REVIEW COMMENTS
DEPARTMENT OF DEVELOPMENT
MEMORANDUM NO. PZ 04-050
SITE PLAN REVIEW STAFF REPORT
COMMUNITY REDEVELOPMENT AGENCY AND CITY COMMISSION
February 25, 2004
DESCRIPTION OF PROJECT
Project Name/No.: Deliverance by Faith/ NWSP 04-001.
Property Owner: Deliverance by Faith Church, Inc.
Applicant/Agent: Mr. Mike E. Sipula.
Location: Lots 4 and 5 on the North side of Martin Luther King Boulevard approximately
400 feet east of Seacrest Boulevard.
Land UselZonlng: Local Retail Commercial/ C-2.
Type of Use: Church.
Project Size: Site Area: 0.32 acres (14,008 square feet)
Building Area: 3,090 square feet
Tower and Trellis Area: 464 square feet
Total Building Area: 3,554 square feet
Lot Coverage: 25.37 %
Adjacent Uses: (See Exhibit "A" - Location Map)
North -
Vacant property with a Medium Density Residential (MEDR)
land use designation and zoned Single and Two Family
Residential (R-2);
South -
Martin Luther King Boulevard Right-of-Way, farther south is a
vacant property with a Local Retail Commercial land use
designation and zoned Neighborhood Commercial (C-2);
East -
Vacant property with a Local Retail Commercial land use
designation and zoned Neighborhood Commercial (C-2); and
Developed commercial property (Authentic Soul Food
Restaurant) with a Local Retail Commercial land use
designation and zoned Neighborhood Commercial (C-2).
West -
Site Characteristics: The site is located within the Martin Luther King Boulevard Overlay Zone
(MLKB). This overlay zone has been established to specifically guide
development along this corridor consistent with direction from the Visions
20/20 Redevelopment Plan and the Heart of Boynton Community
Redevelopment Plan (See Exhibit "0"). The site is composed of two (2) lots
totaling 0.32 acres. The site is cleared and is predominately vegetated with a
variety of overgrown grasses. There is no other vegetation of any
significance on the site.
Page 2
Deliverance by Faith Site Plan Review Staff Report
Memorandum No. PZ 04-050
Proposal:
Concurrency:
The developer is proposing to construct a one (1) story, 3,090 square foot
church, excluding a proposed tower and a trellis area totaling 464 square
feet, to be located on a vacant 0.32-acre parcel. The proposed building
height is 29 feet - 1 inch, which is below the 30-foot maximum allowed in the
Martin Luther King Overlay Zone. The parking lot associated with the use is
proposed to be located at the rear of the church building (See Exhibit "B" _
Proposed Site Plan).
a. Traffic - A traffic statement for this project was submitted and sent to the Palm
Beach County Traffic Division for their review and approval. Staff h~s
received confirmation from Palm Beach County's Traffic Division
regarding standards compliance.
b. Drainage - Conceptual drainage information was provided for the city's review.
The city's concurrency ordinance requires drainage certification at
time of site plan approval. The Engineering Division is recommending
that the review of specific drainage solutions be deferred to time of
permit review.
Driveways: The proposed project includes one (1) point of ingress / egress along Martin
Luther King Boulevard. The proposed entrance would be comprised of a
10.5-foot wide ingress lane and 10.5-foot egress lane separated by a striped
median in the center of the opening to direct vehicular traffic in and out of the
subject property.
Parking Facility:
Landscaping:
Since the project is within the Community Redevelopment Agency
boundaries, the minimum required backup distance for parking lot drive
aisles is reduced from 27 feet to 24 feet in Width, which the applicant has
provided. The proposed on-site traffic circulation system includes one (1),
two-way drive aisle 21-feet in width. This drive aisle is proposed to extend
from the north and south property lines. Driveway circulation is proposed to
the rear of building.
The parking spaces required for the proposed project have been tabulated
based on the ratio of one (1) space per 100 square feet of gross floor area,
which is required for churches (Places of assembly). A 3,090 square foot
building would require a minimum of 31 spaces. However, since the Martin
Luther King Boulevard Overlay zone provides a 50% reduction in the number
of required parking spaces, the site plan proposes a total of 16 spaces for
the proposed use, which includes one (1) handicap space. All parking
spaces excluding the handicap space will be dimensioned at least nine (9)
feet by eighteen feet (9' x 18'), and will include wheel stops.
The landscaping of the site will fully meet the code requirements when staff
comments are incorporated. The proposed pervious or "green" area is 3,140
square feet or 22.4% of the total site. A 2.5-foot wide landscape buffer is
proposed along the east and west property lines. This landscape buffer
consists of 5 (five) Green Buttonwood trees along the west property line,
three (3) Satin Leaf trees along the east property line and Red Tip Cocoplum
shrubs to be planted at the base of the trees. Along the north property line a
Page 3
Deliverance by Faith Site Plan Review Staff Report
Memorandum No. PZ 04-050
Building and Site
Regulations:
Community Design
Plan:
Si9nage:
five (5) foot wide buffer is provided. Within this buffer, the applicant will
provide the required six (6) foot masonry wall with Red Tip Cocoplum along
the northern property line of the site to separate the church use from the
adjacent residential zoning district to the north. The foundation planting for
the proposed building will include Pink Ixora, Wax Jasmine and Variegated
Dwarf Schefflera enhanced with accent trees such as Bougainvillea and
White Bird of Paradise. The development would be provided with the
required amount of perimeter and internal landscaping as required in the
Land Development Regulations, Chapter 7.5 Article II.
The proposed building is designed as a one (1 )-story church with a gable
roof. The top of the gable would be 29 feet one (1) inch In height. The
minimum building and site regulations in the C-2 zoning district require
minimum setbacks as follows: 30-foot front setback; 15-foot side setback;
and a 20-foot rear setback. However, the Martin Luther King Boulevard
Overlay Zone requires separate building and site regulations, which
encourage a reduction in the building setbacks to bring the building closer to
the street. This results in a minimum front setback of 3 feet and a maximum
setback of 12 feet; a side setback ranging between 3 to 5 feet, and a
maximum of 12 feet for corner lots. No dumpster enclosure is proposed since
a trash room has been provided to store small, portable containers in lieu of
a dumpster. The proposed building setbacks will fully meet the Martin Luther
King Boulevard Overlay Zone development standards. Additionally, building
and site regulations will fully meet code when staff comments are
incorporated into the permit drawings.
The proposed one-story building will have a maximum height of 29 feet - 1
inch measured to the roof peak. The proposed building is a traditional
design. It would have painted stucco facades the following three (3) colors:
Lighting Bug (M.A.B. Paints 5059M), Canberra (M.A.B. Paints 5114Y) and
Desert Spring (M.A.B. Paints 5626M). The accent color, which includes the
cross in the proposed tower and the bottom of the proposed building wall, will
be Babbling Brook (M.A.B. Paints 5624P). All trim fascia, will be painted in a
semi-gloss white. The doors and windows including the frames will be white.
The roof will be constructed of light gray asphalt shingles. There is no
established architectural character within the area with which to compare the
proposed project, however, the Heart of Boynton Plan recommends a
"Floribbean" architectural style, which represents a combination of an .Old
Florida" and "Caribbean" influence. The proposed project does not exhibit the
elements of the "Floribbean" style. Metal roofs, dormers, steep pitched
gabled and hipped roofs, and exposed wood trusses are some of the
elements the Heart of Boynton Plan recommends for this redevelopment
area of the city.
No project monument sign is proposed. Any future signage will require
separate review and approval. However, the project proposes two (2) wall
signs on the proposed tower. On the west and south fac;ades of the proposed
tower two (2) wall signs measuring 14 square feet are proposed depicting the
church's name. A board measuring 12 square feet Is proposed on the
southeast fa9ade describing the church service and related Information. The
Page 4
Deliverance by Faith Site Plan Review Staff Report
Memorandum No. PZ 04-050
proposed wall signs would comply with sign standards including maximum
sign area and height as set forth in the Land Development Regulations,
Chapter 21.
RECOMMENDATION:
This project complies with all current code and Land Development Regulations. However, and most
significantly, the project is not consistent with the Heart of Boynton Community Redevelopment
Plan, which recommends the site of the proposed church be developed as part of a larger
"gateway" activity node consisting of an integrated commercial/mixed-use development (See Exhibit
"0"- Hearth of Boynton Plan Phase 1 MLK Boulevard Redevelopment Section). This
recommendation is in accordance with Chapter 2, Zoning. Section. 3.A.7, which allows for adopted
redevelopment plans to supercede zoning regulations where such plans: " includes policies which
impose limitations or requirements on the use or development of property...which are more
restrictive than those set forth in zoning regulations". Therefore, the Planning and Zoning Division
recommends that this request for site plan approval be denied. If the proposed project Is approved,
staff recommends that the approval be subject to the conditions listed in exhibit "C", attached
hereto.
xc: Central File
S:\PlannlngISHAREDIWPlPROJECTSlFallh by DellverancelNWSP 04-OO11Slaff Report.doc
...
1 in. = 100.0 feet
-2
R-2
,~.' o.
,\(f f,Y,
I (! "
\ ,T
"
(-.
LOCATION MAP DELIVERANCE BY FAITH EXHIBIT "A"
lI,f I un rUi
I" Ualt "fllllf
'II ulhf hh ,I"
1 II ,U(l1 nil fJ~!
I~I: .. ~al!i IIH~i hll
u I ~'rJ · U' ~ ~ I
IIlijl=; ii1h i It
!" hi, i I
~ ! af fl.. I
it h -
f lEI 1'1. IP
I I"'ti! , fit
I dr~ 'II! fi~ .
I ! 11.1 (lr
. I h! I ! G~f
ilu:![ , Ii ll~f
~ ~~'l % I r 11
fn- II.n
liJ lie I}
!II I! I I
'- I
I I
I
I I
Ilft~1 !eliI !IIIII
'II III.I~ l!a
It-. 11..'11 .1.'1
tllll ~ II ~ III)i
lill !llli'l liill' I
~I,. ) !I~ I ,I
I I
: =111 IIII
'II I "'.
11~~1 Iii!
i: -:11 Ills
.._' ,I
-I
"
S~
~
s
~
8'-
Ig
~
o
%
::r
>-
"
I I;
& .
i j i f
:!
n
L r
..
!!l
i r I J
~
: : f
~ ; 1
~ e l
g 6 f
i ~ i
i ; J
i i { Ii
5
w - h-!!
: .
;t 3 19'
I-i"
II I ~
i ff
. ~~
i g
: :1
IIi
, [
~
I ~
.
I ~
LOT e. 8lOCK 1
lOCAl. RETAIl COIIMERCW. (LRC lAND USE
'Ci'm NElGHIIOIlHOOO COlotMERCW.. ZONING
EXHIBIT "B
Lit
~ HII.
.-.-'
III 55.02' 55.02' _' .'
.~~
alS
J l....
LOT 3, BlOCK 1
lOCAl. RETAIL ~ (LRC lAND US[
ocr m NEIGHBORHOOD COl.iIotERCW.. ZONING
. '~6----
,ill .-
: ;.'~:...... ".
)100. :.".
I~~ I ~;I'
.01 < .
~%II:. .
rl I
LOT 6. BlOCl< 1
lOCAl. RETAIL COMMERCW.. (lRC lAND USE
ocr m NElGHBORHOOO COfoIMERcw. ZONING
i
C" C" e: C'~_.: :~--'C" ~ ~i:'; _I:', 1'C'9
. ~- f4O.06' --""-1'-' .. : ; C"
G:' C" C" ". ". ~ ". .. i:' ~ r--~::;I ~ I ~
.. C" !If C" .. !If I:f I:f !If C" " -- . "I~ I
----------- -, g~ . . , . ~
. . -." 'c--'1:"'" !f l'-.. ~... ,. - ~ i!
"',' i ::: :,: r li!
!f I:f ~ <tJU~
I.. ". I:f C" ~----ot. ; uU ~
f-~ !If ~~ ~ G:' ; :' ~~;
-.-...- '" _.--.' 'l.;1z~
I-: !:" t:' ra" ~ co; ::~Io-i
,--- -.--- :. ~ ~'"
. ~.__~_.. ..t'..___"',<I~~!
( k-5_~L_.t........~:....
_" ...._- ...-<>- _u._ --8503"~ --- ..,.-""
'!!' ~5.0,!!, '!!' I:' .. i:' 1:" I:' i:' i:' i:' i:' c-
LOT 3. BlOCl< 1
LOC.lI. RET..... COfoIMERCw.. (LRC WlO USE
"crm NEIGHBORHOOD COMt.tERCW.. ZONING
~- +,' :I~ .
en i:' ! )1
iii ' ! l!
r- I I:' i ,:
~ ..! I
~ z' 11
~ ~:'I c- i ':
> I:i! C" i I
1l:Z:.'" ,
~ ili {r.:
~ I ',I"ll,l t
~ i 1ilq--
I. :!:
, c- : ;1
1 ' P
: 1>-j! .
~-.~ ~--
I i I
,;! _11
0'
= Il1E ILIN lIE\'lEW
1lEL.JVERANCE BY FAITH" ctUCH - OFF STE PAN<NG
LOTS 4 & 50 8L.OCK I
FJWt< WEBBER ADOITlON TO BOYNTON BEAQi. R.OllIDA I
@
~
I
~
8
j
EXH BIT "B"
DitSTIIG RE:SDENCE
flOOR +/7.56
!i II~ ~ r-
~~ ~ s () 0
hi ~ ~~
r +15.6:
+
ll1
'"
~
<;l
,.
Ilo
'"
!ll
~
~
+I5.5J
,+
.~: ~ .
~"'~ I T
~;i~ I
+ !2"
~!:ii:l
",~'ti I !Jl'
li11~ ~ Ii ~I
~ I~ ~ I~ ~I
"'~~ ~I
~+::t ... e +
i~h c. ~ 2 ~
1'~~2 I~ 2
~~!il ~
II! "~!:l~ I <il
,",~iii 2+:i ..
~..", I ~~~ ~
o"'ll:: I ~..:.. 0.
c:"'~ ~....... I
"""~~
~~d
"'~."
!ill
I~
140. 6'
+
ll1
....
+/6.2
+/6.2
1,'1'
~r- l '"
~
"1;. ()O
'oS> <")'-i :..
='\01 ....
'"
;;; ~
~
Ii (Ij
,I~ ~
I~~
I
I...... ~
II C) :tJ
+t'
I !==> lil..Po
lC)b-C
I~ ~
Id
~~ ~
01
~
+/6.7
+16.9
'"
):,. +/6.5 _ _ _ -.r:-- - -----+r-
---0--- ~..> i>l ~
'" ..
):,.
+
lil
i.
~/
<
-c
'"
~r-
"-6- ()O
.... (") --t
='\~
'"
~
:..
+
1;;
c.
Q).....~.-) I...
%.l~ i
~ to.
+
~
~
~
;;;
1;;
p
'"
q
+15. +/5.J +14.9
140.06' ,...
+15.1 ~ +14.7 ~r-
JHI~ ()()
(")-;
~b1 ~ ~~
~ 3'
...
(;1
b
+
;i:
'"
fASTE:RL Y LIMiTS OF PLA r
~~ ~~ ~~~ ),.QJ)a.- ~~fll}:!!o t;::) tll<: tI):<::-!- ;:!l ~ r-
U~B ~ (') ~
l;J -<;0 ~~p; 0 ~
tl: C) !li~ (,)(,):>':0"""1 p~ 0 <: II
~~ OO(')C)-I>. ~ ~~.~ g II ~ ~
oj ~i~ ~~~-< ::t:.: e:~P: ~ "ii ~"4 ~
.- ~ :B ~""tJ tI)!'l:>1.....l> -<;)>.11 ~ ~ II j:;J
-rii :j <:
~;!~ .,.., ~ti :::0 ili~~ "'illS ol;:jf-'''-i~ ~ """1~ Inr- Q, (') ~
-I>.~o fil ~ ~ ~h~a "'::e~;l:r- ~ ~l;:)~ ~ II II . ~ Pi
~~ 0\ :-i '" :1J el'Tjo (')l>o, 3ll
~ :t:::. ~< ~~~ )>.;:l:!l>::l!"""1 <;) :t~:<:: 3ll 0 ~ ~ :z:
'" t:JE3 n E/!:<O " ...""l-J r-l> . ~ 3:::>': (') ~ ~ ,."
.... t:i ~ SJ a",...~ ~"""1l>~~ ~-g ...,
ji ~~i r- <;) ~ :1J i:;j
'1'~:J>3~V) ~!iii", ClJ tlltllR:>(r- l> ~~<: ~ ~ g
t; r- ill ~ ;2: c::: ~~ ~~~~ 8 ~oo~[;J ~ lOin l>
~ ~ ;;:t t5-...;; ~~ C)~e:Gltl) cl )>. :1J 0 ~
~ ~~oV):-; ti ~tI)~ ~ c::
....~~..,s:::[1i :to" ~~;;!~ ;:::: :J:: ::e!"i~ :t
ld:<!G~~::O (').!O<;);o;:t r>j ::QOt:j )>. j;;J
~~ II}:-t ~Ei~ ~ Ol) l>I'Yj ~ )>.~ ::e :; ~
'!:o~;2rTj ~5~\ ~~~l;:}tI) -<;C)~
~I ld!"1 ~--<~ ~ r- -<: l:l
~~t""~~ ~~ ~~~~ ~ """1~"-iS!~ ~P.i;c: ~ r-
~~ ~~;t:j"-i ~ o A ~ ~
-<:'" ~ V) ~tI) :t' ~~Ill~ -< :1J:>1"-i
ii ~ ~~ ~ ~ :>1 1'Tj~:t A ~f-'~ [:l ~ tll
:O!'1 __ ~~... 8~;:l:!"""1a :j ~;c: ~
~~~fi; ~ ~l> I ~ ~~ V) 0 <:
I ::Q l><::>:>1 $: ~i:;A ~ c."
J\o OJ;!! l>l ~~ .. Sl i! i 5::: e"-i"""1 !"i !Jl~r-
.!.~~.... fi1 ~~ ~ l>~ tlll'>j l> I'>j~~
"'...~ . ;X!~"""1 tI)
;;!l'I-<: ::0
I ~ It:~~ <: ~ ~~~~ ~ ~~<:;x! ;g ;Il~o
O!=:J ... " ~r-~
;0 \ ~~~~
18~ ~~ "'- 0 .'O"-i
<: ~ ~...~ -< ;:;; "'"\~()
I ... ~ ~h l> 0 ~ (')
~ . ~ -1>.. l>
'I tll tI) :'1 I;:j r-
Q. 10
,: I\) A:: +r- 7L
. q
-I
-<
~
n
,.. 'll
r- ll'
l/l '''1
~ y' ;t;l'"
::! .~ .
o .. ~~f:
z ';' ~...i[
.. i:.il
i lllli!
g q h~l
;E i !lt~
~ . t. t
.... hi
~ lh
:;=:: "
z
.G")
,..
~
,..
s,.@:
i ill; I I I
..:II I I ~
- "la' I I I
I III I I I
! -hi ; ; I
e!.!~ i I
. 11.1
IU!
;;,
I
o
;>0
>-
%
>-
e-
m
g-o
_ r-
~~
i;
&,
!
t
l' F !' F F!' ., .' . .. S!!1l
1I1~ I"II '1111 II Iii 11I1111l~ III iJlq:I"llr~ iii Iln i I
1t)'1 11.1 I il I M Ie I I ill pi 1 it ~
. ill ill !II! II j! l'i1lili ill !m 'Iii b !! ili11 E I
!II ,It ii'! ! I i~ ii!i:1 !II!, n!! iil't I; . HI I
III II ji i I IPlii! II '!ll!i iiI Ii i Ii!
.r-
I~
::I
<:)
:z:
::c
~
L
_._.~~--_.-
~
o
m
::::
,..
r-
;::;
Ii
..
~. i:i
Ii ~
.. ~
o
m
-l
!;:
r-
t<i
~.
I
EXHIBIT "B"
lOT 6. BLOCK 1
.LOSA'- RETAIL COMMERCIAl (LRC lAND USE
C2 m NEIGHBORHOOD COMMERCIAl ZONING
; C
+
t
~I
};I'
~,
I
~~
:'1
~ ~ 1-
! I S~
.... a ~!i!
~ II 0
~" I a~ ~ "I
FB !.!;~ I~ I! . ~
~ II e~ ,; I
r:! i z:il I i
~ I~ ~~ I I
12
g.. ll;~
H Ii.
"'>;;.E l~
I i
il .
i I
~ i
: I
s ~
&
,,'" "'
~~ ~
~!:i I
~
~
.. i
~ E
g Ii
..
H
I :.8
~ i IO! =
'1. ~II
Q ~ ,
..
SITE PlAN fE>IeN
"DELIVERANCE BY FAIT., CHURCH - OFF SITE PARKING
LOTS 4 &. 5. BLOCK 1
FRANK WEBBER ADDITION TO BOYNTON BEACH. FLOPJDA
, I'
. ~~ ~~
. i 012
" 1S!6
I ::l12
! III 1m
I il~I~;j
!~IU~
:: · N_~
1 !1~lll:
:: ~ i~
i ill 0...
! i ~~
: :
D
55.02'
lOT 3. BLOCK 1 .
.LOSAL RETAIL COMMERCIAl (LRC vAD USE
C2 m NEIGHBORHOOD COMMERCIAl ZONING
! ~~ ~i1
I '_
'11
~ ~ u
. ~ 4 ot
~ ~ ~
:: \ ~ I
m 9f1=i~
I! ~'" L'
I- I ~ II;
! li:~I~ ~
, I
~ ~
~ =. of
~ \ ~ ~
,
~ ~ ~!
;1 I !9 II r-:lSl II ! T
_ II III ~~ ~ Il( ! ~
~ Illki~~!~!~ ~"
Ii . II III p:rl,111 l:! 10,
g C ~Hil.ll 1~~~I~iI z ;1
r- '-1 ~Ini!~; :I!ii!;l. s
~~ ~ z ui!1 I~ 'II lS
:~ i ffi~lliit Imll!l: ffi ~ I I
:2 J l'I' 1,,1 ,II ~ .I~ ,r
.. I . !~ ~ ., I '1
~
f
(9
I
ill
~ ICON DESIGN GROUP
:;.~.IT~~. ~E~~N!.E~;.
I 1IWIllE 11111113'1111 FAlISlII 3Il-Gl1l
q !
;
!l
j i
I I
I ;
I I
I ~
iii · i u e Ii i I II . II G
III 11.lle! {tr-
.1. '. .iJ~1 !
i!i 1 ; I ; ; I Hi: .
:'11111 Ip~1 II
II II. I,!~I
i . II II
i III ii~
J 5 I III
r. J I" I
Ill' I
~ i I I
"I · I!
_.-
. ..-
:.
I I
I
S
I
I I
~ I
I ·
- i
i
,... ..:'" I
i 161
I Ii J
I..q
I ~ 5
! y!
I Ii I
i ~ i
J If
d'
II
.~
..
II
I I Ii 'I!=I'
I I~ .' I
. I .; 'i
~ ~ ,. I
i
I I I~ ~ I I
I I. I' ·
I ; I '1
. I.
. I: ;
I ! II i
! I I. I
e. ! liqe
I
,~ rihiPil
I 11;1 !
I Gila ! I
. ~I!E I . .
~ i!;1 i
III!! I I
Iii I .
.. ~III i
I".'
i ~ . I ·
! .
~I. I
. 0
...
'.j
ill G
1 !i
I
~!
ii
I
o
I; 0 .
11 n
.1
Q !!, :::...r'
o 0
! !.
co. ~
~lllg Iii ii I'
!l I:: .:
~ In =1
Ii: lor Ii
~ g I .1
~~ I it h II
~g IS Il it
!E~ !I PI i I
~ Ii;
m ! I ·
1
II,.
~ g J!
~ . II
11m' t~ I
:P;.I J
j !
I~~~
::.
! ill Ili~Hi!' ;
!!
;
!l
S Ir I ,.... .., " ""
Ii !.; I!I !! iU~o ""
I ""
;;1 II ..! I..I!;~! ""
""
~ q u; ,luti!
;l g
~ I " ~ I' I ,:u
!!l I D I II;. Hi:
I I ,.. ii" jllll m! i lP.~!i!1 ,
~ II.. I .I~I
~ 1';- I il~ I P.;i~ I
c; I , I II! I .pl.q
01
, I; '!Ii
~e.
'"
liB"
I
i
" .;< I!~ I" r nS" IW i' ::-:~! : .," I" r,.-, I
Ii ~I" ~ -~ -,.~ aJ!1 ii '"Ie. Iii i ~!I!.
'n id ,I ~ ;;n .Iil. i !It , ;~: ~11i!!I. '. .
. :i ~i: .!.~! ~ri! IHI i !:Ij 1;: I h;;;
!I lpl I i~ l"jG li:1 I ~i~~ ;<jl I' 'I"~II
111"1 & I " "'1 I -, "II I .
: I, p; ~~; III : I :!; . ; i'il:
I; II!H II'!!' iU I Iii 1'111";1.. .
I! I; ! I .!~ ,': I t i . ..
. i ..~. I I I
I~ l~ S!: J!;: II~ Iml oU':;: I!II"
= h Ii; I!I Iii . ,..: .d II.
"1 'lOll I.II~. !5ili' Ii!, iii
~ J I~ J fili :~!i! II~i Iii;;
e. "". ". a. i . i
I! il 'j! ',II! ;11 !h: ~I"i ':~III
Iii if ".lli !dl ill, II II!~.
'1 "s "1_ I!~' II.. I=E i
II ~J II iJlli! ell I!!! iiill I
: II !! 'i: ;! !I:~ !il~! I!" II "S
I~
J
I
LOT 6. BLOCK 1
LOCAL RETAIL COMMERCIAl. (LRC LANO USE
"CX'm NEIGHBORHOOD COMMERCIAL ZONING
~"i
I'~
li~
J;
t
AS
-..
~ l4Q.06'
'"
~~
"'",
~
I
I
I
JI
_---e--
I~~ 55.02' .-/
'I' ---- LOT 3, BLOCK 1
! ~ LOCAl. RETAIL COMMERCIAl. (LRC lANO USE
__ .CX'm NEICHBORHOOO COMMERCIAL ZONING
- -
-
J
: : I~
i ;11 ~~
. : E~
:: l!: 2'"
i !181,,;~~
:: . "\:< is
:: m~:z:
1 Rlt!:!lil~
1 ill ~~8
::\ ~~:
\ j ~lli~~
: :1'1 fi '"
'1 c'"
:: l'\~
, ,
" '"
I II D~ SITE !'LAN IlEVEW
o '" LlELlVERANCE BY FAITH'" CHURCH - OFF SITE PARKING
.. ~ LOTS -4 a. 5. BLOCK 1
5! ! FRAI'f< WEBBER ADOITION TO BOYNTON BEACH, FLORIDA
IICON DESIGN GROUP I=~'-- J
AllOIITI3CT11 A: EIIQIIllEmUII
... N.I. 4U COJIT, IClCA "'10<, Fl.. 13432
I lBBIOE '1111 _II m 11111 .1-41074
~I~ ~ 't'i 'i Il,~ !i Ii i W ~ ~ II 'llf1jll'l ~'til
liil~liP!I~il!illli 'rd~' l.~l~l
!~!!il!PiBn!!iIl,;h "I th',l~~ I ~ II ~~
~II -i I i ~~ 'II' ~I il' aii HI 111.11": !1 fi 0'11
I'IIAU!I ~'Uhiihln!~ 11 ~I~~~ Ii ij Imi
.~; ,Cii 1 11 In' ~ Iii ! U jl'IU D)I ,1111
~ti!lld ;1;;; I H it I!; u'!n U d hli r:
Iii ~ a 1& ~liI I; f~! . , ',II If J' d !I
II , i i ilii ! II i~ lli PP II 'pOii p ta1jl pn~~'
~ ! i I!III;'I flli II U {.n I ill~lIlrml1
. i dJ U h Wi, 11 N1nu'! i!1~
1,1 II 1 1131.0 IPlli
-I! 'I: t I IJ)'II -n 11
I,l I I ,..- l!l'U IHjU
n III i It ! tllilf It1llli
II Ii! "~!l 1.III!
" I, t 'I 11ft
a \ II ( I'
11 ! i JI ji nlqt
I
. '" r r "-f
i~ ' . p~
I~ ~ ~ d<
n I ~ ~ IIIP ~~
I JI.. IUI.1 "
I . ~ ~ ill n
'i l! I(
I
'I
II
J'
I
J
. 'j -0
'ull! ;
l.jsjg
Illh 5
11;11
n i ~ .11
i. f I
ql
t
~l.)I I
'I
II
'I
ft
Ii
.
l
~
nq! ~
in~ ~
I I Q)
~ I
i ; ~
n.
-g . ,I
- ~ . f I
.Jl
EXH~~IT nan
-....
I ....
! R I
~ s
2
J:
I>
..
~
!
l
I
&
fi f t>liIt!l1 ~i ~I &:I. B ]
!l r~u""R'" p g:
"qqllll ;
I ~i~l 11 i 1 il
~IU I, i r' if
. 't 'r
I ! II ! it
I
'1'" II. .. ".
~! ~ ~ i~
of, . ,. ~~
'1 ! J ..
Ii ! i ~~
"f'"
I I :~
t j U
ii)iU1i) DELIVERANCE 6Y FAITI-I CI-IURCI-I ) ([~f mn 'DB
M l~r~1 eoTIlTON eeACH,F\..~OA H~! I; 'il !I""
f 1'1, ~I~~ It! p
l C I"L~J"I.,AN ti ia
f i't1
! m~
i t;~\~
; ,!
i
.
I
~';J!
, 0
.,." ~ ~
'-0
r-
)>.
%
~ i I
,:.. ~ I
0-
B
~
~
I
I
t
o
o
D
~ r po" ~ ~
EXHIBIT "B"
~
~
~
~
~
~
~
iii
PlANNING I: CONSULTAN'I1KG ..-............-
III ,.-' HII._ wat IU_
lIll1( 1I.1Il.11I11_HlI1IU,...
-'--.-......-..
~ lITE PUN Ia'IEW
"DELIVERANCE BY FAITH" ctU\CH - OFF SITE PAII<JIlG
LOTS .. & s. BLOCK I
FRAN< WEBBER ADDITION TO BOYNTON BEACH. FLOII\DA I
~
~
~
I
~ !till HII I :!I m
.
~ Ill.1 f 11111,1 ~
-II- I ~ id ~ t ~
I I t=IIIIII~,:
Illi II i .I~ ~: ~
151~jC!:!:!:!:F~
I: III ~~
JJJJ .. .. i ~ g;
I - l>
~~I ~5i
"~6..11 ~r: I~ 'i III
!:!:~!: I I!~II~. ..
OOOOOOOO~~I!I
0, m 1;1~;g~HHI g
l> b
(I>
~ -i '"
~p! !~ II~jHljl 0
:E:
.. m I~ ' ; l>
< '"
l> ....
-i ~
(5
%
I rrr'"
~
~ i !III I I~
I I ~~I II lis i
~ ~I' iP
~
?:
t
hi
~h
riB
lal
EXHIBIT "B"
I 1 ~
~ ~ I
...., ~ II
0-
~ sm; PUIC IE'IlEW
1lELIVERANCE BY FAIlli ctUICH - OFF SITE PA~
LOTS" & 5. BLOCK I
FftAN< WEBBER ADDITION TO BOYNTON BEACH. R.OfI)A I
EXHIBIT "e"
Conditions of Approval
Project name: Deliverance by Faith
File number: NWSP 04-001
Reference: 2nd review plans identified as a New Site Plan with a February 10, 2004 Planning & Zoning date
ki
stamp mar ng,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS- General
Comments: None X
PUBLIC WORKS- Traffic
Comments: None X
UTILITIES
Comments:
1. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (CODE, Section 26-16(b)).
2. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each X
building be within 200 feet of an existing or proposed fire hydrant. Please
demonstrate that the plan meets this condition.
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
3, Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
BUILDING DIVISION
Comments:
4. Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6. and
Conditions of Approval
2
DEPARTMENTS INCLUDE REJECT
the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application.
5. At time ofpennit review, submit signed and sealed working drawings of the X
proposed construction.
6. On the drawing titled site plan, identify and label the symbol that represents X
the property line.
7. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may X
not, therefore, be used for landscape irrigation where other sources are
readily available.
8. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the
permit shall be submitted at the time of permit application, F.S. 373.216.
9. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a) The full name of the project as it appears on the
Development Order and the Commission-approved site
plan.
b) The total amount paid and itemized into how much is
for water and how much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
10. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this project must be submitted to the Building Division for
review at the time of permit application. submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
11. The full address of the project shall be submitted with the construction X
documents at the time of permit application submittal.
12. Please note that changes or revisions to these plans may generate additional X
comments. Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the commission
and at permit review.
PARKS AND RECREATION
Comments: None X
FORESTERlENVIRONMENTALIST
DEPARTMENTS INCLUDE REJECT
Comments:
13. No Irrigation plan included in the submittal. X
PLANNING AND ZONING
Comments: None. X
ADDITIONAL COMMUNITY REDEVELOPMENT AGENCY BOARD
CONDITIONS
Comments:
1. None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
1. To be determined.
S:\Planning\SHARED\WP\PROJECTS\Faith by Deliverance\NWSP 04-001\COA2.doc
I
I I
\.
J
... C ::o~
:-0 Cb_
:,..
"Ti i w _ zti U)g.~
_. f=- 2.a
~ _ -g~ 5 "1
re. ::l (') < :P ~ ~J(f);:
t\oS:-':'i. e~ goo ~~ +%
..., ~~E~- - ~ ear~
~ ~t!WJ<': g,~OJO~ r i IJ~==_
-~ 3-a ....1".,
I t\J .J. \!oS' S~ 5'~ ~ ~ 8 - fQQ..
w ;'" ..a:: C - R ".g-
.. ...- ~ t
;; ~ .,
l ~ ~ ~""l i
l:;' ::JQ.
.-t. ..
..tIll A.II~.ITm~TIJ)II&L l.mIlIGII, III~
PLANNING & CONSUL TING
211 SOlllH FED:E.IL\L lllGI-W.;AY, SUIE 11. BOYNTON BEACH, FL HOS
H,Ln)HO.N~: \'01el, (~61) "35 99~'J l""'\CSll\ll.L,~ (561J -::3~ :J9:}1
REG. NO AROOII026
February 10,2004
- I 0 l1lO4
To: City of Boynton Beach
Planning And Zoning Division
Technical Review Committee (TRC)
] 00 East Boynton Beach Blvd.
Boynton Beach, Florida 33425-0310
Ref.: 1st REVIEW COMMENTS (Response)
Deliverance By Faith Church (project #02010)
Lots 4 & 5
N .E. 1 Oth Avenue (M.L.K. Overlay Zone)
Boynton Beach, Florida
(File Number NWSP 04-001)
Ladies and Gentleman,
The following is a written response to your list of "Technical Review Committee"
comments from your 1 st review dated January 7, 2004.
PUBLIC WORKS - General
1. Applicant acknowledges that prior to permit we will contact Public Works
regarding storage and handling of refuse
PUBLIC WORKS - Traffic
2. Applicant acknowledges that prior to permit we will need "Palm Beach County
Traffic Engineering approval (traffic statement provided with application).
ENGINEERING DIVISION
3. Applicant acknowledges that all changes will be reflected on appropriate sheets.
4. Applicant acknowledges that changes or may generate additional comments.
5. Graphic scales have been included on all drawings
6. The "Site Plan" and "Civil Plans" have been revised to show all existing utilities.
Utility as-built plans as provided by the "City of Boynton Beach" attached for
reference only and will be verified prior to construction.
7. Site lighting has been shown on sheet L-l "Landscape Plan"
8. Note added to Sheet L-l "Landscape Plan" as related to site triangle shall be clear
at 2.5' to 8' vertical distance.
9. Applicant acknowledges that full drainage plans and calculations shall be required
at time of permitting.
10. Applicant acknowledges that all engineering plans shall be in accordance with
City of Boynton Beach Drawings and will be reviewed at time of building permit.
UTILITIES
11. Water and Sewer plans have been provided as Sheet C-2 for review showing
availability of existing services. Utility as-built plans as provided by the "City of
Boynton Beach" attached for reference only and will be verified prior to
construction. Applicant acknowledges that additional comments may be generated
as a result of this review.
12. All area utilities have been shown on Sheet SP.1, C-l "LOCATION MAP", C-2
"WATER & SEWER PLAN" and Sheet L-l,
13. Points of service connections for water and sewer have been shown on Sheet SP.l
"SITE PLAN", Sheet C-l "LOCATION MAP" and Sheet C-2 "WATER &
SEWER PLAN".
14. A Civil Engineer's certified "FIRE FLOW" calculation data has been attached and
applicant acknowledges that a site fire flow test is to be provided prior to permit.
15. Applicant acknowledges that the capacity reservation fee will be paid as directed
by the City.
16. It is understood that a building permit for this project will not be issued until the
Utilities Department has approved the plans for water and sewer improvements.
17. Existing fire hydrant locations have been shown on Sheet SP.l "LOCATION
MAP" and a 200' radius line from hydrants has been noted on the "SITE PLAN"
and on Sheet C-2 WATER & SEWER PLAN".
18. Applicant acknowledges that all engineering utility construction details shall be in
accordance with City of Boynton Beach Utilities Drawings and will be reviewed
at time of building permit.
FIRE
19.
23.
Existing fire hydrant locations have been shown on Sheet SP.l "LOCATION
MAP" and a 200' radius line from hydrants has been noted on the "SITE PLAN"
and on Sheet C-2 WATER & SEWER PLAN". Building falls within 200' radius.
Applicant acknowledges that a site fire flow test is to be provided prior to permit
demonstrating at least 1500 gpm @ 20psi is provided at existing hydrants,
N.A. (no new hydrants anticipated).
Applicant acknowledges that prior to building permit issuance a site fire flow test
is to be provided prior to permit demonstrating at least 1500 gpm @ 20psi is
provided at existing hydrants.
Applicant acknowledges and has noted on Sheet SP.l NOTE that "EMERGENCY
ACCESS SHALL BE PROVIDED AT THE START OF THE PROJECT AND
BE MAINTAINED THROUGHOUT CONSTRUCTION PER THE "FLORIDA
FIRE PREVENTION CODE"
Applicant acknowledges Emergency access roadways must be firm and unyielding
(note: existing access roads are in place and our on site parking/paving per sheet
C-l "GENERAL NOTES: PAVING AND DRAINAGE #9" states LBR of 40
requirement.
20.
21.
22.
POLICE
NONE
BUILDING DIVISION
24. Note added to Sheet A.2 "ELEV A TrONS" that "EXTERIOR WALL OPENINGS
AND EXTERIOR WALL CONSTRUCTION COMPL Y WITH 2001 FBC,
TABLE 600".
25. Per F.Re. "TABLE 600" and 705.1.1.2 "Exception I" this building as a "TYPE
VI Unprotected" building, the "EXTERIOR BEARING WALLS" are a "0" hour
protected and therefore do not require opening protection.
26. Applicant acknowledges that the building shall be designed to withstand I40mph
wind forces and design calculations shall be provided by architect at time of
permitting.
27. Applicant acknowledges that signed and sealed drawings shall be provided by
architect at time of permitting for construction.
28. Property lines have been identified on Sheet SP.I "SITE PLAN" as "N.P.L.,
S.P.L., E.P.L. and W.P.L."
29. On Sheet SP.I "SITE PLAN" all (closest to property line) corners of buildings
have been dimensioned for setback compliance.
30. On Sheet SP.1 "SITE PLAN" and on Sheet L-Ilandscape plan the irrigation well
pump has been noted and at the "NOTES" on Sheet L-I it specifies "WATER
SOURCE TO BE WELL WATER"
31. Applicant acknowledges that a water use permit for irrigation form SFWMD will
be required prior to building permit submittal.
32. Applicant acknowledges that if capital facility fees are paid in advance owner will
provide documentation as requested.
33. Applicant acknowledges for permit all condition for approval must be meet.
34. Applicant acknowledges an address must be issued to project at time of permit.
35. Applicant acknowledges that changes or revisions to these plans may generate
additional comments.
36. Applicant acknowledges that a drinking fountain is required per F.B.C. and has
been shown on Sheet A.I "FLOOR PLAN".
37. Applicant acknowledges that a service sink is required per F.B.e. and has been
shown on Sheet A.I "FLOOR PLAN".
PARKS AND RECREATION
NONE
FORESTERlENVIRONMENT ALIST
Existing Trees Management Plan Sheet L-l
38. There are no existing trees on site and a note has been added Sheet L-1
accordingly.
Landscape Plan Sheet L-l
39. Specifications on the Landscape plan have been revised to indicate the required
tree height and caliper. A note has been added regarding the height of
measurement for the tree caliper (3" at 4.5' above the ground).
40. All shrubs and accent plants have a height and spread indicated in their
specifications.
41. The Tree Planting Detail has been revised to indicate where the height of the tree
and it's caliper will be measured.
42. A Palm Planting Detail has been added to the Landscape plan incorporating the
heights for measurements.
43. The Shrub Planting Detail has been revised to indicate where the height and
spread of the plant will be measured.
44. The building has been placed such that the parking spaces will not be visible from
NE 10th A venue with the exception of those directly in line with the entry drive.
45. A note has been added to the Landscape plan regarding the screening of all utility
boxes or structures.
Irrigation Plan
46. Applicant acknowledges design of irrigation system is to implement separate zone
design for turf and landscape bed based on time duration and water conservation
needs and will be provided at time of permit application
PLANNING AND ZONING
47. Traffic impact statement attached.
48. Drainage statement fro Civil Engineer previously submitted.
49. Church Spire has been removed from tower to eliminate conflict with height
restriction and is shown on Sheet A.2 "ELEVATIONS".
50. Rider to "Site Plan Application" previously submitted.
51. Note added to Sheet SP.1 at "BUFFER WALL SECTION" noting "BOTH SIDES
OF WALL TO BE PAINTED TO MATCH BUILDING COLOR F-1 "DESERT
SPRING" 5626M BY MAB PAINTS".
52. Site triangle shown Sheet SP.1 "SITE PLAN" and Sheet L-1.
53. Survey revised with "Future Land Use" and "Zoning" all around subject property.
54. Cumulative sign area shown for "SOUTH ELEV A TION" and "WEST
ELEVATION" on Sheet A.2 "SIGNAGE NOTES". Signage to be under separate
permit.
55. Applicant acknowledges signage is subject to review and approval of the
Community Redevelopment Agency and City Commission. Plans have been noted
as such on Sheet SP.1 and Sheet A.2 "SIGNAGE NOTES".
56. N.A. (no monument sign).
57. N.A. (no monument sign).
58. Colored elevation will be provided for Community Redevelopment Agency
meeting and City Commission meetings.
59. Two Yellow Elders have been placed along the entry drive. These signature trees
are in addition to the required perimeter buffer trees. Because this project is in the
Martin Luther King Corridor, the building is located in close proximity to the
street. For this reason, the 100.00' of frontage on N.E. 10th Avenue was not
included in the perimeter buffer tree calculation.
60. Landscape buffers have been dimensioned and labeled on Sheet SP.1 "SITE
PLAN" and Sheet L-1 Landscape plan.
61. Tree height and calipers have been noted at Sheet L-1
62. Parking detail shown and detailed on Sheet SP.1 "TYPICAL PARKING
STRIPING" detail.
63. Dumpster enclosure not required per review of Laurinda Logan. Wheel out
container will be provided. See Sheet A.2 "ELEV A TIONS" for trash can
enclosure notes and details.
64. Applicant acknowledges all above ground mechanical equipment will be screened
and all wall mounted equipment will be painted to match building color. See
Sheet L-I landscape plan and Sheet A.2 "ELEVATIONS" for notes.
65. N.A. (no rooftop equipment)
66. Curb cuts have been adjusted on Sheet SP.1 "SITE PLAN" and Sheet C-1
"PAVING GRADING & DRAINAGE PLAN" to stay within property lines
67. Poly corrugated panels have been replaced with silver galvanized corrugated
metal at sloped roof eyebrow areas and single-ply roofing over cedar t&g planks
on joists at flat roofed areas (114":12" min. slope areas). See Sheet A.2
"ELEV A TIONS" for notes.
68. Sheet L-1 has been revised to show hedge on both sides of site buffer wall and
wall has been moved one foot to the south to accommodate planting. Note -
pavement at north side of side has been revised to curb wheel stop type.
69. The Pink Tabebuias have been substituted with Yellow Elders and have been
placed along the entry drive.
70. The subject site is a parallelogram with the building honoring the front/street side
property line. The parking as such followed the dynamics of the building
orientation and not the side yard property lines.
71. Applicant acknowledges that a "Unity Of Title" will be required and provided
prior to building permit issuance.
If there are any further questions or concerns please feel free to call us at
(561)735-9990 so that we may help in the final Site Plan Approval process.
(~ncerelY' L~ ()
M~ Si~bjtect
,~/
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 04-014
TO:
Michael W. Rumpf, Director, Planning and Zoning
FROM:
Laurinda Logan, P,E" Senior Engineer
DATE:
January 23,2004
RE:
Review Comments
New Site Plan -1st Review
Faith by Deliverance Church
File No. NWSP 04-001
The above referenced Site Plans, received on January 14, 2004, was reviewed for Public Works,
Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of
Ordinances. Following are our comments with the appropriate Code and Land Development Regulations
(LOR) referenced.
PUBLIC WORKS - GENERAL
1, Prior to permit application contact the Public Works Department (561-742-6200) regarding the
storage and handling of refuse.
PUBLIC WORKS - TRAFFIC
2. Provide a traffic analysis and notice of concurrency (Traffic Performance Standards Review) from
Palm Beach County Traffic Engineering.
ENGINEERING
3. All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets.
4. Please note that changes or revIsions to these plans may generate additional comments.
Acceptance of these plans during the TRC process does not ensure that additional comments may
not be generated by the Commission and at permit review.
5. Provide written and graphic scales on all sheets.
6. Show all existing utilities on Site Development plan (LOR, Chapter 4, Section 7,A.3).
7, Show site lighting on the Landscape plan. It may be necessary to replace or relocate large canopy
trees adjacent to light fixtures to eliminate future shadowing on the parking surface (LOR, Chapter
23, Article II, Section A.1,b).
8. Indicate, by note on the Landscape Plan, that within the sight triangles there shall be an unobstructed
cross-visibility at a level between 2.5' and 8' above the pavement (LOR, Chapter 7.5, Article II,
Section 5.H.).
I Dep'"bTtment of Public Works, ~'Igineering Division Memo No. 04-014
Re: Faith by Deliverance Church, New Site Plan 15t Review
January 23, 2004
Page 2
9. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article
IV, Section 5 will be required at the time of permitting.
10. All engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application.
UTILITIES
11. No utility plan was included with this submittal, therefore the Utilities Department considers this plan
incomplete as submitted. However, the proposed Site Plan is an existing site located within the
Utilities' service area, and is located where utility support is available. We are providing only a
cursory review of the proposed site plans as submitted at this time. Additional comments may be
required after a utility plan has been submitted.
12, Show all utilities on or adjacent to the tract (LDR, Chapter 3, Article IV, Section 3(0).
13. Show points of service connections for water and sewer,
14. The LDR, Chapter 3, Article IV, Section 3(P) requires a statement be included that utilities are
available and will be provided by all other appropriate agencies. This statement is lacking on the
submitted plans,
15. Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g,p,m, as
stated in the LDR, Chapter 6, Article IV, Section 16, or the requirement imposed by insurance
underwriters, whichever is greater (CODE, Section 26-16(b)).
16, The CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either
upon the request for the Department's signature on the Health Department application forms or within
30 days of site plan approval, whichever occurs first. This fee will be determined based upon final
meter size, or expected demand.
17. A building permit for this project shall not be issued until this Department has approved the plans for
the water and/or sewer improvements required to service this project, in accordance with the CODE,
Section 26-15.
18. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each building be within 200 feet
of an existing or proposed fire hydrant. Please demonstrate that the plan meets this condition,
19. All utility construction details shall be in accordance with the Utilities Department's "Utilities
Engineering Design Handbook and Construction Standards" manual (including any updates);
they will be reviewed at the time of construction permit application.
LUck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H, David Kelley, Jr" P.E.I P,S.M" City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
S:\Engineering\Kribs\Faith by Deliverance Church New Site Plan, 1st Review.doc
r--
j
DATE: January 14, 2004
List of Acronyms/Abbreviations:
ASCE - American Society of Civil
Engineers
BBA - Boynton Beach Amendments
CBB - City of Boynton Beach
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensive Plan Policy
CFR - Code of Federal Regulations
EPA - Environment Protection Agency
FBC - Florida Building Code
FIRM - Flood Insurance Rate Map
F.S. - Florida Statutes
LOR - Land Development Regulations
NEC - National Electric Code
NFPA - National Fire Prevention Assn
NGVD - National Geodetic Vertical
Datum of 1929
SFWMD - South Florida Water
Management District
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 04-012
TO: Michael W. Rumpf
Director of Planning and Zoning
FROM: Timothy K. Large h);iiiY
TRC Member/Buildi~n
SUBJECT: Project - Faith by Deliverance Church
File No. - NWSP 04-001 - 1st review
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits.
Buildina Division (Site Specific and Permit Comments) - Timothy K. Larae (561) 742-6352
1 Place a note on the elevation view drawings indicating that the exterior wall openings and
exterior wall construction comply with 2001 FBC, Table 600. Submit calculations that
clearly reflect the percentage of protected and unprotected wall openings permitted per
2001 FBC, Table 600.
2 Every exterior wall within 15 feet of a property line shall be equipped with approved
opening protectives per 2001 FBC, Section 705.1.1,2.
3 Buildings, structures and parts thereof shall be designed to withstand the minimum wind
loads of 140 mph, Wind forces on every building or structure shall be determined by the
provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind
Loads). Calculations that are signed and sealed by a design professional registered in the
state of Florida shall be submitted for review at the time of permit application.
4 At time of permit review, submit signed and sealed working drawings of the proposed
construction,
5 On the drawing titled site plan, identify and label the symbol that represents the property
line.
6 As required by the CBBCO, Part III titled "Land Development Regulations", submit a site
plan that clearly depicts the setback dimensions from each property line to the leading
edge of the building. The leading edge of the building begins at the closest point of the
overhang or canopy to the property line.
S:IDevelopmentlBuildingl TRCI TRC 2003\Name of Project
Page 1 of 2
..
7 CBBCPP 3,C,3.4 requires the conservation of potable water, City water may not,
therefore, be used for landscape irrigation where other sources are readily available.
8 A water-use permit from SFWMD is required for an irrigation system that utilizes water
from a well or body of water as its source, A copy of the permit shall be submitted at the
time of permit application, F.S. 373.216,
9 If capital facility fees (water and sewer) are paid in advance to the City of Boynton Beach
Utilities Department, the following information shall be provided at the time of building
permit application:
a) The full name of the project as it appears on the Development Order and the
Commission-approved site plan.
b) The total amount paid and itemized into how much is for water and how much is for
sewer,
(CBBCO, Chapter 26, Article II, Sections 26-34)
10 Pursuant to approval by the City Commission and all other outside agencies, the plans for
this project must be submitted to the Building Division for review at the time of permit
application submittal. The plans must incorporate all the conditions of approval as listed in
the development order and approved by the City Commission.
11 The full address of the project shall be submitted with the construction documents at the
time of permit application submittal.
12 Please note that changes or revisions to these plans may generate additional comments.
Acceptance of these plans during the TRC process does not ensure that additional
comments may not be generated by the commission and at permit review.
13 A minimum of one drinking fountain shall be installed per the 2001 FBC, Plumbing, Table
403.1.
14 A minimum of one service sink shall be installed per the 2001 FBC, Plumbing, Table
403,1,
bf
S:\Development\Building\TRC\TRC 2003\Faith by Deliverance Church
Page 2 of 2
TRC Memorandum
Page 1 of2
-"
./
,~
Coale, Sherie
From: Hallahan, Kevin
Sent: Thursday, January 22, 2004 1 :11 PM
To: Breese, Ed
Cc: Coale, Sherie
Subject: Deliverance By Faith Church- TRC Review comments
Planning Memorandum: Forester / Environmentalist
To:
Ed Breese, Principal Planner
From:
Kevin J. Hallahan, Forester / Environmentalist
Subject:
Faith By Deliverance Church
New Site Plan - 1st Review
NWSP 04-001
Date:
January 22, 2004
Existing Trees Management Plan Sheet Ll
The Landscape Architect should indicate if there are any existing trees to be preserved in place,
relocated on site, or removed / replaced on site, All existing trees must be relocated rather than
removed if the trees are in good health. These trees should be shown as a separate symbol on the
plan,
Landscape Plan
Sheet Ll
1. All shade and palm trees on the Plant List must be listed in the specifications as a minimum of
12'-14' height, 3" caliper at DBH (4.5' off the ground), and Florida #1 (Florida Grades and
Standards manual). The height ofthe trees may be larger than 12'-14' to meet the 3" caliper
requirement. [Environmental Regulations, Chapter 7.5, Article II Sec. 5,C. 2.]
2. All of the accent and shrub plants should include the height and spread at time of planting,
[Environnemental. Regulations, Chapter. 7.5, Article II Sec. 5.C.3, N.]
3, The Planting Details section for the Tree Planting should include a line indicating where the
height of the tree and the caliper @ dbh (4.5' offthe ground) will be measured at time of planting
and inspection,
4. The Planting Details section should include a Palm Planting sketch and include a line
indicating where the height of the palm trees will be measured at time of planting and inspection.
5. The details section for the Shrub Planting should include a line indicating where the height
and spread of the plant will be measured at time planting and inspection.
6, The applicant should show an elevation cross-section detail indicating how the height of the
proposed landscape material drawn to scale will visually buffer the proposed parking lot automobiles
from the NE 10th Avenue road right-of-way.
7, The applicant should add a note that all utility boxes or structures (not currently known or
shown on the plan) should be screened with Coco plum hedge plants on three sides.
1/22/2004
TRC Memorandum
Page 2 of2
Irrigation Plan-No Irrigation plan included in the submittal
Kjh
1/22/2004
LITY OF BOYNTON BEACH, FLORIDA
INTER-OFFICE MEMORANDUM
,/
,TO:
Michael W. Rumpf DATE:
Dir. of Planning & Zoning
1/20104
FILE: NWSP 04-00 I
FROM:
Off. John Huntington
Police Department
CPTED Practitioner
SUBJECT: Faith by Deliverence Church
REFERENCES: Site Plan
ENCLOSURES:
I have viewed the above building plans and have the following comments:
No Comments
..-
~
CITY OF BOYNTON BEACH
Fire and Life Safety Division
100 East Boynton Beach Blvd.
P.O. Box 310
Boynton Beach, Florida 33425-0310
PLAN REVIEW COMMENTS
For review of:
NWSP 04-001 1st review
Deliverance Church
NE 10th Ave E of Seacrest Blvd,
Project Name and Address:
Reviewed by:
-~
Rodqer Kemmer, Fire Protection Enqineer
Department:
Fire and Life Safety
Phone:
(561) 742-6753
Comments to:
Sherie Coale by email on 1/14/04
Code Requirements
Design documents shall demonstrate compliance with LOR Chapter 6,
Section 16, which provides requirements for hydrants, Hydrants in
commercial applications shall be no more than 300 ft, apart and the
remotest part of any structure shall be no more than 200 ft. from a
hydrant. Connections shall be to mains no less than 6 inches in diameter,
In addition to domestic requirements at a residual pressure of not less
than 20 psi, a fire flow of at least 1500 gpm is required,
Design documents where underground water mains and hydrants are to
be provided, must demonstrate that they will be installed, completed, and
in service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3.2,
Prior to Fire Department approval of a building permit, new construction
projects must provide the results of a hydrant flow test indicating a fire flow
not less than 1500 gpm @ 20 psi above domestic use, This applies to
new or existing hydrants within the required 200 ft, of the facility.
Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Construction, Alteration,
and Demolition Operations, Section 5-4.3,
Emergency access roadways must be firm and unyielding, having a
bearing value of not less than 40 (i.e. LBR 40), compacted to 98% of the
maximum density as determined by AASHTO T180, in accordance with
the FOOT Standard Specifications for Road and Bridge Construction
(2000) Division II, Section 160, STABILIZING. A copy of the test results
shall be provided and accepted prior to above grade construction. Testing
frequency shall not be less than that specified in the FOOT Sampling,
Testing and Reporting Guide, or as required by the Fire Marshal. The
roadway shall be maintained free from ruts, depressions, and damage,
and at the required bearing value for the duration of it's intended use,
cc: Steve Gale
Bob Borden
Project name: Deliverance by Faith
File number: NWSP 04-00 I
Reference: I streview lans identified as a New Site Plan with a Janua
Department date stamp marking
1 st REVIEW COMMENTS ~~. ,A~Eb
New Site Plan '"" I JJ P1'ret:>
~118lo+
7 2004
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse,
PUBLIC WORKS - Traffic
Comments:
2. Provide a traffic analysis and notice of concurrency (Traffic Performance
Standards Review) from Palm Beach County Traffic Engineering.
ENGINEERING DIVISION
Comments:
3, All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
4, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the Commission
and at permit review,
5. Provide written and graphic scales on all sheets,
6. Show all existing utilities on Site Development plan (LDR, Chapter 4,
Section 7.A.3).
7, Show site lighting on the Landscape plan, It may be necessary to replace or
relocate large canopy trees adjacent to light fixtures to eliminate future
shadowing on the parking surface (LDR, Chapter 23, Article II, Section
A.1.b),
8. Indicate, by note on the Landscape Plan, that within the sight triangles there
shall be an unobstructed cross-visibility at a level between 2.5' and 8' above
the pavement (LDR, Chapter 7.5, Article II, Section 5.H,),
9. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
10, All engineering construction details shall be in accordance with the
applicable City of Boynton Beach Standard Drawings and the
1 ST REVIEW COMMENTS Faith Deliver
02/17/04
2
DEPARTMENTS INCLUDE REJECT
"Engineering Design Handbook and Construction Standards" and will
be reviewed at the time of construction permit application,
UTILITIES
Comments:
II. No utility plan was included with this submittal, therefore the Utilities
Department considers this plan incomplete as submitted. However, the
proposed Site Plan is an existing site located within the Utilities' service
area, and is located where utility support is available, We are providing
only a cursory review of the proposed site plans as submitted at this time,
Additional comments may be required after a utility plan has been
submitted.
12, Show all utilities on or adjacent to the tract (LDR, Chapter 3, Article IV,
Section 3(0),
13. Show points of service connections for water and sewer
14. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (CODE, Section 26-16(b)),
15. The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within 30 days of site plarI
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
16. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15,
17. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building be within 200 feet of an existing or proposed fIre hydrarIt. Please
demonstrate that the plarI meets this condition
18. All utility construction details shall be in accordance with the Utilities
Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
19, Design documents shall demonstrate compliarIce with LDR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants in
commercial applications shall be no more than 300 feet apart and the
remotest part of arIY structure shall be no more than 200 feet from a hydrarIt.
Connections shall be to mains no less tharI six (6) inches in diameter, In
1ST REVIEW COMMENTS Faith Deliver
02/17/04
3
///e
~
I I
DEPARTMENTS INCLUDE REJECT
addition to domestic requirements at a residual pressure of not less than 20
psi, a fire flow of at least 1500 gpm is required.
20. Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2,3.2,
21. Prior to Fire Department approval of a building permit, new construction
projects must provide the results of a hydrant flow test indicating a fire flow
not less than 1500 gpm @ 20 psi above domestic use. This applies to new
or existing hydrants within the required 200 ft, of the facility,
22, Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Construction, Alteration,
and Demolition Operations, Section 5-4.3,
23. Emergency access roadways must be firm and unyielding, having a bearing
value of not less than 40 (i,e. LBR 40), compacted to 98% of the maximum
density as determined by AASHTO Tl80, in accordance with the FDOT
Standard Specifications for Road and Bridge Construction (2000) Division
11, Section 160, STABILIZING. A copy of the test results shall be provided
and accepted prior to above grade construction, Testing frequency shall not
be less than that specified in the FDOT Sampling, Testing and Reporting
Guide, or as required by the Fire Marshal. The roadway shall be maintained
free from ruts, depressions, and damage, and at the required bearing value
for the duration of it's intended use,
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
24, Place a note on the elevation view drawings indicating that the exterior wall
openings and exterior wall construction comply with 2001 FBC, Table 600. /
Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 200 I FBC, Table 600,
25, Every exterior wall within 15 feet of a property line shall be equipped with /
approved opening protectives per 2001 FBC, Section 705,1.1.2.
26. Buildings, structures and parts thereof shall be designed to withstand the /
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
1 ST REVIEW COMMENTS Faith Deliver
02/17/04
4
I u
DEPARTMENTS INCLUDE REJECT
the provisions of 2001 FBC, Section 1606 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
27. At time of permit review, submit signed and sealed working drawings of the
proposed construction. V
28, On the drawing titled site plan, identify and label the symbol that represents V
the property line. - OEf1A)1,. "'f.l~ A8SIte.v/ATlaJ~'.
, N Po I' ., ,Po If ~ L "
, . .L'J~' .1..., t!.RL. AAJO W, . .
29. As required by the CBBCO, Part III titled "Land Development
Regulations", submit a site plan that clearly depicts the setback dimensions
from each property line to the leading edge of the building. The leading V
edge of the building begins at the closest point of the overhang or canopy to
the property line.
30. CBBCPP 3.C,3.4 requires the conservation of potable water. City water may
not, therefore, be used for landscape irrigation where other sources are /
readily available.
31. A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source. A copy of the V
permit shall be submitted at the time of permit application, F.S. 373,216,
32, If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a) The full name of the project as it appears on the V
Development Order and the Commission-approved site plan.
b) The total amount paid and itemized into how much is
for water and how much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
33. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for V
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
34, The full address of the project shall be submitted with the construction /
documents at the time of permit application submittal.
35, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not ,/
ensure that additional comments may not be generated by the commission
and at permit review.
/'
36, A minimum of one drinking fountain shall be installed per the 2001 FBC, V
-:/; J-e
1ST REVIEW COMMENTS Faith Deliver
02/17/04
5
I I
DEPARTMENTS INCLUDE REJECT
Plumbing, Table 403.1,
37, A minimum of one service sink shall be installed per the 200 I FBC,
Plumbing, Table 403.1, 1/
PARKS AND RECREATION
Comments:
FORESTERlENVIRONMENT ALIST
Comments:
Existin2 Trees Mana2ement Plan Sheet Ll
38, The Landscape Architect should indicate if there are any existing trees to be
preserved in place, relocated on site, or removed / replaced on site. All
existing trees must be relocated rather than removed if the trees are in good
health. These trees should be shown as a separate symbol on the plan,
39. Landscape Plan Sheet Ll
All shade and palm trees on the Plant List must be listed in the
specifications as a minimum of 12 feet -14 feet in height, three (3) inch
caliper at DBH (4,5' off the ground), and Florida #1 (Florida Grades and
Standards manual), The height of the trees maybe larger than 12'-14' to
meet the 3" caliper requirement. [Environmental Regulations, Chapter 7,5,
Article II Sec. 5.C. 2.]
40. All of the accent and shrub plants should include the height and spread at
time of planting, [Environnemental. Regulations, Chapter. 7.5, Article II
Sec. 5.C.3, N,]
41. The Planting Details section for the Tree Planting should include a line
indicating where the height of the tree and the caliper @ dbh (4,5 feet off
the ground) will be measured at time of planting and inspection.
42. The Planting Details section should include a Palm Planting sketch and
include a line indicating where the height of the palm trees will be measured
at time of planting and inspection
43, The details section for the Shrub Planting should include a line indicating
where the height and spread of the plant will be measured at time planting
and inspection.
44. The applicant should show an elevation cross-section detail indicating how
the height of the proposed landscape material drawn to scale will visually
buffer the proposed parking lot automobiles from the NE lOth A venue road
right-of-wav.
45. The applicant should add a note that all utility boxes or structures (not
1 ST REVIEW COMMENTS Faith Deliver
02/17/04
6
, II
DEPARTMENTS INCLUDE REJECT
currently known or shown on the plan) should be screened with Coco plum
hedge plants on three sides.
46, Irrhration Plan-No Irri!!ation nlan included in the submittal
PLANNING AND ZONING
Comments:
47, A traffic impact statement is required prior to the Technical Review
Committee meeting (Chapter 4. Section 8,P,).
48. A drainage statement is required prior to the Technical Review Committee
meeting (Chapter 4, Section 7,P.2.),
49. The proposed church spire exceed the district height limit of thirty (30) feet,
approval of a height exception is required or revised the proposed plans
accordingly.
50, Complete and submit a rider to "Site Plan Application" form
5l. Provide a note indicating that the buffer wall will resemble the color and
material, the design of the proposed building (Chapter 9, Section 10.E.).
52, Identify the sight triangles for the entrance on the site plan.
53, The survey must identify the Puture Land Use and Zoning designation for
the adjacent properties (Chapter 4, Section A.3.).
54. Provide the cumulative maximum square footage for all wall signage, The
wall signage shall not exceed 105.9 square feet since the building frontage
is 70.6 linear feet (Chapter 21, Article 4, Section 2,C.),
55. All signage is subject to review and approval of the Community
Redevelopment Agency and City Commission. The elevations shall
indicate the location of the proposed wall signs, including their dimensions,
sign type, and letter colors, The cumulative area for all wall signs shall be
in compliance with Chapter 21, Article IV, Section 2.B.
56, All signage is subject to review and approval of the Community
Redevelopment Agency and City Commission, Will there be monument
sign proposed for the project? If so, on the site plan, indicate its location
and provide a detail of the sign area, including the dimensions, exterior
fInish, and letter color(s) (Chapter 4, Section 7.D,),
57. The base of any proposed monument sign shall be enhanced with colorful
groundcover plants and a minimum of two (2) colorful shrub species
1 ST REVIEW COMMENTS Faith Deliver
02/17/04
7
I i
DEPARTMENTS INCLUDE REJECT
(Chapter 7.5, Article II, Section 5.0.),
58. Include a color rendering of all elevations prior to the Technical Review
Committee meeting (Chapter 4, Section 7.D,2.).
59. Landscaping at project entrances shall contain a minimum of two (2)
colorful shrub species on both sides of the entrance and a signature tree
(Chapter 7.5, Article II, Section 5.N.). Note that signature trees do not
contribute toward the total number of required perimeter trees,
60, Label and dimension required landscape buffer on the site plan and
landscape plan,
61. All required trees shall be at minimum 12 feet overall height and 3 caliper
inches when planted (Chapter 7.5, Article II, Section 5.C,2.),
62. Provide a standard parking space detail showing all dimensions in
accordance with drawing No. K-1.
63, Provide a dumpster enclosure detail. The dumpster enclosure shall
resemble with respect to the color and materials, the design of the principal
buildings and shall be integrated with other site elements (Chapter 9,
Section 10.E,3,). On the site plan, place a note indicating this requirement.
Contact the Sanitation Supervisor to determine of roll-out refuse collection
can be utilized in lieu of a dumpster. If roll-out is acceptable, designate on-
site storage and screening of these units,
64. All above ground mechanical equipment such as exterior utility boxes,
meters, and transformers, shall be visually screened (Chapter 9, Section
10.CA.). Equipment placed on the walls of the building shall be painted to
match the building color. Place a note on the site plan indicating this
requirement.
65. Rooftops will be treated as part of the building elevation, All rooftop
equipment must be completely screened from view at a minimum distance
of 600 feet (Chapter 9, Section II,E.).
66. The curb cut flare for the driveway appears to encroach across the property
to the west.
67, The poly corrugated panels on the trellis and over the windows are not
compatible materials with this type of architecture. A canvass awing or
bahama shutter should be used over the windows and the trellis left open or
roofed with material used elsewhere on the building
68. The wall at the rear property line should have a hedge placed on both
sides.
1ST REVIEW COMMENTS Faith Deliver
02/17/04
8
DEPARTMENTS INCLUDE REJECT
69, The "flowering trees" pink tabebuias are required to be along the entry drive
adjacent to the street. The plan depicts their placement at the rear of the
building,
70. What is the purpose for skewing the parking lot and building as opposed to
being parallel with the side property lines?
71. A Unity of Title will be required.
72. Since this property is included in the parcels to be acquired by the CRA as
part of Phase I of the Heart of Boynton Redevelopment Plan and pertinent
correspondence has been sent to the owner, Staff recommends denial of the
site plan.
MWRlsc
S:\Planning\SHARED\WP\PROJECTS\Faith by Deliverance\NWSP 04-001\1ST REVIEW COMMENTS.doc
1 st REVIEW COMMENTS
New Site Plan
Project name: Deliverance by Faith
File number: NWSP 04-001
Reference: 1 slreview plans identified as a New Site Plan with a January 7,2004 Planning and Zoning
Department date stamp marking,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse,
PUBLIC WORKS - Traffic
Comments:
2. Provide a traffic analysis and notice of concurrency (Traffic Performance
Standards Review) from Palm Beach County Traffic Engineering.
ENGINEERING DIVISION
Comments:
3. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets.
4, Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the Commission
and at permit review.
5, Provide written and graphic scales on all sheets.
6. Show all existing utilities on Site Development plan (LDR, Chapter 4,
Section 7,A.3).
7. Show site lighting on the Landscape plan. It may be necessary to replace or
relocate large canopy trees adjacent to light fixtures to eliminate future
shadowing on the parking surface (LDR, Chapter 23, Article II, Section
A.1.b).
8. Indicate, by note on the Landscape Plan, that within the sight triangles there
shall be an unobstructed cross-visibility at a level between 2,5' and 8' above
the pavement (LDR, Chapter 7.5, Article II, Section 5.H.).
9. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
10, All engineering construction details shall be in accordance with the
applicable City of Boynton Beach Standard Drawings and the
1 ST REVIEW COMMENTS Faith Deliver
02/12/04
2
DEPARTMENTS INCLUDE REJECT
"Engineering Design Handbook and Construction Standards" and will
be reviewed at the time of construction permit application,
UTILITIES
Comments:
II. No utility plan was included with this submittal, therefore the Utilities
Department considers this plan incomplete as submitted. However, the
proposed Site Plan is an existing site located within the Utilities' service
area, and is located where utility support is available. Weare providing
only a cursory review of the proposed site plans as submitted at this time.
Additional comments may be required after a utility plan has been
submitted,
12, Show all utilities on or adjacent to the tract (LDR, Chapter 3, Article IV,
Section 3(0),
13. Show points of service connections for water and sewer
14, Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters,
whichever is greater (CODE, Section 26-16(b)),
15. The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within 30 days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
16. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15,
17. The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building be within 200 feet of an existing or proposed fire hydrant. Please
demonstrate that the plan meets this condition
18. All utility construction details shall be in accordance with the Utilities
Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
19. Design documents shall demonstrate compliance with LDR Chapter 6,
Section 16, which provides requirements for hydrants. Hydrants In
commercial applications shall be no more than 300 feet apart and the
remotest part of any structure shall be no more than 200 feet from a hydrant.
Connections shall be to mains no less than six (6) inches in diameter. In
1ST REVIEW COMMENTS Faith Deliver
02/12/04
3
DEPARTMENTS INCLUDE REJECT
addition to domestic requirements at a residual pressure of not less than 20
psi, a fire flow of at least 1500 gpm is required.
20, Design documents where underground water mains and hydrants are to be
provided, must demonstrate that they will be installed, completed, and in
service prior to construction work per the Florida Fire Prevention Code,
(2000) Section 29-2.3,2.
21. Prior to Fire Department approval of a building permit, new construction
projects must provide the results of a hydrant flow test indicating a fire flow
not less than 1500 gpm @ 20 psi above domestic use. This applies to new
or existing hydrants within the required 200 ft. of the facility,
22, Emergency access shall be provided at the start of a project and be
maintained throughout construction per the Florida Fire Prevention Code,
Section 3-5, and NFPA 241, (1996) Safeguarding Construction, Alteration,
and Demolition Operations, Section 5-4.3,
23. Emergency access roadways must be firm and unyielding, having a bearing
value of not less than 40 (i.e, LBR 40), compacted to 98% of the maximum
density as determined by AASHTO Tl80, in accordance with the FDOT
Standard Specifications for Road and Bridge Construction (2000) Division
11, Section 160, STABILIZING. A copy of the test results shall be provided
and accepted prior to above grade construction, Testing frequency shall not
be less than that specified in the FDOT Sampling, Testing and Reporting
Guide, or as required by the Fire Marshal. The roadway shall be maintained
free from ruts, depressions, and damage, and at the required bearing value
for the duration of it's intended use.
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
24. Place a note on the elevation view drawings indicating that the exterior wall
openings and exterior wall construction comply with 200 I FBC, Table 600.
Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 2001 FBC, Table 600.
25. Every exterior wall within 15 feet of a property line shall be equipped with
approved opening protectives per 200 I FBC, Section 705.1,1.2.
26, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph, Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
1ST REVIEW COMMENTS Faith Deliver
02/12/04
4
DEPARTMENTS INCLUDE REJECT
the provisions of 2001 FBC, Section 1606 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
27. At time of permit review, submit signed and sealed working drawings of the
proposed construction,
28. On the drawing titled site plan, identify and label the symbol that represents
the property line.
29, As required by the CBBCO, Part III titled "Land Development
Regulations", submit a site plan that clearly depicts the setback dimensions
from each property line to the leading edge of the building. The leading
edge of the building begins at the closest point of the overhang or canopy to
the property line.
30. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may
not, therefore, be used for landscape irrigation where other sources are
readily available,
31. A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source, A copy of the
permit shall be submitted at the time of permit application, F.S. 373,216.
32, If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a) The full name of the project as it appears on the
Development Order and the Commission-approved site plan.
b) The total amount paid and itemized into how much is
for water and how much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
33, Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
34, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal.
35. Please note that changes or revisions to these plans may generate additional
comments. Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the commission
and at permit review.
36. A minimum of one drinking fountain shall be installed per the 200 I FBC,
1ST REVIEW COMMENTS Faith Deliver
02/12/04
5
DEPARTMENTS INCLUDE REJECT
Plumbing, Table 403.1,
37. A minimum of one service sink shall be installed per the 200 I FBC,
Plumbing, Table 403,1.
PARKS AND RECREATION
Comments:
FORESTER/ENVIRONMENTALIST
Comments:
Existin2 Trees Mana2ement Plan Sheet Ll
38, The Landscape Architect should indicate if there are any existing trees to be
preserved in place, relocated on site, or removed / replaced on site, All
existing trees must be relocated rather than removed if the trees are in good
health. These trees should be shown as a separate symbol on the plan.
39. Landscape Plan Sheet Ll
All shade and palm trees on the Plant List must be listed in the
specifications as a minimum of 12 feet -14 feet in height, three (3) inch
caliper at DBH (4.5' off the ground), and Florida #1 (Florida Grades and
Standards manual). The height of the trees may be larger than 12'-14' to
meet the 3" caliper requirement. [Environmental Regulations, Chapter 7,5,
Article II Sec. 5.C. 2,]
40. All of the accent and shrub plants should include the height and spread at
time of planting. [Environnemental. Regulations, Chapter, 7,5, Article II
Sec, 5.C.3, N,]
41. The Planting Details section for the Tree Planting should include a line
indicating where the height of the tree and the caliper @ dbh (4.5 feet off
the ground) will be measured at time of planting and inspection,
42. The Planting Details section should include a Palm Planting sketch and
include a line indicating where the height of the palm trees will be measured
at time of planting and inspection
43, The details section for the Shrub Planting should include a line indicating
where the height and spread of the plant will be measured at time planting
and inspection,
44. The applicant should show an elevation cross-section detail indicating how
the height of the proposed landscape material drawn to scale will visually
buffer the proposed parking lot automobiles from the NE lOth A venue road
right-of-way,
45, The applicant should add a note that all utility boxes or structures (not
1ST REVIEW COMMENTS Faith Deliver
02/12/04
6
DEPARTMENTS INCLUDE REJECT
currently known or shown on the plan) should be screened with Coco plum
hedge plants on three sides.
46. Irrh!ation Plan-No Irril!ation Dlan included in the submittal
PLANNING AND ZONING
Comments:
47. A traffic impact statement is required prior to the Technical Review
Committee meeting (Chapter 4, Section 8.F.).
48. A drainage statement is required prior to the Technical Review Committee
meeting (Chapter 4, Section 7,F.2,).
49. The proposed church spire exceed the district height limit of thirty (30) feet,
approval of a height exception is required or revised the proposed plans
accordingly,
50. Complete and submit a rider to "Site Plan Application" form
51. Provide a note indicating that the buffer wall will resemble the color and
material, the design of the proposed building (Chapter 9, Section 1O.E.).
52, Identify the sight triangles for the entrance on the site plan,
53, The survey must identify the Future Land Use and Zoning designation for
the adjacent properties (Chapter 4, Section A.3,).
54. Provide the cumulative maximum square footage for all wall signage. The
wall signage shall not exceed 105,9 square feet since the building frontage
is 70,6 linear feet (Chapter 21, Article 4, Section 2,C,).
55. All signage is subject to review and approval of the Community
Redevelopment Agency and City Commission, The elevations shall
indicate the location of the proposed wall signs, including their dimensions,
sign type, and letter colors. The cumulative area for all wall signs shall be
in compliance with Chapter 21, Article IV, Section 2.B,
56. All signage is subject to review and approval of the Community
Redevelopment Agency and City Commission, Will there be monument
sign proposed for the project? If so, on the site plan, indicate its location
and provide a detail of the sign area, including the dimensions, exterior
finish, and letter color(s) (Chapter 4, Section 7,D,).
57. The base of any proposed monument sign shall be enhanced with colorful
groundcover plants and a minimum oftwo (2) colorful shrub species
1ST REVIEW COMMENTS Faith Deliver
02/12/04
7
DEPARTMENTS INCLUDE REJECT
(Chapter 7.5, Article II, Section 5,0.),
58, Include a color rendering of all elevations prior to the Technical Review
Committee meeting (Chapter 4, Section 7.D.2,).
59, Landscaping at project entrances shall contain a minimum of two (2)
colorful shrub species on both sides of the entrance and a signature tree
(Chapter 7.5, Article II, Section 5.N.), Note that signature trees do not
contribute toward the total number of required perimeter trees,
60. Label and dimension required landscape buffer on the site plan and
landscape plan.
61. All required trees shall be at minimum 12 feet overall height and 3 caliper
inches when planted (Chapter 7,5, Article II, Section 5,C.2,).
62. Provide a standard parking space detail showing all dimensions in
accordance with drawing No, K-1.
63. Provide a dumpster enclosure detail. The dumpster enclosure shall
resemble with respect to the color and materials, the design of the principal
buildings and shall be integrated with other site elements (Chapter 9,
Section IO,E,3,), On the site plan, place a note indicating this requirement.
Contact the Sanitation Supervisor to determine of roll-out refuse collection
can be utilized in lieu of a dumpster. If roll-out is acceptable, designate on-
site storage and screening of these units.
64, All above ground mechanical equipment such as exterior utility boxes,
meters, and transformers, shall be visually screened (Chapter 9, Section
1O.C.4.). Equipment placed on the walls of the building shall be painted to
match the building color. Place a note on the site plan indicating this
requirement.
65. Rooftops will be treated as part of the building elevation. All rooftop
equipment must be completely screened from view at a minimum distance
of 600 feet (Chapter 9, Section 11.E,),
66. The curb cut flare for the driveway appears to encroach across the property
to the west.
67. The poly corrugated panels on the trellis and over the windows are not
compatible materials with this type of architecture. A canvass awing or
bahama shutter should be used over the windows and the trellis left open or
roofed with material used elsewhere on the building
68, The wall at the rear property line should have a hedge placed on both
sides,
1ST REVIEW COMMENTS Faith Deliver
02/12/04
8
DEPARTMENTS INCLUDE REJECT
69, The "flowering trees" pink tabebuias are required to be along the entry drive
adjacent to the street. The plan depicts their placement at the rear of the
building,
70, What is the purpose for skewing the parking lot and building as opposed to
being parallel with the side property lines?
71. A Unity of Title will be required.
72, Since this property is included in the parcels to be acquired by the CRA as
part of Phase I of the Heart of Boynton Redevelopment Plan and pertinent
correspondence has been sent to the owner, Staff recommends denial of the
site plan,
MWR!sc
S:\Planning\SHARED\WP\PROJECTS\Faith by Deliverance\NWSP 04-001\1ST REVIEW COMMENTS.doc
.....
DELIVERANCE BY FAITH CHURCH
NWSP 04-001
1 st Review Planning
January 23, 2004
A traffic impact statement is required prior to the Technical Review Committee meeting (Chapter
4. Section 8,F.).
A drainage statement is required prior to the Technical Review Committee meeting (Chapter 4,
Section 7.F.2.).
The proposed church spire exceed the district height limit of thirty (30) feet, approval of a height
exception is required or revised the proposed plans accordingly.
Complete and submit a rider to "Site Plan Application" form,
Provide a note indicating that the buffer wall will resemble the color and material, the design of
the proposed building (Chapter 9, Section 10,E.),
Identify the sight triangles for the entrance on the site plan,
The survey must identify the Future Land Use and Zoning designation for the adjacent properties
(Chapter 4, Section A.3.).
Provide the cumulative maximum square footage for all wall signage. The wall signage shall not
exceed 105.9 square feet since the building frontage is 70,6 linear feet (Chapter 21, Article 4,
Section 2.C.).
All signage is subject to review and approval of the Community Redevelopment Agency and City
Commission. The elevations shall indicate the location of the proposed wall signs, including their
dimensions, sign type, and letter colors, The cumulative area for all wall signs shall be in
compliance with Chapter 21, Article IV, Section 2.B.
All signage is subject to review and approval of the Community Redevelopment Agency and City
Commission. Will there be monument sign proposed for the project? If so, on the site plan,
indicate its location and provide a detail of the sign area, including the dimensions, exterior
finish, and letter color(s) (Chapter 4, Section 7,D,),
The base of any proposed monument sign shall be enhanced with colorful groundcover plants and
a minimum of two (2) colorful shrub species (Chapter 7,5, Article II, Section 5.0.).
~_'" ~)I~ ulJ>1' L .,:.~
Include a color rendering of all elevations prior to the Technical Review Committee meeting
(Chapter 4, Section 7.D.2,). ~
Landscaping at project entrances shall contain a minimum of two (2) colorful shrub species on
both sides of the entrance and a signature tree (Chapter 7,5, Article II, Section 5,N,), Note that
signature trees do not contribute toward the total number of required perimeter trees,
Label and dimension required landscape buffer on the site plan and landscape plan.
~* 4{SOI P/IJE ~ ~ ???
~ ..
All required trees shall be at minimum 12 feet overall height and 3 caliper inches when planted
(Chapter 7,5, Article II, Section 5.C.2,).
Provide a standard parking space detail showing all dimensions in accordance with drawing No,
K-l.
*
~
Provide a dumpster enclosure detail. The dumpster enclosure shall resemble with respect to the
color and materials, the design of the principal buildings and shall be integrated with other site ~ ~
elements (Chapter 9, Section 10.E.3.t On the site plan, place a note indicating this requirement. ~",: A-~'n)
~.pro.er riIri ~'nt1le>l) ~fSt:JIl,. '1ll ~ ,ue IF f<oLt. .0"," ru:~E. ClJUSCrIf}d CJll(J Il€ (J rfq"lQ 110 U IlL. .
IF /1()LV6vr NI&' ~ I NSI~1t'fE 4CI" GIrL G~ ~D gc:.4ED"1U(, 6lF ~ (J~,JS.
All above ground mechanical equipment such as exterior utility boxes, meters, and transformers,
shall be visually screened (Chapter 9, Section lO,C.4.), Equipment placed on the walls ofthe
building shall be painted to match the building color. Place a note on the site plan indicating this
requirement.
Rooftops will be treated as part of the building elevation. All rooftop equipment must be
completely screened from view at a minimum distance of 600 feet (Chapter 9, Section 11,E.).
f= /..4/Z€.
. I/fre. ~ e.v.:r- ~ ~ -rf-k; PMV~~ ~ ~ ~ ~
--q(~ ~ ib ~ 1J~..,..
· (/-f(; PoL-~ ~u~ ~ dV nJ.o 'TrLeu.IS /t1(}f) ~~ n-w:. Wi~ ~
Nr;y ~(bee. ~tU6 Wt'f1.r 'f1Jt~ ~ "" 1HU!Ht~. k ~
Ik>>wIJ~ tJIZ., ~ ~EI'L.$~ lJG '4ff,t!D ~t:YZ 7JIE. fbr~ AofI.l) TIJ.e
~.5 I4Pr tJ"hmJ aQ. ~ w/'11I- ~4ol- ~ 1El$~ rnv 'V1fS
'Bul c..A-t..<Jr:P. .
· THe. ~ k 71f€. /l.aA.- ~ t1A16 ~WJ IIWt5 A- ~ ~
I#J ~ ~/~.
. T /-We. II ~ /( II)
'e7ZA~ Tl1.a:S rlAJ!L TIlrfPE-fx)IA;-.$ 4-1te lt6pUI/le:t) J1J ~ ~
TIlt: ~ ~U€. ktJ~ 7() TIft!; S~. TfIE hAvu lJEPrer.5 ~L.
~ 4-r me. ~ 4& T}f€ l!vl(./)I).X,..
.
t()~ IS nit; ~ ~ SJt:.eWt V'GI.- 'flrI€. ~PrP ltJr A1t;t) IJvI <-lH~
lIS ~ T?; ~/hf:p ~ WIn/- ~ .51/)6 ~ UAJ~S ?
IJ I'rJ 'f'1j IF 7/ 77.E. ~ () fila:> .
.
",
ICON DESIGN GROUP
01/06/04 11:42am P. 001
581 3870074
"
"DELIVERANCE BY FAITH" CHURCH
BOYNTON BEACH, FL
UTILITY DEMANDS
FILE P~NTEO 1-7-04
DEMAND.WKl
DATA; TYPE OF USE:
CHURCH
BUIIDING AREA 3200 SF, TOTAL CHURCH
133 SEATS
UNIT FLOW: 3 GPO/SEAT, CHURCH
399 GPO (AVERAGE)
TOTAL AVERAGE FLOW = 399 GPO
0.29 GPM
DETERMINE WATER AND SEWER FLOW:
TOTAL WATER OEMAND =
399 GPD/350GPD/ERC 23 F.U.
1,14 ERC
399 GPD/300GPD/ERC
998 GPD
0.69 GPM
...
TOTAL SEWER DEMAND =
TOTAL PEAK FLOW ..
DETERMINE FIRE FLOW:
PER ISO "GUIDE FOR DETERMINATION OF REQUIRED FIRE FLOW"
F 18*C*(A) **0.5
C "" COEFFICIENT RELATED TO TYPE OF CONS'l'RUCTION
0.8 (NONCOMBUSTIBLE CONSTRUCTION)
A = FLOOR AREA =
3200 SF
F = FIRE FLOW, GPH
= 815 GPM
o:(~ J (..., \ ,) t.>
.
ICON DESIGN GROUP
561 8670074
"
TYPICAL EXFILTRATION TRENCH
"DELIVERANCE BY FAITH" CHURCH
BOYNTON BEACH, FLORIDA
FILE PRINTED 1-7-04
TOTAL SITE AREA ::l:
0.32 ACRE, ON-SITE
WATER TABLE ELEVATION =
8 . 50 NGVD
MINIMUM GRATE ELEVATION =
15.50 NGVD
TOP OF 'l'BENCH ELEVATON =
13.7S NGVD
PIPE INVERT =
a . 50 NGVD
H2 =
DU =
DS =
W =
7.0 FEET
5 . 3 FEET
1. 0 FEET
3.0 FEET
cAR = VOLUME TO BE RETAINED (ACRE-INCH)
= 0 . 02 ACRE-FEET
= 0.24 ACRE-INCH
K = 1. 00E-04 CFS/SF-FT HEAD (ASSUMED FIELD VALUE)
01!06!04 07:04pm P. 12101
L = cAR/[K*(H2*W + 2*H2*DU - DU*DU + 2*82*D5) + (1.39E-04)W*DU]
L = 23 FEET REQUIRED
6S FEET PROVIDED
VOLUME PROVIDED =
0.06 ACRE-FEET
...
ICON DESIGN GROUP
561 8670074
01/06/04 11:42am P. 002
-.
"DELIVERANCE BY FAITH" CHORCH
BOYNTON BEACH, FLORIDA
PALM 'BEACH COUNTY
WATER MANAGEMENT ANALYSIS
FILE PRINTED 1-7-04
CHURCHWM. WK1
LAND USE:
TOTAL
14006 SF
o . 32 ACRES
BUILDING
3200 SF
O. 07 ACRES
PAVEMEN'I'
7670 SF
0.18 ACRES
LAKE
o SF
o . 00 ACRES
OPEN SPACE
3136 SF
o . 07 AClU:S
MINIMUM ELEVATIONS:
ROADS AND PARKING
FINISH FLOOR
15.50 FEET
17.3S FEET (MINI.MUM PER 18" RULE)
CONTROL ELEVATION:
8.50 FEET (TO BE VERIFIED)
DESIGN RAINFALL: 24-HOUR STORMS
5- YEAR
10-YEAR
25-YEAR
lOO-YEAR
7.50 INCHES
9 . 00 INCHES
11 . 00 INCHES
14 . 00 INCHES
ICON DESIGN GROUP
581 3870074
01/08/04 11:42am P. 003
-"
DESIGN CRITERIA
WATER QUALITY: (POLLUTION ABATEMENT)
1. FIRST HALF INCH RUNOFF'" 0 ,5 X
0.32 ACRES X 1 FT/12 IN
0.01 ACRE-FEET
2. RUNOFF FROM FIRST INCH OF RAINFALl ciA
c = 0.80 WEIGHTED AVERAGE
i = 1.00 INCH
A = 0.32 ACRES
RUNOFF = 0.02 ACRE-FEET
3. 2.5 INCHES TIMES THE PERCENT IMPERVIOUS:
SITE AREA = TOTAL - (RET 'N AREA + BUILDING)
= 0.25 ACRES
IMPERVIOUS AREA = SITE AREA - OPEN SPACE
= 0.18 ACRES
% IMPERVIOUS = IMPERVIOUS AREA/SITE AREA X 100%
'" 70.98
VOL 2.! X % IMPERVIOUS = 0 .05 ACRE-FEET
=
0.01 ACRE-FEET
584 CF
3. REQUIRED RETENTION STORAGE =
4 . REQUIRED PRE'l'REA'l'MENT VOLUME ...
0.5 IN X (TOTAL -LAKE)f12
O. 01 ACRE-FEET
584 CF
5. RETENTION/DETENTION CRITERIA:
THE RETENTION AND PRE'l'REA'l'MENT WILL BE PROVIDED BY MEANS OF
EXFIL'l'RATION TRENCHES, REFER TO ATTACHED CALCULATIONS.
Utilities Department
124 East Woolbright Road
LOCATIONS AND MEETS
r Caller Name:
I Date Requested:
Caller Telephone:
Property Address:
Subdivision or Nearest
i Cross Street:
! Location Description:
I
I
I
I
I
I
1m" hE 3' f'.{ S L;eSI ~fhMeet Time:
I J-1j- O~ ; Need Date:
1135-9 C1 0
VULCA-ffi LoT)
I
I
I
: Emergency: I Yes 0
13 0 =t- S.e. u LiE STOl1m LK
s- k?lLL I-Ls
TO BE COMPLETED BY THE UTILITIES LOCATIONS DIVISION
I Received By :
I
I Completed By :
i Caller NOTified of
Completion:
. Date: 2-6--tJL-
: Date:
~(iJImIPUH~
U!J FEB - 6 2004 ~
~ re~~4n:~ D
L::'J'
BOYNTON BEACH UTILITIES DEPARTMOO
LOCATOR DMSION
III
i!!lllil
~ili~!
iI:~~:a
~ifa;
;!
alii
--i
--
~
CD
r
-- .tr'
::J
CD ~.
~
f'
~t
~~
)t~
-+z
5'
II
-"
-"
-....J
co
CD'
~
~..;f"
'i\:.
~;r.~'
J 'i'Ii':."'" '
,f~~~";'t1f~
,~,,'t
"", /:1l
_ -<~ ,,,,,. ,f
r,"
...
'l,C
-R/W
54}./, fiEWER
MANf./OLE
f N.W; 10 TI-I AVE.
t; I( J1I. M.
Rlw
FIRE
J-IVoRANT.
\
~
~
,
~
::t:I.
IJ.J
-...J.
~
,
'-!)
,I '
'.Sa ~
~ ~
.~
~<vQ; ~(J
~,? ~q;.
Vj
t-..
t\J
~
1}.
\U
-..1 .
~~
Q... ~
~J
~~
~..,.~..
\fJit
~
~.
I
t
,.;
~
~
'"
~
......
'"
't;j.. -
,
~.
~
~
~
" ,-
~Ij ~
/ () r
~. ~-l\V
,\\)'l'0~
~ ~
D
V.
\ c..
D'''\
l '
,/
+
1=
N.E. /0 TII AilE
---
(j," w'M.
RI/f -
FIRE
HYORANT
C TO C, O. P. ~ 8:" T"
D TO E.O, P. = I'
E TO E. O. P. :::: I'
E TO F = 8:..a /I
~
--.J
It)
h.
m
l1J
~'
\J
~I
llJ;
U)
:::::
N
~
~
~
~
I .
061D~2D ,,",. <to 100
~ ". ." .,
SCALf IN. FE.ET
VALVE. NUMBER. 7~A 7cP 8 '7~C 7f;,D 7GE ?~,c.
PIPE. SIz.E 2'1 ZII 14 " (p" (;,1/ 4"
~lJRFAc.t. Tl'PE'. RoO. f? I!OAD ICOAD r;;:()A~ ll~
NUMBI:R OF. TUIUl6. ~S
oPo.I To, CLO~"
';', I~,,:;' ,r-. 1\1
DA.TE. Uo.6T / ...,). ill.
OPfJU,Tr.O' . "'VI
JlEVI.ION.
CITY OF BOYNTON BEACH
ENGINEERING. DEPARTMENT'
_.II.v .. ()l
.___'20' of
142.' 8 i
" . 1), Q
lit
i: 1,;' i ---\
I' Ci) ::c
I, I. , I -'" I
\j )> +
0
--l 21' 'tqO 0
if1
P )>
y < ()'
r if1 +
0
33r.. 0
II i I! I,' . rv
" I ' ,
, , )>
" , "1 : II
Ct4 \;'
, . rv
I! : :. t -+
I,; ; 'v
, 0
i: , II!
I! II
,
13"7'
~ -:l
~ ...
I~' 0
0
UJlVEYE
lonEO
R^DE$ CHECUO
. .,1. NOTED
TAUCTURE N01AnlS CHot:D
(\)
U'
I'
I
, .
I
I'
I
! !
II
Ii
I!
i I
~MAT(.\-\. LlN~ 14-~OO
c-.--
o
____.-!z?
104' .
~ <:20'
L.
2<08 rr
..
8
0EAGi)'f~ r 8L v Of
'58
Iv
('\.l
...
o
o
u 6"
in :
~
\]0
O'T""I
lt1lJ
;..;<-
l>-
r~
322'
AI E. 2~D j T.
30' o/IV
. 70'
(pr
~~
o rf'
~
A) ~.
'13'
.,,~'
11'7'
164'
IS(#'
;,) ~-_.-- lie" .
--...
-Z,I
.t>-
O
'2~' ~
~
'21;4' '2~I'
--
I: :
I" I
i: '
N
IU'
1M'
'Z70'
4
ze'
I..J
1-1
J:
~24'
/
S'
-t;.-
./.
_ <.0&' '>;
- -.--- - - .- 1,)'
,.
>- ~
<
~
/81'
e)
..;::.
~
'2of.~ '