CORRESPONDENCE
'I!ie City of
'Boynton 'Beac/i
pfanni"tJ & Zoni"tJ 'Department
100 'E, 'Boynton 'Beadi 'Boulevard
P.O. 'B01(31O
'Boynton 'Beadi,:J(oritia 33425,0310
(407) 738,7490, :J5l.X: (407) 738,7459
~~
. ~'/:;'-.'...~~. . ~
(~ .. ~)
~I~, "7/
~V"y
March 27, 1992
John Hlis, Real Estate Director
Sears, Roebuck and Company
National Headquarters
Sears Tower
Chicago, Illinois 60684
Dear John,
Thank you for your patience regarding this letter on the
availability of square footage at the Boynton Mall.
We have reviewed your analysis of leasable square footage at the
mall and while there are discrepancies, we feel based on your
findings our review and the existence of a substantial deviation
which are added square footage to the mall site that enough
square footage exists to allow for the construction of an
automotive center at the Boynton Mall.
We will need to work with you and the mall owners on rectifying
our square footage information, but this can be done during the
site plan and building permit process.
I hope this letter is of some help to you, if you should have any
questions please feel free to call me.
Yours truly,
\:J.v......1<~1^"" ("""t./,-
Christopher Cutro, AICP
Planning and Zoning Director
CC:cp
."lmericas gateway to the gulf stream
EDWARD J, DeBARTOLO & ASSOCIATES
BOYNTON BEACH MALL
Drawing No. Date(Revision)
SP-l 10/18/82
SP-2 10/18/82
SP-3 10/18/82
SP-4 10/18/82
SP-5 10/18/82
------
678T-2 4/81
678T-4 -------
1 10/.19/82(2)
I-A 9/13/82
I-B 9/13/82
MS-l 10/19/82
MS-2 10/19/82
BP-l 10/1/82
BP-2 10/1/82
BP-3 10/1/82
L-A 9/10/82
L-B 9/10/82
L-C 9/10/82
L-D 9/10/82
ENT-C 10/5/82(1)
ENT-D 10/5/82(1)
ENT-E 10/5/82(1 )
2 9/23/82(1)
2-A 10/6/82(1)
2-C 8/27/82
3 10/5/82
3-A 4/14/82
3-B 4/14/82
M-l 10/5/82(2)
M-IA 9/30/82(2)
M-IB 11/24/81
M-2 9/23/82(l)
M-3 8/9/82
M-3A lO/5/82
Description
Site Plan (Phase I)
Site Plan (Phase II)
Preliminary Subdivision Plan
Landscaped Area Plan (Phase I)
Landscaped Area Plan (Phase II)
Boundary Survey prepared by
O'Brien, Suiter & O'Brien, Inc,
Topographic survey (existing) pre-
pared by O'Brien, Suiter & O'Brien
Entrance locations (existing) pre-
pared by O'Brien, Suiter & O'Brien
Site Plan (Detailed)
Paint Striping & Sig~ing Plan
Paint Striping & Signing Details
Exterior Mall Entrance Pylon
Double Support Vehicular Directional
Sign
Building Perimeter (Building Exterior
and Landscaping)
Building Perimeter (Building Exterior
and Landscaping)
Building Perimeter (Building Exterior
and Landscaping)
Site Landscape Plan
Site Landscape Plan
Site Landscape Plan
Site Landscape Plan
Entrance Drive "C" Details
Entrance Drive "D" Details
Entrance Drive "E" Details
Building Location Plan
Site Clearing Plan
Geometric Control Plan
Grading Plan
Demucking & Surcharge Plan
Existing Muck Depth Plan
Storm Sewer Plan
Storm and Sanitary Sewer Details
Outfall Structure Details
Sanitary Sewer Plan
Water Plan
Water Details
EDWARD J, DIBARTOLO & ASSOCIATES
Specifications:
Section 02102
Section 02200
Section 02251
Section 02500
Section 20560
Section 02612
Section 02620
Section 02630
Section 03310
Clearing, Grubbing & Demolition
Earthwork
Termite Control
Site Drainage
Wastewater Collection
Asphalt Concrete Paving
Curbs and Gutters
Walks
Structural concrete
ROSSI AND MALA V ASI
ENGINEERS. INC.
CONSULTING ENGINEERS
~I~
-f. r't&M+
~I~
FORUM III . SUITE 407
11175 PALM BEACH LAKES BLVD,
WEST PALM BEACH, FLORIDA 33401-21711
TELEPHONE: (305) ~554
July 15, 1985
REef'"
flUl I,
. PLAI'I'
~: t.- 'i,!hll..,.J
.
j
"
;'jJ
..hJ'/:
-
Mr. Fred Adolphson
Power Services Representative
FLORIDA POWER & LIGHT CO.
P. O. Box 2409
Delray Beach, Fla. 33444
..
--
-
Re: Boynton Beach Mall Access Road - Street Lighting
Dear Mr. Adolphson:
In response to your letter dated July 9, 1985, I would like to make
the following comments as it regards to where we presently stand on
the matter of street lights for the Mall Access Road. As you know,
we have approval from Charles Walker of the County Engineer's Office,
to construct the lights on the 12.5' wide, curbed, concrete median.
Mr. Walker indicated that he wanted the lights to be installed in
the median and not on the inside edge of the sidewalk. We also had
a meeting with you and Mr. Villavicenchio, at which time it was
agreed that the poles could be constructed in the concrete median,
and you subsequently furnished us with the conduit which was in-
stalled to provide electrical service at the median pole locations.
Mr. Winchester agreed that he would pay for the cost of installation
and Florida Power & Light would maintain the system, with power costs
to be paid by Mr. Winchester. At some point in time the road would
be dedicated to the City of Boynton Beach, who would than assume the
responsibility from Mr. Winchester.
We would like to have Florida Power & Light construct the street
lighting as it was permitted and approved, Toward that end, by copy
of this letter, we are inviting Charles Walker and Florida Power &
Light to sit down to resolve this matter.
Your earliest reply would be appreciated.
Very truly yours,
ROSSI~LAVASI
~
Enrico Rossi, P.E.
ENGINEERS, INC.
ER:jp
cc: Bill Winchester
Charles Walker
Cannen Annunzi ato l---
IJ~~ ~fVlJ
~ ~ _ o~,6~ ~;-iI<-r-'
rL ~ - ;08 ~
_ ~ ~-I J;--" -""~~~ ~ ~
.r~~.
~~
jJ~ :zL
~ ~ i,I.?' 7/' .",
~_ i/_Y'~YZY'"
6 ~N~~ ~
.
v
/ J