LEGAL APPROVAL
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DMSON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
August 23,2004
Mr. James Comparato and Mr. Carl E. Klepper
Compson Associates, Inc.
980 North Federal Highway - Ste. 200
Boca Raton, Florida 33432
RE:
File No.:
Location:
Renaissance Commons Phase IV
(NWSP 04-006)
SE corner of Gateway Blvd and Congress Avenue
Dear Mr. Comparato and Mr. Klepper:
Enclosed is the Development Order granted by the City Commission on August 3, 2004 for the construction of a six story
building (328 condominium units) and 70 townhouse units on an 18.184 acre portion of the 85.522 acre Renaissance
Commons Master Plan. The site plan approval is valid for one year from the date of final approval. In order to maintain
vested status, a building permit must be secured or an extension granted within one year of final site plan approval.
To continue this project through the development process, please revise relevant pages of your approved site plan to
incorporate all conditions of approval as applicable. A copy of the Development Order, including these conditions, must
accompany the submission of the fully amended site plan set. The person managing your permit applications should be made
aware of any additional documents and third party letters listed in the conditions of approval that need to be submitted with
your permit package.
The Building Division is committed to speedy and efficient completion of the building permit process for your project.
However, please note that failure to meet all applicable Development Order conditions in the submitted plan set may produce
unnecessary delays in permit issuance. A thorough review will be conducted by the Plan Review Analyst and if the necessary
documentation is not attached and/or the plans are not amended to reflect all of the approval conditions, the plans will be
returned to the applicant for correction and re-submittal before the permit is further processed. Feel free to contact any TRC
member for additional clarification of comments.
Important: If you plan to introduce any changes to your approved site plan beyond those required by conditions of approval,
please contact our staff for a review before submitting a permit package to the Building Division.
A copy of the complete Development Order and Amended Site Plans reflecting the "Conditions of Approval" must be
submitted to the Building Department along with the first permit request to avoid any delays in the processing of your
permit.
Should you have any questions regarding this matter, please feel free to contact this office at (561) 742-6260.
Sincerely,
~~
Michael W. Rumpf
Director of Planning & Zoning
S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\Site Plans\Phase N COUS 04-004\approvalletter after CC.doc
,'9
DEVELOPMf "-:;' ORDER OF THE CITY COMMIS'JN OF THE
G'. I Y OF BOYNTON BEACH, FLORID~
Development
paz
Building
Engineering
Occ. License
Deputy City Clerk
PROJECT NAME:
Renaissance Commons Phase IV
APPLICANT'S AGENT:
Mr. James Comparato and Mr. Carl E. Klepper I Compson Associates
Incorporated
AGENT'S ADDRESS:
980 North Federal Highway, Suite 200 Boca Raton, Fl 33432
DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION:
August 3, 2004
TYPE OF RELIEF SOUGHT: Request conditional use I new site plan approval for the construction of
six (6) story building (328 condominium units) and 70 townhouse units
on an 18.184-acre portion of the 85.522-acre parcel in the SMU zoning
district.
lOCATION OF PROPERTY: Southeast corner of Gateway Boulevard and Congress Avenue, just
north of the C-16 canal.
DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO.
THIS MATTER came before the City Commission of the City of Boynton Beach, Florida
appearing on the Consent Agenda on the date above. The City Commission hereby adopts the
findings and recommendation of the Planning & Development Board, which Board found as follows:
OR
X THIS MATTER came on to be heard before the City Commission of the City of Boynton
Beach, Florida on the date of hearing stated above. The City Commission having considered the
relief sought by the applicant and heard testimony from the applicant, members of city administrative
staff and the public finds as follows:
1. Application for the relief sought was made by the Applicant in a manner consistent with
the requirements of the City's land Development Regulations.
2. The Applicant
/HAS
HAS NOT
established by substantial competent evidence a basis for the relief requested.
3. The conditions for development requested by the Applicant, administrative staff, or
suggested by the public and supported by substantial competent evidence are as set
forth on Exhibit "C" with notation "Included".
4. The Applicant's application for relief is hereby
,/ GRANTED subject to the conditions referenced in paragraph 3 hereof.
DENIED
5. This Order shall take effect immediately upon issuance by the City Clerk.
6. All further development on the property shall be made in accordance with the te
and conditions of this order.
DATED:
7. Other
S:IPlanninglSHAREDIWPIPROJEcrSlRenaissance CommonslSite PlanslPhase N
r '
-.,
'<-.
EXHIBIT "A"
"
RENAISSANCE COMMONS LOCATION MAP
LEGEND,
N
~-'E--
S
----.,--..--. Future Land.lJsea..___________
_H'H" - Ht.1Nt- .-Low Densltybstcftmtlaf
MODR - Moderate Density Residential
LRC - Local Retail Commercial
o 200 <100 800 1.200 1.~
5
.~
i
I
l
J b
r I'jli.
l!rl ~.
I'f!i a-
...f .... if. .I..~.;g...
{~;l~
-!Il' g
Lflf., ~
."",
.. ----.~.~'~",,:. t,~-c~
EXHIBIT "8"
...-
II
!
~
~
- -~-:::---
.....
_.~ ...
0'
e~D
8
o
· 0
1-0-
~
o . ~ ~
St 0
J
~
~b
ill
I
::::'::~~~~~,i:~--- -
-::.;;;-
1-11
~.
r ..---
\
\ f : ':~=-H~' · ~ ~~ .'+H', HI"~- FFR' . UP I
\ ~ ~:~. ..... .~~ :~. mall'l.i..i.j'.i'~I';" ',;.;.;.: .~r ,;:111
, iii , . . . . -, . . .. ~ ~ ", 'I
I : .' ~. "I~" ~~. Illfg:-: . ~:''''t~.''Jnt[ . . ",. ~: ~;!;; !I
I r ~~ .~,"",~; ~. ~ · 1$t~1 ~ - R i l'li,;
! (~f\~ r. .: t~=~:'iC":':~jl,,;~0 I':: ::
/ ~ :,If-i." 1'1-1'1" I"~I+ ~ ~: ~ ., ~:l':"'nL..I~..tt-~ ' L :! ,,111'
j1cJ. 1/ ,:'~: .... .... : : ~I~~ ~. -..- ~~ 0 ,~" I/~ :i: il;, p III
RI ~ -i '..~ fI'''~ II.. :: H:"'H tj .t' ,II- ". ;-.. I~;'j,'i'~ i!:, I
~/UJIi ~. .. ,- w.l;r~~l'!~,::::~:,::,-,% I!B r :;: 'I'~; i
. ~ '.'_L. .. 1_..... "1-1- . _.~!!.!;;". """,,-, . ,., 1.1.1,:,;.",:,.,::, :":';:""" !
I . ~ 'i#i:."~ -. . .. '~"'''. '. :: :i · ~~1:':1~ ~~:.- ..~.II~..l; II 1,'1l I!
f :,: ~, .1... ...~1....1.1...: : ~ _.. - ': ItL:,:~~~
, I '~ \l ---- :--: .", ..... ."., "-1.
. i -,.'~ _ ---'.
1 , :.:~ =l !i"~,~;Li
,I i k! 7 --- , , .:~~ ..... j!~!ii::
! !(J ..' ~ '.:~ ~ 1!!~Hi,
l,fJ Ii -- ~ ~<~ ~ ~i1Ji;:
i i/ 1;', ':-.: 'd:'~~ ~~.....~:. '- H i:i!'
"', ftii' ,. .~ i.,;;i'~ ~ 5
II I I
~",~..., ': .~,.:: :~ ,/ '11
.:,,~ "~~ ;, 1',1 .
(. Do ... ~ :~x..... - L H ':
S ....~<8 ~ .mIH: ii' I
" ~ ~ r--' ''I ii "Ill
..~ \.:. !t
,~~. ~ ~
....'X' J
1'< '~
"
III
Ii
---l
!
.
i
\ \ I L ")
\11\ \ i,..
I- \ ~ .~~:: ~'c,
;~ ~ ~\.. ,\ ~ :,' - '
~ I' '"","
U CIl \ \ I .~ ~~ .>0;", ~
::.::j !\ ~\ I ~.... ~ ",,<;~' ;...,~
m ~ ~\ :~: '~
I;II I t \ ~ ~
~~ \ '\ ~
\ ~ k,
... \ \ .
, \ \ ~.
~~ \ \ \ ";
~~, \ \\
\ \ i \\
EXHIBIT "B"
I
~~ ~
S; . ~ ':,
, "~
, .
, ...~:
~" ,
... ~:.
. ,~"
......... ,.:::-~
,r.: ~ __~L--
m,:
,
I
" 'E'::
"
" '
. .....:-
~<:.-:
-----------.
"~
II
;s
.L
/
IIQ,....u..WAIII.YO
~
'\ (
.
"
~ c!a
I;;
It\ MOURIZ -.--c: I i
a:......-::-... .... LQo
.. -
~~~~E~ ::"..:.:;.... COIAPSON ASSOCL\1'BSOI BCmm:lND,L.L.C.
l.lIOADDa
__..at_
~~~~~-:i.:-_-:=t=--_""'~~-:J'=:""~":=' ,
"
EXHIBIT "B"
"Ool!I':":'rr:..'~"".'''r.:.:.'':''':t''i''''-
-
#' ..L-
-----
I
f
r
~
~
~I~U Iii
~Ifl if
~'llllf
~ II
; Ii
; I,
I 'I
j '.
I
r----1
Ufi't ~1.~ i~J
(I
,.
t
58
Nt MOURIZ -.--c: I
= ='---J.:r -- "",. LIIfIO
-- -
~CH~~~ :-...:;:'" <U8'ICIt AlISOCIA11S Of IIDIrHOON Jl,u..c.
......
--~
:tF"'.::d.5.!-::ti\~"":L::t.:-.: _ ="'_'"l.,===z:e:..n--= ~
EXHIBIT "B" -.
Ie
~
~
~
ti
q i I\. I' J
\ '" _ ..~' I
t-\k ':i. /" - . ~ 11
f~ l;D I ~l' .:::J. ,~V
I 0.'- ~~?-, ~~, ~ )
~ ~ J~ ) \ ' -. I Jr~ :1,' r
~I .,. -
~ ~ d t= J ~ ~ ; ir /
-\,,--' ) I>' ~ _ 1 J
tI I""--' ~
Ii! 1 = JlD~_ ~ ::..
-nl,~ ~- J lD~ lD :l n
· o~) ,I,!: I ~Jrl.
(, -J. ~ '0 Ii-- 18 "Jl . r ":, .
~
~\ ! J,- ~ ~-- ~ II... ~~ m
\( -,....] ~
~ ~ ["-. ( i-'
n tI ,r III>' I J: IE -I : l! ~ I I
-o~ ~ r _ , _ ~~ j
n.~ ,i= s:l
n l:I >>~ >
I jj L- ~,,18 [J.)L 8 .i
tI \ ~ ~ J~ ~
g - I>' "'-'-' i)
~ .- ~ ~ 1- ~ > ~ ~ > ~ I
n 0 :l--1~ J -1 - - e l,
----1 ~ I 1 lD...... III ~ r ~
n~ . lIl!!r
>---~ 18 = _ I :B ;::l
n > >,J v ./
~I'r r.: "'- .1. ~ ! 'I:ZM r=..a I ~
- ~ F "I~'- "l::J ~ ~ .f=
OM \ , .!.-; I- ~
-,,~~ ~ ~ ff~l ~ ~.~ ~
~
~ ~~.r. I.,j I<" ""-
I ~ ~ J. III L ._
, .~ I~ 11;8 - ; r (
'. ~ ~~ ~ ( ~. ~ ~ III l I ~
, .
~ ~iL rtl8 .. ; Sr. ~
m
~ L~-~{ Ili.-rJr! j I
~r \\ I " 1'1 -
, . I i , ~~
\ I
I n II
/
/
/
K!'II=I
'lID I'
r;
. II
! II
~ I.
I 'I
J "
I
;I~~
'TII
.f~,
~ i ~~I~
I
-I
i I
.lfJ~:~~;J .
&
Nt MOURIZ ~:;='"'C ""--~
SALAZAR M_ L:nof~=~u.c.
ARCHITECTS & Pl.ANIERS !:!F"'.=.:;r:.i:t.~"=.:w-=.....n.-=-===.r:c...~__
i
!t
@@@@ @ @~@@)0
15 I 1III'i i III
II n;;II; 1111
I IIIII11 'I
I, ! i (
J I
J
.@e~_. E>l.1l
!III!II !i lillI
1111" hll'~
liS IIIIII ii
II pI
II' 'Ialr ,uil' J
II I:tll! IPi
II it ,111.11'.
iIIlJII!ltl, I
~. 'It II It Ii
I
i
I
.
ff
i
't
EXHIBIT "B"
s :
I ,-'-'-!:J-'-!;, I
ltlfFm.
~t~lt
... MOURIZ -.-T ~
=. =-~::-..-n ",.. ~
;: =-... .. I
. !~~l' -- OllIeII:IfAllOaADlWJlOnl1Qf"u.c.
--
-.....-
~~~~~.:-_-==""_oo(.~~=--r:'-==- !i
: ~ ~~r"~
3 l~tIJI; I
~
I
~
~.
~t t\~,
U - It
'\1 H {
f ~l .
l i
1
EXHIBIT "B"
~ It
r, If
lr
I.
1---1--
!! ~f ~
~[ (I ~I
"t~~~~ -'--G B I llC
,... ~"~::r- -. ....1114 L".o !
fa =..... rea
~ - CCtdPSON ASSOClATIlS Of BOYNTON n. w..c.
. ~~~ -~
IIOYNIQI MAaI. ft.OIl_
~L~~~-==-:'::i.;'"..:"'.::=:t..:::-"...;-..~~..~~-=~...~ t. -.. - -
';\!
EXHIBIT .Hl'l'
.1 1 f r f f , f'f f
, ::
.~ 4 '~
I I I I
I I I I I I I
I I
I I I
I I
l/.I I ~ I
~ 0 I I
c: ~
l/.I :i! I I
>-i I I
~ tt3 ~
~
~
~
:j :j
@ ~ @
.....
~~
~8
~~
~~-
["'4
J
,
~
'-!l ffl
.~ ~ :q:
'~ '~ ~'
I I
I I
.~
~
II
II
II
"
II
~
"
"
II
"
"
~
>-i
~
~
g
Z
ie-
f r r f
~ === ~.:::.::: -=E:iF= =QI::.- -=--=- q = == ~
" "
II "
" g "
II ~ II
II "
. ......t4"-
,
---lr---l
I "l! I
___JL-lL_J
--lr~-l
,," I
L___JL___J II
'"
~
J>
fi
t i~
~~
b
1~lf
n
(C) 2DMQMiIIcJ ~A...-..~""AII"""""" MD_af............. ............--...... .........................._..........~o.a-........................ ""--
Vista Bella
BO}'tolI.BoId, l'b14a
Town &: Country Builders, lnc.
Boca RIIflJiJ. FItriIa
I'H
Ji,
>
l!
l!ll i
I~'
Air
..
1'1811 ~
1i!1 J
Uu
I" 10. r
I~ !Ii Ii
~I iiO I~
~ i~ i i~
i .I~ i
o u .
R ~: ~
I d !
a I~ ~
i i: ~
I d i
/BBBE!
iv.. ~ ~
-r" ~
si si ~ <
"~ ~ a ~
~. ~ ~ :
,,~"&
~~ ~ g
~ "
a ~ ~
. rTJ
r
<
~B~@3~
!~e~-
Hn~
. " ~ ~
nH~
qi~--<
I a a Z
g rTJ
(.fl
t:::I~lCI@1
r.tQe
Ji ~ I ~
21 ~ I I
9~ ~ g ~
i ~ i
(U,lj;)!L:l
~n
ni
q.
e n R
. a .
~ p 9
~
.
.
~
>
i
i
>
> ~~~
00 6> ~
~ ,
f:XHIBIT "B"
~ J !,
I..
;%'-3 V2" ,
l1t)"POIiT Of THE ~bOf --.r-
42'~' I
HOO1T Of THE POK Of THE PITCH Of THE ~00f ~
,
,~"~
; ~~
b 0'
. ~~
~ ~ i ~
i~ji "~
r
iEa i 1EB
, i
I
I
I
1m
m
lE133
,
I
.
I
i
,
--i !
rTJ ~ !
,.1
,
'0 !
Z 1
,
I
(EEl
4-
~
rll
if
@"""llIiooJ'____....AII_-"",..ol-_,...,.._..,..._........Io...---..._--ol~--__
flf:
,,,
1'1811 -
1i!1 J .
Uu
III
lial
Vista Bella
Boy/r>It &adl, FIDriiIII
Town &: Country Builders. Inc.
BoctJ RtItcil. F7DrltItI
~
eQ if
la : ~ ..
~. ~ ~
i . ~~
Q ~~
· III
~ ~
i ~~
z ..I~~
~~~:t~._._m_______ ..
Z
GJ
()
);>
Z
);>
.-
r'\
\
EXHIBIT "B" , .
..
\~.~ -,.,.......,.,~ ~~~...t+ -- ~
-~~.. J .-J..+ 1. ~^I \'h~d' > ,~_ i--
.:A;: _ ___L ~_L ~~ml____ ~~-~.._}.~ '
<.... I~ 1d ~:1 }~-.JI- --~I--' !~_m~___ /A--l~""~ --
, .. J L....J\ t · "0 I I .
. -=.lYf:x:l ~ \ 0 I ""\:: 1,
9 L ----" \ Q. :-L
. ~~, -- ,1" ~ .
:: . ~~'" i+f':~ ~: s<[ .
l~ ~ ' 'I=l- ""
rr' b!1'f-.
~. \ nIT. ~', J 0 I;-
.. ' \.. - -~ I I J ': r ~ r-:,
.. ':'I' b: i... I~
~~ ~-~.' , ..' 1 F: t ['
j ~ II ; 'h: - 1 "U ~. :::~.:J
~~ I - \ \~.r JII ~ ' ,
~H\ 'f' liU: , V~..,. J J lc L.....
. I L I, J ',;" L
. ~ , ic.l !",
~- I-I I\-- ] F: r ['
. ~ I lei k
. - C' '11-0.. M.1'"
';70- \':. ~\I' ~ (~ .t-
1,- r I ,1 r 1$: L
~ - 1 ~ ~ .
.;' \,', J Ii -t L
... Lurf.' ~.
~( - ,_' \ ] ~, r
. 1il-6~. ~ .p'
.~ - L. I IF] ~: r.
'~~~~; l ~ ..~ :.._
_, _~ Jr<;~ ~ ~mn ie.r
.. ~ : i! i rr 1"J
.. 'l" 'l"~ +-,;:J . t L
~~ ~: .f
i - ~ ~ J 'r ~
<:..t:a -, t~ r I
....if' . Iii i.;
~ .: Wf. II ..r J
.\1' _~_~- --- nn------~~1t~J~-
S_ ,
", ,
~~'
\ \ '~
\
-+>-
I
i
1111111I1"1"111'1111111111111111'11111111111')
111111I11I111 I III 1111 III ,
.-.__ 111I11I111111I1,-..-..-1111"1111111I111111111111111111
i~~iji;iiji:iiiii;i!ii:!iiii;I;;i:j;;;;iii;i;;;;;;111 iiiil;r
11111111111111!IIIIII!IIIIIII/1I1111111111111I11111111111II IIJIII II ,
1llllllillllllllllllllllllllllllllll,lllllllillilJIIIIIILdl
iiiillilililiiliijiilllillliillllllilillillllllllllllllllllllllllll,
...... ...,.......,. "'-". ...... --, .......... "'" ...."
.... . .. 'h'~. "..... ...... . uu. .
,~ I' I Renaissance Commons ~'frln~
. ~
0> I Boynton Beach, Florida
: ~~
. ~~
~~
, ~~
,
~~
ij """ ~
z ..~~
~~~~
W
!f
";
.
w
Q
"
EXHIBIT "B"
...'
"
~
.
I
,
_/~--
........-
~ ,.-
,~....-
\ ~--
~--f
__.IT--
1111I11"11"/11111I11"11I11111I1111111"111111/1111111"111111111'1
1111I111111111111111I11I111111111111111111111111111 III,
::::::::::::::::::::::::::::::::::::::::::::::::::::::"::.~~_::::::.:I '
11I1,1~IIII,illlilllllllll,Il,111111111ll1111ill111111111111l1III':,
liiilllllllllllllllllll!1111111111111111111111111111111111111111111111'
111111111II1111111111111II111111I111,1,lllIllIIlId,IIIIILJI
iiilllillliliiliiliilililliiillllllillillllllllllllllllllllllllllll,
::::': ':~'::::::',"._;::;-; :::::; .., 0",:'::::: '''; .....
111111111111111111,11111111111111111111,111111111111111I
,~ ~ I Renaissance Commons R'JPlJ~~
' I Iii II g
(l) I Boynton Beach. Aorlda
EXHIBIT "C"
Conditions of Approval
Project name: Renaissance Commons Phase IV
File number: COUS 04-004
Reference: 2nd review plans identified as a New Site Plan with a May 4. 2004 Planning and Zoning
Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: None X
PUBLIC WORKS - Traffic
Comments: None X
ENGINEERING DIVISION
Comments:
1. A pre-application meeting with the Engineering Division to discuss plat X
process is required subsequent to site plan approval.
2. Provide clarification on the Live Oaks shown as "TBD" on Sheets L-3 and L- X
4. These do not show up in the plant lists.
3, Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II, X
Section 5.H.). Reference FDOT Standard Index 546 for the sight triangles
along all collector and arterial roadways.
4. Indicate, by note on the landscape plan, that within the sight triangles there X
shall be an unobstructed cross-visibility at a level between 2.5 feet and 8 feet
above the pavement (LDR, Chapter 7.5, Article II, Section 5.H.).
5. Full drainage plans, including drainage calculations, in accordance with the X
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
UTILITIES
Comments:
6. Please provide a timeline that clearly illustrates when water and sewer X
services will be required to serve the proposed project. Your starting date for
the timeline should be the date of City Commission approval. Also, provide
milestone dates for permit application, the start of construction, and the
setting of the first water meter. This timeline will be used to determine the
adequacy of water and wastewater treatment capacity for your project upon its
completion. Please be as accurate as possible.
COA
07/23/04
2
DEPARTMENTS INCLUDE REJECT
7. An intensification of this magnitude warrants a re-evaluation of our utilities X
master plan in order to evaluate the adequacy of the service main network in
the area. Any off-site improvements required to support this development
will be the"responsibility of the applicant. The developer has funded a study
of this issue, however, and our final approval will be delayed until
the completion of that study.
8. Palm Beach County Health Department permits will be required for the water X
and sewer Systems serving this project (CODE, Section 26-12).
9. Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g.p.m. (500 g.p.m. some residential developments) with
20 p.s.i. residual pressure as stated in the LDR, Chapter 6, Article IV, Section
16, or the requirement imposed by insurance underwriters, whichever is
greater (CODE, Section 26-16(b)).
10. The CODE, Section 26-34(E) requires that a capacity reservation fee be paid X
for this project either upon the request for the Department's signature on the
Health Department application forms or within 30 days of site plan approval,
whichever occurs first. This fee will be determined based upon final meter
size, or expected demand.
11. This office will not require surety for installation of the water and sewer X
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy
12. A building permit for this project shall not be issued until this Department has X
approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15.
13. Utility construction details will not be reviewed for construction acceptability X
at this time. All utility construction details shall be in accordance with the
Utilities Department's "Utilities Engineering Design Handbook and
Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application.
FIRE
Comments:
14. Buildings and structures more than three (3) stories or thirty-six (36) feet in X
height or all buildings more than two (2) stories in height and more than
30,000 square feet per floor level, shall be equipped with approved Class 1
standpipes. City Ordin3llce Section 9-6, Section 6-2.2.
I,
15. Please see attached FD Design Guide. It contains criteria currently being X
COA
07/23/04
3
DEPARTMENTS INCLUDE REJECT
considered by the City Commission for a new ordinance. (Copy emailed to
Mr. Carl Klepper 3/30/04).
POLICE
Comments: None X
BUILDING DIVISION
Comments:
16. Place a note on the elevation view drawings indicating that the exterior wall X
openings and exterior wall construction comply with 2001 FBC, Table 600.
Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 2001 FBC, Table 600.
17, Every exterior wall within 15 feet of a property line shall be equipped with X
approved opening protectives per 2001 FBC, Section 705.1.1.2.
18. General area modifications to buildings shall be in accordance with 2001 X
FBC, Sections 503.3, 503.3.2, and 503.3.3. Provide calculations verifying
compliance with the above code sections and 2001 FBC, Table 500.
19. Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph. Wind forces on every building or structure
shall be determined by the provisions of ASCE 7, Chapter 6, and the
provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are
signed and sealed by a design professional registered in the state of Florida
shall be submitted for review at the time of permit application.
20. Every building and structure shall be of sufficient strength to support the X
loads and forces encountered per the 2001 FBC, Section 1601.2.1 and Table
1604.1. Indicate the live load (pst) on the plans for the buildin11; design.
21. Buildings three-stories or higher shall be equipped with an automatic X
sprinkler system per F.S. 553.895. Fire protection plans and hydraulic
calculations shall be included with the building plans at the time of permit
application.
22. At time of permit review, submit signed and sealed working drawings of the X
proposed construction.
23, A minimum of2% of the total parking spaces provided for the dwelling units X
covered under the Fair Housing Act shall be accessible and comply with the
requirements of the act. Accessible parking spaces shall be equally distributed
for each type of parking provided, e.g. surface parking, parking structures,
etc. per Title 24 CFR, Part 100.205.
COA
07/23/04
4
DEPARTMENTS INCLUDE REJECT
24. On the drawing titled site plan, identify and label the symbol that represents X
the property line.
25. As required by the CBBCO, Part ill titled "Land Development Regulations", X
submit a site plan that clearly depicts the setback dimensions from each
property line to the leading edge of the buildings. The leading edge of the
buildings begins at the closest point of the overhang or canopy to the property
line. In addition, show the distance between all the buildings on all sides.
26. To properly determine the impact fees that will be assessed for the one-story X
pool/clubhouse, provide the following:
~ Will the pool/clubhouse building be restricted to the residents of the
entire project only?
~ Will the residents have to cross any major roads or thoroughfares to get
to the pool/clubhouse?
~ Will there be any additional deliveries to the site?
~ Will there be any additional employees to maintain and provide service
to the site?
Please have the applicant provide the City with a copy of the letter that will be
sent to the impact fee coordinator. To allow for an efficient permit review, the
applicant should request that the County send the City a copy of their
determination of what impact fees are required for the pool/clubhouse.
27. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may X
not, therefore, be used for landscape irrigation where other sources are readily
available.
28. A water-use permit from SFWMD is required for an irrigation system that X
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time of permit application, F.S. 373.216.
29. If capital facility fees (water and sewer) are paid in advance to the City of X
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
~ The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
~ If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
~ The number of dwelling units in each building.
~ The number of bedrooms in each dwelling unit.
~ The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
30. Pursuant to approval by the City Commission and all other outside agencies, X
the plans for this proiect must be submitted to the Building Division for
COA
07/23/04
5
DEPARTMENTS INCLUDE REJECT
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the City Commission.
31. At time of building permit application, submit verification that the City of X
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property. The following information
shall be provided:
~ A legal description of the land.
~ The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
~ If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
~ The number of dwelling units in each building.
~ The total amount being paid.
(CBBCO, Chapter 1, Article V, Section 3(f))
32. The full address of the project shall be submitted with the construction X
documents at the time of permit application submittal. If the project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
33. Add to the floor plan drawings of the individual units a breakdown of the area X
within the unit. The area breakdowns for each unit shall specify the total area
of the unit, area of the balcony, total area that is air-conditioned and, where
applicable, total area of storage and garage space. If the garage and storage
areas are not part of a specific unit, the area shall be included and identified
within the area of the building. Indicate how many of each type of unit will be
on each floor and within the building.
34. Add to the site data the total area under roof of each residential building. X
Provide tabular area data for each floor of each building. The breakdown shall
include the following areas and each area shall be labeled on the applicable
floor plan drawing:
~ Conunon area covered walkways;
)> Covered stairways;
)> Common area balconies;
~ Entrance area outside of a unit;
)> Storage areas (not part of a unit);
)> Garages (not part of a unit);
)> Elevator room;
)> Electrical room;
)> Mechanical room;
)> Trash room;
)> Mailbox pickup and delivery area; and
)> Any other area under roof.
(Chapter 4 - Site Plan Review, Section 7.E.2 and 3).
'"
COA
07/23/04
6
DEPARTMENTS INCLUDE REJECT
Villa Lae:o
35. Title Sheet "Data". A 13R system cannot be used in these structures. A 13 X
system shall be installed per NFP A 13.
36. Provide match lines on Sheets E-l through E-3. BBA to the 2001 FBC, X
Section 104.2.1.
37. Sheets A-I through A-7. Define on the plans ifparking spaces numbered 200, X
309,418,527,638, and 639 are handicapped accessible spaces.
38, Sheet A-to. Show all clear floor spaces per the Federal Fair Housing Act. X
Show method of compliance for the kitchens and the bathrooms, and which
design option (A or B) is being used.
Vista Bella
39. Submit drawings for the Gazebo. BBA to the 2001 FBC, Section 104.2.1. X
PARKS AND RECREATION
Comments:
40. The Recreational Facilities Impact fee will be $269,138 based on the X
following:
328 multi-family units @ $656 ea. =$215,168
70 single family attached units @ $771 ea. =$ 53,970
FORESTERlENVIRONMENTALIST
Comments: None X
PLANNING AND ZONING
Comments:
41. This project requires conditional use approval from the Planning & X
Development Board and City Commission. If approved, staff recommends
that a period of one (1) year be allowed to initiate this project (obtain a
building permit).
42. This project is the fourth phase of the Renaissance Commons (f.k.a. X
Motorola) development. The School District of Palm Beach County
approved the Renaissance Commons project for 1,001 residential units for
school concurrency purposes. At the time of permitting, please confirm the
cumulative number of residential units approved through phases One through
Four.
.'
COA
07/23/04
7
DEPARTMENTS
INCLUDE REJECT
43. The SMU zoning district allows up to 20 units per acre. This phase is the X
fourth phase of the Renaissance Commons project. At the time of permitting,
provide staff with the project density. This density would take into
consideration the entire Renaissance Commons land area (+/- 86 acres) and
the approved number of units from phases One through Four.
44. At the time of permitting, on Villa Lago's site plan (sheet SP-2), eliminate the X
reference to "property line" because the arrow merely points to the phase line
of the proiect and not its true propertY line.
45. The "Q-l Villa Lago" portion of the phase requires 629 spaces while the "Q- X
2 Vista Bella" portion requires 145 spaces for a grand total of 774 parking
spaces, The project provides 804 spaces, or an excess of 30 spaces. This
should be noted as such on the "Total Parcel Data Phase IV" on the cover
sheet at the time of permitting.
46, At the time of permitting, all parking spaces, including handicap spaces, X
should be labeled on Villa Lago's lSllevel (sheet A-I) through the 6th level
(sheet A-6) of the parking garage. Ensure that the configuration of the
parking area is consistent between all plans. The total number of proposed
parking spaces should match between the graphic and the tabular data on the
cover sheet and on sheet SP-2. On the site plan ensure that the labels
regarding the number of parking spaces for each row (including on-street
parking) is correct and directly corresponds to the actual number proposed
within each row.
47. The cover sheet's tabular data for "Villa Lago" regarding the required parking X
is incorrect because five (5) spaces are required for the recreation area. At the
time of permitting, please revise the tabular data to indicate that five (5) more
spaces are required for recreation area, resulting in a total of 629 required
parking spaces. Also, this information should correspond with the "Parking
Distribution Table" on the correspondinJJ; site plan (sheet SP-2).
48, The "Total Parcel Data - Phase IV" on the cover sheet, the impervious X
surface and the pervious surface should equal 100% of the Phase IV site.
Update cover page at time of permitting. Also, on the cover sheet, ensure that
the information indicated in the "Total Parcel data Phase IV" directly
corresponds and agrees with the information derived from both the "Vista
Lago" and "Vista Bella" portions of the project. These three (3) tables (on
the cover sheet) will be reviewed for accuracy at the time of permitting.
49. The area of the brass letters proposed within the subdivision development X
sign of "Villa Lago" (as shown on sheet A-IS) cannot exceed 32 square feet
in area (Chapter 21, Article IV, Section l.D.). This is the same for the "Vista
Bella" development as well (as shown on sheet SP-1.l). Also, the sign walls
should be setback 10 feet from the outside of the curb.
50. On the cover sheet tabular data regarding "Vista Bella", based upon the X
"
.
.
COA
07/23/04
8
DEPARTMENTS
INCLUDE REJECT
proposed uses and their intensities, this portion of the project requires a total
of 145 parking spaces, not 150 spaces as currently indicated. At the time of
permitting, correct the tabular data to accurately reflect the true number of the
required and provided parking spaces. This table (on the cover sheet) should
directly correspond with the "Parking Distribution Table" provided on sheet
SP-3. Also, indicate on both tables, the correct number of spaces provided as
on-street, off-street (driveway), one-car, and two-car garage parking.
51. The site plan page for "Vista Bella" (sheet SP-3), prepared by Mouriz Salzar, X
incorrectly identifies the sheet as "Vista Lago". Correct the names of the
plans at the time of permitting.
52. The photometric plans indicate the lighting levels but do not show the X
outdoor lighting fixtures that would be used throughout the project. At the
time of permitting, provide a detail of the typical freestanding outdoor
lighting fixture. The detail should include the dimensions, materials, and
colors. Staff recommends that its design and style be compatible with the
building design (height) and poles that were used throughout Phases One
through Three (Chapter 9, Section IO.F.U.
53. Place a note on the site plan for "Vista Bella" (sheet SP-3) that no screened or X
solid roof enclosures are permitted for those units proposed along the 40-foot
wide landscape buffer (along the east property line).
54. Include large sized color renderings of all elevations for both "Villa Lago" X
and "Vista Bella" by Planning & Development Board meeting (Chapter 4,
Section 7.D.).
55. At the time of permitting, the elevation pages for "Vista Bella", including its X
clubhouse (sheet A-I) shall indicate the exterior finish, paint manufacturer's
name, and color codes. Staff recommends using a color schedule (Chapter 4,
Section 7.D.).
56. Landscaping at project entrances shall contain a signature tree at both sides of X
the entrance (Chapter 7.5, Article II, Section 5.N.). A signature tree is a tree
with blossoms or natural color other than green intended to beautify project
entrances and contribute to the city's image with this element of aesthetic
conformity. Signatures trees include Yellow Elder, Tibouchina Granulosa,
and Bougainvillea. Note that signature trees do not contribute toward the
total number of required perimeter trees. Signature trees must have 6 feet of
clear trunk if placed within the safe-sight triangle (Chapter 7.5, Article 2,
Section 5.N.).
57. Fifty percent (50%) of all site landscape materials must be native species X
(Chapter 7.5, Article II, Section 5.P). This native requirement should be
shown At the time of permitting, please categorize as follows:
· Shade trees,
.
I
.'
COA
07/23/04
9
DEPARTMENTS INCLUDE REJECT
. Palm trees, and
. Shrubs / Groundcover.
On the Phase IV landscape plan (sheet L6 of 6), provide the total quantities
and percentage of native species for both residential developments (Villa
Lago and Vista Bella).
PLANNING & DEVELOPMENT BOARD COMMENTS:
Comments:
58. None X
CITY COMMISSION COMMENTS:
Comments:
59. To be determined. ~
MWRIelj
S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\Site Plans\Phase IV COUS 04-004\COA.doc
THE SCHOOL DISTRICT OF
PALM BEACH COUNTY, FLORIDA
PLANNING DEPARTMEt-lf
, 3320 FOREST HILL BLVD., C-331
WEST PALM BEACH. FL 33406-5813
(561) 434-8020 FAX: (561) 434-8187
ARTHUR C, JOHNSON, Ph.D.
SUPERINTENDENT
December 19, 2003
4
Dick Hudson, AICP
Senior Planner, Planning Department
City of Boynton Beach
100 E, Boynton Beach Blvd.
Boynton Beach, FL 33435
RE: CONCURRENCY DETERMINATION - CASE #03120301C - RENAISSANCE
COMMONS DRI (FKA MOTOROLA) PHASE III
Dear Mr. Hudson:
The Palm Beach County School District has reviewed the above referenced project for a
Concurrency Determination for 1001 multi-family units.
Attached please find the approved Palm Beach County School District Concurrency
Application and Service Provider Form for Renaissance Commons DRI Phase III. This
concurrency determination is valid for one (1) year from the date of issuance. Once a
Development Order has been issued for the project, the concurrency determination will be
valid for the life of the Development Order.
If you have any questions regarding this determination, please feel free to contact me at
(561) 434-7343,
Sincerely,
P
cc: Ruden McClosky
enc.
S :\Plan ning\Publicll NTERGOV\Concu rrency\Concurrency Determination Letters\Concurrency\C0312030 1 C. doc
AN EQUAL OPPORTUNITY EMPLOYER
"
..
"
Compson Associates of Boynton II, LLC
May 3, 2004
C/o City of Boynton Beach
100 East Boynton Beach Blvd.
Boynton Beach, Florida 33425
Attn: Mr. Ed Breese. Principle Planner Plannine: and Zonine: Division
Re: TRC Meetine: on Mav 4. 2004 (ii) 10 AM Renaissance Commons
{former Motorola Property. Phase IV. 328 Condominium Units
(Villa Lae:o). 70 Townhomes. (Vista BeDa). and balance of roads
from Phase I to Gatewav Blvd.
Dear Ed,
As per your TRC requirement, please find the following enclosures:
1. Ten (10) copies signed of architectural plans for applicant AI-AI5, co-applicant
TH AO-A40;
2. Ten (10) copies signed and sealed civil drawings sheet CI-C5;
3. Ten (10) copies of signed and sealed landscape Plan LI-L6;
4. Ten (10) copies of engineered photometric EI-E3;
5. 8 1/2 x 11 Reductions of above drawings for your final report;
6. Ten (10) copies letter from Pinder Troutman's response to engineering;
components dated;
7. Evidence of school concurrency;
8. Color 8 ~ x 11 of Villa Lago and Vista Bella;
9. Paint chart for each;
10. Ten (10) copies of responses for TRC meeting;
As we discussed, should you find in your review in TRC anything that you may need
contact me at (561) 391-6570 and I will have it to you in short order.
Thank you in advance for your cooperation in this matter.
CEK/crd
C:\Documenls ond SelIinp\Ccmplcn AIaooiIbls\My Doc:umcnIs\Mo1Drola 29 01; S7IMoIIlIOIaICK MoloroIaICK IIr to Ed Ilnleoe re meeting OIl 5-4-04 10 AM.doc
l.
1st REVIEW COMMENTS
New Site Plan
Project name: Renaissance Commons Phase IV
File number: NWSP 04-006
Reference: 1st review plans identified as a New Site Plan with a March 17, 2004 Planning and
Zoning Deoartment date stamo marking
I II
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Article
II, Section 10-26 (a). Larry Quinn has accepted the container for San
Raphael. We will be utilizing the same container and means and methods,
2, Explain how solid waste pickup will be handled, The trash rooms are not
located nor oriented in such a manner to allow standard pickup methods,
The 10 feet x 18 feet dumpster holding pad on the south side of the condo
complex is not accessible for solid waste. Waste containers will be
transported to the south side loading area demised on SP-2, They will be
picked up on the frequency determined based on the occupancy, (ie 2x per
week).
PUBLIC WORKS - Traffic
Comments:
3, Provide a traffic analysis and notice of concurrency (Traffic Performance
Standards Review) from Palm Beach County Traffic Engineering.Please
see Letter from Pinder Troutman dated April 29th, 2004 which contains the
approved Traffic Performance standards review
4, The traffic analysis should address the need for dual westbound turn lanes
from the northbound roadway to westbound Gateway Blvd. and dual
northbound turn lanes from northbound Gateway Blvd to the internal site
roadway, The developer should consider building improvements to all
approaches of this intersection that accommodates traffic from the full
build out of the total DR!. If not, the developer is advised that there is the
potential for additional intersection reconstruction that may be required by
the City to support future phases,
Dual left turn lanes have been shown on the south approach to the Gateway
intersection. Please see Letter from Pinder Troutman dated April 29th, 2004
5, Explain the reasoning for shifting the proposed northbound roadway(s) east
of the existing configuration at Gateway Blvd,
The onsite road has been shifted west to align with the current intersection.
Please see Letter from Pinder Troutman dated April 29th, 2004
6, On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators
I II
DEPARTMENTS INCLUDE REJECT
striping, directional arrows and "Do Not Enter" signage, etc, See City
Standard Drawings "K" Series for striping details,
The traffic control devices has been shown on the site and civil plans.
7, Revise the traffic circle into the condo complex to provide a minimum 50
foot centerline turning radius,
As discussed with Roger Kemmer and Larinda Logan, The traffic circle is
not required to accommodate a fire or garbage truck turn around. Fire
Trucks will not enter the parking garage and trash pick-up is at the south
end of the garage. The entrance and exit radii have been increase to allow
better maneuverabilitv.
8. Add a "No Left Turn" sign in the median, westbound, east of the south
entrance into the condo parking structure,
ENGINEERING DIVISION
Comments:
9. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets,
All changes have been shown on all sheets.
10, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the Commission
and at permit review,
Acknowledged.
11. Upon Commission approval of the site plan schedule a pre-application
meeting with the Engineering Division to begin the plat process,
Acknowledged.
12. Show proposed site lighting on the site and landscape plans (LDR, Chapter
4, Section 7,BA,)
The site lighting has been shown on the site, civil, and landscape plans.
13, It may be necessary to replace or relocate large canopy trees adjacent to
light fixtures to eliminate future shadowing on the parking surface (LDR,
Chapter 23, Article II, Section A.1.b),
To the extent feasible, the Applicant has placed proposed landscaping, III a
manner, not to adversely effect the lighting distribution and photometric.
14, North arrow is incorrectly oriented on all landscape sheets. Please correct.
The north arrow has been rotated to depict the correct orientation on the
landscape plans,
15. Please provide a plant list/legend on each Landscape sheet for that specific
sheet.
The plant list for each sheet depicting all plant materials, quantities, and
DEPARTMENTS
specifications has been provided the specific landscape sheet.
16. It is recommended that all Live Oaks be placed a minimum of 10 feet from
buildings, sidewalks, and/or walls,
The applicant agrees and has not located any Live Oaks within 10 feet of a
building.
17, Provide clarification on the Live Oaks shown as "TBD" on Sheets L-3 and
LA, These do not show up in the plant lists,
Live Oaks with the "TBD" notation are oaks that will be trees relocated from on
site. The specific tree number corresponding with the tree survey has yet to be
determined, The landscape plans and the plant list has been revised to include
these trees and they are tagged at "QVR" on the plans,
18, The irrigation source for this project is noted as re-use water, which is not
currently available, Please specify irrigation source,
The source of irrigation water will be onsite lake or adjacent L WDD canal.
The irrigation system will be designed to convert to reuse water when it
is available.
19, Show sight triangles on the Landscape plans (LDR, Chapter 7,5, Article II,
Section 5,H.), Reference FDOT Standard Index 546 for the sight triangles
along all collector and arterial roadways,
The landscape plans have been revised to include the FDOT 546 sight triangle at
the project entrance on Gateway Blvd,
20, Indicate, by note on the landscape plan, that within the sight triangles there
shall be an unobstructed cross-visibility at a level between 2,5 feet and 8
feet above the pavement (LDR, Chapter 7,5, Article II, Section 5,H,),
The required note has been added to the landscape plans,.
21, Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
Full drainage plans will be provided with the final engineering plans at the
time of permitting.
22, Paving, Drainage and Site details will not be reviewed for construction
acceptability at this time, All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application.
INCLUDE REJECT
i,.,pJ~
I ,
DEPARTMENTS INCLUDE REJECT
Acknowledged.
UTILITIES
Comments:
23. All utility easements shall be shown on the Site plan and Landscape plans
(as well as the Water and Sewer Plans) so that we may determine which
appurtenances, trees or shrubbery may interfere with utilities, In general,
palm trees will be the only tree species allowed within utility easements,
Canopy trees may be planted outside of the easement so that roots and
branches will not impact those utilities within the easement in the
foreseeable future, The LDR, Chapter 7,5, Article I, Section 18,1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way,
Utility easements are shown in grey-scale on the landscape plans. Shade trees
have been located outside of these easements and in a manner so as not to affect
the utilities within those easements,
24, An intensification of this magnitude warrants a re-evaluation of our utilities
master plan in order to evaluate the adequacy of the service main network
in the area. Any off-site improvements required to support this
development will be the responsibility of the applicant, The developer has
funded a study of this issue, however, and our final approval will be
delayed until the completion of that study,
Acknowledged. After preliminary review with Utilities it is our belief that
Renaissance Commons will require an improved lift station and that
minimal off site improvements will be quantifiable. As of this date certain
phases ofthe DRI (water & sewer) have already been paid or reserved.
25, Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Section 26-12).
Acknowled2:ed.
26. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g,p,m, (500 g,p,m, some residential developments)
with 20 p.s.i, residual pressure as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by msurance underwriters,
whichever is greater (CODE, Section 26-16(b)).
Fire flow calculations will be submitted with the final engineering plans at
the time of permittin2:.
27, The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within 30 days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
Acknowledged.
28, Comprehensive Plan Policy 3,C.3.4, requires the conservation of potable
""f/iI
I II
DEPARTMENTS INCLUDE REJECT
water, As other sources are readily available City water shall not be
allowed for irrigation,
Acknowledged.
29, Water and sewer lines to be owned and operated by the City shall be
included within utility easements, Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated in
CODE Sec, 26-33(a),
Utility easements have been shown for all water and sewer lines.
30. This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy
Acknowled~ed.
31. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required
to service this project, in accordance with the CODE, Section 26-15,
Acknowledged.
32, The LDR, Chapter 6, Article IV, Section 16 requires that all points on each
building be within 200 feet of an existing or proposed fire hydrant. Please
demonstrate that the plan meets this condition,
The water line has been extended along the south side of the condo building
and an additional fire hydrant added.
33, Residential buildings over three stories in height require the use of a RPZ,
not a DDCV downstream of the meter. Accordingly, correct the two
proposed meters on the south side of the condo complex
Potable water services will have an RPZ downstream of the meter - the
drawin~ has been corrected.
34, Fire sprinkler systems may be required on all structures in excess of three
stories, based upon building code requirements, and a booster pump system
may be required for the fire building water systems to allow for pressure
losses, When using a booster pump a RPZ will be required on the fire line
also,
All buildings in excess of three stories (the condo building) will contain a fire
service with double detector check valve.
35. Please provide a master plan sheet showing all proposed water and sewer
for Phase IV,
A master water, sewer, and draina~e plan has been included as sheet Cl.
36, A force main is depicted running south and then west from the proposed
lift station and refers to it continuing through Phase III. This referenced
force main is not shown in Phase III,
The preliminary engineering plan has been revised. See the newly created
Master Water, Sewer, and Draina~e Plan for the complete view.
37. Per previous discussions with the Utilities Department only two lift stations
will be permitted for the Renaissance Commons master plan, Currently
three are proposed - one existing, one in Phase I, and now one in Phase IV,
....
',. ,'#
I D
DEPARTMENTS INCLUDE REJECT
Please coordinate with Engineering and Utilities to resolve this conflict,
The existing lift station will only be utilized temporarily for Phase 3. With
the construction of Phase 4, the existing lift station will be eliminated
and the ohase 3 sewer flow directed to the new lift station.
38, Maintain a minimum horizontal separation of 10 feet between water main
and stormwater drainage pipe,
The water main has been revised to provide for a 10 foot separation from
the drainage.
39, Utility construction details will not be reviewed for construction
acceptability at this time, All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any
updates); they will be reviewed at the time of construction permit
application.
Acknowledl?:ed.
FIRE
Comments:
40, Buildings and structures more than three (3) stories or thirty-six (36) feet in
height or all buildings more than two (2) stories in height and more than
30,000 square feet per floor level, shall be equipped with approved Class 1
standpipes. City Ordinance Section 9-6, Section 6-2.2,
Acknowledl?:ed.
41. Please see attached FD Design Guide, It contains criteria currently being
considered by the City Commission for a new ordinance. (Copy emailed to
Mr. Carl Klepper 3/30/04)
Acknowledged. It Has been documented and agreed the that Fire
Department will hold a workshop concerning this issue. While the
criteria is an excellent step in the right direction we would like to have
the opportunity to provide input into the final guidelines which need
further clarification before imolementation.
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
42, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the commission
and at permit review, Acknowledged.
43, The height and area for buildings or structures of the different types of
construction shall be governed by the intended use or occupancy of the
building, and shall not exceed the limits set forth in Table 500 of the 2001
I ,
DEPARTMENTS INCLUDE REJECT
FBC,
Acknowledl!ed.
44, Place a note on the elevation view drawings indicating that the exterior
wall openings and exterior wall construction comply with 2001 FBC, Table
600, Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 2001 FBC, Table 600,
Acknowledged.
45, Every exterior wall within 15 feet of a property line shall be equipped with
approved opening protectives per 2001 FBC, Section 705,1,1,2,
All openings within 15 ft. of a property line shall comply with the 2001 FBC,
Section 705.1.1.2.
46, General area modifications to buildings shall be in accordance with 2001
FBC, Sections 503.3, 503,3,2, and 503,3.3. Provide calculations verifying
compliance with the above code sections and 2001 FBC, Table 500,
General area modifications to buildings are not reQuired at Vista Bella.
47, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph. Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application
Acknowledged.
48, Every building and structure shall be of sufficient strength to support the
loads and forces encountered per the 2001 FBC, Section 1601.2,1 and
Table 1604.1. Indicate the live load (psf) on the plans for the building
design,
Acknowledl!ed.
49, Buildings three-stories or higher shall be equipped with an automatic
sprinkler system per F.S, 553.895, Fire protection plans and hydraulic
calculations shall be included with the building plans at the time of permit
application,
Acknowledged.
50, At time of permit review, submit signed and sealed working drawings of
the proposed construction
Acknowledged.
51. A minimum of 2% of the total parking spaces provided for the dwelling
units covered under the Fair Housing Act shall be accessible and comply
with the requirements of the act, Accessible parking spaces shall be equally
distributed for each type of parking provided, e.g. surface parking, parking
structures, etc, per Title 24 CFR, Part 100.205.
Revised, see sheet SP-1. Total of parking spaces are 140 * (2%) = 2.8 spaces.
Three (3) handicap spaces are required and provided.
52. At the time of permit review, submit details of reinforcement of walls for
the future installation of grab bars as required by the Federal Fair Housing
Act Title 24 CFR, Part 100,205, Section 3, Requirement #6, All bathrooms
"
DEPARTMENTS
within the covered dwelling unit shall comply,
Revised, see additional sheets A-O.l and A-.2.
53, On the drawing titled site plan, identify and label the symbol that
represents the property line,
Acknowledged.
54, As required by the CBBCO, Part III titled "Land Development
Regulations", submit a site plan that clearly depicts the setback dimensions
from each property line to the leading edge of the buildings. The leading
edge of the buildings begins at the closest point of the overhang or canopy
to the property line, In addition, show the distance between all the
buildings on all sides.
Revised, see sheet SP-l.
55, To properly determine the impact fees that will be assessed for the one-story
pool/clubhouse, provide the following:
~ Will the pool/clubhouse building be restricted to the residents of the
entire project only? ( I )
~ Will the residents have to cross any major roads or thoroughfares to get
to the pool/clubhouse? (2)
~ Will there be any additional deliveries to the site? (3)
~ Will there be any additional employees to maintain and provide service
to the site? (4)
Please have the applicant provide the City with a copy of the letter that will
be sent to the impact fee coordinator, To allow for an efficient permit review,
the applicant should request that the County send the City a copy of their
determination of what impact fees are required for the pool/clubhouse,
1- Only the building they serve.
2- No
3- No
4- Yes
56, CBBCPP 3.C.3.4 requires the conservation of potable water. City water
may not, therefore, be used for landscape irrigation where other sources are
readily available.
The applicant agrees and has provided a note on the landscape plans stating that
irrigation water will come from the on-site lakes or adjacent canals,
57, A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source, A copy of the
permit shall be submitted at the time of permit application, F,S, 373,216,
A water use permit will be obtained for the irrigation water source.
58, If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
~ The full name of the oroiect as it appears on the Development Order and
INCLUDE
REJECT
, "J
DEPARTMENTS
the Commission-approved site plan,
., If the project is a multi-family project, the building numberls must be
provided, The building numbers must be the same as noted on the
Commission-approved site plans,
., The number of dwelling units in each building.
., The number of bedrooms in each dwelling unit.
., The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
Acknowled2:ed.
59. At time of building permit application, submit verification that the City of
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property, The following
information shall be provided:
., A legal description of the land.
., The full name of the project as it appears on the Development Order and
the Commission-approved site plan,
., If the project is a multi-family project, the building numberls must be
provided, The building numbers must be the same as noted on the
Commission-approved site plans,
., The number of dwelling units in each building,
., The total amount being paid.
(CBBCO, Chapter 1, Article V, Section 3(f))
Acknowledged.
60, Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission,
Acknowledged.
61, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. If the project is
multi-family, then all addresses for the particular building type shall be
submitted. The name of the project as it appears on the Development Order
must be noted on the building permit application at the time of application
submittal.
Acknowled2:ed.
62. Add to the floor plan drawings of the individual units a breakdown of the
area within the unit, The area breakdowns for each unit shall specify the
total area of the unit, area of the balcony, total area that is air-conditioned
and, where applicable, total area of storage and garage space, If the garage
and storage areas are not part of a specific unit, the area shall be included
and identified within the area of the building, Indicate how many of each
type of unit will be on each floor and within the building,
Revised, see sheets A-I.I, A-I.2, A-I.3 and A-I.4.
63, Add to the site data the total area under roof of each residential building,
Provide tabular area data for each floor of each building, The breakdown
INCLUDE
REJECT
\,
'#
I I
DEPARTMENTS INCLUDE REJECT
shall include the following areas and each area shall be labeled on the
applicable floor plan drawing:
y Common area covered walkways;
y Covered stairways;
y Common area balconies;
).0- Entrance area outside of a unit;
).0- Storage areas (not part of a unit);
y Garages (not part of a unit);
y Elevator room;
y Electrical room;
y Mechanical room;
,- Trash room;
"
y Mailbox pickup and delivery area; and
y Any other area under roof,
(Chapter 4 - Site Plan Review, Section 7,E,2 and 3)
Acknowledged.
Villa La20
64, Title Sheet "Data", A 13R system cannot be used in these structures, A 13
system shall be installed per NFPA 13.
Acknowledged.
65, Provide match lines on Sheets E-l through E-3, BBA to the 2001 FBC,
Section 104.2,1.
66, Sheets A-I through A-7, Define on the plans if parking spaces numbered
200, 309, 418, 527, 638, and 639 are handicapped accessible spaces. All
Handicapped parking is illustrated separately on the drawings
67, Sheet A-lO, Show all clear floor spaces per the Federal Fair Housing Act.
Show method of compliance for the kitchens and the bathrooms, and which
design option (A or B) is being used, This condition is illustrated on Sheet
A-II
Vista Bella
68, Submit drawings for the Gazebo, BBA to the 2001 FBC, Section 104,2,1.
Shop drawin2s for the Gazebo shall be provided by contractor.
PARKS AND RECREATION
Comments:
69. 328 multi-family units @ $656 ea, = $215,168
70 single family attached units @ $771 ea, =$ 53.970
Recreation Facilities Impact Fee $269,138 Total
Revised
J
"
,<J
I I
DEPARTMENTS INCLUDE REJECT
FORESTER/ENVIRONMENT ALIST
Comments: Comments to follow.
PLANNING AND ZONING
Comments:
70, Abandonment and rededication of easements must be recorded prior to
issuance of a building permit for the project.
Acknowledged.
71. Will an on-site lift-station be required as a result of this development? If
so, show its location on the overall site plan (sheet SP-l),
One existing and One proposed New.
72, The method of trash removal will be subject to Public Works' review and
approval
Acknowledged.
73, The width of the roadway (pavement) and rights-of-way is subject to the
Engineering Division of Public Works' review and approval.
Acknowledged.
74, Submit a traffic impact analysis by the Technical Review Committee
meeting, It must be approved by the Palm Beach County Traffic Division
for concurrency purposes prior to the issuance of any building permits
(Chapter 4, Section 8.F.),
75. The project must obtain approval from the School District of Palm Beach
County regarding school concurrency prior to the issuance of a building
permit. PLEASE SEE A TT ACHED from the school board dated LETTER
DATED December 19th 2003. This approval is valid through December of
2004.
76, All parking spaces, including handicap spaces, should be labeled on Villa
Lago's 1st level (sheet A-I) and 6th level (sheet A-6) of the parking garage.
Ensure that the configuration of the parking area is consistent between all
plans. The total number of proposed parking spaces should match between
the graphic and the tabular data, On the site plan ensure that the labels
regarding the number of parking spaces for each row (including on-street
parking) is correct and directly corresponds to the actual number proposed
within each row.
'\.
.;
I ~
DEPARTMENTS INCLUDE REJECT
Acknowledged. Please see Letter from Pinder Troutman dated April 29th, 2004
77, The cover sheet's tabular data for "Villa Lago" regarding the required
parking is incorrect because five (5) spaces are required for the recreation
area, Please revise tabular data to indicate that five (5) more spaces are
required for recreation area, resulting in a total of 645 parking spaces
required and provided, In addition, modify the tabular data of the
corresponding site plan (sheet SP-2),
Acknowledged.
78, On the cover sheet's tabular data regarding "Villa Lago", based upon the
proposed uses and their intensities, include the following parking scenario:
Proposed Use Required Provided Parking
Parkin~
64 One-bedroom units @ 1.5 96
parking spaces
224 Two-bedroom units @ 2 448
parking spaces
48 Three-bedroom units @ 2 80
parking spaces
Recreation area @ 5 spaces 5
Total required parking 630
On-street parking 6
Off-street parking 4
Parking Garage 630
Total Parking Provided 640
Net Difference 10
The Table on Sp2 & Sp 3 has been revised to read like the above
79, On the "Villa Lago" site plan (sheet SP-2), show the location of the five (5)
on-street parking spaces and the four (4) off-street parking spaces, The
cover sheet indicates that that the site plan will provide nine (9) spaces
outside the parking garage, Show their location,
Acknowledged.
80, On each of the "Villa Lago" floor plan sheets (A-l through A-6), as a
spreadsheet, itemize each floor by providing their quantities, For example,
on sheet A-I, itemize it as follow: A-II, B - 15, C - 21, D- 8.
Acknowled2ed.
81. Provide a landscape plan for "Villa Lago" (Chapter 4, Section 7 ,C.), It
should correspond with the landscape plan for "Vista Bella" since both
~)JI1 prl
~ )Jff JJ'f1 ~
~ jJH')JIr j)H' j)H" 1
~- ~fll
"".
."
I !
DEPARTMENTS INCLUDE REJECT
communities are a component of Phase IV.
The landscape plan for Villa Lago has been provided on Sheet L2 of 6 and the
landscape plan for Vista Bella has been provided on Sheet L3 of 6,
82, The detail of the security gate should indicate the dimensions, materials
used, exterior finish, and colors (Chapter 4, Section 7,D,),
Acknowledged.
83, On the "Villa Lago" elevations (sheet A-8), label the height of the top of
the parapet wall and also, the peak the pitch roof, Provide this information
for the clubhouse,
Acknowledged.
84, Include a color rendering of all elevations for "Villa Lago" at the Technical
Review Committee meeting (Chapter 4, Section 7 ,D,),
Acknowledged.
85. Provide paint swatches for the elevations for "Villa Lago" (Chapter 4,
Section 7,D,),
Acknowledged.
86, The elevation pages for "Villa Lago" (sheets A-8 and A-9), including its
clubhouse (sheet A-B) shall indicate the exterior finish, paint
manufacturer's name, and color codes, Staff recommends using a color
schedule (Chapter 4, Section 7,D,),
Acknowledg;ed.
87, On sheet A-9, the "Key Plan" of "Villa Lago" is incorrect because the label
that identifies the north elevation should be shown as "3" rather than as a
"4" .
Acknowled2ed.
88, The subdivision development sign for "Villa Lago" as shown on sheet A-
15 cannot exceed 32 square feet in area (Chapter 21, Article IV, Section
I.D,), The detail shows it as 76 square feet in area, Modify to comply with
code.
Acknowled2ed.
89, Provide a detail of the proposed wall, including its dimensions, materials
used, exterior finish, and color(s) (Chapter 4, Section 7,D,).
Acknowled2ed.
'!o.,
,,;'
I i
DEPARTMENTS INCLUDE REJECT
70 Three-bedroom townhouse units 140
Recreation area @ 5 spaces 5
Total required parking 145
On-street parking ?
Off-street parking ?
One-car garage ?
Two-car garage ?
Total Parking Provided ?
Net Difference ?
90, On the cover sheet's tabular data regarding "Vista Bella", based upon the
proposed uses and their intensities, include the following parking scenario: 0
This information should also be itemized on the "Vista Bella" site plan
(sheet SP-1.
This is displayed on SP-3
91. The site plan for "Vista Bella" (sheet SP-l) should identify each unit as
"A", "B", "C", or "D", similar to the site plan for "Villa Lago" on sheet
SP-2,
Revised, see sheet SP-l.
92, On the "Vista Bella" elevations (sheets A-8, A-18, and A-39), label the
height of the peak the pitch roof and also the mid-point of the roof,
Revised, see sheets A-8, A-9, A-10, A-H, A-I8, A-I9, A-2I, A-22, A-30, A-3I,
A-33, A-34 and A-39.
93, The site plan page for "Vista Bella" (sheet SP-3), prepared by Mouriz
Salzar, incorrectly identifies the sheet as "Vista Lago",
Acknowled2ed.
94, On the cover sheet, ensure that the information indicated in the "Total
Parcel data Phase IV" directly corresponds and agrees with the information
derived from both the "Vista Lago" and "Vista Bella" portions of the
project.
Acknowled2ed.
95, Are screened roof or solid-roof enclosures proposed at the rear of each
townhouse in the "Vista Bella" subdivision? According to Chapter 16 of
the 2001 Florida Building Code, a concrete slab is required at the base of
screen enclosures, Indicate the extent of the boundary and change in
impervious area should all homeowners choose to build a screen or solid-
roof enclosure at the rear of their unit. Would the amenities fall outside the
envelope of each property's lot lines?
Screen roof and/or screen enclosures are not proposed at any units. Pavers
shall be provided at rear of unit types C and D. See sheets A-l.3 and A-l.4.
96, Roof plans of "Vista Bella" are not a component of site plan review and
should not be included within this submittal.
Roof plans have been removed from submittal.
~;".;"..li'
.....;
DEPARTMENTS
97, All sIgnage IS subject to reVIew and approval of the Planning &
Development Board and City Commission, Is there an entrance sign
proposed for the "Vista Bella" project? If so, on the site plan, indicate its
location and provide a detail of the sign area, including the dimensions,
exteriorfinish, and letter color(s) (Chapter 4, Section 7.D,),
An entrance si2n is proposed for Vista Bella. See spot for location.
98, Include a color rendering of all elevations for "Vista Bella" at the
Technical Review Committee meeting (Chapter 4, Section 7,D,),
Acknowledged.
99, Provide paint swatches for the elevations for "Villa Lago" (Chapter 4,
Section 7 .D,). See Attached 8 1/2 X 11"
100, The elevation pages for "Vista Bella", including its clubhouse (sheet A-I)
shall indicate the exterior finish, paint manufacturer's name, and color
codes, Staff recommends using a color schedule (Chapter 4, Section 7,0,),
Acknowledged.
101. The landscape plan for "Vista Bella" (sheet L3 of 6) should indicate all
proposed plant material with a symbol which indicates the botanical name
and the proposed quantity,
The plant list for each sheet depicting all plant materials, quantities, and
specifications has been provided the specific landscape sheet.
102, Landscaping at project entrances shall contain a signature tree at both sides
of the entrance (Chapter 7.5, Article II, Section 5,N,), A signature tree is a
tree with blossoms or natural color other than green intended to beautify
project entrances and contribute to the city's image with this element of
aesthetic conformity, Signatures trees include Yellow Elder, Tibouchina
Granulosa, and Bougainvillea, Note that signature trees do not contribute
toward the total number of required perimeter trees, Signature trees must
have 6 feet of clear trunk if placed within the safe-sight triangle (Chapter
7.5, Article 2, Section 5,N,),
The landscape plans have been revised to incorporate signature trees at project
entrances,
103, Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7,5, Article II, Section 5.P), Please categorize as follows: Shade
INCLUDE
REJECT
.~;, "
'" ""
DEPARTMENTS
trees, Palm trees, Shrubs & Groundcover,
The percent of proposed native species has been provided on the Landscape
Detail sheet L6 of 6,
104. On the Phase IV landscape plan (sheet L6 of 6), provide the total quantities
for all proposed plant material of both residential projects (Villa Lago and
Vista Bella), Include the percent native,
The plant list on sheet L6 of 6 depicts all plant materials, quantities, and
specifications including the percent of proposed native species.
105, Staff recommends screening the A/C units with either landscaping or a
knee wall, Label the location of the A/C pads on the site plan,
The A/C units for Vista Bella are shown on sheet L5 of 6 and are appropriately
screened with a hedge, The A/C units for Villa Lago are located on the roofs.
106. Indicate pedestrian connectivity between these two residential
developments and commercial development to the west. Pedestrians should
not be required to utilize the main east/west Spine road or Gateway for this
access.
Revised, see sheet Spot. The pedestrian connectivity between developments
are made at the Northeast and Southwest areas of the site.
107, Note on Site Plan (SP-I) indicates maximum building height at 4 stories
(maximum 45 feet), Other pages indicate up to 6 stories and an elevation of
70 feet.
See sheet A-O and SP-l. General notes have been revised. The SMU zoning
district allows hei~hts up to 70 '
108, Depict required setbacks in conformance with Suburban Mixed Use (SMU)
zoning category,
Acknowled~ed.
109. No Board or Commission action can occur on this application until final
Commission action on DRIA 03-001 and CPTA 03-001 and LUAR 03-
I
INCLUDE REJECT
"
~.,,"
"""'1,;"
I ~
DEPARTMENTS INCLUDE REJECT
009,
Acknowledged.
MWR/sc
S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\NWSP 04-006\1 ST REVIEW COMMENTS.doc
'..... .
";;,d'''
'"
PINDER TROUTMAN CONSULTING. INC.
-Tra-nsportation Planners and Engineers
April 29, 2004
Mr, Carl Klepper
Compson Associates, Inc.
980 N, Federal Highway
Suite 400
Boca Raton, FL 33432
2324 South Congress Avenue, Suite 1 H
West Palm Beach, FL 33406
(561) 434-1644 Fax 434-1663
www.pindertroutman.com
Re: Renaissance Commons Phase IV. #PTC03-75
Dear Mr, Klepper:
The purpose of this letter is to respond to City staff comments regarding the above referenced project, For ease of review, I
have summarized the comment and provided the response,
Public Works - Traffic
3,
Comment:
Response:
4.
Comment:
Response:
5,
Comment:
Response:
Planning and Zoning
74, Comment:
Response:
Traffic analysis and TPS Concurrency Review,
Palm Beach County has reviewed the entire project. The attached letter (Attachment 1) from Palm
Beach County, dated December 30, 2003, states that the project meets the Traffic Performance
Standards of Palm Beach County, The developer will provide all turn lanes as detailed in the
County letter.
Address the need for dual westbound left turn lanes and dual northbound left turn lanes at the
Project's eastern driveway connection to Gateway Boulevard,
Projected westbound left turn volumes (Attachment 2) at this intersection do not meet the
threshold (typically 300 or more left turns per hour) to warrant dual left turn lanes, The developer
will provide dual northbound left turn lanes,
Explain the reason for relocation of the eastern driveway on Gateway Boulevard from its existing
location,
The eastern driveway will not be moved from its existing location,
Submit a traffic impact analysis approved by Palm Beach County,
A traffic impact analysis, for the entire project, has been submitted and approved by Palm Beach
County, See Attachment 1 ,
The above responds to all the traffic related questions
KMP/ldr
Enclosures
cc: David Poist
Jeff Schnars
Letter Klepper 03-75 4-29-04
Pi
.-.
Department of Engineering
and Public Works
P.O. Box 21229
West Palm Beach, FL 33416-1229
(56!) 684-4000
www.pbcgov.com
.
Palm Beach County
Board of County
Commissioners
Karen T. Marcus. Chair
Tony Masilotti, Vice Chairman
Jeff Koons
Warren H. Newell
Mary McCarty
Burt Aaronson
Addie L. Greene
County Administrator
Robert Weisman
"An Equal Opportunity
Affirmative Action Employer"
w
Q::J printed on recycled paper
ATTACHMENT 1
~ RECEIVED
~~
December 30, 2003
Mr. Michael Rumpf
Director Planning & Zoning
City of Boynton Beach
100 East Boynton Beach Boulevard
Boynton Beach, FL 33425-0310
RE:
Motorola DRI - Renaissance Commons - NOPC #2
TRAFFIC PERFORMANCE STANDARDS REVIEW
Dear Mr. Rumpf:
The Palm Beach County Traffic Division has reviewed the traffic statement for the
previously approved DRI entitled; Motorola DRI- Renaissance Commons - NOPC #2,
pursuant to the Traffic Performance Standards in Article 15 of the Palm Beach County
Land Development Code. The project is summarized as follows:
Location:
Southeast corner of Congress Avenue and Gateway
Boulevard intersection,
Boynton Beach
13,020 Daily, 1,634 Peak Hour Trips,
1,551 MF Residential Units, 247,800 SF General Office,
198,000 SF General Retail, and 15,000 SF Daycare
Center.
1,214 AM and 1,630 PM Peak Hour Trips
2005
Municipality:
Vested DRI Trips:
Proposed Uses:
New PH Trips:
Build-out:
Based on our review, the Traffic Division has determined that the revised DRI is
projected to generate less peak hour trips than what was previously approved, and
therefore meets the Traffic Performance Standards of Palm Beach County. Based on
the peak hour forecasts provided by the consultant, it is however suggested that the
following project access driveways turn-lanes (as required in NOPC #1) to be provided:
. Southbound left-turn lanes along Congress Avenue, onto the northern and
the middle driveways,
. Northbound right-tum lanes along Congress Avenue, onto the southern and
the middle driveways.
. Westbound left-turn lane along Gateway Boulevard, onto the eastern
driveway,
. Eastbound right-turn lane along Gateway Boulevard, onto the eastern
driveway.
,.
Furthermore, due to the substantial changes in land use types, in comparison to what
was approved in NOPC #1, there may be a shift of project generated traffic to other
driveway locations, hence, requiring additional exclusive turn lanes at these locations.
These new requirements may be identified upon completion of the project site plan, and
subsequent forecast of peak hour trips.
If you have any questions regarding this determination, please contact me at 684-4030.
Sincerely,
Masoud Atefi,
Sr. Engineer -
OFFICE OF THE COUNTY ENGI
~
/V7 . c~/<
if
cc: Pinder Troutam Consulting Inc,
File: General - TPS - Mun - Traffic Study Review
F :\TRAFFIC\ma\Admin\Approvals\031225,doc
;D
o
.'"
ATIACHMENT 2
GATEWAY BLVD
UJ
:J
Z
UJ
>
<(
U)
U)
UJ
~
U
z
a
u
z
z
z
a
l-
e...
~
<(
I
N.T.S.
39 (65)
l
104 (161)
l
51 (47),
.
23 (36)
l
<(
-1
a
~
a
I-
a
~
d
t
lARGET DRIVEWAY r
~ ~. ~
t
CATALINA BLVD r MOTOROLA DRIVE
t
--
~I SOUTH DRIVEWAY
LEGEND
20 -AM PEAK HOUR
(57) -PM PEAK HOUR
04/01/04
03-75
I~
RENAISSANCE
COMMONS
INBOUND TURN VOLUMES
THE SCHOOL DISTRI-.....,.F
PALM BEACH COU~FLORIDA
PLANNING DEPARTMENT
3320 FOREST HILL BLVD., C-331
WEST PALM BEACH. FL 33406-5613
(561) 434-8020 FAX: (561) 434-8167
,,#
ARTHURC, JOHNSON, Ph.D.
SUPERINTENDENT
December 19, 2003
Dick Hudson, AICP
Senior Planner, Planning Department
City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33435
RE: CONCURRENCY DETERMINATION - CASE #03120301C - RENAISSANCE
COMMONS DRI (FKA MOTOROLA) PHASE III
Dear Mr. Hudson:
The Palm Beach County School District has reviewed the above referenced project for a
Concurrency Determination for 1001 multi-family units.
Attached please find the approved Palm Beach County School District Concurrency
Application and Service Provider Form for Renaissance Commons DRI Phase III. This
concurrency determination is valid for one (1) year from the date of issuance. Once a
Development Order has been issued for the project, the concurrency determination will be
valid for the life of the Development Order.
If you have any questions regarding this determination, please feel free to contact me at
(561) 434-7343.
Sincerely,
P
cc: Ruden McClosky
enc.
S :\Planning\Public\INTERGOv\Concurrency\Concurrency Determination Letters\Concurrency\C0312030 1 C.doc
AN EQUAL OPPORTUNITY EMPLOYER
"
.....,.,.
"-'
Compson Associates of Boynton II, LLC
May 3, 2004
C/o City of Boynton Beach
100 East Boynton Beach Blvd.
Boynton Beach, Florida 33425
Attn: Mr. Ed Breese. Principle Planner Plannin2 and Zonin~ Division
Re: TRC Meetin2 on Mav 4. 2004 (i) 10 AM Renaissance Commons
{former Motorola Pro_ray. Phase IV. 328 Condominium Units
(Villa La20). 70 Townhomes. (Vista Bella). and balance of roads
from Phase I to Gatewav Blvd.
Dear Ed,
As per your TRC requirement, please find the following enclosures:
1. Ten (10) copies signed ofarcbitectura1 plans for applicant AI-AI5, co-applicant
TH AO-A40;
2. Ten (10) copies signed and sealed civil drawings sheet CI-C5;
3. Ten (10) copies of signed and sealed landscape Plan LI-L6;
4. Ten (10) copies of engineered photometric EI-E3;
5. 8 1/2 x II Reductions of above drawings for your final report;
6. Ten (10) copies letter from Pinder Troutman's response to engineering;
components dated;
7. Evidence of school concurrency;
8. Color 8 * x II ofVtlla Lago and Vista Bella;
9. Paint chart for each;
10. Ten (10) copies of responses for TRC meeting;
As we discussed, should you find in your review in TRC anything that you may need
contact me at (561) 391-6570 and I will have it to you in short order.
Thank you in advance for your cooperation in this matter.
Sincerely,
~ ~n~o;;~
CEK/crd
c:~ end Selliap\CaalplmAllooillMIMyDoallulall\McJb 29 a. ~1\Me*lIda\CK MolIlrOIaICKJlrlD Ed em.esemeetias OIl ~ 10 AM.cIac
"
" /
'<..---,#
1st REVIEW COMMENTS
New Site Plan
Project name: Renaissance Commons Phase IV
File number: NWSP 04-006
Reference: I st review plans identified as a New Site Plan with a March 17, 2004 Planning and
Zoning Department date stamp marking
I II
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
l. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Article
II, Section 10-26 (a), Larry Quinn has accepted the container for San
Raphael. We will be utilizing the same container and means and methods,
2. Explain how solid waste pickup will be handled, The trash rooms are not
located nor oriented in such a manner to allow standard pickup methods,
The 10 feet x 18 feet dumpster holding pad on the south side of the condo
complex is not accessible for solid waste , Waste containers will be
transported to the south side loading area demised on SP-2, They will be
picked up on the frequency determined based on the occupancy. (ie 2x per
week).
PUBLIC WORKS - Traffic
Comments:
3, Provide a traffic analysis and notice of concurrency (Traffic Performance
Standards Review) from Palm Beach County Traffic Engineering,Please
see Letter from Pinder Troutman dated April 29th, 2004 which contains the
approved Traffic Performance standards review
4, The traffic analysis should address the need for dual westbound turn lanes
from the northbound roadway to westbound Gateway Blvd. and dual
northbound turn lanes from northbound Gateway Blvd to the internal site
roadway, The developer should consider building improvements to all
approaches of this intersection that accommodates traffic from the full
build out of the total DR!. If not, the developer is advised that there is the
potential for additional intersection reconstruction that may be required by
the City to support future phases,
Dual left turn lanes have been shown on the south approach to the Gateway
intersection. Please see Letter from Pinder Troutman dated April 29th, 2004
5. Explain the reasoning for shifting the proposed northbound roadway(s) east
of the existing configuration at Gateway Blvd.
The onsite road has been shifted west to align with the current intersection.
Please see Letter from Pinder Troutman dated April 29th, 2004
6, On the site and civil plans, show and identify all necessary traffic control
devices such as stop bars, stop signs, double yellow lane separators
..&0; ,/
, II
DEPARTMENTS INCLUDE REJECT
striping, directional arrows and "Do Not Enter" signage, etc, See City
Standard Drawings "K" Series for striping details,
The traffic control devices has been shown on the site and civil plans.
7, Revise the traffic circle into the condo complex to provide a minimum 50
foot centerline turning radius,
As discussed with Roger Kemmer and Larinda Logan, The traffic circle is
not required to accommodate a fire or garbage truck turn around. Fire
Trucks will not enter the parking garage and trash pick-up is at the south
end of the garage. The entrance and exit radii have been increase to allow
better maneuverability.
8, Add a "No Left Turn" sign in the median, westbound, east of the south
entrance into the condo parking structure.
ENGINEERING DIVISION
Comments:
9, All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets,
All changes have been shown on all sheets.
10, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the Commission
and at permit review,
Acknowledged.
II. Upon Commission approval of the site plan schedule a pre-application
meeting with the Engineering Division to begin the plat process,
Acknowledged.
12, Show proposed site lighting on the site and landscape plans (LDR, Chapter
4, Section 7,B.4,)
The site lighting has been shown on the site, civil, and landscape plans.
13, It may be necessary to replace or relocate large canopy trees adjacent to
light fixtures to eliminate future shadowing on the parking surface (LOR,
Chapter 23, Artie Ie II, Section A. 1, b),
To the extent feasible, the Applicant has placed proposed landscaping, In a
manner, not to adversely effect the lighting distribution and photometric.
14. North arrow is incorrectly oriented on all landscape sheets, Please correct.
The north arrow has been rotated to depict the correct orientation on the
landscape plans,
] 5, Please provide a plant list/legend on each Landscape sheet for that specific
sheet.
The plant list for each sheet depicting all plant materials, quantities, and
.
..
DEPARTMENTS
specifications has been provided the specific landscape sheet.
16, It is recommended that all Live Oaks be placed a minimum of 10 feet from
buildings, sidewalks, and/or walls,
The applicant agrees and has not located any Live Oaks within 10 feet of a
building.
17, Provide clarification on the Live Oaks shown as "TBD" on Sheets L-3 and
L-4, These do not show up in the plant lists,
Live Oaks with the "TBD" notation are oaks that will be trees relocated from on
site. The specific tree number corresponding with the tree survey has yet to be
determined. The landscape plans and the plant list has been revised to include
these trees and they are tagged at "QVR" on the plans.
18, The irrigation source for this project is noted as re-use water, which is not
currently available, Please specify irrigation source.
The source of irrigation water will be onsite lake or adjacent L WDD canal.
The irrigation system will be designed to convert to reuse water when it
is available.
19, Show sight triangles on the Landscape plans (LDR, Chapter 7.5, Article II,
Section 5.H.), Reference FDOT Standard Index 546 for the sight triangles
along all collector and arterial roadways,
The landscape plans have been revised to include the FDOT 546 sight triangle at
the project entrance on Gateway Blvd,
20, Indicate, by note on the landscape plan, that within the sight triangles there
shall be an unobstructed cross-visibility at a level between 2,5 feet and 8
feet above the pavement (LDR, Chapter 7.5, Article II, Section 5,H,),
The required note has been added to the landscape plans"
21, Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
Full drainage plans will be provided with the final engineering plans at the
time of permittine:.
22, Paving, Drainage and Site details will not be reviewed for construction
acceptability at this time. All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
and will be reviewed at the time of construction permit application,
INCLUDE
REJECT
.
" "jI
, "
DEPARTMENTS INCLUDE REJECT
Acknowledged.
UTILITIES
Comments:
23, All utility easements shall be shown on the Site plan and Landscape plans
(as well as the Water and Sewer Plans) so that we may determine which
appurtenances, trees or shrubbery may interfere with utilities, In general,
palm trees will be the only tree species allowed within utility easements,
Canopy trees may be planted outside of the easement so that roots and
branches will not impact those utilities within the easement In the
foreseeable future, The LDR, Chapter 7,5, Article I, Section 18,1 gives
public utilities the authority to remove any trees that interfere with utility
services, either in utility easements or public rights-of-way,
Utility easements are shown in grey-scale on the landscape plans. Shade trees
have been located outside of these easements and in a manner so as not to affect
the utilities within those easements,
24. An intensification of this magnitude warrants a re-evaluation of our utilities
master plan in order to evaluate the adequacy of the service main network
in the area, Any off-site improvements required to support this
development will be the responsibility of the applicant. The developer has
funded a study of this issue, however, and our final approval will be
delayed until the completion of that study,
Acknowledged. After preliminary review with Utilities it is our belief that
Renaissance Commons will require an improved lift station and that
minimal off site improvements will be quantifiable. As of this date certain
phases of the DRI (water & sewer) have already been paid or reserved.
25. Palm Beach County Health Department permits will be required for the
water and sewer systems serving this project (CODE, Section 26-12),
Acknowledged.
26. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g,p.m. (500 g,p,m, some residential developments)
with 20 p,s.i, residual pressure as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwri ters,
whichever is greater (CODE, Section 26-16(b)),
Fire flow calculations will be submitted with the final engineering plans at
the time of permitting.
27, The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within 30 days of site plan
approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
Acknowledeed.
28, Comprehensive Plan Policy 3,C.3.4, requires the conservation of potable
<<, -,
. II
DEP ARTMENTS INCLUDE REJECT
water. As other sources are readily available City water shall not be
allowed for irrigation,
Acknowled2:ed.
29, Water and sewer lines to be owned and operated by the City shall be
included within utility easements, Please show all proposed easements on
the engineering drawings, using a minimum width of 12 feet. The
easements shall be dedicated via separate instrument to the City as stated in
CODE Sec, 26-33(a),
Utilitv easements have been shown for all water and sewer lines.
30, This office will not require surety for installation of the water and sewer
utilities, on condition that the systems be fully completed, and given to the
City Utilities Department before the first permanent meter is set. Note that
setting of a permanent water meter is a prerequisite to obtaining the
Certificate of Occupancy
Acknowledged.
31. A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required
to service this project, in accordance with the CODE, Section 26-15.
Acknowledged.
32, The LOR, Chapter 6, Article IV, Section 16 requires that all points on each
building be within 200 feet of an existing or proposed fire hydrant. Please
demonstrate that the plan meets this condition,
The water line has been extended along the south side of the condo building
and an additional fire hydrant added.
33, Residential buildings over three stories in height require the use of a RPZ,
not a DDCV downstream of the meter. Accordingly, correct the two
proposed meters on the south side of the condo complex
Potable water services will have an RPZ downstream of the meter - the
drawing has been corrected.
34, Fire sprinkler systems may be required on all structures in excess of three
stories, based upon building code requirements, and a booster pump system
may be required for the fire building water systems to allow for pressure
losses, When using a booster pump a RPZ will be required on the fire line
also,
All buildings in excess of three stories (the condo building) will contain a fire
service with double detector check valve.
35. Please provide a master plan sheet showing all proposed water and sewer
for Phase IV,
A master water, sewer, and drainage plan has been included as sheet Cl.
36, A force main is depicted running south and then west from the proposed
lift station and refers to it continuing through Phase III, This referenced
force main is not shown in Phase III.
The preliminary engineering plan has been revised. See the newly created
Master Water, Sewer, and Drainage Plan for the complete view.
37, Per previous discussions with the Utilities Department only two lift stations
will be permitted for the Renaissance Commons master plan, Currently
three are proposed - one existing, one in Phase I, and now one in Phase IV.
,~
,
I II
DEPARTMENTS INCLUDE REJECT
Please coordinate with Engineering and Utilities to resolve this conflict.
The existing lift station will only be utilized temporarily for Phase 3. With
the construction of Phase 4, the existing lift station will be eliminated
and the phase 3 sewer flow directed to the new lift station.
38, Maintain a minimum horizontal separation of 10 feet between water main
and stormwater drainage pipe,
The water main has been revised to provide for a 10 foot separation from
the drainage.
39, Utility construction details will not be reviewed for construction
acceptability at this time, All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any
updates); they will be reviewed at the time of construction permit
application,
Acknowled~ed.
FIRE
Comments:
40, Buildings and structures more than three (3) stories or thirty-six (36) feet in
height or all buildings more than two (2) stories in height and more than
30,000 square feet per floor level, shall be equipped with approved Class I
standpipes, City Ordinance Section 9-6, Section 6-2,2.
Acknowledged.
41. Please see attached PD Design Guide. It contains criteria currently being
considered by the City Commission for a new ordinance, (Copy emailed to
Mr, Carl Klepper 3/30/04)
Acknowledged. It Has been documented and agreed the that Fire
Department will hold a workshop concerning this issue. While the
criteria is an excellent step in the right direction we would like to have
the opportunity to provide input into the final guidelines which need
further clarification before implementation.
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
42, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TRC process does not
ensure that additional comments may not be generated by the commission
and at permit review, Acknowledged.
43, The height and area for buildings or structures of the different types of
construction shall be governed by the intended use or occupancy of the
building, and shall not exceed the limits set forth in Table 500 of the 200 1
"
I II
DEPARTMENTS INCLUDE REJECT
FBC.
II Acknowledl!ed.
44, Place a note on the elevation view drawings indicating that the exterior
wall openings and exterior wall construction comply with 200 I FBC, Table
600, Submit calculations that clearly reflect the percentage of protected and
unprotected wall openings permitted per 200 I FBC, Table 600,
Acknowled~ed.
45, Every exterior wall within 15 feet of a property line shall be equipped with
approved opening protectives per 2001 FBC, Section 705,1,1,2.
All openings within 15 ft. of a property line shall comply with the 2001 FBC,
Section 705.1.1.2.
46, General area modifications to buildings shall be in accordance with 2001
FBC, Sections 503,3, 503,3.2, and 503.3,3. Provide calculations verifying
compliance with the above code sections and 2001 FBC, Table 500,
General area modifications to buildin~s are not required at Vista Bella.
47, Buildings, structures and parts thereof shall be designed to withstand the
minimum wind loads of 140 mph, Wind forces on every building or
structure shall be determined by the provisions of ASCE 7, Chapter 6, and
the provisions of 2001 FBC, Section 1606 (Wind Loads), Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application
Acknowled~ed.
48, Every building and structure shall be of sufficient strength to support the
loads and forces encountered per the 2001 FBC, Section 1601,2,1 and
Table 1604,1. Indicate the live load (psf) on the plans for the building
design,
Acknowledged.
49, Buildings three-stories or higher shall be equipped with an automatic
sprinkler system per F.S, 553,895, Fire protection plans and hydraulic
calculations shall be included with the building plans at the time of permit
application,
Acknowledged.
50, At time of permit review, submit signed and sealed working drawings of
the proposed construction
Acknowled~ed.
51. A minimum of 2% of the total parking spaces provided for the dwelling
units covered under the Fair Housing Act shall be accessible and comply
with the requirements of the act. Accessible parking spaces shall be equally
distributed for each type of parking provided, e.g, surface parking, parking
structures, etc. per Title 24 CFR, Part 100,205,
Revised, see sheet SP-1. Total of parking spaces are 140 * (2%) = 2.8 spaces.
Three (3) handicap spaces are required and provided.
52, At the time of permit review, submit details of reinforcement of walls for
the future installation of grab bars as required by the Federal Fair Housing
Act Title 24 CFR, Part 100,205, Section 3, Requirement #6. All bathrooms
",."
'.,
DEPARTMENTS
within the covered dwelling unit shall comply,
Revised, see additional sheets A-O.t and A-.2.
53, On the drawing titled site plan, identify and label the symbol that
represents the property line,
Acknowledl!ed.
54, As required by the CBBCO, Part III titled "Land Development
Regulations", submit a site plan that clearly depicts the setback dimensions
from each property line to the leading edge of the buildings, The leading
edge of the buildings begins at the closest point of the overhang or canopy
to the property line, In addition, show the distance between all the
buildings on all sides,
Revised, see sheet Spot.
55, To properly determine the impact fees that will be assessed for the one-story
pool/clubhouse, provide the following:
~ Wi\l the pool/clubhouse building be restricted to the residents of the
entire project only? (I)
~ Wi\l the residents have to cross any major roads or thoroughfares to get
to the pool/clubhouse? (2)
~ Wi\l there be any additional deliveries to the site? (3)
~ Wi\l there be any additional employees to maintain and provide service
to the site? (4)
Please have the applicant provide the City with a copy of the letter that will
be sent to the impact fee coordinator. To allow for an efficient permit review,
the applicant should request that the County send the City a copy of their
determination of what impact fees are required for the pool/clubhouse,
1- Only the building they serve.
2- No
3- No
4- Yes
56, CBBCPP 3,C.3.4 requires the conservation of potable water. City water
may not, therefore, be used for landscape irrigation where other sources are
readily available,
The applicant agrees and has provided a note on the landscape plans stating that
irrigation water will come from the on-site lakes or adjacent canals,
57, A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source, A copy of the
permit shall be submitted at the time of permit application, F.S. 373,216,
A water use permit will be obtained for the irrigation water source.
58, If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
~ The full name of the proiect as it appears on the Development Order and
INCLUDE
REJECT
'~
-.",,/f
DEPARTMENTS
the Commission-approved site plan,
~ If the project is a multi-family project, the building number/s must be
provided, The building numbers must be the same as noted on the
Commission-approved site plans,
);> The number of dwelling units in each building,
~ The number of bedrooms in each dwelling unit.
~ The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
Acknowledged.
59, At time of building permit application, submit verification that the City of
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property. The following
information shall be provided:
~ A legal description of the land,
~ The full name of the project as it appears on the Development Order and
the Commission-approved site plan,
~ If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans,
~ The number of dwelling units in each building,
~ The total amount being paid.
(CBBCO, Chapter 1, Article V, Section 3(f))
Acknowledged.
60. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission,
Acknowledged.
61, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. If the project is
multi-family, then all addresses for the particular building type shall be
submitted, The name of the project as it appears on the Development Order
must be noted on the building permit application at the time of application
submittal.
Acknowledged.
62, Add to the floor plan drawings of the individual units a breakdown of the
area within the unit. The area breakdowns for each unit shall specify the
total area of the unit, area of the balcony, total area that is air-conditioned
and, where applicable, total area of storage and garage space, If the garage
and storage areas are not part of a specific unit, the area shall be included
and identified within the area of the building, Indicate how many of each
type of unit will be on each floor and within the building,
Revised, see sheets A-LI, A-L2, A-I.3 and A-L4.
63, Add to the site data the total area under roof of each residential building,
Provide tabular area data for each floor of each building, The breakdown
INCLUDE
REJECT
'it.;......"
I II
DEPARTMENTS INCLUDE REJECT
shall include the following areas and each area shall be labeled on the
applicable floor plan drawing:
~ Common area covered walkways;
~ Covered stairways;
~ Common area balconies;
)> Entrance area outside of a unit;
~ Storage areas (not part of a unit);
~ Garages (not part of a unit);
)> Elevator room;
)> Electrical room;
~ Mechanical room;
~ Trash room;
)> Mailbox pickup and delivery area; and
)> Any other area under roof,
(Chapter 4 - Site Plan Review, Section 7,E,2 and 3)
Acknowledged.
Villa Laeo
64, Title Sheet "Data", A 13R system cannot be used in these structures, A 13
system shall be installed per NFPA 13.
Acknowledged.
65, Provide match lines on Sheets E-l through E-3. BBA to the 2001 FBC,
Section 104,2.1,
66, Sheets A-I through A-7, Define on the plans if parking spaces numbered
200, 309, 418, 527, 638, and 639 are handicapped accessible spaces. All
Handicapped parking is illustrated separately on the drawings
67, Sheet A-to. Show all clear floor spaces per the Federal Fair Housing Act.
Show method of compliance for the kitchens and the bathrooms, and which
design option (A or B) is being used. This condition is illustrated on Sheet
A-II
Vista Bella
68. Submit drawings for the Gazebo, BBA to the 2001 FBC, Section 104.2,1,
Shop drawin2s for the Gazebo shall be provided by contractor.
PARKS AND RECREATION
Comments:
69. 328 multi-family units @ $656 ea, = $215,168
70 single family attached units @ $771 ea, =$ 53,970
Recreation Facilities Impact Fee $269,138 Total
Revised
......,4
I II
DEPARTMENTS INCLUDE REJECT
FORESTER/ENVIRONMENT ALIST
Comments: Comments to follow.
PLANNING AND ZONING
Comments:
70, Abandonment and rededication of easements must be recorded prior to
issuance of a building permit for the project.
Acknowled2:ed.
71. Will an on-site lift-station be required as a result of this development? If
so, show its location on the overall site plan (sheet SP-l),
One existing and One proposed New.
72, The method of trash removal will be subject to Public Works' review and
approval
Acknowledged.
73. The width of the roadway (pavement) and rights-of-way is subject to the
Engineering Division of Public Works' review and approval.
Acknowledged.
74, Submit a traffic impact analysis by the Technical Review Committee
meeting, It must be approved by the Palm Beach County Traffic Division
for concurrency purposes prior to the issuance of any building permits
(Chapter 4, Section 8.F.),
75, The project must obtain approval from the School District of Palm Beach
County regarding school concurrency prior to the issuance of a building
permit. PLEASE SEE A TT ACHED from the school board dated LETTER
DATED December 19th 2003. This approval is valid through December of
2004,
76, All parking spaces, including handicap spaces, should be labeled on Villa
Lago's lSllevel (sheet A-l) and 6th level (sheet A-6) of the parking garage.
Ensure that the configuration of the parking area is consistent between all
plans, The total number of proposed parking spaces should match between
the graphic and the tabular data, On the site plan ensure that the labels
regarding the number of parking spaces for each row (including on-street
parking) is correct and directly corresponds to the actual number proposed
within each row,
-'
'" ;,
I II
DEPARTMENTS INCLUDE REJECT
Acknowledged. Please see Letter from Pinder Troutman dated April 29th, 2004
77, The cover sheet's tabular data for "Villa Lago" regarding the required
parking is incorrect because five (5) spaces are required for the recreation
area. Please revise tabular data to indicate that five (5) more spaces are
required for recreation area, resulting in a total of 645 parking spaces
required and provided, In addition, modify the tabular data of the
corresponding site plan (sheet SP-2),
Acknowledged.
78, On the cover sheet's tabular data regarding "Villa Lago", based upon the
proposed uses and their intensities, include the following parking scenario:
Proposed Use Required Provided Parking
Parkin2
64 One-bedroom units @ 1.5 96
parking spaces
224 Two-bedroom units @ 2 448
parking spaces
48 Three-bedroom units @ 2 80
parking spaces
Recreation area @ 5 spaces 5
Total required parking 630
On-street parking 6
Off-street parking 4
Parking Garage 630
Total Parking Provided 640
Net Difference 10
The Table on Sp2 & Sp 3 has been revised to read like the above
79. On the "Villa Lago" site plan (sheet SP-2), show the location of the five (5)
on-street parking spaces and the four (4) off-street parking spaces, The
cover sheet indicates that that the site plan will provide nine (9) spaces
outside the parking garage, Show their location,
Acknowledged.
80, On each of the "Villa Lago" floor plan sheets (A-I through A-6), as a
spreadsheet, itemize each floor by providing their quantities, For example,
on sheet A-I, itemize it as follow: A-II, B - 15, C - 21, D- 8,
Acknowledl!ed.
81. Provide a landscape plan for "Villa Lago" (Chapter 4, Section 7 ,C.), It
should correspond with the landscape plan for "Vista Bella" since both
.J
....""
I II
DEPARTMENTS INCLUDE REJECT
communities are a component of Phase IV,
The landscape plan for Villa Lago has been provided on Sheet L2 of 6 and the
landscape plan for Vista Bella has been provided on Sheet L3 of 6,
82. The detail of the security gate should indicate the dimensions, materials
used, exterior finish, and colors (Chapter 4, Section 7.0,),
Acknowledged.
83, On the "Villa Lago" elevations (sheet A-8), label the height of the top of
the parapet wall and also, the peak the pitch roof. Provide this information
for the clubhouse,
Acknowledged.
84. Include a color rendering of all elevations for "Villa Lago" at the Technical
Review Committee meeting (Chapter 4, Section 7,D,),
Acknowledged.
85, Provide paint swatches for the elevations for "Villa Lago" (Chapter 4,
Section 7 .0,),
Acknowledged.
86, The elevation pages for "Villa Lago" (sheets A-8 and A-9), including its
clubhouse (sheet A-13) shall indicate the exterior finish, paint
manufacturer's name, and color codes. Staff recommends using a color
schedule (Chapter 4, Section 7,0,),
Acknowledged.
87, On sheet A-9, the "Key Plan" of "Villa Lago" is incorrect because the label
that identifies the north elevation should be shown as "3" rather than as a
"4".
Acknowledged.
88, The subdivision development sign for "Villa Lago" as shown on sheet A-
15 cannot exceed 32 square feet in area (Chapter 21, Article IV, Section
l.D.), The detail shows it as 76 square feet in area, Modify to comply with
code.
Acknowledged.
89, Provide a detail of the proposed wall, including its dimensions, materials
used, exterior finish, and color(s) (Chapter 4, Section 7.D,),
Acknowledged.
"",,,,,,'"
, II
DEPARTMENTS INCLUDE REJECT
70 Three-bedroom townhouse units 140
Recreation area @ 5 spaces 5
Total required parking 145
On-street parking ?
Off-street parking ?
One-car garage ?
Two-car garage ')
Total Parking Provided ?
Net Difference ?
90, On the cover sheet's tabular data regarding "Vista Bella", based upon the
proposed uses and their intensities, include the following parking scenario: 0
This information should also be itemized on the "Vista Bella" site plan
(sheet SP-1.
This is displayed on SP-3
91. The site plan for "Vista Bella" (sheet SP-l) should identify each unit as
"A", "B", "C", or "0", similar to the site plan for "Villa Lago" on sheet
SP-2,
Revised, see sheet Spot.
92. On the "Vista Bella" elevations (sheets A-8, A-I8, and A-39), label the
height of the peak the pitch roof and also the mid-point of the roof,
Revised, see sheets A-S, A-9, A-10, A-ll, A-1S, A-19, A-21, A-22, A-30, A-31,
A-33, A-34 and A-39.
93. The site plan page for "Vista Bella" (sheet SP-3), prepared by Mouriz
Salzar, incorrectly identifies the sheet as "Vista Lago".
Acknowled2.ed.
94, On the cover sheet, ensure that the information indicated in the "Total
Parcel data Phase IV" directly corresponds and agrees with the information
derived from both the "Vista Lago" and "Vista Bella" portions of the
project.
Acknowledged.
95, Are screened roof or solid-roof enclosures proposed at the rear of each
townhouse in the "Vista Bella" subdivision? According to Chapter 16 of
the 2001 Florida Building Code, a concrete slab is required at the base of
screen enclosures, Indicate the extent of the boundary and change in
impervious area should all homeowners choose to build a screen or solid-
roof enclosure at the rear of their unit. Would the amenities fall outside the
envelope of each property's lot lines?
Screen roof and/or screen enclosures are not proposed at any units. Pavers
shall be provided at rear of unit types C and D. See sheets A-t.3 and A-t.4.
96, Roof plans of "Vista Bella" are not a component of site plan review and
should not be included within this submittal.
Roof plans have been removed from submittal.
J
..
v,~
DEPARTMENTS
97, All slgnage IS subject to review and approval of the Planning &
Oevelopment Board and City Commission, Is there an entrance sign
proposed for the "Vista Bella" project? If so, on the site plan, indicate its
location and provide a detail of the sign area, including the dimensions,
exterior finish, and letter color(s) (Chapter 4, Section 7,0,),
An entrance sign is proposed for Vista Bella. See SP-l for location.
98, Include a color rendering of all elevations for "Vista Bella" at the
Technical Review Committee meeting (Chapter 4, Section 7,0,),
Acknowledged.
99, Provide paint swatches for the elevations for "Villa Lago" (Chapter 4,
Section 7,0,), See Attached 8 Yz X 11"
100, The elevation pages for "Vista Bella", including its clubhouse (sheet A-I)
shall indicate the exterior finish, paint manufacturer's name, and color
codes. Staff recommends using a color schedule (Chapter 4, Section 7,0,),
Acknowledged.
101. The landscape plan for "Vista Bella" (sheet L3 of 6) should indicate all
proposed plant material with a symbol which indicates the botanical name
and the proposed quantity.
The plant list for each sheet depicting all plant materials, quantities, and
specifications has been provided the specific landscape sheet,
102. Landscaping at project entrances shall contain a signature tree at both sides
of the entrance (Chapter 7.5, Article II, Section S.N ,), A signature tree is a
tree with blossoms or natural color other than green intended to beautify
project entrances and contribute to the city's image with this element of
aesthetic conformity, Signatures trees include Yellow Elder, Tibouchina
Granulosa, and Bougainvillea, Note that signature trees do not contribute
toward the total number of required perimeter trees, Signature trees must
have 6 feet of clear trunk if placed within the safe-sight triangle (Chapter
7,5, Article 2, Section 5,N,),
The landscape plans have been revised to incorporate signature trees at project
entrances,
103, Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7,5, Article II, Section S.P), Please categorize as follows: Shade
INCLUOE
REJECT
...
DEPARTMENTS
trees, Palm trees, Shrubs & Groundcover.
The percent of proposed native species has been provided on the Landscape
Detail sheet L6 of 6.
104, On the Phase IV landscape plan (sheet L6 of 6), provide the total quantities
for all proposed plant material of both residential projects (Villa Lago and
Vista Bella), Include the percent native,
The plant list on sheet L6 of 6 depicts all plant materials, quantities, and
specifications including the percent of proposed native species,
105, Staff recommends screening the AlC units with either landscaping or a
knee wall. Label the location of the AlC pads on the site plan,
The AlC units for Vista Bella are shown on sheet L5 of 6 and are appropriately
screened with a hedge, The AlC units for Villa Lago are located on the roofs.
106, Indicate pedestrian connectivity between these two residential
developments and commercial development to the west. Pedestrians should
not be required to utilize the main east/west Spine road or Gateway for this
access.
Revised, see sheet SP-l. The pedestrian connectivity between developments
are made at the Northeast and Southwest areas of the site.
107, Note on Site Plan (SP-I) indicates maximum building height at 4 stories
(maximum 45 feet). Other pages indicate up to 6 stories and an elevation of
70 feet.
See sheet A-O and SP-l. General notes have been revised. The SMU zoning
district allows heights up to 70 '
108, Depict required setbacks in conformance with Suburban Mixed Use (SMU)
zoning category.
Acknowledged.
109, No Board or Commission action can occur on this application until final
Commission action on DRIA 03-001 and CPTA 03-001 and LUAR 03-
INCLUDE ' REJ~
.Ii';""'-
.....,;.F
DEPARTMENTS INCLUDE REJECT
009,
Acknowledged.
MWRJsc
S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\NWSP 04-006\1 ST REVIEW COMMENTS.doc
PinDER TROOTMfi"'-tO"SOLTI"G. I"c.
~,.';.....
2324 South Congress Avenue, Suite 1 H
West Palm Beach, FL 33406
(561) 434-1644 Fax 434-1663
www.pindertroutman.com
Transportation Planners and Engineers
April 29, 2004
Mr, Carl Klepper
Compson Associates, Inc.
980 N, Federal Highway
Suite 400
Boca Raton, FL 33432
Dear Mr, Klepper:
Re: Renaissance Commons Phase IV - #PTC03-75
The purpose of this tetter is to respond ~ City staff comments regarding the above referenced project For ease of review, I
have summarized the comment and provided the response,
Public Works - Traffic
3.
Comment:
Response:
4,
Comment:
Response:
5.
Comment:
Response:
Planning and Zoning
74. Comment:
Response:
Traffic analysis and TPS Concurrency Review,
Palm Beach County has reviewed the entire project The attached letter (Attachment 1) from Palm
Beach County, dated December 30, 2003, states that the project meets the Traffic Performance
Standards of Palm Beach County, The developer will provide all turn lanes as detailed in the
County letter.
Address the need for dual westbound left turn lanes and dual northbound left turn lanes at the
Project's eastern driveway connection to Gateway Boulevard,
Projected westbound left turn volumes (Attachment 2) at this intersection do not meet the
threshold (typically 300 or more left turns per hour) to warrant dual left turn lanes. The developer
will provide dual northbound left turn lanes,
Explain the reason for relocation of the eastern driveway on Gateway Boulevard from its existing
location,
The eastern driveway will not be moved from its existing location,
Submit a traffic impact analysis approved by Palm Beach County,
A traffic impact analysis, for the entire project, has been submitted and approved by Palm Beach
County, See Attachment 1,
The above responds to all the traffic related questions
KMP/ldr
Enclosures
cc: David Poist
Jeff Schnars
Letter Klepper 03-75 4-29-04
fiDi
Department of Engineering
and Public works
P.O. Box 21229
West Palm Beach, FL 33416-1229
(561) 684-4000
www.pbcgov.com
.
Palm Beach County
Board of County
Commissioners
Karen T. Marcus, Chair
Tony Masilotti, Vice Chairman
Jeff Koons
Warren H. Newell
Mary McCarty
Burt Aaronson
Addie L. Greene
County Administrator
Robert Weisman
-An Equal Opportunity
Affirmative Action Employer-
@ printed on recycled paper
..
A IT ACHMENT 1
......;...,.1'
~ RECEIVED
~~
December 30, 2003
Mr. Michael Rumpf
Director Planning & Zoning
City of Boynton Beach
100 East Boynton Beach Boulevard
Boy~ton Beach, FL 33425-0310
RE:
Motorola DRI - Renaissance Commons - NOPC #2
TRAFFIC PERFORMANCE STANDARDS REVIEW
Dear Mr. Rumpf:
The Palm Beach County Traffic Division has reviewed the traffic statement for the
previously approved DRI entitled; Motorola DRI- Renaissance Commons - NOPC #2,
pursuant to the Traffic Performance Standards in Article 15 of the Palm Beach County
Land Development Code. The project is summarized as follows:
Location:
Southeast comer of Congress Avenue and Gateway
Boulevard intersection.
Boynton Beach
13,020 Daily, 1,634 Peak Hour Trips.
1,551 MF Residential Units, 247,800 SF General Office,
198,000 SF General Retail, and 15,000 SF Daycare
Center.
1,214 AM and 1,630 PM Peak Hour Trips
2005
Municipality:
Vested DRI Trips:
Proposed Uses:
New PH Trips:
Build-out:
Based on our review, the Traffic Division has detennined that the revised DRI is
projected to generate less peak hour trips than what was previously approved, and
therefore meets the Traffic Perfonnance Standards of Palm Beach County. Based on
the peak hour forecasts provided by the consultant, it is however suggested that the
following project access driveways turn-lanes (as required in NOPC #1) to be provided:
· Southbound left-turn lanes along Congress Avenue, onto the northern and
the middle driveways.
· Northbound right-turn lanes along Congress Avenue, onto the southern and
the middle driveways.
· Westbound left-turn lane along Gateway Boulevard, onto the eastern
driveway.
· Eastbound right-turn lane along Gateway Boulevard, onto the eastern
driveway.
. . .
lio./
<'j" ,;j.i
Furthermore, due to the substantial changes in land use types, in comparison to what
was approved in NOPC #1, there may be a shift of project generated traffic to other
driveway locations, hence, requiring additional exclusive turn lanes at these locations.
These new requirements may be identified upon completion of the project site plan, and
subsequent forecast of peak hour trips.
If you have any questions regarding this determination, please contact me at 684-4030.
Sincerely,
Masoud Atefi,
Sr. Engineer - r
cc: Pinder Troutam Consulting Inc.
File: General - TPS - Mun - Traffic Study Review
F:\TRAFFIC\ma\Admin\Approvals\031225.doc
~. ,. .
..
UJ
::)
z
UJ
>
<(
U)
U)
UJ
a!
G
Z
o
u
I --
ATTACHMENT 2
~""".,
--0
N.T.S.
GATEWAY BLVD
t
TARGET DR,VEWA' r
z
z
z
o
~
Q..
~
<(
I
39 (65)
l
104 (161)
l
~ f ~
l
CATALINA BLVD r MOTOROLA DRIVE
l
f SOUTH DR'VEWA'
51 (47).
~
23 (36)
l
<(
-'
o
a!
o
~
o
~
RENAISSANCE
COMMONS
LEGEND
20 -AM PEAK HOUR
(57) -PM PEAK HOUR
INBOUND TURN VOLUMES
04/01/04
03-75
I~
THESCHOOLDISTP'" 'IF
PALM BEACH COU~LORIDA
PLANNING DEPARTMENT
3320 FOREST HILL BLVD" C-331
WEST PALM BEACH. FL 33406-5813
(561) 434-8020 FIV<:. (561) 434-8187
,"""",,ff
ARTHURC, JOHNSON, PhD.
SUPERINTENDENT
December 19, 2003
Dick Hudson, AICP
Senior Planner, Planning Department
City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, FL 33435
RE: CONCURRENCY DETERMINATION - CASE #03120301C - RENAISSANCE
COMMONS DRI (FKA MOTOROLA) PHASE III
Dear Mr. Hudson:
The Palm Beach County School District has reviewed the above referenced project for a
Concurrency Determination for 1001 multi-family units.
Attached please find the approved Palm Beach County School District Concurrency
Application and Service Provider Form for Renaissance Commons DRI Phase III. This
concurrency determination is valid for one (1) year from the date of issuance. Once a
Development Order has been issued for the project, the concurrency determination will be
valid for the life of the Development Order.
If you have any questions regarding this determination, please feel free to contact me at
(561) 434-7343.
Sincerely,
P
cc: Ruden McClosky
enc.
S :\Planning\Public\INTERGOV\Concurrency\Concurrency Determination Letters\Concurrency\C0312030 1 C,doc
AN EQUAL OPPORTUNITY EMPLOYER