the
cut 5~eet lix~~rE to the fixt~res shown on the sitE
lighting photolliE"tric drawing. site lighting electric
plan and site plan,
iii) the type of luminary that matches in every respect
with the type of luminary specified on the
photometric drawing
iv) the power Dr wattage of the luminary that matches in
every respect with the power or wattage of the
luminary specified on the photometric drawi~g
b. the firlish color of the fixture
c. "t'he of c.eptb at ......;:~ich t:he co::-.d~i t -that carr ie= the powe1:~
source to the pcles is installed belcw grade
d, the type and size of the conduit that carries the power
source to the poles
e. the size of the wire that carries the power source to the
pDles enabling voltage to maintain minimum level allowed
f. the type and size of grounding for each pole
g, the location of the source Df power (ex, service panel or
separate pDwer drop. panel and meter)
h, the designation of the electrical panel and the circuit
numbers that are required for all required site lighting
fi):tures
i, where direct burial cable is specified, identify the
following information:
1) type of cable
ii) size of the cable
i1i) the depth t~e ca8le is :nstalled below grade
i...,~) :?rcvide a :'\.1"t sbG'e~ :01 tLe D;:"O";:)C'sed Junction D::::::.
SITE AND ZONING DIVISION
TRB CHECKLIST
Project:
J'~~ q:F~
Date:
(. 1,1/1,)
A. Zoning: dl'JIr
1- Permitted Zone Use
,
2 . Set Back: Requi r'ed Applied
Front: '1:0 ft i" ft
Side A: 2A) ft i ft
Side B: 1fl ft ft
Rear: 1A) ft '10 ft
3. Fl oor Area sq.ft. sq.ft.
4 . Lot Area sq. ft. sq.ft.
~ /'
5 . % Lot Coverage % 3 . ) %
/
B. Pli~,p'/Submittec ~
~. Signed and Sealed
- 2. Scale Used
3. Recorded Plat Submitted
c. ot6er
Government Agency Approval
Oi"'iO'___~~
~.
X
South Florida Water Management
Lake Worth Drainage
3. 0.0. T.
4. Health Oepartment
S. Other's
O.
Landsc~ping Other Than CBO Zone
/. General Plant Requir'ements
a. Percent native species (50%)
b. Plant material Florida #1 or better
.
f~
J
-
d-
c. Automatic Irrigation
{JII~ 11~
~
2. Flanting Specifications
a. Trees
vl,
/?
/ bb.
Height 3 ft minimum
No nuisance root planted
closer than 12 ft from
public improvements
L
~
r'
t~~
- .
b. Shrubs/ Hedge
aa.
Height 16" minimum
4-
r~
bb.
'2 f t oJ. '.. .
c. Vines
aa.
Height 2 ft on planting
t/
bb.
5 ft O.C.
--
d.
Ground Cover/ Sod
1-
aa. Specify type
3 .
Landscaping Adjacent to Public Rights of Way
~!?
(~c.
a.
Width minimum of 5 ft
J
~ ;J~t
_l~t.
1 Tree every 40 feet on
at least 25 sq.ft.
Shrubs 3 ft in height
area
d.
Easement location
4. Landscaping Relating to Abutting Froperty
/.
a.
Width minimum of 2 1/2ft
cI-
J-
b.
Hedge 4 feet no greater than 6 feet
c.
Presence of hedge to abutting
proper~y or dedicated alley
J....
,
~
Easement location
5. Interior Landscaping
a. 20 sq. ft. landscaping per 1 parking space
number of parking spaces
in interior' =
~/
x 20SCl.ft.
Total required landscape area =
.-
sq.ft.
PAGE 2
E. Parking
../---
b. minimum of 25 sq.ft. for a landscape area
c. one tree every 500 sq. feet
Total landscape area required =
Divided by
Total # of trees required
6. Point of Access
a. Intersects 1 R.O.W.
- Cross visibility of 3D" and 6 ft
on a 10 f t t ria ng Ie
b. Intersects 2 R.O.W. or corner
- Cross visibility of 3D" and 6 ft
on a 35 ft triangle
Dumpster
a. Size 10ft L x 10ft W on the inside
b. Screening on 3 sides with hedge
or' accent shrubs
8. Cluster and Multifamily Development
a. One tree every 1500 sq.ft.:
Total sq.ft. of developed ar'ea =
Divided by
Total number of trees required =
9. Foundation Landscaping
a,
Front and side of each multifamily
or cluster dwellings
10. SUTTer' Areas (Screening)
a. Wall or landscaped chain link
fence at least 5 feet height to
separate residential from
C and M districts
.r-
,./
-
500
A- '-
~.
'-
....---.
-' ~ LCJ
t~J
----- '
15.00
,..---
~.
b. Other' requi rements based on .J.-,
zoning of abutting property
PAGE 3
1.
Spaces:
a. Required
b. Provided
c. Handicapped required
d. Handicapped provided
e. Handicapped ramp
?J
/'
v.)
I
,
,1..
2. Striping
a.
Double lines
J-.
'-
b. Handicapped 12 ft space width
---
4 ft stripe width
A
c .
Handicapped signs
-1
;: 4 ft str'ipe width ~
3. Curb and car' stops I...}. It ..D.._.oO 'i. ~ -;;t
4. parki ng Area Lighting ,:~. ~ ,.,- ~ " ~
5. Pedestrian Lighting ~ -
d.
at he r
9 ft space width
6. Traffic Control
a. stop signs and stop bars
.{
II ~c::;~y
.A
b. Directional arrows
c. Other signs if needed
7.
Drainage
a. To be contained on site
b,
First 1/2" of run off must pass
grassy swale or landscaped area
J-.-
.
8. Fire lanes
a. If floor area of building is
15,000 or greater needs fire lane
../--
1
b. Minimum pavement is 22 ft
9.
Parcel pick-up and drop off lanes
, """--
F. Si gn
1. Sign program to comply with
Boynton Beach Sign Ordinance
-f~
TRBCKLST,SDD
PAGE 4
SITE DEVELOPMENT DIVISION
,rlist Procedure To Be Followed In Reviewing Building Permit Plans Of
jects That Have Received Technical Review Board (TRB) Sign-Off.
F'uK. G~ ~
Project Name:
Permit Number:
Reviewer Name:
Date:
oK:-
'Ole
,
6P
I!> I(
oj I A
Iv / A
()?
Ort:-
Ot'J
/ (, . u
!() /L
roL
Sheet
No.
Identify Project File No. (on the permit plans)
Obtain final signed-off plans, TRB file and, where
Review the permit application to ensure zoning district
is identified correctly and that the description of
work portion of permit application is complete.
compare permit plans to TRB plans and, where
applicable, color elevation drawings to ensure the
following items match:
p. ( Horizontal control dimensions (building setback)
I
i
, I
I
\--4- '.
I plans (where applicable, match SFWMD elevation)
I A'I/l'L-*Dumpster enclosure location and size (minimum inside
I~ opening width 10 feet) place the following note on
I the plan near the dumpster enclosure: "Prior to
I pouring the dumpster pad, call 738-7483 and request a
I dumpster location inspection using the building
I permit number" ,'., '
I
I
(ffl-f> - 3S"'L1-1
(() ~ I
I applicable, approved color elevation drawings
:~ ~~ReView TRB file and plans for outstanding issues and/or
I conditions that must be rectified prior to issuing the
I building permit
I
I
I
I
I
I
I
I
A" J1(
Total square footage of building
Where applicable, number of units
Where applicable, number of seats
Building elevations (configuration of exterior
sur face) 4 ( oJ.... , ~-------.,
overal1~ht 'of building an~pe ~f tAe roof
~ '--~-
Exterior finish color and material identified, match
the appr0ved color elevation drawing and TRB plans
(stamp the "Notice to Contractors" stamp on the
elevation drawings of plans that have City Commission
approved color elevation drawings)
"'.
Minimum finish floor elevation identified on the
*Flat work showing the handicapped accessibility
leading to the entrance of the building, tenant
and/or other amenities at the site from the
path
space
lARD OF ADJUSTMENT APPLICATION
age 2
B. That the special conditions and circumstances do not result
from the actions of the applicant;
C. That granting the variance requested will not confer on the
applicant any special privilege that is denied by this
Ordinance to other lands, buildings or structures in the same
zoning district;
D. That literal interpretation of the provisions of this chapter
would deprive the applicant of rights commonly enjoyed by other
properties in the same zoning district under the terms of the
Ordinance and would work unnecessary and undue hardship on the
applicant;
E. That the variance granted is the minimum variance that will
make possible the reasonable use of the land, building or
, structure;
F. That the granting of the variance will be in harmony with the
general intent and purpose of this chapter and that such
variance will not be injurious to the area involved or
otherwise detrimental to the public welfare.
6. Application fee in the amount of $275, payable to the City of
Boynton Beach, must accompany this petition.
Hamlet Joint Venture
7. Name and address of owner: 4723 W. Atlantic Ave .119. Delrsy Beach. FL 33445
8. Name of applicant:
Applicant I S address: 2101 N. W. ,,2nd Ave., Boca Raton
".'" ,.,..Mat;k Bur~ Sla~tery & Root Architects
407 39 -3720
Date:
5/23/90
Signature of Applicant:
'.
-----------------------------------------------------------------------
To be completed bv the Buildinq Official or Representative
1. Section of Ordinance for which variance is being sought:
Appendix A,
Sec. 5.G.2
2. Property is presently zoned:
R-3
Formerly zoned:
R-[
3. Property Control Number:
08-43-45-15-03-000-0201
4. Denial was made upon existing zoning requirements (list sections[s]
of Code from which relief is required:
Appendi~ A-Zoning, Sec. 5.G.2
5. Nature of exception or variance required: Code requires a 40' rear
yard setback & applicant is requesting a 20' rear setback; therefore
a variance of 20'
Date:
5/31/90
is requested.
Permit denied: LOJz (J] hn ~
Milt Duff, Buildi~~partment
6. Case Number:
147
Meeting Date: July 9, 1990
S"A""fJ "TO e, 1\A~O 0,..) 'B~h.4),1\Ho 'P~I\N\IY ~LA^IS iWA1 .tA~ B~
~Mt~A'C "r1> M() MATC~ ~ r,N'"... S'rt.A)~-'Ul='l= ""f~B ';>&.AIIIS
C.'t)R~ i::)NYe
/
I
S~.D.
..
,..,u..""
'SPP'^,~r
o F ~T~""'p
S:PCc.,~ T~Q CbI"\~'~fII A&~....,
/' . ' ' 14~ sr.-....,p
...
Sign.off~
~,-
~D(tSt\9 ~ s".
~4eA ,.". "'lIiIT """6
cOlMfAAlo '11>_ n& PL4tJt
J>>J
.
"L
l
, '
/../S1" S'~ ~(.A~ ~
Sl"tiAR" A'Jr" PE.RM\TS REQU\REO........- ~"~ilI~ ,"lIlr
t:.r t\ t:. ,. ~ Be ~~ 41 6,*",,'N eAt,
FOR · ~"','wltfc.1'lle t.,.. ~
TlCE TO CONTRM~lOR~ ~ I\AC~ ~'T&l~ "'VA"''''' ~,flol) bb"",,,*$
~o , d' consistent ...ith II" ( o~ ?lA"......., .. C /"
"Failure to construct bUll IOg\ renderl!1&' en ...~ · NIn' ,.,,,lIt '-' '-O",,,,,SSIIJI\J
elevations of th~, cO\~'::t.a~i1i result illl the ~ff~II'O Cl)l~ 6(."~A""'" ~~"'"'.~
file at the Bull 109 ncy being y/lthhew.-,
Certificate of Qceupa