APPLICATION
PROJECT NAME: Neptu"iie Commerce Center
LOCATION:
PCN: 08-43-46-05-00-000-7022
I FILE NO.: SPTE 06-003 II TYPE OF APPLICATION: I
AGENT/CONTACT PERSON: OWNER: Pelican Estates, Inc.
William Wietsma Co. Inc. ADDRESS: 214 NE 4th Street Delray Beach,
ADDRESS: 578 Palm Way FL 33444
Gulfstream, FL 33483 FAX:
FAX: 561-266-5915 PHONE:
-
PHONE: 561-441-8276
2/15/06
SUBMITTAL / RESUBMITT AL
1 ST REVIEW COMMENTS DUE:
PUBLIC NOTICE: 4/15/06
TRC MEETING:
LAND DEVELOPMENT SIGNS POSTED
(SITE PLANS):
PLANNING & DEVELOPMENT BOARD 4/25/06
MEETING:
COMMUNITY REDEVELOPMENT
AGENCY BOARD
CITY COMMISSION MEETING: 5/16/06
COMMENTS:
S:\Planning\SHARED\WP\PROJECTS\Neptune Commerce Ctr\NWSP 05-006\SPTE\2004 PROJECT TRACKING INFO,doc
...
GERALD B. CHURCH, P.E.
CONSULTING CIVIL ENGINEER
505 N.E. 3rd STREET, #3
DELRA Y BEACH, FLORIDA 33483
PHONE (561) 266-9520
FAX (561) 266-9520
LEITER OF TRANSMITIAL
Date: 3/31/06
To: Masoud Atefi, Senior Engineer, Traffic Division
Company: Palm Beach County
From: Gerald B. Church, P .E.
Project: Neptune Commerce Center
# of Prints
_ For Approval
_ Urgent
_ As Requested
For Review
_ Please Reply
Please Return
_ Sign & Return
_ Other (see below)
Notes/CommentslRequest:
Per your request, enclosed are 3 Traffic Statements, for the Neptune Commerce
Center, for which the City of Boynton Beach requested that it be revised to reflect
the build-out date. The project is exactly the same, except for the timing
Signed: --'
~,:o'" ( ."<~", /
(-", /-{ ->" '::.-", ,- !
P'"""~~"~~
//
,-'7 "_+ V
I /. , , I ''lo~l' bil,,' K (/;n/_7 _
I f ~>'- ' , " E:
_, /,_ t.-:f' p,/.0"n ;'IU I r .
V,yc-C'/"-'CIJ
,
;", ll:.r
/' '
L-~,/Y'
-
TRAFFIC STATEMENT
NEPTUNE COMMERCE CENTER
BOYNTON BEACH, FLORIDA
PROJECT DESCRIPTION:
The proposed Neptune Commerce Center will be located at 1320 Neptune Drive in Boynton
Beach, approximately 0.25 mile east of Congress Avenue. The 0.969-acre tract is vacant.
The Neptune Commerce Center building, with five bays, will have a first floor area of 16,707
square feet and 1,535 square feet on the mezzanine. The use is typically a contractor office with
equipment and storage of materials, considered Light Industrial.
SCOPE OF STUDY:
In conjunction with a site plan submission, the City of Boynton Beach Land Development
Regulations requires a Traffic Statement. This traffic study has been prepared in accordance with
the standards and criteria as set forth in the Palm Beach County Unified Land Development Code,
Article 15, Traffic Performance Standards..
The scope of the study is to:
i) Determine the volume of traffic volume to be added to the thoroughfare system
by the proposed Neptune Commerce Center for both daily and peak hour traffic.
ii) Determine if the peak hour traffic is above the 1 % LOS D threshold for the
roadway impacted, and if so, analyze the intersections impacted by the project.
PROJECT TRAFFIC:
The trips generated for the proposed uses are tabulated, and summarized as follows:
Total daily Trips = 121 trips.
Total P.M. Peak Hour Trips = 17 trips.
Total A.M. Peak Hour Trips = 16 trips.
BUILDOUT:
Year end 2007
MAJOR ROADWAY LINK IMPACTED:
Congress Avenue, a six lane divided roadway
1% OF P.M. PEAK HOUR TRAFFIC:
46 trips, versus 17 actual.
NO SIGNIFICANT IMP ACT
Prepared by: Gerald B. Church, P.E.
Date: 11/10/04
Revised: 1/6/05
Revised: 4/4/06
'~/:.. ,P
/ '-, ~ ' ~C="
v7 ~"
. 4. . f i,-../
Ir- -....-.
.
....
IX:
~
~
z
~
u
~
u
f;I;1
~
~
u
~
z
;;l
t
~
z
CI:l
~
~
~
5
-
~
~
~
a3
Co:)
~
~
- 00
~ 00
---
N
- ......
~!3 00
~ 0 ~
~:I: 0
~
:; N
~ ......
--
00
- 00
~!3 N
_ 0 0-
~:I: 0
<
~
/Xl
I ~
ell
ell
~
l:l.. It")
~
Cl1
~ t"-
..Q 0-
.; .,c
0
-
....
.1:: 0-
s::: en
;:J g
q
......
Q) to
en
;:J -'E
] -Eben
..... ::s
.....l"tl
=
-
~
>.IJ
f--
ffi
u
>.IJ
~
~
~
o
U
>.IJ
~
l:l..
>.IJ
Z
~
o
....
6
E=:
~
>.IJ
Z
>.IJ
c:>
l:l..
S
:; V)
~ ......
--
N
1-g
l:l..f-- t"-
's ......
~o
l:l..:I:
:; ~
~ '<t"
......
-
~en
~.~
'f-- \0
~ 3 ......
<( 0
~:I:
Z
en
Q.
'C ......
~ N
- ......
Q)
z
Ii
0- N
"<t
en N
~ 00
Cl1 ......
...
<(
Q) to
en
;:J ~'E
"tl ..... ~
j .....l"tl
=
-
William Wietsma Company, Ioe
578 Palm Way, Gulf Stream, FI. 33483
561/441-8276 Fax 266-5915
~E8 j 5
February 8, 2006
Ed Breese, Principal Planner
City of Boynton Beach
Planning & Zoning Division
100 E. Boynton Beach, Fl. 33425
Re: Neptune Commerce Center
Dear Mr. Breese:
Due to several factors, including Hurricane Wilma and the resulting construction labor and material
shortages, we are formally requesting a time extension of one year to submit construction documents and
apply for a building permit for the above mentioned project. We have nearly completed all of the
architectural and engineering drawings, and applied to the Lake Worth Drainage District for their approval.
We hope td be in a position to proceed with this project in the near future and would hope that the City
would be kind enough to grant this extension request. Thank you in advance for your consideration.
ih,"",r, IY',
J ~
William Wietsma
DEPARTMENT OF DEVELOPMENT
Planning and Zoning Division
Memorandum
PZ 06-022
DATE:
RE:
William Wietsma
Ed Breese
Princi al Planner
2/1/06
Neptune Commerce Center
TO:
FROM:
Please be advised that site plan approval for the above referenced project will expire on March 1.
2006.
The City Commission granted site plan approval on March 1. 2005. To date, no building permit has
been issued for this project. A building permit must be secured within one year of site plan approval in
order to maintain the vested status.
The Land Development Regulations Chapter 4, Section 5, provides for a one-year extension for site
plan approval if the application is submitted before the expiration date. Please call the Planning and
Zoning Division at (561) 742-6260 for more information regarding the site plan time extension
procedure.