Loading...
CORRESPONDENCE The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org June 1, 2007 Mr. Carl Klepper Compson Associates, Inc. 980 N. Federal Highway, Suite 200 Boca Raton, FL 33432 Re: Renaissance Commons Phase III MMSP 07-049 Dear Mr. Klepper: In response to your request dated May 18, 2007 for the administrative review and approval of the modifications proposed to the above-referenced approved site plan, depicting the following: · Modification to the first intersection east of Congress Avenue on Renaissance Drive (as depicted on the attached plan) . Please be informed that the proposed changes on the revised date stamped 5/22/07 are "minor" as defined within the Development Regulations, Chapter 4 Si te Plan Review. project may continue to be processed by the Building Division permit application. plan Land This as a Be advised that the proposed changes may require a modification to the building permit. Please contact me at (561) 742-6260 if you have additional questions. Sincerely, Ed Breese, Principal Planner Cc: Karen Main, Plan Review Analyst Laurinda Logan, Senior Engineer DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION MEMORANDUM NO. 07-068 FROM: Michael W. Rumpf, Director, Planning and Zoning Laurinda Logan, P.E., Senior Engineer _~--- June 1 , 2007 ( \, \ / TO: DATE: RE: Review Comments Minor Site Plan Modification _1st Review Renaissance Commons Phase III File No. MMSP 07-049 The above referenced site plan, received on 5/30/07, was reviewed for Public Works, Engineering, and Utilities against the requirements outlined in the City of Boynton Beach Code of Ordinances. This request is for modifications to the first driveway east of Congress Ave. on Renaissance Drive. We have no objection to the proposed changes. Please feel free to contact me if you have questions or need additional information regarding this minor modification. Cc: Jeffrey R. Livergood, P.E., Director, Public Works Peter V. Mazzella, Deputy Utility Director, Utilities H. David Kelley, Jr., P.E./ P.S.M., City Engineer, Public Works/Engineering Glenda Hall, Forestry & Grounds Manager, Public Works/Forestry & Grounds Division Larry Quinn, Solid Waste Manager, Public Works/Solid Waste File S:\Engineering\ Memorandums\Memorandums 2007\07-068 LOGAN MMSP 07-049 Renaissance Commons Phase III 053107.doc ,- ~ RC Shoppes, LLC (RCC III, IV and V, LLC) 980 North Federal Highway, Suite 200 Boca Raton, FL 33482 May 18, 2007 Ed Breese Principle Planner Planning & Zoning City of Boynton Beach 100 E. Boynton Beach Blvd. Boynton Beach, FL 33425 Re: Phase III Site Plan Modification @ Renaissance Commons Dear Ed: Enclosed please find four (4) copies of the minor modification to our site plan which modify our driveway openings and a check for $150.00. Also enclosed for your review is the letter from Laurinda Logan accepting our request for a change. If you have any questions regarding the enclosed, kindly contact me at 561-391-6570. Thank you, " /",,- Ene. CEKlsel I !!iCHNAR, ENGINEERING CORPORATION Jeffrey T. Schnars. P.E. President May 15, 2007 James W Mahannah. P.E. Vice President Ms. Laurinda Logan City of Boynton Beach Engineering Department 100 East Boynton Beach Boulevard Boynton Beach, FL 33435 RE: Renaissance Commons Renaissance Drive Modification Schnars Em!:ineerin2 Corporation Proiect No. 02151 Laurinda: In response to your letter dated May 4,2007, please accept this request for a formal modification to the approved engineering plans for Renaissance Drive as it affects the Phase 1 and Phase 3 plans. Attached are the following documents for your review: A. Four (4) copies of Revised Paving, Grading and Drainage Plans to implement the conceptually approved Renaissance Drive modification. 1. Renaissance Commons Phase 1: Revised Sheet 1/23 of the Paving, Grading, and Drainage Plans. The first intersection east of Congress Avenue on Renaissance Drive was modified as follows: a. Add a full access point. b. Add a left turn lane to the west approach c. Add a stop condition to the east approach d. Remove the right turn only restriction at the south approach e. Continue two eastbound through lanes past the intersection f. Revise pavement marking and signage as appropriate 2. Renaissance Commons Phase 3: Revised Sheet 2/13 of the Paving, Grading, and Drainage Plans. The first intersection east of Congress Avenue on Renaissance Drive was modified to allow full access movements. Therefore, the striping and signage was modified to remove the right turn only restriction at the north approach. Compson will make a submittal to Ed Breese, Planning and Zoning Division, for the minor modification to the Site Plan. As usual, let me know if you have any questions or comments. Sincerely, copy: David Poist, Compson Associates, via fax 561.391.2423 q:\projects\2002\02151 \docs\city of boynton\logan3.doc 951 Broken Sound Parkway, Suite 320 · Boca Raton, FL 33487 · Tel: (561) 241-6455 · Fax: (561) 241-5182 05/17/2007 09:24 FAX 9544287391 -+ COMPSON 141 001 -. t) U S1../ The City of Boynton Beach :.-~;'-~ v 0:,;" "-. " .... / .. ......"\ ~ . . . .\ .\ '\ I . I~- 0\ " ' f........ ~.". ."'.~'" ..." J " \~'/~\"". ,,', :. :,'.' .>:~II1'i~'> \,.l1v...... .............~~ v..../' .,....~! ll~' ~\U ..~. P.O. Box 310 BOYlllOrlBeach, Florida 33425.0310 PUBliC WORKS DEPAllTMENT FAX: (561) 742-6JI3J www.hoynton-beachorg May 4, 2007 Fax # Fall # Jeffrey T. Schnars, P.E. Schnars Engineering Corporation 951 Broken Sound Parkway, Suite 320 Boca Raton, FL 33487 RE: Renaissance Commons Request to "Modify' Driveway AccessP"oints' - Renaissance Dr. ..__..................._..____. .0- __.._. __ _~__ _ Dear Mr. Schnars: We are in receipt of your plan revisions. dated April 20, 2007, which respond to comments made November 29, 2006. The new proposed layout is acceptable and you may proceed with formal site plan modifications through the Planning & Zoning Department. We do have two items that need to be resolved prior to approval of a minor modification: . Delete the "left tum only" arrow .shown on the fir.stdriveway east of Congress Ave. The arrow is located in the southbound lane of this driveway. . Add signing at the first driveway west of Congress Ave. on the north and south side of Renaissance Dr. indicating that eastbound traffic is through traffic (Le.: does not stop.) If you have questions or need additional information- please feel free to contact me at (561) 742-6982. Sincerely, E. xc: Jeffrey R. Livergood, P.E., Director, Public.Works H. David Kelley, Jr., P.E./P.S.M., City Engineer, Public Worksl Engineering Ed Breese. Principal Planner. Planning & Zoning File ' $:\Engineerlng\Offlce Associa= File\LOI;I<1nIAenaissance Commons Driveway MQdific;$none 05CJ:907.doc AMKl?lOA. 'S GA TEWA r TO THE G[TLli'STREAM MRY-17-2007 09:30RM FRX:9544287391 ID: PRGE:001 R=95% ..........................................-...::...:..:.;.,;... .'. ~.:... I' ::.LUiUJJ!U.. : ~:lli' , I , :.' 10 . . ;l :; :'.J ::. l ..- ~ . .:: :'. . . . . . : I ...;............ ............... ~..-.. . . . . . . . . .. i .............. . . ! I ._._~_._._ ___._._._._._._,_._._._~.-._._-_._._.- ;-:-'-'-'1 . ~~~'QI\18SNOl'mOO;:lNVSSIYN31:I__ \ i : ~~~~~.:_~.':.:_~~' . . . ~~-'''.~-,:~.._..:':;;;: ',:[ , I:: 0:1, (C,:: -- -- - : - ---~,-~_: --~:--~:-:~~~ i [" ~~J.L.,_.._.._~_.,_.._.._._.._.._~=.:~~:~==:=:='_.._~: ~ .....-~-~I----. -'-'-'-' - ---.-.----.-.---.------ ,,oL i . I i...-... I i I i i , , KlMON ~18 st<<)Wnoo 3ONVSS...;;aH ~ :;~::~~~~t) " H.1\K>N .~ SNOnWOO 2:')N'f'S$lVN3.!... .,,1 II t.'''.~_..~'~,1 , I ~1ll~jT' , I .. !\, ,. I , , '. h '" , ! , I , , .! I ~ i I I' it: I I ' , ,I i I ~( i_.~._._ ( ; ,:;.~;' t- -'... I " , I i , :1 :1 : Iw : I~ , ~ I I~ ll~ t I~ i '1" I . I.. . .' ....~ i', I .Y'. :<"::~+'> I :\i: I .'~ . 11,1, " , II' t# II"" Oil , ' ~~;~-. , ' , ' " , I" ,_. , " ~, . ~ _~o~ ~~- ~ -""0 ~, A :~~ 3nN3I.Y SS3~:l H.1.HON I' 1- I " r o ij)l ~~i ......~...~=t:! ~ :z: w ::ii w > 0 a: c.. 1!! w > a: c w <> :z: "" ~ ~ w a: ~ ! en :z: 0 == :!! 0 <> w <> :z: "" en en ~ :z: W a: ~ i .. ~ ....I Z i! 0 .... w :z: t= >- ill a 0 '" >= ... ~ ~ 0 ~ en W ;;: ~ ~ z <> ~ ~ 0 en ... en i g "" :z: .. 0 ~ ~ ::ii 0 <> .~ ~h " .. -H ~ ~.! 0: " .. 0: " " ,,~ ,. . . PROJECT NAME: Renaissance Commons Phase III LOCATION: PCN: I FILE NO.: MMSP 07-'" ()~g II TYPE OF APPLICATION: I AGENT/CONTACT PERSON: OWNER: RCR Holdings I, LLC Carl E. Klepper, Jr. ADDRESS: ADDRESS: RCR Holdings I, LLC FAX: 980 N. Federal Highway Suite 200 PHONE: Boca Raton, FL 33482 FAX: PHONE: 561-391-6570 SUBMITTAL / RESUBMITTAL 5/22/07 1 ST REVIEW COMMENTS DUE: PUBLIC NOTICE/ SIGNS 30 days /10 days IPARC: TART MEETING: LEGAL AD PLANNING & DEVELOPMENT BOARD MEETING: COMMUNITY REDEVELOPMENT AGENCY BOARD CITY COMMISSION MEETING: COMMENTS: S:\Planning\SHARED\WP\PROJECTS\Renaissance Commons\Site Plans\Phase III NWSP 03-017\MMSP 07-049\2007 PROJECT TRACKING INFO.doc