AGENDA DOCUMENTS
CITY OF BOYNTON BEACH
AGENDA ITEM REQUEST FORM
Requested City Commission Date Final Form Must be Turned
Meeting Dates in to City Clerk's Office
D December 6, 2005
D December 20, 2005
~ January 3, 2006
D January 17,2006
NATURE OF
AGENDA ITEM
Requested City Commission
Meeting Dates
Date Final Form Must be Turned
in to City Clerk's Office
November 14, 2005 (Noon.)
D February 7,2006
D February 21, 2006
D March 7, 2006
D March 21, 2006
March 6, 2006 (Noon)
January 17,2006 (Noon)
December 5, 2005 (Noon)
February 6, 2006 (Noon)
December 19,2005 (Noon)
February 21, 2006 (Noon)
January 3, 2006 (Noon)
D Administrative
D Consent Agenda
~ Public Hearing
D Bids
D Announcement
D City Manager's Report
D Development Plans
D New Business
D Legal
D UnfInished Business
D Presentation
RECOMMENDATION: Please place this request on the January 3,2006 City Commission Agenda under Public
Hearing, to follow the corresponding items for annexation, land use amendment and rezoning. The Community
Redevelopment Agency Board recommended that the subject request be approved on December 13, 2005, subject to all staff
comments with the exception of #20, which is proposed to be revised to address the project density, and with the addition of a
new condition regarding pedestrian improvements along Old Dixie Highway. For further details pertaining to the request, see
attached Department Memorandum No. PZ 05-204.
EXPLANATION:
PROJECT:
AGENT:
OWNER:
LOCATION:
DESCRIPTION:
PROGRAM IMPACT:
FISCAL IMPACT:
ALTERNATIVES:
Developme
Gulfstream Gardens Phase II (NWSP 05-028)
Bradley Miller, Miller Land Planning Consultants, Inc.
P. B. Chinese Christian Chapel, Inc., Parbbubbal K. Patel, and Howard Britt
One-quarter mile north of Gulfstream Boulevard, between Federal Highway and Old Dixie
Highway
Request for new site plan approval to construct 110 townhouse units, recreation amenities and
related site improvements on a 5.47-acre parcel in the Planned Unit Development (PUD) zoning
district.
City Manager's Signature
Z-;J~
Planning and Z mg Drrector CIty Attorney / Fmance / Human Resources
S:\Planning\SHARED\WP\PROJECTS\Gulfstream Gardens\Gulfstream Gardens 1I\NWSP 05-028\Agenda Item Request - Gulfstream Gardens II NWSP 05-
028 1-3-06.dot
S:\BULLET1N\FORMS\AGENDA ITEM REQUEST FORM.DOC
Requested City Commission
Meeting Dates
~ December 6, 2005
D December 20, 2005
D January 3, 2006
D January 17, 2006
NATURE OF
AGENDA ITEM
CITY OF BOYNTON BEACH
AGENDA ITEM REQUEST FORM
Date Final Form Must be Turned
in to City Clerk's Office
Requested City Commission
Meeting Dates
Date Final Form Must be Turned
in to City Clerk's Office
November 14,2005 (Noon.)
D February 7, 2006
D February 21, 2006
D March 7, 2006
D March 21, 2006
March 6, 2006 (Noon)
January 17,2006 (Noon)
December 5, 2005 (Noon)
February 6,2006 (Noon)
December 19,2005 (Noon)
February 21,2006 (Noon)
January 3, 2006 (Noon)
D Administrative
D Consent Agenda
~ Public Hearing
D Bids
D Announcement
D City Manager's Report
D Development Plans
D New Business
D Legal
D UnfInished Business
D Presentation
RECOMMENDATION: Please place this request on the December 6,2005 City Commission Agenda under Public
Hearing, to follow the corresponding items for annexation, land use amendment and rezoning. The corresponding items were
advertised for the November gth CRA Board meeting and December 6th City Commission meeting. The project was not
prepared for Board review and it therefore will be readvertised for the December 13th CRA meeting and January 3,2006 City
Commission meeting. To properly inform the public who may attend this Commission meeting as advertised, this item should
appear on the agenda with a bold note describing the planned postponement. No staff report has been prepared to date.
EXPLANATION:
PROJECT:
AGENT:
OWNER:
LOCATION:
DESCRIPTION:
PROGRAM IMP ACT:
FISCAL IMPACT:
ALTERNATIVES:
Develo
Gulfstream Gardens Phase II (NWSP 05-028)
Bradley Miller, Miller Land Planning Consultants, Inc.
P. B. Chinese Christian Chapel, Inc., Parbbubbal K. Patel, and Howard Britt
One-quarter mile north of Gulfstream Boulevard, between Federal Highway and Old Dixie
Highway
Request for new site plan approval to construct 109 townhouse units on a 5.47-acre parcel in the
Planned Unit Development (PUD) zoning district.
Not heard by the CRA; to be postponed to the December 13,2005 CRA Board meeting and
January 3,2006 City Commission meeting.
N/A
N/A
N/A
City Manager's Signature
Pl~;J z~r City Attorney / Finance / Hwnan Resonrces
S:\Planning\SHARED\WP\PROJECTS\Gulfstream Gardens\Gulfstream Gardens I1\NWSP 05-028\Agenda Item Request - NWSP - Dec 6, 2005.dot
S:\BULLETIN\FORMS\AGENDA ITEM REQUEST FORM.DOC
CITY OF BOYNTON BEACH
AGENDA ITEM REQUEST FORM
Requested City Commission Date Final Form Must be Turned Requested City Commission Date Final Form Must be Turned
Meeting Dates in to City Clerk's Office Meeting Dates in to City Clerk's Office
D December 6, 2005 November 14, 2005 (Noon.) D February 7, 2006 January 17, 2006 (Noon)
D December 20, 2005 December 5, 2005 (Noon) D February 21,2006 February 6, 2006 (Noon)
D January 3, 2006 December 19,2005 (Noon) D March 7, 2006 February 21, 2006 (Noon)
~ January 17,2006 January 3, 2006 (Noon) D March 21, 2006 March 6, 2006 (Noon)
D Administrative D Development Plans
NATURE OF D Consent Agenda D New Business
AGENDA ITEM D Public Hearing ~ Legal
D Bids D UnfInished Business
D Announcement D Presentation
D City Manager's Report
RECOMMENDATION: Please place this request on the January 17, 2006 City Commission Agenda under Legal,
Ordinances - Second Reading to follow the corresponding Land Use Amendment and Rezoning items. The City Commission
tabled this request on January 3, 2006 to allow for fmal approval of the land use amendment and rezoning request prior to
approval of the site plan. For further details pertaining to the request, see attached Department Memorandum No. PZ 05-
204.
EXPLANATION:
PROJECT:
AGENT:
OWNER:
LOCATION:
Gulfstream Gardens Phase II (NWSP 05-028)
Bradley Miller, Miller Land Planning Consultants, Inc.
P. B. Chinese Christian Chapel, Inc., Parbbubbal K. Patel, and Howard Britt
One-quarter mile north of Gulfstream Boulevard, between Federal Highway and Old Dixie
Highway
Request for new site plan approval to construct 110 townhouse units, recreation amenities and
related site improvements on a 5.47-acre parcel in the Planned Unit Development (PUD) zoning
district.
DESCRIPTION:
PROGRAM IMPACT: N~
FlSCALIMPACT, ,e:(Jrf ~/A
ALTERNATIVES, Cb!..JfiM
Development Department Director
City Manager's Signature
/.-j./Z ~
Planning and Zonin ector City Attorney / Finance / Human Resources
S:\Planning\SHARED\WP\PROJECTS\Gulfstream Gardens\Gulfstream Gardens I1\NWSP 05-028\Agenda Item Request - Gulfstream Gardens II NWSP 05-
0281-I7-06.dot
S:\BULLET1N\FORMS\AGENDA ITEM REQUEST FORM.DOC
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DIVISION
MEMORANDUM NO. PZ 05-204
STAFF REPORT
TO:
Chair and Members
Community Redevelopment Agency Board and
Mayor and City Commission
FROM:
Eric Lee Johnson, AICP
Planner
t
THROUGH:
Michael W. Rumpf
Director of Planning and Zoning
DATE:
December 7, 2005
PROJECT NAME I
NUMBER:
Gulfstream Gardens II PUD I NWSP 05-028
REQUEST:
New site plan approval to construct 110 fee-simple townhouses on a 5.47-
acre parcel in the PUD Planned Unit Development zoning district
PROJECT DESCRIPTION
Property Owner: Multiple owners, including:
Palm Beach Chinese Christian Chapel, Inc.
Parbhubhai K. Patel
Howard K. Britt
Applicant: Gulfstream Gardens, LLC
Agent: Bradley D. Miller, AICP with Miller Land Planning Consultants, Inc.
Location: Approximately one-quarter (1f4)-mile north of the intersection of
Gulfstream Boulevard between Federal Highway and Old Dixie Highway
(Exhibit "A" - Location Map)
Parcel Size: :f::5.47 acres
Existing Land Use: CHIS (Palm Beach County), Local Retail Commercial (LRC) and General
Commercial (GC)
Proposed Land Use: Special High Density Residential (SHDR)
Existing Zoning: CG General Commercial (Palm Beach County), C-3 Community
Commercial and C-4 General Commercial
Proposed Zoning: PUD Planned Unit Development
Proposed Use: 110 townhouse units
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 2
Adjacent Uses:
North:
South:
East:
West:
To the northeast, property within the City of Boynton Beach currently
being developed as a multi-family residential project (Bayfront) classified
Special High Density Residential (SHDR) and zoned IPUD Infill Planned
Unit Development. To the northwest, developed (residential) property
lying in Palm Beach County designated CHIS and zoned CG General
Commercial;
Property designated Special High Density Residential (SHDR) and zoned
PUD Planned Unit Development approved for development as multi-family
residential (Gulfstream Gardens I);
Right-of-way of Federal Highway then property in Palm Beach County
designated CHIS and zoned CG General Commercial; and
Rights-of-way of Old Dixie Highway and the FEC railroad then property
designated Conservation (C) and zoned REC Recreation (Seacrest Scrub).
PROPERTY OWNER NOTIFICATION
Owners of properties within 400 feet of the subject request for new site plan approval were mailed a
notice of this request and its respective hearing dates. The applicant certifies that they posted signage
and mailed notices in accordance with Ordinance No. 04-007.
BACKGROUND
Site Characteristic: According to the survey, the subject property is comprised of several lots forming a
parallelogram-shaped parcel, nearly 5.47 acres in size. A portion of the property is
located outside the city limits within a small enclave of unincorporated Palm Beach
County. The applicant submitted accompanying requests to annex (ANEX 05-004)
the property into the city and to rezone it (LUAR 05-012) to PUD. Therefore,
approval of the site plan is contingent upon the approval of the accompanying
annexation and rezoning requests (see Exhibit "c" - Conditions of Approval). The
survey shows the site contains several one (1) and two (2)-story buildings, asphalt
areas, chain-link fences, and a lift station. All would be removed as a result of the
proposed development. The survey also shows that a cell tower and its
maintenance building are currently located at the southwest corner of the parcel.
The cell tower is proposed to remain as legal non-conforming pursuant to the city's
regulations. The site plan for Gulfstream Gardens Phase II continues the overall
design of Phase I lying to the south, which was approved on October 5, 2005. The
survey shows that highest ground elevation (18.76 feet above sea level) of the
subject property occurs at the center, near the existing one (i)-story church. It
should be noted that the property lies within Study Area V of the Federal Highway
Corridor Community Redevelopment Plan, which earmarks the site for higher
residential densities.
Proposal:
The applicant proposes to develop the subject property with 110 townhouse units.
Townhouses are permitted uses in the PUD zoning district. The maximum density
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 3
Concurrency:
Traffic:
Utilities:
allowed by the Special High Density Residential (SHDR) land use is 20 dwelling
units per acre, which would allow for 109 units. The site proposes 110 townhouses
units and therefore, exceeds the project's maximum allowable density. The site
plan will have to be modified to show one (1) less dwelling unit (see Exhibit "C" -
Conditions of Approval).
ANALYSIS
A traffic impact analysis was sent to the Palm Beach County Traffic Division for
concurrency review in order to ensure an adequate level of service. On September
19, 2005, the Palm Beach County Traffic Division determined that the proposed
residential project is located in the county designated Coastal Residential Exception
area and therefore, meets the Traffic Performance Standards of Palm Beach
County. However, the County is recommending the provision of an exclusive left-
turn lane onto the project access driveway on Federal Highway (see Exhibit "C" -
Conditions of Approval).
The City's water capacity, as increased through the purchase of up to 5 million
gallons of potable water per day from Palm Beach County Utilities, would meet the
projected potable water for this project (project estimated to require a total of
46,000 gallons per day). Local piping and infrastructure improvements may be
required, especially on the water delivery system for the project, depending upon
the final project configuration and fire-flow demands. These local improvements
would be the responsibility of the site developer and would be reviewed at the time
of permitting. Sufficient sanitary sewer and wastewater treatment capacity is
currently available to serve projected total of 22,000 gallons per day, subject to the
applicant making a firm reservation of capacity, following approval of the site plan
(see Exhibit "C" - Conditions of Approval).
Police/Fire: Staff reviewed the site plan and determined that current staffing levels would be
sufficient to meet the expected demand for services.
Drainage: Conceptual drainage information was provided for the City's review. The
Engineering Division has found the conceptual information to be adequate and is
recommending that the review of specific drainage solutions be deferred until time
of permit review. All South Florida Water Management District permits and other
drainage related permits must be submitted at time of building permit (see Exhibit
"C" - Conditions of Approval).
School: The proposed project is located within the School District of Palm Beach County
Concurrency Service Area (CSA) #19. The District determined that adequate
capacity exists to accommodate the projected resident children.
Driveways: The plans show that this phase of Gulfstream Gardens would primarily utilize the
points of ingress / egress proposed from the first phase. The approved Gulfstream
Gardens Phase I site plan shows that the project would have two (2) points of
ingress / egress. The main driveway opening (within Phase I) is currently approved
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 4
at Federal Highway, approximately 520 feet south of the north property line. Each
of the two ingress and egress lanes are approved at 12 feet in width. They would
be separated by a 12-foot wide landscaped median. The exit lane would allow for
right-turn only (south) traffic movements onto Federal Highway. The second point
of ingress / egress (from Phase I) is approved at Old Dixie Highway, approximately
72 feet north of the south property line. The site plan shows that this is a narrower
opening (24 feet in width) than the one approved at Federal Highway. However,
this would allow for both right-turn (north) and left-turn (south) traffic movements
onto Old Dixie Highway. Both driveway openings would be restricted with a
decorative gate. It should be noted that an alternate point of ingress / egress is
proposed within Phase II. This driveway opening would contain stabilized sod and
be limited to emergency vehicles. However, staff recommends finishing this
driveway for full ingress / egress to be used by the residents. Staff justifies this
additional driveway by the large number of units proposed (throughout Phase I and
Phase II combined) compared with the general remoteness of the other entrances
within Phase I. Phase I and II are a master planned community and it should
perform as such. Furthermore, the plan exhibits some new urbanism qualities, and
creating additional access points helps to further that type of design concept (see
Exhibit "C" - Conditions of Approval). The applicant prefers to keep the opening as
designed. Staff understands that their reluctance to add this third entrance is
attributed to its cost.
Parking Facility: One (l)-bedroom dwelling units require one and one-half (1.5) parking space per
unit. Two (2) and three (3)-bedroom dwelling units require two (2) parking spaces
per unit. The project proposes 20 one (l)-bedroom units, 60 two (2)-bedroom
units, and 30 three (3)-bedroom residential units, and a recreation area and
therefore, 215 parking spaces are required. The floor plans show that each unit
would have either a one (1) or two (2)-car garage for a total of 150 parking spaces.
In addition, the site plan (sheet CE-2) shows 41 carport spaces and 52 regular
parking spaces are also proposed, for a total of 241 total parking spaces or an
excess of 26 spaces. The floor plan (sheet A-1) shows that the one (l)-car garage
would be dimensioned 10 feet - two (2) inches in width by 20 feet - two (2) inches
in depth. The floor plan sheet (A-3) shows that the two (2)-car garage would be
dimensioned 18 feet - eight (8) inches in width by 20 feet - two (2) inches in
depth. The site plan shows that the 90-degree parking spaces (under the carport
and regular spaces) would be dimensioned nine (9) feet in width by 18 feet in
depth. The handicap parking stalls would be dimensioned 12 feet in width (with 5-
feet of striping) by 18 feet in depth.
Landscaping: More than one-half (1/2) an acre of the subject property would be set-aside as
"green area". This pervious surface would account for 10.79% of the total site.
The existing tree inventory list (sheet TS-1) indicates the site contains 17 trees for
a total of 64 caliper inches. The plan indicates that two (2) trees would remain and
three (3) trees would be relocated. The master plan list on sheet L-1 indicates that
the project would have a total of 173 canopy trees, 112 palm trees, 4,287 shrubs,
and 3,265 groundcover plants. The plans propose 50% native canopy trees and
50% native palm trees. The tree species would include the following: Green
Buttonwood, Italian Cypress, Live Oak, Bald Cypress, Slash Pine, Glaucous Cassia,
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 5
Lagerstomia, Purple Glory Tree, Alexander palm, Medjool Date palm, Royal palm,
and Cabbage palm. The plans propose landscaped areas around the entire
development. In order to ensure proper maintenance of the landscaped areas at
the rear of each unit, staff recommends that they be maintained by the Home
Owners Association or protected as such in the Home Owner's Association
documents, so that no individual property owner removes any of the required plant
material along the perimeter of the PUD (see Exhibit "C" - Conditions of Approval).
The site plan shows that the buildings would be setback at least 16.4 feet from the
east (front) property line along Federal Highway. This buffer would contain a
pedestrian path and a decorative aluminum fence. The landscape plan indicates
that Slash Pine, Royal palm, Medjool Date palm, Purple Glory tree, Purple Showers,
Glaucous Cassia, Gold Mound, and Silver Buttonwood shrubs would be provided
within this buffer. The typical landscape buffer detail shows that the planting area
along Federal Highway would be seven (7) feet in width with another one (l)-foot
set aside for the fence on top of a retain wall, followed by a four (4) foot wide
sidewalk and then a five (5)-foot wide planting strip proposed along each building.
The site plan shows that the buildings would be setback zero (0) feet from the
south (side) property line abutting the Phase I portion of the site plan, and
therefore no additional landscape buffer is required in this area. The site plan
shows that the buildings would be setback 14 feet along the west (rear) property
line, along Old Dixie Highway. Sidewalks are also proposed within this buffer,
leaving five (5) feet of pervious surface between the edge of the sidewalk and the
west property line. However, the intent is to install extra plant material within the
Old Dixie Highway right-of-way (along the west property line of the subject
property) to match that approved in Phase I. The landscape material proposed
within this right-of-way was preliminarily reviewed and approved by the
Engineering Division of Pubic Works. The typical landscape buffer detail shows that
a five (5)-foot wide planting strip is proposed between the west property line and
the six (6)-foot high aluminum fence. A three (3)-foot wide planting strip is
proposed along the west (front) of the building. This strip would contain an array
of plant material. The site plan shows that the buildings would be setback 10.1
feet along the north property line. A sidewalk is proposed within this buffer, similar
to the other landscape buffers. The landscape plan proposes the following plant
material within this buffer: Cabbage palm, Alexander Palm, Italian Cypress, Green
Buttonwood, Slash Pine, and Firebush.
A note on the landscape plan indicates that all above-ground mechanical
equipment such as exterior utility boxes, meters, transformers, and back-flow
preventers would be visually screened with two (2)-foot high Redtip Cocoplum
hedges. Each building would have landscape material proposed along all four (4)
building sides. Select trees would be installed at half the building height.
Building and Site: As previously mentioned, the maximum density allowed by the Special High Density
Residential (HDR) land use classification is 20 dwelling units per acre, which
translates to a maximum of 109 units. The site proposes 110 townhouses units
and therefore, exceeds the project's maximum allowable density. The site plan will
have to be modified to show one (1) less dwelling unit. The site plan tabular data
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 6
indicates that the buildings would account for 2.22 acres or 40.58% of the entire
property. The recreation buildings and pool decks would account for 3.84% of the
site. The remaining portions would be comprised of roadways / driveways,
sidewalks, carports, and pervious surface. The recreation area would
accommodate a swimming pool and a small cabana facility. The recreation area
would be centrally located, easily accessible to all residents within the phase.
According to Chapter 2.5, Section 9.B., when rezoning a property, no minimum lot
size or minimum yard shall be required; provided however, that PUD frontage on
dedicated public roads shall observe front yard requirements in accordance with
the zoning district the PUD use most closely resembles and that peripheral yards
abutting other zoning districts shall be the same as required in the abutting zone.
The abutting land to the northeast is zoned IPUD for the Bayfront townhouse
project. The Bayfront site plan (NWSP 04-002) shows that the buildings are
setback between five (5) feet and 10 feet - six (6) inches from the south property
line. The site plan proposes a side (north) setback of slightly over 10.1 feet. This
would be acceptable. Also, the property to the northwest is located Palm Beach
County's Commercial General (CG) zoning district, which requires a side setback of
15 feet. Again, the side setback for the subject project would be acceptable as
proposed. The abutting land to the south is Phase I of Gulfstream Gardens, zoned
PUD. The site plan shows that the Phase I buildings would be zero (0) feet from
the north property line (of Phase I). Therefore, no setback is required along the
south property line. However, it should be noted that the proposed south setback
for the buildings proposed within this phase (Phase II) would range between 10
feet to 15 feet. This would be more than adequate. The abutting lands to the
west of the subject property are rights-of-way for Old Dixie Highway and the
Florida East Coast Railroad. Therefore, no required setback is germane to the west
boundary. In any case, the site plan proposes a 14-foot rear (west) setback.
Similarly, to the east of the subject site is right-of-way for Federal Highway.
Located within an enclave of unincorporated Palm Beach County, the commercial
properties east of Federal Highway are zoned Gc. Again, no setback from the east
(front) property line (per Chapter 2.5, Section 9.B.), is warranted by abutting
properties due to the separation distance between the subject site from CG-zoned
properties across Federal Highway. The site plan shows the buildings would be
setback 16.4 feet from the east property line.
The site plan proposes 10 three (3)-story buildings throughout the entire
development. They are labeled #19 through #28 because this is the second phase
of the two (2)-phased Gulfstream Gardens project. The unit sizes range between
1,601 square feet (1,265 square feet under air) to 3,191 square feet (2,600 square
feet under air). The applicant is not proposing any solid-roof enclosures. The
intent is that homeowners would be allowed to have screen-enclosures where the
ground floor concrete slabs are under the second story balcony. The elevations
show that the mean roof height of the three (3)-story buildings would be 37 feet.
The peak of the roof would be 42 feet - six (6) inches in height. The PUD allows a
building height of up to 45 feet. The site plan shows that a buffer wall / fence
material would surround the entire development. The development would also
have several carports within the parking areas. The elevations show that the
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 7
carports would be 17 feet - seven (7) inches in height and allow for an opening of
nine (9) feet - two (2) inches. The Wall Detail (sheet H-6) shows the buffer wall
would be six (6) feet in height. The decorative Type "A" Column would be seven
(7) feet in height and would be spaced 18 feet apart. The Aluminum Fence Detail
(sheet H-6) shows the aluminum fence with the same decorative columns. The
cabana building would be one (i)-story. It would be dimensioned 11 feet - six (6)
inches in height (mean height level). The detail of the freestanding outdoor lighting
poles show that each tapered fiberglass pole would be 16 feet in height with a
decorative spun aluminum top.
Design:
Associated with the proposed type of townhouse developments are a wide variety
of possible building designs (i.e. contemporary, traditional, Spanish-Mediterranean,
etc.). The developer describes the proposed architectural style as "Old French
Country". The design, as proposed, would provide for a sense of separation
between units. The articulation of the front fa~ade would relieve the monotony
and possibly lessen the perceived density typical of townhouse developments.
The elevations show the roofing material would consist of either brown Hanson
Nordic Maple or Nordic Redwood flat roof tile. The exterior finish of the walls
would be rough textured stucco. The applicant is proposing two (2) color schemes.
The Sherman Williams paints are as follows:
Scheme 1 Color
Main Body SW 7050 Useful Gray
Accent SW 7045 Intellectual Gray, SW 7046 Anonymous
Doors and
Shutters SW 6494 Lakeshore
Trims & Band SW 7009 Pearly White
Scheme 2 Color
Main Body SW 6133 Muslin
Accent SW 6135 Ecru, SW 6138 Artifact
Doors and
Shutters SW 6472 Composed
Trims & Band SW 7005 Pure White
It is staff's opinion that the colors of Phase II are compatible with the colors of
Phase I despite the fact that the developer is using a different paint manufacturer
(Sherwin Williams versus MAB). Staff has no objections to the proposed building
colors, architectural style, or roof type. The subject development would be
consistent and compatible with the newer, recently approved townhouse projects
approved within the vicinity. However, within the subject project, staff
recommends matching the roof styles between the buildings and carports (see
Exhibit "C" - Conditions of Approval).
Staff Report - Gulfstream Gardens II PUD (NWSP 05-028)
Memorandum No PZ 05-204
Page 8
The elevations indicate that the buildings would be accented with white aluminum
single hung windows, decorative brackets, stucco score lines, metal decorative
shutters, horizontal sliding doors, decorative louvers, and aluminum picket railing.
The project would also have shade trellises and spa trellises located within the
recreation areas and water fountains located in select locations.
Signage:
This phase of the project is ineligible for additional project signage and no
additional signs are proposed.
RECOMMENDATION:
Staff has reviewed this request for new site plan approval and recommends approval, contingent upon the
approval of the corresponding request for annexation (ANEX 05-004) and rezoning (LUAR 05-012) and
subject to satisfying all comments indicated in Exhibit "C" - Conditions of Approval). Any additional
conditions recommended by the Board or City Commission shall be documented accordingly in the
Conditions of Approval.
S:\Planning\SHARED\WP\PROJECTS\Gulfstream Gardens\Gulfstream Gardens II\NWSP OS-028\Staff Report.doc
LOCATION MAP
Ii(,
Gulfstream Gardens II
H~t ~
~~It"lfj II L"1 V
-----., !-------J /
- /
o --:/
~9 ~ I ~
1 I SjV
~ I I
J
) I
LU
B
o
o
-J
o
I
J I
I
I
I
~
Lo
I I
I[
II I I
_aD
~ (/ I
/ ~ uLn
'I
'l I
I I
t==: 1 City Bonnd"" / J
I ..1. .-..1. III i I II ~ ir<=
, I I / ~... I
/
f fW
I I I ~
BSI;;_ j~ I ~
~~Y///////~;' r-- _ _ L-
- ->---
I I t; ='~=Ii-~!I~
/- ~
City Bonndary /
NIC~ I
\
f---
- -
-
- -
c------- _
-
I
I
7; w, 'MrRn\<
I
I
/
160 0
320
640
960
1,280
I Feet
Exhibit "A"
N
+
~~},
m
~~f
,'i~
~~~
a~~
,\i~
t~ \'.
~~
~
tp
-......
~~~
i~
?f
t~
~~
,.'1
~;
~XHIBIT
B
.?
l_~
'"
m
! ~ '" ~
~----
........
\.\1
"
m
h
.\)
b~
I~~
H}:
__ "'1
-~
----
---
---
~
'----,--'
.---'",
~i p~{;'"! JPX'T
!I ""'_tk
T>'F\C' ('fl'
~ I, lJ;n:f;.'l':r:\'~;[" ~~L;;~~(~-; I(/t.~~:-:\'" 11 )1\;('
'! ,[': lb~~:h ;..,T,,;V
IFI ",;j'::L,;',,::' ,;; '0~"",:;~,1'~~:';,::::,~;:~1;'\';1 ',11';
:Sj:';.J
~ q i ~
H ~ ~ ~
~ i ~
; ~ ~ ~;
~ ~ ~~
n ~~
~ n
~81~~~'~ g.
i~t~~~h ~i
.
~~~i~~~~
~1';~~i!;1';i'ii'i E
^
~~~;~~~!
~ U Iii! ;
i ~ ~i ~ >
. ~ ci
,I
"
q n n
H"'~V; ""'";' .... ·
;~ni~~:~ ~~~~~!~ ~iH !
~Ic~~~~~! ~~~gg.. ~.~~ ~
!;~~.~~.' ~.,~~~ n
!i~",:;;j~.! '11~'" ~~
~~~~~, ~, ~
~ ~ iOi 51
;.~"lSg ~"'~
.. "," ~ ~
~~ ' ,
; ~ ~~~l!~
~ol g~*!~~!~~ ~ !~ ~
i~ ~5;~~5;~5;~ ~ I~ ~
l~ .~~ '~'p ~ ;1
- ~ . ~
.
."~ m m ;;
.~~ ~~~ II
'"il m ~~~ .
'55 ~l~
"-" ~aa .~~
F c~l .
"'" ." ~
<> ~ I:;~
~c
~~~~
~i~y
;i;!
~g~~
~I~~
~~:'-'
O~~
..,~,...,
~,,~
~~~
;~~
ll)Qr:!
:raY'
oz.
~~~
- z;;;;
~~~
~Qz
zg~
r~1:
"liI~l~i
l ~ g II
iPH
! ,a
'" ! ~
! ~
: ,
i i
.
~ g ~ ~ o~
~ ~~ ~.. ;;:~[;:
~ b F . ~~
0> N ~s:
m 8 ~~
(Xl
~~~f~
. < z
~~~~y
~~~~!
~~~a~
~~~Q~
~~I~~
~~g;~
_;:;z~15'::'
~~~~
~~~~
d~:8
;r!1:li:-o
,..,m....):
~~~~
~~~i
~.=<z""
~~~~
,k;i~G
: ~~
~~~~
;H
"
-,
~ "'~
; ~"
>
~ -~.----~:----
~~. ~. ~-~ .
<" ;-:~-
~~slj
~~~;
m~
~c'
gg~~
"i"
~:~1
m
~g~
~Ig
i~~
~~~
~:r5
I:~~
.-~,.._.
GULF STREAM GARDENS
I OT"\A SHAH
~ ~DROTOS
~ & ASSOCIATES
I ENGINEERING
SURVEYING
PLANNING
..n ~
11-10-05 0Cl.
CITY OF BOYNTON BEACH. PALM BEACH COUNTY. FLORIDA
SITE PLAN / PHASE 2
Certlflccte of Authorlzctlon No. LB6456
3410 North "'ndr.w, .......nu. Ed.. Pompono hoeh, F1. 33064
PH: 954-943-9433 . F"'X: 954-783-4754
EXHIBITB
e-
o
"
~
a o'
c
ii"
c
.. "i!
,..i !:
.i!
"
-" Ii!
"
!!~
"~I
~!J
~:I
-!i
III
~If
I,
~l!;' l~ ~ 'I'HI .
i~P~ !~ ~ ~.;~,~
.Cd .~ ~ 'i"~~
iii~i 'i · bli~~
~~~:a .~ ! ~"181
~.~~ ~, " "hl
I" ~'l ,~" .
~~~ .~ ~ ..~"~
" ." . ~~"".'
2~"2 "~ ~ ~l:"~
!~~ i; g "i~~1
;~~ I.! ~.;io
,2 ~l .'..
~ ~l 1~~ ~
:*
.. .
OUClll"'O!l
II[VISi.-oU.U,COIIlICNtS
('
o
'Il ~ i2 0
~ ~~
. . .. .... ~ 1~1
~~U~~~h ~~~
~~!~nl~3 ~I~
~t~~~~~U H;
~~~~:J:Ji'l~ !~~
~~o<Jlh'" Hi.l
~"h~~:g :"g
.~.O"llil~ ~:'lt
~1-1~tJ~, _~...
rullt.~ ij 'I
~~iil3~ ~ ~ ~
l>.l;Z'~~ .. g UI
ii$l~ i; ~
~~~l ~ ~
~~~~ i '!.
..:::1.-1 I!
z~~~ . i
~ g ~
~ I i
~
"
~
o
"2
~~
3E
g ~~
v ~!
00
cO
'0
~~
-;;:m
rr_D
:pc
S:jj
om
:pO
OJ,
Op
m.2
ZO
"Hft
UO
I:P
l>"
",m
mo
=r
o
,..
~
a
z
'"
.'~ Hll ~<~~. H ~'l ~~.Bq ~~f
~l:!~l:a-~;~'l~j,;~;~~l
~i'~Hl.g1 .g~H.Jii.,hh-
;~;iif~:i !ljiiil[1:~1!
.~~"~!f'l ~fi&"l'~ .4~_
-{ll~it~ if~~~[~ ~!ii!
i("iHd i.t!ii! ~;h~
!~I-l!'[lJ~ 11i;Jit ~1~.~i
~ i~1~: 1 i.itr"' t~~l'
1 n:; ~ ..~~t!l~ '-8.i'~~
"'tJ u~ t ];~:f 3't 5'ii.~J
'-~g'i. I &Jf~~l~ ~ ~ ~f
!f ~ ~i ! ~'r;'Jg {j;a'
n l ;c i ~lf~~ >l ~'ti
~; " .! t ;f:~' ~ Jfl'
10. l i! " o!E.=~ . ''iH
!~ 8' !~ 1 p~ijt & ~~il
h j h ! ~ ..II i r "..i
~. ~ g.... ~ ~,l-l~!~
~l ~ g'l ii 1 ,rt ' ~;,U
~[ .." il PIl ~ r q-y
ji ~ i ! i iit : fiil
il i i f ~~'!4 J
~~
l~ ']
c~ '~ (\:.-
Ie
I~
f~
J. t:;
0 , , C1 .
" D , . ,. l ; ~ ~ ,. ~ ~ . 0 0
~ 8 .
~ 0 0 . ~ 0 ~
" u 0 0 <; '" ~
0 ~
;g " > m '" , I
" ~ ~
~ ~ , " " ;;; ~
., ~ -;;;: :n (; , '" ~
" ~ i ~
~ ~ ~
, "
r,
~ ~
<.1 "
;:. ij <-i
, 1-.:: 2 " " "
" " ~ ~) :> ~ 'j <> , , ~
.~ 'i 0 ~-r; 'i :> .
" .'. ~
, " i~
, . '. ,
" .
'j - " '.
F e-; 0 " " 0 ~
8 ~ ~ Ii
,. ;0; ,
"
c"
,,,
z~
~3
l
ci i
f~ '--'
;i ii, ;;; ~, ~
~ ~ ~ ~
.
(j) - '"
~ ~
" r
D ,
-
,', ,
< ~ ~ :;. ?
" , ~ ~ ? ~ 2s 0 "
0 '7i " " ; .0
^ 0 c' 0 ~ F.:
0 " " ;;
" , ~
~ 2 'i' ~ ;::: ~
') ~ <
0
>0
",
c
f!i' ~f
.~
g ~ ;:;:;
.
;: t.' ~>
.',,,
~ f 0
n"
" ~ ~~ I
, , ':i I
)> , I
zt
....
E 2
!I E Gl
. i "
~ r- I
)>
.... 2 I
I I I
?- ~ ;. 1:. :L.
~~ '
EXHIBIT B
#
------Eli.... ~-=::~lt'. ,-______
-----..... \. "-lEli-S"~
--...:.:=>~ '" /
~~' '
:p
· ~ f EEl>
g I! ~
II ~
~U
)>c
CJl....
(/lo-
OOl
()::J
iii'
ar
(/l
~,~,
i:I :;:
..~
~~
~ ~
~ ~
= ~
~
~
s-
f>
EXHIBIT B
"Ii
& . .. ..:'" f g- ~ ~ ~
:: ~~.~~nH!~HnHHn
'1 "I'! I o!.~ " "tl' I"". , · ,- '..' -, -:--0 . r-
hll!!iII111ihil !1i'hl!l! \:"--':?"~-:.., ~ ~1
~t~f}~~ ... ~J.h:llI. fil~~!ln~,--_~/ L-_~)'i. ~i~ ~ _,_
iiI;;!, l!;, 'h'll III '11' H / "-'- ~ .0._
"'/1', 'I"l.,." "'''.'" / ., . . y:-;,
[~!~IH i~i lH1H iHiH~!~-37. f~ I 1t".... _ _ /. .
.~H.-~ Z~3 .1" 0. '. .~t _. /. I.. !'-../J"~ ':r.. _ ..
,. "1, ';' " .1. ,,;,;,.,; _ L.",......
J~ t, I 3 i'l'. ''ll'' ~llf'9t !}-:v,.7
..,8,11 ill &~".!ol! ~1I"'1~.E~>>~~.:~t7~.
}:iI1F 'l! i'll'lll ..Ili ~~J
t'th! II! lp'h ~ {n~1 ~ _1\ ,(!
"i'ti~ (~i I~~ihl 51 "Hi}
SfiqJ[o., ,.~t,H.. I~
~ - -ad> I ! & ~ ~ ,~
~!~. I i l
.. ..
~ ;;,
'';; '('!
i-: ~
t >>;
( ;!>"" -'C-J. G=' 11
.. - . 0 ,\ ,::~.~ ~11 $1 ~ q!l1ij!J
!(I~'~,ol'~l; " ", '~!l W\t1i "i
"., "" " u "'" '..
-,..~ ^L . fTJ\..<.g.1 ~.
Tm" · '<, / ;tJ,~' , ',~ .
"1!1'"1 I~ ~~ v~; " eW'h u..!:. --;
o
;:: - H lP~ !:l'!ll~ ~1 ~r1 y-: ~ :n~\~~e~ ,
Ii Ie i"'" ;;;:~.' ...;;. " =, 1 \ " '::.{; )
. ':.,'~, ,i ~ rf[!j l' i ~~ ~$ ti i 'liE 1
.: .,1 ," ~;:.'~ I?t" t~I' ,,4",_~"'(L. J~ 1,~iM <1l
I! i!' ~i !l.~!I: ~I~I'~.~'~ ~ !~~ ':, ;~ ~
.. ";; ,,~ ~'. F "U"~ : l~, "~ !?i-R' ~ II ~ -;-j ,
~: ~h ~.; ~,e r :: j--,~ I III ;;, D "1 "' l,f I 1 "'.
';!";'(i,W,1=e :i~ ! 1 .' ~'"O" liP: '4'
:;', ~ d , r TT1, I I tr " , ~ I 'I Lh ~ ~..I 'I ~ I, I
; ,;' .r II -'-l: : 1\' , aH ~<8l I~I I' ")
c i~ r 1.1.........," I I ~ :;I n, " r1-J f'1 ~ 1k,I 'I I I \.
'I=]II~' I ~<f.D ~ " 'II "']
:r- ]11 --f I I' . 'i' A I . f\ t--- ;1 d -, If' ti
H~ f-:II i I~ ~ " ,I ; 11,r-t9 I ~ 1P1J1.IX ii
'4-R : .. ~ J t...j i
'LL_ I'I~; !_ ".""-" ~'~ ~
.r iii ,I I.: ~.. ~ '. 'I "L :; ...j , :---,
.r--iif;j I ". tI>J '- ~t--.:: \ J "'"
r~+-: II~ J 1 ~:l" ~~~'" , ~~
O ,../ I c<< ~,~ '" \--,.
· 1 0","", ~, t--t
. . I "" 4. '" ,(l., ,_ ~_
r
" " fD ~ 'I r t." y ~"". .",. ,""
· lwz. fJ! F=1~'hi j;:;""- - -, '~!?"!;l~J: ~~ It, ;:o~1 i f~~ ~, ~,'
' , "00 v ,. " . .
'~ h 0..' 0 , l
"'11' · i I 11!1f!! d 'i :i r j =!
L .,
. .
Z
Gl
"
....
)>
z
~ .
~:n:j )
~~..I.,.i
~?:JI
"",'
~'~
I~
), Ig
,- ,;: ;--, ;:1
:. I p!
~ ~
:; ~~ ~~
c,
~; ~~ ~ ~
'I il II !!
~ ~nn
';~~~R~;:
.....<
9 2~ ~
7'i'O .,
S ~g
,- '"''':
';~
.m
~~
t ~,~
ft.::,
,
~ ;~
;' <;;
~ ~ j - ~
nn
~;r; .;
~!: s
:1
~ ..
: ~ EEl>
,~HIBIT B
ei.
..~
H Pi~fHHFHU~Hn~m n~;
Hi ~~!dll~ilt ~~~P~~11i~J; tl
hS~l~i=~t~td~-li f1~~~iit.q~
.B~~i~~~ Ih}!HH~a .~~~~~:~H
~Hn... "'_[PH~a~ ~{l~ ~.J:~
~,."p' 'l..t &~ ,"iO _'i!'~-
!q,[1,H J a-nf.li l>V "Pgi
,,{i'~H ~:~i1~~iH ~~!! 19H,
~~~~F5 .l!Hi~...H~ "H~ H~.!l
~:r'Hi i~~{ihl~~ Hl'.i .H~~
:i;~;t,~ f~2"fi~"9~i il:~ 1!~i~
~~i~l~j ~{a ~<l.! ~ iHi . Pu
5j,,~.i1a !lit ~lHlt H~~ {i~a{
~~g'i!."'. i~i ~ ~ ~ -- w "P'
~:i~[i{ Ial {~;ti !~ i ~~!~
<l.d ~H [Ql J~:H i; ~ fj ~i
q ;11 g g {!:o~ 1 !2 ~
... ~ D.
.['~ "'J.
,~ ~:
c~
:~
.~
~ ~~
.'....1..... ,
:~~!
66 mI
_ r ~ ~
~~ ~~" ~~
:;;;
l:,'7
,
"~ ,.::'
,~ ~
~ ~ r'
'.
~~ ~~ 0"
....
,.
.~;; ",;,
;')
~'~ ... r"
~~ ;'l
~ ~~
~';' ~ ~
~ ';
.,-+
r;-~~
c.>
"'tJ:;
r.l
:o-c
z#
-f
Z
Cl
...
r-
:0-
:z
)>C
(/I.....
(/10"
OW
OJ
iii'
it
(/I
~
,," ~"
~ ~
~~
~"S;::
~.....-..
~ ~
'" '-..:)
-~
-~
?I "'I
I
II
f.
T - r ~
~ ] , < < ~
~< ~a t
~?
- " ~
,,,.,0 I ~
n~ <
~
~ 0 . ~
~ " E ~ ~ 0
~ ~ ~
l~' , ~
~ :~ n
0 i w
c, i
~ ~
~ i
'" ~ I
2 ~ ~
~
~ '" < .
" " ~ "
0 0 " , F 0
,
0 0 <' "
, C ~
C <) " Q > C, ~
" "
~~
<
ili
.'l'
Si. 9~1~lBl ~HHn~"ilrn~~ n~f
~ t i -,II "W; ==N"lI1"!_Il"ll- ~Ii-u
~ .jl ~.liH .1~.ii~igJ P'H"'~iq [
!.'i~~-=~ g~-~~-.f f'~l~a' ,
H~n~i:~i~Hi~t~ Il'f[!~~~''H
~f:i~~ l:ti~j~1 a ~.~.~~~~l~
li~~lfJ !!fgili~li ~!~~ ii,lt!
. ..-.1l all~..-'a ;.... ~! ~f
~\~ni ~lll 9d~' ~&jf. il~
.~'@lqlf ~h...nQ! II l ~~.-if
l~Pi,~ .Eih['l_fgs -t~~ ~.~h
~'t:.;! 2~-'~!31i[ ~,;~ ll~~'
~....~! . i~~-[~i J!l '1.- f"~h
~lhi:i hi u...!.: .h{l IPH
J~~hl~ iJl ~~1"11 f~~f file~
"lll'l"!~~ iH ~~':!~ i; "! .H~
~~~f~I Jti {8~Q~2 ~ a a=J~
'.H~~- -i'9' .~i!t~:; ~,.'
\..q[ [.! HzH Ij ... ~.~~
~ ~o.Q.l '1 ~~:>CI~ 1 ~! 2
.. '" ~ \ . ~ ji= {1.
EXHIBIT B
" ." .... . ~ g> )>C ~ ~-1 ~~ ,,~
<:i:::T
r -< ~ am ~ :::
l> ." 4~ (/l'" St
z (5 ,. (/leY ~~
.... l> "'- ru all) :tc
Z r ~jt ("l::l ~~ .... ,"'
::: Gl II! C:-Q, iii' ~ "
r ~ c iYi G) t' ;
.i:. ;::: (b g ~
c = ~
Z m (/l ;0
Gl 3"
"
)>
r
C
~
2
C
~
"
m
2
o
m
o
m
-I
;!:
r
1.
~
!
I
in!
Ii ~~
-t i
~
1l U~ t
8Ui ~
r ~.- .
;;J J!d1 ~
z ~ ~
o . 1
m ~,l
Qo i~-
~~~~~a~ ;;
-I~,&iP. .
m I~ilili i
o.~i?l~ ~
~ ~~~t~ ~
;!: :~Ia~
r ~l~~l
J'
I~ Ii i
~I a
~
8~:il~!
'.~~pa
ft~~~.~
~.'U.
~~~i :!
1~1in
1', !i~ -ii~t~
5l~ ~alr-
~ii ~8lia
JJP ~MI
n.2C1iow.liI
il~~a~
1~3ii~q
~~r'
~ ~q
m i'~ ~
~. m
)>
~ r 8
~ ~U ~i i; ~'i t:
I ~~ n i ~~ ~
a i~
6 1 " :i "
!!! J'
-t ,~
m_
0"
m
....
)>
i"
'"
l> g: t5 t:: ~
o a ~I~
-I 0 ~
N i
".
~
il
~
>>
~
::u
:!::
(J)
m
o
1l
r
)>
2
-l
m
::u
~
)>
r
r
o
m
-l
)>
r=
I
L
I
i---.-..
lu~
I J~~
I i~:
! ~r;
i ~~3
\
I.
I ~
II
i~
L
i~
~~
i;'
~~
l~
d
.r
\
a:
F
~i
I!
l'
~
I
~
I
I'
il
1
~,',~ ~$
, ~~
!.. 'Po::'_~' .
~~ ~~
g~ gp:
g" 0-
-
EXHIBIT B
au
r-" m
D-l
0<':
-,
x -
ffi~
:r:
Gl
:r:
~
p
-<
;0
b
~
1
- i
II l,------1-ri\
~~
mE
"
s
:.;';
~. J:
~
!!.
"0
mm
o -j
m)>
;OF
~~
:r:
Gl
:r:
:?'
)>
-<
;0
b
?E
IJ
I
~
.-
>>
o
,.
o
<--l
!1
b
~~
~
~ ~~
m)>
i ~i -t~ ~.
.I --t' ~~~, HJtE
:fi::z:m .
-~ )> ~ ...
;; ~-
a...!!' ... B..l
:2: 12
"' {'. I .
& l' 1.1'.....=:
! ~ ~E~ ~~
Oi rn~_ UJO
w ~~~ ~
GIH~
~~~
'>6
~ ;--1 ~ ~
i ~H ,,~r P' 0
Q ift ~~ ~~ R~ C
J ~~ :& ~ ~~ ~
~ ~1 ~~ h 2
a
)>C
CII""
ClIO"
olll
o::l
fir
CD
CII
~@~
.g'irI
~ig
;rf'S.
~ LCO
\;~ \;"
~.::::
~~
~ "-
... ...
~ ~
-~
- "
~
~
Gl
a
-5
~
j,::"I/;:';
," ,,'.'
'-.-r.b
': ~ :~-I'i ,I
; I.\.'~ r~ :,:~ :
, 1-- Iii
l,~rlr-.l '~"""1
~ ! L,,~;...' \\ \U ,,! H'~~ " ' ~; \::1 I:' J!
" !~~ --t~l'~
" 4f'-'"""~~__~ '
L ~~;~!1i i '
"'" ~~ h\ L
,,' H~:' ,,,_\U,""~lH,,,,,...,tE'h...".~,,,,-.~tF,,,,'_",';H--' i ,- ....,) '>-" 1
f'&'9",' :,."",~,:" I, r
'ilf!l "d
r
\11
I,
~~ ~
MtJ'i
tj ~ t~
m
;:~ ~
~1~~
>~ '
~~ ~
:;of~; .,
i~ ~
" "
~fd'i1 \g~
. W'
'f! 1_
~-T-~
"~'"~ I ~r-:~'-:-i"-]
r nil" ~ ~ j I, ','
l ~..~" i
~"I,Jl5"~'~QF~'rn"-+~' film", 1'"
L ->, ,. ~ ".Ii. -
\~J[~ "W, './ ~ !
:[t:.,;;C'~; ~ ;1:"&-;~7
,s ~? ,tL~._"_,,,_.J,
t1 ~il_ _______::mc:r-~ ; r
"\U"'~ '
kJ=1 .~ '~.~ (I r .- I
~ib='f=iL~"TI):n~" .
! ""'j:[', 1r'!t E;~'--~'.l
!1' 1\1 I ~,..""."'-._"~,,,.~~
I', fi~l" ~ nj," l'
1",',', ~ ~ 7.t:,TiI~~
- -- , ~ --:lduttL~~
I
ft~~
;j;l;j~ i
;I~
rn
'I
I't.,
L'
i
,
I
<
jj : j , ;11
~ ~ r~ ~ J: ~ In
{~~~~~~,Q! (0
(lh tII~'" [,; ,'!],
~i~;3~i~ v
l;di"'T~ o;:!
Ie "r ~:~
:~~~I~ l- ~
i AI 1_" ')
~;I~ ~I~ ~
~!~: ii
~ { ~i i ~ l. ~ C
~ --j I lj~ ~~ ~ i;'~ !
U
/
n
l~ \
',<
,.
<.
~i f'ROTF'T
~j O",..'i-.iEl?
[.: n
EXHIBIT B
;"'
n'~.-.~
....,b ""''
1~1 HI
;:
I
.~- -I
v;~
i"
T-;F:'\!.: \"O'\.:)I'1.T1",:C CR01'f' 1\("
~'1\,H1TEi.1':,hr: ,H,,(;,hEEhJ:'.l- ;L:I\~,I:\h
3
Iji
I,
;:W14
'1 Ibf:,-h ;;fHf;:;-" r,q,\\H j!'PH,:!:A VI.-,'
TEL \::0:"1} l}-1;)-,~"174 P'A\ (:.'1orll g,:V)--Ibl')
A!, 1;110:JWf, l';ll-D'.l"ti5<.';';. m--COUnJ4f~
1 r,<
-J~ '--70: '
~---- / ~
//::1
~/I
I
I
I
,
i
I~I nl
, , ~,
it"
ii.! (II
,01 \,;1
I
I
i
.~, ::1
'_.___ i _ _ .__'___'___' _ '~'"'' :: i
~ ~"::i
I rtr- --'::11 X-~ '
_._-~c----_-.-_jL...ll_~_-_,~J 1
..~!
, ,
.L t
!
I
?!)J~~'jri.l
IR,~,~~~~~
l~~I~T~~~~
, OJ
~ ~~ \ ;'-; C ~, 2 \
_\1 ~ U~ '!{~ i'J f
(j\ ,1
\~\
==
~i PPfJ,rr.r-T
l;
:f~ '"l"iil-B
'1')~ ;:;iq1
EXHIBIT B
..t
.-..------';/'
/~
"
jl
! H
f' : 1 ! ~:
'. I
:: I
Ti 1 ~ I
~,~~ I
I:...... ,
!i'l ""'" :
~..~' ~ i
lll7^1
" I
" I
:i./, ( ,
lIi .'"
\': i li---..n-,: n__ ~
~__ - __ __n~
'.
II - ;:
\ I: '~"''''' .....
I /p~m ....~W'
t:: / I 'i n -;: -' .
J J:____~_ : ~~ 1:1 ..
t)' n .-... l -- J. _.n.-__.-_-___ I
-J----
I j'
, ,
P' '-\~~F' II
TSEV; nr.:;-:I1LTIV: CTwn' l~;C
~+:lJ:rECT 'f{.,.: . f~:,.~;f:~~::'l'.; J'L'\,\\I\i:
LC
:1 \:<: lbl'i:h ::.:n-<F-:~- ;,~IA~q [.Lnl;:l',,\ '):31.;::
'ff:L i~\l)f1 9Y) ,~r'4 ~'AX (:\0"\1 ~J.h lhl:S
AA--'J(10JI6H EB :)'llJIL:':~ . IB ,.::lUIO,If,
". H& T C',\,[[ C~l"'![NT .',;ojU....~'~""i"" It..."~""'~'-...;,.~ J':':'~
:';::';';''';;_'B...",,,,_,,,:l!:
{!'
f
~I~
'.
~.
\~1
l:
i
I'''f~- if-
I,r Ii
~I
"
~} ~.~
"l.
~ ' -;r,
m
m
~)
J:1
~"" .
~r(r~
ill!
~
~ r
J
; H
~ ~f
T<'F~'-C C()"\:;-.::;r,Tl"~l': ~~;FnlTp :i\('
','r', ten;i'; U,' ,-'u.~.\l';"
;'LnRl i,\ U\i;"
'iE~ "~Ii~'\ 1-J.t') fA,-"! i'\O",j +;,T) Ihl \
,,\}, ':~)~):H0fi ELl :}'l'lti~)~::; . III uGU1~:!)f-.'
EXHIBIT B
.'
rlD
i:n
'Urn
','lI HI
m
(\ i':
--j
\)
/
~ 1\'; i
" ,I
m:m I
2: ,
~
. ! ~
-r
;' i~
I;
if
Hl'bl'"
1m i :~'l
'-: r
~ ~ -"
Hi;
,
~J
,t!
': ~ ~ ~ i~ ,..,' ~
l!qp1llli
;:' ("
) J " l 1 _oj n
un -~ ,~ -ti 1'. -ri III
m In F: III :11 rr m
lni~ !lIP 'HI (\)
I ~~ \f -l-- \>' '-' c: 01
~;~~):~~7'l
=-~ i ~ <r: :11 o~ &
(\
Ilj.II"1
[,' 'r
i~'
iflJ
'j"'
r~
m:,",'
'I> ~
:1:"
n~
(\
:, PRfJ.n:C'1'
I!
j~
L. L C
"1 \.L 16f": h :~ri-g::':--' Mj,\\H FLnpJ';,\ "j:;!l':.;._
TEl j'1,}""',j 1..)1') -H,~.t ,"\\ r;\{);11 ~J-;-'-)--lI_;n
.';.\ l:C:J:Jl!Y: EB :)..j,lt,5::::. IH;.:O~)lU'lb
~;lYr,a II
P:!~,"F !]
EXHIBIT B
~:)\ ~~'~~Jt
~~~~~'\.,.~h'
;,,'~~'i" >~;V: ,,-,,~->,,-,~
i~:':(' 'f t (~ ;'-"':~~:':>
, : j '", ''-'",
/1V~
ii lEE: . ' ,
I
I
i:"~' IIu I
:1 ii" \ trnlj
ill' " m:Il!
,I ~____,
I
i!
~ml i~:,'i
/~
,
'.
l
\
1
I.
11
II
I!
ill r~I.11
: ::J~ ~JJImJlpI 'I:iTf
l' ,7"">I'5'i"l'" I',i' 'w
AI tifiL ri i j:Ji ,J':
,,11~ ~l~J~td I Inn!
\) 'cO-C"" I
;BLt~L
J:"I,f1Wt;,
!IIi'"
II
l'
I
I
,I I' 1'-1 I.' II
I, ',~ "'-''-'\" . 'I ii" "+,+ 'il
I' i'.L i ~
I] '!.' , I l ",~ 'I'
o '11ld
"met
I I: [;i:
I I I
~
,\,);
i~
i
i
~
.'w
T~I:::':(~ CO':;:;:1 Tr\~C; C;F~n1 'r E\('
.",..;J,TU-''L f;:;:. . HI: ~~::;:;"'J:'" ;'Ly\:';I',,;
<j'<'---;~()q'f
EXHIBIT "C"
Conditions of Approval
Project name: Gulfstream Gardens II
File number: NWSP 05-028
Reference: 2nd review plans identified as a New Site Plan with a November 18,2005 Planning arId Zoning
Department date stamp marking.
DEPARTMENTS INCLUDE REJECT
PUBLIC WORKS - General
Comments:
1. Prior to permit application contact the Public Works Department (561-742-
6200) regarding the storage and handling of refuse per the CODE, Section
10-26 (a).
2. It appears that the compactor for Phase I will also be used for Phase II.
Adjustments to the frequency of pickup may be required to handle the
additional waste stream.
PUBLIC WORKS - Traffic
Comments: None
ENGINEERING DIVISION
Comments:
3. Full drainage plans, including drainage calculations, in accordance with the
LDR, Chapter 6, Article IV, Section 5 will be required at the time of
permitting.
4. No off-site landscaping would be allowed without consent from the
Engineering Division of Public Works. The proposed plant material within
the right-of-way should not be included within the plant list because it is not a
part of the property.
UTILITIES
Comments:
5. Fire flow calculations will be required demonstrating the City Code
requirement of 1,500 g.p.m. (500 g.p.m. some residential developments) with
20 p.s.i. residual pressure as stated in the LDR, Chapter 6, Article IV, Section
16, or the requirement imposed by insurance underwriters, whichever is
greater (CODE, Section 26-16(b)).
6. Add a Permanent Sampling Station on the west side of Building 26.
7. The City's water capacity, as increased through the purchase of up to 5
million gallons of potable water per day from Palm Beach County Utilities,
COA.doc
12/07/05
2
DEPARTMENTS INCLUDE REJECT
would meet the projected potable water for this project (project estimated to
require a total of 46,000 gallons per day). Local piping and infrastructure
improvements may be required, especially on the water delivery system for
the project, depending upon the final project configuration and fire-flow
demands. These local improvements would be the responsibility of the site
developer and would be reviewed at the time of permitting. Sufficient
sanitary sewer and wastewater treatment capacity is currently available to
serve projected total of 22,000 gallons per day, subject to the applicant
making a firm reservation of capacity, following approval of the site plan.
FIRE
Comments: None
POLICE
Comments: None
BUILDING DIVISION
Comments:
8. Buildings three-stories or higher shall be equipped with an automatic
sprinkler system per F.S. 553.895. Fire protection plans and hydraulic
calculations shall be included with the building plans at the time of permit
application.
9. CBBCPP 3.C.3.4 requires the conservation of potable water. City water may
not, therefore, be used for landscape irrigation where other sources are readily
available.
10. A water-use permit from SFWMD is required for an irrigation system that
utilizes water from a well or body of water as its source. A copy of the permit
shall be submitted at the time of permit application, F.S. 373.216.
11. If capital facility fees (water and sewer) are paid in advance to the City of
Boynton Beach Utilities Department, the following information shall be
provided at the time of building permit application:
A The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
B If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
C The number of dwelling units in each building.
D The number of bedrooms in each dwelling unit.
E The total amount paid and itemized into how much is for water and how
much is for sewer.
(CBBCO, Chapter 26, Article II, Sections 26-34)
COA.doc
12/07/05
3
DEPARTMENTS INCLUDE REJECT
12. At time of permit review, provide a completed and executed CBB Unit of
Title form. The form shall describe all lots, parcels, or tracts combined as one
lot. A copy of the recorded deed with legal descriptions, of each property that
is being unified, is required to be submitted to process the form. The property
owner that is identified on each deed shall match.
13. At time of building permit application, submit verification that the City of
Boynton Beach Parks and Recreation Impact Fee requirements have been
satisfied by a paid fee or conveyance of property. The following information
shall be provided:
A A legal description of the land.
B The full name of the project as it appears on the Development Order and
the Commission-approved site plan.
C If the project is a multi-family project, the building number/s must be
provided. The building numbers must be the same as noted on the
Commission-approved site plans.
D The number of dwelling units in each building.
E The total amount being paid.
(CBBCO, Chapter 1, Article V, Section 3(f))
14. Pursuant to approval by the City Commission and all other outside agencies,
the plans for this project must be submitted to the Building Division for
review at the time of permit application submittal. The plans must incorporate
all the conditions of approval as listed in the development order and approved
by the City Commission.
15. The full address of the project shall be submitted with the construction
documents at the time of permit application submittal. If the project is multi-
family, then all addresses for the particular building type shall be submitted.
The name of the project as it appears on the Development Order must be
noted on the building permit application at the time of application submittal.
16. The garage for the handicapped adaptable units shall comply with the FFHA,
24 CFR 100.205.
17. Calculations for the percent of permitted wall openings shall be provided at
this review stage and comply with 2004 FBC, Section 704.8.
PARKS AND RECREATION
Comments:
18. Park impact fee 108 units @ $771.00/unit=$83,268.00
COA.doc
12/07/05
4
DEPARTMENTS INCLUDE REJECT
FORESTER/ENVIRONMENT ALIST
Comments: None
PLANNING AND ZONING
Comments:
19. Approval of this site plan is contingent upon the accompanying request for
annexation (ANEX 05-004) and land use amendment / rezoning (LUAR 04-
012). At the time of permitting, indicate these two (2) applications on the site
plan tabular data.
20. The Special High Density Residential (SHDR) land use classification allows
for up to 20 dwelling unit per acre. Based on the project acreage, the site
plan would be limited to a total of 109 dwelling units. At the time of
permitting, eliminate one (1) dwelling unit and submit a rectified site plan so
that there are no more than 109 dwelling units.
21. As part of its projected concurrency review, Palm Beach County Traffic
Division is recommending the provision of an exclusive left-turn lane onto
the proiect access driveway on Federal Highway (within Phase I).
22. The existing telecommunication tower is a legally non-conforming use. As
such, any modification or relocation of the tower shall be in conformance
with Chapter 10 of the LDR's.
23. Provide a detail of the fencing proposed around the telecommunication tower.
An eight (8) foot fence or wall shall be required around the facility.
24. At the time of permitting, on the site plan tabular data, correct the number of
provided parking so that it accurately corresponds with the graphic
representation.
25. At the time of permitting, provide a floor plan of the one (I)-bedroom unit.
26. The project must obtain approval from the School District of Palm Beach
County regarding school concurrency prior to the issuance of a building
permit. It would be preferable to have this approval prior to the Community
Redevelopment Agency Board meeting.
27. All building elevations, including the clubhouse, should correctly indicate
paint manufacturer's name and color codes (Chapter 4, Section 7.D.). The
paint details proposed on the elevations should correspond and match with
the paint swatches.
28. All trees, if proposed as trees, must be at least 12 feet in height and three (3)
COA.doc
12/07/05
5
DEPARTMENTS INCLUDE REJECT
caliper inches at the time of their installation (Chapter 7.5, Article II, Section
5.C.2.).
29. Fifty percent (50%) of all site landscape materials must be native species
(Chapter 7.5, Article II, Section 5.P). Please categorize as follows: Canopy
trees, Palm trees, Shrubs & Groundcover. On the landscape plan), indicate
the total quantities within each category and their native percentages.
30. The plans propose landscaped areas around the entire development. In order
to ensure proper maintenance of the landscaped areas at the rear of each unit,
staff recommends that they be maintained by the Home Owners Association
or protected as such in the Home Owner's Association documents, so that no
individual property owner removes any of the required plant material along
the perimeter of the PUD.
31. Because there is no master landscape plan, staff recommends that the plant
material and landscape design of Phase II be consistent with the same in
Phase I (in perpetuity).
32. Staff recommends matching the roof styles between the buildings and
carports. The tile roof styles can either be Nordic Maple or Nordic Redwood.
33. Staff recommends substituting the emergency ingress 1 egress point (proposed
at the northwest comer of the subject phase) with a third point of access to be
used by the residents only.
ADDITIOINAL COMMUNITY REDEVELOPMENT AGENCY
COMMENTS:
Comments:
34. To be determined.
ADDITIONAL CITY COMMISSION COMMENTS:
Comments:
35. To be determined.
MWR/elj
S:\Planning\SHARED\WP\PROJECTS\Gulfstream Gardens\Gulfstream Gardens II\NWSP 05-028\COA.doc