LEGAL APPROVAL
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DMSON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
November 22, 2004
Mr. Chip Bryan
Julian Bryan & Associates, Inc.
1700 Arcadia Way
Boca Raton, FL 33432
RE: Serrano Beach
File No.: SPTE 04-010
Location: 1,300 feet west of Congress Avenue on the north side of the Lake Worth Drainage District Lateral Canal 28 (L-28)
Dear Mr. Bryan:
Enclosed is the Development Order granted by the City Commission on November 3, 2004. This approval extends for five
(5) months the site plan for the forty-seven (47) zero lot line single family homes approved on August 5,2003 from August 5,
2004 to January 5,2005. In order to maintain vested status, a building permit must be secured or an extension granted within
one year of this extension approval.
To continue this project through the development process, please revise relevant pages of your approved site plan to
incorporate all conditions of approval as applicable. A copy of this new Development Order, including these conditions, must
accompany the submission ofthe fully amended site plan set, as well as the original Development Order and associated
conditions. The person managing your permit applications should be made aware of any additional documents and third party
letters listed in the conditions of approval that need to be submitted with your permit package.
The Building Division is committed to speedy and efficient completion of the building permit process for your project.
However, please note that failure to meet all applicable Development Order conditions in the submitted plan set may produce
unnecessary delays in permit issuance. A thorough review will be conducted by the Plan Review Analyst and if the necessary
documentation is not attached and/or the plans are not amended to reflect all of the approval conditions, the plans will be
returned to the applicant for correction and re-submittal before the permit is further processed. Feel free to contact any TRC
member for additional clarification of comments.
Important: If you plan to introduce any changes to your approved site plan beyond those required by conditions of approval,
please contact our staff for a review before submitting a permit package to the Building Division.
A copy of the complete Development Order and Amended Site Plans reflecting the "Conditions of Approval" must be
submitted to the Building Department along with the first permit request to avoid any delays in the processing of your
permit.
Should you have any questions regarding this matter, please feel free to contact this office at (561) 742-6260.
sryc~
~hael W. Rumpf
Director of Planning & Zoning
S:\Planning\SHARED\WP\PROJECTS\Serrano Beach\SPTE 04-01 O\Appvl Ltr after CC.doc
'"
i
DEVELOPML.t' ORDER OF THE CITY COMMIS~tON OF THE
CITY OF BOYNTON BEACH, FLORIDA
Development
paz
Building
Engineering
Occ. license
Deputy City Clerk
C'
PROJECT NAME:
Serrano Beach
APPLICANT'S AGENT: Mr. Chip Bryan with Julian Bryan & Associates, Incorporated
APPLICANT'S ADDRESS: 1700 Arcadia Way Boca Raton, FL 33432
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION:
November 3, 2004
TYPE OF RELIEF SOUGHT: Request three (3) month site plan time extension for 47 zero lot line
single-family homes approved on August 5, 2003 (an extension to
November 5,2004)
LOCATION OF PROPERTY: 1,300 feet west of Congress Avenue on the north side of the Lake
Worth Drainage District Lateral Canal 28 (L-28).
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning and Development Board, which Board found as follows:
OR
TH IS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
DATED:
1.
2.
Application for the relief sought was made by the Applicant in mnr;\er .
the requirements of the City's Land Development Regulations. 0 > .(L'2-LJL\
The Applicant ~ ! I NOV I S 2004
<..../fiAS '"' ' ~
- I
HAS NOT L-~_______u _
OUARn';,-~;T cr: '~F.'_,:" i. i I
established by substantial competent evidence a basis for the relIef requ'esleCr.m-- - ------
3.
The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4.
The App~t's application for relief is hereby
_ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5.
This Order shall take effect immediately upon issuance by the City Clerk.
All further development on the property shall be made in accordance wi
and conditions of this order.
6.
7.
Other
S:\Planning\SHARED\WP\PROJECTS\Serrano Beach\SPT
",
,
4
Location M
Serrano at 8 a p
oynton Beach
i
i
I
I
,
i
!
I
r-;/
/'
{/ ..//
--.~'
;---
.-
/. --
;" ~~. / ".
. ----
\ ./V
""~ /.... \
~
I
I
( i I
~.' I
PU
<I>
800
o
800 Feet
N
.~,
s
IIITmU-~-~
-- .-......-..-- .....'7- .......... _,~U....._ ~ ...,.......... -- .....- u_ S9PlOOssy ~ uoAle uOllnr tJ U r
!'
~.. if 1
,.. ~11'
~ I' I
~ i I!H
~l Hp
< :; i~' I
g; ;fj:
..J I"'. C
Rill
~Id ,
~d! i
!l~ " .-
i , ! ~ I ~
.-
NV1d 3J.IS ~
---,
ON~~3S
~ ]1
I,
J
~l u~~..~ U
0< ') U!5!!I H
~ .1, .......
~ tHu.J UH HI
'I J ,.
'I II1I 'Itl III
1.11111 I.i. II'
UB 'tS
111((111
I .1111'1'
~ ~ lilJa'1
Q . h ~I'II~ I
!. If!' ;. Ie
I ~ I 11111'111
I I IiI tl d dlllMI
, 1.1 ~ 11111111"1
~ I ! !!Illdll
'IAY..''''NO:)
I
i
~
3
!
I'
':
~ i
'~=~
. I
: ,
! !
(_ AI_OI3)-W :lluIuoz
H:>V3B NOJ.NAoe
O3OV.IOBnS'Hn
- . -
.j
II
~.
"'Ii!
f
J
~j
~f
~
~~
~J
--
-
,I
.1 :I
I
.
I
.
1
i
t
I
81HX3
.------ - -
~!'i~ ..-'
'A....~4~~ ~
:noe :lO EIIDYn!1'-
~ :1---
,_.... II.O..Ot~".
"1.1KJ ,UlIIOJ. ".... ... ......
~ JIOE) pu. A....:/'9IOUts I8lI'I8PIWlI-V :lluiuOz
:1100 :10 ii1f>YTl,^
j }30l1\1OBns-tfll
.
.
/'....
EXHIBIT "e"
Conditions of Approval
Project name: Serrano Beach
File number: SPTE 04-010
Reference:
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS- General
Comments: None X
PUBLIC WORKS- Traffic
Comments: None X
UTILITIES
Comments: None X
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments: None X
BUILDING DIVISION
Comments: None X
PARKS AND RECREATION
Comments: None X
FORESTERlENVIRONMENT ALIST
Comments: None X
PLANNING AND ZONING
Comments:
1. The applicant must submit an updated/corrected traffic concurrency approval X
letter from Palm Beach County Traffic Engineering prior to issuance of any
permits.
Conditions of Approval
2
DEPARTMENTS INCLUDE REJECT
2. All previous conditions of approval must still be complied with. X
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
To be determined. ~
S:\P1anning\SHARED\ WP\PROJECTS\Serrano Beach\SPTE 04-01 O\COA.doc