Loading...
CORRESPONDENCE The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org December 29, 2005 Mr. Brian Baldocchi Allied Construction, Inc. 1801 NE 4th Street Boynton Beach, FL 33435 Re: The Preserve (fka Barr Property) MMSP 05-105 Dear Mr. Baldocchi: In response to your request dated December 20, 2005 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: · Modification of building elevations, including change in roof tiles from Hanson flat roof tile (Coconut) to Integra flat roof tile (Cedar Tan) for all roofed areas, change from asphalt to pavers at driveways and clubhouse parking, and change of building colors (as depicted on the attached plan) Please be informed that the proposed changes on the revised date stamped 12/20/05 are "minor" as defined within the Development Regulations, Chapter 4 Si te Plan Review. project may continue to be processed by the Building Division permit application, subject to the following conditions: plan Land This as a 1. Final building colors to be Sherwin-Williams as follows: Base colors - "Sand Dollar" (SW 6099) and "Persimmon" (SW 6339), Accent color - "Pearly White" (SW 7009), and Door & Shutters - "Country Squire" (SW 6074). The proposed "Canyon Clay" is not approved. 2. Plans should be changed to indicate the new development name "The Preserve at Boynton Beach". The plans indicate "East Boynton Village", which was approved subject to the name being changed due to a conflict with another project. Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst ...go! .c. iYlredem-e "'.,..,# AT BOYNTON BEACH December 20, 2005 Alliance Construction Inc. 2121 Ponce DeLeon Blvd. Suite 310 Coral Gables Fl. 33134 RE: Minor Modification Submittal To Whom It May Concern: I am requesting a minor modification change for The Preserve at Boynton Beach project located at 1801 N.E. 4th Street, Boynton Beach, Fl. 33435. The reason for the change is because of the following: 1. We have decided to change from Benjamin Moore paint colors and products to Sherwin Williams paint colors and products. (See paint board submitted with exact color and location changes). 2. We have also changed from Hanson flat roof tile (color: coconut), to Integra flat tapered shake roof tile (color: Cedar Tan). A picture of new roof tile was also submitted with the minor modification change. 3. We are also changing the asphalt driveways and the clubhouse parking lot to a 4" X 8" Tremron paver (color Brown/Tan) with running bond pattern and a soldier course border. Weare also submitting the product specs and color for the paver brick. If you should have any questions please feel free to call me at 786-402-1928. Sincerely, ryan Baldocchi Project Manager Alliance Construction Bryan.Baldocchi@alliancefl.com 1801 NE 4th Street. Boynton Beach, Florida 33435 Toll Free: 1-866-740-3111 . www.preserveboyntonbeach.com