CORRESPONDENCE
The City of Boynton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DMSON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
February 13, 2006
Mr. Chris Hair
Anderson Architecture, Inc.
399 W. Camino Gardens Blvd., Suite 202
Boca Raton, Fl33432
Re: Quantum Park Lots 15 & 16
MMSP 06-001
Dear Mr. Hair:
In response to your request dated January 12, 2006 for the administrative review and approval ofthe
modifications proposed to the above-referenced approved site plan, depicting the following:
· Addition of parking and associated drainage, landscaping, and lighting (as depicted on the
attached drawings).
· Addition of two (2) equipment enclosures (as depicted on the attached drawings).
Please be informed that the proposed changes on the revised plan date stamped 1/13/06 and revisions
dated 2/1/06 are "minor" as defined within the Land Development Regulations, Chapter 4 - Site Plan
Review. This project may continue to be processed by the Building Division as a permit application,
subject to the following conditions:
1. The Paving & Drainage Plan (Sheet C-l) depicts an existing curb cut onto Quantum Boulevard, at
the south end of the project (new parking area) not shown on other plan sheets or shown as further
south (adjacent to Phase II.). Please ensure this discrepancy is corrected at the time of permitting.
2. Discrepancies were noted between City of Boynton Beach Standard Details and the details and
notes provided on Sheet C-3. Please ensure all details and notes agree with City of Boynton
Beach standards at the time of permitting.
3. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6,
Article N, Section 5 will be required at the time of permitting.
4. Paving, Drainage and Site details will not be reviewed for construction acceptability at this time.
All engineering construction details shall be in accordance with the applicable City of Boynton
Beach Standard Drawings and the "Engineering Design Handbook and Construction
Standards" and will be reviewed at the time of construction permit application.
5. Please note that changes or revisions to these plans may generate additional comments.
Acceptance of these plans during the minor modification review process does not ensure that
additional comments may not be generated at permit review.
. Page 2
February 13, 2006
Be advised that the proposed changes may require a modification to the building permit. Please
contact me at (561) 742-6260 if you have additional questions.
Sincerely,
Ed Breese, Principal Planner
Cc: Karen Main, Plan Review Analyst
Laurinda Logan, Senior Engineer
Kevin Hallahan, City Forester
The CihJ..!d Bounton Beach
DEVELOPMENT DEPARTMENT
PLANNING AND ZONING DMSON
100 E. Boynton Beach Boulevard
P.O. Box 310
Boynton Beach, Florida 33425-0310
TEL: 561-742-6260
FAX: 561-742-6259
www.boynton-beach.org
January 27, 2005
Mr. Chris Hair
Anderson Architecture, Inc.
399 W. Camino Gardens Blvd., Suite 202
Boca Raton, Fl33432
Re: Quantum Park Lots 15 & 16
MMSP 06-001
Dear Mr. Hair:
The City of Boynton Beach staff has reviewed the revisions to your plans for the above-mentioned
project. The following comments are being forwarded to you for your review and response:
1. Provide a drainage plan showing how the addition of the expanded parking area will integrate
with the previously approved on-site drainage system.
2. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate grate, rim and
invert elevations for all structures. Indicate grade of storm sewer segments. Indicate material
specifications for storm sewer.
3. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6,
Article N, Section 5 will be required at the time of permitting.
4. Paving, Drainage and site details will not be reviewed for construction acceptability at this
time. All engineering construction details shall be in accordance with the applicable City of
Boynton Beach Standard Drawings and the "Engineering Design Handbook and
Construction Standards" and will be reviewed at the time of construction permit
application.
5. Provide a revised Landscape Plan that includes the new parking area and the modifications
associated with the two new equipment enclosures.
6. Provide a revised Lighting Plan that includes the new parking area.
7. Indicate that the doors of the new enclosures will be painted to match the building color.
8. The new parking area appears to add 61 spaces as opposed to the 62 indicated. Please correct.
9. With the addition of 61 parking spaces, additional handicap spaces are required. Please revise
the site plan and site data accordingly.
10. Please note that changes or revisions to these plans may generate additional comments.
. Page 2
January 27, 2006
Please submit revised plans reflecting the changes discussed above to continue the review of your
request through the process. Do not hesitate to contact me with any questions or ifthere is anything I
can do to assist you.
Sincerely,
Ed Breese
Principal Planner
CC: Karen Main, Plan Review Analyst
Laurinda Logan, Senior Engineer
Kevin Hallahan, City Forester
Page 1 of 3
architecture, inc.
January 31,2006
r;-~'~i-~I~'--~.'- .~~ '-". .
I I'D l~ ,'n if" '
II n ~ 1--"'-'-"" ...
!In,! ~ I r. .~'
ilJUl reo (, J
!
Plans Reviewer - City of Boynton Beach
!
<.,...-."",,---..~_.....-~--~---_.
I f'! : ~ ',,' , ~J
L___,__~.{_,.~ ;~~~:..~:~i..~" : J
RE:
Quantum Corporate Center
COMM:
05-047
MSPM Number:
06-001
The following is a narrative of our responses to the comments generated during site
plan approval.
1. Provide a drainage plan showing how the addition of the expanded parking area will
integrate with the previously approved on-site drainage system.
Response: See attached drainage plan.
2. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate grate,
rim and invert elevations for all structures. Indicate grade of storm sewer segments.
Indicate material specification for storm sewer.
Response: Above information contained on attached Civil Drawings.
3. Full drainage plans, including drainage calculations, in accordance with the LDR,
Chapter 6, Article IV, Section 5 will be required at the time of permitting.
Response: Noted.
399 W. CAMINO GARDENS BLVD. . SUITE 202 . BOCA RATON. FLORIDA 33432 . V: 561.362.0220 · F: 561.362.0224 · www.andersonarchitecture.com
M C001997
Page 2 of 3
4. Paving, drainage and site details will not be reviewed for construction acceptability at
this time. All engineering construction details shall be in accordance with the
applicable City of Boynton Beach Standards Drawings and the "Engineering Design
Handbook and Construction Standards" and will be reviewed at the time of
construction permit application.
Response: Noted.
5. Provide a revised Landscape Plan that includes the new parking area and the
modifications associated with the two new equipment enclosures.
Response: See attached Landscape Plan.
6. Provide a revised Lighting Plan that includes the new parking area.
Response: See attached Lighting Plan.
7. Indicate that the doors of the new enclosures will be painted to match the building
color.
Response: See note added to Sheet A-6 calling for the doors to match
the building color.
8. The new parking area appears to add 61 spaces as opposed to the 62 indicated.
Please correct.
Response: The net add is 62. The original approval was for 206 spaces,
the newly proposed is 268 spaces resulting in the 62 added spaces as
part of this request.
9. With the addition of 61 parking spaces, additional handicap spaces are required.
Please revise the site plan and site data accordingly.
Page 3 of 3
Response: With the addition of 62 parking spaces, the total provided
parking equals 268 spaces. The Table in FBC Section 11-4.1.2 requires
7 HC spaces between 201 and 300 total provided spaces. We show 7
HC accessible spaces on the Site Plan.
10. Please note that changes or revisions to these plans may generate additional
comments.
Response: Noted.
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 06-025
TO:
FROM:
Ed Breese, Principal Planner, Planning and Zonin
Laurinda Logan, P.E., Senior Engineer ".
DATE:
February 1 0, 2006
~--
RE:
Review Comments
Minor Site Plan Modification - 2nd Review
Coiltronics (Quantum Park Lots 15 & 16)
File No. MMSP 06-001
The above referenced Minor Modification, received on February 1, 2006, was reviewed against the
previously provided comments provided January 25, 2006. Following are the remaining conditions of
approval which may be addressed at the time of permitting. Please note the addition of two new
comments/conditions generated during the review of the revised plans.
1. Please note that changes or revisions to these plans may generate additional comments.
Acceptance of these plans during the minor modification review process does not ensure that
additional comments may not be generated at permit review.
2. Full drainage plans, including drainage calculations, in accordance with the LDR, Chapter 6, Article
IV, Section 5 will be required at the time of permitting.
3. Paving, Drainage and Site details will not be reviewed for construction acceptability at this time. All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application.
4. The Paving & Drainage Plan (Sheet C-1) depicts an existing curb cut at the south end of the project
(new parking area) not shown on other plan sheets or shown as further south (adjacent to Phase II.)
Please ensure this discrepancy is corrected at the time of permitting.
5. Discrepancies were noted between City of Boynton Beach Standard Details and the details and
notes provided on Sheet C-3. Please ensure all details and notes agree with City of Boynton Beach
standards at the time of permitting.
Please feel free to call or e-mail me if you have any questions about these comments or need additional
information. Thank you for the opportunity to review and offer comments on this revised plan.
LUck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Coiltronics Minor Site Plan Mod, 2nd Review.doc
~....\\~,.
, . '\
c,,(. ... ..... )
Ct \ ..._-/
J>.,. /.' v
I. . _~,v
! () :"'J \-,
DEPARTMENT OF PUBLIC WORKS
ENGINEERING DIVISION
MEMORANDUM NO. 06-016
FROM:
Ed Breese, Principal Planner, Planning and Zoning
Laurinda Logan, P.E., Senior Engineer)()' \.' ~. ~\'>-
January 25, 2006 ~;= 1~\'f) '.
TO:
DATE:
RE:
Review Comments
Minor Site Plan Modification - 1 st Review
Coiltronics (Quantum Park Lots 15 & 16)
File No. MMSP 06-001
The above referenced Minor Modification, received on January 23, 2006, was reviewed against the
requirements outlined in the City of Boynton Beach Code of Ordinances. Following are our comments
with the appropriate Code and Land Development Regulations (LOR) referenced.
1. Please note that changes or revisions to these plans may generate additional comments.
Acceptance of these plans during the minor modification review process does not ensure that
additional comments may not be generated at permit review.
2. Provide a drainage plan showing how the addition of the expanded parking area will integrate with
the previously approved on-site drainage system.
3. Specify storm sewer diameters, inlets types, etc. on drainage plan. Indicate grate, rim and invert
elevations for all structures. Indicate grade of storm sewer segments. Indicate material specifications
for storm sewer.
4. Full drainage plans, including drainage calculations, in accordance with the LOR, Chapter 6, Article
IV, Section 5 will be required at the time of permitting.
5. Paving, Drainage and site details will not be reviewed for construction acceptability at this time. All
engineering construction details shall be in accordance with the applicable City of Boynton Beach
Standard Drawings and the "Engineering Design Handbook and Construction Standards" and
will be reviewed at the time of construction permit application.
I do not recommend that this project be approved until a preliminary drainage plan is submitted and
reviewed. Please feel free to call or e-mail me if you have any questions about these comments or need
additional information. Thank you for the opportunity to review and offer comments on this plan.
lL/ck
Cc: Jeffrey R. Livergood, P.E., Director, Public Works (via e-mail)
Peter V. Mazzella, Deputy Utility Director, Utilities
H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering (via e-mail)
Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division
Larry Quinn, Solid Waste Manager, Public Works/Solid Waste
Kenneth Hall, Engineering Plans Analyst, Public Works/Engineering (via e-mail)
File
S:\Engineering\Kribs\Coiltronics (Quantum Park, Lots 15 & 16) Minor Site Plan Mod. 1st Rev..doc
01.12.06
Michael Rumpf
City of Boynton Beach
100 E. Boynton Beach Blvd.
Boynton Beach, Florida 33425
JAN I 3 200h
Re: Quantum Corporate Center, Lots 15 & 16
Parking revision of MSPM 05-009
Michael,
The scope of this project includes a revision to MSPM 05-009 which was approved last
October. The revision is outlined below.
Site modifications:
. Addition of 62 parking spaces. The work creates approximately 22,562 square feet
of new impervious area to the site.
. The addition of new landscaping and light poles.
. The addition of two equipment enclosures.
Attached are the revised drawings for your review.
If you have any questions, please do not hesitate to call.
Sincerely,
Chris Hair
cc: Bob Burrow
Jorge Camero
399 W. CAMINO GARDENS BLVD. . SUITE 202 . BOCA RATON, FLORIDA 33432 · V: 561.362.0220 · F: 561.362.0224 · www.andersonarchitecture.com
AA C001 997
,""J .
PROJECT NAME: Quantum Park Lots 15 + 16
LOCATION: 3601 Quantum Blvd
PCN:
I FILE NO.: MMSP 06-001 II TYPE OF APPLICATION: I
AGENT/CONTACT PERSON: OWNER:
Chris Hair - Anderson Architecture Inc. ADDRESS:
ADDRESS: 399 W. Camino Gardens Blvd.
Suite 202 Boca Raton, FL 33432 FAX:
FAX: 561-362-0224 PHONE:
-
PHONE: 561-362-0220
SUBMITTAL / RESUBMITT AL 1/13/06
1 ST REVIEW COMMENTS DUE:
PUBLIC /IP ARC NOTICE:
TART MEETING:
LAND DEVELOPMENT SIGNS POSTED
(SITE PLANS):
LEGAL AD:
PLANNING & DEVELOPMENT BOARD
MEETING:
COMMUNITY REDEVELOPMENT
AGENCY BOARD
CITY COMMISSION MEETING:
COMMENTS:
S:\Planning\SHARED\WP\PROJECTS\Quantum Park Lots 15 + 16 Coiltronics\Coiltronics\MSPM 05-009\MMSP 06-001\2005 PROJECT TRACKING
INFO. doc