REVIEW COMMENTS
, .
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 03-63
\') &
1 ?/~ G
"
If!
)'4
q1
TO:
TRC MEMBERS
Rodger Kemmer, Fire Plans Review Analyst
Kevin Hallahan, ForesterlEnvironmentalist
John Huntington, Police Department
H. David Kelley, Jr., Utilities Department
Timothy Large, Building Department
Jeff Livergood, Public Works, Traffic
Ken Hall, Public Works, General
Laurinda Logan, Engineering
LusiaGalav, Planning & Zoning
John Wildner, Parks
~v
~
FROM:
Michael W. Rumpf
Planning and Zoning Director
DATE:
March 25, 2003
SUBJECT:
3" Review- Major Site Plan Modification
Project- The Residences @ Marina Village
Location: 743 NE 1"' Avenue
Agent: Lawrence Justiz- The Related Group
File No.-MSPM 03-001
Please document your review time and calculated cost based on your hourly rate plus benefits, for the 3 cd
review on the above referenced proj ecl. Please provide me with this documentation no later than
Wednesday, March 26. 2003.
MWR: sc
S IPlanningISHAREDlWP\PROJECTSIMARINAIMSPM O~-OOl\~rd Re\1CW Memo doc
I ;11t e ,q:s.r
~ ){--
" ~
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 03-63
TO:
TRC MEMBERS
Rodger Kemmer, Fire Plans Review Analyst
Kevin Hallahan. ForesterlEnvironmentalist
John Huntington, Police Department
H. David Kelley, Jr., Utilities Department
Timothy Large, Building Department
Jeff Livergood, Public Works, Traffic
Ken Hall, Public Works, General
Laurinda Logan, Engineering
LusiaGalav, Planning & Zoning
John Wildner, Parks
~\J..f
1--~f,
FROM:
Michael W. Rumpf
Planning and Zoning Director
DATE:
March 25, 2003
SUBJECT:
3" Review- Major Site Plan Modification
Project- The Residences @ Marina Village
Location: 743 NE I" Avenue
Agent: Lawrence Justiz- The Related Group
File No.-MSPM 03-001
Please document your review time and calculated cost based on your hourly rate plus benefits, for the 3 ,.
review on the above referenced project. Please provide me with this documentation no later than
Wednesday, March 26, 2003.
'Iv hA.
f( l-t-. '-f. z...-
MWR: sc
S. \Pllll1ning\SHAREDlWP\PROlECTS\MARINA\MSPM OJ-OOI\Jrd Review Memo.doc
~
c>(~
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 03-63
TO:
TRC MEMBERS
Rodger Kemmer, Fire Plans Review Analyst
Kevin Hallahan, Forester/Environmentalist
John Huntington, Police Department
H. David Kelley, Jr., Utilities Department
Timothy Large, Building Department
Jeff Livergood, Public Works, Traffic
Ken Hall, Public Works, General
Laurinda Logan, Engineering
LusiaGalav, Planning & Zoning
John Wildner, Parks
j,lp--6. =~ I n. 50
FROM:
Michael W. Rumpf
Planning and Zoning Director
DATE:
March 25, 2003
SUBJECT:
3" Review- Major Site Plan Modification
Project- The Residences @ Marina Village
Location: 743 NE 1" Avenue
Agent: Lawrence Justiz- The Related Group
File No.-MSPM 03-001
Please document your review time and calculated cost based on your hourly rate plus benefits, for the 3 ,.
review on the above referenced project. Please provide me with this documentation no later than
Wednesday, March 26, 2003.
MWR: sc
S,IPlanningISHAREDlWPlPROJECTS\MARlNAIMSPM 03-001\3rd Review Memo doc
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 03-63
TO: TRC MEMBERS
Rodger Kemmer, Fire Plans Review Analyst
Kevin Hallahan, ForesterlEnvironmentalist
John Huntington, Police Department
H. David Kelley, Jr., Utilities Department
Timothy Large, Building Department
Jeff Livergood, Public Works, Traffic
Ken Hall, Public Works, General
......... Laurinda Logan, Engineering
LusiaGalav, Planning & Zoning
John Wildner, Parks
FROM: Michael W. Rumpf
Planning and Zoning Director
DATE: March 25,2003
SUBJECT: 3" Review- Major Site Plan Modification
Project- The Residences @ Marina Village
Location: 743 NE 1"' Avenue
Agent: Lawrence Justiz- The Related Group
File No.-MSPM 03-001
Please document your review time and calculated cost based on your hourly rate plus benefits. for the 3"
review on the above referenced project. Please provide me with this documentation no later than
Wednesday, March 26, 2003.
IIIz. hI'.
1",\
~ -
MWR: sc
SIPlanning\SHAREDlWP\PROJECTS\MARlNA\MSPM OJ-OOIIJrd Review Memo doc
lI1U.JU0(.c ~
(, j-=",lZ,::;/C'3
DEVELOPMENT DEPARTMENT
MEMORANDUM NO. PZ 03-63
TO:
TRC MEMBERS
Rodger Kemmer, Fire Plans Review Analyst
Kevin Hallahan, Forester/Environmentalist
John Huntington, Police Department
H. David Kelley, Jr., Utilities Department
Timothy Large, Building Department
Jeff Livergood, Public Works, Traffic
Ken Hall, Public Works, General
Laurinda Logan, Engineering
LusiaGalav, Planning & Zoning
John Wildner, Parks
FROM:
Michael W. Rumpf
Planning and Zoning Director
DATE:
March 25, 2003
SUBJECT:
3" Review- Major Site Plan Modification
Project- The Residences @ Marina Village
Location: 743 NE I"' Avenue
Agent: Lawrence Justiz- The Related Group
File No.-MSPM 03-001
Please document your review time and calculated cost based on your hourly rate plus benefits, for the 3"
review on the above referenced project. Please provide me with this documentation no later than
Wednesday, March 26,2003.
.L';; (Y(;
..--;:,. '1};:z
,- ---- . )li
/
.'t! Ii"
\ ,,,ii I \.'V~
I
MWR: sc
S IPlanningISHAREOIWPlPROJECTS\MARINAIMSPM 03-00 [\3rd Review Memo.doc
DEPARTMENT OF PVBLlC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 02-000
TO:
Michael W. Rumpf, Director, Planning and Zoning
FROM:
Laurinda Logan, P.E., Senior Engineer
DATE:
February 28, 2003
RE:
Review of COUS 98-008 Conditions of Approval
Major Site Plan Modification
The Residences at Marina Village (Boynton Marina)
The Related Group
.....-file No. MSPM 03-001
Per your reques1 the Condi1ions of Approval from COUS 98-008 were reviewed against 1he above
referenced plans and 1 st Review comments. Following are comments that we believe should be
addressed by 1he current developer (The Related Group) during this approval process.
PUBLIC WORKS - GENERAL
Comments #1 and #2, COUS 98,008, may be deleted. They are being addressed wi1h new comments
for MSPM 08,001.
PUBLIC WORKS - TRAFFIC
Add 1he following comments:
1 Provide a Traffic Impact Analysis/S1udy, to determine if signal timing changes, slriping modifica1ions,
or lane additions are necessary as a result of 1his development. The study shall include the impact of
traffic accessing Ocean Avenue from Marina Way and accessing Federal Highway from Boynton
Beach Blvd. The traffic study shall also consider any improvements on Boynton Beach Blvd. east of
Federal Highway to the site.
2. The applicant shall be required 10 dedica1e to the Ci1y 25 feet of land adjacent to 1he exis1ing NE 6th
Slreet as currenlly platled and in use, to allow the Ci1y the abili1y 10 control ingress }lnd ;gres~ in10. .
the project site and maintenance of exis1 and proposed City u1ilities. UY\ 0;>5 ~,:.fL ~,,~
I/rd... h'7 5 1/ C( fi C<-
fN~{v-'; lY( ~yA""-~
ENGINEERING
Delete Commen1s #17,19,21,24,25,28, and 30, COUS 98,008. They are either being addressed wi1h
new comments for MSPM 08,001 or have been addressed. The following comments (revised for this
project) Irarn CGUS 98,008 should be added to our previously made comments for MSPM 08,001.
,/ Pay a "Fee in Lieu Of' de'dication as set forth in the LDR, Chapter 1, Article V.
,
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification - 1 st Review, MSPM 03-001
February 24, 2003
Page 2
/' The Ci1y of Boyn10n Beach and 1he applican1 shall jointly participate in extending Boynton Beach
Blvd. east from i1s current point of terminus as outlined in 1he Revised Development Agreemen1 and
indicated on the approved plan. (LOR, Chapler 4, Section 8.C; Chapter 6, Article III, Sec1ion 12;
Chap1er 6, Article IV, Sec1ion 10; Chapter 6, Article IV, Section 10.3; Chapter 6, Article IV, Section
10.B; Chapter 2, Section 11.2.0) This comment shall be read in conjunction wilh Paragraph 17.G 6
of 1he Revised Developmen1 Agreement.
/The applicant shall agree to incorporate in the dock leasing agreemenls a stipulation disallowing boat
tenants from using the public parking spaces along Casa Loma Blvd., NE 6th St., the private roadway
west of the residential building and the first floor of the parking garage for their parking purposes.
The dock leasing agreements must also stipulate that live aboards are not allowed in accordance
with the DEP permit. Provide the City with copies of the proposed leasing agreements for review and
approval.
/ The applicant shall agree to incorporate in the leasing agreements for all retail uses a stipulation
disallowing retail employees from using the public parking spaces along Casa Loma Blvd., NE 6th
SI., the private roadway west of the residential building and the first floor of the parking garage for
their parking purposes. Provide the City with copies of the proposed leasing agreements for review
and approval.
t;l..llnlll""""PllrcggsalJrthe R.,vi"'i'a Oe;v"IOfJlI,,,,,t J\!ijFeCII'''''Ltfovide the City with the appropriate ~.;:(oJ..-
CJ documents to designate public access and recreational uSlt"easements::fslrthe F. _~_ I I 1I~lh pH:!; 0 II ;f1
at the Intracoastal Waterway, lhg fleae:3triBA f3Btl:1'''<1Y~ h"lw.,.,n "'ng SA tRs AQrlh "irle> of the
-prgi3e~eJ 'It::tdil buildh Ig! cl,Jrer.th(:.' G.Ol:JllYdl J ctl cz. loeated ~~c:t nf the prop9~B8 resiEf9r.atisl b1lilding,
i~11)9inQ a walkw",~' Jg thEl80rlh property lire> of the sitp. ,
8. Show proposed p ic f . 'lies on the site plan and construclion and use detail of proposed designs
" for 1he propose :.ca&::l !.eFAEl verlook, Casa Loma Blvd., OII,ej lI,e; fJuollc cUUII) ard fer nil"i,,'''. Plans
LJ~ shall include posed public ameni1ies such as benches/sealing, trash receptacles, bike racks,
~tains, Iigh1ing, landscaping, etc.
;l'Regarding proposed conslruction of Casa Loma Blvd., NE 61h St., and 1he priva1e roadway 1he
applicant should be aware that roadways constructed in muck or peat shall be constructed in
conformance wi1h the LOR, Chapter 6, Article IV, Section 10.E.
f. Shqwthe six fishc;leaning and garbage stafkins required by theDEP permit on the Site Plan.
UTILITIES
Dele1e Commen1s #3,10, COUS 98,008. They are either being addressed with new commen1s for
MSPM 08-001 or have been addressed. The following commen1s (revised for this project) from COUS
98-008 should be added to our previously made comments for MSPM 08,001.
Gl Note 1hat the addition of multi-story condominium buildings and townhouses greatly intensifies the
U use of the site above what was originally anticipated. This change will result in ?n addi1ional capital
facilities charge, if approved. The developer is responsible for payment of all adaitional fees.
2.
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification - 1 st Review, MSPM 03-001
February 24, 2003
Page 3
hlAl1 infrastructure improvemen1s necessary for 1his en1ire site mus1 be completed before the firs1
U certifica1e of occupancy is issued, other than for docks and fuel pumps constructed simultaneously
with related support infras1ructure including access roads, water and sani1ary sewer, regardless of
bonding or olher surety. For 1his purpose, "infrastructure" shall be defined as potable water, sanitary
sewer, drainage, and a second paved access road for service and emergency purposes.
Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e'mail)
Peter Mazzella, Assistant 10 Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Foreslry & Grounds Division (PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e,mail)
File
J:\SHRDATA\Engineering\Logan\Plan Reviews\Major Mod - Marina - Review of Old CommentS.doc
\'^- ~ 's \l~s
f< ""^"-
CITY OF BOYNTON BEACH
OFFICE OF THE ASSISTANT CITY MANAGER
INTER-DEPARTMENTAL CORRESPONDENCE
JAN - J ,:1'/
DATE:
G" 'January 2, 2003
,t-
Scott Blasie
Bob Borden
Kurt Bressner
Nancy Byrne
Jim Cherof
Marshall Gage
Lusia Galav
Steve Gale
Quintus Greene
Ken Hall
Kevin Hallahan
Dick Hudson
John Huntington
G&-t ev,,,., ,-1: ,_.t. '"
- 5e.11 q ',Sc/f"'" If.., ',7
Doug Hutchinson oJ
Don Johnson p) S - ~e(' lpc.\(. pe.<.o.,' I ~'t''( I..L
David Kelley V"" "\ l -, ~" ~'t '7 \
Rodger Kemmer -:Is ,,",C,.l'., (( u'"'(' (,(: J, ,
Bob Kenyon ,,(.~ "",,,,-Ie,'~ " ,,,\ .~
Tim Large O'i~(=K. ','
Mark Law \.)c._ ~'i!lt$\",(.Yk'{- "".,<1-<<",),<,'
Jeff Livergood, _ , Ie' . .' )
L . d L \kj I U \. ~ \.. u '\ eLL" '^', ,,(., ( '> '
aUrin a ogan ' " ' ' ,,' .
Pete Mazzella .
Larry Quinn
Mike Rumpf
John Wildner
FROM:
Dale S. Sugerman, Assistant City Manager
SUBJECT: Agenda & Supporting Documentation for Staff "Summit" Meeting on the
Marina Project/Marina District- Monday, January 13, 2003~\~ ;\'\'1 , /
10:00 am - 4:00 pm YJ'1 _ L (< ck: '!'" J f, "'''~.l~ oY <x-'
Conference Room "C" C c, ,., {. ,.." '" /' ,,' (k:s_
(v'; / <,,(-' Cc f
'. L C' ..,.," ~0.<pS'
Attached is the agenda for the staff "summit" meeting that we have scheduled on the
Marina. Also attached are three documents: 1) The currently active Second Revised
Development Agreement (with a two page Third Revised Development Agreement
addendum); 2) The Amended Mediation Agreement (settling the lawsuit between Garcia,
Two Georges and the City), and; 3) The Approved Development Order (including
Conditions of Approval) for the Revised Marina Site Plan. Please review your copy of each
of these three documents and bring them with you to the summit meeting with any notes on
which items have been met, which items have been modified, and which items are still
outstandina accordina to your oarticular discioline.
I) The purpose of the first half of the meeting is so we can get a complete, up-to-date
r; accounting of where all of the issues stand on the Marina project.
,1
The purpose of the second half of the meeting is so we can develop a staff consensus on
our vision for the Marina District going forward. For the afternoon session, we will have
maps, aerials and GIS information available in the room.
Lunch will be provided by the City Manager between the two halves of the full-day meeting.
If you have any questions or comments about this process, or about any of the
attachments, please be sure to contact me at extension 6456 prior to the meeting.
':D~
Dale S. Sugerman
Assistant City Manager
AGENDA
STAFF "SUMMIT" MEETING
ON THE MARINA PROJECT!
MARINA DISTRICT
Monday, January 13, 2003
10:00 am - 4:00 pm
Conference Room "C"
I. Welcome and introduction- purpose of meeting.
II. Review and accounting of disciplines:
a) Outstanding permits
b) Use issues
c) Parking issues
d) Utility issues
e) Engineering issues
f) Police/Fire issues
g) Public Works issues
h) Other TRC issues
III. Public access
IV. Mixed use
V. Pending litigation (Molle vs. City of Boynton Beach)
VI. Other issues
Lunch will be served in Conference Room "C"
VII. The Marina District Visioning Process- Quintus Greene, Facilitator
VIII. Final questions/discussion
IX. Adjournment
NOTES:
~""
rr--~
I'
f \,
l I ...'
. \ l )
, /
['> <_.// ,-\'
,,-'J....) ,",
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-032
TO:
Michael W. Rumpf, Director, Planning and Zoning
DATE:
February 25, 2003
\
FROM:
Laurinda Logan, P.E., Senior Engineer
RE:
Review Comments
Major Site Plan Modification - 1 st Review
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
The above referenced Site Plans, forwarded on February 6, 2003, were reviewed by representatives
from Public Works, Engineering, Solid Waste, Parks and Utilities against the requirements outlined in the
City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and
Land Developmen1 Regulations (LOR) referenced.
PUBLIC WORKS - GENERAL
1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. The dumpster will be supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at the east end of the
townhomes, at the two story commercial building, and at the north end of Building NO.3. Full size
compactor units are recommended at the east end of the Marina (possibly in the restaurant) and
adjacent to/in the Lift Station enclosure. Coordinate with adjacent property owners regarding shared
use of centralized facilities.
PUBLIC WORKS - TRAFFIC
3. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc.
Delineate and stripe the "Loading Area" (where applicable - LOR, Chapter 2, Section 11.J); include a
pavement message in yellow indicating "No Parking - Loading Zone". See City Standard Drawings
B-98001 and B-90013 for striping details.
4. The fire lane signage and markings shall conform to the LOR Chapter 23, Article II, Sections B. & M.
The 3-foot high "Fire Lane" words shall be placed along both lanes and staggered. Please note this
requirement is applicable to buildings with a gross area greater than 15,000 SF.
5. Show traffic control devices within the east turn-around area including pavement arrows and one-way
arrow signs in the inner circle. Show pavement directional arrows within the drive aisles along Marina
Drive (Casa Loma).
. '
Department of Development, Engineering Division Memo No. 03-032
Re': The Residences at Marina Village, Major Site Plan Modification - 1st Review Comments
February 25, 2003
Page 2
6. Show the curbing around the circle painted yellow and appropriate "no parking-fire lane" post signs
every 50 feet around the circle.
7. Show a "Stop" sign and 24 inch stop bar at the sou1hwest leg of the intersection of Marina Dr. (Casa
Lorna Blvd.) and E. Marina Dr. for traffic control. Place the stop sign on a cantilevered mast arm for
visibility. Add a "Do Not Enter" and "Left Turn Only" sign at the southeast corner of this same
intersection.
8. Extend the stop bar at the east leg of the intersection of Marina Dr. (Casa Lorna Blvd.) and E. Marina
Dr. (westbound traffic is one-way only at this location).
9. Staff strongly recommends deleting the "bump-out" on the west leg of Marina Dr. (Casa Lorna Blvd.)
and E. Marina Dr., which separates E. Marina Dr. from the drop-off area in front of Building #2.
Additional pavement markings will need to be added at this intersection to clarify traffic movement(s),
especially where transitioning from one-way, westbound (east of intersection) to two-way traffic (north
and west of intersection).
10. Post "No Parking" for both East and West Marina Drive (both sides of roads).
11. Provide directional pavement arrows throughout.
12. All pavement return radii shall be a minimum of 30 feet. The following intersections do not meet this
criteria:
SE corner of Marina Dr. (NE 6th Street) and Marina Dr. (Casa Lorna Blvd.) @ 30 feet.
NW corner of Marina Dr. (Casa Lorna Blvd.) and Marina Dr. (northward) @ 15 feet.
NE corner of Marina Dr. (Casa Lorna Blvd.) and Marina Dr. (northward) @ 10 feet.
SW corner of Marina Dr. (northward) and Boynton Beach Blvd. Extension (NW 2nd Ave.) @ 15 feet.
13. Public parking spaces may not be counted towards required parking.
14. The two story commercial building and the adjacent restaurant should have an additional two
handicap parking spaces to provide the minimum required based on the "provided" parking (not to
include the two next to Two George's Restaurant).
15. Provide cross-sections and details for the Boynton Beach Blvd. extension. This section of roadway
shall be constructed in conjunction with other site improvements.
ENGINEERING
16. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's
Code requirements at time of application. These permits include, but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
D~velopment, Engineering Division Memo No. 03-032
Re: The Residences at Marina Village, Major Site Plan Modification _1'1 Review Comments
February 25, 2003
Page 3
permitting agencies such as Florida Department of Transportation (FDOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with the permit request.
17. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
18. Show all proposed site lighting on the Site and Landscape plans (the Photometrics plan does not
agree with the Site Plan and Landscape Plan).
19. Show all sight triangles on the Landscape plans, using 35 feet on public rights-of-way (LDR, Chapter
7.5, Article II, Section 5.H.) A 10 foot sight triangle is allowable at the parking garage ingress/egress
point. There appears to be conflicts between landscaping and lines of sight at each of the
intersections with sight triangles depicted. Please correct.
20. Indicate, by note on the Landscape Plan, that within the sight triangles there shall be an unobstructed
cross-visibility at a level between 2.5' and 6' above the pavement (LDR, Chapter 7.5, Article II,
Section 5.H.).
21. The City of Boynton Beach has existing irrigation, hardscaping, and plant material along Ocean
Avenue. Any damage as a result of the contractor's operations shall be repaired or replaced to the
equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole
responsibility of the developer. Please acknowledge this notice in your comments response and add
a note to the plans with the above stated information.
22. Indicate how conflicts between the City's landscaping on Ocean Blvd. and the proposed landscaping
will be resolved.
23. Provide details for the proposed paver systems showing compliance with the LDR, Chapter 2,
Section 6.F.8.d.(2).
24. Review proposed landscaping, particularly along the center median at the intersection of Marina Dr.
and East Ocean Ave., for possible conflicts with trucks and street maintenance equipment (street
sweepers, garbage trucks, delivery trucks, etc.)
25. Per the LDR, Chapter 7.5, Article II, Section 5.C.2. use of Ficus species shall not be permitted.
26. Be consistent with use of scale(s). The overall site plan uses an engineering scale with the
remaining landscaping plans utilizing an architectural scale. Additionally the scale noted on Sheets
L-4 and L-5 is incorrect. At a minimum, the LDR requires the Landscape plan (in this case the
Overall Site Planting Plan) scale shall match that of the Site plan - which you have done (LDR,
Chapter 4, Section 7.C.1). However for the detailed drawings please use an engineering scale at an
appropriate scale, say a 20 scale.
27. Provide an engineer's certification on the Drainage Plan as specified in LDR, Chapter 4, Seclion
7.F.2.
Department of Development, Engineering Division Memo No. 03-032
Re: The Residences at Marina Village, Major Site Plan Modification _1st Review Comments
February 25, 2003
Page 4
28. The current SFWMD permit on file for this project requires 2000 L.F. of exfiltration trench (per
Specific Condition #2 of Permit #EI 50-0129079-001). This permit will be required to either be
amended, again, or to be adhered to. Revise the Drainage Plan and calculations accordingly and
resubmit for review.
29. Full drainage plans in accordance with the LOR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
30. Structures #2 and #5 are incorrectly identified as Manholes, they should be called out as Inlets.
31. Verify storm sewer diameter between Manholes #10 and #11, and #1 and the existing manhole at the
west end of Marina Dr. They are called out as 24 inches, with 30 inch HOPE used upstream of this
site and 36 inch storm sewer used downstream.
32. Runoff from roads, parking lots, and other impervious areas must be routed through percolation
areas prior to discharge (LOR, Chapter 6, Article IV, Section 5.1.d).
33. Indicate to what standard the project is to be constructed; if the FOOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
34. Provide written and graphic scales on all sheets.
35. Provide a cross-section of the east turn-around area to show the type of construction, including the
appropriate specifications.
36. All roadways shall be a minimum of 24 feet (2-12 foot lanes) in width, including the parking garage
entryways (north and east). This site was previously approved with the correct width lanes and
roadways, with a fair amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was previously approved.
37. The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be widened to a minimum seven
(7) foot width to act both as a pedestrian path and as a continuous wheel stop.
38. An inverted roadway crown for Section B-B shall not be permitted. Too much roadway flooding is
possible, with settlement around the inlets, leaving significant maintenance and repair concerns.
39. Paving, Drainage and site details will not be reviewed for construction acceptability at this time. All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and will be reviewed for constructability at the time of construction permit
application.
40. Correct spelling of "stripping" to "striping" in the Paving Notes.
41. Specify type of ownership. Are the town homes to be condominiums or fee simple? Will the
apartments be rental or condominiums?
Department of Development, Engineering Division Memo No. 03-032
Re: The Residences at Marina Village, Major Site Plan Modification - 1 sl Review Comments
February 25, 2003
Page 5
42. Will the project be constructed in phases? If yes please provide a phasing plan.
UTILITIES
1. All utility easements shall be shown on the site and landscape plans (as well as the Water & Sewer
Plan Sheet) so that we may determine which trees may interfere with utilities. In general, palm trees
will be the only tree species allowed within utility easements. Canopy trees may be planted outside
of the easements so that roots and branches will not impact those utilities within the easement in the
foreseeable future. The LDR, Chapter 7.5, Article I, Section 18.1 gives public utilities the authority to
remove any trees that interfere with utility services, either in utility easements or public rights-of-way.
The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa) which will not be permitted.
Use of Trinette (Scheff/era Arboricola) and Florida Royal Palms trees/shrubs is discouraged. The
Landscape Plan also reflects a 'property line' that does not agree with previous acceptable roadway
right-of-way.
Due 10 the depth of the proposed sanitary collection trunk sewer re-route along East Marina Drive,
the sanitary sewer easement shall be required to be a minimum of 35-feet wide. The use of Florida
Royal Palms (Roystonea elata), within proposed utility easements, is discouraged due their size at
maturity. The same situation exists along the south roadway area (Marina Drive) at the initial re-
routing of the sanitary trunk line.
2. Palm Beach County Health Department permits will be required for the water and sewer systems
serving this project (CODE, Article II, Section 26-12).
3. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as
stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)). In addition, the LDR,
Chapter 6, Article IV, Section 16 requires that all pOints on each building will be within 200 feet of an
existing or proposed fire hydrant (as the hose drags, not as the hose flies). Please demonstrate that
the plan meets this condition by showing all hydrants (both proposed and existing).
4. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project
either upon the request for the Department's signature on the Health Department application forms or
within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
5. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water. City water may not,
therefore, be used for irrigation where other sources are readily available.
6. Water and sewer lines to be owned and operated by the City shall be included within utility
easements. Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet (and wider where noted above). The easements shall be dedicated via separate
instrument to the City as stated in the CODE, Article II, Section 26-33(a).
Department of Development, Engineering Division Memo No. 03-032
Re: The Residences at Marina Village, Major Site Plan Modification _1st Review Comments
February 25, 2003
Page 6
7. Again, the proposed re-routing of the sanitary trunk sewer (approximately 660 LF) will replace some
378 LF currently routed in an existing utility easement routed through proposed Buildings No. 1 & 2
as well as the swimming pool area. First, the re-route to the east then north (on East Marina Way)
and back to the master lift station is Questionable at best as this puts a major transmission trunk into
brackish soil conditions which include some 8 to 17 feet of unsuitable soil composition. This would
require cradle and pile to construct throughout its length to ensure the relocated system will work.
You are advised that the current (permitted) relocated trunk tracks westward to the west property
line, then northward along the west property line to the NW 2nd Avenue right-of-way and reconnects
with another major trunk system at a point near the link about to enter the master lift station. In
addition, the soil conditions along the current permitted route are acceptable for this task.
Second, the proposed re-route of the sanitary trunk sewer can only achieve a longitudinal slope of
0.08%, which is below the acceptable minimum. The additional calculations called for last June
2002, and submitted by the design engineer, reflected that capacity may be available, but velocity
was not. In order to overcome the Utilities Department concerns, the re-routed sanitary trunk system
should increase to a 30-inch diameter in order to allow for the slow moving capacity in the re-route
segments
8. While PVC material mav be allowed on the City's water system on this particular project; poly-lined
DIP is preferred. HOWEVER, all sanitary lines shall be poly-lined DIP on either the 24-inch or 30-
inch trunk line segment; PVC will be acceptable on the 8-inch collection segment.
9. The proposed 1O-inch water main connection from NW 2nd Avenue to the line located in Marina Drive
(currently known as Casa Loma Boulevard) will require a 20-foot horizontal separation along East
Marina Drive, due to the depth of the sanitary trunk sewer. (Refer to Comments noted above.)
10. This office will not require surety for installation of the water and sewer utilities, on condition that the
systems be fully completed, and given to the City Utilities Department before the first permanent
meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
11. A building permit for this project shall not be issued un1il this Department has approved the plans for
the water and/or sewer improvements required to service this project, in accordance with CODE,
Article II, Section 26-15.
12. The LOR, Chapter 3, Article IV, Section 3.0. requires Master Plans to show all utilities on or adjacent
to the tract. The plan must therefore show the point of service for water and sewer, and the
proposed off-site utilities construction needed in order to service this project. In addition, the LOR,
Chapter 3, Article IV, Section 3.P. requires a statement be included that utilities are available and will
be provided by all appropriate agencies. This statement is lacking on the submitted plans.
13. Utility construction details as shown on Civil Engineering (CE) sheets C-6 thru C-8 will not be
reviewed for construction acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual; and will be reviewed at the time of construction permit
application.
Department of Development, Engineering Division Memo No. 03-032
Re: The Residences at Marina Village, Major Site Plan Modification - 151 Review Comments
February 25, 2003
Page 7
14. Any utilities placed/remaining under the landscaped island within the West Marina Drive right-of-way
shall require a hold-harmless agreement for future utility maintenance.
15. There is some conflict between the General Notes and Water & Sewer Separation Notes on Sheet
C2. The minimum required horizontal separation between water, sanitary sewer, storm sewer, etc. is
10 feet. There is no exception for sewer lines. Please correct, and as appropriate, consolidate
LUck
Xc: Jeffrey L. Livergood, P.E., Director, Public Works (via e-mail)
Peter Mazzella, Assistant to Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division (PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Residences @ Marina Village 1st Review Comments.doc
----
PARKS DEPARTMENT MEMORANDUM #03-07
TO:
FROM:
Mike Rumph, Planning and Zoning Director
John Wildner, Deputy Recreation and Parks Directorji
Boynton Beach Marina, 1st Review-Major Site Plan Modification
RE:
Date:
February 11, 2003
The Recreation and Parks Department has reviewed the major site plan
modification for the Boynton Beach Marina Development. The following
comments are submitted:
1. The plans indicate that there will be 12 single family attached homes in
this development and 338 multi-family units. According to Chapter 1,
Article V, of the Land Development Regulations, the formulas for Single
Family Attached Units and Multi-family units are applied towards the
calculation of the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each =
338 Multi-family Units @ $ 656 each =
Total =
9,252
221,728
$ 230,980
2. The fee is due at the time of the first applicable building permit.
JW
-----
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 03-024
TO: Michael W. Rumpf
Director of Planning and Zoning
FROM: Timothy K. Large ~
TRC Member/Building Divi~
DATE: February 11 , 2003
SUBJECT: Project - Boynton Beach Marina
File No. - MSPM 03-001 - 1st review
We have reviewed the subject plans and recommend that the request be forwarded for
Board review with the understanding that all remaining comments will be shown in
compliance on the working drawings submitted for permits.
BuildinQ Division (Site Specific and Permit Comments) - Timothv K. LarQe (561)
742-6352
1. Sheet A-2. Parking Breakdown Table. The calculations for the required handicap
accessible parking spaces in the garage are based on a total number of 813
spaces, which requires 17 accessible spaces. The plans also note there are 664
spaces in the garage which requires 14 accessible spaces. Clarify on the plans the
correct number of parking spaces in the garage and the correct number of required
accessible parking spaces.
2. At the time of permit review, the construction plans shall show that all bathrooms in
the covered dwelling units comply with the provisions of the Federal Fair Housing
Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2), Paragraph (A) or (B). Clear
floor space shall be provided at fixtures to allow a person in a wheelchair or other
mobility aid use of the fixtures. Clear floor space shall be shown on the plans and
designate which option of Requirements #7 (A or B) is being used.
3. As required by Chapter 4, section 7 of the Land Development Regulations, submil
a floor plan drawing. The building plans are not being reviewed for compliance with
the applicable building codes. Therefore, add the words "Floor plan layout is
conceptual" below the drawing titled Floor Plan found on Sheets A-9 thru A-12.
4. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
bf
S:IDeve/opmentIBui/dingITRCITRC 20031Boynton Beach Marina MSPM 03,001
Page 1 0/1
~
CITY OF BOYNTON BEACH
Fire and Life Safety Division
100 East Boynton Beach Blvd.
P.O. Box 310
Boynton Beach, Florida 33425,0310
PLAN REVIEW COMMENTS
For review of:
MSPM 03-001 1st review-fire
Project Name and Address:
Boynton Beach Marina
743 NE 1st Avenue
~ Rodqer Kemmer. Fire Protection Enqineer
Reviewed by:
Department:
Fire and Life Safety
Phone:
(561) 742-6753
Comments to:
Sherie Coale by email on 2/19/03
CODE REQUIREMENTS
Water & Sewer Plan (C,5) is inadequate. Hydrants are not clearly shown and the
dock standpipe system with the Fire Department Connection (FDC) is not shown.
Show location of all the FDC's for all buildings with fire sprinkler protection.
The site plan and master plan design documents shall adhere to Chapter 9 of the
Code of Ordinances of the City of Boynton Beach entitled "Fire Protection and
Prevention." This ordinance adopts NFPA I, Fire Prevention Code, 2000 edition,
and NFP A 10 I, Life Safety Code, 2000 edition. (These codes, as amended are
identified as the Florida Fire Prevention Code)
Design documents shall demonstrate compliance with LDR Chapter 6, Section 16,
which provides requirements for hydrants. Hydrants in commercial applications
shall be no more than 300 ft. apart and the remotest part of any structure shall be
no more than 200 ft. from a hydrant. Connections shall be to mains no less than 6
inches in diameter. In addition to domestic requirements at a residual pressure of
not less than 20 psi, a fire flow of at least 1500 gpm is required.
Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in service
prior to construction work per the Florida Fire Prevention Code, (2000) Section
29,2.3.2.
Emergency access shall be provided at the start of a project and be maintained
throughout construction per the Florida Fire Prevention Code, Section 3,5. and
NFPA 241, (1996) Safeguarding Construction. Alteration, and Demolition
Operations, Section 5-4.3. Emergency access roadways must be firm and
unyielding, having a bearing value of not less than 40 (i.e. LBR 40), compacted to
98% of the maximum density as determined by AASHTO Tl80, in accordance
with the FDOT Standard Specifications for Road and Bridge Construction (2000)
Division 11, Section 160, STABILIZING. A copy of the test results shall be
provided and accepted prior to above grade construction. Testing frequency shall
not be less than that specified in the FDOT Sampling, Testing and Reporting
Guide, or as required by the Fire Marshal. The roadway shall be maintained free
from ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
City Ordinance Section 9,6, 3. /7-11 requires approved automatic fire sprinkler
systems throughout the following:
I. All buildings or structures regardless of the type of construction
which are 3 stories or more in height or all buildings or structures
in excess of 30 ft. in height as measured from finish ground floor
grade to the underside of the topmost roof assembly.
2. All buildings or structures regardless of the type of construction
that are in excess of 12,000 square feet per floor.
High-rise buildings shall be protected throughout by an approved, supervised
automatic sprinkler system in accordance with Section 9.7. A sprinkler control
valve and a waterflow device shall be provided for each floor. Florida Fire
Prevention Code, (2000) Section 11.8.2.1
High-rise buildings shall be protected throughout by a Class I standpipe system in
accordance with Section 9.7. Florida Fire Prevention Code, (2000) Section
11.8.2.2
Class I, Type 60, standby power in accordance with NFP A 70, National
Electrical Code, and NFP A 110, Standard for Emergency and Standby Power
Systems, shall be provided. Florida Fire Prevention Code, (2000) Section 11.8.4.2
cc: Steve Gale
Bob Borden
L.Y OF BOYNTON BEACH, FLORIlJA.
INTER-OFFICE MEMORANDUM
~/
TO:
2/21/03
FILE: MSPM 03-001
Michael W. Rumpf DATE:
Dir. of Planning & Zoning
FROM:
SUBJECT: Boynton Beach Marina
REFERENCES: Site Plan
Off. John Huntington
Police Department
CPTED Practitioner
ENCLOSURES:
I have viewed the above building plans and have the following comments:
I. Show placement of traffic signs on site plan.
2. Show direction of traffic flow.
TRC Memorandum
Page 1 of I
~.
Coale, Sherie
From: Hallahan, Kevin
Sent: Thursday, February 27,20039:29 AM
To: Coale, Sherie
Cc: Galav, Lusia
Subject: 02,Plan.doc
Planning Memorandum: Forester / Environmentalist
To:
Lusia Galav, Principal Planner
From:
Kevin J. Hallahan, Forester / Environmentalist
Subject:
Boynton Beach Marina
Major Site Plan Modification - I sl Review
MSPM 03-001
Date:
February 27,2003
Existinl! Trees
I. The applicant must submit a tree survey of the existing trees on the site.
2. The applicant must prepare a tree management plan (document) to quantify the trees on
the site. This document should outline those trees that will be preserved, relocated, or
removed / replaced on the site. This should be coordinated with the identification symbol
used on a landscape plan sheet. [Environnemental. Regulations, Chapter. 7.5, Article II
Sec. 7.C.]
Irrigation System
3. There is not an irrigation system design included with the landscape plans.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 5,A.]
kjh
File
2/27/2003
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 02-000
TO:
Michael W. Rumpf, Direc10r, Planning and Zoning
FROM:
Laurinda Logan, P E, Senior Engineer
DATE:
February 28, 2003
RE:
Review of COUS 98-008 Conditions of Approval
Major Site Plan Modification
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
Per your request 1he Conditions of Approval from COUS 98-008 were reviewed agains1 the above
referenced plans and 1 st Review comments Following are comments 1hat we believe should be
addressed by the curren1 developer (The Rela1ed Group) during this approval process.
PUBLIC WORKS - GENERAL
Comments #1 and #2, COUS 98,008, may be deleted They are being addressed wi1h new comments
for MSPM 08,001.
PUBLIC WORKS - TRAFFIC
Add the following commen1s:
1. Provide a Traffic Impact Analysis/Study, to determine if signal timing changes, striping modifications,
or lane additions are necessary as a result of 1his developmenl. The study shall include the impact of
traffic accessing Ocean Avenue from Marina Way and accessing Federal Highway from Boynton
Beach Blvd. The traffic sludy shall also consider any improvemen1s on Boyn10n Beach Blvd. east of
, Federal Highway to the si1e.
(j1nbs.s'f}.1 zfrUci"'-ptl1hw,t ~b:"Jowwd...,
2. The applicant shall be required to dedica1e to the City 25 feel of land adjacen110 1he existing NE 6th
Street as currently platted and in use, to allow the City the ability to con1rol ingress and egress into
the projec1 site and maintenance of exis1 and proposed City utili1ies.
ENGINEERING
Delete Comments #17, 19, 21, 24, 25, 28, and 30, CO US 98-008. They are either being addressed with
new comments for MSPM 08,001 or have been addressed. The following comments (revised for this
projact) :,-0.,1 CCUS 93,008 should be addE;d to our previously made comments for MSPM 08-001.
7.
~
~,
Dept. of Public Works, Engineering Division Memo No. 03,xxx
RE: Boynton Beach Marina, Major Site Plan Modificalion - 1st Review, MSPM 03,001
February 24,2003
Page 2
4. The Ci1y of.Boynton Bach and the ap . ant sh II join11y participa1e i extendi g Boynton Beach
Blvd. east from its curr nt poin1 of ter nus as out ined in the Revis Developm nt Agreemen1 a d
indica1e.d' on the appr ved plan. DR, Chapter ,Section 8.C' hap1er 6, Arti Ie III, Sec' 12:
Chapy{r 6, Article IV, ectio ; Chap1er 6, Articl IV, Se . n 10.3; Chapter 6, Article I ,Section
10.B: Chapter 2, Sec1io .2.0) This comment shal e read in conjunction with ar aph 17.G.6
of lI1e Revised Developmenl Agreement.
5.
-
6.
<lWll'xt
8. Show proposed public facilities on the site plan and construction and use detail of proposed designs
for the proposed Casa Loma Overlook, Casa Loma Blvd., ? "U , ,.. " fa for review. Plans
shall include proposed public amenilies such as benches/seating, trash receptacles, bike racks,
drinking fountains, lighting, landscaping, etc.
9.
10.
UTILITIES
Delete Comments #3,10, COUS 98-008. They are either being addressed wi1h new comments for
MSPM 08-001 or have been addressed. The following commen1s (revised for this project) from CO US
98,008 should be added to our previously made comments for MSPM 08-001.
1. Note thai 1he addition of multi'slory condominium buildings and townhouses greatly intensifies the
use of the site above wha1 was originally an1icipated. This change will result in an additional capital
facilities charge, if approved. The developer is responsible for payment of all additional fees.
2.
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification - 1 st Review, MSPM 03-001
February 24, 2003
Page 3
3. All infrastructure improvements necessary for 1his entire site must be completed before the first
certificate of occupancy is issued, olher than for docks and fuel pumps constructed simultaneously
with related support infras1ructure including access roads, water and sanitary sewer, regardless of
bonding or other surely. For this purpose, "infrastructure" shall be defined as po1able water, sani1ary
sewer, drainage, and a second paved access road for service and emergency purposes.
Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e,mail)
Peter Mazzella, Assistant to Director, Utili1ies
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mai!)
Glenda Hall, Main1enance Supervisor, Public Works/Fores1ry & Grounds Division (PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Was1e
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
J:\SHRDATA\Engineering\Logan\Plan Reviews\Major Mod - Marina - Review of Old Comments.doc
~"'-2..
.,\1(\:/.... . .~"[
.) ~ /,
/ /v
l'/(:)~.~:.,''-'
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-034
TO:
Michael W. Rumpf, Director, Planning and Zoning
DATE:
February 28, 2003
FROM:
Laurinda Logan, P.E., Senior Engineer
RE:
Review of COUS 98-008 Conditions of al
Major Site Plan Modification
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
Per your request the Conditions of Approval from COUS 98-008 were reviewed against the above
referenced plans and 1st Review comments. Following are comments that we believe should be
addressed by the current developer (The Related Group) during this approval process.
PUBLIC WORKS - GENERAL
Comments #1 and #2, COUS 98-008, may be deleted. They are being addressed with new comments
for MSPM 08-001.
PUBLIC WORKS - TRAFFIC
Add the following comments:
1. Provide a Traffic Impact Analysis/Study, to determine if signal timing changes, striping modifications.
or lane additions are necessary as a result of this development. The study shall include the impact of
traffic accessing Ocean Avenue from Marina Way and accessing Federal Highway from Boynton
Beach Blvd. The traffic study shall also consider any improvements on Boynton Beach Blvd. east of
Federal Highway to the site.
2. The applicant shall be required to dedicate to the City 25 feet of land adjacent to the existing NE 6th
Street as currently platted and in use, to allow the City the ability to control ingress and egress into
the project site and maintenance of existing and proposed City utilities.
ENGINEERING
Delete Comments #17,19,21,24,25,28, and 30, COUS 98-008. They are either being addressed with
new comments for MSPM 08-001 or have been addressed. The following comments (revised for this
project) from COUS 98-008 should be added to our previously made comments for MSPM 08-001.
,
Department of Public Works, Engineering Division Memo No. 03-034
Re: The Residences at Marina Village, Review of COUS 98-008 Conditions of Approval
February 28, 2003
Page 2
3 P' 'i';!i!IIAtl:>c"~;:'i'\_:A;'..;;;l;.it,.;:l;1ll!1'___~'Iii.__.lIlilJ^'''t.I&'V
. ,a'i!".:l,J<li!__l,!t,,,:'""'..,"II"_____~""~_,..IIli_,~, "
4. The City of Boynton Beach and the applicant shall jointly participate in extending Boynton Beach
Blvd. east from its current point of terminus as outlined in the Revised Development Agreement and
indicated on the approved plan. (LDR, Chapter 4, Section 8.C; Chapter 6, Article III, Section 12;
Chapter 6, Article IV, Section 10; Chapter 6, Article IV, Section 10.3; Chapter 6, Article IV, Section
10.B; Chapter 2, Section 11.2.D) This comment shall be read in conjunction with Paragraph 17.G.6
of the Revised Development Agreement.
5.
6.
7.
8. Show proposed public facilities on the site plan and construction and use detail of proposed designs
for the proposed Casa Loma Overlook, Casa Loma Blvd., and the public courtyard for review. Plans
shall include proposed public amenities such as benches/seating, trash receptacles, bike racks,
drinking fountains, lighting, landscaping, etc.
9. Regarding proposed construction of Casa Loma Blvd., NE 6th St., and the private roadway 1he
applicant should be aware that roadways constructed in muck or peat shall be constructed in
conformance with the LDR, Chapter 6, Article IV, Section 10.E.
10. Sn~""J!.~~~::=r~~-" ~",,";Wlt:r.ill_1!;Il:."""'1j;"'^ " "'~ '-<Plan:
" I,/,mIII_""t_!!lJyl!l!lV\.l1ll:lS!li!<l9!l_IIllJ\lB"ll'N..I....IiM~JiiIilllllll.llAW.,qJ,lti!ii,~, ,^,
UTILITIES
Delete Comments #3-10, CO US 98-008. They are either being addressed with new comments for MSPM
08-001 or have been addressed. The following comments (revised for this project) from COUS 98-008
should be added to our previously made comments for MSPM 08-001.
,
Department of Public Works, Engineering Division Memo No. 03-034
Re: The Residences at Marina Village, Review of COUS 98-008 Conditions of Approval
February 28, 2003
Page 3
1. Note that the addition of multi-story condominium buildings and townhouses greatly intensifies the
use of the site above what was originally anticipated. This change will result in an additional capi1al
facilities charge, if approved. The developer is responsible for payment of all additional fees.
2. All infrastructure improvements necessary for this entire site must be completed before the first
certificate of occupancy is issued, other than for docks and fuel pumps constructed simultaneously
with related support infrastructure including access roads, water and sanitary sewer, regardless of
bonding or other surety. For this purpose, "infrastructure" shall be defined as potable water, sanitary
sewer, drainage, and a second paved access road for service and emergency purposes.
LUck
Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e-mail)
Peter Mazzella, Assistant to Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division (PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Residences at Marina Village (Marina) Rev. of COUS 98-008 Condo of Appr..doc
2nd
, ,
REVIEW COMMENTS - Responses from The Related Group
Major Site Plan Moditication (Responses in "Bold")
Project name' Boynton Beach Marina
File number:MSPM 03-00 I
Reference: 2nd review plans identified as a Maior Site Plan Modification with a March 18. 2003 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Conunents:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
Comment is noted.
2. Staffrecommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
All dumpster pick-up locations shown on Sheet A-2. Details at each
location shown on Sheet A-3.
PUBLIC WORKS - Traffic
Comments:
3. Show traffic control devices within the east turn,around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
Traffic control devices within the east turn-around area including
pavement arrows and one way arrow signs in the inner circle have
been added to the plans. Pavement directional arrows are shown
within the drive aisles along Casa Lorna.
4. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
The plans reflect the curbing around the circle painted yellow and
"no parking-file lane" signs every fifty (50) feet around circle.
5. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast corner of this
same intersection.
Stop signs and 24-inch stop bars have been added at the
intersection of Marina Dr. (Casa Loma Blvd.) and East Marina Drive.
2nd REVIEW COMMENTS Responses from The Related Gronp
03/24/03
2
DEPARTMENTS INCLUDE REJECT
6. Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop,off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarifY
traffic movement(s ), especially where transitioning from one-way,
westbound (east of intcrsection) to two,way traffic (north and west of
intersection).
Resolved in first T.R.e. meeting with 35' radius and road taper.
7. Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this development. The study shall include the impact of traffic accessing
Ocean Avenue from Marina Way and accessing Federal Highway from
Boynton Beach Blvd. The traffic study shall also consider any
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
The traffic study for Marina Village was recently completed by
Pinder Trontman and forwarded to the City and PBC. PBC has
notified us that the "...project meets the Traffic Performance
Standards of Palm Bcach County."
8. Unless the applicant petitions for abandonment, the applicant shall be
required to dedicate to the City 25 feet ofland adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
A) Applicant formally petitions the City to abandon its portion of
NE 6th Street so this roadway will become a privatcly owned and
maintained road.
B) In the alternative, if the adjacent property owners decide not to
accept the abandoned portion of NE 6th Street, applicant will dedicate
to the City 25' of its property to create a full public road R.O.W.
UTILITIES
Comments:
9. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
Page 2 of 9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
3
DEPARTMENTS INCLUDE REJECT
rights,of,way.
All utility easements are shown on the engineering site plan and
landscape plans. Proposed tree locations have been adjusted to not
intcrfere with underground utility lines.
10. The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa)
which will not be permitted. Use of Trinette (SchejJlera Arboricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of,way.
A) Ficus microcarpa "Dwarf Green Island," a non,invasive low
growing scrub, has been deleted from the plant list and plans.
B) Scheffiera Arboricola "trinette" is not a tree. This is a Dwarf
ornamcnta1 scrub which in not invasive and is used throughout the
landscape industry in sonth Florida. We would propose to use this
plant.
C) Florida Royal palms are proposed for this project. They are a
native to sonth Florida.
D) The cnrrent architectural site plan has been used to prepare the
landscape plan. All property lines are correct.
11. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.rn. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by msurance underwriters,
whichever is greater (see CODE, Article II, Section 26,16(b )). In addition,
the LDR. Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
A) All existing and proposed fire hydrants are depicted on the
schematic engineering water and sewer plans.
B) No fire hydrants will be required on the west property line since
all buildings are fully sprinkled and accessible from public streets.
ENGINEERING DIVISION
Comments:
12. Show all proposed site lighting on the site and landscape plans (the
photometrics plan does not agree with the site plan and landscape plan).
Site lighting, site and landscapc plans are all coordinated.
13. Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
Correct City landscaoine: at Ocean Blvd. is shown in site and
Page 3 of 9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
4
DEPARTMENTS INCLUDE REJECT
landscape plans. Note regarding protection of City landscaping added
to Sheet A-I and Sheet L-2.
14. Provide an engineer's certification on the drainage plan as specified in
LDR, Chapter 4, Section 7.F.2.
Engineer's Certification is on Sheet C-3 of the Engineering plans.
15. The current SFWMD permit on file for this project requires 2000 L.F. of
exfiltration trench (per Specific Condition #2 of Permit #E1 50,0129079,
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
Please see attached letter to the various agencies regarding
drainage. Once the permitting approach is defined, calculations will be
snbmitted for your review.
16. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
Comment is noted.
17. Provide written and graphic scales on all sheets.
Written and graphic scales have been added to all sheets.
18. Provide a cross-section of the east tum,around area to show the type of
construction, including the appropriate specifications.
A cross-section of the east tnrn-around has been added to Sheet C-
4.
19. All roadways shall be a minimum of 24 feet (2,12 foot lanes) in width,
including the parking garage entryways (north and east). This site was
previously approved with the correct width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
Applicant is filing a reqnest for variance to allow for the private
roads within Marina Village to be constructed pursuant to the plans
submitted, i.e., 24' of driving surface from inside face of curb to inside
face of curb.
20. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
Page 4 of 9
2nd REVIEW r:OMMENTS Responses from The Related Group
03/24/03
5
DEPARTMENTS INCLUDE REJECT
Comment is noted.
21. Correct spelling of "stripping" to "striping" in the Paving Notes.
Spelling has been corrected.
22. Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the
Intracoastal Waterway.
We agree to comply with this comment.
FIRE
Comments:
23. Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29,2.3.2.
Comment noted.
24. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3,5, and NFPA 241, (1996) Safeguarding Construction, Alteration,
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO T180, in accordance with the FDOT Standard Specifications for
Road and Bridge Construction (2000) Division 11, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling, Testing and Reporting Guide, or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of its intended use.
Comment is noted.
25. City Ordinance Section 9,6, 3. /7,11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
Page 5 of 9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
6
DEPARTMENTS INCLUDE REJECT
in excess of 12,000 square feet per floor.
Comments are noted.
26. High,rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A
sprinkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
Comment is noted.
27. High,rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code,
(2000) Section 11.8.2.2
Comment is noted.
28. Class 1, Type 60, standby power in accordance with NFPA 70, National
Electrical Code, and NFPA 110, Standard for Emergency and Standby
Power Systems, shall be provided. Florida Fire Prevention Code, (2000)
Section 11.8.4.2.
Comment noted.
POLICE
Comments:
BUILDING DIVISION
Comments:
29. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(N), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
Comment is noted.
30. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
Comment is noted.
PARKS AND RECREATION
Comments:
Page 6 of 9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
7
DEPARTMENTS INCLUDE REJECT
31. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter I, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi,family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units@ $ 771 each = 9,252
338 Multi-family Units @ $ 656 each ~ 221,728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
Applicant agrees to pay the parks and Recreation Impact Fees for
the residential mix of units approved by the City for Marina Village.
FORESTER/ENVIRONMENT ALIST
Comments:
Trees
32. The applicant must submit a tree survey of the existing trees on the site.
The tree survey is attached.
33. The applicant must prepare a tree management plan (document) to quantifY
the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 7.C.]
To the exteut possible, existing on-site trees will be relocated to
available site areas. A tree management plan will be prepared prior to
any request for removal or relocation of any trees.
PLANNING AND ZONING
Comments:
34. Approval of the site plan is contingent upon approval of the Land Use
Amendment to the MX,C designation that allows the density proposed.
Comment is noted.
35. Residential single-family attached units (Townhouses) are not permitted in
the MU,H district. (Ch. 2, Sec. 6,F. - Table 6F-l). The applicant has
requested a Code review to add Townhomes to the list of permitted uses.
Site Plan approval is contingent upon the approval of this amendment to the
LDR's.
Page 7 of9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
8
DEPARTMENTS INCLUDE REJECT
Comment is noted.
36. All utility, storm sewer and access easements in conflict with the proposed
building must be abandoned and relocated prior to issuance of a building
permit for this phase of the project.
Comment is noted.
37. The required build,to setback line on Ocean A venue is 10 feet if the intent
is to widen the sidewalk. The site plan indicates a 12 foot setback in some
areas. Revise the plan to 10 feet for the center portion of the building. (Ch.
2, Sec. 6, F)
Center nortion revised to 10' setback.
38. Developer is required to establish a property owners association for the
project.
A) If it becomes apparent that a POA between the property
owners would offer some benefit to the area for parking and garbage
disposal issues, and if the other property owners are willing to form a
POA with the applicant, then the applicant would be glad to study a
possible POA fnrther.
B) The City has notified all property owners that they must
provide for their own parking and garage disposal. Applicant will
provide for the parking and garbagc disposal for its own project,
Marina Village.
39. The information provided under "Project Data" on the site plan does not
correspond to the information provided on the application, particularly the
pervious/impervious area calculations. Please review and revise.
Project data and site plan application information have been
coordinated.
40. Place a note on sheet A,2 that charter, drift fishing or sightseeing boats are
not permitted to operate out of the 38 dock spaces provided on site.
Note added to Sheet A-2.
41. Site plan approval is contingent upon approval of the height exception.
(Ch.2 SecA.F.)
Comment is noted.
42. Submit color elevation drawings for all sides of all buildings prior to the
CRA Board meeting.
Color elevations will be orovided.
43. Place a note on Sheet A,2 that reads: All rooftop equipment must be
screened from view at a minimum distance of 600 feet. (Ch .9. Sec. 11)
Note added to Sheet A-2.
44. Location for monument signs are shown on the site plan. Provide a detail for
these signs showing dimensions, material, lettering and colors. Any signage
not shown on the plans will require separate approval from the CRA and
City Commission.
A seoarate annrova1 will be requested for sign age.
45. The proposed plan docs not meet the parking reqUIrements as provided in
LDR's Chapter 2, Sec. 11. Applicant has requested to use the "fee in lieu
of' orovision in Ch. 2, Sec. II H, to compensate for the 70 space deficit.
Page 8 of 9
2nd REVIEW COMMENTS Responses from The Related Group
03/24/03
9
DEPARTMENTS INCLUDE REJECT
Site plan approval is contingent upon CRA and City Commission approval
of this project. A total of $70,000.00 would be required to be paid prior to
issuance of a building permit.
Comment noted.
46. The landscape code Chapter 7.5 requires that 50% of 1ill.landscape material
provided be native. Rcvise note and calculations on Sheet L-2 accordingly.
The current landscape plan includes more than 50% native trees
and Palms. Shrub and Ground Cover is under 50% based on lack of
availabilitv of suitable native plant variety.
47. Tree trunks shall be a minimum four-inch caliper with seven (7) feet of
vertical clearance for visibility. (Ch .2. Sec. 6, F.8.a. (2). Revise note on
Landscape Plan sheets.
The Notes on the Plant Specifications have been revised..
48. Revise sheet L-I and L-4 to reflect the correct table for the parking garage
(see Sheet A-2)
The parking garage tables have been removed from the landscape
plans.
49. Landscape Plan Sheet L-4 indicates 8 Medjool Date Palms (PD) on the plan
but lists only 2. Revise the plant list.
The auantities have been corrected.
50. Landscape Plan Sheet L-4 indicates 2 Alexander Palms (PE,2) on the plan
but lists 5. Revise the plan accordingly.
The auantities have been corrected.
51. Elevations and floor plans for the 2-story commercial building and
restaurant will require separate CRA and City Commission approval.
Comment is noted.
52. All trees shall be a minimum of 12 feet in height with a minimum caliper of
3 inches. (Ch.7.5, Art. II, Sec.5.C.2).
The minimum tree heights, Note and Specifications have been
chanl1:ed.
53. Explain the changes in the Project Data for Paved Vehicular Use Area,
Sidewalks, Pools and Pool Decks, Pervious Area and Water Area.
The nrevious submittal (1" Review Comments) was incorrect.
J:\THE RELATED GROUP\PROPERTY FOLDERS\BOYNTON BEACH MARINA\2nd Review StaffComments\2nd REVIEW COMMENTS
Responses from The Related Group.doc
Page 9 of9
2nd REVIEW COMMENTS
Maior Site Plan Modification
&triA
)J /4'Sff It-
Project name: Bo ton Beach Marina
File number: M 03-001 :2"-
Reference: review plans identified as a Maior Site Plan Modification with a MarchJ-l( 2003 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT ,
PUBLIC WORKS - General ,
I
Comments:
rY Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
.K Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
X Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
A Show the curbing around the circle painted yellow and appropriate "'no
parking-fire lane" post signs every fifty (50) feet around the circle.
1 Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast corner of this
same intersection.
~ Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarifY
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
j Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this development. The study shall include the impact of traffic accessing
2nd REVIEW COMMENTS
03/19/03
2
DEPARTMENTS
INCLUDE REJECT
Ocean Avenue from Marina Way and accessing Federal Highway from
Boynton Beach Blvd. The traffic study shall also consider any
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
8. Unless the applicant petitions for abandonment. the applicant shall be
required to dedicate to the City 25 feet of land adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
UTILITIES
Comments:
All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
rights-of-way.
*
10. Thp. T ~nrlC',?~@ l?1af1. fe:Rg~t'i thp 1I<::p. nfnri'en Lluud {F;LU.) ./.'Y{;l-una,pa)
urhi....h m;n nAt 1-.~ 13sFHHFted. U-s€ QfTr-i~4'tTp (5"'~<<fjJ(rfl.l~s6.'-ief)!>3) and
Fforida Reyal Paltru: tr88~/fhr:p\?i' ii ,:ri'i\Ollr"ged. Th.~ LaflBSeap... PIau also
r~fk,e;t3 u 'Plup""dJ lil~" that a.ae3 flat 1lg.lG6 'H;{h pTPvif\ll<;: ~rc;p.ptahle
rg~Qv:ElJ l~ellt-vf-vydy.
Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II, Section 26-16(b)). 1,1 add;t;vH,
th" LDR, Chi1pkl 6, Anidt: rv, St:\,;LiuH 16 l(.'!uires that all poiI1t~ 6ft each
b\lilelil'lg '",ill Be '::ithil'l 200 feet 9f 111 py;ct;ng 9r pr8Jl63ea fi,c l'ydl1l"t (as
the RQi'e grags, 1'151 a;:, Llu;; llu~1;; Oil;;;:'). rt..a;:,~ dI;;1l1uu;:.llal"" tllGlt Lll\..< pIau LUCcts-
tbl~ rrmclit;on hy ~H9~..,qRg all fiyaraHt3 (b6th fhoposcd auJ ~Ai.:lting).
ENGINEERING DIVISION
Comments:
Show all proposed site lighting on the site and landscape plans (the
hotometrics Ian does not a ee with the site Ian and landsca elan).
2nd REVIEW COMMENTS
03/19/03
3
DEPARTMENTS
INCLUDE REJECT
~
Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
Provide an engineer's certification on the drainage plan as specified in
LDR, Chapter 4, Section 7.F.2.
The current SFWMD permit on file for this project requires 2000 L.F. of
ex filtration trench (per Specific Condition #2 of Permit #EI 50-0129079-
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
16. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
)c( Provide written and graphic scales on all sheets.
Provide a cross-section of the east turn-around area to show the type of
construction, including the appropriate specifications.
1.
All roadways shall be a minimum of 24 feet (2-12 foot lane ~jf:.
including the parking garage entryways (north and east)} VfCY~(
previollc;:ly ~ppTnvp.n with thp rnrrp....t nridt'h bnpC' :l:R9 faaa.'::a-ys, ";lith fi ft1ir
amo1mt Of mnrl...- betu,,,,,,,.,., City it<:1ff 1:R.Q. t.H~ a.s','slapers 18 ad",,,!ualdy ddillGSS
ak
pre',qgl:lsl) applvv~d, VI ~[lL1" ivadwd)' i~ LO be ahandvl1l:id, ploviae ~ulr1p.nce
of eeflscflt Elf aajaeent I'rElj'lefly S':.'Rers.
20. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
Correct spelling of "stripping" to "striping" in the Paving Notes.
Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at. the
Intracoastal Waterway. 'theie ~hW -j,e. pR.v,ded O:+~ -+.vo--e.
~l .
FIRE
Comments:
Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3.2.
2nd REVIEW COMMENTS
03/19/03
4
.
DEPARTMENTS INCLUDE REJECT
/ B
! 24. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Construction. Alteration.
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO Tl80, in accordance with the FDOT Standard Specifications for
Road and Bridge Construction (2000) Division 11, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling, Testing and Reporting Guide, or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
I 3 ~ity Ordinance Section 9-6, 3. /7-11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
( ~ in excess of 12,000 square feet per floor.
d High-rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A
sprinkler control valve and a waterflow device shall be provided for each
( ^ floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
o High-rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code,
L - (2000) Section 11.8.2.2
~ Class 1, Type 60, standby power in accordance with NFPA 70, National
Electrical Code, and NFPA 110, Standard for Emergency and Standby
Power Systems, shall be provided. Florida Fire Prevention Code, (2000)
Section 11.8.4.2.
POLICE
Comments:
BUILDING DIVISION
2nd REVIEW COMMENTS
03/19/03
5
DEPARTMENTS
Comments:
r;-,
, 29.) At the time of permit review, the construction plans shall show that all
J bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is beinl! used.
~ At time of permit review, submit signed and sealed working drawings of the
. - -) proposed construction.
PARKS AND RECREATION
Comments:
,.. "0 The plans indicate that there will be 12 single family attached homes in this
:./ development and 338 multi-family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each = 9,252
338 Multi-family Units @ $ 656 each = 221,728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
FORESTER/ENVIRONMENTALIST
Comments:
\~
~
The applicant must submit a tree survey of the existing trees on the site.
"33\ The applicant must prepare a tree management plan (document) to quantify
~ the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 7.C.]
PLANNING AND ZONING
Comments:
INCLUDE REJECT
2nd REVIEW COMMENTS
03/19/03
6
DEPARTMENTS
Approval of the site plan is contingent upon approval of the Land Use
Amendment to the MX,C desi ation that allows the densi ro osed.
Residential single-family attached units (Townhouses) are not permitted in
the MU-H district. (Ch. 2, Sec. 6,F. - Table 6F-I). The applicant has
requested a Code review to add Townhomes to the list of permitted uses.
Site Plan approval is contingent upon the approval of this amendment to the
LDR's.
All utility, storm sewer and access easements in conflict with the proposed
building must be abandoned and relocated prior to issuance of a building
ermit for this hase of the ro' ecl.
The required build-to setback line on Ocean A venue is 10 feet if the intent
is to widen the sidewalk. The site plan indicates a 12 foot setback in some
areas. Revise the plan to 10 feet for the center portion of the building. (Ch.
2, Sec. 6,F)
Developer is required to establish a property owners association for the
ro.ecl.
The information provided under "Project Data" on the site plan does not
correspond to the information provided on the application, particularly the
ervious/im ervious area calculations. Please review and revise.
Place a note on sheet A,2 that charter; drift fishing or sightseeing boats are
not ermitted to 0 erate out of the 38 dock s aces rovided on site.
Site plan approval is contingent upon approval of the height exception.
(Ch.2 SecA.F.
Submit color elevation drawings for all sides of all buildings prior to the
CRA Board meetin .
Place a note on Sheet A-2 that reads: All rooftop equipment must be
screened from view at a minimum distance of 600 feet. Ch .9. Sec. II)
L .
these sigRs skev,if1.~ d~u~Gll.:t~vu5, nu~t(.l~Al, ktt(.J.~llg 009. ~.....1I"\r5 .AtJj signage
wd .1 " r'"~ will require separate approval from the CRA and
Ci Commission.
The proposed plan does not meet the parking requirements as provided in
LDR's Chapter 2, Sec. 11. Applicant has requested to use the "fee in lieu
of' provision in Ch. 2, Sec. 11 H, to compensate for the 70 space deficit.
Site Pla~D~val is contingent upon eRA and City Commission approval
of this . A total of $70,000.00 would be required to be paid prior to
issuance of a buildin ermil.
The landscape code Chapter 7.5 requires that 50% of all landscape material
rovided be native. Revise note and calculations on Sheet L,2 accordin I
Tree trunks shall be a minimum four,inch caliper with seven (7) feet of
vertical clearance for visibility. (Ch .2. Sec. 6, F.8.a. (2). Revise note on
Landsca e Plan sheets.
Revise sheet L-l and L-4 to reflect the correct table for the parking garage
(see Sheet A,2
Landscape Plan Sheet L-4 indicates 8 Medjool Date Palms (PD) on the plan
but lists onI 2. Revise the lant list.
Landscape Plan Sheet L-4 indicates 2 Alexander Palms (PE-2) on the plan
but lists 5. Revise the Ian accordin I .
INCLUDE REJECT
No ${q 11
2f?rvawz.
i!.
2nd REVIEW COMMENTS
03/19/03
7
DEPARTMENTS
INCLUDE REJECT
Elevations and floor plans for the 2-story commercial building and
restaurant will re uire se arate CRA and Cit Commission a roval.
All trees shall be a minimum of 12 feet in height with a minimum caliper of
3 inches. Ch.7.5, Art. II, Sec.5.C.2
Explain the changes in the Project Data for Paved Vehicular Use Area,
Sidewalks, Pools and Pool Decks, Pervious Area and Water Area.
MWR/sc
1 J:\SHRDATA\PLANNING\SHARED\WP\FORMS\BLANKS FORMS FOLDER\lST REVIEW COMMENTS.DOC
Mt: OffibiMJ.. , .--
7 ;)4. AdJtQ.Y) a.J.lfiC!OldJJ--tM If) "fk "'/M.e /2; 2<!t~ ~~
4M1rPd ~~c&hc..,.;~~1uJ-
~\'-'2.
"
(I )
'c\ ~ 1/
)-~---~-,,-
I J ().< '
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-057
TO:
Lusia Galav, Principal Planner, Department of Development/Planning & Zoning
FROM:
Laurinda Logan, P.E., Senior Engineer
DATE:
March 26, 2003
RE:
Review Comments
Major Site Plan Modification - 3rd Review
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
Based on our TRC meeting of March 25, 2003 please revise the following 2nd Review Comments:
UTILITIES
9. No change.
10. Please relocate the Florida Royal Palms proposed in the utility easements to prevent the possibility of
damage to subsurface structures.
11. Fire flow calculations will be required demonstra1ing the City Code requirement of 1,5000 g.p.m. as
stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)).
ENGINEERING
19. All roadways shall be a minimum of 24 feel (2-12 fool lanes) paved width, including the parking
garage entryways (north and east), with the exception of (East) Marina Drive. This segment of
roadway may consist of 2 - 11 foot lanes (22 feet paved width). Width is measured from edge to
edge of pavement and shall not include any portion of adjacent curb and gutler.
If you have any questions or need additional informa1ion please feel free to give me at call at x6482.
LUck
Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e-mail)
H. David Kelley, Jr., PE/ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineeting\Kribs\Residences@MarinerVillage_3rd Review Comments.doc:
,
m'''' 0"
....I,F.,~[~(..'.
III _.. I ...... J:
o - -.-;;: 0
J.... _.MM' '_" V'
'VrON e"
.
o
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 03-XXX
TO:
Lusia Galav, Principal Planner, Department of Development/Planning & Zoning
FROM:
Laurinda Logan, P.E., Senior Engineer
DATE:
March 26, 2003
Ol2.ArT
RE:
Review Comments
Major Site Plan Modification - 3rd Review
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
'3/ZfI:/03
Based on our TRC meeting of thiSodate please revise the following 2nd Review Comments:
march 25,2tJ03
UTILITIES
9. No change.
1 O. The-l:andscape:pla[lJeflects.th~Se-<lf..Green:lsland~F-lcu&MiGorcarpa)..Wl11Cllwi1l'not-be'Qermitted.
Please relocate the Florida Royal Palms proposed in the utility easements to prevent the possibility of
damage to subsurface structures.
11. Fire flow calculations will be required demonstrating the City Code requirement of 1,5000 g.p.m. as
stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)).
ENGINEERING
19. All roadways, shall be a minimum of 24 feet (2-12 foot lanes) paved width, including the parking
garage entryways (north and east), with the exception of (East) Marina Drive. This segment of
roadway may consist of 2 - 11 foot lanes (22 feet paved width). Width is measured from edge to
edge of pavement and shall not include any portion of adjacent curb and gutter.
If you have any questions or need additional information please feel free to give me at call at x6482.
Cc: Jeffrey L. Livergood, P.E., Director, Public Works (via e-mail)
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
J:\SHRDATA\Engineering\Logan\Plan Reviews\Major Mod - Marina - Related Group-3rd Review Comment Revisions.doc
<
.
. .
2nd REVIEW COMMENTS
Maior Site Plan Modification
Project name: Boynton Beach Marina
File number:MSPM 03-001
Reference: 2nd review plans identified as a Maior Site Plan Modification with a March 18. 2003 Planning and
Zonin De artment date stam markin .
DEPARTMENTS
INCLUDE
REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-( l~z'31
6200) regarding the storage and handling of refuse. The dumpster will be ---J
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
re ardin shared use of centralized facilities.
(:3/Z~ <3
PUBLIC WORKS - Traffic
Comments:
3. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
4. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
5. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
6.
Staff strongly recommends deleting the "bump-out" on the west leg of ",---j"3/Z51 ~
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings win need to be added at this intersection to clarify
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
Provide a Traffic Impact Analysis/Study, to determine if signal timing \'Zf5/(T
changes, striping modifications, or lane additions are necessary as a result f
this develo men!. The stud shall include the im act of traffic accessin ,
@
,
,
.
.
2nd REVIEW COMMENTS
03/19/03
2
DEPARTMENTS INCLUDE REJECT
Ocean A venue from Marina Way and accessing Federal Highway from
Boynton Beach Blvd. The traffic study shall also consider any
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
@ Unless the applicant petitions for abandonment, the applicant shall be I _
required to dedicate to the City 25 feet of land adjacent to the existing N~ ( :S~Z80
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
UTILITIES
Comments:
9. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article 1, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
rights-of-way.
10. The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa)
which will not be permitted. Use-of-Trinette,(&heffiera-Arborieola)-and
Florida-Royal-Palms-treesl&hrubs..is..diSC{)uraged" The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of-way. ~l~ .to tMlcale... IYIOVtnt\ (O'la.I~ off' 0( '5A .
11. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II, Section 26-16(b)). In addition,
the LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
ENGINEERING DIVISION
Comments:
12. Show all proposed site lighting on the site and landscape plans (the ~123IC53
ohotometrics nlan does not alrree with the site nlan and landscaoe olan). (
"--.)
.
.
.
.
.
2nd REVIEW COMMENTS
03/19/03
3
DEPARTMENTS
INCLUDE REJECT
13. Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
14. Provide an engineer's certification on the drainage plan as specified in
LDR, Chapter 4, Section 7.F.2.
15. The current SFWMD permit on file for this project requires 2000 L.F. of
exfiltration trench (per Specific Condition #2 of Permit #EI 50-012907~
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
16. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting. \
(ZJ5( '3
17. Provide written and graphic scales on all sheets.
18. Provide a cross-section of the east turn-around area to show the type of
construction, including the appropriate specifications.
19. All roadways shall be a minimum of 24 feet (2-12 foot lanes) in width,
including the parking garage entryways (north and east). This site wa
previously approved with the correct width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
20. Paving, Drainage and site details will not be reviewed for construction . L
acceptability at this time. All engineering construction details shall be in(
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
22. Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the'
Intracoastal Waterway. 1hL~ <>I'tCllI b<.- pro\llck?t CLt..j-hL hM<:-
6f m.mr.,,-
21. Correct spelling of "stripping" to "striping" in the Paving Notes.
FIRE
Comments:
23. Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3.2.
'i
. .'
2nd REVIEW COMMENTS 01l-t"
Maior Site Plan Modification 5('S IO~
Project name: Boynton Beach Marina
File number:MSPM 03-001
Reference: 2nd review plans identified as a MaiO[ Site Plan Modification with a March 18. 2003 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
3. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
4. Show the curbing around the circle painted yellow and appropriate uno
parking-fire lane" post signs every fifty (50) feet around the circle.
5. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
6. Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarify
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
7. Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this development. The study shall include the impact of traffic accessing
-
.
.
i
2nd REVIEW COMMENTS
031l9/03
3
DEPARTMENTS INCLUDE REJECT
13. Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
14. Provide an engineer's certification on the drainage plan as specified In
LOR, Chapter 4, Section 7.F.2.
15. The current SFWMD permit on file for this project requires 2000 L.F. of
exfiltration trench (per Specific Condition #2 of Pennit #EI 50-0129079-
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
16. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
17. Provide written and graphic scales on all sheets.
18. Provide a cross-section of the east turn-around area to show the type of
construction, including the appropriate specifications.
19. All roadways shall be a minimum of 24 feet (2-12 foot lanes) in width,
including the parking garage entryways (north and east). This site was
previously approved with the correct width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
20. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
21. Correct spelling of "stripping" to "striping" in the Paving Notes.
22. Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the
Intracoastal Waterway.
FIRE
Comments:
23. Design documents where underground water mains and hydrants are to be /
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3.2.
..
.
.
y'
2nd REVIEW COMMENTS
03/19/03
4
DEPARTMENTS INCLUDE REJECT
24. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevelllion Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Constn,ction. Alteration.
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e. /
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO T 180, in accordance with the FDOT Standard Specifications for
Road and Bridge Construction (2000) Division ll, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling. Testing and Reporting Guide. or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
25. City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in /
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
in excess of 12,000 square feet per floor.
26. High,rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A ~
sprinkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
27. High-rise buildings shall be protected throughout by a Class I standpipe ~
system in accordance with Section 9.7. Florida Fire Prevelllion Code,
(2000) Section 11.8.2.2
28. Class 1, Type 60, standby power in accordance with NFP A 70, National
Electrical Code, and NFPA 110, Standard for Emergency and Standby V'
Power Systems. shall be provided. Florida Fire Prevelllion Code, (2000)
Section 11.8.4.2.
POLICE
Comments:
BUILDING DIVISION
2nd REVIEW COMMENTS
03/19/03
5
~ ~ ) )-03
3'0'
. .
DEPARTMENTS INCLUDE REJECT
Comments:
29. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or Bl is bein" used.
30. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
PARKS AND RECREATION
Comments:
31. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi,family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each ~ 9,252
338 Multi-family Units @ $ 656 each ~ 221,728
Total ~ $ 230,980
The fee is due at the time of the first applicable building permit.
~ FORESTER/ENVIRONMENT ALIST )
'--- ------
Comments:
Trees V
32. The applicant must submit a tree survey of the existing trees on the site.
33. The applicant must prepare a tree management plan (document) to quantify
the trees on the site. This document should outline those trees that will be ~ ,/
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 7.C.]
PLANNING AND ZONING
Comments:
"
2nd REVIEW COMMENTS
Maior Site Plan Modification
/.
"
I'
,
y ;.~-;-
0/..:.: "
'':':J /
I {( /" (~,,).
,..j
Project name: Boynton Beach Marina
File number:MSPM 03,001
Reference: 2nd review plans identified as a Maior Site Plan Modification with a March 18. 2003 Planning and
Z 0 d ki
onIng enartment ate stamn mar n".
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742, ",,-,
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent tolin
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
3. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
4. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
5. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter " and "Left Turn Only" sign at the southeast comer of this
same intersection.
6. Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop,off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarify
traffic movement(s ), especially where transitioning from one-way,
westbound (east of intersection) to two,way traffic (north and west of
intersection).
7. Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of ~
this development. The studv shall include the impact of traffic accessing
"
\.
,"
2nd REVIEW COMMENTS
03/19/03
2
DEPARTMENTS INCLUDE REJECT
Ocean Avenue from Marina Way and accessing Federal Highway from
Boynton Beach Blvd. The traffi c study shall also consider any
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
S. Unless the applicant petitions for abandonment, the applicant shall be
required to dedicate to the City 25 feet of land adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
UTILITIES
Comments:
9. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may ~
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section IS. 1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
rights-of-way.
10. The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa) \
which will not be permitted. Use of Trinette (Schefflera Arboricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of-way.
11. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV, '\.
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II, Section 26,16(b)). In addition,
the LDR, Chapter 6, Article N, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
ENGINEERING DIVISION
Comments:
12. Show all proposed site lighting on the site and landscape plans (the
photometrics plan does not agree with the site plan and landscape plan).
~
2nd REVIEW COMMENTS
Maior Site Plan Modification
L" ~/- ole: 4<<./1
I'~~. '
~
J/ pit
Project name: Boynton Beach Marina
File number:MSPM 03,001
Reference: 2nd review lans identified as a Ma" or Site Plan Modification with a March 18
Zoninl! Deoartment date stamo markinl!.
2003
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General I
I
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
rel!ardinl! shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
3. Show traffic control devices within the east turn,around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
4. Show the curbing around the circle painted yellow and appropriate "no
parking,fire lane" post signs every fifty (50) feet around the circle.
5. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
6. Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarifY
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
7. Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this develoomenl. The study shall include the imoact of traffic accessinl!
.
2nd REVIEW COMMENTS
03/19/03
4
DEPARTMENTS INCLUDE REJECT I
24. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3,5, and NFPA 241, (1996) Safeguarding Construction. Alteration.
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO Tl80, in accordance with the FDOT Standard Specifications for
Road and Bridge COllstn/ctioll (2000) Division ll, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling, Testing and Reporting Guide. or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
25. City Ordinance Section 9,6, 3. /7-11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
in excess of 12,000 square feet per floor.
26. High,rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A
sprinkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
27. High-rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code,
(2000) Section 11.8.2.2
28. Class 1, Type 60, standby power in accordance with NFP A 70, National
Electrical Code, and NFPA 110, Standard for Emergency and Standby
Power Systems, shall be provided. Florida Fire Prevention Code, (2000)
Section 11.8.4.2.
POLICE
Comments:
BUILDING DIVISION
-
2nd REVIEW COMMENTS
03/19/03
5
DEPARTMENTS INCLUDE REJECT
Comments:
29. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the /
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Reauirements #7 (A or B) is being used.
30. At time of permit review, submit signed and sealed working drawings of the V
proposed construction.
PARKS AND RECREATION
Comments:
31. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each = 9,252
338 Multi-family Units @ $ 656 each = 221,728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
FORESTER/ENVIRONMENT ALIST
Comments:
Trees
32. The applicant must submit a tree survey of the existing trees on the site.
33. The applicant must prepare a tree management plan (document) to quantify
the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
(Environnemental. Regulations, Chapter. 7.5, Article 11 Sec. 7.C.]
PLANNING AND ZONING
Comments:
~hJ ~~~~
rt REVIEW COMMENT~
2Vl'.l Maior Site Plan Modification
Project name: ~ton Beach Marina
File number:~PM 03-001 J.ia.ech I!=;/
Reference: 1- review plans identified as a Maior Site Plan Modification with a Fe19nlUfV 5. 2003 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
...comments:
l Y Prior to permit application contact the Public Works Department (561-742,
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
( y
2. Staff recommends adding trash pick,up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
C'}"'ments:
On the site and civil plans, show and identifY all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LDR, Chapter 2, Section II.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-98001 and B-90013 for striping details.
k The fire lane signage and markings shall conform to the LDR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than 15,000 SF.
( '~\ Show traffic control devices within the east turn-around area including
J pavement arrows and one,way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
L, (Casa Loma).
( Y Show the curbing around the circle painted yellow and appropriate "no
~ parking,fire lane" post signs every fifty (50) feet around the circle.
iJ Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
1ST REVIEW COMMENTS
03/18/03
2
DEPARTMENTS INCLUDE REJECT
X Extend the stop bar at the east leg of the intersection of Marina Dr. (Casa
Loma Blvd.) and E. Marina Dr. (westbound traffic is one-way only at this
location.
( ~ Staff strongly recommends deleting the "bump-out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarify
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two,way traffic (north and west of
/' intersection).
IX Post "No Parking" for both East and West Marina Drive (both sides of
I roads).
)<}. Il Provide directional pavement arrows throughout.
I
1. All pavement return radii shall be a minimum of 30 feet. The following
I \ intersections do not meet this criteria:
a) SE comer of Marina Dr. (NE 6th Street) and Marina Dr. (Casa Loma
Blvd.) @ 30 feet.
b) NW comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@15 feet.
c) NE comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@ 10 feet.
d) SW comer of Marina Dr. (northward) and Boynton Beach Blvd. Extension
(NW 2'" Ave.) @ 15 feet.
LX Public parking spaces may not be counted towards required parking.
'~. The two story commercial building and the adjacent restaurant should have
an additional two handicap parking spaces to provide the minimum required
based on the "provided" parking (not to include the two next to Two
George's Restaurant).
K Provide cross,sections and details for the Boynton Beach Blvd. extension.
This section of roadway shall be constructed in conjunction with other site
-- improvements.
( j Provide a Traffic Impact Analysis/Study, to determine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this development. The study shall include the impact of traffic accessing
Ocean Avenue from Marina Way and accessing Federal Highway from
Bovnton Beach Blvd. The traffic study shall also consider any
1ST REVIEW COMMENTS
03/18/03
3
DEPARTMENTS
-=- improvements on Boynton Beach Blvd. east of Federal Highway to the site.
~7. nless the applicant petitions for abandonment, the applicant shall be
equired to dedicate to the City 25 feet of land adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
UTILITIES
Comments:
""
( 18.') All utility easements shall be shown on the site and landscape plans (as well
J as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
~ rights,of-way.
~ The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa)
which will not be permitted. Use of Trinette (SchejJlera Arhoricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of,way.
I
~.
Due tot he depth 0 f the proposed sanitary collection trunk sewer re-route
along East Marina Drive, the sanitary sewer easement shall be required to be
a minimum of 35-feet wide.
I
~.
Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Article II, Section 26-
12).
( ~Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
~ Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II. Section 26-16(b)). In addition.
the LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
V. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee
1\
INCLUDE REJECT
1ST REVIEW COMMENTS
03/18/03
4
DEPARTMENTS INCLUDE REJECT
be paid for this project either upon the request for the Department's
signature on the Health Department application forms or within 30 days of
site plan approval, whichever occurs first. This fee will be determined
I based upon final meter size, or expected demand.
r Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. City water may not, therefore, be used for irrigation where other
sources are readily available.
~5. Water and sewer lines to be owned and operated by the City shall be
included within utility easements. Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet (and wider
where noted above). The easements shall be dedicated via separate
instrument to the City as stated in the CODE, Article II, Section 26-33(a).
2 Again. the proposed re,routing of the sanitary trunk sewer (approximately
I 660 LF) wi\l replace some 378 LF currently routed in an existing utility
easement routed through proposed Buildings No. 1 & 2 as well as the
swimming pool area. First, the re,route to the east then north (on East
Marina Way) and back to the master lift station is questionable at best as
this puts a major transmission trunk into brackish soil conditions which
include some 8 to 17 feet of unsuitable soil composition. This would
require cradle and pile to construct throughout its length to ensure the
relocated system will work.
f
2 You are advised that the current (permitted) relocated trunk tracks westward
I to the west property line, then northward along the west property line to the
NW 2" Avenue right-of-way and reconnects with another major trunk
system at a point near the link about to enter the master lift station. In
addition, the soil conditions along the current permitted route are acceptable
for this task.
~ The proposed re-route of the sanitary trunk sewer can only achieve a
longitudinal slope of 0.08%, which is below the acceptable minimum. The
additional calculations called for last June 2002, and submitted by the
design engineer, reflected that capacity may be available, but velocity was
not. In order to overcome the Utilities Department concerns, the re-routed
sanitary trunk system should increase to a 30,inch diameter in order to allow
for the slow moving capacity in the re,route segments.
~. While PVC material may be allowed on the City's water system on this
particular project; poly, lined DIP is preferred. All sanitary lines shall be
poly-lined DIP on either the 24,inch or 3~-inch trunk line segment; PVC
will be acceptable on the 8-inch collection segment.
/
, The proposed lO-inch water main connection from NW 2" A venue to the
line located in Marina Drive (currently known as Casa Loma Boulevard)
wi\l require a 20,foot horizontal separation along East Marina Drive, due to
the depth of the sanitary trunk sewer. (Refer to Comments noted above.)
1ST REVIEW COMMENTS
03/18/03
5
DEPARTMENTS INCLUDE REJECT
~ This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
~. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with CODE, Article II, Section 26,15.
3 . The LDR, Chapter 3, Article IV, Section 3.0. requires Master Plans to show
all utilities on or adjacent to the tract. The plan must therefore show the
point of service for water and sewer, and the proposed off-site utilities
construction needed in order to service this project. In addition, the LDR,
Chapter 3, Article IV, Section 3.P. requires a statement be included that
utilities are available and will be provided by all appropriate agencies. This
statement is lacking on the submitted plans.
3f Utility construction details as shown on Civil Engineering (CE) sheets C,6
thru C,g will not be reviewed for construction acceptability at this time. All
utility construction details shall be in accordance with the Utilities
Department's "Utilities Engineering Design Handbook and
Construction Standards" manual; and will be reviewed at the time of
construction permit application.
3Y. Any utilities placed/remaining under the landscaped island within the West
Marina Drive right,of,way shall require a hold,harmless agreement for
future utility maintenance.
~. There is some conflict between the General Notes and Water & Sewer
Separation Notes on Sheet C2. The minimum required horizontal
separation between water, sanitary sewer, storm sewer, etc. is ten (10) feet.
There is no exception for sewer lines. Please correct, and as appropriate,
consolidate.
~. Note that the addition of multi-story condominium buildings and
townhouses greatly intensifies the use of the site above what was originally
anticipated. This change will result in an additional capital facilities charge,
if approved. The developer is responsible for payment of all additional fees.
~ All infrastructure improvements necessary for this entire site must be
completed before the first certificate of occupancy is issued, other than for
docks and fuel pumps constructed simultaneously with related support
infrastructure including access roads, water and sanitary sewer, regardless of
bonding or other surety. For this purpose, "infrastructure" shall be defined
as potable water, sanitary sewer, drainage, and a second paved access road
for service and emergency purposes.
1ST REVIEW COMMENTS
03/18/03
6
DEPARTMENTS INCLUDE REJECT
ENGINEERING DIVISION
Comments:
~. Add a general note to the site plan that all plans submitted for specific
permits shall meet the City's Code requirements at time of application.
These permits include, but are not limited to, the following: paving,
drainage, curbing, site lighting, landscaping and irrigation. Permits required
from other permitting agencIes such as Florida Department of
Transportation (FDOT), South Florida Water Management District
(SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department
(PBCHD), Palm Beach County Engineering Department (PBCED), Palm
Beach County Department of Environmental Resource Management
(PBCDERM) and any others, shall be included with the permit request.
~ All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
~. Show all proposed site lighting on the site and landscape plans (the
photometrics plan does not agree with the site plan and landscape plan).
A'f Show all sight triangles on the Landscape plans, using 3 5 feet 0 n public
rights,of,way (LDR, Chapter 7.5, Article II, Section 5.H.) A 10 foot sight
triangle is allowable at the parking garage ingress/egress point. There
appears to be conflicts between landscaping and lines of sight at each of the
intersections with sight triangles depicted. Please correct.
i Indicate, by note on the landscape plan, that within the sight triangles there
shall be an unobstructed cross-visibility at a \evel between 2.5 feet and 6
feet above the pavement (LDR, Chapter 7.5, Article II, Section 5.H.).
*. The City of Boynton Beach has existing irrigation, hardscaping, and plant
material along Ocean Avenue. Any damage as a result of the contractor's
operations shall be repaired or replaced to the equivalent or better grade, as
approved by the City of Boynton Beach, and shall be the sole responsibility
of the developer. Please acknowledge this notice in your comments response
and add a note to the plans with the above stated information.
Q Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
41. Provide details for the proposed paver systems showing compliance with the
LDR, Chapter 2, Section 6.F.8.d.(2).
I
4'Q. Review proposed landscaping, particularly along the center median at the
1\
I ST REVIEW COMMENTS
03/18/03
7
DEPARTMENTS INCLUDE REJECT
intersection of Marina Dr. and East Ocean Ave., for possible conflicts with
trucks and street maintenance equipment (street sweepers, garbage trucks,
delivery trucks, etc.)
i Per the LDR, Chapter 7 .5, Article II, Section 5.C.2. use of Ficus species
shall not be permitted.
i Be consistent with use of scale(s). The overall site plan uses an engineering
scale with the remaining landscaping plans utilizing an architectural scale.
Additionally the scale noted on Sheets L-4 and L-5 is incorrect. At a
minimum, the LDR requires the landscape plan (in this case the overall site
planting plan) scale shall match that of the site plan which you have done
(LDR, Chapter 4, Section 7.C.I). However for the detailed drawings please
~. use an engineering scale at an appropriate scale, say a 20 scale.
~ Provide an engineer's certification on the drainage plan as specified in
0\ LDR. Chapter 4, Section 7.F.2.
~ The current SFWMD permit on file for this project requires 2000 L.F. of
exfiltration trench (per Specific Condition #2 of Permit #EI 50-0129079-
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
Q Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
~. Structures #2 and #5 are incorrectly identified as Manholes, they should be
called out as Inlets.
~. VerifY storm sewer diameter between Manholes #10 and #11, and #1 and
the existing manhole at the west end of Marina Dr. They are called out as
24 inches, with 30 inch HDPE used upstream of this site and 36 inch storm
sewer used downstream.
sX. Runoff from roads, parking lots, and other impervious areas must be routed
through percolation areas prior to discharge (LDR, Chapter 6, Article IV,
, Section 5.l.d).
i{. Indicate to what standard the project is to be constructed; if the FDOT
Standard Specifications for Road & Bridge Construction and Standard
Index are to be used - the 2000 Specifications are recommended since they
contain both English and Metric units.
8 Provide written and graphic scales on all sheets.
@ Provide a cross-section of the east turn,around area to show the type of
construction, including the appropriate specifications.
I ~9) All roadways shall be a minimum of 24 feet (2,12 foot lanes) in width.
1 ST REVIEW COMMENTS
03/18/03
8
DEPARTMENTS INCLUDE REJECT
including the parking garage entryways (north and east). This site was
previously approved with the correct width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
h The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be
widened to a minimum seven (7) foot width to act both as a pedestrian path
and as a continuous wheel stop.
~: An inverted roadway crown for Section B-B shall not be permitted. Too
much roadway flooding is possible, with settlement around the inlets,
leaving significant maintenance and repair concerns.
~ Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
~ application.
0) Correct spelling of "stripping" to "striping" in the Paving Notes.
\4. Will the project be constructed in stages? If yes please provide a staging
~ plan.
"",'
65. Provide the City with the appropriate documents to designate public access
V and recreational use easements for the proposed public overlook at the
Intracoastal Waterway.
FIRE
Comments:
~. The water and sewer plan (C,5) is inadequate. Hydrants are not clearly
shown and the dock standpipe system with the Fire Department Connection
(FDC) is not shown. Show location of all the FDC's for all buildings with
fire sprinkler protection.
IX The site plan and master plan design documents shall adhere to Chapter 9 of
the Code of Ordinances of the City of Boynton Beach entitled "Fire
Protection and Prevention. II This ordinance adopts NFPA I, Fire
Prevention Code, 2000 edition, and NFPA 101, Life Safety Code, 2000
edition. (These codes, as amended are identified as the Florida Fire
Prevention Code).
V Design documents shall demonstrate compliance with LDR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants In
1ST REVIEW COMMENTS
03/18/03
9
DEPARTMENTS INCLUDE REJECT
commercial applications shall be no more than 300 feet apart and the
remotest part of any structure shall be no more than 200 feet from a hydrant.
Connections shall be to mains no less than six (6) inches in diameter. In
addition to domestic requirements at a residual pressure of not less than 20
A' psi, a fire flow of at least 1500 gpm is required.
( 69. \ Design documents where underground water mains and hydrants are to be
~ provided, must demonstrate that they will be installed, completed, a nd in
service prior to construction work p er the Florida Fire Prevention Code,
""". (2000) Section 29,2.3.2.
70. Emergency access shall be provided at the start of a project and be
J maintained throughout construction per the Florida Fire Prevention Code,
Section 3,5, and NFPA 241, (1996) Safeguarding Constmction, Alteration.
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO Tl80, in accordance with the FDOT Standard Specifications for
Road and Bridge Constmction (2000) Division 11, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling, Testing and Reporting Guide. or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
f/'\
71. ) City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire
I....J sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or an buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) An buildings or structures regardless of the type of construction that are
~ in excess of 12,000 square feet per floor.
72. High,rise buildings shall be protected throughout by an approved,
"--/ supervised automatic sprinkler system in accordance with Section 9.7. A
sprinkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
.5 High-rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code,
/"'.. (2000) Section 11.8.2.2
'/' "\
V Class I, Type 60, standby p ower in accordance with NFPA 70, National
Electrical Code, and NFPA 110, Standard for Emergency and Standby
Power Svstems. shan be orovided. Florida Fire Prevention Code. (2000)
1ST REVIEW COMMENTS
03/18/03
10
DEPARTMENTS INCLUDE REJECT
Section 11.8.4.2.
POLICE
Ctmments:
1Xs. / Show placement of traffic signs on the site plan.
.~ Show direction of traffic flow.
\.
BUILDING DIVISION
Cpmments:
f\ /
Vi7. Sheet A-2. Parking Breakdown Table. The calculations for the required
handicap accessible parking spaces in the garage are based on a total
\ number of 813 spaces, which requires 17 accessible spaces. The plans also
note there are 664 spaces in the garage which requires 14 accessible spaces.
ClarifY on the plans the correct number of parking spaces in the garage and
the correct number of required accessible parking spaces.
3
78. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
~ As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
~ on Sheets A,9 thru A,12.
80.} At time of permit review, submit signed and sealed working drawings of the
/ proposed construction.
PARKS AND RECREATION
ents:
\
I ~~, plans indicate that there will be 12 single family attached homes in this
development and 338 multi,family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities imnact Fee as follows:
1ST REVIEW COMMENTS
03/18/03
11
~
\W'
DEPARTMENTS
12 Single Family Attached Units@ $ 771 each = 9,252
338 Multi-family Units @ $ 656 each = 221.728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
FORESTER/ENVIRONMENTALIST
Comments:
Trees
The applicant must submit a tree survey of the existing trees on the site.
The applicant must prepare a tree management plan (document) to quantify
the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 7.C.]
Irril!ation System
There is not an irrigation system design included with the landscape plans.
Please provide one. [Environnemental. Regulations, Chapter. 7.5, Article II
Sec.5,A.]
PLANNING AND ZONING
Comments:
The traffic study must meet the requirements of Palm Beach County Traffic
En ineerin rior to issuance of a buildin ermil.
Approval of the site plan is contingent upon approval of the Land Use
Amendment to the MX-C desi ation that allows the densi ro osed.
Residential single-family attached units (Townhouses) are not permitted in
the MU-H district. (Ch. 2, Sec. 6,F. - Table 6F,I). R@Il'lQ"g tAgH! H-QHl the
a Code review.~ c ?'dd To"","'u,pJ -Ie. Itu I,~tf- t,,~ IUJ'
All utility, storm sewer and access easements in conflict with the proposed
building must be abandoned and relocated prior to issuance of a building
ermit for this hase of the ro' ecl.
The required build-to setback line on Ocean Avenue is 10 feet if the If,!tent
is to widen the sidew Ik The site Plan.iudicatest 12 t setback;,''Re~e?
, c<1 f'#.r pr.,..J1t.... "f-IAJ.. 75l)/t I ~.
the Ian to 10 feet t . I. ( h.2, ec. ,
Developer is required to establish a property owners association for the
ro'ecl.
Provide the "net buildable" land area calculation under Project Data on the
INCLUDE REJECT
t/'<fi[A h=
S,k (I""
"".
fUrk-dZ
r'",d~'" C't i1rJ-
8r
'f;.0 ?>n<i ""J f-o
'Iu. L-Dr:~ .
1ST REVIEW COMMENTS
03/18/03
12
DEPARTMENTS
Site Plan Sheet A-2. (Ch. 4)
INCLUDE
REJECT
/
!
2.f (I I uM,..:h So";',..,,,,,,,,
/1J>.f-J/Jitj; ,?/21'/a3
slips being provided than
]'(
tluce ;: ng
Ilflif
-:;,," n
v pp
the pIer.
(lej,<.) (c11J1< fII ~
SA-iP d '" ?J..?r~'"
1\
,t
Pfov~d~ a ddail fuJ. ull sigHage 13FEI]38Sea fer tfle pI~CGt. The J.uuutlineRt aign
she.,T!. if!. the 1~8rtk..est e Elmer aftRe aile 111tlJt be 10 feet back flUlII1:he
e. Plea .site an. (Ch. 21)
The garage entrances appear to be 20 feet in width. Engineering standards
re uire a minimum of 24 feet. Revise lans accordin I .
How do residents in Building 3 access the pool and fitness center amenities?
Please ex lain and rovide a note on the lans. ,,' ,t;
The proposed plan does not meet the parking requirements fur twn alia Iilr€e
qeoroom f.e€ideHtial HLit.3. 1\'\"6 and t.flice SeMSQIR units f@GJ.11ire 1'.',19 !r~r'f>S
Wr "nit (0, 2, Spc 1:~ ~~~~~e ~e rG>I~d F"rlrinp; or:-Gempensate-fur
the 129 I'.FkiHg .I"G. aeficit by U.,: [J 'J..~ fee in lieu of' provision in C .
2, Sec. 11 H r.eq'Il?!t ~ v~ri~n('f' or rf"qllf~d ~ sad...... 1l..vil;W tv allvn 1.$ spaces
.......~.#
.,k, CU",
$.kr'/h'1'
Label the location of all surface parking spaces included for this project on
the Site Plan Sheet A-2.
According to the table on Sheet A-2, parking spaces in the garage total 665
not 664 as shown. Please revise accordin I .
On the parking layouts for each floor 0 f the garage, Sheet A,22, provide
dimensions and a s ace count for each floor.
Provide a typical parking space detail for regular and handicap spaces. j,v"
Provide traffic control markings (stop signs/stop bars) at both entrances to
the arkin ara e.
Who will construct improvements on Boynton Beach Boulevard? These
improvements are the responsibility of the developer to accommodate
access to Building No. I Lobby and parking garage? Provide details
regarding construction plans and time frame prior to issuance of a building
ermil.
~uffl1d r,+t<: a~ dv)<~n "" '!u..JU.t fl",-,- t..tdA. C~ det.J .t.... Yw",,- S,,'Tw SA",-..,,:" O{''''''~
~ 1-<:'"Y'''1 ~ <"(1M! Am1 SI1'''''I'' ,oat ChdWn C4 0!fl"'~1 klti r.ef,)'~ ..u}2rcU-e '
?VPT1/JhJ -/.0" _ lL. I (IlA 2..,1 t1J-. {' ~JNlJ ...,,;0:; 0
'/0 "
,,?PMi'
1ST REVIEW COMMENTS
03/18/03
13
DEPARTMENTS
INCLUDE REJECT
Landscape Plan indicates the use of the ficus species. Ficus is not permitted.
(Ch 7.5, Art. II, Sec. 5.C.). Revise lans accordin I .
Landscape Plan Sheet L-4 shows 262 Schefflera (SU) on the site plan but
lists 294. Please correct. Also, review the use of the Schefflera species that
I a ears on the Palm Beach Coun list of Prohibited Trees.
Landscape Plan Sheet L-5 indicates 23 Green Maypan Coconut (CN) of the
Ian but lists 27. Revise lans accordin I .
Landscape Plan Sheet L,5 indicates 200 Philodendron Selloum (PS) on the
Ian but lists 100. Revise lans accordin I .
Pervious Landscape Area calculations on the Site Plan Sheet A -2 don ot
match those on the Landsca e Plan Sheet L-2. Revise lans accordin I .
he landscape code Chapter 7.5 requires that 50% of all landscape material
rovided be native. Revise note and calculations on Sheet L,2 accordin I .
Indicate the method and source of irrigation of the Landscape Plans.
Tree trunks shall be a minimum four-inch caliper with seven (7) feet of
vertical clearance for visibili . Ch.2. Sec. 6, F.8.a. (2) ;. .:(' 1.Jo./(?],.., -,' i', :; ,!c h,
Will flower containers be used along the fa9ade adjacent to Ocean Avenue?
Please indicate on the Landsca e Plan. (Ch. 2, Sec. 6 F.8.e)
Minimum tree sizes planted along the west side of the project shall be 16
feet. (previous CRA comment)
MWR/sc
J:\SHRDATA\PLANNING\SHARED\WP\FORMS\BLANKS FORMS FOLDER\1ST REVIEW COMMENTS DOC
..---.,. J ,',
I,. /"
'; >.!
I ' I
- ,
" .'
{..,
('
.,1
"
l :if I'''' /
I '
-,' t ..~ c~ : I I
.
;-.:c
.1-)
, ,
-....::>> I. " , - , I , u.(
L~ " / "
. 1'-$1 " ,
~ ".
"
-- I , l ,
, i ,
to j ! , i .-
.
'1,1
(,.'
v/,'.J,
("I.;j;' /-
,
//.~+;
) 01\ ,,+.1 r .; I ~,
-. I .0'
1"'/,, J'
"
2..
fl,
, ,
Iy, '-lie (I.'
" I,'j,i.t(
, ~
-............,..-
/
"';I!
I, J'"
,I );,.,
",-/
,
I <':li
'1:/ C(/_1
','~ ~
I (
, .
.1
" .(
~~.F;,
" j I" ...",.
:--
'.'r.t.'~ \h 0.1,1 [.-.'
:'1'J:),. '.,
~ ............ I . { 'I
, I - ~.I'
,-.:', .J;"JIJ'l (~J /1; 'I
" I " T~ - , <
fl,,) f,'v'Ii'" ~d ,- rl'~
rl~.'(.J)r,:...iv J; J., ..tU! II! .:/.,./ ~I': C1. I,'
,
roJ"". I ""/':,1,,,-1.[[.; ~6,e. ::.)
"C' if) ___:1"_, --1:'11. (,., (1" 'I I !):. I'~J :-
,
,I ,;'
---
. :(
,()):
1 st REVIEW COMMENTS - Responses from The Related Group
Maior Site Plan Modification (Responses in BOLD)
Project name: Boynton Beach Marina
File number:MSPM 03,001
Reference: 1" review plans identified as a Maior Site Plan Modification with a February 5. 2003 Planning and
Zoning Department date stamp marking
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
This comment is noted.
2. Staff recommends adding trash pick,up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building NO.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilIties.
A) Trash rooms added for the townhouses at the west cnd of the
townhouses.
B) Trash doors added for restaurant and commercial building at
south side of restaurant building.
C) Trash rooms added at North end of Building #3 for Building #3
apartments and commercial space.
D) Trash rooms for Buildings #1 and #2 located at west end of
each building in garage.
E) The proposal for all locations is to nse moveable dumpsters and
have maintenance staff locatcd dumpsters outside trash rooms on
designated trash pick-up days and to place dumpsters into trash rooms
after pick-up.
PUBLIC WORKS - Traffic
Comments:
3. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LDR, Chapter 2, Section II.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-98001 and B,90013 for striDing details.
DEPARTMENTS INCLUDE REJECT
See revised sheet C3 Schcmatic Paving and Drainage Plan for
additional information. All applicable traffic control markings have
been depicted on this sheet.
4. The fire lane sign age and markings shall conform to the LDR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than 15,000 SF.
Per Sun-Tech Engineering's meeting with Ms. Laurinda Logan and
Mr. Roger Kemmer, this item will not bc required along Marina Drive
since this rcquirement is not valid for streets.
5. Show traffic control devices within the east tum,around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
Per Sun-Tech Engineering's meeting on March 10,2003 with Ms.
Laurinda Logan this item is not applicable.
6. Show the curbing around the circle painted yellow and appropriate "no
parking, fire lane" post signs every fifty (50) feet around the circle.
See revised plans. The cnrbing around the cul,de-sac is now
labeled to be painted yellow and "no parking - fire lane" signs are
designated at 50' intervals around the circle.
7. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer ofthis
same intersection.
See revised plans. This intersection has been modified to become a
3-way stop. A cantilevered mast arm has also been designated for the
eastbonnd Marina Drive for visibility.
8. Extend the stop bar at the east leg of the intersection of Marina Dr. (Casa
Lorna Blvd.) and E. Marina Dr. (westbound traffic is one-way only at this
location.
Per Snn-Tech Engineering's meeting on March 10,2003 witb Ms.
Laurinda Logan this item is not applicable.
3117/2003' 5:56PM
Page 2 of 23
DEPARTMENTS
9. Stall strongly recommends deleting the "bump,out" on the west leg of
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E.
Marina Dr. from the drop,off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarify
traffic movement(s), especially where transitioning from one,way,
westbound (east of intersection) to two,way traffic (north and west of
intersection).
A) "One-Way" traffic is NOT proposed for any interior roads for
Marina Village.
B) Due to tight conditions at buildings, streets, and sidewalks, the
"bump-out" at this location is proposed to remain. To alleviate the
problem associated with the transition from the parking lot to the west,
3 parking spaces have been removed on the south side of the parking
lot at the transition point. This also provides space for much needed
landscaping at the sonth end of thc north leg of Marina Drive.
10. Post "No Parking" for both East and West Marina Drive (both sides of
roads) .
See revised plans. "No Parking" signs have been added on both
East and West Marina Drive at 50' incremcnts.
11. Provide directional pavement arrows throughout.
See revised plans. Directional pavement arrows have been added.
12. All pavement return radii shall be a minimum of 30 feet. The following
intersections do not meet this criteria:
a) SE comer of Marina Dr. (NE 6'h Street) and Marina Dr. (Casa Loma
Blvd.) @ 30 feet.
b) NW comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@15 feet.
c) NE comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@ 10 feet.
d) SW comer of Marina Dr. (northward) and Boynton Beach Blvd. Extension
(NW 2'" Ave.) @ 15 feet.
Pavement radii of 30' have been provided at intersections noted.
13. Public parking spaces may not be counted towards required parking.
Public spaces on Boynton Beach Blvd. have been deleted from this
site plan and are not counted toward required parkin!!.
311712003' 5:56 PM
Page 3 of 23
INCLUDE
REJECT
DEPARTMENTS INCLUDE REJECT
14. The two story commercial building and the adjacent restaurant should have
an additional two handicap parking spaces to provide the minimum required
based on the "provided" parking (not to include the two next to Two
George's Restaurant).
Two additional handicap parking spaces have been added adjacent
to the restaurant.
15. Provide cross,sections and details for the Boynton Beach Blvd. extension.
This section of roadway shall be constructed in conjunction with other site
improvements.
A) The Boynton Beach Blvd. extension is revised to comply with
existing 30' R.O.W. A cross-section is provided in the civil drawings.
The section of roadway will be constructed prior to the first building
CO.
B) The CRA has already selected a design/build team for the
Boynton Beach Blvd. extension, and has indicated that this new
roadway will be constructed by the CRA and completed prior to
Marina Village requesting CO.'s.
16. Provide a Traffic Impact Analysis/Study, to detel111ine if signal timing
changes, striping modifications, or lane additions are necessary as a result of
this development. The study shall include the impact of traffic accessing
Ocean Avenue from Marina Way and accessing Federal Highway from
Boynton Beach Blvd. The traffic study shall also consider any
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
The traffic study for Marina Village was recently completed by
Pinder Troutman and forwardcd to the City and PBC PBC has
notified ns that the "...project meets the Traffic Performance
Standards of Palm Beach County."
17. Unless the applicant petitions for abandonment, the applicant shall be
required to dedicate to the City 25 feet of land adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
A) Applicant formally petitions the City to abandon its portion of
NE 6'h Street so this roadway will bccome a privately owned and
maintained road.
B) In the alternative, if the adjacent property owners decide not to
accept the abandoned portion of NE 6th Street, applicant will dedicate
to the City 25' of its property to create a full public road R.O.W.
3/17/2003' 5:56PM
Page 4 of 23
DEPARTMENTS INCLUDE REJECT
UTILITIES
Comments:
]8. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services. either in utility easements or public
rights'of-way.
Utility easements are shown on the site plan, landscape plan, and
schematic engineering plan. Proposed three locations have been
adjusted to avoid conflicts with underground utility lines.
19. The Landscape Plan reflects the use of Green Island (Ficus Micorcmpa),
which will not be permitted. Use of Trinette (Schejjlera Arboricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right,of,way.
A) Ficus microcarpa "Dwarf Green Island" a non-invasive low
growing scrub has been dcleted.
B) Schefllera Arboricola "trincttc" is not a tree. This is a Dwarf
ornamental scrub which in not invasive and is used thronghout the
landscape industry in south Florida. We would propose to use this
plant.
C) Florida Royal palms are proposed for this project. They are a
native species that is better adapted to the soil conditions.
D) The current architectural site plan has been nsed to prepare the
landscape plan. All property lines are correct.
20. Due to the depth of the proposed sanitary collection trunk sewer re-route
along East Marina Drive, the sanitary sewer easement shall be required to be
a minimum of 35,feet wide.
All proposed utility easements for both the water and sewer
systems have been discussed with the Utilities Department.
21. Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Article II, Section 26,
3/17/2003' 5:56 PM
Page 5 of 23
DEPARTMENTS INCLUDE REJECT
12).
This comment is noted and permits will be obtain cd prior to the
start of construction.
22. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II, Section 26-16(b)). In addition,
the LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
A) All existing and proposed fire hydrants are depicted on the
schematic engineering water and sewer plans.
B) No fire hydrants will be required on the west property line since
all bnildings are fully sprinkled and accessible from public streets.
23. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee
be paid for this project either upon the request for the Department's
signature on the Health Department application forms or within 30 days of
site plan approval, whichever occurs first. This fee will be determined
based upon final meter size, or expected demand.
The applicant has already paid to the City Utility Department thc
Utility Reservation Fee in thc amount of $54,062.90, which was based
upon the proposed site plan's intensity of uses.
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable
water. City water may not, therefore, be used for irrigation where other
sources are readily available.
This comment is noted, however there are no cost effective
alternatives readily available for irrigation.
25. Water and sewer lines to be owned and operated by the City shall be
included within utility easements. Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet (and wider
where noted above). The easements shall be dedicated via separate
instrument to the City as stated in the CODE, Article II, Section 26'33(a).
A) All proposed utility easemcnts are shown on tbe schematic
engineering plaus.
B) Utility easements will be dedicated via separate instrument to
the City.
3/1712003' 5:56 PM
Page 6 of 23
DEPARTMENTS INCLUDE REJECT
26. Again, the proposed re,routing ofthe sanitary trunk sewer (approximately
660 LF) will replace some 378 LF currently routed in an existing utility
easement routed through proposed Buildings No. I & 2 as well as the
swimming pool area. First, the re,route to the east then north (on East
Marina Way) and back to the master lift station is questionable at best as
this puts a major transmission trunk into brackish soil conditions which
include some 8 to 17 feet of unsuitable soil composition. This would
require cradle and pile to construct throughout its length to ensure the
relocated system will work.
Based on thc current design and soils reports by Ardaman and
Associates, construction of this main will require the excavation of the
majority of unsuitable material and replaced with cleau fill.
27. You are adVised that the current (permitted) relocated trunk tracks westward
to the west property line, then northward along the west property line to the
NW 2"" A venue right,of,way and reconnects with another major trunk
system at a point near the link about to enter the master lift station. In
addition, the soil conditions along the current permitted route are acceptable
for this task.
The previonsly permittcd route does not conform to the new site
plan. The project Geotechnical Engineer (Ardaman) will advise as to
how to deal with nnsuitable material.
28. The proposed re-route of the sanitary trunk sewer can only achieve a
longitudinal slope of 0.08%, which is below the acceptable minimum. The
additional calculations called for last June 2002, and submitted by the
design engineer, reflected that capacity may be available, but velocity was
not. In order to overcome the Utilities Department concerns, the re-routed
sanitary trunk system should increase to a 30,inch diameter in order to allow
for the slow moving capacity in the re,route segnlents.
Based on the Ten States Standards, the longitudinal slope of 0.8%
is acceptable for a 24" main. This slope meets the required scouring
velocity as indicated in the calculations previonsly submitted.
29. While PVC material may be allowed on the City's water system on this
particular project; poly-lined DIP is preferred. All sanitary lines shall be
poly, lined DIP on either the 24,inch or 30-inch trunk line segment; PVC
will be acceptable on the 8,inch collection segment.
The design plans will reflect the material change to poly-lined DIP
(shown on Sheet C5).
3117/2003' 5:56 PM
Page 7 of 23
DEPARTMENTS INCLUDE REJECT
30. The proposed I O,inch water main connection from NW 2"d A venue to the
line located in Marina Drive (currently known as Casa Loma Boulevard)
will require a 20, foot horizontal separation along East Marina Drive, due to
the depth of the sanitary trunk sewer. (Refer to Comments noted above.).
The material and rcquired separation of 10' has been approved by
the Utility Dcpartment.
31. This office will not require surety for installation of the water and sewer
utilIties, on condition that the systems be fully completed, and given to the
City UtilIties Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
This comment is noted.
32. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
servICe this project, in accordance with CODE, Article II, Section 26,15.
This comment is noted.
33. The LDR, Chapter 3, Article IV, Section 3.0. requires Master Plans to show
all utilities on or adjacent to the tract. The plan must therefore show the
point of service for water and sewer, and the proposed off-site utilities
construction needed in order to service this project. In addition, the LDR,
Chapter 3, Article IV, Section 3.P. requires a statement be included that
utilities are available and will be provided by all appropriate agencies. This
statement is lacking on the submitted plans.
This comment is noted and is now inclnded on Sheet C2 General
Notes.
34. Utility construction details as shown on Civil Engineering (CE) sheets C-6
thru C-8 will not be reviewed for construction acceptability at this time. All
utility construction details shall be in accordance with the Utilities
Department's "Utilities Engineering Design Handbook and
Construction Standards" manual; and will be reviewed at the time of
construction permit application.
This comment is noted.
35. Any utilities placed/remaining under the landscaped island within the West
Marina Drive right,of,way shall require a hold,harmless agreement for
future utility maintenance.
3/17/2003' 5:56 PM
Page 8 of 23
DEPARTMENTS INCLUDE REJECT
,
The landscaped island in West Marina Drive has been removed.
36. There is some conflict between the General Notes and Water & Sewer
Separation Notes on Sheet C2. The mmlmum required horizontal
separation between water, sanitary sewer, storm sewer, etc. is ten (10) feet.
There is no exception for sewer lines. Please correct, and as appropriate,
consolidate.
This comment is noted.
37. Note that the addition of multi,story condominium buildings and
townhouses greatly intensifies the use of the site above what was originally
anticipated. This change will result in an additional capital facilities charge,
if approved. The developer is responsible for payment of all additional fees.
This comment is noted.
38. All infrastructure improvements necessary for this entire site must be
completed before the first certificate of occupancy is issued, other than for
docks and fuel pumps constructed sImultaneously with related support
infrastructure including access roads, water and sanitary sewer, regardless of
bonding or other surety. For this purpose, "infrastructure" shall be defined
as potable water, sanitary sewer, drainage, and a second paved access road
for service and emergency purposes.
This comment is noted.
ENGINEERING DIVISION
Comments:
39. Add a general note to the site plan that all plans submitted for specific
permits shall meet the City's Code requirements at time of application.
These permits include, but are not limited to, the following: paving,
drainage. curbing, site lighting, landscaping and irrigation. Permits required
from other permitting agencies such as Florida Department of
Transportation (FDOT), South Florida Water Management District
(SFWMD), Lake Worth Drainage District (L WDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department
(PBCHD), Palm Beach County Engineering Department (PBCED), Palm
Beach County Department of Environmental Resource Management
(PBCDERM) and any others, shall be included with the permit request.
This comment is noted and incorporated on Sheet C3 Schematic
3/17/2003' 5:56 PM
Page 9 of 23
DEPARTMENTS INCLUDE REJECT
Paving and Drainage Plans.
40. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
This comment is noted.
41. Show all proposed site lighting on the site and landscape plans (the
photometrics plan does not agree with the site plan and landscape plan).
Revised photometrics are provided. See Sheet A-24 and A-2S. Site
lighting poles coordinated with the site plan, landscape plan, and
photometrics plan.
42. Show all sight triangles on the Landscape plans, using 35 feet on public
rights-of,way (LDR, Chapter 7.5, Article II, Section 5.H.) A 10 foot sight
triangle is allowable at the parking garage ingress/egress point. There
appears to be conflicts between landscaping and lines of sight at each of the
intersections with sight triangles depicted. Please correct.
All site triangles are depicted on the site plan. All conflicts have
been removed from the sight triangles.
43. Indicate, by note on the landscape plan, that within the sight triangles there
shall be an unobstructed cross,visibility at a level between 2.5 feet and 6
feet above the pavement (LDR, Chapter 7.5, Article II, Section 5.H.).
The Note has been added to Sheet L,2 throngh L-S.
44. The City of Boynton Beach has existing irrigation, hardscaping, and plant
material along Ocean A venue. Any damage as a result of the contractor's
operations shall be repaired or replaced to the equivalent or better grade, as
approved by the City of Boynton Beach, and shall be the sole responsibility
of the developer. Please acknowledge this notice in your comments response
and add a note to the plans with the above stated information.
The note has been added to thc General Notes on the Cover Sheet,
N otc #6.
45. Indicate how conflicts between the City's landscaping on Ocean Blvd. and
the proposed landscaping will be resolved.
The existing trees in the sidewalk along Ocean A venue are shown
3117/2003' 5:56 PM
Page 10 of 23
DEI' ARTI\1ENTS INCLUDE REJECT
on the site plan and landscapc plan. The landscape plan has becn
revised to show Ocean Avenue plautiug.
46. Provide details for the proposed paver systems showing compliance with the
LDR, Chapter 2, Section 6.F.8.d.(2).
See detail provided on Sheet C4.
47. Review proposed landscaping, particularly along the center median at the
intersection of Marina Dr. and East Ocean Ave., for possible conflicts with
trucks and street maintenance equipment (street sweepers, garbage trucks,
delivery trucks, etc.)
Thc centcr median at West Marina Drive north of Ocean Blvd. has
been removed.
48. Per the LDR, Chapter 7.5, Article II, Section 5.C.2. use of Ficus species
shall not be permitted.
These Ficns species havc bcen deleted.
49. Be consistent with use of scale(s). The overall site plan uses an engineering
scale with the remaining landscaping plans utilizing an architectural scale.
Additionally the scale noted on Sheets L,4 and L,5 is incorrect. At a
minimum, the LDR requires the landscape plan (in this case the overall site
planting plan) scale shall match that of the site plan - which you have done
(LDR, Chapter 4, Section 7 .C.1). However for the detailed drawings please
use an engineering scale at an appropriate scale, say a 20 scale.
The overall planting plan is I" = 40'. All detail planting plans have
been modified to have a scale of 1" = 20'.
50. Provide an engineer's certification on the drainage plan as specified in
LDR, Chapter 4, Section 7.F.2.
This comment is noted and incorporated on Sheet C3 Schematic
Paving and Drainage plan.
5!. The current SFWMD pennit on file for this project requires 2000 L.F. of
ex filtration trench (per Specific Condition #2 ofpermit #EI 50,0129079,
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review.
3/17/2003' 5 :56 PM
Page 11 of 23
DEPARTMENTS INCLUDE REJECT
The existing referenced permit (DEP Permit # EI 50,0129079,001)
will be closed out and tbe existing SFWMD permit will be modified to
direct runoff to the City retention arca.
52. Full drainage plans in accordance with the LDR, Chapter 6, Article IV,
Section 5 will be required at the time of permitting.
This comment is noted.
53. Structures #2 and #5 are incOlTectly identified as Manholes, they should be
called out as Inlets.
This comment is noted.
54. Verify storm sewer diameter between Manholes # 1 0 and # 11, and # I and
the existing manhole at the west end of Marina Dr. They are called out as
24 inches, with 30 inch HDPE used upstream of this site and 36 inch storm
sewer used downstream.
This comment is noted and revised on the plans.
55. Runoff from roads, parking lots, and other impervious areas must be routed
through percolation areas prior to discharge (LDR, Chapter 6, Article IV,
Section 5.l.d).
This comment is noted.
56. Indicate to what standard the project is to be constructed; if the FDOT
Standard Specifications for Road & Bridge Construction and Standard
Index are to be used - the 2000 Specifications are recommended since they
contain both English and Metric units.
This comment is noted and is addressed on Sheet C2 General
Notes.
57. Provide written and graphic scales on all sheets.
Written and graphic scales are provided on all engineering plan
sheets.
58. Provide a cross,section of the east turn-around area to show the type of
construction, including the appropriate specifications.
3117/2003' 5:56PM
Page 12 of 23
DEPARTMENTS INCLUDE REJECT
See revised plans. A cross-section of the cul,de,sac has bcen
incorporated into the design for ease of construction.
59. All roadways shall be a minimum of 24 feet (2-12 foot lanes) in width,
including the parking garage entryways (north and east). This site was
previously approved with the COlTect width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
All roadways have bccn revised to a minimnm of 24' from face of
curb to face of curb. Both garage entrances have been revised to 24'
wide.
60. The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be
widened to a minimum seven (7) foot width to act both as a pedestrian path
and as a continuous wheel stop.
A) The sidewalk at the north side of Marina Drive (Casa Loma
Blvd.) has been revised to 6'-0" wide to allow for 2'-0" of car overhang
and a minimum 4'-0" clear sidewalk.
B) Applicant proposes to not install the sidewalk at the south side
of the parking lot to provide a space for landscaping.
61. An inverted roadway crown for Section B-B shall not be pennitted. Too
much roadway flooding is possible, with settlement around the inlets,
leaving significant maintenance and repair concerns.
This comment is noted and thc design is revised to incorporate a
"crown" section.
62. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
This comment is noted.
63. Conect spelling of "stripping" to "striping" in the Paving Notes.
This comment is noted and is revised.
3/17/2003' 5:56 PM
Page 13 of 23
DEPARTMENTS INCLUDE REJECT
64. Will the project be constructed in stages? If yes please provide a staging
plan.
Marina ViIla!!e will be built in the followin!! approximate sta!!es:
Stage 1) Building #1 and the large portion of the garage.
Stage 2) Building #2 and the small portion of the garage.
Stage 3) The townhouses and the restaurant/retail on the
Overlook.
65. Providc the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the
Intracoastal Waterway,
We agree to comply with this comment.
FIRE
Comments:
66. The water and sewer plan (C,5) is inadequate. Hydrants are not clearly
shown and the dock standpipe system with the Fire Department Connection
(FDC) is not shown. Show location of all the FDC's for all buildings with
fire sprinkler protection.
See revised plans. Hydrants and Fire Department Connections are
now shown.
67. The site plan and master plan design documents shall adhere to Chapter 9 of
the Code of Ordinances of the City of Boynton Beach entitled "Fire
Protection and Prevention." This ordinance adopts NFP A 1, Fire
Prevention Code. 2000 edition, and NFP AID 1, Life Safety Code, 2000
edition. (These codes, as amended are identified as the Florida Fire
Prevention Code).
This comment is noted.
68. Design documents shall demonstrate compliance with LDR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants in
commercial applications shall be no more than 300 feet apart and the
remotest part of any structure shall be no more than 200 feet from a hydrant.
Connections shall be to mains no less than six (6) inches in diameter. In
addition to domestic requirements at a residual pressure of not less than 20
psi, a fire flow of at least 1500 gpm is required.
3/17/2003' 5:56 PM
Page 14 of 23
,
DEPARTMENTS INCLUDE REJECT
This comment is noted.
69. Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29,2.3.2.
Water mains and hydrants will be installed, completed and in
service prior to construction.
70. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3,5, and NFP A 241, (1996) Safeguarding Constnlction, Alteration,
and Demolition Operations. Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO Tl80, in accordance with the FDOT Standard Specifications for
Road and Bridge Construetion (2000) Division 11, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FDOT Sampling. Testing and Reporting Guide, or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
Emergency access will be providcd at thc start of the project and
maintained throughout construction.
71. City Ordinance Section 9,6,3. /7-11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
in excess of 12,000 square feet per floor.
All buildings will be provided with automatic sprinkler systems.
72. High,rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A
sprinkler control valve and a waterflow device shall be provided for each
3/17/2003' 5:56 PM
Page 15 of 23
,
DEPARTMENTS INCLUDE REJECT
,
tJoor. Florida Fire Prevcnlion Code, (2000) Section 11.8.2.1
This comment is noted.
73. High,rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code,
(2000) Section 11.8.2.2
This comment is noted.
74. Class I, Type 60, standby power in accordance with NFP A 70, National
Electrical Code, and NFP A 110, Standard for Emergencv and Standby
Power Systems, shall be provided. Florida Fire Prevention Code, (2000)
Section 11.8.4.2.
This comment is noted.
POLICE
Comments:
75. Show placement of traffic signs on the site plan.
Traffic signs are shown on civil drawings Sheet C3 (Paving and
Drainage plans).
76. Show direction of traffic tJow.
Traffic flows are shown on civil drawings Sheet C3 (Paving and
Drainage olans1.
BUILDING DIVISION
Comments:
77. Sheet A,2. Parking Breakdown Table. The calculations for the required
handicap accessible parking spaces in the garage are based on a total
number of 813 spaces, which requires 17 accessible spaces. The plans also
note there are 664 spaces in the garage which requires 14 accessible spaces.
Clarify on the plans the correct number of parking spaces in the garage and
the correct number of required accessible parking spaces.
The Parking Calculations have been updated in the Project Data
table.
3/17/2003' 5:56 PM
Page 16 of 23
.
DEPARTl\1f~NTS INCLUDE REJECT
,
78. At the time of permit review. the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
This comment is noted.
79. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
on Sheets A,9 thru A-12.
This Note has been added to Sheets A-9 throngh A-l2.
80. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
This comment is noted.
PARKS AND RECREATION
Comments:
81. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi,family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each = 9,252
338 Multi,family Umts @ $ 656 each = 221,728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
Applicant agrees to pay the Parks and Recreation Impact Fees for
the residential mix of units approved bv the City for Marina Village.
3117/2003' 5:56PM
Page 17 of 23
.
DRPARTMENTS INCLUDE REJECT
FORESTER/ENVIRONMENTALIST
Comments:
Trees
82. The applicant must submit a tree survey of the existing trees on the site.
The Tree Survey is attached.
83. The applicant must prepare a tree managemcnt plan (document) to quantify
the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site. This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations. Chapter. 7.5, Article II Sec. 7.C.]
To the extent possible, existing on-site trees will be relocated to
available areas adjacent to the site.
Irrigation System
84. There is not an irrigation system design included with the landscape plans.
Please provide one. [Environnemental. Regulations, Chapter. 7.5, Article II
Sec. 5 ,A.]
A complete automatic irrigation system plan will be submitted
prior to the time of building pcrmits (100% coverage, and 50%
overlap).
PLANNING AND ZONING
Comments:
85. The traffic study must meet the requirements of Palm Beach County Traffic
Engineering prior to issuance of a building pe1111il.
Tbis comment is noted. Our traffic stndy, by Pinder Troutman,
has been submitted to the City and to PBC.
86. Approval of the site plan is contingent upon approval of the Land Use
Amendment to the MX,C designation that allows the density proposed.
Applicant understands this comment.
3/17/2003' 5:56 PM
Page 18 of 23
~
f
,
DEPARTMENTS INCLUDE REJECT
1 po: Residential single, family atlachcd units (Townhouses) are not pennitted in
/Y the MU,H district. (Ch. 2, Sec. 6,F. - Table 6F,I). Remove them from the
~ plan or request a Code review.
Applicant has submittcd to the Mr. Mike Rnmph of the Planning
Department, our letter rcquest for thc City to amend its MU-H zoning
district to change townhouse from a Non-Permitted Usc to a Permitted
Use.
r-,
~ All utility. storm sewer and access easements in conflict with the proposed
building must be abandoned and relocated prior to issuance of a building
permit for this phase of the project.
This comment is noted and will be addressed prior to the issnance
of a building permit.
89. The required build,to setback line on Ocean Avenue is 10 feet if the intent
1 is to widen the sidewalk. The site plan indicates a 12 foot setback. Revise
the plan to 10 feet to meet the code requirement. (Ch. 2, Sec. 6, F)
.
~ Building #3 has been revised to provide a 10' setback to the
commercial use at the ground Iloor.
90. Developer is required to establish a property owners association for the
rz project.
.
A) If it becomes apparent that a POA bctwcen the property
owners would offer some benefit to thc area for parking and garbage
disposal issues, and if the other propcrty owners are willing to form a
POA with the applicant, then thc applicant would be glad to study a
possible POA further.
B) The City has notified all property owners that they must
provide for their own parking and garage disposal. Applicant will
provide for the parking and garbagc disposal for its own project,
Marina Village,
, /
!\ Provide the "net buildable" land area calculation under Project Data on the
Site Plan Sheet A-2. (Ch. 4)
The Net Buildable land area is provided in the Project Data table
on Sheet A-2.
--r 92. The information provided under "Project Data" on the site plan does not
correspond to the information provided on the application, particularly the
b rd' pervious/impervious area calculations. Please review and revise.
~v\~
~ The site plan application will bc correctcd to correspond with the
revised Project Data.
3/17/2003' 5 :56 PM
Page 19 of 23
2
~
99.
"~
DEPARTMENTS
INCLUDE
Provide the total floor area calculations for all uses under the Project Data
section of the Site Plan Sheet A,2
The Total Floor Arca calculation is provided in Project Data on
Sheet A-2.
The revised plans show two (2) less boats slips being provided than
previously approved. Please explain.
Two of the 40 boat slips are for "Transicnt Usc" and are not
proposed for sale or lease; therefore, these two slips will not require
parking spaces.
95. If charter, drift fishing or sightseeing boats are proposed, additional parking
. s required per Ch 2. Sec. 11, H.e.(11).
No charter, drift fishing, 01' sightseeing boats are proposed for the
marina slips. (11JIt' I'uk' fiN-"
Provide height dimensions to peak of rooffor all buildings on the elevation
drawings. A height exception may be required. (Ch 2. Sec. 4.F.)
Building height dimensions are provided on building elevation
drawings. Height exception dimcnsions are provided on Elevation "A"
at Building #1 and #2.
Provide dumpster locations for the commercial buildings on the pier.
Indicate method of refuse pick,up for the project. (Ch. 4)
All trash dumpster locations arc shown in the site plan on Sheet A-
2 and in building plans for Buildings #1, #2, and #3. See response to
comment #2 for further discussion of trash pick-up plan.
Submit color elevation drawings for all sides of all buildings prior to the
CRA Board meeting.
This comment is noted.
All rooftop equipment must be srreened from view at a minimum distance
of600 feet. (Ch .9. Sec. 11) J'ltl<?>> (tUl< w jJ-<Lf f '2 .
All rooftop equipment is screened from view by roof parapets and
mansards.
(L I O<l.l Provide a color chart for all buildings on the elevation drawings indicating
~ the manufacturers name and number.
3117/2003' 5:56 PM
lJoC4U ,/~},j ~ (~(oy,4I"<d Ifl~
Page 20 of 23 ~
REJECT
CJ
,
~y
DEPARTMENTS
rJJ
"J ~
(~~ r. ')
\:~.
./ ~
The color charts are provided on the building elevation drawings.
rovide a detail for all signage proposed for the project. The monument sign
shown in the northwest comer of the site must be 10 feet back from the
property line. Please provide thIS dimension on the site plan. (Ch. 21)
The monument sign location had been revised to meet the
minimum setback requirements. Signage design provided on Sheet A-
20.
The garage entrances appear to be 20 feet in width. Engineering standards
require a minimum of 24 feet. Revise plans accordingly.
The garage cntrances have been revised to 24' wide. The revised
width is shown on site plan Sheet A-2.
How do residents in Building 3 access the pool and fitness center amenities?
Please explain and provide a note on the plans.
Residents from Bnilding #3 will have card access through the main
entrance at Building #2 and the gate cntry at the east side of the pool
court (Note added to Shcet A-2).
04. The proposed plan does not meet the parking requirements for two and three
bedroom residential units. Two and three bedroom units require two spaces
per unit. (Ch 2, Sec. 11) Provide the required parking or: Compensate for
the 129 parking space deficit by using the "fee in lieu of' provision in Ch.
2, Sec. 11 H, request a variance or request a code review to allow 1.5 spaces
~ per unit for two and three bedroom units.
Applicant will apply to thc City and the CRA for a reduction in
required parking. Applicant will apply to the CRA and the City under
the "Payment in Lieu of Parking" program.
Label the location of all surface parking spaces included for this project on
the Site Plan Sheet A,2.
There are no snrfacc parking spaccs assigned to this project.
Pursuant to the Mediation Agreement, all parking on Casa Loma Blvd.
are".. .nonexclusive reciprocal parking..." spaces for use by the public.
A total of 45 surface spaces parking spaces are shown on the revised
site plan along Casa Loma Blvd. Applicant has included 22 ofthe 45
spaces in the total Parking Provided count in the Project Data table.
According to the table on Sheet A,2, parking spaccs In the garage total 665
not 664 as shown. Please revise accordingly.
~;p
~
ara e has been reviscd to include additional
Page 21 of 23
INCLUDE
REJECT
DEPARTMENTS
spaccs. Refer to the revised Parking Calcnlations on Sheet A-Z and thc
revised garage plans on Sheet A,ZZ.
On the parking layouts for each 1100r of the garage, Sheet A-22, provide
dimensions and a space count for each 1100r.
The parking space count and dimensions are now provided.
;y, . 1 8. rovide a typical parking space detail for regular and handicap spaces.
IfJ .;.}J.
_~,~ The parking space details are provided on Sheet A-ZZ.
f
rovide traffic control markings (stop signs/stop bars) at~ entranc~ to
the parking garage.
Sce revised plans. Traflic control markings are shown on
schematic engineering plans.
Who will construct improvements on Boynton Beach Boulevard? These
improvements are the responsibility of the developer to accommodate
access to Building No.1 Lobby and parking garage? Provide details
regarding construction plans and time frame prior to issuance of a building
permit.
A) The "CRA piau" for Boynton Beach extension has heen
removed from our site plan. We are now showing a Z,lane access road
within the cnrrent 30' wide R.O.W. of Boynton Beach Blvd.
B) The CRA Executive Dircctor has indicated to us that the
Boynton Beach Blvd. extension will be built hy the CRA, which has
already selected a design - bnild team, including Kimlcy-Horn and
Burkhart Construction. Furthcr, this extcnsion project will be
completed long before our request for the lirst C.O. for Marina
Village.
Landscape Plan indicates the use of the ficus species. Ficus is not permitted.
(Ch 7.5, Art. II, Sec. 5.C.). Revise plans accordingly.
Ficus ground cover has been deleted.
~
Landscape Plan Sheet LA shows 262 Scheft1era (SU) on the site plan but
lists 294. Please correct. Also, review the use of the Schefflera species that
appears on the Palm Beach County list of Prohibited Trees.
~
Shrub counts bave been corrected (Sec comment/response #19).
113, Landscape Plan Sheet L-5 indicates 23 Green Maypan Coconut (CN) of the
plan but lists 27. Revise plans accordmgly.
3/17/Z003' 5:56 PM
Page 22 of 23
INCLUDE
REJECT
DEPARTMENTS
INCLUDE
Coconut counts have been corrected.
114. Landscape Plan Sheet L,S indicates 200 Philodendron Selloum (PS) on the
plan but lists 100. Revise plans accordingly. ~"/ Jw.~
Philodendron counts have been corrccted. ~
Pervious Landscape Area calculations on the Site Plan Sheet A-2 do not
match those on the Landscape Plan Sheet L,2. Revise plans accordingly.
Pervious landscape area calculations have been changed to reflect
correct architectural site data.
he landscape code Chapter 7.5 reqUIrcs that 50% of andscape material
rovided be native. Revise note and calculations on Sheet L,2 accordingly.
~
50% of all Code Required Landscape Materials are provided as
native. Counts indicated on Landscape Site Data and Native Species
indicated on Plant Lists.
{l9.
117. Indicate the method and source ofinigation of the Landscape Plans.
rt
"
Irrigation Note addcd under Landscape Site Data. Antomatic
system with 100'10 coverage and 50% ovcrlap with rain sensors. City
,water is to bc uscd. -
Tree trunks shall be a minimum four-inch calipcr with seven (7) feet of
vertical clearance for visibility. (Ch .2. Sec. 6, F.8.a. (2)
Clearance visibility heights of trces shown on Plant Lists, and Note
dded to Landscape Site datc.
Will flower containers be used along the fayade adjacent to Ocean Avenue?
Please indicate on the Landscape Plan. (Ch. 2, Sec. 6 F.8.e)
Pre,cast containcrs added to Ocean Avenue building fa~ade (see
Sheet L-3).
120. Minimum tree sizes planted along the west side of the project shall be 16
feet. (Previous CRA comment)
Tree and palm heights along west property line to be 16' minimum
(see Plant Lists).
I2e II I~Jh..d- L-5' c{!J/':"-;-
I ST REVIEW COMMENTS Responses from The Related Group
s-M 11-2
3/17/2003' 5:56PM
Page 23 of 23
REJECT
.
O Q" e(.lbhc. woVlc0/~cl'Kritl <{
. ""n~lnUVi'::J 'Tvzdhc...
1 st REVIEW COMMENTS
Maior Site Plan Modification L..a.U VlV\d tl Lo4an
3/1BIO~ :.)
Project name: Boynton Beach Marina
File number:MSPM 03-001
Reference: 1 "review olans identified as a Maior Site Plan Modification with a February 5.2003 Planning and
Zonin De artment date stam markin .
DEPARTMENTS
INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be/
supplied by Public Works. (
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
/
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
re ardin shared use of centralized facilities. Oot clUM 'OkV-",> I"D\
PUBLIC WORKS - Traffic
Comments:
3. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LDR, Chapter 2, Section 11.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-98001 and B-900l3 for striping details.
<J'N
4. The fire lane signage and markings shall conform to the LOR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than 15,000 SF.
(JOAN'
Show the curbing around the circle painted yellow and appropriate
parking-fire lane" post signs every fifty (50) feet around the circle.
Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. ShoW.
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
Q)
Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of thl
same intersection.
o
o
1ST REVIEW COMMENTS
03/03/03
2
DEPARTMENTS INCLUDE REJECT
8. Extend the stop bar at the east leg of the intersection of Marina Dr. (Casa ~J/e 5
Loma Blvd.) and E. Marina Dr. (westbound traffic is one-way only at this (
location.
$ Staff strongly recommends deleting the "bump-out" on the west leg of 1~ .
Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. which separates E. ~i3/I'e;IU
Marina Dr. from the drop-off area in front of Building #2. Additional
pavement markings will need to be added at this intersection to clarify ~J
traffic movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
,
10. Post "No Parking" for both East and West Marina Drive (both sides of ( "< \ 3/1e> ~
roads).
"- ~ )
11. Provide directional pavement arrows throughout. '\ 'BWolc 3>
12. All pavement return radii shall be a minimum of 30 feet. The following ( /, \
intersections do not meet this criteria: '\311e>fC
rl~lIt'l~ ....... ,,"-v,. C rA"-'IfI.-JP ~ ~.c:: ~i .:. i IJl" J.rh, \'L Ll / 3
a) SE comer of Marina Dr. (NE 6th Street) and Marina Dr. (Casa Loma ( )
Blvd.) @ 30 feet.
b) NW comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@15 feet.
c) NE comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
@ 10 feet.
d) SW comer of Marina Dr. (northward) and Boynton Beach Blvd. Extension
(NW 2'" Ave.) @ 15 feet.
13. Public parking spaces may not be counted towards required parking. I....
.... \ oile~ 3>
14. The two story commercial building and the adjacent restaurant should have ~~AO
an additional two handicap parking spaces to provide the minimum required 0"3
based on the "provided" parking (not to include the two next to Two
George's Restaurant).
15. Provide cross-sections and details for the Boynton Beach Blvd. extension. ( ~O/lef F->
This section of roadway shall be constructed in conjunction with other site
improvements.
@ Provide a Traffic Impact Analysis/Study, to determine if signal timing 1'e/~,
changes, striping modifications, or lane additions are necessary as a result of (
this development. The study shall include the impact of traffic accessing
Ocean Avenue from Marina Way and accessing Federal Highway from
Bovnton Beach Blvd. The traffic studv shall also consider anv
o
o
1ST REVIEW COMMENTS
03/03/03
3
DEPARTMENTS INCLUDE REJECT
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
17. Unless the applicant petitions for abandonment, the applicant shall be l\~.~
required to dedicate to the City 25 feet of land adjacent to the existing NE(
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing"
and proposed City utilities.
UTILITIES
Comments:
18. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LDR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
rights-of-way.
19. The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa)
which will not be permitted. Use ofTrinette (Schefflera Arboricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of-way.
20. Due to the depth of the proposed sanitary collection trunk sewer re-route
along East Marina Drive, the sanitary sewer easement shall be required to be
a minimum of 35-feet wide.
21. Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Article II, Section 26-
12).
22. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (see CODE, Article II, Section 26-16(b)). In addition,
the LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
23. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee
.
o
1ST REVIEW COMMENTS
03/03/03
6
DEPARTMENTS INCLUDE REJECT
ENGINEERING DIVISION
Comments:
~ Add a general note to the site plan that all plans submitted for specific I.....
permits shall meet the City's Code requirements at time of application. 'Q 3IIB~
These permits include, but are not limited to, the following: paving,
drainage, curbing, site lighting, landscaping and irrigation. Permits required
from other permitting agencies such as Florida Department of
Transportation (FDOT), South Florida Water Management District
(SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Protection (FDEP), Palm Beach County Health Department
(PBCHD), Palm Beach County Engineering Department (PBCED), Palm
Beach County Department of Environmental Resource Management
(PBCDERM) and any others, shall be included with the permit request.
40. All comments requiring changes and/or corrections to the plans shall be ( ~/Lex'
reflected on all appropriate sheets.
@ Show all proposed site lighting on the site and landscape plans (the ( ~ 3//6/1
photometrics plan does not agree with the site plan and landscape plan).
@ . '\ J"
Show all sight triangles on the Landscape plans, using 35 feet on public
rights-of-way (LDR, Chapter 7.5, Article II, Section 5.H.) A 10 foot sight
triangle is allowable at the parking garage ingress/egress point. There
appears to be conflicts between landscaping and lines of sight at each of the
intersections with sight triangles deoicted. Please correct.
43. Indicate, by note on the landscape plan, that within the sight triangles there (s/efO~
shall be an unobstructed cross-visibility at a level between 2.5 feet and 6
feet above the pavement (LDR, Chapter 7.5, Article II, Section 5.H.).
44. The City of Boynton Beach has existing irrigation, hardscaping, and plant ( :J'''''O,
material along Ocean A venue. Any damage as a result of the contractor's
operations shall be repaired or replaced to the equivalent or better grade, as
approved by the City of Boynton Beach, and shall be the sole responsibility
of the developer. Please acknowledge this notice in your comments response
and add a note to the plans with the above stated information.
oIL
45. Indicate how conflicts between the City's landscaping on Ocean Blvd. and 1~3A5fCE
the proposed landscaping will be resolved. ':dd nole'" rf p'd<-CI1Dn
46. '-J-"-"'~ 'v. l I-J I~~f(
Provide details for the proposed paver systems showing compliance with the-.
LOR, Chapter 2, Section 6.F.8.d.(2). (
47. Review proposed landscaping, particularlv along the center median at the I'-----..J
B
.3
'3
03
3
.'
.
o
1ST REVIEW COMMENTS
03/03/03
7
DEPARTMENTS
INCLUDE
REJECT
intersection of Marina Dr. and East Ocean Ave., for possible conflicts with
trucks and street maintenance equipment (street sweepers, garbage trucks,
delivery trucks, etc.)
(
'\.
48.
Per the LDR, Chapter 7.5, Article II, Section 5.C.2. use of Ficus species
shall not be permitted.
(
(3"0
03
49.
Be consistent with use of scale(s). The overall site plan uses an engineering
scale with the remaining landscaping plans utilizing an architectural scale.
Additionally the scale noted on Sheets L-4 and L-5 is incorrect. At a
minimum, the LDR requires the landscape plan (in this case the overall site
planting plan) scale shall match that of the site plan - which you have done
(LDR, Chapter 4, Section 7.C.l). However for the detailed drawings please
use an engineering scale at an appropriate scale, say a 20 scale.
50.
Provide an engineer's certification on the drainage plan as specified
LDR, Chapter 4, Section 7.F.2.
51.
The current SFWMD permit on file for this project requires 2000 L.F. of 5
exfiltration trench (per Specific Condition #2 of Permit #EI 50-0l29079{ '"3/1el03
001). This permit will be required to be adhered to, or amended. Revise
the drainage plan and calculations accordingly and resubmit for review. \ . .
Full drainage plans in accordance with the LDR, Chapter 6, Article IV, ~3fleIO:
Section 5 will be required at the time of permitting. ( \ ~ .
Structures #2 and #5 are incorrectly identified as Manholes, they should be' )
called out as Inlets.
52.
53.
54.
Verify storm sewer diameter between Manholes # I 0 and # 11, and # 1 and
the existing manhole at the west end of Marina Dr. They are called out as
24 inches, with 30 inch HDPE used upstream of this site and 36 inch storm
sewer used downstream.
55. Runoff from roads, parking lots, and other impervious areas must be routed
through percolation areas prior to discharge (LOR, Chapter 6, Article IV,
Section S.l.d).
\
5'"
56. Indicate to what standard the project is to be constructed; if the FDOT
Standard Specifications for Road & Bridge Construction and Standard
Index are to be used - the 2000 Specifications are recommended since they
contain both English and Metric units.
Provide written and graphic scales or@'Sheets. /
Provide a cross-section of the east turn-around area to show the type \~
construction, including the appropriate specifications. \'
57.
58.
59.
All roadwavs shall be a minimum of 24 feet 12-12 foot lanes) in width.
. '
.
o
1ST REVIEW COMMENTS
03/03/03
8
DEPARTMENTS
including the parking garage entryways (north and east). This site was
previously approved with the correct width lanes and roadways, with a fair
. I
amount of work between City staff and the developers to adequately addres
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
60.
The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be
widened to a minimum seven (7) foot width to act both as a pedestrian path
and as a continuous wheel stop.
6 I. An inverted roadway crown for Section B-B shall not be permitted. Too
much roadway flooding is possible, with settlement around the inlets,
leaving significant maintenance and repair concerns.
62. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in/
accordance with the applicable City of Boynton Beach Standard Drawing~
and will be reviewed for constructability at the time of construction permit
application.
63. Correct spelling of "stripping" to "striping" in the Paving Notes.
64. Will the project be constructed in stages? If yes please provide a stagin
Ian. . (
"
65. Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the
Intracoastal Waterway.
FIRE
Comments:
66. The water and sewer plan (C-5) is inadequate. Hydrants are not clearly
shown and the dock standpipe system with the Fire Department Connection
(FDC) is not shown. Show location of all the FDC's for all buildings with
fire s rinkler rotection.
67. The site plan and master plan design documents shall adhere to Chapler 9 of
the Code of Ordinances of the City of Boynton Beach entitled "Fire
Protection and Prevention." This ordinance adopts NFP A 1, Fire
Prevention Code, 2000 edition, and NFPA 101, Life Safety Code, 2000
edition. (These codes, as amended are identified as the Florida Fire
Prevention Code).
68. Design documents shall demonstrate compliance with LDR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants m
INCLUDE REJECT
".
03
~'e/O
1 st REVIEW COMMENTS
Maior Site Plan Modification
, ,,---:---
...... \:...
/.~ \
'---' / \
/rI/'J
, /
/
Project name: Boynton Beach Marina
File number:MSPM 03-001
Reference: l"review olans identified as a Maior Site Plan Modification with a Februarv 5.2003 Planning and
Zoning Deoartment date stamo marking.
'........
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (S6l-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
3. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LOR, Chapter 2, Section ll.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-9800 1 and B-900 13 for striping details.
4. The fire lane signage and markings shall conform to the LOR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than 15,000 SF.
5. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
6. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
7. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
.'
1ST REVIEW COMMENTS
03/03/03
3
DEPARTMENTS INCLUDE REJECT
improvements on Boynton Beach Blvd. east of Federal Highway to the site.
17. Unless the applicant petitions for abandonment, the applicant shall be
required to dedicate to the City 25 feet of land adjacent to the existing NE
6th Street as currently platted and in use, to allow the City the ability to
control ingress and egress into the project site and maintenance of existing
and proposed City utilities.
UTILITIES
Comments:
18. All utility easements shall be shown on the site and landscape plans (as well
as the water & sewer plan sheet) so that we may determine which trees may
interfere with utilities. In general, palm trees will be the only tree species '\/
allowed within utility easements. Canopy trees may be planted outside of
the easements so that roots and branches will not impact those utilities
within the easement in the foreseeable future. The LOR, Chapter 7.5,
Article I, Section 18.1 gives public utilities the authority to remove any trees
that interfere with utility services, either in utility easements or public
rights-of-way.
19. The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa) ~
which will not be permitted. Use of Trinette (Schefflera Arboricola) and
Florida Royal Palms trees/shrubs is discouraged. The Landscape Plan also
reflects a 'property line' that does not agree with previous acceptable
roadway right-of-way.
. 'j(
20. Due to the depth of the proposed sanitary collection trunk sewer re-route /~.
" .
along East Marina Drive, the sanitary sewer easement shall be required to be '-"',""'__ I
.~J ,
a minimum of 35-feet wide. ~, '-..
. .
('
21. Palm Beach County Health Department permits will be required for the ' ('
" ,'1"
I '/:>.J
water and sewer systems serving this project (CODE, Article II, Section 26-
12). J
22. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LOR, Chapter 6, Article N, ,
Section 16, or the requirement imposed by msurance underwriters, \
whichever is greater (see CODE, Article II, Section 26-l6(b )). In addition,
the LOR, Chapter 6, Article N, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
the hose drags, not as the hose flies). Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing).
,
23. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee ' 'y:(,
-~,/ ,', I
{"{ /'-:
,.....
1ST REVIEW COMMENTS
03/03/03
4
,
DEPARTMENTS INCLUDE REJECT
be paid for this project either upon the request for the Department's
signature on the Health Department application forms or within 30 days of
site plan approval, whichever occurs first. This fee will be determined
based upon final meter size, or expected demand.
'\j
24. Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable /" "
water. City water may not, therefore, be used for irrigation where other , '
sources are readily available.
Water and sewer lines to be owned and operated by the City shall be '. t.
25. fri \1-
included within utility easements. Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet (and wider ", f, j
J! '"
where noted above). The easements shall be dedicated via separate (;..
instrument to the City as stated in the CODE, Article II, Section 26-33(a). ,
,
26. Again, the proposed re-routing of the sanitary trunk sewer (approximately \ ;(
"'(
660 LF) will replace some 378 LF currently routed in an existing utility . ,-
l' \
easement routed through proposed Buildings No. I & 2 as well as the ': :(. \ /
swimming pool area. First, the re-route to the east then north (on East c*
Marina Way) and back to the master lift station is questionable at best as I 'I
I(
this puts a major transmission trunk into brackish soil conditions which
include some 8 to 17 feet of unsuitable soil composition. This would
require cradle and pile to construct throughout its length to ensure the
relocated system will work.
27. You are advised that the current (permitted) relocated trunk tracks westward "~
to the west property line, then northward along the west property line to the ,.
NW 2"d A venue right-of-way and reconnects with another major trunk .'.//
system at a point near the link about to enter the master lift station. In I,' >r-~~J '
addition, the soil conditions along the current permitted route are acceptable
for this task.
28. The proposed re-route of the sanitary trunk sewer can only achieve a r'\
longitudinal slope of 0.08%, which is below the acceptable minimum. The ~:XI
additional calculations called for last June 2002, and submitted by the
design engineer, reflected that capacity may be available, but velocity was ,>-.
not. In order to overcome the Utilities Department concerns, the re-routed ,x
, .
sanitary trunk system should increase to a 30-inch diameter in order to allow ' ,
for the slow moving capacity in the re-route segments.
29. While PVC material may be allowed on the City's water system on this \"/c-
particular project; poly-lined DIP is preferred. All sanitary lines shall be e/\
poly-lined DIP on either the 24-inch or 30-inch trunk line segment; PVC ,;,. ,
'. J> v
will be acceptable on the 8-inch collection segment. ,
30. The proposed lO-inch water main connection from NW 2"d A venue to the / . (.;.
line located in Marina Drive (currently known as Casa Loma Boulevard) , "
(./', .
will require a 20-foot horizontal separation along East Marina Drive, due to ,(/".J
,
the depth of the sanitary trunk sewer. (Refer to Comments noted above.)
1ST REVIEW COMMENTS
03/03/03
5
,
DEPARTMENTS INCLUDE !\EJECT
~R
31. This office will not require surety for installation of the water and sewer ' :!{\~,'V
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy. "
/;~
32. A building permit for this project shall not be issued until this Department " r
./;;: -
has approved the plans for the water and/or sewer improvements required to /",..:: f
service this project, in accordance with CODE, Article II, Section 26-15. '~ ~
33. The LOR, Chapter 3, Article IV, Section 3.0. requires Master Plans to show ' ,
//\ (
all utilities on or adjacent to the tract. The plan must therefore show the 1/ \/-
point of service for water and sewer, and the proposed off-site utilities ./ i' ),
construction needed in order to service this project. In addition, the LOR, (/ ''/
Chapter 3, Article IV, Section 3.P. requires a statement be included that ./r',
utilities are available and will be provided by all appropriate agencies. This
statement is lacking on the submitted plans.
34. Utility construction details as shown on Civil Engineering (CE) sheets C-6 /-\'~!
'. ' "'.
thru C-8 will not be reviewed for construction acceptability at this time. All 'c \
/... .
utility construction details shall be in accordance with the Utilities '\ /
Department's "Utilities Engineering Design Handbook and " \.'
Construction Standards" manual: and will be reviewed at the time of
construction permit application.
35. Any utilities placed/remaining under the landscaped island within the West /- '/
, \.
Marina Drive right-of-way shall require a hold-harmless agreement for '1._, \ I
-~~'<,\ !
future utility maintenance. . , ...
,
",/ .
36. There is some conflict between the General Notes and Water & Sewer /\~r-
Separation Notes on Sheet C2. The minimum required horizontal "
separation between water, sanitary sewer, storm sewer, etc. is ten (10) feet. ',/,~/
... -
There is no exception for sewer lines. Please correct, and as appropriate, "
,
consolidate.
,
37. Note that the addition of multi-story condominium buildings and ~\
... '/t
townhouses greatly intensifies the use of the site above what was originally '.... r "x, i
anticipated. This change will result in an additional capital facilities charge, '--/ "-
"'I. -
if approved. The developer is responsible for payment of all additional fees. ,
, -,
38. All infrastructure improvements necessary for this entire site must be \ ' ,
" \
completed before the first certificate of occupancy is issued, other than for
docks and fuel pumps constructed simultaneously with related support
./ ' I
infrastructure including access roads, water and sanitary sewer, regardless of ~'
bonding or other surety. For this purpose, "infrastructure" shall be defined
as potable water, sanitary sewer, drainage, and a second paved access road , "
for service and emergency purposes.
03
~\k- '3,'\~'
DEPARTMENTS INCLUDE REJECT
FORESTER/ENVIRONMENT ALIST
Comments:
Trees
82. The applicant must submit a tree survey of the existing trees on the site. V
The Tree Survey is attached.
83. The applicant must prepare a tree management plan (document) to quantify
the trees on the site. This document should outline those trees that will be
preserved, relocated, or removed / replaced on the site, This should be
coordinated with the identification symbol used on a landscape plan sheet.
[Environnemental. Regulations, Chapter. 7,5, Article II Sec. 7.C.]
To the extent possible, existing on-site trees will be relocated to v
available areas adjacent to the site.
Irrigation System
84. There is not an irrigation system design included with the landscape plans.
Please provide one. [Environnemental. Regulations, Chapter. 7.5, Article II
Sec.5,A.] V
A complete automatic irrigation system plan will be submitted
prior to the time of building permits (100'Yo coverage, and 50%
overlap).
PLANNING AND ZONING
Comments:
85, The traffic study must meet the requirements of Palm Beach County Traffic
Engineering prior to issuance of a building pemlit.
This comment is noted. Our traffic study, by Pinder Troutman,
has been submitted to the City and to PBC.
86. Approval of the site plan is contingent upon approval of the Land Use
Anlendment to the MX-C designation that allows the density proposed.
Applicant understands this comment.
3/17/2003' 5:56PM
Page 18 of 23
o
,~Q)
\
[\9:
'"P
DEPARTMENTS
Residential single-family attached units (Tm\11houses) are not permitted in
the MU-H district. (Ch, 2, Scc, 6,F, - Table 6F-l), Remove them from the
plan or request a Code revlcw
INCLUDE
REJECT
Applicant has submittcd to the Mr. Mike Rumph of the Planning
Dcpartment, our letter request for the City to amend its MU-H zoning
district to change townhouse from a t\'on-Permitted Usc to a Permitted
Use.
88 All utility, stOilll sewer and access easements In conflict with the proposed
building must be abandoned and relocated pnor to issuance of a building
permit for this phase ofthc project.
89.
1
This comment is notcd and will be addressed prior to the issuance
of a building permit.
The required build-to setback line on Ocean A venue is 10 feet if the intent
is to widen the sidewalk. The site plan indicates a 12 foot setback. Revise
the plan to 10 feet to meet the code requirement. (Ch, 2, Sec. 6, F)
"
Q.,W Building #3 has been revised to provide a 10' setback to the
r commercial use at the ground noor.
90. Developer is required to establish a property owners association for the
;Z project.
A) If it becomes apparent that a POA between the property
owners would offer some benefit to the arca for parking and garbage
disposal issues, and if the other property owners are willing to form a
POA with the applicant, then the applicaut would be glad to study a
possible POA further.
B) The City has notified all property owners that they must
provide for their own parking and garage disposal. Applicant will
provide for the parking and garbage disposal for its own project,
Marina Village.
10-
; ~,r 1
\jJ 1\((' tp i/) (~ C/
~.\) <"
'I \
I X
\ ,
'-./
)( /~ \~)
I (l.,.
/'\ \~'
, ')
I. Provide the "net buildable" land area calculation under Project Data on the
Site Plan Sheet A-2. (Ch. 4)
The Net Buildable land area is provided in the Project Data table
on Sheet A-2.
The information provided under "Project Data" on the site plan does not
correspond to the informatlOn provided on the application, particularly the
perv"ious/impervlOus area calculations. Please review and revise.
The site plan application will be corrected to correspond with the
revised Pro' ect Data.
3/17/2003' 5:S6 PM
Page 19 of 23
1st REVIEW COMMENTS
Maior Site Plan Modification
(\\Lt; ) /'
d'~ ;<....-'
Project name: Boynton Beach Marina
File number:MSPM 03-001
Reference: I "review olans identified as a Maior Site Plan Modification with a Februarv 5.2003 Planning and
Zonin" Denartment date stamn markin".
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
I. Prior to permit application contact the Public Works Department (S6l-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments:
3. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LOR, Chapter 2, Section 11.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-9800 1 and B-900 13 for striping details.
4. The fire lane signage and markings shall conform to the LOR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than IS,OOO SF.
5. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
6. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
7. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
1ST REVIEW COMMENTS
03/03/03
8
DEPARTMENTS INCLUDE REJECT
including the parking garage entryways (north and east). This site was
previously approved with the correct width lanes and roadways, with a fair
amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was
previously approved, or if the roadway is to be abandoned, provide evidence
of consent of adjacent property owners.
60. The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be
widened to a minimum seven (7) foot width to act both as a pedestrian path
and as a continuous wheel stop.
61. An inverted roadway crown for Section B-B shall not be permitted. Too
much roadway flooding is possible, with settlement around the inlets,
leaving significant maintenance and repair concerns.
62. Paving, Drainage and site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the time of construction permit
application.
63. Correct spelling of "stripping" to "striping" in the Paving Notes.
64. Will the project be constructed in stages? If yes please provide a staging
olan.
65. Provide the City with the appropriate documents to designate public access
and recreational use easements for the proposed public overlook at the
Intracoastal Waterway.
FIRE
Comments:
66. The water and sewer plan (C-5) is inadequate. Hydrants are not clearly
shown and the dock standpipe system with the Fire Department Connection /
(FOe) is not shown. Show location of all the FDC's for all buildings with
fire sprinkler protection.
67. The site plan and master plan design documents shall adhere to Chapter 9 of
the Code of Ordinances of the City of Boynton Beach entitled "Fire /
Protection and Prevention. n This ordinance adopts NFPA I, Fire
Prevention Code, 2000 edition, and NFPA 101, Life Safety Code, 2000
edition. (These codes, as amended are identified as the Florida Fire
Prevention Code).
68. Design documents shall demonstrate compliance with LOR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants m
1ST REVIEW COMMENTS
03/03/03
9
DEPARTMENTS INCLUDE REJECT
commercial applications shall be no more than 300 feet apart and the
remotest part of any structure shall be no more than 200 feet from a hydrant. /
Connections shall be to mains no less than six (6) inches in diameter. In
addition to domestic requirements at a residual pressure of not less than 20
psi, a fire flow of at least 1500 gpm is required.
69. Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in ,/
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3.2.
70. Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Construction. Alteration,
and Demolition Operations, Section 5-4.3. Emergency access roadways
must be firm and unyielding, having a bearing value of not less than 40 (i.e.
LBR 40), compacted to 98% of the maximum density as determined by
AASHTO Tl80, in accordance with the FOOT Standard Specifications for ./
Road and Bridge Construction (2000) Division 11, Section 160,
STABILIZING. A copy of the test results shall be provided and accepted
prior to above grade construction. Testing frequency shall not be less than
that specified in the FOOT Sampling, Testing and Reporting Guide, or as
required by the Fire Marshal. The roadway shall be maintained free from
ruts, depressions, and damage, and at the required bearing value for the
duration of it's intended use.
71. City Ordinance Section 9-6, 3. /7-11 requires approved automatic fire
sprinkler systems throughout the following:
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground floor grade to V
the underside of the topmost roof assembly.
b) All buildings or structures regardless of the type of construction that are
in excess of 12,000 square feet per floor.
72. High-rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Section 9.7. A ,/'
sprinkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11.8.2.1
73. High-rise buildings shall be protected throughout by a Class I standpipe
system in accordance with Section 9.7. Florida Fire Prevention Code, ;/'
(2000) Section 11.8,2,2
74. Class I, Type 60, standby power in accordance with NFPA 70, National V
Electrical Code, and NFPA 110, Standard for Emergency and Standby
Power Svstems. shall be orovided. Florida Fire Prevention Code. (2000)
1ST REVIEW COMMENTS
03/03/03
10
DEPARTMENTS INCLUDE REJECT
Section 11.8.4.2.
POLICE
Comments:
75. Show placement of traffic signs on the site plan.
76. Show direction of traffic flow.
BUILDING DIVISION
Comments:
77. Sheet A-2. Parking Breakdown Table. The calculations for the required
handicap accessible parking spaces in the garage are based on a total
number of 813 spaces, which requires 17 accessible spaces. The plans also
note there are 664 spaces in the garage which requires 14 accessible spaces.
Clarify on the plans the correct number of parking spaces in the garage and
the correct number of required accessible parking spaces.
78. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
79. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
on Sheets A-9 thru A-12.
80. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
PARKS AND RECREATION
Comments:
81. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter I, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities imoact Fee as follows:
I ST REVIEW COMMENTS
03103/03
10
DEPARTMENTS INCLUDE REJECT
Section 11.8.4.2.
POLICE
Comments: ,
11 ___
7S, Show placement of traffic signs on the site plan. ,/) 1/fi;
76. Show direction of traffic flow. ( ~,g
--.J
BUILDING DIVISION
Comments:
77. Sheet A-2. Parking Breakdown Table. The calculations for the required
,-
handicap accessible parking spaces in the garage are based on a total
number of 813 spaces, which requires 17 accessible spaces. The plans also
note there are 664 spaces in the garage which requires 14 accessible spaces.
Clarify on the plans the correct number of parking spaces in the garage and
the correct number of required accessible parking spaces.
78. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
79. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
on Sheets A-9 thru A-12.
80. At time of permit review, submit signed and sealed working drawings of the
proposed construction.
PARKS AND RECREATION
Comments:
81. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter I, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities imoact Fee as follows:
1 st REVIEW COMMENTS
Maior Site Plan Modification ~
tv::! /J14
Project name: Boynton Beach Marina /1.' 0' t1 '>
File number;MSPM 03-001 ? tJl :::::>
Reference: l"review lans identified as a Ma'or Site Plan Modification with a Februa 2 03 Plannin
Zoning Deoartment date stamo marking
~/
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
I. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse. The dumpster will be
supplied by Public Works.
2. Staffrecommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. Full size compactor units are recommended
- at the east end of the Marina (possibly in the restaurant) and adjacent to/in
the Lift Station enclosure. Coordinate with adjacent property owners
regarding shared use of centralized facilities.
PUBLIC WORKS - Traffic
Comments;
3. On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators striping,
directional arrows and "Do Not Enter" signage, etc. Delineate and stripe the
"Loading Area" (where applicable - LOR, Chapter 2, Section 11.J); include
a pavement message in yellow indicating "No Parking - Loading Zone".
See City Standard Drawings B-9800l and B-900l3 for striping details.
4. The fire lane signage and markings shall conform to the LOR Chapter 23,
Article II, Sections B. & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered. Please note this requirement is
applicable to buildings with a gross area greater than 15,000 SF.
5. Show traffic control devices within the east turn-around area including
pavement arrows and one-way arrow signs in the inner circle. Show
pavement directional arrows within the drive aisles along Marina Drive
(Casa Loma).
6. Show the curbing around the circle painted yellow and appropriate "no
parking-fire lane" post signs every fifty (50) feet around the circle.
7. Show a "Stop" sign and 24 inch stop bar at the southwest leg of the
intersection of Marina Dr. (Casa Loma Blvd.) and E. Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
','
',' r-
1ST REVIEW COMMENTS
03/03/03
10
"70
1S~
g~
'l :{ ("
DEPARTMENTS INCLUDE REJECT
Section 11.8.4.2.
POLICE
Comments:
75. Show placement of traffic signs on the site plan.
76. Show direction of traffic flow. ---.
~~ILDING DIVISI~N )
\.. ~
Comments:
77. ,- Sheet A-2. Parking Breakdown Table. The calculations for the required
handicap accessible parking spaces in the garage are based on a total 1/
number of 813 spaces, which requires 17 accessible spaces. The plans also
note there are 664 spaces in the garage which requires 14 accessible spaces. V
Clarify on the plans the correct number of parking spaces in the garage and
the correct number of required accessible parking spaces.
78. At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR 100.205(C)(3)(IV), Requirement #7(2), ~
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
79. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawing. The building plans are not being reviewed for V
compliance with the applicable building codes. Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
on Sheets A-9 thru A-12.
/
80. At time of permit review, submit signed and sealed working drawings of the t/
pronosed construction.
PARKS AND RECREATION
Comments:
81. The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities imoact Fee as follows:
DEPARTMENTS INCLUDE REJECT
.
78, At the time of permit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of the
Federal Fair Housing Act 24 CFR I 00.205(C)(3 )(IV), Requirement #7(2),
Paragraph (A) or (B). Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use of the fixtures. Clear floor
space shall be shown on the plans and designate which option of
Requirements #7 (A or B) is being used.
This comment is notcd.
79. As required by Chapter 4, section 7 of the Land Development Regulations,
submit a floor plan drawmg. The building plans are not being reviewed for
compliance with the applicable building codes, Therefore, add the words
"Floor plan layout is conceptual" below the drawing titled Floor Plan found
on Sheets A-9 thru A-12,
This Note has been added to Sheets A-9 through A-12.
80. At time of permit review, submIt signed and sealed working drawings of the
proposed construction.
ThIs comment is noted.
PARKS AND RECREATION
Comments:
81. The plans indicate that there will be 12 single family attached homes in this X
development and 338 multi-family units. According to Chapter 1, Article V,
of the Land Development Regulations, the formulas for Single Family fJ
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
12 Single Family Attached Units @ $ 771 each = 9,252
338 Multi-family Units @ $ 656 each = 221,728
Total = $ 230,980
The fee is due at the time of the first applicable building permit.
Applicant agrees to pay the Parks and Recreation Impact Fees for
the residential mix of units aDllroved bv the City for Marina Villa!'e.
3/17/2003' 5:56 PM
Page 17 of23
1ST REVIEW COMMENTS
02/20/03
4
~
, ,
DEPARTMENTS INCLUDE REJECT
Submit a traffic study prior to the TRC meeting. The traffic study must meet the
requirements of Palm Beach County Traffic Engineering prior to issuance of
a building oermit.
Approval of the site plan is contingent upon approval of the Land Use
Amendment to the MX-C designation that allows the density orooosed.
Residential single-family attached units (Townhouses) are not permitted in the
MU-L district. (Ch. 2, Sec. 6,F. - Table 6F-l). Remove them from the plan
or reauest a Code review.
All utility, storm sewer and access easements in conflict with the proposed
building must be abandoned and relocated prior to issuance of a building
oermit for this ohase of the oroiect.
The required build-to setback line on Ocean A venue is 10 feet ifthe intent is to
widen the sidewalk. The site plan indicates a 12 foot setback. Revise the plan
to 10 feet to meet the code reauirement. (Ch. 2, Sec. 6, F)
Provide the "net buildable" land area calculation under Project Data on the Site
Plan Sheet A-2. (Ch. 4)
The information provided under "project Data" on the site plan does not
correspond to the information provided on the application, particularly the
perviouslimoervious area calculations. Please review and revise.
Provide the total floor area calculations for all uses under the Project Data section
of the Site Plan Sheet A-2
The revised plans show two (2) less boats slips being provided than previously
aoproved. Please exolain.
If charter, drift fishing or sightseeing boats are proposed, additional parking is
required oer Ch 2. Sec. 11, H.e.(ll).
Provide height dimensions to peak of roof for all buildings on the elevation
drawings. A height exceotion mav be reauired. (Ch 2, Sec. 4.F.)
Provide dumpster locations for the commercial buildings on the pier. Indicate
method of refuse nick-uo for the oroiect. (Ch. 4)
Submit color elevation drawings for all sides of all buildings prior to the CRA
Board meetinl!.
All rooftop equipment must be screened from view at a minimum distance of 600
feet. (Ch .9. Sec. 11)
Provide a color chart for all buildings on the elevation drawings indicating the
manufacturers name and number.
Provide a detail for all signage proposed for the project. The monument sign
shown in the northwest corner of the site must be 10 feet back from the
orooertv line. Please orovide this dimension on the site plan. (Ch. 21)
A 20 foot pavement width is shown for the north two-way section of Marina
Drive and the one-way, two lane, south portion. Engineering standards
require a minimum of22 feet be provided (II feet per lane) Revise plans
accordinglv.
The garage entrances appear to be 20 feet in width. Engineering standards require
a minimum of 22 feet. Revise olans accordingly.
How do residents in Building 3 access the pool and fitness center amenities?
Please exolain and orovide a note on the plans.
The proposed plan does not meet the parking requirements for two and three
bedroom residential units. Two and three bedroom units reauire two soaces
1ST REVIEW COMMENTS
02/20103
S
. II
DEPARTMENTS INCLUDE REJECT
per unit. (Ch 2, Sec. 11) Provide the required parking or: Compensate for the
129 parking space deficit by using the "fee in lieu of' provision in Ch. 2,
Sec. 11 H, request a variance or request a code review to allow 1.5 spaces
oer unit for two and three bedroom units.
Label the location of all surface parking spaces included for this project on the
Site Plan Sheet A-2.
According to the table on Sheet A-2, parking spaces in the garage total 665 not
664 as shown. Please revise accordingly.
On the parking layouts for each floor of the garage, Sheet A-22, provide
dimensions and a snace count for each floor.
Provide a typical parking space detail for regular and handicap spaces.
Provide traffic control markings (stop signs/stop bars) at both entrances to the
oarking garage.
Who will construct improvements on Boynton Beach Boulevard? These
improvements are needed to accommodate access to Building No. 1 Lobby
and parking garage? Provide details regarding construction plans and time
frame orior to issuance of a building permit.
Landscape Plan indicates the use of the ficus species. Ficus is not permitted. (Ch
7.5, Art. II, Sec. S.C.). Revise nlans accordingly.
Landscape Plan Sheet L-4 shows 262 Schefflera (SU) on the site plan but lists
294. Please correct. Also, review the use of the Schefflera species that
aopears on the Palm Beach County list of Prohibited Trees.
Landscape Plan Sheet L-5 indicates 23 Green Maypan Coconut (CN) of the plan
but lists 27. Revise olans accordinglv.
Landscape Plan Sheet L-S indicates 200 Philodendron Selloum (PS) on the plan
but lists 100. Revise nlans accordin<!lv.
Pervious Landscape Area calculations on the Site Plan Sheet A-2 do not match
those on the Landscaoe Plan Sheet L-2. Revise olans accordinglv.
The landscape code Chapter 7.5 requires that 50% of!!lLlandscape material
provided be native. Revise note and calculations on Sheet L-2 accordinglv.
Indicate the method and source of irrigation of the Landscape Plans.
Tree trunks shall be a minimum four-inch caliper with seven (7) feet of vertical
clearance for visibility. (Ch .2. Sec. 6, F.8.a. (2)
Will flower containers be used along the fal'ade adjacent to Ocean Avenue?
Please indicate on the Landscane Plan. (Ch. 2, Sec. 6 F.8.e)
Minimum tree sizes planted along the west side of the project shall be 16 feet.
(Previous CRA comment)
MWRlsc
J:\SHRDATA\PLANNING\SHAREDlWP\FORMS\BLANKS FORMS FOLDER\1ST REVIEW COMMENTSDOC
.
Conditions of Approval
6
/,
I DEPARTMENTS I INCLUDE ! REJECT !
28. All bathrooms and kitchens in the dwelling units shall comply with the X
provisions of the Federal Fair Housing Act, 24 CFR 100.205il:l(3)(I-IV),
Requirement #7(1)(2), subparagraphs (A) or (B). Clear floor space shall be
provided at fixtures to allow a person in a wheelchair or other mobility aid
use of the fixtures. The clear floor space for the fixtures shall be shown on the
plans and designate which option of Requirement #7 (A or B) is being used.
PARKS AND RECREATION
Comments:
29. Since this development would be classified as most similar to a multi-family X
development, the City should charge the applicant an impact fee of $656 per
dwelling unit. The park impact fee for the 277 units would be $181,712.
Payable prior to issuance of a building permit.
30. Submit detailed irrigation plans for right-of-way landscape and irrigation X
improvements during the construction document permitting stage, for review
and approval by Parks Department and Public Works Department staff.
Include on the plan the location of any existing irrigation in the right-of-way.
FORESTER/ENVIRONMENT ALIST
r"mmpnk
Existinl! Trees
31. The applicant must identify and quantify the Royal and Washington Palm X
trees that exist throughout the site. The landscape plans should indicate the
existing trees that will be preserved, or relocated throughout the site. These
trees should be shown with an appropriate symbol on the landscape plans.
PLANNING AND ZONING
Comments:
~~ "- ..fr:;#c .s-iud't t'1!</A :1-0 ~ (Jell . '::!J '
32. ra lC study must meet the requirements of Palm Beach County traffic X
engineering prior to building permit.
,>
33. ~ll utility, storm sewer and access easements in conflict with the proposed X
.-------1luilding must be abandoned and relocated prior to issuance of a building
permit for this phase of the project.
...?;
34)>rovide traffic control markings (stop signs/stop bars) at both entrances to the X
/ parking garage. -~..
--.. -
7' b~;1 ais~ih'i~~~OOng garage ~hould be 24 feEt. Provide a , X
dimensron on the sit an sheet A2. .. ' ..
2, :
3.
"--. ~ ~.; ;,0"
I, 10,;
I
I,) i f
/.I{ I
~. ' ,
,~
';"':
...,}
'/1 ; '/
. I J: (Fl ir
I DEPARTMENTS I INCLUDE I REJECT I
, ~Who will construct improvements on Boynton Beach Boulevard? These X
improvements are needed to accommodate the access to the Building NO.1
Lobby and parking garage. Provide details regarding construction plans and
time frame prior to issuance of a building permit.
37. At time of permitting provide a landscape plan for the off-site dumpster area.
(Ch.7.5,Art.II, Sec.5.J.) X
(- "
l2.~:' No site signage was submitted for approval. Signage plans to be submitted X
separately for CRA Board and City Commission approval.
/
39.. Submit a color elevation drawing for all sides of Buildings NO.1 and No.2 4--/J ?
prior to the CRA Board meeting. X
~O)All rooftop equipment must be screened from view at a minimum distance of
, - 600 feet. (Ch.9.Sec.ll) X
~larrisSiibJectt()'approvaI of the rezoning request-to MU-H. , ---. ~
42. There is a discrepancy in the total gross acreage for the project. The site plan
sheet A-2 indicates 7.349 (inclusJes y, of Cas a Loma) and the surv;:y indicates X
6.93. Correct, the survey to re.flect the correct'project area. j
ADDITIONAL COMMUNITY REDEVELOPMENT BOARD
CONDITIONS
Comments:
43. Lighten the paint color proposed for the ends of the parking garage (approx. 2 X
shades).
44. Since this development would be classified as most similar to a multi-family X
development, the City should charge the applicant an impact fee of $656 per
dwelling unit. Condition #29 is corrected to include the following unit total
and impact fee calculation: 282 units and $184,992.
~ Minimum tree sizes planted along the west side of the oroiect shall be 16 feet. X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
I 1. To be determined. I I I
It
S:\Plannlng\SHARED\WP\PROJECTS\MARI NA\MSPM 02.005\COA.doc
,
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 02-000
TO:
Michael W. Rumpf, Director, Planning and Zoning
FROM:
Laurinda Logan, P.E" Senior Engineer
DATE:
February 24, 2003
RE:
Review Comments
Major Site Plan Modification -1st Review
The Residences at Marina Village (Boynton Marina)
The Related Group
File No. MSPM 03-001
The above referenced Site Plans, forwarded on February 6, 2003, were reviewed by representatives
from Public Works, Engineering, Solid Wasle, Parks and Utilities against the requirements outlined in the
City of Boynton Beach Code of Ordinances. Following are our comments with the appropriate Code and
Land Development Regulations (LOR) referenced.
PUBLIC WORKS - GENERAL
1. Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse. The dumpster will be supplied by Public Works.
2, Additional comments will be made after a meeting between the developers, Engineering and Solid
Waste, to be held at 2:00 p,m., Monday, February 24. 2003.
PUBLIC WORKS - TRAFFIC
3. On the Site and Civil plans, show and identify all necessary traffic control devices such as stop bars,
stop signs, double yellow lane separators striping, directional arrows and "Do Not Enter" signage, etc.
Delineate and stripe the "Loading Area" (where applicable - LOR, Chapter 2, Section 11.J); include a
pavement message in yellow indicating "No Parking - Loading Zone". See City Standard Drawings
B-98001 and B-90013 for striping details,
4, The fire lane signage and markings shall conform to the LOR Chapter 23, Article II, Sections B, & M,
The 3-foot high "Fire Lane" words shall be placed along both lanes and staggered. Please note this
requirement is applicable to buildings with a gross area greater than 15,000 SF.
5. Show traffic control devices within the east turn-around area including pavement arrows and one-way
arrow signs in the inner circle. Show pavement directional arrows within the drive aisles along Marina
Drive (Casa Loma).
6, Show the curbing around the circle painted yellow and appropriate "no parking-fire lane" post signs
every 50 feet around the circle,
7, Show a "Slop" sign and 24 inch stop bar at the southwest leg of the intersection of Marina Dr, (Casa
Loma Blvd.) and E. Marina Dr. for traffic control. Place the stop sign on a cantilevered mast arm for
,
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification -1st Review, MSPM 03-001
February 24,2003
Page 2
visibility, Add a "Do Not Enter" and "Left Turn Only" sign at the southeast corner of this same
intersection,
8. Extend the stop bar at the east leg of the intersection of Marina Dr. (Casa Loma Blvd,) and E. Marina
Dr. (westbound traffic is one-way only at this location,
9, Staff strongly recommends deleting the "bump-out" on the west leg of Marina Dr. (Casa Loma Blvd,)
and E. Marina Dr. which separates E. Marina Dr, from the drop-off area in front of Building #2.
Additional pavement markings will need to be added at this intersection to clarify traffic movement(s),
especially where transitioning from one-way, westbound (east of inlersection) to two-way traffic (north
and west of intersection).
10, Post "No Parking" for both East and West Marina Drive (both sides of roads),
11, Provide direclional pavement arrows throughout.
12. All pavement return radii shall be a minimum of 30 feet. The following intersections do not meet this
criteria:
SE corner of Marina Dr. (NE 6th Street) and Marina Dr. (Casa Loma Blvd,) @ 30 feet.
NW corner of Marina Dr. (Casa Loma Blvd,) and Marina Dr. (northward) @ 15 feet.
NE corner of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward) @ 10 feet.
SW corner of Marina Dr. (northward) and Boynton Beach Blvd. Extension (NW 20d Ave.) @ 15 feet.
13. Public parking spaces may not be counted towards required parking.
14. The two story commercial building and the adjacent restaurant should have an additional two
handicap parking spaces to provide the minimum required based on the "provided" parking (not to
include the two next to Two George's Restaurant),
15. Provide cross-sections and details for the Boynton Beach Blvd. extension. This section of roadway
shall be constructed in conjunction with other site improvements,
ENGiNEERING
16. Add a general note to the Site Plan that all plans submitted for specific permits shall meet the City's
Code requirements at time of application. These permits include, but are not limited to, the following:
paving, drainage, curbing, site lighting, landscaping and irrigation. Permits required from other
permitting agencies such as Florida Department of Transportation (FOOT), South Florida Water
Management District (SFWMD), Lake Worth Drainage District (LWDD), Florida Department of
Environmental Prolection (FDEP), Palm Beach County Health Department (PBCHD), Palm Beach
County Engineering Department (PBCED), Palm Beach County Department of Environmental
Resource Management (PBCDERM) and any others, shall be included with the permit request.
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification -1st Review, MSPM 03-001
February 24,2003
Page 3
17. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
18, Show all proposed site lighting on the Site and Landscape plans (the Photometries plan does not
agree with the Site Plan and Landscape Plan).
19. Show all sight triangles on the Landscape plans, using 35 feet on public rights-of-way (LOR, Chapter
7,5, Article II, Section 5.H.) A 10 foot sight triangle is allowable at the parking garage ingress/egress
point. There appears to be conflicts between landscaping and lines of sight at each of the
intersections with sight triangles depicted. Please correct.
20. Indicate, by note on the Landscape Plan, that within the sight triangles there shall be an unobstructed
cross-visibility at a level between 2.5' and 6' above the pavement (LOR, Chapter 7,5, Article II,
Section 5.H.).
21. The City of Boynton Beach has existing irrigation, hardscaping, and plant material along Ocean
Avenue. Any damage as a result of the contractor's operations shall be repaired or replaced to the
equivalent or better grade, as approved by the City of Boynton Beach, and shall be the sole
responsibility of the developer. Please acknowledge this notice in your comments response and add
a note to the plans with the above stated information,
22, Indicate how conflicts between the City's landscaping on Ocean Blvd. and the proposed landscaping
will be resolved.
23. Provide details for the proposed paver systems showing compliance with the LOR, Chapter 2,
Section 6.F.8.d.(2).
24. Review proposed landscaping, particularly along the center median at the intersection of Marina Dr.
and East Ocean Ave., for possible conflicts wilh trucks and street maintenance equipment (street
sweepers, garbage trucks, delivery trucks, etc.)
25. Per the LOR, Chapter 7.5, Article II, Section 5.C.2, use of Ficus species shall not be permitted.
26. Be consistent with use of scale(s). The overall site plan uses an engineering scale with the
remaining landscaping plans utilizing an architectural scale. Additionally the scale noted on Sheets
L-4 and L-5 are incorrect. At a minimum, the LOR requires the Landscape plan (in this case the
Overall Site Planting Plan) scale shall match that of the Site plan - which you have done (LOR,
Chapter 4, Section 7.C.1). However for the detailed drawings please use an engineering scale at an
appropriate scale, say a 20 scale.
27. Provide an engineer's certification on the Drainage Plan as specified in LOR, Chapter 4, Section
7.F.2,
28. The current SFWMO permit on file for this project requires 2000 L.F, of exfiltration trench (per
Specific Condition #2 of Permit #EI 50-0129079-001). This permit will be required to either be
amended, again, or to be adhered to, Revise the Drainage Plan and calculations accordingly and
resubmit for review.
29. Full drainage plans in accordance with the LOR, Chapter 6, Article IV, Section 5 will be required at
the time of permitting.
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification - 1 st Review, MSPM 03-001
February 24, 2003
Page 4
30, Structures #2 and #5 are incorrectly identified as Manholes, they should be called out as Inlets,
31. Verify storm sewer diameter between Manholes #10 and #11 and #11 and the existing manhole at
the west end of Marina Dr. It is called out as 24 inches, with 30 inch HOPE used upstream of this
site and 36 inch storm sewer used downstream.
32. Runoff from roads, parking lots, and other impervious areas must be routed through percolation
areas prior to discharge (LOR, Chapter 6, Article IV, Section 5.1.d).
33. Indicate to what standard the project is to be constructed; if the FOOT Standard Specifications for
Road & Bridge Construction and Standard Index are to be used - the 2000 Specifications are
recommended since they contain both English and Metric units.
34, Provide written and graphic scales on all sheets,
35. Provide a cross-section of the east turn-around area to show the type of construction, including the
appropriate specifications.
36. All roadways, shall be a minimum of 24 feet (2-12 foot lanes) in width, including the parking garage
entryways (north and east). This site was previously approved with the correct width lanes and
roadways, with a fair amount of work between City staff and the developers to adequately address
each area based on its use. Please revise the plans back to what was previously approved,
37. The sidewalks on either side of Marina Dr. (Casa Loma Blvd.) shall be widened to a minimum seven
(7) foot width to act both as a pedestrian path and as a continuous wheel stop.
38. An inverted roadway crown for Section B-B shall not be permitted. Too much roadway flooding is
possible, with settlement around the inlets, leaving significant maintenance and repair concerns.
39. Paving, Drainage and site details will not be reviewed for construction acceptability at this time, All
engineering construction details shall be in accordance with the applicable City of Boynlon Beach
Standard Drawings and will be reviewed for construclability at the time of construction permit
application.
40. Correct spelling of "stripping" to "striping" in the Paving Notes.
be co
miniums
simple.
the
42. Will the project be constructed in phases? If yes please provide a phasing plan.
!l /l ,. 1 I
Lm'-sk'4.c-tyCL &~1'3lG<~'
UTILITIES
1. All utility easements shall be shown on the site and landscape plans (as well as the Water & Sewer
Plan Sheet) so that we may determine which trees may interfere with utilities, In general, palm trees
will be the only tree species allowed within utility easements. Canopy trees may be planted outside
of the easements so that roots and branches will not impact those utilities within Ihe easement in the
foreseeable future, The LOR, Chapter 7,5, Article I, Section 18,1 gives public utilities the authority to
remO'/8 any trees that interfere with utility services, either in utility easements or public rights-of-way.
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification -1st Review, MSPM 03-001
February 24, 2003
Page 5
o;Y
The Landscape Plan reflects the use of Green Island (Ficus Micorcarpa) which will not be permitted.
Use of Trinette (Schefflera Arboricola) r 0 a s trees/shrubs is discouraged. The
Landscape Plan also reflects a 'property line' that does not agree with previous acceptable roadway
right-of-way.
Due to the depth of the proposed sanitary collection trunk sewer re-route along East Marina Drive,
the sanitary sewer easement shall be required to be a minimum of 35-feet wide, The use of Florida
Royal Palms (Roystonea e/ata), within proposed utility easements, is discouraged due their size at
maturity. The same situation exists along the south roadway area (Marina Drive) at the initial re-
routing of the sanitary trunk line.
2, Palm Beach County Health Department permits~,& be required for the water and sewer systems
serving this project (CODE, Article II, Section 26-1 ). <'J'l5
3. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g.p.m. as
stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (see CODE, Article II, Section 26-16(b)), In addition, the LDR,
Chapter 6, Article IV, Section 16 requires that all points on each building will be within 200 feet of an
existing or proposed fire hydrant (as the hose drags, not as the hose flies), Please demonstrate that
the plan meets this condition by showing 9l! hydrants (both proposed and existing).
4. CODE, Article II, Section 26-34(E) requires that a capacity reservation fee be paid for this project
either upon the request for the Department's signature on the Health Department application forms or
within 30 days of site plan approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand.
5, Comprehensive Plan Policy 3.C.3.4. requires the conservation of potable water, City water may not,
therefore, be used for irrigation where olher sources are readily available.
6, Water and sewer lines to be owned and operated by the City shall be included within utility
easements, Please show all proposed easements on the engineering drawings, using a minimum
width of 12 feet (and wider where noted above), The easements shall be dedicated via separate
instrument to the City as stated in the CODE, Article II, Section 26-33(a).
7. Again, the proposed re-routing of the sanitary trunk sewer (approximately 660 LF) will replace some
378 LF currently routed in an existing utility easement routed through proposed Buildings NO.1 & 2
as well as the swimming pool area. First, the re-route to the east then north (on East Marina Way)
and back to the master lift station is questionable at best as this puts a major transmission trunk into
brackish soil conditions which include some 8 to 17 feet of unsuitable soil composition. This would
require cradle and pile to construct throughout its length to ensure the relocated system will work.
You are advised that the current (permitted) relocated trunk tracks westward to the west property
line, then northward along the west property line to the NW 2'd Avenue right-of-way and reconnects
with another major trunk system al a point near the link about to enter the master lift station. In
addition, the soil conditions along the current permitted route are acceptable for this task.
Second, the proposed re-route of the sanitary trunk sewer can only achieve a longiludinal slope of
0.08%, which is below the acceptable minimum. The additional calculations called for last June
2002, and submitted by the design engineer, reflecled that capacity may be available, but velocity
was not. In order to overcome the Utilities Department concerns, the re-routed sanitary trunk system
Dept. of Public Works, Engineering Division Memo No. 03-xxx
RE: Boynton Beach Marina, Major Site Plan Modification -1st Review, MSPM 03-001
February 24, 2003
Page 6
should increase to a 30-inch diameter in order to allow for the slow moving capacity in the re-route
segments.
8. PVC material may permitted on the City's water system on this particular project: poly-lined DIP is
preferred. HOWEVER, all sanitary lines shall be poly-lined DIP on either the 24-inch or 30-inch trunk
line segment; PVC will be acceptable on the 8-inch collection segment.
9, The proposed 10-inch water main connection from NW 2cd Avenue to the line located in Marina Drive
(currently known as Cas a Loma Boulevard) will require a 20-fool horizontal separation along East
Marina Drive, due to the depth of the sanitary trunk sewer. (Refer to Comments noted above.)
10. This office will not require surety for installation of the water and sewer utilities, on condition that the
systems be fully completed, and given to the City Ulilities Department before the first permanent
meter is set. Note that setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy.
11. A building permit for this project shall not be issued until this Department has approved the plans for
the water and/or sewer improvements required to service this project, in accordance with CODE,
Article II, Section 26-15.
12, The LDR, Chapter 3, Article IV, Section 3.0. requires Master Plans to show all utilities on or adjacent
to the tract. The plan must therefore show the point of service for water and sewer, and the
proposed off-site utilities construction needed in order to service this project. In addition, the LDR,
Chapter 3, Article IV, Section 3.P. requires a statement be included that utilities are available and will
be provided by all appropriate agencies. This statement is lacking on the submitted plans.
13. Utility construction details as shown on Civil Engineering (CE) sheets C-6 thru C-8 will not be
reviewed for construction acceptability at this time. All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual; and will be reviewed at the time of construction permit
application.
14, Any utilities placed/remaining under the landscaped island within the West Marina Drive right-of-way
shall require a hold-harmless agreement for future utility maintenance.
15, There is some conflict between the General Notes and Water & Sewer Separation Notes on Sheet
C2, The minimum required horizontal separation between water, sanitary sewer, storm sewer, etc. is
10 feet. There is no exception for sewer lines. Please correct, and as appropriate, consolidate
notes.
Cc: Jeffrey L. Livergood, P.E., Direclor, Public Works (via e-mail)
Peter Mazzella, Assistant to Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division (PW/F&G)
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Ken Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
J:\SHRDATA\Engineering\Logan\Plan Reviews\Major Mod - Marina - Related Group.doc
1 st REVIEW COMMENTS
Maior Site Plan Modification
Protect name' Boynton Beach Marina
File number:MSPM 03-001
Reference' 1" review olans identified as with a PlanninQ and Zoning De12artment date stamo marking
...
DEP ARTMENTS INCLUDE REJECT
PUBLIC WORKS - Gcncral
Comments: ,
I
I
I Prior to permit application contact the Public Works Department (561-742- i
(200) regarding the storage and handling of refuse. The dumpster wilI be
supplied by Public Works. 'I
II
2. Staff recommends adding trash pick-up locations (small compactor units) at
the east end of the townhomes, at the two story commercial building, and at
the north end of Building No.3. FulI size cnmpactor units arc recommended
at the east end of the Marina (possibly in the restaurant) and adjacent tolin
the Lift Station enclosure. Coordinate with adjaccnt property owners
regarding shared use of centralized facilities. ,------"
PUBLIC WORKS - Traffic
(' omlnents: ,
!
3, On the site and civil plans, show and identify all necessary traffic control !
,
devices such as stop bars, stop signs, double yelIow lane separators striping,
directional arrows and "Do Not Enter" signage, etc, Dclincatc and stripc the
"Loading Area" (where applicable.. LOR, Chaptcr 2, Section ll.J); include
a pavement message in yellow indicating "~o Parkmg - LO:lding Zone". 1
See City Standard Drawings B-9800l and B-900l3 for striping details.
4 Thc fire lane signage and markings shall conform to the LOR Chapter 23,
Article U, Sections B, & M. The three (3) foot high "Fire Lane" words shall
be placed along both lanes and staggered, Please note this requirement is
applicable to buildings with a gross area grcater than 15,000 SF,
I
, S, Show traffic control devices within the east turn-around area including
, and the circle, Show
pavement arrows one-way anow SIgnS m lOner
pavcmult directIOnal arrows wnhin the drl' c: aisles along l'vlarina Drive II
(Casa Lama).
6. Show the curbing around the circlc painted yelIow and appropriate "no I
II
parking-fire lane" post signs every fifty (50) feet around the circle.
,I
7, Show a "Stop" sign and 24 inch stop bar at the southwest leg of the !
intersection of Marina Dr. (Casa Loma Blvd,) and E, Marina Dr. for traffic
control. Place the stop sign on a cantilevered mast arm for visibility. Add a
"Do Not Enter" and "Left Turn Only" sign at the southeast comer of this
same intersection.
1ST REVIEW CO",IMENTS
02/28/03
"
,
, DEPARTME1IiTS INCLUDE REJECT
I
II 8 Extend the stop bar at the east leg of thc intersection of Marina Dr. (Casa I
I Loma Blvd.) and E, Marina Dr (westhound tranic is onc~way only at this
location. 'I
II 9 StatT strongly recommends deleting the "bump-out" on the west leg of :1
Marina Dr. (Casa Loma Blvd.) and E, Marina Dr. which separates E. I
I
Marina Dr. from the drop-off arca m front of Building #2, ^dditional i
I
pavement markings will need to bc added at this intersection to clarify
tramc movement(s), especially where transitioning from one-way,
westbound (east of intersection) to two-way traffic (north and west of
intersection).
10, Post "No Parking" for both East and West Marina Drive (both sidcs of ,
roads) . ,
I
I
I
11. Provide directional pavement arrows throughout. i
'I
12, All pavement return radii shall be a minimum of 30 feet. The following
intersections do not meet this criteria:
,
: a) SE comer of Marina Dr. (NE 6'" Street) and Marina Dr. (Casa Loma
Blvd.) @ 30 feet.
, b) NW comer of Marina Dr. (Casa Loma Blvd.) and Marina Dr. (northward)
I @15 feet.
I c) NE comer of Marina Dr. (Casa Loma Blvd,) and Marina Dr. (northward)
'S 10 feet.
d) SW comer of Marina Dr. (northward) and Boynton Beach Blvd, Extension
(NW 2"d Ave,)@ 15 feet.
13. Public parking spaces may not be counted towards required parking.
14, The two story commercial building and the adjacent restaurant should have
I an additional two handicap parking spaces to provide the minimum required
I
: based on the "provided" parking (not to include the two next to T\vo
George's Restaurant). I
14, Provide cross-sections and details for the Boynton Beach Blvd, extension, I
This section of roadway shall be constructed in conjunction with other site I
improvements, I
:,
I UTILITIES
I
I
Comments: ,
I
I ST REVIEW COMMENTS
02;'2X/03
,
,
,
DEPARTMENTS INCLUDE REJECT I
II
,I
15, All utility easements shall be shown on the site and landscape plans (as wcll
as the water & sewer plan sheet) so that we may determine whIch trees may
i interfere with utilitIes, In general, palm trces will be thc only trce species
all owed within utility easemcnts, Canopy trees may he planted outside of
the easements so that roots and branches will not impact those ulilities
within the easement in the foreseeablc future. The LDR, Chapter 7,5,
Article I, Section IS, I gives public utilities the authority to remove any trees ,
that interfere with lltility services, either in utility easements or public
rights-of-way.
16, The Landscape Plan reflects the use of Green Island (Ficlls Micorcwpu) 'I
which will not be permitted. Use of Trinette (Scheff/em Arboricola) and I
Florida Royal Palms trces/shrubs is discouraged, The Landscape Plan also
reflects a 'property linc' that does not agree with prcvious acceptahle
roadway right-of-way,
17. Due to the depth of the proposed sanitary coIlection trunk sewer re-route
I along East Marina Drive, the sanitary sewer easement shaIl be required to he !
a minimum of 35-feet wide.
IS, Palm Beach County Health Department pemlits WlII be required for the I
water and sewer systems serving this project (CODE, Article II, Section 26-
12),
19. Fire !low calculations wiIl be required demonstrating the City Code
requirement of 1.500 g,p.m. as stated in the LOR, Chapter 6, Article IV,
Section 16. or the requirement imposed by insurance unuerwriters,
whichever is greater (see CODE, Article II. Section 26.l6(b)), In addition.
the LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building will be within 200 feet of an existing or proposed fire hydrant (as
thc hose drags, not as thc hose flies), Please demonstrate that the plan meets
this condition by showing all hydrants (both proposed and existing),
20, CODE, Article 11, Section 26-34(E) requires that a capacity reservation fee i
be paid for this project either upon the request for the Department's
~i ~natlJre on the Hp3.1th Depmtment Z1.pplicltinn forms or within ]0 days of
site plan approval, whichever occurs first. This fee will be determined I
based upon final meter size, or expected demand, :1
,
21. Comprehensive Plan Policy 3,C.3.4, requires the conservation of potable ,
,
water. City water may not, therefore, be used for irrigation where other
sources are readily available, !I
I
22. IVliter and sewer lines to be owned and opcrated by the City shall be ~ I
included WIthin utility easements. Please show all proposed easements on I
the engineering drawings, using a minimum width of 12 feet (and wider I
!
where noted above). The easements shalI be dedicatcd via separate
instrument to the City as stated in the CODE, Articlc 11, Section 26-33(a),
1ST REVIEW COMMENTS
02,'20/03
4
I
I,
OEPARTMEi\TS
IINCI.UOE ~CJEl'T
Ii 0' Again, thc proposed rc.routing of the sanitary trunk sewer (approximately
~_....
Ii 660 LF) w1l1 rcplace somc 378 LF currently routed in an cxisting utihty
I casement routed through proposed Buildings No. I &2 as wc1! as the
swimming pool area. First, the rc-route to the east then north (on East
i Marina Way) and back to the master lit! statIon is questiunable at bcst as i
,
this puts a major transmission trunk into brackish sui I conditions which ,
include some S to 17 feet of unsuitable soil composition. This would
reqUIre cradle and pile to construct throughout its length to ensure the
relocated system wi1! work.
I I
24. You arc advised that the current (permittcd) relocated trunk tracks westward ,
to the west property line, thcn northward along the west property hne to the i
i
NW 2"d A venue right-of-way and reconnects with another major trunk
! system at a point near the link about to enter the master ht! station, In
addition, the soli conditions along the current permitted route are acceptable :1
for this task.
25, The proposed re-route of the sanitary trunk sewer can only achieve a
longitudinal slope of 0.08%, which is below the acceptable minimum. The
additional calculations ca1!ed for last June 2002, and submitted by the
design engineer, reflected that capacity may be available, but velocity was
not. In order to overcome the Utilities Department concerns, the re-routed
sanitary trunk system should increase to a 30-inch diameter in order to allow
for thc slow moving capacity in the re-route segments,
, 26, While PVC material may be allowed on the City's water system un this I
particular project; poly-lined DIP is preferTed. All sanitary lines shall be
poly-lined DIP on either the 24-inch or 30-inch trunk line scgment; PVC
wi1! be acceptable on the S-ineh collectIon scgment,
The proposed 1 O-inch water main connectiun from NW 2"" A venue to the ,
27. ,
line located in Marina Drive (currently known as Casa Loma Boulevard) I
will require a 20-foot horizontal separation along East Marina Drive, due to
the depth of the sanitary trunk sewer. (Refer to Comments noted above,)
J~, :ni.:; offic;:" \\'111 rot rcq1l1re Sl1ff'ty filr i!ist~dbtion of the \';~ter and sewer
I utIhtIes, on condition that the systems be fully completed, and given to the
City Utilities Department before thc first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy, ,
29, A buildmg pernlit for this project shall not be issued until this Department
]-;:lS appro\ed the plans for the \vater and:of St\ver in1prTilccmt:nts reyuired tu
I service tillS proJect, m accordance with CODE, Anicic II. Section 26-15,
11
30, The LOR, Chapter 3, Article IV. Scctton 3 O. requires Mastcr Plans to show
all utilities on or adjacent to the tract. The plan must therefore show the
Doint of service for water and sewer. and the DroDosed ot1~site utilities
1ST REVIEW COMMENTS
112.2R/03
5
'I
DEPARTMENTS INCLUDE REJECT
construction needed in ordcr to service this project. In addition. the LOR.
Chaptcr 3, Article lV, Section 3,P, requires a statement be included that
utilities are available and will be provided by all appropriate agencies. Th1s
statement is lacking on the submitted plans, ,
31 Utility construction details as shown on Civil Engineering (CE) sheets C-6
thru C -8 will not be rcviewed for construction acceptability at this time. All
utility construction details shall be in accordance with the Utllitics
Department's "Utilities Enginccring Design Handbook and
Construction Standards" manual; and will be rcviewed at the time of
construction permit application,
32- Any utilities placed/remaining undcr thc landscaped island within the West
Marina Drive right-of-way shall require a hold-harmless agreement for
future utility maintenance,
33, There is some conflict between the General Notes and Water & Sewer i
Separation Notes on Sheet C2. The minimom required horizontal I,
separation hetween \vater, sanitary sewer, staml se\ver, etc. is ten (10) feet.
'~-:'i..'1 c L~ no e.v;,;\;,')'I ".',: ior sc\'/c:r jllll'~;. FlL'J.,,"' ~TTTCCl, ;"tnJ as a~'p[i..'t~'nzue, I.
consolidate. "
,
I !
.. I
I
I ENGINEERING DIVISION I
il !
I, Comments: i
I
,~---~-,-,- --- ".-.----.. , !
!i
0' .:\cd a gcn~r:JJ nute tu thc site plan tilat all plans submittcll f{)[ sI,ecific "
_)i.T jl
, pcrmi ts shall meet the City's Code requirements at time of application.
,
These permits include, but are not limited to, the fl)llowing: pavmg,
drainage, curbing, site lighting, landscaping and irTigation, Pelmits required !
ti-om other permitting agencIes such as Florida Department of
Transportation (FOOT), South Florida Water Management District I
(SFWMD), Lake Worth Drainage District (L WOO), Florida Department of I
! Environmental Protection (FDEP), Palm Beach County Health Department
, (PBCHD), Palm Beach County Enginecring Department (PBCED), Palm ;,
,
Beach County Department or EnVIronmental Resource !vIanagement
(PBCDERM) and any others, shall be included with the permit request.
35, All conunents requiring changes andlor corrections to the plans shall be
rel1ccted on all appropriate sheets.
I
36. Show all proposed site lighting on thc site and landscape plans (the I
I
photometrics plan does not agree with the site plan and landscape plan),
37, Show all sight triangles on the Landscape plans, using 35 feet on public i
I
rights-of-way (LOR, Chapter 7,5, Article II, Section 5,H,) A 10 foot sight ,
triangle IS allowable at the parking garage ingress/egress point. There
appears to be conflicts between landscaping and lines of sight at each of the
1ST REVIEW COMMENTS
02l28/03
6
II :1
DEPART:YIENTS INCLllOE REJECT :1
I intersections with sirrht triangles denicted, Please correct. ,
, I
3R Indicate. by note on the landscape plan, that within the sight triangles thcrc
shall be an unobstructed cross-visibility at a level between 2,5 feet and 6
fcet abovc the pavement (LOR. Chapter 7,5, Article II, Section 5,H,).
Ii 39. The City of Boynton Beach has existing inigation, hardscaping, and plant
material along Ocean A venue, Any damagc as a result of the contractor's I
operations shall bc repaired or rcplaced to the equivalent or better grade, as I
I
approved by the City of Boyrton Bcach, and shalI bc the sole responsihility
of the developer. Plcase acknowlcdge this notice in your comments response
and add a note to the plans with the above stated information, ,
:i
40, Indicate how conflicts between the City's landscaping on Ocean Blvd. and II
the proposed landscaping wilI bc rcsolved.
41. Provide details for the proposed paver systems showing compliance with thc
LOR, Chapter 2, Section 6.F.8,d,(2).
42. Review proposed landscaping, particularly along the center median at the
intersection of Marina Dr. and East Ocean Ave" for possible conflicts with
trucks and street maintenance equipment (street sweepers, garbage trucks,
dcli very trucks, etc.)
, 43, Pcr the LOR. Chapter 7.S, Article II. Section 5.C.2. Lise of ficus species
, ::1-]:..11 [jot h.: ~';':;-; 1tLkd. I
,
:~consistcnt with use ofscale(s). The overall site plan uses an cngineering I
, scale with the remaining landscaping plans utilizing an architectural scale.
i Additionally the scale noted on Sheets LA and L-5 is incorrect. At a
Ii minimum, the LDR requires the landscape plan (in this case the overall site 1
,
planting plan) scale shall match that of thc site plan - which you have donc
(LOR, Chapter 4, Section 7.C.l), However for the dctailed drawings please
use an engineering scale at an appropriate scale. say a 20 scale.
45, Provide an engineer's ccrtification on the drainage plan as specified 111
LOR. Chapter 4, Section 7,F,2. I
, 46. The current SFWMD permit on tIle for this project requires 2000 L.F. of
,
I c"tlltration trench (per Specific Condition #2 of Pcrmit #El 50-0129079-
001 ) This permit will be required to be adhered to, or amended. Revise
II the drainage plan and calculations accordingly and resubmit for review, :
II 47, F ulI drainage plans in accordance with the LOR, Chaptcr 6, Al1icle IV. I
I
,
Scction 5 will be required at the time of permitting, I
:,1 4R, Structures #2 and #5 are incorrcctly identified as Manholes, they should be
called out as Inlets. I
I
I:
1ST REVIEW COMMENTS
02,'28/'03
7
i;
DEPARTMENTS rNCLUDI' REJECT 't
.)9, Verify storm sewer diameter between Manholes #10 and #11, and #1 and
!,
the existing manhole at the west end of Marina Dr They arc called out as II
24 inches, with 30 inch HOPE used upstream of this site and 36 inch storm
sewer used downstream. I
,I
: 50. Runoff from roads, parking lots, and other impervious areas must be routed I
,
through percolation areas prior to dischargc (LDR, Chapter 6. Article IV, ,
Section 5,1.d), I
I I
1 S1. Indicate to what standard the project is to be constructed; if the FDOT ,
Standard Specifications for Road & Blidge Construction and Standard
Index are to be uscd - the 2000 Specifications arc recummended since they
contain both English and Metric units.
52. Provide written and b'faphic scales on all sheets. II
I
53. Provide a cross-section of the east turn-around area to show the type of I
construction, including the appropriate specifications,
5,), All roadways shall be a minimum of 24 feet (2-12 foot lanes) in width,
including the parking garage entryways (north and cast). This site was !
, prevlOusly approvco. \vith the cnrrect \vidth lanes anJ 1'03::1\V31':-;, \\'ith a fair
amount of work between City staff and the developers to adequately address I
each area based on its use. Please revise the plans back to what was I
previously approved. !!
55. The sidewalks on cither side of Marina Dr. (Caso Loma Blvd,) shall be
widcned to a minimum seven (7) foot width to act hoth as a pedestrian path
and as a continuous wheel stop.
56, An inverted roadway crown for Section B-B shall not be permitted. Too
much roadway flooding IS possible, with settlement around the inlets.
leaving significant maintenance and repair concerns.
57, Paving, Drainage and site details will not bc reviewed for construction
acceptability at this time. All engineering construction details shall be in
II accordance with the applicable City of Boynton Beach Standard Drawings
and will be reviewed for constructability at the tIme of construction permIt
application, ,
,
I !
5S, Correct spelling of "stripping" to "striping" in the Paving Notes, I
59, Will the project be constructed in stages" If yes please provide a staging II
plan.
! :1
, i'
FIRE I!
Comments: !I
I
1ST REVIEW COMMENTS
02,128/03
8
,
DEPARTVIENTS INCLUDE REJECT 'I
,
60, The water and sewer plan (C-5) is inadcquate, Ilydrants arc not clearly
shown and the dock standpipe system with the Fire Department Connection
(FOe) is not shown, Show location of all the FDe's for all buildings with
fire snrinklcr nrotection, I
"
"
61. Thc sitc plan and master plan desi!,'1l documcnts shall adhere to Chapter 9 of II
the Code of Ordinances of the City of Boynton Beach entitled "Fin..:
Protection and Prevention, I! This ordinance adopts NFPA I, Fire II
PreveJltioll Cude, 2000 edition, and NFP A 101, Life Safe/v Cude, 200U
! edition. (These codes, as amended arc identified as the Florida Fire I'
Prevention Cude!. ,
62. Dcsign documents shall demonstrate eompliancc with LDR Chapter 6,
Section 16, which provides requirements for hydrants, Hydrants m
commercial applications shall bc no more than 300 feet apart and the
remotest part of any structure shall be no more than 200 feet from a hydrant.
Connections shall be to mains no less than SIX (6) inches in diameter. In
addition to domestic requirements at a residual pressure of not less than 20 I
,
psi, a fire flow of at least 1500 gpm is required, ,
I
I I
, ,
, 63. "'0"' ~~';'~ .i~l'~:n~.:; ::,c,,': underground water mains and hydrants are to be I
providcd, must demonstrate that they will be installed, completed, and in I
service prior to construction work per the Florida Fire Prevention Code,
(2000) Scetion 29-2.3.2.
64. Emera-eney access shall be providcd at the start oI a project and bc
~ ~
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFP A 241, (1996) Safeguarding Constructiun, Alteratiun.
, and Demnlitir)}1 Operations, Section 5-4,3. Emergency access roadways
, must be finn and unyielding, having a bearing value afnot less than 40 (i.e.
LBR 40), compacted to 98'% of the maximum density as determined by
AASHTO T180, in accordance with the FOOT Standard Specifications for
Ruad and Bridge CUl1stnlctiun (2000) Division 11, Section 160.
STABILIZING, A copy of the test results shall be provided and accepted
prior to above grade construction. Testing Irequency shall not be less than
that specified in the FDOT Sampling, Testing and Repurting Guide, or as
rcquired by thc Firc Marshal. The roadway shall be maintained free Irom
ruts, dcpressions, and damage. and at the required bearing value for the I
duration of it's intended use. I
65. CIty Ordinance Section 9-6, 3. 17- 11 requires approved automatic lire I
sprinkler systems throughout the following: I
I
,
a) All buildings or structures regardless of the type of construction which
are three (3) stories or more in height or all buildings or structures in
excess of 30 feet in height as measured from finish ground Jk10r t,Jfadc tu
the underside of the topmost roof assembly.
,
I
1 S1' REVIEW COMMENTS
02,'28/03
9
II II
! DEPARTMENTS INCLUDE REJEt'
b) All buildings or structures regardless of the typc of construction that are I
in excess of 12,000 square feet per floor.
66. High-rise buildings shall be protected throughout by an approved,
supervised automatic sprinkler system in accordance with Scction 9,7. A
',I spnnkler control valve and a waterflow device shall be provided for each
floor. Florida Fire Prevention Code, (2000) Section 11,8,2,1
I[ 07, High-rise buildings shall bc protcctcd throughout by a Class I standpipe
I system m accordance with Scction ,),7, Florida Fire Prevention Cod/!,
I (2000) Section 11.8,2.2 ,
i
68, Class 1, Type 60, standby power in accordance with NFP A 70. Natiollal
Electrical Code. and NFP A 110, Standard for Emergency and Standby I
I
Power Systems, shall be provided. Florida Fire Prevention Code, (2000) ,
Scctian 11.8.4.2,
. -------,
POLICE ~
Comments: ,
,
_. n_ _..._._...,_._~_,_._____._.____ .__ - "
!, 69, Show placement of traffic signs on the site plan, 'I
70 Show direction of traffic flow,
BUILDING DIVISION
Comments:
71. Sheet A-2. Parking Breakdown Table, The calculatlOns for the required
handicap accessible parking spaces 111 the garage are based on a total
number of 813 spaces, which requires 17 accessible spaces. Thc plans also
note there are 664 spaces in the garage which requires 14 accessible spaces,
Clarify on the plans the correct number of parking spaces in the garage and i
the correct number of required accessible parking spaces.
72. At the time of pennit review, the construction plans shall show that all
bathrooms in the covered dwelling units comply with the provisions of thc
Federal Fair Housing Act 24 CFR 100,205iC)(3)(lV). Requircmcnt #7(2),
Paragraph (A) or (8), Clear floor space shall be provided at fixtures to allow
a person in a wheelchair or other mobility aid use ofthe fixturcs, Clear floor
space shall be shown on the plans and designate which option of I
Requirements #7 (A or B) is being used. i
,
,
c, As i'eqUlred by Chapter 4, section 7 of the Land Development Regulations, !
,0 II
submit a floor plan drawing, The building plans are not being reviewed for
compliance with the applicable building codes, Thercfore, add the words .. u --. _... J
1 ST REVIEW rOMlvIENTS
02,'28,'03
10
OEPARTME:"iTS
"Floor plan layout is conecptual" below the drawing tItlcd Floor Plan f')llnd
on Sheets A-9 thru A-12,
74. At timc ofpcrmit review, submit signed and sealed workmg drawings ofthc
proposed construction. __ J
PARKS Ai'iD RECREATION
Comments:
75, The plans indicate that there will be 12 single family attached homes in this
development and 338 multi-family units, According to Chapter 1, Article V.
of the Land Development Regulations, the formulas for Single Family
Attached Units and Multi-family units are applied towards the calculation of
the Parks and Recreation Facilities impact Fee as follows:
I
1_-
12 Single family Attaehcd Units liP $ 771 each - 9.252
338 Multi-family Units (!lJ S 656 each = 22 1.728
Total - $ 230,980
The fee is duc at thc time of the tlrst applicable building pennit.
FORESTERJE:'-IVIRONMENT ALIST
Comments:
Trees
77. The applicant must submit a tree survey of the existing trees on the site.
7'8.
The applicant must prepare a tree management plan (document) to quantify
thc trees on the site. This document should outline those trees that will be
preserved, relocated, or removed 1 replaced on the site, This should be
coordinated with the identitlcation symbol used on a landscape plan sheet,
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 7.C.J
79,
Irri!!:ation System
Thcre is not an irrigation system design included with the landscape plans,
[Environnemental. Regulations, Chapter. 7.5, Article II Sec, 5,A.j
I
!,
I
I
'I
,I
:1 Comments:
PLANNING AND ZONING
80,
Submit a traffic study prior to the TRC meeting, The traffic study must mcct
INCLUDE
REJECT
I
~~~I
'I
II
II
'I
II
I
I
!i
,
:1
I ST REVIEW COMMENTS
02.'28,:'03
II
C :
DEPARTMENTS II\CUTDE ReJECT :
the requirements of Palm Beach County Traffic Engineering prior to ! I
issuancc of a building pennit. I
- I
81. Approval of the site plan is contingent upon approval of the Land I ise i
Amendment to the MX-C designation that allows the denSIty proposed.
82, Residential single-family attached units (Townhouses) are not permitted in I i
the MIT-H district. (Ch. 2, Sec. 6,F, - Tablc 61'-1). Remove them hom the I
,
plan or request a Code review, I
83, All utility, storm sewer and access easements in conDict with the proposed i
I building must be abandoned and rclocated prior 10 issuance of a building ~
I permit for this phase of the project.
!
~4. The required build-to setback line on Ocean Avenue is 10 feet if the intent I
IS to widen the sidewalk. The site plan indicates a 12 foot sctback. Revise I
the plan to 10 feet to meet the code requiremcnt. (Ch, 2, Sec. 6, F) I
I 85, Developer is requircd to establish a propcrty owners association for the ;1
1
II proiect. il
86. Provide the "net buildable" land area calculation under Project Data on thc
Site Plan Shcet A-2, (Ch. 4)
87, The infOlmation providcd under "project Data" on the site plan does not
correspond to the information provided on the application, pmiicularly the
perviouslimpervious area calculations. Please review and revise.
88. Provide the total floor area calculations for all uses under the Project Data I
sectIon of the Site Plan Sheet A-2 I
,
89. The revised plans show two (2) Icss boats slips being provided than
previous Iv aooroved. Please exolain.
90, If chartcr, drift tlshing or sightseeing boats are proposed, additional parking
is f."Cluired per Ch}-,.~ec, 11, H.e.( 11). .
91. Provide height dimensions to pcak of roof for all buildings on the elevation
drawings, A height exceotion mav be required. (Ch 2, Sec. 4.F,)
92, Provide dumpster locations for the commercial buildings on the pIer.
Indicate method of refuse pick-up for the E'.r<:>iect. (Ch, 4)
93. Submit color clevation drawings for all sides of all bUIldings pnor to the
i
CRA Board meeIing, !
94. All rooftop equipment must bc screcncd from view at a minimum distance II
I
of 600 feet. (Ch ,9, Sec. 11) I
95, Providc a color chart for all buildings on the elevation drawings indicating I
,
the manufacturers name and number. , i
I
96. Provide a detail for all signage proposed for the project. The monument sign I
shown in the northwest comer of the site must be 10 fect back from the
property line, Please orovide this dimension on the site olan, (Ch, 21)
n, The garage cntrances appear to be 20 feet in width, Enginccring standards I
require a minimum of 24 feet. Revise plans accordinQly, i
I
98, How do residents in Building 3 access the pool and tltness center amenities"
Please explain and orovide a note on the plans.
99, The proposed plan does not meet the parking requirements for two and three
bedroom residential units, Two and three bedroom units require two spaces
per unit. (Ch 2, Sec, 11) Provide the required parking or: Compcnsate for
I the 129 parking space deficit by using the "fee in lieu of' provision in Ch,
II 2. Sec. II H, request a variance or request a code review to allow 1,5 spaces
1ST REVIEW COMMENTS
02:'28/0J
P
-
II
DEPARTMENTS INCLUDE REJECT I
per unit for twu and three bedroom units. I I
I
I
Label the location of all surfacc parking spaces 1l1cludcd for this projcct un I I ~~'1
100, I
I
the Site Plan Sheet A-2. I m ~
101. According to the tablc on Sheet A-2, parking spaces in the garage total 665 I
I
not 664 as ShOVll1. Please revise accordingly i I
102, On the parking layouts il)r each floor of the garage, Shect A-22, provide ,
I
dimensions and a space count for each Iloor !
---
103. Provide a typical parking space dctail for regubr and handicap spaces. i
I
104, Provide traffic control markings (stop signs/stop bars) at both cntranccs to -
the oarking garage, -
105, Who will construct improvemcnts on Boynton Beach Boulcvard'J These
improvements are needed to accommodate access to Building No. I Lobby
and parking garage? Provide details regarding construction plans and time I
frame prior to issuance of a building permit. !
106, Landscape Plan indicates the use of the ficus species, Ficus is not permitted. I
(Ch 7.5, Art. II, Sec. S.c.). Revise plans accordingly
107, Landscape Plan Sheet LA shows 262 Scheft1era (SU) on the site plan but
lists 294. Please correct. Also, review the use of the Sehemera species that
appears on the Palm Beach County list of Prohibited Trees,
] OS, Landscape Plan Sheet L-5 indicates 23 Green Maypan Coconut (CN) of the
plan but lists 27, Revise P~~~!Yj.a(~~~0.1.l.'1 :"y. ___
roY. Landscape Plan Sheet L-S indicates 201l Pllllodendrun ScHoum (PS) on the
plan hut lists 100, Revise plans accordingly.
110, Pcrvious Landscapc Area calculations on the Site Plan Sheet A-2 do not I
n~~tch t12.ose on the Landscape Plan Sheet L-2'.Bce..vise plans accordingly.
111, The landscape code Chapter 7,5 requires that 50% of <tlllandscape matcrial
provided be native, Revise note and calculations on Sheet L-2 accordingly,
112, Indicate the method and source of ilTigation of the Landscape Plans.
113, Tree trunks shall be a minimum t'our-inch caliper with seven (7) feet of
vertical clearance for visibility, (Ch ,2. Sec, 6, F,S.a. (2)
114, Willl10wer containers be used along the fa<;ode adjaccnt to Ocean Avenue') JI
Please indicate on the Landscape Plan, (Ch, 2, Sec, 6 F.S.e)
1 IS Minimum tree sizes planted along the west side of the project shall be 16
,. feet. (Previous CRA comment) ---
MWR'sc