Loading...
CORRESPONDENCE .... The World's Premier Movie Experience March 8, 2005 Eric Johrlson Planning & Zoning Division City of Boynton Beach 100 E. Boynton Beach Boulevard Boynton Beach, FL 33425 Dear Mr. Johnson: This is to inform you that we are having a Public Hearing regarding the Site Plan of Boynton Beach Mall to allow for a movie theater. If you should have any questions regarding the hearing, please do not hesitate to call me at 954-564-6550. Sincerely, / C~'{e~y~ rhqk-'/ Gdorge UiglerJ Senior Project Manager Design and Construction. Enclosure ....,~..~....."-.,..~,,------" , lr'"\ ',' '~'I ,,' '\ :,{" '2 1\: i, . 1 It"' ,ill :1 : ,/ lr. II" I' 1\ 0 . ;' ',' ,C , . . III '1 n~, 'I I ~ I lUll ~ I - i L-. ! or ~-I{I~f::..t~_~~~~:_: .~~!:_!~._~:.~~_ nf')_~~~_~ ~'l 3101 North federal Highway, 6th Floor fort Lauderdale, FL 33306-1042 Tel: (954) 564-6550 fax: (954) 564-6553 Department of Engineering and Public Works P.O. Box 21229 West Palm Beach. FL 33416-1229 (561) 684-4000 www.pbcgov.com . Palm Beach County Board of County Commissioners lbny Masilotti. Chairman Addie L. Greene. Vice Chairperson Karen T. Marcus Jeff Koons Warren H. Newell Mary McCarty Burt Aaronson County Administrator Robert Weisman "An Equal Opportunity Affirmative Action Employer" @ printed on recycled paper March 9, 2005 Mr. Michael W. Rumpf Director of Planning & Zoning Department of Development City of Boynton Beach P.O. Box 310 Boynton Beach, FL 34425-0310 RE: Muvico Theater Addition - Boynton Beach Mall TRAFFIC PERFORMANCE STANDARDS REVIEW Dear Mr. Rumpf: The Palm Beach County Traffic Division has reviewed the traffic study for the redevelopment project entitled; Muvico Theater Addition - Boynton Beach Mall, pursuant to the Traffic Performance Standards in Article 12 of the Palm Beach County Land Development Code. This project is summarized as follows: Location: Municipality: Existing Uses: Proposed Uses: NW Quadrant of Congress Avenue and Old Boynton Road Boynton Beach 1,244,449 SF general Retail Demolishing Existing Macy's (169,510 SF General Retail) and replace it with 79,500 SF (3,650 seats) Movie Theater. 1,603 Trip Reduction Trip Reduction New Daily Trips: New PH Trips: Build-out Year: Based on our review, the Traffic Division has determined that the proposed re- development project generates less peak hour trips than the existing uses, and therefore, meets the Traffic Performance Standards of Palm Beach County. No building permits are to be issued by the City, after the build-out date specified above. The County traffic concurrency approval is subject to the Project Aggregation Rules set forth in the Traffic Performance Standards Ordinance. The following is also suggested to the City of Boynton Beach: . . Consider implementation of traffic circulation mitigation measures for the links and intersections in the vicinity of the project site, currently being identified and evaluated inthe "Central Boynton Beach Regional Traffic Circulation Study", by Kimly-Horn Associates. Potential mitigations include providing new turn-lanes, or extension of storage lengths at exclusive turn lanes at major intersections. If you have any questions regarding this determination, please contact me at 684-4030. Sincerely, ~T~EC Masoud Atefi, MS Sr. Engineer - Traffic Division EER illl ~ ~ ~n : ~ ill cc: URS Corporation File: General - TPS - Mun - Traffic Study Review F:\TRAFFIC\ma\Admin\Appreovals\D50133.doc DEPARTMENT OF DEVELOPMENl URS 12004536.00000 February 3, 2005 Mr. Eric Lee Johnson, AICP City of Boynton Beach Planning and Zoning Division 100 E. Ocean Blvd. PO Box llO Boynton Beach, FI 33425-0310 Re: Boynton Beach Mall- Muvico Addition Dear Mr. Johnson, We are transmitting herewith 12 additional sets of the Muvico site plan package along with 12 separate copies of the Retail "A" floor plan and elevation sheet, PD A-I, which also includes the color information. As I mentioned in our phone conversation, I have submitted this revised set mainly because Muvico asked me to move their building approximately 8 ft to the north to better align the walkway between the theater and the mall. This really has minimal effect in reality, but it does impact the accuracy of all drawings related to the site work. You will also note that we have excluded the architectural sheets A-I and 30.01. Some other highlights: 1. Signed and sealed survey requested, but they have not confirmed delivery as of today, 2. We have added catch basins outside the work area as requested. 3. We have adjusted the water line connection near the southwest corner of Muvico and added fire hydrants to sheet C- 7. 4. We have added double yellow lines to the main drive aisles and eliminated the stop condition on the ring road on sheet C-8. 5. Note that Muvico has also requested that we make their entry drive one way. Appropriate signs and pavement marking has been added to sheet C- 8. 6. 12" stabilized subgrade has been added to standard pavement section on sheet C-9 7. Landscape quantities have been adjusted based on building shift and widening of the new landscape islands. We have scheduled a meeting with Kevin Hallahan for Tuesday, the 8th to review tree mitigation issues on site. Based on that meeting we will have further adjustments to the tree count with respect to relocation/mitigation. URS Corporation 7650 West Courtney Campbell Causeway Tampa, FL 33607-1462 Tel: 813.286.1711 Fax: 813.287.8591 FEB - 4 ZOOS URS Thanks again for the assistance and please call if you need any additional Information. Sincerely, URS Corporation Southern ~4~ Thomas A. Marsicano, AICP Vice President Development and Planning Services CC: Bill Ranek .. O'BRIEN, SUITER & O'BRIEN, INC. LAND SURVEYORS 260 I NORTH FEDERAL HIGHWAY DELRA Y BEACH, FLORIDA 33483 PHONE (561) 276-4501 FAX (561) 276-2390 February 2, 2005 City of Boynton Beach Planning Department 100 East Boynton Beach Boulevard Boynton Beach, Florida 33425 Attn: Eric Johnson Dear Mr. Johnson, Find enclosed the most recent signed &: sealed print of the Muvico site at the Boynton Beach Mall as requested by Mr. Thomas Marsicano of URS, Tampa. Please contact Paul Engle, Surveyor at the above listed number with any questions or concerns. O'Brien, Inc. .' '~:=J ~ I ~ ~ ~ ~ \\1.. f~ ~ ..1 . i II! I I ~ \1 [:-. -': ^, I Li I U U I . k. .' . J U I L- DEPARTMENT OF DEVELOPMENT "",,,,. The City of Boynton Beach P.O. Box 310 Boynton Beach, Florida 33425-0310 PUBLIC WORKS DEPARTMENT FAX: (561) 742-6285 www.boynton-beach.org Iro1~& ~ twJ~-l~l i u11 i JAM 2 ,2005 · OFFICE OF THE CITY ENGINEER January 21, 2005 Thomas A. Marsicano, AICP Vice President, Development and Planning Services U RS Corporation 7650 West Courtney Campbell Causeway Tampa, FL 33607-1462 RE: Request to Revise Internal Roadways and Intersections Boynton Beach Mall - Muvico Addition (MSPM 05-001) Dear Mr. Marsicano: We are in receipt of your fax of January 13, 2005 to make several revisions to the internal flow patterns and intersections adjacent to the Muvico addition at the Boynton Beach Mall. The requested changes are as follows: 1. Add a westbound to southbound through-left turn lane on the entrance road from Congress Ave. 2. Offset the west leg of the intersection adjacent to the proposed Muvico to intersect the ring road at approximately 900 and in near alignment to the entrance road from Congress Ave. 3. Revise parking north of the intersection. 4. Create a 3-way stop at the northwest corner of the proposed Muvico. Staff has carefully considered this request and is not supportive of the proposed revisions. We offer the following concerns regarding this proposal. 1. The adjustments to the intersection of the ring road, entrance from Congress Ave. and proposed relocated west driveway would require a 4-way stop condition. The ring road has only two stop conditions in its entire circumference, both on the west side of the mall. The public is accustomed to traveling this east portion of the ring road with no stops. 2. Again with respect to the proposed changes at this intersection, if the west driveway were to be relocated it would be the only such driveway with a direct access to Congress Ave., perhaps further confusing the motorist. 3. It is our opinion that by reconfiguring the area south of the west driveway (in its existing location) additional parking could be provided. 4. The proposed intersection at the northwest corner of the Muvico in its present configuration has some deficiencies that, could, when revised, provide a safer intersection. AMERICA '8 GATEWA Y TO THE GULF8TREAM .. '" URS Corporation, Attention: Thomas A. Marsicano, AICP, Vice President Re: Boynton Beach Mall, Muvico Addition - Request to Revise Internal Roadways & Intersections January 21, 2005 Page 2 We recognize that the above comments address conditions on private property where the City of Boynton Beach does not exercise regulatory control or enforcement. However we are hopeful that you will favorably consider our comments and discuss them with Muvico and Simon Mall. If you have questions or need additional information we would be happy to discuss these issues further or you may feel free to contact me at (561) 742-6482. Senior En ineer \ I LUck J ""-"._._........~//'. Xc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail) H. David Kelley, Jr., P.E./P.S.M., City Engineer (via e-mail) Ed Breese, Principal Planner, Planning & Zoning File S:\Engineering\Kribs\Muvico (BB Mall) - Req. to revise internal Roadways & Intersections.doc .J The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 To: Cc: From: Date: Re: www.boynton-beach.org Peter Mazzella, Assistant Director, Utilities Nem Gomez, Interim Director of Utilities Marshall Gage, Police Chief Rodger Kemmer, Deputy Chief / Fire Marshal Jody Rivers, Parks Superintendent William Bingham, Fire Chief Wally Majors, Parks Director Laurinda Logan, Civil Engineer Rick Lee, Fire Protection Analysist John Huntington, Police Officer Ed Breese, Principal Planner ~ 12/8/04 Impacts of proposed site plan upon City facilities and services Project: Boynton Beach Mall - Muvico File Number: MSPM 05-001 MEMORANDUM As part of the City's concurrency requirements, the City Commission directed the Planning & Zoning Division to report whether or not the City could maintain an adequate level of service with current infrastructure and / or staffing levels in order to support the proposed development. Plans for the above-mentioned project have been forwarded to your department's TRC representative for their technical review and comment. We are requesting that you review the proposed project for anticipated impacts to your department's level of service (as requested by the City Commission) and provide us with your comments for direct insertion into our staff report. In the past, you have sent us something that indicates your current staff / infrastructure would either be able to support the proposed project or what would be required to meet the adopted level of service. Please respond no later than 2 weeks from today. Also, any recommendations that you believe that would enhance the project are certainly welcomed. I thank you for your assistance in this matter. Should you have any questions regarding the requested information, please do not hesitate to call me at 742-6260. 5: \Planning\SHARED\ WP\AGEN DAS\ TRC\correspondence\Impact Analysis.doc ~cr The City of Boyiiton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org December 1, 2004 Mr. Masoud Atefi MSCE, Senior Traffic Engineer Palm Beach County Traffic Division Department of Engineering and Public Works P.O. Box 21229 West Palm Beach, Florida 33416 Re: Traffic Study: Boynton Beach Mall Dear Mr. Atefi: The enclosed traffic study update, prepared by URS Corporation dated December 2004, was received by Planning and Zoning for the above- referenced application. Please review the enclosed information for conformance with the County.s Traffic Performance Standards Ordinance, and provide Tim Large, Building Code Administrator and me with your written response. If you have questions regarding this matter, please call me at (561) 742- 6260. Sincerely, Ji)~ Michael W. Rumpf Director of Planning and Zoning MWR/sc Attachments