Loading...
CORRESPONDENCE ((( The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DMSON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynlon-beach.org June 2, 2004 Mr. Jarvis Wyandon, Project Manager Quincy Johnson Architects 949 Clint Moore Road Boca Raton, FL 33487 Re: Boynton Commerce Center - 2100 B1dg, 2111 Corporate Dr. MMSP 04-048 Dear Mr. Wyandon: In response to your request dated May 20, 2004 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: . Installation of an overhead door, removal and construction of a dri ve approach attached plan) . of two parking spaces (as depicted on the Please be informed that the proposed changes on the revised date stamped 5/27/04 are "minor" as defined within the Development Regulations, Chapter 4 Site Plan Review. project may continue to be processed by the Building Division permit application, subject to the following conditions: plan Land This as a 1. The new overhead door match the others within the center relative to style, materials and color. 2. The wall opening for the new door match the height and width of others within the center. 3. Due to the excess parking for Boynton Commerce Center, the two parking spaces may be removed, however the approach shall be designed not to interfere with or require removal of the trees on either side of the proposed opening. 4. If the scope of the project demands removal of any other landscaping, then such plant material must be relocated to an area subject to approval of the City Forester. . Page 2 Be advised that the proposed changes may the building permit. Please contact me have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst Kevin Hallahan, City Forester June 2, 2004 require a modification to at (561) 742-6260 if you . ..... OUINCY JOftNSON ARCHITECTS .... . RII[l(fU-ll C.AIT\'!.PO,.\[\ BRIT!' P. A\l IUU, \( .\RH 1-\\11:.\ C. KL\\\TY, S(\],B RIl II \IW C. JU"'-"', ,\1.\ Sit \1 ,< 1:. .".hOIT, I", "".' I May 20, 2004 A\:\JI II- LS.\IIIIl, 111),\, \\1]) ROBI,R] L \.\l (,Il\, JR., (O() City of Boynton Beach Planning and Zoning Division 100 East Boynton Beach Blvd. Boynton Beach, FL 33425 1\\11\ R. \\'1111.\.\':-', .\1.\,.\\\1<11 QU\CY R.]OII\";ll\, 111,\1\, \1110\, \( ,\HI1 Re: NAD - Boynton Commerce Center- 2100 Corporate Dr. Minor Site Plan Modification The Architect of record is requesting a minor site plan modification. We are proposing to remove two parking spaces to allow for installation of a new overhead door and driveway. Boynton Commerce Center contains 295,000 square feet of Office /Manufacturing /Warehouse spaces, which requires 600 parking spaces. They are currently providing 709 parking spaces. We are proposing to eliminate 2 spaces, which will still meet and exceed the parking requirements. If you should any questions, please call me at (561) 997-9997 ex. 34. Sincerely, QUINCY JOHNSON ARCHITECTS Z 4 LVJC, arvis Wyan on Project Manager . l (1,\1,\\1 I,',l I'll . 1'1 \1111:' I! \1 . I: I: \:1 . III I\j'j I,ll i I Sl4Y Clint I\]oon: ROdd Boca Ratun, FJ'llida JJ4's7 Ph(561 J\}')7 G\}\}7 En 150] )4<17 161(1 J\,\ ((11121l}3/]B-()(JlI11,1::> \\'\\'\\',qulJlcyi,d1ns"n.C\1Ill 5."60 Bet' Ridge ROdd, SUIte D5 SaraS\ltcl, nDfidJ )4233 !'h (941) 377 :;11111 E-Fax (50S) 2511 772') ........... (llIl2]'i3I1H (JI)lI] 14::> \\'w\\'.qulI1c)whnson.clllll PROJECT NAME: Boymon Commerce Center .;;Ccrf-- P- LOCATION: 2100 Corporate Drive PCN: I FILE NO.: MMSP 04-048 II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: Jarvis Wyandon:'" Project Manager ADDRESS: Quincy Johnson Architects FAX: ADDRESS: 949 Clint Moore Rd. PHONE: Boca Raton, FL 33487 FAX: - 561-997-1610 PHONE: 561-997-9997 Date of submitta1!Proiected meetinl! dates: SUBMITTAL / RESUBMITTAL 5/24/04 1 ST REVIEW COMMENTS DUE: PUBLIC NOTICE: TRC MEETING: LAND DEVELOPMENT SIGNS POSTED (SITE PLANS): PLANNING & DEVELOPMENT BOARD MEETING: COMMUNITY REDEVELOPMENT AGENCY BOARD CITY COMMISSION MEETING: COMMENTS: S:\Planning\SHARED\WP\PROJECTS\Boynton Commerce Ctr\MMSP 04-048\2004 PROJECT TRACKING INFO.doc