August 23, 1991
City of Boynton Beach
Bill DeBeck, Project Manager
100 E. Boynton Beach Boulevard
Boynton Beach, FL 33435
RE: Sidewalk variance for 125 S.E. 2nd Avenue
Dear Mr. DeBeck:
At the Technical Review Board meeting, held on July 30, 1991,
your request for a sidewalk variance for the above referenced
address was approved subject to the following conditions. These
conditions are to be added to the site plan when submitted for
final Sign-off.
1. show on the site plan a sidewalk located on the north
side of the S.E. 2nd Avenue right-of-way. The sidewalk
shall run within the right-of-way between the City
project property line and the asphalt surface of S.E.
2nd Avenue. The sidewalk shall start at the west side
of the south driveway leading into the Activity Center
parking area and extend west to and connect with the
sidewalk running along the east side of Seacrest
Boulevard.
2. A second sidewalk shall be shown on the site plan. This
sidewalk shall be located directly north and run
parallel with the property line shown north of the
Activity building on sheet 1 of 1, Gee & Jenson plan
#91-050. The Sidewalk shall start at the west side of
the new Activity Center sidewalk that crosses said
property line and extend west to the east side of the
east library parking aisle.
3. Sidewalk specifications:
a. Sidewalk located within public rights-of-way shall
be located and constructed according to the
Engineering Department standard, incorporate same
as part of the drawings,
,qmerica's qateway to the qu(jstream
To: Bill DeBeck
Sidewalk - 125 S.E. 2nd Avenue
Page Two of Two
b. specify the width, type of material and slope for
the entire length of the north sidewalk. Specify
and show a curb-cut where the sidewalk meets the
edge of the existing east library parking aisle.
4. Incorporate the following as a note on the site plan:
Specify that the remainder of the required
right-of-way sidewalk will be installed when
future improvements are made to the Madsen Center.
If I can be of further assistance, please contact me.
E. Haag
& Site Development Administrator
Central Files
Project File
TRBAUG.SDD
-
..-
./.
..-
BUILDING DEPARTMENT
MEMORANDUM NO. 91-276
_ July 22, 1991
TO: Bill DeBeck
Project Manager
THRU: J. Scott Miller
City Manager
FROM: Don Jaeger
Building & Zoning Director
RE: ACTIVITIES BUILDING
I am in receipt of your memorandum #91-088 and respond
as follows:
The Building Department cannot waive the requirements of
Section 22-25 "Sidewalks required"; however, we will
place this item on the next Technical Review Board
agenda as that Board has the ability to comply with your
request. We are currently reviewing your application
and will make a recommendation at the next T.R.B.
meeting.
~F
DJ:bh
XC: Chris cutro
Charles Frederick
Michael Haag
SIDEWALK. DOC
~
MEMORANDUM 91-088
July 19, 1991
r1-c..
[, ,
./
To:
Don Jaeger
Building Department
From:
Bill DeBeck
Project Management
J Scott Miller
city Manager
Thru:
Subject:
Activities Building
This letter will serve as a formal request for approval from
the Building Department to waive the requirements at this time to
install sidewalks on the north and south sides of the project on
First and Second Avenue.
There exists no other sidewalks on this block and future
plans for the east end are incomplete to date. sidewalks were
already excluded on the Library site due to indecision on type
and placement, ie; swale and walk vs. curb and gutter. This item
was referred to the Engineering Department as part of their
street program.
completion of all sidewalks on First and Second Avenue and
First Street will be included with the completion of Phase III
Madsen Center project.
Variances for other work are already processing through the
Planning Department for the east end parking and landscaping
conflicts.
Please prOVide written approval for consideration at the
July 30th TRB meeting.
f1d/d)~
Bill DeBeck
Project Manager
cc: Chris Cutro
Charles Frederick
.'
BD/jj
r- E)(I$TII-.l"'~ 1'....1".1"-1"'..
~\ .......... U""
~ ~ I~
,I i2 :~
)i ~"
~
l~
~\,~
-
l:'::- ..~':~~~.. . .'. ,.,:,,':',:;:'~!.~::~','
(,~.., ...
)j'~.i f ~: . .
"""'~ ~ ~
. .,..-r:Il 0_
1&1 ... __~.(f'_'~_"O',___
'Il'
~
<
"
.
,.
,.
~
~
f<
,.
~
f '
'.
'. .
~
;..
~
..
"
!
o
l\
..
,-
..
D.
,." "',
!II
l"
'I
'1\
~ I
;", i
:. I'
''''
..
'"
..
.
"
''"'
,
l>
"-
1\\
'C
C;
(Il
~
'-!K':l~;:
)\.
""
r.
,.1\
-
("~'."-';;'~";:
11
,.
0>
Jl
~
~
n'
,
;~ i. ,'~
-{'l"f ff~" 1S'j- ''''f~'f'
.. "
" "
.. 6.1':. 7.z.1!
.
I I
II I I
I I
~ I I
~ I .
>- I .
"-
I
/
;;
""':~7'.... ",,"~,':'''''J'.:~, r .,.~'.. :"i>.':;~~~:.o~'ll:t:;~~:l'
.....-......--
I
- .
3
-.
-+-
\11
"
~
'E
...
-lo
~
~
o
..yl
n
o
::5
(JI
-l-
'1
s::
('
:t:.
o
:5
~
~
".
"
.
L..
... 1\ ""
~ .l\ 0_ ~3 In
~ "
" · " 7'1
.- ..
.. ~! E
,.
c.. ~t. (. t~ g
c
l "'I
~r.~
~f
~ r
Q
t G. ~
..~"
I
, :
.........-.:.;..
'~
~ ~
;j; ~
:!
-r: t. ^b1\
J\ 1\ ,,~~
~ oj. o 01-
'f '&'~
t ~ ~(
, ~ ~
~ ~ ~ '"
c I-I>
'" .. tE
"
OJ z:.
J\
--0
.,
o
o
(II
(II
n.-
(jl
:+-
/I
1)
-
~
"
''"
-6.1;. I ~f 4ip:,~T