Loading...
LEGAL APPROVAL The City of Boynton Beach DEVELOPMENT DEPARTMENT PLANNING AND ZONING DIVISON 100 E. Boynton Beach Boulevard P.O. Box 310 Boynton Beach, Florida 33425-0310 TEL: 561-742-6260 FAX: 561-742-6259 www.boynton-beach.org April 3, 2006 Mr. Dale Meaux API Group 11 I East Palmetto Park Road Boca Raton, FL 33432 RE: File No.: Location: St. John's Armenian Church (flea St. Gregory's) SPTE 05-006 South side of Boynton Beach Blvd., approximately 300 feet west of southwest 8th Street Dear Mr. Meaux: Enclosed is the Development Order granted by the City Commission on February 2 I, 2006. The site plan time extension approval is a second one-year time extension of the site plan approval granted on September 2,2003, from September 2,2005 to September 2, 2006. In order to maintain vested status, a building permit must be secured or an extension granted within one year of this extension approval, and please note the additional conditions of approval that originate from the agreement with representatives of adjacent property owners. To continue this project through the development process, please revise relevant pages of your approved site plan to incorporate all conditions of approval as applicable. A copy of this new Development Order, including these conditions, must accompany the submission of the fully amended site plan set, as well as the original Development Order and associated conditions. The person managing your permit applications should be made aware of any additional documents and third party letters listed in the conditions of approval that need to be submitted with your permit package. The Building Division is committed to speedy and efficient completion of the building permit process for your project. However, please note that failure to meet all applicable Development Order conditions in the submitted plan set may produce unnecessary delays in permit issuance. A thorough review will be conducted by the Plan Review Analyst and if the necessary documentation is not attached and/or the plans are not amended to reflect all of the approval conditions, the plans will be returned to the applicant for correction and re-submittal before the permit is further processed. Feel free to contact any TART member for additional clarification of comments. Important: If you plan to introduce any changes to your approved site plan beyond those required by conditions of approval, please contact our staff for a review before submitting a permit package to the Building Division. A copy of the complete Development Order and Amended Site Plans reflecting the "Conditions of Approval" must be submitted to the Building Department along with the first permit request to avoid any delays in the processing of your permit. Should you have any questions regarding this matter, please feel free to contact this office at (56 I) 742-6260. ~~e!f? ~~mpf Director of Planning & Zoning Enc: Development Order with Conditions of Approval S:\Planning\SHARED\WP\PROJECTS\St. Gregory's Armenian Church. St. Johns Armen\SPTE OS-006\Approvalletter after CC.doc 11 DEVELOPMENT ORDER OF THE CITY COMMISSION OF THE CP"# OF BOYNTON BEACH, FLORIDJ PROJECT NAME: APPLICANT'S AGENT: St. John's Armenian Church 1 Development P&Z Building Engineering Occ. License Deputy City Clerk I --I Mr. Dale Meaux with API Group, Incorporated APPLICANT'S ADDRESS: 111 East Palmetto Park Road Boca Raton, FL 33432 DATE OF HEARING RATIFICATION BEFORE CITY COMMISSION: February 21, 2006 TYPE OF RELIEF SOUGHT: Request an additional one (1) year site plan time extension for a 162- seat church originally approved on September 2, 2003 (an extension to September 2, 2006) LOCATION OF PROPERTY: South side of Boynton Beach Boulevard, approximately 300 feet west of Southwest 8th Street. DRAWING(S): SEE EXHIBIT "B" ATTACHED HERETO. X THIS MATTER came before the City Commission of the City of Boynton Beach, Florida appearing on the Consent Agenda on the date above. The City Commission hereby adopts the findings and recommendation of the Planning and Development Board, which Board found as follows: OR THIS MATTER came on to be heard before the City Commission of the City of Boynton Beach, Florida on the date of hearing stated above. The City Commission having considered the relief sought by the applicant and heard testimony from the applicant, members of city administrative staff and the' public finds as follows: 1. Application for the relief sought was made by the Applicant in a manner consistent with the requirements of the City's Land Development Regulations. 2. The Applicant HAS HAS NOT established by substantial competent evidence a basis for the relief requested. 3. The conditions for development requested by the Applicant, administrative staff, or suggested by the public and supported by substantial competent evidence are as set forth on Exhibit "C" with notation "Included". 4. The Applicant's application for relief is hereby - GRANTED subject to the conditions referenced in paragraph 3 hereof. DENIED 5. This Order shall take effect immediately upon issuance by the City Clerk. 6. All further development on the property shall be made in a9cordance with the terms and conditions of this order. DATED: 7. Other S:\Planning\SHARED\WP\PROJECTS\St. Gregory's Annenian ell - - -. .. . ~ . .. .... ... st. Jrl-'n's Armenian Chu.~h -- Exhibit "A" 100 0 200 400 600 + 800 I Feet N + EXHIBIT "C" Conditions of ApproyaI Project name: 81. John's Armenian Church File number: SPTE 05-006 Reference' I DEPARTMENTS I JNCLUDE I REJECT I PUBLIC WORKS- General Comments: None X PUBLIC WORKS- Traffic Comments: None X UTILITIES . Comments: 1. The applicant paid for the water reservation fee on February 16, 2004. X However, the applicant would be required to pay additional fees to retain the water reservation due to the lack of securing a building permit. FIRE Comments: None X POLICE Comments: None X ENGINEERING DIVISION Comments: None X BUILDING DIVISION Comments: None X PARKS AND RECREATION Comments: None X FORESTER / ENVIRONMENTALIST Comments: None X PLANNING AND ZONING Conditions of Approval 2 DEPARTMENTS INCLUDE REJECT Comments: 2. Submit an updated traffic analysis. The traffic impact analysis must be X approved by the Palm Beach County Traffic Division for concurrency purposes prior to the issuance of any building permits. 3. All previous conditions of approval must still be complied with. X ADDITIONAL PLANNING & DEVELOPMENT BOARD CONDITIONS Comments: 4. None X ADDITIONAL CITY COMMISSION CONDITIONS Comments: 5. Per understanding between adjacent residents and applicant, pump station X and lift station shall be relocated to a central, acceptable location away from adjacent properties 6. Per understanding between adjacent residents and applicant, perimeter buffer X wall shall be 6 feet high. 7. Per understanding between adjacent residents and applicant, permit drawings X shall include photometic details for adjacent residential properties to verify that project lighting will not have off-site impacts, and light fixtures will include shields to prevent glare. 8. Per understanding between adjacent residents and applicant, consider X relocating dumpster or use alternative containers kept central/away from adjacent properties. S:\Planning\SHARED\WP\PROJECTS\St. Gregory's Armenian Church\SPTE 05-006\COA.doc Meeting Minutes Planning and Development Board Boynton Beach, Florida December 22, 2005 Mr. Rumpf reviewed the request for approval of the major site plan modification and recommended approval, contingent upon all comments/conditions. There were no comments from the public. Motion A motion was made by Mr. Saberson, seconded by Mr. Casaine to approve the staff recommendation. Ms. Jaskiewicz complimented the landscaping on the project. Vote The motion carried 7-0. C. St. Johns Armenian Church Site Plan Time Extension 1. PROJECT: AGENT: OWNER: LOCATION: St. Johns Armenian Church (SPTE 05- 006) (fka St. Gregory Armenian Church) Dale Meaux, API Group The Armenian Cultural Association South side of Boynton Beach Boulevard, approximately 300 feet west of Southwest 8th Street. Request for a second (1) one year time extension of the site plan approval granted on September 2, 2003, from September 2, 2005 to September 2, 2006. DESCRIPTION: This item was removed from the agenda. Mr. Rumpf explained the item is not being continued to a date certain. There has to be legal notice processed for it. The application exists only as a Planning and Development Application, but is not ready to proceed for the Board's review. It was noted there was a member of the public present for this item but he did not speak. 8. Other There were no comments received. 9. Comments by members Ms. Johnson inquired about a previous discussion that the Planning and Development Board would workshop with the Community Redevelopment Agency Board (CRA) to discuss overaU projects already approved in the city. 4 Meeting Minutes Regular City Commission Meeting Boynton Beach, Florida January 18, 2005 Commissioner McKoy was in line to make the next appointment to the eRA. Commissioner McKoy stated that as the City moved forward, it was important to have a more diversified representation on all Boards that-would include all minorities. Motion Commissioner McKoy appointed Henderson Tillman to the Community Redevelopment Agency. Motion seconded by Vice Mayor McCray and carried 5~0. Mayor Taylor thanked Mr. Norem for his service and for his action tonight for the benefit of the entire City. D. Ratification of Planning & Development Board Action: 1. 51. Gregor~ Armenian Church (SPTE 04-011) - West of Southwest 8 Street, South of Boynton Beach Boulevard - Request for a one (1) year time extension of the site plan approval granted on September 2, 2003, from September 2, 2004 to September 2, 2005 (POSTPONED TO JANUARY 18, 2005 AT APPLICANT'S REQUEST) Vice Mayor McCray pointed out that the Commission was being asked to approve a site plan extension, which Attorney Cherof confirmed. This is not a re~review or modification of the original site plan. Commissioner Ensler reported that the site plan extension was approved by the Planning and Development Board by a 4 to 3 vote, which he did not consider was a good vote. He would prefer that the Commission received stronger votes. Since the item was pulled, Mayor Taylor opened the public audience. Shirley Jaskiewicz, 1917 5W 13th Avenue, Boynton Beach thanked Mr. Meaux, the representative of the Armenian Cultural Association, Commissioner Ensler and staff for meeting with the residents that were concerned about this project. The residents feel that this is an overuse of the property. Most of the project intrudes into residential areas on both sides. She would like the use of the facility to be a church and the fellowShip building. Ms. Jaskiewicz also noted that the dumpster and the pump station were located along the boundaries of the residential areas and she noted that Mr. Meaux did make some changes to address these concerns. She felt that trash cans should be used in place of a dumpster. Mayor Taylor explained to Ms. Jaskiewicz that the Commission was only addressing the time extension for the site plan and the site plan had already been approved. 18 Meeting Minutes Regular City Commission Meeting Boynton Beach, Florida January 18, 2005 Dale Meaux, of the API Group, Boca Raton, Florida, is the architect for the project. Mr. Meaux confirmed that the site plan was approved and there have been no changes in the ordinances that would make the site plan non-conforming. He acknowledged that they have met with the neighbors and are trying to address their concerns. Mr. Meaux requested that the Commission approve their request so they could continue their project. Motion Vice Mayor McCray moved to extend the site plan approval granted from September 2, 2004 to September 2,2005. Motion seconded by Commissioner Ferguson. Commissioner Ensler noted that there were three phases to the site plan, the first two deal with the church and the third phase is the development of a building in back of the church to be used as a basketball court. He felt that this building would interfere with the residents that live adjacent to those buildings and would devalue the neighboring homes. The residents of Leisureville would like the request to be turned down and that the site plan time extension be re-approved for phases 1 and 2 and that phase 3 be discussed at a future date. Commissioner Ensler was opposed to having a 30' building in the backyard of the residents living in single-family homes. Mike Rumpf, Planning and Zoning Director, pointed out that at the Planning and Development Board meeting, the Assistant City Attorney explained that anything on the site plan represented approval and phase 3 was part of the approval of the approved site plan. Vice Mayor McCray noted that staff recommended approval of 1he site plan time extension until September 2,2005. Vote The vote on the motion passed 4-1 (Commissioner Ensler dissenting). VI.E. Ratification of CRA Action: 1. Arches (SPTE 05-001) - Southwest corner of Ocean Avenue and Federal Highway - Request for a second time extension of the site plan approval granted on June 3, 2003 for one (1) year from the previously extended date of December 3, 2004 to December 3, 2005 Commissioner Ferguson requested that the applicant furnish. the Commission with two reports; the first one would be due on May 1, 2005, and the second one on September 1, 2005. Also, Commissioner Ferguson would like to receive a memorandum on the same dates from the City regarding the City's progress on this project. 19