Loading...
REVIEW COMMENTS 7.B.1 RENAISSANCE COMMONS PHASE II (NWSP 03-016) NEW SITE PLAN TO: THRU: FROM: DATE: PROJECT NAME/NO: REQUEST: DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISION MEMORANDUM NO. PZ 03-263 STAFF REPORT Chairman and Members Planning and Development Board and City Commission Michael Rumpf Planning and Zoning DirectO;fr , Eric Lee Johnson, AICP Planner November 12, 2003 Renaissance Commons (Phase Two) / NWSP 03-016 New Site Plan Property Owner: Applicant: Agent: Location: PROJECT DESCRIPTION Compson Associates of Boynton, LLC Compson Associates of Boynton, LLC Mr. James Comparato and Mr. Carl Klepper East side of Congress Avenue, south of Gateway Boulevard (see Exhibit "AU - Location Map) Existing Land Use/Zoning: Local Retail Commercial (LRC) / Community Commercial (C-3) Proposed Land Use/Zoning: Proposed Use: Acreage: Adjacent Uses: North: South: East: No change proposed 4,200 square foot commercial/retail building 0.5360 acre (23,348 square feet) - a component of the entire site of 28.36 acres or 1,235,717 square feet Developed Motorola site zoned Planned Industrial Development (PID); Right-of-way for Boynton (C-16) Canal, then farther south is vacant properly, zoned Single-family Residential (R-1AA); Right-of-way for Lake Worth Drainage District (LWDD) Equalizing E-4 Canal, then farther east is the Boynton Beach Community High School, zoned PID; and Staff Report - Renaissance Commons Phase II (NWSP 03-016) Memorandum No PZ 03-263 Page 2 West: Right-of-way for Congress Avenue, then father west are developed commercial properties, zoned Community Commercial (C-3). BACKGROUND Proposal: On July 15, 2003, Compson Associates of Boynton, LLC, owner of the 28.36-acre parcel was approved for a large-scale mixed-use project known as Renaissance Commons (NWSP 03-007). The project consisted of a 10,662 square foot commercial building combined with eight (8) townhouse units, a 4,338 square foot stand-alone commercial building, 250 multi-family (apartment) units with their two (2) parking garages, and 242 fee-simple townhouse units. All components of the project were approved for Phase One except for the 4,338 square foot stand-alone commercial building. The stand-alone commercial building was noted as being a part of Phase Two. Accordingly, when the Renaissance Commons (NWSP 03-007) project was reviewed, no floor plans or elevations were included for the Phase Two building. As a condition of approval, staff required full site plan review for just the Phase Two building. Therefore, this submittal represents the information that was required for the Phase Two building, conceptually approved in July of 2003. However, at this time, the applicant is proposing a 4,200 square foot commercial building instead of a 4,338 square foot building. This new building would be 138 square feet smaller than what was originally approved. However, the 138 square foot difference would be returned to the project during Phase Three (see accompanying staff report for Renaissance Commons Phase III - NWSP 03-017). Site Characteristic: The Phase Two portion of the subject site is a small component (0.53 acre) of the entire 28.36-acre rectangular-shaped parcel. The entire parcel, known as Renaissance Commons, is located on the east side of Congress Avenue and north of the C-16 Canal, extending eastward to the LWDD E-4 Canal. The applicant has no intention of subdividing this 0.53-acre "leased lot" from the greater parcel. Therefore, no cross-parking or cross-access easements would be required and there would be no setback issues as well. All uses proposed in the Renaissance Commons project are permitted in the C-3 zoning district. The proposed commercial areas (of Phase One and Two) would be divided into two (2) separate buildings. As mentioned in the original Renaissance Commons staff report (NWSP 03-007), Phase One consisted of the vast majority of the commercial and residential development, while this phase (Phase Two), represents only the review of the stand-alone commercial building, proposed in the northwest corner of the site. A lift station located off the property (on the Motorola site to the north - Phase Three) may require upgrades as a result of this project. The required upgrade of the off-site lift station would be determined at the time of permitting. This boundary survey of the 28.36-acre parcel showed an existing metal fence running in a north-south direction along the western property line (near Congress Avenue). It connects to the same fence used on the Motorola site (Phase Three). This boundary survey also showed two (2) existing asphalt paths within the interior of the site and various easements that were dedicated on the 28.36-acre site. If required, the abandonment and / or re-dedication of easements Staff Report - Renaissance Commons Phase II (NWSP 03-016) Memorandum No PZ 03-263 Page 3 must be recorded prior to the issuance of the first certificate of occupancy. ANALYSIS Concurrency: Traffic: Generally, a project's anticipated traffic is generated by two factors, namely the proposed use and its intensity. Typically, the intensity is measured by the proposed building area (in square feet). When the original Renaissance Commons (NWSP 03-007) project was reviewed, a traffic statement was sent to Palm Beach County Traffic Division for their review and approval. At that time, the Traffic Division determined that the project was part of the previously approved Motorola Development of Regional Impact (DRI) and met the Traffic Performance Standards of Palm Beach County. Also, at the time of its review, the City's Engineering Division of Public Works required various off-site improvements as a result of this project. No new conditions are required as a result of the development of Phase Two. However, since July of 2003, the developer has assembled the Motorola property to the north (see accompanying staff report for Phase Three - NWSP 03- 017). This property to the north is earmarked for the third phase of the Renaissance Commons project. A revised traffic impact analysis was sent to the Traffic Division for their review and approval. The new analysis, which includes all three phases of the Renaissance Commons project consists of 300 apartment units, 200 townhouse units (for a total of 500 dwelling units), and 43,820 square feet of retail space. As proposed, the retail area would be divided into five (5) separate buildings. No building permits will be issued until the Traffic Division determines that the entire project meets the Traffic Performance Standards (TPS) of Palm Beach County. Drainage: Conceptual drainage information was provided for the City's review. According to the original Renaissance Commons (NWSP 03-007) staff report, the project would discharge into the LWDD E-4 Canal, which would be limited by a control structure to 62.6 CSM at the 25-year storm event. Additional on-site retention would be provided within a new lake constructed off the northeast corner of the property adjacent to the LWDD E-4 Canal. A berm would be placed around the perimeter of the site with a top elevation equal to or exceeding the calculated 25-year three (3) day storm event to prevent unpermitted discharge from the site. At this time, the Engineering Division is recommending that the review of specific drainage solutions for Phase Two be deferred until time of permit review. All South Florida Water Management District permits and other drainage related permits must be submitted at time of building permit (see Exhibit "C" - Conditions of Approval). School: School concurrency is not required for non-residential uses. The original Renaissance Commons, which included Phase One and Two, was approved for 500 dwelling units and met the concurrency requirements of Palm Beach County. Staff Report - Renaissance Commons Phase II (NWSP 03-016) Memorandum No PZ 03-263 Page 4 Driveways: No direct points of ingress / egress are proposed on any roadways as a result of the development of this second phase of the Renaissance Commons project. On the entire 28.36-acre parcel, Phases One and Two were approved with a total of four points of ingress / egress. Two (2) of these four (4) points were approved as driveway openings directly onto Congress Avenue. The closest point of ingress / egress onto Congress Avenue from the 0.53-acre portion of the Renaissance Commons project would occur from a main entry driveway that runs along the subject property's north boundary line. For edification purposes, "north boundary line" is not a property line but rather is only used to describe limits of the Phase Two construction. In any event, this point of ingress / egress (from Congress Avenue) is proposed to connect to an internal driveway that would run in an east- west direction along the northern limits of the subject Phase Two property. Access to the Phase Two portion of the project would only occur internally by driving through the parking lots of Phase One. There would be no direct ingress or egress involving Congress Avenue for this small "leased" portion. Parking Facility: The Renaissance Commons project proposes a mix of residential and commercial uses. The Phase Two component only deals with a 4,200 square foot retail building. Commercial uses require one (1) parking space per 200 square feet of floor area. Therefore, 21 parking spaces would be required. The project would provide 22 parking spaces, one (1) space in excess of what is required. The detail of the parking spaces (as shown on sheet SP-2) indicates that parallel parking spaces would be dimensioned nine (9) feet - six (6) inches in width by 25 feet in length. All other parking spaces would be dimensioned nine (9) feet - six (6) inches in width by 18 feet - six (6) inches in length, except for handicap spaces, which would be 12 feet in width with five (5) feet of striping by 18 feet - six (6) inches in length. At the time of permitting, the applicant is required to submit a rectified overall site plan indicating the parking required / provided for Phase One and Phase Two (see Exhibit "C" - Conditions of Approval). Landscaping: According to the tabular data of the Renaissance Commons (NWSP 03-007) site plan approved in July of 2003, the total pervious area equaled 7.28 acres or 25.66% of the entire 28.36-acre site. No significant changes have been made to the landscape plan or pervious area as a result of this Phase Two development. The landscape material that was approved in Phase One would remain as-is in the landscape buffers around Phase Two. The landscape plan (sheet L2 of 3) proposes a variety of trees and shrubs around the Phase Two building. This plant material includes Ligustrum, Live Oak, and Brazilian Beauty Leaf shade trees and Coconut, Alexander, Pygmy Date, and Christmas palm trees. The shrubs / groundcover would include the following: Redtip Cocoplum, Yellow Ixora, Podocarpus, and Viburnum. A vast majority of these species were approved on the Phase One landscape plan. Prior to the issuance of a building permit, the landscape plan (sheet L3 of 3) tabular data must indicate the percentage of native species to ensure that at least 50% of the plant material is native (see Exhibit "c" - Conditions of Approval). However, it must be noted that this native plant material requirement is applied to the entire 28.36-acre parcel and not just this small portion of the project. The applicant, could in fact, choose to install over 50% non-native plant material on this Phase Two portion if a minimum of 50% native plant material is Staff Report - Renaissance Commons Phase II (NWSP 03-016) Memorandum No PZ 03-263 Page 5 maintained throughout the entire 28.36-acre site. Building and Site: The proposed building and site design would generally meet code requirements when staff comments are incorporated into the permit drawings. The Phase Two portion of the Renaissance Commons project was conceptually approved as a 4,338 square foot bank with a drive-through lane. However, the plans have been modified and the floor plan (sheet A-1) now shows it proposed as a one (1) story, 4,200 square foot building with three (3) retail bays. The building, including the arcades, would be 91 feet in length by 58 feet - six (6) inches in depth. The maximum building height in the C-3 zoning district is 45 feet. The elevation drawings (sheet A-2) show that the top of the roof would be 27 feet in height. The top of the decorative cupola would be 41 feet in height. Design: The entire Renaissance Commons project was designed with extensive high quality treatment of ground floor public space, discrete separation of private residential spaces (to the rear and upper levels of the project) and articulated building bases with store fronts, pilasters, cornices, and arcades proposed on the mixed-use building. Also, the roof material would be composed of Terracotta Cement S-tiles. The elevations (sheet A-2) show that this Phase Two building would be consistent and compatible with the Phase One commercial building. The consistency and compatibility in architectural enhancements includes foam banding, similar building colors, same roof type, awnings, and similar exterior finish. To maintain consistency, these same features are also repeated on Phase Three (see accompanying staff report for Renaissance Commons Phase Three - NWSP 03- 017). All buildings in the commercial portion of all three (3) phases would be multi-colored and have a stucco exterior finish. The building colors would be light brown (IeI #553) and light yellow (ICI #667) with a grayish (ICI #769) trim. The canvas awnings would be hunter green and the buildings would be adorned with black metal railings. The outdoor freestanding lighting fixture detail (sheet SP-2) does not indicate the structure's dimensions. The Phase One detail, approved in July of 2003, illustrated that the structure would be approximately 15 feet tall and come with a variety of lighting fixtures (lamps). Staff recommends utilizing the same pole heights and lighting fixtures that were approved during Phase One (see Exhibit "C" - Conditions of Approval). Signage: The elevation of the commercial building (sheet A-2) shows that each tenant would have the same sized wall signs, similar to the signs approved in Phase One. Once the building is built and all tenants of the commercial buildings are determined, the cumulative area of all wall signage would have to comply with Chapter 21, Article IV, Section 2.C. of the Land Development Regulations (see Exhibit "C" - Conditions of Approval). The cumulative signage area would be based on the west building fa~ade. A note on the elevations (sheet A-2) indicates that the signs would consist of reverse channel letters that are Helvetica medium gloss black font. No additional freestanding monument signs are allowed or proposed for Phase Two. Staff Report - Renaissance Commons Phase II (NWSP 03-016) Memorandum No PZ 03-263 Page 6 RECOMMENDATION: The Technical Review Committee (TRC) has reviewed this request for new site plan approval. Staff recommends approval, contingent upon successfully satisfying all comments indicated in Exhibit "Cn - Conditions of Approval. Any additional conditions recommended by the Board or City Commission shall be documented accordingly in the Conditions of Approval. 5:\Plannin9\5HARED\WP\PROJECTS\Renaissance Commons\NW5P 03-016 Phase II\Slaff Report,doc Location Map RENAISSANCE COMMONS EXHIBIT "A" ~, \jIC ~ . I --, ! ill II 'I , I, I I !C3 I \,-, ( r, 'I' ,,'I \' , 1,,1 /,---c , \\",\ _,........-r i \..----c-- ------1'l.r-~, , , ,i" I I i \ ' I', I ! \___- , , / , " GATEWAYBJ0iD \'\ \ \ ,I \\ II \ \, ~,",I.-------------',"\ 1,\ \ ,', \ " \ 1,1, II \ ')~II , , mr 'II. I;"': I, , I i I (~ I L- ,':-.------------ '(' '\ \>~I, " / ,-------------- ,/ "~, -' I .~ '11 , ,-' I I ill I" I, ~- ; , '"lJ u L- L 7 ~ ( '" b, I) (/" :1 " PIO I I i , /jPIO 'y/ I , ! i :J .--------r- I , I I i I i i :j I L.J, I ~ ni , , I , I W~E I S I / --"" 0';", i, ". -"-?"f' - n i '" '" it ~.. iliiijll'j!Ij!llilf!IIIIIIII!:lli il'I I i'! I . I'!. :1 I 'll!!!!i!!!l Iii I! it illllH i i i I i ., i.1 ,II i I I i jJ! g.19, _ , i I' I' ! I -, f I I . . I ., ii I'iiiliii!! il! "- ~i#j~#~-,~9.9. ~~-l "':l lll-,,,,,,,ll.ll.'l. '" ," 'l.g "..iU... _ I! 'i H , II ~ I . " I ;; 'j iSi~-~-~ ~I ~ ;;: i:i I -I ~ "II' , :~ :tjl ! ._il:; · B Ii '1.1 i\ iiii'!ljjilij!llillli,lil ": '. lP I . I Ii H Ii I J ~ ~.. ~; I i I !' ! · i i I ie! "1 !'iiJlW il! I I H,ll" ,! } I · : i I I . . 'i 1 I I ; i I . ! . .. r;BH'i~a ;;':,l "''''',;0 ;... J ,. , , i , I i 1 l ;~ " ~~ ~~ " '< I I ! j I 'l~i"i x r\,.~ ,i,s;. l~,", " '. .~ ~? , ~ . ''''I1>S ',j' !6; ll"l ~~ ~I ~m p i i' , !! I I. I Ii p ~ i ~ j 5 "1l ;:: m z -I ~ > ;:: ~ > " . ~I~~~ ~~ liii!~~ i1,' ii~~ ., ~ F <l~ "("l_ ! ~ ~ trj Z > ~ rJ). rJ). 1<Jl1.1 I() ~ ~j) ~- v ,......... 'co; IF ~ Z c:::;::l <$!l '1".-, 'lOl,o ~ '~ (/,- 9;~'hi:?c,...., Q ~ lfUll c,ci ~ \ J. ~ ~ (Ilf/! :'ill ffi trj IGlii ~g, (hi '-----' iiII,' .'~ _ ,...., dO. 'lij] \ J. <<~[02il 0 .?S (L~ 3: LUll r -~~ U 5: ~~u') ~ 9 ~ -,^u, g ~ Kjl ~ 0 d0 Z rJ). \V i',1 , "l ' ~) C'il , ~ '---,;;) " !, "~ ~~ ~ i r;~ (~~ l ~_,; , ilg,,~ .1'1~ Ii!' ~ !I, !~ !1I " o ~ '<n, F ,_u ~V I 'I ~!J ~ 'r f .. ;1;;1 i'i H II; I) 1111: l H k m H' x , . !I'I ,q 0 l'l I I ! II ~~ ~ ~ i ,i, , . i~ ~ ., 'I , ,)> l! ' . , ~ "I z i I " I G) I , i " , , !' Ii :, I ~' 'i i. I, 'I I I I , , 1"1 !I , . I ~:-o~.._,,: _ ,_,~:,,:,;~, =. .:~:;:;;: ':~c:":::,, 7."~,:~.,,;,,,.::; :::,;;:"=;; :-;':'-~',::: ",,:::, - ,"0.."" HIBIT "B" i~ ~ il il~--I Ii . 9~ ,- -, p~ - -~JJ: ~ , 9~ '. p. ,. ~ I: ~ - , - :11, ,.- , , , - , , ~ d t t ~ ",~~ g -0 r )> ~ z " :;,~ ~ ~ It \\ 38 /'~.... " " .. , '--- ~I~- =L-T"'"-' - ~~-- -4 -~.- --- -'- 1 ~-- ~ __ ----=-----' _ --.. - ...:====l__ c- _-=-=~ ---.------..-......- ,-- "\ (-=- , 7 ~ e~:' <::: ' = , =, ; ,'lz~Ci;n W .."" I~! ~ ~ " ,Ii ,... -"",r_,,,,,< o "..", () -,--c::::lT;; ~ ~ ~: ~ :; a2 il ,~ B 'i: ,~ ,~ '. ftj ~ ",~ ""~, . o F2~"-,!~j }; ~"'\ }.. ""~ l!(~~ '''Itl ~ \ Ii --. I.. L ___ .J Nt ~~rd~ IREIJIAISSAIHICIE COMIMiOIllllS I.!l'HASE II ~ CQM>SQ"l ASSOCIATES a= OOYTOO II. u...c, M' EIO'fNTON €EACk A..CQIDA :::.?:,;,t~:t'~!'0!':ii:;~t:~~:.=.~~...:l .;-.:;:;~='t ,~,';:':;;.:';i~~~~;~:.:,~":,;,.a.'I::;":;'~:'~;;w.:. ~ '~~ ~ ~i ;il - lL 'Iii ~~I-' I"" .--1 . \ ' 'I [: " 2 ili'l~ !;il~ ~"k I'" II · 11ft" '1 ft In . lil:'!i !!ei' "11 .;! - Ii jl il ! 'I ~ B _..~.".. III, In,J i d Iii! I!I l~~ 'Il]~ '1'!1 'I"':;'~CC i'!g r'FJ; I I I,! "!1 " li~' I l Pi" j' ,z~, " , " 1" II '> '1'1' I , '~I, f , !" j:i!l 'e I " ' lilllli!1 \ ',"-- . MO . _ ,..L lIiiljiil ., SA URIZ i;';;:~:";::c" ( LAZAR M"'" .. l ~1li:W1AI3~'!!'li'IrG ARCH'Tlm & PLANNER' C0~ "..:. ~~....~.. ].. "SSOC'A~OFBOT1 " B01N~O..... ON LI, L.l ,c. NBEACH,PLCi<IOA 1il\ .\.J~li!- ~\ 1r-1m~~/~~7. jj I~ tl ~',., ;l::?~{ 1: ,;'~l- III 'I . ,~,:I I ,_- ~!;~t - I --~ , ' : : _ Ii- - I -, , +_ , ," " 1"/ '.' I ,_,1' _J ........ ~~ ~ I , "";{Y _j" ::r~ '" J ~. ,!~J~-- ~-G I ..<IS " ~ ...... I 1 ~ 'I:~ I J ~ I .:{,", .., ~'- .~~-' . I.>/., _ _~ ~ ' ~ I_j >, ~~ ~: _- ': ~,.._' '---'' " II , I I - ,-"-"=.. ,',' .4['1' _ ,;' . _',_ 'il', " l I : ,I' I '~" 'J" 01 -,~ :-'=- ' "11"1 1'- ' , _.,. __,-'0- ",,_--c> t',: I I' " - - -~' ~~. I,' I ,...-=;- -==......._ .~r : 1~ ,l; ,\ ",_ ::~-: '111,1"1'1 I' I ,I I __ 1-,,: ill'jll : -.-----1:1 II , ,... : ,-;----"1 ,I' II j \ 'j": , 'I <'. ", ITTTTTri ) .: :: 11'111 " I,' ~,' II 1\ ' - II II ' __ " ".oil, I'll : '\fJLJUI 1-.J~~JI i.' ~{U,~ !i ::1111:: I ; ,'t<!! .=JI::, II :' E'l' II' III1 : r I:'L~ ~':i :1'1 II! ~' \ii I ,I II I -<J> : J ,,!:' 'I II i~' 'II !I: j if ' Jt '"1"11 i i Ii! '1 'I' I: '\ ~....,.C* ' :E :- I ,I h !'\ II t/ " I ,IITTTl) ." i :' II 11\1 ril-- ~-r'-c- . 1-;: I: :\i liTI""::- _~ I ! \ I I I I I '~ I I I ',;< 1] 1: l> (fJ m " q "' ~ (\(,(1) .--.. ~~ 5 , ]?lS r@ ~,,- ~ " ' I v' U ~ Ii@ I j: . ,I. EXHIBIT "B" l o o 7 ~ m "' m " < m z c m illl' ~@~ I ~ i 1111I1I11:Illi i !!iIII'lllll!1 111'1,11' .1 I I II II llill,,,I i ., I!?'F,' i i iill i Ilil!~ Iii 111111 , !ii ,1 I I".!'il I II t Il't . I ;i Ii ~'-'I'I . ",,11 , L:ulL ,....- '!I, 11~~~!IIIF.Ili!ii lll!l'li!~ Iii i I ~fil' ~ '1'1' I j" I ~~dll~il II il! II Iii ! II I I II : L,", ,! I' I I __ Ii, J ~~\l:~ !~ I . ~ \ ~ b L ' II L .- , ~ 1 0 11 r 0 . 0 'l . ;Jl )> z ~ ID r 0 (j) C)> ~, oi~ ~\~ r!;~ ~ ~~g ~ ~ r"l~ ~9 'l6~ (j)~ 2 ~l IiWF ~ =1B2l '" \ F ! '" , li! ~ ~ .. ~@ ~ I ~ " "'''I 'i;'~' ~ ~, ,hi n n r-t -- -'--'~I ~~-,-,~:= -"~:~~~;: --'-~l) ,- I In 'n_ ~,- __ /,'/,/ I.'L': , / \ I , . !i II, , _ I I I I ! I I , I I I: : -- I I 'i I, I, I I , , , , , : I " " 'i I, 16'. I l --rib' i , , " " 'i , , , , , , , I ," i'l , , , , , I " " ' " t~" \. ;'c '- ^.~ ",-"" I I Nt ~~rd~ EXHIBIT "B" -~--- - . ~ .. ,r~ -L '~~ I ;;:,4 '-.-~'~" ,-' I --r ....- &. &.&. ~. Pt,l !.2i: , ~ - t-:.;rJ(f)~ Om-lo O~2(i) ~F-<'" " . ..; ! ~;" " 31'. 2"~'" 2~ - 24'..- j' ,! ~ & ' " j . ~T' I ", ",,","" ~; : ;i;~'j:- 6~';'~J ~ .~,tIU,r1 "!i" ""'Tn . ,iQ r .,,,,,,;<....,(>,,... R i'CEt ~ l:; ~! ~ !~ ~ ~ ,- ,~ d 5~, I~,: i ~ ;~ .u Q f':~'~' -.;-~ !~ f,:~ &~}~'I ,~ ( lID ' ~L,,_ !! RIENAIS"3iIlllClE COiilMlON~ PHA$IE II = CX':lM'SON ASSOCIA~ OF BOYTON II. L..LC, BOYNTOO EEAO-l. R-QI;!IDA :~t~~_:;1f,d:~~,r:~~."t7~0:";';.~ ';"".~"^"':':::'.~,~' ,~:;':..:-::',"":'.~:':'~.1' :;:':;~,::'.::O .~-;:;'::;~<;'.. ~~~.:. "'"''''MWJ<."".,'''',H.>.''''' ,"","",..m''''~''"''' n~! _I " 0 :e ] m m l> . en en --i -; J pl , m < , ~ l> --i (5 Z ~ ,.~ ~ ,~! ~ Iii ~ q ~ I! (M) ~" ~ !l ::or!.,,1 411-01 ___ A1..d'_ 0 en 0 c . i! m ~ ~ l> --i (5 Z ~ ~ !!!l & '~, :',' Ii ~~ " " '! I " 'V '~~'I I I ~~ ~ - ~ i ~z o ----'- , ~ n " , €>- !:l ~ m ,,:i ~ ~ ~Jlf'l ~ i:"IS J.- Ik!l Ji. & -~ ' ~lj ...=. Iii ~ i~: Ii. 1m, iii J i~i ~u :~: h ;!cn: Ih t ::g: .1 ~ '0: .I~ J L~ " .\ill :/Y r". "n::~"(o? .l'l! i!!i,(i,1 11!"lml'l~ i! ." 'jl-IZ 8' .11 ~I h 0 I' hi -- II oj I!!ll il!'" ! I . II i;: Idl"!I' Ii I I "I EXHIBIT "B" o . ~ ~ ~ ~ ..Cd tt MOURIZ 1Ji:=.:::='K "."A"'A~'" "o,,"o~. t """"'.." PJtlASIl; II SAlA.Z^.R CQMPSON ASSOC1~5 OF BOHON u...c MCHITECTS & PlANNERS <.m"""'"""....' "","",,,",,,"'__ we ...u,.."'.....~:c:'::o::-=~~ _...;;;;..-;;.-_,;;. ~~~t.."_'''''~' "'M~'_""'_' ,-_..~__,"__.____~,""", I' . il~ ,. II: :! d:~U " '; ;!! ~~ ~;; = .... u~ IW .,0 Ii" i ! I ;:: ~ ~ !il ~ ~ > H~ ~d ~ I ~ q~ ~ ~ ~~ fi ~ ~ ~ '" m ;:; in ~~ >z ~ n mm ~n o II: "' !il ~ i ." ill c: "' ~ '" -< m i!i z m m '" Z ., '" ~ ... ., - ~ !OJ ~ ~ ~ "'5",..~", ;;-' ! <;> , ~ ~ ~ 0' II ~ , Il I . f. . I L , I I" I' !i ,I, " ~ ' ' j .' , , j! _L Oi . , I I'. I. ' , ' "'-----I ~---~~~ Ii ~F ','" f;':t .'; hl-T :-_,,1 '.i ;< l,; lJ ';":1" :~/ g;~ ;:~~ ~~ '; ,~nA'_ 1 r' i ~I~;r illll '1111, )1111. :1>1" 1-: II: ;;.~ :m ; ::I_lt :LJ II1I ,.tJ!!-II. "+11111 , I_~' II! 11:1111 H'Ij.II, 11;,"11- .~,' I ~_ 'I, I I. 1111' e, '! 1 II' 11'1111~ ,JjJl~! ,,.,,'" :J V~", : I'::::: ~_,,'I\ j.,",_;;,_ 11,1i11' Jt;'~ +il;:;"2" "ESiiW d:J "I;J 1'__...,_"_,-':""""'~:2:!I'--_Jt!i )~'1'11 }~,", i --r~'l--- :~: :,--1 '~>_ - n" ...rJf.. ' ,,'7- ' ",I' '1"-' I ", '" l~l,: " ',"1' ' , '" 'I' III~ ,"'", ~~;;2~~"d~""c~uii :!> ,II' ,ill., I" __'~'f~~~~,.:;'lJ; i ll"-=.J> , , / ,~i ; i'll / -(':~ l: r : ~jl,,: ,i~ / ,_~:~ \ s ::;.: -, ",' .l#l' f 1m I (I I I ~I '" :':~~ :~~~~?~~:. ~ ~ ~:;~ ~ ~ ~:-~-:~~i> I:: '" ::1 II: '" '" ::1 " " " " " :' ," ---'~ t u ~,--" ,.If' < ~" "II""'; I 3; i ~~~ i H~~~ i ~;I ~ ~~~~ ~ II' I _I"~ II' ",' "-. "'1 'II i!~.~ ~ J. . ~. ~ . iSi ij" 'ili II . ~. 1 '''!~ ;. , " . ~ U" ". I ,!".,,, I ~~ ";~:~;:H !il'! !!! iil If!!:! !i i I'i!' ~ ! i III 1i,IlI II ,!",p' ~ -i, I"i'" .I! ~~~~ ~ 'is eii~ i gi~ ~~ Ii ~I~!i ~ :,8 1..;l~1 ~i .. ~~161 ~ ~I! lilll~~;; .,!!;;; ;:~ ~:I::i ~~!~ i~ ill ~ ; .,Ii !i 1:1;' I;;a ~ iii ~ ~ . ~ . ii" :'1'; ,,;.; I' I! !li,' qlll' i ill 1-;; ~ ~i' ' l III I" ~ . . . - I ~il P:~ II i;;~ :1 Iii iii': !i!'!i ,., II lib;;! ., I;; "...~ I -10 II < ~~,. I!, ,i! ill' . . ~ :~~:.'""U.". '0' . , 'u' suniii.R.". .H' ~:!g~~~~H Hi i liP ~! ii i'!!iiill!iillliqni:~ .1l11il:P"!: in II ~ j I' ! ~ - ! I 5 'jIDo'l: .1]ITIJ,..li .~ nmHiil!!iI'!" ~ i I_~.q~. .u1i ! iI _ duq!!LH ~ :; ~,; ~ pt' . j ~ . J A: Ii: ! ! \ ~ , I I j , , I I I ,I 1 :1 'T I! " , EXHIBIT "B" ~ . ;! g ~ m ~ , " ,: , H I' i' , 0; ~' ,. ';IV"" '" ~ , EXHIBIT "C" Conditions of Approval Project name: Renaissance Commons Phase II File number: NWSP 03-016 Reference: 2nd review plans identified as a New Site Plan with a November 4. Planning and Zoning Department date stamp marking, DEPARTMENTS INCLUDE REJECT PUBLIC WORKS - General Comments: None PUBLIC WORKS - Traffic Comments: None UTILITIES Comments: 1. City of Boynton Beach Utility Department approval and Palm Beach County Health Department permits will be required for all water and sewer work on this project (CODE. Section 26-12), 2. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LDR. Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)), 3. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancv. 4. A building permit for this project shall not be issued unlil this Department has approved the plans for the water and/or sewer improvements required to service lhis projecl, in accordance with the CODE, Section 26-15. 5. All utility conslruction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); and will be reviewed at the time of construction permit application, ENGINEERING DIVISION Comments: 6. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets, COA 11/12/03 2 DEPARTMENTS INCLUDE REJECT 7. At the time of permitting, ensure that proposed canopy trees do not conflict with the freestanding outdoor lighting fixtures, It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (Chapter 23, Article II, Section A,l.b), 8. The sight triangle shown on Sheet SP-1 does not meet FDOT Standard Index 546 as stated. Please correct. 9. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 10. Engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction oermit aoolication. FIRE Comments: 11. Emergency access shall be provided at the start of a project and be maintained throughout construction per the Florida Fire Prevention Code, Section 3-5, and NFPA 241, (1996) Safeguarding Construction, Alteration. and Demolition Operations, Section 5-4,3, POLICE Comments: None BUILDING DIVISION Comments: 12, Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 2001 FBC, Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit aoolication. 13, At time of permit review, submit signed and sealed working drawings of the proposed construction. 14, A water-use permit for the irrigation system is required from the SFWMD, A copy of the permit shall be submitted at the time of permit application, F.S. 373.216. COA 11/12/03 3 . DEPARTMENTS INCLUDE REJECT 15. If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: >- The full name of the project as it appears on the Development Order and the Commission-approved site plan. >- The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO), Chapter 26, Article II, Sections 26-34) 16, At time of permit review, submit separate surveys of each lot, parcel or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel or tract. The recorded deed shall be submitted at time of permit review, 17. The required fire separation between tenants in building #6 shall comply with Section 704 and Table 704 of the 2001 FBC. PARKS AND RECREATION Comments: None FORESTER/ENVIRONMENTALIST Comments: 18. The applicant must indicate on the landscape plan, the eXlstmg trees / vegetation that will be preserved, relocated, and removed / replaced on the site, A separate symbol should be used on the landscape plan to identify these trees / vef!etalion. 19. All shade trees on the Plant List must be listed in the specifications as a minimum of 12-14 feet in height, three (3) or four (4) inches in caliper at DBH four and one-half (4.5) feet off lhe ground, and Florida #1 (Florida Grades and Standards manual) The height of lhe trees may be larger than 12- 14 feet to meet the three (3) or four (4) inch caliper requirement (Chapter 7,5, Article II Sec. S.C. 2.). 20. During the permit review process, the proposed 22,000 square foot lake shown on sheet SP-1 must be designed with upland and littoral zone trees / vef!etation alonf! 50% of the lake oerimeter (Chaoter 7,5, Article II Sec. SA.). 21. The irrigation design should be designed for water conservation and tree health. All shade and palm trees should receive irrigation from a bubbler source, including the lake plantinf!s (Chaoter 7.5, Article II Sec. SA.). 22, Turf areas should be limited in size. Landscape (bedding plants) areas should COA 11/12/03 4 DEPARTMENTS INCLUDE REJECT be designed on separate zones with proper time duration for water conservation (Chapter 7,5, Article II See,S, C.2.). PLANNING AND ZONING Comments: 23, The traffic impact analysis for the entire Renaissance Commons project consists of 300 apartment units, 200 townhouse units (for a total of 500 dwelling units), and 43,820 square feet of retail space, As proposed, the retail area would be divided into five (5) separate buildings. No building permits can be issued until the entire project meets the Traffic Performance Standards (TPS) of Palm Beach County, At the time of permitting, submit a rectified overall site plan, indicating all the above referenced uses and their respective square footages. The number of units and retail buildings areas proposed on the rectified overall plan must match the annroved traffic imnact analysis. 24. If not done so already, abandonment and rededication of easements must be recorded prior to issuance of a building permit for the proiect. 25. Staff wants to ensure that the (entire) Renaissance Commons' parking requirements are still met. At the time of permitting, submit a rectified overall site plan indicating an updated required / provided parking tabulation (for Phase One and Two). 26. Since Phase Two is not proposed as a separate out-parcel, include a revised setback table (as shown on sheet SP-2) with only the "front yard" information comnleted. 27. Equipment placed on the walls of the buildings shall be painted to match the building color (Chapler 9. Section lO,CA,), Place a note on the sile plan indicating this requirement. 28, All trees, if proposed as trees. must be alleast 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7,5, Article II, Section 5,C,2,). This would apply to the Ligustrum, Bouganvillea, and Pygmy Dale palm trees. 29. Once the building is built and all tenants of the commercial buildings are determined, the cumulative area of all wall signage would have to comply with Chapter 21, Article IV, Section 2.C. of the Land Development Regulations. 30. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7.5, Article II, Section 5,P). On the landscape plan (sheet L3 of 3), provide the percentage of native canopy trees. palm trees, shrubs / accents, and groundcover to ensure compliance with this code requirement. This requirement applies to the entire 28.36-acre site known as Renaissance COA 11/12/03 5 DEPARTMENTS INCLUDE REJECT Commons and not just this phase. 31. The Landscape Plan (Sheet L2 of 3) does not depict the trellises and associated landscaping visually portrayed on the elevations (sheet A-2). Please update this sheet and ensure that these structures and landscaping do not encroach into the loading space and do not infringe on the exit access for pedestrian movements. 32. For the Phase Two portion of Renaissance Commons project, staff recommends utilizing the same outdoor freestanding lighting fixture's pole heights and lighting heads that were approved during Phase One, ADDITIONAL PLANNING & DEVELOPMENT BOARD COMMENTS: Comments: 33, To be determined. ADDITIONAL CITY COMMISSION CONDITIONS: Comments: 34, To be determined. ELJ S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\NWSP 03-016 Phase meOA.doc DEVELOP!>.. .NT ORDER OF THE CITY COMMl~ .>ION OF THE CITY OF BOYNTON BEACH, FLORIDA PROJECT NAME: Renaissance Commons Phase Two APPLICANT'S AGENT: Mr. James Comparato and Mr. Carl Klepper - Compson Associates, Inc. APPLICANT'S ADDRESS: 980 North Federal Highway, Suite 200, Boca Raton, FL 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: December 2,2003 TYPE OF RELIEF SOUGHT: Site Plan approval for a 4,200 square foot commercial building on a 28.368-acre site in a C-3 zoning district. LOCATION OF PROPERTY: East side of Congress Avenue, north of the Boynton Canal DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above, The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: 1, Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations, 2, The Applicant HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3, The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included", 4. The Applicant's application for relief is hereby _ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk, 6. All further development on the property shall be made in accordance with the terms and conditions of this order. 7. Other DATED: City Clerk S:\Plannlng\SHARED\WP\PROJECTS\Renalssance Commons\NWSP 03-016 Phase IIIDO.doc FROM: CITY OF BOYNTON BCH UTIL11 lc~ ~RX NU. ; ~bl(~~b~~~ JU.l. l. ( -=::::ralQ.:l 1Q.:l..1 rrTI r--=:::: . , ~I'" MEMORANDUM UTILITIES DEPARTMENT NO. 03.101 ',I, ,,-\" ,..>> i" TO: Diane Reese, Financ~rec~r p~ V. Mazzella, ~tilities Director FROM: DATE: July 8, 2003 SUBJECT: Capital Facilities charge Transmittal - Motorola Site . Renai..anee COlDIDorik The developer has elected to pre-pay the capital facilities charges for a portion of this project rather than pay the capacity reservation fee, as allowed by section 26-34(B) of the City's code. '. The capital facilities charie ill baaed upon the unit size and COWlt as shown on the attached sheet. Payment of this fee waa a condition of the purchase contract for the land, which is why we are receiving such a large amount at this time. The plans for tho project are still being revised, so we cannot ascCJtain exact buUding and unit numbers or addresses at this t.ime. We ww. however, request a breakdown of buildIDllUld UIIIt numben for thele capital f.cUitlea eharp8 frolD the developer. and traDImlt that information to the BuilcUnl Dlvlllon 10 that these IUIIOUllts may be properly eredUed. The attaebed check no. 1601 in the amount ofS447,693.8S sh~uld be credited as follows: Water Capital Facilities Charge Sewer Capital Facilities Charge Amount $ 380,092.08 Amount$~ Total ~ , : Please deposit this check in the appropriate cap fee accounts. Thank you. The reservation fee for the balance of this project is being sent to you under separate cover. Attachment PVM Xc: Peter Mazzella (w/copy of att:acluncn~) Tim Large, BuildiDS Division, Dept. of DllVClopment (w/copy of attachmentl) John Pagliarulo, Building Division (w/copy of attac}1m"11ts) File FROM : CITY OF BOYNTON BCH UTILIT1~~ ,RX NU. : ~bl(4~b~~~ JUl. l( ,:::lQlQ~ t:I..J..1.r,11 r..J , .' ;a...'" i~~~im i~ II pjlJllJl " ~!! sra!l~ Ii 111m ~f~ ~f ~~I I; Ii i ~~ m l- i I ~ ...... f ..~p'..,..p ! :..,m.. :. ...bI"'''' I I !ll",rn {TI:!lmrn~'" , .. c:1'!=I p. j!!!=I P I II !=!= i != !=!= S' ! ~ .lK I ~I II ~ ~~ U~ I~I !i~ .. 1 !::l J:.i ~~ .... ~; ~~.~ i ....I Ii) iI.. 1 I I sit ~ ~ I l I , 1 lr e.. If t M !%;~~~! i~ I !l!2!: a ~ I!I. ~!I I Et~l~ gi ',' I Ii, ~f~ i j jjl-lIlgOl I~ I ~Ii "all I lil II ~ ~ !:!: mUll lilll.ll. !l$~ , , ~ I ~~~ III ill Slr:l8 iliil~m j 121 I ~~~ '" "N~ ~~UM : CITY OF HUYNIUN H~H UIIL111~~ t ~ t"'H^ ["tw. . ;,)OJ. r....O:::'Ol::::IO ..I\,.I.J.. .1.1 ,,,,",U-' ~""""'''''''' .... ...., ... - Dale S. sugerman, Assistant City Manager 100 E. Boynton Beach Boulevard Boynton Beaoh, F/orld8 33425 581.742-tJ466 (telephone) 661-742-8298 (fax) 8Uf..mMn8n1 bDVfttan,.Matlh R.ue (e-mail) City of Bovnton 6e~lch, Flol idzl \ { "--" ~ ,~~~ 'nil carll<IeppBr- Ctll.lp1D11 A8&0Cia\llll .... 1i81-3D1~ ...... 1lltI-3Il1.e67ll ... Q1(1f d R8c8Ipl "'11II Dale S. Sugem1III1. AlI&I8I8nt CIty MaI.eger ....... rIVe .... 07117103 CCI None c ...... C ..... ...11- [J ...... c_._..... c ........., Cl......u~c1. .c.a.....~ Mr. Klepper- Congratulations on the approval of your site-plan by the BoynlDn Beach City Comml88lon this put Tue&day evening. M per your .-quest. attached 18 a oapy of the docun'lentatloll' .haWing recelpt of the payment for water and eewer Impact fees for the Renal_nee Commons project, TheBe fees are payment for the 127,000 gpcl capital facllltiee charges thllt were originally vested In the MotOrOla DR!. Should you need any additionai infannlltlon, please be sure to contact me at the telephone number of e-malladdreSl lI.led abOVe. 1,- Dak- Dale S. Sugerman, AslIi.tant City Manager ct:-~ 1)mt- :n.... - ~~M : CITY O~ HUYNIUN H~H UIIL111c~ t'H^ r'lu. . JOJ.. r.....::::.o.:::.='o .,Ju..L. .Lr lC:.CJu.... ~............,., '''' . ..., Dale S. sugerman, Assistant City Manager 100 E. Boynton Beach Boulevard Boynton Beaoh, Florida 33425 581-742-8456 (telephone) 661.742~298 (faK) 'b~.oI bIWntari.:~ah.n.UB (e-mail) City of Boynton Beach, Flol Ida \ OMMW'l -:t\- ~ { '........... )-// _~.-c/ 'IbI carll<Ieppllr- CanpIOI1 AI80Cialllll r.a fllI1-391~ "'IN Dale S. s~, A.N11Jd: CIty MalI8glll' ......1 F'1V8 ..... fllI1-391-8670 ..... (17117103 ... COW d R8ceIpI CCI None C...... C ,.,....4" C...n-lPc...-- [] ......., C"__Rnv'" . cw,..'......1I Mr. Klepper- Congratulations on the approval of your lite-plan by the Boynton Beach City CommIuIon this put TuBlday evening. M per your J8quea~ attached is a oopy of the docunentatlof'\ shoWing receipt of the payment for water and sewer Impact t'eeB for the Renal_nc8 eommone projeCt. TheBe feel are payment for the 127,000 gpd capital facilities charges that \MIre origlnaUy vested In the Motorola DR!. Should you need any additional info".llItIon, please be sure to contact me at the telephone number of e-mail addrese Us18d abOVe. ',- D a.k- Dale S. Sugerman. As&i8tant City Manager ~.V DO\t. :rL-' FROM: CITY OF BOYNTON BCH UTILlll~~ rRX NU. : ~bl(q~b~~~ JUl. .i( ~lQlQ") lQ.:l~.L(rl'l r'~ MEMORANDUM UTILITIES DEPARTMENT NO. 03-101 . . ,~:" ...a i" TO: Diane Reese, Finance Erec~r P~r V. Mazzella, ~tilities Director FROM: DATE: July 8, 2003 SUBJECT: Capital Facilities Charge Transmittal - Motorola Site . Renaissanee Commori'i The developer has elected to pre-pay the capital facilities charges for " pordon of this project rather than pay the capacity reservation fee, as allowed by section 26-34(E) of the City's code. '. The capital facilities charge ill based upon the unit size and count as shown on the attached sheet. payuumt of this fee was a condition of the purchase contract for the land. whieb is why we are receiving such a large amount at this time. The plans for the project are still being revised, so we C8JIJlCIt asc~in exact building and unit numbers or addresses at this time. We ww. however, request a breakdown of buiJdlDl and UIIIt awaben for these capital factJ1tiell ebal1Ies from the developer, amd tr....mlt that informatioD to the BuBdtng Division .0 that these 8PlOUlltB may be properly eredlted. The attached chcckno. 1601 in the amount ofS447,693.8S sh~uld be credited as follows: Sewer Capital Facilities Charge Amount $ 380,092.08 Amount S....61.6fll,ll Total ~ Waw Capital FacUities Charge , i Please deposit this check in the appropriate cap fee accounts. Thank you. The reservation fee for the balance of this project is being sent to you under separate cover. Attachment PVM Xc: Peter Mazzella (w/copy of amahp'ePts) Tim Large, Building Division, Dept. of Development (w/copy of attaclunlmtR) John Pagliarulo, Building Division (w/copy of attacIunents) File FROM: CITY OF BOYNTON BCH UTILITI~~ ~RX NU. : ~bl(q~b~~~ JUl. I( .r:::;t:llQ.,) lO..JoJ.lrTI r..J ;II"'''' N,,~(,IN"" ;~ II pjlDal ~~PlIR;~ ~!! SlshS r !il I~Un al elf :aq- I. t mg~ I 9 mm m l- I !~ ""IS"''''''''' ~ "'.... J ~i:D:' . ....lDN'" I !llrnrn fT1~!llrn~rn . .. ~f c:l'P o. cP l' I !=!= i= !=!= I I !l' ~ i I ~l ~ ~~ U~ IiI ~~ .. I !::l .!:l ~~ ~ ~; ~9'~ i ....I iii iii.. 1 1 o ~ I I:, J ~ , 1 IS' f ! !!If!~~~! Ii M I !!l!!l!l a ~ Il I!I I Itl~~ I~ '"' i ~ ii1if~ i i:l1"lIl~Di i~ I ~I i .. "all .... .. IiI 1 11 ~ ~ !!l!!l ~ 1'1 I Qll.1I. ~S~ "lll~ !!l I I ~~~ to l~ , . ~~I 19i!l III ill linl! ;"~i~i i ill I ~~~ ;., .. ~ ~ ii'A.. i 10/31/2003 09:31 5514341553 PINDER TROUH1AN PAGE 02 PINDER TROUTMAN CONSULTING. INC. October 30, 2003 2324 South Congress Avenue, Suite 1 H West Palm Beach, FL 33406 (561) 434-1644 Fax 434-1663 www.pindertroutman.com Transportation Planners and Engineers Ms. Sherrie Coale City of Boynton Beach 100 E. Boynton Beach Boulevard P.O. Box310 Boynton Beach, Ft. 33425-0310 Re: Renaissance Commons - Phase II - #PTC03.75 Dear Ms. Coale: The purpose of this letter is to respond to 1" Review Comments regarding traffic issues for the above referenced project. The department comment is summarized below with a response following. Public Worb - Traffic 5. Comment: Response: County Notice of Concurrency Attached is a copy of the County's letters of concurrency for the Motorola project as well as the City's letler regarding vested trips. The proposed, Phase I and Phase II, development is well below the thresholds approved for the entire project as well as below the trips for the approved plan. Attachments 1A-1 C provide the daily, AM and PM peak hour trip generation analysis for the proposed plan. Planning & Zoning 68. Comment: Response: Equivalency Analysis Attachments lA-l C include the comparison of the approved 3,500 SF bank with the proposed 4,200 SF of retail. This analysis shows that the proposed development generates less traffic than the approved development If you have any questions, please do not hesitate to contact this office. AMT/ldr Attachments cc: Carl Klepper Jeff Schoors letre, Coale 03-75 ItJ.30-03 Pi 10/31/2003 09:31 tn~.$ro"I ~g!l'O .....~flIY'" ~~~t o ~ ~ ... a = !! . j ... c t 'E .." e:: .. ~ ..c:: .... .. e:: o E < g e:: ~ u.g ... e ~ 5i c UJ ] .m~ <.> .. ~ 5i .g- <"'I- 5614341663 J is. '" '" '" ~ ~ . '" . ." '" .. .- "l. "!. IX> . '" z~ ~ ~ .- ." ~ ." ~ 0 co >-~ 0 0 ..= ...; ..,c . . . a.~ . ;1; co co "" ....... ' . "" '" 0_ ~ ~ '" '" '" ..... '" '" !i .~ ~, '" N '" '" N "t IX> '" .Jl.... ~ ~ ~ ",- ~ ~ ~ ~ ." .2 "" '" '" 0 cO ~ ...: ...: 0 0 .... ~ ~ ;;; E IX> '" 0 '" "" .l!l '" 0 ..... '" ('of .E ~ ~ ~ '" ,: .~ :$.... u- .. -e =.21 Us: 1; _~ :5 ~ ..... '" '" '" ('of '" ~ "", '" ~ o "C ",- ",,- ........ ~ ~ ~ "" "" c ~ .21 '" u.. + '" ~ 8 8 c: :l :l , ,g 0 0 c: ~ - - -' - '" l! ..... ..... . ~ ~ "" "! 0 '" .. "" U 8 '" .~ E ~ .... e:: .... .~ '" '" ::l ::l u.. u.. .. 0 0 '" '" c: 0 8 0 8 .21 0 0 .5 '" '" "t '" ~ ",' ~ .. 0 0 0 '" ...... .... 0 '" '" N ~ -u N N '" '" ~ Sl c: ::l .. 0 E 1 Sl II :l e:: -r ... , . .~ c: ;;; OJ ~ "" 'oW 0 e:: c: 1II 1II . ... ... S .>t ~ .;; e:: ~ ~ .z .." Ql > 2 0.. ~ > ... < Q PINDER TROUH1AN 0 ..... ~ '" '" '" 0 '" '" M ",- .' ~ N N '" ~ .e. .e. N ~ ~ ~ !::! - N '" ~ ~ ~ fj ~ fj S ill S ~ c: c: ::l ::l 0 8 u = ~ ." .. c: U .. ... '" 0 ill z "' .c: ... 02 0 "' E s ~ < 'C: .... ... J!l '" ~ , > ... ~ ~ .9- '" '" . ~ . '" '" '" "l. "!. '" N z~ ~ ~ -i' ." ~ ." 0 '" >-~ 0 0 ...= ..,c . , a .9- ..... ..... ...~ 0 0 , . co '" "' .e '" '" ~ co j;:: . '" 0 '" "', "'_ co_ 0 ~ ~ ~ .,,' ~ ~ ~ "1ft. .e . '" "l 0 cO ~ ...: ... 0 .... ~ OJ c: ~ IX> '" :5 '" .l!l '" 0 '"' .5 ~ ~ N . ,: .e c: ~ 8= ow - E = .l!l U.5 - .e 0 0 8 ~ .l! ._ 0 0 0 ~ ., "t o ~ ",- ........ ~ N ." ~ "" "" c ~ .l!l ." ~ + 8 c: :l :l 0 e. 0 e:: ."" - .... '" l! ..... ... . ~ '" Ql c::i U 8 .~ E ~ .... t:: .... .~ .. .. ::l ::l u.. .. 0 0 '" c: 8 8 ~ J!l .E '" '" '" .- ~ .. 0 0 0 ...... .... 0 '" '" ('of -u N '" '" 'c: Sl ::l .. 0 € .c: ill c: :l ~ ~ .." , , c: OJ OJ ow -' "" "" c: c: 1II 1II ... ... ]j j .;; ~ ~ .." ill o Q.. o ~ .... PAGE 03 g ~ ;;, ~ I .Il ~ ~ !! ~ -c ~ c ::l ...= 5 ~ Q -c u~ 1 ~:I ~ ~ ;" ~~ u.. C: i~ E ~ ;;;!' ~ ~ '" c ~ -8 .J'! !'! -= 8.. "j;; ~ u.. l! ol"l- go ,a, ~ j] ~ ~ Q Q SlSl c!::! 10/31/2003 09:31 "'!!J:..!!'" ""~~'15 8Q..... dH .....~ ~ ~ ~ o 1 1 t :s = ... " .. ! 11 .... ... e - ... co ... ~ < . E .. . c " ::> ~\Jj 0 ~ . ~ :I: " y . .. ~ co co .... .1.3 < ~ ,..... ... "- ~ <I~ 5614341663 1!:2 :::::1 .. ~ N ... - ~":i~~ ..~ ~ ~ . 0 ~ N ! ...... ~N ill .s N ~ ~ ~ ~~ ~~ .!"Eioo l~ * .f~ .... '" . , ~ ~ ~ ~..~ ii ... ..... ~ ~ ~ ... ~...~~ "'.. 0 ~ ~ ~ ti :::I .... N EO ! ...... :!;:::l ~ Sr"ol....... .~ ~~ tt ~ ~ t~l"\IN ~~ . H...~ ...... '^ Jj ~ .: >.@ 8;; -" ; ~ . tJ~ 1~= ;; .. N ~ ... .~.... ~ ~ N" ~ ..." ~ N~ ... 10 N ... ...'" ~'" 0; N~ N N .: 6'_ .!:?; Ei- :0.. j~~ at~ :;l", siSiS U .~-- t.l~~ i~ ~=o '^~ " ci .~ , ... E 5 ~H :l;il; iiss ~~ .5I"l1N ~~ ~ ~OO ON ; ~~ go; '81 & :!l J CO 'T ... r.i . .~ Ii I - 1! 0 ~ -I li < J ... 0 6 6 6 a. ~. ~ .. ~ ~ ~ ~ ~ <a ~ N <:! ::! '" I j ~ - PINDER TROUH1AN , .. ::> o :I: .. < ~ ... ~ 1!0\""'~ .. .....N '" . ~ N ... - .;: 1l'I.. 0 .. l-~rt"""~ 0 .o~ N . Z ......'" ~ .sN,...r- '" ~~~ fEoo; .!! .... ~ l- . , N N 1P~ iii N ~... i= ""....10 ... -!;~......... ~ EO N ! ........ 18 .st'lC....N ~l'" '" ~ ,~ . . ~ ~ joooNNC . .111 .... oE,."".." N Jj ~ .: ,:~ S... y .. -e ; Jj , "s 19 ~ I:;; St . ~ N el- .;:...::.: ~:c ~ I- ,,~ N -0 N ~ ...'^~ I- N~~ R s 6' .!:? ai~ ~ '" at .!I~J:;:; N :J~~ ~ ... ~ ~~ . g .,::; l 5 Ii ci ci Ii " '" .~ ci , ... E 5 .!i~~ ill ... iiss i SI"lIN ... ~ ~-82~ 0 =8NN g '8 I & :!! j 3ji ~ 1 i:5 '1 s 1 &. e ... PAGE 04 , 6 9 '2 ~ i ! j ] ~ :> t~ ,h P ~t q h }= .L Hi ~h ~.. -i. Ih iH cas 10/31/2003 09:31 ~u.;; ~:;;ai. ~~~.l s! ~ ~ ,J, c 1 I J = 1 " II .2 ... . i E u 0 ~ ~u.g - ~ l! :;" 11 E .. .. ....-u ~ ~ C- ....'" <..... 5514341553 111~=~~ 1.1'" ~ ~~:;~~~ eO z "'::8""...... .=;: "'. ~l~ ~aoci;~ * - _ 0 ....:;: \Ole lN~\Of"t .....O'l""..... ~ ~ ~ .... ~~f ~ :;;:::::;::;; 11'I"""".... .5::"'\010 ~~~~ .L.. . ~~""'IO~~ e"'O'IoII\CJ\ ...- ,....... ..5 ,;} Ii'::: U'1i - ~ I ~ 01 "if1~~Sf ~...'!""'.....- ... . ...100110 ~~\O"''''''O'I 10 ~ u'\f'4NID N.....,..,CJI ..5~ ~~ - "'a !;!:i~!!!l a~~~ll;~ aI ........!'PI c:~:::J+ ilo!~8~ ..."'....,S..... I"!~o~ tJoo::g~ ~ ~ ... E ~ ~ ~ ~ clS 1.1. It.I. ~c Vllll l~~~~ ~,., ~ "0 ~ 2 ... ... < c>> coo N ....~......- t::aNNIOG\ .. :;, o :z: .. < .... ... :1: ... ~j II ~ = ;:, ... - ]ii ! :li'i~ ,I!...l!,z .. ,., ... :; "l. ~ ~ - '" ... ~ .. ~ ~ ! ~ ~ ~ t - :2; .. ~ ... - i ... '" ... .. ,., ,., ,., * .. ,,; ... ... ... ,., '" .. ... .. ... '" ,., ~ < o ,., '" ,., ,., .Ii! ~ j 3 ~ " <3 PINDER TROUH1AN "0 1 e ... 158: l!l .. ... ,., .... . i!:'S~~ '" '" ... ,., ~o ~ . z ~:s ~ ,., .5 ~ .. .. -~~ >II. '" ~!:::loo ; I.!! N 1:! ..~ , , ... l~=~ ~ ,., ~ ~ ... .... ~ ....,.,,., ,., ....~ ...,.,,,, ... '1i . ~ EO ~ ~:s ... '" ..5~ ... ... .. ,e.~a a f; "! ...~"'<<lI~ '" ~i;!":!! - ... .5 ,; ,~ = ~ 0'" u.... - ~ :; ~ <.,j , 1""11011) .. "'0'" ... ~ ~- ... .... I.J:I. ... \I).., !il ~~""to"IO\ sO ~ 0 .... ........ .. .....'" '" .5~ .. '" 5;;;-~ ~ !: ,., ... ,., !~~ i ~:e ".; =::J::J + i~~ 8 ~..... ~ i"!"! ~ 00 <.:> .l! ci . .... E = - .~ c3h !gg Ii: .$ro'1N ~ ... ~ tl'O~O ....a.. l;l ~ NN ~ I !H ." , , !-,. i1 ~ II 1 ;!: 0 .... .. :;, o :z: .. < .... ... l PAGE 05 g - 2 . ~ ! f 1! -'l l :> t' ~j Ii ~.i !'" 115 1 ,l ]~ Jt H . ~ 0'>; H H E5 10/31/2003 09:31 5514341553 PINDER TRDUH1AN PAGE 05 DEPARTMENT OF DEVElOPMENT PLANNING AND ZONING DMSION . a.tiIdInfI . """';1'IJ&ZDniftg . 0--'. ,.,..,~ · ~R~.J!I'.:....,....._... ~f~~t~ August 29. 2002 Mr. K3hart M. Pinda, AlCP Pinder Troutman Consulting. Inc. 2324 South Congress Avenue Suile 1H West Palm Beach, FL 33406 Re: Motorola DR! Dear Mr. Pinder: 1 am respondiDg to your letter to Michael Rumpf, date4 August 26, 2002. reprding vested trips for the Motorola DR!. 1 concur with your asse"""'enl, that the Motorola DR! is vested for 13.020 daily trips aud 1,634 PM peak hour trips. If you have any additional questioDS, please contact me a1 561. 742~260. Sincerely, ~A~V Lusia Galav, AlCP Principal PIanDcr Cc: Michael Rumpf, PlaaDing & Zoning Director Jim Chcrof, City Anomey $.~~r -I"'IT . ..,.,....T_...... CilydB..,..t..<._. 1ar 1lB..,.....8oKh-. P.o. BaI:no -!lor lIaCIt.- >>,,~o 10/31/2003 09:31 ~.f""'~ _..W"'~ P.O. _ 21229 "'.... Palm ..act>. ..._ ':HI..I....... \5.,168.....000 -~.<!,", . --~ _.r~ C'.8nwal...... WlIrnn H. tie.-c.ll, CNlrmon C_'" -... Vice Choir ~...ftT.Marc.'" MaoJ MCC:Iny aun Aa1'OftJOt1 ""'" MuilORl Addie I.. Graene ~ ..........Mo.~J' Robotn: \Neil man --.,.....,.,..-", _.......~ @"'-"'-- 5514341553 PINDER TROUTHAN PAGE 07 December 12. 2002 i I i i I I ! , I I . i I Mr. ~ RIrIlpf DindIDr Planning & Zonag City of BayIllon BeacI1 100 Ed BOyOtM Beadl BauleVilrd BoyOton Beac:h. FL 3342fHl310 RE: Motorola DR! - Reviled TAAFFlC PERFORMANCE STANDARDS MVIEW Our Mr. Rump!: ! The ~Irn Beach County TraffIC DiviSion has reviewed the ttafflC 5latem~' t fo,-the Pf8Viously approve<! DRI entitled: Motorola ORI pursuant lo the Trafl\c; P rfonMnc& Stand8nls ~ Al1Ide 15 of the Palm Beach COUTlIy land Oe\IelOPment Code. projec::t is 5IIr11fT\8liZed as taIcJW$: I Location: I southeast corner of congre&s Avan~ an1 GatjlWaY BouleVard i'ltelS8CliOn. IlOVntDn Beach 13,020 Daily. 1,1134 Peel< Hour ~50,OOO SF GenenlI Olfioe. 500 Mulli Family ~icllJntlal Units, 15,000 SF D8yCMl, 10.000 SF Hilah _ QualitY Reslauranl, 6,000 SF High Tum-over Res1auraljt, 8,000 SF Fast Food Res1aurenl. 20.000 SF General RelII'it, ~.5ClO SF Bank & 01', alld 12B,OllO SF W,.ehouse. I 12.837. and 1,402 Peak HW'Tr\pll . 2005 Municipally: V..ted OR! Tripe: Proposed u...: Nwr Dally Trips: Build~Ul: I \ I e.ed on our review, \118 Traffic Division lms determined lhatlhe projedled to getlI!rBtelesS trips than what was prevlCIu&Iy approled, and lh the TraIliC PerfomIance S1a1dards of Palm Beach COunty. Based on fofKll$tS prO\/iCll!d 1Iy the c;ortSIlIlIInI, it is IlCllMMlf' suggesll!d tlIalll1e foA access drivewa)'$ tul'n-\ane$ to be provided: I . Soul/lbOUnd lall-Ium 1an85 810119 CQr\gf8$$ Avenue. onlothe r and the middle driveWa ' ___ ..non,' _____ ys . NorIhbOUf1d righl~tum lanes "long Congress AWrNe. onlo!he t' u\Ilt!m and the middle drt\l8wayS. . Weslbound Ieft.lum lane along Gateway Boulevard, onto i e~em driveoo8Y- . EastPound riglll-Iurn lane a!ong G2ltewav Boule'nrd. ontO ~e ea6lern dnv-v. I 1 I I ! I I 10/31/2003 09:31 pIt-mER TROUH1AN F'AGE 08 OCC.13.200z 5:02PM " : 5514341553 .: IRATIC ENG t-lO.421 P.3 i ! Attachment 1(Cont'd.) i , I , i i I I . I . If you nave any questions regardifl!llhis detenninlllion. please COfllacl me 811684""030, i '" Sincerely. ):J~. ~ . ~ ~' Masoue! Alefi. M 51. Engineer ~ T = Pind..- Tn>utam Con....1ling Inc. File: General - TPS - Mun . Tl1Il!ic Study R...n.w F:\TRAFFIC\rT1lllAdmJllApprova/sIOZ 101 fl.dac I 10/31/2003 09:31 \ , ,~ '4;~~ Depumaent of ~eeria, and "',"Uc __ P,O. Box 21229 West !'.Im lleach. FL J3416.1229 (561) 684-4000 www.pbc:gov.com . Pabn Beach c......ty Board of County CoIIUIIbsionen l<aren T. Marcus. Chair Tony MasiJotti. Vice Ch~rman Jeff I<Dons Warren H. Newell Mill)' MCCarty Burt Aaronson Addie L Greene County Admlnisuator Roben Weis.man 'An&pWOppo_ "IJimwti.. Action Elnp/Dye'" ~ 5514341553 PINDER TROUH1AN PAGE 09 U;::;$J May 21, 2003 Mr. Michael W. Rumpf Director of Planning & Zoning Department of Development City of Boynton Beach P.O. Box 310 Boynton Beach. FL 34425-0310 RE: Motorola 29 - Renaissance Commons TRAFFIC PERFORMANCE STANDARDS REVIEW Dear Mr. Rumpf: The Palm Beach County TraffIC Division has reviewed the traffic statement for the project entitled; Motorola 29, Renaissance Commons pursuant to the TraffIC Performance Standards in Article 15 of the Palm Beach County Land Development Code. This project is summarized as follows: Location: Municipality: Existing Uses: Proposed Uses: East side of Congress Avenue, south of Gateway Boulevard Boynton Beach None 500 MF Residential Units, 11.500 SF General Retail, 3,500 SF Bank with DT. 4,531 383 - PM Peak Hour 2004 New Daily Trips: New PH Trips: Build-out Year: Based on our review, the Traffic Division has determined that the project is part of the previously approved Motorola DRI. and also meets the Traffic Performance Standards of Palm Beach County. If you have any questions regarding this determination, please contact me at 664-4030. Sincerely, OFFICjo OF THE, GQ.lJ:NlYE~GI!\tEE~ Masoud Atefi, MS Sr. Engineer" Tra cc: Pinder Troutman Consulting Inc. File: General. TPS - Mun . Tralic: Study Review F:\TRAFFIC'malAdminlApprovlls\D30523,doc . ' RENAISSANCE COMMONS NWSP 03-016 1st Review Planning October 9, 2003 On July 15,2003, the City Commission approved the project known as Renaissance Commons project (NWSP 03-007). Condition of Approval #37 stated, "The stand alone commercial building (shown as Phase II) proposed in the northwest comer of the property will require separate site plan review". Staff acknowledges that this project will satisfy that condition. Also, Condition of Approval #48 stated, "For consistency and compatibility, staff recommends that the stand-alone commercial building (Phase II) should incorporate the same architectural enhancements as that of the mixed-use building (i.e. foam banding, similar building colors, same roof type, awnings, and similar exterior finish). The Renaissance Commons project (NWSP 03-007) was approved for 500 multi-family dwelling units, 11,500 square feet of general retail, and a 3,500 square foot bank with a drive-through feature. A revised traffic impact statement or equivalency determination is required for Phase II because this 4,200 square foot building will take the place of the 3,500 square foot bank with drive-through. Staff acknowledges that this project represents only the second phase the Renaissance Commons site plan and is not proposing to subdivide into a separate out-parcel. Staff also acknowledges that the plans approved by the City Commission included 15,000 square feet of retail, of which, 4,328 square feet was earmarked for Phase II. Since this is an updated plan of the project approved by the City Commission, it should show the most updated information, such as required / provided parking, Staff wants to ensure that the (entire) Renaissance Commons' parking requirements are still met. Please provide an updated parking tabulation for the entire Renaissance Commons project, which would now include the Phase II use, building area, required, and provided parking. Note: required parking for this type of use would be the same as in Phase 1- one (1) parking space per 200 square feet of gross floor area. If not done so already. abandonment and rededication of easements must be recorded prior to issuance of a building permit for the project. No site-specific survey for Phase II was required for this submittal. By submitting a site-specific survey, it appears that applicant wants to subdivide the lot to create a separate out-parcel. The only survey required for Phase II would be an updated (not older than six months) version of the original project's survey, A drainage statement is required prior to the Technical Review Committee meeting (Chapter 4, Section 7.F.2,), The drainage statement is subject to review by the Engineering Division of Public Works. A cross-access / cross-parking agreement will be required if Phase II is a "leased" parcel. The method of trash removal will be subject to Public Works' review and approval. On the site plan, provide a label indicating the number of parking spaces for each row. . . . The elevation (sheet A-2) must indicate the paint manufacturer's name and color code (Chapter 4, Section 7.D.). Include a color rendering of all elevations prior to the Technical Review Committee meeting (Chapter 4, Section 7.D.2.). Include color swatches, Equipment placed on the walls of the buildings shall be painted to match the building color (Chapter 9, Section 10.CA.). Place a note on the site plan indicating this requirement. The Crape Myrtle trees (as shown on the Typical Unit Plan, sheet L6 of 7) must be installed at mimmum 12 feet overall height and three (3) caliper inches (Chapter 7.5, Article II, Section 5,C.2,). On the landscape plan (sheet L2 of 3), identify the trees proposed in the landscaped median. All trees, if proposed as trees, must be at least 12 feet in height and three (3) caliper inches at the time of their installation (Chapter 7,5, Article II, Section 5.C.2.). This would apply to the Ligustrum, Coconut, Alexander, Pygmy Date, and Christmas palm trees. Fifty percent (50%) of all site landscape materials must be native species (Chapter 7,5, Article II, Section 5.P). On the landscape plan (sheet L3 of 3), provide the percentage of native canopy trees, palm trees, shrubs / accents, and groundcover to ensure compliance with this code requirement. S:\Planning\SHARED\WP\PROJECTS\Renaissance Connoons\NWSP 03-0]6 Phase lI\Planning 1st review,doc Planninn Memonnldum: For SlcT! En\'in'i1mt'ntalist To: Eric Johnson, Planner From: Kevin 1. Hallahan, Forester! Environmentalist Subject: Renaissance Commons Phase II and III New Site Plan - 1 st Review NWSP 03-016, 03-017 Date: October 8, 2003 " Landscape Plan-Plant List Sheet L3 of 3 The applicant must indicated on a landscape plan the existing trees! vegetation that will be preserved, relocated, and removed! replaced on the site. A separate symbol should be used on the landscape plan to identify these trees! vegetation. 1. All shade trees on the Plant List must be listed in the specifications as a minimum of 12'- 14' height, 3" or 4" caliper at DBH (4.5' off the ground), and Florida #1 (Florida Grades and Standards manual) The height of the trees may be larger than 12'-14' to meet the 3"or 4" caliper requirement. [Environmental Regulations, Chapter 7.5, Article II Sec. S.C. 2.] 2. The Details sheet section on this page should include a line indicating where the height of the large tree and palm tree will be measured at time of planting and inspection, 3. The applicant should show on Sheet L2 of3 an elevation cross-section detail indicating how the height ofthe proposed landscape material on the Phase I landscape plan will visually buffer the proposed parking lot facility on Phase II from the Congress Avenue road right-of-way. 4, The applicant should add a note that no Cypress mulch can be used on the site. 5. The applicant should add a note that all utility boxes or structures (not currently known or shown on the plan) should be screened with Cocoplum hedge plants on three sides. 6. The proposed 22,00sq. Ft. lake shown on sheet SP-l must be designed with upland and littoral zone trees! vegetation along 50% of the lake perimeter. [Environmental Regulations, Chapter 7.5, Article II Sec. SA.] Irril!ation Plan 7. There is no irrigation system design included with the site plans, The irrigation design should be designed for water conservation and tree health. All shade and palm trees should receive irrigation from a bubbler source. This includes the lake plantings, [Environmental Regulations, Chapter 7.5, Article II Sec. SA.] 8. Turf areas should be limited in size, Landscape (bedding plants) areas should be designed on separate zones with proper time duration for water conservation. [Environmental Regulations, Chapter 7.5, Article II Sec. 5. C.2.] Kjh File 0\,~'~ 't\)'.2 C Il.. L" . ,.,' (.' I D :::j"""'; ~~:y . / DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 03-192 TO: Michael W. Rumpf, Director, Planning and Zoning FROM: Laurinda Logan, P.E., Senior Engineer t\ ,) DATE: October 9, 2003 RE: Review Comments New Site Plan - 1 st Review Renaissance Commons Phase II File No. NWSP 03-016 The above referenced Site Plans, received on September 18, 2003, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and Land Development Regulations (LDR) referenced. PUBLIC WORKS. GENERAL 1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the storage and handling of refuse. 2. Provide a dumpster enclosure per the LOR, Chapter 2, Section 11.J.2.b. 3. Indicate by note that the site dumpster enclosure shall be constructed in accordance with City Standard Drawing G-4. 4. Provide a minimum turning radius of 60 ft. to approach the dumpster. Provide a minimum backing clearance of 60 ft. (measured from the front edge of the dumpster pad.) (LDR, Chapter 2, Section 11.J.2.b,) PUBLIC WORKS - TRAFFIC 5. Provide a notice of concurrency (Traffic Performance Standards Review) from Palm Beach County Traffic Engineering. 6. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars, stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the "Loading Area" (where applicable - LDR, Chapter 2, Section 11.J); include a pavement message in yellow indicating "No Parking - Loading Zone". See City Standard Drawings "K" Series for striping details. 7, Show all off-site improvements needed for this project. Department of Public Works, Engineering Division Memo No. 03-192 Re: Renaissance Commons Phase II_1st Review October 9, 2003 Page 2 8. The site plans depict a median opening on the Catalina Dr. extension approximately 140 ft. from Congress Ave. This condition is not permitted per Condition of Approval #4, Renaissance Commons Phase I (NWSP 03-007). ENGINEERING 9. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate sheets. 10. Please note that changes or revIsions to these plans may generate additional comments. Acceptance of these plans during the TRC process does not ensure that additional comments may not be generated by the Commission and at permit review, 11. Provide written and graphic scales on all sheets. 12. The plans refer to "Existing Conditions" throughout the plans for improvements that are not existing, nor have they been reviewed and approved by the City of Boynton Beach Utilities Department or Building Department. Permitting for this project is dependent on successful review, approval(s), and construction of Renaissance Commons Phase I infrastructure and associated off-site improvements. Please indicate how these projects will be phased to ensure that all required improvements will be in place prior to beginning the permitting process. 13. If possible please provide photometrics as part of your TRC plan submittals - it is much easier to identify and correct any deficiencies now than while you are waiting on a permit! 14, It may be necessary to replace or relocate large canopy trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LDR, Chapter 23, Article II, Section A,1,b). 15. Revise note on the Landscape Plans regarding the sight triangles that "There shall be an unobstructed cross-visibility at a level between 2.5' and 8' above the pavement." (LDR, Chapter 7,5, Article II, Section 5.H.) 16, The sight triangle shown on Sheet SP-1 does not meet FDOT Standard Index 546 as stated, Please correct. 17. The Landscape Plans (Sheet L2 of 3) indicates proposed landscaping outside the limits of the proposed project. Please correct. 18. The medians on Congress Avenue have existing irrigation and plant material belonging to the City of Boynton Beach, Any damage to the irrigation system and/or plant material as a result of the contractor's operations shall be repaired or replaced to the equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole responsibility of the developer. Please acknowledge this notice in your comments response and add a note to the plans with the above stated information. 19. The proposed Cocos Nucifera (Green Malayan) palms shall be oriented in such a manner that they do not overhang the roadway. Department of Public Works, Engineering Division Memo No. 03-192 Re: Renaissance Commons Phase II - 151 Review October 9, 2003 Page 3 20, Relocate Quercus Virginiana (Live Oak) along Catalina Dr. extension on the west side of the proposed building. The specified 5 ft. of clear trunk will create a conflict with traffic (trucks, etc.) 21. Phoenix Dactylifera "Medjool" are proposed in the Catalina Dr. extension but are not called out in the Landscape Quantities or on the plans, The spread of these palms is greater than the width of the median. Please correct. 22. Proposed landscaping along the north side of the proposed building overhang into the travel way on the Catalina Dr. extension. Please correct. 23. Provide a drainage plan showing existing and proposed elevations, flow areas and any required drainage structures. Include preliminary drainage calculations. Specify storm sewer diameters and materials, inlets types, etc. on drainage plan. Indicate grate, rim and invert elevations for all structures. Indicate grade of storm sewer segments, 24, Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Section 7.F.2. 25. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of permitting. 26. Indicate by note that catch basin and manhole covers shall be bicycle proof (LDR, Chapter 6, Article IV, Section 5.A.2.g). 27. Engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and will be reviewed for constructability at the time of construction permit application. UTILITIES 28. No utility plan was included with this submittal, therefore, the Utilities department considers this plan incomplete as submitted. However, contemplated uses as submitted during the NOPC #1 process, indicate that office, retail, commercial, self-storage, restaurant and residential uses are proposed. In view that the South Florida Water Management District (SFWMF) is reluctant to increase new water uses, several questions come to mind: i. Is this proposed density suitable for the location? An increase of 300% over and above the existing approved land use. ii. Is the timing for the proposed re-development near-term or far-term? This has a significant bearing on the consumptive use requirements. iii. An intensification of this magnitude warrants a re-evaluation of our utilities master plan in order to evaluate the adequacy of the service main network in the area. Obviously any off-site improvements required to support this development will be the responsibility of the applicant. To date, the applicant has not convinced the Department that it has the utility capacity to support this proposed development. Department of Public Works, Engineering Division Memo No. 03-192 Re: Renaissance Commons Phase II_1st Review October 9, 2003 Page 4 29. All utility easements shall be shown on the site plan and landscape plans (as well as the Water and Sewer Plans) so that we may determine which trees may interfere with utilities. In general, palm trees will be the only tree species allowed within utility easements. Canopy trees may be planted outside of the easement so that roots and branches will not impact those utilities within the easement in the foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to remove any trees that interfere with utility services, either in utility easements or public rights-of-way. 30. City of Boynton Beach Utility Department approval and Palm Beach County Health Department permits will be required for all water and sewer work on this project (CODE, Section 26-12), 31, The plans refer to "Existing Conditions" throughout the plans for improvements that are not existing, nor have they been reviewed and approved by the City of Boynton Beach Utilities Department, Building Department, or Palm Beach County Health Department. Permitting for this project is dependent on successful review, approval(s), and construction of water, sewer and drainage improvements of Renaissance Commons Phase I. Please indicate how these projects will be phased to ensure that all required improvements will be in place prior to beginning the permitting process, 32. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (CODE, Section 26-16(b)). 33, The LDR, Chapter 6, Article IV, Section 16 also requires that all points on each building will be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by showing all hydrants. 34, PVC material not permitted on the City's water system. All lines shall be DIP. 35. Appropriate backflow preventer(s) will be required on the domestic water service to the building, and the fire sprinkler line if there is one, in accordance with CODE Sec. 26-207, 36. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either upon the request for the Department's signature on the Health Department application forms or within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon final meter size, or expected demand, 37. Water and sewer lines to be owned and operated by the City shall be included within utility easements. Please show all proposed easements on the engineering drawings, using a minimum width of 12 feet. The easements shall be dedicated via separate instrument to the City as stated in CODE Sec. 26-33(a). 38. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may not, therefore, be used for irrigation where other sources are readily available. 39. This office will not require surety for installation of the water and sewer utilities, on condition that the systems be fully completed, and given to the City Utilities Department before the first permanent meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the Certificate of Occupancy. Department of Public Works, Engineering Division Memo No. 03-192 Re: Renaissance Commons Phase 11_15t Review October 9, 2003 Page 5 40. A building permit for this project shall not be issued until this Department has approved the plans for the water and/or sewer improvements required to service this project, in accordance with the CODE, Section 26-15. 41, The Preliminary Engineering plan apparently indicates the sanitary sewer service tying into a sanitary sewer manhole. This condition is not permitted. Please correct. 42, All utility construction details shall be in accordance with the Utilities Department's "Utilities Engineering Design Handbook and Construction Standards" manual (including any updates); and will be reviewed at the time of construction permit application. LUck Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail) Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail) File S:\Engineering\Kribs\Renaissance Commons Phase II, 1st Review.doc ~' Wildner, John From: Sent: To: Subject: Wildner, John \ Monday, Septe er 22, 2003 2:45 PM Coale, Sherie \ \ Renaissance Commons Phase II and III Sherie - The Recreation and Parks Department has no comments on Renaissance Commons Phase II and III. There does not appear to be any residential component in these phases, No Recreation and Parks Impact Fee is therefore required, John 1 . ---------- CITY OF BOYNTON BEACH Fire and Life Safety Division 100 East Boynton Beach Blvd, P.O, Box310 Boynton Beach, Florida 33425-0310 PLAN REVIEW COMMENTS For review of: NWSP 03-016 1st review Project Name and Address: Renaissance Commons Phase II Conqress Ave, S, of Gateway (Motorola Site) 4. Rodqer Kemmer, Fire Protection Enqineer Reviewed by: Department: Fire and Life Safety Phone: (561) 742-6753 Comments to: Sherie Coale by email on 9/19/03 Code Requirements Emergency access shall be provided at the start of a project and be maintained throughout construction per the Florida Fire Prevention Code, Section 3-5, and NFPA 241, (1996) Safeguarding Construction, Alteration, and Demolition Operations, Section 5-4.3. cc: Steve Gale Bob Borden r ClfY OF BOYNTON BEACH, FLORIDA INTER-OFFICE MEMORANDUM TO: Michael W. Rumpf DATE: Dir. of Planning & Zoning 9/23/03 FILE: NWSP 03-016 FROM: Off. John Huntington Police Department CPTED Practitioner SUBJECT: Renaissance Commons Phase II REFERENCES: Site Plan ENCLOSURES: I have viewed the above building plans and have the following comments: No Comment. ." .-- SUBJECT: Project - Renaissance Commons Phase II File No. - NWSP 03-016 List ot Acronvms/Abbreviations: ASCE - American Society of Civil Engineers CBB - City of Boynton Beach CBBCO - City of Boynton Beach Code of Ordinances CBBCPP - City of Boynton Beach Comprehensive Plan Policy CFR - Code of Federal Regulations EPA - Environment Protection Agency FBC - Florida Building Code FIRM - Flood Insurance Rate Map F,S, - Florida Statutes LDR - Land Development Regulations NEC - National Electric Code NFPA - National Fire Prevention Assn NGVD - National Geodetic Vertical Datum of 1929 SFWMD - South Florida Water ManaQement District DEPARTMENT OF DEVELOPMENT BUILDING DIVISION MEMORANDUM NO. 03-207 FROM: Michael W, Rumpf o;ffictoc of PI,oo;og ~ Timothy K. Large ;: TRC Member/Building IVlsion TO: DATE: September 30, 2003 We have reviewed the subject plans and recommend that the request be forwarded for Board review with the understanding that all remaining comments will be shown in compliance on the working drawings submitted for permits, Building Division (Site Specific and Permit Comments)- Timothv K. Large (561)742-6352 1 Place a note on the elevation view drawings indicating that the wall openings and wall construction comply with Table 600 of the 2001 FBC, 2 Buildings, structures and parts thereof shall be designed to withstand the minimum wind loads of 140 mph, Wind forces on every building or structure shall be determined by the provisions of Chapter 6 of ASCE 7, and the provisions of Section 1606 (Wind Loads) of the 2001 FBC, Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application, 3 At time of permit review, submit signed and sealed working drawings of the proposed construction, 4 Identify within the site data the finish floor elevation (lowest floor elevation) that is proposed for the building, Verify that the proposed elevation is in compliance with regulations of the code by adding specifications to the site data that address the following issues: a) The design professional,of-record for the project shall add the following text to the site data, "The proposed finish floor elevation _' _ NGVD is above the highest 100- year base flood elevation applicable to the building site, as determined by the SFWMD's surface water management construction development regulations," b) From the FIRM map, identify in the site data the title of the flood zone that the building is located within. Where applicable, specify the base flood elevation. If there is no base flood elevation, indicate that on the plans, c) Identify the floor elevation that the design professional has established for the building within the footprint of the building that is shown on the drawings titled site plan, floor plan and paving/ drainage (civil plans), S,lDevelopmentlBuildinglTRCITRC 20031Renaissance Commons Phase /I Page 1 of 2 5 On the drawing titled site plan, identify and label the symbol that represents the property line. 6 As required by the CBBCO, Part III titled "Land Development Regulations", submit a site plan that clearly depicts the setback dimensions from each property line to the leading edge of the building/s. The leading edge of the building/s begins at the closest point of the overhand or canopy to the property line, 7 CBBCPP 3.C.3.4 requires the conservation of potable water. City water may not, therefore, be used for landscape irrigation where other sources are readily available, 8 A water-use permit for the irrigation system is required from the SFWMD. A copy of the permit shall be submitted at the time of permit application, F.S. 373,216. 9 If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach Utilities Department, the following information shall be provided at the time of building permit application: a) The full name of the project as it appears on the Development Order and the Commission-approved site plan, b) The total amount paid and itemized into how much is for water and how much is for sewer. (CBBCO), Chapter 26, Article II, Sections 26-34) 10 At time of permit review, submit separate surveys of each lot, parcel or tract. For purposes of setting up property and ownership in the City computer, provide a copy of the recorded deed for each lot, parcel or tract. The recorded deed shall be submitted at time of permit review. 11 The title sheet denotes "M" occupancy, Type IV, unprotected. Sheet A-2 and SP-2 notes Type V, unprotected. Indicate the correct type of construction of the structure per Chapter 6 of the 2001 FBC. 12 Sheet A-2 notes "Bldg A @ Phase III similar-reverse. Please clarify the meaning of this statement. 13 The required fire separation between tenants in building #6 shall comply with Section 704 and Table 704 of the 2001 FBC. 14 Preliminary engineering sheet number 1 of 1. Change the slope of the handicap ramp from 12:1 to 1:12 perSeclion 11-4.8.2 of the 2001 FBC, bf S:IDevelopmentIBuilding\TRC\TRC 20031Renaissance Commons Phase /I Page 2 of 2