REVIEW COMMENTS
il$.;c<,"'" ~
DEPARTMENT OF DEVELOPMENT
Memorandum PZ 05-127
TO:
Chair & Members Planning & Development Board
FROM:
Michael Rum~~Y
Planning & Z;~'i~9 'Director
Ed Breese, ~
Principal Planner
July 15, 2005
Interstate Sign Crafters - 130 Commerce Road
(NWSP 05-025)
Re-review of expired site plan
THROUGH:
DATE:
RE:
Staff has received a request for New Site Plan approval (NWSP 05-025) of the previously approved
Interstate Sign Crafters (NWSP 03- 014) site plan at 130 Commerce Road, in High Ridge Commerce
Center. The original approval expired October 7, 2004, and depicted a 17,384 square foot warehouse
building. The applicant was not prepared to move forward with the financing and construction without
the necessary tenant leases, which he now has, The applicant has indicated he will be submitting for
building permit immediately following City Commission approval of the project.
Staff has conducted a review of the proposed plans to ensure consistency with the original approved
drawings. Additionally staff has taken into consideration any changes in the development regulations
since original approval, for conformance purposes.
Attached is the original staff report (NWSP 03-014) dated September 10, 2003 and an updated set of
Conditions of Approval (COA's), based upon the re-submitted plans,
Staff concludes that the site plan (NWSP 05-025), depicting the same 17,384 square foot warehouse
building is consistent with the previously approved plan and recommends approval, contingent upon
all comments indicated in Exhibit "C" - Conditions of Approval. The Technical Application Review
Team (TART) recommends that the deficiencies identified in this exhibit be corrected on the set of
plans submitted for building permit. Also, any additional conditions recommended by the Board or
City Commission shall be documented accordingly in the Conditions of Approval.
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 03 - 215
STAFF REPORT
TO:
Chairman and Members
Planning and Development Board and City Commission
THRU:
Michael Rumpf
Planning and Zoning Director
FROM:
Ed Breese
Principal Planner
DATE:
September 10, 2003
PROJECT NAME/NO:
Interstate Sign Crafters / NWSP 03 - 014
REQUEST:
New Site Plan
PROJECT DESCRIPTION
Property Owner:
Interstate Sign Crafters
Applicant:
Jeffrey Petersen of Interstate Sign Crafters
Agent:
Michael E. Sipula, JMS Design, Inc.
Location:
130 Commerce Road (see Exhibit "A" - Location Map)
Existing Land Use/Zoning:
Industrial (I) / Planned Industrial District (PID)
Proposed Land Use/Zoning:
No change proposed
Proposed Use:
Request site plan approval for a one-story, 17,384 square
foot warehouse on a 2.533-acre lot in the High Ridge
Commerce Center Planned Industrial District.
Acreage:
110,341 square feet (2.533 acres)
Adjacent Uses:
North:
Right-of-way for Commerce Road, then farther north is Atlas Party Rental and
Harrison Import/Export with an Industrial (I) land use designation, zoned Planned
Industrial District (PID);
South:
Sermatech Power Solutions with an Industrial (I) land use designation, zoned Light
Industrial (M-1);
East:
Multi-tenant Flex/Warehouse space with an Industrial (1) land use designation,
zoned Planned Industrial District (PID), then farther east is the S.A.L. Railroad and
Staff Report - Interstate Sign Crafters (NWSP 03-014)
Memorandum No PZ 03-215
Page 2
Interstate 95;
West:
A business named SEMSCO with an Industrial (I) land use designation, zoned
Planned Industrial District (PID).
Project size:
The proposed 17,384 square foot warehouse building is the third phase in the
development of this 2.533-acre site. Phases one and two total 22,492 square
feet.
Site Characteristic: The subject parcel is comprised of Lots 13 & 14 within the High Ridge Commerce
Center, located on the south side of Commerce Road, east of High Ridge Road.
According to the survey, Lot 14 contains the Phase one and two warehouse
building and the associated parking and landscaping. Lot 13, according to the
Landscape Plan, contains three Slash Pine trees and a number of exotic plant
materials, including Brazilian Pepper trees. The survey shows that the highest
elevation is 21.5 feet above sea level, located near the northeast corner of the site.
BACKGROUND
Proposal:
Mr. Michael Sipula, of JMS Design, Inc., proposes to construct a 17,384 square foot
warehouse for Interstate Sign Crafters. The developer proposes to create four bays
within the building for warehousing/manufacturing and limited accessory office
space. This would be the third, and final phase for build -out of the site.
ANALYSIS
Concurrency:
Traffic: A traffic impact statement for this project was submitted by the applicant and sent
to the Palm Beach County Traffic Division for their review and approval. The
County, in a letter dated September 4, 2003, determined the project meets the
Traffic Performance Standards of Palm Beach County.
Drainage: Conceptual drainage information was provided for the City's review. The
Engineering Division has found the conceptual information for the subject property
to be adequate and is recommending that the review of specific drainage solutions
be deferred until time of permit review (see Exhibit "C" - Conditions of Approval).
The Civil Plans indicate use of swale areas along the east and west sides and at the
rear (south end) ofthe property.
School: This project is exempt from the school concurrency requirements of Palm Beach
County.
Driveways: The subject property fronts on Commerce Road. Proposed on-site circulation
consists of a 32 foot wide driveway on Commerce Road at the center of the site.
Parking Facility: Parking required for warehouse/manufacturing is based on either one (1) parking
space per 500 square feet of gross floor area or, in the High Ridge Commerce
Center PID, a factor of 1.5 parking spaces per 2 employees. When Phases 1 & 2
Staff Report - Interstate Sign Crafters (NWSP 03-014)
Memorandum No PZ 03-215
Page 3
were approved in 1998, the second methodology was utilized. Based upon a
maximum of 30 employees on a shift, 23 parking spaces were required and 26
provided. With the Phase 3 submittal, 6 of those 26 parking spaces will be
relocated and merged into the new unified site plan for all three phases. The site
plan indicates the provision of 35 parking spaces for Phase 3, based upon 1 space
per 500 square feet of warehouse/manufacturing and 6 additional parking spaces
to replace those lost in the merger of the two parcels into a unified site plan. When
added to the 20 remaining spaces from the previous approval, the total is 61
parking spaces, one more than required by code. The dimensions of all of the
newly created 90 degree parking spaces would be nine (9) feet - six (6) inches in
width by 18 feet - six (6) inches in length. The handicap spaces would be
dimensioned 12 feet in width (with 5 feet of striping) by 18 feet - six (6) inches in
length. The site plan also depicts four (4) new 12 foot by 35 foot loading zone
spaces.
Landscaping: The proposed pervious or "green" area of the lot would be 30,885 square feet
or 27.99% of the total site. The landscape plan tabular data (Sheet L-1) indicates
that 23 trees and 660 shrubs are being provided, in addition to the landscaping
previously provided in Phases 1 & 2. There is also a 25 foot landscape buffer at the
rear (south) property line which will be sodded and irrigated and planted with
Mahogany trees to match the buffer on adjacent properties. The three existing
Slash Pine trees on the site are proposed to be mitigated through the installation of
(2) Live Oak and (5) Mahogany trees. The landscape plan indicates the use of two
(2) Tibouchina trees as the signature trees required by code. The applicant has
also agreed to terrace the plantings between the existing parking lot and the street
to closely match that proposed for the new construction, through the use of Indian
Hawthorn and Ixora Nora Grant shrubs.
Building and Site: Building and site regulations will be fully met when staff comments are
incorporated into the permit drawings. The proposed one-story warehouse
building would be 22 feet - eight (8) inches in height to the top of the parapet wall.
The maximum allowed height in the PID zoning district is 45 feet. The floor plan
(Sheet A -1) shows that the Phase 3 building footprint would be 17,384 square feet
and divided into four (4) bays. Sheet A-2 provides an illustration of the building
facades, with CBS walls, stucco finish and score lines, standing seam metal roofs
over the bay doors, and gabled standing seam metal roofs supported by decorative
piers at the bay entrances, The applicant has also agreed to make some subtle
fa~ade improvements to the east elevation of the previously constructed Phase 1 &
2 building (facing inward towards the new building). These improvements are
depicted on Sheet A-3 and include standing seam metal roofs over the roll-up
doors, supported by decorative piers designed and painted to match the
improvements on the new building. The existing roll-up doors will also be painted
to match those of the new construction.
Design: The elevation drawings (Sheet A-2) show that the building would be designed as a
typical industrial building within the park with the fa~ade improvements discussed
above. The body of the building would be stucco and painted a tan color (MAB
Paints - "Oat Cakes" 5080P). The base of the building, below a stucco band, is
Staff Report - Interstate Sign Crafters (NWSP 03-014)
Memorandum No PZ 03-215
Page 4
proposed to be painted a slightly darker tan color (MAS Paints - "River Rock"
5028P), The stucco band, the area between score lines near the top of the wall and
the metal parapet cap are all proposed to be painted white (MAS Paints -
"Camelia" 5889P). The standing seam metal roofs, roll-up doors and address
numbers are all proposed to be painted verdi green (MAS Paints - "Pine Castle"
5741D).
Signage:
The signage, according to Sheet A-2, will be 1 foot - 6 inch channel letters, "Pine
Castle" verdi green in color to match the storefront roofs and roll-up doors, and
placed within the white stucco score lines above each storefront entry. The
applicant proposes four (4) tenant signs totaling 15 square feet each, meeting the
City sign code requirement of 60 square feet for the building.
RECOMMENDATION:
The Technical Review Committee (TRC) has reviewed this request for new site plan approval. Staff
recommends approval, contingent upon all comments indicated in Exhibit "C" - Conditions of Approval.
The Technical Review Committee (TRC) recommends that the deficiencies identified in this exhibit be
corrected on the set of plans submitted for building permit. Also, any additional conditions recommended
by the Soard or City Commission shall be documented accordingly in the Conditions of Approval.
e
NIC
Location Map
INTERSTATE SIGNCRAFTERS
SITE
M
EXHIBIT "A"
o
<3
a:::
-.J
~
o
a:::
<(
o
~
en
R~
I~
\.............--....................
I.C')
0)
W
h-
~
CJl)
0:::
W
h-
~
REI
N
W~E
s
EXHIBIT -8-
I~
I ~ T-
. ....
ill:
II!!
~~
~ Iii.
~ d
(5
z
,
~ :II Od'_ JI
! !1i1!3 ii ~~!~ .... . :'
i~f~l-ll i~Q"" ",lll~ =r~-- :"_":'-:1' - =:.;=~._':~'irrr-
! ~ t .. ....... t ... ~ - .. - - - ..... -_, _ .,_: I' -~~ - - - -."'tJ~1- -
,.. i. ........... ;! ~ !I .._-....... Ii I "11
~ ... rn -. ~ il ""',"!' ......-:..01
~ :"tmm~ ;lIII'!!; - -. :g ... -~, ...- 1:1 ! I I
~ I!if.: r!1 ~J,~' - ~ -_U'-fiG- ",..'-, r "I~' ..... I: I I
· i!ll · ~ ~ 1; '. . 1:1 ...... I
- ; I: ~..: . I I: t
~:;.~..& o;f i ' I I
t J I I
11 11 !: : :
I I I I
I , I
-- _~I
------------------ ;~!
111 ,:~.
0' f ....
I I
I
: I. 1
I ' I
1
t I I
I : I
t
. .! I il. " ./ . I I
. "II~ / ~~ -
" ---. --'-, / . . I I ' 1
'I ,I I," !I 11' I'
I.... ..!. 11',1
_ ...~_ _____ _ r, I
. , 'I!' !r- - .1H'~ . -. . . . .":.... . . , I~ I
_ 1--.-.1i1-7 _ _ _ _ _ -- -.- - - - · - - -11 L -
9 :: ..... . - , .1. -:.=" ...::~'"~-:a T ____
~'J; , .-
IIU fII H _ Pill"'" ./ "'} 0'-... :
.
-... -
I!~~'
Itlfili ~iI
;
. I~
I ~n
, I":
. 11
.m
'"
~
.
"
~
~
~
- .
~~-
~:~ d.
. "<,; If
,
..,.
"
..
...- . .:.
d~ ~~
I:!
II
::1::1
U
I'
'"
I :: i ~..:...
.~ .Ii.
i i!:. .. '! I
'11 T H..
~ I
;'. ~ r 11~li.;
~ "I ,II il!! .
~ '] t
-f-- ...,. fi ~'
I...........
i -~;
~
~
.r.
~
-
..... ~r r
h i"~
. It'" ::wJ_. :..
I I. _.~
.IiJ ~'''.
11: ii' -....
i"'_ ,,,",
8'
....It;~ i~!~
j-ti~
r
/.
. . .. ..
I Dill!1 !lil1i CUI i:~:9U 1'1 11t
friu11i 'I~ ~ t.' ~ -
!I!I ~ 'hi ~~ I ~I'
C:~1Ia _
#fI--
"\ /---
.__~_.__E~,_,__._._.___'___._
II '(111' I "r' ( (II If f ( (',:" m' III J J II' OJ
lJ ;ll'l~ J I fltl '!HJII1UII' J ijJ:rr I I
· ;; .--....;. ~':lIm~ ';h I~ i !ii!lli III r I li ! ! p~ !~ HPI~ II i !: ! a IWlli
I: LJI".:;:.:"' IHi J,,!:,=ifi!i! ,Ii '~ 'I;~l !liiiiiH iiilll(1 i ~lIinnullll,!i!JI'd~!~ 1:~U ~I' ~l,!!l',l'
> I !. ; :: ~ Ifl{ ~ ,I, '0 I.. .H. '~I:!!!1Ir.I'I., "'1', uR... .' I,
..:....... .-..- .:jj :.1 lIJ :. 1 1'1 Jill II' (lnnum Jf ., 'H, rum:D: [H"
-i \ .i II nil' 1111' II I , I I w tWJ J' ii, Il.:! If ~ :::1, , ,:!I
" .I ., I '! 11 ~ l! dJ 1 'i, ~! l' I
. . , !
. I
.; ."! ~n'
INTERSTATE SIGN CRAFTERS. INC.
AT HIGH RIDGE COMMERCE PARK
LOTS 13 Ie J 4. BLOCK 2. CEDAR RIDGE. ~ _ ~ U. D.
~~
,
.
!
!II
'"
...
I!!
'"
~
;
~
~
~
i
.
~
,-
In
'flh
",.' "
liHt !'
L, I
:1: t
.-. .
u: i ~
i;$ ,
i!1; ::~;a
"1 J I~'
Hil ~.
c'
I~
'I
I.
;
.
~
~
. .."
.' ',1
-
i..-.;:L.
j! .~
.r I"
='" ,.,
.,. .,..
EXHIBIT -8- .
..~,--.._~
'.
, '
::'-t'
. ". ..- i
, "' , I I I I P- I ., , , , i i ; I
k I i II . . i . , t t
fi I C C .
, D I II I t. t ,
. . . t t !
I
III II' I; UI '. S" S" II 'I I: r. R I ft . I.
,! .!
JI" ,-I I. ." II It I I I Ii I
i,1 ~Ii · II, ""
i. ... ,I .' .1 , I I I '. ,
hi Jl ;. III ,I I II ! ! I I" i~ I,
I il co ,
'II' Iii llil It I IU Iii Ii' It I Iii 1'1 t;1 Iii tli Iii III Ii' ,
.1 . lit! 1,1 dii N h; Iti 1.1 III I" I.; llll,1 II, 1,1 1,1 I' I
. " 1111 U ~' .11 " " U · I ., I,. I 11 H I I
~ .... I 1 Ihl I' I h . jI ,_ In I .
. ..... p
. , I .
: Z " i
L~ ~! I
INTERSTATE ,SIGN CRAFTERS, INC,
AT HIGH RIDGE COJlllERCE PARK
LOT.S 13 It 14. BLOCK 2. CEDAR RIDGE. A p, U,D,
It HIGH RIDGE COIlJlERCE PARI(; A P,LD,
: !
I . .1
i'
i
I I _. i
:
:!;.
--!
if
--
0
U
!.
D
D
0
II
31
D
U
31 D
.
....... I
JI
~
-
...
!
2
~
;
~
;
';~
~
r:
!~
~!!l
II i:
i~ 12 f
III !I
....".
.~ '.
r~l .'
; !
II: i i
p:
i! I! n I I i I! I II , I I I I 1 1 I
,. ," '. I I" I ill' II I I I I I I I'
lei II I, ,I I I I I I I S
II II I i! I II II e · I ' I IS
II! !il I' 1:1 Ii !Ii :! II II n nUll 'I n il ! !
III 'I" 'I ul h ,I .' II 'I I I I Ii II .. I! I ;;
U! iil Ii nl II .1 I II I I I il I! I Ii ~
tUI Ii' llil It; 'II Ii! Iii' u; IiI III III III II' Ii' III Iii I ~
Iii! .! "U il, II; Iii ,! II, I,) II; 1111,1 'II I,! 1,1 lei ~ II~
Iill It p~; ;1' 1, i' II 1 U 11 III I 11 r. I it I 1m
~ ! f i
1t ~! I
4
.
-
,,"
,
.
!
EXHIBIT -8-
~
n
~
E
I
~
;
II
II
I1n-EBSTATE SIGN CRAF'l'ERS. INC.
AT HIGH RIDGE COJlMERCE PARK
LOTS 13 It 14, BLOCK 2, CEDAR 1UDGE. .A P. U.D.
It HIGH IUDGE COJIJIERCE PARK. .A P.LD.
!
.
I
~ 5
-
. .
:I
I
I
I
I:: Mltsll -B-
\- :--\1 r
-,1.. _
. .
. . I
~ & -.J "'. MliIO
."
I
I
.
I
I
I
I
I
5b
I~ ..:1.
~
g
~ 1...4.......
nf
af
-1 I ~ 1IIIqlllliil.~"'TA"'1ICIN CIUr...4, tIC. Ilt~il~I' II
L ~ I I1II1 ='::':1=:='...'" -
...........
EXHIBIT C
Conditions of Approval
Project name: Interstate Sign Crafters
File number: NWSP 05-025
Reference: 1 slreview plans identified as a New Site Plan with a June 21, 2005 with a Planning and Zoning
Department date stamp marking,
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments: NONE
PUBLIC WORKS - Traffic
Comments: NONE
ENGINEERING DIVISION
Comments:
1. All comments requiring changes and/or corrections to the plans shall be
reflected on all appropriate sheets,
2, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the Technical Advisory
Review Team (TART) process does not ensure that additional comments
may not be generated by the Commission and at permit review,
3, Revise the note on the Landscape Plan to indicate that within the sight
triangles there shall be an unobstructed cross-visibility at a level between
2,5-feet and 8-feet above the pavement (LDR, Chapter 7,5, Article II,
Section 5,H.)
4, There is a potential conflict between the existing Swietenia Mahagoni (West
Indies Mahogany) and the wall-mounted light on the south end of the
building,
5, There is a potential conflict between the proposed Strelitzia Nicolai (White
Bird of Paradise) and wall-mounted lights on the north and west sides of the
building,
6, Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
7, The SFWMD Surface Water Management General Permit provided with
this package has expired, A new permit will be required to complete
construction of the on-site surface water management system,
8, Paving, Drainage and Site details will not be reviewed for construction
acceptability at this time, All engineering construction details shall be in
accordance with the applicable City of Boynton Beach Standard Drawings
and the "Engineering Design Handbook and Construction Standards"
COA
07/19/05
2
DEPARTMENTS INCLUDE REJECT
and will be reviewed at the time of construction permit application,
UTILITIES
Comments:
9. Palm Beach County Health Department permits may be required for the
water and sewer systems serving this project (CODE, Section 26-12),
10, Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g,p,m. (500 g,p,m. some residential developments)
with 20 p,sj, residual pressure as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by Insurance underwriters,
whichever is greater (CODE, Section 26-16(b)),
11. The CODE, Section 26-34(E) requires that a capacity reservation fee be
paid for this project either upon the request for the Department's signature
on the Health Department application forms or within seven (7) days of site
plan approval, whichever occurs first. This fee will be determined based
upon final meter size, or expected demand,
12, A building permit for this project shall not be issued until this Department
has approved the plans for the water and/or sewer improvements required to
service this project, in accordance with the CODE, Section 26-15,
13. Cleanouts will be required every 75 feet along the sanitary sewer service
lateral.
14, Utility construction details will not be reviewed for construction
acceptability at this time, All utility construction details shall be in
accordance with the Utilities Department's "Utilities Engineering Design
Handbook and Construction Standards" manual (including any updates);
they will be reviewed at the time of construction permit application,
FIRE
Comments:
15, All entrance gates to construction area shall have a Knox lock system that
will also open in case of electrical power failure, All gates shall be a
minimum of 20 foot wide if two lane, and 12 foot wide if single lane, Fire
Department apparatus shall be able to turn into the construction site in one
turn,
16, The construction site access roads shall be maintained free of obstructions at
all times.
17, All required fire hydrants, standpipes or sprinkler systems shall be in place
COA
07/19/05
3
DEPARTMENTS INCLUDE REJECT
before going vertical. Vertical construction shall be protected by standpipes
and the sprinkler system to one level below the highest level of construction
throughout the building,
18, Any cost of damage to Fire Department vehicles because of improperly
stabilized roads or any towing fees if a vehicle becomes stuck will be the
responsibility of the contractor. A minimum of 32 tons is required for
ground stabilization, The pouring of the foundation pad is considered
vertical construction, The roads must be acceptable before construction
begins,
19, Adequate Fire Department vehicle turn around space shall be provided in
the construction area, We understand that this is an existing in use property,
so we want to insure that there is no conflict.
20. This building will require a full NFP A 13 fire sprinkler system, per City
Ordinance Chapter 9, section 7-3,2 (4),
21. Provide information on the types of businesses that will be in this building
to determine the hazard designations, so a decision on the requirements for
the sprinkler system can be made,
POLICE
Comments: NONE
BUILDING DIVISION
Comments:
22, Please note that changes or revisions to these plans may generate additional
comments, Acceptance of these plans during the TART (Technical
Advisory Review Team) process does not ensure that additional comments
may not be generated by the commission and at permit review.
23, At time of permit review, submit separate surveys of each lot, parcel or tract.
For purposes of setting up property and ownership in the City computer,
provide a copy of the recorded deed for each lot, parcel or tract. The
recorded deed shall be submitted at time of permit review,
24, Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must
incorporate all the conditions of approval as listed in the development order
and approved by the City Commission.
25, The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. The name of the
COA
07/19/05
4
DEPARTMENTS INCLUDE REJECT
project as it appears on the Development Order must be noted on the
building permit application at the time of application submittal.
26, Indicate on Sheet SP-l the square footage of the building that will be
dedicated for factory/industrial and how much square footage will be
storage, Areas shall comply with Table 500 to the 2001 FBC,
27. A total of three handicap accessible parking spaces are required for the new
building per the 2001 FBC, Section 11-4,1.2(5),
PARKS AND RECREATION
Comments:
28. Plant list shows the Ilex vomitoria 'Stokes Dwarf to be 16 inches in height x
18 inch spread, Needs to change to be a minimum of24 inches high and 24
inch spread at installation, and to avoid confusion with note in Plant
Specifications.
29, Include palm tree planting detail.
30, The landscape plan sheet should be include details indicating by a line
where the height, diameter @ DBH, and clear and booted wood areas of
the shade and palm trees will be measured at time of planting and
inspection,
31. Irrigation coverage should be 110%.
FORESTER/ENVIRONMENTALIST
Comments:
Landscape Plan-Plant List Sheet L-l
32, The applicant must indicate on the landscape plan that any existing trees /
vegetation in accordance with the original approved landscape plan for lot
# 14 that are dead, missing or in poor health must be replaced throughout the
lot.
33, The applicant must indicate on the landscape plan that any existing trees /
vegetation in accordance with the original approved landscape plans for lots
#15, #12 and Minor Road ("existing buffers on adjacent properties") must
be replaced throughout these three buffers,
34, All trees on the Plant List must be listed in the specifications as a minimum
of 12'-14' height, 3" diameter at DBH (4,5' off the ground), and Florida #1
(Florida Grades and Standards manual) The height of the trees may be
larger than 12' -14' to meet the 3" diameter requirement. [Environmental
COA
07/19/05
5
DEPARTMENTS INCLUDE REJECT
Regulations, Chapter 7,5, Article II Sec, S.C. 2.]
35, The Typical Tree Planting Detail, and the Typical Palm Planting Detail
should include a line indicating where the diameter, height and spread of the
trees / palms will be measured at time of planting and inspection,
36, The Commerce Road rights-of-way must receive Floratam sod and irrigation
coverage for both lots #14 and #13. [Environmental Regulations, Chapter
7,5, Article II Sec, 5,C, 2,]
37, The applicant should show a landscape elevation detail for the existing and
proposed buildings and landscape improvements to scale along the
Commerce Road right-of-way,
38, The applicant should add a note that all utility boxes or structures (not
currently known or shown on the plan) should be screened with Cocoplum
hedge plants on three sides,
PLANNING AND ZONING
Comments:
40, Provide updated letter of traffic concurrency from Palm Beach County
Traffic Engineering prior to issuance of first permit.
MWRlsc
S:\Planning\SHARED\WP\PROJECTS\lnterstate Signcrafters\NWSP 05-025 Phase III\COA.doc
.
EXHIBIT "C"
Conditions of Approval
Project name: Interstate Sign Crafters
File number: NWSP 03-014
Reference: 2nd review plans identified as a New Site Plan with a September 9,2003 Planning & Zoning date
ki
stamp mar ng.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS- General
Comments:
1. Prior to permit application contact the Public Works Department (561-742- X
6200) regarding the storage and handling of refuse,
PUBLIC WORKS- Traffic
Comments: None X
UTILITIES
Comments:
2. Palm Beach County Health Department permits will be required for the water X
system serving this project, primarily the fire sprinkler system feed line
(CODE, Section 26-12),
3, Fire flow calculations will be required demonstrating the City Code X
requirement of 1,500 g,p,m. as stated in the LDR, Chapter 6, Article IV,
Section 16, or the requirement imposed by insurance underwriters, whichever
is greater (CODE, Section 26-16(b)),
4, The CODE, Section 26-34(E) requires that a capacity reservation fee be paid X
for this project either upon the request for the Department's signature on the
Health Department application forms or within 30 days of site plan approval,
whichever occurs first. This fee will be determined based upon final meter
size, or expected demand,
FIRE
Comments: None X
POLICE
Comments: None X
ENGINEERING DIVISION
Comments:
5, An ExcavationlFill permit will be required if on-site fill is removed, X
Conditions of Approval
2
DEPARTMENTS INCLUDE REJECT
6, Full drainage plans, including certified drainage calculations, in accordance X
with the LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting,
7, Indicate how many lifts the asphalt will be placed in on the Roadway/Parking X
Area Typical Section,
BUILDING DIVISION
Comments:
8, Buildings, structures and parts thereof shall be designed to withstand the X
minimum wind loads of 140 mph, Wind forces on every building or structure
shall be determined by the provisions of Chapter 6 of ASCE 7, and the
provisions of Section 1606 (Wind Loads) of the 2001 FBC, Calculations that
are signed and sealed by a design professional registered in the state of
Florida shall be submitted for review at the time of permit application,
9, Every building and structure shall be of sufficient strength to support the X
loads and forces encountered per the 2001 FBC, Section 1601,2.1 and Table
1604,1, Indicate the live load (pst) on the plans for the building design,
10. At time of permit review, submit signed and sealed working drawings of the X
proposed construction,
11. A water-use permit for the irrigation system is required from the SFWMD, A X
copy of the permit shall be submitted at the time of permit application, F,S,
373.216.
12, If capital facility fees (water and sewer) have been paid in advance to the City X
of Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
a, The full name of the projeet as it appears on the Development Order
and the Commission-approved site plan,
b, The total amount paid and itemized into how much is for water and
how much is for sewer, (CBBCO, Chapter 26, Article II, Sections 26-34)
PARKS AND RECREATION
Comments: None X
FORESTER/ENVIRONMENTALIST
Comments: None X
PLANNING AND ZONING
Comments: None X
DEPARTMENTS INCLUDE REJECT
ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS
Comments:
1. None X
ADDITIONAL CITY COMMISSION CONDITIONS
Comments:
1. To be determined,
S :\Planning\SHARED\ WP\PROJECTS\lnterstate S igncrafters\NWSP 03-0 l4\COA.doc
S:\Planning\Planning Templates\Condition of Approval 2 page -P&D ORA 2003 form,doc
To:
From:
Subject:
Date:
Plannine Memorandum: Forester / Environmentalist
Ed Breese, Principal Planner
Kevin J, Hallahan, Forester / Environmentalist
Interstate Signcrafters
New Site Plan - 1 st Review
NWSP 05-025
July 11, 2005
Landscape Plan-Plant List Sheet L-l
Kjh
File
1. The applicant must indicate on the landscape plan that any existing trees /
vegetation in accordance with the original approved landscape plan for lot #14
that are dead, missing or in poor health must be replaced throughout the lot.
2. The applicant must indicate on the landscape plan that any existing trees /
vegetation in accordance with the original approved landscape plans for lots #15,
#12 and Minor Road ("existing buffers on adjacent properties") must be replaced
throughout these three buffers,
3. All trees on the Plant List must be listed in the specifications as a minimum of
12'-14' height, 3" diameter at DBH (4.5' off the ground), and Florida #1 (Florida
Grades and Standards manual) The height of the trees may be larger than 12' -14'
to meet the 3" diameter requirement. [Environmental Regulations, Chapter 7.5,
Article II Sec, S.C. 2.]
4. The Typical Tree Planting Detail, and the Typical Palm Planting Detail should
include a line indicating where the diameter, height and spread of the trees / palms
will be measured at time of planting and inspection.
5. The Commerce Road rights-of-way must receive Floratam sod and irrigation
coverage for both lots #14 and #13. [Environmental Regulations, Chapter 7.5,
Article II Sec. S.C. 2.]
6, The applicant should show a landscape elevation detail for the existing and
proposed buildings and landscape improvements to scale along the Commerce
Road right-of-way,
7, The applicant should add a note that all utility boxes or structures (not currently
known or shown on the plan) should be screened with Cocoplum hedge plants on
three sides.
~
DATE: July 1, 2005
List \::;:~cronvms/Abbreviations:
ASCE - American Society of Civil
Engineers
CBB - City of Boynton Beach
CBBA - Boynton Beach Amendments
CBBCO - City of Boynton Beach
Code of Ordinances
CBBCPP - City of Boynton Beach
Comprehensive Plan Policy
CFR - Code of Federal Regulations
EPA - Environment Protection Agency
FBC - Florida Building Code
FIRM - Flood Insurance Rate Map
F.S. - Florida Statutes
LOR - Land Development Regulations
NEC - National Electric Code
NFPA - National Fire Prevention Assn
NGVD - National Geodetic Vertical
Datum of 1929
SFWMD - South Florida Water
Management District
FFPC - Florida Fire Prevention Code
DEPARTMENT OF DEVELOPMENT
BUILDING DIVISION
MEMORANDUM NO. 05-128
TO: Ed Breese
Principal Planner
FROM: Timothy K, Larg~
TART Member/;i~ision
SUBJECT: Project - Interstate Signcrafters
File No, - NWSP 05-025 - 1 st review
We have reviewed the subject plans and recommend that the request be forwarded for Board
review with the understanding that all remaining comments will be shown in compliance on the
working drawings submitted for permits,
Buildina Division (Site Specific and Permit Comments) - Timothv K. Larae (561) 742-6352
1 Please note that changes or revisions to these plans may generate additional comments,
Acceptance of these plans during the TART (Technical Advisory Review Team) process
does not ensure that additional comments may not be generated by the commission and at
permit review,
2 At time of permit review, submit separate surveys of each lot, parcel or tract. For purposes
of setting up property and ownership in the City computer, provide a copy of the recorded
deed for each lot, parcel or tract. The recorded deed shall be submitted at time of permit
reView,
3 Pursuant to approval by the City Commission and all other outside agencies, the plans for
this project must be submitted to the Building Division for review at the time of permit
application submittal. The plans must incorporate all the conditions of approval as listed in
the development order and approved by the City Commission,
4 The full address of the project shall be submitted with the construction documents at the
time of permit application submittal. The name of the project as it appears on the
Development Order must be noted on the building permit application at the time of
application submittal.
5 Indicate on Sheet SP-1 the square footage of the building that will be dedicated for
factory/industrial and how much square footage will be storage, Areas shall comply with
Table 500 to the 2001 FBC.
6 A total of three handicap accessible parking spaces are required for the new building per
the 2001 FBC, Section 11-4,1.2(5).
bf
S:\Deve/opment\Bui/ding\ T ART\ TART 2005/nterstate Signcrafters
Page 1 of 1
/
TRC COMMENTS
PROJECT: INTERSTATE slGNCRAFTERs
LOCATION: 130 Commerce Road
FILE# NWsP 05-025
TYPE OF PROJECT: New Light Industrial Building
AREA: Site; 110,341 sqft, - Building; 37,389 sqft.
CAPACITY: 52 Bays
COMMENTS
1. All entrance gates to construction area shall have a Knox lock
system that will also open in case of electrical power failure. All
gates shall be a minimum of 20' wide if two lane, and 12' wide if
single lane. Fire Department apparatus shall be able to turn into the
construction site in one turn.
2, The construction site access roads shall be maintained free of
obstructions at all times.
3, All required fire hydrants, standpipes or sprinkler systems shall be in
place before going vertical. Vertical construction shall be protected
by standpipes and the sprinkler system to one level below the
highest level of construction throughout the building,
4. Any cost of damage to Fire Department vehicles because of
improperly stabilized roads or any towing fees if a vehicle becomes
stuck will be the responsibility of the contractor, A minimum of 32
tons is required for ground stabilization, The pouring of the
foundation pad is considered vertical construction. The roads must
be acceptable before construction begins,
5. Adequate Fire Department vehicle turn around space shall be
provided in the construction area, We understand that this is an
existing in use property, so we want to insure that there is no
conflict.
6, This building will require a full NFPA 13 fire sprinkler system, per
City Ordinance Chapter 9, section 7-3.2 (4).
7. What types of businesses will be in this building? We need to know
the hazard designations so we can decide the requirements for the
sprinkler system.
ctry OF BOYNTON BEACH, FLORI])A
INTER-OFFICE MEMORANDUM
/
TO:
Ed Breese,
Principal Planner
DATE:
June 30, 2005
FILE: NWSP 05-025
FROM:
Off. John Huntington
Police Department
CPTED Practitioner
SUBJECT: Interstate Signcrafters
REFERENCES: Site Plan
ENCLOSURES:
I have viewed the above building plans and have the following comments:
No Comments.
/
Rivers, Jody
To:
Subject:
Breese, Ed; Coale, Sherie
Site Plan Review - Interstate Signcrafters
Project:
File No,:
Interstate Signcrafters
NWSP 05-025
1,
of 24"
2,
3,
clear
4.
Plant list shows the lIex vomitoria 'Stokes Dwarf' to be 16" height x 18" spread, Needs to change to be a minimum
high and 24" spread at installation, and to avoid confusion with note in Plant Specifications,
Include palm tree planting detail.
The landscape plan sheet should be include details indicating by a line where the height, diameter @ DBH, and
and booted wood areas of the shade and palm trees will be measured at time of planting and inspection.
Irrigation coverage should be 110%
Jov{tj R~ve\'.s
Parks Superintendent
City of Boynton Beach
100 E, Boynton Beach Blvd,
Boynton Beach, FL 33425
(561) 742-6226
(561) 742-6233 (fax)
1
,./
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 05-084
TO:
Ed Breese, Principal Planner, Planning and Zoning
FROM:
Laurinda Logan, Senior Engineer
DATE:
July 6, 2005
RE:
Review Comments
New Site Plan - 1 st Review
Interstate Sign Crafters
File No. NWSP 05-025
The above referenced Site Plans, received on June 28, 2005, was reviewed for Public Works,
Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of
Ordinances, Following are our comments with the appropriate Code and Land Development Regulations
(LDR) referenced,
PUBLIC WORKS - GENERAL
1. Staff recommends placing the proposed dumpster next to the existing dumpster enclosure to
eliminate excessive maneuvering for Solid Waste pickup,
PUBLIC WORKS - TRAFFIC
No comments at this time,
ENGINEERING
2, All comments requiring changes and/or corrections to the plans shall be reflected on all appropriate
sheets,
3, Please note that changes or reVISions to these plans may generate additional comments,
Acceptance of these plans during the Technical Advisory Review Team (TART) process does not
ensure that additional comments may not be generated by the Commission and at permit review,
4, Revise the note on the Landscape Plan to indicate that within the sight triangles there shall be an
unobstructed cross-visibility at a level between 2,5-ft. and 8-ft. above the pavement (LDR, Chapter
7,5, Article II, Section 5,H,)
5. There is a potential conflict between the existing Swietenia Mahagoni (West Indies Mahogany) and
the wall-mounted light on the south end of the building,
6, There is a potential conflict between the proposed Strelitzia Nicolai (White Bird of Paradise) and wall-
mounted lights on the north and west sides of the building,
Department of Public Works/Engineering Division Memo No. 05-084
Re: Interstate Sign Crafters New Site Plan - 1st Review
July 6, 2005
Page 2
7, Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article
IV, Section 5 will be required at the time of permitting,
8, The SFWMD Surface Water Management General Permit provided with this package has expired, A
new permit will be required to complete construction of the on-site surface water management
system.
9, Paving, Drainage and Site details will not be reviewed for construction acceptability at this time, All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application,
UTILITIES
10, Palm Beach County Health Department permits may be required for the water and sewer systems
serving this project (CODE, Section 26-12),
11, Fire flow calculations will be required demonstrating the City Code requirement of 1,500 g,p,m, (500
g.p,m, some residential developments) with 20 p,s,i. residual pressure as stated in the LDR, Chapter
6, Article IV, Section 16, or the requirement imposed by insurance underwriters, whichever is greater
(CODE, Section 26-16(b)),
12, The CODE, Section 26-34(E) requires that a capacity reservation fee be paid for this project either
upon the request for the Department's signature on the Health Department application forms or within
seven (7) days of site plan approval, whichever occurs first. This fee will be determined based upon
final meter size, or expected demand,
13, A building permit for this project shall not be issued until this Department has approved the plans for
the water and/or sewer improvements required to service this project, in accordance with the CODE,
Section 26-15,
14. Cleanouts will be required every 75-ft. along the sanitary sewer service lateral.
15, Utility construction details will not be reviewed for construction acceptability at this time, All utility
construction details shall be in accordance with the Utilities Department's "Utilities Engineering
Design Handbook and Construction Standards" manual (including any updates); they will be
reviewed at the time of construction permit application,
LUck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V, Mazzella, Deputy Utility Director, Utilities
H, David Kelley, Jr" P,E./ P.S,M" City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Maintenance Supervisor, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\lnterstate Sign Crafters, New Site Plan 1st Rev..doc