Loading...
LEGAL APPROVAL The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DMSON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org July 26, 2005 Mr. Shayne Conover Kilday & Associates 1551 Forum Place - Ste. 100A West Palm Beach, Florida 33401 RE: File No.: Location: Bethesda Memorial Hospital- Comprehensive Heart Center MSPM 05-005 2815 S. Seacrest Blvd. Dear Mr. Conover: Enclosed is the Development Order granted by the City Commission on July 19, 2005. The site plan approval is valid for one year from the date of final approval. In order to maintain vested status, a building permit must be secured or an extension granted within one year of final site plan approval. To continue this project through the development process, please revise relevant pages of your approved site plan to incorporate all conditions of approval as applicable. A copy of the Development Order, including these conditions, must accompany the submission of the fully amended site plan set. The person managing your permit applications should be made aware of any additional documents and third party letters listed in the conditions of approval that need to be submitted with your permit package. The Building Division is committed to speedy and efficient completion of the building permit process for your project. However, please note that failure to meet all applicable Development Order conditions in the submitted plan set may produce unnecessary delays in permit issuance. A thorough review will be conducted by the Plan Review Analyst and if the necessary documentation is not attached and/or the plans are not amended to reflect all of the approval conditions, the plans will be returned to the applicant for correction and re-submittal before the permit is further processed. Feel free to contact any TRC member for additional clarification of comments. Imoortant: If you plan to introduce any changes to your approved site plan beyond those required by conditions of approval, please contact our staff for a review before submitting a permit package to the Building Division. A copy of the complete Development Order and Amended Site Plans reflecting the "Conditions of Approval" must be submitted to the Building Department along with the first permit request to avoid any delays in the processing of your permit. Should you have any questions regarding this matter, please feel free to contact this office at (561) 742~6260. Sincerely, 71JJt, Michael W. Rumpf Director of Planning & Zoning Enc. S:\Planning\SHARED\WP\PROJECTS\Bethesda\Bethesda Open Heart MSPM 05-D05lapprovalletter after CC.doc .., . -fI DEVELOPME.. ORDER OF THE CITY COMMISt..";.,,N OF THE CITY OF BOYNTON BEACH, FLORIDA Development paz Building Engineering Oce. License Deputy CIty Clerk PROJECT NAME: Bethesda Memorial Hospital Comprehensive Heart Center APPLICANT'S AGENT: Shayne Conover - Kilday and Associates APPLICANT'S ADDRESS: 1551 Forum Place Suite 100A West Palm Beach, FL 33401 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: July 19, 2005 TYPE OF RELIEF SOUGHT: Request Major Site Plan Approval for a four-story 86,167 square foot addition to the hospital to accommodate a Comprehensive Heart Center. LOCATION OF PROPERTY: 2815 S. Seacrest Blvd. Boynton Beach, FL DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the public finds as follows: DATED: 1. Application for the relief sought was made by the Applicant in a mannw con~i~tFmt ~th the reqUi~ements of the City's Land Development Regulations. II~ r~ (f; JtJL~~~JL Fill The APp~lca t ! n i ~ : , ;, ; : HAS I,.. J!i'.. ULJ i (II - I HAS NOT 2. ---1 established by substantial competent evidence a basis for the relief DEPAR MNT or:: DEVELOP~~ L 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4. The ApplicaJ1t's application for relief is hereby ~ GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. All further development on the property shall be made in accordance with the terms and conditions of this order. 6. 7. Other 7-~~-o5" S:\Planning\SHARED\WP\PROJECTS\Be City Clerk Bethesda Open Heart MSPM 05-005\0 .... I , . L ... . I I 1,11.- I · I . It II ! "In . J fJ ~ , r 1~IHIS!~ ,. III .... l!s . . ~;t en ., = ~ ~ ~l I ! !Iii '111111 a lit.. I.!:il .: f.ll: IOHli · OJ. f ~ I ~,rll I ~ I I I I. II · [f a I ~!. II Ii Ii Ii 16 I ~ I .. II ~ r. - . I . Ii i I II r. \ . s~ .~I' l-a;j. il: ' I ,I' I',' I I, I , I I I i- ..... .~ -- I .@ =- ::: ~ - . '. ., ... . ,.. ~ .- ~ - - .' .-. I.' I~ - -- .... ,I..... r.\. - 6. .iiIit- $ -- El @- pi -- ~ @- ~ . . i I' ~ 8' - ,..............1.. ... .. _.1) . - I @..L __ ! ~ ~_I I u . L I .1., j,,' j , . . . , . ....i 1111 ". '.:. . , · i:1-.-1 r ~!~ '" I . ..' ,. , ,,':.., '" . I' . i . . . . ~. . . . ,,. ....... ....- "- '-.. _.-~':'.:... '. .- .,~ -_. - -..-.:.:. ..*~::'.~..I:~<-:<-::~:.;.>. ..::. -. J i .'fJ ilJ 1:1 . i ~I !fJ~ o. STI I I C) I f ztiol iii ! ! ~I tt!i :r~ -~ ~ a j ~ ; l'l .. ... .. ::i r a i I . !l! ~ ~ ci I ; ~ i ~ 1:1 . .. i . if Pl :: ": .. '-, ..:iI Conditions of Approval 2 DEPARTMENTS INCLUDE REJECT 4. All comments requiring changes and/or corrections to the plans shall be X reflected on all appropriate sheets. 5. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TART process does not ensure that additional comments may not be generated by the Commission and at permit review. 6. Full drainage plans, including drainage calculations, in accordance with the X LDR, Chapter 6, Article N, Section 5 will be required at the time of permitting. 7. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate X grate, rim and invert elevations for all structures. Indicate grade of storm sewer segments. Indicate material specifications for storm sewer. 8. Paving, Drainage and Site details will not be reviewed for construction X acceptability at this time. All engineering construction details shall be in accordance with the applicable City of Boynton Beach Standard Drawings and the "Engineering Design Handbook and Construction Standards" and will be reviewed at the time of construction permit application. BUILDING DIVISION Comments: 9. Please note that changes or revisions to these plans may generate additional X comments. Acceptance of these plans during the TART process does not ensure that additional comments may not be generated by the commission and at permit review. 10. Buildings, structures and parts thereof shall be designed to withstand the X minimum wind loads of 140 mph. Wind forces on every building or structure shall be determined by the provisions of ASCE 7, Chapter 6, and the provisions of 2001 FBC, Section 1606 (Wind Loads). Calculations that are signed and sealed by a design professional registered in the state of Florida shall be submitted for review at the time of permit application. 11. Buildings three-stories or higher shall be equipped with an automatic X sprinkler system per F.S. 553.895. Fire protection plans and hydraulic calculations shall be included with the building plans at the time of permit application. 12. Add to all plan view drawings of the site a labeled symbol that represents X the location and perimeter of the limits of construction proposed with the subject request. 13. At time of permit review, submit signed and sealed working drawings of the X proposed construction. Conditions of Approval 4 DEPARTMENTS INCLUDE REJECT 20. Major Site Plan Modification approval is contingent upon City Commission X approval of the Code Review and proposed Height Exception. ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 21. Applicant shall work with FP&L to attempt the relocation of power lines to X underground locations.. ADDITIONAL CITY COMMISSION CONDITIONS Comments: 1. To be determined. S:\PJanning\SHARED\WP\PROJECTSIBethesdaIBethesda Open Heart MSPM 05-005\COA.doc