Loading...
REVIEW COMMENTS DEVELOPMENT DEPARTMENT PLANNING & ZONING DIVISION MEMORANDUM NO. PZ 02-206 FROM: Chairman and Members community~~eelopment Agency Board Dick Huds~CP Senior Planner TO: THROUGH: Michael W. Rumpf Director of Planning and Zoning DATE: September 30, 2002 PROJECT DESCRIPTION Project/ Applicant: Merano Bay/Woodside Land Development Corp. Agent: Carlos Ballbe Owner: AutoZone, Inc. Location: Southeast corner of Shore Drive and North Federal Highway File No: Land Use Amendment/Rezoning (LUAR 02-006) Property Description: Vacant property consisting of +1.75 acres, classified Local Retail Commercial (LRC) and zoned C-3 Community Commercial Requested change/use: To reclassify the subject property from Local Retail Commercial (LRC) to High Density Residential (HDR), and rezone from C-3 Community Commercial to IPUD - Infill Planned Unit Development in order to construct a 20-unit fee simple townhouse community. Adjacent Land Uses and Zoning: North: Right-of-way of Shore Drive, then developed commercial (Yachtsman's Plaza) designated Local Retail Commercial (LRC) and zoned C-3 Community Commercial. South: Right-of-way of Boynton (C-16) Canal, then developed single-family residential (Harbor Estates) designated Mixed Use (MX) and zoned R-1-AA Single Family Residential (5.4 du/ac), East: Right-of-way of Shore Drive, then developed single-family residential (Coquina Cove) designated Low Density Residential (LDR)(4.84 du/ac) and zoned R-1-AA Single Family Residential (5.4 du/ac). Page 2 File Number: LUAR 02-006 Merano Bay West: Rights-of-way of Federal Highway and the Florida East Coast (FEC) Railroad, then undeveloped property designated Local Retail Commercial (LRC) and zoned C-3 Community Commercial. MASTER PLAN ANALYSIS A master plan is required for all requests to rezone to Planned Unit Development (PUD) or Infill Planned Unit Development (IPUD). For this project, the site plan also functions as the master plan. Generally, staff is in favor of converting the existing vacant commercial property to a residential use and to increase the overall allowable density to 11.46 dwelling units per acre. However, this exceeds the maximum density of the High Density Land Use Classification. Under its present land use the property could be developed for the range of commercial uses permitted with the existing Local Retail Commercial designation. This land use designation also allows rezoning to the IPUD zoning district at a density of 10.8 dwelling units per acre for a total of 18.9 units. The developer requested a change of land use to the High Density Residential, which also has a maximum density of 10.8 dwelling units per acre, while a change to Special High Density Residential land use would allow the necessary 20 dwelling units per acre. The City Commission adopted the Federal Highway Corridor Redevelopment Plan on May 15, 2001 to allow for a variety of housing styles at intensities that will assist in supporting the downtown redevelopment. It also served as a catalyst to encourage redevelopment and infill development of the eastern portion of the City along Federal Highway and to promote the overall general economic expansion of the City. Implementation of the Plan included an amendment to the Land Development Regulations to create the IPUD zoning district. This new zoning district allows for a greater variety of housing types in order to redevelop infill parcels, specifically along the Federal Highway corridor. This new zoning district allows for greater fiexibility in terms of lot size and setback restrictions. As promulgated in the Comprehensive Plan, all development proposed within the IPUD should exceed the basic deveiopment standards of the conventional residential zoning districts. This characteristic should be evident in terms of a project's site design and site amenities. This project represents one of the first requests for the IPUD zoning district designation. Staff recognizes this circumstance and expects the best possible development, in particular, that this project will set the standard for future IPUD developments. Staff determined that the layout of the buildings, the allocation of back-up space, and the distance between each building are in the optimal configuration and therefore, exceed the basic development standards. In conclusion, the proposed site plan does meet the intent of the IPUD zoning district. As previousiy stated, the subject property would be eligible for 10.8 units / acre or 18.9 total units if converted to a residential use under the existing commercial land use. The plan proposes 20 total units or two (2) additional units over the current maximum allowable number of units. The plan and its configuration of the townhouses buildings satisfy optimal design objectives without forfeiting on any site amenities. Staff is recommending that the rezoning to the IPUD zoning district and master/site plan be approved contingent upon the approval of a reclassification to the Special High Density land use classification, which allows the proposed density, or the reduction in units to conform to the maximum density (10.8 units per acre) currentiyallowed. Page 3 File Number: LUAR 02-006 Merano Bay PROJECT ANALYSIS The eight criteria used to review Comprehensive Plan amendments and rezonings are listed in Article 2, Section 9, Administration and Enforcement, Item C. Comprehensive Plan Amendments: Rezonings. These criteria are required to be part of a staff analysis when the proposed change includes an amendment to the Comprehensive Plan Future Land Use Map. a. Whether the proposed rezoning would be consistent with applicable comprehensive plan policies including but not limited to, a prohibition against any increase in dwelling unit density exceeding 50 in the hurricane evacuation zone without written approval of the Palm Beach County Emergency Planning Division and the Citys risk manager. The planning department shall also recommend limitations or requirements, which would have to be imposed on subsequent development of the property, in order to comply with policies contained in the comprehensive plan. The property in question does lie east of Federal Highway, and therefore is in the hurricane evacuation zone for a Category 1 (SaffirjSimpson Scale) hurricane; however, the applicant proposes to develop a townhouse community of only 20 units, therefore falling below the 50- unit level. Staff would recommend that the developer apprise each homebuyer in the development of the fact that they are buying property in a hurricane evacuation zone and provide a mechanism to disseminate continuing information to residents concerning hurricane evacuation and shelters through a homeowners' or residents' association. Policy 1.13.3 of the Land Use Element reads: "The City shall continue to encourage intill development and redevelopment by implementing actions of the Boynton Beach 20/20 Redevelopment Master Plan, and the policies contained in the Coastal Management Element. " The adoption of the Infill Planned Unit Development (IPUD) regulations was a direct response to the cited policy directions as well as policy directions in the Federal Highway Corridor Community Redevelopment Plan. The introduction to the regulations states: ''It is a basic public expectation that landowners requesting the use of the IPUD district will develop design standards that exceed the standards of the basic development standards in terms of site design, building architecture and construction materials, amenities and landscape design. The extent of variance or exception to basic design standards, including but not limited to requirements for parking spaces, parking lot and circulation design and setbacks, will be dependent on how well the above stated planning expectations are expressed in the proposed development plan. " The site plan (Exhibit B) for the proposed development will, upon approval, become the master plan for the IPUD. It also meets the basic expectations of the code through the provision of notable architectural character that will be an enhancement to the corridor; convenient and Page 4 File Number: LUAR 02-006 Merano Bay adequate parking as well as recreational amenities for residents and guests; and landscaping that is both varied and abundant. b, Whether the proposed rezoning would be contrary to the established land use pattern, or would create an isolated district unrelated to adjacent and nearby districts, or would constitute a grant of special privilege to an individual property owner as contrasted with the protection of the public welfare. The proposed rezoning would not create an isolated district, but would relate to the adjacent single-family residential lands to the east and will form a logical transition between that lower density residential development and the commercial development, lying to the north of the subject site, along Federal Highway. c. Whether changed or changing conditions make the proposed rezoning desirable, A number of changed and changing conditions make the proposed rezoning desirable. The Federal Highway Corridor Community Redevelopment Plan, adopted by the City Commission on May 15, 2001, included the following strategy to provide a strong residential base that is aesthetically inviting: "Encourage a variety of housing. Develop intensity standards that allow for a variety of housing styles and types at intensities that will assist in supporting the downtown and general economic expansion. " In response to this strategy, the city adopted amendments to the land development regulations, adding the Infill Planned Unit Development (IPUD) zoning district to allow a greater range of housing types to be developed on infill parcels, specifically along Federal Highway in the entrance districts. Residential densities for the IPUD zoning district can range from 10.8 dujac to 20 dujac. The two entrance districts are defined by the redevelopment plan as the areas of the Federal Highway corridor from the north city limits to the Boynton (C-16) Canal, and from Woolbright Road to the south city limits. The IPUD zoning district regulations are relatively flexible in order to encourage developer creativity, including townhouse developments on small infill and redevelopment parcels in exchange for a superior residential project that exceeds conventional standards. In addition, the South Florida housing market is experiencing a growing popularity of townhouse developments as a residential unit of choice, particularly in urban areas. d. Whether the proposed use would be compatible with utility systems, roadways, and other public facilities. Development of the property for residential use will reduce the demand for water and sewer capacity from the potential demands, if the property is developed with the commercial uses and intensities allowed under the existing land use and zoning. Likewise, utilizing the daily trip generation rate used by the Fair Share Road Impact Fee Schedule, the project is expected to have a total average trip generation of 140 trips per day. This is far less than the 2,623 trips per Page 5 File Number: LUAR 02-006 Merano Bay day that 61,000 sq. ft. of commercial space would generate, if the property were developed under its present land use designation. It is also less than the 500 trips per day threshold requiring submittal of a traffic impact analysis. With respect to solid waste, the SWA has stated in a letter dated December 18, 2001, that adequate capacity exists to accommodate the county's municipalities throughout the lO-year planning period. The Palm Beach County School District has reviewed the project for school concurrency and approved it. Lastly, drainage will also be reviewed in detail as part of the review of the conditional use application, and must satisfy all requirements of the city and local drainage permitting authorities. e. Whether the proposed rezoning would be compatible with the current and future use of adjacent and nearby properties, or would affect the property values of adjacent or nearby properties. The master plan for the proposed use shows a residential development with easily accessible recreational amenities, attractive elevations and well-designed residences that will have a positive effect on adjacent residential property values. f. Whether the property is physically and economically developable under the existing zoning. Under its present land use and zoning the property could be developed for the range of commercial uses permitted in the C-3 Community Commercial zoning district. In 1998 a request for site plan approval was submitted to construct a 7,234 sq. ft. retail commercial building for auto parts sales. The applicant withdrew the application prior to review by the City Commission. g. Whether the proposed rezoning is of a scale which is reasonably related to the needs of the neighborhood and the city as a whole. The proposed development is exemplary of the type of redevelopment and infill projects envisioned when the IPUD regulations were adopted in that the design well exceeds the requirements of the basic development standards as cited under the response to criterion "a'; above. This and similar developments will help to underpin the redevelopment efforts in the Federal Highway Corridor and also increase the variety of types and styles of housing to support general economic expansion. h. Whether there are adequate sites elsewhere in the city for the proposed use, in districts where such use is already allowed. There are very few residentially designated sites in the City that provide opportunities for small to medium-sized developments of this type. CONCLUSIONSIRECOMMENDATIONS As indicated herein, this request is consistent with the intent of the Infill Planned Unit Development zoning district; will not create additional impacts on infrastructure that have not been anticipated in the Comprehensive Plan; will be compatible with adjacent land uses and will contribute to the overall economic development of the City. Therefore, staff recommends that Page 6 File Number: LUAR 02-006 Merano Bay the rezoning to the IPUD zoning district and master/site plan be approved subject to the Conditions of Approval accompanying the site plan, which upon approval, becomes the master plan for the IPUD, and contingent upon the approval of a reclassification to the Special High Density land use classification, which allows the proposed density, or the necessary reduction in units as described herein. If the Community Redevelopment Agency Board or the City Commission recommends conditions, they will be included within Exhibit "C". ATTACHMENTS J:\SHRDATA\Planning\SHARED\WP\PROJECTS\MERANO BAy\LUAR\STAFF REPORT LUAR.doc Location Map Merano Bay __ u j -, -~ Iii I , Iii' BOYN ----"~, 'i J -____ TONCANALC-16 ~, " I' II I r".-il" 'I" i II' I' 1, ,:=' .;:::I~i'. ~_n_'__'_ ",~-' , ! i_~_~.1itEl'_11\/~: II i i!, II! I :1 Ii ,:' II i i-m------JiL:; ~W~-~C----rl-I IT.~------------r I f'l " ,,~i ",' '~_- '_._ ,I!' SOtJIl:IiRQ I Ui :. I . Ul . "L I " I I ' i' "<<< ! ' --,----,-l---,--r 'IIIIIITI' I.," 11f-'=101" ;oi"", I ';--r-iTlo ~'FH-A)l__-~ '~_~LL-J~ 'i' ~.I " -I-~.I!: I ,i 1:,n~i1-~,! ll'i!Tl H' '~ i "'I" I ,,1' ,,' I'. ;. I_I :-'!!.:_"iilill"'~II; I_~i jl: jJW~...:Lb' 1,;lLJ~'-- 111 "i'! ! " I' II :Ti ' !!' I I I : I ' - I I , ' i i hll_~1Iil i I I : I I ',' i L---J il! ~,-__'-.!~.~~___~'I~',LL~.~, .1111 I 'I" 1:,1' --,- z, -T !L.Lif~1 II; _____~_~!_LJ ';' ~ ,i R3 --- --~I __ __----jl__~ . __-I': I Ii I ,! ' ,I---~' ,_ -C,', =_ 'i~--'; ,I'~.. : I~~~ I, I' ' ,;- -,' j--iZ , " -e cNE4:iTJ;f4Y~-"__",~"_,;=-~ C2,~ ----iIL=-~~ '_ ,I,-~~ 1,'lz' _~ ';_____~ :-1 -; --:--. -~---:-~ -;- I ,_ m -- ------: UJ , I ' ' , . '" ' '0 ' --,~-~:-~--;~~ ~o:.;.. ,- --"-.. ;'; ,,' .W C' 3 i " 1'1' . , --', I I,' J-,' ,:_:"=--c:r-iE::14],I:iAV~-_ (/),SITE' !2: i ... '. ! i I I I I I I .;~;-;-'--------_'----'----_;_.:...t ' , : I . I , '! ! i ' I i _L--'-1..__!-----'---_,~ '----.--! I, Ii I , I . , I, I i-.:SE,6,j,'1 , c-~ -"l I , , I I , , ,'I i '----~._.:.._.._~ 800 o 800 Feet i ~ , , M~k-FW>~~ "- ~._-~-' \ ! ' ' I ! \ GFil I .. ,LI L~ ~I~~I I"" I 1--- I I I I Iii i ! I: I -r---! SHORE QR I I ill , ~-~ _I ,,~ ---1- I 1i!1 I i \ il:II'\~ EXHIBIT "A" LAKE WORTH ICWW r / / , w~, , ~ " :~;I ':!f[!ff<1 . 1 ~ ~ i! ! ~ ij ~~ " ~" " .. 'I >" ~ 'j ~ ; ~~ ~~ i. j II ~ ,- ,; I, i ., ;1 " a ^, i! , ~~ ~ , H OJ " j i 3, i, H , 11 ~~ , H H ," I U ;! " l ~~ l , " H ~~~~ ~~~~ ~'.1 ~~'.J'.J ~~<' ~~ ~ ~ ~ ~ ~u . ~ 1 ~ g i. , ; ., , I 'j' ~~ " I ~ , 1 . ~! i ! ,~~ ~ H ~! ~: ~ ~~~ , , i , ~ ! ~ ~ ~ ~ ~1 ~ " ~ ~ . ~ ~U~ ~ ~~~~ ~ c :i .: , i~ :1 > 'Jli _:-J___n____':t j,; IC-~:.~_ huY. "";.; :i , , , :i !i , , w > " o w ~ o r " , m :L , , , , , ,-..-..,.... .2,""~ " , , _ ""::;is. ,";:- i , 1_ ~ {. G I' __-,,:'H"'_C'''- t-.J. "-1'.;::':'::111=-= " 3~~i~ 'Or ~~i! -- -- -~- ~!~; , , ,'-.L-~-. ; , " (I 'ON A'VMHDIH snl <;. , -T---~- , O"VOCl 3.1';1.1$ ~ !i ~ ft , , p l':~ I~j-:::- ~'I ~I:'; ~ z 3 < ~ 0 c , a >, W <" " ~ Q)~ " a 1 "' ~~ ~ 1 < 0' , 'r , , z, I ~ <, 0< z w~ < ," i'i ~ :l 0 w , j i 'Ii ~ ~ iii :~ ~ , ~ I, ..I , , Jll 1ist-J1 1 It'" i I'; ~ H ~ 4 z 4 u ~ 3~ , " - "'~." ~;:;'/)G> co ~- j'~~~ <r.::JE:~ cc blI,1 cid~ :~ ;;; ~lL. ::I: s~~ E-<Uo2 ~ ~~ 0:: - L~ z o ~ z > o ro ~() o;z o::~ "'ll 'I> ,I .1 ~i , , , 1 I r. I I ! ! i II I 1 ~ , I i , I , I ! ~ J;: ~ ~ ~ o ~ ra ~ !:: ra ::I: >< W EXHIBIT "e" Conditions of Approval Project name: Merano Bay File number: NWSP 02-D14 nd I' h &2 d k' fS b 24 2002 Reference: 2 Review plans WIt aP anmng, omng ate stamp mar mg 0 eptem er , DEPARTMENTS INCLUDE REJECT PUBLIC WORKS- General Comments: None PUBLIC WORKS- Traffic Comments: 1. Minimum backup distance for 900 parking is 24 feet. Revise roadway width accordingly. 2. Reference FOOT Standard Index 546 for the sight triangles along all collector and arterial roadways. A 10 feet x 10 feet sight triangle is inadequate for Federal Highway. It is also necessary to check sight distances at the intersection of Shore Drive and Federal Highway to ensure there is no conflict with sight distances and the new privacy wall on the north property line UTILITIES ~ 3. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as stated in the LOR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater (see CODE, Section 26-16(b)). In addition, the LOR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition, by showing all hydrants, both existing and/or proposed. 4. A "Hold-Harmless" agreement with the Utilities Department, for maintenance and repairs, will be required where paverblock is placed within the utility easements. FIRE Comments: None POLICE Comments: None ENGINEERING DIVISION Conditions of Approval 2 I DEPARTMENTS I INCLUDE I REJECT I Comments: 5. All work done within the Federal Highway right-of-way shall require FDOT approval and permitting. 6. Sheet SP-I of I refers to the relocation of several signs and power poles along Federal Highway. Indicate where the signs will be relocated to and who will perform the work. All work done within the Federal Highway right-of-way will require FDOT approval and permitting. 7. Indicate to what standard the project is to be constructed; if the FDOT Standard Specifications for Road & Bridge Construction and Standard Index are to be used ~ the 2000 Specifications are recommended since they contain both English and Metric units. 8. Provide written and graphic scales on all sheets. 9. Sections A-A, B-B, and C-C are indicated on Sheet DI of I but no typical sections were found in the plan set. 10. Provide a detail for the paverblock driveways. BUILDING DIVISION Comments: II. Sheet A-I - Pool House Front Elevation - shows a water feature and floor plan shows a drinking fountain. ClarifY. Drinking Fountain shall comply with 2001 Florida Building Code, Section 11-4.1.3 (1O)(A). PARKS AND RECREATION Comments: 12. The Park and Recreation Facilities Impact Fee requirement for Single Family Attached Homes is based on $771 per unit. Since there are 20 single family attached homes shown on the plan, the fee is computed to be $15,420 ($ 771 x 20 units). Fee is due at the time of the first applicable building permit. FORESTERlENVIRONMENTALIST Comments: 13. The applicant should provide a tabular summary on sheet L-I showing that the site contains a minimum of 50% native species. All trees must be minimum of 12 feet in height. Revise plans. I DEPARTMENTS l INCLUDE I REJECT I PLANNING AND WNING Comments: 14. Approval of this site plan is contingent upon the approval ofrezoning to Infill Planned Unit Development (IPUD). IS. The site plan tabular data indicates that the total pervious area is 0.74 acres or 42.7% of the total site. Likewise, the tabular data indicates the setbacks for concrete patios for each townhouse, which can be built out in the future. In the tabular data, provide the pervious area if all townhouses built concrete patios pursuant to the PUD's self-imposed restrictions. In addition, on the site plan, outline the area (in a soft dashed line) of the patio area if developed according to the maximum allowable restrictions. 16. If a fence is required around the pool/clubhouse area, provide a detail of the fence including the dimensions, material, and color (Chapter 4, Section 7.D.). 17. Fifty percent (50%) of site landscape materials must be native species. Indicate the amount of native material in the plant list of the landscape plan (Chapter 7.5, Article II, Section 5.P). 18. Coordinate with the City Forester / Environmentalist regarding the installation of brick pavers and palm trees within the U.S. I right-of-way. 19. Staff recommends placing a Palm Tran bus shelter along Federal Highway. The shelter dimensions are typically six (6) feet in width by nine (9) feet in length. If a bus shelter is located nearby, staff would also recommend collaborating with Palm Tran and the affected property owner (FDOT) in order to upgrade the facility. 20. No signage was submitted with these plans. Any proposed sign will require separate review and approval. 21. Provide a note on the plan stating that the proposed buffer wall be painted to match the color of the buildings. 22. On the elevation sheet label all major exterior finishes to include the manufacturer's name and color code. 23. A 24-foot backup is required for unit I and 20. A Waiver is required. ADDITIONAL COMMUNITY REDEVELOPMENT BOARD AGENCY CONDITIONS Comments: 1. To be determined. Conditions of Approval 4 DEPARTMENTS INCLUDE REJECT ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. S:\Planning\SHARED\V\P\PROJ ECTS\MERANO SA YlNWSP\COA.doc